Investigating risk of bridge construction project: exploring Suramadu strait- crossing cable-stayed bridge in Indonesia Citation for the final version: Ongkowijoyo, Citra S., Gurmu, Argaw and Andi, Andi 2020, Investigating risk of bridge construction project: exploring Suramadu strait-crossing cable-stayed bridge in Indonesia, International Journal of Disaster Resilience in the Built Environment, pp. 1-16. Available in its final form at: https://doi.org/10.1108/IJDRBE-03-2020-0018 This is the accepted manuscript. ©2020, Emerald Publishing Limited This peer reviewed accepted manuscript is made available under a Creative Commons Attribution Non-Commercial No-Derivatives 4.0 Licence. Downloaded from DRO: http://hdl.handle.net/10536/DRO/DU:30140524 DRO Deakin Research Online, Deakin University’s Research Repository Deakin University CRICOS Provider Code: 00113B International Journal of Disaster Resilience in the Built Environment Page 1 of 30 International Journal of Disaster Resilience in the Built Environment 1 2 1 INVESTIGATING RISK OF BRIDGE CONSTRUCTION PROJECT: EXPLORING 3 4 2 SURAMADU STRAIT-CROSSING CABLE-STAYED BRIDGE IN INDONESIA 5 3 6 7 4 PURPOSE. The complexities in strait-crossing cable-stayed bridge project increasing the risks. This 8 9 5 research focuses on identifying and analyzing the significant and worth-considered construction risks of 10 11 6 the first, biggest and longest-span of the strait-crossing bridge project in Indonesia. 12 7 DESIGN/METHODOLOGY/APPROACH. As many as 32 risk events were identified and determined 13 14 8 as the risks that exist and can be represented in the Suramadu bridge project context. Data was collected 15 16 9 through a design-based questionnaire disseminated to experts involved in the project as well as semi- 17 18 10 formal interviews. Several quantitative methods were applied to analyze the significant risks, such as; 19 11 Relative Importance Index, Spearman’s rank correlation test, and the Mann-Whitney U test. 20 21 12 FINDINGS. The analyses reveal that ‘Unexpected natural behavior’ confirmed by both contractor and 22 23 13 consultant parties as the most significant and crucial risk event. Another risk event found to be significant 24 14 is the ‘Delayed payment’. On the other hand, it is also found that several risks within the legal category 25 26 15 are found to be less significant compared to other major risk events. 27 28 16 RESEARCH LIMITATION. The results of the present research should be interpreted in the context of 29 30 17 several limitations. Given these possible concerns regarding the generalisability of the findings, along 31 18 with the relativity low rate of a participant in the current research, additional studies are needed to provide 32 33 19 a more complete picture of stakeholder perceptions who involve directly in the construction environment 34 35 20 as well as to identify more construction risks specifically in the large-scale bridge project. 36 37 21 PRACTICAL IMPLICATION. This research has provided fundamental contributions to the body of 38 22 knowledge and practical implication to promote and assists decision-makers towards developing a 39 40 23 comprehensive risk assessment of large-scale bridge project. 41 42 24 ORIGINALITY/VALUE. The analysis outcomes and discussion, as well as the findings of this 43 25 research, have shedded lights on the construction risks understanding which contributes to delivering a 44 45 26 theoretical framework for achieving large-scale bridge project success. 46 47 27 KEYWORDS: Infrastructure, construction project, risk analysis, Suramadu bridge, megaproject. 48 49 50 51 52 53 54 55 56 57 58 59 1 | P a g e 60 International Journal of Disaster Resilience in the Built Environment International Journal of Disaster Resilience in the Built Environment Page 2 of 30 1 2 3 4 29 INTRODUCTION 5 6 30 Public infrastructure such as bridge plays a significant role as the backbone of society. A bridge refers to 7 8 31 an engineering structure that is constructed to maintain the functions of railroads, roads, and waterways. 9 10 11 32 Not to mention, bridge structure also supports and provides modern society needs and services 12 13 33 respectively. In fact, a bridge is essential to enable sustain and enhance community living conditions as 14 15 34 well as economic stability. Accordingly, regardless funded by the public or private institution, the 16 17 18 35 development of bridge in various sectors is developed rapidly in every country. 19 20 36 To meet current modern and vast society demand, the longer span bridge projects are increasingly 21 22 37 constructed worldwide. The construction of a long-span bridge is considered enormously complex, a 23 24 38 daunting task and as a risky business. The complexity arises from its’; (i) project scale, (ii) ‘technical 25 26 27 39 structures’ cost, and (iii) the involvement of many contracting parties such as; owners, designers, 28 29 40 contractors, subcontractors and suppliers. Further, the complexity also emerges from the internal project 30 31 41 team that is assembled from different countries, companies, and cultures. 32 33 34 42 This leads that the bridge project requires larger and long-term financing scheme with various 35 36 43 stakeholders involved and influenced by various aspects. In this way, it is inarguably that the 37 38 44 complexities increasing the risks affected the project, particularly within the construction phase. Project 39 40 41 45 risk can be defined as an uncertain event or condition that-if it occurs-has a positive or negative effect 42 43 46 on at least one project objective, such as; time, cost, scope, or quality . 44 45 47 In the view of construction context, construction risks are viewed as unexpected events which 46 47 48 result in a cost overrun or schedule delay (Wang and Chou 2003). As such, inadequately dealt and 48 49 50 49 mismanaged construction risks have been shown to cause inefficiencies in particular project and make 51 52 50 contract relationships adversarial (Andi 2006, Mousavi, Tavakkoli-Moghaddam et al. 2011). Moreover, 53 54 51 the inherent risks exert significant disruption and have negative consequences on project success. 55 56 57 58 59 2 | P a g e 60 International Journal of Disaster Resilience in the Built Environment Page 3 of 30 International Journal of Disaster Resilience in the Built Environment 1 2 52 Therefore, achieving large-scale bridge project successes indeed a daunting task. In view of this, 3 4 53 the proper strategy to reach bridge project success is to comprehensively identify the most critical risks 5 6 7 54 and thus control them. On that account, this research aims to remedy this knowledge gaps by presenting 8 9 55 a risk analysis of bridge project by using the case study of the first, largest and longest strait-crossing 10 11 56 bridge project in Indonesia. 12 13 14 57 It is expected that this research will potentially benefit various stakeholders (e.g., the project 15 16 58 owners, contractors, sub-contractors and other stakeholders) involved towards understanding the 17 18 59 construction risk of the large-scale bridge project. By then, it is also expected that this research will 19 20 60 contribute to the implication for delivering both theoretical framework and practical tools for decision- 21 22 23 61 makers to measure the significant construction risks specifically in the large-scale bridge project. 24 25 62 LITERATURE REVIEW 26 27 63 According to the Oxford Handbook of megaproject management, megaprojects are large-scale, complex 28 29 30 64 ventures that typically cost $1 billion or more, take many years to develop and build, involving multiple 31 32 65 public and private stakeholders, are transformational, and impact millions of people (Flyvbjerg 33 34 66 2017). However, $1 billion are not a constraint in defining megaprojects. As such, megaproject can also 35 36 37 67 be referred to as the large-scale project which can be defined as a temporary endeavours characterized 38 39 68 by large investment commitment, vast complexity, and long-lasting impact on the economy, the 40 41 69 environment, and society (Brookes and Locatelli 2015). 42 43 70 On the other hand, conventional large-scale delivery is highly problematic with a dismal 44 45 46 71 performance record in terms of actual costs and benefits (Flyvbjerg 2014). Large-scale projects are 47 48 72 challenging, complex, and risky inherent with a large number of personnel, activities, interfaces, and 49 50 73 interdependencies (Jergeas and Ruwanpura 2010). Due to complexities of the construction environment, 51 52 53 74 an increase of size, large resource requirements, long time horizons and exposure to interrelated and 54 55 75 pervasive drivers of risk, large-scale project by their nature are faced with unique risks and tend to stretch 56 57 76 available resources to the limit and sometimes beyond during development. 58 59 60 3 | P a g e International Journal of Disaster Resilience in the Built Environment International Journal of Disaster Resilience in the Built Environment Page 4 of 30 1 2 77 Trying to eliminate all risks in the large-scale project is impractical. Accordingly, effective risk 3 4 78 management is to recognize inherent risk events as organizing frames and the extent to which risk 5 6 7 79 analysis provides a window on mitigating the inherent risk and minimizing its impact. For that reason, 8 9 80 risk management in the project development process is required to reduce any possible optimism 10 11 81 bias and strategic misrepresentation, as a curious paradox exists in which more megaprojects are being 12 13 14 82 proposed despite their consistently poor performance against initial forecasts of budget, schedule, and 15 16 83 benefits (Flyvbjerg, Bruzelius et al.
Recommended publications
  • Chapter 5 in the Name of Islam: the Kiai and People’S Resistance Against Government Plans to ‘Modernise’ Madura

    Chapter 5 in the Name of Islam: the Kiai and People’S Resistance Against Government Plans to ‘Modernise’ Madura

    Cover Page The handle http://hdl.handle.net/1887/21539 holds various files of this Leiden University dissertation. Author: Pribadi, Yanwar Title: Islam and politics in Madura : ulama and other local leaders in search of influence (1990-2010) Issue Date: 2013-08-28 Chapter 5 In the Name of Islam: the Kiai and People’s Resistance against Government Plans to ‘Modernise’ Madura Introduction This chapter discusses the government’s plans to ‘modernise’ Madura during the New Order administration and how segments of society responded to these plans. Specifically, it is concerned with two conflicts between the government (at central, provincial, and regency levels) and the powerful Islamic elites together with the people. The first is the Nipah dam incident and the second is the rejection of the industrialisasi scheme (to introduce industrialisation and to create industrial estates in Madura) by the kiai of Bassra (Badan Silaturahmi Ulama Pesantren Madura - The Association of Friendship of Madurese Pesantren Ulama).73 Among the questions posed in this chapter are: what is the origin and nature of the Nipah dam incident and the Suramadu Bridge affair? What were the government’s efforts in implementing plans to ‘modernise’ Madura? How did the kiai and the people respond to the government’s approaches? How were Islamic symbols used in order to convey messages of rejection? Under the Suharto administration, the lack of state74 73 The industrialisasi scheme was included in a plan to build the Suramadu Bridge that would connect the islands of Java and Madura and be the country’s longest bridge. I will refer to this henceforth as the Suramadu Bridge affair.
  • East Java: Deadheat in a Battleground Province

    East Java: Deadheat in a Battleground Province

    www.rsis.edu.sg No. 058 – 27 March 2019 RSIS Commentary is a platform to provide timely and, where appropriate, policy-relevant commentary and analysis of topical and contemporary issues. The authors’ views are their own and do not represent the official position of the S. Rajaratnam School of International Studies, NTU. These commentaries may be reproduced with prior permission from RSIS and due recognition to the author(s) and RSIS. Please email to Mr Yang Razali Kassim, Editor RSIS Commentary at [email protected]. Indonesian Presidential Election 2019 East Java: Deadheat in a Battleground Province By Alexander R. Arifianto and Jonathan Chen SYNOPSIS Home to roughly 31 million eligible voters, both President Joko Widodo and his opponent Prabowo Subianto are currently locked in a statistical deadheat in East Java – a key province in which the winner is likely to become Indonesia’s next president. COMMENTARY FOR BOTH contenders of the 2019 presidential election – incumbent President Joko ‘Jokowi’ Widodo and his challenger Prabowo Subianto − East Java is a “must win” province. East Java has a total population of 42 million − including an estimated 31 million citizens who are eligible to vote in the 2019 Indonesian general election. It is Indonesia’s second largest province measured in terms of its population. East Java is generally considered a stronghold of Jokowi. This is because he won handily against Prabowo in the province – with a margin of six percent – during the pair’s first presidential match-up in 2014. Most experts expect Jokowi to have a strong advantage in East Java because of the dominance of two political parties within the president’s coalition, the Indonesian Democratic Party Struggle (PDIP) − which traces its lineage to Indonesia’s founding president Sukarno, and the National Awakening Party (PKB) − which is affiliated with Nahdlatul Ulama (NU), Indonesia’s largest Islamic organisation.
  • ACSET Q2 2018 Progress Report

    ACSET Q2 2018 Progress Report

    PT Acset Indonusa Tbk Performance Update 1H 2018 Integrated Construction Company Disclaimer The material in this presentation has been prepared by PT Acset Indonusa Tbk (ACSET) and is general background information about ACSET activities current as at the date of this presentation and are subject to change without prior notice. This information is given in summary form and does not purport to be complete. Information in this presentation, including forecast financial information, should not be considered as advice or a recommendation to investors or potential investors in relation to holding, purchasing or selling securities or other financial products or instruments and does not take into account your particular investment objectives, financial situation or needs. Before acting on any information you should consider the appropriateness of the information having regard to these matters, any relevant offer document and in particular, you should seek independent financial advice. This presentation may contain forward looking statements including statements regarding our intent, belief or current expectations with respect to ACSET business and operations, market conditions, results of operation and financial condition, capital adequacy, specific provisions and risk management practices. Readers are cautioned not to place undue reliance on these forward looking statements, past performance is not reliable indication of future performance. ACSET does not undertake any obligation to publicly release the result of any revisions to these forward
  • The Indonesia Atlas

    The Indonesia Atlas

    The Indonesia Atlas Year 5 Kestrels 2 The Authors • Ananias Asona: North and South Sumatra • Olivia Gjerding: Central Java and East Nusa Tenggara • Isabelle Widjaja: Papua and North Sulawesi • Vera Van Hekken: Bali and South Sulawesi • Lieve Hamers: Bahasa Indonesia and Maluku • Seunggyu Lee: Jakarta and Kalimantan • Lorien Starkey Liem: Indonesian Food and West Java • Ysbrand Duursma: West Nusa Tenggara and East Java Front Cover picture by Unknown Author is licensed under CC BY-SA. All other images by students of year 5 Kestrels. 3 4 Welcome to Indonesia….. Indonesia is a diverse country in Southeast Asia made up of over 270 million people spread across over 17,000 islands. It is a country of lush, wild rainforests, thriving reefs, blazing sunlight and explosive volcanoes! With this diversity and energy, Indonesia has a distinct culture and history that should be known across the world. In this book, the year 5 kestrel class at Nord Anglia School Jakarta will guide you through this country with well- researched, informative writing about the different pieces that make up the nation of Indonesia. These will also be accompanied by vivid illustrations highlighting geographical and cultural features of each place to leave you itching to see more of this amazing country! 5 6 Jakarta Jakarta is not that you are thinking of.Jakarta is most beautiful and amazing city of Indonesia. Indonesian used Bahasa Indonesia because it is easy to use for them, it is useful to Indonesian people because they used it for a long time, became useful to people in Jakarta. they eat their original foods like Nasigoreng, Nasipadang.
  • An Investigation of Madura Island, Indonesia

    An Investigation of Madura Island, Indonesia

    What does Tourism Mean to Residents? An Investigation of Madura Island, Indonesia Dian Yulie Reindrawati BSocSc, MM Thesis submitted for the Degree of Doctor of Philosophy The University of Newcastle August 2013 STATEMENT OF ORIGINALITY This thesis contains no material which has been accepted for the award of any other degree or diploma in any university or other tertiary institution and, to the best of my knowledge and belief, contains no material previously published or written by another person, except where due reference has been made in the text. I give consent to the final version of my thesis being made available worldwide when deposited in the University’s Digital Repository**, subject to the provisions of the Copyright Act 1968. **Unless an Embargo has been approved for a determined period. Dian Yulie Reindrawati: _____________________________ ii ACKNOWLEDGEMENTS Thanks to Allah Almighty for all His endless blessings. The completion of this thesis was only possible because I had the support and assistance of many individuals. First and foremost, I would like to express my sincerest appreciation to my supervisors: Associate Professor Dr. Kevin Lyons and Dr. Tamara Young for the valuable feedback and constructive criticism on my work. The support you have both given me has been exceptional. I wish to extend my sincere appreciation to Dr. Patricia Johnson for insightful comments, and to Prof. Dr. Kevin Markwell for bringing me to Newcastle for my PhD journey. Thankfulness is also expressed to Prof. Dr. Alison Dean, Dr. Patricia Stanton, Associate Professor Dr. Suzanne Ryan and Michael Romeo for their constant support. I also wish to thank Dr.
  • Project Formation Study on Surabaya Toll Ring Road

    Project Formation Study on Surabaya Toll Ring Road

    PROJECT FORMATION STUDY ON SURABAYA TOLL RING ROAD CONSTRUCTION PROJECT Study Report March 2007 Engineering and Consulting Firms Association, Japan Nippon Koei Co., Ltd. This work was subsidized by Japan Keirin Association through its Promotion funds from KEIRIN RACE. Suramadu Bridge Madura Strait To Gresik N Tanjung Perak Port Surabaya - Gresik Waru(Aloha)-Wonokromo - Tj. Perak Juanda - Tj. Perak (SERR) SIER Surabaya - Mojokerto SS.Waru - Juanda To Mojokerto Juanda Intl. Airport Surabaya - Gempol t i Ceram a Jakarta r Sunda Bekasi S Tangerang Rangkasbitung Purwakarta Bogor n ebo Cianjur r Surabaya Ci Brebes PekalonganPemalang Semarang Pati Bandung Cimahi Purwodadi Madura Garut CiamisJAWA Salatiga Temanggung Purwokerto Madiun Jombang Madura Surait Kebumen Jogjakarta Pasuruan Marang Lumajang Banyuwangi SCALE 1:5,000,000 0 50 100 150 200 250 km 0 1000 2 000 3 000 4 000m 5 000m : in Operation : Under Construction : Negotiation for Signing of : Tender Preparation Consession Agreement LOCATION MAP SURABAYA TOLL RING ROAD CONSTRUCTION PROJECT Surabaya Toll Ring Road Construction Project Photos (1/2) Pic1. Suramadu Bridge(Perspective) Pic2. Suramadu Bridge Construction Site Pic3. Model for development plan of Suramadu Pic4. New Juanda Airport (Nov. 06 Open) Bridge Approach Area Pic5. Existing Tj. Perak Port March 2007 Surabaya Toll Ring Road Construction Project Photos (2/2) Pic6. Existing Toll Road (Surabaya - Gresik) Pic7. SS.Waru – Juanda Construction Site Pic8. SERR Proposed construction site Pic9. SERR Proposed construction site for Inter
  • DAFAM Hotels Collections Dafam Hotel Management Is a Hotel Management That Stands in Quality with International Standard

    DAFAM Hotels Collections Dafam Hotel Management Is a Hotel Management That Stands in Quality with International Standard

    DAFAM Hotels Collections Dafam Hotel Management is a hotel management that stands in quality with international standard. It designs four inspiring brands to accommodate wide range of market segments in various locations. These brands are diversely created specically with each style of service and facilities which guests will enjoy best. S I G N A T U R E by DAFAM A signature brand with its A brand that shows its Our mid-scale brand, Young and dynamic hotel No frills and to the point beyond expected luxury of service and spread across archipelago with retro concept at style, reduce time wasted experience in personal facilities. Stands tall in the offers a homy service and economic scale. National of guest’s valuable time, services and hi-end capital city of province yet pleasant tranquility where vintage legend and simple make them move products and facilities. metropolis. Equals to its business are well taken service, brought our guest independently to savor Stands majestically at modern style for upscale care of within outstanding travel in time, explore its the hotel. More than just a Central Business District or market. service and facilities. unique style. budget, fulll guest basic metropolitan area. Equals needs in smart way. to the next style for savvy customers. Brand that mounted to our partner’s Our hotel collection with a natural Our hotel collection which adopted genuine marks assure its constant setting of environment and located the Syariah management system and quality of service which bring by our away from crowded area or procedure, according to Halal service culture.
  • The Development Study of Madura Area (An Area Marketing Approach)

    The Development Study of Madura Area (An Area Marketing Approach)

    16 IPTEK Journal of Proceedings Series No. 6 (2019), ISSN (2354-6026) The 1st International Conference on Global Development - ICODEV November 19th, 2019, Rectorate Building, ITS Campus, Sukolilo, Surabaya, Indonesia The Development Study of Madura Area (An Area Marketing Approach) Muchammad Nurif1, Hermanto2 Abstract - The development of Madura area has its own The isolation of the districts in Madura region from other challenge due to its low development indicators which districts or cities in East Java Province by the Madura become the complexity barometer of development problems Strait is one of the factors. In addition, the unavailability in this area. The development of Madura area has main of natural conditions in the Madura region for farming obstacles, such as the limitation of infrastructure and activities causes Madurese people tend to migrate to other transportation acces from and to Madura that weakens the economic development in this area. However, there are many regions outside Madura island for a better living. promising potentials of the island that can be developed Presidential Decree number 79/2003 concerning the although until now because of its limitation, the development Construction of the Surabaya-Madura Bridge was a new of Madura is not yet optimal. hope for the people in Madura island in their efforts to This research used area marketing concept called develop their territory. 2009 was a year of new challenge Strategic Place Triangle model with nine elements that are for residents in the Madura region because the categorized into three dimensions, namely strategic construction of the Surabaya-Madura Bridge project (segmentation, targeting, positioning), tactic (differentation, completed.
  • 4 Days 3 Nights

    4 Days 3 Nights

    BROMO GROUND ARRANGEMENT ONLY 4 DAYS 3 NIGHTS Day 1 Upon arrival at Surabaya Airport, meet and great with guide. After lunch, Driver will pick up you and go to Malang Hotel .After that, go to dinner then check in hotel. In the evening, we will prepare to go Bromo Tour. Day 2 After breakfast at the hotel, we will go to Peranakan or Bukit Cinta looking for sunrise. Go to sea of sand, Bromo crater by jeep. After lunch, go to Batu City, Apple Farm and Museum Angkut. In the evening, go to dinner and back to hotel. Day 3 Enjoy your breakfast at the hotel. Driver will pick up you to Pelangi Village at Surabaya. After lunch at local restaurant, we stop at Suramadu Bridge and Madura Island for sightseeing. In the evening, go to dinner and back to hotel. Free and easy. Day 4 Enjoy your breakfast. Driver will pick up to Kapal Selam and move to Tanjungan Plaza for shopping. After that, transfer to airport for next destination. FROM RM989 NETT/PAX TRIPZ EAZY (M) SDN BHD Unit No. 22A, 1st Floor, Jalan Mamanda 4, Ampang Point, 68000 Ampang, Selangor Tel/Fax: 03-4065 0407 TOUR HIGHLIGHTS BROMO CRATER It is an active volcano. Depending on the degree of volcanic activity, the Indonesian Centre for Volcanology and Disaster Hazard Mitigation sometimes issues warnings against visiting Mount Bromo BATU CITY It is a city in Indonesia where visitors can visit many attractive place at the city. APPLE FARM The farm where visitors can imagine having a wild time plucking fruits to eat fresh from the trees and having a chance to climb some the trees too MUSEUM ANGKUT It is a Whimsical museum featuring scenes & characters from Hollywood movies, plus cars, tanks & mopeds.
  • ASDP Ship Conversion Into Suramadu River Cruise Agum Setyo Bintoro1, Refiantika Rachma Utami1, Suci Amalia Putri1 Wimolo Katamsi2

    ASDP Ship Conversion Into Suramadu River Cruise Agum Setyo Bintoro1, Refiantika Rachma Utami1, Suci Amalia Putri1 Wimolo Katamsi2

    Proceedings of the 11th Annual International Conference on Industrial Engineering and Operations Management Singapore, March 7-11, 2021 ASDP Ship Conversion Into Suramadu River Cruise Agum Setyo Bintoro1, Refiantika Rachma Utami1, Suci Amalia Putri1 Wimolo Katamsi2 Departement of Marine Transportation Engineering1, Department of Naval Architecture2 Faculty of Marine Technology Institut Teknologi Sepuluh Nopember [email protected] Abstract The existence of the Suramadu (Surabaya Madura) bridge connecting Java island and Madura island has a huge impact on the crossing ferry sector of Port of Ujung Surabaya to Port of Kamal Madura. The decreasing of users in the crossing service has to result in the unused vessels that have been operating on this crossing route. Abolishing toll road fee in Suramadu bridge in 2018 resulted in a huge decreasing number of crossing service passengers in 2008 to 2009 reached 2.9 million passengers which caused the management of ASDP to lose 15 Billion rupiah per-year in average due to large operational costs and lack of passengers. On another hand, the trend of tourist visits to Surabaya continued to increase with an average increase of 4% from 2010 to 2015 making the Surabaya city government continue to look for ways to develop tourism in Surabaya. The utilization of ASDP ships originally used to serve the crossing can be converted into Suramadu tourist ships to develop the tourism attractions in Surabaya. The conversion of the ship can also help in overcoming the losses sustained by the ASDP. Keywords Ship Conversion, Tourism Ship, Benefit Cost Ratio, Supply and Demand Analysis, Suramadu bridge 1.
  • The Infrastructure Impact of Suramadu Bridge Development

    The Infrastructure Impact of Suramadu Bridge Development

    J. Basic. Appl. Sci. Res., 2(8)8471-8476, 2012 ISSN 2090-4304 Journal of Basic and Applied © 2012, TextRoad Publication Scientific Research www.textroad.com The Infrastructure Impact of Suramadu Bridge Development Sutanto Hidayat Institut Teknologi Nasional Malang, Malang, East Java of Indonesia ABSTRACT Suramadu bridge is the connection between Madura Island and Java Island. The main reason of developing the longest bridge in South-East Asia is to spread the development in Madura Island which during the time is still assumed very much behind and limited in the development expantion of Java Island. This research intended to analyse comprehensively the social and economic impact of development policy in Suramadu and the implementative policy which was formulated in the development of Suramadu. Result showed some conclusions as follow: 1) the development of Suramadu bridge gave the positive as well as negative impact for the society, even though enomically, Suramadu bridge has opened possibility the entering of investor in Madura Island; 2) The increasing of infestation value certainly will cause the quality increasing of supporting infra-structure which formerlly enters in the agenda of Suramadu Development Masteragenda. This research has also been success to reconstruct the policy in the policy model of Suramadu development. The theoritical implication of this result is policy model of physical infra-structure can map the function of policy subsystem dtrategy in using policy instruments for producing the agenda of sustainable infra-structure policy based on the local demand and potential resources. Model construction is built by looking human capital and social capital as the important pilar which is not allowed to forget in the development process and it is as an important input for the policy maker.
  • The Construction of Science and Technology Culture on the Development of Suramadu Bridge

    The Construction of Science and Technology Culture on the Development of Suramadu Bridge

    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Universiti Teknologi Malaysia Institutional Repository Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference (APSEC 2006), 5 – 6 September 2006, Kuala Lumpur, Malaysia THE CONSTRUCTION OF SCIENCE AND TECHNOLOGY CULTURE ON THE DEVELOPMENT OF SURAMADU BRIDGE Asep Wawan Jatnika, Anggiat Sinaga, Dicky R. Munaf Research Group on Humanity, Institut Teknologi Bandung, Bandung 40132, INDONESIA E-mail:[email protected] ABSTRACT : The Construction of Suramadu Bridge is a technological product in view of people knowledge, which means that besides construction technology, its include the society development process. Learning from the previous bridge construction around the world, its also important to consider the human resources and societal adaptability to accept the bridge. The sociotechnology approach in this paper, gives a new perspective for develop Science and Technology Culture. Keywords : indigenous knowledge, strata, main bridge, approach bridge 1. INTRODUCTION Suramadu Bridge is located in the northern part of East Java Province, Indonesia. With an overall length of 5.4 km, it spans Madura Straits and connects Surabaya and Madura Island. The bridge is composed of Causeway (40.25m + 35 x 40.5m) + Approach Bridge (40m + 7 x 80m + 72m) + Main Bridge (192 m + 434 m + 192 m) + Approach Bridge (72m + 7 x 80m + 40m) + Causeway (44 x 40.5m + 40.25m). The bridge floor is transverly divided into motorcycle lane 3.05m + emergency stopping lane 2.25m + 2 x carriageway 3.50m + central reservation 2.00m + 2 x carriageway 3.50m + emergency stopping 2.25m + motorcycle lane 3.05m, the total width of bridge floor is 30m, with a transverse slope of 2%.