STATE ELECTRICITY BOARD IIM.ITED (Incorporated under the Companies Act, 1956)

Reg.Office: Vydyuthi Bhavanam, Pattom, - 695 004, Kerala Phone: +9 I 47'J. 251,457 6, 2446885, I 446008884 F ax: 047 L 24447 38 E-mail: dtksc!@ksebjt Website: www.kseb.in.CIN :U40100KLz011SGC027 +24 ABSTRACT I Construction of 110kV GIS Substation at 220 kV Substation, Shornur - Administrative sanction - accorded - orders issued. Corporate Office (SBU-T) B.O.(FTD)N o.935120L9/D(T,SO&Sl/I7 /PKD-ShornurGlS l2OLg-20/Ihiruvananthapuram dated t3.t2.20L9

Read: Note No:D(T,SO&S\/T7/PKD-Shornur clS/2O19-20/87 dtd. 07.IL.2OL9 of the Director (T,SO&S) (Agenda 3s/ L2/ Lgl

ORDER

The Chief Engineer (Transmission North), submitted, an estimate amounting to Rs.4450 lakh and Detailed Project Report for the 110 kV GIS substation at Shornur. The work involves the construction of 110 kV GIS substation with four transformer bays, 10 feeder bays, two bus coupler bays and two bus sectionalisers and'1 number capacitor bay in the compound of existing compound oI22O kV Substation, Shornur without disrupting the existing system. During the work of Transgrid 2.O, 220 kV Substation, Shoranur has.to feed major portion of district in addition to the normal loading of the station. Since the feeder and 12.5 MVA transformer are connected to the same bay, the maintenance of the feeder/ transformer is very difficult, causing load restrictions. Due to space constraints, it is not at all possible to add new bays to the existing station and the flexibility of different sources, like 220 kV sources from Madakkathara and Areekkode, 110 kV sources from Madakkathara and Malaparambu, cannot be explored efficiently and effectively. Considering the tangible load growth in the periphery of Shoranur town, the enhancement of L2.5 MVA transformers, are necessitated. The existing 110 kV bus is not capable to cater the rated full load capacity of 2X2OO MVA transformers, when the transformers are enhanced. The main highlight of the new 110 kV GIS scheme isthat it provides an alternate remedy for the above issues and helps to reduce interruption. Similarly, the scheme provide a reliable source to feed Malappuram and and normal feeding of Districts by providing two bus couplers and two bus sectionalisers.

The DPR committee in the meeting held on 24.I0.2OL9 approved the proposaland directed to place the matter before the FTD for approval. The Director (T,SO&S), vide note read above elaborated on the technical and financial viability and necessity of the project and placed the matter before the FullTime Directors. Having considered the matter in detail, the FullTime Directors in the meeting held on.10.12.2019, Resolved to accord Administrative Sanction for an estimate amount of Rs. 44.50 crore(Rupees forty four crores and fifty lakhs only) for the constrLri:tisn ci 11-0kV GIS Substati

Orders are issued accordingly. By Order of the Full Time Directcrs,

sdl- LEKHA.G Compa ny Secretary (ln-Charge) To : The Chief Engineer (Transmission North)

Copy to: The Deputy Chief Engineer(lT)/ Deputy Chief Engineer(Transmission

Circle, Pa lakkad ) The Financial Adviser/ The Chief lnternal Auditor/ The Company Secretary The RCAO/ RAO. The TA to Chairman & MD/ D(T&SO)/ D(D & lT)/ D(G-C&HRM)/ D(CP,G-E, SCM&S),PA to D(F)

Fa ir Copy Su peri nten dent/Li brary/Stock Fi le.

Forwarded / By Order t\y)4. A ., i Assistant Edgineer