Make Better Decisions Pp 9974/08/2013 (032820)

Total Page:16

File Type:pdf, Size:1020Kb

Make Better Decisions Pp 9974/08/2013 (032820) FRIDAY DECEMBER 11, 2015 ISSUE 2065/2015 A PULLOUT EVERY FRIDAY WITH Read this copy online @ theedgeproperty.com MAKE BETTER DECISIONS PP 9974/08/2013 (032820) Congratulations to those who won tickets for Joey Yap’s Feng Shui seminar ep8 NEWS ep18 DEALMAKERS ep22 FENG SHUI in JB (Dec 12). Enter now for tickets to seminars in PJ (Jan 9 & 10) & Penang (Jan 24). IOI to launch Enigma Square How to turn pro More than just about in Bandar Puteri Bangi in tough times decorating your property Find out how at theedgeproperty.com READY TO SHINE Strategically located between Petaling Jaya and Sungai Buloh in Selangor, Damansara North — comprising Bandar Sri Damansara and Damansara Damai — is expected to benefi t from the massive Kwasa Damansara development in Sungai Buloh. See story on pages ep12 & 14. MOHD IZWAN MOHD NAZAM/THE EDGE PROPERTY EP2 FRIDAY DECEMBER 11, 2015 • THEEDGE FINANCIAL DAILY FRI FRIDAY DECEMBER 11, 2015 • THEEDGE FINANCIAL DAILY EP3 EP4 FRIDAY DECEMBER 11, 2015 • THEEDGE FINANCIAL DAILY FRI FRIDAY DECEMBER 11, 2015 • THEEDGE FINANCIAL DAILY EP5 TROPICANA AMAN MASTER LAYOUT PLAN 85 Acres Central Park FRIDAY DECEMBER 11, 2015 • THEEDGE FINANCIAL DAILY EP6 PROPERTY | NEWS ON NEWS ROUNDUP Go to theedgeproperty.com for more property news Nusajaya to be renamed infrastructure, interchanges and by Kulim’s internally generated Ministry of Urban Wellbeing at www.theedgeproperty.com Iskandar Puteri in 2016 roads. funds. developing housing Th e company will invest an ad- The land is currently rented database ditional RM3.5 billion in property by EPASA Shipping Agency Sdn development, bringing its total Bhd, a wholly-owned subsidiary investments next year to about of Sindora Bhd, which is a whol- RM7.5 billion. Lin said Gamu- ly-owned subsidiary of Kulim, at da’s gearing will be about 0.7% the rate of RM90,000 per month or of its equity. RM1.08 million a year, from JCorp. For the calendar year 2015, Gamuda has spent about RM4.5 KTM Komuter service to be Sunway Bhd — billion in projects in Vietnam, Sin- rerouted during six-month Malaysia’s No 1 gapore and Melbourne, among trial developer others. Lin is positive on the con- struction industry as the govern- ment is embarking on several rail- Nusajaya, the administrative cen- way projects. tre of Johor, will be renamed Iskan- He added that now is the time dar Puteri from January next year. to make capital investments and State secretary Datuk Ismail Karim analyse the cost structure to help Th e Ministry of Urban Wellbeing, said on Tuesday that the name mitigate the slowdown in the Housing and Local Government is change was made with the agree- economy. developing a database of housing ment of the Sultan of Johor, Sultan He said Gamuda would focus across the country. IJM Land Ibrahim Iskandar, and the state on deepening its investments in Datuk Abdul Rahman Dahlan Bhd among government. Two other districts the seven countries in which it said the system, which was be- will also be renamed: Ledang (to operates – Malaysia, Vietnam, Sin- ing developed by the National Malaysia’s top be renamed Tangkak) and Kulai- gapore, Taiwan, India, Australia Housing Department, will provide 10 property jaya (Kulai). and Qatar. information on off ers for bumi- developers Sultan Ibrahim had requested putera units and the progress of the state government to reinstate Kulim to acquire land from The KTM Komuter train service residential projects throughout Kulaijaya’s original name with Johor Corp for RM17.93 mil will be rerouted from Dec 15 for the country. immediate eff ect in August, out Kulim (Malaysia) Bhd has pro- six-months in preparation of an He said that through this sys- of respect for its history, and for posed to acquire 14 acres of indus- infrastructure upgrade and track tem, bumiputera units in all states the state government to consider trial land in Johor from Johor Corp rehabilitation work. According to a that have not been sold will be a new name for Nusajaya for sim- Bhd (JCorp) for RM17.93 million. statement on the KTM Bhd (KTMB) made known to the public for the ilar reasons. Th e acquisition will result in website, one of the new routes is fi rst time. savings on monthly rent payable from Tanjung Malim/Rawang to Th e ministry will request an ad- Gamuda to invest RM7.5 bil to JCorp and accrue benefi ts to Port Klang, instead of Seremban. ditional three-month period from in construction division Kulim, in anticipation of its fu- Th e other is from Batu Caves developers to off er these units to Gamuda Bhd will invest about ture value appreciation, as the to Seremban/Gemas, instead of bumiputera buyers before they are The Edge Communications Sdn Bhd RM7.5 billion in its construction property has a 45-year unexpired Port Klang. Members of the public released as freehold property, he (266980-X) division in its fi nancial year 2016, lease period. is advised that delays are expect- said in reply to a supplementary Level 3, Menara KLK, No 1 Jalan PJU 7/6, Mutiara Damansara, 47810 Petaling Jaya, said its group managing director In a fi ling with Bursa Malaysia, ed, caused by factors such as the question from Senator Norliaza Selangor, Malaysia Datuk Lin Yun Ling after the com- Kulim said it had entered into a weather and works by contractors. Abdul Rahim at the Dewan Ne- pany’s annual general meeting sale and purchase agreement with Th e upgrading and track rehabili- gara on Monday. on Monday. JCorp for the proposed acquisition tation work is expected to take four Norliza wanted to know about Publisher and Group CEO Ho Kay Tat Gamuda has invested RM2 bil- of 14 acres of industrial land in years. Th ey are part of the dou- the government’s eff orts to assis lion in three townships and al- mukim of Plentong, Johor Bahru. ble-tracking project in the Klang low and middle income earners Editorial For News Tips/Press Releases located another RM2 billion for Th e acquisition will be funded Valley which will begin in April. to own a home. Tel: 03-7721 8219 Fax: 03-7721 8038 Email: [email protected] Senior Managing Editor Azam Aris Contributing Editor Sharon Kam If you have any real estate-related events, email us at [email protected]. Editor Rosalynn Poh LAUNCHES & EVENTS Events listed here will also appear on theedgeproperty.com. Deputy Editors E Jacqui Chan, Wong King Wai Assistant Editor Lam Jian Wyn Senior Writer Racheal Lee Mah Sing Property Showcase Southville by Mah Sing Willy Wonka’s units are part of a 100-acre Writers Chai Yee Hoong, Date: Dec 12-13 (Sat and Sun) Property Roadshow Christmas Party township. The project off ers semi- Rachel Chew, Hannah Rafee, Venue: SJK (C) Kepong, Date: Dec 12-13 (Sat and Sun) detached and bungalow houses Tan Ai Leng, Natalie Khoo, Ewe Shufei Jalan Besar Kepong Venue: D’sara Sentral, Star priced from RM2.05 million. Art Director Sharon Khoh Time: 11am to 6pm Avenue, No. 3, Jalan Zuhal Design Team Cheryl Loh, Contact: 03 6092 6599 U5/179, Shah Alam E&O’s Straits Quay hosts Valerie Chin, Aaron Boudville, Featuring talks by the Malaysian Time: 12pm to 4pm VEGA Open House Aminullah Abdul Karim, Institute of Estate Agents Contact: 016 306 6000 / dsara. Yong Yik Sheng, Tun Mohd Zafi an Mohd Za’abah, Noorain Duasa immediate past president Siva [email protected] Shanker and Soleil Trinity Mah Sing is organising a Corporate Resource owner and founder Christmas party to celebrate Managing Director Au Foong Yee Jessie Lee, as well as activities the unveiling of its fi nal phase Deputy Managing Director Lim Shiew Yuin for children such as coin-bank of 2-bedroom and 3-bedroom painting and playdough- dual-key units. Expect family- Date: Dec 18-27 (Fri to Sun) Advertising & Marketing crafting workshop. The fi rst 100 Date: Dec 14-20 (Mon to Sun) friendly activities such as balloon- Venue: Straits Quay Marina, To advertise contact registrants receive a mystery Venue: IPC Shopping Centre atrium, sculpting and “Snap-A-Pic” with Jalan Seri Tanjong Pinang, GL: (03) 7721 8000 Fax: (03) 7721 8288 gift. Refreshments provided. No 2, Jalan PJU 6/2, Mutiara Willy Wonka, Christmas carolling Tanjung Tokong, Penang Chief Marketing Offi cer Damansara, 47800 Petaling Jaya and a full-spread candy buff et Time: 10am to 6pm Sharon Teh (012) 313 9056 UEM Sunrise Property Time: 10am to 10pm on top of a Christmas lunch. Contact: 04 899 5228 General Manager, Digital Media Showcase Opening Contact: 019 988 3856 VEGA is a historic 120-year-old Kingston Low (012) 278 5540 Senior Sales Managers Date: Dec 12-13 (Sat and Sun) Southville City @ KL South, Launch of Permata Norwegian vessel that collects and Geetha Perumal (016) 250 8640 Venue: Lot 19, Level G2, developed by Mah Sing Group, is Heights, Gombak delivers donated tools, educational Fong Lai Kuan (012) 386 2831 Publika Shopping Gallery, a freehold 428-acre integrated Date: Dec 12 (Sat) and medical supplies to remote Peter Hoe (019) 221 5351 Solaris Dutamas, Jalan township off ering 2.5-storey Venue: Permata Heights Sales islands in Indonesia. Guests can Gregory Thu (012) 376 0614 Creative Marketing Dutamas 1, Kuala Lumpur and 3-storey link houses. It Gallery, No 1, Jalan Bukit learn more about its mission, meet Chris Wong (016) 687 6577 Time: 11am to 6pm places emphasis on regenerative Permata, Taman Bukit Permata, the people operating it, explore the Head of Marketing Support & Ad Traffi c Contact: 1 800 888 008 landscaping and healthy lifestyles.
Recommended publications
  • Ampang Point Branch Temporarily Closed Bandar Sri Damansara
    NOTICE : REVISED OPERATING HOURS AS AT 12 JULY 2021 Updated as at 9.45am 12 July 2021 Updates are highlighted in yellow. Our Customer Contact Centre has been operating on a reduced capacity since 26 January 2021, in order to ensure the health and safety of our employees and to comply with the SOP on social distancing. You may reach us at [email protected] offsite ATMs and Cheque Deposit for Machinesassistance. (SSTs) within the MCO areas will be operational from 6.00am to 10.00pm. SSTs within branches will operate as stated below. Branch Operating Hours Branch Operating Hours SST Operating Hours SST Operating Hours RHB BANK - KLANG VALLEY NORTH REGION Notes From To From To Ampang Point Branch Temporarily closed Bandar Sri Damansara Branch 9.15am 2.00pm 8.00am 8.00pm Dataran Wangsa Melawati Branch Temporarily closed 8.00am 8.00pm Jalan Pasar Branch 9.15am 2.00pm 8.00am 8.00pm Kepong Branch 9.15am 2.00pm 8.00am 8.00pm Kuala Lumpur Main Branch 9.15am 2.00pm 8.00am 8.00pm Kota Damansara Branch 9.15am 2.00pm 8.00am 8.00pm Pandan Indah Branch 9.15am 2.00pm 8.00am 8.00pm Rawang Branch 9.15am 2.00pm 8.00am 8.00pm Setapak Branch 9.15am 2.00pm 8.00am 8.00pm Pasar Borong Selayang Branch 9.15am 2.00pm 8.00am 8.00pm Bandar Baru Sg Buloh Branch Temporarily closed Jinjang Utara Branch 9.15am 2.00pm 8.00am 8.00pm Jalan Bukit Bintang Branch 9.15am 2.00pm 8.00am 8.00pm Plaza OSK Branch 9.15am 2.00pm 8.00am 8.00pm Jalan Raja Laut Branch 9.15am 2.00pm 8.00am 8.00pm Cawangan Utama Kuala Lumpur 9.15am 2.00pm 8.00am 8.00pm KLCC Branch 9.30am 2.00pm
    [Show full text]
  • Umran2014 Organizing Committee
    UMRAN2014: Fostering Ecosphere In The Built Environment UMRAN2014 ORGANIZING COMMITTEE Program Advisor Asst. Prof. Dr. Nor Zalina Harun Chairman UMRAN2014 Asst. Prof. Dr. Aniza Abu Bakar Program Director Aizuddin Iklil Shah Ahmad Shafiee Asst. Program Director Muhammad Ruzaini Roslan Secretariat Haizal Baharuddin Norsyafiqah Abd Kadir Lukman Ramli Nurkhaleda Mohd Nasir Treasurer Annur Jalilah Ramlan (Head) Nur Athirah Kassim Aimi Zarak Ali Scientific Review Nurul ‘Ain Mohd Norddin (Head) Nur Emira Ahmad Kamaruddin Committee Nabila Farhah Mohd Noor Nur Fatin Rashidah Abdul Ropal Noor Aqmal Hakim Noor Azman Nur Ikma Mohamad Nasir Norul Hafizah Yusoff Nurul Hani Muhamad Noh Scientific Reviewer Emeritus Prof. LAr. Dr. Ismawi Hj. Zen Asst. Prof. Dr. Zainul Mukrim Asst. Prof. Dr. Aida Kesuma Azmin Baharuddin Asst. Prof. Dr. Aliyah Nur Zafirah Sanusi Asst. Prof. Dr. Zaiton Abdul Rahim Asst. Prof. Dr. Aniza Abu Bakar Asst. Prof. Dr. Zumahiran Kamarudin Asst. Prof. Dr. Fadzidah Abdullah Asst. Prof. Dr. Zuraini Denan Asst. Prof. Dr. Izawati Tukiman Asst. Prof. LAr. Dr. Khalilah Zakariya Asst. Prof. Dr. Jamilah Othman Asst. Prof. LAr. Dr. Mohd Ramzi Asst. Prof. Dr. Lukman Hakim Mahamod Mohd Hussain Asst. Prof. Dr. Maheran Yaman Asst. Prof. LAr. Dr. Nurhayati Abdul Asst. Prof. Dr. Mariana Mohamed Osman Malek Asst. Prof. Dr. Mazlina Mansor Assoc. Prof Dr. Abdul Razak Sapian Asst. Prof. Dr. Nor Zalina Harun Assoc. Prof. Dr. M. Zainora Asmawi Asst. Prof. Dr. Norzailawati Mohd. Noor Assoc. Prof. Dr. Md. Mizanur Rashid Asst. Prof. Dr. Nurul Hamiruddin Salleh Assoc. Prof. Dr. Mohd Zin Mohamed Asst. Prof. Dr. Nurul Syala Abdul Latip Assoc. Prof. Dr. Noor Hanita Abdul Asst.
    [Show full text]
  • For Sale - No.5, Jalan Ara SD 7/3B, Bandar Sri Damansara, Petaling Jaya, Jalan Ara SD 7/3B, Bandar
    iProperty.com Malaysia Sdn Bhd Level 35, The Gardens South Tower, Mid Valley City, Lingkaran Syed Putra, 59200 Kuala Lumpur Tel: +603 6419 5166 | Fax: +603 6419 5167 For Sale - No.5, Jalan Ara SD 7/3B, Bandar Sri Damansara, Petaling Jaya, Jalan Ara SD 7/3B, Bandar Reference No: 102088135 Tenure: Freehold Name: Leslie Low Address: No.5, Jalan Ara SD 7/3B, Land Title: Commercial Company: Glory Lands & Properties Bandar Sri Damansara, Petaling Property Title Type: Individual Jaya, Selangor, Jalan Ara SD Email: [email protected] 7/3B, Bandar Sri Damansara, Posted Date: 29/08/2021 Selangor State: Selangor Property Type: Shop-Office Asking Price: RM 1,800,000 Built-up Size: 5,000 Square Feet Built-up Price: RM 360 per Square Feet Land Area Size: 1,760 Square Feet Land Area 22 x 80 Dimension: Land Area Price: RM 1,022.73 per Square Feet BANK LELONG : No.5, Jalan Ara SD 7/3B, Bandar Sri Damansara, Petaling Jaya, Selangor. ~ Freehold 3- storey SHOP ~ Land Size 1760 sqft (22' x 80') *Lelong Price RM1.8mil *Lelong Date : 28/9/2021 *For Registration / Untuk Daftar:* *Whatsapp / SMS to 016-2068088 (Mr Leslie Low) : Full Name & IC Number.* ** Follow address go see property OUTSIDE only. All Bank Lelong see outside only. ** Ikut alamat pergi tengok LUAR sahaja. Semua Bank Lelong tengok LUAR saja. ** Need to have 10% downpayment to prepare Bank Draft (maximum loan 90% only). ** Perlukan ada wang pendahuluan 10% untuk s.... [More] View More Details On iProperty.com iProperty.com Malaysia Sdn Bhd Level 35, The Gardens South Tower, Mid Valley City, Lingkaran Syed Putra, 59200 Kuala Lumpur Tel: +603 6419 5166 | Fax: +603 6419 5167 For Sale - No.5, Jalan Ara SD 7/3B, Bandar Sri Damansara, Petaling Jaya, Jalan Ara SD 7/3B, Bandar No photo available for this listing.
    [Show full text]
  • MEDIA RELEASE for Immediate Release
    MALAYSIAN RESOURCES CORPORATION BERHAD [Company No: 7994-D) Level 30, Menara Allianz Sentral, No. 203, Jalan Tun Sambanthan, Kuala Lumpur Sentral, P.O.Box 12640, 50470 Kuala Lumpur, Malaysia [tel] 603 2786 8080 / 603 2859 7070 [fax] 603 2780 5883 [url] www.mrcb.com • MEDIA RELEASE For Immediate Release Management Contract for Kwasa Utama Signed Between KUSB and MRCB Kuala Lumpur Sentral CBD, 28 October 2015 – Malaysian Resources Corporation Berhad (MRCB) is pleased to announce that it has signed a Management Contract with Kwasa Utama Sdn Bhd (KUSB) for the development of Kwasa Utama also known as Plot C8, located in the new Kwasa Damansara township in Sungai Buloh, Selangor Darul Ehsan. Signing the agreement for MRCB was YBhg Tan Sri Mohamad Salim Fateh Din, the company’s Group Managing Director, while KUSB was represented by its Executive Director, YBhg Dato’ Mohd Lotfy Mohd Noh. The witnesses to the signing were Encik Mohd Imran Tan Sri Mohamed Salim, MRCB’s Executive Director and Puan Nor Hazqiah Che Idris, Senior General Manager Corporate Services Kwasa Land Sdn Bhd. The Management Contract signing between KUSB and MRCB will kick off the 29.82-acre Kwasa Utama commercial development, which comprises 8 office towers, 1 block of hotel, 1 block of auditorium and 1 common facility block. In addition, Kwasa Utama development is located adjacent to Kwasa Sentral, which will make for an integrated Town Centre within the overall Kwasa Damansara Township, with direct connections to the MRT Line 1 (Sungai Buloh – Kajang Line) and future Line 2 (Sungai Buloh – Serdang – Putrajaya Line) .
    [Show full text]
  • 6. Executive Summary WTE Jeram
    EIA for the Proposed Waste to Energy Plant at Jeram Integrated Solid Waste Management Centre, Mukim Jeram, District of Kuala Selangor, Selangor Darul Ehsan. EXECUTIVE SUMMARY I. Introduction to the Proposed Project Project Title Proposed Waste to Energy Plant at Jeram Integrated Solid Waste Management Centre, Mukim Jeram, District of Kuala Selangor, Selangor Darul Ehsan. Project Proponent Worldwide Holdings Berhad. Jurisdiction Majlis Daerah Kuala Selangor (MDKS) General Location Located on Jeram ISWMC, Mukim Jeram, District of Kuala Selangor, Selangor Darul Ehsan. • The general location of the Project is depicted in Figure A. • Geographical location of the proposed Project Site is at a latitude and longitude shown in Figure B. Project Area 30.00 acres (12.14 hectares) WTE Information • Moving Grate Incinerator • Operating Capacity: 1200 tons per day • Capacity of generating energy: 26.13 MWatt. • Operating Hours: 8,000 hours per year. Project • The Revised Terms of Reference (TOR) has been submitted to the Background Department of Environment (DOE) on 8th April 2019 and endorsed by DOE on the 7th May 2019 via its letter [Reference No.: JAS:600- 2/13/7 (29)] as appended in Appendix 1. Accessibility • The proposed development is accessible via Federal Highway (FR2) New North Klang Straits Bypass (E30) Federal Route 5 (Jalan Kapar) Jalan Bukit Kerayong. Legal Status • Falls under following item under the Second Schedule of the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment Order 2015) made under sub-section 34A (1) of the Environmental Quality Act 1974 [Act 127] (DOE, 2015). Item 14: Waste Treatment and Disposal (b) Solid Waste: (iii) Construction of thermal treatment plant.
    [Show full text]
  • Budget 2021 Review
    Budget 2021 Review: We shall chart your Supersized financial course towards But Spread Too Thin a profitable future. 7 November 2020 7 November 2020 KLCI 1519.64 @ 6 November 2020 Budget 2021 “A something for everyone budget but not sufficient to tackle the Malaysia Macro & Strategy sectors badly hit by Covid-19” NEUTRAL (maintain) 2020 KLCI Target: 1,650 Up/Downside: +8.6% Previous Target: 1,650 KLCI vs MSCI World, MSCI AxJ Budget 2021: Supersized but spread too thin MSCI World MSCI AxJ FBMKLCI 10% MSCI AxJ: 4.6% 5% With a 10% growth in total expenditure, Budget 2021 addresses the needs 0% MSCI World: 11.9% -5% of everyone. Including a surprise cut in taxes and a reduction in employee -10% FBMKLCI: -4.4% EPF contribution, focus remains on domestic demand to support growth in -15% the coming year -20% -25% This expansionary budget will result in a budget deficit of 5.4% of GDP in -30% 2021E. However, in the event of a prolonged and widespread lockdown due -35% Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 to Covid-19, we think the government still has room to fiscal pump-prime Source: Bloomberg, Affin Hwang We expect the gloves to rally, as a key overhang is removed. Other sector Key market statistics beneficiaries are the Construction sector and Cellular operators. No 2020E 2021E additional taxes for the sin sector and BAT could also benefit from GDP growth (%) (5.0) 6.0 increased government focus to tackle the illicit cigarette market KLCI EPS growth (%) (21.0) 29.0 Source: Affin Hwang forecasts 2021 Economic Outlook and Fiscal Outlook – Government Financial Position Top calls for 2020 Based on the assessment and projection on the country’s economic prospects for 2021, the Ministry of Finance (MOF) expects real GDP growth to recover and expand Ticker Stock Rating Price TP by between 6.5% and 7.5% in 2021, rebounding from -4.5% estimated for (RM) (RM) Top buys: 2020.
    [Show full text]
  • Malaysia Industrial Park Directory.Pdf
    MALAYSIA INDUSTRIAL PARK DIRECTORY CONTENT 01 FOREWORD 01 › Minister of International Trade & Industry (MITI) › Chief Executive Officer of Malaysian Investment Development Authority (MIDA) › President, Federation of Malaysian Manufacturers (FMM) › Chairman, FMM Infrastructure & Industrial Park Management Committee 02 ABOUT MIDA 05 03 ABOUT FMM 11 04 ADVERTISEMENT 15 05 MAP OF MALAYSIA 39 06 LISTING OF INDUSTRIAL PARKS › NORTHERN REGION Kedah & Perlis 41 Penang 45 Perak 51 › CENTRAL REGION Selangor 56 Negeri Sembilan 63 › SOUTHERN REGION Melaka 69 Johor 73 › EAST COAST REGION Kelantan 82 Terengganu 86 Pahang 92 › EAST MALAYSIA Sarawak 97 Sabah 101 PUBLISHED BY PRINTED BY Federation of Malaysian Manufacturers (7907-X) Legasi Press Sdn Bhd Wisma FMM, No 3, Persiaran Dagang, No 17A, (First Floor), Jalan Helang Sawah, PJU 9 Bandar Sri Damansara, 52200 Kuala Lumpur Taman Kepong Baru, Kepong, 52100 Kuala Lumpur T 03-62867200 F 03-62741266/7288 No part of this publication may be reproduced in any form E [email protected] without prior permission from Federation of Malaysian Manufacturers. All rights reserved. All information and data www.fmm.org.my provided in this book are accurate as at time of printing MALAYSIA INDUSTRIAL PARK DIRECTORY FOREWORD MINISTER OF INTERNATIONAL TRADE & INDUSTRY (MITI) One of the key ingredients needed is the availability of well-planned and well-managed industrial parks with Congratulations to the Malaysian Investment eco-friendly features. Thus, it is of paramount importance Development Authority (MIDA) and the for park developers and relevant authorities to work Federation of Malaysian Manufacturers together in developing the next generation of industrial (FMM) for the successful organisation of areas to cater for the whole value chain of the respective the Industrial Park Forum nationwide last industry, from upstream to downstream.
    [Show full text]
  • Selangor Journal L APRIL 2021
    Considering Kita Selangor: Eight Stepping up to protect A fair chance vaccine choices projects completed our earth in Bukit Lanjan 3 5 8&9 10 FREE l APRIL 2021 EDITION l www.selangorjournal.my SELANGOR Airshow ready for takeoff elangor will be hosting its inaugural Selangor Avi- ation Show 2021 (SAS 2021) from Aug 12 to 14. Themed ‘Selangor, the Asean Business & General Aviation Hub’, it is expected to draw at least 5,000 Svisitors and 30 exhibitors from local and international companies. The event is set to create a business ecosystem with investment opportunities on both the domestic and international stage. The state govern- ment had in its 2021 budget allocated a MORE ON total of RM2 million for the event. PAGE 7 2 NEWS Selangor Journal l APRIL 2021 Digital payments cut paper waste Exco: e-parking won’t be SHAH ALAM - Parking payments made through the Smart Selangor Parking (SSP) application has helped save 634,994 kilo- grams of paper, said state executive coun- imposed on everyone cillor for local government Ng Sze Han. He said the savings were calculated By SHERILYN PANG based on the number of users registered with the digital parking payment system SHAH ALAM - Visitors and non-residents which now exceeded 1.5 million since its of Selangor can still pay for their park- launch in July 2018. ing through e-parking agents once the “For the record in the last two to three Smart Selangor Parking (SSP) system is years, the response to the application has fully implemented next year. been very encouraging and (it) even has State executive councillor for local the largest number of users compared to government Ng Sze Han said e-parking other (similar) applications in Malaysia.
    [Show full text]
  • MRCB Announcement 22 Mar 2018
    MALAYSIAN RESOURCES CORPORATION BERHAD (“MRCB” OR THE “COMPANY”) MANAGEMENT CONTRACT BETWEEN KWASA SENTRAL SDN BHD, A 70%-OWNED SUBSIDIARY OF MRCB (“KSSB”), AND MRCB LAND SDN BHD, A WHOLLY-OWNED SUBSIDIARY OF MRCB (“MRCB LAND”), FOR THE APPOINTMENT OF MRCB LAND AS THE MANAGEMENT CONTRACTOR IN CONNECTION WITH THE DEVELOPMENT AND CONSTRUCTION OF A MIXED DEVELOPMENT IDENTIFIED TO BE THE TOWN CENTRE OF THE KWASA DAMANSARA TOWNSHIP, ON A PIECE OF LAND OWNED BY KSSB MEASURING 64.30 ACRES KNOWN AS MX-1, HELD UNDER HSD 315671, LOT NO. PT50854, MUKIM SUNGAI BULOH, DAERAH PETALING, SELANGOR DARUL EHSAN, FOR A PROVISIONAL TOTAL PROJECT SUM OF RM7,461,991,606 (“PROPOSED CONSTRUCTION”) 1. INTRODUCTION On behalf of the Board of Directors of MRCB (“ Board ”), RHB Investment Bank Berhad (“ RHB Investment Bank ”) wishes to announce that MRCB Land had on 22 March 2018 entered into a management contract with KSSB (“Employer ”), for the appointment of MRCB Land as the Management Contractor in connection with the development and construction of a mixed development identified to be the town centre of the Kwasa Damansara Township, on a piece of land owned by KSSB measuring 64.30 acres known as MX-1, held under HSD 315671, Lot No. PT50854, Mukim Sungai Buloh, Daerah Petaling, Selangor Darul Ehsan (“ Development ”), for a provisional total project sum of RM7,461,991,606 (“ Provisional Total Project Sum ”) (“ Management Contract ”). (KSSB and MRCB Land shall hereinafter be collectively referred to as the “ Parties ” and “ Party ” shall be construed accordingly). 2. DETAILS OF THE PROPOSED CONSTRUCTION 2.1 Background of the Development The Development, which will span approximately 12 years from 2018 to 2030, is expected to be a residential and commercial hub with a plot ratio of 1 to 3.5, of which 60% is designated for commercial use and the remaining 40% is designated for residential use.
    [Show full text]
  • Malaysia Real Estate Highlights
    RESEARCH REAL ESTATE HIGHLIGHTS 1ST HALF 2015 KUALA LUMPUR PENANG JOHOR BAHRU KOTA KINABALU KUALA LUMPUR HIGH END CONDOMINIUM MARKET (MPC) meeting in May in an effort to support economic growth and domestic HIGHLIGHTS consumption. • Softening demand in the SUPPLY & DEMAND high-end condominium With the completion of seven notable segment amid a cautious projects contributing an additional market. 1,296 units [includes projects that are physically completed but pending Madge Mansions issuance of Certificate of Completion • Lower volume of transactions and Compliance (CCC)], the cumulative expected to come on-stream. The KL in 1Q2015. supply of high end condominiums in City locality will account for circa 35% Kuala Lumpur stands at 39,610 units. (1,310 units) of the new supply; followed • Developers with niche high by Mont’ Kiara / Sri Hartamas with Approximately 45% (582 units) of the new 34% (1,256 units); KL Sentral / Pantai / end residential projects in KL completions are located in the Ampang Damansara Heights with 20% (734 units); City review products, pricing Hilir / U-Thant area, followed by some and the remaining 11% (425 units) from and marketing strategies in 26% (335 units) in the locality of KL City; the locality of Ampang Hilir / U-Thant. a challenging market with 16% (204 units) from the locality of KL lacklustre demand, impacted Sentral / Pantai / Damansara Heights Notable projects slated for completion by a general slowdown in the area; and 14% (175 units) from the Mont’ in KL City include Face Platinum Suites, economy, tight lending Kiara / Sri Hartamas locality. Le Nouvel, Mirage Residences as well as guidelines, weaker job market the delayed project of Crest Jalan Sultan The three completions in Ampang Hilir amongst other reasons.
    [Show full text]
  • Director of Importer / Distributor in Malaysia AGRICULTURAL
    Director of Importer / Distributor in Malaysia AGRICULTURAL FEEDMILLS ANIMAL HEALTH PRODUCTS Sinmah Multifeed Sdn. Bhd. Agritech Enterprise Sdn. Bhd. AG5730, Alor Gajah Industrial Estate 22, Jalan SS4C/5, Taman Rasa Sayang 78000 Alor Gajah, Melaka 47301 Petaling Jaya Tel: 606-5561293 Tel: 603-78033226, 78035239 Fax: 606-5562445 Fax: 603-78033911 Email : [email protected] Email: [email protected] Website : www.sinmah.com.my Contact: Mr. Chew Heng Chong – M.D. Gymtech Feedmill (Malacca) Sdn. Bhd. Chem Ventures Sdn. Bhd Lot 13A, Kawasan Perindustrian Bukit Rambai 32-3, USJ 1/1C, USJ 1 75250 MELAKA 47620 Subang Jaya Tel: 606-3512992 Tel: 603-80241877 Fax: 606-3512998 Fax: 603-80241868 Email: [email protected] Ayamas Integrated Poultry Industry Sdn. Bhd. Contact: Mr. Quah Siew Seng Feedmill Division Jalan Parang, Pelabuhan Utara 42007 Pelabuhan Klang, SELANGOR QL Pacific Vet Group Sdn. Bhd. Tel: 603-31766954 Bay C8 Lot 886, Jalan Subang 9 Fax: 603-31766946 Taman Industri Sg. Penaga 47500 Subang Jaya KL Supreme Feedmill Sdn. Bhd. Tel: 603-80249508 No. 5, Persiaran Industry, Fax: 603-80249634 Sri Damansara Industry Park Email: [email protected] 52200 KUALA LUMPUR Contact: Mr. Cheah Soon Hai Tel: 03-62736781 Fax: 03-62736591 SCC Corporation Sdn. Bhd. 19-21, Jalan Hujan, Taman Overseas Union Gold Coin Feedmills (M) Sdn. Bhd. 58200 Kuala Lumpur Jalan Parang, Pelabuhan Utara, Tel: 603-77828384 P. O. Box 68 Fax: 603-77818561 42000 Pelabuhan Klang, Selangor Email: [email protected] Tel: 03-31767300, 31767311 Contact: Mr. Goh Keng Chin Fax: 03-31767295, 31766842 Johor Bahru Flour Mills Sdn.
    [Show full text]
  • KWASA DAMANSARA Petaling Jaya Selangor Darul Ehsan
    Draf Rancangan Kawasan Khas RKK KWASA DAMANSARA Petaling Jaya Selangor Darul Ehsan MAJLIS BANDARAYA PETALING JAYA Prepared Under The Provision Of Section 12A , Town And Country Planning Act 1976 (Act 172) Notis Ini Disediakan Di Bawah Peruntukan Seksyen 12A, Akta Perancangan Bandar Dan Desa 1976 (Akta 172) MAJLIS BANDARAYA PETALING JAYA MAC 2017 www.mbpj.gov.my Majlis Bandaraya Petaling Jaya pjkita Muka Hadapan : Penyediaan Awal Draf Rancangan Kawasan Khas (RKK) ini adalah sebagai dokumen sokongan kepada RKK kelak mengikut proses di bawah peruntukan Seksyen 16B(1), Seksyen 16B(2) dan Seksyen 16B(3) Akta Perancangan Bandar dan Desa, 1976 (Akta 172). Disediakan Oleh: MAJLIS BANDARAYA PETALING JAYA Jalan Yong Shook Lin 46675 Petaling Jaya Selangor Darul Ehsan. i KANDUNGAN Isi Kandungan Muka Surat 1.0 Tujuan 01 2.0 Peruntukan Perundangan 02 3.0 Prosedur Penyediaan Rancangan Kawasan Khas (RKK) 03 4.0 Keperluan Penyediaan 04 5.0 Latarbelakang Kawasan Kajian 05 • Pelan Sempadan Kawasan Kajian 05 • Pelan Lokasi 06 • Maklumat Tanah 07 6.0 Pelan Induk Keseluruhan Kwasa Damansara 09 7.0 Cadangan RKK Kwasa Damansara, Petaling Jaya 10 7.1 Matlamat 11 7.2 Cadangan Komponen Pembangunan 13 8.0 Kesimpulan 15 ii Tujuan Laporan ini disediakan untuk pemeriksaan Majlis telah mengadakan Mesyuarat 10semasa program publisiti awalan terhadap Jawatankuasa Teknikal Pengubahan proses Penyediaan Awal Draf Rancangan Rancangan Tempatan Petaling Jaya 1 , 2 Kawasan Khas (RKK) Kwasa Damansara, dan Rancangan – Rancangan Kawasan Petaling Jaya. Laporan ini boleh dijadikan Khas pada 23hb Januari 2017, 8hb Februari asas kepada pemilik tanah, pemaju, orang 2017 dan 14hb Februari 2017. awam, Badan-Badan Bukan Kerajaan (NGO) dan pihak - pihak yang berkepentingan untuk Keputusan ketiga – tiga mesyuarat tersebut mengemukakan sebarang cadangan dan telah dipersetujui di Mesyuarat pandangan sepanjang tempoh program Jawatankuasa Perancang Bandar Bil 2 pada publisiti dijalankan.
    [Show full text]