North East Appendix B
Total Page:16
File Type:pdf, Size:1020Kb
NORTH EAST APPENDIX B NORTH EAST TRANSPORT SCHEMES DEVELOPMENT PROGRAMME 2008/2009 ROAD COST PARISH/TOWN LOCATION DESCRIPTION STATUS NO BAND Buckminster Primary School 20mph Consultation Buckminster C School Zone Complete Substantially Burton on the Wolds Burton Primary School Traffic Calming C complete – developer funded Vehicle Activated Consultations A60 Cotes Loughborough Road C Sign (VAS) underway Croxton Kerrial C of E School 20mph Consultations Croxton Kerrial C Primary School Zone ongoing School 20mph East Goscote Broomfield Primary School C Preliminary design Zone School 20mph Gaddesby Gaddesby Primary School C Preliminary design Zone Consultations B6047 Great Dalby Great Dalby VAS/Gateway C ongoing Pedestrian Consultations A6 Hathern Derby Road B Crossing ongoing Hathern Loughborough Road Cycle Route C Preliminary design Cycle Route Consultations Loughborough Burleigh Way B Extension ongoing Cycle Route Loughborough Blackbrook Way C Complete Upgrade Complete Loughborough Badger Way Cycle Route C supported by Sustrans cont. – Complete Loughborough Lowden Way Cycle Route C supported by Sustrans cont. - Local Safety A6004 Loughborough Epinal Way/Ling Road Scheme – Route C Complete Treatment Local Safety A6004 Loughborough Epinal Way/Park Road Scheme – Route C Reserve Treatment Local Safety Bishop Meadow Loughborough Scheme – Route C Preliminary design Road/Belton Road West Treatment Fairmeadows Way/Laurel Rd (Outwoods Edge Loughborough Traffic Calming B Reserve Primary/Woodbrook Vale High School) 1 E:\moderngov\data\published\Intranet\C00000699\M00002244\AI00021398\AppendixBTSD0.doc ROAD COST PARISH/TOWN LOCATION DESCRIPTION STATUS NO BAND Robert Bakewell Primary School 20mph Consultations Loughborough C School Zone ongoing Woodbrook Vale High School 20mph Loughborough C Preliminary design School Zone Consultations Cycle Route ongoing – Loughborough Various – University Link C Upgrade supported by Sustrans cont. Cycle Network Consultations Loughborough Various C Signing ongoing William Street, RNIB Cycle Track Consultation Loughborough C College Crossing Point ongoing Ped Facilities at Substantially Loughborough Alan Moss Road B Signal Junction complete LSS – Route A6004 Loughborough Ling Road C Complete Treatment Junction A607 Melton Mowbray Thorpe End/Norman Way A Complete Improvement Leicester Road, White A607 Melton Mowbray VAS C Preliminary design House Farm Bends Grange Drive (Sherrard Consultations Melton Mowbray Traffic Calming C Primary School) ongoing Kings Rd area, Brownlow Substantially Melton Mowbray Cycleway C Primary School complete Consultations Melton Mowbray Country Park Fencing C ongoing Consultation Normanton Main Street VAS C ongoing Redmile C of E Primary School 20mph Redmile C Preliminary design School Zone St Michael & All Angels School 20mph Consultations Rearsby C C of E Zone ongoing C3212 Shepshed Hathern Road Traffic Calming C Preliminary design School 20mph Stathern Stathern Primary School C Preliminary design Zone C5216 Sileby Ratcliffe Road Traffic Calming C Preliminary design Consultations Syston/Thurmaston Melton Road Bus Corridor Imps C ongoing Consultations Syston Barkby Road Traffic Calming B ongoing – developer funded 2 E:\moderngov\data\published\Intranet\C00000699\M00002244\AI00021398\AppendixBTSD0.doc ROAD COST PARISH/TOWN LOCATION DESCRIPTION STATUS NO BAND School 20mph Consultations Syston The Merton Primary School C Zone ongoing Syston Fosse Way Traffic Calming C Preliminary design Preliminary design C4301 Syston Barkby Road Traffic Calming B – developer funded Consultations Thorpe Satchville Thorpe Satchville VAS/Gateway C ongoing Thurcaston Station Road VAS/Gateway C Reserve Thurmaston/East Thurmaston – Bus Corridor Consultations C Goscote East Goscote Improvements ongoing Melton Road/Humberstone Pedestrian A607 Thurmaston C Reserve Road Crossing Thurmaston Colby Drive Traffic Calming C Complete A607 Thurmaston The Dales Area Bus Corridor Imps C Reserve Consultations C3301 Thurmaston Barkby Thorpe Lane Traffic Calming C ongoing – Developer funded Consultations Twyford Twyford VAS/Gateway C ongoing Watermead Park Watermead Park Area – Footway/Cycleway B Preliminary design Area Connect2 Improvements Wymeswold C of E Primary School 20mph Consultations Wymeswold C School Zone ongoing Cost band Key:- C < £50k; B £50k - £200k; A > £200k * All shaded lines are within the Charnwood Area. Officer to Contact: Martin O’Connor Tel. (0116) 305 6186 Email [email protected] 3 E:\moderngov\data\published\Intranet\C00000699\M00002244\AI00021398\AppendixBTSD0.doc .