Investing in the A46 to Keep the Midlands Moving 1 the Case for Improving the A46
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Infrastructure Delivery Position Updates – MOD Ashchurch, 2016
Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements Issue | 20 April 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number Ove Arup & Partners Ltd 63 St Thomas St Bristol BS1 6JZ www.arup.com Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements Contents Page 1 Strategic Allocation Key Data 1 1.1 Location & Extent of Allocation 1 1.2 Key Data 2 1.3 Proposed Scale & Mix of Development 2 1.4 Proposed Build Out Trajectory & Population Growth 4 2 Infrastructure Requirements 5 2.1 Identification of Priority Infrastructure 5 2.2 Critical Infrastructure: Transport 7 2.3 Critical Infrastructure: Flood, Water & Waste Water 8 2.4 Critical Infrastructure: Education 8 2.5 Critical Infrastructure: Healthcare 9 2.6 Desirable Infrastructure : Community & Culture 9 2.7 Desirable Infrastructure: Sports & Outdoor Recreation (Pitches & Play Space), Informal & Natural Open Space 10 2.8 Essential Infrastructure: Energy 10 | Issue | 20 April 2016 200416_MOD ASHCHURCH JCS INFRASTRUCTURE POSITION STATEMENT.DOCX Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements 1 Summary of Infrastructure Risk This statement has been produced to set out the current position in terms of infrastructure requirements for the proposed Site Allocation at MOD Ashchurch. The statement draws upon a number of resources including planning application supporting material and detailed discussions with the site promoters and service providers undertaken in September / October 2015. -
Prime Unique Connected
PRIME UNIQUE CONNECTED DESIGN AND BUILD OPPORTUNITIES UP TO 1,300,000 SQ FT MOUNTPARK BRISTOL XL SEVERN ROAD / CENTRAL AVENUE, BRISTOL, BS10 7ZE MOUNTPARK.COM/BRISTOLXL CHEPSTOW M48 SEVERN BRIDGE THORNBURY Mountpark BristolXL is a new industrial / logistics development situated at the gateway to the south J1 west, Avonmouth in Bristol. M48 A4O3 J23 The scheme has three fundamental benefits: M4 SEC OND SEV ERN A38 CRO M4 J21 SSING J22 M5 NEW J15 / J2O JUNCTION PRIME SEVERN ESTUARY JO1 The site is situated in a prime distribution M4 location, adjacent to the established Central A4O3 M5 A38 Park area of Avonmouth, 10 miles to the M49 A432 north west of Bristol City Centre. A4O3 AVONMOUTH DOCKS FILTON J19 RIVER AVON J18 A4O18 M4 UNIQUE ROYAL A41744 HRS SHEFFIELD PORTBURY J18a DOCKS M32 M1 A38 M6 The proposed scheme can accommodate A4162 NOTTINGHAM a single unit of over 1,000,000 sq ft, which A4 is unique for the area. 3 HRS M42 A4176 A432 A4174 BIRMINGHAM M5 2 HRS M5 M1 A369 M4O CONNECTED A42O A42O BRISTOL 1 HR OXFORD The scheme is strategically located for local and O.5 HRS national distribution via the M49, M4 and M5 A37O M4 M4 LONDON motorways. Accessibility will be further improved in CARDIFF BRISTOL SWINDON 2019 with the opening of a new junction on the M49 A38 A4174 A431 A4174 M3 motorway which is within 1 mile of the site. M4 A37 SOUTHAMPTON PORTSMOUTH A37O BRISTOL AIRPORT CONNECTED ABUNDANT Strategically located, offering Bristol is the economic hub of the south west both connectivity and accessibility, region with excellent labour availability, education resources, and connectivity. -
TO LET Offices—1,860 Sq Ft (172.86 Sq M)
TO LET Offices—1,860 sq ft (172.86 sq m) Self-contained Detached Building Parking New Lease available Former Custom House, Sharpness Docks, Sharpness, Gloucestershire 01452 380064 LOCATION Sharpness Docks are situated adjacent to the river Severn in Gloucestershire and at the end of the Gloucester to Sharpness Ship Canal. The Docks remain very much a working port and receive ships from around the world. Accordingly the area remains popular with commercial property occupiers. The Docks are situated at the far end of the B4066 linking directly to the A38 Bristol Road. Junction 13 and 14 of the M5 Motorway are approximately a 10 minute drive time. DESCRIPTION A detached single storey building of facing brickwork to the elevations under a flat roof. Internally the main office area has been subdivided to form 3 separate working/office areas, however this could be opened out to a more open plan format. Ladies & Gents W.C.’S, a kitchen and shower room are installed. The building benefits from a Quayside location and externally there are lawned areas and demised car parking. The property has a floor area of approximately 1,860 sq ft (172.86 sq m) measured on a gross internal floor area basis. 01452 380064 KEY INFORMATION Services Service Charge Mains water, drainage, gas and electricity are connected to A charge is made to cover the upkeep and maintenance of the property. the common parts of the estate. Heating is via a gas fired boiler and traditional ‘wet’ Quoting Terms radiator system. The property is available by way of a new full repairing and insuring lease for a negotiable term of years. -
M5 Junction 10 Improvements Scheme
M5 Junction 10 Improvements Scheme Technical Appraisal Report Volume 1 - Report M5 Junction 10 Improvement Scheme Volume 1 - Report - Technical Appraisal Report Notice This document and its contents have been prepared and are intended solely for the Client’s information and use in relation to M5 Junction 10 Improvement Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document history Purpose Revision Status Originated Checked Reviewed Authorised Date description C03 A1 Final Issue CJ CCR TT TT 15/09/20 C02 A1 Final Issue CJ CCR TT TT 10/08/20 C01 A1 Second issue CG CCR HC HC 18/06/20 First Draft for P01 S3 GCC Internal SW MT CCR --- 03/12/19 Review Client signoff Client Gloucestershire County Council Project M5 Junction 10 Improvement Job number 5188483 Client signature / date Security Classification - High Page 2 of 186 GCCM5J10-ATK-GEN-XX-RP-ZM-000001 | C03 | M5 Junction 10 Improvement Scheme Volume 1 - Report - Technical Appraisal Report Contents Chapter Page Executive Summary 8 1. Introduction 12 1.1. Scheme Background 12 1.2. Location of the scheme 12 1.3. Purpose of this Report 14 2. Planning Brief 15 2.1. Introduction 15 2.2. Scheme Objectives 15 3. Existing Conditions 17 3.1. Description of the Locality 17 3.2. Existing Highway Network 17 3.3. Current Issues at M5 Junction 10 18 3.4. Existing Structures 19 3.5. Existing Road Pavement 31 3.6. Existing Traffic Conditions 37 3.7. -
Joint Spatial Plan Joint Transport Study Final Report October 2017
WEST OF ENGLAND “BUILDING OUR FUTURE” West of England Joint Spatial Plan Joint Transport Study final report October 2017 NOVEMBER 2017 9 www.jointplanningwofe.org.uk West of England Joint Transport Study Final Report Notice This document and its contents have been prepared and are intended solely for the West of England authorities’ information and use in relation to the West of England Joint Transport Study. Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 120 pages including the cover. Document history Job number: 5137782 Document ref: Final Report Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 First Draft JFC TP, SG RT, TM JFC 05/05/17 Rev 2.0 Second Draft JFC, TP 26/05/17 Rev 3.0 Third Draft JFC BD, SG RT JFC 07/06/17 Rev 4.0 Fourth Draft JFC SG RT JFC 21/06/17 Rev 5.0 5th Draft (Interim Version) JFC 27/06/17 Rev 6.0 Sixth Draft JFC SG RT JFC 28/06/17 Rev 7.0 Final Draft JFC RT RT JFC 07/07/17 Rev 8.0 Revised Final Draft JFC JFC 01/09/17 Rev 9.0 Final JFC SG RT JFC 19/10/17 Client signoff Client West of England authorities Project West of England Joint Transport Study Document title Final Report Job no. 5137782 Copy no. Document 5137782/Final Report reference Atkins West of England Joint Transport Study Final Report | October 2017 West of England Joint Transport Study Final Report Table of contents Chapter Pages 1. -
Westconnex New M5 5-122 Roads and Maritime Services Environmental Impact Statement
(blank page) WestConnex New M5 5-122 Roads and Maritime Services Environmental impact statement (blank page) WestConnex New M5 5-124 Roads and Maritime Services Environmental impact statement 5.8.1 Operational management control systems and incident and emergency response The project has been designed to include control systems to ensure safe and efficient operation of the New M5 under normal operating conditions, and to respond to incidents and other emergency events that may occur. These control systems would include: • A central motorway control centre to manage the New M5 when it is operational • Traffic monitoring and management systems along the project • Air quality monitoring and management systems within the main alignment tunnels • Incident and emergency response infrastructure • Maintenance facilities • Motorway tolling infrastructure. Motorway control centre A WestConnex motorway control centre would be provided within the Burrows Road motorway operations complex (MOC5) (refer to Figure 5-42). The motorway control centre would be the central building for all communications and control of the project’s operational management control systems. The motorway control centre would be staffed 24 hours a day, seven days a week, and would require around 26 full time equivalent staff. The motorway control centre would include a video wall and operating interfaces for all monitoring and control systems, an incident control facility, training and incident response room, air conditioning, power supply systems and workforce facilities (ie amenities). An indicative layout of the motorway control centre is shown in Figure 5-42. Urban design principles would be applied to the motorway control centre to integrate the building with St Peters interchange and the surrounding landscape to minimise its visual impact. -
Annual Assessment of Highways England's
Annual Assessment of Highways England’s Performance April 2020 to March 2021 HC454 Annual Assessment of Highways England’s Performance April 2020 to March 2021 Presented to Parliament pursuant to section 10(8) of the Infrastructure Act 2015 Ordered by the House of Commons to be printed 15 July 2021 HC454 © Crown copyright 2021 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at www.gov.uk/official-documents. © Crown copyright 2020 Any enquiries regarding this publication should be sent to us at This 25 Cabot Square, London, E14 publication is licensed under 4QZ. the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3ISBN 978-1-5286-2760-3 . Where we have identified any third party copyright information you will need to obtain CCS0621812220 07/21 permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum This publication is available at orr.gov.uk Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery OfficeAny enquiries regarding this publication should be sent to us at orr.gov.uk/contact-us Office of Rail and Road | Annual Assessment of Highways England’s Performance: April 2020 to March 2021 Contents Foreword ..............................................................................................................6 Executive summary ..................................................................................................8 1. -
Strategic Economic Plan for Gloucestershire Contents
90 Strategic Economic Plan for Gloucestershire Contents Foreword page 3 1 Introduction pages 4-5 1.5 What we will deliver pages 19-20 1.1 Gloucestershire pages 6-8 1.6 Our ‘ask’ of government pages 21-27 1.2 SWOT page 9 1.7 VFM summary statement pages 28-30 1.3 Developing clear strategic priorities page 10 1.8 Local Partnership Working page 31 1.4 Plans for Growth 1.9 Alignment with EU Structural and Investment Funds page 31 1.4.1 Flagship Projects pages 11-13 Introduction 1.4.2 Enablers for Growth pages 14-18 2. Key Facts & Data page 32-33 4.2.3 Broadband and Mobile Phone Networks page 69 2.1 Areas of High Growth Potential page 34 4.2.4 Planning (Collaboration) page 70 2.2 Supporting Evidence page 35 4.2.5 Housing page 71 3. Opportunities and Challenges page 36 4.2.6 Regeneration page 72-73 3.1 Opportunities page 36-39 5. Local Authority Contribution page 74 3.2 Challenges page 40-41 5.1 Financial support page 74 3.3 Building on our strengths and addressing our weaknesses page 42-45 5.2 Land assets and co-location page 75 4. Growth Programme page 46 5.3 Improvements to the planning process page 76 5.4 Supporting delivery page 76 4.1 Flagship Projects page 46 5.5 Governance page 76-78 4.1.1 Growth Hub page 46-51 9 0 4.1.2 Gloucestershire Renewable Energy, 6. Delivery Arrangements page 79 Engineering and Nuclear Skills Centre (GREEN) page 52-55 6.1 Sequencing and prioritisation page 80-81 Main document 4.1.3 Growth Zone page 56-58 6.2 Timeline page 82 4.2 Enablers for Growth page 59 6.3 Risk page 84-86 4.2.1 Transport Projects page 59 7. -
Midlands 16 South Midlands OAR March 2017
Route strategies: Option Assessment Report Study Name Midlands Study Area 16 Road / Junction A46 – M5 to M40 Name Route South Midlands Local Authority/ies Warwickshire County Council, Worcestershire County Council and Gloucestershire County Council HE Region Midlands Date: 05/01/17 Version: 0.1 1 Document Control Document Title A46 between M5 J9 and the M40 J15 (inclusive of M5 J9) OAR Author Nicola Glover (ACJV) Owner Strategy and Planning Route Strategies team Distribution For review Document Status Final Draft Revision History Version Date Description Author 0.1 06/12/2016 Draft Nicola Glover 2.1 24/02/2017 Draft for assurance review Nicola Glover Reviewer List Name Role AECOM Highways England Spatial Planning Consultants for East and West Midlands Chris Bate Highways England Asset Manager – Worcestershire Kathryn Simmonite Highways England Asset Manager – Worcestershire Serena Howell Highways England Asset Manager - Worcestershire Approvals Name Signature Title Date of Version Issue Tim Lund Tim Lund Project Manager 21/03/17 2.1 Reviewed by regional coordinators March 2017. Please ensure that comments in Annex F are reviewed. Original format of this document is copyright to the Highways England. 2 Table of Contents 1. Understanding the current situation 5 2. Understanding the future situation 16 3. Justification for intervention 18 4. Identifying objectives and defining geographic scope 20 5. Generating and assessing potential options 22 6 Better performing option(s) - costing 31 Annex A – Current Year Issues from the Stakeholder -
Tewkesbury Borough Housing Monitoring Report
Tewkesbury Borough Housing Monitoring Report 2018/19 AUGUST 2019 Tewkesbury Borough Council Planning Policy Tewkesbury Borough Council Council Offices Gloucester Road Tewkesbury Gloucestershire GL20 5TT www.tewkesbury.gov.uk 1 TABLE OF CONTENTS TABLE OF CONTENTS ........................................................................................................................................... 2 LIST OF TABLES .................................................................................................................................................... 3 EXECUTIVE SUMMARY ........................................................................................................................................ 4 INTRODUCTION ................................................................................................................................................... 5 What is the Housing Monitoring Report? ...................................................................................................... 5 Adopted Plan Context ..................................................................................................................................... 5 Joint Core Strategy ...................................................................................................................................... 5 Tewkesbury Borough Plan to 2011 .............................................................................................................. 6 Emerging Planning Policy – Tewkesbury Borough Plan .............................................................................. -
River Mease Walkover Survey Report Natural England APEM Ref 413482 March 2016 This Project Is Part of the IPENS Programme (LIFE1
River Mease Walkover Survey Report Natural England APEM Ref 413482 March 2016 This project is part of the IPENS programme (LIFE11NAT/UK/000384IPENS) which is financially supported by LIFE, a financial instrument of the European Community Dr Peter Stone Client: Natural England Address: APEX Court City Link Nottingham NG2 4LA Project reference: 413482 Date of issue: April 2015 ________________________ Project Director: Dr David Fraser Project Manager: Dr Peter Stone Other: Hugh Graham ________________________ APEM Ltd Riverview A17 Embankment Business Park Heaton Mersey Stockport SK4 3GN Tel: 0161 442 8938 Fax: 0161 432 6083 Registered in England No. 2530851 “This is a draft document and should not be cited” Registered in England No. 2530851, Registered Address Riverview A17 Embankment Business Park, Heaton Mersey, Stockport, SK4 3GN Revision and Amendment Register Version Date Section(s) Page(s) Summary of Changes Approved by Number 1 10/2/15 Draft for client review PS 2 27/02/15 5 27 Final following client comment PS Contents 1. Introduction ...................................................................................................................... 1 1.1 Project Background ................................................................................................... 1 1.3 Aims and Objectives ................................................................................................. 1 2. Methodology ................................................................................................................... -
Ashton Under Hill Parish Council
ASHTON UNDER HILL PARISH COUNCIL Parish Clerk: Michelle English, Delamere House, Hill Furze, Fladbury, Pershore, WR10 2NB Tel: 01386 860502, email [email protected] Source Minutes of the Parish Council Meeting held on Tuesday 12th January 2015 @ 7.00pm in the Green Room, Ashton under Hill Members and Officers present: Cllr Smith (Chair), Cllr Moore, Cllr Cope, Cllr Hague, Cllr Becket, Cllr McIntyre & Cllr Rowley In attendance: District Cllr Darby, 2 members of the public 1. Apologies: M English (Clerk) 2. Declarations of Interest: a) Register of Interests: Councillors are reminded of the need to update their register of interests. b) To declare any Disclosable Pecuniary Interests in items on the agenda and their nature. Confirmed that Cllr Hague and Cope have submitted Declaration of Interest forms to Wychavon. c) To declare any Other Disclosable Interests in items on the agenda and their nature. d) Written requests for the council to grant a dispensation (S33 of the Localism Act 2011) are to be with the clerk at least four clear days prior to a meeting. e) Councillors who have declared a Disclosable Pecuniary Interest, or an Other Disclosable Interest which falls within the terms of paragraph 12(4) (b) of the code of conduct, must leave the room for the relevant items. Failure to register or declare a Disclosable Pecuniary Interest may result in the commission of a criminal offence. 3. Minutes from November meeting were approved as true and accurate The meeting was adjourned for Public Question Time at 7.10pm to listen to Mr Finch & Mr Facer, (notes attached below) The time allocated is at the discretion of the council/chairman.