श्री चित्रापुर मठ, शिराली

SHRI MATH,

Bhadrapadha Sh Chaturdashi, Vilambi Samvatsar Sunday, September 23, 2018

At Shri , Shirali Request

• Kindly switch off your Mobile phones or at least turn to silent mode to enable undisturbed and uninterrupted proceedings Agenda

• Sabha Prarambha Prarthana • Confirmation of minutes of previous Admin Committee/ Standing Committee meeting • Matters arising out of minutes of previous meeting • Vantiga • Summarised Financial statements of SCM & key affiliated institutions of SCM • Canara Bank case • Progress on various projects • Samvit Sudha progress • Reports from Sub-committees • Any other matter with the permission of the chair • Sabha Samapti Prarthana Vision announced in Mahasabha 2017

1. Doubling Vantiga collection to Rs.5 crore by 2021-22 2. Establish strong connection of the Chitrapur Saraswat community with the Math 3. Establish strong connection of the Math with society at large 4. Project execution within the timelines and cost estimates 5. Establish strong Math Governance structure

4 VANTIGA

5 Vantiga for the Year [Actual remittances-net of 6% retained Vantiga by Sabha-s] (Rs. In lakh)

FY-2017-18 Sabha-s Apr-Sept 18 Apr-Sept 17

269.38 Grand Total 110.83 101.84 4.74 Vantiga - Interest on Vantiga Capital 4.74 Vantiga - Vantiga Capital-Interest Accruals - - 51.25 Vantiga - NRIs 6.29 0.31 27.34 Vantiga - USA Sabha 4.51 0.06 2.64 Vantiga - Canada Sabha 1.78 0.25 16.21 Vantiga - ANZ Sabha - - 4.82 Vantiga - U K Sabha - - 0.25 Vantiga - Singapur Sabha - - 213.39 Vantiga - R Is 104.54 101.52 23.00 Vantiga - Sabha 13.50 15.00 15.54 Vantiga - [Borivli] Sabha 13.17 12.79 38.49 Vantiga - Sabha 13.07 14.00 16.39 Vantiga - Mumbai [Santacruz] Sabha 12.11 10.14 12.68 Vantiga - Mumbai [Thane] Sabha 11.30 7.00 12.17 Vantiga - Mumbai [Dadar] Sabha 8.09 5.33 10.88 Vantiga - Mumbai [Goregaon] Sabha 8.00 7.00 8.20 Vantiga - Mumbai [Vileparle] Sabha 6.27 6.44 12.74 Vantiga - Mumbai [Grant Road] Sabha 4.53 3.45 6 Vantiga for the Year [Actual remittances-net of 6% retained Vantiga by Sabha-s] (Rs. In lakh)

FY-2017-18 Sabha-s Apr-Sept 18 Apr-Sept 17

269.38 Grand Total 110.83 101.84 213.39 Vantiga - R Is 104.54 101.52 16.02 Vantiga - Mumbai [Andheri] Sabha 3.00 6.50 3.06 Vantiga - Hubli Sabha 2.53 2.00 3.89 Vantiga - New Delhi Sabha 2.51 3.70 3.08 Vantiga - Mumbai [Virar] Sabha 1.84 2.90 2.17 Vantiga - Hydarabad Sabha 1.15 1.17 2.44 Vantiga - Chennai Sabha 0.75 0.75 6.79 Vantiga - Direct Remittances 0.75 1.78 0.62 Vantiga - Nashik Sabha 0.73 0.25 1.30 Vantiga - Shirali Sabha 0.70 - 5.49 Vantiga - Mumbai [Bandra-Khar] Sabha 0.42 0.84 0.93 Vantiga - Udupi Sabha 0.10 0.03 0.78 Vantiga - Sagar Sabha 0.03 - 1.62 Vantiga - Ahmedabad Sabha 0.01 0.96 Vantiga - Belgaum Local Sabha - - 0.58 Vantiga - Dharwad Sabha - -

7 Vantiga for the Year [Actual remittances-net of 6% retained Vantiga by Sabha-s] (Rs. In lakh)

FY-2017-18 Sabha-s Apr-Sept 18 Apr-Sept 17

269.38 Grand Total 110.83 101.84 213.39 Vantiga - R Is 104.54 101.52 2.80 Vantiga - Sabha - - 3.25 Vantiga - Gujarat [South] Sabha - - 0.52 Vantiga - Honavar Sabha - - 0.19 Vantiga - Kolhapur Sabha - - 0.23 Vantiga - Kumta Sabha - - 0.10 Vantiga - Kundapur Sabha - - 5.00 Vantiga - Sabha - - 0.78 Vantiga - Mysore Sabha - - 0.33 Vantiga - Nagpur Sabha - - 0.37 Vantiga - Gokarn Sabha 0.01 269.38 Grand Total 110.83 101.84

8 FINANCIAL POSITION

9 10

Shri Chitrapur Math - Shirali Income & Expenditure Account for the Year ended 31st March, 2018 Schedule : 1 (Rs. in crs) Previous Year Current Year Vantiga - Appropriation 2016-17 2017-18

2.70 Vantiga Collections - Gross 2.81 Appropriations 2.23 a. Expenditure on Objects of the Trust 2.42 0.46 b. Expenditure in respect of Properties 0.39 0.13 Repairs - buildings 0.15 0.33 Repairs - other Assets 0.24 Shri Chitrapur Math - Shirali 11 Income & Expenditure Account for the Year ended 31st March, 2018 Schedule : 1 (Rs. in crs)

Expenditure on the Objects of the Trust Previous Year Current Year Account Heads 2016-17 2017-18

1.05 Remuneration to Staff 1.13 0.41 Seva/Viniyoga/Santarpana Expenses 0.42

0.37 Dharmaprachar Expenses 0.52

0.31 Charitable Activities 0.11

0.18 Office & other Admn Exp 0.23

0.19 Goshala Expenses 0.18

0.02 Agricultural Expenses 0.04

0.09 Security Services Charges 0.12

0.13 Lighting & Electricity 0.14

0.08 Anandashraya Maintenance Expenses 0.09

0.09 Motor Vehicles Expenses 0.09

0.15 Rathotsava Expenses 0.07 0.03 Guest house expenses 0.02 0.01 Pathashala Expenses 0.01 3.12 Gross Expenses 3.17 Less : 2.23 Vantiga - Appropriated against Gross Expenses 2.42

0.89 Amount carried to I & E Account 0.76 SHRI CHITRAPUR MATH, Shirali, Uttara 581354 (Regd No A-347/ ) Balance Sheet as on 31st March 2018 (Rs. in crs) PreviousCurrent Year Year Current Year Previous Year Current Year Funds & Liabilities Properties & Assets 31-Mar-1731st March 2017 31-Mar-18 31-Mar-17 31-Mar-18 22.00 Trust Corpus 22.36 16.05 Assets - As per Schedule 19.81 20.71 As per last Balance Sheet 22.00 13.26 Fixed Assets - Land & Buildings 13.96 1.23 Add : Additions during the year 0.25 2.30 Fixed Assets - Others 3.87 Add : Surplus of the preceding 3rd year 0.06 transferred 0.10 0.49 Capital Work In Progress 1.99 0.25 Income & Expenditure A/c 0.20 2.34 Valuables 2.37 0.19 As per last Balance Sheet 0.25 2.30 As per last Balance Sheet 2.34 Less : Surplus of the preceding 3rd year -0.06 transferred -0.10 0.03 Additions during the year 0.03 Excess of Income over Expenditure for the 0.12 year 0.05 18.35 Capital Funds 19.16 20.23 Investments [Term Deposits] 20.52 18.28 Funds - Endowment 19.05 16.39 Scheduled Coop Banks 14.94 0.07 Funds - Capital projects 0.11 3.84 PSU/Other Commercial Banks 5.58 0.00 Loans - Cash Credit against FDs on lien 1.05 3.18 Current Assets 2.76 0.66 Long Term Lease/Rent Deposits 0.71 0.91 Advances and other Receivables 1.47 0.00 [from Lessees at Chitrapur Bhavan B'lore 0.00 0.48 Closing Stocks 0.52 0.00 and Complex at Mangalore] 0.00 0.00 Foodgrains,Stationery and other inventories 0.00 0.38 Liabilities and Provisions 1.74 0.00 [Value & Physical verification as certified 0.00 0.01 Advance - received against sale of Land 1.23 0.00 by the Management] 0.00 0.33 Creditors - Suppliers & Expenses 0.41 1.79 Cash and Bank Balances 0.77 0.04 Creditors - Capital Projects 0.09 1.77 In Banks 0.73 0.02 Cash in Hand 0.04 6.43 Matters under litigation 6.46 6.27 Matters under litigation 6.21 5.66 Long Lease Deposit [Canara Bank] 6.46 5.26 Mesne Profit & other dues [Canara Bank] [Subject to Appropriation against mesne [Subject to appropriation against Lease Profit of Rs 5,26,16,875.80 and other dues] Deposit Rs. 5,65,80,173.02 under litigation] 0.77 Other Dues 1.01 Other dues [Subject to Appropriation of Rs. 1,00,88,197 due as per contra - under litigation and under [Subject to Appropriation of Rs. 76,81,698 the purview of of the High Court at dues from other Lessees as per contra] Bangalore] 48.06 51.67 48.06 51.67 SHRI CHITRAPUR MATH, Shirali, . (Regd. No A-347/Karwar) Income and Expenditure Account for the year ended 31st March 2018 (Rs. in crs) Previous Year Current Year Previous Year Current Year EXPENDITURE INCOME 2016-17 2017-18 2016-17 2017-18 0.04 Expenditure in respect of Properties 0.09 0.94 Interest on Investments 0.84 0.33 Repairs other assets 0.24 0.44 Donations & Kanika 0.47 0.13 Repairs buildings 0.15 0.42 Rent & Annuity income 0.38 0.00 Lease Rent paid 0.06 0.05 Other Income 0.07 0.03 Municipal & Panchayat Taxes 0.03 0.03 Incentive from Govt for Goshala 0.00 0.01 Insurance for Assets 0.01 0.01 Sale of Asset - Surplus 0.06 0.50 0.49 0.00 Interest on TDS refund 0.00

-0.46 Less : Appropriated against Vantiga -0.39 0.00 Excess provisions w/back 0.00

0.89 Expenses on Objects of the Trust 0.76 3.12 Gross Expenses 3.17 -2.23 Less : Vantiga Appropriated -2.42

0.02 Other Expenses 0.05 0.01 Professional Fees 0.03 0.00 Audit Fees - Math 0.00 0.00 Audit Fees - Local Sabhas 0.00 0.00 Receivables/written offs 0.01 0.78 Depreciation on Assets 0.81

0.12 Excess of income over expenditure 0.05 1.84 1.76 1.84 1.76 Financial summary

Shri Chitrapur Math Balance Sheet Figures in Crores Mar-18 Application of Funds: Aug-18 19.81 Fixed Assets 23.63 20.52 Investments 24.87 0.27 Working Capital -3.61 2.36 Valuables 2.36 0.52 Closing Stock 0.60 43.48 Total 47.85 Sources of Funds: 22.36 Capital Account 22.36 1.05 Loans (Liability) 5.40 0.71 Long Lease Deposits 0.72 19.16 Specific Funds 19.20 0.20 Excess of income over expenditure 0.17 43.48 Total 47.85 14 Financial summary

Srivali Trust Balance Sheet Figures in Crores Mar-18 Application of Funds: Aug-18 2.09 Fixed Assets 2.02 4.04 Investments 4.01 0.14 Working Capital 0.38 6.26 Total 6.41

Sources of Funds: 4.81 Capital Account 4.82 1.18 Funds - Endowments 1.18 0.27 Excess of income over expenditure 0.41 6.26 Total 6.41

15 Financial summary

SCM Charitable Trust Balance Sheet Figures in Crores Mar-18 Application of Funds: Aug-18 4.57 Fixed Assets 4.72 3.40 Investments 3.40 0.12 Working Capital -0.06 8.09 Total 8.06 Sources of Funds: 6.47 Capital Account 6.82 0.36 Bank loans 0.00 0.38 Funds - Endowments 0.38 0.88 Excess of income over expenditure 0.86 8.09 Total 8.06

16 Financial summary

Parijnan Foundation Balance Sheet Figures in Crores Mar-18 Application of Funds: Aug-18 2.17 Fixed Assets 2.14 1.91 Investments 1.91 0.66 Working Capital 0.74 Stock-in-Hand - Closing[B/Sheet] 4.73 Total 4.79 Sources of Funds: 2.99 Capital Account 2.99 0.11 Loans (Liability) 0.03 1.65 Specific Funds 1.72 -0.02 Profit & Loss A/c 0.05 4.73 Total 4.79

17 Agenda

• Sabha Prarambha Prarthana • Confirmation of minutes of previous Admin Committee/ Standing Committee meeting • Matters arising out of minutes of previous meeting • Vantiga • Summarised Financial statements of SCM & key affiliated institutions of SCM • Canara Bank case • Progress on various projects • Samvit Sudha progress • Reports from Sub-committees • Any other matter with the permission of the chair • Sabha Samapti Prarthana Canara Bank case - Update

• The Reconcilation Meetings with Canara Bank, which had been suggested by the Hon. High Court while examining the Appeal of Canara Bank, ended in failure because Canara Bank took a inflexible stand. On the due date set by the Hon. High Court for hearing the outcome of the Reconciliation efforts, in view of the failure of the reconciliatory meeting, our Advocates were permitted to file Objections to the Appeal.

• The Objections have been drafted and are being verified before filing.

• The Hon. High Court will take up the matter of admission thereafter, the date of hearing will also be advised later.

19 Education

Srivali High School, Shirali & Guruprasad High School,Mallapur: Number of students

• Srivali High School – 351 • Guruprasad High School -207

• The SSLC results this year are quite encouraging.

• Passing % of Srivali HS 95.65 (PY 92%),

• Passing % of Guruprasad HS 88.71%

• In the recently held Honavar Taluka Zonal Sports competition, Guruprasad High School was adjudged as the Overall Champion.

20 Goshala

• The new Goshala at Kembre has been functioning very well under the guidance of Dr. Gaurish Padukone mam.

• Cattle population – 56 – Cows – 37 – Bulls – 5 – Calves & Heifers - 14

21 Progress on various projects

• Satchinadanand Dattatreya Temple, Kundapur • Shankarnarayan Temple, Udipi • Kotekar Campus • Goa • New English medium school at Karla • Saraswat Education society, Mangalore • Centenary Building • Kotekar school campus • Uma Maheshwari Devasthan, Mangalore • Gokarn Math • • Website & IT projects Kundapur site – Bhoomi pujan 02 October 2017

Building ready as

on date 23 Udupi project – Bhoomi pujan 22 April 2018

24 Udupi project – Foundation work completed

25 Kotekar project

26 Vittal – Extension on Saparya Nilaya

27 Bhandikeri Math renovation

28 Gokarn project – Vajpi House construction work completed

29 Varanasi

• Acquisition of Premises - Sept. 2010

• Renovation work had stopped till Mid 2016 due to PIL filed in Allahabad High Court by an NGO

• Post issue of order by Hon’ble HC renovation work has started in line with the guidelines issued by Allahabad HC & Varanasi Development Authority

30 Varanasi – New property

In August 2015, we completed an acquisition of a residential property just behind the existing property which we had bought from the Peshwas. This property can be used for future developments in Varanasi

31 Goa Project

• On 31 October 2014, Shri Chitrapur Math Charitable Trust (SCMCT) executed an agreement with Gram Panchayat of Village Kundaim for acquiring plot admeasuring 21075 m² • Plan to build Orchard and Meditation Centre post getting all necessary approvals • Expect to be on regular itinerary of HH Swamiji in the years to come

32 Karla

33 Karla

34 Website and IT

35 A Salute To STREE-SHAKTI

36 Parijnan Foundation- Samvit Sudha

• No of hubs - 9

• No of volunteers helping Samvit Sudha - 90

• No of events held in current financial year – 13 (Padukone-Dravid Centre for Sports Excellence Bangalore, HDFC Bank, Intel Bangalore, Ingram Micro, Apartment complexes in Mumbai & Bangalore, Little bug fest in Pune, Chemspec, ITC Mumbai)

• No of corporate customers - 15 viz Manipal University, Mahindra Pride School, Kshitij Foundation, Exim Marketing - Hyderabad, Divya Vithika Enterprises Bangalore, Ananth Technology Chennai, Kasturba College Mangalore, 21st Century Hospital Pardi, Rhodia Chemicals Ltd. Roha, Khusboo Welfare Trust Bangalore, Malnad College of Engineering Hassan, etc.

• No of other institutions and non amchi direct customers - 22

37 Parijnan Foundation- Samvit Sudha

• 1 New product is introduced every month

• Production numbers (April to August 2018) – Fabric products – 16,606 nos. – Hand made paper products – 30,473

• Presently we have 75 fabric products, 25 Paper products and 17 books under Parijna Series

• 2 new activity books made using our handmade paper were released in Parijna Series

• We successfully executed an order of Rs.3.46 lakh for Mahindra Pride School of which Rs.1.80 lakh was for HMPP products specially customized for them

38 Hub wise Sales figures for Fabric products, Paper products and Parijna Books

Hubs/Outlets Total gross Apr-18 May-18 Jun-18 Jul-18 Aug-18

Master Hub 1,282,434 233,114 104,920 244,850 184,855 514,695 Wadi 1,180,105 241,775 185,665 216,235 240,480 295,950 Bangalore-I 463,710 37,815 30,935 220,710 108,920 65,330 Shirali-I 443,465 86,815 90,685 19,890 77,230 168,845 Karla sales 386,510 76,030 59,530 152,185 49,190 49,575 Events 250,425 25,935 104,165 - 31,740 88,585 Pune-2 136,525 58,225 19,885 27,970 11,965 18,480 Santacruz 84,115 30,190 21,635 7,135 8,100 17,055 Hyderabad 58,025 16,195 - 7,155 7,720 26,955 Delhi 27,200 - - - 27,200 - Bangalore-4 2,490 350 1,090 - 1,050 - Ahmedabad 2,285 - - 2,285 - - Chennai 400 - - - 400 - 4,317,689 806,444 618,510 898,415 748,850 1,245,470

39 Agenda

• Sabha Prarambha Prarthana • Confirmation of minutes of previous Admin Committee/ Standing Committee meeting • Matters arising out of minutes of previous meeting • Vantiga • Summarised Financial statements of SCM & key affiliated institutions of SCM • Denotification of temples • Canara Bank case • Progress on various projects • Samvit Sudha progress • Reports from Sub-committees • Any other matter with the permission of the chair • Sabha Samapti Prarthana Chitrapur Prarthana activities

41 PRARTHANA ACTIVITIES

43 CHILDREN FROM THE 4 Prarthanotsava at Shri Chitrapur VARGAS - MALLESWARAM JR A N D SR, JAYANAGAR AND Math, Bangalore INDIRANAGAR AND 10 TEACHERS PARTICIPATED AT SHRI CHITRAPUR M A T H BENGALURU IN THE ANNUAL CHATURMAS PROGRAMME . CHILDREN SPOKE ON THE VARIOUS FESTIVALS CELEBRATED AND SAMARADHANA O B S E R V E D D U R I N G CHATURMAS . CHILDREN ALSO PRESENTED DANCES, BHAJANS AND STORY TELLING ON THE SAME THEME. Prarthana Varga

28TH-30TH JULY 2018 VENUE: SHRI CHITRAPUR MATH, SHIRALI, DURING CHATURMAS  37 PRARTHANA TEACHERS FROM INDIA AND ABROAD ATTENDED 3-DAY SHIBIR FROM 28TH - 30TH JULY 2018  INTERACTION WITH PARAMA PUJYA SWAMIJI ON 29T H JULY

43  CPO GUIDELINES ON WEEKLY REPORTS SESSIONS CONDUCTED THROUGH G O O G L E FORMS AND RULES TO OBSERVE FOR CONDUCTING SESSIONS.  M U D R A - B H AVA N I NAYEL & VAISHALI HEBLEKAR ’ S LEC - D E M O N M U D R A - S U S E D I N DANCE AND GURU PUJANA .  2 SESSIONS ON "SALIENT FEATURES OF THEATRE ” A N D SCRIPTING DRAMA BY S U D H I R BALWALLY.  S A N S K R I T SAMBHASHAN SESSION BY SUJATA & S A N G I TA PAWAR  VIMARSHA B Y TEJASHREE  SESSION ON “ H O W T O U S E NINAAD I N STOTRA AND BHAJANS ” DEMONSTRATED BY VIJJAYLAKSHMI NAIMPALLY  SESSION ON “ INCULCATING HEALTHY EATING HABITS IN CHILDREN ’ B Y U M A TRASI PRARTHANA ACTIVITIES

G U R U PUJANA BEING PERFORMED ON THE OCCASION O F GURUPURNIMA BY NEW JERSEY PV VATA POOORNIMA N A G A P A N C H A M I I N M I L P I T A S , U S A A N D A T M I R A R O A D P V . VARALAKSH M I VRATA B Y J U N I O R A N D S E N I O R P V MALLESWA RAM & DADAR R A K S H A B A N D H A N A T CUPERTINO , U S A Yuvadhara – Central Activities (contd.)

Chitrapur Yuvadhara Sammelanam – 11th to 13th August 2018 Activites included: • Visit to School, Vocational Training Centre and Art Gallery • Ashtang Yudh Session • Ninaada Sessions • Devi Anushthanam and the Sanshipta Sandyavandhan session • Attending Swadhyaya session by Parama Pujya Swamiji • Bhajan Seva during Shri Paduka Pujan and performing Shri Paduka Pujan • Personal Finance Session • Interaction with Parama Pujya Swamiji • Tree Plantation and Session on Organic Farming.

46 Central Activities

Volunteering During Janmotsav Chitrapur Yuvadhara Sammelanam

47 Central Activities

Chaturmas Fitness Challenge

The idea of this activity was to promote fitness and a healthy lifestyle amongst yuvas. This was a unique activity organised by Chitrapur Yuvadhara using the social media app – Instagram.

48 Girvāṇapratis̲ h̲ t̲h̲ ā Saṅskṛt Dinam Shiviram

Mumbai – Khār Mat̲h̲ on 26th August • Attended by 30 participants

BeṅgaĪūrū – Shrī Chitrāpur Mat̲h̲ on 18th August • Attended by 86 participants including 3 prārthanā kids and 5 yuvā-s

Puṇe – Aundh on 10th August • Attended by 80 participants

49 Girvāṇapratis̲ h̲ t̲h̲ ā Sambhās̲ h̲ aṇa Varga

• @ Puṇe – Conducted by – Bhārati Karpe, Suman Nāgarkaṭṭi and Sharad Uppoṇi • @ Kārlā – Conducted by – Suman Nāgarkaṭṭi and Saṅgītā Pawār • @ BeṅgaĪūrū – Conducted by – Udayā Māvinkurve - advanced Sambhās̲ h̲ aṇa for senior students (Malleswaram) – Rashmi Chandragiri (Malleswaram) – Sunetrā Nāgarkaṭṭi (Vijaynagar) – Sadhanā Kaikiṇi (Jayanagar) • @ Mumbai – Conducted by – Suneelā Māvinkurve (Grant Road) – Shobha Putli (Dādar – Prārthanā children/ Adults - Kaṭṭa) – Sujātā Haldipur (Khār – Ānandāshram) – Sheetalā Chandavar and Shrikalā Kaushik (Andheri) – Samyuktā Kaikiṇi (Goregaon) – Varadā Soukoor (Mālāḍ) – Sharayu Haldipur (Borivili) • @ Shirālī – Conducted by – Aruṇā Baṅkeshwar • @ Shirālī - During Chāturmāsa 2018 – By any of the GP teachers present for all Saṅskṛt lovers

50 Girvāṇapratis̲ h̲ t̲h̲ ā - Regular Courses

• Ārādhanā, Sādhanā and Dhāraṇā • Centres at Mumbai, BeṅgaĪūrū, Puṇe Staravardhana Varga for teachers • Attending these SV vargas helps to refresh and enhance their knowledge • Mumbai – Sheelā KaĪāwar and Vaishāli Koppikar every Wednesday at Ānandāshram – Khār Math̲ ̲ • BeṅgaĪūrū – GP teachers study editorials / articles on alternate Fridays – GP teachers share best practices to help each other improve their teaching skills and methodologies on alternate Fridays Web Lessons • Lessons uploaded on website • Shrī Kris̲ h̲ nānand Maṅkikar in charge of Web lessons

Girvāṇavaikhari • Interactive classes via internet taken by Shilpā Mudur • Students in United States • Completed one module and working on the next one

51 Engagement of laity with President

As suggested in the last Standing committee meeting, President, Standing committee alongwith Vice President, SC and Yuvas of VCM cell made presentations at various sabhas which was well attended • Thane sabha 194 • Andheri & Vile Parle 152 • Goregaon 180 • Borivli 225 • New Jersey, USA 50 • UK (via videoconference) 50

Remaining sabhas would be covered shortly 52 धꅍयवाद Thank You