March 2006 Back Page Useful Contact Telephone Numbers
Total Page:16
File Type:pdf, Size:1020Kb
Whats in this Issue? Page 2 Future water supply School parking Page 3 Community Warden, Victimisation Page 4 IwadeVillage Cubs and Beavers, WI, , Tinkerbells, Youth Club Page 5 Happy Days Parent & Toddler Page 6 All Saints Church, News Page 7 Message from the Church Wardens, Church Services March 2006 Back page Useful contact telephone numbers, the summer". noise road surfacing works and Minister of Work has progressed well the installation of street lighting during the early part of the and signage on the new road winter and if the relatively mild will be carried out during the Transport weather continues, the new early part of 2006 Sheppey Crossing will be open to traffic in the early summer. On completion of the announces construction of the Almost 10,000 tonnes of the Improvement Scheme, there British steel used to construct will be two route on and off the New Name the new crossing is now in Isle of Sheppey, via the place. The steel work from Sheppey Crossing and dual Piers 1-7, 8-14 and 17 to the carriageway or via the existing for the New northern abutment was Kingsferry Bridge and local launched into place using a road. Crossing jacking mechanism to push the steel skeleton of the bridge Traffic between mainland Kent The Highways Agency received deck into place from each end and the Isle of Sheppey will more than 700 entries for the of the work site. The remaining travel along the dual Name the Crossing competition sections of bridge deck (Piers carriageway Iwade bypass 7-8 and Piers 15-17) were lifted straight over the new crossing and the Judging Panel met in into place during October and and onto the Island. Access to December 2005 to choose the November. the east and west sides of the winning entry. Entries received Island will be possible from the Construction of the bridge deck new Cowstead Roundabout included names based on naval has progressed quickly and approximately 1½ miles north and aviation themes and placing the pre-cast concrete of the new crossing. figures from the Islands history. planks on top of the steelwork is complete. The in situ The Kingsferry Bridge will be The most popular names concrete slab now extends retained for local traffic and will suggested were variations north from the southern provide an alternative route to incorporating the words abutment on the mainland as the new crossing on and off the Sheppey or Swale. The far as the northern shore of The Isle of Sheppey. Travelling Judging Panel considered that Swale and south from the onto the Island, a dedicated slip there was strong local support railway line towards Pier 15. road leads off the dual carriage for a name that would convey a way to the Kingsferry sense of local identity, be The new crossing will measure Roundabout and along the unique and also mean 21½metres in width, wide existing single carriageway something to the majority of enough for two lanes of traffic in road over the Kingsferry Bridge local residents. It was felt that each direction. Construction of onto Sheppey Way to the the name 'The Sheppey 2½metre reinforced concrete Cowstead Corner Roundabout. Crossing', suggested by cantilevers on either side of the Leaving the Island, a dedicated Minister-on -Sea Mr Grimwade, main deck, to provide the slip road leads south from the satisfied these criteria best.. required width of the crossing, Kingsferry Roundabout, under started in October and will the new crossing before Dr Stephen Ladyman, Minister continue into spring 2006. merging with the southbound of Transport, said; "We are dual carriageway of the Iwade delighted with the response to Work to lay the low noise Bypass. the competition to name the surface on top of the bridge bridge. The name reflects the deck will start in late spring.. A dedicated footpath and local identity of this important cycleway on this local route will project. The Sheppey Crossing Construction of the new road be available for pedestrians is evidence of the Governments between the new crossing and and cyclists who, for safety commitment to improve Queenborough has advanced reasons, will not be permitted to transport in the area and we well and some sections of it are use the new high level look forward to its opening in almost complete. Further low crossing. iwade village news local area is second to none 8.30am to 9.30am Monday to What and will be missed by the Iwade School Friday residents of Iwade. 2.30pm and 5.00pm Monday to Keep Clear Friday Dedication However, Jeanne can not leave the Church completely Marking The restrictions will only apply After 35 years of service, Mrs and has agreed to continue to during term times. Jeanne Stockley of School participate in Church events Enforcement Lane has retired from the and keep her hand in Parochial Church Council. occasionally with the flowers. The restrictions have been During most of this time However Jeanne is now unable The Council have made a implemented in this way to Jeanne has been responsible to commit fully to the church traffic order that will allow balance the needs of Iwade for lovingly ensuring there has due to health and family enforcement action to be taken residents while making sure been a beautify display of fresh commitments. against drivers who park on that the yellow School Keep flowers in the Church, whether yellow School Keep Clear Clear is observed during the it was for Weddings, or just the With such dedication that does markings. The purpose of the school drop off and collection daily flower display for the not happen much today, regular visitors of the church. school keep clear marking is to times. The markings will be everyone connected to All create an area in front of the enforceable once the signs Jeanne was so dedicated to Saints Church wished to say a her cause that she even school accesses that increases indicating the restrictions have big thank you for all of the visibility of pedestrians and been erected on site. It is arranged her own garden so Jeanne's energy, dedication school children. The Councils anticipated that the signs will that she could provide flowers and support over the years. all year round for the Church. parking attendants will be put in place during February At the last Parochial Church undertake the enforcement and March 2006. Jeanne who was born and Council meeting it was and will issue fixed penalty raised as a local girl and suggested that others might notices to vehicles parked on dedicated her time to All Saints like to follow in Jeanne's shoes the markings. Church and over the years and maybe form a rota and Jeanne has produced the most take a turn in arranging the The traffic order will apply imaginative displays for the bi- flowers at the Altar. If anyone during the following times annual Flower Festivals which wishes to take this task on has been enjoyed by many. during school drop off and please contact either Jeanne collection times: Her experience and knowledge on 01795472635 or Sylvia of the history of the church and O'Shea on 01795 478103 development and I would explain meet those future demands that connection is made at a Future Plans that Southern Water is involved through a mix of demand particular point. in the planning process at two management measures and new levels, long term planning for resource development. These As regards businesses, public for Iwade water resources and also with the water resource plans are transport vehicles are excluded every day planning process when produced to replicate the from the hosepipe ban. Public Water Supply we look at the needs of a specific demands and supplies available service vehicles are those development. in a design situation that is capable of carrying more than For the future, Swale Water is representative of design drought eight persons at separate fares. considering a number of options With regard to long term conditions. These plans are Taxis or driving instructors' for new supplies. These include planning, you may be aware that subject to approval by our vehicles are not public service both building new and raising future development proposals economic regulator, OFWAT, and vehicles. Goods vehicles such existing reservoirs. Other are set out in two main their environmental regulator, the as vans are also exempt, options, such as desalination and documents, the County Council Environment Agency. although company estate cars effluent re-use are also possible Structure Plan and the District are not. The restrictions also in the future. However, major Local Plans. These plans set out Looking at demand in the shorter apply to garage forecourts, new resources take many years development proposals, as term, the planning application except when a hosepipe is used to design, promote and construct approved by Government. Both process is the process by which to remove the wax off brand new and the environmental impact Plans are subject to consultation, the local Planning Authority cars. and cost need to be taken into which takes place over two draft decides whether individual consideration. stages, and finally at an Inquiry in developments can proceed. This The present restrictions do not public. At the conclusion of this "everyday" process is under the apply to parks, recreation areas, Their first contingency plan is to process, the Plans are adopted. control of the local Planning swimming pools, fishponds, extend the present drought order Southern Water is a stakeholder Authorities and Southern Water public buildings, construction concerning Bewl Water. The in the consultation process and is not a statutory consultee.