Kayak Trip Plan on Nashua River from Mine Falls Park
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
NH Trout Stocking - April 2018
NH Trout Stocking - April 2018 Town WaterBody 3/26‐3/30 4/02‐4/06 4/9‐4/13 4/16‐4/20 4/23‐4/27 4/30‐5/04 ACWORTH COLD RIVER 111 ALBANY IONA LAKE 1 ALLENSTOWN ARCHERY POND 1 ALLENSTOWN BEAR BROOK 1 ALLENSTOWN CATAMOUNT POND 1 ALSTEAD COLD RIVER 1 ALSTEAD NEWELL POND 1 ALSTEAD WARREN LAKE 1 ALTON BEAVER BROOK 1 ALTON COFFIN BROOK 1 ALTON HURD BROOK 1 ALTON WATSON BROOK 1 ALTON WEST ALTON BROOK 1 AMHERST SOUHEGAN RIVER 11 ANDOVER BLACKWATER RIVER 11 ANDOVER HIGHLAND LAKE 11 ANDOVER HOPKINS POND 11 ANTRIM WILLARD POND 1 AUBURN MASSABESIC LAKE 1 1 1 1 BARNSTEAD SUNCOOK LAKE 1 BARRINGTON ISINGLASS RIVER 1 BARRINGTON STONEHOUSE POND 1 BARTLETT THORNE POND 1 BELMONT POUT POND 1 BELMONT TIOGA RIVER 1 BELMONT WHITCHER BROOK 1 BENNINGTON WHITTEMORE LAKE 11 BENTON OLIVERIAN POND 1 BERLIN ANDROSCOGGIN RIVER 11 BRENTWOOD EXETER RIVER 1 1 BRISTOL DANFORTH BROOK 11 BRISTOL NEWFOUND LAKE 1 BRISTOL NEWFOUND RIVER 11 BRISTOL PEMIGEWASSET RIVER 11 BRISTOL SMITH RIVER 11 BROOKFIELD CHURCHILL BROOK 1 BROOKFIELD PIKE BROOK 1 BROOKLINE NISSITISSIT RIVER 11 CAMBRIDGE ANDROSCOGGIN RIVER 1 CAMPTON BOG POND 1 CAMPTON PERCH POND 11 CANAAN CANAAN STREET LAKE 11 CANAAN INDIAN RIVER 11 NH Trout Stocking - April 2018 Town WaterBody 3/26‐3/30 4/02‐4/06 4/9‐4/13 4/16‐4/20 4/23‐4/27 4/30‐5/04 CANAAN MASCOMA RIVER, UPPER 11 CANDIA TOWER HILL POND 1 CANTERBURY SPEEDWAY POND 1 CARROLL AMMONOOSUC RIVER 1 CARROLL SACO LAKE 1 CENTER HARBOR WINONA LAKE 1 CHATHAM BASIN POND 1 CHATHAM LOWER KIMBALL POND 1 CHESTER EXETER RIVER 1 CHESTERFIELD SPOFFORD LAKE 1 CHICHESTER SANBORN BROOK -
Winnipesaukee Brook Trout Summary
Winnipesaukee Brook Trout Surveys 2010 NH Fish & Game The many watersheds that comprise the drainage of the Winnipesaukee River were recently surveyed by the New Hampshire Fish and Game Department. These surveys were part of a statewide effort to quantify the presence of self-sustaining brook trout (Salvelinus fontinalis) populations and to gather some preliminary information on their habitat. These surveys also provide some information on the region’s general fish community. An assessment to determine the status of brook trout within this region of New Hampshire is of particular interest to the overall goal of protection because information regarding this watershed does not currently exist. Current information indicates brook trout populations are abundant and secure to the north of the Winnipesauke River watershed, while impacts to habitats and localized extirpations appear to have reduced populations to the south of this region. As this region continues to grow, more pressure is placed on the ability to sustain water quality and habitat for wild brook trout populations. Background Brook trout are the only native stream dwelling trout species in New Hampshire, having a historic range that extended from Georgia to eastern Canada. It is believed that wild brook trout were once present throughout all watersheds in New Hampshire. Increased stream temperatures, changes to water chemistry, habitat fragmentation, increased rates of predation and competition, loss of spawning locations, and the loss of stream habitat complexity have led to reduced and isolated populations of wild brook trout both in New Hampshire and throughout the species’ native range in the eastern portions of the United States. -
Official List of Public Waters
Official List of Public Waters New Hampshire Department of Environmental Services Water Division Dam Bureau 29 Hazen Drive PO Box 95 Concord, NH 03302-0095 (603) 271-3406 https://www.des.nh.gov NH Official List of Public Waters Revision Date October 9, 2020 Robert R. Scott, Commissioner Thomas E. O’Donovan, Division Director OFFICIAL LIST OF PUBLIC WATERS Published Pursuant to RSA 271:20 II (effective June 26, 1990) IMPORTANT NOTE: Do not use this list for determining water bodies that are subject to the Comprehensive Shoreland Protection Act (CSPA). The CSPA list is available on the NHDES website. Public waters in New Hampshire are prescribed by common law as great ponds (natural waterbodies of 10 acres or more in size), public rivers and streams, and tidal waters. These common law public waters are held by the State in trust for the people of New Hampshire. The State holds the land underlying great ponds and tidal waters (including tidal rivers) in trust for the people of New Hampshire. Generally, but with some exceptions, private property owners hold title to the land underlying freshwater rivers and streams, and the State has an easement over this land for public purposes. Several New Hampshire statutes further define public waters as including artificial impoundments 10 acres or more in size, solely for the purpose of applying specific statutes. Most artificial impoundments were created by the construction of a dam, but some were created by actions such as dredging or as a result of urbanization (usually due to the effect of road crossings obstructing flow and increased runoff from the surrounding area). -
Illicit Discharge Detection and Elimination: State/Local Partnerships
Illicit Discharge Detection and Elimination: State/Local Partnerships Part 2: NHDES’s program Stormwater Management in Cold Climates November, 2003 ! Portland, ME Andrea Donlon, NHDES In this presentation… " Context " Methods " Status of work " Case studies Context of DES Watershed Assistance Section’s work " DES has been conducting investigations in " Coastal watershed since 1996 " Merrimack watershed since 2002 " Focus on bacteria sources " Efforts fall under N.H. Nonpoint Source Management Plan (October, 1999) Management Plan (2000) Water Quality Action Plans Illicit Connections in Urban Areas WQ-4A Establish on-going training and support for municipal personnel in monitoring storm drainage systems for illicit connections. WQ-4B Assist Seacoast communities in completing and maintaining maps of sewer and stormwater drainage infrastructure systems. WQ-4C Eliminate illicit connections in Seacoast communities. Required minimum control measures 1. Public education and outreach 2. Public participation / Involvement 3. Illicit discharge detection and elimination 4. Construction site runoff control 5. Post-construction runoff control 6. Pollution prevention / Good housekeeping Methods " Shoreline surveys " Investigations " Grant/technical support " Outreach " DES enforcement referrals are rare Shoreline surveys Nashua River, Nashua NH Surveys can be done on foot or by boat. They are conducted in dry weather and low tide. Back Channel We look for all outfall pipes and any sources of pollution. Souhegan River, Merrimack NH We document outfall type, size, location, appearance. We make note of flow, odors, staining, and floatables. Nashua NH A GPS unit is very helpful for keeping track of location. Nashua NH Samples are collected from all pipes discharging during dry weather. DES collects samples mainly for E.coli bacteria, but there are a variety of other methods. -
QUALITY ASSURANCE PROJECT PLAN for Nashua River Watershed Association Volunteer Water Monitoring Program
QUALITY ASSURANCE PROJECT PLAN FOR Nashua River Watershed Association Volunteer Water Monitoring Program Amended Document Date: June 27, 2018 Prepared by: Nashua River Watershed Association 592 Main St, Groton, MA 01450 With funding from: The Fieldstone Foundation, The Greater Lowell Community Foundation, and member donations PROJECT MANAGER_________________________________________________________________ Martha Snow Morgan, Water Programs Director Date Nashua River Watershed Association PROJECT COORDINATOR____________________________________________________________ Kathryn Nelson, Water Monitoring Coordinator Date Nashua River Watershed Association PROJECT SUPERVISOR_______________________________________________________________ Elizabeth Ainsley Campbell, Executive Director Date Nashua River Watershed Association MassDEP QA COORDINATOR _______________________________________________________ Richard Chase Date NHDES QA COORDINATOR____________________________________________________________ Ted Walsh Date New Hampshire Department of Environmental Services Nashua River Watershed Association Quality Assurance Project Plan Revision 2.0 4/30/2019 2.0 TABLE OF CONTENTS 1.0 TITLE AND APPROVAL PAGE…............................................ ............................................................. 1 2.0 TABLE OF CONTENTS ................................................................................................................................. 2 3.0 DISTRIBUTION LIST .................................................................................................................................... -
Eastman Falls Certification Review Report 2019
FRANC LOGIC April 2019 Low Impact Hydropower Institute’s (LIHI) Certification Review for Eastman Falls Hydroelectric Project 1. BACKGROUND The Eastman Falls Hydroelectric Project (Project) is located in central New Hampshire in Merrimack and Belknap Counties, and in the city of Franklin and towns of Hill, Sanbornton, and New Hampton. The Project is located on the Pemigewasset River, approximately 1.5 miles downstream of the U.S. Army Corps of Engineers (USACE) Franklin Falls Flood Control Dam, and about one mile upstream of its confluence with the Winnipesaukee River. The Project was originally constructed by the Pemigewasset Power Company in 1903, redeveloped by the Boston and Maine Railroad in 1910-1911, and further redeveloped by Public Service of New Hampshire (PSNH) in 1937 and 1983. The Project’s prior 30-year license was issued on August 25, 1987, with an effective date of January 1, 1988, expiring on December 31, 2017. The Project was issued a new license on April 20, 20171, by the Federal Energy Regulatory Commission (FERC) as Project #2457, effective January 1, 2018, one day after the termination of the prior license. The new 30-year license expires on December 31, 2047. On July 7, 20182, FERC filed notice of approval of license transfer from PSNH to Hull Street Energy (HSE)3. The Project’s hydroelectric facilities are operated by HSE’s affiliate, Central Rivers Power NH, LLC (CRPNH)4. On January 16, 2019, FERC was notified that the Project changed its name from HSE Hydro NH Eastman Falls, LLC to CRP NH Eastman Falls, LLC. The general Project area includes the Pemigewasset River from Sumner Island in the north to the Pemigewasset-Winnipesaukee River confluence in the south, and the lands immediately adjacent to the Pemigewasset River. -
VOL. 11, Issue 1 Awatershed Is an Area of Land Containing Streams and Rivers That All Drain Into a Single Larger Body of Water
VOL. 11, issue 1 © RON CHAPPLE STUDIOS / DREAMSTIME.COM watershed is an area of land A containing streams and rivers that all drain into a single larger body of water, such as a river, a lake or an ocean. The journey of water from stream to ocean begins in our neighborhoods and backyards. Precipitation comes down as rain, hail, snow or sleet. Once it reaches the ground, some water is absorbed by trees and other plants. Water not absorbed by roots enters the ground and becomes part of the water supply or runs downhill off the surface, eventually finding its way into a stream or river. © CAPPI THOMPSON / DREAMSTIME.COM New Hampshire’s Downstream Journey A watershed can cover a small area or a large stretch of land. Small watersheds are usually part of larger watersheds. For example, the Merrimack River watershed is a large watershed in New Hampshire and Massachusetts that is formed by many smaller watersheds. The Baker River, Pemigewasset River, Winnipesaukee River and Contoocook River are all 2. tributaries in New Hampshire that collect rainwater from the surrounding hills and mountains and flow together to form the Merrimack River, which eventually flows through Massachusetts and drains PHOTO © NHFG / STAFF into the Atlantic Ocean. There are five major watersheds in New Hampshire. NEW HAMPSHIRE WATERSHEDS Androscoggin River and watershed Connecticut River and watershed © NHFG / VICTOR YOUNG PHOTO © NHFG / VICTOR YOUNG Merrimack River and watershed Piscataqua River and watershed A river begins at its source or Saco River headwaters, usually at a spring, and watershed 1. swamp, marsh or lake in the mountains. -
Water Quality
LAWRENCE HYDROELECTRIC PROJECT LIHI APPLICATION ATTACHMENT B WATER QUALITY 314 CMR 4.00: DIVISION OF WATER POLLUTION CONTROL 4.06: continued 314 CMR 4.00 : DIVISION OF WATER POLLUTION CONTROL 4.06: continued TABLE 20 MERRIMACK RIVER BASIN BOUNDARY MILE POINT CLASS QUALIFIERS Merrimack River State line to Pawtucket Dam 49.8 - 40.6 B Warm Water Treated Water Supply CSO Pawtucket Dam to Essex Dam, 40.6 - 29.0 B Warm Water Lawrence Treated Water Supply CSO Essex Dam, Lawrence to 29.0 - 21.9 B Warm Water Little River, Haverhill CSO Little River, Haverhill to 21.9 - 0.0 SB Shellfishing Atlantic Ocean CSO The Basin in the Merrimack River - SA Shellfishing Estuary, Newbury and Newburyport Stony Brook Entire Length 10.3 - 0.0 B Warm Water Beaver Brook State line to confluence 4.2 - 0.0 B Cold Water with Merrimack River Spicket River State line to confluence 6.4 -0.0 B Warm Water with Merrimack River Little River State line to confluence with 4.3 - 0.0 B Warm Water Merrimack River Cobbler Brook Entire Length 3.7 - 0.0 B Cold Water Powwow River Outlet Lake Gardner to tidal 6.4 - 1.3 B Warm Water portion Tidal portion 1.3 - 0.0 SB Shellfishing Plum Island River North of High Sandy sand bar SA Shellfishing Outstanding Resource Water 1 Water quality standards for Class B and Class SB waters Designated Use/Standard Parameter Support ≥ 5.0 mg/l Inland waters, Class B, Dissolved Oxygen ≥ 60% saturation unless background conditions warm water fishery lower Massachusetts waters, MADEP Temperature ≤ 28.3ºC (83ºF) pH 6.0 to 8.3 S.U. -
Walking & Trail Guide
! e v o M e h t e k a M e pshir m a H New , n ankli r F by printed & 1 Franklin Falls Dam, US Army Corps of Engineers 5 Knowles Pond Conservation Area 9 Winnipesaukee River Trail • 5.3 miles Designed 1½-mile round trip from parking lot Several short trails (<1 mile) that can be Marked in half-mile increments, this is an easy walk on a tar surface with one downhill/uphill area. connected for longer walks trail is a hard-packed surface.. For the long distance walker, you may continue and add another 2.2 miles to your jaunt starting This trail is a dirt path that runs through the woods and along Knowles Pond. Several signs are g r .healnh.o w ww Moderate Moderate Easy key: iculty di rail T located along the way pointing out hemlock stands, wetland sites, and several wildlife park at McDonalds or Super 8. 3 To start your walk at the Franklin end, park in downtown Franklin at Trestle View Park. To start at the Tilton end, you can park in 93 ea er t en C y t ommuni C hompson T y e appl T are available at the kiosk in the parking area. 43.459339 Longitude: -71.562393 Longitude: 43.459339 Latitude: 5 2 r 1 7 12 Mill Rd. Area fm 94.1 ix M stores. in not but leash, a on allowed are Piney Point Nature Trail, Franklin Falls Dam, US Army Corps 2 Three Rivers Three Franklin Dogs open. are stores when available are Bathrooms weather. -
North Nashua River Master Plan for Fitchburg
North Nashua River Master Plan... Walking paths • Housing Businesses Water Access Views Redevelopment Art History Parks Walking paths • Housing Businesses Water Access Views Redevelopment Art History Parks ...industry runs through it Prepared for Project Advisory Group TTThe MA Rivvverwerwerwaaays PrPrys ogogogramramram Mayor Dan Mylott, City of Fitchburg MassacMassacMassachusetts DeDehusetts parparpartment ofoftment Fish and Game Trevor Bonilla, City of Fitchburg: Planning-GIS Elizabeth Ainsley Campbell, Prepared by Nashua River Watershed Association Al Futterman, Nashua River Watershed Association Boston, Massachusetts Janet Morrison, North County Land Trust with Michael Crane, Associates John McNamara, Fitchburg Stream Team Burlington, Vermont Michael O’Hara, City of Fitchburg: Planning- Conservation Marion Stoddard, Nashua River Watershed Association David Streb, City of Fitchburg: Planning Lisa Wong, Fitchburg Redevelopment Authority June 2004 2 Introduction The North Nashua River continues to be a tremendous resource for the City of Fitchburg, its miles of riverbank and rushing waters a treasure in the heart of an urban core. The river is the intersection of the City’s past and its fu- ture. The ideas presented on the following pages are in- tended to get the Fitchburg community thinking about the river and the many opportunities to integrate the river into the fabric of the City. This report is only a concep- tual master plan; the ideas presented here are intended to be refined - to change and evolve - as they are designed and implemented. Moving to design and implementation is as much a function of commitment by the citizens of the City as it is a function of market conditions, funding, and opportunities. This plan is for the people of Fitchburg to use to see their dreams for the North Nashua River come to fruition. -
Stocking Report, May 14, 2021
Week Ending May 14, 2021 Town Waterbody Acworth Cold River Alstead Cold River Amherst Souhegan River Andover Morey Pond Antrim North Branch Ashland Squam River Auburn Massabesic Lake Barnstead Big River Barnstead Crooked Run Barnstead Little River Barrington Nippo Brook Barrington Stonehouse Pond Bath Ammonoosuc River Bath Wild Ammonoosuc River Belmont Pout Pond Belmont Tioga River Benton Glencliff Home Pond Bethlehem Ammonoosuc River Bristol Newfound River Brookline Nissitissit River Brookline Spaulding Brook Campton Bog Pond Carroll Ammonoosuc River Columbia Fish Pond Concord Merrimack River Danbury Walker Brook Danbury Waukeena Lake Derry Hoods Pond Dorchester South Branch Baker River Dover Cocheco River Durham Lamprey River Week Ending May 14, 2021 Town Waterbody East Kingston York Brook Eaton Conway Lake Epping Lamprey River Errol Clear Stream Errol Kids Pond Exeter Exeter Reservoir Exeter Exeter River Exeter Little River Fitzwilliam Scott Brook Franconia Echo Lake Franconia Profile Lake Franklin Winnipesaukee River Gilford Gunstock River Gilsum Ashuelot River Goffstown Piscataquog River Gorham Peabody River Grafton Mill Brook Grafton Smith Brook Grafton Smith River Greenland Winnicut River Greenville Souhegan River Groton Cockermouth River Groton Spectacle Pond Hampton Batchelders Pond Hampton Taylor River Hampton Falls Winkley Brook Hebron Cockermouth River Hill Needle Shop Brook Hill Smith River Hillsborough Franklin Pierce Lake Kensington Great Brook Week Ending May 14, 2021 Town Waterbody Langdon Cold River Lee Lamprey River -
Carroll County, New Hampshire
VOLUME 1 OF 2 CARROLL COUNTY, NEW HAMPSHIRE (ALL JURISDICTIONS) Carroll County Community Community Community Community Name Number Name Number ALBANY, TOWN OF 330174 JACKSON, TOWN OF 330014 BARTLETT, TOWN OF 330010 MADISON, TOWN OF 330220 BROOKFIELD, TOWN OF 330179 MOULTONBOROUGH, TOWN OF 330015 CHATHAM, TOWN OF 330181 OSSIPEE, TOWN OF 330016 CONWAY, TOWN OF 330011 SANDWICH, TOWN OF 330017 EATON, TOWN OF 330204 TAMWORTH, TOWN OF 330018 EFFINGHAM, TOWN OF 330012 TUFTONBORO, TOWN OF 330234 FREEDOM, TOWN OF 330013 WAKEFIELD, TOWN OF 330019 *HALE’S LOCATION, TOWN OF 330246 WOLFEBORO, TOWN OF 330239 HART’S LOCATION, TOWN OF 330213 *No Special Flood Hazard Areas Identified Effective: March 19, 2013 FLOOD INSURANCE STUDY NUMBER 33003CV001A NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study (FIS) report may not contain all data available within the Community Map Repository. Please contact the Community Map Repository for any additional data. The Federal Emergency Management Agency (FEMA) may revise and republish part or all of this FIS report at any time. In addition, FEMA may revise part of this FIS report by the Letter of Map Revision process, which does not involve republication or redistribution of the FIS report. Therefore, users should consult with community officials and check the Community Map Repository to obtain the most current FIS report components. Selected Flood Insurance Rate Map panels for this community contain information that was previously shown separately on the corresponding Flood Boundary and Floodway Map panels (e.g., floodways, cross sections).