BD091520 RESOLUTION NO. 21-XX

RESOLUTION PROGRAMMING $4,308,164 IN PROP AA VEHICLE REGISTRATION FEE FUNDS TO THREE PROJECTS AND AMENDING THE 2017 PROP AA STRATEGIC PLAN

WHEREAS, In November 2010, voters approved Proposition AA (Prop AA), authorizing the San Francisco County Transportation Authority (Transportation Authority) to collect an additional $10 annual vehicle registration fee on motor vehicles registered in San Francisco and to use the proceeds to fund transportation projects identified in the Expenditure Plan; and

WHEREAS, The Prop AA Expenditure Plan identifies eligible expenditures in three programmatic categories: Street Repair and Reconstruction; Pedestrian Safety; and Transit Reliability and Mobility Improvements and mandates the percentage of revenues that shall be allocated to each category over the life of the Expenditure Plan at 50%, 25% and 25%, respectively; and

WHEREAS, In May 2017, through Resolution 17-45, the Transportation Authority Board adopted the 2017 Prop AA Strategic Plan, which among other elements, included policies for the administration of the program; screening and prioritization criteria; and a 5YPP for each programmatic category covering Fiscal Years 2017/18 to 2021/22, programming $26.9 million in Prop AA funds to 17 projects; and

WHEREAS, The Transportation Authority Board subsequently amended the 2017 Prop AA Strategic Plan through adoption of Resolutions 19-48, 19-63, and 20- 62; and

WHEREAS, Consistent with Prop AA’s focus on quickly delivering tangible benefits to neighborhoods citywide, the Strategic Plan policies allow for periodic calls for projects to reprogram cost savings and other available funds; and

WHEREAS, In June 2020, Transportation Authority staff released a call for projects to program an estimated $4.24 million in Prop AA funds available from canceled projects, projects completed under budget, higher than anticipated

Page 1 of 4 BD091520 RESOLUTION NO. 21-XX revenues, and interest earnings; and

WHEREAS, By the July 31, 2020 deadline, staff had received four candidate projects requesting over $6.3 million in Prop AA funds as shown in Attachment 1; and

WHEREAS, Transportation Authority staff evaluated the projects using the Board-adopted screening and prioritization criteria, and follow-up communications with sponsors to clarify and seek additional project information as needed; and

WHEREAS, Attachment 2 contains our programming recommendations for the $4,308,164 available for projects, which includes $63,280 recently de-obligated from the SFMTA’s Webster Street Pedestrian Countdown Signals project which was completed under budget; and

WHEREAS, The staff recommendation is to fully fund two projects and partially fund one project as summarized in Attachment 2 and detailed in the enclosed Project Information Forms, and to amend the three projects into the Prop AA Strategic Plan; and

WHERAS, Attachment 3 shows what the amended 2017 Prop AA Strategic Plan Programming and Allocations would look like if the proposed recommendations are approved; and

WHEREAS, At its September 2, 2020 meeting, the Citizens Advisory Committee was briefed on the proposed programming of Prop AA funds and the associated Prop AA Strategic Plan amendment and unanimously adopted a motion of support for the staff recommendation; now, therefore, be it

RESOLVED, That the Transportation Authority hereby programs $4,308,164 in Prop AA Vehicle Registration Fee Funds to three projects as described in Attachment 2; and be it further

RESOLVED, That the Transportation Authority hereby amends the 2017 Strategic Plan to add the three aforementioned projects.

Page 2 of 4 BD091520 RESOLUTION NO. 21-XX

Attachments: 1. Summary of Applications Received 2. Draft Recommendations 3. Proposed 2017 Prop AA Strategic Plan Amendment

Enclosure: Project Information Forms (3)

Page 3 of 4 Attachment 1. Prop AA 2020 Summary of Applications Received1 Pedestrian Safety Category Planned Total Project Prop AA # Project Name Brief Project Description District(s) Sponsor2 Phase(s) Allocation Cost Requested Fiscal Year(s)

Prop AA funds would be used to implement pedestrian, school zone, and traffic safety improvements. Scope includes six sidewalk bulbouts along Page Street at Page Street Gough, Laguna, and Buchanan streets to shorten crossing distances, slow turning Neighborway vehicle traffic, and improve overall pedestrian safety and comfort. At the Page 1 5 SFMTA Construction $ 1,849,000 $ 262,636 20/21 (Webster to and Buchanan intersection (within the John Muir Elementary school zone), the Market) project would construct the city's first raised intersection, with vertical deflection for vehicles, special paving to enhance pedestrian priority, and seating opportunities for rest/social gathering.

This project will install four new pedestrian-scale street lights on Joice Alley, between Clay and Sacramento streets, making the path safer and more inviting for Joice Alley pedestrians. This alley is situated directly across from Gordon J. Lau Elementary. Design, 20/21, 2 Lighting 3 SFPW $ 500,000 $ 500,000 It is also located one block away from the Powell cable car line, one block away Construction 21/22 Improvements from the 30 Stockton line, and 2 blocks away from the new Chinatown subway station. Pedestrian Safety Category $ 2,349,000 $ 762,636 Subtotal Transit Reliability and Mobility Improvements Category Planned Total Project Prop AA # Project Name Brief Project Description District(s) Sponsor2 Phase(s) Allocation Cost Requested Fiscal Year(s)

BART seeks Prop AA funds to design, construct, install, and deploy 20 New Generation Pneumatic Barrier Style Accessible Fare Gates (AFGs) at the eight San New Francisco BART stations and at the Daly City BART station. The New Generation Generation Pneumatic Swing Style Barrier AFGs will benefit anyone who needs Pneumatic additional space and time to tag their and pass through. These Design, 20/21, 3 3,6,8,9,11 BART $ 2,600,000 $ 1,950,000 Barrier Style benefits are particularly important for people with disabilities and seniors. The Construction 21/22 Accessible new AFGs will be safer and provide a better customer experience. The customer Fare Gates experience will be improved as the advance sensor technology will recognize movements, including from animate objects like guide dogs, and provide adequate time to transition through the gate.

Replace light rail track and overhead contact system components along the L- L Taraval Taraval light rail line, between West Portal and Sunset Boulevard. This project is Improvement part of a larger set of transit and street improvements including transit stop Project placement optimization, new sewer and water systems, construction of bus bulbs 4 (Segment B – and boarding islands, pedestrian improvements, street resurfacing, installation of 4,7 SFMTA Construction $ 71,209,060 $ 3,664,159 20/21 Sunset traffic signals, and traffic and turn lane modifications to improve safety, reduce Boulevard to travel time, and improve reliability on the L-Taraval corridor. SFMTA is West Portal) requesting Prop AA funds in lieu of Regional Measure 3 funds originally planned to help fully fund the project. Transit Reliability and Mobility $ 73,809,060 $ 5,614,159 Improvements Category Subtotal 1 Projects are not listed in priority order. Projects are sorted by category, then fiscal year in which Prop AA funds are needed, then by Sponsor, then by Project Name. 2 Sponsor abbreviations include: the San Francisco Municipal Transportation Agency (SFMTA) and San Total Prop Total Project Francisco Public Works (SFPW). AA Cost Requested TOTAL $ 76,158,060 $ 6,376,795

M:\1. CAC\Meetings\2. Memos\2020\09 Sept 2\Item X - Prop AA 2020 Call for Projects\ATT 1 Prop AA Summary of Applications Received 2020 Page 1 of 1 Attachment 2. 2020 Prop AA Call for Projects Draft Programming Recommendations1

Street Repair and Reconstruction Category Recommended Evaluation Total Project Prop AA Project Name Sponsor1 Phase(s) Prop AA Notes Score Cost Requested Programming Subtotal $ - $ - $ - No applications were submitted Street Repair and Reconstruction Category Amount $318,089 Available

Pedestrian Safety Category Recommended Evaluation Total Project Prop AA Project Name Sponsor2 Phase(s) Prop AA Notes Score Cost Requested Programming

In order to fully fund both Pedestrian Safety projects, our staff recommendation is to partially fund the Page Street Neighborway project with Prop AA funds ($144,005) with the remaining funding ($118,631) coming from the Prop K Bicycle Page Street Neighborway Circulation and Safety category. There is $360,000 in 15 SFMTA Construction $ 1,849,000 $ 262,636 $ 144,005 (Webster to Market) Prop K funds programmed to Page Street Neighborway Phase 2 (Webster to Stanyan), which has not yet started, that is available for allocation in FY 20/21 and another $1.2 million programmed in FY 21/22. SFMTA has no objection to this recommendation.

Recommend full funding from Prop AA due to the Joice Alley Lighting Design, 12 SFPW $ 500,000 $ 500,000 $ 500,000 lack of other options for funding pedestrian-scale Improvements Construction lighting. Subtotal $ 2,349,000 $ 762,636 $ 644,005

Pedestrian Safety Category Amount Available $325,916

Transit Reliability and Mobility Improvements Category

M:\1. CAC\Meetings\2. Memos\2020\09 Sept 2\Item X - Prop AA 2020 Call for Projects\ATT 2 Draft Programming Recommendations 2020 Page 1 of 2 Attachment 2. 2020 Prop AA Call for Projects Draft Programming Recommendations1

Recommended Evaluation Total Project Prop AA Project Name Sponsor2 Phase(s) Prop AA Notes Score Cost Requested Programming L Taraval Improvement Project (Segment B – 14 SFMTA Construction $ 71,209,060 $ 3,664,159 $ 3,664,159 Recommend full funding. Sunset Boulevard to West Portal)

Staff will work with BART to identify funds for this New Generation Design, project from other sources, including the regional 7 Pneumatic Barrier Style BART $ 2,600,000 $ 1,950,000 $ - Construction transit operator's share of the Transportation Accessible Fare Gates Sustainability Fee and Prop K. Subtotal $ 71,209,060 $ 3,664,159 $ 3,664,159

Transit Reliability and Mobility Improvements Category Amount Available $3,664,159

Recommended Total Project Total Prop AA Prop AA Cost Requested Programming TOTAL $ 73,558,060 $ 4,426,795 $ 4,308,164

TOTAL Available $4,308,164

1 Projects are sorted by evaluation score from highest ranked to lowest. Total possible score varies by category. 2 Sponsor abbreviations include the San Francisco Municipal Transportation Agency (SFMTA) and San Francisco Public Works (SFPW).

M:\1. CAC\Meetings\2. Memos\2020\09 Sept 2\Item X - Prop AA 2020 Call for Projects\ATT 2 Draft Programming Recommendations 2020 Page 2 of 2 Attachment 3 2017 Prop AA Strategic Plan Programming and Allocations Pending September 2020 Board Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Project Name Phase Sponsor 5-Year Total 2017/18 2018/19 2019/20 2020/21 2021/22 Street Repair and Reconstruction Target Funds Available in Category $ 2,264,097 $ 3,980,066 $ 2,290,392 $ 2,205,817 $ 2,175,836 $ 12,916,208 Geary Boulevard Pavement Renovation1, 2 Construction SFPW $ 3,386,732 $ 3,386,732 Richmond Residential Streets Pavement Renovation2 Construction SFPW $ 2,020,000 $ 2,020,000 23rd St, Dolores St, York St and Hampshire St Pavement Renovation1 Construction SFPW $ 2,397,129 $ 2,397,129 Mission Street Transit and Pavement Improvement Construction SFPW $ 2,397,129 $ 2,397,129 Fillmore Street Pavement Renovation Construction SFPW $ 2,397,129 $ 2,397,129 Subtotal Programmed to Category (% all time) 49.4% $ - $ - $ 5,783,861 $ 4,417,129 $ 2,397,129 $ 12,598,119 Cumulative Remaining Capacity $ 2,264,097 $ 6,244,163 $ 2,750,695 $ 539,383 $ 318,089 $ 318,089 Pedestrian Safety Target Funds Available in Category $ 1,010,858 $ 1,776,991 $ 1,022,598 $ 984,837 $ 971,451 $ 5,766,735 Haight Street Streetscape (Pedestrian Lighting) Construction SFPW $ 2,052,000 $ 2,052,000 Potrero Gateway Loop (Pedestrian Safety Improvements)1, 2 Design SFPW $ 80,000 $ 80,000 Potrero Gateway Loop (Pedestrian Safety Improvements)1, 2, 3 Construction SFPW $ 220,000 $ 2 20,000

Vision Zero Coordinated Pedestrian Safety Improvements (Bulbs & Basements)1, 2 Construction SFPW $ 700,000 $ 700,000 Arguello Boulevard Traffic Signal Upgrade Construction SFMTA $ 655,000 $ 6 55,000 5th Street Quick Build Improvements2, 3 Construction SFMTA $ 378,372 $ 3 78,372 Bayshore Blvd/Cesar Chavez St/Potrero Ave Intersection Improvements Construction SFMTA $ 368,519 $ 368,519 Segments F/G2 Western Addition Transportation Plan Implementation (Pedestrian Lighting)1 Design SFPW $ 60,000 $ 60,000 Western Addition Transportation Plan Implementation (Pedestrian Lighting)1, 3 Construction SFPW $ 926,928 $ 9 26,928 Page Street Neighborway (Webster to Market) Construction SFMTA $ 144,005 $ 144,005 Design, Joice Alley Lighting Improvements SFPW $ 500,000 $ 500,000 Construction Subtotal Programmed to Category (% all time) 25.6% $ 2,052,000 $ 655,000 $ 1,208,519 $ 2,169,305 $ - $ 6,084,824 Cumulative Remaining Capacity $ (1,041,142) $ 80,849 $ (105,073) $ (1,289,540) $ (318,089) $ (318,089) Transit Reliability and Mobility Improvements Target Funds Available in Category $ 1,503,678 $ 2,643,321 $ 1,521,141 $ 1,464,971 $ 1,445,059 $ 8,578,170 Station Enhancements - Phase 1 Construction SFMTA $ 2,465,316 $ 2,465,316 Third Street Transit and Safety Improvements2 Construction SFMTA $ 383,776 $ 383,776 Design, Transit Stop Signage Enhancement Program - Phase 1 SFMTA $ 1,043,898 $ 1,043,898 Construction Design, Transit Stop Signage Enhancement Program - Phase 2 SFMTA $ 1,021,021 $ 1,021,021 Construction L Taraval Improvement Project (Segment B – Sunset Boulevard to West Portal) Construction SFMTA $3,664,159 $ 3,664,159

Subtotal Programmed to Category (% all time) 25.0% $ 2,465,316 $ - $ 383,776 $ 5,729,078 $ - $ 8,578,170 Cumulative Remaining Capacity $ (961,638) $ 1,681,682 $ 2,819,047 $ (1,445,059) $ 0 $ 0

Total Available Funds $ 4,778,633 $ 8,400,377 $ 4,834,131 $ 4,655,626 $ 4,592,346 $ 27,261,113 Total Programmed $ 4,517,316 $ 655,000 $ 7,376,156 $ 12,315,512 $ 2,397,129 $ 27,261,113 Cumulative Remaining Capacity $ 261,317 $ 8,006,694 $ 5,464,669 $ (2,195,217) $ 0 Allocated Pending Action Notes 1 Comprehensive 2017 Strategic Plan Amendment (Res 19-48, approved 03/19/2019). 2 Comprehensive 2017 Strategic Plan Amendment (Res 19-63, approved 06/25/2019). 3 Comprehensive 2017 Strategic Plan Amendment (Res 20-62, approved 06/23/2020).

P:\Prop AA\2 Strategic Plan\3 Living Project List\5-Year Project List 2017SP Page 1 of 2 Attachment 3 2017 Prop AA Strategic Plan Cash Flow Pending September 2020 Board Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Project Name Phase Total 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Street Repair and Reconstruction Target Funds Available in Category $ 2,264,097 $ 3,980,066 $ 2,290,392 $ 2,205,817 $ 2,175,836 $ 12,916,208 Geary Boulevard Pavement Renovation1, 2 Construction $ 846,683 $ 1,246,683 $ 1,293,366 $ 3,386,732 Richmond Residential Streets Pavement Renovation2 Construction $ 2,020,000 $ 2,020,000 23rd St, Dolores St, York St and Hampshire St Pavement Renovation1 Construction $ 750,000 $ 1,647,129 $ 2,397,129 Mission Street Transit and Pavement Improvement Construction $ 1,198,565 $ 1 ,198,564 $ 2,397,129 Fillmore Street Pavement Renovation Construction $ 480,000 $ 1 ,437,129 $ 480,000 $ 2,397,129 Cash Flow Subtotal $ - $ - $ 1,596,683 $ 2,893,812 $ 4,991,931 $ 2,635,693 $ 480,000 $ 12,598,119 Cumulative Remaining Capacity $ 2,264,097 $ 6,244,163 $ 6,937,873 $ 6,249,878 $ 3,433,782 $ 798,089 $ 318,089 $ 318,089 Pedestrian Safety Target Funds Available in Category $ 1,010,858 $ 1,776,991 $ 1,022,598 $ 984,837 $ 971,451 $ 5,766,735 Haight Street Streetscape (Pedestrian Lighting) Construction $ 500,000 $ 1,050,000 $ 50 2,000 $ 2,052,000 Potrero Gateway Loop (Pedestrian Safety Improvements)1, 2 Design $ 80,000 $ 80,000 Potrero Gateway Loop (Pedestrian Safety Improvements)1, 2, 3 Construction $ 220,000 $ 220,000

Vision Zero Coordinated Pedestrian Safety Improvements (Bulbs & Basements)1, 2 Construction $ 400,000 $ 300,000 $ 700,000

Arguello Boulevard Traffic Signal Upgrade Construction $ 655,000 $ 655,000 5th Street Quick Build Improvements2, 3 Construction $ 378,372 $ 378,372 Bayshore Blvd/Cesar Chavez St/Potrero Ave Intersection Improvements Segments Construction $ 368,519 $ 368,519 F/G2 Western Addition Transportation Plan Implementation (Pedestrian Lighting)1 Design $ 15,000 $ 45,000 $ 60,000 Western Addition Transportation Plan Implementation (Pedestrian Lighting)1, 3 Construction $ - $ 926,928 $ 926,928 Page Street Neighborway (Webster to Market) Construction $ 144,005 Design, $ 87,000 $ 413,000 $ 500,000 Joice Alley Lighting Improvements Construction Cash Flow Subtotal $ 500,000 $ 1,705,000 $ 1,285,519 $ 1,961,305 $ 633,000 $ - $ - $ 6,084,824 Cumulative Remaining Capacity $ 510,858 $ 582,849 $ 319,927 $ (656,540) $ (318,089) $ (318,089) $ (318,089) $ (318,089) Transit Reliability and Mobility Improvements Target Funds Available in Category $ 1,503,678 $ 2,643,321 $ 1,521,141 $ 1,464,971 $ 1,445,059 $ 8,578,170 Muni Metro Station Enhancements - Phase 1 Construction $ 1,232,658 $ 1,232,658 $ 2,465,316 Third Street Transit and Safety Improvements2 Construction $ 383,776 $ 383,776 Design, Transit Stop Signage Enhancement Program - Phase 1 $ 521,949 $ 521,949 $ 1,043,898 Construction Design, Transit Stop Signage Enhancement Program - Phase 2 $ 168,051 $ 128,051 $ 624,919 $ 100,000 $ 1,021,021 Construction L Taraval Improvement Project (Segment B – Sunset Boulevard to West Portal) Construction $ 1,832,080 $ 1,832,079 $ 3,664,159

Cash Flow Subtotal $ 1,232,658 $ 1,232,658 $ - $ 2,905,856 $ 2,482,079 $ 624,919 $ 100,000 $ 8,578,170 Cumulative Remaining Capacity $ 271,020 $ 1,681,682 $ 3,202,823 $ 1,761,939 $ 724,919 $ 100,000 $ 0 $ 0

Total Available Funds $ 4,778,633 $ 8,400,377 $ 4,834,131 $ 4,655,626 $ 4,592,346 $ 27,261,113 Total Cashflow $ 1,732,658 $ 2,937,658 $ 2,882,202 $ 7,760,973 $ 8,107,010 $ 3,260,612 $ 580,000 $ 27,261,113 Cumulative Remaining Capacity $ 3,045,975 $ 8,508,694 $ 10,460,623 $ 7,355,276 $ 3,840,612 $ 580,000 $ 0

P:\Prop AA\2 Strategic Plan\3 Living Project List\5-Year Project List 2017SP Page 2 of 2 Memorandum

AGENDA ITEM 7

DATE: September 3, 2020

TO: Transportation Authority Board

FROM: Anna LaForte – Deputy Director for Policy and Programming

SUBJECT: 9/22/2020 Board Meeting: Program $4,308,164 in Prop AA Vehicle Registration Fee Funds to Three Projects and Amend the 2017 Prop AA Strategic Plan

Information ☒ Action ☐ Fund Allocation RECOMMENDATION ☐ Program $4,308,164 in Prop AA Vehicle Registration Fee Funds to ☒ Fund Programming Three Projects: Policy/Legislation ☐ • San Francisco Municipal Transportation Agency’s Plan/Study (SFMTA’s) Page Street Neighborway (Webster to Market) ☐ Capital Project ($262,636) ☐ Oversight/Delivery • SFMTA’s L Taraval Improvement Project (Segment B – Sunset Boulevard to West Portal) ($3,664,159) Budget/Finance ☐ • San Francisco Public Works’ (SFPW’s) Joyce Alley Lighting Contract/Agreement ☐ Improvements ($500,000) Other: ☐ Amend the 2017 Prop AA Strategic Plan. ______SUMMARY

On June 26, 2020, we released a call for projects for an estimated $4.24 million in Prop AA funds available. By the July 31, 2020 deadline we received four requests totaling $6,376,795. Attachment 1 lists the requests, including a brief description and supervisorial district(s) for each project. Attachment 2 contains our programming recommendations for the $4,308,164 available for projects, which includes additional funds recently de-obligated from a project completed under budget. We are recommending full funding for SFPW’s Joyce Alley Lighting Improvements which has limited funding options and SFMTA’s L Taraval Improvement projects which was the highest scoring project in the Transit Reliability and Mobility Improvements category. We recommend partial funding from Prop AA for the Page Street Neighborway which can be fully funded with available Prop K funds. We are not recommending funding for BART’s New Generation Pneumatic Barrier Style Accessible Fare Gates project in order to fund higher scoring projects. The proposed 2017 Strategic Plan amendment would incorporate the recommended projects into the relevant Prop AA 5-Year prioritized program of projects (5YPP) as shown in Attachment 3.

Page 1 of 4 Agenda Item 7 Page 2 of 4

BACKGROUND In November 2010, San Francisco voters approved Prop AA, authorizing the Transportation Authority to collect an additional $10 vehicle registration fee on motor vehicles registered in San Francisco to fund transportation improvements in the following three categories, with revenues split as indicated by the percentages: Street Repair and Reconstruction – 50%, Pedestrian Safety – 25%, and Transit Reliability and Mobility Improvements – 25%. Given its small size – less than $5 million in annual revenues, one of Prop AA’s guiding principles is to focus on small, high-impact projects that will provide tangible benefits to the public in the short-term. Thus, Prop AA only funds design and construction phases of projects and places a strong emphasis on timely use of funds. Correspondingly, Prop AA Strategic Plan policies allow for periodic calls for projects to reprogram cost savings or funds from programmed projects that failed to request funds in a timely manner. The Prop AA Expenditure Plan requires development of a Strategic Plan to guide the implementation of the program and specifies that the Strategic Plan include a 5YPP for each of the Expenditure Plan categories as a prerequisite for allocation of funds. The intent of the 5YPP requirement is to provide the Board, the public, and Prop AA project sponsors with a clear understanding of how projects are prioritized for funding.

DISCUSSION Call for Projects and Funds Available. In June 2020 we provided an update to the Board on available Prop AA funds, primarily due to the SFMTA ‘cancelling’ Phase 2 of the Muni Metro Station Enhancements project, freeing up $3,503,099 in Prop AA funds from the Transit Reliability and Mobility Improvement for other eligible projects. Phase 1 of this project, also funded with Prop AA funds, is experiencing significant delays due to difficulties coordinating with active rail operations at the platforms, inadequate documentation of existing “as-built” station conditions, and a slower than anticipated process for obtaining permits from BART to conduct the work. SFMTA has put Phase 2 on hold to make Prop AA transit funds available for higher priority projects that are ready-to-go during the current 2017 Prop AA Strategic Plan period. Additional available funds consist of de-obligated funds from projects completed under budget, higher than anticipated revenues, and interest earnings. The Board approved an amendment to the 2017 Prop AA Strategic Plan to update the fiscal year of programming for several delayed projects, however, the Board did not approve an amendment for SFMTA’s Bulb-outs at WalkFirst Locations project due to concerns over ongoing project delivery delays, resulting in $500,000 in funds in the Pedestrian Safety category being made available for reprogramming. As noted above, in June we issued a call for projects for approximately $4.24 million in Prop AA funds and by the July 31, 2020 deadline we had received four applications requesting $6,376,795 in Prop AA funds. Attachment 1 summarizes the applications received with additional detail in the enclosed (for projects recommended to receive funds) and attached (for project not recommended to receive funds) Project Information Forms. Agenda Item 7 Page 3 of 4

Subsequently, we were able to supplement the funds available with $63,280 de-obligated from SFMTA’s Webster Street Pedestrian Countdown Signals project, which was completed under budget. Table 1 below summarizes Prop AA funds available for this call for projects.

Table 1. Prop AA Funds Available for Projects

Initial Funds Available (from Canceled Projects, Projects $4,244,884 Unable to Meet Timely Use of Funds Requirements, Projects Completed Under Budget, and Interest Earnings) Additional Funds De-obligated from Project Completed $63,280 Under Budget Total Available for Projects $4,308,164

Project Evaluation Process. We developed the draft programming recommendation based upon project information submitted in response to the Prop AA call for projects, application of the Board-adopted prioritization criteria, and follow-up communications with sponsors to clarify and seek additional project information as needed. We first screened project submissions for eligibility and determined that all four projects were eligible for Prop AA funding. We then evaluated the projects using program-wide prioritization criteria such as project readiness, community support, and construction coordination opportunities, and category specific criteria such as whether projects seeking funds from the Pedestrian Safety category are located on the High Injury Network or directly improve access to transit, schools, and/or Communities of Concern. Draft Recommendations. Our recommendation is to fully fund two projects and partially fund one project, as summarized in Attachment 2. We are not recommending Prop AA funds for BART’s New Generation Pneumatic Barrier Style Accessible Fare Gates, which was the lowest scoring application in the Transit Reliability and Mobility Improvement category. The main factors contributing to the lower score as compared to the higher scoring L Taraval project, is it would not improve the speed or reliability of transit service, was not being actively coordinated with other construction projects, and would not address a documented safety issue. Also, the L Taraval project is ready to advertise in Fall 2020, while the BART Fare Gate project will not be ready to go to construction until late in FY 21/22. Prop AA Strategic Plan Amendment. The proposed Strategic Plan amendment would add the three projects recommended for funding to the 2017 Strategic Plan. Attachment 4 shows what the amended 2017 Prop AA Strategic Plan Programming and Allocations would look like if the proposed recommendations are approved. Pending Allocation Request for L Taraval Project. Given the urgency of the construction schedule for the L Taraval project, SFMTA has requested that the Transportation Authority consider allocating the recommended Prop AA funds to the L Taraval project at the same meeting as the Board approves the programming. SFMTA’s allocation request for Prop AA funds and additional Prop K funds programmed to the project is included as a separate agenda item at the September 15 Transportation Authority Board meeting. The staff recommendation is conditioned upon Board approval of the subject Prop AA programming. Agenda Item 7 Page 4 of 4

FINANCIAL IMPACT There are no impacts to the Transportation Authority’s proposed Fiscal Year 2020/21 budget associated with the recommended action. Allocations of Prop AA funds are the subject of separate Board actions.

CAC POSITION The Citizens Advisory Committee considered this item at its September 2, 2020 meeting and unanimously adopted a motion of support for adoption of the final report.

SUPPLEMENTAL MATERIALS • Attachment 1 – Summary of Applications Received • Attachment 2 – Draft Recommendations • Attachment 3 – Proposed 2017 Prop AA Strategic Plan Amendment • Attachment 4 – Project Information Form: BART’s New Generation Pneumatic Barrier Style Accessible Fare Gates • Enclosure – Project Information Forms (3) Attachment 4 Prop AA Vehicle Registration Fee Project Information Form

Project Name: New Generation Pneumatic Barrier Style Accessible Fare Gates (Transit Reliability and Mobility Improvement) Implementing Agency: San Francisco District (BART) Project Location: Stations: Embarcadero, Montgomery Street, Powell Street, Civic Center/UN Plaza, 16th Street Mission, 24th Street Mission, Glen Park, Balboa Park, Daly City Number of Stations: 9 Number of Accessible Fare Gates: 20 Supervisorial District(s): 3, 6, 8, 9, 11 Project Manager (name, phone, email) Debanjan Chakraborty, 510-464-6844, [email protected]

Brief Project Description for MyStreetSF (50 words BART seeks Prop AA funds to design, construct, install, and deploy New Generation Pneumatic Barrier Style max): Accessible Fare Gates (AFGs). The project will retrofit 20 AFGs located at San Francisco stations and the . The new AFGs will increase access and connectivity for community members living, working, and/or visiting San Francisco. The project is part of BART's Station Accessibility Improvement Program, listed in FY 2019 Short Range Transit Plan/Capital Improvement Program.

Detailed Scope (may attach Word document): Please Please see Attachment A. describe the project scope, benefits, coordination with other projects in the area (e.g. paving, MuniForward, Vision Zero), and how the project would meet the Prop AA screening and prioritization criteria as well as other program goals (e.g., short-term project delivery to bring tangible benefits to the public quickly). Please describe how this project was prioritized. Please attach maps, drawings, photos of current conditions, etc. to support understanding of the project.

Describe Benefits to Communities of The project is expected to increase transit accessibility and connectivity for community members who live in a Concern and Disadvantaged Populations Community of Concern. Multiple BART stations, located in the City and County of San Francisco and in Daly City, are within the Community of Concern areas (per SFCTA's 2017 Supplemental Communities of Concern/ MTC's 2017 Communties of Concern Map). The project will also directly benefit disadvantaged populations and provides a fair geographic distribution of services. The New Generation Pneumatic Swing Style Barrier Accessible Fare Gates will benefit anyone who needs additional space and time to tag their Clipper card and pass through. These benefits are particularly important for people with disabilities and seniors. The Civic Center and Powell Street stations, for example, serve an area with 23% to 42% of people with disabilities. The new AFGs will be safer and provide a better customer experience. The customer experience will be improved as the advance sensor technology will recognize movements, including from animate objects like guide dogs, and provide adequate time to transition through the gate.

Prior Community Engagement/Support (may attach Word document): Please reference any community Please see Attachment A, pg. 5. outreach that has occurred and whether the project is included in any plans (e.g. neighborhood transportation plan, corridor improvement study, station area plans, etc.). Partner Agencies: Please list partner agencies and identify BART anticipates coordination efforts with the San Francisco Municipal Transportation Agency. These a staff contact at each agency. efforts will be based on the condition of each site and if any infrastructure changes are needed. Type of Environmental Clearance: Categorically exempt

Project Delivery Milestones Status Work Start Date End Date Phase* % Complete as In-house, Contracted, Month Calendar Month Calendar of 7/1/20 or Both Year Year Planning/Conceptual Engineering (typically 30% design) 80% Both Apr-Jun 2020 Jan-Mar 2021

Environmental Studies (PA&ED) N/A Design Engineering (PS&E) 0% Both Apr-Jun 2021 Oct-Dec 2021 Right-of-Way N/A Advertise Construction 0% N/A Jan-Mar 2022 N/A N/A Start Construction (e.g. Award Contract) 0% Both Apr-Jun 2022 N/A N/A Open for Use N/A N/A N/A Jan-Mar 2024 *Only design engineering (PS&E) and construction (including related procurement) phases are eligible for Prop AA funds.

Page 1 of 2 Attachment A

New Generation Pneumatic Swing Style Barrier Accessible Fare Gates The San Francisco Bay Area Rapid Transit District (BART) seeks Prop AA funds for New Generation Pneumatic Swing Style Barrier Accessible Fare Gates. This is a small but high impact project that will provide immediate tangible benefits to the public. The overall project scope is described below: Scope of Work The scope of work includes designing, constructing, and installing New Generation Pneumatic Swing Style Barrier Accessible Fare Gates (AFGs). These AFGs will be based on a design approved by the BART Board of Directors in September 2019. The new design, developed by BART engineers, removes dependency on a single vendor which offers BART more control over the installation schedule. The project will retrofit all existing AFGs located at BART stations in the City and County of San Francisco (CCSF) and at the Daly City Station, a total of 9 stations and 20 AFGs. The new AFGs will incorporate advanced sensor technology that will be operated by air pressure, utilizing fewer moving parts than the current motorized fare gate system. Project Location

Station # of AFGs Station ID

Embarcadero 3 M16

Montgomery Street 4 M20

Powell Street 3 M30

UN Plaza/Civic Center 2 M40 16th Street Mission 1 M50 24th Street Mission 2 M60 Glen Park 1 M70 Balboa Park 3 M80 Daly City 1 M90 Total 20

July 2020 | 1 Project Design The design of current and new AFGs is shown below. The new AFGs will provide customers additional space and time to tag their Clipper card and pass through. This new technology will improve accessibility and connectivity for people who live, work and/or visit San Francisco.

Current AFG located at Montgomery Station, ID M20, Elevator Platform

July 2020 | 2 Design of New Generation Accessible Swing Style Fare Gate

New AFG Installed at BART's Richmond Station

July 2020 | 3 Impact The New AFGs in San Francisco and at the Daly City Station are expected to have significant impact, especially for community members with disabilities and those who need additional space when going through the gates, e.g., people traveling with strollers, walkers, pets, or luggage. These stations serve millions of community members from the region as they are located in a key regional area of employment. In 2019 alone, AFGs at the nine stations recorded 2,300,000 entries and 2,340,000 exits (based on annual ridership data). Given that San Francisco is a popular tourist location, many people using the stations are also tourists. Based on daily ridership data from FY18-19 and FY19-20, the average overall exit count, for all faregates, at the nine stations was as follows:

Station FY18 FY19 Embarcadero 47,887 48,569 Montgomery Street 45,541 45,842 Powell Street 26,629 25,980 UN Plaza/Civic Center 22,812 22,700 16th Street Mission 12,196 12,411 24th Street Mission 11,983 11,922 Glen Park 7,111 7,123 Balboa Park 9880 10,101 Daly City 9197 9,299

Prioritization In September 2019, the BART Board of Directors voted unanimously to adopt the New Pneumatic Swing Style Barrier fare gate design as the new standard for new fare gates. A variety of designs were considered and rated based on reliability, maintainability, throughput capacity, effectiveness against fare evasion, appearance, and ability to easily integrate with Clipper. This project is under BART's Station Accessibility Improvement Program and it is listed in BART's Fiscal Year 2019 Short Range Transit Plan/Capital Improvement Program (SRTP/CIP). The SRTP/CIP summarizes BART’s operating financial plan for the period FY19-FY28 and capital financial plan for the period FY19-FY33. BART’s operating and capital plans are driven by the BART Strategic Plan Framework. The Station Accessibility Improvement Program invests in projects to bring original BART facilities into compliance with current accessibility rules and to implement a program of investments to improve accessibility above what the Americans with Disabilities Act requires. Projects Include installation of new accessible faregates, improved accessible signage, and improved navigation systems for people who have vision impairments.

July 2020 | 4 Community Engagement and Support. On July 23, 2020, the Project team conducted a presentation for BART's Accessibility Task Force (BATF) to provide an overview, and obtain feedback, regarding the AFG deployed at BART's Richmond Station. The BATF advises the BART Board of Directors and staff on disability-related issues and advocates on behalf of people with disabilities and seniors to make the BART system accessible to and useable by people regardless of disability or age. BATF members provided very positive feedback regarding the new AFG. Mr. Roland Wong, an BATF member, stated that his "experience was positive and [he] had no problems entering and exiting the swing gates." He also stated that the "faregates did not make loud noises and were quiet." A copy of the presentation, and a copy of a test performed by Mr. Roland, are attached, see Attachment C and video file.

Maintenance Commitment Fare gates require recurrent maintenance to remain reliable and operational. BART's Maintenance and Engineering Department ensure AFGs are in optimum condition with its preventive maintenance practices. The AFGs undergo preventive maintenance every ten weeks. Corrective maintenance is also conducted when AFGs are underperforming. Currently, BART receives an average of 2,000 annual requests/tickets to address AFG performance. BART regularly deploys technicians to address corrective maintenance tasks and ensure fare gates perform at their optimum capacity. In order to minimize corrective maintenance, BART has been dedicating $120,000 to preventive maintenance tasks. The BART Maintenance and Engineering Department is committed to ensuring that the New Generation Accessible Swing Style Fare Gates perform at their optimum level. A Maintenance Assurance Commitment Letter is attached, See Attachment B.

July 2020 | 5 Prop AA Vehicle Registration Fee Project Information Form

Project Name: n Pneumatic Barrier Style Accessible Fare Gates (Transit Reliability and Mobility

PROJECT COST ESTIMATE Funding Source by Phase Phase Cost Prop AA Prop K Other Source of Cost Estimate Planning/Conceptual Engineering $200,000 N/A $200,000 FY 19 FTA Environmental Studies (PA&ED) $0 N/A Design Engineering (PS&E) $600,000 $450,000 $150,000 FY 19 FTA Right-of-Way $0 N/A Construction $1,800,000 $1,500,000 $300,000 FY 19 FTA TOTAL PROJECT COST $2,600,000 $1,950,000 $0 $650,000 Percent of Total 75% 0% 25% PROP AA EXPENDITURES BY FISCAL YEAR (CASH FLOW)*

20/21 21/22 22/23 23/24 24/25 Total

Design Engineering (PS&E) $250,000 $200,000 $450,000 Construction $400,000 $700,000 $400,000 $1,500,000 TOTAL BY FISCAL YEAR $250,000 $600,000 $700,000 $400,000 $0 $1,950,000 *This call for project will program funds in FYs 2020/21 and 2021/22. Cash flow can extend beyond this period.

FUNDING PLAN FOR ALL PHASES - ALL SOURCES Desired Prop AA Funding Source Planned Programmed Allocated TOTAL Programming Year Prop AA $1,950,000 $1,950,000 Fiscal Year 2021/22 FTA $0 $0 $650,000 $650,000 Source 2 $0 TOTAL $1,950,000 $0 $650,000 $2,600,000

Comments/Concerns

Page 1 of 1 Attachment B SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT 300 Lakeside Drive, P.O. Box 12688 Oakland, CA 94604-2688 (510) 464-6000

2020

Maintenance Assurance Commitment Letter Lateefah Simon PRESIDENT

Mark Foley July 30, 2020 VICE PRESIDENT

Robert Powers GENERAL MANAGER San Francisco County Transportation Authority 1455 Market Street, 22nd Floor DIRECTORS San Francisco, CA 94103

Debora Allen 1ST DISTRICT

Mark Foley Dear Review Committee, 2ND DISTRICT

Rebecca Saltzman 3RD DISTRICT This is to confirm that the San Francisco Bay Area Rapid Transit District (BART) is Robert Raburn, Ph.D. committed to perform the necessary maintenance for the entire useful life of the New Swing 4TH DISTRICT Style Accessible Fare Gates in San Francisco and the Daly City Station. The BART Annual John McPartland Operating Budget provides funding which will allow maintenance to occur, as needed, to 5TH DISTRICT ensure the new fare gates remain operational. Elizabeth Ames 6TH DISTRICT Department responsible for the maintenance: BART’s Maintenance and Engineering Lateefah Simon 7TH DISTRICT

Janice Li Maintenance task(s): on-going preventative maintenance and as needed corrective 8TH DISTRICT maintenance Bevan Dufty 9TH DISTRICT Maintenance schedule: preventive maintenance is performed every ten weeks

Cost of maintenance: $120,000 annually

Estimated useful life: 15 years

Please contact Debanjan Chakraborty, Project Manager, at (510) 464-6844, if you have any questions.

Sincerely,

G. J. Lombardi ______. Greg Lombardi Assistant Chief Maintenance & Engineering Officer

www.bart.gov Attachment C Richmond Accessible Fare Gate

Engineering Started: November 2019 Pilot Installed in Richmond: May 2020 Features of the Gate: - Swing Gate - Clear doors - Light Sensors - Air pressure instead of electric motor

1 Deployment Schedule New Accessible Gates

. Coliseum - 1 gate at the elevator – Sept 2020 . Montgomery - 1 gate at the elevator – Oct 2020 . Concord - 2 gates – Dec 2020

2 Under Evaluation - New Sensors

Types ofFare Sensors Gate SensorsBenefits

. Ultrasonic . Increased range – Up to 5 feet range approaching gate . . Infrared Better characterization – Wheelchair, dogs, people . Better detection . Thermal – Gates less likely to close on patrons and their belongings