Table 1 - Queensland's Northern Australia Roads Programme

Total Page:16

File Type:pdf, Size:1020Kb

Table 1 - Queensland's Northern Australia Roads Programme Table 1 - Queensland's Northern Australia Roads Programme II Project/package name National Land Transport Network • National Land Transport Network: Road Renewal 50.0 • Flinders Highway (Townsville- Torrens Creek): Pavement strengthening and rehabilitation (Package 1) 17.0 • Flinders Highway (Townsville - Charters Towers): Overtaking lanes 15.0 • Flinders Highway (Townsville - Charters Towers): Heavy Vehicle Safety and Productivity Package 5.0 • Flinders Highway (Charters Towers - Richmond): Culvert upgrades (Package 1) 25.0 • Flinders Highway (Hughenden - Cloncurry): Pavement widening and strengthening (Package 2) 30.0 • Barkly Highway (Cloncurry- Mount Isa): Intersection upgrades in Mount Isa urban area 6.2 • Landsborough Highway (Barcaldine - Cloncurry): Heavy vehicle rest areas and stopping places 5.0 • Landsborough Highway (Longreach - Winton): Pavement widening and strengthening 25.0 Other nationally-accredited Key Freight Routes • Peak Downs Highway (Clermont- Nebo): Logan Creek to Nine Mile Creek - Pavement widening and 35.0 strengthening • Capricorn Highway Duplication - Rockhampton to Gracemere 75.0 • Capricorn Highway (Rockhampton - Duaringa): Valentine Creek bridge upgrade 5.6 • Capricorn Highway (Rockhampton - Emerald): Overtaking lanes 19.0 • Capricorn Highway (Duaringa - Emerald): Gregory Highway eastern intersection upgrade 4.2 • Gregory Developmental Road (Belyando Crossing - Charter Towers): Cape River bridge upgrade 34.6 • Gregory Developmental Road (Belyando Crossing -Charter Towers): Pavement widening 36.0 •Other higher-order state-controlled roads Gregory Developmental Road (Charters Towers - The Lynd): Pavement widening 47.0 • Gulf Developmental Road (East of Mount Surprise - Normanton): Pavement widening (Package 1) 10.0 • Burke and Karumba Developmental Roads (Cloncurry - Karumba): Pavement widening (Package 1) 9.3 •Road Network Upgrades in Regional Centres Ill Cairns (Cairns Western Arterial): Bill Fulton bridge duplication 35.7 Cairns (Captain Cook Highway): Cairns Airport Access upgrade 6.0 • Townsville (Garbutt- Upper Ross) : Riverway Drive duplication (Allambie Lane- Gollogly Lane) 25.0 • Rockhampton (Bajool - Port Alma Road): Pavement widening port access road 14.5 •Other state-controlled roads Kennedy Developmental Road (Mount Garnet - The Lynd): Pavement widening 2.5 • Kennedy Developmental Road (The Lynd - Hughenden): Progressive sealing 50.0 61 .
Recommended publications
  • Queensland Transport and Roads Investment Program for 2021–22 to 2024-25: Far North
    Far North 272,216 km2 Area covered by location1 5.68% Population of Queensland1 2,939 km Other state-controlled road network 217 km National Land Transport Network2 211 km National rail network See references section (notes for map pages) for further details on footnotes. Cairns Office 15 Lake Street | Cairns | Qld 4870 PO Box 6185 | Cairns | Qld 4870 (07) 4045 7144 | [email protected] • continue construction of road safety improvements on • commence installation of new Intelligent Transport Program Highlights Gillies Range Road Systems on the Kuranda Range section of Kennedy Highway, jointly funded by the Australian Government • commence construction of the Bruce Highway – Cairns and Queensland Government as part of the COVID-19 In 2020–21 we completed: Southern Access Cycleway, jointly funded by the economic recovery response Australian Government and Queensland Government • completed paving and sealing paving of a section of • commence early works on the Cairns Ring Road (CBD Peninsula Development Road at Fairview (Part B) • continue design of a flood immunity upgrade on the to Smithfield) project, jointly funded by the Australian Bruce Highway at Dallachy Road, jointly funded by the Government and Queensland Government • an upgrade of the Clump Point boating infrastructure at Australian Government and Queensland Government Mission Beach • commence upgrade of the culvert at Parker Creek • continue construction of a new overtaking lane on Crossing on Captain Cook Highway, Mossman, as part • construction of the Harley Street
    [Show full text]
  • Queensland Transport and Roads Investment Program (QTRIP) 2016-17 to 2019-20
    Far North Far North | Map and Contact Details Cairns office Floor 4, Cairns Corporate Tower | 15 Lake Street | Cairns | Qld 4870 PO Box 6185 | Cairns | Qld 4870 (07) 4050 7144 | [email protected] Divider Image: Gravel laid on wet bitumen at Sorayas Hill on the Peninsula Developmental Road, part of the Cape York Region Package. Copyright © 2015 Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Far North Overview In 2016-17 we will: • Complete paving and sealing sections of the Peninsula Developmental Road at Coen South, Musgrave, between The Far North District covers an area of about 273,158km2, • Progressively seal sections of the Kennedy Archer and Wolverton, and between Little Laura and or around 15.8% of Queensland1. It extends from the Torres Developmental Road (The Lynd-Hughenden), known Fairview, through the Cape York Region Package, jointly Strait Islands in the north to the top of the Cardwell Range locally as the Hann Highway, which is currently funded by the Australian Government and Queensland in the south, and from Cairns in the east to Croydon in the reporting under North West District. As the Hann Government. west. Highway spans both Far North District and North West District, project funding may be allocated to Far North • Install variable message signs on the Kuranda Range The district has an estimated residential population of about District when scope and costings have been finalised. Road section of the Kennedy Highway. 272,609 or around 5.9% of Queensland’s total population1. • Complete widening and sealing of various sections of • Commence a package of works to improve safety at The district looks after about 2,941km of other state- the Gulf Developmental Road between Croydon and priority intersections on the Atherton Tablelands, under controlled road and about 217km of the National Land Georgetown, near Forsayth, funded by the Queensland the Queensland Government’s Safer Roads Sooner Transport Network.
    [Show full text]
  • Capricorn Highway (Rockhampton to Emerald)
    Notification of works Road reconstruction – Fitzroy Capricorn Highway – Rockhampton to Emerald Rockhampton Emerald Gracemere Blackwater Stanwell Comet Bluff Kabra Dingo Westwood Gogango Kalapa Capric orn Duaringa Mount High way Morgan Milroy Downs Wooroonah Reconstruction works are taking place on the Capricorn Highway between Rockhampton and Emerald. Length of Multiple sites along the 270 kilometre section Key information road being of highway. reconstructed • Reconstruction works have commenced on the Capricorn Highway between Rockhampton and Emerald. Reconstruction works to sealed pavements Works involved including repairs, pavement replacement, • Multiple sections of road will be reconstructed along this 270 stabilisation and bitumen resurfacing. kilometre section of the Capricorn Highway. Duration of works June 2011 to 2013 (weather permitting). Traffic conditions Possible delays Of up to 15 minutes at each worksite. The safety of motorists and road workers is the number one priority Generally 6 am – 6 pm weekdays with some Hours of work when delivering these works. Traffic lights, traffic controllers, single lane weekend and out-of-hours work also possible. closures and speed restrictions will be used at worksites. Motorists should drive to the changed conditions and obey all signage The project for their own safety and the safety of road workers. Operation Queenslander is the largest reconstruction effort in Delays can be expected as this work is undertaken and motorists Queensland’s history, rebuilding communities, fixing infrastructure and should plan their journey. restoring regional economies. Motorists are asked for their patience while these important repairs take Queensland’s road network received more damage than any other state place and to check www.131940.qld.gov.au before travelling.
    [Show full text]
  • Subsoil Dispersibility
    Map design and production by the Land and Spatial Information Group, Landcentre, Department of Natural Resources and Mines. © The State of Queensland (Department of Natural Resources and Mines) {2017} Disclaimer: While every care is taken to ensure the accuracy of this product, the Department of Natural Resources and Mines makes no representations or warranties about its accuracy, reliability, completeness or suitability any particular purpose and disclaims all responsibility Workspace - \\LSIFILE1\Project\CMS\Client_Mapping\CMS_jobs\CM193 and all liability (including without limitation, liability in negligence) for all expenses, losses, damages (including indirect or consequential damage) and costs which you might incur as a result of the product being inaccurate or incomplete in any way and for any reason. 147° E 148° E 149° E 150° E 151° E Sarina Bruce Highway FFitzroyitzroy NNRMRM RRegionegion SSubsoilubsoil DDispersibilityispersibility Nebo PProducedroduced bbyy SSoiloil aandnd LLandand RResources,esources, Marlborough Sarina Road DDSITISITI 22° S 22° S Moranbah Isaac River Peak Downs Highway Connors River Dysart Bruce Highway Middlemount Clermont Marlborough 23° S 23° S Capella Fitzroy River Gregory Highway Yeppoon Mackenzie River Rockhampton Emerald Blackwater Capricorn Highway Nogoa River Mount Morgan Bruce Highway Lake Maraboon Comet River Gladstone Tannum Sands 24° S 24° S Springsure Woorabinda Lake Burnett Highway Awoonga Lake Callide Biloela Rolleston Lake Dawson Highway Kroombit Dawson Highway Moura Carnarvon Highway Theodore
    [Show full text]
  • Peak Downs Highway – Walkerston to Moranbah
    Road reconstruction – Mackay/Whitsunday Region Peak Downs Highway – Walkerston to Moranbah Package overview Traffic conditions The Department of Transport and Main Roads is The department will make every reconstructing over 40 kilometres of the Peak Downs effort during construction to minimise Highway between Walkerston and Moranbah as part of delays to motorists and appreciates your Operation Queenslander. patience while these essential works are completed. Reconstruction works will be progressively undertaken at The safety of motorists and roadworkers is the number multiple sections of the highway from April 2012, weather one priority when delivering these works. Traffic lights, permitting. traffic controllers, single lane closures and speed Operation Queenslander is the largest reconstruction restrictions will be used at worksites. effort in Queensland’s history as part of the joint federal Motorists should drive to the changed conditions and and state-government funded Natural Disaster Relief obey all signage for their own safety and the safety of and Recovery Arrangements (NDRRA). Under these road workers. arrangements, the Australian Government provides 75% of To assist you to plan your travels please check the funding, with 25% from the Queensland Government. www.131940.qld.gov.au before travelling. Key information Works involved Reconstruction works to sealed pavements including Farleigh repairs, pavement replacement, Marian stabilisation, widening and bitumen Mackay resurfacing. Walkerston Eton Possible delays Up to 15 minutes
    [Show full text]
  • Capital Statement Budget Paper No.3 3 Budget.Qld.Gov.Au Queensland Budget 2021–22 Budget Queensland Capital Statement Budget Paper No
    Queensland Budget Budget Queensland QUEENSLAND BUDGET 2021–22 2021 – 22 Capital Statement Statement Capital CAPITAL STATEMENT Budget Paper No. Paper Budget BUDGET PAPER NO. 3 3 Queensland Budget 2021–22 Capital Statement Budget Paper No.3 budget.qld.gov.au budget.qld.gov.au 21-050_Budget 2021-22 _A4_Core Paper_Cover.indd 5 7/6/21 3:44 pm 2021–22 Queensland Budget Papers 1. Budget Speech 2. Budget Strategy and Outlook 3. Capital Statement Service Delivery Statements Appropriation Bills Budget Highlights Regional Action Plans The budget papers are available online at budget.qld.gov.au © The State of Queensland (Queensland Treasury) 2021 Copyright This publication is protected by the Copyright Act 1968 Licence This document is licensed by the State of Queensland (Queensland Treasury) under a Creative Commons Attribution (CC BY 4.0) International licence. In essence, you are free to copy, communicate and adapt this publication, as long as you attribute the work to the State of Queensland (Queensland Treasury). To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ Attribution Content from this publication should be attributed to: © The State of Queensland (Queensland Treasury) - 2021–22 Queensland Budget Translating and interpreting assistance The Queensland Government is committed to providing accessible services to Queenslanders from all cultural and linguistic backgrounds. If you have difficulty in understanding this publication, you can contact us on telephone (07) 3035 3503 and we will arrange an interpreter to effectively communicate the report to you. Capital Statement Budget Paper No. 3 ISSN 1445-4890 (Print) ISSN 1445-4904 (Online) Queensland Budget 2021–22 Capital Statement Budget Paper No.3 21-050_Budget 2021-22 _A4_Core Paper_Cover.indd 6 7/6/21 3:44 pm Capital Statement 2021–22 State Budget 2021–22 Capital Statement Budget Paper No.
    [Show full text]
  • Renewable Energy Industry Profile Townsville & Dry Tropics 2018
    RENEWABLE ENERGY INDUSTRY PROFILE TOWNSVILLE & DRY TROPICS 2018 For decades, north Queensland has relied on electricity generated in the south-east of the state – but now the picture is starting to change. Three new solar farms have been switched on it to the rest of the state. If all proceed, they in the Townsville & Dry Tropics region1 this year, could generate more than 15% of Queensland’s and another 12 large power plants – driven current electricity needs. by the wind, sun and water – are planned or under construction. This renewable energy boom is already creating new jobs, supporting local businesses and These clean energy projects will be able to providing benefits for local communities. provide electricity for the local area and export As the sunniest city on Australia’s east coast, Townsville is poised to become Queensland’s renewable energy capital. The Townsville & Dry Tropics region is blessed with an years to come, north Queensland could even export abundance of solar, wind, hydro and biomass resources, electricity to neighbouring countries. which can be sustainably harnessed to generate The map at right provides a current snapshot of the affordable clean energy. region’s large-scale renewable energy industry. It shows The area has some of the best solar energy resources in known renewable energy projects that are already the world, and solar farms here generate 25-50% more operating, under construction or currently being electricity per unit than most other countries. This gives planned. We can expect to see many more projects like us a competitive advantage on the world stage, so in these proposed in the future.
    [Show full text]
  • Traffic and Transport Byerwen Coal Project Chapter 27 – Traffic and Transport
    Chapter 27 Traffic and Transport Byerwen Coal Project Chapter 27 – Traffic and Transport TABLE OF CONTENTS 27. Traffic and Transport..................................................................... 27-1 27.1 Introduction.....................................................................................................27-1 27.2 Scope of the Assessment ..................................................................................27-1 27.3 Consultation ....................................................................................................27-2 27.4 Existing Road Infrastructure..............................................................................27-3 27.4.1 Road Network Proposed for Use.............................................................................. 27-3 27.4.2 Scheduled Road Improvement Projects................................................................... 27-7 27.5 Current Road Use .............................................................................................27-7 27.5.1 Forecast Traffic Volumes.......................................................................................... 27-9 27.5.2 Existing Road Crash Data.......................................................................................... 27-9 27.5.3 Road Rest Areas ..................................................................................................... 27-11 27.5.4 Public Transport ..................................................................................................... 27-11 27.6
    [Show full text]
  • Factsheet 19 – Why Are Dinosaur Fossils Being Found in the Outback?
    Factsheet 19 – Why are dinosaur fossils being found in the Outback? Quirky fact : Australian Curriculum Links Year Subject Curriculum Links The Muttaburrasaurus 5 Science ACSHE081 was the first dinosaur 6 Science ACSSU094, ACSHE098 in Australia to be 7 Science ACSSU111, ACSHE119 cast and mounted 8 Geography ACHGK050 on display. Science ACSSU153, ACSHE134 Background Information Sauropods The discovery of dinosaur remains dates back to 1865 when Sauropods are very large plant-eating dinosaurs with long James Sutherland unearthed an ichthyosaurus on the Flinders necks and tails. Since 1932, the fossil bones of several River. The pieces of vertebrae were sent to the Museum of individual sauropods have been found in the Flinders region Victoria where their discovery was briefly noted in 1867. While of Queensland. They probably belonged to Austrosaurus. waiting on the museum’s findings, Sutherland continued to The remains of an Austrosaurus Mckillopi were discovered uncover a more complete specimen, including a skull and by the McKillop family on Clutha Station west of Richmond, many more vertebrae. Again, these were sent to Melbourne in 1932, and were dated to be 100 million years old. Half of for further study. Despite a second paper in 1869 describing a cervical (neck) vertebra from another sauropod was found the new material, it was not until 1984 that Dr Mary Wade of the Queensland Museum published the finding of two skulls near Hughenden. It is similar to the vertebra of Brachiosaurus, present in the material. Other palaeontology discoveries in a huge sauropod with long forelegs found in Africa and the area include: North America.
    [Show full text]
  • Far North Queensland Regional Organisation of Councils
    Far North Queensland Regional Organisation of Councils Our Ref: #6177508 6 September 2019 Committee Secretariat Select Committee on the Effectiveness of the Australian Government’s Northern Australia Agenda Via: online portal. Dear Sir/Madam Select Committee on the Effectiveness of the Australian Government’s Northern Australia Agenda The Far North Queensland Regional Organisation of Councils (FNQROC) was established in the 1980’s and represents 13 member councils from Hinchinbrook, north to Cook and west to Carpentaria in far north Queensland. The FNQROC region is the largest and fastest growing region in Northern Australia. It extends over 320,000 square kilometres with a population of approximately 276,000 and a gross regional product (GRP) of $15.15 billion. Further details can be found on our website at www.fnqroc.qld.gov.au. Thank you for the opportunity to provide comments on the effectiveness of the objectives, design, implementation and evaluation of the Australian Government’s Northern Australia agenda. The agenda is about unlocking the region’s full economic potential as a gateway to global markets, a source of rich resources and a home to pristine environments. There is a 20-year plan for investment and support to grow the north through 6 key pillars: 1. A trade and investment gateway 2. A more diversified northern economy 3. Indigenous entrepreneurship and businesses 4. World-class infrastructure 5. Water infrastructure investment, and 6. Research and innovation. The terms of reference for the select committee is to inquire into and report on the effectiveness of the objectives, design, implementation and evaluation of the Australian Governments Northern Australia Agenda with particular reference to: a.
    [Show full text]
  • Fitzroy Fitzroy | Map and Contact Details
    Fitzroy Fitzroy | Map and Contact Details Rockhampton office 31 Knight Street | North Rockhampton | Qld 4702 PO Box 5096 | Red Hill Rockhampton | Qld 4702 (07) 4931 1500 | [email protected] Divider Image: Yeppen Roundabout at the Bruce Highway and Capricorn Highway intersection near Rockhampton. Copyright © 2015 Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Fitzroy Overview • Construction of overtaking lanes on the Bruce Highway the Heavy Vehicle Safety and Productivity Programme, between Benaraby and Calliope, south of Gingerbeer jointly funded by the Australian Government and The Fitzroy District covers an area of about 117,813km2, Creek, funded by the Australian Government. Queensland Government. or around 6.8% of Queensland1. It extends from north of Capella to south of Taroom, and from Gladstone in the In 2016-17 we will: • Commence upgrading two intersections on the east to west of Emerald. Gregory Highway, at Cotherstone Road and Retro Corry • Continue widening various sections of the Burnett Road, north of Emerald, to cater for Type 2 road trains, The district has an estimated residential population of about Highway, between Monto and Biloela. jointly funded by the Australian Government and 229,483 or around 4.9% of Queensland’s total population1. Queensland Government. • Commence the Rockhampton Road Train Access The district looks after about 3,163km of other state- Stage One project, to provide road train access and • Commence construction of overtaking lanes on a controlled roads and about 366km of the National Land intersection upgrades on Rockhampton-Yeppoon Road, section of the Capricorn Highway, 6km east of Duaringa.
    [Show full text]
  • View Timetables
    Eective from: 15th June 2020 Eective from: 15th June 2020 Eective from: 15th June 2020 Eective from: 15th June 2020 Brisbane Coach Terminal, Parklands Cres adj to platform 10 Roma St Mount Isa Outback at Isa Centre, 19 Marian Street Ipswich Bus Stop A, Bell Street, Ipswich Cloncurry Flinders Medical Centre, 27 Ramsey Street Haigslea Sundowner Hotel on Service Road Cloncurry (Meal Stop) Puma Service Station, Ramsey Street Minden Crossroads Crossroads on Warrego Highway, near Barbs Kitchen Cloncurry (Meal Stop) Puma Service Station, Ramsey Street Plainlands Plainland Hotel Bus Stop on off ramp to Laidley McKinlay United Roadhouse, Landsborough Highway Gatton College Bus Shelter on Highway, after over pass Kynuna Kynuna Roadhouse, Landsborough Highway Gatton Railway Station, Crescent Street Winton (Meal Stop) Newsagent, 74 Elderslie Street Withcott Bus Shelter on Highway, Opposite Withcott Hotel Winton (Meal Stop) Newsagent, 74 Elderslie Street Toowoomba Bus Interchange (Bay 1), Neil Street Longreach Commercial Hotel, Cnr Eagle St and Duck St Toowoomba Depot Bus Queensland, 308 Taylor Street, Toowoomba Ilfracombe Opposite Ilfracombe Post Office, Landsborough Highway Oakey Railway Station Bus Shelter, Bridge Street Barcaldine Council Bus Stop, Opposite 133 Oak Street Jondaryan Cobb and Co Roadhouse, Duke Street Blackall (Meal Stop) BP Blackall, 10 Shamrock Street Dalby Shell Roadhouse, Cnr Drayton Street and Cunninham Street Blackall (Meal Stop) BP Blackall, 10 Shamrock Street Warra Cnr Warrego Highway and Raff St Tambo Post Office, Cnr Arthur
    [Show full text]