Croc's 05.Qxd
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
A Case of Mwanamugimu Nutrition Unit, Mulago National Referral
SIT Graduate Institute/SIT Study Abroad SIT Digital Collections Independent Study Project (ISP) Collection SIT Study Abroad Fall 2013 A Comparison of Malnutrition Causes and Treatments: A Case of Mwanamugimu Nutrition Unit, Mulago National Referral Hospital, Kampala District and Nakifuma Government Health Unit, Mukono District Berkley Singer SIT Study Abroad Follow this and additional works at: https://digitalcollections.sit.edu/isp_collection Part of the Community-Based Research Commons, Community Health and Preventive Medicine Commons, Family, Life Course, and Society Commons, Health Services Research Commons, Inequality and Stratification Commons, Maternal and Child Health Commons, Place and Environment Commons, and the Public Health Education and Promotion Commons Recommended Citation Singer, Berkley, "A Comparison of Malnutrition Causes and Treatments: A Case of Mwanamugimu Nutrition Unit, Mulago National Referral Hospital, Kampala District and Nakifuma Government Health Unit, Mukono District" (2013). Independent Study Project (ISP) Collection. 1693. https://digitalcollections.sit.edu/isp_collection/1693 This Unpublished Paper is brought to you for free and open access by the SIT Study Abroad at SIT Digital Collections. It has been accepted for inclusion in Independent Study Project (ISP) Collection by an authorized administrator of SIT Digital Collections. For more information, please contact [email protected]. A Comparison of Malnutrition Causes and Treatments: A Case of Mwanamugimu Nutrition Unit, Mulago National Referral Hospital, Kampala District and Nakifuma Government Health Unit, Mukono District Berkley Singer Advisor: Dr. Jolly Kamugisha Academic Director: Dr. Charlotte Mafumbo Fall 2013 Acknowledgement: I would like to acknowledge Dr. Charlotte Mafumbo for all her hard work and dedication throughout the research process. She is an amazing worker and deserves all the praise in the world. -
October 21 2017 Thesis New Changes Tracked
The Status, Rights and Treatment of Persons with Disabilities within Customary Legal Frameworks in Uganda: A Study of Mukono District By David Brian Dennison BA (honours), MBA, JD (cum laude) (University of Georgia, USA) Thesis Presented for the Degree of Doctor of Philosophy in the Department of Private TownLaw Faculty of Law UNIVERSITY OF CAPE TOWN Cape of Date of submission: 31 October 2017 Supervisor: Professor Chuma Himonga University Department of Private Law University of Cape Town The copyright of this thesis vests in the author. No quotation from it or information derivedTown from it is to be published without full acknowledgement of the source. The thesis is to be used for private study or non- commercial research purposes Capeonly. of Published by the University of Cape Town (UCT) in terms of the non-exclusive license granted to UCT by the author. University The copyright for this thesis rests with the University of Cape Town. No quotation from it or information derived from it is to be published without full acknowledgment of the source. The thesis is to be used for private study or non-commercial research purposes only. "ii ABSTRACT Thesis Title: The Status, Rights and Treatment of Persons with Disabilities within Customary Legal Frameworks in Uganda: A Study of Mukono District Submitted by: David Brian Dennison on 31 October 2017 This thesis addresses the question: How do customary legal frameworks impact the status, rights and treatment of persons with disabilities? It is motivated by two underlying premises. First, customary legal frameworks are highly consequential in Sub-Saharan contexts. -
UGANDA: PLANNING MAP (Details)
IMU, UNOCHA Uganda http://www.ugandaclusters.ug http://ochaonline.un.org UGANDA: PLANNING MAP (Details) SUDAN NARENGEPAK KARENGA KATHILE KIDEPO NP !( NGACINO !( LOPULINGI KATHILE AGORO AGU FR PABAR AGORO !( !( KAMION !( Apoka TULIA PAMUJO !( KAWALAKOL RANGELAND ! KEI FR DIBOLYEC !( KERWA !( RUDI LOKWAKARAMOE !( POTIKA !( !( PAWACH METU LELAPWOT LAWIYE West PAWOR KALAPATA MIDIGO NYAPEA FR LOKORI KAABONG Moyo KAPALATA LODIKO ELENDEREA PAJAKIRI (! KAPEDO Dodoth !( PAMERI LAMWO FR LOTIM MOYO TC LICWAR KAPEDO (! WANDI EBWEA VUURA !( CHAKULYA KEI ! !( !( !( !( PARACELE !( KAMACHARIKOL INGILE Moyo AYUU POBURA NARIAMAOI !( !( LOKUNG Madi RANGELAND LEFORI ALALI OKUTI LOYORO AYIPE ORAA PAWAJA Opei MADI NAPORE MORUKORI GWERE MOYO PAMOYI PARAPONO ! MOROTO Nimule OPEI PALAJA !( ALURU ! !( LOKERUI PAMODO MIGO PAKALABULE KULUBA YUMBE PANGIRA LOKOLIA !( !( PANYANGA ELEGU PADWAT PALUGA !( !( KARENGA !( KOCHI LAMA KAL LOKIAL KAABONG TEUSO Laropi !( !( LIMIDIA POBEL LOPEDO DUFILE !( !( PALOGA LOMERIS/KABONG KOBOKO MASALOA LAROPI ! OLEBE MOCHA KATUM LOSONGOLO AWOBA !( !( !( DUFILE !( ORABA LIRI PALABEK KITENY SANGAR MONODU LUDARA OMBACHI LAROPI ELEGU OKOL !( (! !( !( !( KAL AKURUMOU KOMURIA MOYO LAROPI OMI Lamwo !( KULUBA Koboko PODO LIRI KAL PALORINYA DUFILE (! PADIBE Kaabong LOBONGIA !( LUDARA !( !( PANYANGA !( !( NYOKE ABAKADYAK BUNGU !( OROM KAABONG! TC !( GIMERE LAROPI PADWAT EAST !( KERILA BIAFRA !( LONGIRA PENA MINIKI Aringa!( ROMOGI PALORINYA JIHWA !( LAMWO KULUYE KATATWO !( PIRE BAMURE ORINJI (! BARINGA PALABEK WANGTIT OKOL KINGABA !( LEGU MINIKI -
Legend " Wanseko " 159 !
CONSTITUENT MAP FOR UGANDA_ELECTORAL AREAS 2016 CONSTITUENT MAP FOR UGANDA GAZETTED ELECTORAL AREAS FOR 2016 GENERAL ELECTIONS CODE CONSTITUENCY CODE CONSTITUENCY CODE CONSTITUENCY CODE CONSTITUENCY 266 LAMWO CTY 51 TOROMA CTY 101 BULAMOGI CTY 154 ERUTR CTY NORTH 165 KOBOKO MC 52 KABERAMAIDO CTY 102 KIGULU CTY SOUTH 155 DOKOLO SOUTH CTY Pirre 1 BUSIRO CTY EST 53 SERERE CTY 103 KIGULU CTY NORTH 156 DOKOLO NORTH CTY !. Agoro 2 BUSIRO CTY NORTH 54 KASILO CTY 104 IGANGA MC 157 MOROTO CTY !. 58 3 BUSIRO CTY SOUTH 55 KACHUMBALU CTY 105 BUGWERI CTY 158 AJURI CTY SOUTH SUDAN Morungole 4 KYADDONDO CTY EST 56 BUKEDEA CTY 106 BUNYA CTY EST 159 KOLE SOUTH CTY Metuli Lotuturu !. !. Kimion 5 KYADDONDO CTY NORTH 57 DODOTH WEST CTY 107 BUNYA CTY SOUTH 160 KOLE NORTH CTY !. "57 !. 6 KIIRA MC 58 DODOTH EST CTY 108 BUNYA CTY WEST 161 OYAM CTY SOUTH Apok !. 7 EBB MC 59 TEPETH CTY 109 BUNGOKHO CTY SOUTH 162 OYAM CTY NORTH 8 MUKONO CTY SOUTH 60 MOROTO MC 110 BUNGOKHO CTY NORTH 163 KOBOKO MC 173 " 9 MUKONO CTY NORTH 61 MATHENUKO CTY 111 MBALE MC 164 VURA CTY 180 Madi Opei Loitanit Midigo Kaabong 10 NAKIFUMA CTY 62 PIAN CTY 112 KABALE MC 165 UPPER MADI CTY NIMULE Lokung Paloga !. !. µ !. "!. 11 BUIKWE CTY WEST 63 CHEKWIL CTY 113 MITYANA CTY SOUTH 166 TEREGO EST CTY Dufile "!. !. LAMWO !. KAABONG 177 YUMBE Nimule " Akilok 12 BUIKWE CTY SOUTH 64 BAMBA CTY 114 MITYANA CTY NORTH 168 ARUA MC Rumogi MOYO !. !. Oraba Ludara !. " Karenga 13 BUIKWE CTY NORTH 65 BUGHENDERA CTY 115 BUSUJJU 169 LOWER MADI CTY !. -
PBU AGENTS Central Region
PBU AGENTS Central Region Name of Agent or Outlet Place of Business District Abusha Junior (U) Ltd Bombo Luweero Parmer Financial Services Ltd Kapeeka Nakaseke Q&A Education and Management Consultancy Bombo Luweero Holy Saints Uganda Limited Bombo T/C Luweero Danortry Financial Link (U) Ltd Opposite PostBank Bombo Branch Luwero Dithcom Trading Co. Limited Opposite Centenary Bank ATM Luwero Glarison Technologies Limited Near the Barracks Luwero Nasu Express Outlet Bombo, near SR Fuel Station Luwero Nasu Express Outlet Opposite Bombo UPDF Play ground Luwero Uganda Post Limited Kyambogo Kampala Uganda Post Limited Nakawa Kampala NIK Tel Traders Nakawa Kampala Prime Secretarial Services Luzira Stage 6 Kampala ESSIE. RE Classic Fashions Biina Mutungo Kampala Nandudu Babra Kireka Wakiso Blessed Mina General Merchandise Kireka Wakiso Niktel Traders Pioneer Mall Kampala 6 GS Money Point Kireka Kampala Cinemax General Hardware Bweyogerere Wakiso Ariong Enterprises Mutungo Kampala Isip Connections Ltd Bugolobi Kampala Kireka BodaBoda Police Stage Co-Operative Kireka Kampala Savings and Credit Society Limited Chelanasta Cash Point Solutions Jinja Highway, Mukono Mukono Milly's Laundry Opposite UCU Main Gate Mukono Rana Phones 83 Enterprises Opp Kirinya Shopping Centre Wakiso Boadaph Financial Services Limited Sports Pro Hostel. Kampala Jeba (U) Limited Cwa 2 Street Kampala Tusaboomu Enterprises Ltd URA building, Nakawa Kampala Alpha Immanuel's Cash Point Najeera Road, Bweyogerere Wakiso Beulah Business Center Biina Road, Kunya Stage Kampala Kyobe -
Community Media Narrowcasting in Uganda: an Assessment of Community Audio Towers
COMMUNITY MEDIA NARROWCASTING IN UGANDA: AN ASSESSMENT OF COMMUNITY AUDIO TOWERS ROBERT BRIAN SEMUJJU (214581303) SUPERVISOR: DR. LAUREN DYLL A THESIS SUBMITTED TO THE CENTRE FOR COMMUNICATION, MEDIA AND SOCIETY, UNIVERSITY OF KWAZULU-NATAL, IN FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY 2016 DECLARATION COLLEGE OF HUMANITIES DECLARATION - PLAGIARISM I, …………………………………………………declare that: 1. The research reported in this dissertation, except where otherwise indicated, is my original research. 2. This dissertation has not been submitted for any degree or examination at any other university. 3. This dissertation does not contain other persons‘ data, pictures, graphs or other information, unless specifically acknowledged as being sourced from other persons. 4. This dissertation does not contain other persons' writing, unless specifically acknowledged as being sourced from other researchers. Where other written sources have been quoted, then: a. Their words have been re-written but the general information attributed to them has been referenced b. Where their exact words have been used, then their writing has been placed inside quotation marks, and referenced. 5. This dissertation does not contain text, graphics or tables copied and pasted from the Internet, unless specifically acknowledged, and the source being detailed in the dissertation and Bibliography. Signature: Date: Place: Supervisor: Signature: Date: Place: ii READER Dr. Terje Skjerdal Gimlekollen School of Journalism and Communication, NLA University College, Kristiansand, Norway. iii DEDICATION This thesis is dedicated to my grandmother. iv ACKNOWLEDGEMENT There is a supreme being somewhere above my head, who gives me the strength to carry on. This is a gift that I needed most throughout this journey. -
Assessment Form
Local Government Performance Assessment Mukono District (Vote Code: 542) Assessment Scores Accountability Requirements 67% Crosscutting Performance Measures 70% Educational Performance Measures 74% Health Performance Measures 85% Water Performance Measures 72% 542 Mukono District Accontability Requirements 2018 Definition of Summary of requirements Compliance justification Compliant? compliance Annual performance contract Yes LG has submitted an annual • From MoFPED’s Mukono District Local performance contract of the inventory/schedule of Government submitted the forthcoming year by June 30 on the LG submissions of annual performance contract basis of the PFMAA and LG Budget performance contracts, on 14th July 2018. This is guidelines for the coming financial check dates of within the adjusted deadline of year. submission and 1st August 2018. Therefore issuance of receipts the LG is compliant. and: o If LG submitted before or by due date, then state ‘compliant’ o If LG had not submitted or submitted later than the due date, state ‘non- compliant’ • From the Uganda budget website: www.budget.go.ug, check and compare recorded date therein with date of LG submission to confirm. Supporting Documents for the Budget required as per the PFMA are submitted and available Yes LG has submitted a Budget that • From MoFPED’s includes a Procurement Plan for inventory of LG budget the forthcoming FY by 30th June submissions, check The Local Government (LG PPDA Regulations, 2006). whether: submitted the budget together with the Procurement Plan on o The LG budget is 14th July 2018. This is within accompanied by a the adjusted deadline of 1st Procurement Plan or August 2018. Therefore the not. -
Detailed Planned Shutdown July 2021
PLANNED SHUTDOWN FOR JULY 2021 SYSTEM IMPROVEMENT AND ROUTINE MAINTENANCE REGION DAY DATE SUBSTATION FEEDER/PLANT PLANNED WORK DISTRICT AREAS & CUSTOMERS TO BE AFFECTED Kampala West Friday 02nd July 2021 Namungoona 20MVA 132/33kV TX 1 Oil treatment, and curing oil leakage on 20MVA 132/33kV TX 1 Nakulabye Lusaze, Lubya Mast ,Kosovo, Bukulugi, Kinonya, Lubya hill Pastor Namutebi , nationa housing estates, Namungoona, Lubya, National housing, Nabulagala, Kigobe, Namugoona, Part of Nakibinge Rd, Nansana Jenina, Nansana Church of Uganda," Kampala West Saturday 03rd July 2021 Namungoona 20MVA 132/33kV TX 1 Oil treatment, and curing oil leakage on 20MVA 132/33kV TX 1 Nakulabye Lusaze, Lubya Mast ,Kosovo, Bukulugi, Kinonya, Lubya hill Pastor Namutebi , nationa housing estates, Namungoona, Lubya, National housing, Nabulagala, Kigobe, Namugoona, Part of Nakibinge Rd, Nansana Jenina, Nansana Church of Uganda," Kampala West Saturday 03rd July 2021 Kisubi Kisubi Mission 1.Erection of 2poles in a combined construction Entebbe Areas of Kisubi and Entebbe Garuga 11kV Feeder 2.Passing Conductors of newly constructed pearl-marina 33kv line over existing 11kv line 3.Conductor stringing. Western Saturday 03rd July 2021 Masaka West Kyaka 132kV Cleaning of discs at section structures and transposition towers Masaka None Transmission Line Kampala West Sunday 04th July 2021 Lugogo Kitante road 1 Line clearance and network maintenace Metro Airtel, Wampewo Ave., Hotel Africana, Ngabo close, KAR drive, Lower Kololo 11kV Feeder terace, Golf course rd and UMI. Kampala West Sunday 04th July 2021 Lugogo Kololo 11kV feeder Resolve DARM RED 1 Metro Accacia ave, somero rd, Mabua rd, Philp rd, and windsor crescent, Prince Charles drive, Upper Kololo terace, York terace, Impala Ave., Archer rd, Malcom X, Mackenzi vale, Baskaville, Hesketh bell, Roscoe rd and sorounding areas. -
Local Government Councils' Perfomance and Public
LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 Lillian Muyomba-Tamale Godber W. Tumushabe Ivan Amanigaruhanga Viola Bwanika-Semyalo Emma Jones 1 ACODE Policy Research Series No. 45, 2011 LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 2 LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 LOCAL GOVERNMENT COUNCILS’ PERFORMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/10 Lillian Muyomba-Tamale Godber W. Tumushabe Ivan Amanigaruhanga Viola Bwanika-Semyalo Emma Jones i LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 Published by ACODE P. O. Box 29836, Kampala Email: [email protected], [email protected] Website: http://www.acode-u.org Citation: Muyomba-Tamale, L., (2011). Local Government Councils’ Performance and public Service Delivery in Uganda: Mukono District Council Score-Card Report 2009/10. ACODE Policy Research Series, No. 45, 2011. Kampala. © ACODE 2011 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying, recording or otherwise without the prior written permission of the publisher. ACODE policy work is supported by generous donations and grants from bilateral donors and charitable foundations. The reproduction or use of this publication for academic or charitable purpose or for purposes of informing public policy is excluded from this general exemption. -
37 Appendix-6 Results of Geophysical Survey 1. Introduction Geology Of
Appendix-6 Results of Geophysical Survey 1. Introduction Geology of the survey areas in Masaka, Mukono and Kayunga Districts is mostly composed of weathered zone of Uganda-Toro formations covering the basic rocks of gneiss-granite composite rocks. The targeted ground water formation is considered to be in the fractured zone developed in the boundary of this basic rocks and weathered formations. Ground water development in this project aims to provide tubewells with handpump units; however, the hydro-geological examination conducted in these areas has expressed concerns about the following two points at the stage of utilization: 1) TDS (Total dissolved solids) of ground water might be too high for use. 2) Water table could be too deep for pumping up by a handpump. Taking these two points into consideration, the following studies were carried out geological and geo-structural analysis by using topographic maps and geological maps, lineament analysis by using satellites imageries as well as geophysical investigations by using magnetic and electrical methods. 2. Satellites Imageries Analysis 2.1 General Satellite imageries data were obtained in order to find out faults and fractured system in the survey area by analyzing lineaments as follows: 1) Satellite imagery used: LANDSAT No.7 ETM+ False color image 2) Path number and date of images taken are as follows; Details of Images District Path Row Date Masaka 172 060 Dec.31,1999 Mukono 171 059 Nov.27,2001 Kayunga 171 060 Nov.27,2001 3) Combination of band Blue : Green : Red= Band 1 : Band 4 : Band 5 4) Scenery mosaic Digital mosaic process was made for sceneries (171-059 and 171-060) taken near the boundary of Mukono and Kayunga Districts. -
SERVICE PLAN ASSESSMENT REPORT Abridged Version
SERVICE PLAN ASSESSMENT REPORT Abridged Version Bus Rapid Transit-KCCA/GKMA June 2020 CIG Uganda is funded with UK Aid and implemented by Cardno International Development This work is a product of the staff of the Cities and Infrastructure for Growth Uganda, a UK Government funded programme implemented by Cardno International Development in Uganda. The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the UK Foreign and Commonwealth Development Office (FCDO), Cardno International Development or its Board of Governors of the governments they represent. Cardno International Development does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. Rights and Permissions Cardno. Cardno International Development encourages printing or copying information exclusively for personal and non- commercial use with proper acknowledgment of source. Users are restricted from reselling, redistributing, or creating derivative works for commercial purposes without the express, written consent of Cardno International Development of their CIG Uganda office. Any queries should be addressed to the Publisher, CIG Uganda, Plot 31 Kanjokya Street, 3rd Floor, Wildlife Tower, Uganda Kampala or Cardno International Development, Level 5 Clarendon Business Centre, 42 Upper Berkley Street, Marylebone, London, W1H5PW UK. Cover photos: CIG Uganda Table of Contents List of Tables i List of Figures iii List of Acronyms iv EXECUTIVE -
Suganda Gazette :::E;
9.V The SUganda Gazette :::e; . Vol. LXXXVII No. 23 2nd June, 1994 Price: Shs. 500 CONTENTS Pact Mukongoro — Kanyum — Kumi — Ngora — Kyere —> Soroti. The Traffic and Road Safety Act—Notice ... 93-95 ECL 41: Jinja — Iganga — Busembatya — Advertisements Namutumba — Terrinyi — Palisa — Mukongoro —- Kanyum — Kumi ■— Ngora — Kyere —• Soroti with extension to Kaberamaido. ECL 4/2: Kampala — Lugazi —■ Jinja — Iganga — General’ Notice No. 75 of 1994. Busembatia — Namutumba — Terrinyi — Palisa — Mukongoro — Kanjum •— THE TRAFFIC AND ROAD SAFETY ACT', 1970. Kumi — Ngora — Kyere — Soroti —• (Cap. 38) with extension to Kaberamaido. (Section 90(1) of the Act). ECL 5: Tororo — Malaba — Bridge via Cement Factory Filing Station with No Inter NOTICE. mediate Stops. ECL 6: Kampala — Luwero — Nakasongola — STAGE AND EXPRESS CARRIAGE LICENCES. Kigumba— Karuma — Olweyo —• Anaka In Accordance with the provisions of sub section 90 (i) Hospital — Pakwach —• Nebbi — Ama. of the Traffic and Road Safety Act, 1970 as amended by ECL 6(i): Kampala — Luwero — Nakasongola — decree No. 18 of 1973, the Transport Licensing Board is Kigumba — Karuma — Kamdin Comer advertising here under Routes on which the Board is —• Gulu. proposing to offer Stage and Express Carriage Licences. ECL 7: Kampala — Masaka — Mbarara — Omnibus Operators are invited to apply for the Public Kabwohe — Kitagata — Kabira — Omnibus Operator’s Licences to enable them operate on Rukungiri — Kambuga — Kanungu — these routes. Kihihi — Butogota. Application forms in Triplicate on Form TRV Form 2 ECL 8: Rukungiri — Kabira — Kitagata — obtainable from the Transport Licensing Board, Old Port Kabwohe — Mbarara — Masaka — Bell Road, P.O. Box 2666, Kampala, should be completed Kampala. and returned to the Secretary to the Board within thirty days after the publication of this notice.