Government of the People's Republic of Bangladesh

Total Page:16

File Type:pdf, Size:1020Kb

Government of the People's Republic of Bangladesh Government of the Peoples’ Republic of Bangladesh Local Government Engineering Department Office of the Executive Engineer Dbœq‡bi MYZš¿ ‡kL nvwmbvi g~jgš¿ District: Jhalakathi. www.lged.gov.bd Memo No: 46.02.4200.000.07.490.19-541 Date: 21-04-2019 Tender Notice No-14/2018-19 (Re-Tender) E-tender is hereby invited in the National e-GP system portal (http://www.eprocure.gov.bd) for the procurement of following work. Tender Name of the work with Package No Method of Last Date of Last Date of ID Procurement Selling Receiving Tender FDR/Jha/18-19/UNR/W-01&UZR/W-02 (a) Rehabilitation of Barisal-Nobogram RHD road Sugandia Bazar to Barisal- Jhalokathi RHD Road Satpaki via Nathullabad UPC from Ch.00-7540m under Upazila Sadar 15-05-2019 16-05-2019 310648 District Jhalokathi. Road ID No 542403009 (OSTEM) 3:30 pm 13:00 pm (b) Rehabilitation of Barisa-Perojpur RHD Gabkhan Bridge- Gauton Bazar Sekherhat UP-Amrajury Ferry Ghat Road from Ch. 4000-8700m under Upazila Sadar District Jhalokathi Road ID 542402005 BJP/JHA/RAJ/DW-22 Improvement of BC Road from Mirer Hat GC -Barisal Bhandaria R & H Nalbunia via Gazir Hat & Talukder Hat at Ch 3700m-5175m including 04 Nos 3.0mX3.0m RCC Box Culvert 15-05-2019 16-05-2019 310672 at Ch 4086m 4300m 4630m & 4720m and 03 Nos 2.0mX2.0m (OSTEM) 3:30 pm 13:00 pm RCC Box Culverts at Ch 3813m Ch 4540m & 4858m and 06 Nos 1.6mX1.6m RCC Box Culvert at Ch 3924m 4050m 4220m 4377m 4811m & 5170m under Rajapur Upazila Jhalokathi. ID No 542842006 Salvage Cost Tk. 447430.00 E-Tender will be accepted in the National e-GP portal and no offline/hard copies will be accepted. To submit e-Tender, registration in the National e-GP system portal (http://eprocure.gov.bd) is required. The fees for downloading the e-Tender documents from the National e-GP System portal have to be deposited online through any registered bank’s branches. Details information and guidelines are available in the National e-GP System portal and from e-GP help Desk ([email protected]). (Md. Ruhul Amin) Executive Engineer Phone: 0498-63494 E-mail: [email protected] Memo No: 46.02.4200.000.07.490.19-541(20) Date: 21-04-2019 Copy forwarded for kind information and necessary action: 1. The Chief Engineer, LGED, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207 2. The Additional Chief Engineer, LGED, Barisal Division, Barisal. 3. The Superintending Engineer, LGED, Barisal Region, Barisal. 4. The Project Director (BDRIDP/FDDRIRP), LGED HQ, Dhaka. 5. The Editor, ‰`wbK Avgvi msev`, The Daily Bangladesh Post I ˆ`wbK kZKÚ, SvjKvwV with request to publish the above Tender Notice limiting it within 4x6” in your widely circulated national/regional daily newspaper on or before 23-04-2019 for once only. 6. The Upazila Engineer, Rajapur/Sadar/Nalchity/Kathalia Upazila, District: Jhalakathi. 7. Notice Board. (Md. Ruhul Amin) Executive Engineer Phone: 0498-63494 E-mail: [email protected] .
Recommended publications
  • 74D4c4a50377e9fec12575c3
    Disaster Management Information Centre Disaster Management Bureau (DMB) Ministry of Food and Disaster Management Disaster Management and Relief Bhaban (6th Floor) 92-93 Mohakhali C/A, Dhaka-1212, Bangladesh Phone: +88-02-9890937, Fax: +88-02-9890854 Email:[email protected],H [email protected] Web:http://www.cdmp.org.bd,H www.dmb.gov.bd Emergency Summary of Cyclonic Storm “AILA” Title: Emergency Bangladesh Location: 20°22'N-26°36'N, 87°48'E-92°41'E, Covering From: TUE-26-MAY-2009:2130 Period: To: TUE-27-MAY-2009:1400 Transmission Date/Time: TUE-27-MAY-2009:1600 Prepared by: DMIC, DMB Summary of Cyclonic Storm “AILA” Current Situation Maritime ports of Chittagong, Cox’s Bazar and Mongla have been advised to lower signal. Total 14 districts were affected by the cyclone. 100 persons reported dead. Many areas of the affected districts were inundated and houses, roads and embankments were damaged. Detailed damage information collection is in progress. Government and other organization have started their relief and rehabilitation operations immediately just after the cyclone crossed over. Actions Taken • A total of BDT 1200000 G.R. Cash has been allocated to the “AILA” affected districts Bhola, Pirojpur, Barguna, Jhalokathi, Bagerhat. • G. R. Rice 1000.000 MT has been allocated to the “AILA” affected districts Barishal, Barguna, Bhola, Jhalokathi and Satkhira. • 400 pcs Saree and 1 Carton Water purification tablet for Charfassion Upazila of Bhola, 400 pcs Saree and 1 Carton Water purification tablet for Kolapara and 300 pcs Saree for Galachipa upazila of Patuakhali and 400 pcs Saree and 1 Carton Water purification tablet for Shyamnagar Upazila of Satkhira District have been allocated.
    [Show full text]
  • Read Details
    Prodipan Shaheb Bari Road, Moheswarpasha Khulna-9203 Cyclone SIDR 2007 Response by Prodipan Implementing Type of intervention Area targeted/covered # of family Implementing Funding Agency Amount Agency targeted/ covered partner, if budgeted/spent applicable (BDT) Dry Food & Medical Support (i) Khulna District 5054 HHs Own Own 562,000.00 Prodipan (Dacope, Paikgacha & Koyra Upazila) (ii) Bagerhat District (Mongla & Sharonkhola Upazila) Non Food Support (i) Khulna District 3500 HHs Own CAFOD 4,158,000.00 (Dacope, Paikgacha & Koyra Upazila) (ii) Bagerhat District (Mongla & Sharonkhola Upazila) Construction of Low Cost (i) Khulna District 264 HHs Own CAFOD 21,767,737.00 Housing with Latrine (Koyra Upazila Community Wind Barrier (i) Bagerhat District 500HHs Own (Sapling Distribution) ( Sharonkhola Upazila) Boat-Net Support (i) Bagerhat District 52 HHs Own USAID-CARE 746,125.00 (Sharonkhola Upazila) (Operation cost) Homestead Gardening and (i) Bagerhat District 1000 HHs Own USAID-CARE 4,437,075.00 Cash for Work (Sharonkhola Upazila) Food Support (Humanitarian (i) Bagerhat District 4000 HHs Own ECHO-CARE 5,986,800.00 Assistance) (Morelganj Upazila) Cloths & Non-food Support (i) Bagerhat District 500 HHs Own MOFA-Germany-CARE 12,825.00 (Morelganj Upazila) (Operation Cost) Cloths & Non-food Support (i) Bagerhat District 300 HHs Own MOFA-Norway-CARE 11,124.00 (Morelganj Upazila) (Operation cost) Non-Food Items Distribution (i) Bagerhat District 3500 HHs Own CARE 89,301.00 (Sharonkhola Upazila) (Operation Cost) Food Assistance (i) Bagerhat District
    [Show full text]
  • Ministry of Food and Disaster Management
    Disaster Management Information Centre Disaster Management Bureau (DMB) Ministry of Food and Disaster Management Disaster Management and Relief Bhaban (6th Floor) 92-93 Mohakhali C/A, Dhaka-1212, Bangladesh Phone: +88-02-9890937, Fax: +88-02-9890854 Email:[email protected],H [email protected] Web:http://www.cdmp.org.bd,H www.dmb.gov.bd Emergency Summary of Cyclonic Storm “AILA” Title: Emergency Bangladesh Location: 20°22'N-26°36'N, 87°48'E-92°41'E, Covering From: TUE-29-MAY-2009:1430 Period: To: TUE-30-MAY-2009:1200 Transmission Date/Time: TUE-30-MAY-2009:1500 Prepared by: DMIC, DMB Summary of Cyclonic Storm “AILA” Current Situation Total 14 districts were affected by the cyclone. 147 persons Total Death: 155 reported dead. Many areas of the affected districts were inundated and houses, roads and embankments were People Missed: 10 damaged. Detailed damage information collection is in progress. People Injured: 7,108 Government administration, local elected representatives and Family Affected: 8,01,602 other Non Government organizations are now working in rescue and response in cyclone affected upazilas around the coastal People Affected: 36,06,116 areas. These organization have started their relief and Houses Damaged: 5,64,315 rehabilitation operations immediately just after the cyclone crossed over. Crops Damaged: 3,27,406 acre Local elected representatives and elites are encouraging and providing confidence to the affected people for facing the situation. The Bangladesh army and Coast Guard are trying to establish local communication and still handling the rescue operations. Actions Taken • In a special meeting of Disaster & Emergency Response (DER) group, the Director General of the Disaster Management Bureau and the chair has requested NGOs to respond immediately to the situation and to notify the Disaster Management Information Centre (DMIC) of their current and planned activities.
    [Show full text]
  • List of Upazilas of Bangladesh
    List Of Upazilas of Bangladesh : Division District Upazila Rajshahi Division Joypurhat District Akkelpur Upazila Rajshahi Division Joypurhat District Joypurhat Sadar Upazila Rajshahi Division Joypurhat District Kalai Upazila Rajshahi Division Joypurhat District Khetlal Upazila Rajshahi Division Joypurhat District Panchbibi Upazila Rajshahi Division Bogra District Adamdighi Upazila Rajshahi Division Bogra District Bogra Sadar Upazila Rajshahi Division Bogra District Dhunat Upazila Rajshahi Division Bogra District Dhupchanchia Upazila Rajshahi Division Bogra District Gabtali Upazila Rajshahi Division Bogra District Kahaloo Upazila Rajshahi Division Bogra District Nandigram Upazila Rajshahi Division Bogra District Sariakandi Upazila Rajshahi Division Bogra District Shajahanpur Upazila Rajshahi Division Bogra District Sherpur Upazila Rajshahi Division Bogra District Shibganj Upazila Rajshahi Division Bogra District Sonatola Upazila Rajshahi Division Naogaon District Atrai Upazila Rajshahi Division Naogaon District Badalgachhi Upazila Rajshahi Division Naogaon District Manda Upazila Rajshahi Division Naogaon District Dhamoirhat Upazila Rajshahi Division Naogaon District Mohadevpur Upazila Rajshahi Division Naogaon District Naogaon Sadar Upazila Rajshahi Division Naogaon District Niamatpur Upazila Rajshahi Division Naogaon District Patnitala Upazila Rajshahi Division Naogaon District Porsha Upazila Rajshahi Division Naogaon District Raninagar Upazila Rajshahi Division Naogaon District Sapahar Upazila Rajshahi Division Natore District Bagatipara
    [Show full text]
  • Annual Report 2012- 2013
    Annual Report 2012- 2013 Nagorik Uddyog House # 8/14, Block-B, Lalmatia Dhaka-1207, Bangladesh Tel: 88 02 8115868, Fax: 9141511 E-mail: [email protected] Web: www.nuhr.org Annual Report 2012-2013 Photography: Nagorik Uddyog Cover: Prepare by: Nori Khisa Rororting & Documentation Officer Published by: Nagorik Uddyog House # 8/14, Block-B, Lalmatia Dhaka-1207, Bangladesh Tel: 88 02 8115868, Fax: 9141511 E-mail: [email protected] Web: www.nuhr.org Nagorik Uddyog Any material published in this report may be reproduced with acknowledgements to Nagorik Uddyog CONTENTS Page Preface Nagorik Uddyog – introduction a brief 1. Community Institution Building ................................................................................... 1-10 1.1. Ward Level Shalish Committees 1.2. Human Rights Minitoring Gruoup (HRMG) 1.3. Grassroots Women Leaders Network (GWLN) 1.4. Impact of NU’s Community Institute Building Initiative 2. 1 Access to Justice ......................................................................................................... 11-29 2.1.a. Traditional Mediation ............................................................................................ 11-15 • Status of the shalish during 2012-2013 • Status of dispute Resolution (Officially recorded) - 2012-2013 • Status of dispute Resolution (conducted by community group) - 2012-2013 • Monetary realization • What Significant in NU’s Mediation • Effectively Functioning Complain Center 2.1.b. Legal Aid and Investigation ...............................................................................
    [Show full text]
  • 20 May 2013.Pdf
    CYCLONE MAHASEN UPDATE Issue 1, Monday, May 20, 2013 Date of landfall: Thursday, 16 May 2013 Areas affected: Chittagong, Noakhali, Laksmipur, Patuakhali, Bhola, Jhalokathi, Borguna and Pirozpur, Highlights Cyclone Mahasen has struck the southern coast of Bangladesh, lashing remote fishing villages with heavy rain and fierce winds that flattened mud and straw huts and forced the evacuation of more than 1 million people. The main section of the storm reached land on Thursday, 16 May 2013 and immediately began weakening. However, its forward movement was also slowing, meaning that towns in its path would have to weather the storm for longer. [Source: BBC.] Chittagong: 54,295 people of 28 Unions of Sitakunda, Shondip, Banshkhali and Mirsharia Upazila are affected. 50 houses are totally collapsed and 2,005 are partially damaged. Two elderly women died in the cyclone shelter, probable cause of death is prolonged illness and aging. 2 died in total. Cox’s Bazar No casualties, damage and loss reported. Noakhali 35,127 people of 6,893 families affected by Mahasen in 33 Unions of Hatiya, Shubornochar, Companygonj, Kabirhat and Noakhali Sadar Upazila. 1,710 houses are totally and 4,968 are partially damaged. No casualties reported. Laksmipu 9,890 people of 1,896 families affected by Mahasen in 15 Unions of Laksmipur Sadar, Raypur, Ramgoti and Komolnagar Upazila. 120 houses are totally and 359 are partially damaged. No casualties reported. Patuakhali 70,409 people of 72 Unions of Doshmina, Golachipa, Kolapara, Rangabali, Mirjagonj and Dumki Upazila are affected. 7,540 houses are totally and 18,238 are partially damaged.
    [Show full text]
  • Inventory of LGED Road Network, March 2005, Bangladesh
    The Chief Engineer Local Government Engineering Department PREFACE It is a matter of satisfaction that LGED Road Database has been published through compilation of data that represent all relevant information of rural road network of the country in a structured manner. The Rural Infrastructure Maintenance Management Unit of LGED (former Rural Infrastructure Maintenance Cell) took up the initiative to create a road inventory database in mid nineties to register all of its road assets country-wide with the help of customized software called, Road and Structure Database Management System. The said database was designed to accommodate all relevant information on the road network sequentially and the system was upgraded from time to time to cater the growing needs. In general, the purpose of this database is to use it in planning and management of LGED's rural road network by providing detailed information on roads and structures. In particular, from maintenance point of view this helps to draw up comprehensive maintenance program including rational allocation of fund based on various parameters and physical condition of the road network. According to recent road re-classification, LGED is responsible for construction, development and maintenance of three classes of roads, which has been named as Upazila Road, Union Road and Village Road (category A & B) in association with Local Government Institution. The basic information about these roads like, road name, road type, length, surface type, condition, structure number with span, existing gaps with length, etc. has been made available in the road inventory. Side by side, corresponding spatial data are also provided in the road map comprising this document.
    [Show full text]
  • Upazila Parishad Election Annex-Report-2009
    Annexure Upazila-wise Detailed Findings Dhaka Division Munshiganj Sadar Upazila: Munshiganj District In Idrakpur High School polling centre, supporters of different candidates were found distributing voter slips with their own symbols ‘CHATA’ (umbrella), ‘DOYAT-KOLOM’ (inkpot-pen) and ‘TALA’ (lock). Polling agents of various candidates were moving around the center. The presence of voters was comparatively poor. Similarly, in P.T.I. Govt. Primary school polling centre, supporters of AL-backed Chairman candidate, Anisuzzaman, and the BNP-backed candidate distributed slips with their own symbols on them. In Mukarpur Govt. Primary School polling centre, campaign posters with the symbol ‘Rickshaw’ were found within 400 yards of the center in contravention to electoral rules. Some unauthorised persons were also loitering around. There was no systematic process of voting, and large, haphazard gatherings of voters was found in all the polling booths. The Presiding officer was feeling unsafe. A window beside the polling booth was kept open, through which one could easily observe where the voters were putting the stamp on the ballot paper. In Chardumuria Govt. Primary School, Banial High School, Munshigonj High School and Deobhog Govt. Primary School polling centres, polling agents had no voter list to check. They were seen moving in the polling booths. A local leader of the Awami League, Golam Martuza, along with five associates were found chatting with security forces in Banial High School polling centre. Chaos broke out between the supporters of Chairman candidates with the symbol ‘Inkpot-pen’ and ‘Wall clock’ in Juginighat Govt. Primary School polling centre, which disrupted voting. A number of activists of Chairman candidate Shahjahan Shikdar, local BNP leader, were influencing voters.
    [Show full text]
  • Zila: JHALOKATI -..:: Bangladesh Bureau of Statistics
    BANGLADESH POPULATION AND HOUSING CENSUS 2011 COMMUNITY REPORT Zila: JHALOKATI July 2013 BANGLADESH BUREAU OF STATISTICS (BBS) STATISTICS AND INFORMATICS DIVISION (SID) MINISTRY OF PLANNING GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH ISBN-984-508- COMPLIMENTARY iii Contents Page Number Foreword v Preface vii Census results at national, divisional and zila level ix Physical features of Jhalokati Zila x-xi Map of Jhalokati Zila xii Geo-code of Jhalokati Zila, upazila and union/ward xiii Chapter-1: Introductory notes on census 1-6 Chapter-2: Concepts and definitions 7-8 Chapter-3: Summary findings 9-24 3.1: Jhalokati Sadar upazila 11-14 3.2: Kanthalia upazila 15-18 3.3: Nalchity upazila 19-22 3.4: Rajapur upazila 23-26 Chapter-4: Community tables 27-240 Table C-01: Area, household, population and density by residence and community 29-44 Table C-02: Distribution of household and population by sex, residence and 45-60 community Table C-03 : Percentage distribution of general household by size, residence and 61-76 community Table C-04 : Percentage distribution of population by age group, residence and 77-92 community Table C-05 : Percentage distribution of population aged 10 years and above by sex, 93-108 marital status, residence and community Table C-06 : Distribution of population aged 7 years and above by literacy, sex, 109-124 residence and community Table C-07 : Distribution of population aged 3-14 years by age group, school 125-140 attendance, sex, residence and community Table C-08 : Distribution of population aged 15-29 years
    [Show full text]
  • Mamoni HSS FY16 Q3 Quarterly Report
    MaMoni Health Systems Strengthening Activity (USAID Cooperative Agreement AID-388-LA-13-00004) Quarterly Report April 1 – June 30, 2016 Razia Begum with her 12 day old daughter after being discharged from the newly installed Special Care Newborn Unit at Noakhali District Hospital (SCANU) with support from MaMoni HSS Project. 320 newborns were admitted to the SCANU Noakhali District Hospital since its introduction in March 2016 Submitted August 6, 2016 Cover Photo Story: Razia Begum with her 12 day old daughter after being discharged from the newly installed Special Care Newborn Unit at Noakhali District Hospital (SCANU) with support from MaMoni HSS Project. 320 newborns were admitted to the SCANU Noakhali District Hospital since its introduction in March 2016. MaMoni HSS has supported installation of five SCANUs in this quarter: Habiganj, Noakhali, Lakhsmipur, Pirozepur and Bhola districts. Photo Credit: Marufa Aziz Khan, Save the Children/MaMoni HSS Project This document is made possible by the generous support of the American people through the support of the Office of Population, Health, Nutrition and Education, United States Agency for International Development (USAID), Bangladesh (USAID/Bangladesh), under the terms of Associate Cooperative Agreement No. AID-388-LA-13-00004 through Maternal and Child Health Integrated Program (MCHIP). The contents of this document are the responsibility of the MCHIP Project and do not necessarily reflect the views of USAID or the United States government. Table of Contents MaMoni Health Systems Strengthening
    [Show full text]
  • Inventory of LGED Road Network, March 2005, Bangladesh
    JHALAKATHI LOCAL GOVERNMENT ENGINEERING DEPARTMENT DISTRICT SUMMARY OF ROAD DISTRICT : JHALOKATHI EARTHEN BC BRICK PVT. RIGID PVT. ROAD TYPE NUMBER OF TOTAL SURFACE TYPE-WISE BREAKE-UP CONDITION OF BC & RIGID PVT. ROAD STRUCTURE EXISTING GAP ROAD LENGTH (Km) (As of December, 2003) (Km) (Km) EARTHEN FLEXIBLE BRICK RIGID GOOD FAIR POOR BAD NUMBER SPAN NUMBER SPAN PAVEMENT PAVEMENT PAVEMENT (m) (m) (BC) (WBM/HBB/ (CC/RCC) BFS) Upazila Road 29 266 116 52 98 0 30 21 1 0 546 5150 257 977 Union Road 65 327 163 38 123 2 30 10 1 0 604 5122 229 1481 Village Road-A 405 1293 1140 16 134 3 14 5 0 0 933 7990 1010 7480 Village Road-B 289 665 640 2 23 0 2 0 0 0 337 3542 666 5318 TOTAL 788 2551 2059 108 379 5 76 36 2 0 2420 21805 2162 15257 1779 18 157 3 16 5 0 0 Length of Total Road Network Length of Total Road Network under Condition of BC & Rigid Pavement under different Categories different Surface Categories of Total Road Network 10% 26% 2% 0% 14.9% 0.2% 13% 31% 4.2% 67% 51% 80.7% Upazila Road Union Road Village Road-A Village Road-B EARTHEN BC BRICK PVT. RIGID PVT. GOOD FAIR POOR BAD Different Surface Categories and Condition of Different Surface Categories and Condition of BC & Rigid Pavement under Upazila Road BC & Rigid Pavement under Union Road 300 350 300 250 250 200 Total Length Total Length Earthen 200 Earthen Brick Pvt. Brick Pvt.
    [Show full text]
  • BANGLADESH Annual Human Rights Report 2017
    BANGLADESH Annual Human Rights Report 2017 12 January 2018 Cover Photo: Left side (from top to bottom): 1. Police beating up a protester. Photo: Daily Star, 16 March 2017, http://www.thedailystar.net/city/march-against-gas-price-hike-foiled-1376698 2. Stamped ballot papers on Awami League electoral symbol ‘boat’ found in Mandra Govt. Primary School polling centre in Nangolkot, Comilla. Photo: Prothom Alo, 29 December 2017. www.prothomalo.com/bangladesh/article/1396661/ Right side (from top to bottom): 3. Police obstructed the protest rally of the students of seven government colleges in front of the national museum at Shahbagh, Dhaka. During this time, police threw tear gas shells at the students. Photo: Prothom Alo, 21 July 2017. www.prothomalo.com/bangladesh/article/1260011/ 4. Families of the disappeared in collaboration of Odhikar organised a human chain in front of the National Press Club, Dhaka, in protest of enforced disappearances during the International Week of the Disappeared in May 2017. Photo: Odhikar. 2 Foreword Odhikar was formed in 1994 and it has been diligently working to protect and promote the civil, political, social, economic and cultural rights of the people since its inception. Odhikar, being an organisation of human rights defenders in Bangladesh, has always been consistent in creating mass awareness of human rights by several means, including reporting violations perpetrated by the State and advocacy and campaign to ensure internationally recognised civil and political rights of citizens. We unconditionally stand by the victims of oppression and maintain no prejudice with regard to their political leanings or ideological orientation.
    [Show full text]