Besix: Corporate Brochure
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Qatar 2022 Overall En
Qatar Population Capital city Official language Currency 2.8 million Doha Arabic Qatari riyal (English is widely used) Before the discovery of oil in Home of Al Jazeera and beIN 1940, Qatar’s economy focused Media Networks, Qatar Airways on fishing and pearl hunting and Aspire Academy Qatar has the third biggest Qatar Sports Investments owns natural gas reserves in the world Paris Saint-Germain Football Club delivery of a carbon-neutral tournament in 2022. Under the agreement, the Global Carbon Trust (GCT), part of GORD, will Qatar 2022 – Key Facts develop assessment standards to measure carbon reduction, work with organisations across Qatar and the region to implement carbon reduction projects, and issue carbon credits which offset emissions related to Qatar 2022. The FIFA World Cup Qatar 2022™ will kick off on 21 November 2022. Here are some key facts about the tournament. Should you require further information, visit qatar2022.qa or contact the Supreme Committee for Delivery & Legacy’s Tournament sites are designed, constructed and operated to limit environmental impacts – in line with the requirements Media Team, [email protected]. of the Global Sustainability Assessment System (GSAS). A total of nine GSAS certifications have been awarded across three stadiums to date: 21 November 2022 – 18 December 2022 The tournament will take place over 28 days, with the final being held on 18 December 2022, which will be the 15th Qatar National Day. Eight stadiums Khalifa International Stadium was inaugurated following an extensive redevelopment on 19 May 2017. Al Janoub Stadium was inaugurated on 16 May 2019 when it hosted the Amir Cup final. -
Belhasa Six Construct LLC. P.O Box: 13055, Al Quoz 3, Dubai, United Arab Emirates
Certificate CH10/1230.00 The management system of Belhasa Six Construct LLC. P.O Box: 13055, Al Quoz 3, Dubai, United Arab Emirates. has been assessed and certified as meeting the requirements of ISO 14001 :2004 For the following activities Civil works, Marine works, Building works, Industrial, Quarrying, Tunnelling and Environment Construction Projects. This certificate is valid from 19 July 2016 until 14 September 2018 and remains valid subject to satisfactory surveillance audits Recertification audit due before 6 July 2019 Issue 3. Certified since July 2010 This is a multi-site certification Additional site details are listed on the subsequent page Authorised by SGS Societe Generale de Surveillance SA Technoparkstrasse 1 8005 Zurich Switzerland t +41(0)44445-16-80 f +41(0)44445-16-88 www.sgs.com Page 1 of 2 This document is issued by the Company subject to its General Conditions of Certification Services accessible at www.sgs.com/terms_and_conditions.htm. Attention is drawn to the limitations of liability. indemnification and jurisdictional issues established therein. The authenticity of this document may be verified at http://www.sgs.com/en/Our-Company/Certified- Client-Directories/Certified-Client-Directories.aspx. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law. Certificate CH10/1230.00, continued Belhasa Six Construct LLC. ISO 14001 :2004 Issue 3 Detailed scope The Scope of registration appears on page 1 of the certificate. Additional facilities Six Construct Co. Ltd, P.O Box: 226, 32nd Street, Abu Dhabi, United Arab Emirates. -
Uefa Euro 2008
Expect emotions Info-Guide Impressum Publisher Euro 2008 SA Headquarters Route de St.-Cergue 9 1260 Nyon 1 Switzerland Tel.: +41 (0) 848 00 2008 Fax: +41 (0) 848 01 2008 Translation UEFA Language Services Design The Works Ltd. / Leeds (England) Layout/Setting team2graphics / Helsingør (Denmark) Printing ATAR Roto Press SA / Vernier (Switzerland) Photos: Keystone, GEPA, Action Images, L’Equipe, EMPICS, Terry Linke, Euro 2008 SA, UEFA 2 Contents 4 Editorial – Expect emotions 6 UEFA EURO 2008™ – Facts and figures 7 Countdown 8 Distances and travel times 10 UEFA EURO 2008™ match schedule 12 The stadiums 14 The finals 15 The winning captains The champion coaches 16 Attendances 17 Numbers games from 2004 in Portugal 18 Brief portraits of the host countries 22 The two host associations 26 The organisers 27 The Board of Administration 32 Tasks of Euro 2008 SA 33 The Management Board 36 EURO ABC – from A for accommodation to Z for Zurich 70 Contact details The Henri Delaunay trophy and EUROPASS, the official UEFA EURO 2008™ match ball. 3 Expect emotions The official UEFA EURO 2008™ slogan, expect emotions, describes in a nutshell what the 2008 European Championship has to offer: emotions that are felt by everyone alike – be they fans, players, coaches, referees, officials or organisers. Over a million spectators will flock to the 31 matches in the eight stadiums. Many millions will celebrate on the streets and in the official fan zones. Eight billion (cumulative) television viewers will share the excitement on screen. UEFA EURO 2008™ is by far the biggest sports event ever to take place in Austria and Switzerland. -
NEW Friday 20Th March – TT No.122: Brian
Updated on 20/03/20 NEW Friday 20th March – TT No.122: Brian Buck – ‘The pitch, a bumpy one, was rather hemmed in on all sides, but it was not unattractive and daffodils dotted around made it look quite pleasant'. It’s a trip up to Norfolk for Brian as he takes in East Ruston (v Hickling) in the North East Norfolk League Division One fixture played on 14/03/20…read more about his hop by logging on to the TT Reports page for 2019-20… NEW Friday 20th March – Latest Images: Ian Brown – It’s a trip to Cheshire for Ian as he brings us plenty of ground photos from 1874 Northwich (vs Barnoldswick Town) in the North West Counties League Premier Division played on 14/03/20…now added to the FGIF album gallery… NEW Friday 20th March – Latest Images: Richard Panter – Check out Richard’s matchday photos from a hop to Darlaston 1874 (v Shawbury United) in the West Midlands (Regional) League Premier Division played on 14/03/20…now added to the FGIF album gallery… NEW Friday 20th March – TT No.121: Keith Aslan – ‘It's a sports complex…there's nothing wrong with it, just a bit samey from the neutrals point of view’. Stoneham Saunters. Read more about Keith’s trip to watch AFC Stonham (v Solent University) in the Wessex League Premier Division played on 14/03/20…now added to the TT Reports page for 2019-20… NEW Friday 20th March – Latest Images: Gary Spooner – Don’t miss Gary’s awesome selection of matchday photos from a trip to Boston Town (v Shepshed Dynamo) in the United Counties League Premier Division played on 14/03/20…now uploaded to the FGIF album gallery… Gary adds via E-Mail sent on 15/03): ‘Trip to Boston yesterday where the mighty Dynamo won comfortably to keep up their title challenge. -
Driving Innovation and New Technologies
30 BESIX Creating the highest value for our stakeholders - Innovation Activity Report 2019 31 Driving innovation DeliverApp: an example of collective and new innovation Developed by BESIX Infra, DeliverApp consists of digitizing the reception of deliveries to technologies construction sites. Concretely, by using QR Codes, paper delivery notes are replaced by a fast, simple and efficient digital operation. This speeds up the administrative process, which is beneficial for both the supplier and the site manager. “DeliverApp is a perfect example of an A LEADER IN OPEN INNOVATION innovation that only makes sense if it is widely shared within the industry,” says Peter Bertels. OPEN INNOVATION IS ONE OF THE SIX PILLARS OF THE ‘BESIX FORWARD’ STRATEGY. “WHAT Today, supported by the Association of Belgian IS CALLED ‘INNOVATION’ TODAY ARE THE POTENTIAL BENEFITS FOR TOMORROW. SOLUTIONS Contractors, the solution has already been fully THAT ENABLE US TO CREATE ADDED VALUE FOR OUR CLIENTS. BESIX’S APPROACH IS TO GET adopted by two key suppliers in the construction sector, about 10 suppliers are working on INVOLVED IN THE DEVELOPMENT OF NEW IDEAS AND START-UPS AND THEN TO TRY THEM implementation, and it continues to spread. OUT IN OUR DEPARTMENTS AND ON OUR SITES”, EXPLAINS PATRIK PEYNSAERT, INNOVATION Want to know more? Just scan this QR Code: COORDINATOR. INTERNAL AND EXTERNAL IDEAS (see page 58). This building, which houses the headquarters of BESIX Nederland, is now considered to be a European Created in 2016, the Unleash program consists of a series reference in the field. In the same spirit, in collaboration with of initiatives focused on open innovation. -
An All-Time Record 97 Buildings of 200 Meters Or Higher Completed In
CTBUH Year in Review: Tall Trends All building data, images and drawings can be found at end of 2014, and Forecasts for 2015 Click on building names to be taken to the Skyscraper Center An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 Report by Daniel Safarik and Antony Wood, CTBUH Research by Marty Carver and Marshall Gerometta, CTBUH 2014 showed further shifts towards Asia, and also surprising developments in building 60 58 14,000 13,549 2014 Completions: 200m+ Buildings by Country functions and structural materials. Note: One tall building 200m+ in height was also completed during 13,000 2014 in these countries: Chile, Kuwait, Malaysia, Singapore, South Korea, 50 Taiwan, United Kingdom, Vietnam 60 58 2014 Completions: 200m+ Buildings by Countr5,00y 0 14,000 60 13,54958 14,000 13,549 2014 Completions: 200m+ Buildings by Country Executive Summary 40 Note: One tall building 200m+ in height was also completed during ) Note: One tall building 200m+ in height was also completed during 13,000 60 58 13,0014,000 2014 in these countries: Chile, Kuwait, Malaysia, Singapore, South Korea, (m 13,549 2014 in these Completions: countries: Chile, Kuwait, 200m+ Malaysia, BuildingsSingapore, South byKorea, C ountry 50 Total Number (Total = 97) 4,000 s 50 Taiwan,Taiwan, United United Kingdom, Kingdom, Vietnam Vietnam Note: One tall building 200m+ in height was also completed during ht er 13,000 Sum of He2014 igin theseht scountries: (Tot alChile, = Kuwait, 23,333 Malaysia, m) Singapore, South Korea, 5,000 mb 30 50 5,000 The Council -
Isak Venter Receives Geotechnical Gold Medal
April 2018 Vol 26 No 3 Isivili Enjiniyering ISAK VENTER SWARTBERG DUBAI CREEK RECEIVES PASS TOWER: GEOTECHNICAL EMERGENCY FOUNDING AN GOLD MEDAL REHABILITATION ICONIC BUILDING Est 1974 DELIVERING TOP QUALITY GEOTECHNICAL SOLUTIONS FOR OVER 40 YEARS. Fairbrother Geotechnical Engineering is an established Cape Town based company offering a full range of geotechnical solutions. With exceptionally skilled and experienced staff, along with a professional management team, we are able to provide top quality geotechnical solutions throughout Africa. DURBANVILLE - PILING SERVICES OFFERED: DRIVEN CAST-IN-SITU PILING: Pile diameter range LATERAL SUPPORT: Full range of lateral support solutions from 280mm to 610mm with working loads from 250kN which includes a design and construct service. to 1650kN. CFA PILING: Pile diameters of 400mm to 600mm with FORUM BORED PILING: Pile loads of 600kN to 800kN working loads from 500kN to 1650kN. SLOPE STABILISATION: Various forms of rockfall netting MARINE GEOTECHNICAL INVESTIGATIONS: and catch fences with nailed and anchored solutions. 3 Self Erecting Work Platforms (SEWP’s) used primarily for drilling investigations in nearshore and harbour DRILLING & GEOTECHNICAL INVESTIGATIONS environments. BANTRY BAY - LATERAL SUPPORT LAKE MALAWI – MARINE GEOTECHNICAL INVESTIGATION [email protected] (021) 715 5470 4 ESTMIL CLOSE, DIEP RIVER, CAPE TOWN WWW.FAIRBROTHER.CO.ZA FROM THE EDITOR’S DESK Our regular feature (From the CEO’s Desk) stands over until next month Est 1974 DELIVERING TOP QUALITY GEOTECHNICAL SOLUTIONS FOR OVER 40 YEARS. Fairbrother Geotechnical Engineering is an established Cape Town based company offering a full range of geotechnical solutions. When God dropped our magazine With exceptionally skilled and experienced staff, along with a professional management team, we are able to provide top quality geotechnical solutions throughout in the rubbish bin Africa. -
FY-2017-Annual-Report.Pdf
Table of Contents Introduction At a Glance ................................................... 04 Note from the CEO ....................................... 06 Group Overview ......................... 10 Our History ................................................... 12 Decades of Building Egypt ........................... 14 Geographic Diversification ........................... 16 Our Brands ................................................... 18 Our Strategy ................................................. 28 Construction Materials & Investment ............ 30 New Capital Power Plant, Egypt New Assiut Barrage, Egypt Operational Review............... 36 Concessions & Infrastructure Investments ... 64 Management Discussion & Analysis ....... 66 Our People ........................................ 72 Corporate Governance ..... 80 Our Board of Directors ................................. 82 Our Corporate Governance Structure .......... 86 USD Risk Management and Controls ................... 88 Risk Management Approach ........................ 94 BN Statement of Directors ................................. 96 Corporate Social 6.4 Responsibility ............................... 98 Pro forma backlog as of FY 2017 El Alamein Road, Egypt Financial Statements ........ 106 + + USD AT A GLANCE 65 70K 3.7 BN Years of contracting Employees Revenues for FY 2017 experience Orascom Construction Ltd. currently reported USD USD “ a pro forma backlog BN BN of USD 6.4 billion and 10 6.4 3.5 consolidated revenues of countries where OCL has pro forma backlog -
EVERSENDAI CORPORATION BERHAD EVERSENDAI ENGINEERING FZE EVERSENDAI ENGINEERING LLC EVERSENDAI Offshore SDN BHD Plot No
Towering – Powering – Energising – Innovating Moving to New Frontiers MANAGEMENT SYSTEMS EXECUTIVE CHAIRMAN & GROUP MANAGING DIRECTOR’s MESSAGE TAN SRI A.K. NATHAN Moving To New Frontiers The history of Eversendai goes back to 1984 and As we move to new frontiers, we are certain we after three decades of unparalleled experience, will be able to provide our clients the certainty and engineering, technical expertise and a strong network comfort of knowing that their projects are in capable across various countries, we are recognised as a and experienced hands. These developments will leading global organisation in undertaking turnkey complement our vision, mission and core values and contracts; delivering highly complex projects with simultaneously allow us to remain one of the most innovative construction methodologies for high rise successful organisations in the Asian and Middle buildings, power & petrochemical plants as well as Eastern Region and beyond with corresponding composite and reinforced concrete building structures efficiency and reliability. in the Asian and Middle Eastern regions. The successful and timely completion of our projects We have a dedicated workforce of over 10,000 accompanied by soaring innovation, creativity and people and an impressive portfolio of more than 290 our aspiration to move to new frontiers have been the accomplished projects in over 14 different countries key drivers for achieving continuous growth through with 5 steel fabrication factories located in Malaysia, the years and we remain committed to these values. Dubai, Sharjah, Qatar and India, with an annual This stamps our firm intent to dominate the various capacity of 150,000 tonnes. With our state-of-the-art industries which we are involved in and also marks steel fabrication factories, we have constructed some the next phase in our development to be amongst the of the world’s most iconic landmark structures. -
Massive Rush to Buy Tickets for Gulf Cup Semis
WEDNESDAY DECEMBER 4, 2019 RABI AL-AKHIR 7, 1441 VOL.13 NO. 4807 QR 2 Fajr: 4:43 am Dhuhr: 11:24 am Asr: 2:23 pm Maghrib: 4:44 pm Isha: 6:14 pm MAIN BRANCH LULU HYPER SANAYYA ALKHOR Business 9 Sports 12 Doha D-Ring Road Street-17 M & J Building QP seals 5-year Gulf Cup sees a P ARTLY CLOUDY MATAR QADEEM MANSOURA ABU HAMOUR BIN OMRAN HIGH : 28°C Near Ahli Bank Al Meera Petrol Station Al Meera naphtha sale agreement record 39 goals LOW : 19°C alzamanexchange www.alzamanexchange.com 44441448 with Shell in group stage AMIR REVIEWS PRogRESS ON WORLD CUP PROJECTS Massive rush to buy tickets for Gulf Cup semis Qatar to play Saudi Arabia at Al Janoub Stadium tomorrow TRIBUNE NEWS NETWORK DOHA THE Amir HH Sheikh Tamim bin Hamad al Thani chaired the third meeting of 2019 of the Board of Directors of the Supreme Committee for Delivery & Legacy (SC) at the Amiri Diwan on Tuesday. The meeting was attended by the Deputy Amir HH Sheikh TICKETS for the 24th Arabian Abdullah bin Hamad al Thani, Personal Representative of the Amir and Deputy Chairman of the Board of Directors HH Sheikh Gulf Cup semi-finals have been Jassim bin Hamad al Thani, Prime Minister, Minister of Interior and board member HE Sheikh Abdullah bin Nasser bin Khalifa al selling like hot cakes. There is a Thani, and other members of the board. During the meeting, they reviewed the progress of work on all the FIFA World Cup Qatar mad rush at ticket counters, the 2022 projects, and the progress of the operational and security plan for 2019 FIFA Club World Cup in Qatar. -
Days to Go: Lation
Sakkari QatarTribune Qatar_Tribune shocks QatarTribuneChannel qatar_tribune Osaka to storm into Miami Open semis PAGE 15 THURSDAY, APRIL 1, 2021 Ahmad Bin Ali Stadium Al Janoub Stadium Khalifa International Stadium TRIBUNE NEWS NETWORK hospitality. This uniquely Qatari stadium comes complete DOHA with a state-of-the-art retractable roof and is surrounded by 400,000m² of green spaces for the local community. ARCH 31, 2021 marked the 600-day count- The venue will host nine matches through to the semi- down to the FIFA World Cup Qatar 2022™. finals stage of Qatar 2022. THE first WorldC up in the Middle East and Construction update: The stadium structure has Arab world will kick off on 21 November and been completed and is ready to host matches. This in- Mconclude 28 days later on 18 December – Qatar National cludes the laying of the stadium pitch in record time. This Day. Qatar’s infrastructure plans are well advanced. Four year, the venue achieved a high sustainability rating from stadiums have been inaugurated, the new metro system GSAS. The surrounding Al Bayt Park opened on Qatar is up and running, and a host of expressways have been National Sports Day in February 2020. built. Here’s a closer look at the eight stadiums which will host matches during Qatar 2022. Khalifa International, Al Janoub, Education City and Ahmad Bin Ali have all Al Thumama Stadium hosted major matches, while the construction of Al Bayt Capacity: 40,000 has been completed. Along with Al Bayt, Al Thumama and Designer: Arab Engineering Bureau Ras Abu Aboud are set to be inaugurated during 2021, Distance from Doha city centre: 12km (7 miles) while the venue for the Qatar 2022 final, Lusail, is set to With a design inspired by the ‘gahfiya’, a traditional open early next year. -
2019 BESIX Activity Report
ACTIVITY REPORT 2019 ACTIVITY REPORT 2019 ACTIVITY REPORT BESIX in 2019 EVOLUTION OF REVENUES EVOLUTION OF ORDER BOOK (IN MEUR) (IN MEUR) 3,332 4,763 4,794 2,542 2,359 2,337 2,160 3,229 2,930 3,031 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019 REVENUES BY REGION ORDER BOOK BY REGION (2019) (AT 31/12/2019) 3,332 MEUR 4,794 MEUR BELGIUM 36% EUROPE 30% MIDDLE EAST 17% INTERNATIONAL 15% THE NETHERLANDS, MIDDLE EAST 18% LUXEMBOURG & FRANCE 12% AUSTRALIA 17% AUSTRALIA 28% REGIONAL CONTRACTORS 20% REST OF THE WORLD 7% REVENUES BY AREA OF EXPERTISE ORDER BOOK BY AREA (2019) OF EXPERTISE (AT 31/12/2019) 3,332 MEUR 4,794 MEUR BUILDINGS 65% BUILDINGS 58% CIVIL WORKS 16% CIVIL WORKS 28% MARINE WORKS 4% ENVIRONMENTAL WORKS 1% FOUNDATIONS 5% MARINE WORKS 7% ENVIRONMENTAL WORKS 2% FOUNDATIONS 1% OTHER (CABLING AND INFRA) 6% OTHER 5% QUARRIES / CONCRETE 2% DPG MEDIA, ANTWERP, BELGIUM Consolidated Key Figures 2019 (in MEUR) 2019 2018 2017 2016 2015 INCOME STATEMENT Revenues 3,332.0 2,542.1 2,337.0 2,359.1 2,159.7 EBITDA 97.8 131.4 122.5 168.1 46.1 EBITDA margin (%) 2.9% 5.2 5.2 7.1 2.1 EBIT 22.0 83.7 78.9 117.8 0.4 EBIT margin (%) 0.7% 3.3 3.4 5.0 0.0 Earnings before taxes 48.1 103.2 115.5 135.0 15.4 Consolidated profit 42.2 95.3 102.6 120.8 3.8 Net result on revenues (%) 1.3% 3.7 4.4 5.1 0.2 Cash flow 127.4 149.8 142.1 159.3 79.5 Cash flow margin (%) 3.8% 5.9 6.1 6.8 3.7 BALANCE SHEET Equity 698.5 695.1 660.4 653.0 518.3 Net cash position 141.0 135.7 34.1 172.4 26.4 Solvency ratio (%) 24.2% 26 28.1 27.3 24.4 Liquidity ratio 1.31 1.30 1.42 1.42 1.40