Government of Ministry of Development of North Eastern Region ------

Minutes of the 53rd Meeting of the NLCPR Committee held at 12.00 Noon on 30.11.2007 under the Chairmanship of Secretary, M/o DoNER in Committee Room, Vigyan Bhavan Annexe.

1. Smt. Sushma Singh, Secretary, Ministry of Development of North Eastern Region…..In Chair. 2. Dr. Hari Krishna, Joint Secretary, Ministry of Development of North Eastern Region. 3. Shri Naveen Verma, Joint Secretary (NE), Ministry of Home Affairs, North Block, New Delhi. 4. Shri R.K. Vats, Joint Secretary & FA, Ministry of DoNER and Ministry of Urban Development, Nirman Bhawan, New Delhi 5. Shri S. N. Brohmo Choudhury, Director (SP-NE), Planning Commission 6. Ms. Mithlesh, Dy. Director (PF-I), Ministry of Finance, North Block, New Delhi. 7. Shri K. Guite, Joint Director, IFD, Ministry of DoNER

Ms. Jayati Chandra, Sr. Adviser (SP-NE), Planning Commission and Shri V.S. Senthil, Joint Secretary (PF-I), Ministry of Finance were granted leave of absence.

Following Officers were also present as special invitees:

Shri Nikhil Pandey (Director), Shri P.R. Meshram (Director), Shri B.B. Samaddar, Deputy Secretary, Shri D.P. Singh (Under Secretary) and Shri S.K. Saha (Section Officer), Ministry of DoNER.

The Committee met and deliberated on the Agenda items. Following observations and recommendations were made:

Item No.1: Confirmation of Minutes of 52nd Meeting of the NLCPR Committee held on 24.10.2007 and 31.10.2007.

Minutes of the 52nd Meeting were confirmed.

* * *

Item No.2: Action taken report of decisions / recommendations made by NLCPR Committee in the 52nd Meeting held on 24.10.2007 and 31.10.2007

The Committee noted that the Minutes for 52nd Meeting have been issued on 05.11.2007 and action has been initiated by the Ministry of DoNER on the decisions/ recommendations made by the NLCPR Committee in that meeting. It was decided that the action be taken and progress reported in the next meeting.

* * * *

1 Item No.3: Reconsideration of 2007-08 Priority Lists of the Stat Governments of Arunachal Pradesh, , Meghalaya, , Nagaland, Sikkim and Tripura and consideration of 2007-08 Priority List of .

The NLCPR Committee noted that projects worth Rs. 345.34 crore have been retained from the 2007 – 08 Priority Lists of the States of Arunachal Pradesh, Assam, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura against an inernal notional allocation of Rs. 800 crore. The Priority List of Manipur could not be considered as it was received late. As per the provisional figures of accruals to the Non Lapsable Central Pool of Resources from the unspent balances out of 10% mandatory budgetary provision of the non-exempted Central Government Ministries, there is a scope available for retention of some more projects.

After taking into account the committed liabilities of ongoing and the retained projects and assessment of the availability of the untied funds in the Pool, the Committee decided to retain more some more projects for the 7 States, besides Manipur for which retention of projects from the Priority List 2007-08 was also considered. The Committee decided to retain projects for these States as per the details given below:

Sl. State State-wise notional Actual Allocation as Amount for which No. allocation against per retained Projects proposed Rs. 800 crore projects to be retained by Committee. Rupees in Crore 1 Arunachal 115.90 115.79 116.01 Pradesh 2 Assam 274.90 289.86 259.94 3 Manipur 77.25 Priority List yet to be 154.50 considered. 4 Meghalaya 76.72 76.57 76.87 5 Mizoram 56.75 60.82 52.68 6 Nagaland 68.24 77.22 59.26 7 Sikkim 51.00 50.46 51.54 8 Tripura 79.47 80.27 78.67 Total 800.23 345.34 849.47

********

Item No.4 (a): Reconsideration of 2007- 08 Priority List of Arunachal Pradesh for retention of more projects for detailed examination

The Committee noted that the Government of Arunachal Pradesh had submitted 2007 - 08 Priority List for NLCPR containing 53 proposals with a total estimated cost of Rs. 783.52 crore of which 8 projects have already been retained with an estimated cost of Rs. 115.79 crore on the recommendations of the Committee made in the 52nd meeting held on 24.10.2007 and 31.10.2007.

As per the provisional figures of accruals to the Non Lapsable Central Pool of Resources from the unspent balances out of 10% mandatory budgetary provision of the non-exempted Central Government Ministries, there is a scope available for retention of some more projects. As per equitable allocation formula the share of Arunachal Pradesh for this year’s Priority List will be upto Rs. 231.80 crore against the total notional allocation of Rs. 1600.00 crore for all the 8 NE States. Therefore, it has been decided to pick up additional projects worth around Rs. 116.01 crore from the Priority List of 2007 – 08 of the State Government of Arunachal Pradesh.

The Committee deliberated on the remaining projects in the Priority List, also took into account the letters written by Hon’ble Chief Minister, Arunachal Pradesh with regard to the priority list and recommended retention of the following 12 additional projects at a total estimated cost of Rs. 117.66 crore: 2

S. Project Name Retained Cost No. (Rs. in Crore) 1. Construction of Tamen-Tali road via Yirkoum (60 KM) – Phase-I 10.00 (total estimated cost Rs 30.00 Crore). 2. Construction of road from Kheti to Dadam (21 KM)- Total 11.00 estimated cost Rs.22.00 crore. 3. Construction of Satnaguri to Longding road via Kanubari, 5.00 Banfera, Wanu and Zedua (Phase-I)- total estimated cost Rs 32.27 crore. 4. Construction of Wak-Liromoba road (78 KM) – Phase-I (total 10.00 estimated cost Rs 39.00 crore). 5. Construction of road from Sangram to Phassang-Pallang via 10.00 Nyapin (SDO HQ) – Phase-I 6. Construction of Gachham-Morsing Road (27 KM) 23.00 7. Construction of Bailey suspension motorable bridge over Siyom 10.50 river to connect left bank at Paya (Span 122 mtr.) 8. Construction of Single lane bailey bridge (span 40 mtr) over 2.80 Tasing river in between Borguli village and Seram in East Siang district. 9. Construction of Steel bridge over Pakke river. 2.33 10. Construction of road from 80 KM point on Kimin – Ziro BRTF 8.03 road to Krishi Vigyan Kendra at Yachuli (5.00 KM) 11. Improvement & Extension of Dorsing, Pareng, Sine, Yibuk, 15.00 Liging road. (Phase-I)- total estimated cost Rs 30.00 crore. 12. Construction of an Auditorium at Rajiv Gandhi University, Rono 10.00 Hills, Arunachal Pradesh. Total 117.66

*****

Item No.4 (b): Reconsideration of 2007 - 08 Priority List of Assam for retention of more projects for detailed examination

The Committee noted that the Government of Assam had submitted 2007 - 08 Priority List for NLCPR containing 77 proposals with a total estimated cost of Rs. 822.49 crore of which 42 projects have already been retained with an estimated cost of Rs. 289.86 crore on the recommendations of the Committee made in the 49th Meeting held on 16.07.2007.

As per the provisional figures of accruals to the Non Lapsable Central Pool of Resources from the unspent balances out of 10% mandatory budgetary provision of the non-exempted Central Government Ministries, there is a scope available for retention of some more projects. Therefore, it has been decided to pick up additional projects worth around Rs. 260 crore from the Priority List of 2007 – 08 of the State Government of Assam as per equitable allocation for this year’s Priority List which will add upto Rs. 550 crore.

The Committee deliberated on the remaining projects in the Priority List and recommended retention of the following eight projects at a total estimated cost of Rs. 61.62 crore:

Sl. Name of the Project Estimated No cost (Rs. in crore) 1 Construction of Bus Terminus at Barpeta Town (Barpeta Dist.) 3.21 2 Construction of new Infrastructure of Govt. College of Arts & Crafts 5.00 in Kamrup Dist. (Funding through NLCPR for this project would be restricted to Administrative and Academic building, Boys’ and Girls’ Hostels, Open Air Theatre, Parking Shed and brick boundary wall

3 Sl. Name of the Project Estimated No cost (Rs. in crore) around the complex) 3 Kaziranga from Sky, Kohra Assam (Karbi Anglong) 3.52 4 Setting up of Multi – Fruit processing Plant at Silchar (Cachar Dist.) 18.10 5 Development of Water body at Kohra (Kaziranga) in Karbi Anglong 2.93 (Construction of Swimming Pool would not be funded through NLCPR, under this project. Besides, rationalization of other components should be done by the State Government) 6 Bodoland Institute of Information & Technology at Udalguri 10.00 7 Construction of 800 capacity Auditorium of Srimanta Snakaradeva 15.18 Kalashetra (Kamrup District) 8 Construction of Fly Over at the intersection of Pramathesh Barua 3.68 Road and N.F. Railway Tract at Bijni Town Total 61.62

The retention of the project at S.No. 3 is subject to the clearance from the Environment & Forest Department and at Sl. No. 6 is subject to the condition that the State Government gives firm commitment that they will bear the maintenance and operation costs including salary etc and also about the availability of free land.

The Committee also recommended that the State Government may be requested to provide Priority List of projects out of which projects worth around Rs. 198 crore may be retained after scrutiny by the Ministry and the NLCPR Committee.

*************

Item No.4(c): Consideration of Priority List 2007-2008 of Manipur for retention of projects for detailed examination

The Committee noted that the Government of Manipur submitted a Priority List of 55 projects with an estimated cost of Rs.467.98 crore for 2007-08. As the tentative allocation so far decided for the 2007-08 Priority Lists for all the states (Rs.1600 crore) the share of Manipur as per the equitable allocation formula works out to be Rs. Rs.154.50 crore.

After deliberations, the Committee recommended to retain the following 10 projects (Estimated Cost Rs.155.75 crore) for detailed examination:

Sl.No. Name of the Project Estimated cost ((Rs. in crore) 1 Loktak Down stream H.E. Project (2x33 MW), Tamenglong 100.00 district 2 Installation of 2x1 MVA 33/11 KV sub-station at Chakpi 5.52 Karong, Chandel district 3 Installation of 2x12.5 MVA 132/33 KV Sub-station at 18.27 Chandel 4 Installation of 2x1 MVA 33/11 KV sub-station at Henglep, 3.90 Churachandpur 5 Construction of bridge over River at Mongkhang 5.77 Lambi/Waikhom Leika Mapa, Imphal East 6 Construction of bridge over Iril river at Chingaren mapa, 5.30 Imphal East 7 Construction of RCC bridge over Iril River at Keirao Litan 5.82 Makhong, Imphal East 8 Construction of barrage across Itam river at Kharason, 4.39 Imphal East 4 Sl.No. Name of the Project Estimated cost ((Rs. in crore) 9 Modernisation of Kakching Ithel Maru Main Canal, Thoubal 4.19 10 Infrastructure Development of three Government Colleges 2.59 and one Govt.-Aided college of Manipur at Imphal West, Senapati and Imphal East Total 155.75

******

Item No.4(d): Reconsideration of 2007- 08 Priority List of Meghalaya for retention of more projects for detailed examination

The Committee noted that the Government of Meghalaya had submitted 2007 - 08 Priority List for NLCPR containing 54 proposals with a total estimated cost of Rs. 363.46 crore of which 2 projects have already been retained with an estimated cost of Rs. 76.57 crore on the recommendations of the Committee made in the 52nd meeting held on 24.10.2007 and 31.10.2007.

As per the provisional figures of accruals to the Non Lapsable Central Pool of Resources from the unspent balances out of 10% mandatory budgetary provision of the non-exempted Central Government Ministries, there is a scope available for retention of some more projects. As per equitable allocation formula the share of Meghalaya for this year’s Priority List will be upto Rs. 153.44 crore against the total notional allocation of Rs. 1600.00 crore for all the 8 NE States. Therefore, it has been decided to pick up additional projects worth around Rs. 76.87 crore from the Priority List of 2007 – 08 of the State Government of Meghalaya.

The Committee deliberated on the remaining projects in the Priority List, also took into account the letters written by Hon’ble Chief Minister, Meghalaya with regard to the priority list and recommended retention of the following 10 additional projects at a total estimated cost of Rs. 76.36 crore: S. Project Name Retained Cost No. (Rs. in Crore) 1. Replacement of Spt. Bridges by permanent RCC bridges on 33.00 Mawphlang- Balat- Gomaghat- Maheshkhola (MBGM) Road (Balat Bagli – Road section II & III). Br.Nos.21/1, 21/4, 24/1, 25/3, 25/6, 26/1, 26/2, 27/5, 28/14, 29/6, 30/4, 30/8, 32/1, 32/10, 34/2, 37/7, 36/1, 37/4, 37/14, 41/4, 43/1, 44/1, 44/2, 54/4, 55/1, 56/5, 57/1, 57/2, 57/3, 57/7, 57/8, 58/3, 67/2, 68/4, 70/7, 72/3, 72/5, 72/6, 72/9, 75/9, 76/2, 78/7, 79/5, 79/9, 81/8, 81/2, 81/3, 83/3, 83/4, 84/5, 84/10 = 51 nos. 2. Reconstruction of washed out timber bridge No.1/4 on Chockpot 5.51 Sibbari via Rongrikimgre Road. 3. Replacement of SPT bridges by permanent bridges of Damalgre- 10.00 Mellim road 4. Improvement/construction including Metalling and Blacktopping of 6.85 a double lane road from Rymbai to Deichynrum (7Km) 5. Improvement including Metalling & Blacktopping of road from 8.00 Sonapur (NH-44) to Lad Borsora (10 Km). 6. Construction of Maharam Govt, Secondary School 2.00 7. Construction of Jirang Govt. Secondary School 2.00 8. Construction of RCC Building at Govt. Girls’ Higher Secondary 3.00 School, Shillong. 9. Rymbai Presbyterian Higher Secondary School, Rymbai 3.00 10. Khliehriat Secondary School Khliehriat 3.00 Total 76.36

*****

5

Item No. 4(e): Reconsideration of 2007- 08 Priority List of Mizoram for retention of more projects for detailed examination

The committee noted that the Government of Mizoram had submitted 2007– 08 Priority List for NLCPR containing 23 proposals with a total estimated cost of Rs. 730.62 crore of which 2 projects have already been retained with an estimated cost of Rs. 60.82 crore. In addition, one project that figured at Sl No. 4 in the priority list had already been retained with an estimated cost of Rs. 5.60 crore from earlier priority list on the recommendations of the Committee made in the 49th meeting held on 16.07.2007. The committee also noted that Government of Mizoram have clubbed projects figuring at Sl No. 6, 12, 18 and 19 together and accorded priority number 6 to these new project proposal in their revised priority list having 20 projects with total estimated cost of Rs. 732.82 crore for 2007-08.

2. As per the provisional figures of accruals to the Non Lapsable Central Pool of Resources from the unspent balances out of 10% mandatory budgetary provision of the non- exempted Central Government Ministries, there is a scope available for retention of some more projects. Therefore, it has been decided to pick up additional projects worth around Rs. 52.68 crore from the Priority List of 2007 – 08 of the State Government of Mizoram as per equitable allocation for this year’s Priority List which will add upto Rs. 113.50 crore.

3. The Committee deliberated on the remaining projects in the Priority list and recommended retention of the following two projects at a total cost of Rs. 52.56 crore.

Sl. Components Estimated cost No (Rs. in crore) 1 Greater Water Supply Scheme 38.27 2 (a) Reconstruction of RCC Bridge over R.Teirei on Bairbari – 14.29 Zamuang Road (Estimated cost Rs.8.33 crore) and (b) Reconstruction of RCC Bridge over River R. Tuivawl on Saitual – Phullen road (Estimated cost Rs.5.96 crore). Total 52.56

******** Item No.:4(f): Reconsideration of 2007-2008 Priority List of Nagaland for retention of more projects for detailed examination.

The committee noted that the Government of Nagaland had submitted 2007– 08 Priority List for NLCPR containing 20 proposals with a total estimated cost of Rs. 569.79 crore of which 4 projects have already been retained with an estimated cost of Rs. 77.22 crore. The committee also noted that the State Government have added one more project to their Priority list according Priority No 6.. They have splitted one project of the list (Priority No. 9) into 2 projects

2. As per the provisional figures of accruals to the Non Lapsable Central Pool of Resources from the unspent balances out of 10% mandatory budgetary provision of the non- exempted Central Government Ministries, there is a scope available for retention of some more projects. Therefore, it has been decided to pick up additional projects worth around Rs. 68.24 crore from the Priority List of 2007 – 08 of the State Government of Nagaland as per equitable allocation for this year’s Priority List which will add upto Rs. 145.48 crore.

3. The Committee deliberated on the remaining projects in the Priority list and recommended retention of the following three projects with an estimated cot of Rs. 68.23 crore: Sl Project / scheme Estimated Cost No. (Rs in crore) 1 Upgradation of 132/66/33 KV Grid Sub-Station 34.23 Nagarjan,Dimapur from 3x100 (200) MVA 2. Construction of road from Razieba to Chizami via Thetsiimi 25.00 (25.30 Km) 6 Sl Project / scheme Estimated Cost No. (Rs in crore) 3. Construction of road from Noklak-Thnoknyu via Sanglao (64 9.00 Km) Total 68.23

********

Item No.4(g):Reconsideration of 2007-2008 Priority List of Sikkim for retention of more projects for detailed examination

The committee noted that the Government of Sikkim have submitted 2007– 08 Priority List for NLCPR containing 12 proposals with a total estimated cost of Rs. 176.62 crore of which 4 projects have already been retained with an estimated cost of Rs. 50.46 crore. The committee also noted that the State Government have added one project with an estimated cost of Rs. 36.00 crore to their Priority list. They have requested for enhancement of estimated cost for their retained project, Namely “Construction of Multipurpose hall cum classrooms for 5 Sr. Sec. Schools” from Rs. 6.26 crore to Rs. 10.24 crore as per the Concept note.

2. As per the provisional figures of accruals to the Non Lapsable Central Pool of Resources from the unspent balances out of 10% mandatory budgetary provision of the non- exempted Central Government Ministries, there is a scope available for retention of some more projects. Therefore, it has been decided to pick up additional projects worth around Rs 51.00 crore from the Priority List of 2007 – 08 of the State Government of Sikkim as per equitable allocation for this year’s Priority List which will add upto Rs. 101.46 crore.

3. The Committee deliberated on the remaining projects in the Priority list and recommended retention of the following 3 projects at a total cost of Rs.40.78 crore.

Sl Project / scheme Estimated Cost No. (Rs in crore) 1 Extension of Dicheling Crematorium 0.80 2 Construction of multipurpose hall cum classrooms for 5 Sr. 3.98 Sec. Schools (additional estimated cost) 3 Pakyong –Machong - Rolep Road, East Sikkim (35 km) 36.00 Total 40.78

The Committee recommended that the State Government may be requested to provide Priority List of projects out of which, projects worth around Rs. 10.76 crore may be retained after scrutiny by the Ministry and the NLCPR Committee.

***********

Item No.4(h): Reconsideration of 2007- 08 Priority List of Tripura for retention of more projects for detailed examination

The Committee noted that the Government of Tripura had submitted 2007 - 08 Priority List for NLCPR containing 53 proposals with a total estimated cost of Rs. 783.52 crore of which 8 projects have already been retained with an estimated cost of Rs. 115.79 crore on the recommendations of the Committee made in the 49th Meeting held on 16.07.2007.

As per the provisional figures of accruals to the Non Lapsable Central Pool of Resources from the unspent balances out of 10% mandatory budgetary provision of the non-exempted Central Government Ministries, there is a scope available for retention of some more projects. As per equitable allocation formula the share of Tripura for this year’s Priority List will be upto Rs. 158.94 crore against the total notional allocation of Rs. 1600.00 crore for all the 8 NE States. Therefore, it has been decided to pick up additional projects worth around Rs. 78.67 crore from the Priority List of 2007 – 08 of the State Government of Tripura. 7 The Committee deliberated on the remaining projects in the Priority List and also took into account the letter of the State Government submitting one additional project, namely, “Construction of Building for College of Agriculture” at an estimated cost of Rs.58.50 crore in the priority list.

After Delibrations the Committee recommended retention of the following 6 additional projects at a total estimated cost of Rs. 80.46 crore: S. Project Name Retained Cost No. (Rs. in Crore) 1. Construction of District Sports Complex at Kailashahar, North 4.75 Tripura District 2. Construction of District Sports Complex at Ambassa, Dhalai 4.95 District 3. Construction of District Sports Complex at Udaipur 4.75 4. Construction of Sports Complex at Khumlwng, Sadar 4.75 5. Construction of Motor Stand at Khumulwng, TTAADC 2.76 6. Construction of Building for College of Agriculture 58.50 Total 80.46

In view of the request of the State Government, the NCLPR Committee also recommended deletion of the project proposal namely 'Rural Training Centre of Agartala Government Medical College at Mohanpur CHC, Mohanpur, West Tripura' (Estimated Cost - Rs. 5.02 crore) retained from Priority List 2007 - 08.

*****

Item No.5: Proposal for Development and Up gradation of Jyoti Chitraban Film and Television Institute at Guwahati in Assam.

The Government of Assam had included the above project in the Priority list of 2006- 07 and the NLCPR Committee in their 42nd Meeting held on 16.06.2006 recommended to retain it for techno-economic examination at an estimated cost of Rs. 1295.00 Lac.

The Committee noted that the M/o Information and Broadcasting have conveyed their approval to the project subject to the following conditions:

(i) The project proposal “Development and Up gradation of Jyoti Chitraban Film and Television Institute” submitted to M/o DONER is to convert JCFTI into a full fledged Film & Television Institute. The Government of Assam has decided to bifurcate Jyoti Chitraban Film Studio, Guwahati and to take over Jyoti Chitraban Film and Television Institute under the Department of Culture Affairs with separate Budget provision.

(ii) The proposed items for JCFTI in the project “Modernization & Up gradation of Jyoti Chitraban Film Studio, Guwahati” are not included in the project proposal of “Development and Upgradation of Jyoti Chitraban Film and Television Institute (JCFTI)” except item No. 3 ( Electrical Computer Laboratory ) of Rs. 3.00 Lac.

(iii) It has been suggested to reduce the amount of Rs. 3.00 Lac from the amount proposed for the project “Development and Upgradation of Jyoti Chitraban Film and Television Institute (JCFTI)”

It was also noted that the Ministry of Urban Development have examined the project and found it technically acceptable subject to the following conditions:- (i) The project has been checked arithmetically for Rs. 9.63 crore for civil items only with respect to the measurement and details supplied with the estimate. The estimate includes lump sum provision of rates for various civil items, which are either specialized items or market rate items, which may be checked by the tender accepting authority.

(ii) The total estimate amounting to Rs. 13.81crore includes equipment/teaching aids and establishment works. The correctness of these rates will be checked by the competent 8 authority. Sanctioning authority may exercise his discretion for sanction and providing funds for these purposes.

(iii) This is further subject to feasibility of work at site, site conditions, technical viability etc. which are to be checked at site by the competent authority before taking up the execution of work.

After deduction of the the inadmissible items, the Committee recommended sanction of this project at a cost of Rs. 1346.77 lac inclusive of 1% contingency (on civil work only) i.e. Rs. 9.53 Lac, for the following item of works:

(Rs. in lac) Sl. Item of Works Amount No. A Civil Work 1 Construction of Three storied Administrative and Art Building 323.82 2 Construction of Three storied RCC Boys’ Hostel 163.34 3 Construction of Three storied RCC Girls’ Hostel 74.10 4 Construction of Two storied RCC Staff Quarter 85.69 5 Ground Floor of RCC Grade IV Quarter 23.36 6 Sub- soil investigation 4.84 7 Rapid sand RCC Filter 2.00 8 Deep Tubewell (Single point) 10.67 9 RCC underground water reservoir Tank 7.53 10 Development of site hilly area earth cutting 196.52 11 Construction of internal approach road to the proposed site 46.77 12 For campus lighting with Sub-station & H.T. line 7.74 13 A.S.E.B Load Security & other charges 3.39 14 Landscaping 3.87 15 Add 1% as contingency 9.53 Total (A) 963.17 B Equipments/Teaching Aids 1 Equipments/Teaching aids for the Department of Audiography & 98.46 Sound Engineering. 2 Equipments/Teaching aids for the Department of Motion Picture 147.27 Photography 3 Equipments/Teaching aids for the Department of Film & Video 87.74 Editing 4 Equipments/Teaching aids for the Department of Applied Acting 9.33 (Film & TV) 5 Equipments/Teaching aids for the Electronic and Electrical 5.90 6 Estimated cost for Establishment works of Library and Video/ Video 20.07 Unit 7 Equipment for Information and Networking services with LAN facility 6.63 8 Acoustic Treatment for the Studio and Laboratories for the 8.20 department of Auduiography & Sound Engineering and Department of Film & Video Editing and Electrical items. Total (B) 383.60 Total (A+B) 1346.77

The project has been recommended subject to the following conditions:

• The observations of M/o I & B and MOUD would be observed by the State Government. • The State Government and the project executing department would ensure that all the codal formalities are observed. • The codal formalities would include calling tenders on a competitive basis against advertisements in Newspapers, Trade Journal, website etc. to ensure wide publicity with a view to ensure healthy response.

9 • The estimate includes lump sum provision of rates for various civil items, which are either specialized items or market rate items, which may be checked by the tender accepting authority. • Feasibility of work at site, site conditions, technical viability etc. should be checked at site by the competent authority before taking up the execution of work. • The State Government will ensure that the project is executued within 24 months’ from the date of sanction • The terms and conditions contained in the Guidelines for NLCPR projects would be observed by the State Government during implementationm of the project. • The contingency charges would be reimbursed to the State Government on production of documentary evidence of actual contingent expenditure. However, the contingency charges would not include any work Charged establishment, daily wages charges or any other staff charges.

*************

Item No.6: Project for LIS from River Buridihing in Tengakhat Kheremia Mouza in Dibrugarh Division in Assam.

The project “LIS from River Buridihing in Tengakhat Kheremia Mouza in Dibrugarh Division” in Assam was retained for techno-economic examination by the NLCPR Committee in their 42nd Meeting held on 16-06-2006 at an estimated cost of Rs.298.00 lac

The Committee noted that the DPR has been examined by the Ministry of Water Resources who have stated that cost estimate of project seems to be in order and have, therefore, recommended the proposal for funding under NLCPR.

After deducting the inadmissible charges and restricting the contingency expenditure to 2% of the project cost, the Committee recommended sanction of the project with an estimated cost of Rs 291.63 lac as per the details given below: (Rs. in lac) A Civil works 1 Final survey 0.64 2 E/W in canal 92.40 3 Cross drainage work 4.51 4 Bank protection work 7.56 5 Boundary fencing around control cabin 2.81 6 Accommodation 5.15 7 Approach road 2.06 8 Cattle crossing 4.21 9 R.C.C. culvert 3.22 10 Regulator 0.63 11 Aqueduct 5.37 12 Canal lining work 33.58 13 M.D.T.W. I/S 65.57 14 Field channel 34.68 Total A 262.39 B Electrical & Mechanical works 1 Repairing of Barges 8.37 2 Pipes and Accessories 3.95 3 Pumps and Motors Spares 2.97 4 L.T. Electricals 5.95 5 Anchoring Device 1.62 6 Misc. Items 0.35 7 Painting Materials 0.22 8 Transportation 0.10 Total (B) 23.53 Total (A+B) 285.92 Contingency 2% 5.71 Grand Total 291.63

10 The project was recommended for sanction subject to the following conditions: • It must be certified by the State Government that this scheme is not included in the Tribal Sub-Plan of the State Government, before issue of the Sanction Letter. • State Government and State Irrigation Department should follow all codal formalities while executing the project. • The codal formalities should include calling of tenders on competitive basis by giving wide publicity in newspapers, trade journals etc. as well as web based publishing. • The Contingency Charges would be reimbursed to the State Government on production of documentary evidence of actual contingent expenditure. However, the Contingency Charges would not include any work charged establishment, daily wage charges or any other establishment charge. • The State Government will ensure that the project is implemented within 24 months from the date of issue of sanction order.

**************

Item No.7: Project for Remodeling of LIS from River Buridihing in Sassoni Mouza in Dibrugarh District in Assam.

The project for Remodeling of LIS from River Buridihing in Sassoni Mouza in Dibrugarh District in Assam was retained for techno-economic examination by the NLCPR Committee in their 42nd Meeting held on 16-06-2006 at an estimated cost of Rs. 245.00 lac. The Committee noted that the DPR has been examined by the Ministry of Water Resources who have stated that cost estimate of project seems to be in order and have, therefore, recommended the proposal for funding under NLCPR. After deducting the inadmissible charges and restricting the the contingency expenditure to 2% of the project cost, the Committee recommended sanction of the project with an estimated cost of Rs. 239.79 lac as per the details given below: (Rs. in lac) A Civil works 1 Final survey 0.74 2 E/W in canal system 88.40 3 Cross drainage work 7.21 4 Bank protection work 14.33 5 Control cabin 7.19 6 Accommodation 4.19 7 Approach road 0.89 8 Cattle crossing 2.59 9 R.C.C. slab culvert 6.48 10 Regulator 0.63 11 Aqueduct 4.19 12 Brick lining work 41.96 13 Intake reservoir 1.25 14 Water Course 5.50 Total (A) 185.55 B Electrical and Mechanical Works 1 Fabrication of Barrage 16.52 2 Salvaging of Old Barrage 0.78 3 Pumps and Motors Spares 12.35 4 Pipes and accessories 7.39 5 L.T. Electricals 6.57 6 Repairing of H.T. Line & 500 KVA new transformer 5.32 7 Misc. Items 0.19 8 Painting Materials 0.32 9 Transportation 0.10 Total (B) 49.54 Total (A+B) 235.09 Contingency 2% 4.70 Grand Total 239.79 11

The project was recommended for sanction subject to the following conditions: • It must be ensured that the project is not taken up under State Plan including Tribal Sub Plan, CSS/CPS, MP/MLA LAD. • State Government and State Irrigation Department should follow all codal formalities while implementing and executing the Project. • The codal formalities should include calling of tenders on competitive basis by giving wide publicity in newspapers, trade journals etc. as well as web based publishing. • The Contingency Charges would be reimbursed to the State Government on production of documentary evidence of actual contingent expenditure. However, the Contingency Charges would not include any work charged establishment, daily wage charges or any other establishment charge. • The State Government will ensure that the project is implemented within 24 months from the date of issue of sanction order.

**************

Item No.8: Project for consideration under NLCPR – Improvement of Roads in Sivasagar Town in Assam.

The project for Improvement of Roads in Sivasagar Town in Assam was retained by the NLCPR Committee in the 46th meeting held on 12.01.2007 for techno-economic examination with an estimated cost of Rs. 250.00 Lac.

The Committee noted that the Department of Road Transport & Highways have examined the DPR and found it to be in order. DoRT&H have further stated that the estimated cost of the project is reported to be based on survey and investigations carried out by the State PWD and various items of works have been priced at current Schedule of Rates for the year 2007-08 prevailing in the area or as per analyzed rates and may be taken as firm and DPR may be considered for approval. However, M/o DONER may examine admissibility of funding the Municipal Roads from NLCPR. DoRT&H have also desired that necessary certificates from Government of Assam should be obtained that this work is not funded against any other source/programme.

The Committee observed that the State Government in the DPR itself have certified that this work is not included in any other Centrally Sponsored Scheme like CRF, E&I, PMGSY, ISC etc. or under any scheme of State Government. It was further noted that the NLCPR Committee, while considering the project for retention, had taken into the aspect of the road being in municipality area. In view of these reasons, after deduction of inadmissible expenditure on quality control, the NLCPR Committee recommended sanction of the project with an estimated cost of Rs. 242.46 lac as per the following details : - (Rs. in lac) Sl.No. Name of item Road Length Amount 1 Improvement of Mahatma Gandhi Road via Mahatma Gandhi Road (0.00 to 33.70 TP Chaliha Road, Kalidham Road & Bishram 900.00 M) Path (Phukon Nagar Burning Ground) Ward T.P. Chaliha Road (0.00 to No.IX & X within Municipality area of 950.00 M) Sivasagar Town under Integrated road Kalidham Road (0.00 to 300.00 Development Scheme for the Year 2006-07 M) under PWD, Sivasagar State Road Division, Bishram Path (0.00 to 200.00 M) Nazira. 2 Improvement of KP Changkokati Path within K P Changkokati Path (0.00 to 44.79 Municipality area of Sivasagar Town under 1540.00 M) Integrated Road Development Scheme for the year 2006-07 under PWD, Sivasagar State Road Divisionn, Nazira. 3 Improvement of JP Agarwalla Path leading J P Agrawalla Path (0.00 to 57.48 from Lalchit park upto Honuman Mandir viar 30.00 M) Bora Road Ward No.III, IV, V, VII & VIII Bora Road (0.00 to 350.00 M) within Municipality area of Sivasagar Town L K Baruah Road (0.00 to 200.00 under Integrated Road Development Scheme M) for the Year 2006-07 under PWD, Sivasagar Bishnuram Baruah Path (0.00 to 12 Sl.No. Name of item Road Length Amount State Road Division, Nazira. 210.00 M) Puranapatty Road (0.00 to 320.00 M) Old Chalk Bazar Road (0.00 to 350.00 M) 4 Improvement of Swahid Joyram Dhulia Path Swahid Joyram Dhulia Path 33.00 (Old Post Mortem Road). Anand Nagar & (0.00 to 380.00 M) Milan Nagar Path Ward No.XIII within Milan Nagar Path (0.00 to Municipality area of Sivasagar Town under 300.00 M) Integrated Road Development Scheme for the Anand Nagar Path (0.00 to Year 2006-07 under PWD, Sivasagar State 350.00 M) Road Division, Nazira. 5 Improvement of Sivasagar Tank Side Roads Jail Side road (0.00 to 800.00 M) 65.59 including wielding of remaining portion of Commerce College Road (0.00 to Tank Side within Municipality area of 630.00 M) Sivasagar Town under Integrated Road Circuit House Side Road (0.00 to Development Scheme for the year 2006-07 650.00 M) under PWD, Sivasagar State Road Division, Shiv Dol Side Road (0.00 to Nazira. 810.00 M) 6 Improvement of Roads from HCB Roads to AT HCB Road to A T Roads (0.00 to 5.50 Road within Municipality area of Sivasagar 115.00 M) Town under Integrated Road Development Scheme for the year 2006-07 under PWD, Sivasagar State Road Division, Nazira. Contingency @ 1% 2.40 Total (A) 242.46

The project was recommended for sanction subject to the following conditions:

• The terms and conditions contained in the Guidelines for NLCPR projects should be observed by the State Government during implementation of the project. • The State Government should follow all codal formalities in executing the project and Implementing agency should strictly abide by the completion schedule. • The codal formalities should include calling of tenders on competitive basis by giving wide publicity in newspapers, trade journals etc. as well as web based publishing. • The Contingency Charges would be reimbursed to the State Government on production of documentary evidence of actual contingent expenditure. However, the Contingency Charges would not include any work charged establishment, daily wage charges or any other establishment charge. • Before starting the work the State Government will get the videography done of the existing condition of roads in full length. • The State Government will ensure that the project is implemented within 24 months from the date of issue of sanction order.

**************

Item No.9: Project for consideration under Non Lapsable Central Pool of Resources (NLCPR) for Construction of Road from Bhangarpar to Chandranathpur via Baburbazar (Length 5.5 Km) in Assam.

The project for Construction of Road from Bhangarpar to Chandranathpur via Baburbazar (Length 5.5 Km) was retained by NLCPR Committee in their 42nd Meeting held on 16.06.2006 at an estimated cost of Rs 200.00 Lac.

The Committee noted that DoRT&H have examined the DPR submitted by the State Government and have found it to be in order. DoRT&H have also stated that the estimated cost of the project is reported to be based on survey and investigations carried out by the State PWD and various items of works have been priced at current Schedule of Rates for the year 2006-07 prevailing in the area or as per analyzed rates and may be taken as firm and DPR may be considered for approval. D/O RT&H further suggested that a certificate may be

13 obtained from State Government that this work is not funded against any other source/ programme.

The Committee observed that the State Government have certified in the DPR itself that this project /scheme or any other part thereof are neither proposed nor taken up under any schemes/ programmes like NEC/ State Plan/ ISC/ MLALADS/ PMGSY/ CRF/ RSVY/ Economic and Importance, etc. nor this shall be proposed for such schemes in future.

After deducting the inadmissible cost for preparation of DPR, the Committee recommended sanction of this project at a cost of Rs. 249.05 Lac for the following items of work (Rs. in lac) Sl.No. Name of the Item Amount 1 Clearing and Grubbing 0.25 2 E/W in Core filling 65.23 3 E/W in sub grade & shoulder 8.99 4 G.S.B. Gr.II 49.66 5 W.B.M. base course Grade II 23.75 6 W.B.M. base course Grade III 25.81 7 Providing PC and SC 33.99 8. H. P. Culvert 3.70 9. R C C Minor Bridge 33.88 10. Road furniture 0.11 11 Contingency 3.68 Total 249.05

The project was recommended for sanction subject to the following conditions: (i) The State Government and State PWD should follow all codal formalities while executing the project

(ii) The codal formalities should include calling of tenders on competitive basis by giving wide publicity in newspapers, trade journals etc. as well as web based publicity.

(iii) The contingency charges would be reimbursed to the State Government on production of documentary evidence of actual contingent expenditure. However, these would not include any work charged establishment, daily wage charges or any establishment expenditure.

(iv) The State Government will ensure that the project will be completed within 12 months from the date of issue of sanction order.

(v) The State Government before starting the work will get the videography done of the existing condition of road in full length.

**************

Item No.10: Project for consideration under Non Lapsable Central Pool of Resources NLCPR) - “Improvement of Roads in Jorhat Town” in the State of Assam

The project for “Improvement of Roads in Jorhat Town” in the State of Assam was retained for techno-economic examination by NLCPR Committee in their 46th Meeting held on 12.01.2007 at an estimated cost of Rs. 250.00 Lac.

The Committee noted that DoRT&H have examined the DPR and have found it to be in order. DoRT&H have also stated that M/o DONER may consider it for approval, however, admissibility of funding the Municipal road from NLCPR may be examined at their end. They have further stated that estimated cost of the project is reported to be based on survey and investigations carried out by the State PWD and various items of works have been priced at current Schedule of Rates for the year 2007-08 prevailing in the area or as per 14 analyzed rates and may be taken as firm and DPR may be considered for approval. DoRT&H have also suggested that a certificate may be obtained from State Government that this work is not funded against any other source/ programme.

The Committee observed that the State Government have certified in the DPR itself that this project/ scheme or any other part thereof are neither proposed nor taken up under any schemes/ programmes like NEC, State Plan, ISC / MLAADS/ PMGSY/CRF/ RSVY/ Economic and Importance, etc. nor this shall be proposed for such schemes in future. The Committee also note that the project was retained taking into account the aspect that the project was for the Municipal area roads.

The NLCPR Committee recommended sanction of the project at a cost of Rs. 250.00 lac, inclusive of Contingency expenditure of Rs.1.17 Lac, as per the following details: (Rs. in lac) Sl. Name of the Item Amount No. 1 Improvement of Rajamaidam New Colony Road from Fancy Ali to 33.64 Gajpuria via Royal Road (L=1.451 Km) 2 Improvement of BNP Road from rice Mill Road to J.B. Road via Dewal Road 37.32 (L=1.576 Km.) 3 Improvement of Pound Ali from Station Road to M.G. Road (L=1.007 Km) 23.98 4 Improvement of R.B. Path from M.G. Road to A.T. Road via Choladhara 33.84 (L=1.438 Km) 5 Improvement of Madhuban Path road from J.B. Road to Choladhara 35.90 (L=1.497 Km) 6 Improvement of Extension Sonarigaon Road from K.B. Road to A.T. Road 42.58 via Atilagaon (L=1.791 Km.) 7 Improvement of Pub Bongal Pukhuri Road from Na-Ali to Tocklai(L=1.091 25.94 Km.) 8. Improvement of Dhenususa Path from A.T. Road to A.T. Road (L=0.662 15.63 Km.) 9 Contingency 1.17 Total 250.00

The project was recommended for sanction with the following conditions:

(i) The state Government and State PWD should follow all codal formalities while executing the project’ and (ii) The codal formalities should include calling of tenders on competitive basis by giving wide publicity in newspapers, trade journals etc. as well as web based publicity. (iii) The contingency charges would be reimbursed to the State Government on production of documentary evidence of actual contingent expenditure. However, these would not include any work charged establishment, daily wage charges or any other staff charge. (iv) The State Government before starting the work will get the videography done of the existing condition of roads in full length. (v) The State Government will ensure that the project will be completed within 18 months from the date of issue of sanction order.

********

Item No.11: Project for consideration under NLCPR - Widening and Raising of Nazirakhat Sonapur Road (Length- 6Km) under NLCPR in the State of Assam

The project for Widening and Raising of Nazirakhat Sonapur Road (Length=6Km) was retained by NLCPR Committee in its 46th Meeting held on 12.01.2007 at an estimated cost of Rs. 250.00 Lac.

15 The NLCPR Committee observed that DoRT&H have examined the DPR submitted by the State Government and have found it to be in order. The DoRT&H have also stated that estimated cost of the project is reported to be based on survey and investigations carried out by the State PWD and various items of works have been priced at current Schedule of Rates for the year 2006-07 prevailing in the area or as per analyzed rates and may be taken as firm and DPR may be considered for approval. DoRT&H also suggested that a certificate may be obtained from State Government that this work is not funded against any other source/ programme.

The Committee noted that the State Government have certified, in the DPR itself, that this project/ scheme or any other part thereof are neither proposed nor taken up under any schemes/ programmes like NEC/ State Plan/ ISC/ MLALADS/ PMGSY/CRF/ RSVY /E & I etc nor this shall be proposed for such schemes in future.

In view of the above, the Committee recommended sanction of this project at a cost of Rs. 265.08 lac as per following details: (Rs. in lac) Sl.No. Name of the Item Amount 1 E/W in core 35.70 2 E/W in sub grade & shoulder 20.41 3 G.S.B. Gr.II 101.70 4 W.B.M. 55.52 5 Tack Coat 1.57 6 Premix Surfacing 21.08 7 Seal Coat 9.69 8. Surface Drain 1.50 9. Construction of Single Row HPC 11.79 10. Construction of Retaining wall 6.12 Total 265.08

The Committee recommended sanction of the project subject to the following conditions:

(i) The state Government and State PWD should follow all codal formalities while executing the project’ and (ii) The codal formalities should include calling of tenders on competitive basis by giving wide publicity in newspapers, trade journals etc. as well as web based publicity. (vi) The State Government before starting the work will get the videography done of the existing condition of roads in full length. (vii) The State Government will ensure that the project will be completed within 12 months from the date of issue of sanction order.

***************

Item No.12: Proposal for “Construction of Bodoland India Indigenous Tribal Art and Cultural Complex cum-Film Studio at Kathalguri, Pt.II, ” in Assam.

The project “Construction of Bodoland India Indigenous Tribal Art and Cultural Complex cum-Film Studio at Kathalguri, Pt.II, Kokrajhar” in Assam had been included by State Government of Assam in the priority list 2006-07 and the NLCPR Committee in their 42nd meeting held on 16.06.2006 recommended to retain the project for techno-economic examination at an estimated cost of Rs. 500.00 lac.

The NLCPR Committee noted that the Ministry of Culture have conveyed their “No objection” from Cultural angle and have suggested that on technical and cost aspect, CPWD may be consulted.

16 The Committee also observed that Ministry of Urban Development, who have examined the DPR, have found it to be technically acceptable and have cleared the proposal subject to certain conditions which are at Annex.

After restricting the contingency charges to 2%, the Committee recommended sanction of this project at a cost of Rs.495.14 lac as per the details given below:- (Rs. in lac) Sl. Item of Works Amount No. 1 Civil Works 220.52 2 Sanitary and Water Supply Works 7.56 3 Land Development 30.82 4 Road, Parking, Drain, Culverts & Entrance Gate & Gate Office and 30.65 Landscaping. 5 Boundary Wall 29.21 6 Electrical Works 41.97 7 Air-conditioning 39.61 8 Acoustic 35.23 9 Sound Reinforcement 14.35 10 Auditorium Chair 19.50 11 Projector, Movie screen, Curtain and Stage lighting 16.02 12 Contingency @ 2% 9.70 Total 495.14

The project was recommended for sanction with the following conditions:

(i) The State Government would observe all the conditions imposed by the Ministry of Urban Development (as at Annexure-I)

(ii) A certificate may be obtained from the State Government that the project is not included in any other Schemes of the State or Central Government including MPLAD, before the sanction order is issued to the State Government.

(iii) The Government of Assam should follow all codal formalities while executing the project. Codal formalities should include calling tenders on competitive basis by giving wide publicity in print media as well as web-based publicity.

(iv) The contingency charges would be reimbursed to the State Government on production of documentary evidence of actual contingent expenditure. However, these would not include any work Charged establishment, daily wage charges or any other establishment charges.

(v) The State Government will ensure that the project will be completed within 24 months from the date of issue of sanction order.

(vi) It will also be ensured by the State Government and the Bodo Territorial Council (BTC) that there is not duplication of this project components with the project components of BODAFA Cultural Complex project sanction by this Ministry under B.T.C Package of Rs. 500 crore.

**********

Item No.13: Proposal for “Construction including Metalling and Blacktopping of Road from Mushut to Lumputhoi via Rngad (0-12 Km)" in Meghalaya under Non-lapsable Central Pool of Resources (NLCPR)

The Committee noted that the project was retained at an estimated cost of Rs.8.00 crore in their 34th meeting held on 18.07.2005. The Department of Road Transport & Highways, Government of India vetted the project at Rs.793.49 lac. The proposal is for

17 widening of formation from Mushut to Rngad (9 Km) from the existing formation width to 5.95 m including metalling and blacktopping. The proposal also includes construction of 3 Kms of new road from Rngad to Lumphuthoi. After deliberations, the Committee, excluding inadmissible items, recommended the project for sanction with the following components at an estimated cost of Rs.487.21 lac:

S. Components of work Amount No. (Rs. in lac) 1. Excavation in hilly area by mechanical means 108.08 2. Construction of embankment with materials deposited from 6.39 roadway 3. Protection Works (Retaining Walls) 48.92 4. Cross Drainage Works 116.66 5. Construction of Granular Sub Base 46.68 6. Construction of unlined surface drain 10.79 7. Providing laying spreading and compacting stone aggregates 69.39 8. Blacktopping 57.13 9. Supplying of Signboard 2.00 10. Escalation Cost of Bitumen 11.62 Sub Total 477.66 11. Add 2% Contingency 9.55 Grand Total 487.21

The Committee observed that the sanction will be subject to the following conditions:

i. The Government of Meghalaya should follow all codal formalities while executing the project. ii. The codal formalities should include tenders being called on competitive basis by giving wide publicity in print media like Newspapers & Trade Journals and the web based publicity. iii. The State Government would ensure that the project is completed within 24 months from the date of issue of sanction of the project. iv. The 2% contingency charges amounting to Rs.9.55 lac may be reimbursed for actual contingent expenditure to the State Government on production of documentary evidence. However, they would not include any work charge, daily wages or any other establishment charges. v. The State Government would immediately get the video-graphy done of the project site so as to highlight the existing condition with the details of those areas where specific works are to be done, including proposed embankment, CD Works, approaches, earth work, protection works, pavement works, etc.

***** Item No.14: Intensive & Strengthening of Central Rural Sanitation Programme in Mara Autonomous District Council Areas of Mizoram - regarding.

The Committee noted that as per guidelines on Central Rural Sanitation Programme issued by the Department of Drinking Water Supply, Union Ministry of Rural Development, the components of the proposal are covered under their schemes.

2. After deliberation, the Committee recommended that the project may be retained but the Union Ministry of Rural Development may be requested examining the project in view of the provisions of their scheme. (Rs. in Lac) Sl.No. Components No. of Unit Total Unit Cost

1 Construction of individual house hold, latrine / 2667 0.15 40.00 toilets

18 Sl.No. Components No. of Unit Total Unit Cost

2 Public Bathroom in selected villages 35 0.25 8.75 3 Dumping Ground 20 1.50 30.00 4 Public Toilets 125 0.20 25.00 5 Disable persons / women complex 225 0.15 33.75 6 Public Dustbin / Urinal Shed 508 0.05 25.40 Total 162.90

In the meantime, Mara ADC through the State Government may be requested to indicate location of each unit of components and name of beneficiaries (village wise) of each unit of individual latrine / toilet in the DPR while making request for submission of DPR. ********

Item No.15: Construction of School Building in Mara Autonomous District Council (MADC) under NLCPR – regarding.

The committee noted that the project was retained at an estimated of Rs. 3.86 crore from the 2005 – 06 Priority List on recommendation of NLCPR committee in their 32nd meeting held on 28 February 2005. The Union Ministry of Human Resources Development have supported the proposal and the Union Ministry of Urban Development have vetted the DPR for Rs. 308.61 lakh.

2. After deliberation, the Committee recommended sanction of the project for funding from NLCPR as under: A: School Building (Primary) Sl.No. Name of Schools Amount (Rs. in lac) 1 N.Saiha P/S – I 6.37 2 Meisa Vaiha P/S – I 6.37 3 Thiahra P/S 6.37 4 Zyhno P/S – I 6.37 5 Phusa P/S 6.37 6 Vahia P/S 6.37 7 Laki P/S – I 6.37 8 Pala P/S 6.37 9 Lohry P/S 6.37 10 Khakhy P/S 6.37 11 Zyhno P/S – III 6.37 12 Khopai P/S 6.37 13 Siasi P/S 6.37 14 Lobo p/S – I 6.37 15 Maila P/S 6.37 16 Chahalo P/S – I 6.37 Total 101.92

B. School Building (Middle) Sl.No. Name of Schools Amount (Rs. in lac) 1 Saikao UPS 5.50 2 UPS 5.50 3 Chhaolo UPS 5.50 4 Laki UPS 5.50 5 Lobo UPS 5.50 6 Iana UPS 5.50 7 Siasi UPS 5.50 8 Amobyu ‘B’ UPS 5.50 9 Laty UPS 5.50 19 Sl.No. Name of Schools Amount (Rs. in lac) 10 Kaochao UPS 5.50 11 Vahia UPS 5.50 12 Tisopi UPS 5.50 13 Chakhci UPS 5.50 Total 71.50

C. Hostel Building (Primary) Sl.No. Name of Schools Amount (Rs. in lac) 1 Siata P/S 3.00 2 Tokalo P/S 3.00 3 Chapi P/S 3.00 4 Amotlah P/S 3.00 5 Amobyu ‘B’ P/S 3.00 6 Laki P/S 3.00 Total 18.00

D. Hostel Building (Middle) Sl.No. Name of Schools Amount (Rs. in lac) 1 Lobo UPS 3.00 2 Tisi UPS 3.00 3 UPS 3.00 4 Phura UPS 3.00 5 N.Laty UPS 3.00 6 Tipa ‘V’ UPS 3.00 7 N.Colony UPS 3.00 Total 21.00

Grand total (A+B+C+D) =Rs. 212.42 lac

The Committee observed that the sanction will be subject to the following conditions: vi. The Government of Mizoram should follow all codal formalities while executing the project. vii. The codal formalities should include tenders being called on competitive basis by giving wide publicity in print media like Newspapers & Trade Journals and the web based publicity. viii. The State Government would ensure that the project is completed within 12 months from the date of issue of sanction of the project.

*****

Item No.16: Upgradation & Improvement of roads to tourist villages from the major / minor hubs under PM’s package.

The committee noted that the then Prime Minister during his visit to Nagaland in October 2003 had announced a package of Rs. 25.00 crore for development of Tourism in the State. The Ministry of Tourism have sanctioned Rs.1009.65 lakhs for development of 3 tourism site and released an amount of Rs. 807.72 lakh to the State Government. The road connectivity to these places is not good. Therefore, the Ministry of Tourism, Government of Nagaland had submitted the proposal to the Union Department of Tourism for funding by them. The proposal could not be considered by the Union Ministry of Tourism. They have forwarded the proposal to the Ministry of DoNER for funding.

2. After deliberation, the Committee recommended retention of the project for further consideration for funding under NLCPR as under:

20

Sl. Name of road Estimated cost No. (Rs. in lac) 1 Upgradation of State Border road to Longwa Tourist Vill, Mon 13.90 Dist (0.85 Km) 2 Upgradation of Yikhum to Riphyim Yanhen Tourist Vill, Wokha 34.77 Dist. (2.20 Km) 3 Upgradation of State highway to Tourist Eco-Camp Doyang, 32.22 Wokha Dist. (2.00 Km) 4 Upgradation of State Border Road to New Thewati Tourist 23.47 Village, Phek Dist. (1.50 Km) 5 Upgradation of State Border Road to Ihuvihse Old Tourist Village, 14.73 Zunheboto dist (1.00 Km) 6 Upgrdation of State Border Road to Ghukiye Tourist Village, 75.86 Zunheboto dist. (5.00 Km) 7 Upgradation of Stae Border Road to Sukhayi Tourist Village, 113.52 Zunheboto Dist. (7.50 Km) 8 Upgrdation of State Border Road to Satoi Tourist Village, 188.14 Zunheboto Dist. (12.50 Km) Total 496.61

*********

Item No.17: Tsurang Irrigation Project for possible funding under NLCPR.

The committee noted that the project was retained on recommendation of NLCPR committee in their 33rd meeting held on 10 May 2005 at an estimated cost of Rs. 16.15 crore from the priority list for 2005-06. The Union Ministry of Water Resources (Minor Irrigation Division) have examined the revised DPR with estimated cost of Rs.31.08 lakh and found it in order.

2. After deliberation, the Committee recommended the sanction of the project for funding from NLCPR with the components as contained in the following table:

A. Barrage and Head Regulator Sl. Project Component Amount No. (Rs. in lac)

1 Excavation in foundations 58.98 2 Soil treatment in foundations 1.70 3 1.5m thick stone apron 27.55 4 0.6m thick stone pavlis 3.15 5 0.6 thick inverted filters 1.60 6 R.R. masonry for toe walls in foundation and guide bund 10.00 7 Lean concrete in foundation, etc. (for Spillway, Under - sluici and 76.65 C.C blocks of 1.5m thick) 8 RCC for main structure (Spillway, Undersluici, Piers, Divide walls 307.38 and Abutments) 9 Reinforcement 264.16 10 Rough stone pitching for guide bunds 31.77 11 Shuttering 0.87 12 Sheet of piles for upstream and down stream of the raft 78.31 13 Dewatering 17.89 14 Spillway gates and under sluici gates 159.78 15 Stoplogs with 6 blockout / embedded parts for stoplogs 44.12 16 Hoist supporting structure 26.09 17 Head regulator gate and screw hoist 0.90 18 Electrification 4.45 19 Water supply, purification and distribution 4.45 20 Sewerage disposal and storm water drainage works 2.97 21 Fire fighting equipment 0.72 21 Sl. Project Component Amount No. (Rs. in lac) 22 Construction of 3 km black top road with culvert etc. upto project 26.40 site 23 Boundary pilles & Stones, Distance marks & bench 0.44 24 Power supply 1.48 25 Time Keeping Cabin 0.37 26 Wireless communication system 0.37 27 Inflow forecasting and flood warning system 1.11 28 Contingency @ 2% on items no. 1 and 3 to 17 22.18 Total 1175.84

B. Canal Sl. Project Component Amount No. (Rs. in lac) 1 Regulators in canal (excluding canal head regulator) : 3 nos. 8.10 2 Falls in the main canal (2.00 m -1, 2.50 m - 2, 3.00 m – 1no.) 18.59

3 Cross Drainage Works (Aqueduct 3, outlet / turnout 12, syphon 101.73 aqueduct 7 and Drainage syphon 3 nos.) 4 Bridges (at road crossing the canal) :2 nos. 29.70 5 Escapes (tail escape) : 4 nos. 11.88 6 Earthwork 271.59 7 Construction of road up to project site (1km) 9.50 8 Distributaries, minors and sub-minors(1159 Ha) 55.38 9 Drainage work in commend area (1159 Ha) 11.01 Total 517.48

Grand Total (A+B) =Rs. 1693.32 lac The Committee, however, laid down the following condition with the sanction of the project: i. The Government of Nagaland should follow all codal formalities while executing the project. ii. The codal formalities should include tenders being called on competitive basis by giving wide publicity in print media like Newspapers & Trade Journals and the web based publicity. iii. The State Government would ensure that the project is completed within 36 months from the date of issue of sanction of the project. iv. The 2% contingency charges amounting to Rs.22.18 lac may be reimbursed for actual contingent expenditure to the State Government on production of documentary evidence. However, they would not include any work charge, daily wages or any other establishment charges.

*******

Item No.18:Proposal for “Construction of Cultural Center Complex at Dotma,” at in Assam.

The project “Construction of Cultural Center Complex at Dotma,” at Kokrajhar District in Assam had been retained at an estimated cost of Rs. 272.00 lac from the priority list 2006-07 of Assam, on the basis of recommendations of the NLCPR Committee made in their 42nd meeting held on 16.06.2006.

The Committee noted that the Ministry of Culture have conveyed their “No objection” from Cultural angle and have suggested that on technical and cost aspects, CPWD may be consulted.

The Committee also noted that the Ministry of Urban Development have examined and vetted the DPR at a cost of Rs.222.78 lac excluding VAT charges and manpower and human resources provisions. 22

After restricting the contingency charges to 2% of the project cost, as per policy, the Committee recommended sanction of the project at a cost of Rs. 221.06 lac as per details given below:- (Rs. in lac) Sl. No. Item of Works Amount A Cultural Centre Complex at Dotma Town in Kokrajhar District 1 Civil cost 94.68 2 Electrical cost 20.69 3 Sanitary and Water supply works 4.61 4 Road, Parking, Culverts and Landscaping. 3.81 5 Entrance Gate 0.26 Sub- Total (A) 124.05 B Cultural/ Convention Hall at Dotma Town in Kokrajhar District 1 Civil cost 64.83 2 Electrical cost 7.47 3 Sanitary and Water supply works 3.00 4 Road, Parking, Culverts and Landscaping. 6.52 5 Boundary Wall and Entrance Gate 10.86 Sub-Total (B) 92.68 Total cost (A) + (B) 216.73 Contingency @ 2 % 4.33 Grand Total 221.06

The project was recommended for sanction subject to the following conditions :-

• The State Government and State PWD should follow all the codal formalities while executing the project. • The codal formalities should include calling of tenders on competitive basis by giving wide publicity in newspapers, trade journals etc., as well as web based publicity. • The Implementing Agency should strictly adhere to the schedule of completion of the project. • The contingency charges would be reimbursed to the State Government on production of documentary evidence of actual contingent expenditure. However, these would not include any work Charged establishment, daily wage charges or any other establishment charges. • The sanction letter will be issued to the State Government only after obtaining a certificate from the State Government that this project is not being or proposed for funding from any other source. • The State Government will ensure that the project will be completed within 24 months from the date of issue of sanction order.

**********

Item No.19: Project “Construction of 500 bedded hospital in Itanagar (250 beds in Phase-I)", in Arunachal Pradesh for deletion from the list of 'Retained Projects' from Priority List 2005 - 06.

The Committee noted that the project was retained on 22.01.2004 at an estimated cost of Rs.119.28 crore. The Detailed Project Report 9DPR) was received and was examined by M/o Urban Development (MoUD), M/o Health & Family Welfare (MHFW) and the Planning Commission. Their observations on the DPR of the project were communicated to the State Government for compliance on 18.03.2004, 07.05.2004 and 28.07.2004 respectively. Despite several reminders the State Government could not comply with these observations. Therefore, in a meeting under the chairmanship of Secretary, M/o DoNER it was decided that a team of officers from MoUD, MHFW, Planning Commission and M/o DoNER should be deputed for site visit and assessment of availability of referral facilities. The Team visited

23 the proposed project site, General Hospital Naharlagun and the R.K. Mission hospital at Itanagar on 11.08.2007 and recommended that:

“Considering the present status of proposed 500-bedded hospital at Naharlagun and functional Naharlagun General Hospital, it is suggested that the existing General Hospital at Naharlagun may be strengthened to 250- bedded hospital in phases, with all modern diagnostic and treatment facilities as a referral hospital of Arunachal Pradesh. Considering the population of the state and utilization of present facilities of existing beds, another 500 bedded hospital 6 kms away shall not be properly utilized and shall have no load to run the hospital.

The existing strengthening initiatives of District Hospitals under NRHM (already Rs.14 crore released to the State) also shall need specialists in District Hospitals. So the manpower situation particularly for specialists shall not be favorable to staff the proposed 500-bedded hospital with adequate specialist.

It is recommended that instead of constructing a new 500-bedded referral hospital at Nagarlagun, the existing hospitals rendering tertiary health care services i.e. General Hospital Naharlagun & R.K. Mission Hospital may be considered for further strengthening.”

After deliberations committee recommended that as per the report of the team of officers from MoUD, MHFW, Planning Commission and DoNER, who visited project site, the State Government may be advised to upgrade the existing General Hospital at Naharlagun and strengthen it to 250 bedded referral hospital, with all modern diagnostic and treatment facilities as a referral hospital of Arunachal Pradesh, in place of the existing proposal.

______

24 Annexure-I to Item No. 12

Proforma for vetting of Estimate

1) Name of the Project : C/o Bodoland India indigenous tribal art and cultural complex cum film studio at Kathaguri, Pt-II, Assam.

2) Estimated Cost of the project :Rs. 500.00 Lakhs

3) Estimated prepared by: Executive Engineer, PWD, Kokrajhar Building Division, Kokrajhar.

4) Estimate prepared by :APWD schedule 2004-05 & Market Rate.

5) Cost Index : Cement and steel (PMT base) rate have been considered as per CE, PED instructions, dated 12.12.06.

6) Scope of project : (a) Construction of Auditorium hall with seating capacity of 527 person’s i/c stage, projection room, rehersal room , office and toilets etc. i/c air – conditioning of hall & stage area with acoustic treatment. (b) Water supply – deep tube well and over head tank. (c) Fire protection arrangement and underground storage tank. (d) Godrej chairs, sound system projector and stage lighting.

7) Technical acceptability : Acceptable. The structural design is, however, prescibe to be earth-quake resistant.

8) Clarification needed : if so details : Subhead 7,8,9,10 & 11 are based on market rates. No quotation / rate list is attached. Reasonability of the rates to be endorsed by executing officer

9) Amount of estimate vetted for Rs. 500.00 Lakhs

REMARKS:

The above estimate is also required to be checked for structural adequacy from earth quake point of view. Also, since the above project is situated in the North Eastern region, the feasibility of proposal at work site may be got checked by the competent authority of state PWD. The correctness of rates will be endorsed by the technical sanctioning authority of state P

(Sd/-) Superintending Engineer(P&A) NDZ-II,CPWD, Nirman Bhawan, New Delhi

*************

25