Federal Register/Vol. 80, No. 100/Tuesday, May 26
Total Page:16
File Type:pdf, Size:1020Kb
30066 Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices Historic Preservation Act, and the the Midcontinent Independent System DEPARTMENT OF ENERGY implementing regulations of the Operator, Inc. (MISO)—PJM Advisory Council on Historic Interconnection, L.L.C. (PJM) Joint and Federal Energy Regulatory Preservation at 36 CFR 800.2. Common Market Initiative (Docket No. Commission m. With this notice, we are AD14–3–000): [Project Nos. 175–028 and 1988–086] designating Erie as the Commission’s MISO/PJM Joint Stakeholder non-federal representative for carrying Meeting—May 27, 2015. Pacific Gas and Electric Company; out informal consultation pursuant to The above-referenced meeting will be Notice of Application Accepted for section 7 of the Endangered Species Act held at: MISO Headquarters, 720 City Filing, Soliciting Comments, Motions and consultation pursuant to section Center Drive, Carmel, IN 46032–7574. To Intervene, and Protests 106 of the National Historic The above-referenced meeting is open Preservation Act. to the public. Take notice that the following n. Erie filed a Pre-Application Further information may be found at hydroelectric application has been filed Document (PAD; including a proposed www.misoenergy.org. with the Commission and is available process plan and schedule) with the The discussions at the meeting for public inspection: Commission, pursuant to 18 CFR 5.6 (d) described above may address matters at a. Type of Application: Application of the Commission’s regulations. issue in the following proceedings: for Temporary Variance of Minimum o. A copy of the PAD is available for Docket No. EL13–47, FirstEnergy Flow Requirements. review at the Commission in the Public Solutions Corp. and Allegheny Energy b. Project Nos.: 175–028 and 1988– Reference Room or may be viewed on Supply Company, LLC v. PJM 086. the Commission’s Web site (http:// Interconnection, L.L.C. c. Date Filed: May 12, 2015. www.ferc.gov), using the ‘‘eLibrary’’ Docket No. EL13–88, Northern Indiana d. Applicant: Pacific Gas and Electric link. Enter the docket number, Public Service Company v. Company (licensee). excluding the last three digits in the Midcontinent Independent System e. Name of Projects: Balch and Haas- docket number field to access the Operator, Inc. and PJM Kings River. document. For assistance, contact FERC Interconnection, L.L.C. f. Location: North Fork Kings River in Online Support at Docket No. EL11–34, Midcontinent Fresno County, California. [email protected], (866) Independent System Operator, Inc. g. Filed Pursuant to: Federal Power 208–3676 (toll free), or (202) 502–8659 Docket No. EL14–21, Southwest Power Act, 16 U.S.C. 791(a)–825(r). (TTY). A copy is also available for Pool, Inc. v. Midcontinent h. Applicant Contact: Mr. Jaime inspection and reproduction at the Independent System Operator, Inc. Hoffman, License Coordinator, Pacific Docket No. EL14–30, Midcontinent address in paragraph h. Gas and Electric Company, Mail Code: p. The licensee states its unequivocal Independent System Operator, Inc. v. N13E, P.O. Box 770000, San Francisco, intent to submit an application for a Southwest Power Pool, Inc. CA 94177, Phone: (415) 973–1554. Docket No. ER10–1791, Midwest new license for Project No. 2837. i. FERC Contact: Mr. John Aedo, (415) Independent Transmission System Pursuant to 18 CFR 16.8, 16.9, and 16.10 369–3335, or [email protected]. Operator, Inc. j. Deadline for filing comments, each application for a new license and Docket No. ER11–1844, Midwest any competing license applications motions to intervene, protests, and Independent Transmission System recommendations is 15 days from the must be filed with the Commission at Operator, Inc. least 24 months prior to the expiration issuance date of this notice by the Docket No. ER13–1864, Southwest Commission (June 3, 2015). The of the existing license. All applications Power Pool, Inc. for license for this project must be filed Commission strongly encourages Docket Nos. ER13–1923, ER13–1938, electronic filing. Please file motions to by March 31, 2018. ER13–1943, ER13–1945, Midcontinent q. Register online at http:// intervene, protests, comments, or Independent System Operator, Inc. recommendations using the www.ferc.gov/docs-filing/ Docket Nos. ER13–1924, ER13–1926, esubscription.asp to be notified via Commission’s eFiling system at http:// ER13–1927, ER13–1936, ER13–1944, www.ferc.gov/docs-filing/efiling.asp. email of new filing and issuances ER13–1947, PJM Interconnection, related to this or other pending projects. Commenters can submit brief comments L.L.C. up to 6,000 characters, without prior For assistance, contact FERC Online Docket Nos. ER13–1937, ER13–1939, registration, using the eComment system Support. Southwest Power Pool, Inc. at http://www.ferc.gov/docs-filing/ Docket No. ER14–1174, Southwest Dated: May 19, 2015. ecomment.asp. You must include your Kimberly D. Bose, Power Pool, Inc. Docket No. ER14–1736, Midcontinent name and contact information at the end Secretary. Independent System Operator, Inc. of your comments. For assistance, [FR Doc. 2015–12604 Filed 5–22–15; 8:45 am] Docket No. ER14–2445, Midcontinent please contact FERC Online Support at BILLING CODE 6717–01–P Independent System Operator, Inc. [email protected], (866) Docket No. ER15–623, PJM 208–3676 (toll free), or (202) 502–8659 Interconnection, L.L.C. (TTY). In lieu of electronic filing, please DEPARTMENT OF ENERGY For more information, contact Valerie send a paper copy to: Secretary, Federal Teeter, Office of Energy Policy and Energy Regulatory Commission, 888 Federal Energy Regulatory First Street NE., Washington, DC 20426. Commission Innovation, Federal Energy Regulatory Commission at (202) 502–8538 or Please include the project numbers (P– Notice of Commission Staff [email protected]. 175–028 and 1988–086) on any Attendance comments, motions to intervene, Dated: May 19, 2015. protests, or recommendations filed. The Federal Energy Regulatory Kimberly D. Bose, k. Description of Request: The Commission hereby gives notice that Secretary. licensee requests a temporary variance members of the Commission’s staff will [FR Doc. 2015–12602 Filed 5–22–15; 8:45 am] of the minimum flow requirements in attend the following meeting related to BILLING CODE 6717–01–P Helms Creek, North Fork Kings River VerDate Sep<11>2014 17:50 May 22, 2015 Jkt 235001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\26MYN1.SGM 26MYN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices 30067 and Dinkey Creek from June 1 to comment date for the particular b. Project No.: 77–275. December 31, 2015. The licensee application. c. Date Filed: May 13, 2015. requests Commission approval to adjust o. Filing and Service of Responsive d. Applicant: Pacific Gas and Electric the instantaneous minimum flow Documents: Any filing must (1) bear in Company (licensee). requirement to a 24-hour average flow all capital letters the title e. Name of Project: Potter Valley regime. The licensee also proposes to ‘‘COMMENTS’’, ‘‘PROTEST’’, or Project. maintain minimum flows, such that the ‘‘MOTION TO INTERVENE’’ as f. Location: Eel River and East Fork instantaneous requirement is decreased: applicable; (2) set forth in the heading Russian River in Lake and Mendocino From 4 to 3 cfs in Helms Creek below the name of the applicant and the Counties, California. Courtright Dam (gage KI–17) from June project number of the application to g. Filed Pursuant to: Federal Power 1 to November 30; from 2.5 to 2 cubic which the filing responds; (3) furnish Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Neva feet per second (cfs) in Helms Creek the name, address, and telephone Geldard, License Coordinator, Pacific below Courtright Dam; from 15 to 10 cfs number of the person protesting or Gas and Electric Company, Mail Code: in the North Fork Kings River below intervening; and (4) otherwise comply N13E, P.O. Box 770000, San Francisco, Wishon Dam (gage KI–27); from 15 to 10 with the requirements of 18 CFR cfs in the Dinkey Creek Siphon at Balch CA 94177, Phone: (415) 973–3076. 385.2001 through 385.2005. All i. FERC Contact: Mr. John Aedo, (415) (gage KI–31); from 2.5 to 2 cfs in the comments, motions to intervene, or 369–3335, or [email protected]. North Fork Kings River below Balch protests must set forth their evidentiary j. Deadline for filing comments, Diversion Dam (gage KI–9); from 10 to basis and otherwise comply with the motions to intervene, protests, and 7 cfs in the North Fork Kings River requirements of 18 CFR 4.34(b). All recommendations is 15 days from the above Dinkey Creek (gage KI–21); and comments, motions to intervene, or issuance date of this notice by the from 25 to 17 cfs in the North Fork protests should relate to project works Commission (June 2, 2015). The Kings River below Dinkey Creek (gage which are the subject of proposed Commission strongly encourages KI–22). The licensee states that the flow action. Agencies may obtain copies of electronic filing. Please file motions to reductions are necessary due to the the application directly from the intervene, protests, comments, or ongoing drought conditions and historic applicant. A copy of any protest or recommendations using the low snowpack levels this year. motion to intervene must be served l. Locations of the Application: A Commission’s eFiling system at http:// upon each representative of the www.ferc.gov/docs-filing/efiling.asp. copy of the application is available for applicant specified in the particular inspection and reproduction at the Commenters can submit brief comments application. If an intervener files up to 6,000 characters, without prior Commission’s Public Reference Room, comments or documents with the located at 888 First Street NE., Room registration, using the eComment system Commission relating to the merits of an at http://www.ferc.gov/docs-filing/ 2A, Washington, DC 20426, or by calling issue that may affect the responsibilities (202) 502–8371.