Badagaon, Harpalpur & Ghuwara Water Supply Improvement
Total Page:16
File Type:pdf, Size:1020Kb
Initial Environmental Examination Document stage: Draft Project Number: 42486-016 August 2018 IND: Madhya Pradesh Urban Services Improvement Program – Subproject of Water Supply Improvement in Badagaon, Harpalpur & Ghuwara Package No: MPUSIP- 6G Prepared by Madhya Pradesh Urban Development Company, Government of Madhya Pradesh for the Asian Development Bank. This draft initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, management, or staff, and may be preliminary in nature. Your attention is directed to the ‘terms of use’ section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Draft Initial Environmental Examination August, 2018 IND: Madhya Pradesh Urban Services Improvement Program –Subproject of Water Supply Improvement in Badagaon, Harpalpur & Ghuwara- Package 6G , 1 | BLG CONSTRUCTION SERVICES (P) LTD., JODHPUR IEE Package 6G CURRENCY EQUIVALENTS (as of August, 2018) Currency unit – Conversion INR1.00 = $.0.015 $1.00 = INR 66.00 ABBREVIATIONS ADB - Asian Development Bank AP - Affected Person BPL - Below Poverty Line CWC - Central Water Commission DP - Displaced Person EA - Executive Agency GOI - Government of India GOMP - Government of Madhya Pradesh GWSS - Group Water Supply Scheme HHs - Households IA - Implementing Agency IR - Involuntary Resettlement KM - Kilometer MPUDC - Madhya Pradesh Urban Development Company MPUSIP - Madhya Pradesh Services Improvement Project O&M - Operation and maintenance PHED - Public Health Engineering Department PIU - Project Implementation Unit PMC - Program Monitoring Consultant PMU - Program Management Unit PO - Project Officer PWD - Public works Department R&R - Resettlement and Rehabilitation RF - Resettlement Framework RFCTLARR - The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 RP - Resettlement Plan ROW - Right of Way RWA - Resident Welfare Associations RWRM - Raw Water Rising Main SO - Safeguard Officer SPS - Safeguard Policy Statement TA - Technical Assistance UADD - Urban Administration and Development Directorate UDHD - Urban Development and Housing Department ULBs - Urban Local Bodies WRD - Water Resource Department WSS - Water Supply Scheme WTP - Water Treatment Plant 2 | BLG CONSTRUCTION SERVICES (P) LTD., JODHPUR IEE Package 6G WEIGHTS AND MEASURES C Degree Celsius km kilometre lpcd litres per capita per day MCM Million Cubic Meter mm milli meter m metre MLD million litres per day mm millimetre Nos Numbers sq.km Square Kilometre 3 | BLG CONSTRUCTION SERVICES (P) LTD., JODHPUR IEE Package 6G Table of Contents I. EXECUTIVE SUMMARY ........................................................................................ 7 II. INTRODUCTION .................................................................................................. 13 A. Background ..................................................................................................... 13 B. Purpose of this IEE Report ............................................................................. 15 C. Report Structure .............................................................................................. 15 III. DESCRIPTION OF THE PROJECT ..................................................................... 16 A. Project Area ..................................................................................................... 16 B. Existing Water Supply Situation .................................................................... 17 C. Proposed Project ............................................................................................. 19 IV. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK ................................... 31 A. ADB Policy ....................................................................................................... 31 B. National Environmental Laws ........................................................................ 31 V. DESCRIPTION OF THE ENVIRONMENT ............................................................ 35 A. Methodology Used for Baseline Study .......................................................... 35 B. Baseline Environmental Profile ...................................................................... 35 VI. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES .. 55 A. OVERVIEW ....................................................................................................... 55 B. Pre-Construction Impacts – Design & Location ........................................... 56 C. Construction Impacts ...................................................................................... 66 D. Operation and Maintenance Impacts ............................................................. 73 E. Project Benefits ............................................................................................... 74 VII. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE ......................... 75 A. Overview .......................................................................................................... 75 B. Public Consultation ......................................................................................... 75 C. Information Disclosure ................................................................................... 77 VIII. GRIEVANCE REDRESS MECHANISM ............................................................... 78 A. Project Specific Grievance Redress Mechanism .......................................... 78 B. Purpose of the GRM Manual: ......................................................................... 78 C. Principles: ........................................................................................................ 78 D. Nature and scope of Grievance Redress Mechanism under MPUSIP ......... 79 E. Structure of GRM and its Functions .............................................................. 80 F. Monitoring and Evaluation systems of GRM ................................................ 91 G. Action Plan for the formation of the GRM ..................................................... 91 IX. ENVIRONMENTAL MANAGEMENT PLAN .......................................................... 92 A. Implementation Arrangements ....................................................................... 92 B. Environmental Management Plan .................................................................. 92 C. EMP Compliance Responsibilities ............................................................... 111 D. Training Needs .............................................................................................. 113 E. Monitoring and Reporting ............................................................................. 114 F. EMP Implementation Cost ............................................................................ 115 X. CONCLUSION AND RECOMMENDATIONS ..................................................... 117 4 | BLG CONSTRUCTION SERVICES (P) LTD., JODHPUR IEE Package 6G LIST OF TABLES Table 1: Details of existing water source & system ................................................................ 17 Table 2: Details of existing Distribution system ..................................................................... 17 Table 3: Details of water source & system .............................................................................. 17 Table 4: Details of Rising main & Distribution network .......................................................... 18 Table 5: Proposed Water Supply Subproject Components .................................................... 22 Table 6: Applicable Environmental Regulations ..................................................................... 32 Table 7: WHO Ambient Air& Noise Quality Guidelines ........................................................... 34 Table 8: Baseline Environmental Profile of towns .................................................................. 36 Table 9: Site Environmental Features of Badagaon and Ghuwara GWSS ............................ 47 Table 10: Site Environmental Features of Harpalpur WSS ..................................................... 52 Table 11: Catchment Area – Rainfall based Water Yield Estimate in Dhasan River at Proposed Weir Site ................................................................................................................... 60 Table 12: Design Stage Environmental Management Plan ..................................................... 95 Table 13: Pre-Construction State Environmental Management Plan ..................................... 96 Table 14: Construction Stage Environmental Management Plan .......................................... 99 Table 15: Operation Stage Environmental Management Plan .............................................. 106 Table 16: Construction Stage Environmental Monitoring Plan ............................................ 108 Table 17: Operation Stage Environmental Monitoring Plan ................................................. 109 Table 18: Outline Capacity Building Program on EMP Implementation ............................. 113 Table 19: Cost Estimates to Implement the EMP .................................................................. 115 LIST OF FIGURES