Philippines: Energy Sector Assessment, Strategy, and Road Map
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
COAL MINING EQUIPMENT Capacity
COMPANY PROFILE VISION, MISSION AND VALUES Our Vision: COAL Towards An Energy-Sufficient Philippines Our Mission: To fulfill its commitment to provide affordable power to the Filipino people through the responsible use of coal as energy source, Semirara Mining and Power Corporation will continue to remain as: •The undisputed leader in the coal mining industry and vertically integrated coal-based power producer in the Philippines •Playing a vital role in the energy sector & working in harmony with the government to promote the use of coal as a reliable and economical power source. •Supplying its customer s with quality coal that meets their stringent specifications •Providing reasonable economic returns to its investors & business partners •Empowering its employees to prosper in a climate of integrity & excellence •Working in partners with its host communities to improve their sustainability while engaging in the judicious use and rational conservation of the country’s natural resources. Our Values: In fulfilling our vision, we are guided by : Teamwork that enables us to work toward common goals; Excellence that drives us to deliver outstanding results; Loyalty that keeps us steadfast over challenges and time; Integrity that upholds the cornerstone of our business ethics; Commitment that fuels realization of our mission; and Professionalism that embodies our work quality. ORGANIZATIONAL STRUCTURE A member of the DMCI Holdings, Inc. group of companies 100% 100% 100% 100% 100% 100% 100% *Sem-Cal *Sem- Southwest *St. Raphael Industrial *Semirara *Semirara Balayan Sem-Calaca Luzon Power Power Park Claystone, Energy Power Power Power Corp. Generation Generation Developers, Inc. Utilities, Inc. Generation Corp. Corp. Inc. -
Chapter 26: Philippines
26 Philippines 26.1 Summary of Coal Industry 26.1.1 ROLE OF COAL IN THE REPUBLIC OF THE PHILIPPINES Currently, coal-fired thermal power plants remain the number one producer of electricity and accounted for a total of 5,568 megawatts (MW), or 33 percent, of the Republic of the Philippines’ total installed power generating capacity in 2012 (PDOE, 2014a). The Philippines consumed 16.3 million tonnes (Mmt) of coal in 2012, around 75 percent of which was for power generation (EIA, 2014; Ocampo, 2012). The Philippines relies on imports to meet coal demand, importing 10.6 Mmt from Indonesia and 277 thousand tonnes from Vietnam in 2011 (Ocampo, 2012). The Philippine Energy Plan 2012-2030 (PEP) projects coal demand to increase by more than 70 percent between 2012 and 2030 (PDOE, 2014b). The country’s recoverable coal reserves, as shown in Table 26-1, are estimated at 315 Mmt, with most reserves as lignite. Total coal resources compiled by the Geothermal and Coal Resources Development Division (GCRDD) of the Department of Energy of the Philippines, are estimated at a minimum of 2,268.4 Mmt (USGS, 2006). The Philippines produced 8.0 Mmt of coal in 2012, the highest annual production to date. Coal production is increasing rapidly, more than doubling between 2008 and 2012 (EIA, 2014). The PEP projects domestic coal production to continue to increase, reaching more than 11 Mmt in 2015 and more than 12.5 Mmt in 2020 (PDOE, 2014b). Table 26-1. Philippines’ Coal Reserves and Production Sub- Anthracite & bituminous Total Global Rank Indicator Bituminous & Lignite (million tonnes) (# and %) (million tonnes) (million tonnes) Estimated Proved Coal Reserves 41 275 315 41 (0.04%) (2011) Annual Coal Production (2012) 8.0 0.0 8.0 29 (0.10%) Source: EIA (2014) The combined lignite and sub-bituminous coal reserves of the Philippines, including indicated and inferred reserves, are about 1,899.2 Mmt, which make up about 84 percent of the total coal reserves of the Philippines. -
Department of the Interior Us Geological Survey
DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY Introducing coal-water-mix fuels to the Philippines Assessment of project feasibility Volume 1 - The Philippine coal resource by !/ 2!/ 2/ E. R. Landis, M. D. Carter, and J. H. MedlTn Open-File Report Report prepared for National Economic and Development Authority, Republic of the Philippines on behalf of the National Power Corporation, Development Bank of the Philippines under the auspices of the Office of Energy, U.S. Agency for International Development. This report is preliminary and has not been reviewed for conformity with U.S. Geological Survey editorial standards and stratigraphic nomenclature, I/ U.S. Geological Survey, Denver, CO Jj U.S. Geological Survey, Reston, VA 1985 FRONTISPIECE _____ ito f 12 0 Treaty limits of the Philippines PHILIPPINES PHILIPPIC CATANDUANES ISLAND MIMDANAO MALAYSIA CELEBES SEA Treaty limits of the Philippines L»'.' 'ssi'S.c-.s A (lnden«*io 1 / Index map of the Philippine Islands CONTENTS PREFACE.................................................. iii ACKNOWLEDGEMENTS......................................... iv 1.0 SUMMARY AND CONCLUSIONS............................. 1 2.0 COAL RESOURCES OF THE PHILIPPINES................... 4 2.1 Introduction.............'...................... 4 2.2 Geologic Setting............................... 6 2.3 Quanti ty....................................... 7 2.4 Quality........................................ 13 2.4.1 Philippine coals........................ 13 2.4.2 Coal from Seinrirara..................... 15 2.4.3 Coals -
9M 2019 Results Briefing Reports
Q1 Q2 Q3 (Amounts in Mln PhP, Except Sales Volume) Q1 2019 Q2 2019 Q3 2019 Q1 2018 Q2 2018 Q3 2018 % Inc (Dec) % Inc (Dec) % Inc (Dec) Sales Volume (GWh) 10,381 12,442 12,182 10,145 11,520 11,256 2% 8% 8% Revenues 75,378 89,575 76,173 70,807 79,737 76,867 6% 12% -1% Electric 73,632 87,635 74,109 69,009 77,894 74,363 7% 13% 0% Distribution 14,273 18,182 16,769 14,081 16,582 15,546 1% 10% 8% Generation and other pass-through 59,359 69,453 57,340 54,928 61,312 58,817 8% 13% -3% Non-electricity 1,746 1,940 2,064 1,798 1,843 2,504 -3% 5% -18% Core Income 5,598 6,719 6,136 4,917 5,934 5,835 14% 13% 5% Reported Income 5,671 6,336 6,314 5,312 6,661 6,239 7% -5% 1% Core EBITDA 8,828 11,051 9,883 8,688 8,897 8,979 2% 24% 10% Reported EBITDA 8,828 11,051 9,883 8,688 8,897 8,979 2% 24% 10% 241,126 241,126 227,411 227,411 Distribution revenues 49,224 46,209 Q3 76,173 76,867 Q2 89,575 79,737 Generation & other pass- 186,152 through charges 175,057 Electricity Revenues = 235,376 = Revenues Electricity Electricity Revenues = 221.266 = Revenues Electricity Q1 75,378 70,807 Non-electricity revenues 5,750 6,145 9M 2019 9M 2018 9M 2019 9M 2018 6,400 9,092 19,346 3% 4% 9% Costs Costs and Expenses 183,355 84% Purchased Power Operating Expenses Depreciation & Amortization Other Expenses 15,701 Others 10,048 Subtransmission & 23% Distribution Facilities 77% Capital Capital Expenditures 9M 2019 9M 2018 12.3% 11.7% 12.3% 11.7% Margins 7.7% 7.3% 7.6% 8.0% 29,762 29,762 26,564 26,564 Q3 9,883 9,883 8,979 8,979 18,453 18,321 18,212 16,686 6,136 6,314 Q2 11,051 -
ADDITIONAL REVENUE STREAMS for SERVICE PROVIDERS USING GPON Fttx SOLUTIONS
Addition Revenue Streams for Service Providers Using GPON Solutions Reggie A. Posadas BSEE MSIEM MSECE Philippine Country Manager YFC-BONEAGLE International Inc., ADDITIONAL REVENUE STREAMS FOR SERVICE PROVIDERS USING GPON FTTx SOLUTIONS Reggie A. Posadas BSEE MS IEM MS ECE Country Manager, Philippines YFC-BONEAGLE INTERNATIONAL, INC. ADDITIONAL REVENUE STREAMS FOR SERVICE PROVIDERS USING GPON FTTx SOLUTIONS Lecture Outline : 1. Introduction to GPON FTTx Cabling 2. GPON FTTx Cabling Architecture 3. GPON Business Models 4. Sample Additional Revenue Streams Thru GPON FTTx 5. Sample Project/s ADDITIONAL REVENUE STREAMS FOR SERVICE PROVIDERS USING GPON FTTx SOLUTIONS Introduction to GPON FTTx Cabling GPON OVERVIEW PON/GPON grew from a requirement for more bandwidth in the Service Provider Market. (Higher access speeds than DSL could deliver) More Bandwidth (2.5G Downstream and 1.2G Upstream) – Higher Subscriber density – Best replacement for aging copper / coax infrastructure – Environmentally friendly - green – Reduce power and TCO (Total Cost of Ownership) • Long term life expectancy of the fiber infrastructure • Lower capital expenditures, since AN eqpt. and components are considerably reduced and/or completely excluded in the FTTx network • Lower operating costs through reduction of active components, support for greater distances between equipment nodes • Reduced re-occurring operating and maintenance costs ADDITIONAL REVENUE STREAMS FOR SERVICE PROVIDERS USING GPON FTTx SOLUTIONS Introduction to GPON FTTx Cabling GPON OVERVIEW • The -
Club Intramuros Golf Course
ClubClub IntramurosIntramuros GolfGolf CourseCourse BonifacioBonifacio Drive,Drive, Intramuros,Intramuros, ManilaManila The golf course is stretched on a prime parcel of land bounded on the West by Roxas Blvd., from Del Pan Bridge to Manila Hotel; on the East by P. Burgos, from the Manila City Hall to Roxas Boulevard; and on the North to Northwest by the walls of Intramuros, from Del Pan Bridge to the Manila Bulletin Building. It is adjacent to the historic Fort Santiago, Letran College and the Port Area. Competitive Advantages: v Unique - This is the only day & night golf course; it can host weddings, parties and seminars. v Historical - It is set amidst the old Spanish walled city of Intramuros, with the San Agustin Church and Manila Cathedral providing a scenic backdrop. v Accessibility – It is located right in the heart of the City of Manila. v Environmentally friendly – the planning and development of the golf course improved the scenery due to the additional trees planted within and outside the property and fresh water from the lagoon is used to irrigate the golf course. Mode of Privatization: Lease/Management Contract Total Land Area: 233,600 sqm Status: Operational Legal Bases: PD 1763 TIEZA Business Development Department Tourism Infrastructure & Enterprise Zone Authority 142 Amorsolo St. Legaspi Village Makati Contact no. 831-0811 Facilities: Par 66, 18-hole Day & Night Golf Course Driving Range Practice Green Main Club Verandah Restaurant Main Dining Room (A/C – 70 pax) Function Room (A,B & C - 150 pax) Executive Lounge VIP Room Locker Room (male & female) Roof Deck (Open Air, (300 – 400 pax) Male / Female Comfort Room Administration Offices 19th Hole Bar & Restaurant Utilities: A. -
Celebrating a Future of Possibilities 2 MERALCO POWERCLUB MERALCO POWERCLUB 3 AUGUST 2017 AUGUST 2017 Inside MESSAGES a MERALCO PUBLICATION
MERALCO POWERCLUB 1 AUGUST 2017 A MERALCO PUBLICATION | SPECIAL LUMINARIES EDITION | AUGUST 2017 CELEBRATING A FUTURE OF POSSIBILITIES 2 MERALCO POWERCLUB MERALCO POWERCLUB 3 AUGUST 2017 AUGUST 2017 INSIDE MESSAGES A MERALCO PUBLICATION MERALCO POWER CLUB MAGAZINE VOLUME 7 ISSUE 3 eralco launched its Luminaries and open access to keep them PUBLISHER: SUMMIT MEDIA LOOK BACK, program six years ago, when competitive. We enable their pursuit of Analysis A joint project with Meralco’s Mthe Philippine economy was green initiatives with renewable energy 4 CAN WE AFFORD TO SAVE Corporate Business Group, Marketing, MOVE beginning to take off. Inspired by Meralco sources or electric-vehicle and charging THE CLIMATE? Customer Solutions and Product Chairman Manuel V. Pangilinan, our systems. And to serve them and their The Paris Agreement compels even V20 members to tap renewable energy Development. Published four times a FORWARD vision for the Luminaries is to showcase local communities, we build large-scale year for key officers of Meralco businesses that make a difference in the electric infrastructure for their real-estate Electric Capital Projects corporate accounts. lives of Filipinos across the country. projects. 7 ENERGIZING THE ASEAN AT 50 Our pioneering Luminaries As the economy continues to Meralco makes sure the Philippines’s hosting of the Asean Summit goes at full power EDITORIAL TEAM were already household names in the soar, we anticipate more positive EDNA T. BELLEZA Publisher electronics, food manufacturing, and real- changes. Small businesses become large Industry Trends estate sectors; companies like Samsung enterprises. Established businesses 8 COLD COMFORTS Estrellita Faustino Editor-in-Chief Companies in the air conditioning business look Electro Mechanics Philippines, Universal diversify into non-core activities such Creative Director/ forward to a promising business climate DONDI LIMGenco Robina Corp., and Ayala Land Inc. -
DECARBONIZING MERALCO the Imperatives to Prioritize Pro-People, Pro-Climate Models in the Power Business
DECARBONIZING MERALCO The imperatives to prioritize pro-people, pro-climate models in the power business To be part of the solution to the climate crisis, power companies must urgently shift to renewable energy. This study shows how the Philippines’ biggest distribution utility Meralco, together with its power generation subsidiary MGen, can refocus its business and source all of its new energy contracts from renewable energy while ensuring a reliable, affordable, and secure supply of clean electricity. DECARBONIZING MERALCO The imperative to prioritize pro-people, pro-climate models in the power business © Greenpeace Southeast Asia - Philippines, April 2021 Greenpeace is a global, independent campaigning organization that uses peaceful protest and creative communication to expose global environmental problems and promote solutions that are essential to a green and peaceful future. Greenpeace has been present in the Philippines since 2000, working to safeguard the constitutional rights of Filipinos to a balanced and healthful ecology. Greenpeace Southeast Asia - Philippines 30 Scout Tuason Street Room 201 JGS Building, Quezon City, 1103 Metro Manila, Philippines www.greenpeace.org.ph The Center for Renewable Energy and Sustainable Technology (CREST) is the lead author of this report. CREST is a non-government organization that promotes the use of renewable energy systems and climate technologies by providing technical support and capacity-building to cities and communities. Decarbonizing Meralco is dedicated to the memory of the late Roberto S. Verzola, who was the lead researcher for this project. DECARBONIZING MERALCO The imperatives to prioritize pro-people, pro-climate models in the power business Table of Contents PART 1: Meralco, the Company PART 3: Generation Cost A. -
CHR 2015 Annual Accomplishment Report
2015 Accomplishment Report COMMISSION ON 3333 HUMAN RIGHTS 2015 ACCOMPLISHMENT REPORT 2015 Accomplishment Report TABLE OF CONTENTS EXECUTIVE SUMMARY HUMAN RIGHTS PROTECTION SERVICES 1 DOCUMENTATION OF COMPLAINTS 1 Complaints Evaluated for Investigation 2 Gender-Based Violations 11 Violations of Children’s Rights 12 Business and Human Rights 15 Violations of Indigenous Peoples’ Rights 18 Internal Displacement of Peoples and Communities 20 Disposition of Cases 21 Persons Assisted 22 Monitoring of Jails/ Detention Centers 22 Financial Assistance 23 Forensic Services 24 Issuance of Human Rights Clearance/ Certification 24 HUMAN RIGHTS PROMOTION SERVICES 26 EDUCATION AND TRAINING ACTIVITIES 26 Human Rights IEC Materials 28 Training Modules Developed 31 Training Kits 32 HR Milestone Events and Celebratory Events 32 HUMAN RIGHTS POLICY SERVICES 35 Human Rights Advisories 35 Human Rights Position Papers 38 Human Rights Mechanisms/ Measures 39 Human Rights Treaty/ Situation Report 40 On-going Policy Development Initiatives 41 INTERNATIONAL COOPERATION PROJECTS 45 United Nations Development Programme (UNDP) 45 AECID Fortaleza 46 The Asia Pacific Forum (APF) 51 INSTITUTIONAL BUILDING 54 Internal Policies 55 International Engagements 55 Internal Capacity Building Programs 58 Manpower Complement 59 General Appropriations 59 2015 Accomplishment Report EXECUTIVE SUMMARY In monitoring the human rights situation in 2015, the Commission received a total of 6,448 requests for protection services of different types of human rights violations. Based on the preliminary evaluation of 6,448 complaints, only 1,413 required full blown investigation, while majority or 4,971 needed legal aide and counseling services. Some 29 complaints were found to be outside of the CHR jurisdiction, which were immediately referred to other agencies. -
Impact Evaluation Study
Impact Evaluation Study on Public-Private Partnership the case of Angat Water Supply Optimization Project and the Metropolitan Waterworks and Sewerage System Republic of the Philippines FINAL REPORT July 2003 UTCE Ltd. Japan PFI Association Contents Executive Summary Acknowledgements List of Acronyms and Abbreviations 1. Introduction ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 1 1.1 Background ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 1 1.2 PPP in Public Utilities General ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 1 1.3 Water Supply Service and Waste Water Treatment (Sanitation) Service ・・・・・・・・・・・・・ 4 1.4 Objective ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 11 1.5 Study Focus ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 12 1.6 Outline of this Report・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 12 2. Framework and Methodologies of the Study ・・・・・・・・・・・・・・・・・・・ 13 2.1 Study Framework ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 13 2.2 Data Collections and Fact Findings・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 16 3. Provision and Process of PPP in Water and Sanitation Services in Metro Manila ・・・・・・・・・・・・・・・・・・・・ 19 3.1 Background ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 19 3.2 PPP in Philippines ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 20 3.3 Process of PPP ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 21 3.4 Initial Facilities Conditions in West and East Zone ・・・・・・・・・・・・・・・ 23 3.5 Concession Agreement ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 24 4. Comparative Analysis Ⅰ ~Service-related Performance~ ・・・・・・・・・・・・・・・・・・・・・・・・・・ 27 -
Oriental Mindoro Facts and Figures 2013 Table of Contents
ORIENTAL MINDORO FACTS AND FIGURES 2013 TABLE OF CONTENTS Page General Information 1 Administrative Map 2 Land and Other Natural Resources 3 a. Land Area by Municipality 3 b. Land Classification Statistics 3 c. Geographical Zone Surfaces 3 d. Mineral Resources 4 e. Forest Cover 4 f. Coastal Resources 5 Demography 8 a. Population Size by Municipality by Census 8 Years b. Actual and Projected Population and Number 9 of Households, Growth Rate by Municipality c. Life Expectancy 9 d. Projected Population by Province, MIMAROPA 10 e. Urban-Rural Population 10 f. Population Density 11 g. Mangyan Tribes by Municipality 11 h. Mangyan Households by Sex 12 Economic Profile 13 a. Agriculture 13 b. Tourism 18 c. Commerce and Industry 22 Infrastructure and Utilities 24 a. Transportation 24 b. Communication 25 c. Water 27 d. Power 28 Social Development Profile 30 a. Labor and Employment 30 b. Poverty and Income 30 c. Health 33 d. Education 36 e. Social Welfare Services 37 f. Protective Services 37 Financial Profile 39 a. Income Classification of City/Municipality 39 b. Annual Income and Budget Per 39 City/Municipality c. Income and Expenditure, Provincial 40 Government f Oriental Mindoro Institutional Profile 41 a. Organizational Chart of the Provincial 41 Government of Oriental Mindoro b. Provincial Government Personnel by Office 42 ORIENTAL MINDORO FACTS AND FIGURES 2013 General Information A. LOCATION Oriental Mindoro is located in Region IV-B, otherwise known as the MIMAROPA Region. It lies 45 kilometers south of Batangas and 130 kilometers south of Manila. B. BOUNDARY It is bounded on the North by Verde Island Passage; Maestro del Campo Island and Tablas Strait on the East; Semirara Island on the South; and Occidental Mindoro on the West. -
X------X Date: .~~!3,F.?~.~.,.~Rm
Republic of the Philippines ENERGY REGULATORY COMMISSIO San Miguel Avenue, Pasig City IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE INTERIM POWER SUPPLY AGREEMENT (IPSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND PANASIA ENERGY, INC. (PANASIA) ERC CASE NO~ 2014-042 RC MANILA ELECTRIC COMPANY (MERALCO), Applicant. DOCKliTliD x----------------------x Date: .~~!3,f.?~.~.,.~rm. -my: _ ••.ttY.:&llU"-__ ORDER On April 10, 2014, Manila Electric Company (MERALCO) filed an application for the approval of its Interim Power Supply Agreement (IPSA) with Panasia Energy, Inc. (PANASIA). In the said application, MERALCO alleged, among others, the following: 1. It is a private corporation existing under the laws of the Republic of the Philippines, with principal office located at Lopez Building, MERALCO Center, Ortigas Avenue, Pasig City; 2. It has a legislative franchise to operate and maintain a distribution system in the Cities/Municipalities of Metro Manila, Bulacan, Cavite and Rizal and certain Cities/Municipalities/Barangays in 8atangas, Laguna, Quezon and Pampanga, pursuant to Republic Act No. 9209, and is authorized to charge all its customers for ERC CASE NO. 2014-042 RC ORDER/April 21, 2014 Page 2 of 19 their electric consumption at the rates approved by the Commission; 3. PANASIA is a corporation duly organized and existing under the laws of the Republic of the Philippines, with office address at E-3204-B Philippine Stock Exchange Centre, Exchange Road, Ortigas Center, Pasig City. It operates and manages the energy output of the 540 MW diesel-fired combined cycle power plant in Limay, Bataan (Limay Plant); 4. Based on the power supply forecast of the System Operator, National Grid Corporation of the Philippines (NGCP), for the supply period April to June 2014, the reserve capacity will be below the required Contingency Reserves due to scheduled maintenance shutdowns and forced outages of major baseload coal- and gas-fired power plants in Luzon; 5.