5 Potential Environmental & Social Impacts
Public Disclosure Authorized REPUBLIC OF LEBANON COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION Public Disclosure Authorized ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN LEBANON ROADS AND EMPLOYMENT PROJECT LOT 5 - PACKAGE 1 - BATROUN CAZA Final March 2020 Public Disclosure Authorized Public Disclosure Authorized in association with EXECUTIVE SUMMARY INTRODUCTION The Government of Lebanon (GOL) has solicited and obtained World Bank (WB) financing for the Roads and Employment Project (REP). The Council for Development and Reconstruction (CDR) is acting as the executing agency on behalf of the GOL and its Council of Ministers (COM). The REP involves rehabilitation activities that are confined within the alignments of existing roads with no road widening, no involuntary resettlement, and no land acquisition. As such, the WB classified the REP as a category B project that require the preparation of an Environmental and Social Management Plan (ESMP) for its sub-components. Accordingly, a series of ESMPs were stipulated to be prepared for these roads and put together by CDR in packages for bidding purposes. In this context, CDR awarded the contract number 20379 to TEAM International, hereinafter referred to as the Consultant, to prepare the assessment, design and ESMPs for roads in the districts of Batroun, Bcharre, Koura, Tripoli, Baalbeck, and Hermel. This ESMP is concerned with roads within the Batroun district. PROJECT DESCRIPTION The REP consists of the rehabilitation, maintenance, and minor construction. Activities to be performed during the project vary between one road and the other, depending on the road rating in terms of the condition of the pavement, shoulders, potential flooding and drainage, potential landslide/soil erosion and retaining walls, and/or pedestrian walkways.
[Show full text]