Chapter 8. Road

Total Page:16

File Type:pdf, Size:1020Kb

Chapter 8. Road PRA AR D T ES T H U Chapter 8 Road 8.1. Introduction The rest of the chapter is organised as follows: Section 8.2 provides an overview of the roads sector. Uttar Pradesh has an extensive road network, but it Section 8.3 discusses the institutional set-up of the is of sub-standard capacity and its quality is not sector in the state. The reform initiatives are talked adequate due to poor maintenance. Although the about in Section 8.4. Section 8.5 brings out the maintenance expenditure requirement was estimated to strategy for the roads sector and the last Section 8.6 be approximately Rs. 2040 crores in the last five years, gives the conclusion. only about 60 per cent of this sum was allocated and spent on maintenance of roads (Appendix A-8.1.1). This 8.2. An Overview of the Roads Sector has led to progressive deterioration of the road network. There is an urgent need to increase focus on For the purpose of management and administration, rehabilitation and maintenance of roads in the state. roads in India are divided into National Highways (NH), State Highways (SH), Major District Roads The problems in this sector relate to the weak (MDR), Other District Roads (ODR) and Village Roads institutional framework, inadequate and erratic flow of (VR). In Uttar Pradesh,1 the expansion of the road funds, lack of clearly defined responsibilities, network in recent years has been mainly in other ineffective management structures, and lack of district roads, village roads and other departments’ managerial abilities. roads, reflecting growing urbanisation and an attempt TABLE 8.1 Road Network in Uttar Pradesh (in Kms.) Target 2001* 1985 1992 1997 1998 1999 2000 2001** 2002** 2003** National Highways 5888 2754 2754 2862 3083 4019 4495 3811 4860 4931 State Highways 35300 7957 9782 9647 9444 8702 9486 9939 9609 9022 Major District Roads 59310 10132 8863 8874 8896 8809 9831 7198 7305 7301 ODR/Village Roads 254662 121790 78315 91696 96046 100135 102931 91095 94861 99385 Other Dept. Roads+ 58568 78592 78592 78592 142767 93035 94616 94616 Total 355660 142633 158282 191671 196061 200257 269510 205078 211251 215255 Source: PWD, Uttar Pradesh. Note: *Lucknow Plan, ** After the formation of Uttaranchal. +Other Dept. include Zilla Parishad, Village Panchayat, Municipal Roads, Forest, Irrigation Dept., MES, Sugar Cane, Railway Roads. 1. Before the National Highway Development Programme started in 1999, there was no significant move to upgrade state highways to national highways. Since 1999, many state highways have been classified as national highways across the country. Uttar Pradesh has received a fair share of reclassification of SH to NH. 246 UTTAR PRADESH DEVELOPMENT REPORT—VOL. 2 to provide connectivity to villages. In some categories, TABLE 8.3 part of the expansion is on account of reclassification of roads. For example, the NH length remained nearly National Highways and NHDP Projects constant at 2754 kms between 1985 and 1992 (Table Programme Section NH Length Status 8.1), since then it has increased as certain SH sections (Km) (NHDP have been declared as NH since 1996.1 (Table 8.2). Projects) GQ Delhi-Agra 2 199 Four laned A large part of NH (21%) is classified as High by May 2000 Density Corridors, i.e. with traffic of more than 30000 Agra–Varanasi+ 2 632 Civil construction passenger car units (pcu) per day as compared to nearby is in progress states (Table 8.2). Sikandara – 2A 25 Civil Bhognipur construction TABLE 8.2 is in progress NS-EW Lucknow-Kanpur- 25 270 Civil National Highways Jhansi Section construction is in progress Agra + 3 26 Civil National Highways % High Density construction Corridors** is in progress 1990- 1995- 1996- 2002- 91 96 97 03* Varanasi-Mangwan 7 128 Civil Section construction Madhya Pradesh 2976 2976 2976 4664 13.9 is in progress Punjab 968 988 1198 1553 29.0 Other NHs Moradabad Bypass 24 18 Completed Rajasthan 2840 2846 2846 4597 12.9 Ghaziabad-Hapur 24 33 Civil Haryana 655 656 656 1361 21.1 and Hapur Bypass construction is in progress Uttar Pradesh 2754 2862 2883 4931 20.8 Agra-Jaipur Route 11 51 All India 33650 34508 34849 58125 Delhi-Bareilly Lucknow 24 431 Source: MORTH Bakshi-ka-Talab 24A 17 Note: **— Corridors having more than 30000 pcu/day. Chenhat * From NHAI website as of 1.11.2003. Jhansi-Lakhandon 26 128 Section Allahabad-Margwan 27 43 Conditions of roads in Uttar Pradesh have been Section persistently poor.2 Capacity of SH and MDR has been Lucknow-Gorakhpur 28 311 abysmally low. Only 40 per cent of SH and four per Route Gorakhpur-Varanasi 29 196 cent of MDR are two-laned (Appendix A-8.1.2). More Lucknow-Varanasi 56 285 than one-third of the roads in Uttar Pradesh are Chenhat (NH28)– 56A 13 unsurfaced and almost half of the unsurfaced roads are Km 16 NH56 Km 15 (NH56)– 56B 19 non-motorable (Appendix A-8.1.4). About 36 per cent Km 6 (NH25) SHs are below standard single-lane roads (Appendix Delhi-Meerut- 58 165 A-8.1.5). Roorkee Route Chutmalam- 72A 30 Dehradun Link 8.2.1. Development under the NHDP Programme and Roorkee- 73 59 National Highways Saharanpur Link Rewa-Renukoot Link 74 147 Work to convert NH2 from Delhi to Varanasi (as Kanpur-Sagar Route 86 180 part of the Golden Quadrilateral) and NH25 from Rampur-Pantnagar 87 32 Route Lucknow to Lalitpur (as part of NS-EW corridor) into Gaziabad-Kanpur 91 405 four-laned highways under the aegis of NHAI is being Bhongaon-Etawah 92 75 carried out. Table 8.3 gives the summary of NHAI Agra-Moradabad 93 220 projects and their status in the state. Other than these, Faizabad-Allahabad 96 160 Uttar Pradesh has NH7, NH11, NH24, NH26, NH27, Gaziapur-Saiyedraja 97 45 NH28, NH29, NH56, NH58, NH72, NH73, NH74, Source: NHAI website www.nhai.org as of 1.11.2003. NH86, NH87, NH91, NH92, NH93, NH96 and NH97. Note: GQ–Golden Quadrilateral; NS-EW–North-South and East-West In the recent past a large part of these highways has Corridor. 2. The PWD admits that, on an average 40 per cent of the roads are under ‘repair’ at any point of time. This category also includes those roads which are half- finished and have been disbanded for want of funds (Times of India - February 24, 2001). Chapter 8 • ROAD 247 been carpeted and toll is collected on behalf of NHAI Almost one-fifth of the roads in Uttar Pradesh are on these stretches. non-motorable i.e. connectivity to many villages is of limited use (Table 8.4). Road network statistics are a 8.2.2 Comparison with Neighbouring States grim reminder of how far behind the network is from 3,4 The state has better road density (road length per the set target (Table 8.1). unit area) than all its neighbours except Punjab, but, Uttar Pradesh’s road intensity (road length per capita) TABLE 8.4 is the lowest in the region (Figures 8.1 and 8.2). This Roads by Type of Surface–1997 indicates that areas in the state are more accessible, although roads are more congested. Compared to the Surfaced (%) Unsurfaced (%) all-India average in 1997, Uttar Pradesh’s road density WBM BT CC Motorable Non- Total Motorable Length and intensity are lower by 15 and 50 per cent in Kms respectively. If only surfaced and motorable unsurfaced roads are taken into account, Uttar Pradesh’s road Madhya Pradesh 31.0 25.7 0.0 40.7 2.6 146225 intensity worsens further. Punjab 0.0 100.0 0.0 0.0 0.0 46121 Rajasthan 8.5 55.8 0.7 22.8 12.2 109513 FIGURE 8.1 Haryana 0.0 94.7 0.0 2.0 3.3 23442 Uttar Pradesh 12.0 52.4 0.0 17.6 18.0 155414 Road Density-1997 140 All India 22.7 36.6 0.1 15.8 24.8 1917335 s 120 m Source: MORTH, 1998-99. K . 100 Note: WBM–Water Bound Macadam, BT–Black Top, CC–Cement q S 80 Concrete. d re d 60 40 s/ Hun m 20 K 0 FIGURE 8.3 Punjab Uttar Madhya Pradesh Pradesh Haryana Road Intensity (Kms/Lakh Persons) All India All Rajasthan State Source: MORTH, 1998-99. 200 180 FIGURE 8.2 160 140 Road Intensity-1997 120 300 100 n o 250 80 60 pulati 200 o 40 f P 150 Kms/ Lakh of Population o 20 100 0 akh L s/ 50 India India m Purvi Uttar Uttar K 0 Pradesh Pradesh Paschimi Kendriya Uttaranchal Bundelkhand Uttar Punjab State Madhya Pradesh Pradesh Haryana All India Rajasthan Source: Monthly Review of Uttar Pradesh Economy, (various issues) CMIE, State Mumbai. Source: MORTH, 1998-99. 3. “I am myself perplexed. None of the officials know how many roads are lying half-finished and for how many years,” former PWD minister Om Prakash Singh (Times of India, February 24, 2001). 4. During the Ninth Plan period Rs. 8609 crore was to be spent for the construction of roads in the state. In the first four years of the Plan actual expenditure was 30 per cent. So by March 2002 the shortfall in this important sector would be as high as Rs. 4841 crore (The Pioneer-May 8, 2001). 248 UTTAR PRADESH DEVELOPMENT REPORT—VOL. 2 FIGURE 8.4 Rural Roads Road Density (Kms/Sq. Km) Rural roads have been classified into two categories: ODRs and VRs. Rural roads are planned under several 0.4 0.35 rural development programmes of the state and the 0.3 Centre, the prominent ones being Minimum Needs 0.25 Programme, National Rural Employment Programme, 0.2 Rural Landless Employment Generation Programme and 0.15 Jawahar Rozgar Yojana.
Recommended publications
  • 14 Development of Pavement Maintenance
    International Journal of Engineering & Applied Sciences (IJEAS) Vol.9, Issue 1(2017) 14-31 http://dx.doi.org/10.24107/ijeas.286473 Development of Pavement Maintenance Management System (PMMS) of Urban Road Network Using HDM-4 Model a* b c d Tanuj Chopra , Manoranjan Parida , Naveen Kwatra , Jyoti Mandhani a,c,dDepartment of Civil Engineering, Thapar University,Patiala,India bDepartment of Civil Engineering, Indian Institute of Technology, Roorkee,India *E-mail address: [email protected] Received date: January 2017 Abstract The aim of the study is to develop Pavement Maintenance Management System (PMMS) for four road sections of urban road network (Patiala, Punjab, India) using Highway Development and Management (HDM-4) model. The HDM-4 provides a deterministic approach in data input and process data of existing road condition, traffic volume and pavement composition to predict road deterioration as per the urban road conditions in terms of International Roughness Index (IRI) value. This study presents the use of HDM-4 model for the computation of optimum Maintenance and Rehabilitation (M&R) strategy for each road section and comparative study of scheduled and condition responsive M&R strategies. The results of present study will be useful for gaining better support for decision-makers for adequate and timely fund allocations for preservation of the urban road network. Keywords: Pavement, management, maintenance, HDM-4, urban road, predict, road deterioration. 1. Introduction Construction of road network involves substantial investment and therefore proper maintenance of these assets is of paramount importance. It is found that the actual available maintenance expenditure amount is much less than what is required for urban roads.
    [Show full text]
  • Curriculum Vitae
    CURRICULUM VITAE 1. PERSONAL (a) Name SATISH CHANDRA (b) Date of Birth September 5, 1962 (c) Address Director, \ Central Road Research Institute Delhi – Mathura Road NEW DELHI 110025 09412394357 (mobile) E-mail: [email protected] (d) Nationality Indian (e) Marital Status Married 2. EDUCATIONAL QUALIFICATIONS Name of Degree Year of passing University Class Subject/specialization B.E. 1983 University of Roorkee I Civil Engineering M.E. 1985 University of Roorkee I (Hons) Transportation Engg. Ph.D. 1994 University of Roorkee -- Transportation Engg. (Now IIT Roorkee) 3 EMPLOYMENT/RESEARCH EXPERIENCE Position held Employer Period Nature of duties Director CSIR-CRRI, New Delhi 18-1-2016 till date Administration (on lien from IITR) Professor IIT Roorkee May 11, 2006 till Teaching, Research and date Consultancy Associate Professor IIT Roorkee February 2001 to --do-- May 11, 2006 Assistant Professor IIT Roorkee April 1996 to Feb. --do-- 2001 Lecturer University of Roorkee November 1985 to --do-- (Now IIT Roorkee April 1996 Research Scientist – B University of Roorkee, June 1985 to Nov Work on sponsored (Now IIT, Roorkee) 1985 research schemes R-23 & R-24 University of Roorkee, February 1985 to Work on sponsored Research Associate (Now IIT, Roorkee) June 1985 research schemes R-23 & R-24 1 4. SUMMARY OF PERFORMANCE (a) Teaching Experience From to (i) Undergraduate Nov’ 85 January 2016 (ii) Post graduate Jan’86 January 2016 (iii) Short term courses conducted 19 (see annexure – II) (b) Publications (i) Research papers in referred journals 137 (Annexure – III) (ii) Papers in conferences/symposia 72 (Annexure – III) (iii) Books 03 (iv) Review/research/Design Reports about 60 reports prepared related to sponsored research and consultancy projects (c) Number of theses supervised Completed in progress (i) Ph.D.
    [Show full text]
  • Report Road Safety in India. Joint Working Group Recommendations
    Report Road Safety in India. Joint Working Group Recommendations. February 14, 2020 The Road Safety Knowledge Sharing Platform was launched late 2018 through the initiative of the Autoliv Group. All participating stakeholders in the platform share a common goal to reduce road traffic fatalities in India. A review and evaluation of the current situation of road traffic safety in India was completed 2019. The result is a set of recommendations on how to address the number of fatalities on Indian roads. This report presents issues and recommendations with the ambition to support Indian governmental bodies, at both national and state level, in the formation of future policies and implementation of strategies. Table of Contents 1. EXECUTIVE SUMMARY 4 2. BACKGROUND 6 3. INTRODUCTION 8 4. DISCUSSION 11 5. RECOMMENDATIONS 13 Recommendations on infrastructure 13 Roads and road furniture 13 Road evaluation 14 Road accident data 14 Recommendations on Vehicle Technology 14 Vehicle Safety Regulations 14 Vehicle Rating Programs 15 Other Measures 15 Recommendations on Human Behavior 15 Education and Tests 15 Reward and Recognition 15 Focus on Drunk Driving, Speeding and Other Dangerous Traffic Behavior 15 Use of Safety Devices 15 Recommendations on Monitoring 15 Monitoring 15 Further Recommendations 16 6. MORE INFORMATION – POINT OF CONTACT 17 7. AUTHORS OF THE REPORT 17 8. REFERENCES 18 9. APPENDIX – JWG ROAD SAFETY DISCUSSIONS 20 Infrastructure 20 Vehicle Technology 27 Human Behavior 37 REPORT ROAD SAFETY IN INDIA. JOINT WORKING GROUP RECOMMENDATIONS. 1. Executive summary The official national statistics in India show that adopted to guide safe road infrastructure around 150,000 fatalities occur on the roads each design.
    [Show full text]
  • Strategy for Financing of Maintenance of Roads in India
    STRATEGY FOR FINANCING OF MAINTENANCE OF ROADS IN INDIA By N. K. Sinha President M/s. Intercontinental Consultants and Technocrats Pvt. Ltd. A-8 &9, Green Park, New Delhi – 110016, Tel.: 011-40863000, email: [email protected] Also Chairman, IRF, India Chapter ABSTRACT Indian Road network has presently a total length of approximately 4.87 million km. and is reckoned as second largest in the world. A well maintained road provides good surface to road users. It also lowers the vehicle operating costs besides savings in travel time. Conversely, a badly maintained road provides a rough and uneasy riding surface. It gives high vehicle operating costs and induces damages to vehicles and is environmentally undesirable Road management authorities therefore always aim at having well maintained road network. But maintenance of this huge national asset is a challenging task, specially in view of complexity arising due to political system, technical requirements and financial constraints. Though road sector is very important from the point of view of growth of economy, availability of funds for the sector is quite low in the budget because of competing urgent societal needs. Consequently, funds for maintenance of road which is sub set of road sector funds is also toned down to the minimum. India has therefore been continuously striving for a sustainable strategy for financing of maintenance of roads. 1. INDIAN ROAD NETWORK Indian road network comprises various classes of roads Table-1 below gives the road classification and their present lengths maintenance: Table-1 Road classification Total length National Highways *92,851 State Highways 242,687 Rural Roads, and Urban roads and 4,629,462 other roads *4,865,000 *Source – MoRT&H The network carries over 65 percent of its freight and about 85 percent of passenger traffic.
    [Show full text]
  • Roads Routes and Canal Systems
    ROADS AND CANALS OF ANCIENT WORLD. ROADS From the earliest times, one of the strongest indicators of a society's level of development has been its road system-or lack of one. Increasing populations and the advent of towns and cities brought with it the need for communication and commerce between those growing population centers. A road built in Egypt by the Pharaoh Cheops around 2500 BC is believed to be the earliest paved road on record-a construction road 1,000 yards long and 60 feet wide that led to the site of the Great Pyramid. Since it was used only for this one job and was never used for travel, Cheops's road was not truly a road in the same sense that the later trade routes, royal highways, and impressively paved Roman roads were. The various trade routes, of course, developed where goods were transported from their source to a market outlet and were often named after the goods which traveled upon them. For example, the Amber Route traveled from Afghanistan through Persia and Arabia to Egypt, and the Silk Route stretched 8,000 miles from China, across Asia, and then through Spain to the Atlantic Ocean. However, carrying bulky goods with slow animals over rough, unpaved roads was a time consuming and expensive proposition. As a general rule, the price of the goods doubled for every 100 miles they had to travel. Some other ancient roads were established by rulers and their armies. The Old Testament contains references to ancient roads like the King's Highway, dating back to 2000 BC.
    [Show full text]
  • The Politics of Road Safety in Mumbai.Pdf
    Making in-roads The politics of road safety in Mumbai Tanushri Gupte Case study March 2018 This project was generously supported by: The views expressed in this report and the accuracy of its findings do not necessarily represent the views of or confer liability on the FIA Foundation. Overseas Development Institute World Resources Institute: Ross Center for Sustainable Cities 203 Blackfriars Road 10 G Street, NE Suite 800 London SE1 8NJ Washington, DC 20002 Tel: +44 (0) 20 7922 0300 Tel: +1 (202) 729 7600 Fax: +44 (0) 20 7922 0399 Fax: +1 (202) 729 7610 Email: [email protected] Email: [email protected] www.odi.org www.wri.org www.odi.org/facebook www.facebook.com/worldresources www.odi.org/twitter www.twitter.com/worldresources Readers are encouraged to reproduce material from ODI publications for their This document contains preliminary research, analysis, findings and own outputs, as long as they are not being sold commercially. As copyright recommendations. It is being circulated to stimulate timely discussion and holder, ODI requests due acknowledgement and a copy of the publication. For critical feedback, and to influence ongoing debate on the emerging issue of online use, we ask readers to link to the original resource on the ODI website. the political economy analysis of road safety. The views presented in this paper are those of the author(s) and do not necessarily represent the views of ODI. © Overseas Development Institute 2018. This work is licensed under a Creative Commons Attribution-NonCommercial Licence (CC BY-NC 4.0). Cover photo: Pedestrians try to cross the Bharatmata Intersection in busy traffic in the Island City of Mumbai © Prasad Shekhar/WRI India, 2018 About this case study This study examines the political economy of road safety in India, with a focus on Mumbai.
    [Show full text]
  • National Infrastructure Pipeline
    National Infrastructure Pipeline Report of the Task Force Department of Economic Affairs Ministry of Finance Government of India Volume II 1 2 Contents Infrastructure Progress 20 Sector Progress, Deficits and Challenges, Vision and Reforms 23 General Reforms 174 Financial Sector Reforms 188 Infrastructure Financing 206 Business Models 230 Financing the NIP 244 Way Forward 248 Annexure 254 3 List of Figures Figure 1 Year-wise investment trend in infrastructure (Rs lakh crore, FY13-17, FY 18E and FY 19E) 21 Figure 2 Share of infrastructure investment by the Centre, states and private sector 21 Figure 3 Power sector investment (Rs lakh crore) and share in total infrastructure investment (%) 24 Figure 4 Trends in power generation capacity (GW) and per capita electricity consumption in India (kWh) 25 Figure 5 Trend in power transmission lines in India (ckm) 25 Figure 6 Length of natural gas pipeline in India (in km) 27 Figure 7 CGD bidding rounds snapshot 27 Figure 8 Per capita consumption (kWh/ person) 29 Figure 9 Share of fossil fuel in electricity generation (%) 29 Figure 10 Electricity distribution losses (%) 29 Figure 11 Gas consumption by different sectors (in MMSCMD) 30 Figure 12 Roads sector infrastructure investment (Rs lakh crore) and share in total infrastructure investment (%) 46 Figure 13 Trend in road network in India (lakh km) 46 Figure 14 Achievement targets set by MoRTH 47 Figure 15 Road connectivity (Score: 1 - 100) 49 Figure 16 Quality of road infrastructure (Score: 1 – 7) 49 Figure 17 Railways infrastructure investment (Rs
    [Show full text]
  • Infrastructure
    Page 1 of 89 INFRASTRUCTURE Page 2 of 89 ● INTRODUCTION ● TYPES OF TRANSPORTATION ● IMPORTANCE OF TRANSPORTATION IN ECONOMY ● PROBLEMS OF TRANSPORTATION CHAPTER 1: ROADWAYS ● GROWTH AND DEVELOPMENT OF ROAD TRANSPORT ○ NATIONAL HIGHWAYS ○ STATE HIGHWAYS ○ DISTRICT ROADS ○ RURAL ROADS ○ OTHER ROADS ● PROBLEMS IN ROAD TRANSPORT ● RECENT INITIATIVES ● FUNDING MECHANISM IN ROAD INFRASTRUCTURE ○ NATIONAL HIGHWAYS INVESTMENT PROMOTION CELL (NHIPC) ○ MEASURES TO REVIVE LANGUISHING STALLED PROJECTS ○ TOLL OPERATE TRANSFER MODEL ○ CENTRAL ROAD FUND ● PLANNING FOR MULTI MODAL TRANSPORT SYSTEMS ● Urban Mobility in India ● GREEN INITIATIVE ● E-INITIATIVES ● ROAD SAFETY: A TOUGH TASK ● MOTOR VEHICLE (AMENDMENT) BILL, 2017 ● COMMITTEE ON TRANSPORT DEVELOPMENT CHAPTER 2: RAILWAYS ● INTRODUCTION, ● SIGNIFICANCE OF RAILWAY ● INSTITUTIONS GOVERNING RAILWAYS(RDB) ● MERGER OF RAIL BUDGET WITH UNION BUDGET ● RAILWAY ZONES ● RAILWAYS FOR URBAN MOBILITY ● NEED OF RAILWAYS IN URBAN TRANSPORT ● TRANSIT ORIENTED DEVELOPMENT ● PROBLEMS IN INDIAN RAILWAYS ○ POOR PERFORMANCE OF FREIGHT SEGMENT: ○ INEFFECTIVE CONNECTIVITY AND PROBLEMS OF DELAY: ○ POOR SERVICE DELIVERY AND EFFICIENCY: ○ PROBLEMS OF RAILWAY SAFETY ● MAJOR-COMMITTEES ● RECENT DEVELOPMENT IN RAILWAYS ForumIAS Offline Guidance Centre 2nd Floor, IAPL House, 19, Pusa Road, Karol Bagh, New Delhi – 110005 | [email protected]|9821711605 Page 3 of 89 ○ DEDICATED FREIGHT CORRIDORS ○ BULLET TRAIN ○ TRAIN 18 ○ RASHTRIYA RAIL SANRAKSHA KOSH (RRSK) ○ AVATARAN ○ ALTERNATE TRAIN ACCOMMODATION SCHEME – VIKALP
    [Show full text]
  • Critical Aspects of Planning, Design and Operation of High Speed Roads
    1 CRITICAL ASPECTS OF PLANNING, DESIGN AND OPERATION OF HIGH SPEED ROADS Dr. T S Reddy LEA Associates South Asia Pvt Ltd., New Delhi [email protected] ABSTRACT High Speed Roads are the major contributors to the mobility and thus link the major centers separated over long distances. These roads account for more than 50 percent of the vehicle kilometers travelled in any country and more so in India. Normally these high speed roads will have limited and restricted access and operate at high speeds. Access to these roads is normally through properly planned and designed interchanges provided with appropriate speed change lanes merging in to or diverging from the carriageway of the high speed roads. At present there are a few of these roads in the form of Expressways and National Highways in India. Expressways are mainly fully access controlled and the National Highways are partially access controlled. These facilities are designed to operate at 120 kmph but due to the problems related to cost and land acquisition safety aspects are compromised in planning and design. As a result these high speed roads are becoming potential contributors to serious and fatal accidents. Recent accident statistics indicate the rising trends of fatalities and serious injuries on National Highways. This paper tries focus on some important safety features that need to be considered at planning, design and operation stages for improved safety on these roads. The paper is intended to illustrate these features and the impact of their absence on safety of users and non-users of high speed roads in India.
    [Show full text]
  • Working Group on Roads for the National Transport Development Policy Committee
    WORKING GROUP ON ROADS FOR THE NATIONAL TRANSPORT DEVELOPMENT POLICY COMMITTEE FINAL REPORT Transport Research Wing Ministry of Road Transport & Highways Government of India May 2012 Working Group on Roads for National Transport Development Policy Committee Terms of Reference 1. Determine the role of road transport in meeting transport requirements of the economy over the next two decades, keeping in view the need to a. Conserve energy and protect the environment, b. Promote development of remote and inaccessible areas through universal connectivity, c. Promote safety and sustain future quality of life, d. Create an optimal intermodal mix. 2. Estimate the growth in road traffic, passenger and freight, by 2020 and 2030 in the context of economic, demographic and technological trends at local, national and global levels. 3. Consistent with the above, assess the current capacity and required capacity in future, of the physical road infrastructure. The requirements may be grouped into different categories: a. Expressways b. National Highways c. State Highways and Major District Roads d. Rural Roads – both PMGSY and non-PMGSY (urban road requirements would be addressed by the working group on urban transport). The following aspects may also be kept in view while assessing the requirements: a. Universal rural connectivity. b. Special problems of remote, difficult and border areas including the north-east region. c. Road connectivity with ports, power plants, water fronts. d. Road connectivity with neighbouring countries. e. Development of regional and international road corridors. 4. In light of the above, a. Assess the investment required to achieve the projected road traffic growth. b. Identify sources of funding and assess fund requirements from budgetary, non-budgetary and private sources for different areas in road infrastructure.
    [Show full text]
  • Tender Competitiveness and Project Performance in India's PMGSY
    Working paper Tender competitiveness and project performance in India’s PMGSY scheme Jonathan Lehne Jacob N. Shapiro Oliver Vanden Eynde February 2019 When citing this paper, please use the title and the following reference number: S-89447-INC-1 Tender competitiveness and project performance in India’s PMGSY scheme † ‡ § Jonathan Lehne Jacob N. Shapiro Oliver Vanden Eynde 6 February 2019 Abstract As part of India’s e-governance revolution, details of tenders for rural road construction programmes were made publicly available. We analyse these tender data for six states, covering more than 20,000 road projects undertaken under India’s flagship rural roads development scheme – PMGSY. We find that matching these tender details to other administrative data sources on the completion of these projects is challenging, and we examine to what extent data quality correlates with road characteristics. We also analyse the relationship between the competitiveness of the tendering process and the cost and quality of the roads constructed. Greater competition in both the technical and financial evaluation is associated with lower cost overruns and better performance on quality inspections. Nonetheless, we show that even after the introduction of e-procurement a large proportion of tenders remain uncompetitive. Keywords: public procurement; infrastructure; auctions JEL Codes: D72, D73, L14, O18 † Corresponding author; Paris School of Economics; Boulevard Jourdan 48, 75014 Paris, France; [email protected]. ‡ Princeton University, Woodrow Wilson School of Public and International Affairs; Robertson Hall, 20 Prospect Ave, Princeton, NJ 08540, USA; [email protected]. § Paris School of Economics; Boulevard Jourdan 48, 75014 Paris, France; [email protected].
    [Show full text]
  • Nber Working Paper Series Highway to Success
    NBER WORKING PAPER SERIES HIGHWAY TO SUCCESS: THE IMPACT OF THE GOLDEN QUADRILATERAL PROJECT FOR THE LOCATION AND PERFORMANCE OF INDIAN MANUFACTURING Ejaz Ghani Arti Grover Goswami William R. Kerr Working Paper 18524 http://www.nber.org/papers/w18524 NATIONAL BUREAU OF ECONOMIC RESEARCH 1050 Massachusetts Avenue Cambridge, MA 02138 November 2012 We are grateful to Partha Mukhopadhyay, Stephen O’Connell, Hyoung Gun Wang and seminar participants for helpful suggestions/comments. We are particularly indebted to Sarah Elizabeth Antos and Henry Jewell for excellent data work and maps. We thank the World Bank’s South Asia Labor Flagship team for providing the primary datasets used in this paper. Funding for this project was provided by a Private Enterprise Development in Low-Income Countries grant by the Centre or Economic Policy Research and by World Bank’s Multi-Donor Trade Trust Fund. Kerr was a paid short-term contractor of the World Bank for this project. The views expressed here are those of the authors and not of any institution they may be associated with. The views expressed herein are those of the authors and do not necessarily reflect the views of the National Bureau of Economic Research. NBER working papers are circulated for discussion and comment purposes. They have not been peer- reviewed or been subject to the review by the NBER Board of Directors that accompanies official NBER publications. © 2012 by Ejaz Ghani, Arti Grover Goswami, and William R. Kerr. All rights reserved. Short sections of text, not to exceed two paragraphs, may be quoted without explicit permission provided that full credit, including © notice, is given to the source.
    [Show full text]