Environmental Assessment ‐ Agency Contact List Lake Chelan Airport, Washington A.I.P

Total Page:16

File Type:pdf, Size:1020Kb

Environmental Assessment ‐ Agency Contact List Lake Chelan Airport, Washington A.I.P Environmental Assessment ‐ Agency Contact List Lake Chelan Airport, Washington A.I.P. No.: 3‐16‐0013‐007 Draft ‐ March 2011 Impact Category Date Sent Date Replied Comments Contact Person Air Quality 3/12/2010 (MKO) Called Project is not within a non‐attainment or Christine Reichgott, Environmental Review 5/13/2010‐ maintenance area for any National Ambient Coordinator Left voice Air Quality Standards (NAAQS). In accordance US EPA Region X message with FAA guidance on air quality and Mail Stop: ETPA‐088 compliance with General Conformity, a 1200 Sixth Avenue General Conformity analysis is not needed. Seattle, WA 98101 Phone: (206) 553‐1601 [email protected] Coastal Contact not usually required in non‐coastal Washington State Department of Ecology Resources zones. P.O. Box 47703 Olympia, WA 98504‐7703 Compatible Land 3/12/2010 Received Talked with Lilith on 2/3/11 re: comments on Bill Bailey, Director Lilith Yanagimachi Use letter dated Agency Draft EA (KSN) Chelan County Community Development 3/15/2010 Chelan County Current Planning 316 Washington Street, Suite 301 Wenatchee, WA 98801 Phone: (509) 667‐6225 Fax: 667‐6475 bill.bailey [email protected] 3/12/2010 Karen Peele, Current Planning Manager Chelan County Current Planning 316 Washington Street, Suite 301 Wenatchee, WA 98801 Phone: (509) 667‐6225 Fax: (509) 667‐6475 [email protected] 01/20/2011 (KAP) Called Called to confirm road names south of Lori Beidler, Addressing Coordinator for 1/20/2011 Runway 2‐ “Chelan Airport Road” and “Airport Roadway Database, GIS, and Addressing Way” division of Chelan County Public Works (509)667‐6415 3/12/2010 (MKO) Called Craig Guildroy, Planning Director 5/17/2010‐ City of Chelan Will email 135 E. Johnson Ave. response (to P.O. Box 1669 Ken) Chelan, WA 98816 Phone: (509) 628‐8017 (509)682‐8017 Fax: (509) 628‐8050 [email protected] Construction Contact not usually required, a description of Impacts proposed construction will be identified. Washington State Best Management Practices will be references to reduce construction impact. Department of 3/2/11 Letter from FAA will contact directly Robert Whitlam, PhD Transportation FAA and SHPO (State Historic Preservation Office) (4f) Cultural Department of Archaeological and Historical 1063 South Capital Way, Suite 106 Resources Preservation (DAHP) P.O. 48343 Report sent to Olympia, WA 98504‐8343 SHPO i Environmental Assessment ‐ Agency Contact List Lake Chelan Airport, Washington A.I.P. No.: 3‐16‐0013‐007 Draft ‐ March 2011 Impact Category Date Sent Date Replied Comments Contact Person Farmlands 3/12/2010 (MKO) Called Amy Hendershot, District Conservationist 5/17/2010‐ N.R.C.S. Left voice 215 Melody Lane message Wenatchee, WA 98801 Phone: (509) 664‐9303 Fax: (509) 662‐1628 [email protected] Fish, Wildlife, 3/12/2010; (MKO) Called Original scoping letter sent on 3/12/2010‐ Jessica Gonzales, Assistant Project Leader and Plants 11/11/2010 5/13/2010‐ MKO followed up, no comments; Letter U.S. Department of the Interior, Fish and No comments acknowledging updated species list sent Wildlife Service (no response); 11/11/2010, KAP followed up via phone, Central Washington Field Office (KAP) Called spoke with Jeff Krupka (USFWS)‐ low risk 215 Melody Lane, Suite 119 01/04/2011‐ project, no comments. Wenatchee, WA 98801 no comments. Phone: (509) 665‐3508 Fax: (509) 665‐3509 [email protected] 3/12/2010; (MKO) Called Original scoping letter sent on 3/12/2010‐ Bob Steele, Habitat Manager 11/11/2010 5/17/2010‐ MKO followed up, no comments; Letter Washington Fish and Wildlife Region 2 Left voice acknowledging updated species list sent 1550 Alder St. NW message; 11/11/2010, KAP followed up via phone Ephrata, WA 98823‐9651 (KAP) Called (509) 754‐4624 01/04/2011‐ (509) 754‐5257 left voice [email protected] message No coastal marine fisheries will be affected, Mr. Tom Sibley Division Director of Habitat contact not required per: 7600 Sand Point Way NE Seattle, Washington 98115‐0070 Phone: (206) 526‐6150 Floodplains If the project is not in a Floodplain, or if it will not change the floodplain (i.e., replacing something existing) no contact is required. If it is in a floodplain or if there is “new” work, then USACE, USF&W, WS Hydraulic Permits, Chelan County all apply Hazardous General database search will be conducted Materials Pollution Prevention and Solid Waste Historical 3/2/11 Letter from FAA will contact directly Robert Whitlam, PhD Archaeological FAA and SHPO (State Historic Preservation Office) Architectural, Cultural 1063 South Capital Way, Suite 106 / P.O. and Resources 48343 Cultural Report sent to Olympia, WA 98504‐8343 SHPO [email protected] Greg Griffith, Comprehensive Planning Specialist Phone: (360) 586‐3073 [email protected] ii Environmental Assessment ‐ Agency Contact List Lake Chelan Airport, Washington A.I.P. No.: 3‐16‐0013‐007 Draft ‐ March 2011 Impact Category Date Sent Date Replied Comments Contact Person 3/2/11 Letter from Mr. Michael Marchand, Executive Director* FAA and Colville Business Council Cultural Colville Confederated Tribes Resources P.O. Box 150 Report sent to Nespelem, WA 99155 Tribe 3/2/11 Letter from Camille Pleasant FAA and Historical and Archaeological Cultural Colville Confederated Tribes Resources P.O. Box 150 Report sent to Nespelem, WA 99155 Tribe Phone: (509) 634‐2654 [email protected] 3/2/11 Letter from Mr. Randy Abrahamson, THPO Cultural FAA and Resources Cultural Spokane Tribe of Indians Resources P.O. Box 100 Report sent to Wellpinit, WA 99040 Tribe 509‐258‐4315 [email protected] Light Emissions 3/12/2010 Karen Peele, Current Planning Manager and Chelan County Current Planning Visual Impacts *SEE COMPATIBLE LAND USE Natural 3/12/2010 (MKO) Called Bill Leffler, Chelan Office Manager Resources 5/13/2010 & Chelan PUD Office and Energy 5/17/2010‐ 1034 E. Woodin Ave Supply (Receptionist) Chelan, WA 98816 will send Phone (509) 682‐2581 response via Fax (509) 661‐8136 email/call Power requirements will not change in any back appreciable way. Noise Will be evaluated within the EA document. Construction noise will be controlled by functional mufflers and schedule control. Secondary, Chelan County, Washington State and US Induced Census Impacts Socioeconomic, Database check, documentation of any impact Environmental categories. Justice, Children’s Health and Safety risks Water Quality 3/12/2010 Christine Reichgott, Environmental Review Coordinator US EPA Region X *SEE AIR QUALITY iii Environmental Assessment ‐ Agency Contact List Lake Chelan Airport, Washington A.I.P. No.: 3‐16‐0013‐007 Draft ‐ March 2011 Impact Category Date Sent Date Replied Comments Contact Person 3/12/2010 (MKO) Called Cheryl Niemi 5/13/2010‐ Water Quality Program Will call/email Department of Ecology response P.O. 47600 Olympia, WA 98504‐7600 Phone: (360) 407‐6440 [email protected] Wetlands Wetlands are not expected. Debbie Knaub Corps of Engineers, P.O. Box 2829 Chelan, Washington 98816 Phone: (509)‐682‐7010 [email protected] Wild and Scenic Wild and Scenic Rivers will not be impacted. Rivers Interested Party 3/12/2010 Chelan County Noxious Weed Control Board Mike Mackey Chelan County Noxious Weed Board 400 Washington Street Wenatchee, WA 98801 Phone: (509) 667‐6550 Fax: 509‐667‐6561 [email protected] Interested / 3/12/2010 (MKO) Called Pangborn Memorial Airport Pat Moore, Airport Manager Assisting Party 5/13/2010‐ Pangborn Memorial Airport Responded via 1 Pangborn Drive email East Wenatchee, WA 98802 509‐884‐2494 Interested Party 3/12/2010 (MKO) Called Lake Chelan Community Hospital Mr. Karl Johasson, Director Emergency 5/17/2010‐ Medical Services, Left voice Lake Chelan Community Hospital message 503 E. Highland Avenue Chelan, WA 98816 509‐682‐6115 [email protected] Interested Party 3/12/2010 (MKO) Called North Cascades National Park Mr. Roy Zipp, Environmental Coordinator 5/17/2010‐ North Cascades National Park Left voice 810 State Route 20 message Sedro‐Woolley, WA 98284 360‐854‐7313 [email protected] Interested Party 3/12/2010 (MKO) Called Douglas County Land Services Mr. Mark D Kulaas, AICP, Director 5/17/2010‐ Douglas County Land Services Responded via 140 19th Street NW, Suite A email East Wenatchee, WA 98802 509‐884‐7173 iv Environmental Assessment ‐ Agency Contact List Lake Chelan Airport, Washington A.I.P. No.: 3‐16‐0013‐007 Draft ‐ March 2011 Impact Category Date Sent Date Replied Comments Contact Person Interested Party 3/12/2010 (MKO) Called Washington State Department of Natural Mr. George Shelton Genie 5/17/2010‐ Resources Assistant State Land Manager Left voice Washington State Department of Natural message Resources, Southeast Region 713 Bowers Road Ellensburg, WA 98926‐9301 509‐925‐8510 [email protected] Interested Party 3/12/2010 (KAR) Called US Forest Service, Chelan Ranger District Mr. Robert Sheehan, District Ranger 5/17/2010‐ US Forest Service Supposed to Chelan Ranger District send email 428 Woodin Avenue (never Chelan, WA 98816‐9724 received) 509‐682‐9004 509‐682‐4900 v .
Recommended publications
  • PANGBORN MEMORIAL AIRPORT MASTER PLAN Pangborn Memorial Airport ______
    FLY WENATCHEE PANGBORN MEMORIAL AIRPORT MASTER PLAN Pangborn Memorial Airport ____________________________________________________________________________________ TABLE OF CONTENTS PAGE INTRODUCTION CHAPTER OVERVIEW i 1. PLAN BACKGROUND II 2. PLAN DOCUMENTATION II 3. PLAN COORDINATION AND PARTICIPATION II 4. STRATEGIC EVALUATION iii CHAPTER 1: AIRPORT INVENTORY CHAPTER OVERVIEW 1 1. AIRPORT OVERVIEW 1 2. AIRFIELD AND AIRSPACE FACILITIES 6 3. TERMINAL AND LANDSIDE FACILITIES AND SUPPORT SERVICES 13 4. METEROLOGICAL CONDITIONS 23 5. AIRPORT LAND USES AND REGULATIONS 27 6. AIRPORT ECONOMIC PROFILE 30 7. FINANCIAL OVERVIEW 31 8. ENVIRONMENTAL OVERVIEW 32 9. INVENTORY CHAPTER SUMMARY 36 CHAPTER 1: LIST OF EXHIBITS 1.1: AIRPORT LOCATION & VICINITY 2 1.2: AIRPORT DIAGRAM 7 1.3: AIRFIELD PAVEMENT CONDITION INDEX (2012) 10 1.4: AERONAUTICAL/AIRSPACE CHART 11 1.5: AERONAUTICAL/AIRSPACE CHART 13 1.6: TERMINAL FACILITY LOCATIONS 14 1.7: AIR CARRIER FACILITY LOCATIONS (BUILDING, APRON, AUTO PARKING) 15 1.8: AIR CARRIER TERMINAL BUILDING FLOORPLAN DIAGRAM 17 1.9: AIR CARGO FACILITIES 19 1.10: GENERAL AVIATION FACILITY LOCATIONS 21 1.11: WIND DIAGRAMS (ALL WEATHER AND INSTRUMENT) 25 1.12: AIRPORT BUSINESS PARK LOTS 28 1.13: AIRPORT AND SURROUNDING ZONING DISTRICTS 29 1.14: AIRPORT FINANCIAL HISTORICAL PROFILE (2011 TO 2015) 32 ____________________________________________________________________________________ Table of Contents: December 2017 – FINAL DRAFT i Pangborn Memorial Airport ____________________________________________________________________________________
    [Show full text]
  • Pierce County Public Works and Utilities Brian J
    Pierce County Public Works and Utilities Brian J. Ziegler, P.E. 2702 South 42nd Street, Suite 201 Director Tacoma, Washington 98409-7322 [email protected] piercecountywa.org/pwu TO: Dan Roach, Chair Pierce County Council FROM: Deb Wallace, Airport and Ferry Administrator DATE: October 28, 2014 SUBJECT: Airport Security The purpose of this briefing paper is to provide an update to Council on the status of security upgrades at Pierce County's airports. Current Situation: The Pierce County Airport and Ferry division is in the process of upgrading gate access, fencing, and security lighting at both airports. In 2015 the division will implement an Airport Watch program to increase the safety and security at each facility. The improvements are being made due to incidents which have occurred at the airports over the last several years and at the request of airport tenants. Currently both airports are fenced with restricted access gates to enhance security, although there are gaps in the fencing allowing unauthorized pedestrian entry. These gaps will be addressed in early 2015. An electronic gate is being added to the north gate at Tacoma Narrows Airport (TIW) and the south gate is being outfitted with a mechanism to allow its use by those who are hearing impaired. Once that improvement is completed, 24 hour security will be implemented at TIW. Thun Field currently operates with 24 hour gate security. Prior to implementation, the airport commissions at each airport discussed airport security measures during the preceding year and staff coordinated the implementation of the security measures with airport tenants.
    [Show full text]
  • CC/B = Courtesy Car/Bike - RC = Rental Car TC = Tent Camp - RV = RV Park - R = Restaurant - PP = Porta Potty - RR = Restroom - S = Shower - FP = Fire Pit
    Field Length - PF = Paved Field - GF = Grass Field - F = Fuel - CC/B = Courtesy Car/Bike - RC = Rental Car TC = Tent Camp - RV = RV Park - R = Restaurant - PP = Porta Potty - RR = Restroom - S = Shower - FP = Fire Pit March 17: FATPNW Winter Fly-Out @ Scappoose, OR SPB (5100’ PF-F-CC-TC-RV-RR) Details @ FATPNW April 21: Wings & Wheels Breakfast & Fly-In @ Emmett Municipal Airport, Idaho S78 (3307’ PF-F-RR) 8:00 - 2:00 Breakfast + Spot Landing Contests + War Birds + Classic Cars Lan Smith 208-365-1754 May 19: WPA, Paine Field Airport, Flying Heritage Collection, Historic Flight Foundation Host 22nd Annual Paine Field Aviation Day PAE (10,000’ PF-F-RR) 10:00-5:00 5K Run/Walk + Breakfast + Air Show + Vendors + More www.painefield.com/198/Paine-Field-Aviation-Day May 19: FATPNW Spring Fly-Out Copalis Beach State Airport S16 (3560’ Hard Sand-PP) Details @ FATPNW May 19: Twisp BBQ & WPA Meeting 2S0 (2701’ PF-CC-TC-RV-PP) 2:00 WPA Meeting. 3:00 BBQ - Potluck. WPA Provides Steaks for Members. (Fuel: Winthrop S52 -122.8) www.twispairport.com June 1: RAF & Oregon Dept of Aviation @ McKenzie Bridge State Airport 00S (2600’ GF) Work Party + Potluck + Camping [email protected] visitmckenzieriver.com/oregon/item/mckenzie-bridge-state-airport-00s June 2: Norman Grier Field Fly-In & BBQ @ Kent S36 (3288’ PF-F-RR) Hosts: Normandy Aircraft 12:00-7:00 Amazing Vintage & Antique Aircraft Display Includes National Aeronca Association Aircraft. Details TBD. June 2: Lake Chelan Airport @ Chelan S10 (3503’ PF-F-TC-PP) Details TBD [email protected] 425-681-2811 www.facebook.com/events/1948353085384310/?ti=icl June 16: Pangborn Airport Fly-In @ Wenatchee EAT (7000’ PF-F-RR) 7:30-9:00 Pancake Breakfast Free to First 30 Pilots + Drawings + Plane & Copter Rides + Kids Activities + Miss Veedol + Lunch on the Ramp.
    [Show full text]
  • Gray Notebook
    59 WSDOT’s quarterly performance report on transportation systems, programs, and department management Quarter ending September 30, 2015 • Published November 2015 Lynn Peterson, Secretary of Transportation Putting construction contracts into perspective WSDOT tracks awarded and completed projects to determine accuracy of engineer’s estimates p. 27 Aviation program soars WSDOT moves ahead with projects to improve, preserve airports p. 12 Building issues WSDOT working hard to maintain and preserve its aging structures p. 8 Strategic Goal: XXX GNB Edition 59 – September 30, 2015 | 1 59 Table of Contents Navigating the Gray Notebook 3 Environment Statewide Transportation Policy Goals 4 Water Quality Annual Report 24 Moving Ahead for Progress in the 21st Century (MAP-21) 5 Economic Vitality and Stewardship Results Washington 6 Construction Contracts Annual Report 27 Results WSDOT – Setting WSDOT’s Direction 7 Lean Process Improvements Quarterly Update 29 Preservation Capital Project Delivery Programs Quarterly Update 31 Asset Management: Capital Facilities Annual Report 8 Current Legislative Evaluation Asset Management: Aviation Annual Report 12 and Accountability Program (LEAP) 32 Safety and Mobility Completed Projects 34 2015 Corridor Capacity Report Executive Summary 16 Watch List 34 Incident Response Quarterly Update 18 Advertisement Record 36 WSDOT Ferries Quarterly Update 20 Schedule and Budget Summaries 37 Rail: Amtrak Cascades Quarterly Update 22 Original LEAP 38 Pre-existing Funds 40 Gray Notebook Information Guide 42 PERFORMANCE
    [Show full text]
  • LGFRS Report for 2012/2013 Entity Name Reported Expenditure Membership Fees
    LGFRS Report for 2012/2013 Entity Name Reported expenditure Membership Fees 2009 2010 2010/2011 2012 2013/ 6 mo Adams Conservation District $413,010 $196,774 $400 $200 $100 Adams County $19,757,183 $18,409,399 $2,000 $1,000 $500 Adams County Cemetery District No 1 $10,826 $6,764 $400 $200 $100 Adams County Cemetery District No 2 $3,538 $4,070 $400 $200 $100 Adams County Cemetery District No 3 $43,152 $47,862 $400 $200 $100 Adams County Fire Protection District No 1 $233,866 $270,899 $400 $200 $100 Adams County Fire Protection District No 2 $199,930 $245,335 $400 $200 $100 Adams County Fire Protection District No 4 $18,483 $19,519 $400 $200 $100 Adams County Fire Protection District No 5 $507,128 $534,757 $400 $200 $100 Adams County Fire Protection District No 6 $20,644 $15,182 $400 $200 $100 Adams County Fire Protection District No 7 $40,713 $74,033 $400 $200 $100 Adams County Mosquito Control District $263,382 $254,616 $400 $200 $100 Adams County Parks and Recreation District No 1 $12,154 $10,318 $400 $200 $100 Adams County Parks and Recreation District No 2 $48,515 $30,099 $400 $200 $100 Adams County Parks and Recreation District No 3 $56,627 $56,576 $400 $200 $100 Adams County Parks and Recreation District No 4 $109,977 $92,693 $400 $200 $100 Adams County Public Hospital District No 2 $5,032,901 $5,088,486 $1,000 $500 $250 Adams County Public Hospital District No 3 $15,771,726 UNRECEIVED $2,000 $1,000 $500 Adams County Rural Library District No 1 $283,719 $427,208 $400 $200 $100 Adams County Water Conservancy Board $2,658 $1,346 $400
    [Show full text]
  • Pangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802 Phone: 509.884.2494 Ext
    TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan – Working Paper #1 DATE: August 25, 2016 Please find attached for your review the ‘draft’ Working Paper #1 documents for the Pangborn Airport Master Plan. These files includes the following: Introduction Chapter Inventory/Environmental Overview Chapter Appendices PAC Packet / Meeting Agenda Each of these materials will be reviewed at the August 31 PAC Meeting #1, with an opportunity for the PAC members to provide input and comment. Again, the PAC Meeting #1 is Wednesday, August 31, 2016, from 11:00 am to 1:00 p.m. at the Confluence Technology Center (285 Technology Center Way, Wenatchee). Lunch will be provided. We look forward to visiting with you, and starting this important Airport Master Plan study. In the meantime, please feel free to contact me at 509-884-2494 Ext. 6 or [email protected] if you have any questions. Sincerely, Trent Moyers Airport Director Pangborn Memorial Airport Pangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802 Phone: 509.884.2494 ext. 6 I Fax: 509.884.0113 I www.flywenatchee.com I www.pangbornairport.com AIRPORT MASTER PLAN PANGBORN MEMORIAL AIRPORT (EAT) 2016 PRELIMINARY DRAFT REPORT – CHAPTER 1 (INTRODUCTION, INVENTORY/ENVIRONMENTAL OVERVIEW) DRAFT: PUBLIC REVIEW “The preparation of this document may have been supported, in part, through the Airport Improvement Program financial assistance from the Federal Aviation Administration (AIP Project Number 3-33-0084- 038-2016) as provided under Title 49 U.S.C., Section 47104. The contents do not necessarily reflect the official views or policy of the FAA.
    [Show full text]
  • Fiscal Year 2003 Approved Grants These Figures Are Based on Estimated Costs and May Change As Construction Bids Are Taken and Actual Grants Are Awarded
    Fiscal Year 2003 Approved Grants These figures are based on estimated costs and may change as construction bids are taken and actual grants are awarded. Location Discretionary State City Identifier/Grant Sponsor Name Entitlement Amount Total Project Summary Amount Sequence Number State of Alaska/Department of AK Akiak AKI-002 $ 592,900.00 $ - $ 592,900.00 Construct Snow Removal Equipment Building Transportation & Public Facilities AK Anaktuvuk Pass AKP-005 North Slope Borough $ 100,000.00 $ - $ 100,000.00 Rehabilitate Runway - 01-19 State of Alaska/Department of AK Anchorage LHD-008 $ 2,349,000.00 $ - $ 2,349,000.00 Construct Apron Transportation & Public Facilities AK Anchorage MRI-036 Municipality of Anchorage $ 240,000.00 $ - $ 240,000.00 Acquire Snow Removal Equipment AK Anchorage MRI-037 Municipality of Anchorage $ - $ 525,000.00 $ 525,000.00 Install Guidance Signs AK Anchorage MRI-038 Municipality of Anchorage $ 760,000.00 $ - $ 760,000.00 Rehabilitate Taxiway State of Alaska/Department of Rehabilitate Runway - 14-32; Improve Runway AK Anchorage ANC-072 $ 11,042,852.00 $ 1,300,000.00 $ 12,342,852.00 Transportation & Public Facilities Safety Area - 14-32 State of Alaska/Department of Construct Apron; Rehabilitate Runway - 6L-24R; AK Anchorage ANC-073 $ 1,518,750.00 $ 3,500,000.00 $ 5,018,750.00 Transportation & Public Facilities Expand Apron; Rehabilitate Apron State of Alaska/Department of AK Anchorage ANC-074 $ 1,387,000.00 $ - $ 1,387,000.00 Construct Taxiway Transportation & Public Facilities State of Alaska/Department of Noise
    [Show full text]
  • Methow Valley State Airport ALP Report
    Methow Valley State Airport Airport Layout Plan Report CHAPTER TWO INVENTORY OF EXISTING CONDITIONS AND FORECASTS OF AVIATION ACTIVITY Introduction Methow Valley State Airport is owned and operated by the Washington Department of Transportation (WSDOT) Aviation Division. The airport is also home to the U.S. Forest Service (USFS) North Cascades Smoke Jumper Base, which is located on USFS-owned property immediately adjacent to the east side of the runway. Methow Valley State Airport accommodates both general aviation aircraft used in business, personal or government travel, and aircraft used in seasonal firefighting efforts. The majority of general aviation activity consists of small single-engine and multi-engine piston aircraft, although the airport also accommodates a variety of turbine aircraft (turboprop, business jets, etc.) on a limited basis. General aviation activity is generated by local residents, businesses, and visitors to the area. The Methow Valley is one of Washington’s most unique year-round destinations and has long attracted visitors and part-time residents for its wilderness setting and unique recreational opportunities, including the nearby Sun Mountain Lodge. Fire-related activity includes some piston engine aircraft, but twin-engine turboprops and helicopters account for the majority of aircraft operations. This chapter documents existing conditions at the airport. Existing airfield facilities were examined during on-site inspections to update facility inventory data collected in prior planning efforts. Data from
    [Show full text]
  • 23190 Wings APR-MAY 2014 APPROVED.Indd
    INSIDE THIS ISSUE: Lake Aero FBO at Chelan Municipal Airport ................... 2 WPA 2014 Annual Retreat ................. 3 AOPA Fly-Ins: Great News & Big Changes ................ 5 Pearson Field Education Center Honored ................................... 5 2014 State Airport Adopt-an-Airport .. 6 Award Winning Maintenance Team ... 6 WPA Logo Clothing ............................ 7 Calendar of Events .............................. 8 April-May 2014 President’s Captain Tyler Voss and Message… the Completion of his RV-8 By Marian Heale Two big meetings within 30 A large number of aviation enthusiasts days! I’m referring to our General in the Spokane area, both military and Membership Meeting on Saturday, nd civilian, have traveled a difficult road this February 22 followed by the past year since the tragic death of Capt. WPA Annual Retreat on March nd rd Tyler Voss and the members of his C-135 22 and 23 . crew, Capt. Victoria Pinckney and Tech. The Northwest Aviation Sgt. Herman Mackey III. Conference and Trade Show Tyler joined Spokane’s EAA 79 in in Puyallup was a success with June 2011. For those who spent a lot of time attendance numbers up over last at the EAA Clubhouse, rapidly becoming year. Our WPA booth was VERY known as the Aviation Event Center with crowded on Saturday. My thanks offices for WPA and EAA, Tyler became Les Smith, to all of those who volunteered a very familiar and friendly face. He was to staff the booth throughout the WPA President at the clubhouse almost every night the weekend. During the course of the last few months of his life working hard show, we saw WPA new membership and renewal numbers to install a new panel and other upgrades grow by twice what they did last year.
    [Show full text]
  • View Port of Chelan County Comprehensive Scheme
    Port of Chelan county Comprehensive scheme of harbor improvements Adopted November 21, 2017 CONTENTS 1 INTRODUCTION 1 1.1 HISTORY OF WASHINGTON PORTS 1 1.2 CHELAN COUNTY 1 1.3 THE PORT OF CHELAN COUNTY 2 1.4 JURISDICTION AND GOVERNANCE 2 2 CHELAN COUNTY REAL ESTATE 4 2.1 OVERVIEW 4 3 COMPREHENSIVE SCHEME OF HARBOR IMPROVEMENTS 5 3.1 PURPOSE 5 3.2 PUBLIC INVOLVEMENT 5 3.3 PUBLIC HEARING COMMENTS 6 3.4 CONSISTENCY WITH OTHER PLANS 6 4 POCC ASSET INVENTORY 7 4.1 INTENT 7 4.2 PROPERTY LOCATION 7 4.3 ASSET AREAS 9 4.4 AIRPORTS 15 4.5 OTHER BUILDINGS AND FACILITIES 20 4.6 INFRASTRUCTURE 21 5 CAPITAL IMPROVEMENT PLAN 22 R:\0779.04 Port of Chelan County\Document\01_2017.11.16 CSHI\POCC Final CSHI 11.16.17.docx PAGE II INTRODUCTION 1 1.1 History of Washington Ports The creation of public port districts throughout Washington State was authorized by the state legislature with the passage of RCW 53 in 1911. Ports are municipal corporations, created for special purposes, but on a broad scale, ports engage in economic development activities with powers specified in the statutes. Because the state has a wide range of physical characteristics and economic needs, each of the 76 ports in Washington has its own characteristics and reasons for existence. Because ports may serve different purposes, each Port in the state differs in size, scope of its facilities and operations, and its jurisdictional boundaries. Because ports continue to evolve over time with changing economic conditions, the continual update and alignment to their keystone documents is vital.
    [Show full text]
  • Department of the Army SCOPING DOCUMENT
    Department of the Army Joint Base Lewis-McChord, Washington SCOPING DOCUMENT Northwest Aviation Operations Off-base Helicopter Training Areas Joint Base Lewis-McChord, Washington June 2015 This page intentionally left blank. ii TABLE OF CONTENTS 1.0 INTRODUCTION ................................................................................................................... 1 2.0 SCOPING .............................................................................................................................. 2 2.1 Purpose of Scoping ........................................................................................................... 2 2.2 Scoping Comments ........................................................................................................... 2 3.0 PURPOSE AND NEED FOR THE ACTION ............................................................................... 4 3.1 Purpose of the Proposed Action ...................................................................................... 4 3.1.1 High Altitude Training Operations .......................................................................... 4 3.1.2 Low Level Training Operations ............................................................................... 4 3.2 Need for the Proposed Action ......................................................................................... 4 3.2.1 High Altitude Training Operations .......................................................................... 4 3.2.2 Low Level Training Operations ..............................................................................
    [Show full text]
  • Klondike Fire Information
    Wildfire Situation Update Date: July 16, 2021 NW Preparedness Level: 5 For DNR’s current fire situation National Preparedness Level: 5 status please visit: NW T2 IMT Rotation: All teams out. http://fireinfo.dnr.wa.gov/ DNR IA Activity: Light Weather Summary: Friday, July 16, 2021 1000 hrs. Jon Bonk – NWS IMET Today/Tonight: Marine layer is 4,000-5,000 feet thick west of the Cascade crest this morning with stratus clouds banking up against, and a short distance across, the crest. Onshore flow will keep fire weather impacts low across the west side with light drizzle and spotty rain is possible for the Olympics and north Cascade west slopes. Meanwhile, breezy winds and fairly low humidity will keep elevated concerns across much of the east side today. The cooler and denser air spilling across the crest is producing another morning of breezy winds through most of the east slope valleys and central/eastern Gorge. Gusts 25-30 mph are common in those areas with gusts around 40 mph in the Kittitas Valley. Gorge winds will remain quite breezy today in and near the Gorge. The east slope valleys will see winds ease up for a few hours later this morning before peaking again this afternoon and evening at 25-35 mph, strongest in the Kittitas Valley. Away from those wind favored areas, expect south to southwest winds with gusts 10-20 mph. The higher terrain may see gusts of 20-25 mph. Today will be the coolest day of the past 7 and next 7 days for the east side with temperatures running close to normal.
    [Show full text]