Post-Disaster

Ministry of National Policies and Economic Affairs Ministry of Disaster Management Recovery Plan , FLOODS AND LANDSLIDES MAY 2017

CONTENTS

Acknowledgments 5 Foreward 7 List of Figures and Tables 9

Acronyms 11

1. Background and Context 13 1.1 Overview of the Post-Disaster Needs Assessments (PDNAs) 2016 and 2017 15 1.2 Recovery Needs 16 1.3 Post-Disaster Recovery Plan and Recovery Framework 17

2. Purpose of the Post-Disaster Recovery Plan 19

3. Recovery Vision, Objectives and Guiding Principals 23

4. Current status of Recovery 27 4.1. Funds Already Allocated Against Recovery and Status of Work that Commenced 29 4.2 Status of Work Commenced and the Implementation Process 30

5. Policy framework/Guideline 33 5.1 Policy Recommendations for Recovery from Floods and Landslides 35 5.2 Vision 2025 and Post-Disaster Recovery 38

6. Institutional Arrangements for Recovery 41 6.1 Role of NPD, MoDM, and Line Ministries 43 6.2 Role of District Secretaries 47 6.3 Role of Provincial Councils and Local Government Institutes 47

7. Implementation Arrangements for Recovery 49 7.1 Implementation Arrangements by sector of intervention 51 7.2 Role of Districts Secretaries and Divisional Secretaries 54 7.3 Role of Provincial Government Authorities 54 7.4 Role of Development Partners, NGOs and Civil Society 54 7.5 Strengthening Implementation Capacity 54 7.6 Constraints and Challenges in Recovery 55 7.7 Monitoring and Transparency 55 7.8 Integrating Gender in Recovery 56

3  8. Financing Needs and Gaps 57 8.1 Budget Allocation 60 8.2 Insurance Compensation 60 8.3 Budget Proposals for 2018 61 8.4 Special Approval by Cabinet 61 8.5 Funds from Ongoing Projects 61 8.6 Resource Mobilization 62

9. Cross Sector Prioritization Criteria and Geospatial Prioritization 65 9.1 Cross sector prioritization criteria 67 9.2 Cross-Sector Prioritization by Recovery Needs and District-wise Recovery Needs 67

10. Sector Recovery Chapters and Sector Recovery Matrices 69

SOCIAL SECTOR 71

HOUSING, LAND AND RESETTLEMENTS 71

HEALTH AND NUTRITION 77

EDUCATION 88

PRODUCTIVE SECTOR 93

FOOD SECURITY, AGRICULTURE, LIVESTOCK, FISHERIES 93

INDUSTRY AND COMMERCE 100

INFRASTRUCTURE SECTOR 106

IRRIGATION 106

WATER AND SANITATION 112

TRANSPORT 121

POWER AND ENERGY 128

CROSS-CUTTING SECTOR 133

ENVIRONMENT 133

DISASTER RISK REDUCTION 140

GENDER AND SOCIAL INCLUSION 151

ANNEX: CERF Allocations 161

4 ACKNOWLEDGEMENTS the post-disaster Recovery Plan (PDRP) for the floods and landslides of May 2017 was devel- oped as a collaborative effort of the Government of Sri Lanka (GoSL) with its partners – the United Nations agencies, the World Bank, the European Union, and other organizations. The process of de- veloping the Recovery Plan was led and conducted by the Ministry of National Policies and Econom- ic Affairs of the Government of Sri Lanka, the Ministry of Disaster Management, and line ministries with support from its partners. The Secretaries to the Ministry of National Policies and Economic Affairs and the Ministry of Disaster Management would like to extend a special acknowledgment to the following Sri Lankan authorities:

Ministry of Agriculture, Ministry of City Planning and Water Supply, Ministry of Education, Min- istry of Finance, Ministry of Fisheries and Aquatic Development, Ministry of Health Nutrition and Indigenous Medicine, Ministry of Highways and Higher Education, Ministry of Housing and Construction, Ministry of Industry and Commerce, Ministry of Plantation Industries, Ministry of Power and Energy, Ministry of Provincial Councils and Local Government, Ministry of Mahaweli Development and Environment, Ministry of Rural Economic Affairs, Ministry of Sustainable De- velopment and Wildlife, Ministry of Transport and Civil Aviation, Ministry of Women and Chil- dren Affairs, Ministry of Hill Country New Villages, Infrastructure and Community Development, Central Environment Authority, Department of Agriculture, Department of Census and Statistics, Department of Agrarian Development, Department of Export Agriculture, Department of Meteo- rology, Disaster Management Centre, Irrigation Department, National Building Research Organi- zation, National Disaster Relief Services Centre.

The Secretaries of the Ministry of Disaster Management and the Ministry of National Policies and Economic Affairs would like to express their gratitude to the members of the Post Disaster Recovery Planning Team:

Dr. S. Amalanadan (Addl. Secretary–Development, Ministry of Disaster Management), Sepali Rupasinghe (Ministry of Disaster Management), M.D.N. Cooray (Ministry of Disaster Manage- ment), Anoja Seneviratne (Disaster Management Centre), Chaminda Pathiraja (National Disaster Relief Services Centre), Savithri Jayakody (NDRSC), Mr. S.S. Mudalige (Director General, Depart- ment of National Planning, Ministry of National Policies and Economic Affairs), J.M.S.D. Rathnay- ake (MNPEA/NPD), M.F.A Mubarak (MNPEA/NPD), Sachith Fernando (MNPEA/NPD), Sanath Jayalath and Y.A.N Yapa (Ministry of Education), Sampath Mallawarachchi (Ministry of Housing), H. D. B. Herath, Janaka Wickramarathne, Thilini Wickramaarachchi (Ministry of Health), Anu- radhi Perera (Ministry of Power and Renewal Energy), D.S.D. Jayasiriwardene (Consultant–World Bank), J. M. C. G. Jayasinghe (National Water Supply and Drainage Board), Janaki Meegastenna (Department of Irrigation), Ishani Abeyratne (Ministry of Industry and Commerce), Pubudunie Lanka Liyanagama (National Enterprise Development Authority), Nadeesha Darshani (Ministry of Agriculture), W.M.W Weerkoon (Ministry of Agriculture), Jagath Ravisinghe (Ministry of Planta- tion Industries), Manoji Jayathilaka (Ministry of Rural Economics Affairs), Indra Samarawickrama (Tea smallholding Development Authority), Seepali De Silva (Ministry of Mahaweli Development and Environment), Manori Dharmabandhu and J.P.S Jayasinghe (Ministry of Women and Child

5  Affairs), N.T.M Sirajudeen (Road Development Authority), Darshana Samarakoon (Ministry of Local Government and Provincial Council), M. Ramamoorthy (Ministry of Social Empowerment and Welfare), Visaka Punyawana Hidellage (UNDP), Buddika Hapuarachchi (UNDP), Sureka Pere- ra (UNDP), Ranjana Piyadasa (University of Colombo), Vajira Hettige (CoordinatorPDNA -PDRF), Luis Gamarra (Editor and Technical Advisor), Madhavi Ariyabandu (DRR and gender technical ad- visor), Rita Missal (UNDP), Kalana Cooray (UNDP), U.W.L Chandradasa, (UNDP), Aziza Uzoof (UN-Habitat), Suranga Kahandawa (World Bank), Keiko Sakoda (World Bank), Priyanka Dissanay- ake (World Bank), David Newhouse (World Bank), Somasisri Dayaratne (Consultant–World Bank), Indika Koralegedara (WFP), Sharika Cooray (UNFPA), Sharni Jayawardena, (Language editor), and W.B. Gayathri Kaushalya and Gihani Dikwaththa (UoC research assistants).

We are also thankful to all the members of the PDNA and PDRP sector teams and their contributors.

6 FOREWORD

In May 2017, Sri Lanka was once again affected by severe floods and landslides. While the spread of the disaster situation was confined only to 15 districts, compared to the 24 districts in the previous year, increased incidents of landslides and deaths in 2017 made the situation equally challenging.

The disaster was triggered by heavy rain and high winds brought about by the southwest mon- soon on 25th and 26th May, affecting 879,778 people with 219 deaths and 74 missing. The disas- ter damaged nearly 80,000 houses and affected livelihoods of over 342,000 people dependent on agriculture, trade, and industry. The Ministry of Disaster Management (MoDM) and District and Divisional Secretariats led the extensive rescue and relief operations with the support of the Sri Lankan Army, Navy and Air Force, media, civil society organisations, private sector and indi- viduals.

A Post-Disaster Needs Assessment (PDNA) was carried out as the emergency/relief phase ended. The PDNA was conducted under the overall leadership of the Ministry of Disaster Management and the Ministry of National Policies and Economic Affairs. The line ministries undertook the -as sessment supported by national experts and a team of young graduates, coordinated by the Uni- versity of Colombo.

As soon as the PDNA was concluded and the main needs identified, a recovery planning process was initiated in September. The resultant recovery plan was prepared with the involvement of all line ministries, departments, units, and supporting agents. Our sincere thanks to all those who contributed to this recovery plan as well as to the United Nations and the World Bank for their overall guidance.

The key objective of the Post-Disaster Recovery Plan PDRP( ) is to restore and reconstruct dam- aged social, infrastructure, and productive sectors, meeting disaster resilient standards, principles of environmental sustainability and gender/social inclusion. In that sense, the document covers nine sectors and three cross-cutting areas and looks at the overall impact of the disaster. As a core section of the recovery plan, the document presents the institutional and implementation arrange- ments to be used for putting all strategies into action, as well as the main objectives, principles and prioritization criteria in order to conduct the recovery process. The Plan considers the available re- sources and budgets for 2017 for the next three years and identifies the unmet budget. Finally, clear monitoring and information management procedures are proposed to follow up the intervention and ensure that the outputs and outcomes are achieved.

The overall outcome we are aiming for is a safer Sri Lanka, where the lives of the Sri Lankan people are better protected from extreme events. In order to ensure this outcome, we envisage continuous and inclusive consultations with the concerned urban and rural communities, particularly vulner- able groups, throughout the recovery process. We look forward to working with all stakeholders in the implementation of the recovery programmes proposed in this recovery plan towards a resilient Sri Lanka. ministry of national policies and economic affairs and ministry of disaster management

7 ACKNOWLEDGEMENTS LIST OF FIGURES AND TABLES

FIGURE 1: INSTITUTIONAL ARRANGEMENTS OF THE POST-DISASTER RECOVERY PLAN 48

TABLE 1. RECOVERY NEEDS RELATED TO FLOODS AND LANDSLIDES – MAY 2016 AND MAY 2017 16

TABLE 2: RECOVERY BUDGET PER YEAR AND COMPARISON WITH PDNA RECOVERY NEEDS 59

TABLE 3: ALLOCATION AND COMMITMENTS OF FINANCIAL RESOURCES AND FUNDING GAPS 61

TABLE 4: ONGOING PROJECTS WITH POTENTIAL CONTRIBUTION FOR RECOVERY 62

TABLE 5: MAIN FIVE SECTORS FOR INTERVENTION PER DISTRICT 68

TABLE 6: SECTOR BUDGET (LKR) DISTRICT WISE (INFORMATION AVAILABLE PER DISTRICT) 68

TABLE 7: RECOVERY PLAN MATRIX – HOUSING SECTOR 86

TABLE 8: RECOVERY PLAN MATRIX – HEALTH SECTOR 86

TABLE 9: RECOVERY PLAN MATRIX – EDUCATION SECTOR 92

TABLE 10: SEED PADDY DISTRIBUTION AMONG DISTRICTS AFFECTED BY FLOODS 2017 94

TABLE 11: ALLOCATION FOR THE REHABILITATION OF SMALL TANKS 94

TABLE 12: ALLOCATION FOR THE CULTIVATION OF ABANDONED PADDY LAND 94

TABLE 13: CROP INSURANCE INDEMNITY PAYMENT 95

TABLE 14: ALLOCATION FOR THE CLIMATE SMART AGRICULTURE PROGRAMME 95

TABLE 15: SECTOR RECOVERY STRATEGIES IN TIMELINE 95

TABLE 16: RECOVERY PLAN MATRIX – AGRICULTURE SECTOR 99

TABLE 17: MICRO, SMALL AND MEDIUM ENTERPRISES AFFECTED BY FLOODS AND LANDSLIDES IN MAY 2017 101

TABLE 18: RECOVERY PLAN MATRIX – INDUSTRY AND COMMERCE SECTOR 105

TABLE 19: RECOVERY PLAN MATRIX –IRRIGATION SECTOR 111

TABLE 20: WATER AND SANITATION BUDGET SUMMARY TABLE 115

TABLE 21: RECOVERY PLAN MATRIX – WATER AND SANITATION SECTOR 116

TABLE 23: RECOVERY PLAN MATRIX – POWER SUPPLY SECTOR 131

TABLE 25: ENVIRONMENTAL PIP PROJECTS RELATED TO THE RECOVERY PROCESS 143

TABLE 26: MONITORING FRAMEWORK INDICATORS 145

TABLE 27: RECOVERY PLAN MATRIX – DISASTER RISK REDUCTION SECTOR 146

TABLE 27: RECOVERY PLAN MATRIX – GENDER SECTOR 150

9 

ACRONYMS

Asian Disaster Preparedness Center ADPC Building Back Better BBB Central Emergency Response Fund CERF Ceylon Chambers of Commerce CCC Ceylon Electricity Board CEB Civil Society Organisation CSO Community-based Organisation CBO Department of Agrarian Development DAD Department of Agriculture DoA Department of Census and Statistics DCS Department of National Planning NPD Disaster Management DM Disaster Management Centre DMC Disaster Preparedness and Response Division, Ministry of Health DPRD Disaster Risk Reduction DRR Early Warning System EWS Government of Sri Lanka GoSL Grama Niladhari GN Insurance Board of Sri Lanka IBSL Japan International Cooperation Agency JICA Lanka Electricity Company LECO Maternal and Child Health MCH Micro, small and medium enterprises MSMEs Ministry of Mahaweli Development and Environment MMDE Ministry of Disaster Management MoDM Ministry of Agriculture MoA Ministry of Education MoE Ministry of Finance and Planning MFP Ministry of Health, Nutrition and Indigenous Medicine MoH Ministry of Hill Country New Villages, Infrastructure and Community Development MHC&CD Ministry of Megapolis and Western Province Development MM&WPD Ministry of National Policies and Economic Affairs MNPEA Ministry of Social Empowerment, Welfare and Kandyan Heritage MSEW&KH Ministry of Women and Child Affairs MWCA National Adaptation Plan NAP National Building Research Organisation NBRO

11  National Disaster Management Coordinating Committee NDMCC National Disaster Management Plan NDMP National Disaster Relief Service Centre NDRSC National Natural Disasters Insurance Scheme NNDIS National Enterprises Development Authority NEDA National Environment Policy NEP National Housing Development Authority NHDA National Insurance Trust Fund NITF National Involuntary Resettlement Policy of 2001 NIRP National Planning Department NPD National Water Supply and Drainage Board NWS&DB Non-food item NFI Non-governmental organization NGO Post-Disaster Needs Assessment PDNA Post-Disaster Recovery Plan PDRP Provincial Offices of the Road Development Authority PRDA Public Investment Programme PIP Rapid Impact and Needs Assessment RINA Regional Director of Health Services RDHS Small and medium enterprises SMEs Standard Operating Procedure SOP Sri Lanka Rupees LKR Sri Lanka Social Security Board SLSSB United Nations Children’s Fund UNICEF United Nations Development Programme UNDP United Nations Population Fund UNFPA Urban Development Authority UDA US Dollars USD World Bank WB World Food Programme WFP World Health Organization WHO Water, Sanitation and Hygiene WASH Water Safety Plan WSP

12 1. BACKGROUND AND CONTEXT

1 BACKGROUND AND CONTEXT

1.1 Overview of the Post-Disaster Needs Secretary to the Ministry of Disaster Man- Assessments (PDNAs) 2016 and 2017 agement to submit the plan to the Depart- In May 2016 and May 2017, Sri Lanka faced ment of National Planning for appraisal catastrophic floods and landslides that af- prior to seeking financial assistance for its fected almost the entire country. The com- implementation. The Cabinet paper also bined fatalities of the two events amounted approved due consideration to a number to 317 persons. The estimated damages and of specific observations of the Minister of losses from the floods and landslides in Finance, Minister of Megapolis and West- May 2016 were over LKR 90 billion and in ern Development and Minister of Ma- the aftermath of the events in May 2017 it haweli Development and Environment, as was estimated at LKR 70.2 billion. Nearly follows: five million people were affected by the May 2016 events, while that of May 2017 exceed- 2) To develop the National Disaster Manage- ed 8 million people. Both events left close ment Plan (NDMP) including the compre- to 10,000 houses fully damaged, and over hensive Action Programme for a five-year 100,000 partially damaged. period covering 2018-23, considering the balance investment needed to imple- In response to these disaster events, the Gov- ment projects identified in the Sri Lanka ernment of Sri Lanka in partnership with Comprehensive Disaster Management the United Nations, the World Bank and the Programme (SLCDMP). Such a plan would European Union conducted a Post-Disaster also take into account recommendations Needs Assessment (PDNA), assessing both for medium- and long-term recovery needs the effects and the recovery needs, across outlined in the PDNA, recommendations all affected sectors and districts. The assess- to reduce drought risk, and requirements ments were conducted under the leadership to achieve global targets outlined in the of the Ministry of Disaster Management Sendai Framework for Disaster Risk Re- and the Ministry of National Policies and duction (SFDRR) and Sustainable Devel- Economic Affairs, building upon the initial opment Goals. and detailed sectoral damage assessments undertaken by central and local governments 3) To request financial assistance from with support from development partners. national and international donor agencies and donor countries to identify specific The PDNA 2016 included six most affected projects to be implemented in the pro- districts in the assessment: Anuradhapura, gramme. Colombo, Gampaha, Kegalle, Puttalam, and Ratnapura. The Rapid Impact and Needs 4) To present the findings of the Post-Disas- Assessment (RINA) conducted after the May ter Needs Assessment with the cabinet 2017 floods and landslides as supplementary ministers1 with the objective of seeking to the 2016 PDNA, covered five of the most additional allocation towards housing affected districts of Kalutara, Galle, Matara, relocation of landslide-affected people in Hambantota, and Ratnapura. Kegalle District and overall housing relo- cation programme in 10 landslide-prone 1) The 2016 PDNA document was endorsed districts in the country. by the Cabinet with a direction to devel- op the National Disaster Management Plan 2018-2023 as proposed and the 1 Cabinet paper dated 15-03-2017.

1. BACKGROUND AND CONTEXT 15 1.2 Recovery Needs recovery needs of the 2016 and 2017 disasters The total estimated recovery needs from the is presented in Table 1. 2016 and 2017 disasters amount to LKR 257.4 billion. The highest recovery needs in both Both the 2016 and 2017 floods and landslides years are concentrated in the Housing, Land demonstrated the urgency for mainstreaming and Settlements sector, amounting to 88.1% of disaster risk reduction (DRR) into devel- and 68.7% for 2016 and 2017 respectively. The opment planning and implementation. The Infrastructure sector, consisting of Irrigation, critical need for immediate and long-term Transport, Power Supply, and Water and Sani- measures to prevent the expansion of urban tation, amounts to 23.6% of the recovery needs and rural settlements and economic activities in 2017. The Agriculture sector recovery needs in hazard-prone areas, which exacerbate the in 2017 are also significant, amounting close existing vulnerable conditions, is evident in all to 4% of the total needs. Post-disaster recovery affected locations. Capacities of government in 2016 was addressed with resources allocat- Ministries and Departments at local, district ed during that same year and commitments and central levels should be strengthened to related to housing compensation (for damage adequately carry out this mandate. Strengthen- to houses and household assets) delivered in ing community capacities and resilience with 2017. While there was not a formal recovery awareness, knowledge, timely and functioning plan in 2016, within this present exercise early warnings to the last mile, and access to already pertinent 2016 recovery strategies required resources is a key requirement for are considered. A detailed breakdown of the priority attention.

TABLE 1. RECOVERY NEEDS RELATED TO FLOODS AND LANDSLIDES – MAY 2016 AND MAY 2017 Recovery Needs 2016 Recovery Needs 2016 Needs Recovery Needs 2017 Recovery Needs 2017 Needs Sectors (LKR) (USD) (%) (LKR) (USD) (%)

Housing 122,492,974,760 844,779,136.28 88.10 81,293,090,000 541,953,933 68.71

Education 413,130,000 2,849,172.41 0.30 1,515,650,000 10,104,333 1.28

Health 1,032,600,000 7,121,379.31 0.70 961,850,000 6,412,333 0.81

Agriculture 2,411,500,000 16,631,034.48 1.70 4,269,890,000 28,465,933 3.61

Industry 27,000,000 186,206.90 0.02 41,000,000 273,333 0.03

Irrigation 1,968,000,000 13,572,413.79 1.40 2,441,000,000 16,273,333 2.06

Transport 3,987,340,000 27,498,896.55 2.90 14,956,100,000 99,707,333 12.64

Water and Sanitation 670,100,000 4,621,379.31 0.50 8,400,139,436 56,000,930 7.10

Power Supply 364,540,000 2,514,068.97 0.30 2,120,000,000 14,133,333 1.79

Environment 230,500,000 1,589,655.17 0.20 833,000,000 5,553,333 0.70

DRR 320,000,000 2,206,896.55 0.20 1,384,500,000 9,230,000 1.17

Gender 32,000,000 220,689.66 0.02 99,930,000 666,200 0.08 Total 139,066,684,760* 959,080,584.55 100.00 118,316,149,436 788,774,330 100.00

* Data for Employment and Livelihoods are incorporated within the relevant sectors.

16 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 1.3 Post-Disaster Recovery Plan ing the PDRP, it was decided that a National and Recovery Framework Recovery Framework will be formulated which In view of the substantial damage, losses and will define the recovery policy, institutional related recovery needs from frequent disas- arrangements and the implementation mech- ters affecting the country, the Department of anisms applicable in all post-disaster recovery National Planning (NPD) under the Ministry contexts. of National Policies and Economic Affairs re- quested the World Bank and UNDP to assist in The remaining sections of this document de- the development of the Post-Disaster Recovery scribe the various aspects of the Recovery Plan, Plan (PDRP) and Recovery Framework. Ac- including Vision, Objectives and Priorities, cordingly, the process for developing the PDRP Policy Framework and Guidelines, Institution- was initiated in September 2017 with a series al and Implementation Arrangements, and Fi- of meetings and consultations as detailed in nancing Needs and Gaps, along with dedicated the section ‘Purpose of the PDRP. Follow- chapters for Sectoral Recovery.

1. BACKGROUND AND CONTEXT 17

2. PURPOSE OF THE POST-DISASTER RECOVERY PLAN

2 PURPOSE OF THE POST- DISASTER RECOVERY PLAN the pdrp is based on the PDNA 2016 in a sustainable manner, to ensure the out- and RINA 2017 led by the Ministry of Disas- comes are resilient to future disaster events. ter Management (MoDM) and the Ministry The PDRP is guided by a number of principles of National Policies and Economic Affairs aimed at improving the quality of recovery, em- (MNPEA). The PDRP specifies priority recovery phasizing equity and inclusion, and promoting needs and financial requirements identified risk reduction. by the sectoral Ministries, embedded in nine key sectors and three cross-cutting areas. It is Further to the PIP, Vision 2025 ‘The Chang- expected to ensure that recovery is resilient ing face of a Dynamic Modern Economy’ and supports the development agenda of the policy document identifies disaster risk as a country. The PDRP emphasizes that recovery threat to economic prosperity and sustainable efforts not only rebuild what was there, but will development. It states that ‘weak environ- also ensure Building Back Better as a necessary ment and disaster management has raised Sri condition to build a resilient nation and con- Lanka’s vulnerability to natural disasters’, and tribute to sustainable development. reiterates that Government will take steps to improve disaster management. Accordingly, Linkages with National Policies in addition to the existing mechanisms such as and Programmes the National Insurance Trust Fund (NITF), a The PRDP is closely linked with the Public National Disaster Reserve Fund for financing Investment Programme (PIP) of 2017-2020 of post-disaster reconstruction will be estab- the Government of Sri Lanka, which contains lished, high-risk communities living in land- specific policy priorities for each sector. slide-prone areas will be resettled, disaster risk assessment will be undertaken, and insurance It should be noted that although the PIP was schemes will be introduced for economically prepared prior to the 2016 and 2017 floods and important sectors.4 Recovery needs and prior- landslides events, since the ‘PIP has a medi- ities identified in the PRDP clearly reflect and um-term perspective and works with broad align with the above stated strategic and policy magnitudes and trends’2, it can be modified for intentions. situations arising from emerging circumstanc- es. It provides adequate scope to accommodate Process of Preparation of the PDRP the recovery needs in the major sectors such as The PDRP preparation process was initiated housing, agriculture, power supply and energy, with a workshop with the Planning Officers education, health, and environment arising of the National Planning Department and from 2016 and 2017 disaster events. This is the Ministry of Disaster Management to also reinforced by the stated policy of disaster discuss the concept and process of developing management (DM) in Sri Lanka ‘to ensure the the recovery plan. Further to this workshop, safety of Sri Lanka by reducing potential disas- representatives of the Planning Departments ter risks and impact on people, property and of the line ministries along with the National the economy’3. The PDRP therefore proposes Planning Department and the Ministry of priority actions which are required to move Disaster Management joined the ‘Resilient forward with the intended actions in the PIP Recovery Workshop’ for a dialogue focusing on the preparation of the PDRP with the lead development agencies: the World Bank, the 2 Department of National Planning, Ministry of United Nations and the European Union. The National Policies and Economic Affairs Sri Lan- ka, Public Investment Programme 2017-2020, workshop discussed the status of and challeng- p. i. 3 Ibid, p. 116. 4 Vision 2025, p. 45.

2. Purpose of the Post-Disaster Recovery Plan 21 es in existing policies, institutional arrange- ministries presenting the first draft of the ments, financing and implementation of the Sector Recovery Plans and the final presenta- recovery plan, which could be resolved through tions of the Sector Recovery Plans were made the development and implementation of the on 24th October. The process for the prepara- PDRP for the short term and the development tion of the PDRP took over two months, with of a National Disaster Recovery Framework several consultative workshops and meetings for the long term. within line ministries among the relevant officials to reach a consensus on a prioritized It was agreed that the scope of the PRDP will list of programmes and projects for recovery. It span across the short-, medium- and long- required several iterations of the sector plans term, recovery needs identified in the 2016 and before seeking a final endorsement of it by the 2017 PDNAs and a National Disaster Recovery relevant ministry. Framework would be developed soon after to provide standard guidance on all post disaster Overall, sectoral plans provide a guide to plan recovery work in the country. and estimate resource requirements for recov- ery and reconstruction activities at the sector Following the workshop, the development level. While annual targets in the sectoral plans of the sectoral plans was led by the respec- can also serve as a basis to monitor progress, tive line ministries, with the leadership of each sector has a set of indicators to monitor the National Planning Department and the the progress. The frequency and modalities for support of relevant development partners. The monitoring needs to be developed further to development of the sectoral plans was sup- measure results on an ongoing basis. ported with a planning matrix and a detailed guideline for preparing the sector reports. The Timeframe for Recovery: The timeframe for Department of National Planning finalized recovery from Floods and Landslides is agreed the recovery vision, objectives and principles for a four-year period from 2017 till 2020. All at a key stakeholders meeting convened with recovery activities included in the sector plans representatives of line ministries. On 28th are expected to be completed within this dura- September, a workshop was held with all line tion, contingent on the allocation of resources.

22 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 3. RECOVERY VISION, OBJECTIVES AND GUIDING PRINCIPALS

3 RECOVERY VISION, OBJECTIVES AND GUIDING PRINCIPALS

The Government of Sri Lanka under the systems in the country. The specific objectives leadership of the Ministry of National Policies for Sri Lanka recovery is as follows: and Economic Affairs developed the present PDRP from Floods and Landslides. The draft- Recovery Objectives ing of the plan was done by the relevant line · To reconstruct damaged infrastructure ministries and departments. In the process of and facilities meeting disaster resilient drafting the Recovery Plan, an overall vision standards and principles of environment that will guide the recovery and reconstruc- sustainability tion was discussed and agreed. This vision, principles, and objectives was the outcome of · To reconstruct, repair and improve disas- discussions with stakeholders from various ter resilient housing with specific focus line ministries on the most vulnerable communities

To strengthen disaster preparedness and Recovery Vision: · early warning systems of all sectors and ‘RECOVERY AND RECONSTRUCTION communities to reduce mortality and CONTRIBUTES TO A RESILIENT SRI LANKA.’ economic losses in future disaster events The Recovery Vision is framed with the aim of ensuring that all recovery and reconstruction · To strengthen resilience and minimize programmes reinforce community resilience losses from future floods and landslides to disasters. The objective is to prepare com- munities, protect businesses, and have disaster · To sustainably restore agriculture resilient infrastructure, improved systems production tea plantation, industry and and better risk transfer mechanisms in place commerce and other livelihoods of com- for future disasters. The vision is also implicit munities about the goal to reduce fatalities in floods and landslides and economic losses in all future · To strengthen the capacity of the institu- disasters. This is aligned to the Sendai Frame- tions and stakeholders to implement the work for Disaster Risk Reduction, which calls recovery plan, guided by the principles of for ‘substantial reduction of disaster risks Build Back Better, aiming for resilience and losses in lives, livelihoods, health and in economic, social, cultural and environmental assets of persons, businesses, communities Guiding Principles for Recovery and countries.’ Given the repeated loss of life and economic losses from disasters, the recovery plan will be guided by a number of principles aimed Objectives of Recovery: at improving the quality of recovery. It will Recovery objectives generally reflect the areas emphasize equity and inclusion, and promote of priorities for recovery. Each sector has its risk reduction. These guiding principles are own recovery objectives but the overall objec- articulated below: tives cluster together the three broad areas that the recovery and reconstruction will focus on: · Recovery should aim to reduce vulner- the reconstruction of all public infrastructure abilities to future disasters and build and houses, the restoration of the economy resilience of people. The aim is to Build including the livelihoods of households, and Back Better and safer through improve- the strengthening of disaster risk reduction ments in built assets, environment assets,

3. Recovery Vision, Objectives and Guiding Principals 25 preparedness of government and com- · Resources for recovery should be priori- munities to manage disaster risks. tized well taking into account the recov- ery of households and their livelihoods, in · Relocation of landslide-affected com- addition to the reconstruction of critical munities will ensure that communities infrastructure. are adequately consulted in the design and construction of the newly planned · Reconstruction of infrastructure will be settlements. Every effort will be made to undertaken taking into account environ- facilitate the voluntary relocation of com- mental risks and will be done in a manner munities with adequate attention given to that will prevent further degradation of facilitating social, cultural and livelihood the environment. activities in the new settlements. · Recognizing that the institutions at the · Recovery should target the most vulner- sub-national level play a major role in the able families and the low-income house- planning and implementation of recov- holds living in high-risk areas. It will ery, the Government will strengthen their also target women-headed households capacities to implement recovery and re- affected by the floods and landslides. It construction and to carry out its mandate will prioritize the needs of the disabled in preparing and mitigating measures to and the elderly. address flood and landslide risks.

· Recovery would adopt a more nuanced · Recovery should be implemented in a approach to increase the skills and asset transparent manner and all the informa- base of the urban poor, the rural poor and tion related to recovery must be avail- on underserved communities in estate able in the public domain and be widely areas so that they are more resilient to disseminated, using means of commu- future disasters. nication that is accessible to the affected communities. · Recovery interventions should be guided by gender equity and social inclusion with · Recovery should be an inclusive and a specific orientation for empowering the collective effort, using the resources and people. Recovery should be implement- expertise of the Government of Sri Lan- ed in consultation with communities, ka, civil society, development partners utilizing social networks, local skills and and the private sector knowledge. It should be culturally sensi- tive and environment-friendly.

26 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 4. CURRENT STATUS OF RECOVERY

4 CURRENT STATUS OF RECOVERY

while immediate shelter and relief for the construction of 21 safe shelters (LKR 350 work for the floods and landslides in May million). 2016 and May 2017 were undertaken by the Government with the generous assistance In addition to the above, the Ministry of Nation- of several donors led by six UN agencies, al Policies and Economic Affairs (MNPEA) allo- the short-, medium-, and long-term recov- cated a special budget to each disaster-affected ery needs were comprehensively assessed- district to meet the sub-national level (Provin- through Post-Disaster Need Assessment cial and District) Infrastructure Recovery needs, (PDNA) Reports. The current effort is to particularly for provincial roads and irrigation transfer these PDNA into an Action Plan sub-sectors. The details of the allocations are under the flag of the ‘Post Disaster Recovery presented below. Plan’ (PDRP). PROVINCIAL COUNCIL ALLOCATIONS: 4.1. Funds Already Allocated All three provinces have received funds for Against Recovery and Status recovery of the Transport sector based on of Work that Commenced their own assessments in a bid to address the short-term recovery of damaged provincial CENTRAL GOVERNMENT ALLOCATIONS: roads (Class C & D roads) and rural roads that The allocations made for disaster recovery come under the purview of local governments came from three sources: (viz. Municipal Councils, Urban Councils and Pradeshya Sabhas). a) Central Government fund through the National Budget, which is presented ALLOCATIONS TO DISTRICT SECRETARIES: annually, Immediately after the disaster, the Ministry of National Policies and Economic Affairs (MN- b) Sub-National level Provincial Council PEA) allocated a special budget of LKR 300 (PC) fund allocation through annual PC million per district to the District Secretaries of budget, seven affected districts in the Western, Southern and Sabaragamuwa Provinces. This budget is ap- c) Local Government funds raised by their portioned to implement the sub-national level annual revenue collection (Provincial and District) infrastructure recovery, particularly for provincial roads and irrigation The Government of Sri Lanka made an sub-sectors. District Secretaries are given the allocation of LKR 35,306,033,227 from its implementation authority to reconstruct the regular budget. The National Insurance damaged structures, in collaboration with the Trust Fund (NITF) made payments of LKR respective Provincial Ministries and Local Gov- 2,541.91 and LKR 5,451.83 million for the ernment bodies. The short-term (2017) recovery year 2016 and year 2017, respectively, as requirements are supposed to be met under insurance payments to fully and partially these district-based allocations. lost houses and properties. In addition, the NITF paid claims for LKR 228.46 million INTERNATIONAL FUNDING ALLOCATIONS: and LKR 2,018.56 million, in 2016 and 2017 Over and above these government fund allo- correspondingly, related to damage to SME cations, there are several ongoing projects and buildings and equipment. Furthermore, spe- funds from donors, International Financial cial allocations not linked to the recovery, but Institutions (IFIs) and partners, which are con- for addressing urgent DRR issues, were made tributing to recovery.

4. Current status of Recovery 29 As for immediate relief for the 2017 disas- The work on relocation of landslide-affected ter-affected people in the districts of Kalutara, houses has not yet commenced. This work will Ratnapura, Galle and Matara, the Central be done under the supervision of the National Emergency Response Fund (CERF) allocated Building Research Organization (NBRO). a total of USD 4,021,325. The allocation was made by six UN agencies to the support imme- Health: diate needs for water and sanitation sector, for Under Health, the majority of the work of health and nutrition, emergency and transi- repair, refurbishing of hospitals, replace- tional shelter. The projects under these funds ment of equipment, and stabilization of land are being implemented in collaboration of the around the hospitals that were damaged due to relevant sector ministries. The details of the landslides has commenced. A budget of LKR agency-wise allocations are provided in Annex: 147.63 million was allocated for the purpose. CERF Allocation. Work has commenced in all the four districts under the overall supervision of the Disaster In addition to the CERF resources, the World Preparedness and Response Division (DPRD), Bank (WB) allocated a total of USD 3,000,000 which is the focal unit for all health emergency/ from the Contingent Emergency Response disaster coordination work in the Ministry. Component (CERC) under the Climate Resil- The Ministry of Health has also planned the ient Infrastructure Programme (CRIP). With purchase of power backup (generators) and this budget, roads and bridges will be rehabili- ambulances for some high-risk areas where tated with resilient reconstruction principles. some of the ambulances are old and inundated in floodwaters. 4.2 Status of Work Commenced and the Implementation Process Education: Recovery and reconstruction is already under- The Ministry of Education in collaboration way in all the affected districts for key infra- with UN agencies, NGOs and Community structure related sectors and for social sectors Organizations provided immediate assistance such as education and health. These immediate to affected schools and students, including the repairs were conducted with a view to restore affected children with disabilities and learning all services and resume functioning to the difficulties. The repair of school buildings and extent possible. The respective line ministries, refurbishment of schools inundated by water district secretaries, and provincial authorities commenced with the immediate allocation of are doing the work. A short description of the funds of LKR 556.13 million which was allocat- work undertaken for each sector is described in ed for short-term needs of repair and recon- the section below. struction. Most of the schools have resumed functioning. A. SOCIAL SECTOR Housing: B. PRODUCTIVE SECTOR A detailed assessment of the beneficiaries Agriculture: eligible for receiving insurance compensation Under the Agriculture sector, Crops, Live- for damaged housing was completed. The stock, Fisheries and Plantation sub-sectors assessment results will provide the basis for were affected. The Ministry of Agriculture the release of funds to selected households. allocated a total of LKR 250 million for the The total amount of funds to be transferred to removal of silt and rehabilitation of small tanks identified households through the National in the affected districts including Colombo and Insurance Trust Fund is LKR 5,451 million. Gampaha through the Department of Agrarian

30 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Development. The work of removal of silt and completed in all flood-affected districts. The rehabilitation of small tanks has commenced. government allocated a budget of LKR 31.2 Additionally, the Ministry of Agriculture, million in 2017 for this purpose. through the Department of Agrarian Devel- opment, distributed paddy seeds to farmers Transport: in five affected districts, for the value of LKR The Road Development Authority had taken 74,096,450. For the recovery of the Planta- immediate measures for the temporary recov- tions sector, a total number of LKR 417.58 ery work, which was estimated as LKR 579.70 million was paid to address the income loss of million. The roads were made passable and tea smallholdings the removal of trees and debris was carried out on the roadways. RDA funds and some funds Industry and Commerce: from District Secretaries were utilized for the The Ministry of National Policies and Eco- temporary recovery measures. nomic Affairs and the Ministry of Industry and Commerce have not received any funds for the Power Supply and Energy: restoration of small and medium enterprises In the immediate aftermath of the May 2017 (SMEs). However, for SMEs covered under floods and landslides, restoration of power insurance, a compensation payment will be supply was done in affected areas using the made. A total amount of LKR 2,018.5 million fullest capacity of the utility providers. Hence, insurance compensation to SMEs is being the power supply was restored to most of the processed through the National Disaster Relief areas within 48 hours. The damaged power Service Centre (NDRSC) and will be distribut- distribution lines and related installations ed as soon as the process of identification and were fully recovered within two to ten days, detailed assessment of the SMEs is completed. depending on the severity of the damage and accessibility. Electricity supply to the affected C. INFRASTRUCTURE SECTOR hospitals, water pumping stations, and Divi- Irrigation: sional Secretariat areas was carried out without The District Directors and Divisional Irriga- any interruption. Special restoration teams of tion Engineers commenced the work of repair- the Ceylon Electricity Board (CEB) were used ing, improving and upgrading flood protection in the reconstruction and restoration of the systems, irrigation infrastructures, and canal power supply. The immediate recovery and systems at district and divisional levels with the reconstruction work was done by the utility immediate allocations of LKR 300 million. The providers using their own funds, amounting to allocation was distributed among the Galle, LKR 469 million. Matara, Ratnapura, and Hambantota districts. An additional LKR 350 million will be used for D. CROSS-CUTTING ISSUES identified priority repairs in the Galle, Matara, Environment: Hambantota, Kalutara, Colombo, Gampaha The Ministry of Mahaweli Development and and Ratnapura districts. Environment (MMDE) instructed all institu- tions under the Ministry to reallocate funds Water and Sanitation: from the current year budget towards the Water and Sanitation has four sub-sectors restoration of environmental damage created which include the national water supply by the floods and landslides. A restoration pro- systems, the rural water supply systems, gramme was carried out in all affected districts dug-wells, and sanitation. The urgent needs on World Environment Day. for repair and restoration of water supply was

4. Current status of Recovery 31 Disaster Risk Reduction: Additionally, it is working together with the As the lead agency in the management of di- NBRO to start assessment for relocation of sasters in the country, the Ministry of Disas- houses destroyed by the landslide in all the ter Management, in particular the National districts. The work pertaining to housing Disaster Relief Services Centre carried out relocation is being done with the Ministry of numerous functions in assisting recovery Housing and Construction. of households. Apart from the work done to provide relief assistance to households, Gender and Social Inclusion: NDRSC, with its district officials and District The Ministry of Women and Child Affairs Secretaries, conducted an assessment of received an allocation of LKR 75 million to houses damaged by the disaster as the first step provide assistance to women entrepreneurs. to providing compensation for families whose The assessment and selection process of the houses were fully damaged in the disaster. beneficiaries under this scheme is underway.

32 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 5. POLICY FRAMEWORK/ GUIDELINE

5 POLICY FRAMEWORK/ GUIDELINE

POLICY CONTEXT necessary will be assisted with replacing The policy and practice of recovery is evolving lost documents as early as possible to in Sri Lanka. The practice of recovery draws on enable them to access services. While the the National Policy on Disaster Management Government may not be able to provide and the Disaster Management Act drafted in full support for recovery of all households, 2006 and endorsed in 2010. The DM policy there should be a minimum level of states the government’s intent and commit- assistance for enabling and kick-starting the ment for emergency response and recovery recovery of households. and establishes the scope of assistance to affected families. It has several provisions to • Relocation and Reconstruction of provide support to affected communities in Housing: The DM policy adequately response and recovery. The scope of recovery in proposes the approach to housing the policy is elaborated under two main areas relocation and reconstruction. The which are ‘Preparedness and Response’ and government made it a priority to relocate ‘Integrated Systems to reduce disaster risk’, but all settlements in high-risk zones of also broadly mentioned across all sections of landslide-prone areas. In the relocation the policy. of communities, NBRO will identify lands safe for relocation and will also ensure that The policy recommendations in this chapter livelihoods of people are ensured in the outlined under section 5.1 are drawn from the new locations. Relocation will be done in Disaster Management Policy and discussions line with government policy on housing of various policy recommendations made by and settlements which must ensure that sector ministries in meetings and workshops people have access to basic services of conducted during developing the PDRP. The education, health, water, electricity, etc. existing provisions on recovery in the Disaster It should also provide space for people Management Policy are considered below. to practise their social and religious However, it also highlights the need for an up- functions. Furthermore, beneficiaries dated policy with a stronger focus on recovery. will be consulted in the design of houses and will participate in the construction of 5.1 Policy Recommendations for Recovery houses. All houses will be made disaster from Floods and Landslides resilient, and to enable this to materialize, • Benefits and Assistance to Households: households will be provided with technical The DM policy states a clear need to provide assistance in rebuilding houses through targeted assistance to the most vulnerable; the deployment of technical experts at that post-disaster assistance, benefits the district level to support and oversee and entitlements should be based on the housing reconstruction and train local values of equality, diversity and inclusion. artisans in disaster resilient construction Assistance should be distributed in an techniques. Awareness programmes will be equitable and non-discriminatory manner. held in villages to disseminate information Therefore, the recovery and reconstruction on low-cost disaster resilient housing from floods and landslides will target the reconstruction. needs of the most vulnerable households, based on a criterion that would prioritize · The National Involuntary Resettlement the people with disabilities and other Policy of 2001 (NIRP), developed under special needs, women-headed households, the Ministry of Lands, provides several the elderly, etc. Affected households where guidelines applicable to communities

5. Policy framework/Guideline 35 relocated from high-risk areas, includ- • Restoration of the Environment: ing the need to ensure community Unlike most other sectors, neither the participation in decision-making in the destruction of the environment nor its resettlement process, gender equity in recovery gets adequate attention, despite assistance, and an integrated approach the significant contribution of the sector to resettlement, including assistance to to risk reduction and strengthening re-establish livelihoods and employment, resilience against disasters. It is obvious, social and cultural networks, and griev- however, that continued disregard to its ance redress mechanisms. restoration will result in greater disaster and economic impacts in the future. • Restoration of Livelihoods: As stated Therefore, environmental recovery should in the DM policy, affected communities get special attention within the recovery should have assistance for the speedy policy recommendations. It could take recovery of disrupted livelihoods and time, but it is important to draw urgent market systems which means that affected attention to initiating the restoration household should receive a minimum process starting with critical ecosystems level of assistance for recovery which will that were affected, during the recovery enable them to restart their livelihoods phase. Guidance for sustainable recovery and businesses, thus giving them a better management can be drawn from the key chance to rebuild their lost assets and add elements of the environment strategy to housing repair and reconstruction. under the National Environment Policy Local markets if damaged in the floods (NEP) which include areas such as and landslides should be repaired so that wider stakeholder engagement, conflict businesses become fully functional. resolution, taking stock of and improving specific eco-systems, public reporting Recovery will support the restoration of against established performance indicators, businesses focusing on small and medium effective environmental governance etc. enterprises through cash grants, credit Furthermore, it would be prudent to facilities from banks and other sources. incorporate a section on environment Financial assistance will be provided recovery within the NEP which is being to replace equipment and machinery. revised at present. Banks will be requested to provide a grace period of a minimum of one year for loan • Recovery should be anchored in national repayments. Efforts will be made to ensure policies and maximize on ongoing that all small and micro enterprises will be programmes and projects: Recovery included under insurance coverage through and reconstruction should contribute to an awareness campaign and special clinics achieving the national vision and goals. to encourage businesses to register for It should contribute towards achieving various insurance schemes. Businesses will Vision 2025. It should be linked to the be supported to develop business continuity Public Investment Programme (PIP) and plans to prepare for future disasters. other government schemes and ongoing Industries will be reviewed to make projects and the Implementation of such structural changes to protect assets against projects should be accelerated in the floodwaters. districts affected by floods and landslides. For example, all housing programmes should be based on the Public Investment

36 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Programme (PIP), which aims to upgrade develop guidelines for preparedness plans 50,000 improvised and semi-permanent for the industries and companies and houses in 2017. Similarly, the Public develop checklists for structural measures Investment Programme has a stated in all public buildings. objective of providing ‘electricity for all people in the country by identifying suitable MoDM will continue to strengthen DRR grid and off grid options’; the recovery and systems; in particular, it will focus on reconstruction of the Power sector can be improving information management aligned to this goal and projects in the PIP. systems to support assessment, relief Vision 2025 has several ambitious goals for distribution, early warning, and all sectors. For the Water and Sanitation monitoring risks. Other areas of work sector, it aims to ‘ensure equitable access include strengthening early warning to safe drinking water and sanitation for dissemination, establishing community the entire population.’ The aim of recovery preparedness plans, reinforcing flood and reconstruction should incrementally forecasting and prediction, conducting increase investment in flood and landslide flood risk assessments and expanding social preparedness and mitigation activities protection systems and insurance coverage through ongoing projects and programmes. for most vulnerable households.

• Recovery to be done in compliance with • Recovery should facilitate the revival of environmental laws and informed by important ecosystems: Recovery must disaster risks: The DM policy affirms the capture detailed destructions to vital need to have a multi-hazard approach and ecosystems that have the potential to reduce reduce risk in all sectors. The government disaster risks and impacts of disasters recognizes this as one of the most and prioritise revival planning of these important principles of reconstruction of all eco-systems and implementation of these infrastructure. Therefore, all reconstruction plans. The National Environment Policy projects will be undertaken after a review (2003)5 (NEP) provides guidance on sound of the risks from natural hazards and management of Sri Lanka’s environment, threats to the environment. Irrigation balancing the needs for social and economic projects, roads, power and energy, development and environmental integrity, relocation of schools and hospitals, should as well as ensuring environmental be informed by disaster risks and comply accountability. The focus of the revival plans with environmental regulations. To enable should be on destroyed, degraded, and the application of the approach of the degrading systems that can protect people principle of Build Back Better and Disaster and assets from recurrent disasters as a Resilience, guidelines will be developed Build Back Better measure. to support the integration of structural and non-structural measures in all • Recovery should conform to the reconstruction and recovery programmes. principles of transparency and These guidelines will be shared with accountability: ln keeping with the officials from line ministries and district principle of transparency and accountability secretaries. Government officials will be in the DM policy, the Ministry of Disaster trained in using these principles during the reconstruction process. The Ministry 5 http://theredddesk.org/sites/default/files/ of Disaster Management (MoDM) will nep_draft_1.pdf

5. Policy framework/Guideline 37 Management and all agencies working and sovereign and private catastrophe under it will promote transparency in insurance products. Several of these policy decision making, engage with communities provisions are already functional and to ensure their participation and being used, such as the National Insurance contribution for any decisions that concern Trust Fund for housing and SMEs and them. Communities will be informed and the Catastrophe Deferred Drawdown made aware of risks and also kept informed Option (CAT-DDO). It is recommended of post-disaster recovery benefits and that the insurance coverage is expanded to entitlements. a larger group to provide better coverage of all productive activities in the country • Recovery will promote community, undertaken through agriculture, commerce INGO, NGO and private sector and industry, and tea plantation. The participation: The Disaster Management expanded coverage will reduce economic Policy emphasizes that Disaster losses in recurrent disasters. It was noted Management is a collective responsibility, that the current insurance mechanism which should involve the government, for houses and SMEs almost function as non-government organizations, religious a social protection mechanism in which organizations, the private sector and all households and registered business, communities. The joint efforts all irrespective of their income level and these stakeholders should aim towards exposure to risks, are assured a sum encouraging ‘a culture of safety and of money after a disaster for repair of attitude of self-recovery’. Floods and houses and restarting businesses. The landslides recovery will be implemented government’s intention to expand coverage through the active participation of local to a larger group of people in all sectors community-based organizations, utilizing of productive activities may increase the local knowledge, skills and ability to bring financial burden on the government which together households to contribute labour is currently paying the premium on behalf to reconstruct houses of people living of households and businesses and farmers, with disabilities, the elderly and other therefore it might be relevant to conduct households who are unable to construct a study on the insurance coverage in the their houses. The District Secretaries will country to explore strategies for expansion seek the support of NGOs and INGOs with low premiums, the viability of different to mobilize community participation in insurance options and the possibility of a reconstruction programmes. Partnerships contribution of households and businesses with the private sector will be sought to towards premiums and making insurance support the rehabilitation of industry and coverage conditional to a modified risk commercial activities and utilize their behaviour. skills to strengthen small and medium enterprises (SMEs) and (micro, small and 5.2 Vision 2025 and Post-Disaster medium enterprises (MSMEs). Recovery The policy recommendations made in the • Recovery will promote risk transfer chapter are also closely linked to the Govern- mechanisms: The Disaster Management ment of Sri Lanka’s Vision 2025 document Policy states that fiscal resilience to disasters which aims for high economic growth by trans- will be improved with efficient budgetary forming Sri Lanka into a knowledge-based, mechanism, access to contingency credit highly competitive and social market economy.

38 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan The vision document recognizes among other things that frequent disasters impose a heavy and make growth more inclusive, through human and financial burden on most vulner- institutional and regulatory reforms to able populations. Increased urbanization, enhance productivity and competitiveness industrial activities, inadequate waste and wa- of the economy. The sector recovery plan for ter management, environment pollution and Industry and Commerce envisions support weak enforcement of environment laws and to SMEs with cash grants, low-interest disaster risk policies have increased the risks loans, and the development of business of disaster and are an impediment to achieving continuity plans and better insurance the Sustainable Development Goals6 and in- coverage to register them formally and deed the country’s vision for economic growth. protect businesses against disaster risks. In support of the vision, the document outlines These programmes align with the vision several goals and programmes to ensure that ‘to integrate SMEs into the formal sector’.7 the country protects its assets and reduces The Ministry of Industry and Commerce economic losses in disasters. The Vision 2025 plans to provide skills training to youth document articulates the need to have a Disas- in the affected districts; a programme is ter Reconstruction Fund. This fund will allow already included in the annual plan for 2018 government to have access to resources for but will be accelerated in this flood- and reconstruction after a disaster. landslide-affected district. The Vision 2025 emphasizes partnership with the private Rather than being viewed as a setback to sector as a key strategy to support inclusive achieving economic growth, recovery and economic growth.8 The Sector Recovery reconstruction, if d one according to the Plan indicates that a key partner in the principles of Build Back Better can become an recovery and reconstruction is the Ceylon opportunity to improve transport services, en- Chambers of Commerce. The Agriculture gage in sustainable food production, strength- sector, which is one of the most important en SMEs and MSMEs, and provide equity in economic sectors, proposes as immediate access to services and livelihoods, thus accel- recovery needs, distribution of paddy seed, erating progress towards economic growth as removal of silt and the rehabilitation of envisioned by the government. The following tanks, canals and other minor irrigation section outlines selected key areas of recovery systems. In the long term, recovery includes and reconstruction that will contribute to Vi- promotion of insurance, development of sion 2025. Each sector recovery plan provides flood resilient varieties of crops, etc. These a link to the Vision 2025 document; therefore, activities would contribute to the vision of this section summarizes the overall links of increased productivity and food security. the recovery plan to the Vision 2025 under two broad headings of Economic Recovery and • Social Recovery: The Post-Disaster Social Recovery. Needs Assessment of 2017 and the Sector Recovery Plans recognize the differentiated • Economic Recovery: The Vision 2025 has impact of the disaster on vulnerable an ambitious target of increasing the per- groups. It brings to attention the effect capita income to USD 5000 per year and of the disasters on low-income groups, creating one million jobs. The Vision 2025 aims to strengthen the drivers of growth 7 Vision 2025, Strengthening the Growth Frame- work, p. 21. 6 Vision 2025, Agriculture and Sustainable Devel- 8 Vision 2025, Economic and Social Infrastruc- opment, p. 45. ture, p. 30.

5. Policy framework/Guideline 39 women-headed households, people living protection and benefits schemes. The with disabilities, agricultural labourers, government’s intent to address social men and women engaged in informal inequalities are covered in the chapter on businesses, the elderly, etc. The recovery Social Safety Nets of the Vision 2025 which plan recommends prioritizing support reaffirms government’s commitment to to these low-income and disadvantaged protecting the most vulnerable populations’ groups for assistance under the various by improving targeting of the Samurdhi recovery programmes, be it assistance Social Development Programme. The same for livelihoods or housing repair and chapter also expresses the intent to improve reconstruction. It also underscores the access to public services, education and need to improve access to basic services employment opportunities for differently for the most vulnerable and ensuring abled making it an important step towards their inclusion into the government social the overall goal of being inclusive and equal.

40 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 6. INSTITUTIONAL ARRANGEMENTS FOR RECOVERY

6 INSTITUTIONAL ARRANGEMENTS FOR RECOVERY

the institutional Arrangement refers Specific functions of the NPD with respect to to a clearly laid out set of processes to facili- the development and implementation of the tate a government-led recovery process, with PDRP are the following: well-defined roles and responsibilities of all relevant sectoral ministries and agencies. The 1) Coordinating the development of the success of these arrangements is contingent PDRP with the line ministries and develop- upon the commitments from all key actors ment partners. involved, including those responsible for different sectors. In terms of the magnitude 2) Facilitating development of detailed of work and budgetary allocation, Housing, recovery plans with broad guidelines on Transport, Water and Sanitation, Agriculture, recovery standards and benchmarks; i.e. and Irrigation are the highest. However, the emphasizing the need to Build Back Better institutional setup is designed to achieve a (BBB), by taking into account existing sustainable recovery, and therefore will op- risks and not creating new ones through erationalize an integrated institutional setup the recovery process. which can support the recovery of the Social, Productive and Infrastructure sectors. 3) Approving and endorsing the PDRP.

In the overall process of the recovery and 4) Approving projects and budget, and reconstruction, the National Planning De- allocating resources through the national partment (NPD) will play the lead coordinating budget. role representing the GoSL and all sectoral/ line ministries and agencies in planning and 5) Providing broad policy guidelines for implementing annual targets and budgets. recovery and reconstruction. In addition to the government’s sector-wise expertise, donors, INGOs, and other partners 6) Facilitating financial approvals and a fast- will provide the necessary technical and finan- track procurement process for recon- cial support. struction by line ministries and district authorities for implementation. 6.1 Role of NPD, MoDM, and Line Ministries 7) Coordinating the implementation of NATIONAL PLANNING DEPARTMENT (NPD) recovery by the line ministries and provin- NPD plays the lead role in coordinating na- cial governments and district secretaries. tional-level policies and facilitating planning. Coordinating when necessary with exter- In relation to the Post-Disaster Recovery Plan nal partners such as donors, the private (PDRP), it spearheads the overall task of its sector and NGOs to ensure coherence in formulation and implementation, in close approach, coverage of programmes across coordination with the sectoral ministries, es- sectors and districts and avoid any duplica- tablishing the scope and priorities for recovery tion of recovery programmes. and reconstruction. The guiding principles in this regard are that recovery should: cover 8) Ensuring that most vulnerable groups of short-, medium- and long-term needs, be com- people including women-headed house- prehensive, and be linked to the Public Invest- holds, people living with disabilities, and ment Programme (2017-20) and Vision 2025. the elderly, receive prioritized assistance to rebuild their homes and restore liveli- hoods.

6. Institutional Arrangements for Recovery 43 9) Monitoring the progress against annual COMMITTEE FOR OVERSEEING RECOVERY: targets for each sector and projects in the The recovery and reconstruction will be imple- recovery plan. mented over a four-year period and this task is arduous considering that there is limited capac- 10) Ensuring accountability and transparency ity within the ministries and that the guidelines in the disbursement and use of funds. for recovery and its implementation are yet to be clearly defined. Added to these, the mechanism MINISTRY OF DISASTER to coordinate the work of the line ministries MANAGEMENT (MODM) and district secretaries will need to be set up MoDM works as the lead Ministry since it and an interface with the affected communities, holds the mandate of disaster preparedness, particularly for all the housing recovery, needs risk reduction and recovery. In the PDRP to be established. Furthermore, a system to exercise, MoDM functions as the central monitor recovery and reconstruction for each of coordinating agency for cross-cutting issues the sector programmes at the central level needs of disaster management. Specifically, MoDM to be delineated. In view of the various functions provides the technical support to develop and the work to be done to facilitate recovery, guidelines for integrating DRR principles in all it is proposed that a committee for recovery is sectoral recovery and reconstruction work. To- established to guide and provide oversight to the gether with its agencies (DMC, NBRO and the entire process of recovery. NDRSC), MoDM will ensure that all relocation of houses and reconstruction of infrastructure, THE ROLE OF THIS COMMITTEE which will lead the implementation of the IS AS FOLLOWS consolidated framework of recovery, will have • Develop guidelines for recovery: Since the following responsibilities: recovery will take place across several sectors and over a duration of 3-4 years, it is 1) Providing technical assistance to other line important that some policy guidelines are ministries to implement reconstruction drafted to inform the recovery process. This using BBB principles. guideline will be a multi-sector effort which builds on the disaster management policy 2) Supporting relevant sectors to prepare but focuses on developing benchmarks for for future disaster impacts, i.e. disaster measuring sector recovery. It will include preparedness. approaches and strategies for achieving household recovery as well as recovery of all 3) Monitoring and reporting the activities on public services and infrastructure. the application of BBB principle in recov- ery undertaken by sectors. • Identify priorities for recovery: The PDRP includes plans for recovery across 12 sectors 4) Conducting hazard and vulnerability with several sub sectors. These programmes assessments to inform sectors of right lo- will be implemented in five affected districts cations and designs for repair, reconstruc- and resource allocation for recovery needs to tion and relocation of infrastructure. be done over the next four years. This inter- ministerial committee will be responsible for 5) Support the National Planning Depart- identifying which sectors and which districts ment (NPD) in coordinating the imple- receive allocations for recovery each year over mentation of recovery in the districts. the four-year period. Based on a pre-defined

44 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan criterion, they will define the sequence of members of this committee may conduct site projects and programmes across sectors visits to verify and validate the use of funds and districts for budgetary allocation and and see the progress on recovery. recommend it to NPD. • Undertake strategic initiatives to support • Strengthen Implementation capacities: recovery: There are a number of policy The PDRP recognizes the need for additional issues that require follow up. This may technical capacities and human resources at include strengthening data on sex, age and the national and district levels for recovery. vulnerable households, conducting studies The inter-ministerial committee can lead an on viability of expanding insurance coverage, exercise of reviewing the existing capacities and defining the role of the private sector in line ministries and districts and propose and media on post-disaster response and immediate additional capacities in the short recovery. The committee can commission term and training and capacity building of such studies or direct relevant line ministries its officials in the long term. or academic institutions to conduct studies to address these gaps in recovery. • Coordinate implementation between stakeholders: The recovery will be The Inter-ministerial committee can be chaired implemented through multiple stakeholders by the Ministry of National Policies and Eco- across line ministries including the nomic Affairs, with representation from the national, district and provincial government MoDM, Central Environment Authority, Min- authorities. NGOs and the private sector istry of Women and Child Affairs, and other rel- may also be engaged in the recovery. It evant line ministries. This committee may meet will require a central level coordination once a quarter and review the recovery plans and mechanism that brings all line ministries take decisions on the issues mentioned above. and district authorities together. This inter-ministerial committee can support The roles of all ministries in charge of sector re- this role of coordinating between the line covery, pertaining to tasks related to each sector, ministries, departments at the national and are summarized below: district level, and also bring together the international and national NGOs and private (i) Ministry of Housing, NDRSC and NBRO sector to join the recovery process. According to the Sector Recovery Matrix, the total budgetary requirement for the housing • Provide oversight in the implementation: sector is estimated at LKR 83,721.14 million. This inter-ministerial committee will The Ministry, with the National Housing De- monitor the implementation of recovery; velopment Authority (NHDA), relevant District in particular, it will ensure that sectors and Divisional Secretariats and supporting adhere to environmental guidelines, agencies (UN-Habitat), need to reconstruct disaster resilient construction standards over 77,000 houses, of which 60% is partially and principles of Build Back Better. It will damaged. Reconstruction of fully damaged also be based on the indicators developed flood-affected houses accounts only for 3008 in sector plans, reviewing the progress of housing units. There is also need for relocation recovery periodically, not only of public and reconstruction of landslide-affected and infrastructure but also reconstruction and high-risk houses and replacement of household relocation of households. If needed, the assets. All these recovery needs call for collective

6. Institutional Arrangements for Recovery 45 institutional coordination and management of covery plan for Industry and Commerce is LKR implementation and monitoring as mid-term 3,026.56 million. (2018) and long-term (2019-2020) measures. The improvement of the housing data collection (vi) Ministry of Irrigation and and management system is also seen as a recov- Water Resources Management ery need, to be handled by sectoral institutions. The Ministry of Irrigation and Water Resourc- The NDRSC and NBRO will play a lead role in es Management will be the lead ministry for the recovery of housing and engage the Minis- the implementation of the PDRP in this sector, try of Housing and Construction in the process with the support of the provincial Ministries of reconstruction. of Irrigation and Agrarian Services. Of the do- nors, the World Bank will play a leading role in (ii) Ministry of Education the recovery of the irrigation sector. According The Ministry of Education and the Depart- to the recovery plan the Irrigation sector bud- ments of Provincial Education in each of the getary estimate stands at LKR 1,937.6 million. affected provinces will share the responsibility of recovery. The implementation encompasses (vii) Ministry of Higher short-, medium- and long-term projects/inter- Education and Highways ventions, following the BBB principle. Accord- The responsible institutions for recovery and ing to the Recovery Matrix, the total budget for reconstruction are the Ministries of Highways the Education sector amounts to LKR 1,397.3 and Transport (through the Road Develop- million. ment Authority, RDA), Provincial Offices of the Road Development Authority (PRDA) and (iii) Ministry of Health, Nutrition the respective local governments (for local and Indigenous Medicine roads). The World Bank will play a leading role As in the other sectors, here too both National in the recovery of the Transport sector as well. and Provincial Health Ministries hold respon- According to the Recovery Matrix, the total sibility for recovery with the assistance of WHO budgetary requirement is estimated at LKR and others. According to the Recovery Matrix, 15,686.97 million for the Sector. the total budget for the Health sector amounts to LKR 713.63 million. (viii) Ministry of City Planning and Water Supply (iv) (Ministry of Agriculture The Water and Sanitation sub-sector has four The institutional responsibility of recovery and components: a) Pipe-borne water supply of the reconstruction lies with the respective Minis- National Water Supply and Drainage Board tries of Agriculture, Plantations, Livestock and (NWS&DB), b) Pipe-borne water supply by Fisheries with the assistance of FAO and others. community-based rural water supply schemes, The budgetary estimate for the Agriculture c) Shallow dug wells (household and com- recovery plan stands at LKR 2,677.17 million. mon), and d) Sanitary latrines. According to the Recovery Matrix, the total budgetary (v) Ministry of Industry and Commerce requirement for the sector is estimated at LKR The recovery responsibility mainly lies with the 2,375.76 million. Ministry of Industry and Commerce with the assistance of the National Enterprises Devel- The responsible institutions for recovery and opment Authority (NEDA) and private sector reconstruction of the Water and Sanitation partners including the Ceylon Chambers of sub-sector are the national ministry of City Commerce. The budgetary estimate for the re- Planning and Water Supply, and provincial

46 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan ministries of Water and respective local govern- tration led by the District Secretary (Govern- ments. As the main donor agency, the World ment Agent) of each district play an important Bank will play a leading role in the recovery of role in implementation as they have received a this sector too. lump sum grant from the central government for infrastructure sector recovery, particularly (ix) Ministry of Power and Renewable Energy for the Transport sector. District Secretaries are The main responsibility for recovery and recon- supported by other district-level line agencies struction lies with the Ministry of Power and as well as the next level of local development Renewable Energy, which is supported mainly administration led by Divisional Secretaries. by the Ceylon Electricity Board (CEB) and the Lanka Electricity Company (LECO), the two The Central Government allocated a special implementation agencies of the power sector. budget of LKR 300 million to each disaster-af- The World Bank will extend its support for the fected district to meet the sub-national level recovery of this sub-sector. The total estimate (provincial and district) infrastructure recovery, for recovery of the sector is LKR 1,884 million. particularly for provincial roads and irrigation sub-sectors. District Secretaries are given the (x) Ministry of Mahaweli implementation authority to reconstruct the Development and Environment damaged structures, in collaboration with re- The Ministry of Mahaweli Development and spective provincial ministries and local govern- Environment together with its agencies in ment bodies. charge of the subject areas of Forestry, Wildlife, Waste and others (i.e. Central Environmen- 6.3 Role of Provincial Councils and tal Authority) will be involved in this leading Local Government Institutes cross-cutting area, with the concerned agencies, Provincial Councils are responsible for im- led by UNDP. The recovery needs estimated for plementing devolved functions through their the sector is LKR 1,790.28 million. ministries, which include main infrastructure sectors (roads, irrigation, water, health, educa- (xi) Ministry of Women and Child Affairs and tion, etc.). In terms of recovery needs, they will Ministry of Social Empowerment and Welfare be in charge of the process of planning, imple- The Ministry of Women and Child Affairs mentation and monitoring. together with the Ministry of Disaster Manage- ment will lead the recovery process of Gender Local Government constitutes three levels of and the Ministry of Social Empowerment and authorities, namely, Municipal Councils, Urban Welfare will deal with the Social Inclusion, in Councils and Pradeshiya Sabhas (Divisional coordination and partnership with the Na- Councils), which are governed by elected bodies. tional Planning Department. UN agencies and They have authority over their jurisdiction, with- partners; international and national NGOs and in their statutory provisions, and they function development partners and donor agencies will as local authorities in revenue collection on support the implementation of the recovery plan houses and commercial buildings, construction led by the government, in accordance with the and maintenance of local roads, water, health, Build Back Better principle. The recovery budget sanitation, and waste disposal facilities. worked out for this sector is LKR 255.75 million. The overallInstitutional Arrangement for the 6.2 Role of District Secretaries implementation of the PDRP is summarized in Apart from the line ministries at the national Figure 1, next page. and the provincial levels, the district adminis-

6. Institutional Arrangements for Recovery 47 MINISTRY OF NATIONAL POLICY AND ECONOMIC AFFAIRS NPD

Sector Agencies of NRP DONORS high Level Policy Guidance Stakeholder Coordination Implementation TABLE 15: SECTOR RECOVERY STRATEGIES IN TIMELINE

UNDP / World Bank MoDM / DMC housing - MohC Activities Short term Medium term Long term Resource Mobilization and Overall Coodination of Technical Assistance Recovery health - MohN&IM Development of anicuts ×

Education - MOE Rehabilitation of minor irrigation according to priority × UN-Habitat / WFP / IOM Provincial Line Ministries Tech. Assistance to housing, IMPLEMENTATION Agriculture - MoA Cultivation of abandoned paddy land × × Shelter & Food Fisheries - MoF DistrictARRANGE Secretary (GA) / - Development of agriculture infrastructure including roads × Divisional Secretaries Irrigation - MoIWRD WHO / UNFPA MENTS FOR Rehabilitation of seasonal water bodies x × Tech. Assistance to health Transport - MoT - (RDA) LocalRECOVERY Governments (MC / UC / PS) Water & Sanitation Supply of agricultural inputs: Seed of paddy and OFC × MoCP&WS Improvement of non-agricultural income sources in order to UNICEF × Tech. Assistance to WASh Power - MoP&E develop the livelihood status of affected people Beneficiary Communities Commerce & Industry Development of flood resistance varieties × MoC&I

Environment - MoMD&E Monitoring of the water level in rivers and tanks × ×

Comprehensive agriculture risk transfer mechanism × × Gender & Social Inclusion - MoW&CA, & MoSE&W

FIGURE 1 •INSTITUTIONAL ARRANGEMENTS OF THE POST-DISASTER RECOVERY PLAN

48 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 7. IMPLEMENTATION ARRANGEMENTS FOR RECOVERY

7 IMPLEMENTATION ARRANGEMENTS MINISTRY OF NATIONAL POLICY AND ECONOMIC AFFAIRS NPD FOR RECOVERY

Sector Agencies of NRP DONORS high Level Policy Guidance Stakeholder Coordination Implementation TABLE 15: SECTOR RECOVERY STRATEGIES IN TIMELINE

UNDP / World Bank MoDM / DMC housing - MohC Activities Short term Medium term Long term Resource Mobilization and Overall Coodination of Technical Assistance Recovery health - MohN&IM Development of anicuts ×

Education - MOE Rehabilitation of minor irrigation according to priority × UN-Habitat / WFP / IOM Provincial Line Ministries Tech. Assistance to housing, Agriculture - MoA Cultivation of abandoned paddy land × × Shelter & Food Fisheries - MoF District Secretary (GA) / Development of agriculture infrastructure including roads × Divisional Secretaries Irrigation - MoIWRD WHO / UNFPA Rehabilitation of seasonal water bodies x × Tech. Assistance to health Transport - MoT - (RDA) Local Governments (MC / UC / PS) Water & Sanitation Supply of agricultural inputs: Seed of paddy and OFC × MoCP&WS Improvement of non-agricultural income sources in order to UNICEF × Tech. Assistance to WASh Power - MoP&E develop the livelihood status of affected people Beneficiary Communities Commerce & Industry Development of flood resistance varieties × MoC&I

Environment - MoMD&E Monitoring of the water level in rivers and tanks × ×

Comprehensive agriculture risk transfer mechanism × × Gender & Social Inclusion - MoW&CA, & MoSE&W

The present PDRP is designed as a com- activities including damage assessment for prehensive action plan geared for organizing insurance compensation, release of compensa- and guiding the implementation of recovery tion, and overseeing monitoring of construc- at the national, sub-national and local levels. tion. The Grama Niladhari (GN) supports these The process involved in planning and coordi- officials as the key focal point at the GN Divi- nation of implementation was advocated in a sion level. The NDRSC officials at district and participatory manner. The focal point for this divisional levels are tasked with supporting the process is the National Planning Department District Secretaries and Divisional Secretaries (NPD) under the Ministry of National Poli- in coordinating relief and recovery activities, cies and Economic Affairs, for which able and assessments and data management. ready support was extended by the Ministry of Disaster Management through the Disaster As such, it is proposed that a joint cabinet Management Centre. paper be submitted by the Ministry of Hous- ing and the MoDM to implement post-di- 7.1 Implementation Arrangements saster housing reconstruction, outlining by sector of intervention the proposed activities and tasks including Housing: This sector concentrates the largest funding requirements for top up-loans and volume of reconstruction work, under the socio-technical facilitation. UN-Habitat and purview of the Ministry of Housing and Con- other civil society organizations may support struction. The Housing sector recovery plan this initiative through capacity building of all has two approaches. The first is the relocation stakeholders. and reconstruction of houses in the landslide affected districts. This work will be done under Health: The Ministry of Health, Nutrition the supervision of the National Building and Indigenous Medicine, is the main focal Research Organization (NBRO) and Nation- point for the implementations of the recovery al Disaster Relief Services Centre (NDRSC). framework at the national level. Provincial The second approach is the repair and recon- and district level Directors of health services struction of houses by the owners themselves are the sub-national agencies for Health Sector with compensation received from insurance, reconstruction at the Provincial level, which and technical assistance from the Ministry of coordinates all the activities, including damage Housing and Construction. assessment, releasing budget, distribution of hospital assets between the national level and The Housing programme in landslide-prone the local level. The Disaster Preparedness and areas is proposed to be implemented by the Response Division (DPRD) will coordinate the respective Divisional Secretariats, with techni- implementation. It is headed by the National cal support from NBRO and financial support Coordinator and operates through a network of through the NDRSC. The National Housing Focal Points appointed in Line Ministry Hospi- Development Authority (NHDA) is involved tals, Provincial and Regional Directorates and in assessing the damage to houses and coordi- line ministry programmes. The DPRD will con- nating the housing construction programme. duct on site visits to ensure that construction NBRO is given the responsibility of providing standards are compliant with NBRO guidelines technical assistance to house owners to incor- for building in landslide-risk areas and conform porate disaster resilient features. Regarding to the guidelines for safe hospitals. the reconstruction programme, the District and Divisional Secretaries are the focal points Education: The Ministry of Education is the at the corresponding levels, coordinating all main agency for the implementation of the

7. Implementation Arrangements for Recovery 51 recovery framework at national level. The Industry and Commerce together with its responsibility of recovery will be shared by the affiliates (Departments, Authorities and Cor- Ministry of Education and Departments of porations) will implement the distribution of Provincial Education in each of the affected compensation relating to the Industry sector. provinces. Provincial Director of Education is On the other hand, the National Enterprise the focal point for Education reconstruction at Development Authority (NEDA) is answerable the corresponding level, which coordinates all for all recovery programmes implemented for the activities, including damage assessment, MSMEs through the Ministry. NEDA has a releasing budget, distribution of school assets strong network of around 260 Development both at the national level and the local level. Officers in the DS level, out of 330 DS divisions The MoE will work closely with UNICEF in in the country and is therefore better equipped building capacities for disaster preparedness to implement the identified recovery of SMEs in schools and also ensuring that schools are in the affected locations. The Ministry of disaster resilient. Industry and Commerce may invite the Ceylon Chambers of Commerce (CCC) to support the Agriculture: The Ministry of Agriculture will process of establishing business continuity implement the Agriculture sector recovery and preparedness plans for all businesses and plan with the support of its agencies, namely, industries. The CCC can also support with the Department of Agriculture (DoA), Depart- expanding the insurance coverage for SMEs in ment of Agrarian Development (DoAD) and partnership with insurance companies in Sri Agriculture and Agrarian Insurance Board, Lanka. which would play a key role in the implementa- tion and coordination arrangements. Irrigation: The Ministry of Irrigation and Water Resources Development is responsible Institutional support for the Crop sub-sector for the implementation of Irrigation sector is mainly governed by the DoA. The DoAD recovery works, mainly through the Irrigation is responsible for repairs and reconstruction Department, which has a well-established of the small-scale irrigation systems, and the network of institutes from national to division- Agriculture and Agrarian Insurance Board al levels. The District Directors and Divisional provides compensation to farmers affected by Irrigation Engineers are the focal points for disaster situations. The institutional support improvement and upgrading of flood protec- for the Livestock sub-sector is provided by the tion systems, irrigation infrastructures, and government and the private sector. However, canal systems at the district and divisional in a disaster situation the government supplies levels. These will coordinate all improvements, most of the recovery needs. The Fisheries sec- upgrading, rehabilitation and reconstruction tor recovery will be executed by the Ministry activities, including damage assessment for of Fisheries, with the support of the National estimation and overseeing monitoring of all Aquaculture Development Authority of Sri activities. The construction work will be con- Lanka. The Plantations sub-sector recovery ducted following the standard tender proce- comes under the purview of the Ministry of dures, mainly by direct labour, and involving Plantation Industry, which has taken action to registered private contractors and registered rehabilitate the damaged plantations, making Farmer Organizations (FOs). use of the different subsidy schemes and addi- tional allocations. Transport: The main implementing agency for the Transport sector recovery is the Ministry of Industry and Commerce: The Ministry of Higher Education and Highways, which bears

52 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan the responsibility of the implementation of The actual implementation of the recovery is the second highest volume of work next to the carried out by the Distribution System of the Housing sector, both in volume and financial CEB, which is divided into four divisions. An allocation. The Implementation agency at Additional General Manager, who directly the national level is the Road Development reports to the General Manager, heads each Authority (RDA), which is the authority for Distribution Division of the CEB. Of the A and B class roads. Road construction and four CEB Divisions formed for all provinces, improvement works are procured in accor- Divisions 3 and 4 are responsible for the work dance with the Government Procurement in the Western, Southern and Sabaragamuwa Guidelines and implemented by the RDA with provinces. assistance of its Provincial Office network. The technical supports will be provided by RDA or Environment: Environment comes under the shall be outsourced if deemed necessary. The purview of the Ministry of Mahaweli Develop- provincial roads (C & D classes) reconstruc- ment and Environment. The implementation tion is entrusted to the Provincial Offices of the and coordination mechanisms for the National Road Development Authority (PRDA), while Adaptation Plan (NAP) will include institutions rehabilitation of rural roads will be carried representing identified vulnerable sectors, out by respective local authorities (Municipal namely, Food Security and Water, Bio-diversity Councils, Urban Councils and Pradhesiya and Coastal Resources, Health, Human Set- Sabhas), mainly through their registered local tlements and infrastructure, Tourism, Energy, contractors. Industry and Infrastructure and Export agri- culture, and the National Working Group for Water and Sanitation: The reconstruction of Cross-cutting National Adaptation Needs and the Water and Sanitation sector is managed a Civil Society Organizations Forum. Other by the Ministry of City Planning and Water lead Implementers of the recovery programme Supply. The main implementation body is the on direct environment-related components are National Water Supply and Drainage Board forestry and wildlife, which are handled by two (NWS&DB), which will handle the main water respective national departments. supply schemes while the Rural Water Sup- ply Division is responsible for Rural Water Gender and Social Inclusion: The Ministry of Supply schemes, in partnership with the Women and Child Affairs and the Ministry of Department of National Community Water Social Empowerment and Welfare will imple- Supply (DNCWS) and Rural Water Supply ment the sector plan. The Women and Child (RWS) district units of NWS&DB. Rural Water Affairs Ministry has units established at the Supply schemes, dug-wells and latrines are Divisional Secretariats consisting of Women implemented and monitored in participation Development Officers (WDO), Relief Sisters, with the CBOs operating at the grassroots, Counsellors, Child Probation and Protection with the coordinating support of the divisional Officers, and Early Childhood Development level health sector workers, community health Care Officers who will support the sector re- workers (CHWs), public health inspectors covery. The Social Inclusion sub-sector comes (PHIs) and Community Development Officers. under the Ministry of Social Empowerment and Welfare, which has a network of institutes Power and Energy: Recovery operations and officials at the district, divisional and GN relating to the Power and Energy sub-sector levels, including the Department of Social Ser- of the Infrastructure Sector is vested upon the vices, Samurdhi Banks, Samurdhi Managers Ministry of Power and Renewable Energy. and officers to assist with implementation.

7. Implementation Arrangements for Recovery 53 Disaster Risk Reduction: The national level Provincial Government Authorities in three responsibility for coordination and monitor- provinces have made institutional provisions ing of the Disaster Risk Reduction activities through their ministries offices by using lies with the Ministry of Disaster Manage- their own fund allocations. The provincial ment, together with its implementation arm, level infrastructure works (roads, irrigation, the Disaster Management Centre (DMC) and water, hospitals and schools) are implemented the National Disaster Relief Services Centre following the accepted tender procedures, (NDRSC) and the National Building Research in coordination with the District Secretary’s Organization (NBRO). implementation mechanism. The short-term recovery of damaged provincial roads (Class- The DMC will take a lead on activities relating es C & D) and rural roads that are under the to rebuilding and will develop sector-specific purview of local governments (viz. Municipal guidelines to assist in the process of recon- Councils, Urban Councils and Pradeshiya struction. Through DMC officials at the district Sabhas) is implemented following the same level, MoDM will monitor the application of legal procedures. these guidelines in all reconstruction projects. The NDRSC has the major responsibility of 7.4 Role of Development Partners, distribution of insurance compensation, which NGOs and Civil Society it is doing through the NDRSC officials based As stated in Chapter 3, allocations were made in the district under the overall supervision of by six UN agencies to the relevant sector minis- the district secretaries. The NBRO has the key tries for disaster relief and recovery for relevant task of providing the design, technical super- sectors. These six UN agencies – UNICEF, vision and clearance for construction of all WHO, UNFPA, IOM, UN-Habitat and WFP – buildings in the landslide-affected areas. NBRO made allocations to WASH, Health, Emergen- officials will provide technical assistance and cy Shelter, and Food and Nutrition sectors. The approval for all housing plans, and will also UN agencies and NGO partners are providing inform sectoral agencies of low-risk sites for continued support to affected communities for relocation of planned schools, hospitals and their immediate recovery needs. other infrastructures. NGOs were requested to support community 7.2 Role of Districts Secretaries preparedness for floods and landslides in all and Divisional Secretaries affected districts. The Sri Lankan Red Cross While all line Ministries at the central level are and agencies working in the flood-affected responsible for planning, coordination, im- districts will build on the preparedness plans plementation and allocation of funds, District and develop guidelines for community pre- Secretaries and Divisional Secretariats lead the paredness. CBOs that are formed for particular recovery augmented with surge capacities. The sectors (Water and Sanitation, Health, SMEs, Coordination cells at the district and divisional Micro-financing etc.) will adhere to their man- levels were established to work with NGOs, dates relating to the recovery process, under INGOs, and the private sector. Information the guidance of sector-specific INGOs, func- dissemination and technical assistance to com- tioning at different districts. munities and grievance redress mechanisms are mainly carried out at the divisional level. 7.5 Strengthening Implementation Capacity 7.3 Role of Provincial Government The execution of recovery programmes calls Authorities for strengthening capacities for implementa-

54 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan tion at all levels from the national level down · Lack of flexibility and permission for to the Grama Niladhari level. A quick capacity emergency procurement to hire required assessment of the technical skills and human machinery to expedite the implementa- resources required for each line ministry and tion process. department for the implementation of recov- ery programmes may be conducted to find the · Lack of appropriate incentive structures capacity gaps for implementation. The addi- to motivate field staff and office staff tional human resources can be sourced from to work day and night during disaster departments from other districts or short-term situations. technical assistance can be hired or seconded from International agencies. · Lack of knowledge and skills of the staff to integrate disaster resilient construc- It is important that in the context of the long- tion techniques into the reconstruction term recovery that key ministries and depart- process. ments such as the Ministry of National Policies and Economic Affairs, the Ministry of Disaster All the challenges and bottlenecks need to be Management, and ministries which have a addressed if recovery and reconstruction is to large portfolio of recovery programmes such as be implemented smoothly. The institution- Irrigation, Water and Sanitation and Transport al structure proposed in the Post-Disaster should be provided with additional staff, be it Recovery Plan is an inter-ministerial commit- engineering capacities, or management capac- tee to oversee the recovery. The NPD will take ities or even staff for coordination of recovery the lead and should designate institutional from stakeholders. arrangements for recovery at the national level and stipulate such arrangements within each 7.6 Constraints and Challenges ministry to address issues of implementation in Recovery capacities, technical expertise and of procure- The Department of Irrigation and the Ministry ment. The flexibility for hiring short-term staff of Transport have brought up several chal- and equipment necessary for implementation lenges encountered in the process of recovery. of recovery should be addressed through spe- While the two ministries identified these chal- cial dispensation given to relevant line minis- lenges, they can be common to all ministries. tries by the NPD. With regard to staff skills on The constraints and challenges can be summa- integrating disaster resilient technologies, the rized as follows: Ministry of Disaster Management (through the NBRO) and the Ministry of Housing · Lack of clarity in terms of institutional and Construction will develop guidelines to structures, as many institutions with integrate DRR techniques in each such sector varying levels of capacity and technical and train ministry staff and local masons and expertise are involved in the relief and construction workers in disaster resilient con- reconstruction process. There is very little struction technologies. Additionally, MoDM coordination among stakeholders. plans to train all department officials in guide- lines for integrating disaster risk reduction · Lack of relevant technical expertise into development projects and programmes. with the capacity to identify appropriate solutions and guide junior staff during 7.7 Monitoring and Transparency the needs assessments process of large A monitoring mechanism was identified and projects. proposed by each sector, which includes sec-

7. Implementation Arrangements for Recovery 55 tor-specific indicators to monitor progress of In addition, in a large-scale recovery process work by the sectors. In addition to indicators such as the one to be undertaken in the next developed by each sector, the MoDM will also four years, it is important that the affected pop- support the sector to integrate principles of ulation are regularly informed of the recovery disaster resilience into reconstruction. The and reconstruction, particularly of benefits MoDM and the Project Management Unit of that directly affect the people such as housing the NPD will also monitor this. The relevant and livelihoods issues. An interface should unit responsible for implementing the activ- be established with people at the district level ity will do the monitoring of the activities. where people can contact the local district Additionally, a central level monitoring system office for any grievance and concerns about the with information on sector level indicators reconstruction. will be developed to provide an overview of the progress of the recovery for all sectors. A quar- 7.8 Integrating Gender in Recovery terly or biannual progress meeting may be held Given the importance of addressing the jointly by the MoDM and NPD to review the special needs of women, the recovery process progress of activities against the indicators and will ensure that women and other vulnera- address any bottlenecks and challenges that ble groups such as those living with physical may arise from the implementation of the var- disabilities receive the necessary benefits and ious sector-specific activities. Periodical field entitlements. Women-headed households will visits may also be organized by each sector in be targeted for livelihoods related assistance as coordination with DMC and NDRSC officials well as housing reconstruction. Data on pro- to see work on site. gramme activities and results will be collected in a gender-disaggregated manner. Moreover, Both monitoring and transparency mecha- people living with disabilities were consulted nisms are based on an agreed set of indicators in the planning and implementation of the defined for recovery objectives and targets. social and economic recovery of communities. In this regard, the following are proposed: a) The Ministry of Women and Child Affairs will database of beneficiaries for housing and live- take a lead in integrating gender and concerns lihoods to allow monitoring of assistance by of vulnerable groups into the recovery pro- households, b) Review meetings at the national grammes. level by NPD and a core committee, c) Annually auditing by third party agency, and d) Impact evaluation at the end of four years to measure the overall progress of recovery.

56 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 8. FINANCING NEEDS AND GAPS

8 FINANCING NEEDS AND GAPS

The recovery needs of the PDNA were not affected by the floods and landslides was estimated at LKR 118,316,144,436 in 2017. In the Industry and Commerce sector, (USD 788 million) while the recovery the increase responds to the GoSL commit- strategies budget in the Post-Disaster ment to supporting the micro, small and Recovery Plan (PDRP) is estimated at LKR medium scale enterprises with compensation 116,847,559,228.17 (USD 778.98 million). for damage to the infrastructure, machinery The financing needs for recovery were and equipment. The allocation for the Envi- drawn up by each line ministry by reviewing ronment sector was also increased due to the

TABLE 2: RECOVERY BUDGET PER YEAR AND COMPARISON WITH PDNA RECOVERY NEEDS

Sectors 2017 2018 2019 2020 or 2020 -2025 Recovery Plan Total Recovery Needs (PDNA)

Housing 11,018,483,253 8,367,315,566.67 7,514,799,300 56,820,538,500 83,721,136,619.67 81,293,090,000

Education 556,135,489 841,183,146 - - 1,397,318,635 1,515,650,000

Health 147,630,000 560,000,000 6,000,000 - 713,630,000 961,850,000

Agriculture 1,015,609,780 766,842,703.12 894,717,703 - 2,677,170,186.24 4,269,890,000

Industry 2,225,000,000 522,560,000 279,000,000 - 3,026,560,000 41,000,000

Irrigation 349,200,000 1,428,400,000 160,000,000 - 1,937,600,000 2,441,000,000

Transpor- tation 2,494,687,178.73 7,274,523,072.36 5,917,761,536.18 - 15,686,971,787.26 14,956,100,000 Water and Sanitation 31,160,000 881,660,000 1,462,940,000 - 2,375,760,000 8,400,139,435.5

Power 469,000,000 915,000,000 500,000,000 - 1,884,000,000 2,120,000,000

Environment 450,775,000 927,013,000 412,500,000 1,790,288,000 833,000,000

DRR 105,000,000 309,552,000 562,122,000 404,700,000 1,381,374,000 1,384,500,000

Gender 182,600,000 69,200,000 2,600,000 1,350,000 255,750,000 99,930,000

Total 19,045,280,700.73 22,863,249,488.14 17,712,440,539.3 57,226,588,500 116,847,559,228.17 118,316,149,435.5

the recovery needs presented in the 2017 importance of the implementation of envi- PDNA report. The district officials of each ronmental strategies to ensure Building Back line ministry conducted detailed sectoral as- Better and a resilient recovery. [Table 2] sessments to arrive at the revised estimates for recovery. From the above table, it can be noted that the financing requirement for the housing sector The Housing sector recovery budget exceeds is over 71% of the total needs for recovery and what was estimated in the PDNA 2017 due to reconstruction. The other important sectors the sanction of an additional allocation of LKR representing high financing needs are the 21 billion for relocation of 20,500 units of Transport, Water and Sanitation, Power, Irri- houses in 10 districts. This programme will be gation, Education, and Disaster Risk Reduc- implemented in the flood-affected districts and tion sectors. also in districts that are prone to landslides but

8. financing needs and gaps 59 In order to determine the financial gaps, the be deemed not to be an emergency response difference between the recovery needs and the action was the sanction of LKR 79,000,000 allocation of financial resources of the follow- to the Ministry of Women and Child Affairs to ing sources was analysed: provide cash grants to women entrepreneurs. The work with the existing allocations has · Allocations already made in the current commenced in all sectors and is estimated to year (2017) be completed before the end of the financial year. · Proposals submitted into the 2018 annual budget In the current financial year, the Government allocated and/or committed LKR 35,306 mil- · Funds for ongoing projects that are re- lion (USD 235.3 million) towards recovery and purposed for flood and landslide recov- reconstruction. A detailed breakup of funds al- ery. located to the various sectors from the national budget is presented in the table below with the The funds that were not available under these financing gaps in all sectors. [Table 3] three categories were deemed be the financial gap for the sector. An estimate of the financial gap will support the allocation of budgetary 8.2 Insurance Compensation resources for sectors that are underfunded in Compensation from insurance is a key source 2017 and 2018. This will also help rationalize of meeting recovery and reconstruction needs. the allocation of funds across sectors rather The total amount to be recovered through than having a focus on one or two specific sec - insurance is LKR 7,993.7 million. The insur- tors. It should be noted that the Housing sec- ance payouts and compensation to houses tor has a specific allocation this year and funds amounting to LKR 5451.83 million will be dis- that are received through insurance coverage tributed to households affected by 2017 floods will be used to repair and reconstruct houses and landslides for repair of damaged houses and there may be no immediate financing gap and replacement of lost assets. In addition, in in the short term but there will be a large gap 2017 an amount of LKR 2,541.91 million was in meeting housing sector targets for 2019 and distributed to households affected in 2016. 2020. Through insurance payments, every affected household will at least receive some funds to 8.1 Budget Allocation repair their houses. Since the housing sector Almost as soon as the PDNA for the 2017 had the largest financing need, the combina- floods and landslides was completed and tion of funds through the insurance payouts presented to the Government, the Depart- and special allocation from the government ment for National Planning took a decision to for reconstruction of landslide-affected allocate additional funds of LKR 300 million households and insurance payouts covers a to each of the seven affected districts to start significant percentage of funds required for the immediate repair and restore services of key housing sector. sectors such as Power Supply and Transport. Other line ministries were advised to use In addition to insurance coverage for Hous- existing allocations from the annual budget for ing, Small and Medium Enterprises (SMEs) immediate recovery and restoration of ser- covered under insurance will also receive vices in their specific sector. The only ministry compensation. The 2017 insurance payouts to which received additional funds in what could businesses amounts to LKR 2,018.5 million for

60 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan TABLE 3: ALLOCATION AND COMMITMENTS OF FINANCIAL RESOURCES AND FUNDING GAPS

Amount allocated/ Recovery Budget Funding Gap Sector Remarks committed in 2017 (LKR) (LKR) (LKR)

Social Sectors

Includes relocation commitments + Housing 29,493,813,448 83,721,136,620 -54,227,323,172 2016-2017 NITF compensation

2017 allocation - Finance Division / Education 556,130,000 1,397,318,635 -841,188,635 MoE

Health 147,630,000 713,630,000 -566,000,000 2017 allocation – Min. of Health

Productive Sectors

2017 allocation in agriculture + Agriculture/Minor Irrigation 741,099,779 2,677,170,186 -193,607,0407 plantations (Budget Dept)

Industry and Commerce 2,018,500,000 3,026,560,000 -1,008,060,000 2017 NITF compensation Infrastructure Sectors

Source of 2017 allocation - Budget Roads/ Transport 579,700,000 15,686,971,787 -15,107,271,787 Dept. Water and Sanitation 31,160,000 2,375,760,000 -2,344,600,000

Irrigation 300,000,000 1,937,600,000 -1,637,600,000

Power and Energy 469,000,000 1,884,000,000 -1,415,000,000 Cross-cutting Sectors

Environment 0 1,790,288,000 -1,790,288,000 DRR 890,000,000 1,381,374,000 -491,374,000 Gender 79,000,000 255,750,000 -176,750,000

Total 35,306,033,227 116,847,559,228 -81,541,526,001

those affected for 2017 floods and landslides, and the second is an allocation of LKR 350 and LKR 228.4 million for those affected in million towards the construction of 21 safe 2016. Despite this insurance payout towards shelters across various districts in the country, SMEs, the Industry and Commerce sector will including Colombo and Gampaha, which were have a large gap as the total coverage of busi- affected in the floods of 2016. This additional nesses under insurance is very low. allocation towards safe shelters has no direct bearing on the recovery needs identified for 8.3 Budget Proposals for 2018 2017 but contributes towards the larger goal of The Government of Sri Lanka has planned preparedness for recurrent disasters and will to allocate funds from the annual budget for ease the occupation of schools and religious projects on recovery and reconstruction. places as evacuation centres.

8.4 Special Approval by Cabinet 8.5 Funds from Ongoing Projects The Government approved two special proj- It should be noted that while a full record of ects this year that will address some gaps in funds and programmes that support imme- recovery and reconstruction. The first is an diate recovery is not being listed here, several allocation of LKR 21 billion towards recon- NGOs, UN agencies and donors have already struction of houses in landslide-affected areas supported recovery in districts. These are off

8. financing needs and gaps 61 budget funds, implemented directly by the 8.6 Resource Mobilization relevant agency in the districts. There are how- It is noted that the total funds available in 2017 ever some large-scale ongoing projects funded from budget allocation, commitments and through the World Bank, JICA, and UN agen- insurance amounts to LKR 35,306 million with cies which have and will contribute towards these resources available, there is still a fund- recovery and reconstruction. The details of ing gap of LKR 81,541.5 million (USD 543.6 these programmes and funds are listed below million). To finance the balance of recovery and against the various sectors. [Table 4] reconstruction needs, the government may consider doing the following: The total funds allocated from ongoing projects in the flood-affected districts is LKR • Allocation of resources from national 750.197 million. budget: The line ministries may be advised to prioritize and include projects

TABLE 4: ONGOING PROJECTS WITH POTENTIAL CONTRIBUTION FOR RECOVERY

Project Name and District Sector and type of programmes Resources allocated

Climate Resilience Improvement Project (CRIP) (World Bank finance) Aiming to reduce the vulnerability of exposed people USD 3 million (under and assets to climate risks and to improve government’s Transport: Rehabilitation of transport Contingent Emergency capacity to respond effectively to disasters. Main infrastructure affected by floods and landslides in Response Component) investments are to develop river basin investment May 2017. LKR 450 million planning for 10 river basins; slope stabilization along key roads and vulnerable school sites; and provide contingent emergency response support in case of disasters.

Systematize the post-disaster housing damage/ needs Housing: Database development and technical LKR 5.48 million assessment (UNDP) assistance for monitoring reconstruction of houses.

Strengthening the institutional capacity of the Recovery assessment data management: Technical Government of Sri Lanka on Rapid Damage Assessments Assistance to MoDM/DMC and NPD in supporting USD 225,000 and Recovery Planning (World Bank Technical PDNA, and development of recovery planning and LKR 33.75 million Assistance) recovery framework.

Environment: Mainstreaming Agro-biodiversity Conservation and use in Sri Lankan agro-ecosystem for livelihoods and adaptation to Climate Change. Mainstreaming Biodiversity Conservation and The Global Environmental Fund (GEF) project: LKR 140.96 million sustainable use for Improved Human Nutrition and Well-being. Conduct a national level awareness campaign on invasive alien species and their impacts on natural habitats.

Disaster Risk Reduction Strengthen PDNA capacities. Data management, assessment capacities and Strengthen information management systems. USD 800,000 / 2016-2018) mainstreaming DRR (UNDP) Guidelines for incorporating DRR into development LKR 120 million planning

62 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan and programmes for recovery and to directly plan and implement projects reconstruction into the annual budget rather than contributing funds to a proposals for 2019 and 2020. This would government account. This flexibility may be assure the availability of resources for accommodated through a memorandum of recovery over the next two years. An annual agreements between parties on the scope allocation of an overall LKR 50 billion will and quality of work. go a long way in addressing the recovery needs across all sectors. • Redirecting resources from ongoing projects: All ongoing projects with • Public - Private Partnerships: In a bid external/donor funds support may be to mobilize additional resources, the reviewed to evaluate how they could government may identify specific priority contribute to recovery and reconstruction. projects and seek funds from the large Multi-year budgeted projects and private companies and the Sri Lankan programmes may be assessed if funds can diaspora. A conference with all well- be redirected to districts affected by floods established private industries, companies, and landslides, or projects and programmes foundations and philanthropies could be planned for any of the five affected districts organized and a set of projects presented to may be accelerated for implementation in them for funding. Additionally, companies the districts. Donors may be approached which have a fund set aside for Corporate to redirect projects and programmes that Social Responsibility (CSR) can direct the have showed slow progress or cannot funds for recovery and reconstruction and be implemented due to unforeseen not only relief as is mostly the practice. impediments. Additional resources may be It may be noted however that private raised through existing partnerships and sector partners have shown a preference projects.

8. financing needs and gaps 63

9. CROSS SECTOR PRIORITIZATION CRITERIA AND GEOSPATIAL PRIORITIZATION

9 CROSS SECTOR PRIORITIZATION CRITERIA AND GEOSPATIAL PRIORITIZATION

9.1 Cross sector prioritization criteria munity organization, capacity building, Each sector drafted its own criteria for prior- training, insurance promotion, and itization of activities. In setting priorities, the pyscho-social support to the most vulner- ministries have broadly considered restoration able families. of services, preparedness for the next monsoon season and assistance to the most vulnerable 9.2 Cross-Sector Prioritization by Recovery as their key priorities. For cross-sector priori- Needs and District-wise Recovery Needs tization, similar considerations may be set but The following table presents the prioritized a larger consideration is the issue of balancing sectors (in terms of recovery needs) for the five reconstruction of infrastructure with softer most affected districts. This does not include needs for database creation, psycho-social the recovery and reconstruction initiatives to counselling, community-level preparedness be implemented at the national level such as and restoration of household-level incomes. policy level changes, training, development of The proposed set of criteria for cross sector databases and related activities. The prioriti- prioritization is as follows: zation is only for large infrastructure projects across key sectors. · Programmes that have significant social and economic impact in all districts. From the table below it can be noted that even though housing still remains the key sector · Programmes that support the recovery with the highest funding across the districts, of vulnerable families, including wom- other sectors that receive high priority in terms en-headed households, people living with of volume of funds in the district of Galle is the disabilities and the elderly. Transport sector followed by Agriculture, Irri- gation, Water and Sanitation, and Education. · Programmes that are time sensitive and These sectors – though in different order – are mitigate disaster risks. the most relevant in terms of recovery needs in all districts, except in Ratnapura, where invest- · Programmes that support preparedness ment in Health recovery is also relevant. for the next rainfall and possible floods and landslides. [Table 5]

· Programmes that restore and restart The following table presents the recovery economic activities and livelihoods of needs by districts indicating that Matara, communities. which was the most severely affected, has the highest concentration of recovery activities, · Programmes that also prioritize the less followed by Galle, Ratnapura, Kalutara and visible aspects of recovery such as com- Hambantota.

[Table 6]

9. Cross Sector Prioritization Criteria and Geospatial Prioritization 67 TABLE 5: MAIN FIVE SECTORS FOR INTERVENTION PER DISTRICT

Districts Sector Amount (LKR)

HOUSING 14,449,890,909.00 Transport 2,707,814,378.73 Galle Agriculture 736,344,273.74 Irrigation 502,200,000.00 Water and Sanitation 309,420,000.00 HOUSING 23,844,802,078.00 Transport 2,606,817,794.01 Matara Irrigation 1,258,400,000.00 Agriculture 699,271,312.50 Water and Sanitation 508,970,000.00

HOUSING 1,176,116,759

Transport 1,094,660,002.15 Hambantota Agriculture 371,874,600.00 Water and Sanitation 295,550,000.00 Education 53,118,000.00 HOUSING 12,485,003,303.00 Transport 841,925,000.00 Ratnapura Water and Sanitation 720,700,000.00 Education 625,572,000.00 Agriculture 421,815,000.00 HOUSING 13,330,950,362.00 Transport 1,037,770,000.00 Kalutara Water and Sanitation 449,050,000.00 Agriculture 444,605,000.00 Education 178,697,000.00

TABLE 6: SECTOR BUDGET (LKR) DISTRICT WISE (INFORMATION AVAILABLE PER DISTRICT)

Sector Galle Matara Hambantota Ratnapura Kalutara Total

Education 164,051,000.00 67,381,000.00 53,118,000.00 625,572,000.00 178,697,000.00 1,088,819,000.00

Health 33,000,000.00 28,930,000.00 62,700,000.00 23,000,000.00 147,630,000.00

Agriculture 736,344,273.74 699,271,312.50 371,874,600.00 421,815,000.00 444,605,000.00 2,673,910,186.24

Irrigation 502,200,000.00 1,258,400,000.00 20,400,000.00 10,000,000.00 117,000,000.00 1,908,000,000.00

Transport 2,707,814,378.73 2,606,817,794.01 1,094,660,002.15 841,925,000.00 1,037,770,000.00 8,288,987,174.89 Water and Sanitation 309,420,000.00 508,840,000.00 295,550,000.00 720,700,000.00 449,050,000.00 2,283,560,000.00

Housing 14,449,890,909 23,844,802,078 1,176,116,759 12,485,003,303 13,330,950,362 65,286,763,411

Total 4,452,829,652.47 5,169,640,106.51 3,011,719,361.15 2,682,712,000.00 2,250,122,000.00 81,677,669,772.13

68 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 10. SECTOR RECOVERY CHAPTERS AND SECTOR RECOVERY MATRICES

10 SECTOR RECOVERY CHAPTERS AND SECTOR RECOVERY MATRICES

SOCIAL SECTOR

• Housing, Land and Resettlements Fund (NITF). Insurance compensation under the National Disaster Insurance was paid out 1 Strategic Vision for Housing to all flood-affected households through the Sector Recovery Divisional Secretaries in 2016. However, there Communities and households are resilient to is no information on how households have hydro-meteorological hazards through im- utilized the funds received and the adequacy proved access to safe and sustainable housing or effectiveness of these funds. Some degree and settlements. of monitoring from Technical Officers took place due to compensation being released in 2 Status of Housing Sector Recovery two tranches. A mechanism shall be developed from 2016 and 2017 to ensure, through the Divisional Secretary or Landslides and Floods the NHDA, that the funds released are used for the construction of houses incorporating Build FLOODS AND LANDSLIDES 2016 Back Better concepts. The floods and landslides of 2016 affected 58,925 houses, of which 6,382 were fully dam- FLOODS AND LANDSLIDES 2017 aged and 25,958 were partially damaged, while The 2017 floods and landslides damaged 26,585 houses suffered minor damages. Over 77,309 housing units in Galle, Matara, Kalu- 60% of the damage was reported from Colom- tara, Ratnapura, and Hambantota Districts, bo and Gampaha Districts affected by urban with 3,008 units fully damaged and 74,301 flooding, and from landslide-affected areas units partially damaged. Life-saving emer- of the Central and Sabaragamuwa Provinces. gency needs of the affected households were The government adopted two approaches to addressed through assistance of LKR 10,000 support housing recovery and reconstruction per household as an advance from NITF from the 2016 floods and landslides. The first compensation, including towards immediate approach was to relocate and reconstruct hous- repairs. A total amount of LKR 5.1 billion was es that are at high-risk from landslides on a pri- allocated towards insurance compensation ority basis. Under this scheme, a total of 1,900 this year for housing and household goods. The housing units are being reconstructed with distribution of the compensation is underway technical support from the National Building and will be paid directly to beneficiaries over Research Organization (NBRO). Over 1,600 the next few months. However, early recovery households from this caseload have opted to needs to include transitional shelter support purchase their own land and construct houses in the form of emergency shelter repairs until through the owner-driven housing approach. such time permanent repairs are completed. Technical Officers from Divisional Secretariats The construction of transitional shelters or are engaged in providing technical support to provision of alternative housing for fully dam- the owners and builders. aged houses was a challenge. Therefore, the government provided three months of rental In addition to relocating households at payment to meet the expenses of temporary high-risk to landslides, the second approach housing needs and it was later extended up to adopted by the government was to provide six months. Some of the needs for the transi- insurance payouts to flood-affected house- tional shelters are being met through CERF holds through the National Insurance Trust funds from UN-Habitat and IOM.

10. Sector Recovery Chapters and Sector Recovery Matrices 71 The Ministry of Disaster Management to incorporate Build Back Better principals. obtained Cabinet Approval to resettle over Beneficiaries and builders also require techni- 20,500 households across ten districts that cal support to incorporate these features into are affected or at high risk of landslides in the reconstruction process. Technical Officers safe locations, including reconstruction from the Divisional Secretariats themselves of housing during the next five years. The have not been exposed to specialized training cost of relocation is LKR 21 billion. This in incorporating disaster risk reduction (DRR) programme is proposed to be implement- into construction and therefore are not ade- ed through an owner-driven approach by quately equipped to impart this knowledge to the respective Divisional Secretariats, with beneficiaries. technical support from NBRO and financial support through the National Disaster Relief ISSUES AND CHALLENGES Service Centre (NDRSC). This includes 2,303 WITH THE HOUSING RECOVERY houses affected or identified as high risk AND RECONSTRUCTION from the 2017 disaster. However, the capac- The purpose of providing compensation is to ities of the Divisional Secretariats who are assist households to rebuild and recover their tasked with implementing the programme is losses through the owner-driven housing re- limited in terms of human resource avail- construction approach. It is of concern that al- ability and technical skills. The National though the release of compensation payments Housing Development Authority (NHDA) from NITF has commenced, the monitoring mandated to develop the housing sector in of the utilization of funds by the households Sri Lanka should be involved in the resettle- and provision of community mobilization ment programme. NHDA shall be involved in and technical support to incorporate disaster assessing the damage to houses and coordi- resilient features into housing reconstruction nate the housing construction programme. seem to be non-existent or inadequate. This NBRO could be given the responsibility of undermines the objective of insurance com- providing landslide risk assessment and pensation, as the purpose of insurance pay- technical know-how to incorporate resilient ment was not adequately communicated to the features into house constructions. beneficiaries who may use the funds for other purposes. ADDITIONAL FINANCE FOR BUILDING BACK BETTER 3 Housing Sector Recovery Considering GoSL’s emphasis on Building Objective and Priorities Back Better, the incorporation of disaster The overall objective is to provide improved resilient construction techniques into housing access to safe, resilient, and sustainable hous- reconstruction, community mobilization as ing and settlements for communities affected well as capacity building of owners, builders, by the 2016 and 2017 hydro-meteorological and officials in incorporating disaster resilient disasters. features to housing is critical. As insurance compensation is calculated at the replacement The priorities are to: cost of damaged houses, it is unlikely that disaster resilient features for Building Back · Empower affected communities through Better can be incorporated into the reconstruc- active participation in decision-making tion process without additional financing. and implementation of the housing Therefore, it is proposed to provide top-up reconstruction process. loans to beneficiaries to meet the expenses

72 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan · Build capacities of the Divisional Sec- 4 Policy Guidelines for Housing retariat and other staff to incorporate Sector Recovery disaster resilient/green construction Thedraft National Housing Policy of January technologies into housing reconstruc- 2017 lists safety and resilience amongst its tion. guiding principles through ‘ensuring safe and resilient human settlements responsive to im- · Build the capacities of local masons in pacts of natural disasters and climate change.’ disaster resilient construction technolo- gies. LINKS TO THE PUBLIC INVESTMENT PROGRAMME (PIP) · Establish a mechanism to provide The Public Investment Programme 2017- socio-technical support (community 2020 aims at ensuring access to affordable, mobilization and technical support) for decent housing facilities for every family housing recovery, from the provincial to in order to improve the quality of life of all the local level. citizens. Key areas proposed to be addressed by the programme include addressing housing · Reconstruct landslide-affected houses requirements of vulnerable communities and with disaster resilient features as a prior- introducing environmentally friendly low-cost ity. technologies. It is planned to upgrade 50,000 improvised and semi-permanent houses · Support households receiving insurance annually under PIP 2017. It is recommended compensation to repair and rebuild hous- that disaster-affected communities be prior- es that are flood safe. itized for assistance in urban and rural areas, while incorporating resilient features into the PRIORITIZATION CRITERIA FOR PROJECTS construction process. The projects under PIP Interventions addressing the following criteria that link directly to the housing sector recovery will be prioritized: plan are as follows:

· Improving the safety of lives and assets of · Construction of houses in landslide-af- affected communities. fected areas in Kegalle: This project/ activity is included under the Disaster · Prevention of further loss of life of com- Management section. A total budget of munities at risk. LKR 2,000 million is allocated for this activity for the period 2017-2018. · Increasing resilience of housing and set- tlements in the face of future hydro-mete- · Establishment of a system for assessing orological hazards. the plans of housing, building construc- tion, and other development projects · Supporting life to return to normal, for incorporation of disaster resilient without recreating the existing risks or features by NBRO prior to granting creating new ones. approval: The total budget for this activity for 2018 and 2019 is LKR 73 million. · Improving the effectiveness of insurance assessments and housing data manage- LINKS TO VISION 2025 ment before and after disasters. Under Section 11 (Agriculture and Sustainable Development) of the Vision 2025 document,

10. Sector Recovery Chapters and Sector Recovery Matrices 73 reference was made to insurance compensa- tionalize the policy was not enacted. Therefore, tion for houses damaged by natural disasters. the current need would be to revise the NIRP to Establishment of a National Disaster Reserve include disaster-induced relocation and estab- Fund for post-disaster reconstruction and re- lish mechanisms to operationalize the same. location of households at high risk of landslide It is also opportune to develop a post-disaster damage is also planned. recovery policy outlining the key agencies tasked with recovery activities and the guiding OTHER POLICIES principles for recovery. The National Involuntary Resettlement Policy of 2001 (NIRP), developed by the Ministry of 5 Sources of Funding/finance for Lands, provides several guidelines applicable Housing Sector Recovery to communities relocated from high-risk areas The total requirement for the recovery of the including the need for community participa- Housing Sector over the next three years is tion in decision-making in the resettlement LKR 83,721.14 million. process, the need to ensure gender equity in assistance, and the need for an integrated KEY SOURCES OF FUNDING approach to resettlement including assistance The main source of funding for recovery activi- to re-establish livelihoods and employment, ties in the housing sector is GoSL. The Cabinet social and cultural networks and grievance approved a total of LKR 21,500 million for a redress mechanisms. period of five years for resettlement of 20,500 houses affected or at high risk of landslides. LINKS TO GLOBAL POLICY FRAMEWORKS These funds will be released through the Min- The Guiding Principles for housing recon- istry of Disaster Management to the respective struction include the Build Back Better princi- authorities including the District Secretaries ple, which aims at ensuring that communities and NBRO. affected by disasters have access to improved and resilient housing and infrastructure as a TheNational Insurance Trust Fund is the result of the reconstruction process. Building other key source of funding for housing recon- Back Better views disasters as an opportunity struction, as compensation based on replace- to reduce vulnerability and improve the resil- ment cost is in the process of being released ience of affected communities as highlighted in directly to flood-affected households. For land- Priority Area 4 of the Sendai Framework for slide-affected households, these funds will not Disaster Risk Reduction. be released, as a housing and land grant was allocated for reconstruction of landslide-af- TheSustainable Development Goals, par- fected houses. ticularly goals 11 and 13 and the New Urban Agenda are other key guiding documents that FUNDING GAPS are applicable to housing reconstruction. A key funding gap remains for socio-techni- cal facilitation oriented to home owners and KEY GAPS IN POLICY local builders engaged in the reconstruction The policies and guiding principles listed of houses to ensure that reconstructed houses above, particularly in the NIRP, addresses have improved resilience to future disasters. many of the issues related to reconstruction Funding for top-up loans to supplement and relocation of disaster-affected and highly insurance payouts in order to incorporate vulnerable communities. However, the NIRP is disaster resilient features in the reconstruction not widely known and the legislation to opera- of affected houses is a key funding require-

74 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan ment, which remains unmet to date. The However, the degree of involvement of the total estimated budget for 2018 and 2019 for Ministry in activities of the housing sector in the provision of top-up loans is LKR 3,862.8 the post-disaster context has not been optimal. million. The funds required for the socio-tech- TheNational Housing Development Au- nical facilitation is LKR 1,133.47 million, which thority (NHDA) under the Ministry has offices is 6% of the total costs for construction of in all Districts and the District Manager is a houses. This is the nationally accepted cost for member of Divisional Housing Committees. socio-technical facilitation. These offices also count with technical capaci- ties in this area and the mechanisms to recruit Funds are also required to establish a housing staff on a contract basis as per the requirement. data management system at the Grama Nilad- Therefore, the NHDA is well placed to imple- hari Division level and streamline the damage ment post-disaster housing reconstruction ac- assessment system for insurance claims. UNDP tivities, while NDRSC implements emergency has planned to partially fund these activities, shelter activities immediately after the disaster. while assistance may be claimed from other bi-lateral or multi-lateral donors to bridge the The NBRO, with its advanced technical capac- funding gap for this activity. ities, but limited ground-level presence is well placed to regulate the housing construction 6 Key Institutional Roles and process, through the development of guide- Implementing Partners lines for post-disaster reconstruction includ- Housing reconstruction for flood-affected ing settlement planning, plot sub-division, households is mainly implemented by using land preparation, and housing reconstruction a ‘Home Owner Driven Approach’, where pertaining to differing disaster contexts, as home-owners make key decisions about well as monitoring of construction quality. construction and implement construction NBRO can also support the implementers in utilizing local construction tradesmen and building capacities to mainstream resilience builders. Insurance compensation payments in housing reconstruction in a cost-effective, are channelled through the District Sec- eco-friendly approach. UN-Habitat and civil retaries directly to beneficiaries, based on society organizations can support NBRO and assessments for compensation conducted by other implementers in this endeavour. NDRSC. Housing data management is proposed to be For landslide-affected households, a cash grant jointly implemented by NDRSC, NHDA, local of LKR 1.2 million for construction of a core authorities, and Divisional Secretariats in house and a land grant of LKR 0.4 million is collaboration with the Department of Census made available. The affected households are and Statistics, Development Officers. Grama also permitted to purchase a house and land Niladharis can update data annually. in a low-risk area for LKR 1.6 million. The NBRO and Technical Officers of the Divisional The Ministry of Disaster Management is pro- Secretariats are closely involved in the recon- posed to raise funds for housing reconstruc- struction process of landslide-affected houses, tion from GoSL and other funding sources. through the provision of technical support and monitoring. 7 Implementation and Coordination Arrangements The mandated ministry for permanent housing The District and Divisional Secretaries are is the Ministry of Housing and Construction. the focal points for housing reconstruction at

10. Sector Recovery Chapters and Sector Recovery Matrices 75 district and divisional levels, who coordinate · Provision of timely on-site advice and all activities including damage assessment guidance during the construction; for insurance compensation, the release of compensation, and overseeing monitoring of · Developing appropriate technical guide- construction. The Grama Niladhari supports lines and options for disaster resistant these officials as the key focal point at GN Divi- construction; and sion level. The NDRSC officials at district and divisional levels are tasked with supporting the · Quality assurance services, leading to District Secretaries and Divisional Secretaries timely completion of disaster-resilient in coordinating relief and recovery activities, houses in the districts. assessments and data management. NBRO provides regulatory, technical facilitation sup- GAPS IN IMPLEMENTATION port and a monitoring role. ARRANGEMENTS Implementation of activities in the sector lacks Coordination at the national level is pro- clarity in terms of institutional structures, as posed through a Steering Committee con- many institutions with varying levels of capac- sisting of the Secretaries of the Ministries ity and technical expertise are involved in the of Housing and Construction and Disaster relief and reconstruction process. There is very Management and heads of the relevant little coordination among stakeholders. The agencies mentioned above, donors to the Ministry of Housing and Construction with programme, and representatives of UN or the mandate for housing construction was not other agencies implementing project activi- actively involved in the housing reconstruction ties, while the District and Divisional Hous - process. Therefore, it is proposed that a joint ing Committees can coordinate activities cabinet paper be submitted by the Ministry between the implementers. of Housing and Disaster Management to implement post-disaster housing reconstruc- Socio-technical facilitation is a key requisite tion outlining the proposed activities and to ensure that the principles of Build Back tasks and roles as indicated above, including Better are incorporated into the housing sector funding requirements for top-up loans and recovery process. Socio-technical facilitation socio-technical facilitation. UN-Habitat and includes, but is not limited to, the following other civil society organizations may support aspects: this initiative through capacity building of all stakeholders. · Ensuring availability of adequate skilled tradesmen (masons, carpenters, etc.) for 8 Monitoring Framework reconstruction; Overall monitoring of the progress of the programme is proposed to be carried out by · Enhancing the awareness of the house the Presidential Task Force, with the monitor- owners and communities on housing ing of activities at district and divisional levels assistance entitlements; being carried out by District and Divisional Secretariats during monthly housing review · Support to households to obtain approv- meetings. Technical monitoring of reconstruc- al from necessary authorities for land tion activities is proposed to be conducted sub-division, low-risk certification, and through NBRO District Offices, supported by building permits; Technical Officers of the respective Divisional Secretariats. Monitoring of activities at com-

76 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan munity level is proposed through Community • Health and Nutrition Monitoring Committees comprising home owners and headed by the Grama Niladhari. 1. Strategic Vision for Health Key indicators of the housing sector recovery Sector Recovery plans include the following: Health systems and services provide continu- ous services during disasters and are resilient · Number of landslide-affected houses to hydro-meteorological hazards through safe relocated at the end of 2019; construction of hospitals, improved services and necessary policy and institutional reforms. · Percentage of insurance compensation payments completed as at the end of 2018; 2. Status of Health Sector Recovery from 2016 and 2017 Landslides and Floods · Percentage of households accessing top- up loans schemes; FLOODS AND LANDSLIDES 2016 In relation to the floods and landslides of 2016, · Percentage of reconstructed households a total of 10 heath institutions in five districts incorporating disaster risk reduction were affected, including seven Maternal and features; Child Health Clinics, one MOH Central Clinic, one Public Health Midwives’ (PHM) quar- · Number of local masons and tradesmen ters and a drug store of the Medical Supplies trained in disaster resilient housing con- division. The Medical Supplies Division’s Sub struction technologies; Stores, which was affected, was a privately owned rented out warehouse in the district of · Number of technical institutions that Colombo. No other institution suffered seri- have adopted a curriculum that integrates ous damage. All the damaged health institu- DRR into housing; tions were repaired and the functions restored. The short-term recovery plan had a budget of · Number of new settlement plans and LKR 191.8 million for the short-term needs of housing development schemes that are repair of hospitals, refurbishing hospitals with informed by climate and disaster risks. equipment and medical supplies. The 2016 recovery plan included a budget for construc- [Table 7] tion of Medical Supplies Stores in Colombo at a cost of LKR 500 million and the relocation of the District Chest Clinic in Kegalle at the cost of LKR 110 million. Both these items were not implemented due to lack of resources. The construction of a new Medical Supplies Store in Colombo and the relocation of the District Chest Clinic may be included in the budget for 2019.

In 2013, Sri Lanka adopted the Safe Hospital Initiative and took steps to address structural safety and non-structural improvements for

10. Sector Recovery Chapters and Sector Recovery Matrices 77

Potential Partner Support UN, NGOs UN-Habitat UNDP, UN-Habitat

NHDA, NBRO, District Secretaries, Divisional NHDA,NBRO,Divisional NITF, District Secretaries, Ministry of Housing, NHDA, District Secretaries, NBRO, Ministry of Housing, NHDA, District Secretaries, Divisional NITF, District Secretaries, Divisional Secretaries Secretaries, Local Government Authorities, Minsistry Secretaries, Local Support Agencies Divisional Secretaries Divisional Secretaries Secretaries of Disaster Management Government Authorities

Ministry of Public MoDM,

NDRSC, Ministry of Disaster Administration NDRSC Lead Agencies NDRSC, Ministry of Disaster Management NDRSC, Ministry of Disaster Management NDRSC, Ministry of Disaster Management Ministry of Housing Ministry of Housing Management Government Lead Government

3,826.80 49,611.26 10.00 20.00 10.00 20.00

1133.4730

Donor Unmet 3.00 2.00

NNDIS Budgetary Support 1,919.94 1,767.80 1,464.00 19,626.87 3,684.03 Government Government

(LKR Total Total 1,919.94 1,767.80 1,464.00 3,684.03 3,826.80 Budget million) 49,611.26 19,626.87 5.00 10.00

1133.47

621.97 621.97

5,480 728.36 1,275.60 ( LKR 8,437.42 9,620.77 49,611.26 18,418.20 Million) budget 12,406.50 2020-2025 2020-2025 Long term 56,820.54 83,721.14 29,084.61 3.00 54,633.53 20.00 20.00 20.00 20.00 ( No 2025 2020- Target Target Annual houses) (LKR 2019 Annual Budget Million) 7,514.80 ( No 2019 Target Annual houses) (LKR 2018 Annual Million) Budgets 8,367.32 (No 2018 Target Annual houses) 2017 ( LKR Annual Budget Million) 5.00 0.00 7.50 2.50 11,018.48 379.7418 400.71 1135 353.02 77309 19333 28701 13148 14992 2283 2739.84 4566 5,479.68 4566 6,574 216.94 9,667 6,574 216.94 318.99 6574 9,667 14,351 318.99 473.57 216.94 9667 14,351 568 473.57 318.99 14351 18.73 38,655 1275.60 473.57 568 38,655 1,275.60 18.73 38655 568 18.73 7,496 247.37 7,496 247.37 7496 247.37 1 0.500 1 0.70 94 47.00 177 123.90 83 99.60 83 100 63 31.50 317 221.67 254 304.40 254 304.40 211 105.50 211 147.70 212 106.00 212 148.40 164 1.59 155 77.50 155 108.50 247 123.50 247 172.90 329 19.38 606 303.00 606 424.20 1181 590.50 1181 826.70 1441 720.50 1441 1008.70 1079 539.50 1079 755.30 1220 610.00 1,220 854.00 4070 2035.00 6690 5824.51 4903 5,883.68 4903 5883.68 9,451 765.61 9,738 180.47 7,586 179.88 6,660 355.72 51,771 3,684.03 15,619 820.13 12,222 895.67 12,565 518.68 39,245 621.97 24,895 1,919.94 48,938 1,767.8 20,626 1,582.57 Target Annual Target2017 Target2017

(No. houses) Districts Other districtsTotal 3,266 67.04 Hambantota Kalutara Galle Matara Ratnapura Hambantota Total Galle Matara Ratnapura Kalutara Galle Matara Ratnapura Kalutara Other districtsTotal 2,483 65.08Hambantota Galle Matara Ratnapura Kalutara Total Galle Matara Ratnapura Kalutara Kegalle Ratnapura Hambantota Other districts Galle Matara Hambantota Total Total Kalutara Hambantota Objective Programme Programme Resettlement of 1,220 flood- and storm-affected households including construction of houses, purchase of land and preparation Socio-technical facilitation for medium-term housing reconstruction Compensation for payment replacement of household goods – Floods and Landslides – 2017 May Long-term reconstruction of resilient housing with Build Back Better features including of upgrading flood-affected and improvised semi-permanent houses and retrofitting permanent houses Resettlement of 15,486 landslide- affected and high-risk households including construction of houses, purchase of land and preparation Top-up Top-up concessionary loans to supplement insurance compensation (50% of the affected caseload is expected to access loans as a top-up for reconstruction) Note: As requested by the NPD, and in accordance with the Government development plans, long-term reconstruction includes the upgrading of sub-standard housing. This strategy is implemented of sub-standard housing. This strategy plans, long-term reconstruction includes the upgrading development and in accordance with the Government Note: As requested by the NPD, and loans. through self-recovery Establishment of GN level Establishment of GN level housing databases Streamlining of housing damage for insurance assessment surveys compensation hazard maps and Climate Change Adaptation of physical and land use plans incorporating Development measures regulatory systems for enforcement of building regulations as per the physical and land use plans Improving 10.00 of Mainstreaming DRR and Climate Change Adaptation measures into the construction industry by training 10.00 and curriculum development tradesmen TOTAL Compensation payment for Compensation payment reconstruction of flood- and landslide-affected houses – May 2016 for Compensation payment replacement of household goods - Floods and Landslides – May 2016 Compensation for payment reconstruction to flood- and landslide- affected houses 2017 – May Priority 2 -- Housing data management Priority 3 – Increasing resilience of settlements to hydro-meteorological disasters and climate change impact Priority 1 -- Rebuilding Homes RECOVERY PLAN MATRIX – HOUSING SECTOR 7: RECOVERY PLAN MATRIX TABLE

78 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan

Potential Partner Support UN, NGOs UN-Habitat UNDP, UN-Habitat

NHDA, NBRO, District Secretaries, Divisional NHDA,NBRO,Divisional NITF, District Secretaries, Ministry of Housing, NHDA, District Secretaries, NBRO, Ministry of Housing, NHDA, District Secretaries, Divisional NITF, District Secretaries, Divisional Secretaries Secretaries, Local Government Authorities, Minsistry Secretaries, Local Support Agencies Divisional Secretaries Divisional Secretaries Secretaries of Disaster Management Government Authorities

Ministry of Public MoDM,

NDRSC, Ministry of Disaster Administration NDRSC Lead Agencies NDRSC, Ministry of Disaster Management NDRSC, Ministry of Disaster Management NDRSC, Ministry of Disaster Management Ministry of Housing Ministry of Housing Management Government Lead Government

3,826.80 49,611.26 10.00 20.00 10.00 20.00

1133.4730

Donor Unmet 3.00 2.00

NNDIS Budgetary Support 1,919.94 1,767.80 1,464.00 19,626.87 3,684.03 Government Government

(LKR Total Total 1,919.94 1,767.80 1,464.00 3,684.03 3,826.80 Budget million) 49,611.26 19,626.87 5.00 10.00

1133.47

621.97 621.97

5,480 728.36 1,275.60 ( LKR 8,437.42 9,620.77 49,611.26 18,418.20 Million) budget 12,406.50 2020-2025 2020-2025 Long term 56,820.54 83,721.14 29,084.61 3.00 54,633.53 20.00 20.00 20.00 20.00 ( No 2025 2020- Target Target Annual houses) (LKR 2019 Annual Budget Million) 7,514.80 ( No 2019 Target Annual houses) (LKR 2018 Annual Million) Budgets 8,367.32 (No 2018 Target Annual houses) 2017 ( LKR Annual Budget Million) 5.00 0.00 7.50 2.50 11,018.48 379.7418 400.71 1135 353.02 77309 19333 28701 13148 14992 2283 2739.84 4566 5,479.68 4566 6,574 216.94 9,667 6,574 216.94 318.99 6574 9,667 14,351 318.99 473.57 216.94 9667 14,351 568 473.57 318.99 14351 18.73 38,655 1275.60 473.57 568 38,655 1,275.60 18.73 38655 568 18.73 7,496 247.37 7,496 247.37 7496 247.37 1 0.500 1 0.70 94 47.00 177 123.90 83 99.60 83 100 63 31.50 317 221.67 254 304.40 254 304.40 211 105.50 211 147.70 212 106.00 212 148.40 164 1.59 155 77.50 155 108.50 247 123.50 247 172.90 329 19.38 606 303.00 606 424.20 1181 590.50 1181 826.70 1441 720.50 1441 1008.70 1079 539.50 1079 755.30 1220 610.00 1,220 854.00 4070 2035.00 6690 5824.51 4903 5,883.68 4903 5883.68 9,451 765.61 9,738 180.47 7,586 179.88 6,660 355.72 51,771 3,684.03 15,619 820.13 12,222 895.67 12,565 518.68 39,245 621.97 24,895 1,919.94 48,938 1,767.8 20,626 1,582.57 Target Annual Target2017 Target2017

(No. houses) Districts Other districtsTotal 3,266 67.04 Kalutara Galle Matara Hambantota Ratnapura Hambantota Total Galle Matara Ratnapura Hambantota Kalutara Galle Matara Ratnapura Kalutara Other districtsTotal 2,483 65.08Hambantota Galle Matara Ratnapura Kalutara Total Galle Matara Ratnapura Kalutara Kegalle Ratnapura Other districts Galle Matara Hambantota Total Total Kalutara Hambantota Objective Programme Programme storm-affected households including construction of houses, purchase of land and preparation Resettlement of 1,220 flood- and Socio-technical facilitation for medium-term housing reconstruction high-risk households including construction of houses, purchase of land and preparation payment for payment replacement of household goods – Floods and Landslides – 2017 May Long-term reconstruction of resilient housing with Build Back Better features including of upgrading flood-affected and improvised semi-permanent houses and retrofitting permanent houses Compensation Resettlement of 15,486 landslide- affected and Top-up Top-up concessionary loans to supplement insurance compensation (50% of the affected caseload is expected to access loans as a top-up for reconstruction) Note: As requested by the NPD, and in accordance with the Government development plans, long-term reconstruction includes the upgrading of sub-standard housing. This strategy is implemented of sub-standard housing. This strategy plans, long-term reconstruction includes the upgrading development and in accordance with the Government Note: As requested by the NPD, and loans. through self-recovery Establishment of GN level Establishment of GN level housing databases Streamlining of housing damage for insurance assessment surveys compensation hazard maps and Climate Change Adaptation of physical and land use plans incorporating Development measures regulatory systems for enforcement of building regulations as per the physical and land use plans Improving 10.00 of Mainstreaming DRR and Climate Change Adaptation measures into the construction industry by training 10.00 and curriculum development tradesmen TOTAL Compensation for payment reconstruction to flood- and landslide- affected houses 2017 – May Compensation payment for Compensation payment reconstruction of flood- and landslide-affected houses – May 2016 for Compensation payment replacement of household goods - Floods and Landslides – May 2016 Priority 2 -- Housing data management Priority 3 – Increasing resilience of settlements to hydro-meteorological disasters and climate change impact Priority 1 -- Rebuilding Homes RECOVERY PLAN MATRIX – HOUSING SECTOR 7: RECOVERY PLAN MATRIX TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 79

Potential Partner Support UN, NGOs Potential Partner Support UN-Habitat UNDP, UN-Habitat UN, NGOs UN-Habitat UNDP, UN-Habitat

NHDA, NBRO, District Secretaries, Divisional NHDA,NBRO,Divisional NHDA, NBRO, District Secretaries, Divisional NHDA,NBRO,Divisional NITF, District Secretaries, Ministry of Housing, NHDA, District Secretaries, NBRO, Ministry of Housing, NHDA, District Secretaries, Divisional NITF, District Secretaries, Ministry of Housing, NHDA, District Secretaries, NBRO, Ministry of Housing, NHDA, District Secretaries, Divisional NITF, District Secretaries, Divisional Secretaries Secretaries, Local Government Authorities,NITF, Minsistry District Secretaries, Divisional Secretaries Secretaries, Local Secretaries, Local Government Authorities, Minsistry Secretaries, Local Support Agencies Divisional Secretaries Divisional Secretaries Secretaries Support Agencies Divisional Secretaries Divisional Secretaries Secretaries of Disaster Management Government Authorities of Disaster Management Government Authorities

Ministry of Public MoDM, Ministry of Public MoDM,

NDRSC, Ministry of Disaster NDRSC, Ministry of Disaster Administration NDRSC Administration NDRSC Lead Agencies NDRSC, Ministry of Disaster Management NDRSC, Ministry of Disaster Management NDRSC, Ministry of Disaster Management Lead Agencies Ministry of Housing NDRSC, Ministry of Disaster Management Ministry ofNDRSC, Housing Ministry of Disaster Management NDRSC, Ministry of Disaster Management Ministry of Housing Ministry of Housing Management Management Government Lead Government Government Lead Government

3,826.80 3,826.80 49,611.26 49,611.26 10.00 20.00 10.00 20.00 10.00 20.00 10.00 20.00

1133.4730

1133.4730

Donor Unmet Donor Unmet 3.00 2.00

3.00 2.00

NNDIS Budgetary Support NNDIS Budgetary Support 1,919.94 1,767.80 1,919.94 1,464.00 19,626.87 1,767.80 3,684.03 1,464.00 19,626.87 3,684.03 Government Government Government Government

(LKR Total Total 1,919.94 (LKR Total Total 1,767.80 1,464.00 1,919.94 3,684.03 3,826.80 Budget 1,767.80 1,464.00 million) 49,611.26 3,684.03 3,826.80 Budget 19,626.87 million) 49,611.26 5.00 10.00 19,626.87 5.00 10.00

1133.47

621.97 621.97

1133.47

621.97 621.97

5,480 5,480 728.36 728.36 1,275.60 ( LKR 8,437.42 9,620.77 1,275.60 ( LKR 49,611.26 8,437.42 18,418.20 9,620.77 Million) budget 12,406.50 49,611.26 18,418.20 Million) budget 12,406.50 2020-2025 2020-2025 Long term 20.00 20.00 20.00 20.0056,820.54 83,721.14 29,084.61 3.00 54,633.53 2020-2025 2020-2025 Long term 56,820.54 83,721.14 29,084.61 3.00 54,633.53 20.00 20.00 20.00 20.00 ( No 2025 ( No 2020- Target Target 2025 Annual 2020- houses) Target Target Annual houses) (LKR 2019 (LKR 2019 Annual Budget Million) 7,514.80 Annual Budget Million) 7,514.80 ( No 2019 ( No Target 2019 Annual houses) Target Annual houses) (LKR 2018 (LKR 2018 Annual Million) Budgets 8,367.32 Annual Million) Budgets 8,367.32 (No 2018 (No Target Annual 2018 houses) Target Annual houses) 14,351 473.57 14,351 473.57 14351 473.57 2017 ( LKR 2035.00 6690 5824.51 4903 5,883.68 4903 5883.68 Annual Budget 2017 ( LKR Million) 5.00 0.00 7.50 2.50 11,018.48 Annual Budget Million) 5.00 0.00 7.50 2.50 11,018.48 19333 28701 13148 379.7418 400.71 353.02 1135 77309 6,574 216.94 9,667 6,574 216.94 318.99 6574 9,667 14,351 318.99 473.57 216.94 9667 14,351 568 473.57 318.99 14351 18.73 38,655 1275.60 473.57 568 38,655 1,275.60 18.73 38655 568 18.73 14992 2283 2739.84 4566 5,479.68 4566 7,496 247.37 7,496 247.37 7496 247.37 1 0.500 1 0.70 379.7418 400.71 1135 353.02 77309 19333 28701 13148 14992 568 18.73 38,655 1275.60 568 38,655 1,275.60 18.73 38655 568 18.73 6,574 216.94 9,667 6,574 216.94 318.99 6574 9,667 318.99 216.94 9667 318.99 2283 2739.84 4566 5,479.68 4566 7,496 247.37 7,496 247.37 7496 247.37 1 0.500 1 0.70 94 47.00 177 123.90 83 99.60 83 100 63 31.50 317 221.67 254 304.40 254 304.40 211 105.50 211 147.70 212 106.00 212 148.40 164 1.59 155 77.50 155 108.50 247 123.50 247 172.90 329 19.38 606 303.00 606 424.20 94 47.00 177 123.90 83 99.60 83 100 63 31.50 317 221.67 254 304.40 254 304.40 1181 590.50 1181 826.70 1441 720.50 1441 1008.70 211 105.50 211 147.70 1079 539.50 1079 755.30 1220 610.00 1,220 854.00 212 106.00 212 148.40 164 1.59 155 77.50 155 108.50 247 123.50 247 172.90 4070 329 19.38 9,451 765.61 606 303.00 606 424.20 1181 590.50 1181 826.70 9,738 180.47 7,586 179.88 1441 720.50 1441 1008.70 6,660 355.72 51,771 3,684.03 1079 539.50 1079 755.30 1220 610.00 1,220 854.00 15,619 820.13 12,222 895.67 4070 2035.00 6690 5824.51 4903 5,883.68 4903 5883.68 12,565 518.68 9,451 765.61 39,245 621.97 24,895 1,919.94 48,938 1,767.8 20,626 1,582.57 9,738 180.47 7,586 179.88 6,660 355.72 51,771 3,684.03 15,619 820.13 12,222 895.67 12,565 518.68 39,245 621.97 24,895 1,919.94 48,938 1,767.8 20,626 1,582.57 Target Annual Target Annual Target2017 Target2017

(No. houses) Target2017 Target2017

(No. houses) Districts Districts otal Galle Matara Galle Matara Ratnapura Kalutara Other districtsTotal 3,266 67.04Hambantota Ratnapura Total Hambantota Matara Ratnapura Kalutara Other districtsTotal 2,483 65.08Hambantota Galle Matara Hambantota Total Galle Galle Galle Ratnapura Kalutara Matara Ratnapura Kalutara Total Hambantota Matara Ratnapura Kalutara Kegalle Other districts T Kalutara Hambantota Hambantota Total Galle Matara Ratnapura Other districtsTotal 3,266 67.04 Hambantota Kalutara Galle Matara Ratnapura Kalutara Hambantota Total Galle Galle Galle Ratnapura Galle Matara Matara Ratnapura Kalutara Other districtsTotal 2,483 65.08 Matara Ratnapura Kalutara Total Matara Ratnapura Kalutara Kegalle Hambantota Hambantota Other districts Total Kalutara Hambantota Objective Programme Programme Objective Programme Programme Resettlement of 1,220 flood- and storm-affected households including construction of houses, purchase of land and preparation Socio-technical facilitation for medium-term housing reconstruction Compensation for payment replacement of household goods – Floods and Landslides – 2017 May Resettlement of 15,486 landslide- affected and high-risk households including construction of houses, purchase of land and preparation Long-term reconstruction of resilient housing with Build Back Better features including of upgrading flood-affected and improvised semi-permanent houses and retrofitting permanent houses loans to supplement insurance compensation (50% of the affected caseload is expected to access loans as a top-up for reconstruction) Top-up Top-up concessionary Note: As requested by the NPD, and in accordance with the Government development plans, long-term reconstruction includes the upgrading of sub-standard housing. This strategy is implemented of sub-standard housing. This strategy plans, long-term reconstruction includes the upgrading development and in accordance with the Government Note: As requested by the NPD, and loans. through self-recovery Establishment of GN level Establishment of GN level housing databases Streamlining of housing damage for insurance assessment surveys compensation hazard maps and Climate Change Adaptation of physical and land use plans incorporating Development measures regulatory systems for enforcement of building regulations as per the physical and land use plans Improving 10.00 of Mainstreaming DRR and Climate Change Adaptation measures into the construction industry by training 10.00 and curriculum development tradesmen TOTAL Compensation for payment reconstruction to flood- and landslide- affected houses 2017 – May Compensation payment for Compensation payment reconstruction of flood- and landslide-affected houses – May 2016 for Compensation payment replacement of household goods - Floods and Landslides – May 2016 Priority 2 -- Housing data management Priority 3 – Increasing resilience of settlements to hydro-meteorological disasters and climate change impact Priority 1 -- Rebuilding Homes RECOVERY PLAN MATRIX – HOUSING SECTOR 7: RECOVERY PLAN MATRIX TABLE Socio-technical facilitation for medium-term housing reconstruction Resettlement of 1,220 flood- and storm-affected households including construction of houses, purchase of land and preparation Long-term reconstruction of resilient housing with Build Back Better features including of upgrading flood-affected and improvised semi-permanent houses and retrofitting permanent houses Compensation for payment replacement of household goods – Floods and Landslides – 2017 May Resettlement of 15,486 landslide- affected and high-risk households including construction of houses, purchase of land and preparation Top-up Top-up concessionary loans to supplement insurance compensation (50% of the affected caseload is expected to access loans as a top-up for reconstruction) Note: As requested by the NPD, and in accordance with the Government development plans, long-term reconstruction includes the upgrading of sub-standard housing. This strategy is implemented of sub-standard housing. This strategy plans, long-term reconstruction includes the upgrading development and in accordance with the Government Note: As requested by the NPD, and loans. through self-recovery Establishment of GN level Establishment of GN level housing databases Streamlining of housing damage for insurance assessment surveys compensation hazard maps and Climate Change Adaptation of physical and land use plans incorporating Development measures regulatory systems for enforcement of building regulations as per the physical and land use plans Improving 10.00 of Mainstreaming DRR and Climate Change Adaptation measures into the construction industry by training 10.00 and curriculum development tradesmen TOTAL Compensation payment for Compensation payment reconstruction of flood- and landslide-affected houses – May 2016 for Compensation payment replacement of household goods - Floods and Landslides – May 2016 Compensation for payment reconstruction to flood- and landslide- affected houses 2017 – May Priority 2 -- Housing data management Priority 3 – Increasing resilience of settlements to hydro-meteorological disasters and climate change impact Priority 1 -- Rebuilding Homes RECOVERY PLAN MATRIX – HOUSING SECTOR 7: RECOVERY PLAN MATRIX TABLE

80 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan

Potential Partner Support UN, NGOs UN-Habitat UNDP, UN-Habitat

NHDA, NBRO, District Secretaries, Divisional NHDA,NBRO,Divisional NITF, District Secretaries, Ministry of Housing, NHDA, District Secretaries, NBRO, Ministry of Housing, NHDA, District Secretaries, Divisional NITF, District Secretaries, Divisional Secretaries Secretaries, Local Government Authorities, Minsistry Secretaries, Local Support Agencies Divisional Secretaries Divisional Secretaries Secretaries of Disaster Management Government Authorities

Ministry of Public MoDM,

NDRSC, Ministry of Disaster Administration NDRSC Lead Agencies NDRSC, Ministry of Disaster Management NDRSC, Ministry of Disaster Management NDRSC, Ministry of Disaster Management Ministry of Housing Ministry of Housing Management Government Lead Government

3,826.80 49,611.26 10.00 20.00 10.00 20.00

1133.4730

Donor Unmet

3.00 2.00

NNDIS Budgetary Support 1,919.94 1,767.80 1,464.00 19,626.87 3,684.03 Government Government

(LKR Total Total 1,919.94 1,767.80 1,464.00 3,684.03 3,826.80 Budget million) 49,611.26 19,626.87 10.00 5.00

1133.47

621.97 621.97

5,480 728.36 1,275.60 ( LKR 8,437.42 9,620.77 49,611.26 18,418.20 Million) budget 12,406.50 2020-2025 2020-2025 Long term 20.00 20.00 56,820.54 83,721.14 29,084.61 3.00 54,633.53 20.00 20.00 ( No 2025 2020- Target Target Annual houses) (LKR 2019 Annual Budget Million) 7,514.80 ( No 2019 Target Annual houses) (LKR 2018 Annual Million) Budgets 8,367.32 (No 2018 Target Annual houses) 2017 ( LKR 2035.00 6690 5824.51 4903 5,883.68 4903 5883.68 Annual Budget Million) 7.50 2.50 5.00 0.00 11,018.48 19333 28701 13148 379.7418 400.71 353.02 1135 77309 14992 6,574 216.94 9,667 6,574 216.94 318.99 6574 9,667 14,351 318.99 473.57 216.94 9667 14,351 568 473.57 318.99 14351 18.73 38,655 1275.60 473.57 568 38,655 1,275.60 18.73 38655 568 18.73 2283 2739.84 4566 5,479.68 4566 7,496 247.37 7,496 247.37 7496 247.37 1 0.500 1 0.70 94 47.00 177 123.90 83 99.60 83 100 63 31.50 317 221.67 254 304.40 254 304.40 211 105.50 211 147.70 212 106.00 212 148.40 164 1.59 155 77.50 155 108.50 247 123.50 247 172.90 329 19.38 606 303.00 606 424.20 1181 590.50 1181 826.70 1441 720.50 1441 1008.70 1079 539.50 1079 755.30 1220 610.00 1,220 854.00 4070 9,451 765.61 9,738 180.47 7,586 179.88 6,660 355.72 51,771 3,684.03 15,619 820.13 12,222 895.67 12,565 518.68 39,245 621.97 24,895 1,919.94 48,938 1,767.8 20,626 1,582.57 Target Annual Target2017 Target2017

(No. houses) Districts otal Galle Matara Ratnapura Galle Matara Ratnapura Kalutara Other districtsTotal 3,266 67.04Hambantota Total Hambantota Kalutara Matara Ratnapura Kalutara Other districtsTotal 2,483 65.08Hambantota Galle Matara Hambantota Total Galle Galle Galle Ratnapura Matara Ratnapura Kalutara Total Hambantota Matara Ratnapura Kalutara Kegalle Other districts T Kalutara Hambantota

Objective Programme Programme Resettlement of 1,220 flood- and storm-affected households including construction of houses, purchase of land and preparation reconstruction Socio-technical facilitation for medium-term housing Long-term reconstruction of resilient housing with Build Back Better features including of upgrading flood-affected and improvised semi-permanent houses and retrofitting permanent houses Compensation for payment replacement of household goods – Floods and Landslides – 2017 May Resettlement of 15,486 landslide- affected and high-risk households including construction of houses, purchase of land and preparation Top-up Top-up concessionary loans to supplement insurance compensation (50% of the affected caseload is expected to access loans as a top-up for reconstruction) Note: As requested by the NPD, and in accordance with the Government development plans, long-term reconstruction includes the upgrading of sub-standard housing. This strategy is implemented of sub-standard housing. This strategy plans, long-term reconstruction includes the upgrading development and in accordance with the Government Note: As requested by the NPD, and loans. through self-recovery Establishment of GN level Establishment of GN level housing databases Streamlining of housing damage for insurance assessment surveys compensation hazard maps and Climate Change Adaptation of physical and land use plans incorporating Development measures regulatory systems for enforcement of building regulations as per the physical and land use plans Improving 10.00 of Mainstreaming DRR and Climate Change Adaptation measures into the construction industry by training 10.00 and curriculum development tradesmen TOTAL Compensation for payment reconstruction to flood- and landslide- affected houses 2017 – May Compensation payment for Compensation payment reconstruction of flood- and landslide-affected houses – May 2016 for Compensation payment replacement of household goods - Floods and Landslides – May 2016 Priority 2 -- Housing data management Priority 3 – Increasing resilience of settlements to hydro-meteorological disasters and climate change impact Priority 1 -- Rebuilding Homes RECOVERY PLAN MATRIX – HOUSING SECTOR 7: RECOVERY PLAN MATRIX TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 81 the safety of healthcare institutions. During re- The objectives of Health sector recovery are construction of the hospitals, the safe hospital to: initiative was taken into consideration. · Ensure the reconstruction/repair/main- Three Emergency Operation Centres (EOC) tenance of all health institutions. are established to monitor disasters and to be prepared for health incidents. Preparedness · Restore health services in all institutions planning has resulted in health systems being to their full capacities. operational during disasters, particularly in high-risk areas. · Prepare health care institutions for future disasters by establishing emergency FLOODS AND LANDSLIDES 2017 operation centres, training of staff and In the May 2017 floods and landslides, four relocation of health care facilities in high- districts suffered damages. A total of 90 health- risk areas. care institutions were partially or fully dam- aged. Several hospitals were inundated and patients had to be evacuated. 4. Prioritization Criteria for Projects The projects selected for recovery will be prior- The Ratnapura district suffered the highest itized based on the following criteria: damage. Repair and reconstruction of hos- pitals has just begun. Funds of LKR 109.38 · Hospitals and institutions that serve a million were allocated from the current year’s large population and provide critical care. budget to start recovery. The majority of the work is oriented to repairs, refurbishing of · Healthcare institutions that are at risk of hospitals, replacement of equipment, and being inundated or being swept away in the stabilization of land around the hospitals another flood or landslide. that were damaged due to landslides. Work commenced in all the four districts under the · Interventions that will help prepare for overall supervision of the Disaster Prepared- and prevent losses in the next monsoon ness and Response Division (DPRD), which season and all natural hazards. is the focal point for all health emergency/ disaster coordination work in the ministry. The · Health interventions that have significant Ministry of Health has planned the implemen- social impact and cater to health needs of tation of EOCs, relocation of health institutes the most vulnerable populations. located in landslide-prone areas, and purchase of power backup (generators) and ambulances for some high-risk areas. 5. Policy Guidelines for Health Sector Recovery THE HEALTH MASTER PLAN 3. Health Sector Recovery One of the objectives of the Health Mas- Objective and Priorities ter Plan for 2016 – 2025 with regard to the The overall objective is to enable a resilient Health Sector Disaster Preparedness and recovery of all health care institutions (build- Response Programme, is to improve struc- ings and services) and provide improved and tural, non-structural and functional capacity sustainable health care to communities and be of health facilities through the ‘Safe Hospital better prepared for future disasters. Initiative’. This policy aims to keep hospi-

82 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan tals and other health facilities operational in Sri Lanka. Within this pillar, the improvement the aftermath of emergencies and disasters. of healthcare for better labour market and Disruption of health services due to damage education outcomes is considered vital. More- to hospitals and the lack of adequate pre- over, in the pillar related to environmental and paredness to respond effectively are two major sustainable development, the improvement factors that can hinder people from receiving of disaster management is proposed. This facility-based life-saving medical care and includes the resettlement of high-risk commu- other essential health services. In that sense, nities living in landslide-prone areas, which making hospitals and health facilities safe from might consider not only housing relocation but disasters is an economic requirement, and also also all services and livelihoods. a social, moral and ethical necessity. OTHER POLICIES LINKS TO THE PUBLIC INVESTMENT The National Policy on Disaster Management PROGRAMME (PIP) identified the need for disaster-affected houses The Public Investment Programme 2017- and settlements to be rebuilt with disaster-re- 2020, aims to ‘improve the National Health silient features as a priority. The healthcare Service targeting a healthy nation with nec- facilities affected by the disasters might be essary institutional and policy reforms and considered within the purview of this policy increased investment in health.’ The strategies statement. It also emphasizes the govern- in the PIP that elaborate on the above and link ment’s role in initiating mechanisms to enable to health systems functions in emergencies and the general public to have emergency services people at risk are as follows: available on a 24/7 basis through EOCs and other mechanisms. · Increase budgetary services provisions to develop rural/primary healthcare insti- tutions. 6. Sources of Funding/Finance for Health Sector Recovery · Prepare and implement programmes to The total requirement for the recovery of the address health needs of estate communi- Health Sector over the next three years is LKR ties. 767.63 million.

· Introduce a National Health Insurance KEY SOURCES OF FUNDING Plan to address issues, including Out-of- The main source of funding for recovery activ- Pocket Expenditure (OOPE) ities in the health sector is GoSL. In addition, the World Health Organization is providing · Implement the National Policy on technical assistance as well as financial assis- Healthcare Quality and Patient Safety. tance. Other UN agencies and NGOs provide technical assistance. · Enhance patient safety and quality of healthcare services. After several discussions with Regional Direc- tors of flood-affected areas, the Ministry of LINKS TO VISION 2025 Health decided to prioritize needs and allocate One of the main pillars of the Vision 2015 is funds from the GoSL budget. The immediate/ related to the provision and improvement of short-term recovery and reconstruction activ- social goods – including healthcare – as part of ities consist of repairing extremely important the development agenda of the Government of and critical components or purchase equip-

10. Sector Recovery Chapters and Sector Recovery Matrices 83 ment to enable the functioning of the health 7. Key Institutional Roles and institutions, e.g. repairing damaged roofs, re- Implementing Partners pairing cracked walls, repainting institutions, Role of MoH – The Ministry of Health, repairing drainage systems around hospitals representing the government health sector, is and healthcare centres, establishing power and one of the technical partners in the Disaster water supply, and clearing of access roads. The Management Coordination Framework of short-term repair and restoration of services Sri Lanka. The Ministry of Health, keeping will also include construction of retention in line with the developments in the National walls, and replacing equipment damaged in the Disaster Management Framework, has its own floods. coordination mechanism which is operat- ed through the Disaster Management and This short-term repair work and purchase of Response Division (DPRD) of the Ministry of equipment is handled by the relevant regional Health. In addition, implementation of the directors under the supervision of Divisional recovery phase of the Health sector is support- Secretariats and the Disaster Preparedness and ed through the technical and financial assis- Response Division (DPRD) of the Ministry of tance of the MoH. The Ministry of Health will Health. The procurement path was changed implement all the recovery-related activities from a rooting system to fast track. Time allo- through the line ministry and the provincial cation to complete phase 1 is eight weeks. The and regional directorates of health services Ministry of Finance is giving LKR 147.63 mil- that are administratively responsible for the lion from the existing 2017 allocated budget to delivery of health-related services. the emergency fund for the implementation of activities listed in Phase 1. Role of DPRD – The DPRD is the focal unit for all health emergency/disaster coordination Phase 2 allocations consist of purchasing am- work. Headed by the National Coordinator, bulances, double cabs and relocation of three it operates through a network of focal points health institutes. This will be funded from the appointed in line ministry hospitals, provincial 2018 budget. However, the numbers of ambu- and regional directorates, and line ministry lances and double cabs are to be calculated and programmes. Hence the DPRD will be the re-confirmed by Regional Directors of Health main focal unit during the entire recovery Services. process. The DPRD will monitor the reloca- tion, construction, repair, refurbishment and Phase 3 is long-term recovery needs, which in- equipment of all health institutions. clude plans to establish Emergency Operation Centres for health in three districts. (Ratna- Role of NBRO – The NBRO is the national pura, Kalutara and Badulla). This is planned to focal point for landslide risk management be implemented in 2019 from the budgetary in Sri Lanka. It is involved in work related allocation of 2019. to landslide risk management, research and development, and provision of technical Funding Gaps: The Safe Hospital Initiative is consultancy and testing services. During the funded by the GoSL. The funds for the recovery recovery process the NBRO provided standard plan are covered by the budgetary allocation of reports on damage assessment of the affected the GoSL. health institutions. The NBRO will conduct the resettlement of communities at high risk of landslides. In this regard, this institution will provide technical support to the reloca-

84 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan tion of the health institutions located in these Center (ADPC) will continue providing their areas. technical assistance in training and capacity building at national, provincial and district lev- Role of District-level MoH officials – The dis- els. Training and capacity building with regard trict-level administrative officer of the health to the Safe Hospital Initiative is supported sector is the Regional Director of Health by WHO. UNICEF takes the leading role in Services (RDHS). The RDHSs of the affected training and capacity building in water and districts gave the reports with regard to the sanitation while the ADPC supports the capac- damages and losses following the floods and ity building in HOPE (Hospital Preparedness landslides. Furthermore, risk assessments in Emergencies) at the provincial and district and recovery needs of the respective institu- levels. tions (both preventive and curative) which are under the purview of the RDHS were provided through the RDHSs. Implementation proce- 9. Monitoring Framework dures of the recovery plan will be carried out by Overall monitoring of the progress of the the RDHSs with the guidance and assistance programme is proposed to be carried out provided by the Ministry of Health through by the Disaster Preparedness and Response the DPRD and the respective Provincial Direc- Division (DPRD) as the focal unit for all health tors of Health. emergency/disaster coordination work. The DPRD, headed by the National Coordinator, operates through a network of Focal Points 8. Implementation and appointed in line ministry Hospitals, provin- Coordination Arrangements cial and regional directorates and line ministry Sub-contracting the reconstruction of new programmes. The DPRD will conduct on-site hospitals – The reconstruction of hospitals will visits to ensure that construction standards are be done under the leadership of the Deputy Di- compliant with NBRO guidelines for build- rector General – Logistics, of the Ministry of ing in landslide-risk areas and confirms to Health. Implementation will be done through the guidelines for safe hospitals. The district the respective Provincial Directors of Health hospitals will be requested to provide monthly Services and Regional Directors of Health progress reports on the work being undertaken Services. Constructions will be done by the for repairs and relocation. locally identified organizations at the RDHS level. In all cases, the Safe Hospital Guidelines Key indicators of the health sector recovery will be used to ensure that Building Back Better plans include the following: infrastructure and functional criteria are being implemented. All these procedures will be · Number of hospitals repaired and func- done in accordance with the e-code and the tional to their full capacities; financial regulations of the country. · Number of hospitals reconstructed incor- Repair of hospitals – Repair of hospitals will be porating disaster resilient features and done following the same procedure as men- adhering to safe hospital guidelines; tioned above. · Readiness of hospitals and health in- Role of partners in training and capacity stitutions with equipment and supplies building – World Health Organization (WHO), for responding to health emergencies, UNICEF, and the Asian Disaster Preparedness including disasters.

10. Sector Recovery Chapters and Sector Recovery Matrices 85 TABLE 8: RECOVERY PLAN MATRIX – HEALTH SECTOR

Annual Annual Annual Budget Annual Annual Target Budget Annual Target Budget Total Budget (LKR Mn) (LKR Mn) Target (LKR Mn) (LKR Mn) Programme Unmet Lead Government

2017 2017 2018 2018 2019 2019 (Financing Government (LKR Mn) Gap)(Rs. Mn)

Renovation/ repair of damages

Kalawana MOH; DH type C - Wevila, Mitipola, Paligala, 2.70 Mahiyangoda, Hindurangala ealth H Ratnapura District – Ratnapura District – 10.00 Essential repairs (PMCU Pulungupitiya)

Ratnapura District –

10.00 Ministry of (PMCU Ganegoda)

Ratnapura District – 10.00 (PMCU Mihindugama)

Ratnapura District 32.70 32.70 32.70

Galle District –Repairs DH – Nagoda 2.00 and painting

MCH clinic – Udumalagala, Kahaduwa, Welivitiya North, Wadu Welivitiya 8.00 (South), Gonalagoda, Yatalamaththa (East), Udugama (North),

Paranathanayamgoda ealth H Painting of walls, PMCU – Kahaduwa 1.50 provision of equipment and PHI office – furniture – Galle Ethkandura, 2.00 District Mapalagama Ministry of MCH Clinic and PHM quarters – Akuretiya, Mapalagama, 6.50 Udalamaththa, Unanwitiya PHM office – 1.00 Thalgaswala

Galle District 21.00 21.00 21.00

DH – Morawaka, Akuressa, 10.50 Ruhunugama, Matara District – Pallegama Repair of damages PMCU – Maramba, Beralapanathara, 4.25 Dehigaspe, Denipitiya, Hakmana Inundated by floods – MOH office Hakmana 2.00 Matara District

Matara District 16.75 16.75 16.75

MCH Clinic – Palanda, Repair of damages – Illuppotha, Morapitiya, 12.50 Kalutara District Diyakaduwa, Molkawa

Colour washing, electricity, retainig MCH – Kapugedara 2.00 wall – Kalutara District

Repairs and 20x20 MCH Clinic – new building – 4.00 Veyangalla Kalutara District

86 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Annual Annual Annual Budget Annual Annual Target Budget Annual Target Budget Total Budget (LKR Mn) (LKR Mn) Target (LKR Mn) (LKR Mn) Programme Unmet Lead Government

2017 2017 2018 2018 2019 2019 (Financing Government (LKR Mn) Gap)(Rs. Mn)

Renovation/ repair of damages

Kalutara District 18.50 18.50 18.50

Reconstruction of Buildings

Matara District – Construction of well, BH – Kamburupitiya 0.15 alternative access road MCH clinic and PHM 2.50 Matara District – office – Thanipita ealth

Reconstruction of H MCH Clinic – roof 0.15 PahalaMaliduwa

Matara District 2.80 2.80 2.80 Ministry of Kalutara District – New building MCH Clinic – Paragoda 3.50 construction

Kalutara District 3.50 3.50 3.50

Equipment & Furniture

MCH Clinic – Happitiya 5.00 Galle District - Repair/ purchasing of DH type B – Hiniduma 6.00 damaged equipment and furniture PHM office H– iniduma 1.00

Galle District 12.00 12.00 12.00

MCH clinic – ealth Matara District - 0.08 Repair/ purchasing of Katuwangoda H damaged equipment PMCU – Makandura 0.10 and furniture (water motor)

Matara District 0.18 0.18 0.18 Ministryof

Kalutara District – Purchasing of MCH Clinic – 1.00 equipment and Madurawala furniture Kalutara District 1.00 1.00 1.00 Mitigation

Ratnapura District – DH – Ayagama; DH 30.00 Landslide prevention Rassagala

Ratnapura District 30.00 30.00 30.00 ealth BH – Deniyaya 4.00 H Matara District – PMCU – Derangala, Earthslip prevention/ 3.20 Kotapola mitigation

MCH clinic – Denagama 2.00 Ministry of Matara District 9.20 9.20 9.20 falta texto Relocation of 3 hospitals hospitals and 560.00 560.00 560.00 targeted purchasing of cabs ealth H Implementation of emergency operation 3 EOC 6.00 6.00 6.00 centres

Total 147.63 560.00 6.00 713.63 713.63 Ministry of

10. Sector Recovery Chapters and Sector Recovery Matrices 87 · Percentage of hospitals who have con- • Education ducted simulation based on a disaster scenario; 1. Strategic Vision of Education · Percentage of households covered under Sector Recovery health insurance schemes. Resilient education systems improve the learn- ing environment and sector performance, and [Table 8] pp. 86 - 87 ensure the safety of students, buildings and assets.

2. Status of Education Sector Recovery from 2016 and 2017 Landslides and Floods FLOODS AND LANDSLIDE 2016 During the May 2016 floods and landslides, 140 pre-schools were affected. Out of these, 73 pre-schools were damaged in Colombo, Gampaha, Kegalle, Ratnapura, Kurunega- la and Mullaitivu districts, affecting 3,500 students. The damage to preschool buildings, furniture, learning materials, stationery, and utensils was estimated at LKR 18.4 million. A total of 173 schools in six districts were also damaged out of a total of 2,850 schools in the Western, North Western and Sabaragamuwa Provinces. Out of the total damaged schools 63, 38 and 32 schools are located in Colombo, Gampaha and Kegalle districts respectively. The net value of the total damages and losses to the education sector is estimated at LKR 623.69 million at pre-disaster prices. Of this, the damage to infrastructure and physical assets is estimated at LKR 507.08 million.

Prior to the disaster, the NBRO had declared that many schools in the Sabaragamuwa Province (Ratnapura and Kegalle districts) are located in high-risk landslide areas and in need of urgent relocation. In addition to damaged schools, the NBRO recommended the relo- cation of five schools in the Sabaragamuwa Province. The Ministry of Education (MoE) provided immediate assistance to affected schools in collaboration with UN agencies, NGOs and community organizations to ensure

88 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan an uninterrupted service in education. The 125.45 million, LKR 1,306.00 million and LKR Ministry of Education will continue to pro- 84.20 million are allocated for recovery needs mote participatory school self-assessment respectively. The Ministry of Education (MoE), and planning processes with emphasis on the in collaboration with UN agencies, NGOs and Child-Friendly Approach, including Disaster community organizations provided immediate Risk Reduction (DRR) and Social Cohesion, assistance to affected schools and students, with support from UNICEF, which enhance including the affected children with disabilities the capacity of school safety and DRR plan- and learning difficulties. In addition, UNICEF ning. The total recovery and reconstruction along with other key stakeholder agencies, needs regarding the education sector for the with financial assistance from donor agencies next three years (Fiscal Years 2017-2019) is such as the Australian Department of Foreign estimated at LKR 413.12 million, using the Affairs and Trade (DFAT) and the Royal Gov- principle of Building Back Better. The budget ernment of Norway, is supporting the MOE to allocation in the short-term, medium-term and ensure the capacity of education services in af- long-term are LKR 71.08 million, LKR 187.59 fected districts. UNICEF, along with other key million and LKR 154.45 million respectively. stakeholder agencies, provide technical and financial assistance to the MoE to enhance the FLOOD AND LANDSLIDES 2017 capacities of school safety and DRR planning. Due to the May 2017 floods, 382 pre-schools were affected, affecting approximately 11,460 students in the five districts. The damage to 3. Education Sector Recovery preschool buildings, furniture, learning ma- Objectives and Priorities terials, stationary and utensils were estimated The overall objective of the recovery plan in the at LKR 33.95 million. A total of 336 schools in education sector is ‘improving the capacity of the five districts were also damaged to varying the sector performance and building resilience degrees out of a total of 2,122 schools. In fi- systems to improve the learning environment nancial terms, Ratnapura district recorded the and safety’. highest damage to infrastructure and physical assets of government schools, followed by · The sector recovery objectives are to: Kalutara and Matara districts respectively. The net value of the total damages and losses to the · Promote emergency response plans at na- education sector is estimated at LKR 1417.80 tional, local and school levels, and ensure million. Of this, the damage to infrastructure their implementation. and physical assets is estimated at LKR 1,084.8 million. More specifically, of the total impact, · Provide training for teachers on risk 96% accrues to the public sector and only reduction curriculum materials. 4% to the private sector. Prior to the disaster, the NBRO had declared that many schools in · Improve early warning systems and com- Kalutara and Ratnapura districts are located in munication related to education. high landslide-risk areas and in need of urgent relocation. · Enhance the contribution of principals, teachers and other school staff for resil- The total recovery and reconstruction cost ience technologies into school recon- estimated for the next three years in the educa- struction. tion sector is LKR 1,515.65 million. Within the short-term, medium-term and long-term, LKR · Strengthen the capacity and capability

10. Sector Recovery Chapters and Sector Recovery Matrices 89 of relevant government agencies including · Minimizing disruption and ensuring the schools in preparedness and planning for continuity of education for all children emergencies, including financial planning. · Developing and maintaining a culture of · Reconstruction of landslide-affected safety. schools as a priority with disaster resilient features. 2) When considering student safety, the points below can be highlighted: · Establish an information system for the education sector from the provincial level · Safe access to the school (road safety) to the local level and prepare risk and vul- nerability mapping of education facilities in · School environment (learning and physi- collaboration with NBRO. cal) safety

· Reinforce national and local plans for Di- 3) School environment safety can be catego- saster Risk Reduction (DRR). rized into:

· Structural safety 4. Prioritization Criteria -- The location (vulnerability to floods, · Restore considering Building Back Better landslides, high wind situations, fire). principles and restart all schools and enable -- Design and construction of buildings, regular functioning of classes and comple- lifetime of buildings. tion of curriculum. · Non- structural safety -- Building furnishings (anything that can · Prepare schools and education institutions cause injury, e.g. heavy equipment and for the next floods and landslides. machines, chemicals, etc.). · Local infrastructure · Prevent school drop-outs due to disasters -- Risks associated with utilities such as and enable children to ‘catch up’ with the water, electricity and transportation. curriculum. · Environmental mitigation -- Risks associated with climate change impacts such as increased temperature, 5. Policy Guidelines for Education drought. Sector Recovery With the aim of improving the capacity of the 4) Planning for the post-disaster period is sector performance and building resilience sys- vital for educational continuity as when tems to improve the learning environment and students are out-of-school for any long safety, the following factors shall be considered periods of time, there is a risk of increas- from the education policy and planning perspec- ing dropout rates. Therefore, in the post tives: disaster period,

1) Three main objectives of a disaster manage- · For continuing education – alternative ment in schools: sites, temporary shelters, delivery of homework packets, etc. should be pro- · Protecting students and the staff from vided. physical harm

90 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan · Through counselling and psychosocial ucation reconstruction at the provincial level, supporting activities, the mental health who coordinates all the activities, including of the students should be maintained. damage assessment, releasing budget alloca- tions, distributing school assets between the Catch up programmes should also be held for national level and Local level. Each province is students with irregular school attendance in divided into zones and each zone is headed by disaster- and post-disaster periods. the Zonal Director of Education who acts as a bridge between the provincial level and the According to the provision of the National school level. Education Commission Act No. 19 of 1991, the key concept is ‘Raising Quality of Education’. In addition, UNICEF along with other key stakeholder agencies, with financial assistance from donor agencies such as the Australian 6. Source of Funding/ Finance for Department of Foreign Affairs and Trade Education Sector Recovery (DFAT) and the Royal Government of Norway, The total recovery and reconstruction cost esti- is supporting the MoE to implement all the mated for the next three years in the education proposed activities in the affected districts. sector is LKR 1,515.65 million. The main source of funding for recovery activities in the educa- Constraints and Challenges in Recovery and tion sector is GoSL. The Cabinet already allo- Reconstruction of Education Sector: Several cated a total of LKR 1,397.319 million for 2017 obstacles were encountered during the recov- and 2018. For short-term recovery, an amount ery process. The main challenge is the alloca- of LKR 556.136 million was released and LKR tion of the necessary funds to implement the 841.183 million was allocated for medium-term recovery plan. Additionally, the lack of a skilled recovery needs in affected districts. assessment team to plan and carry out data collection, data entry and analysis, as well as the verifications of the reliability of data; lack 7. Key Institutional Roles and of dedicated staff for monitoring and supervi- Implementing Partner sion of the recovery process in the MoE, based The Ministry of Education is the key insti- in the provinces and zones; and the lack of tution responsible and the implementing consistency in data collection procedures are partner for Education sector governance and other considerable challenges that are being administration. The Provincial Director of faced during the recovery process. Education and Zonal Director of Education are the responsible government focal points at provincial level and zonal level respectively. 9. Monitoring Framework Apart from that, UNICEF is the main support- The Ministry of Education will carry out the ing agencies for MoE. overall monitoring of the progress of all the proposed activities. The monitoring of activ- ities at the provincial level is to be carried out 8. Implementation and Coordination by the Provincial Director of Education, while Arrangements and Mechanisms monitoring of activities at zonal level is to be The Ministry of Education is the main focal carried out by Zonal Director of Education. point for the implementations of the recovery All the Zonal Directors of Education reported framework at national level. The Provincial their monitoring framework to the provincial Director of Education is the focal point for Ed- level while the Provincial Director of Educa-

10. Sector Recovery Chapters and Sector Recovery Matrices 91 tion reported the monitoring framework of 2) Psychosocial intervention / psychosocial each zone in each province to the MoE. resilience

Key criteria for the education sector recovery 3) School safety / identification of risk plans include the following: factors / vulnerabilities/ and disaster preparedness 1) Restoration of education services consid- ering BBB principle in reconstruction / 4) Progress of preventive services relocation / rehabilitation / repair [Table 9]

TABLE 9: RECOVERY PLAN MATRIX – EDUCATION SECTOR

Annual Annual Government Annual Annual Annual Annual Budgetary Support Budget Budget Lead Programme Affected Target Target Target Budget (LKR Mn) (LKR Mn) Objective Districts Total Government Budget Lead Agencies (LKR Mn) 2017 2017 2018 2018 2019 2019 (LKR Mn)

Galle 50.00 31.94

Reconstruction of Matara 17.85 0.00 Ministry of partially damaged 308.74 114.41 423.14 423.14 Hambanthota 1.59 0.00 Education school buildings Kalutara 139.30 0.00

Ratnapura 100.00 82.47

Construction Galle 25.00 57.12 of schools recommended for Matara 20.00 29.54 relocation and fully damaged Hambanthota 25.00 26.53 schools and DRR Ministry of 197.00 468.68 665.68 665.68 preparedness Kalutara 27.00 12.40 Education in schools and development of a vulnerability Ratnapura 100.00 343.10 report for schools at risk

Provision for lost Ministry of 50.40 50.40 50.40 furniture Education

Provision for lost Ministry of 258.10 258.10 258.10 equipment Education

Galle 8,388 Provision of uniforms, Matara 12,646 textbooks and Ministry of teaching (target Hambanthota 25 Education in number of Kalutara 6,709 students) Ratnapura 54,690

Provision for lost Ministry of Ratnapura 2730 equipment Education

Total (LKR Mn) 556.14 841.18 1397.32 1397.32

92 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan PRODUCTIVE SECTOR of Agriculture and the Department of Agrarian Development.

• Food Security, Agriculture, [Table 10] Livestock, Fisheries II. Removal of Silt and Rehabilitation of Small Tanks The Ministry of Agriculture allocated a total 1. Strategic Vision of the of LKR 250 million for the removal of silt and Sector for Recovery rehabilitation of small tanks, and irrigation As the main source of livelihoods in Sri Lanka, canals and structures in the affected districts the Agriculture sector (Crops, Plantations, including Colombo and Gampaha through the Livestock and Fisheries), which is highly Department of Agrarian Development (more dependent on climatic conditions, improves details are listed below). its resilience to hydro-meteorological disasters and reduces its vulnerability. [Table 11]

III. Cultivation of Abandoned Paddy Land 2. Status of Agriculture Sector Recovery The Ministry of Agriculture plans to rehabili- from 2017 Floods and Landslides tate 130,000 ac of abandoned paddy lands in Within the Productive sectors, damage to the wet zone and the following figures show the Agriculture sector are the highest, and it the allocations for the affected districts. comprises four sub-sectors: crop agriculture, plantations, livestock and fisheries. The overall [Table 12] recovery share of the sector is 2.7% of the total PDNA. A total amount of LKR 741 million IV. Crop Insurance Indemnity Payment was allocated in 2017 –oriented to seed paddy No payments were released to the farmers who distribution (LKR 49.81 million), silt removal are affected by the floods and landslides during and rehabilitation of tanks (LKR 250 million), 2016 and 2017. However, budget allocations rehabilitation of abandoned paddy land (LKR are programmed for 2018 and 2019. 23.7 million, through the Provincial Council) and LKR 417.58 million was paid to the income [Table 13] loss of tea smallholdings. V. Climate Smart Agriculture Programme 2.1 CROP AGRICULTURE SUB-SECTOR (Rain Water Harvesting, Micro Irrigation, Most of the paddy lands affected by floods were Agriculture Roads, Protected Agriculture) at the initial planting and milk stages. Approx- imately, 5,100 ha of paddy cultivations were [Table 14] damaged due to the floods. The highest impact Sector recovery in 2018 and 2019 on paddy cultivation is reported in the Matara Flood mitigation activities are at the top of the district. recovery activities.

I. Seed Paddy Distribution [Table 15] The Ministry of Agriculture decided to distrib- ute seed paddy to the paddy lands that were 2.2 PLANTATIONS SUB-SECTOR destroyed by floods through the Department The Plantation sub-sector reported to have the

10. Sector Recovery Chapters and Sector Recovery Matrices 93 TABLE 10: SEED PADDY DISTRIBUTION AMONG DISTRICTS AFFECTED BY FLOODS 2017 Annual budget (LKR) Budget support (LKR) Government lead

District 2018 2019 Supporting 2017 Total budget Government Donor Lead Agencies (Mn) (Mn) agencies

Matara 24,285,450 25 25 74,285,450 74,285,450 0

Galle 8,207,200 10 10 28,207,200 28,207,200 0 Department of Agriculture Hambantota 16,618,350 17 17 50,618,350 50,618,350 0 Ministry of Department Agriculture of Agrarian Kalutara 700,000 0.8 0.8 2,300,000 2,300,000 0 Development

Ratnapura 24,285,450 0.5 0.5 1,000,000 1,000,000 0

TABLE 11: ALLOCATION FOR THE REHABILITATION OF SMALL TANKS Annual budget (LKR Mn) Budget support (LKR) Government lead

District Supporting 2017 2018 2019 Total budget Government Donor Lead Agencies agencies

Matara 87 50 50 187 187 0

Galle 24 50 50 124 124 0 Department of Agriculture Ministry of Hambantota 10 50 50 110 110 0 Department Agriculture of Agrarian Kalutara 10 50 50 110 110 0 Development Ratnapura - 50 50 100 100 0

TABLE 12: ALLOCATION FOR THE CULTIVATION OF ABANDONED PADDY LAND Annual budget (LKR) Budget support (LKR) Government lead

District Supporting 2017 2018 2019 Total budget Government Donor Lead Agencies agencies

Matara 3,572,612 49,091,625 49,091,625 101,755,86 101,755,862 0

Galle 8,586,167 19,105,453 19,105,453 46,797,073 46,797,073 0

Ministry of Department Hambantota - 7,858,125 7,858,125 15,716,250 15,716,250 0 Agriculture of Agrarian Development Kalutara 8,250,000 8,250,000 4,125,000 20,625,000 20,625,000 0

Ratnapura 3,300,000 1,237,500 1,237,500 5,775,0000 5,775,0000 0

94 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan TABLE 13: CROP INSURANCE INDEMNITY PAYMENT

Annual budget (LKR) Budget support (LKR) Government lead District Lead Supporting 2017 2018 2019 Total budget Government Donor Agencies agencies

Matara - 68 90 158 158 0

Galle - 60 82 142 142 0 Agriculture Ministry of and Hambanthota - 68 90 158 158 0 Agriculture Agriculture Insurance Kaluthara - 60 82 142 142 0 Board

Ratnapura - 50 75 125 125 0

TABLE 11: ALLOCATION FOR THE REHABILITATION OF SMALL TANKS TABLE 14: ALLOCATION FOR THE CLIMATE SMART AGRICULTURE PROGRAMME Annual budget (LKR Mn) Budget support (LKR) Government lead Annual budget (LKR) Budget support (LKR) Government lead District District Supporting 2017 2018 2019 Lead Supporting 2017 2018 2019 Total budget Government Donor Lead Agencies Total budget Government Donor agencies Mn Mn Mn Agencies agencies Matara - 16 20 36 101,755,862.50 0 Matara 87 50 50 187 187 0 Galle - 15 18 33 46,797,073.74 0 Galle 24 50 50 124 124 0 Department of Agriculture Hambantota - 16 20 36 15,716,250.00 0 Ministry of Department Ministry of Hambantota 10 50 50 110 110 0 Department Agriculture of Agrarian Agriculture of Agrarian Kalutara - 15 18 33 20,625,000.00 0 Development Kalutara 10 50 50 110 110 0 Development Ratnapura - 10 15 25 57,750,000.00 0 Ratnapura - 50 50 100 100 0

TABLE 15: SECTOR RECOVERY STRATEGIES IN TIMELINE

Activities Short term Medium term Long term

Development of anicuts ×

Rehabilitation of minor irrigation according to priority ×

Cultivation of abandoned paddy land × ×

Development of agriculture infrastructure including roads ×

Rehabilitation of seasonal water bodies x ×

Supply of agricultural inputs: Seed of paddy and OFC ×

Improvement of non-agricultural income sources in order to × develop the livelihood status of affected people

Development of flood resistance varieties ×

Monitoring of the water level in rivers and tanks × ×

Comprehensive agriculture risk transfer mechanism × ×

10. Sector Recovery Chapters and Sector Recovery Matrices 95 largest damage, mainly due to the damage to 2.4 FISHERIES SECTOR tea plantations. Primarily over 3,035 hectares Reported damages in fisheries is low compared of tea lands were destroyed. Damage to the tea to the other productive sectors for both 2016 factories was also reported as over LKR 400 and 2017 floods and landslides. In the 2017 million, with the largest damages reported in floods, the losses were mainly related to fishing Kalutara and Galle districts. Damage to the nets. Damage to canoes was reported in the rubber sector was also prominent in Ratnapura Hambantota and Galle districts. district (over 27 million LKR). 3. Sector Recovery Objective A total amount of LKR 417.58 million was paid and Priorities to the income loss of tea smallholdings and 3.1 OBJECTIVE LKR 391.81 million is to be paid for the reha- The main objective of the sector recovery is to bilitation of tea smallholdings. A life insurance simulate profitable agricultural production scheme is in operation for the Tea Smallhold- including crop, plantations, livestock and ers who are members of the Tea Shakthi Fund, fisheries sub-sectors in all farming systems to which is currently implemented by the Tea boost rural income and improve self-sufficien- Smallholdings Development Authority (TSH- cy and food security. DA). The TSHDA is also planning to introduce a ‘Crop Insurance Programme’ for the Tea 3.2 PRIORITIES Smalholders by 2018/2019. In the crop sector priority is given to the extent of the damage for a given crop and for the Irri- 2.3 LIVESTOCK SUB-SECTOR gation sector the extent of damage to irrigation Floods and Landslides in 2016: The Ministry infrastructure (number of minor tanks, extent of Rural Economic Affairs gave dairy cows as of damage to bunds, canals, road access etc.) is compensation for damage to livestock in the considered as prioritization criteria. Kegalle district and no compensation was paid for the damage in any other district since the 4. Prioritization Criteria damage was negligible. Ensuring food security is the primary objective while environment sustainability and house- Floods and Landslides in 2017: The Live- hold economy also play a major role in the stock sub-sector was affected mainly in Agriculture sector. Matara, Kalutara and Galle districts. The highest impact was reported in the cattle, 5. Policy Guideline swine, buffalo, goat, and poultry sectors. The In the Agriculture sector, there are three main total damage reported in the livestock sector is objectives in ‘Agriculture Policy’: Ensuring LKR 257.17 million. Out of the total, damage to food security, Sustainable environmental office equipment and medicines is reported as management, and development of economic LKR 1.04 million. activities.

Reported damages recorded was very low in In the Livestock sector, the Livestock Devel- the affected district. The Ministry of Rural opment Master Plan is the orientation docu- Economic Affairs was not given any compen- ment whose objectives require to be taken into sation for the damage of floods and landslides account even in a disaster situation. The policy in 2017. documents of the previous government state that the country should reach a higher level of self-reliance in all livestock production to be

96 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan able to sell the products to consumers at an · Upgrading the skills, management capa- affordable price for improving their nutrition bilities and accountability of the staff status and tapping the potential of the sector for the creation of employment. Involvement of the private sector and also NGOs for the recovery activities is negligible in 6. Sources of Funding a disaster situation. NGOs get involved mostly Financial support (100%) is given by the gov- during large-scale disaster situations. Regard- ernment for the crop and livestock sub-sectors, ing the fisheries sub-sector, the involvement of particularly through the crop and plantations the Department of Agriculture and the Nation- insurance systems, the Climate Smart Agri- al Aquaculture Development Authority of Sri culture Programme and the regular budget. Lanka is considered. Involvement of UN agencies, NGOs and the private sector is considered as supportive of the 8. Implementation and governmental intervention. Coordination Arrangements The Department of Agriculture, the De- 7. Key Institutional Roles and partment of Agrarian Development and the Implementing Partners Agrarian Insurance Board play a key role in the Institutional support for the crop sector is implementation and coordination arrange- governed by the Department of Agriculture ments. Moreover, the involvement of other in- (DoA) and the Department of Agrarian stitutions such as the Institute of Post-harvest Development, which has the responsibility for Technology (IPHT) and the Food Promotion the development of the minor agriculture irri- Board is considered to be low. gation sector. Nevertheless, the Agriculture and Agrarian Insurance Board also supports With regards to the plantation sub-sector, farmers in a disaster situation. the Ministry of Plantation Industries will implement the identified Build Back Bet- There are some other institutions that are ter programme. In addition, the ministry is engaged to take part in post-disaster situa- developing a disaster management plan for tions. Those are the Institute of Post-Harvest the Plantations sub-sector with the assistance Technology, Food Promotion Board, Colombo of the stakeholders of tea, rubber and coconut Commercial Fertilizers Ltd. Ceylon Fertilizer sectors coming under the purview of the Min- Ltd., and the Hector Kobbekaduwa Agrarian istry of Plantation Industries. Research and Training Institute (HARTI). The Fisheries sector recovery will be executed The institutional support in livestock is pro- by the Ministry of Fisheries with the support of vided by the government sector and the private its corporations and authorities. sector. But in disaster situations, most of the recovery needs are supplied by the govern- Coordination and implementation of recovery ment. Government improves the management activities is mostly done with the involvement of livestock development by: of the provincial councils.

· Improving coordination of the institutes 9. Monitoring Framework involved In the Agriculture sector, there is a monitor- ing division in the Ministry of Agriculture · Introducing new and more people-relat- and monitoring is basically carried out by the ed planning and monitoring procedure District Agriculture Director who is supported

10. Sector Recovery Chapters and Sector Recovery Matrices 97 Support Agencies Sri Lanka Tea Sri Lanka Tea Board Department of Agrarian Development Department of Agriculture, Department of Agrarian Development Tea Tea Smallholdings Development Authority Tea Tea Smallholdings Development Authority Department of Agrarian Development Department of Agriculture, Department of Agrarian Development Agricultural and Agrarian Insurance Board Government Lead Government Lead Agencies Ministry of Plantation Industry Ministry of Agriculture Ministry of Agriculture Ministry of Plantation Industry Ministry of Plantation Industry Ministry of Agriculture Ministry of Agriculture Ministry of Agriculture Mn) Unmet (LKR Mn) Donor (LKR 1.540 1.320 1.700 5.775 1.000 2.300 15.716 0.240 77.180 50.618 46.797 74.285 72.520 28.207 44.230 20.625 92.520 59.500 33.000 33.000 25.000 36.000 36.000 98.000 101.756 110.000 110.000 194.780 167.560 187.000 142.000 124.000 142.000 125.000 158.000 158.000 100.000 Budgetary Support (LKR Mn) Government Government 2,677.170 1.540 1.320 1.700 5.775 1.000 2.300 15.716 0.240 77.180 50.618 46.797 74.285 72.520 28.207 44.230 20.625 92.520 59.500 33.000 33.000 25.000 36.000 36.000 98.000 101.756 110.000 110.000 194.780 167.560 187.000 142.000 124.000 142.000 125.000 158.000 158.000 100.000

(LKR Mn) Total Budget Total 2,677.170 4.125 1.238 7.858 0.500 0.800 19.105 17.000 15.000 18.000 18.000 10.000 49.092 75.000 25.000 82.000 82.000 20.000 20.000 50.000 50.000 50.000 50.000 50.000 90.000 90.000 2019 (LKR Mn) 894.718 Annual Budget 1.238 7.858 8.250 0.500 0.800 19.105 17.000 15.000 15.000 16.000 16.000 10.000 10.000 49.092 25.000 68.000 68.000 50.000 50.000 50.000 50.000 50.000 50.000 60.000 60.000 2018 (LKR Mn) 766.843 Annual Budget - - 1.540 1.320 1.700 3.573 8.207 8.586 8.250 0.240 3.300 0.700 16.618 77.180 24.285 72.520 10.000 10.000 44.230 92.520 59.500 87.000 24.000 98.000 194.780 167.560 2017 (LKR Mn) 1,015.610 Annual Budget 2017 District ambantota ambantota ambantota ambantota Matara Matara Colombo Galle Matara Ratnapura Kegalle Kalutara H H H ambantota H ambantota H H Kalutara Kaluthara Galle Galle Kalutara Kalutara Kaluthara Ratnapura Ratnapura Ratnapura Ratnapura Ratnapura Galle Matara Ratnapura Ratnapura Kalutara Galle Matara Kalutara Matara Matara Matara Galle Galle Galle RECOVERY PLAN MATRIX – AGRICULTURE SECTOR – AGRICULTURE RECOVERY PLAN MATRIX Programme Climatic Smart Agriculture Programme (Rainwater H arvesting, Micro Irrigation, Agriculture Roads, Protected Agriculture) Supply seed paddy and distribution Total Providing a Providing special subsidy for the damage of tea factories affected by floods that occurred in May 2017 Providing a Providing special subsidy for replanting of tea smallholdings affected by floods and landslides that occurred in May 2017 – LKR Mn. Total 391.81 Providing relief Providing subsidy for income loss of tea smallholders affected by floods and landslides that occurred in May 2017 – LKR Mn. Total 417.58 Cultivation of Cultivation abandoned pady land Rehabilitation of minor irrigation Crop Insurance Crop Insurance Indemnity Payment TABLE 16: TABLE

98 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Support Agencies Sri Lanka Tea Sri Lanka Tea Board Department of Agrarian Development Department of Agriculture, Department of Agrarian Development Tea Tea Smallholdings Development Authority Tea Tea Smallholdings Development Authority Department of Agrarian Development Department of Agriculture, Department of Agrarian Development Agricultural and Agrarian Insurance Board Government Lead Government Lead Agencies Ministry of Plantation Industry Ministry of Agriculture Ministry of Agriculture Ministry of Plantation Industry Ministry of Plantation Industry Ministry of Agriculture Ministry of Agriculture Ministry of Agriculture Mn) Unmet (LKR Mn) Donor (LKR 1.540 1.320 1.700 5.775 1.000 2.300 15.716 0.240 77.180 50.618 46.797 74.285 72.520 28.207 44.230 20.625 92.520 59.500 33.000 33.000 25.000 36.000 36.000 98.000 101.756 110.000 110.000 194.780 167.560 187.000 142.000 124.000 142.000 125.000 158.000 158.000 100.000 Budgetary Support (LKR Mn) Government Government 2,677.170 1.540 1.320 1.700 5.775 1.000 2.300 15.716 0.240 77.180 50.618 46.797 74.285 72.520 28.207 44.230 20.625 92.520 59.500 33.000 33.000 25.000 36.000 36.000 98.000 101.756 110.000 110.000 194.780 167.560 187.000 142.000 124.000 142.000 125.000 158.000 158.000 100.000

(LKR Mn) Total Budget Total 2,677.170 4.125 1.238 7.858 0.500 0.800 19.105 17.000 15.000 18.000 18.000 10.000 49.092 75.000 25.000 82.000 82.000 20.000 20.000 50.000 50.000 50.000 50.000 50.000 90.000 90.000 2019 (LKR Mn) 894.718 Annual Budget 1.238 7.858 8.250 0.500 0.800 19.105 17.000 15.000 15.000 16.000 16.000 10.000 10.000 49.092 25.000 68.000 68.000 50.000 50.000 50.000 50.000 50.000 50.000 60.000 60.000 2018 (LKR Mn) 766.843 Annual Budget - - 1.540 1.320 1.700 3.573 8.207 8.586 8.250 0.240 3.300 0.700 16.618 77.180 24.285 72.520 10.000 10.000 44.230 92.520 59.500 87.000 24.000 98.000 194.780 167.560 2017 (LKR Mn) 1,015.610 Annual Budget 2017 District ambantota ambantota Matara Matara Colombo Galle Matara Ratnapura Kegalle Kalutara H ambantota H ambantota H H H ambantota H ambantota Kalutara Kaluthara Galle Galle Kalutara Kalutara Kaluthara Ratnapura Ratnapura Ratnapura Ratnapura Ratnapura Galle Matara Ratnapura Ratnapura Kalutara Galle Matara Kalutara Matara Matara Matara Galle Galle Galle RECOVERY PLAN MATRIX – AGRICULTURE SECTOR – AGRICULTURE RECOVERY PLAN MATRIX Programme arvesting, arvesting, Climatic Smart Agriculture Programme (Rainwater H Micro Irrigation, Agriculture Roads, Protected Agriculture) Supply seed paddy and distribution Total Providing a Providing special subsidy for the damage of tea factories affected by floods that occurred in May 2017 Providing a Providing special subsidy for replanting of tea smallholdings affected by floods and landslides that occurred in May 2017 – LKR Mn. Total 391.81 Providing relief Providing subsidy for income loss of tea smallholders affected by floods and landslides that occurred in May 2017 – LKR Mn. Total 417.58 Cultivation of Cultivation abandoned pady land Rehabilitation of minor irrigation Crop Insurance Crop Insurance Indemnity Payment TABLE 16: TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 99 by an Assistant Director and Development • Industry and Commerce Officers.

The monitoring of recovery activities for the 1. Strategic Vision Livestock sector is done through the Provincial Micro, small and medium enterprises (MSMEs) Council. affected by the floods and landslides in May 2017 are recovered in improved resilient conditions The key indicators for Monitoring recovery in through enabling policies, guidelines and DRR the Agriculture sector are as follows: programmes tailored to the different types of MSMEs. · Number of farmers provided with paddy seeds and fertilizers for replanting crops. 2. Status of Sector Recovery from the · Number of minor irrigation projects 2016 and 2017 Landslides and Floods rehabilitated. FLOODS AND LANDSLIDES 2016 The disaster effects costs related to the Industry · Acreage of land where sand and silt is and Commerce sector in all districts were as- removed and land rehabilitated. sessed to be LKR 30.96 billion, out of which LKR 25.09 billion are insured damage and losses. Out · Increase in percentage/number of of all insurance claims, approximately 62% or farmers covered through crop indemnity LKR 13.55 billion accounts for damage and losses insurance in the sub-sector of Food and Beverages and 70% of these are concentrated in the Colombo · Number of rainwater harvesting struc- and Gampaha districts alone. The informal tures, agriculture roads and protected sector was badly hit by the disaster, especially in agriculture schemes constructed. terms of flood-related damage and losses in the six priority districts, accounting for LKR 5.87 bil- The key indicators for the Monitoring sector lion, of which Colombo and Gampaha account recovery in the Plantation sector are as follows: for LKR 3.99 billion.

· Number of tea smallholders provided The government’s National Natural Disaster subsidy to restart plantation. Insurance Policy (NNDIP) covered all SMEs with an annual turnover of less than LKR 10 million. · Number of tea factories provided subsi- Therefore, as per the classification of SMEs by dies to restart production of tea. the National Policy Framework for SME Devel- opment, only a subset of micro-enterprises and [Table 16] pp. 98-99 informal businesses is covered by the NNDIP.

FLOODS AND LANDSLIDES 2017 The damage and losses to the Industry and Commerce sector in both formal and informal sectors in all five mostly-affected districts of the country was assessed to be LKR 4.85 billion. Out of the total damage and losses incurred in the May 2017 disasters, 60% is accounted for by the formal sector, of which 74% are damage claims

100 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan from insurance providers, which amounts ISSUES AND CHALLENGES to LKR 1.93 billion. The informal sector was a) Baseline Data badly affected by the disaster in the five priority Currently, the Ministry of Industry and Com- districts, accounting for LKR 1.94 billion of merce does not have a systematic database of which Matara and Galle districts account for all businesses in the country. To that aim, the LKR 1 billion. Ministry plans to initiate the registration of all businesses in Sri Lanka. An initial fund was The Ministry of Disaster Management, with allocated to set up the necessary legal framework the support of the National Disaster Relief and preparatory activities in this regard. The Services Centre, will complete damage assess- identification of business ventures in vulnerable, ment of the May 2017 disasters to expedite disaster-prone areas in the five most flood/land- compensation provisions under the NITF-sup- slide-affected districts in 2017, will be priori- ported National Natural Disaster Insurance tized by the National Enterprises Development Policy. Authority (NEDA). Nearly 19 million LKR is required for this activity. State banks will provide ‘Athwela’ loans with low-interest rates for business people who will b) Communication Gap start new business ventures. The Ministry of NEDA collected information regarding the National Policies and Economic Affairs, the affected MSMEs through the Development Offi- Ministry of Industry and Commerce and the cers based in the Divisional Secretariats. A con- Ministry of Disaster Management will work siderable number of organizations approached together to promote the insurance schemes for the NEDA officers to get the information related the SMEs not covered under NNDIP. to MSMEs, even at divisional levels. However, despite having information, none of those or- The table 17 shows MSMEs damaged as at ganizations informed NEDA about any recovery 28/07/2017 as per the data collected through activities provided by them. DS divisions. In order to recover all the affected MSMEs in five districts a total amount of 545 Furthermore, it was realized that although NITF Mn LKR is required. payments for SMEs are processed through the Divisional Secretariats, involvement of NEDA

TABLE 17: MICRO, SMALL AND MEDIUM ENTERPRISES AFFECTED BY FLOODS AND LANDSLIDES IN MAY 2017

Ownership of the Nature of the Damage Total No. of Enterprise Value of the # of DS District # MSMEs Damaged Damage divisions Secretariat as @ 28/07/2017 Sole LKR Million affected Fully Partially No details Partnership Proprietor

1 Ratnapura 1847 385 1462 - 437 8 220.6 8

2 Galle 646 45 601 220 0 121.14 14

3 Matara 3128 528 1331 1269 1790 4 158.35 12

4 Hambantota 358 0 266 92 264 2 31.55 8

5 Kalutara 645 7 106 546 113 0 13.125 7

6624 544.77

10. Sector Recovery Chapters and Sector Recovery Matrices 101 officers in this process is at a very low level or based in the divisions and broaden the not at all. Therefore, NEDA officers do not have knowledge on pre- and post-disaster risk information about NITF applications/pay- management measures and post-disaster ments provided to SMEs and this is a barrier to rebuilding process of MSMEs. monitor the recovery activities of SMEs. · To improve the efficiency and effective- c) Capacity Building ness of the baseline, disaster damage and The level of understanding and skills on Di- needs assessments of the SME sector. saster Risk Management in the Industry and Commerce sector is currently at very low level. · To facilitate an island wide disaster insur- Therefore, building the capacity of officers in ance scheme for MSMEs in disaster prone the MIC/NEDA on disaster preparedness and areas. business continuity planning, among other issues, is a priority for all levels. Nearly LKR 2 · To facilitate MSMEs to achieve the million is required for the training budget in growth they expected before the disaster. 2018 and 2019.

d) Insurance Scheme for Micro, 4. Prioritization Criteria Small and Medium Enterprises · MSMEs located in vulnerable areas where Although NITF covers damage to SMEs, it does risk is predetermined by DMC or any not work as a risk reduction management tool, other relevant authorities assumed by the own enterprises – Government pays the insurance – and also it may not fully · Family income coming only from the cover the micro, small and medium industries MSME affected by a particular disaster. Therefore, it is an urgent need to set up a low-premium insur- · The enterprise holder alone cannot ance scheme suitable for MSMEs in a manner recover recurrence in damage and level of that they take into account their own risks damage caused by the disaster. and encourage application of risk mitigation measures. · Enterprises where machineries and land are unusable after a disaster.

3. MSME Sector Recovery Priorities /Objectives 5. Sector Policy Guidelines for Recovery · To ensure that MSMEs affected by Links to Vision 2025, National disasters are fully and better recovered SME Policy, Key Gaps in Policy through provisioning the insurance and The special attention which the government other supporting recovery strategies. has given to industry and its development in recognition of the important role it played · To ensure the business continuation of in the national economy over the last decade MSMEs after a disaster situation with is well reflected in the Public Investment a proper continuity plan taking into Programme (PIP) 2017-2020. Recognizing account the baseline survey on MSMEs multiple conditions required for improvement conducted in disaster prone areas in the industrial sector such as investments, innovation and technology absorption, having · To build the capacity of regional staff an appropriate regulatory and legislative

102 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan environment, among others, the government While facilitating better locations and facilities proposed a strategic roadmap for industrial would bring improvements to industry, invest- reforms emphasizing on few key identified ing in new locations solely on economic and sub-sectors with growth potential. A conducive social grounds may not be wise without carry- investment climate through changes to tax, ing out comprehensive disaster risk analyses. land and foreign exchange regimes to facilitate better investment is envisaged by the PIP. In- Capacity building regarding business conti- dustrial zones with modern infrastructure fa- nuity planning to face crisis situations and cilities are also envisaged. The analysis however resilient building is an area that is missing even seems to have not taken the increasing trend amongst larger industries as clearly shown in and frequency of disasters and the drawbacks it the aftermath of the 2016 flood disaster, and an will have on industrial growth. area that needs attention. Addressing vulner- abilities of the small and informal sector as ThePIP also recognizes a potential SME sector, envisaged by Vision 2025 should also include which comprises over 75% of the sector and investment for developing sustainable busi- 45% employment (40% is vulnerably employed nesses, business continuity planning, becom- according to Vision 2025), to contribute to eco- ing part of resilient value chains, etc. nomic growth (to address regional disparity, employment creation, poverty reduction etc.). Technology transfer, special lending schemes 6. Sources of Funding / and credit guarantee schemes for MSMEs, Finance for Recovery forward linkages to values chains of larger KEY SOURCE OF FUNDING industry, quality improvement and facilitat- NITF is a government scheme which provides ing quality assurance, etc., are some areas in insurance for SMEs affected by disasters. In which the government intends to assist SMEs addition, government funds will be utilized for and MSMEs. Vision 2025 also emphasizes the a proposed baseline survey of the businesses, need to formalize the SME sector through future damage assessments of disasters for financial systems and providing soft and hard SMEs, as well as for recovery activities which infrastructure. While the analysis of SME and are not covered by NITF insurance. Moreover, MSME subsectors identified economic and the Ministry seeks funds from donors for social vulnerability of the sub-sectors and sug- capacity building activities. Other than the gests some measures to address these, disaster Treasury, possible funding agencies are foreign risk is not seriously considered in the analysis. government and intergovernmental funding Most SMEs and MSMEs are vulnerable to bodies like UN, JICA, KOICA, USAID, as well disaster risk as they operate in low-value areas as international NGOs and the private sector. and further exacerbate risks due to having to operate under social and economic limitations. FUNDING GAPS It is not clear how well this is understood by The Ministry of Industry and Commerce and the analysis. NEDA financially depend on the Treasury or the Ministry of Industry and Commerce. In a The PIP proposes establishment of economic disaster situation, the private sector and NGOs corridors to tap into unrealized industrial usually link with the Disaster Management potential in specific locations in the country Committee, at national level, and District as well as addressing regional disparity. There Secretariats, at district level. NEDA finds dif- seem to be implications for better opportuni- ficulties in convincing the treasury for getting ties for SMEs and MSMEs in such corridors. direct funds with regard to disaster recovery of

10. Sector Recovery Chapters and Sector Recovery Matrices 103 MSMEs as there is a specific Ministry/Minis- recovery and avoid the reproduction of risk tries in the subject area. The Ministry is look- conditions. ing for funds to conduct the baseline survey in affected areas and also for training and capacity Implementing partners at national level and building activities on disaster preparedness, district level: business continuity planning, etc. a) Ministry of Industry and Commerce

b) Disaster Management Committee – national 7. Key Institutional Roles and and district level Implementing Partners KEY INSTITUTIONAL ROLES c) Divisional Secretariats and District Secre- The Ministry of Industry and Commerce is tariats the overall responsible agency in the sector. Various institutions under the ministry are conducting programmes to rebuild business- 8. Implementation and Coordination es. The National Enterprises Development Arrangements and Mechanisms – Gaps Authority (NEDA) is the key institution in this in Implementing Arrangements regard as counts with divisional presence to The Ministry of Industry and Commerce, implement and monitor the recovery activities. through the NEDA, will be responsible of all recovery programmes implemented for MS- Working at grassroots level with Development MEs. NEDA has a strong network of around 260 Officers in DS divisions, key roles of the NEDA Development Officers in DS level out of 330 DS in post-disaster recovery situations are as divisions in the country. follows: · Attending to immediate disaster relief of MSMEs are financially assisted for continuation MSMEs in the divisional level as guided of the business after a disaster situation, DO’s are by Divisional Secretariats – by Develop- available with the supervision of the NEDA and ment Officers in DS divisions. the Ministry of Industry and Commerce.

· Collecting information of affected MS- All stakeholders implementing recovery assis- MEs with the help of Grama Niladhari – tance programmes for MSMEs should coordi- by Development Officers in DS divisions. nate with NEDA or the Ministry of Industry and Commerce. · Verifying and assessing the information through TOs at DS level – by Develop- ment Officers in DS divisions. 9. Monitoring Mechanism The development and the continuation of the · Sharing information with the ministry. MSMEs will be monitored through divisional level after six months and one year after provid- · Ensuring efficient and accurate dis- ing assistance under the supervision of NEDA bursement of funds for continuing the and Divisional Secretaries. businesses (if available) for MSMEs at divisional level. The key indicators for monitoring sector recov- ery are as follows: · Provision of technical assistance to affected MSMEs to hasten the enterprises

104 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan NDRSC District Divisional Divisional Divisional Secretaries, Secretaries, Secretariats Secretariats Support Agencies NITF Government Lead Government NEDA NEDA NEDA Lead Agencies 2.000 19.250 Unmet (LKR Mn) 21.250 Donor - 5.310 Budgetary Support 2,000.000 (LKR Mn) Government Government 2,005.310 5.310 2.000 19.250 1,000.000 2,000.000 (LKR Mn) Total Budget Total 3,026.560 1.000 3.000 2019 275.000 Annual Budget (LKR Mn) 279.000 260 scale Officers 2019 Target Annual Enterprise enterprises 100 medium Development Development 2.310 1.000 3.750 3.500 4.000 3.000 5.000 19.250 2018 500.000 Annual Budget (LKR Mn) 522.560 260 scale 50,000 MSMEs Officers scale and 2018 Target and small- Annual Enterprise 500 medium 10,000 Micro Development Development 2017 225.000 Annual Budget (LKR Mn) 2,000.000 2,225.000 100 scale 20,000 2017 Medium Target Annual Micro and Small Ent. RECOVERY PLAN MATRIX – INDUSTRY AND COMMERCE SECTOR RECOVERY PLAN MATRIX Programme ambantota (DS# 12) H Supplementary compensation for MSME Recovery activities not sufficiently covered/ by the NITF covered Building capacity of Ministry/ NEDA officers on Disaster Preparedness, disaster incorporating resilience into business planning, business continuity planning. Total Needs Assessment on MSME in a Disaster (per disaster) Baseline Survey of Baseline Survey MSMEs in vulnerable areas (DS#16) 1. Ratnapura (DS#14) 2. Kalutara 3. Galle (DS#20) (DS#15) 4. Matara Compensation payment Compensation payment for reconstruction to flood affected SMEs and replacement of their equipment - Flood and Landslides May 2017 5. Industry and Commerce TABLE 18: TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 105 i. Number of MSMEs supported INFRASTRUCTURE SECTOR through different assisting pro- grammes

ii. No of people assisted (divisional level/ • Irrigation district level/ national level) iii. Average compensated amount (in LKRs) per MSMEs (district level/ 1. Strategic Vision of the national level) Sector for Recovery Vulnerable communities and crops are safer [Table 18] and more resilient to disasters, contributing to food security, livelihoods, and lifestyles derived from the inclusive and participatory resto- ration of flood protection systems, irrigation systems, infrastructures and protected river basins.

2. Status of Sector Recovery from 2016 and 2017 Landslides and Floods Floods and Landslides 2016: Heavy inten- sity rainfall and consequent accumulation of large volumes of water to rivers exceeding their capacities and over-topping of river embank- ments, heavy run-off, and prolonged inunda- tion of the canals and farm lands have caused severe destruction to the irrigation and flood control infrastructure and deposition of silt in the paddy fields. Damage to the irrigation sector includes: scouring of embankments of several major reservoirs; scouring and breach- ing of the embankments of several village tanks; damages to diversion weirs/anicuts; erosion and washing away of canals and canal embankments, drainage canals and canal structures; damage to flood protection struc- tures and damage to farm access roads within the irrigation schemes. Furthermore, the banks of several major rivers such as Kelani, Kalu, Kala Oya, , , and Attanagalu Oya have eroded heavily at several locations.

The 2016 floods affected the functionality and performance of the irrigation facilities in varying degrees in almost all the districts of the country. Of the 340 major irrigation schemes

106 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan maintained by the Irrigation Department (ID), trol infrastructure of the country is Rs 2,708 irrigation and flood control infrastructure and million. Since irrigation is an integral part of facilities of about 40 schemes were affected by agriculture, these damages, if not rectified, the floods. These irrigation and flood control would not only affect the functionality and facilities are in Anuradhapura, Colombo, performance of the infrastructure but would Gampaha, Kurunegala, Moneragala, Puttlam also have adverse impacts on the agricultur- and Vavuniya districts. However, only two al production and farmer income. Most of small tanks linked with the Mahaweli Irri- the small damages, which can be repaired by gation System H (major scheme) in Anurad- farmers themselves or within the regular main- hapura district, which are maintained by the tenance budgets of the irrigation agencies, Mahaweli Authority of Sri Lanka (MASL), were would not result in potential loss of crops in damaged. the forthcoming cropping seasons. However, some of the major damages, if not repaired Out of the medium-sized schemes maintained and restored, would result in difficulties in by the Provincial Irrigation Departments delivering irrigation water to farms efficiently, (PIDs), irrigation and flood control infra- and would eventually result in potential loss structure and facilities of about 44 schemes of paddy crops in the forthcoming cultivation were damaged by the floods. These damages seasons, and the loss associated to this will be are reported from Ampara, Batticaloa, and captured under the Agriculture sector assess- Trincomalee districts (Eastern Province), Galle ment. However, the Government will not incur district (Southern Province), and Moneragala any revenue losses as no irrigation fees are district (Uva Province). levied and irrigation water is provided as a full subsidy to farmers. Out of the 30,000 minor irrigation schemes maintained by the Department of Agrarian Floods and Landslides 2017: Heavy rainfall Services, irrigation facilities of about 424 occurred on the night of 24th May, 2017 and village tanks serving (6,180 ha and 9,900 farm consequent release of large volumes of flood families) and 17 diversion weirs (anicuts) serv- water through irrigation and drainage canals ing about 209 ha and 700 farm families were and overtopping flood embankments caused affected. In addition, canal systems serving severe damages to irrigation and drainage about 4,877 ha and 8,432 farm families were infrastructure in five districts: Kalutara district affected. These damages were reported from all (Western Province), Ratnapura district (Sa- the districts except from Ampara, Colombo, baragamuwa Province); and Galle, Matara and Gampaha, Moneragala and Nuwara Eliya. The Hambantota districts (Southern Province). breakdown of irrigation, flood control, and Major and medium flood protection schemes drainage structures have affected farmers as of the rivers – , Nilwala Ganga and they are faced with serious difficulties in receiv- too suffered severe damage. More ing irrigation water on time and in adequate specifically, irrigation facilities of Urubok- quantities to irrigate the crops. Some of the ka Oya and Kirama Oya major irrigation farmers may not be able to cultivate crops in schemes of the Hambantota district; Kalu the forthcoming cultivation seasons success- Ganga and Bolgoda flood protection schemes fully, unless the damaged infrastructure and in the Kalutara district; and Gin Ganga flood facilities are restored. protection scheme in the Galle district and several medium and minor irrigation schemes The total estimated cost of the reported flood in Ratnapura district suffered significant damage in 2016 to irrigation and flood con- damages. The damaged irrigation and flood

10. Sector Recovery Chapters and Sector Recovery Matrices 107 control infrastructure are under the purview of 3. Sector Recovery Priorities /Objectives the ID, the PIDs of the Western, Southern and The overall objective is to provide improved flood Sabaragamuwa provinces and the Department protection systems to ensure safe and resilient of Agrarian Development (DAD). communities and protection for communities affected by the 2016 and 2017 hydro-meteorolog- The typical damages includes the scouring of ical disasters. flood embankments; scouring and breaching of the embankments of several minor tanks; The priorities are to scouring of bunds of irrigation and drainage canals of several major, medium and minor · Improve flood protection systems, irriga- tanks; damages to diversion weirs/anicuts; tion systems and infrastructures to protect erosion and washing away of canals and canal ongoing cultivation, minimize water issues structures, including random rubble and in the next Maha season and protection concrete retaining walls and canal water level crops from future floods. control gates; damage to farm access roads within the irrigation schemes; erosion of major · Upgrade existing canal systems, drainage river banks and flood embankments at a few canals, gravity outlets and spill canals to locations; and silting of irrigation and drain- cater to future floods with high rainfall age canals. In addition, floodwater pumps of intensity. Gin Ganga and Nilwala Ganga schemes have suffered minor damages. · Build capacities of the central government and Provincial Irrigation Department staff The total estimated cost of the reported flood for flood forecasting and issuing of early damages in 2017 to irrigation and flood control warnings. infrastructure of the country is LKR 1,814.7 million. The Ministry of Irrigation and Water · Develop basin-level investment plans to Resources Management received LKR 300 address both floods and drought. million to be used for identified and prioritized repairs. Moreover the allocation was distribut- · Support farmers receiving insurance ed among the Galle, Matara, Ratnapura, and compensation to damaged short-term and Hambantota districts based on the estimates long-term crops. from the districts. The Irrigation Depart- ment received LKR 350 million to be used for identified priority repairs in the Galle, Matara, 4. Prioritization Criteria Hambantota, Kalutara, Colombo, Gampaha Interventions addressing the following measures and Ratnapura districts. were identified as priority:

Mid-term and long-term measures are identi- · Activities addressing the safety of crops, fied by the Irrigation Department considering lives and assets of affected communities. the requirement of river basin protection through the reconstruction of major flood pro- · Prevention of further damage and losses of tection schemes, pump houses, flood control communities at risk. reservoirs and flood mitigation projects, in the disaster-prone river basins. · Increasing resilience of affected communi- ties in the face of future hydro-meteorologi- cal disasters.

108 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan · Supporting life to return to normal. aims at ensuring the reduction of the volume of runoff water from 28,000 MCM to 21,500 · Improving the livelihoods and food security MCM and increasing the total irrigable extent of affected communities. to 850,000 hectares by 2020. This includes the construction of minor tanks and anicuts and the expansion of the irrigable extent of the Mahawe- 5. Sector Policy Guidelines for Recovery li development area from 102,300 hectares to Under the Disaster Management Act, the nation- 110,900 hectares and other irrigable extents un- al policy and programme on disaster manage- der the Department of Irrigation from 285,000 ment shall provide guidance for ‘the protection hectares to 325,000 by 2020. The projects under of life of the community, property and envi- PIP that link directly to the sector recovery plans ronment from disasters and development and include the rehabilitation and improvement of maintenance of disaster resilient infrastructure’, damaged reservoirs, minor tanks, anicuts, and ca- ‘the effective use of resources for preparedness, nal systems. It is targeted to reduce the number of prevention, response, relief, reconstruction and people affected by floods by 50% by 2018, which is rehabilitations’ and ‘pre-disaster planning, pre- related to the rehabilitation and improvement of paredness and mitigation while sustaining and flood protection systems in Sri Lanka. further improving post disaster relief, recovery and rehabilitation capacities’. 6. Sources of Funding/Finance for Recovery Sendai Framework: The Sendai Framework Short- and medium-term (2017-2018) fund 2015-s2030 targets the substantial reduction requirements are scheduled to be met through of the number of affected people and disaster ministerial allocations and the long-term (2019- damage to critical infrastructures due to natural 2020 and beyond) requirements are to be borne disasters. by ongoing river-basin development interven- tions, which are ear-marked for funding by both Other Policies: The National Agricultural Policy multi-lateral and bi-lateral donors. addresses Irrigation and Water Management under policy number 6, proposing to safeguard irrigation reservoirs, canals, drainage systems 7. Key Institutional Roles and and other structures from damage by natural Implementing Partners: Government, calamities. Private Sector, NGOs The overall institutional responsibility of the Irri- Links to Global Policy Frameworks: Guiding gation sector recovery implementation lies with Principles for infrastructure reconstruction the Ministry of Irrigation and Water Resource include Build Back Better principles which aim at Management, which will play the lead role. Its ensuring that communities affected by disasters major implementation arm will be the nation- have access to improved and resilient irrigation al Irrigation Department. The provincial level and flood protection infrastructure as a result of irrigation sector recovery will be overseen and the reconstruction process. Building Back Better supervised by the Provincial Irrigation Minis- views disasters as an opportunity to reduce tries, district and divisional level sector agencies. vulnerability and improve resilience of affected The most practical NGO that would be involved in communities. irrigation sector recovery works are the Farmer Organizations (FOs), which are traditionally REFERENCE TO PIP (PAGES 92 AND 93) organized canal-wise, and/or medium and minor The Public Investment Programme 2017-2020, system-wise.

10. Sector Recovery Chapters and Sector Recovery Matrices 109 8. Implementation and Coordination TABLE 19: RECOVERY PLAN MATRIX – Arrangements and Mechanisms IRRIGATION SECTOR The District Directors and Divisional Irriga- Budgetary Support Government Lead Annual Annual Annual Annual tion Engineers are the focal points for im- Annual Target Annual Target Target by Budget Budget (LKR Budget (LKR Unmet provement and upgrading of flood protection Affected by District by District Total Programme District (LKR Mn) Mn) Mn) Government Donor (Financing Districts Budget Lead Agencies (LKR Mn) (LKR Mn) Gap) (LKR systems and irrigation infrastructures, and (LKR Mn) canal systems at district and divisional Level. Mn) 2017 2017 2018 2018 2019 2019 They coordinate all improvements, upgrading, Galle 10.00 35.00 rehabilitation and reconstruction activities, Rehabilitation and Matara 50.00 56.40 including damage assessment for estimation Improvements to flood 67.00 91.40 158.40 158.40 bunds Kalutara 2.00 and overseeing monitoring of all activities. Colombo 5.00

Rehabilitation of Galle 0.20 Gaps in Implementation arrangements: Minor Flood Protection 19.80 19.80 19.80 Implementation of activities in the Irrigation Structures Colombo 19.60 sector have gaps due to lack of relevant staff Galle 5.00 20.00 Rehabilitation and Matara 80.00 50.00 120.00 to execute the implementation process at Improvements to different levels. Relevant technical expertise canal bunds and Canal Kalutara 10.00 113.30 27.00 97.00 12.00 132.00 342.30 342.30 Structures (Canal Spill, with capacity to identify appropriate solutions Anicut etc.) Hambantota 9.20 and guide young staff during the estimation Ratnapura 9.10 process is necessary. Permission for emergen- Galle 2.00 cy procurement and relevant authorities to Construction of access roads Including structures 22.00 22.00 22.00 hire required machinery is very important to e.g. retaining walls Matara 20.00 expedite the implementation process. Further - more, it is necessary to introduce appropriate Matara 10.00 10.00 incentive structures to motivate field staff and Rehabilitation of eroded Kalutara 15.00 5.00 31.30 15.00 46.30 46.30

office staff to work day and night during disas- river bank Hambantota 1.30 Irrigation Department ter situations. Colombo 5.00 Galle 5.00 10.00 In addition to the above, regular maintenance Removing obstructions of Matara 5.00 5.00 49.90 15.00 64.90 64.9 of drainage systems and flood protection rivers including desiliting Kalutara 30.00 systems is essential to minimize the impact of Hambantota 9.90 floods. Hence it is useful to maintain ma- Galle 5.00 10.00 chinery units in Galle, Matara and Kalutara Removing obstructions of Matara 20.00 7.00 10.00 35.90 17.00 13.00 65.90 65.90 Districts. Moreover, the full requirement of canals including desilting Kalutara 10.00 3.00 annual funds for flood protection and drainage Ratnapura 0.90 maintenance should be allocated. Repairs to pump houses Matara 10.00 10.00 10.00 10.00

Rehabilitation of Unit Office Buiding and Kalutara 3.00 3.00 3.00 3.00 9. Monitoring Framework Quarters Overall monitoring of the progress of the Rehabilitation of Nilwala Flood Protection Scheme programme is proposed to be carried out by Pump Houses 475.00 475.00 475.00 Introduction of new the Ministry of Irrigation and Water Resources 180.00 180.00 180.00 gravity outlets Matara Management, while supervising, fund releas- Additional pump house 50.00 50.00 50.00 ing and monitoring of activities at national O & M Machinery Unit 100.00 100.00 100.00 level is to be carried out by the Additional Rehabilitation of Gin Ganga Flood Protection Scheme Director General (System Management) Gin Ganga System 300.00 300.00 300.00 Rehabilitation Galle O & M Machinery Unit 100.00 100.00 100.00 Total 349.20 1428.40 160.00 1937.60 732.60 1205.00

110 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan TABLE 19: RECOVERY PLAN MATRIX – IRRIGATION SECTOR Budgetary Support Government Lead Annual Annual Annual Annual Annual Target Annual Target Target by Budget Budget (LKR Budget (LKR Unmet Affected by District by District Total Programme District (LKR Mn) Mn) Mn) Government Donor (Financing Districts Budget Lead Agencies (LKR Mn) (LKR Mn) Gap) (LKR (LKR Mn) Mn) 2017 2017 2018 2018 2019 2019 Galle 10.00 35.00 Rehabilitation and Matara 50.00 56.40 Improvements to flood 67.00 91.40 158.40 158.40 bunds Kalutara 2.00 Colombo 5.00

Rehabilitation of Galle 0.20 Minor Flood Protection 19.80 19.80 19.80 Structures Colombo 19.60

Galle 5.00 20.00 Rehabilitation and Matara 80.00 50.00 120.00 Improvements to canal bunds and Canal Kalutara 10.00 113.30 27.00 97.00 12.00 132.00 342.30 342.30 Structures (Canal Spill, Anicut etc.) Hambantota 9.20 Ratnapura 9.10 Galle 2.00 Construction of access roads Including structures 22.00 22.00 22.00 e.g. retaining walls Matara 20.00 Matara 10.00 10.00

Rehabilitation of eroded Kalutara 15.00 5.00 31.30 15.00 46.30 46.30 river bank Hambantota 1.30 Irrigation Department Colombo 5.00 Galle 5.00 10.00

Removing obstructions of Matara 5.00 5.00 49.90 15.00 64.90 64.9 rivers including desiliting Kalutara 30.00 Hambantota 9.90 Galle 5.00 10.00

Removing obstructions of Matara 20.00 7.00 10.00 35.90 17.00 13.00 65.90 65.90 canals including desilting Kalutara 10.00 3.00 Ratnapura 0.90 Repairs to pump houses Matara 10.00 10.00 10.00 10.00

Rehabilitation of Unit Office Buiding and Kalutara 3.00 3.00 3.00 3.00 Quarters Rehabilitation of Nilwala Flood Protection Scheme

Pump Houses 475.00 475.00 475.00 Introduction of new 180.00 180.00 180.00 gravity outlets Matara Additional pump house 50.00 50.00 50.00 O & M Machinery Unit 100.00 100.00 100.00 Rehabilitation of Gin Ganga Flood Protection Scheme Gin Ganga System 300.00 300.00 300.00 Rehabilitation Galle O & M Machinery Unit 100.00 100.00 100.00 Total 349.20 1428.40 160.00 1937.60 732.60 1205.00

10. Sector Recovery Chapters and Sector Recovery Matrices 111 / Director of Irrigation (Drainage & Flood • Water and Sanitation Systems) at the Irrigation Department Head Office. The District Director of Irrigation carries out biweekly progress monitoring and monthly 1. Strategic Vision of the progress review meetings. Technical guidance Sector for Recovery and monitoring of improvements, upgrading, The uninterrupted functioning of sector rehabilitation and reconstruction activities is infrastructure is available for disaster-affected to be carried out jointly by the Chief Irrigation communities through more resilient water and Engineer and Divisional Irrigation Engineer. sanitation facilities constructed following the Monitoring of activities at community level is concept of Building Back Better. proposed through farmer organizations and by the project management committee at scheme level. 2. Status of Sector Recovery from 2016 and 2017 Landslides and Floods The Ministry of Irrigation and Water Resources Heavy rainfall occurred on the night of 24th Management monitors the rehabilitation of May, 2017 and consequent release of large the damaged Irrigation schemes operated by volumes of water, severe damages occurred to Provincial Irrigation Departments. The District Water Supply and Sanitation infrastructures and Divisional Secretaries are the focal points in five districts: Ratnapura, Kalutara, Galle, for monitoring at district and divisional Level. Matara and Hambantota. However, disaster They coordinate all activities including damage impacts of water and sanitation in Hamban- assessment, release of funds, and overseeing tota and Galle were found to be far less than in monitoring of rehabilitation, improvements the other three districts. Although Colombo and construction. Technical guidance and mon- district was not identified as a focal district, itoring of improvements, upgrading, rehabilita- the damages to the main transmission pipeline tion and reconstruction activities is to be carried system from Labugama and Kalatuwawa res- out by provincial level and district level officers ervoirs feeding the Greater Colombo area was under the Provincial Irrigation Department. included due to the magnitude of the impacts.

Key indicators of the Irrigation sector recovery In the Water Supply subsector, the assessment plans include the following: focused on the disaster impacts of urban water supply schemes of the National Water Supply · Length of flood protection bunds im- and Drainage Board and community-managed proved rural water supply (RWS) schemes and dug wells. In the Sanitation sub-sector, the assess- · Lengths of irrigation canals, drainage ment focused on household latrines. canals, and river banks improved The cost of overall damages to the Water and · Number of pumps houses, gravity outlets, Sanitation sector was found to be LKR 1,531.9 irrigation infrastructures improved million, of which LKR 854.7 million was for drinking water supply. The balance cost of LKR · Length of agricultural roads, access roads, 677.2 was for the damages to inundated toilets. bund roads improved Regarding drinking water, the largest dam- age corresponds to the RWS. The total cost of [Table 19]. pp. 110-111 losses related to drinking water was LKR 143.5 million, out of which almost 66.0 million was

112 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan for Kalutara district. The District of Kalutara dug wells in all affected communities to was leading in financial damage and losses with restore water supply to households and 34% of the overall effects. communities.

The immediate recovery needs are already met, · The repair and restoration of household’s but more attention should be focused on medi- toilets to ensure access to sanitation um- to long-term interventions, adopting the facilities. concept of Build Back Better. In the five focal districts; short-term, medium-term and long- term water and sanitation related recovery and 4. Prioritization criteria reconstruction needs were estimated at LKR Unlike most of the other sectors, setting 8,400.1 million; LKR 5,487.7 million and LKR priorities for the Water and Sanitation sector 2,912.4 respectively. The highest cost corre- is rather difficult owing to the fact that these sponds to the recovery of dug wells followed by common amenities are equally important for toilets. all communities. However, criteria for priori- tization is made here based mainly on spatial The PDNA assessment of the Water and distribution and number of people affected: Sanitation sector considered the five districts with 60 Divisional Secretary areas and 1472 · Reconstruction of damages in main Grama Niladhari Divisions. The impacts to transmission lines of NWS&DB systems the water and sanitation infrastructure were in Colombo, where coverage is greater, highest of the Matara district in comparison to the more undulating Ratnapura district, and · Improvement to and/or reconstruction the Kalutara district closely followed these two of water supply systems and sanitation in districts. The disaster recovery needs of the remote rural communities in the dis- Matara and Kalutara districts posed different tricts of Kalutara, Matara and Ratnapura problems, particularly concerning stagnation where RWSs and dug-wells are mostly and inundation of water over a long period of affected, time. · Upgrading/replacing locations of dam- aged NWSSs and RWSs, where appro- 3. Sector Recovery Priorities /Objectives priate, to make them resilient to natural The overall objective is to provide access to im- disaster as a long-term measure in each proved water and sanitation facilities assuring affected district. safety, resilience and protection for commu- nities that were affected by the 2016 and 2017 natural disasters. 5. Sector Policy Guidelines for Recovery Prior to the disaster, the water sector was mov- The specific objectives are as follows: ing towards water safety based on Water Safety Plans (WSP), as a key initiative in line with the · The immediate restoration of drinking Sustainable Development Goals (SDGs), by water services though cleaned dug wells, establishing surveillance of water supply from piped water, and rural water supply catchment to consumer. The aftermath of the schemes (RWSSs). disaster highlighted the need for WSPs at both the level of the service provider and house- · The immediate repair and cleaning of holds.

10. Sector Recovery Chapters and Sector Recovery Matrices 113 LINKS TO PUBLIC INVESTMENT Preparedness and Response Capacity/ PROGRAMME (PIP)9 Mechanisms should become a permanent According to the Public Investment Pro- agenda item of the national WATSAN steering gramme 2017-2020, safe drinking water is committee meeting convened by the Ministry seen as an essential prerequisite for better of City Planning and Water Supply together health and socio-economic development. PIP with NWS&DB. This forum may be extended identified some key challenges that need to be towards forming multi-sectoral platforms to addressed as a result of the increased demand materialize long-term strategies for Integrat- for pipe-borne water. These challenges faced ed Water Resource Management with partic- by the country’s Water and Sanitation Sector ular attention to catchments and river basins. include, among others; a) regional disparities, Convergence between the water and health b) serving of Chronic Kidney Disease affected sectors may be further strengthened under areas, c) maintaining better quality in water the Water Safety Plan (WSP) framework sources, d) high rate of non-revenue Water, through District Water Quality Surveillance e) growing demand for reliable pipe-borne Committees to cater to disaster related issues water service, f) creating environs to attract pertaining to household water and sanitation private sector investment, and g) maintaining facilities. a cost-effective tariff system for the sub-sector. The policy direction of the Government during A key highlight during the immediate next five years is to provide equitable access response was the role and response of to safe drinking water and sanitation for the Community-based organizations (CBOs), entire population of the country. communities, civil society organizations, media institutions etc. The sector would assess incorporation of such stakeholders in 6. Sources of Funding/ the medium- to long-term recovery process- Finance for Recovery es as well by setting mechanisms and plat- It is envisaged that short- and medium-term forms. The existing CBOs that manage water (2017-2018) fund requirements are scheduled schemes would play a key role in this aspect to be met through ministerial allocation. through capacity building and integration of The Sustainable Development Goals (SDGs risk management approaches such as water declares the need to ensure universal and safety plans. As a whole the sector would have equitable access to safe and affordable drinking to assess its potential in reaching out both up- water and sanitation for all by 2030, for which stream and downstream audiences through ear-marked funding will be borne mainly by customized communication strategies on multi-lateral donors. risk-informed and disaster-resilient water and sanitation services. Mass media and education system would be more involved in 7. Key Institutional Roles and setting sustainable targets in this regard. Implementing Partners: Government, Private Sector, NGOs Disaster Risk Management encompass- 8. Implementation and Coordination ing pre-emergency, emergency onset and Arrangements and Mechanisms post-emergency contexts and Emergency The Ministry of City Planning and Water Supply together with NWS&DB and Depart-

9 Public Investment Programme (PIP), p. 94 and ment of National Community Water Supply 99 (DNCWS) are the lead agencies in imple-

114 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan TABLE 20: WATER AND SANITATION BUDGET SUMMARY TABLE Scheme District 2017 2018 2019 Total

Galle 0.62 11.50 0.00 12.12

Matara 2.04 78.60 0.00 80.64

Hambantota 2.05 60.50 0.00 62.55 NWSBD Scheme Kalutara 0.75 1.50 0.00 2.25

Ratnapura 1.50 11.00 0.00 12.50

Colombo 24.20 68.00 0.00 92.20 Sub Total 31.16 231.1 0.00 262.26

Galle 0.000 26.14 33.46 59.60

Matara 0.00 54.73 65.67 120.40 Community-Managed Rural Hambantota 0.00 28.10 0.00 28.10 Water Schemes Kalutara 0.00 11.90 0.00 11.90

Ratnapura 0.00 118.97 147.53 266.50 Sub Total 0.0 239.84 246.66 486.50

Galle 0.00 2.36 142.64 145.00

Matara 0.00 18.08 118.12 136.20

Dug Wells Hambantota 0.00 6.23 35.67 41.90

Kalutara 0.00 43.47 147.03 190.50

Ratnapura 0.00 19.38 132.42 151.80 Sub Total 0.00 89.52 575.88 665.40 Galle 0.00 25.60 67.10 92.70

Matara 0.00 61.50 110.10 171.60

Household Toilets Hambantota 0.00 49.30 113.70 163.00

Kalutara 0.00 92.40 152.00 244.40

Ratnapura 0.00 92.40 197.50 289.90 Sub Total 0.00 321.20 640.40 961.60

Grand Total 31.16 881.66 1462.94 2375.76

10. Sector Recovery Chapters and Sector Recovery Matrices 115

Ministry of Health and Health

Department

Support Agencies

Support Agencies

National Water Supply & Drainage

National Water Supply & Drainage Lead Government National Water Supply & Drainage Board and National Water Supply National Water Supply

Government Lead Government Board and Department of National Department of National Community Water Supply Board and Department of National Lead Community Water Supply & Drainage Board and & Drainage Board and

Agencies Lead Community Water Supply Department of National Community Department of National Community Agencies

Water Supply Water Supply

Gap) Unmet

Gap) (Financing Unmet

(Financing

Donor

Donor

Budgetary Support

Government Budgetary Support

Government 6.1

16.0 47.2 48.9 25.9 93.9 96.6 89.0 138.9 102.9 453.3 11.9 Total Total 28.1 59.6 212.1 Budget 120.4 266.5 486.5 216.7 961.6 744.9 Total Total 31.8 88.4 52.6 23.0 20.9 60.9 Budget 110.4 148.6 201.5 223.5 3.7 9.8 29.1 0.0 0.0 25.9 29.5 96.6 50.4 89.0 65.7 33.5 138.9 102.9 453.3 147.5 246.7 122.58 2019

2019 216.7 423.7 640.4 Annual Annual Budget Budget 61.1 87.1 31.8 35.3 88.4 52.6 23.0 20.9 131.1 109.1 95

812 457 483 157

2019 2019 Target Target Annual Annual Target Annual Target 31 RWS 32 RWS ------To 60 To 1350 (10% of the total existing dug wells) 1438 (10% of the total existing dug wells) 1941 (10% of the total existing dug wells) 1245 (10% of the total existing dug wells) 361 (10% of the total existing dug wells)

688 Toilets 688 Toilets 1772 Toilets 1772 Toilets 2128 Toilets 1416 Toilets 992 Toilets 1149 (10 %) of existing Toilets 271 (Only 10%) of existing Toilets 299 (Only 10%) of existing Toilets 412 (Only 10%) of existing Toilets 683 (Only 10%) of existing Toilets 2.4 6.2 11.9 18.1 26.1 28.1 54.7 19.4 43.5 119.0

239.8 89.6 2018 2018 Annual Budget

Annual Budget

61.5 92.4 92.4 49.3 25.6 321.2 321.2

60 100 700 300 300

2018 Target Target Annual 2018

Target Target Annual 25 RWS 25 RWS 10 RWS 12 RWS 50 RWS

Budget for 0.0

0.0 Balance of Year 0.0 Budget for Balance 1500 Toilets 1500 Toilets 1000 Toilets 500 Toilets 800 Toilets of Year 2017 2017

0.0 0.0 0.0

Costs Already 0.0

Costs Already 0.0

Incurred in 0.0 0.0 0.0 0.0 Incurred in 2017 2017

/by 2017 2017 Target Target Annual Annual District location Target by Target

Scheme Scheme District & District & ambantota Water Supply Water ambanthota Water Supply Water Matara Matara 110 Ratnapura 56 Galle 57 Kalutara 10 H 12 1512 Ratnapura 757 Galle 155 Matara 783 H 257 13508 Ratnapura 14384 Galle 19416 Matara 12457 H ambantota 3618 Kalutara Kalutara Kalutara Ratnapura Ratnapura 3272 Kalutara 3628 Matara 2416 Galle 1188 H ambanthota 1792 Ratnapura 11490 Kalutara 2710 Matara 2991 Galle 4123 H ambanthota 6836 RECOVERY PLAN MATRIX – WATER AND SANITATION SECTOR AND SANITATION – WATER RECOVERY PLAN MATRIX Objective Objective Objective Objective Programme Programme Programme Programme Community-Managed Rural Water Schemes Water Community-Managed Rural carry out To required repairs and reconstruction to works identified RWS schemes within the district. Dug Wells Repairing and re-construction of damaged protected wells Total improvement to existing Dug including Wells protection for unprotected (BBB) wells H ousehold toilets Repairing and re-construction of damaged Toilets Total improvement to existing Toilets Including Upgrading Direct Pits to Sealed Water Units (BBB) Sub Total Sub Total Sub Total Sub Total Sub Total Total Grand TABLE 21: TABLE

116 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan

Ministry of Health and Health

Department

Support Agencies

Support Agencies

National Water Supply & Drainage

National Water Supply & Drainage Lead Government National Water Supply & Drainage Board and National Water Supply National Water Supply

Government Lead Government Board and Department of National Department of National Community Water Supply Board and Department of National Lead Community Water Supply & Drainage Board and & Drainage Board and

Agencies Lead Community Water Supply Department of National Community Department of National Community Agencies

Water Supply Water Supply

Gap) Unmet

Gap) (Financing Unmet

(Financing

Donor

Donor

Budgetary Support

Government Budgetary Support

Government 6.1

16.0 47.2 48.9 25.9 93.9 96.6 89.0 138.9 102.9 453.3 11.9 Total Total 28.1 59.6 212.1 Budget 120.4 266.5 486.5 216.7 961.6 744.9 Total Total 31.8 88.4 52.6 23.0 20.9 60.9 Budget 110.4 148.6 201.5 223.5 3.7 9.8 29.1 0.0 0.0 25.9 29.5 96.6 50.4 89.0 65.7 33.5 138.9 102.9 453.3 147.5 246.7 122.58 2019

2019 216.7 423.7 640.4 Annual Annual Budget Budget 61.1 87.1 31.8 35.3 88.4 52.6 23.0 20.9 131.1 109.1 95

812 457 483 157

2019 2019 Target Target Annual Annual Target Annual Target 31 RWS 32 RWS ------To 60 To 1350 (10% of the total existing dug wells) 1438 (10% of the total existing dug wells) 1941 (10% of the total existing dug wells) 1245 (10% of the total existing dug wells) 361 (10% of the total existing dug wells)

688 Toilets 688 Toilets 1772 Toilets 1772 Toilets 2128 Toilets 1416 Toilets 992 Toilets 1149 (10 %) of existing Toilets 271 (Only 10%) of existing Toilets 299 (Only 10%) of existing Toilets 412 (Only 10%) of existing Toilets 683 (Only 10%) of existing Toilets 2.4 6.2 11.9 18.1 26.1 28.1 54.7 19.4 43.5 119.0

239.8 89.6 2018 2018 Annual Budget

Annual Budget

61.5 92.4 92.4 49.3 25.6 321.2 321.2

60 100 700 300 300

2018 Target Target Annual 2018

Target Target Annual 25 RWS 25 RWS 10 RWS 12 RWS 50 RWS

Budget for 0.0

0.0 Balance of Year 0.0 Budget for Balance 1500 Toilets 1500 Toilets 1000 Toilets 500 Toilets 800 Toilets of Year 2017 2017

0.0 0.0 0.0

Costs Already 0.0

Costs Already 0.0

Incurred in 0.0 0.0 0.0 0.0 Incurred in 2017 2017

/by 2017 2017 Target Target Annual Annual District location Target by Target

Scheme Scheme District & District & Water Supply Water ambantota ambanthota ambanthota Water Supply Water Matara Matara 110 Ratnapura 56 Galle 57 Kalutara 10 H ambantota 12 1512 Ratnapura 757 Galle 155 Matara 783 H ambanthota 257 13508 Ratnapura 14384 Galle 19416 Matara 12457 H 3618 Kalutara Kalutara Kalutara Ratnapura Ratnapura 3272 Kalutara 3628 Matara 2416 Galle 1188 H 1792 Ratnapura 11490 Kalutara 2710 Matara 2991 Galle 4123 H 6836 Objective Objective Objective Objective Programme Programme Programme Programme ousehold toilets Community-Managed Rural Water Schemes Water Community-Managed Rural carry out To required repairs and reconstruction to works identified RWS schemes within the district. Dug Wells Repairing and re-construction of damaged protected wells Total improvement to existing Dug including Wells protection for unprotected (BBB) wells H Repairing and re-construction of damaged Toilets Total improvement to existing Toilets Including Upgrading Direct Pits to Sealed Water Units (BBB) Sub Total Sub Total Sub Total Sub Total Sub Total Total Grand

10. Sector Recovery Chapters and Sector Recovery Matrices 117 Support Agencies Lead Government Lead Government Agencies Gap) Unmet (Financing Mn) (LKR Donor Mn) Govern- Budgetary Support ment (LKR Total Total Budget (LKR Mn) 34.5 13.6 22.4 92.2 11.0 9.1 262.3 12.5 14.4 2.1 28.0 5.6 11.6 3.1 2.0 0.2 2019 Annual Budget (LKR Mn) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------2019 Target Annual

2018 Annual Budget (LKR Mn) 33.0 13.2 22.0 68.0 11.0 8.8 231.1 11.0 14.3 1.5 27.5 5.5 11.0 2.8 1.7 0.0 2018 location by District/by Annual Target Annual Target Constructing the new steel Pipe Bridge Replacing of Intake Pumps and Panels Replacing of Intake Pumps and Panels Pipeline strengthened for preventing further slides and similar landslide-prone areas along the pipelines identified Replacing of two Intake Borehole Panels Replacing of Intake Borehole Pumps and panels Generator (400 Generator and three- KVA phase supply) in Intake Ratnapura to be replaced Reconstruction Sand of Slow Filters Repairs to damaged water raw transmission mains Three VSD panels replaced. Replacing of Intake Panels Generator (300 Generator and three- KVA phase supply) replaced Replacing of Intake Borehole Pumps Replacing of Intake Borehole Pumps Repairs to damaged water distribution pipelines

Budget for Balance of Year 2017 (LKR Mn) 0.0 0.0 0.0 12.0 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Costs Already Incurred in 2017 (Rs. Mn) 1.5 0.43 0.4 12.2 0.0 0.3 19.2 0.12 1.5 0.55 0.53 0.13 0.64 0.32 0.37 0.2 2017 Annual Target Temporary Temporary support to restore the pipe lines two (300 mm DI and 200 mm DI) Temporary repairing Temporary Temporary Repairing New pipes connected to the existing three pipelines and strengthen the system. Replacing pumps and associated equipment Boreholes flushed and Cleaned. Borehole Pumps temporary repaired and running Temporary Temporary Restoration Generator Generator temporarily repaired. Temporary Temporary Repairs Three VSD temporarily repaired. Temporary Temporary Repairing Generator Generator (300 KVA and three- phase supply) repaired. Boreholes flushed and cleaned. Borehole pumps temporary repaired and running Replacing of Intake Borehole Pumps Repairs to damaged water distribution pipelines Scheme District & ambantota ambantota Water Supply Water H H Matara WSS H orana Colombo Matara Galle Wakamulla Wakamulla WSS Ranna WSS Ratnapura Akuressa Kalutara Labugama- Kalatuwawa wss Matara Karagoda- WSS Uyangoda Udugama WSS Ratnapura Ingiriya Ingiriya Nimalagama Matara Matara Group Matara Water Town Supply Scheme Deniyaya Galle Pitigala Matara Makandura Kalutara RECOVERY PLAN MATRIX – WATER AND SANITATION SECTOR AND SANITATION – WATER RECOVERY PLAN MATRIX Objective Programme Programme ouse NWS&DB Water Schemes NWS&DB Water Repair and strengthen the three main transmission pipelines damaged along Kaluaggala- Labugama road (200m length) H Replacing two Intake Borehole Panels H ouse Replacing of Intake Borehole Pumps and panels Reconstruction Sand of Slow Filters Generator (400 Generator and three- KVA phase supply) in Ratnapura Intake to be replaced Repairs to damaged water raw transmission mains in and Ingiriya Nimalagama Replace three speed variable VSD drive panels at the Balakawala Intake Replacing of Intake Pumps in and Panels Intake Pump Sub Total Replacing of Intake Pumps in and Panels Intake Pump Replacing of Intake Panels Replace the (300 Generator and three- KVA phase supply) at the Balakawala Intake Replacing of Intake Borehole Pumps Constructing a new steel Pipe Bridge across Urubokka Oya to rest the two pipelines (300 mm DI and 200 mm DI) Replacing of Intake Borehole Pumps Repairs to damaged water distribution pipelines TABLE 21: TABLE

118 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Support Agencies Lead Government Lead Government Agencies Gap) Unmet (Financing Mn) (LKR Donor Mn) Govern- Budgetary Support ment (LKR Total Total Budget (LKR Mn) 34.5 13.6 22.4 92.2 11.0 9.1 262.3 12.5 14.4 2.1 28.0 5.6 11.6 3.1 2.0 0.2 2019 Annual Budget (LKR Mn) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------2019 Target Annual

2018 Annual Budget (LKR Mn) 33.0 13.2 22.0 68.0 11.0 8.8 231.1 11.0 14.3 1.5 27.5 5.5 11.0 2.8 1.7 0.0 2018 location by District/by Annual Target Annual Target Constructing the new steel Pipe Bridge Replacing of Intake Pumps and Panels Replacing of Intake Pumps and Panels Pipeline strengthened for preventing further slides and similar landslide-prone areas along the pipelines identified Replacing of two Intake Borehole Panels Replacing of Intake Borehole Pumps and panels Generator (400 Generator and three- KVA phase supply) in Intake Ratnapura to be replaced Reconstruction Sand of Slow Filters Repairs to damaged water raw transmission mains Three VSD panels replaced. Replacing of Intake Panels Generator (300 Generator and three- KVA phase supply) replaced Replacing of Intake Borehole Pumps Replacing of Intake Borehole Pumps Repairs to damaged water distribution pipelines

Budget for Balance of Year 2017 (LKR Mn) 0.0 0.0 0.0 12.0 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Costs Already Incurred in 2017 (Rs. Mn) 1.5 0.43 0.4 12.2 0.0 0.3 19.2 0.12 1.5 0.55 0.53 0.13 0.64 0.32 0.37 0.2 2017 Annual Target Temporary Temporary support to restore the pipe lines two (300 mm DI and 200 mm DI) Temporary repairing Temporary Temporary Repairing New pipes connected to the existing three pipelines and strengthen the system. Replacing pumps and associated equipment Boreholes flushed and Cleaned. Borehole Pumps temporary repaired and running Temporary Temporary Restoration Generator Generator temporarily repaired. Temporary Temporary Repairs Three VSD temporarily repaired. Temporary Temporary Repairing Generator Generator (300 KVA and three- phase supply) repaired. Boreholes flushed and cleaned. Borehole pumps temporary repaired and running Replacing of Intake Borehole Pumps Repairs to damaged water distribution pipelines Scheme District & orana WSS orana Water Supply Water H ambantota H ambantota Matara H Colombo Matara Galle Wakamulla Wakamulla WSS Ranna WSS Ratnapura Akuressa Kalutara Labugama- Kalatuwawa wss Matara Karagoda- WSS Uyangoda Udugama WSS Ratnapura Ingiriya Ingiriya Nimalagama Matara Matara Group Matara Water Town Supply Scheme Deniyaya Galle Pitigala Matara Makandura Kalutara RECOVERY PLAN MATRIX – WATER AND SANITATION SECTOR AND SANITATION – WATER RECOVERY PLAN MATRIX RECOVERY PLAN MATRIX – WATER AND SANITATION SECTOR AND SANITATION – WATER RECOVERY PLAN MATRIX Objective Programme Programme ouse NWS&DB Water Schemes NWS&DB Water Repair and strengthen the three main transmission pipelines damaged along Kaluaggala- Labugama road (200m length) H ouse Replacing two Intake Borehole Panels H Replacing of Intake Borehole Pumps and panels Reconstruction Sand of Slow Filters Generator (400 Generator and three- KVA phase supply) in Ratnapura Intake to be replaced Repairs to damaged water raw transmission mains in and Ingiriya Nimalagama Replace three speed variable VSD drive panels at the Balakawala Intake Replacing of Intake Pumps in and Panels Intake Pump Sub Total Replacing of Intake Pumps in and Panels Intake Pump Replacing of Intake Panels Replace the (300 Generator and three- KVA phase supply) at the Balakawala Intake Replacing of Intake Borehole Pumps Constructing a new steel Pipe Bridge across Urubokka Oya to rest the two pipelines (300 mm DI and 200 mm DI) Replacing of Intake Borehole Pumps Repairs to damaged water distribution pipelines TABLE 21: TABLE TABLE 21: TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 119 menting the reconstruction of the sector. The · Number of pipelines repaired and water National Water Supply and Drainage Board supply restored and improved (NWS&DB), will handle the main water supply schemes while the RWS Division is responsible · Number of dug wells cleaned and utilized for Rural Water Supply Schemes, in participa- by communities tion with the DNCWS and Rural Water Supply (RWS) district units of NWS&DB. In the imple- · Number of toilets repaired, reconstruct- mentation of RWSs, dug-wells and latrines are ed and sanitation facilities restored to implemented and monitored in participation households with the CBOs operating at the grassroots, with the coordinating support of the divisional level [Table 20-21] pp. 117-119 health sector workers (CHWs, PHIs etc.), and Community Development Officers.

The Ministry of City Planning and the NWS&DB will liaise with the Ministry of Na- tional Policies and Economic Affairs and the Ministry of Disaster Management to ensure that DRR elements are integrated into the sector reconstruction and all initiatives comply with national policies and international ratifi- cation of disaster and humanitarian responses. The Ministry and NWS&DB will collaborate with the international donor community and UN agencies in the recovery / reconstruction process. They would further link the recov- ery and reconstruction work with long-term development and DRR initiatives pertaining to the sector.

9. Monitoring Framework The key indicators for the sector recovery are as follows:

· Number and length of pipelines repaired and restored

· Number of intake panels and pumps replaced

· Number of generators supporting water supply procured

120 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan • Transport were affected. Nearly 18 Bridges were dam- aged. Landslides occurred in Matara, Rat- napura and Colombo Districts. In addition, 1. Strategic Vision for the many retaining walls and drainage structures Sector for Recovery were severely damaged. Road Infrastructure facilities are improved through the concept of Building Back Better Temporary Recovery Measurers: RDA had (BBB) and are resilient to disasters, enabling taken immediate measures for the temporary the smooth functioning of the Transport recovery work which was estimated as LKR Sector. 579.70 million. The roads were made passable and the removal of trees and debris was carried out on the roadways. RDA funds and some 2. Status of sector recovery from 2016 funds from District Secretaries were utilized and 2017 landslides and floods for the temporary recovery measures. Floods and Landslides – 2016: In 2016, Flood damage was experienced in all provinces Additional finance for BBB: Considering of Sri Lanka. Earthslips and landslides weie GOSL’s emphasis on Building Back Better reported in the Southern, Central, Sabarag- through the incorporation of disaster resilient amuwa, Uva and North-Western Provinces. construction techniques into road reconstruc- Road erosion, slope failures, damages of tion, community mobilization and capacity shoulders, retaining walls, drains and culverts building of technical persons, builders, and were also reported in these areas. Rock falling officials in incorporating disaster resilient was reported in the Uva Province. Minor road features to road sector is critical. Technical damages and base failures were experienced in Officers from the Divisional Offices themselves the other provinces. were exposed to specialized training in incor- porating DRR into construction and therefore Tentative Cost Estimate: The relevant Pro- are not adequately equipped to impart this vincial Directors worked out the tentative cost knowledge to beneficiaries. estimates for rectification, as follows: Issues and Challenges with the Transport province tentative cost Recovery and Reconstruction: It is intended (lkr million) to implement the recovery plan in three years Western 686.00 which will be a difficult task with the available Southern 6.00 and limited administrative staff, skilled and Central 230.00 semi-skilled labourers, technical staff, ma- Sabaragamuwa 87.00 chinery, equipment, including construction North Western 118.00 materials. The shortage of public and private North Central 133.00 contractors will impede to achieve the expect- Northern 113.00 Eastern 80.00 ed goals. Total: 1455.00 In addition, the Government Procurement Floods and Landslides – 2017: In 2017, se- Guidelines, Financial Regulations and Admin- vere flood damage and landslides were expe- istrative Regulations will not allow the speedy rienced in eight districts within the Western, implementation of the projects. Southern, and Sabaragamuwa Provinces. Nearly 300 km of Class ‘A’ and Class ‘B’ roads

10. Sector Recovery Chapters and Sector Recovery Matrices 121 3. Sector Recovery Priorities /Objectives 3) Magnitude of the road user communities 1) The immediate priority in the recovery of damaged structures is the removal of 4) Vehicle movement volume of the affected debris and cleaning the surface to open the road network roadways, which was attended to during the year 2017. 5) Protection of public and private assets along the affected roads 2) The first priority thereafter is for the recon- struction of bridges and culverts to make the affected roads passable. 5. Sector Policy Guidelines for Recovery The draft National Housing Policy of January 3) The next priority is the reconstruction of 2017 lists safety and resilience amongst its damage retaining walls in such a way that guiding principles: ‘ensuring safe and resilient they will be resistant to future landslides. human settlements responsive to impacts of natural disasters and climate change’. 4) In combination with retaining walls, measures to consolidate sloping terrain by LINK TO PUBLIC INVESTMENT PROGRAMME appropriate slope protection techniques. – 2017-2020 (PAGES 76 AND 86) The Public Investment Programme 2017- 5) After strengthening the above associated 2020, aims at ensuring access to road infra- components, actual road works need to be structure facilities for every road user in order implemented, which is the final step of the to improve the quality of life of all citizens. sequential rebuilding process. In regard to the transport sector, PIP provides 6) Ongoing monitoring both at national and a detailed account on all its subsectors, viz. sub-national levels (provincial, district and Roads, railways, public transport, ports & local), is equally important. shipping, aviation and challenges vis-à-vis strategies for each mode of transport. The main concern is to upgrade national highways 4. Prioritization Criteria for Projects (including 5 express ways), and making desired The overall priority is to provide uninterrupted connectivity to national and provincial road road access to disaster-affected communities networks. through fully-recovered national roads, pro- vincial roads and local roads as well as assured The main challenges encountered by Transport transport facilities for communities that were Sector (among others) include; a) ensure con- affected by the 2016 and 2017 natural disasters. nectivity to every node or, to every settlement area of the country, b) ensure high mobility The road sector intervention related prioritiza- among growth centres, ensure multi-mod- tion criteria was set accordingly: el connectivity nodes with railway, deontic airports etc., c) bottlenecks at different points 1) Accessibility to the important destinations of road network, d) sustainable maintenance of the existing network, and e) proper coordina- 2) Connectivity to the other road network tion between road sector agencies.

122 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan There are many more issues and challenges fore, the current need would be to revise the regarding public commuting, which is dom- NIRP to include disaster induced relocation inated by bus transport (52%). The present and establish mechanisms to operationalize demand for public passenger travel is around it. It is also opportune to develop a post-disas- 80 billion passenger kilometres per year, of ter recovery policy outlining the key agencies which road transportation amounts approxi- tasked with recovery activities and guiding mately to 93%. principles for recovery.

Other Policies: National Involuntary Re- settlement Policy of 2001 (NIRP) developed 6. Sources of Funding/ under the Ministry of Lands, provides several Finance for Recovery guidelines applicable to communities relocated The budgetary requirement for damaged RDA from high-risk areas including the need for roads for the scheduled three-year period community participation in decision making (2017, 2018 and 2019) is worked out at LKR in the resettlement process, need to ensure 1,876.10, 3,563.00 and 4,062.00 million gender equity in assistance, and an integrated respectively. The highest district-wise financial approach to resettlement including assistance allocations will be for Matara, Galle and Rat- to re-establish livelihoods and employment, napura. The main four items of works include: social and cultural networks and grievance a) rehabilitation of roads, b) reconstruction of redress mechanisms. bridges and culverts, c) construction of retain- ing walls, and d) slope protection measures. Links to Global Policy Frameworks: Guid- ing Principles for road reconstruction include The main source of funding for recovery ac- Build Back Better principles, which aim at en- tivities in the road sector is the GoSL through suring that communities affected by disasters ministerial allocation. Some major reconstruc- have access to improved road infrastructure as tion pertaining to expressways and highways a result of the reconstruction process. Building are ear-marked for funding by multi-lateral Back Better views disasters as an opportunity donors, who have already given their confirma- to reduce vulnerability and improve resilience tion of funding. of affected communities. GOSL funds that were made available to the The Sustainable Development Goals, partic- District Secretaries of each affected district ularly Goals of the New Urban Agenda and amounts to block allocation of LKR 300 mil- the Sendai Framework for Disaster Risk lion per district, which mainly to reconstruct Reduction, are other key guiding documents and/or rehabilitate damaged provincial roads that are applicable for road reconstruction. and local government roads, with the techni- cal assistance and supervision by PRDA and KEY GAPS IN POLICY: district and GN level technical staff. The policies and guiding principles listed above, particularly the NIRP, addresses many of the issues related to reconstruction and relo- 7. Key Institutional Roles and cation of disaster-affected and highly vulner- Implementing Partners: able communities. However, the NIRP is not Key Roles of RDA: Construction and mainte- widely known and the legislation to operation- nance of roads, culverts, bridges and drainage alize the policy has not been enacted. There- structures, and slope protections on national

10. Sector Recovery Chapters and Sector Recovery Matrices 123 A and B roads. The road construction and relevant agencies mentioned above, donors to improvement works were procured in accor- the programme, and representatives of UN or dance with the Government Procurement other agencies implementing project activities. Guidelines and Implemented by the RDA with the assistance of Provincial Offices. The Socio-technical facilitation is a key requisite to technical supports will be provided by RDA or ensure that the principles of Build Back Better shall be out-sourced if necessary. are incorporated into the road sector recovery process. Socio-technical facilitation includes, Implementing Partners are Provincial but is not limited to, the following aspects: Councils and local authorities at the sub-na- tional level. Most of recovery works of the · Ensuring availability of adequate skilled provincial and local government roads are workforce for reconstruction; handled by PRDA and local government authorities through their technical arms. · Provision of timely on-site advice and NWS&DB, CEB, SLT, CECB and Private guidance during the construction; Contractors take part in reconstruction work pertaining to differing disaster contexts and · Developing appropriate technical guide- monitoring of construction quality. NBRO lines and options for disaster resistant can also support the implementers in build- construction; and ing capacities to mainstream resilience into retaining walls and rectification of landslides · Quality assurance services, leading to and slope protection. timely completion of road projects in the districts. Most of the rural roads are technically and financially supported by various INGOs and Gaps in Implementation arrangements: local NGOs, within their capacities, in consul- Implementation of activities in the sector lacks tation with the local government authorities, clarity in terms of institutional structures, as to meet immediate and short-term require- many institutions with varying levels of capacity ments. and technical expertise are involved in the relief and reconstruction process. There is very little coordination among stakeholders. The Minis- 8. Implementation and Coordination try of Higher Education and Highways, with Arrangements and Mechanisms the mandate for road construction, is actively The road construction and improvement involved in the road reconstruction process. works were procured in accordance with the Government Procurement Guidelines and Implemented by the RDA with the assistance 9. Monitoring framework of Provincial Offices. The technical supports Overall monitoring of the progress of the will be provided by RDA or shall be out- programme is proposed to be carried out by sourced if necessary. the Road Development Authority. The relevant Provincial Directors will implement the work Coordination at National level is proposed with the assistance of Divisional Offices of the through a Steering Committee, comprising Districts. The Head Office of RDA will closely the Secretaries of the Ministries of Higher monitor the works. Education and Highways and heads of the

124 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Key monitoring indicators of the Transport The monitoring of the reconstruction of sector recovery plans include the following: National RDA roads, provincial and rural roads, therefore will be based on the priority · number of landslide rectified at the end parameters, which will be conducted by trained of 2019; RDA personnel. PRDA and the technical staff attached to District Secretariats and to local · length of roads completed at the end of government, including CBO activists will 2019; follow a more sustainable monitoring system backed by an appropriate donor-funded M&E · number of bridges and culverts complet- project. ed at the end of 2019. [Table 22 / pp. 124-125]

10. Sector Recovery Chapters and Sector Recovery Matrices 125 Support Agencies Lead Government Lead Government Agencies Ministry of Provincial council and Local Government Ministry of Provincial councils and Local Government Road Development Authority Support Agencies Lead Government Lead Government Agencies Ministry of Provincial Councils and Local Government Ministry of Provincial Council and Local Government Road Development Authority Government Donor Unmet Budgetary Support (LKR Mn) 25.00 32.000 Total Total 375.000 Budget Government Donor Unmet Budgetary Support (LKR Mn) 25.00 32.000 7.014 23.381 Total Total 375.000 41.700 139.000 29.709 99.030 61.285 204.284 715.00 1,445.00 Budget 46.534 155.112 434.00 2,134.000 943.00 2,144.100 500.00 1,000.00 567.501 1,891.671 422.959 1,409.864 1,470.00 2,346.000 Annual Budget 5,917.762 15,686.972 1,288.260 4,294.201 1,220.580 4,068.601 (LKR Mn) 4,062.000 9,501.100 7.014 23.381 41.700 139.000 29.709 99.030 61.285 204.284 715.00 1,445.00 46.534 155.112 434.00 2,134.000 943.00 2,144.100 1.961 500.00 1,000.00 0.910 567.501 1,891.671 6.654 6.307 8.895 0.766 8.034 0.360 3.600 422.959 1,409.864 1,470.00 2,346.000 14.100 Annual 21.675 65.413 Budget 96.170 53.610 15.900 21.600 54.437 46.697 82.493 47.880 27.600 111.990 5,917.762 15,686.972 132.186 1,288.260 4,294.201 582.311 1,220.580 4,068.601 (LKR Mn) 418.232 4,062.000 9,501.100 Annual district/ location Target by Target 1.961 0.910 6.654 6.307 8.895 0.766 8.034 0.360 3.600 14.100 21.675 65.413 96.170 53.610 15.900 21.600 54.437 46.697 82.493 47.880 27.600 111.990 132.186 582.311 418.232 Annual 13.00 district/ location 25.00 Target by Target 59.418 14.029 175.00 93.067 83.400 850.00 500.00 600.00 600.00 800.00 122.570 845.918 Annual Budget 2,441.161 1,135.002 2,576.521 7,274.523 (LKR Mn) 3,563.000 13.00 25.00 59.418 14.029 175.00 93.067 83.400 850.00 500.00 600.00 800.00 600.00 122.570 845.918 Annual Budget 2,441.161 1,135.002 2,576.521 1.532 1.820 7,274.523 (LKR Mn) 3.922 0.720 7.200 12.614 3,563.000 17.790 13.309 16.068 31.800 93.395 95.760 43.350 43.200 55.200 28.200 192.341 164.985 108.874 130.826 107.220 264.372 836.465 223.980 Annual 1,164.622 district Target by Target 1.532 1.820 3.922 0.720 7.200 12.614 17.790 13.309 16.068 31.800 93.395 95.760 43.350 43.200 55.200 28.200 192.341 164.985 108.874 130.826 107.220 264.372 836.465 223.980 Annual 1,164.622 district Target by Target 19.00 2.338 9.903 76.00 15.511 601.10 13.900 130.00 20.428 850.00 200.00 189.167 140.986 429.420 406.860 Annual Budget 1,876.100 (LKR Mn) 2,494.687 19.00 2.338 9.903 76.00 15.511 601.10 13.900 130.00 20.428 850.00 200.00 189.167 140.986 429.420 406.860 Annual Budget 1,876.100 (LKR Mn) 2,494.687 7.810 7.810 46.860 46.860 23.430 23.430 78.100 0.120 1.200 7.225 2.678 2.965 0.654 4.700 0.255 7.200 5.300 0.850 0.850 5.100 5.100 2.550 2.550 8.500 17.870 21.804 15.960 32.057 44.062 139.411 194.104 2017 2017 2018 2018 2019 2019 Annual district/ location Target by Target 7.810 7.810 46.860 46.860 23.430 23.430 78.100 0.120 1.200 7.225 2.678 2.965 0.654 4.700 0.255 7.200 5.300 0.850 0.850 5.100 5.100 2.550 2.550 8.500 17.870 21.804 15.960 32.057 44.062 139.411 194.104 2017 2017 2018 2018 2019 2019 Annual district/ location Target by Target Districts Affected Kalutara hambantota 15.566 Matara Galle Kalutara Ratnapura 27.498 Matara hambantota 2.218 Kalutara Matara Ratnapura 37.330 hambantota 0.303 hambantota 18.146 Matara Galle Kalutara Ratnapura Matara hambantota 2.102 Kalutara Matara Kalutara Galle Kalutara Kalutara Ratnapura 9.200 Ratnapura colombo Kalutara Rathhnapura Gampaha Kegalle Galle Matara hambantota Districts Affected Kalutara Hambantota 15.566 Matara Galle Kalutara Ratnapura 27.498 HambantotaMatara 2.218 Kalutara Matara Ratnapura 37.330 Hambantota 0.303 Hambantota 18.146 Matara Galle Kalutara Ratnapura Matara Hambantota 2.102 Kalutara Matara Kalutara Kalutara Kalutara Galle Ratnapura 9.200 Ratnapura Colombo Kalutara Gampaha Galle Matara Hambantota Kegalle Rathhnapura RECOVERY PLAN MATRIX - TRANSPORTATION SECTOR - TRANSPORTATION RECOVERY PLAN MATRIX Objective Programme Programme Objective Programme Programme Rehabilitation of Roads Reconstruction of Retaining Walls Reconstruction of systems Drainage Reconstruction of culverts Rehabilitation of Roads Reconstruction of Retaining Wall Reconstruction of culverts PRDA Roads (class c and D roads) Reconstruction of Bridges Roads (class E roads) Rural Reconstruction of Bridges RDA Roads (class A and B roads) Rehabilitation of Roads –30 km Retaining Wall – 3 Retaining Wall nos. Slop Protection Rehabilitation of Roads – 3 km Reconstruction of Bridges – 1 nos. – 7 Retaining Wall nos. Rehabilitation of Roads – 24 km Reconstruction of Bridges –7 nos. – Retaining Wall 17 nos. Reconstruction of Bridges – 1 nos. – 10 nos. culvert – 5 Retaining Wall nos. – 18 nos. Drains Slop Protection Rehabilitation of Roads – 1 km Reconstruction of Bridges – 2 nos. - 5 Retaining Wall nos. Rehabilitation of Roads – 15 km Drains – 4 nos. Drains Rehabilitation of Roads – 117 km. Reconstruction of Bridges – 6 nos. – 2 Retaining Wall nos. Rehabilitation of Roads – 80 km Reconstruction of Bridges – 1 nos. – Retaining Wall 14 nos. Rehabilitation of Roads – 29 km Sub Total Sub Total Sub Total Grand Total Grand TABLE 22: TABLE Rehabilitation of Roads Reconstruction of Retaining Walls Reconstruction of systems Drainage Reconstruction of Culverts Rehabilitation of Roads Reconstruction of Retaining Wall Reconstruction of Culverts PRDA Roads (Class C and D roads) Reconstruction of Bridges Roads (Class E roads) Rural Reconstruction of Bridges RDA Roads (Class A and B roads) Rehabilitation of Roads –30 km Retaining Wall – 3 Retaining Wall nos. Slop Protection Rehabilitation of Roads – 3 km Reconstruction of Bridges – 1 nos. – 10 nos. Culvert – 5 Retaining Wall nos. – 18 nos. Drains Slop Protection Rehabilitation of Roads – 1 km – 4 nos. Drains Rehabilitation of Roads – 117 km. Reconstruction of Bridges – 6 nos. – 2 Retaining Wall nos. Rehabilitation of Roads – 80 km Reconstruction of Bridges – 1 nos. – Retaining Wall 14 nos. Rehabilitation of Roads – 29 km Reconstruction of Bridges – 2 nos. - 5 Retaining Wall nos. Rehabilitation of Roads – 15 km Reconstruction of Bridges – 1 nos. – 7 Retaining Wall nos. Rehabilitation of Roads – 24 km Reconstruction of Bridges –7 nos. – Retaining Wall 17 nos. Sub Total Sub Total Sub Total Grand Total Grand RECOVERY PLAN MATRIX - TRANSPORTATION SECTOR - TRANSPORTATION 22: RECOVERY PLAN MATRIX TABLE

126126 SRISRI LANKALANKA FLOODSFLOODS ANDAND LANDSLIDESLANDSLIDES // Post-DisasterPost-Disaster RecoveryRecovery PlanPlan 10. SEctOR REcOvERy chAPtERS AND SEctOR REcOvERy MAtRIcES 127 Support Agencies Lead Government Lead Government Agencies Ministry of Provincial Councils and Local Government Ministry of Provincial Council and Local Government Road Development Authority Government Donor Unmet Budgetary Support (LKR Mn) 25.00 32.000 Total Total 375.000 Budget 7.014 23.381 41.700 139.000 29.709 99.030 61.285 204.284 715.00 1,445.00 46.534 155.112 434.00 2,134.000 943.00 2,144.100 500.00 1,000.00 567.501 1,891.671 422.959 1,409.864 1,470.00 2,346.000 Annual Budget 5,917.762 15,686.972 1,288.260 4,294.201 1,220.580 4,068.601 (LKR Mn) 4,062.000 9,501.100 1.961 0.910 6.654 6.307 8.895 0.766 8.034 0.360 3.600 14.100 21.675 65.413 96.170 53.610 15.900 21.600 54.437 46.697 82.493 47.880 27.600 111.990 132.186 582.311 418.232 Annual district/ location Target by Target 13.00 25.00 59.418 14.029 175.00 93.067 83.400 850.00 500.00 600.00 800.00 600.00 122.570 845.918 Annual Budget 2,441.161 1,135.002 2,576.521 7,274.523 (LKR Mn) 3,563.000 1.532 1.820 3.922 0.720 7.200 12.614 17.790 13.309 16.068 31.800 93.395 95.760 43.350 43.200 55.200 28.200 192.341 164.985 108.874 130.826 107.220 264.372 836.465 223.980 Annual 1,164.622 district Target by Target 19.00 2.338 9.903 76.00 15.511 601.10 13.900 130.00 20.428 850.00 200.00 189.167 140.986 429.420 406.860 Annual Budget 1,876.100 (LKR Mn) 2,494.687 7.810 7.810 46.860 46.860 23.430 23.430 78.100 0.120 1.200 7.225 2.678 2.965 0.654 4.700 0.255 7.200 5.300 0.850 0.850 5.100 5.100 2.550 2.550 8.500 17.870 21.804 15.960 32.057 44.062 139.411 194.104 2017 2017 2018 2018 2019 2019 Annual district/ location Target by Target Districts Affected Kalutara Hambantota 15.566 Matara Galle Kalutara Ratnapura 27.498 HambantotaMatara 2.218 Kalutara Matara Ratnapura 37.330 Hambantota 0.303 Hambantota 18.146 Matara Galle Kalutara Ratnapura Matara Hambantota 2.102 Kalutara Matara Kalutara Kalutara Kalutara Galle Ratnapura 9.200 Ratnapura Colombo Kalutara Gampaha Galle Matara Hambantota Kegalle Rathhnapura Objective Programme Programme Rehabilitation of Roads Reconstruction of Retaining Walls Reconstruction of systems Drainage Reconstruction of Culverts Rehabilitation of Roads Reconstruction of Retaining Wall Reconstruction of Culverts PRDA Roads (Class C and D roads) Reconstruction of Bridges Roads (Class E roads) Rural Reconstruction of Bridges RDA Roads (Class A and B roads) Rehabilitation of Roads –30 km Retaining Wall – 3 Retaining Wall nos. Slop Protection Rehabilitation of Roads – 3 km Reconstruction of Bridges – 1 nos. – 10 nos. Culvert – 5 Retaining Wall nos. – 18 nos. Drains Slop Protection Rehabilitation of Roads – 1 km – 4 nos. Drains Rehabilitation of Roads – 117 km. Reconstruction of Bridges – 6 nos. – 2 Retaining Wall nos. Rehabilitation of Roads – 80 km Reconstruction of Bridges – 1 nos. – Retaining Wall 14 nos. Rehabilitation of Roads – 29 km Reconstruction of Bridges – 2 nos. - 5 Retaining Wall nos. Rehabilitation of Roads – 15 km Reconstruction of Bridges – 1 nos. – 7 Retaining Wall nos. Rehabilitation of Roads – 24 km Reconstruction of Bridges –7 nos. – Retaining Wall 17 nos. Sub Total Sub Total Sub Total Grand Total Grand RECOVERY PLAN MATRIX - TRANSPORTATION SECTOR - TRANSPORTATION 22: RECOVERY PLAN MATRIX TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 127 • Power and Energy The Ministry of Power and Renewable En- ergy offered concessions for the electricity consumers who are severely affected by floods 1. Strategic Vision of the and landslides. Electricity meters were pro- Sector for Recovery vided free of charge to those whose meters Power supply is restored and the national were destroyed due to floods. Utility providers power grid strengthened to ensure a resilient (Ceylon Electricity Board and Lanka Elec- rebuilding process. The recovery strategy for tricity Company Limited) offered social work the power sector aims to restore the power by giving the clearance to the internal wiring supply by reconstructing, repairing damages network by inspecting the same for those who with several preventive measures to avoid dam- are affected. Also, a six-month grace period age in the future. was given for the flood victims to pay their May and June electricity bills in an instalment basis. Free service connections were given for 2. Status of Recovery in the 2016 consumers whose houses were fully destroyed and 2017 Landslides and Floods due to floods and landslides and payments of In the immediate aftermath of the May 2016 previous electricity bills were waved off. Free and 2017 disasters, restoration of power supply electricity services were given for a six-month was done in affected areas using the fullest period for the people displaced due to floods. capacity of the utility providers. Hence, in both Small enterprises and industries affected by situations, power supply was restored to most floods and landslides were given six months to of the areas within 48 hours. The power distri- pay due electricity bills on an instalment basis bution lines and related installations were fully in order to maintain and restore local liveli- resorted and recovered within a short period hoods, culture and traditions. of time, mostly within 2-10 days depending on the severity of the damage and the accessibil- ity. Electricity supply to the hospitals, water 3. Sector Recovery Priorities/Objectives pumping stations, and Divisional Secretaries The highest priority of the power sector is in affected areas was carried out without any ensuring a reliable power supply to all at all interruption. In both the 2016 and 2017 disas- times. Key recovery objectives of the sector are ter situations, special restoration teams of the restoring the damaged electricity distribution Ceylon Electricity Board (CEB) were used in network in affected areas and strengthening the operations of reconstruction and restore related critical power infrastructures. the power supply.

The total estimated recovery and reconstruc- 4. Prioritization Criteria, Sector tion need for the power sector in 2016 was Policy Guidelines for Recovery LKR 364.54 million. Mostly medium- and Prioritization criteria for the power sector long-term recovery and reconstruction needs are based on the supply of electricity to the were proposed in 2016. The 2017 recovery and nation without any interruption. Accordingly, reconstruction needs estimated as LKR 2,120 necessary immediate measures are taken by million is significantly high when compared the utility providers under the guidance of the to the 2016 recovery needs, since more risk re- Ministry of Power and Renewable Energy. duction measures are proposed to strengthen the power distribution network. The Ministry of Power and Renewable Energy is facilitating the Utility Providers (Ceylon

128 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Electricity Board and Lanka Electricity Company done for the immediate restoration of power Limited) by formulating Energy policies to imple- supply in an outage. ment an effective recovery mechanism. According to the provisions of the Disaster Management Act Government policy is to use energy efficient of May 2005, the Ministry directed the CEB to systems wherever possible; hence, there is a implement the Disaster Management Plan for the possibility to use hybrid street lamps that is Power sector, including the Recovery Plan and the setting up Light Emitting Diode (LED) systems business continuity plan. It is expected that the (battery powered solar charging) for street light above arrangements will strengthen the CEB’s and illumination in the affected areas. Communi- LECO’s capacity to respond to future disasters. cation is a salient activity needed for deploy- ment of working teams and materials as well as Several recovery and reconstructions needs were to obtain information regarding power issues identified according to the short-, medium- and in a disaster situation and it is suggested to long-term by the utility providers. Power instru- providing radio communication systems with ments and materials, which are mostly needed for Push to Talk (PTT) in affected areas for smooth the immediate restoration of power supply, are at operations to be carried out. The installation of the highest priority. These materials and instru- sophisticated rain gauging stations in mostly ments are needed within two days to 10 days to needed catchment areas is proposed i.e. the restore the power supply according to accessibil- catchment areas of , Maussakale ity to affected areas. Keeping of such materials as and Castlereagh reservoirs in order to ob- backup material in a convenient storage space and tain real-time rainfall data with telemetering at vicinity for quick transportation is paramount. systems which will enable the reduction or Portable generators with required fuel storage as prevent the impact of floods in downstream ar- backup power is an absolute necessity in order to eas. Among the modern technologies, Drones supply power for very urgent and critical situa- play a major role in getting online informa- tions. Utility providers have proposed to make tion in critical situations such as disasters. available motorized boats in the most affected Auto piloting is a novel concept to gather live areas in order to transport restoration teams and information where places are not accessible; materials to places are inaccessible due to floods. therefore, the introduction of Unmanned This may be worthwhile especially to restore pow- Aerial Vehicles to the power sector to plot the er to critical places such as hospitals and displace- necessary information for immediate recovery ment camps. and reconstruction would be a benefit.

The recent floods exposed some of the vulnerabil- ities in the power sector that exist in the flood-af- 5. Sources of Funding fected areas and several strengthening measures Immediate recovery and reconstruction work were proposed in the medium- and long-term. was done by the utility providers using own This includes conversion of bare conductors into funds which was LKR 469 million. CEB funds ABC conductors as safety precautions and also will be utilized for setting up a disaster pre- to improve reliability. Shifting of auto reclosers paredness plan, building capacity of the staff to a suitable place in Morawaka, and shifting of and setting up disaster management commit- medium voltage distribution networks from most tees and a Power Sector Disaster Management flood-prone areas to more suitable places is also Plan. Funds are not available for other medi- proposed to be done under Building Back Better um- and long-term recovery needs listed in the principles. Re-conducting of medium voltage matrix. lines for alternative power arrangements has to be

10. Sector Recovery Chapters and Sector Recovery Matrices 129 CEB CEB CEB CEB CEB CEB CEB CEB CEB CEB CEB CEB CEB LECO LECO Lead Government Government Lead Agencies 7.00 4.00 3.00 3.00 3.00 5.00 5.00 10.00 150.00 200.00 1000.00 Mn.) Unmet 1390.00 (Funding Gap) (LKR Donor (LKR Mn.) 494.00 25.00 (CEB) (LKR Mn.) Budgetary Support 469.00 (CEB) Government Government 7.00 4.00 3.00 3.00 3.00 5.00 5.00 10.00 25.00 150.00 469.00 200.00 1000.00 1884.00 (LKR Mn) Total Budget Total 500.00 Mn.) Annual 500.00 2019 Budget (LKR

Annual Target Strengthened Distribution network 2019 7.00 4.00 3.00 3.00 3.00 5.00 5.00 10.00 25.00 150.00 200.00 500.00 915.00 Annual Budget (LKR Mn.) 2018 Annual Target Reduce the flood impact (CEB H ead Office, Colombo) H ambantota District. Galle and H ambantota. Collect live information Collect live when places are not accessible Installation done and collection of real data time rainfall at catchment areas of Kukule Ganga, Maussakele and Castlereagh reservoirs Availability of power in of power Availability outage in five a power districts Shifting MV line from the most vulnerable Krama areas in Nilwala, and Uru Boku Oya Oya banks and river river crossings in Matara, power Alternative in place arrangements and strengthened Grid Deniyaya Matara, feeders and Beliatta Galle grid feeders 12 units for the DGM Office, Southern, 10 units for the DGM Office, Sabaragamuwa and 8 units for the DGM Western Office, Replace lighting Facilities Location: DGM Office Southern, Sabaragamuwa, Western of Availability communication facilities for operational activities in five districts: Availability of backup Availability supply in power power outages (4 units): DGM Office Southern (2), DGM Office (1) and Sabaragamuwa (1) Province Western of Availability accessibility in affected areas – Matara, and Kalutara Ratnapura 2018 Strengthened the places of the vulnerable distribution network Baddegama, at Neluwa, and Thalgaswala in Galle Tawalama District, Godagama, Maliboda, Akurassa, in Matara Thudawa District and Kirama and Ranna in the Eheliyagoda, Ratnapura Eheliyagoda, Maintain reliable power supply in Morawaka, District Matara Power & Energy Power 469.00 Annual 469.00 Budget (LKR Mn.) 2017 Annual Target 2017 Restoration of Restoration supply power in affected areas in the Southern Province, Ratnapura and Kalutara Districts Total RECOVERY PLAN MATRIX – POWER SUPPLY SECTOR – POWER SUPPLY RECOVERY PLAN MATRIX Programme Raising the Gantry in Eheliyagoda Deployment of Unmanned to Arial Vehicles collect real time information equipped with Transceivers Risk and Vulnerability Reduction Risk and Vulnerability Installation of Rain Gauging stations in catchment areas with a telemetering system to obtain real time data Solar Powered Solar Powered Chargers for operational/ social needs MV line shifting banks and at river crossing river Re-conducting MV lines for power alternative arrangements Solar Powered Solar Powered Lamps/Lanterns for life supports Radio Communication System/ PTT (Push to Talk) enabled hand (30 held radios Nos.) Service Delivery in Emergency Situation Service Delivery Portable with Generators for fuel storage social needs Motorized Boats with jackets lifesaving for material and workers’ (3 Nos. transport of boats) Repair and of Restoration supply power Conversion of Conversion Bare Conductor to ABC Conductor Strengthening Distribution Network Shifting of Auto Recloser at Morawaka 2.5 3.3 3.2 3 3.1 4.3 4.4 2.4 2.3 2 2.1 2.2 1 4.2 4 4.1 TABLE 23: TABLE

130 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan CEB CEB CEB CEB CEB CEB CEB CEB CEB CEB CEB CEB CEB LECO LECO Lead Government Government Lead Agencies 7.00 4.00 3.00 3.00 3.00 5.00 5.00 10.00 150.00 200.00 1000.00 Mn.) Unmet 1390.00 (Funding Gap) (LKR Donor (LKR Mn.) 494.00 25.00 (CEB) (LKR Mn.) Budgetary Support 469.00 (CEB) Government Government 7.00 4.00 3.00 3.00 3.00 5.00 5.00 10.00 25.00 150.00 469.00 200.00 1000.00 1884.00 (LKR Mn) Total Budget Total 500.00 Mn.) Annual 500.00 2019 Budget (LKR

Annual Target Strengthened Distribution network 2019 7.00 4.00 3.00 3.00 3.00 5.00 5.00 10.00 25.00 150.00 200.00 500.00 915.00 Annual Budget (LKR Mn.) 2018 ambantota. H ead Office, H Annual Target ambantota District. Reduce the flood impact (CEB Colombo) H Galle and Collect live information Collect live when places are not accessible Installation done and collection of real data time rainfall at catchment areas of Kukule Ganga, Maussakele and Castlereagh reservoirs Availability of power in of power Availability outage in five a power districts Shifting MV line from the most vulnerable Krama areas in Nilwala, and Uru Boku Oya Oya banks and river river crossings in Matara, power Alternative in place arrangements and strengthened Grid Deniyaya Matara, feeders and Beliatta Galle grid feeders 12 units for the DGM Office, Southern, 10 units for the DGM Office, Sabaragamuwa and 8 units for the DGM Western Office, Replace lighting Facilities Location: DGM Office Southern, Sabaragamuwa, Western of Availability communication facilities for operational activities in five districts: Availability of backup Availability supply in power power outages (4 units): DGM Office Southern (2), DGM Office (1) and Sabaragamuwa (1) Province Western of Availability accessibility in affected areas – Matara, and Kalutara Ratnapura 2018 Strengthened the places of the vulnerable distribution network Baddegama, at Neluwa, and Thalgaswala in Galle Tawalama District, Godagama, Maliboda, Akurassa, in Matara Thudawa District and Kirama and Ranna in the Eheliyagoda, Ratnapura Eheliyagoda, Maintain reliable power supply in Morawaka, District Matara Power & Energy Power 469.00 Annual 469.00 Budget (LKR Mn.) 2017 Annual Target 2017 Restoration of Restoration supply power in affected areas in the Southern Province, Ratnapura and Kalutara Districts Total RECOVERY PLAN MATRIX – POWER SUPPLY SECTOR – POWER SUPPLY RECOVERY PLAN MATRIX Programme Raising the Gantry in Eheliyagoda Deployment of Unmanned to Arial Vehicles collect real time information equipped with Transceivers Risk and Vulnerability Reduction Risk and Vulnerability Installation of Rain Gauging stations in catchment areas with a telemetering system to obtain real time data Solar Powered Solar Powered Chargers for operational/ social needs MV line shifting banks and at river crossing river Re-conducting MV lines for power alternative arrangements Solar Powered Solar Powered Lamps/Lanterns for life supports Radio Communication System/ PTT (Push to Talk) enabled hand (30 held radios Nos.) Service Delivery in Emergency Situation Service Delivery Portable with Generators for fuel storage social needs Motorized Boats with jackets lifesaving for material and workers’ (3 Nos. transport of boats) Repair and of Restoration supply power Conversion of Conversion Bare Conductor to ABC Conductor Strengthening Distribution Network Shifting of Auto Recloser at Morawaka 2.5 3.3 3.2 3 3.1 4.3 4.4 2.4 2.3 2 2.1 2.2 1 4.2 4 4.1 TABLE 23: TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 131 6. Key Institutional Roles and There are two Branch Offices of LECO in Implementing Partners Galle and Kalutara to carry out the electricity The Ministry of Power and Renewable Energy distribution operations, headed by a Branch is the key institution responsible for the Power Manager who directly reports to the Head of Sector Governance and Administration. Im- Operations in LECO. plementing partners are the Ceylon Electricity Board and Lanka Electricity Company Private Limited. 8. Monitoring Framework CEB: Monitoring is done by the respective Deputy General Managers in areas and report- 7. Implementation and Coordination ed to the relevant Additional General Manager Arrangement and Mechanisms of the Division. All Additional General Man- Implementation of the recovery framework is agers report to the CEB General Manager. The done by the Distribution System of CEB which General Manager reports to the Secretary to is divided into four divisions. Each Distribu- the Ministry of Power and Renewable Energy. tion Division of CEB is headed by an Addition- al General Manager who directly reports to LECO: Head of the Operation monitors the the General Manager. The four divisions are implementation of recovery actions through comprised as follows: Branch Managers of LECO and reports to the General Manager of LECO. The LECO General division 1 Manager reports to the Secretary to the Minis- Colombo City, North Western Province, North try of Power and Renewable Energy. Central Province and Northern Province The following indicators may be used to moni- division 2 tor sector progress: Western Province North, Central Province and Eastern Province · Length of restored and repaired damaged power distribution lines in each districts division 3 and number of electricity grids repaired Western Province South II, Uva and Sabarag- amuwa · Number of districts equipped with stand- by emergency response supplies such as division 4 portable generators, boats, communica- Western Province South I and Southern Prov- tion equipment, solar-powered lanterns ince and solar power chargers to respond to emergencies. Each Distribution Division is divided into provinces and each province is headed by a · Length of new power distribution lines Deputy General Manager. The Province is relocated to safe places. sub-divided into several areas, which are man- aged by Area Electrical Engineers. The Area · Number of catchment areas of the res- is further subdivided into several Consumer ervoirs installed with rain gauges with Service Centres (CSC) headed by an Electrical telemetering facility to obtain real time Superintendent. data.

[Table 23]. pp 130-131

132 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan CROSS-CUTTING SECTOR Impacts of 2016 and 2017 floods and landslides on the environment could not be adequately captured by the PDNAs due to data gaps. No • Environment significant improvement can be reported in data management from 2016 to 2017. How to take action post-/pre- disaster situations is identified 1. Strategic Vision of the Environment by the MMDE as a key gap within the Environ- Sector for Recovery ment policy. Vision 2025 also identified this as an Sustainable environmentally sensitive recovery issue that needs attention. The Environmental and reconstruction mechanisms are in place Protection License (EPL), Initial Environmental across all sectors to ensure the restoration Examination (IEE) and Environmental Impact of disaster-affected environments, while Assessment (EIA) processes are the existing improvements in ecosystem services make requirements for ensuring risk reduction and communities more resilient to disasters. contingency planning to and/or mitigate disas- ters. However, the MMDE acknowledges the urgent need to address gaps in the above and 2. Status of Sector Recovery from 2016 related polices, environmental standards and and 2017 Landslides and Floods guidelines, and proper enforcement. Improper While appreciable damages and losses were municipal waste management systems link to not reported for the environment sector, it increasing disaster impacts and the urgency of is recognized that environment degradation attending to waste dumps (e.g. Meethotamulla) played a role in the 2016 and 2017 floods and was another important highlight of the PDNA landslides, contributing to damages and losses 2016. The Ministry of Megapolis and Western in other sectors. Considering these factors, the Development and the Ministry of Provincial Ministry of Mahaweli Development and Envi- Councils and Local Governments are engaged ronment identifies the need to mitigate effects in identifying and facilitating more appropriate on the environment after a disaster situation. long-term measures, although measures so far consist only of shifting the problem to different The annual allocation (2016) of the Ministry locations to address the political challenge and of Mahaweli Development and Environ- engaging with investors who have technology ment (MMDE) for the Mahaweli Projects and solutions to remove existing dumps. environment conservation activities was LKR 58 Million out of which LKR 33 million was Any improvement to drainage management utilized during the year 2016. Part of this was since last year seems insignificant as blockages used for soil conservation activities, preserv- of drains was identified as a serious contribution ing 230 cubic meters and 15,423 meters of to flooding in urban areas in 2017 too. Similarly soil under the natural resources conservation issues such as wetland degradation, sand min- programme of the ongoing Mahaweli proj- ing, land use violations, establishment of mini ects. The national ceremony to be held on the hydropower and non-adherence to procedure 5th of June 2017 to commemorate the World and standards are also highlighted and remain Environment Day was cancelled due to the unaddressed. Addressing these issues can be disaster situation in the country. Instead, an highly contentious and challenging in the short- environmental clean-up (waste disposal, soil term, due to engrained ‘bad’ practices owing to conservation programme) was conducted in weak- or non-enforcement of regulations and the Kalutara District with the patronage of His strong political patronage. Excellency the President Maithripala Sirisena.

10. Sector Recovery Chapters and Sector Recovery Matrices 133 3. Sector Recovery Priorities /Objectives improve resilience of a wider area and The objectives are to ensure sustainable envi- communities even if these go beyond the ronment sensitive sectoral recovery at national administrative boundaries of districts and sub-national levels and to facilitate the affected by the floods and landslides. revival of the environment to restore and strengthen ecosystem services for resilience · Align with the Public Investment Plan, building. Vision 2025, SDG strategies, NBSAP, NRI- FAP, NAP-CLD, NDCs, and NAP CCI Sri A degraded environment can contribute to Lanka10. increasing disaster risks and impacts while a healthy environment can strengthen resilience to disasters. Therefore, environmental revival 5. Sector Policy Guidelines for Recovery has to be a priority in the recovery plans, al- Sri Lanka in the recent past made some strong though it should not be limited to the revival of pledges to better respect and manage the envi- the environmental damage that occurred due ronment within the country’s development. In to the recent disaster. It should also identify line with the Paris Agreement 2015, in January and include the revival of important degraded 2016, Sri Lanka declared the move towards a and degrading areas that can protect people Blue-Green Economy,11 which aims to provide and assets from recurrent disasters, which standards and guidance to use ocean and land re- seems the new normal in Sri Lanka, as a Build sources. Vision 2025 (2017), which aims to make Back Better measure. Furthermore, ensuring Sri Lanka a wealthy country, also acknowledged the proper management of ecosystem services, weak environmental management in the country, including through value addition in disaster and issues such as industrial activities, urbaniza- prone areas, will ensure its sustainability. tion and related environment pollution, inad- equate waste and water management systems, ineffective regulations and the lack of strong 4. Prioritization Criteria monitoring mechanisms as threats to sustainable · Environment sensitivity is considered a development. key Build Back Better principle in the sec- toral recovery/reconstruction; (a) min- The National Environment Policy (NEP) 200312 imizing further environmental damage aims to promote the sound management of Sri by identification of critical environment Lanka’s environment, balancing the needs for threats which could arise out of the sec- social and economic development and assuring toral recovery and (b) providing specific environmental integrity/accountability. Achiev- guidance to facilitate, or contribute to, ing effective environmental governance and environmental revival during sectoral effecting supportive environmental behaviours recovery. are the key policy statements. The policy does

· Existing environmental threats which 10 National Biodiversity Strategies and Action Plans could get greatly aggravated as a result (NBSAPs), National REDD+ Investment Frame- work and Action Plan (NRIFAP), National Action of possible recurring hazards (e.g. floods Programme for Combating the Land Degradation and landslides), especially those which of Sri Lanka (NAP-. CLD), Nationally Determined could get triggered by the upcoming Contributions (NDCs), National Adaptation Plan for Climate Change Impacts (NAP CCI) Maha rains. 11 http://srilankanext.lk/ 12 http://theredddesk.org/sites/default/files/nep_ · Interventions that have potential to draft_1.pdf

134 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan not specifically consider disaster impacts on done in a manner that helps people understand the environment and its recovery, although, it that not only individual policies can guide devel- can be used to support and prioritize recovery opment, but also how together they can create needs of the sector. a better and stronger foundation for improved environmental governance. Sound technical Serious data gaps found in the environment capacities and acceptable tools and methodolo- sector highlighted by the PDNA 2016 and 2017 gies are essential to adopt environmental sensitive show that there are challenges to implement practical strategies and approaches. the NEP as expected. Therefore, the effective implementation of the NEP and the Strategy The Environment sector, therefore, could also use would facilitate sustainable sector recovery. the opportunity and space created by Sri Lanka The Environment sector must produce sound prioritizing its commitments to SDG and the Paris evidence with economic and social rationale to Declaration to push for required environmental persuade recovery/development programmes policy improvements and implementation, and not to ignore environmental concerns for necessary enforcements. The updated NEP should the sake of immediate needs or short-term be linked to the proposed national recovery poli- returns. cy/master plan and guide post-disaster needs as- sessment and the recovery of environment sector. However, MMDE carried out some important initiatives. ‘Punarudaya’ the National Environ- mental Conservation Programme (2016-2018) 6. Sources of Funding/Finance for Recovery is a short-term programme focused on prior- The ministry proposes to focus on environment itized environmental issues such as environ- destruction within the annual budgets as indicat- mental pollution, including improper waste ed in the matrix as there is flexibility to emphasize removal, deforestation, land degradation, on recovery within the budgets made available to human-animal conflict, threats to biological different agencies. resources, etc. This programme is implement- ed at national and regional levels to address the above-identified risks. The programme facili- 7. Key Institutional Roles and tates people to adopt correct land use practices Implementing Partners: based on recommended land use plans, pro- The mandated ministry for environment pro- motes environment-friendly mining activities tection and therefore the recovery of the envi- and implements climate change adaptation ronmental sector is the Ministry of Mahaweli activities at village level. Furthermore, the Development and Environment (MMDE). While National Adaptation Plan for reducing climate the degree of involvement of the Ministry in the change impact in Sri Lanka (NAP) identifies post-disaster context was not optimal, the Min- climate-induced disaster risk management as istry is taking a keen interest to ensure different a cross-cutting area with broad recommended departments and agencies under the Ministry are actions. aware of, and get engaged in, the recovery pro- cess. Apart from the MMDE, there are number of The government at present is reviewing the sectoral ministries and organizations that need NEP 2003 and the National Action Plan for to work together with the MMDE to ensure due Environment Conservation (Haritha Lanka recovery planning and implementation. The Min- Programme). Review of a range of policies that istry of Megapolis and Western Development, are available on conservation and management Department of Coastal Conservation, Ministry of and sustainable use of natural assets could be Irrigation, Department of Wildlife Conservation,

10. Sector Recovery Chapters and Sector Recovery Matrices 135 1 5 Partner Partner Support Potential Potential Agriculture Department Agriculture Department

Support Agencies

1 5 BDS BDS Government Lead Government Lead Agencies 3 0.5

GEF BDS UNDP

GEF BDS UNEP

GEF BDS UNEP

CF CF Funding source

13 2.5

30.00 50.00 Annual Budget (LKR Mn)

30.00 10.00 40.00

1.48 2.95 3.50 7.93 0.10 10.00 5.00 15.10 0.10 20.00 10.00 30.10 0.10 60.00 30.00 90.10 3.00 5.00 5.00 0.50 1.00 1.00 0.20 20.00 12.00 32.20 0.20 50.00 10.00 60.20 0.20 30.00 15.00 45.20 0.50 10.00 10.00 20.50 5.00 10.00 10.00 25.00 0.50 30.00 15.00 45.50 5.00 10.50 10.50 26.00 18.90 25.56 10.00 54.46 10.00 30.00 15.00 55.00 10.00 20.00 5.00 35.00 16.00 0.00 0.00 16.00 10.00 30.00 10.00 50.00 10.00 0.50 0.50 11.00 10.00 20.00 10.00 40.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 30.00 30.00 70.00 10.00 40.00 50.00 10.00 30.00 20.00 60.00 10.00 80.00 40.00 130.00 20.00 30.00 15.00 65.00 29.00 31.50 10.00 70.50 20.00 50.00 25.00 95.00 20.00 30.00 30.00 60.00 20.00 10.00 10.00 40.00 30.00 10.00 5.00 45.00 20.00 20.00 10.00 50.00 450.77 927.01 412.5 1790.28 100.00 100.00 50.00 250.00 2017 2018 2019 Total Government Donor Unmet Annual Target Institutional facilities for solid management in each waste Measures to strengthen the institutional mechanism identified Life cycle management in designing, manufacturing, consumption and disposal of products

Declaration of Wetland as EPAs as EPAs of Wetland Declaration (CEA) of Management Preparation plans for Declared EPAs (wetlands) * Reviewing the current policy on wetlands on this * Creating awareness aspect (CEA)

identify stakeholders, conduct workshops awarnes

Review the existing policy, Review the existing policy, update the current policy. Raising awareness

Information gathering in environment sector. Establishing database and keep it updated

Information gathering in environment sector. Establishing database and keep it updated

Promoting water conservation conservation Promoting water and domestic practices harvesting rainwater Identifying the gaps in related policies, formulation of a policy mineral Identifying degraded or Identifying degraded prone areas degradation a master and developing catchment plan to integrate practices conservation

Carrying out further research to sand, on alternatives sustainable mining and rehabilitation technologies Current policy on wetland Current policy on wetland reviewed Identifying traditional crops Identifying traditional which can cope with adverse climatic situations. Improved regulatory Improved for IAS policy, framework and Action plan. strategy National coordination mechanism is established. publication, programs, Training profiles, 03 09 provincial research studies, 01 symposium held Undertaking soil conservation Undertaking soil conservation and land improvement measures Activities according to the action plan 1.) number of meetings conducted. 2.) Coordination unit established *Increased number and types programmes of relevant for food mobilizing biodiversity and nutrition

Biodiversity Fairs; training training Fairs; Biodiversity awareness, programmes; learning and sharing Community programmes; Register in each Biodiversity site

Ecosystem conservation plan Ecosystem conservation established Conduct awareness workshops, workshops, Conduct awareness selecting specialized groups Most vulnerable areas to Most vulnerable hazards identified natural Developing guidelines for Developing environmentally sound resource collection, recovery and disposal of hazardous wastes Research papers, identified sites, research papers evaluated Capacity building programmes, Capacity building programmes, advisory group, Provincial Profiles published Biodiversity local authority identified Establishing expert teams on raising, awareness taxonomy, and research able Programme Environment Establish necessary for solid waste infrastructure management in each local authority or adopt appropriate method alternative Strengthen the institutional mechanism for solid waste local management in every authority Promote life cycle management of waste Waste Management Waste Developing integrated urbanization plans to meet future integrated Developing environment challenges Total Prepare and implement management plans conservation that are identified for wetlands as critical systems lying outside network. of the PA Incorporating a biodiversity needs assessment to the EIA/IEE a biodiversity Incorporating process Develop and implement a Develop that reduces national strategy the release of pollutants and into the wetlands solid waste Preparing and implementing recommendations on mini- hydro projects power Wetland Management Wetland Implementing tree planting programme for the restoration of for the restoration Implementing tree planting programme lands degraded Enrichment of urban tree canopies, and training on nursery Enrichment of urban tree canopies, and training management. Develop and implement a Develop that reduces national programme reliance on agrochemical usage Forest Agro chemical usage Review the environment policy and address post disaster needs assessment Promote the substitution of fossil fuels with renew energy sources Establish a monitoring system for post disaster assessment on environment Implement the National Adaptation Plan Develop a database related to Develop the environment sector Climate change Policy related issues Policy Mitigating drought and adaptation to drought Establish a searchable database on traditional knowledge, beliefs knowledge, Establish a searchable database on traditional related to biodiversity and practices Review land related polices, and action plan laws strategies, Promote community-based conservation using sui-generis tools for Promote community-based conservation land community owned Promote the integrated Promote the integrated management of upper watershed areas Traditional knowledge knowledge Traditional Prepare and implement wetland conservation management plans conservation Prepare and implement wetland that are identified as critical systems lying outside of for wetlands network. the protected area (PA) Integrate a system for the Integrate of sustainable exploration, mining and consumption rehabilitation of mined area Develop and implement a Develop that reduces national strategy the release of pollutants and in to wetlands solid waste Promote precision farming, of crops varieties traditional climatic and crops to fit adverse conditions Conduct a national level Conduct a national level campaign on invasive awareness alien species and their impacts habitats. on natural Reduce land degradation Reduce land degradation and rehabilitate degraded lands agricultural Mainstreaming agro- biodiversity Mainstreaming agro- biodiversity and use in Sri conservation Lankan agro-ecosystems for and adaptation to livelihoods Climate Change Institutionalize actions related to landscape design and promoting green cities Mainstreaming agro- biodiversity Mainstreaming agro- biodiversity and use in Sri conservation Lankan agro-ecosystems for and adaptation to livelihoods Climate Change Land Implement the national plan ecosystem conservation it with provincial by integrating plans as and local development sector as ensuring private well participation Conduct Strategic Environment Conduct Strategic Assessments for all nine and identify the best provinces to achieve possible pathway goals with national development the least amount of habitat loss and fragmentation programmes on disasters impacts disasters on programmes on biodiversity Prevent accumulation of Prevent into the hazardous wastes streams Initiate research and monitoring Provide seed grants for research seed grants Provide and on identified sites, taxa ecosystem services Environmental Protection and Conservation Environment Biodiversity Establish a national list of species and ecosystem types with annual updating, research RECOVERY PLAN MATRIX – ENVIRONMENT SECTOR 23: RECOVERY PLAN MATRIX TABLE – ENVIRONMENT SECTOR 24: RECOVERY PLAN MATRIX TABLE

136 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 1 5 Partner Partner Support Potential Potential Agriculture Department Agriculture Department

Support Agencies

1 5 BDS BDS Government Lead Government Lead Agencies 3 0.5

GEF BDS UNDP

GEF BDS UNEP

GEF BDS UNEP

CF CF Funding source

13 2.5

Annual Budget (LKR Mn)

30.00 10.00 40.00

1.48 2.95 3.50 7.93 0.10 10.00 5.00 15.10 0.10 20.00 10.00 30.10 0.10 60.00 30.00 90.10 3.00 5.00 5.00 0.50 1.00 1.00 0.20 20.00 12.00 32.20 0.20 50.00 10.00 60.20 0.20 30.00 15.00 45.20 0.50 10.00 10.00 20.50 5.00 10.00 10.00 25.00 0.50 30.00 15.00 45.50 5.00 10.50 10.50 26.00 18.90 25.56 10.00 54.46 10.00 30.00 15.00 55.00 10.00 20.00 5.00 35.00 16.00 0.00 0.00 16.00 10.00 30.00 10.00 50.00 10.00 0.50 0.50 11.00 10.00 20.00 10.00 40.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 30.00 30.00 70.00 10.00 40.00 50.00 10.00 30.00 20.00 60.00 10.00 80.00 40.00 130.00 20.00 30.00 15.00 65.00 29.00 31.50 10.00 70.50 20.00 50.00 25.00 95.00 20.00 30.00 50.00 30.00 30.00 60.00 20.00 10.00 10.00 40.00 30.00 10.00 5.00 45.00 20.00 20.00 10.00 50.00 450.77 927.01 412.5 1790.28 100.00 100.00 50.00 250.00 2017 2018 2019 Total Government Donor Unmet Annual Target Institutional facilities for solid management in each waste Measures to strengthen the institutional mechanism identified Life cycle management in designing, manufacturing, consumption and disposal of products

Declaration of Wetland as EPAs as EPAs of Wetland Declaration (CEA) of Management Preparation plans for Declared EPAs (wetlands) * Reviewing the current policy on wetlands on this * Creating awareness aspect (CEA)

identify stakeholders, conduct workshops awarnes

Review the existing policy, Review the existing policy, update the current policy. Raising awareness

Information gathering in environment sector. Establishing database and keep it updated

Information gathering in environment sector. Establishing database and keep it updated

Promoting water conservation conservation Promoting water and domestic practices harvesting rainwater Identifying the gaps in related policies, formulation of a policy mineral Identifying degraded or Identifying degraded prone areas degradation a master and developing catchment plan to integrate practices conservation

Carrying out further research to sand, on alternatives sustainable mining and rehabilitation technologies Current policy on wetland Current policy on wetland reviewed Identifying traditional crops Identifying traditional which can cope with adverse climatic situations. Improved regulatory Improved for IAS policy, framework and Action plan. strategy National coordination mechanism is established. publication, programs, Training profiles, 03 09 provincial research studies, 01 symposium held Undertaking soil conservation Undertaking soil conservation and land improvement measures Activities according to the action plan 1.) number of meetings conducted. 2.) Coordination unit established *Increased number and types programmes of relevant for food mobilizing biodiversity and nutrition

Biodiversity Fairs; training training Fairs; Biodiversity awareness, programmes; learning and sharing Community programmes; Register in each Biodiversity site

Ecosystem conservation plan Ecosystem conservation established Conduct awareness workshops, workshops, Conduct awareness selecting specialized groups Most vulnerable areas to Most vulnerable hazards identified natural wastes wastes Developing guidelines for Developing environmentally sound resource collection, recovery and disposal of hazardous Research papers, identified sites, research papers evaluated Capacity building programmes, Capacity building programmes, advisory group, Provincial Profiles published Biodiversity Establishing expert teams on raising, awareness taxonomy, and research local authority identified Programme Environment Establish necessary for solid waste infrastructure management in each local authority or adopt appropriate method alternative Strengthen the institutional mechanism for solid waste local management in every authority Promote life cycle management of waste Waste Management Waste Developing integrated urbanization plans to meet future integrated Developing environment challenges Total Prepare and implement management plans conservation that are identified for wetlands as critical systems lying outside network. of the PA Incorporating a biodiversity needs assessment to the EIA/IEE a biodiversity Incorporating process Develop and implement a Develop that reduces national strategy the release of pollutants and into the wetlands solid waste Preparing and implementing recommendations on mini- hydro projects power Wetland Management Wetland Implementing tree planting programme for the restoration of for the restoration Implementing tree planting programme lands degraded Enrichment of urban tree canopies, and training on nursery Enrichment of urban tree canopies, and training management. Develop and implement a Develop that reduces national programme reliance on agrochemical usage Forest Agro chemical usage Review the environment policy and address post disaster needs assessment Promote the substitution of fossil fuels with renewable energy sources Establish a monitoring system for post disaster assessment on environment Implement the National Adaptation Plan Develop a database related to Develop the environment sector Climate change Policy related issues Policy Mitigating drought and adaptation to drought Establish a searchable database on traditional knowledge, beliefs knowledge, Establish a searchable database on traditional related to biodiversity and practices Review land related polices, and action plan laws strategies, Promote community-based conservation using sui-generis tools for Promote community-based conservation land community owned Promote the integrated Promote the integrated management of upper watershed areas Traditional knowledge knowledge Traditional Prepare and implement wetland conservation management plans conservation Prepare and implement wetland that are identified as critical systems lying outside of for wetlands network. the protected area (PA) Integrate a system for the Integrate of sustainable exploration, mining and consumption rehabilitation of mined area national strategy that reduces national strategy the release of pollutants and in to wetlands solid waste Develop and implement a Develop Promote precision farming, of crops varieties traditional climatic and crops to fit adverse conditions Conduct a national level Conduct a national level campaign on invasive awareness alien species and their impacts habitats. on natural Reduce land degradation Reduce land degradation and rehabilitate degraded lands agricultural Mainstreaming agro- biodiversity Mainstreaming agro- biodiversity and use in Sri conservation Lankan agro-ecosystems for and adaptation to livelihoods Climate Change Institutionalize actions related to landscape design and promoting green cities Mainstreaming agro- biodiversity Mainstreaming agro- biodiversity and use in Sri conservation Lankan agro-ecosystems for and adaptation to livelihoods Climate Change Land Implement the national plan ecosystem conservation it with provincial by integrating plans as and local development sector as ensuring private well participation Conduct Strategic Environment Conduct Strategic Assessments for all nine and identify the best provinces to achieve possible pathway goals with national development the least amount of habitat loss and fragmentation Initiate research and monitoring impacts disasters on programmes on biodiversity Prevent accumulation of Prevent into the hazardous wastes streams Provide seed grants for research seed grants Provide and on identified sites, taxa ecosystem services Environmental Protection and Conservation Environment Biodiversity Establish a national list of species and ecosystem types with annual updating, research RECOVERY PLAN MATRIX – ENVIRONMENT SECTOR 23: RECOVERY PLAN MATRIX TABLE – ENVIRONMENT SECTOR 24: RECOVERY PLAN MATRIX TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 137 1 5 Partner Partner Support Potential Potential Agriculture Department Agriculture Department

Support Agencies

1 5 BDS BDS Government Lead Government Lead Agencies 3 0.5

GEF BDS UNDP

GEF BDS UNEP

GEF BDS UNEP

CF CF Funding source

13 2.5

Annual Budget (LKR Mn)

30.00 10.00 40.00

1.48 2.95 3.50 7.93 0.10 10.00 5.00 15.10 0.10 20.00 10.00 30.10 0.10 60.00 30.00 90.10 3.00 5.00 5.00 0.50 1.00 1.00 0.20 20.00 12.00 32.20 0.20 50.00 10.00 60.20 0.20 30.00 15.00 45.20 0.50 10.00 10.00 20.50 5.00 10.00 10.00 25.00 0.50 30.00 15.00 45.50 5.00 10.50 10.50 26.00 18.90 25.56 10.00 54.46 10.00 30.00 15.00 55.00 10.00 20.00 5.00 35.00 16.00 0.00 0.00 16.00 10.00 30.00 10.00 50.00 10.00 0.50 0.50 11.00 10.00 20.00 10.00 40.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 30.00 30.00 70.00 10.00 40.00 50.00 10.00 30.00 20.00 60.00 10.00 80.00 40.00 130.00 20.00 30.00 15.00 65.00 29.00 31.50 10.00 70.50 20.00 50.00 25.00 95.00 20.00 30.00 50.00 30.00 30.00 60.00 20.00 10.00 10.00 40.00 30.00 10.00 5.00 45.00 20.00 20.00 10.00 50.00 450.77 927.01 412.5 1790.28 100.00 100.00 50.00 250.00 2017 2018 2019 Total Government Donor Unmet Annual Target Institutional facilities for solid management in each waste Measures to strengthen the institutional mechanism identified Life cycle management in designing, manufacturing, consumption and disposal of products

Declaration of Wetland as EPAs as EPAs of Wetland Declaration (CEA) of Management Preparation plans for Declared EPAs (wetlands) * Reviewing the current policy on wetlands on this * Creating awareness aspect (CEA)

identify stakeholders, conduct workshops awarnes

Review the existing policy, Review the existing policy, update the current policy. Raising awareness

Information gathering in environment sector. Establishing database and keep it updated

Information gathering in environment sector. Establishing database and keep it updated

Promoting water conservation conservation Promoting water and domestic practices harvesting rainwater Identifying the gaps in related policies, formulation of a policy mineral Identifying degraded or Identifying degraded prone areas degradation a master and developing catchment plan to integrate practices conservation

Carrying out further research to sand, on alternatives sustainable mining and rehabilitation technologies Current policy on wetland Current policy on wetland reviewed Identifying traditional crops Identifying traditional which can cope with adverse climatic situations. Improved regulatory Improved for IAS policy, framework and Action plan. strategy National coordination mechanism is established. publication, programs, Training profiles, 03 09 provincial research studies, 01 symposium held Undertaking soil conservation Undertaking soil conservation and land improvement measures Activities according to the action plan 1.) number of meetings conducted. 2.) Coordination unit established *Increased number and types programmes of relevant for food mobilizing biodiversity and nutrition

Biodiversity Fairs; training training Fairs; Biodiversity awareness, programmes; learning and sharing Community programmes; Register in each Biodiversity site

Ecosystem conservation plan Ecosystem conservation established Conduct awareness workshops, workshops, Conduct awareness selecting specialized groups Most vulnerable areas to Most vulnerable hazards identified natural Developing guidelines for Developing environmentally sound resource collection, recovery and disposal of hazardous wastes Research papers, identified sites, research papers evaluated Capacity building programmes, Capacity building programmes, advisory group, Provincial Profiles published Biodiversity local authority identified Establishing expert teams on raising, awareness taxonomy, and research astes into the Programme Environment Establish necessary for solid waste infrastructure management in each local authority or adopt appropriate method alternative Strengthen the institutional mechanism for solid waste local management in every authority Promote life cycle management of waste Waste Management Waste Developing integrated urbanization plans to meet future integrated Developing environment challenges Total Prepare and implement management plans conservation that are identified for wetlands as critical systems lying outside network. of the PA Incorporating a biodiversity needs assessment to the EIA/IEE a biodiversity Incorporating process Develop and implement a Develop that reduces national strategy the release of pollutants and into the wetlands solid waste Preparing and implementing recommendations on mini- hydro projects power Wetland Management Wetland Implementing tree planting programme for the restoration of for the restoration Implementing tree planting programme lands degraded Enrichment of urban tree canopies, and training on nursery Enrichment of urban tree canopies, and training management. Develop and implement a Develop national programme that reduces national programme reliance on agrochemical usage Forest Agro chemical usage Review the environment policy and address post disaster needs assessment Promote the substitution of fossil fuels with renewable energy sources Establish a monitoring system for post disaster assessment on environment Implement the National Adaptation Plan Develop a database related to Develop the environment sector Climate change Policy related issues Policy Mitigating drought and adaptation to drought Establish a searchable database on traditional knowledge, beliefs knowledge, Establish a searchable database on traditional related to biodiversity and practices Review land related polices, and action plan laws strategies, Promote community-based conservation using sui-generis tools for Promote community-based conservation land community owned Promote the integrated Promote the integrated management of upper watershed areas Traditional knowledge knowledge Traditional Prepare and implement wetland conservation management plans conservation Prepare and implement wetland that are identified as critical systems lying outside of for wetlands network. the protected area (PA) Integrate a system for the Integrate of sustainable exploration, mining and consumption rehabilitation of mined area Develop and implement a Develop that reduces national strategy the release of pollutants and in to wetlands solid waste Promote precision farming, of crops varieties traditional climatic and crops to fit adverse conditions Conduct a national level Conduct a national level campaign on invasive awareness alien species and their impacts habitats. on natural Reduce land degradation Reduce land degradation and rehabilitate degraded lands agricultural Mainstreaming agro- biodiversity Mainstreaming agro- biodiversity and use in Sri conservation Lankan agro-ecosystems for and adaptation to livelihoods Climate Change Institutionalize actions related to landscape design and promoting green cities Mainstreaming agro- biodiversity Mainstreaming agro- biodiversity and use in Sri conservation Lankan agro-ecosystems for and adaptation to livelihoods Climate Change Land Implement the national plan ecosystem conservation it with provincial by integrating plans as and local development sector as ensuring private well participation Conduct Strategic Environment Conduct Strategic Assessments for all nine and identify the best provinces to achieve possible pathway goals with national development the least amount of habitat loss and fragmentation Initiate research and monitoring impacts disasters on programmes on biodiversity Prevent accumulation of Prevent hazardous w streams Provide seed grants for research seed grants Provide and on identified sites, taxa ecosystem services Environmental Protection and Conservation Environment Biodiversity Establish a national list of species and ecosystem types with annual updating, research RECOVERY PLAN MATRIX – ENVIRONMENT SECTOR 23: RECOVERY PLAN MATRIX TABLE – ENVIRONMENT SECTOR 24: RECOVERY PLAN MATRIX TABLE

138 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan CEA, NBRO, etc. are some examples. MMDE the revised Environmental Policy of Sri must be the convener for a range of different Lanka having a detailed section on post-di- stakeholders such as agencies within its own saster needs assessment and recovery. Ministry and other ministries and institutions Steps taken towards implementation of that need to take part in planning and imple- environment recovery. mentation of recovery. 2) Steps taken to move towards environmen- tally sound land use: Sustainable land 8. Implementation and Coordination management is identified as a key envi- Arrangements and Mechanisms ronmental strategy by the PIP. Its imple- Coordination mechanisms similar to the ones mentation will require environmentally that exist for the National Adaptation Plan for sensitive revision of land use plans. Climate Change Impacts in Sri Lanka 2016 – 2025 (NAP Sri Lanka) and the Nationally De- 3) Implementation of data and information termined Contribution 2016/7 (NDC) – a com- collection and documentation pledges mitment to the Paris Declaration by Sri Lanka under SFDRR and NAPs: The Sendai from 2020 onwards should be used as a mech- Framework for Disaster Risk Reduction anism to coordinating the implementation and (SFDRR), which Sri Lanka is a signatory monitoring of the recovery of the Environment to, prioritizes mapping and management sector. The abovementioned institutional and of natural assets/resources to preserve coordination mechanisms for NAP include in- ecosystem functions to help reduce risks. stitutions representing identified vulnerable sec- The NAP of Sri Lanka plans to conduct re- tors (Food security and Water, Bio-diversity and search studies on climate change impacts Coastal resources, Health, Human settlements on ecosystems and biodiversity, establish and infrastructure, Tourism, Energy, Industry a comprehensive programme to monitor and infrastructure and Export agriculture) and climate change impacts on key natural the National Working Group for Cross-cutting ecosystems and biodiversity, prepare adap- National Adaptation Needs and a Civil Society tive management programmes for climate Organizations (CSO) Forum. A similar set up is sensitive ecosystems, prepare recovery suggested for recovery coordination or the same plans for highly threatened ecosystems may be persuaded to include recovery in its ToR. and species, and develop research insti- tutes’ capacity for conducting research on MONITORING FRAMEWORK: climate change impacts on ecosystems and As the recovery programmes are embedded biodiversity. within the regular work of the Ministry, while the overall progress monitoring would capture 4) Monitoring progress on waste manage- implementation, it is important to ensure that ment: The PIP aims to achieve zero waste environment recovery is monitored within it. dumping by 2018 and allocated resources The institutional and coordination mechanisms of LKR 300 million each year over three for the NAP could be tasked with this, and it years. The Pilisaru project was allocated could be monitored through the overall recov- LKR 190 million each year while integrat- ery coordination that will be carried out by the ed polythene and plastic management is MDME and the NPD. The following would be allocated 19 million in 2018 and LKR 7 key indicators of overall environment recovery: million in 2019.

1) The enforcement of environment standards: [Table 24]

10. Sector Recovery Chapters and Sector Recovery Matrices 139 • Disaster Risk Reduction ing systems at high-risk locations in Kegalle district. Government also provided LKR 50 million in 2016 and further LKR 50 million 1. Strategic Vision for DRR in 2017 to expand the automatic rain gauges Sector Recovery: network for improving the national landslide A safer Sri Lanka with stronger disaster risk re- early warning system. duction systems, institutions and communities to prevent loss of life and livelihoods in future Community Preparedness: Government disaster events. allocated LKR 300 million to NDRSC through MoDM to improve facilities in safe centres located in religious places and construct new 2. Status of DRR Sector Recovery building with required facilities to accommo- from 2016 and 2017 date people displaced by disasters Training In response to the floods and landslides of of NDRSC officers to manage safe centres, 2016 and 2017, the Ministry of Disaster Man- develop preparedness plans, conduct aware- agement through the National Insurance Trust ness programme and mock drills in Kegalle Fund (NITF) distributed insurance compen- and Ratnapura districts will be part of the sation to 164,849 households during 2016- programme. Establishing GN-level disaster 2017. The funds from the NITF are distributed management committees and conducting according to a specific assessment supervised workshops to develop preparedness plans and by NDRSC officials. conducting mock drills would a part of the programme. Additionally, the relocation and resettlement of houses in landslide-risk areas is done by Improving Response capacities: On the the National Building Research Organization request made by the communities in Kalutara (NBRO). In response to the floods and land- and Kegalle districts government allocated slides in Kegalle in May 2016, the Cabinet of LKR 70 million in 2017 to procure Angul (man- Ministers approved the release of LKR 2,918 ually-operated floating platforms) and provide million for the construction of 1,682 houses to on-the-job training to operate the Angul. relocate people living in high-risk areas. The National Insurance Trust Fund agreed to pay Data Management including capacities to for the rehabilitation of 1,845 partially dam- conduct PDNA: DMC developed a database to aged houses. archive the data collected to develop the PDNA report. DMC plans to improve the capacity of Apart from housing, the Ministry of Disaster sector agencies to use a common format to col- Management proposed the construction of lect damage and loss data with the assistance of 21 safe shelters in seven districts at a cost of ADPC. LKR 350 million. These safe shelters will be constructed within the next five years with the Hazard vulnerability risk assessments: Gov- approval of the Cabinet. ernment seriously considered the need for disaster risk information and allocated LKR 40 UPDATE ON OTHER ACTIVITIES: million to the landslide hazard mapping pro- Strengthening Early Warning Systems: Gov- gramme of NBRO and LKR 68 million for the ernment released LKR 44 million and LKR 12 multi-hazard risk profile project implemented million in 2016 and 2017 respectively to NBRO by DMC. to establish community based-early warn-

140 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan 3. DRR Sector Recovery tion management systems of the MoDM Objective and Priorities to provide disaggregated data. The overall objective of the DRR sector recov- ery plan is to ensure that Disaster Risk Re- · Mainstream Disaster Risk Reduction duction systems and capacities are prepared into development planning and harmo- to build resilience of communities and the nize disaster mitigation and DRR into the principle of Build Back Better (BBB) is in- National Development Agenda. tegrated in the recovery and reconstruction process. · Undertake hazard, vulnerability and risk assessment. The specific sectoral priorities are to: · Establish roles, responsibilities and man- · Strengthen multi-hazard early warning dates of all departments /units within systems at national and local levels and MoDM. effective dissemination of timely infor- mation. 4. Project Prioritization Criteria · Support most vulnerable communities · Preparedness for the next floods and in flood and landslide areas to prepare landslides. to manage future disaster events and enhance preparedness, early warning, · Mitigate new risks arising from the response, search and rescue, and first aid floods and landslides. capacities. · Integrate Build Back better and DRR · Strengthen capacities of district-level principles into the ongoing recovery and DMC staff and sector agencies to support reconstruction process. and monitor the application of BBB/DRR principles in the reconstruction of all · Align DRR with the Public Investment infrastructure and restoration of services. Programme with the potential to impact a wider area and group of people beyond · Enhance MoDM capacities to coordinate the districts affected by the floods and and facilitate the role of media, private landslides. sector, NGOs and charities in disaster preparedness and response and ensure that a well-established coordination 5. Policy Guidelines for DRR mechanism is available for both pre- and Sector Recovery post-disaster situations among all stake- The Vision 2025 document states that the holder agencies by 2018. Government will establish a National Disas- ter Reserve Fund for financing post-disaster · Establish a comprehensive centralized reconstruction. This is in addition to the database with proper damage and losses disaster insurance scheme which insures all data collection and strengthen Post-Di- households against disasters. The Government saster Needs Assessment (PDNA) capaci- also expressed its intent to resettle high-risk ties of district officials and line ministries. communities living in landslide-prone areas. Furthermore, it states that hazard, vulnera- · Strengthen data collection and informa- bility and risk assessment will be undertaken

10. Sector Recovery Chapters and Sector Recovery Matrices 141 and insurance schemes will be introduced for to develop risk information and make it freely economically important sectors. available to all government agencies and other partners involved in preparedness, response The DRR sector recovery plan is fully aligned and relief activities. The Census and Statics De- with the National Plan for the Sendai Frame- partment (CSD) will support the development work for Disaster Risk Reduction. All projects of baseline data of risk-prone populations, and activities included in the recovery plan based on the flood and landslide hazard maps are listed as targets within the National Plan developed by technical agencies. for the SFDRR and will contribute towards achievements of the targets of the framework. 6. Sources of Funding/Finance INTEGRATING DISASTER RISK for DRR Sector Recovery REDUCTION INTO RECOVERY The detailed information on funding sources Due to the repeated disasters, the Government for the disaster risk reduction sector is listed of Sri Lanka emphasized the importance of in the matrix of recovery plan against each ac- ensuring that all development projects are tivity. The primary source of funds for recovery informed by risks and built to withstand future is the department’s own annual budget. The disasters. The Ministry of Disaster Manage- Ministry received additional funds for immedi- ment initiated the process to integrate risk ate response and relief activities. For the DRR reduction in all sectoral development plans activities planned under the sectoral recovery and projects. MoDM is supporting the Nation- plan, the ministry will draw on its own bud- al Planning Department to review the for- getary allocations as well as link it to ongoing mats for submission of budget proposals and projects funded by various development included selected indicators and checklists for partners. The total recovery needs for a period considering DRR for recovery and reconstruc- of three years is LKR 44,332,000. The resource tion of damaged infrastructure. Following the requirements by each year are as follows: incorporation of the checklist into the project planning format, the MoDM plans to train all Year 2017 Year 2018 Year 2019 Funding Source

sectoral agencies in the use of the new format gosl 2,210,000 26,822,000 15,300,000 and checklists. Additionally, MoDM will pro- (primary source) vide technical assistance to sectoral ministries to draft guidelines to incorporate disaster The funding from partners is not indicated risk reduction and principles of Build Back but ongoing projects funded by partners are Better (BBB) into sectoral development plans, linked to the various activities indicating the followed by training for all senior officials. The name of project and partner. Therefore, the trained cadre of officials would be utilized to total resource from partners is fully reflected in train officers of sectoral agencies at national the matrix with the exception of an amount of and local levels to incorporate DRR into proj- LKR 1,425,000. The partnership funds come ect proposals. from ongoing projects with the World Bank, JICA, World Food Programme and UNDP. MoDM through the Disaster Management Centre (DMC) will develop risk information It is to be noted that several of the projects and for floods and landslides and make this avail- activities listed under the recovery plan are able to all sectoral agencies. NBRO, Irrigation also listed as projects under the Public Invest- Department, Department of Meteorology and ment Programme 2017 -2020. The following other technical agencies have the responsibility projects listed under the PIP links closely to

142 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan TABLE 25: ENVIRONMENTAL PIP PROJECTS RELATED TO THE RECOVERY PROCESS Project /Activity 2017 budget 2018 budget 2019 budget

Awareness and preparedness of community on disaster 45,000,000 50,000,000 55,000,000 management Strengthening capacity of flood and landslide disaster 70,000,000 70,000,000 9,000,000 response mechanism Meteorological equipment 13,000,000 14,000,000 15,000,000 Installation of community-based early warning systems 12,000,000 0 0 Phase 1 Enhance real time landslide forecasting and early warning capacity by expanding the automated rain 50,000,000 31,000,000 0 gauge network in Sri Lanka Strengthening disaster preparedness capacity 300,000,000 100,000,000 0 Mainstreaming disaster risk reduction into 0 3,000,000 4,000,000 development Development of multi-hazard risk profile for Sri Lanka 68,000,000 80,000,000 31,000,000

Source: PIP (pages 210 and 211) the objectives and activities planned under the ic Affairs (MNPEA) from MoDM is to provide sector recovery plan. Funds therefore that may technical assistance to all sectoral ministries be allocated for the PIP may be used to address in incorporating disaster resilient approaches the recovery needs identified by the post-disas- into recovery and reconstruction. TheDisas - ter needs assessment 2016 and 2017. ter Management Centre (DMC) will take a lead on this activity and as mentioned above [Table 25] will develop sector-specific guidelines to assist in the process of reconstruction. Through Additional funding sources for Disaster Risk DMC officials at the district level, DMMo will Reduction could be mobilized from the private monitor the application of these guidelines in sector for very specific initiatives that may not all reconstruction projects. In landslide-affect- be budgeted, such as purchase of equipment ed areas, officials of theNational Building for villages for search and rescue activities. Research Organization (NBRO) will provide Rain gauges may also be funded through ex- technical assistance and approval for all hous- ternal support. Specific project proposals with ing plans. NBRO will also inform sectoral agen- such needs presented to individual private sec- cies of low-risk sites for relocation of planned tor partners or even a charitable organization schools, hospitals and other infrastructure. and funding sought for equipment required for preparedness and response. TheNational Disaster Relief Service Cen- tre (NDRSC) will continue to coordinate the assessment of damage to housing to facilitate 7. Key Institutional Roles and the distribution of insurance compensation to Implementing Partners: Government, all 77,000 households damaged by the floods Private Sector, NGOs and landslides. As the lead agency in the management of di- sasters in the country, the Ministry of Disaster MoDM with DMC and NDRSC will establish Management has a key role in the implemen- a system to coordinate with all private sector tation of the Post-disaster recovery plan. One agencies, corporates and media during the of the key expectations of the Government and disaster to ensure relief is provided to most the Ministry of National Policies and Econom- needy people and minimize duplication and

10. Sector Recovery Chapters and Sector Recovery Matrices 143 wastages. Strengthening the National Disas- ed by the Asian Disaster Preparedness Center ter Management Coordinating Committee with funds from the World Bank. UNDP may (NDMCC) and involving NGOs and the private also provide support to align the current used sector before the disaster will be useful to plan data sheets for PDNAs with the Damage and effective response. Assessing the strengths Losses data systems. of the private sector agencies through the NDMCC could be done to utilize their services NDRSC will seek the support of the World most productively. Food Programme to develop a logistics data- base to streamline the receipt and distribution of all materials, goods and equipment for relief 8. Implementation and and response. Coordination Arrangements The DRR sector recovery will be carried out The work of mainstreaming disaster risk under the leadership of the Ministry of Disas- reduction principles into recovery and recon- ter Management. The key activities included struction in all sectors will be led by the DMC in the recovery plan fall under the mandates with assistance from UNDP and the World and work of the Disaster Management Centre Bank. (DMC) and the National Disaster Relief and Service Centre (NDRSC). The two depart- Sector Ministries will be supported to hire ments will co-lead the implementation of the consultants to get the required technical assis- sector recovery plan and work closely with the tance to develop guidelines for mainstreaming District Secretaries and the DMC and NDRSC disaster risk reduction into their sector devel- officials at the districts and division level. opment plans. This work will be jointly led my MoDM and the relevant sector ministries. Several of the technical elements of early warning systems for landslides, developing a Further technical assistance from academic hazard profile of Sri Lanka etc., will be led by institutions such as the universities and tech- the National Building Research Organization nical institutions may be mobilized to support (NBRO). NBRO will provide the technical implementation as may be required. inputs and design to the instrumentation and installation of rain gauges and it will be installed and maintained by the village com- 9. Monitoring Framework mittees under the supervision of the District The following indicators may be used to mon- Secretaries and Divisional Secretaries. itor the progress against planned projects and activities. The relevant unit responsible for im- NGOs will be requested to support community plementing the activity will do the monitoring preparedness for floods and landslides in all of the activities. A quarterly or biannual prog- affected districts. Guidelines for community ress meeting may be held jointly by the MoDM preparedness plans and trainings will be im- and NPD to review the progress of activities parted with the expertise of the Sri Lanka Red against the indicators below and address any Cross and other agencies already working in bottlenecks and challenges that may arise from the flood-affected districts. the implementation of the various activities. Field visits may be organized by DMC and Projects on data management and updating NDRSC officials to see work on site. post-disaster needs assessment data may be done through the ongoing project implement- [Table 26]

144 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan TABLE 26: MONITORING FRAMEWORK INDICATORS Frequency of Objective Indicators monitoring

• Number of villages where rain gauges are installed and number of Once a quarter community members trained in reading and maintaining records Strengthen the multi-hazard of rainfall. early warning system • Number of villages receiving early warning messages on impending rainfall, possible floods and landslides from trained community Biannual volunteers.

• Number of community volunteers trained in search and rescue Annual Prepare communities (SAR), early warning systems (EWS), First Aid, etc. and utilizing to manage floods and skills for small-scale disasters. landslides • Number of communities having a preparedness plan. Annual

Support sectors (by • Number of sector-based guidelines developed to integrate BBB Biannual MoDM) to integrate BBB elements into key infrastructure sectors’ reconstruction projects. in all sectoral recovery and • Number of schools and hospitals reconstructed using BBB and reconstruction work aligned to schools’ safety plan and safe hospital initiatives. Annual

• Number of coordination cells established at national and district Annual levels with participation of the private sector, NGOs and charities.

• Increase in the participation of private sector contributions for Annual Enhance MoDM capacities DRR and recovery. to coordinate all non- government stakeholders • Increased participation of NGOS in DRR and community preparedness. Annual • Enhanced communication by the media on disaster events and positive messages on DRR efforts. Annual • Reduction in the number of forms for collecting data from districts; data forms have scope for collected data to be Bi annual Establish a comprehensive disaggregated by sex, age, disability. and centralized database at • All damage and loss data sheets aligned to PDNA methodology Bi annual MoDM and information requirements.

• Number of district-level officials sensitized and trained in the use Annual of new data sheets and in the PDNA methodology.

• Number of sector-specific checklist and guides developed to Annual support mainstreaming DRR into sectoral development plans. • Number of sectoral planning officers sensitized on the use of the Mainstream DRR into Annual checklists and able to support line ministries in developing risk- sectoral development plans informed sectoral plans. • Number of sectoral plans presented for the annual budget of 2019 Annual reflecting how DRR is considered in sectoral budgets.

Develop hazard and • Number of development projects, new housing settlements and Annual vulnerability profiles large infrastructure projects undertaken with risk information.

• TOR for various units of MoDM revised and updated as per current Institutional mandates functions. of all MoDM are clear and endorsed • Number of MoDM officials trained to deliver on their mandates and responsibilities.

10. Sector Recovery Chapters and Sector Recovery Matrices 145 Potential Partner Support

Support Agencies GN,NGO, ITI GA, ID DMC, DS, GN

Lead Agencies DMC NBRO DMC NBRO Unmet (Financing Gap) (LKR Mn)

Donor (LKRMn) 8 Government 15 2.10

(LKR Mn) 15.95 8 15 Total Budget 2.1 (LKR Mn) 15.95

Annual Target 2.500 0.300 5.000 (LKR Mn) 6.000 2020 2020 Annual Target Install community- EWS. level Continue to maintain the system VDMC established VDMC members in using trained EWS and SOPs. EWS expanded 1000 to cover villages prone to landslides. 1000 manual gauges rain installed, and 2000 community members trained.

Annual Target 4.722 2.500 0.300 9.000 (LKR Mn) 2019 2019 Annual Target Install community- EWS. level Continue to maintain the system district. Coverage of district. Coverage 50 GN divisions in each district. 450 GN divisions included in the programme. 150 awareness programmes Identify the balance e GN divisions highly- prone to landslides and floods in nine districts. VDMC established . VDMC in members trained using EWS and SOP. to be 150 workshops conducted in each EWS expanded to 1000 villages cover prone to landslides. 1000 manual rain gauges installed, and 2000 community members trained.

Annual Budget 1.500 4.722 2.000 0.600

(LKR Mn) 2018 2018 Annual Target Install community- Cost EWS. level includes the manufacture and installation of sensors to detect of earth movement and sirens to warn people. Display boards Display installed to indicate the real-time flood of levels water Cost of a the river. unit digital display is Rs 150,000.00. Installation of 10 boards at critical locations. VDMC established floods- and in five landslide- prone districts. 10 members from each VDMC covering trained 10 GN divisions in each Divisional Secretary division. 20 DS divisions to be 2000 VDMC covered. to members trained disseminate EWS messages. Twenty to be workshops conducted in each district. EWS expanded to 1000 villages cover prone to landslides. 1000 manual rain gauges installed, and 2000 community members trained.

Annual Budget 1.000 0.425 0.350

(LKR Mn) 2017 2017 Annual Target Establish sensors to detect the movement of earth and alarm systems to warn communities at selected locations. EWS in 30 landslides prone villages in Kegalle Ratnapura, and Kalutara. Rain gauges and / EWS reactivated appropriated 30 rain gauges installed and 180 VDMC members trained VDMC established in Colombo, Gampaha; Puttalam, Kegalle, SOPs Kalutara. for EWS messages dissemination agreed with community. 10 VCDM members 10 DS in SOP. trained TOT Divisions covered. for DMC programme districts staff in five VDMC to train members conducted RECOVERY PLAN MATRIX – DISASTER RISK REDUCTION SECTOR RECOVERY PLAN MATRIX Priorities Programme Programme Objectives / Objectives Village Disaster Strengthen early warning systems at the national, district and local levels ( Management Committees, VDMC) TABLE 27: TABLE

146 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Potential Partner Support NGOs in working the area Volunteers Volunteers

Support Agencies GN, NGO DS, vNDRSC,GN DS, GN, NGOs, DS, GN, NDRSC DS

Lead Agencies DMC DDMC DMC DMC DMC Unmet 5.10 0.30 (Financing Gap) 0.80

(LKR Mn) 200.00

Donor (LKRMn)

Government 6.1 (LKR Mn) 6.1 5.1 0.8

Total Budget 200 0.30 (LKR Mn)

Annual Target 2.000 0.200 2.000

(LKR Mn) 75.000 2020 2020 Annual Target Continue to conduct simulation in nine exercises districts Disseminate guidelines on household Flood level Preparedness through VDMCs in all flood and landslide affected districts. Continue to Angul provide (floating platforms) to people transport and distribute goods to communities Update community- flood level and landslide preparedness plans with information on safe shelters, relief distribution centres, community assets lists and role of VDMC members.

Annual Target 2.000 0.200 3.000 2019 (LKR Mn) 75.000 2019 Annual Target Continue to conduct simulation exercises in nine districts affected by floods and landslides Disseminate guidelines on household level Flood Preparedness through VDMCs in all flood and landslide affected districts. Continue to provide Continue to provide Angul (floating platforms) to people and transport distribute goods to communities Update community- flood level and landslide preparedness plans with information on safe shelters, relief distribution centres, community assets lists and role of VDMC members.

Annual Budget 1.000 1.000 0.200 50.000

(LKR Mn) 2018 2018 Annual Target Conduct simulation for flood exercises and landslide preparedness with most vulnerable communities in five districts. Disseminate guidelines on household level Flood Preparedness through VDMCs in all flood and landslide affected districts. Provide Angul Provide (floating platforms) people to transport and distribute goods to communities Procure 200 anguls at Rs, 250,000 each Update community- flood level and landslide preparedness plans with information on safe shelters, relief distribution centres, community assets lists and role of VDMC members.

Annual Budget 0.100 0.100 0.200 0.300

(LKR Mn) 2017 2017 Annual Target Conduct simulation for flood exercises and landslide preparedness with most vulnerable communities in five districts. Develop household- Develop flood level preparedness guidelines and disseminate through VDMCs in all flood- and landslide- affected districts. Angul needs identified with flood- affected communities in Colombo, Gampaha, Ratnapura, Kalutara, Galle, and Matara districts Flood levels Flood levels demarcated (towns, buildings electricity or telecom posts) to of keep people aware their risk Update community- flood level and landslide preparedness plans with information on safe shelters, relief distribution centres, community assets lists and role of VDMC members. Priorities Programme Programme Objectives / Objectives Support most vulnerable villages in flood- and landslide- prone areas to prepare manage future disaster events.

10. Sector Recovery Chapters and Sector Recovery Matrices 147 Potential Potential Partner Partner Support Support NGOs C H A NGO World Bank World

Support Support Agencies Agencies DMC, NDRSC, MWCA, Sector Agencies DS, UNDP WB, ADPC, Sector agencies UNDP, WFP, UNDP, UNDP DS, WFP Sector agencies, UNDP

Lead Agencies Lead Agencies MoDM DDMCU DMC NDRSC DMC MoDM NDRSC NDRSC DMC Unmet Unmet 104

(Financing Gap) (Financing Gap) 2.03

(LKR Mn) (LKR Mn) 470.00 3 30 1.10

Donor (LKRMn) Donor (LKRMn) 0.75 33.75

Government Government (LKR Mn) (LKR Mn) 1 4 3 8 0 13 76 38 470

Total Budget Total Budget 0.75 2.03

(LKR Mn) (LKR Mn) 33.75

Annual Target Annual Target 1.500 1.500 1.500 2.000 (LKR Mn) (LKR Mn) 0.200 150.000 2020 2020 2020 2020 Annual Target Annual Target Continue to facilities improve in relief centres. Continue to conduct training for programmes staff of DMC and sector agencies. Continue to operationalize the coordination mechanism developed Monitoring of the process. recovery Continue monitoring support at district level. Monitoring of the livelihoods support recovery

Annual Target Annual Target 1.500 1.500 1.500 2.000 0.200 0.600

(LKR Mn) 2019 (LKR Mn) 2019 200.000 0.100 2.000 2019 2019 Annual Target Annual Target Continue to improve Continue to improve facilities in relief centres. NDMCC meeting Continue to conduct programmes training for staff of DMC and sector agencies. Continue to operationalize the coordination mechanism developed DMC to continue to support the conducting of Implement the recommendation of the study Continue to conduct programmes training for NDRSC officers Monitoring of the process. recovery Continue monitoring support at district level. Monitoring of the recovery livelihoods support

Annual Budget Annual Budget 1.200 1.500 1.500 0.100 0.200 2.000 0.500 11.530 42.000

(LKR Mn) 2018 (LKR Mn) 2018 120.000 ousing, 2018 2018 H Annual Target Annual Target ealth, Education, Continue to develop Continue to develop guidelines for each Continue to support DDMCU to improve coordination. Train staff in the District. relief Improve centres located at religious places, community centres and construction of new centres sector ( H Local Government, to Tourism) Build incorporate Back Better principles and Disaster Resilient Construction Technologies. Operationalize Operationalize the coordination mechanism developed Conducting NDMCC meeting at regular and taking intervals action. follow-up DMC staff to Train secretarial provide support. Implement the recommendation of the study Training programmes programmes Training conducted for NDRSC officers on relief management including safe centres Monitoring of the process. recovery Community groups of beneficiaries organized for implementing and masons/ recovery on artisans trained disaster resilient construction technologies Design and promotion of schemes insurance for small and micro enterprises and disburse cash for women grants entrepreneurs

Annual Budget Annual Budget 0.225 0.250 2.000 3.000 0.500 8.000 31.000 2017 2017 33.750

(LKR Mn) 23.500 (LKR Mn) Ongoing project funded by UNDP. ousing, H 2017 2017 Annual Target Annual Target ealth, Education, Formats used by DMC, NDRSC and other agencies standardized to collect data by sex, age, disability and elderly people Data collection templates aligned with PDNA. Baseline data systems in all districts. District staff in PDNA trained developed ( developed H Tourism) Local Gov., to incorporate BBB principles and disaster resilient construction technologies. DDMCUs established districts. in five actions Recovery database maintained Standard mechanism established to assess, collect, manage and distribute relief materials from non- government sources. Coordination and information mechanisms for relief management in Colombo, Gampaha, Galle, Ratnapura, and Matara. Kalutara, Strengthen the NDMCC. Develop a TOR and identify stakeholders and their roles. Study to assess the present organizational structure and propose institutional capacity strengthening strategies. Sector guidelines Recovery policy Recovery and institutional arrangements to enable developed BBB Database on households receiving payouts, insurance detailed assessment of housing needs at village level and support for monitoring capacities at district level Master plan for promoting business continuity plans implemented and SME and MSMEs trained RECOVERY PLAN MATRIX – DISASTER RISK REDUCTION SECTOR RECOVERY PLAN MATRIX Priorities Priorities Programme Programme Programme Objectives / Objectives / Objectives Strengthen data management systems of the MoDM Strengthen PDNA capacities of districts and line ministries Improve relief Improve management in all flood- and landslide- affected districts Strengthen capacities of district- level DMC staff and sector agencies to support and monitor application of BBB/ DRR principles in the reconstruction of all infrastructure and restoration of services. Strengthen the capacity and mechanism of NDRSC to coordinate and facilitate role of media, private NGOs sector, and charities in disaster preparedness and response TABLE 27: TABLE

148 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Potential Partner

Support A H NGOs C NGO

Support Agencies DMC, NDRSC, MWCA, Sector Agencies DS, UNDP WB, ADPC, Sector agencies UNDP DS, WFP UNDP, WFP, UNDP,

Lead Agencies MoDM DDMCU DMC NDRSC MoDM NDRSC NDRSC DMC Unmet

(Financing Gap) 2.03

(LKR Mn) 470.00 3 1.10

Donor (LKRMn) 0.75 33.75

Government (LKR Mn) 1 4 3 0 470

Total Budget 0.75 2.03

(LKR Mn) 33.75

Annual Target (LKR Mn) 0.200 150.000 2020 2020 Annual Target Continue to facilities improve in relief centres. Continue to operationalize the coordination mechanism developed

Annual Target 0.200 0.600

(LKR Mn) 2019 200.000 0.100 2.000 2019 Annual Target Continue to improve Continue to improve facilities in relief centres. Continue to operationalize the coordination mechanism developed DMC to continue to support the conducting of NDMCC meeting Implement the recommendation of the study Continue to conduct programmes training for NDRSC officers

Annual Budget 1.200 0.100 0.200 2.000 0.500

(LKR Mn) 2018 120.000 2018 Annual Target Continue to support DDMCU to improve coordination. Train staff in the District. relief Improve centres located at religious places, community centres and construction of new centres Operationalize Operationalize the coordination mechanism developed Conducting NDMCC meeting at regular and taking intervals action. follow-up DMC staff to Train secretarial provide support. Implement the recommendation of the study Training programmes programmes Training conducted for NDRSC officers on relief management including safe centres

Annual Budget 0.225 0.250 3.000 0.500 2017 (LKR Mn) 33.750 Ongoing project funded by UNDP. 2017 Annual Target Formats used by DMC, NDRSC and other agencies standardized to collect data by sex, age, disability and elderly people Data collection templates aligned with PDNA. Baseline data systems in all districts. District staff in PDNA trained DDMCUs established districts. in five actions Recovery database maintained Standard mechanism established to assess, collect, manage and distribute relief materials from non- government sources. Coordination and information mechanisms for relief management in Colombo, Gampaha, Galle, Ratnapura, and Matara. Kalutara, Strengthen the NDMCC. Develop a TOR and identify stakeholders and their roles. Study to assess the present organizational structure and propose institutional capacity strengthening strategies. Priorities Programme Programme Objectives / Objectives Strengthen data management systems of the MoDM Strengthen PDNA capacities of districts and line ministries Improve relief Improve management in all flood- and landslide- affected districts Strengthen the capacity and mechanism of NDRSC to coordinate and facilitate role of media, private NGOs sector, and charities in disaster preparedness and response

10. Sector Recovery Chapters and Sector Recovery Matrices 149 Potential Partner Support UNDP (Data Project UNDP ) UNDP UNDP, WFP UNDP, Universities

Support Agencies DMC UNDP DMC, MDM NBRO, ID, ISBL, Insurance Companies

Lead Agencies MoDM MoDM NPD DMC NDRSC Unmet 1.00 1.00

(Financing Gap) 2.00 936.03

(LKR Mn) 460.00 1 Donor (LKRMn) 39.6

Government 14 61 (LKR Mn) 1 1 2 15

Total Budget 460 1,381.37 (LKR Mn)

Annual Target (LKR Mn) 5.000 150.000 2020 404.700 2020 Annual Target Continue to conduct advocacy and training programmes Continue risk information development

Annual Target 1.000 5.000

(LKR Mn) 2019 562.122 250.000 2019 Annual Target Continue to conduct and advocacy programmes training Risk information for developed frequently occurring disasters to facilitate the inclusion of DRR into local level planning Promote risk- based insurance for infrastructure, economic assets and life losses.

Annual Budget 1.000 1.000 1.000 5.000 60.000

(LKR Mn) 2018 309.552 2018 Annual Target TOT oriented to sector agencies and NPD for training development planners and officers on DRR Risk information for developed frequently occurring disasters to facilitate the inclusion of DRR into local level planning. Review the functions and duties of all agencies under the purview of the MoDM and clarify update mandates of each agency. Promote risk- based insurance for infrastructure, economic assets and life losses. Technical assistance Technical to National Planning Department to ensure integration of DRR into sector plans development and budgets.

Annual Budget 0.300

(LKR Mn) 2017 105.000 2017 Annual Target Develop guidelines Develop DRR for incorporating into the development planning process. RECOVERY PLAN MATRIX – DISASTER RISK REDUCTION SECTOR RECOVERY PLAN MATRIX Priorities Programme Programme Objectives / Objectives Establish roles, responsibilities and mandates of all departments /units within MoDM. Mainstreaming Disaster Risk Reduction into Development Planning TOTAL TABLE 27: TABLE

150 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan Potential Partner Support UNDP (Data Project UNDP ) UNDP UNDP, WFP UNDP, Universities • Gender and Social Inclusion assistance for the affected women – particular- Support Agencies ly to widows and women-headed households. DMC UNDP DMC, MDM NBRO, ID, ISBL, Insurance Companies The ministry allocated LKR 75 million for this 1. Strategic Vision of Gender and programme only for 2017. Lead Agencies Social Sector for Recovery MoDM MoDM NPD DMC NDRSC Unmet The needs and rights for women and girls are With the guidance of the Ministry of Disaster 1.00 1.00 (Financing Gap) 2.00 936.03 met and their dignity is respected and acknowl- Management, the National Disaster Manage-

(LKR Mn) 460.00

1 edged, and women have equal capacities to ment Centre took action to develop a com- Donor (LKRMn) 39.6 make choices and equal opportunities to shape prehensive and more detailed data-collecting the outcomes of their actions during recovery. format with the inclusion of women and child Government 14 61 (LKR Mn) aspects for future actions. 1 1 2 15

Total Budget 460 1,381.37 (LKR Mn) 2. Status of Recovery from the 2016 Housing, Agriculture, Employment and Live- - 2017 Landslides and Floods lihoods, Water and Sanitation and Health were Annual Target The 2016 floods and landslides affected 22 of among the main sectors that impacted women (LKR Mn) 5.000 150.000 2020 404.700 the 25 districts in the island impacting a total and girls, of which livelihoods was key in re- of almost 500,000 persons. Colombo, Gampa- covery. As the majority of women affected were ha, Kegalle, Puttalam and Kurunegala districts not part of the formal labour force and were were among the most affected. The 2016 data dependent on agriculture and home-based 2020 reflects, as per the PDNA report (2016), that economies, their income earning avenues and Annual Target Continue to conduct advocacy and training programmes Continue risk information development approximately 221,478 women and girls were food security were severely affected. It is vital

Annual Target affected; around 24,832 were children under in humanitarian crises to support access to 1.000 5.000

(LKR Mn) 2019 562.122 250.000 the age of 18, and 33.6% of the female headed and control of resources by women and girls households belong to elderly widows in the in order to build resilience and minimize their most-affected districts. vulnerability as traditional support structures and protection networks within societies break 2019 One of the main challenges faced in the 2016 down.

Annual Target floods and landslides was the lack of sex and Continue to conduct and advocacy programmes training Risk information for developed frequently occurring disasters to facilitate the inclusion of DRR into local level planning Promote risk- based insurance for infrastructure, economic assets and life losses. age disaggregated data. This created a chal- The May 2017 floods and landslides affected Annual Budget 1.000 1.000 1.000 lenge in understanding the impact of the floods 630,000 persons, of which 151,000 were wom- 5.000 60.000

(LKR Mn) 2018 309.552 on women and girls for pre- and post-disaster en and 189,000 children, which is approxi- analysis. Data on the affected population is mately 54% of the total affected population. critical to implementing effective programme A total of 304,708 households in the five interventions and to ensure resource mobili- districts are female-headed. The same chal- 2018 zation is based on the needs and wants of the lenges faced in 2016 persist, such as the need

Annual Target affected population. to have sex- and age-disaggregated data and TOT oriented to sector agencies and NPD for training development planners and officers on DRR Risk information for developed frequently occurring disasters to facilitate the inclusion of DRR into local level planning. Review the functions and duties of all agencies under the purview of the MoDM and clarify update mandates of each agency. Promote risk- based insurance for infrastructure, economic assets and life losses. Technical assistance Technical to National Planning Department to ensure integration of DRR into sector plans development and budgets. the need for interventions to address the needs Annual Budget The Ministry of Women and Child Affairs of women and girls, especially with regards to 0.300

(LKR Mn) 2017 105.000 collected district-based data on women and protection. As disasters, disproportionately children, who were affected by the disasters. impact on women and girls, making them Furthermore, the Ministry of Women and more vulnerable, it is important to integrate a Child Affairs took action to maintain a data- gender perspective into the planning and im- 2017 base including these details for future actions. plementation of emergency strategies. Camp Annual Target The Women’s Bureau of Sri Lanka, which is an management needs to take into consideration Develop guidelines Develop DRR for incorporating into the development planning process. institution under the purview of this Ministry, the needs of women and girls, especially at the initiated a programme to provide livelihood decision-making level. Priorities Programme Programme Objectives / Objectives Establish roles, responsibilities and mandates of all departments /units within MoDM. Mainstreaming Disaster Risk Reduction into Development Planning TOTAL

10. Sector Recovery Chapters and Sector Recovery Matrices 151 To ensure better preparedness and effective re- disaster related issues from a gender sponse to recurring floods, landslides and simi- perspective. lar humanitarian emergencies, effective policy interventions are required. The Public Invest- · Women’s welfare, rights and needs are ment Policy outlined the need to have strate- protected through gender sensitization gies in place to implement special programmes and camp management systems. for women to enhance their skills in business development and management and the need to · Gender sensitive livelihoods assessment address sexual and gender-based violence. The and market analyses takes into consider- enactment of the National Commission on ation the informal sector and impact of Preventing Sexual and Gender-Based Violence disasters on home-based economies. and providing assistance for victims of gen- der-based violence was also highlighted. These measures, when implemented, can enhance 4. Prioritization Criteria and strengthen the response during emergen- · Measures to ensure that gender sensi- cies and the development context. tive ‘safety and security’ measures are in place in accordance with the accepted standards for implementation in the next 3. Sector Recovery Priorities / Objectives disaster. · To ensure the availability of sex-disaggre- gated data of the areas affected, for effec- · Resilience building of communities to tive response and recovery established cope with and respond to emergencies processes and systems are in place for the and have adequate systems in place to collection of data. provide psycho-social support to men, women and children dealing with loss of · To inform overall recovery strategies of life of family members and trauma. all key sectors information and data col- lected based on gender analysis including · Sex disaggregated data to plan, monitor monitoring indicators aligned with SDGs and track emergency relief and recovery and the Sendai Framework is provided to activities. the NPD. · Women-headed households get priority · Women’s and girls’ needs are prioritized to repair and reconstruct houses and and addressed across all sectors, such restart livelihoods so that normalcy is as in the water, sanitation and hygiene, restored within households. Prioritiza- food, security, shelter, resettlement and tion of recovery of housing and liveli- health sector. hoods based on vulnerabilities (such as of women-headed households), and the · Full participation of women and girls in provision of access to equal income earn- decision-making and interventions in ing opportunities without discrimination preparedness, response and recovery is based on gender. ensured. · Preparedness for next floods and land- · Capacity building is carried out for all lev- slides by ensuring engagement of women els of officers to have the relevant skills, and girls in early warning, preparedness, knowledge and experiences to address response and recovery including the

152 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan engagement of field officers from the rel- 6. Sources for Funding / evant ministries and local level officials. Finance for Recovery · 2017 National Budget – LKR 75 million · Increase coordination and regular (Women Bureau) multi-sectoral meetings with all stake- · Foreign Aid holders to discuss at the community-level · Donor agencies on interventions for preparedness, recov- · Expected for 2018 – LKR 25 million ery and response to ensure that women and girls are not marginalized. 7. Key Institutional Implementing Partners: Government, 5. Sector Policy Guidelines for Recovery Private sector, NGOs · A survivor-centred approach to respond · Ministry of Women and Child Affairs and mitigate SGBV in preparedness, (MWCA) response and recovery by taking into · Disaster Management Centre (DMC) consideration the safety, respect, dignity, · Department of Census and Statistics confidentiality and non-discrimination (DCS) for victims and survivors of GBV. · District and Divisional Secretariats · Ministry of Defence · Ensuring a multi-sectoral cooperation · Ministry of Law and Order for emergency preparedness, response · Ministry of Rehabilitation and Develop- and recovery. ment · Ministry of Health (MoH) · Gender mainstreaming and integration · Ministry of Hill Country New Villages, across all sectors and at every stage of the Infrastructure and Community Develop- ment (MHC&CD) emergency response, especially in the recovery and reconstruction process. · Ministry of Social Empowerment, Wel- fare and Kandyan Heritage (MSEW&KH) Ministry of Megapolis and Western Prov- Community-based approach to ensure · · ince Development (MM&WPD) the participation and engagement of all Ministry of Finance and Planning (MFP) affected populations for effective re- · Ministry National Policies and Economic sponse and recovery. · Affairs (MNPEA) Insurance Board of Sri Lanka (IBSL) Gender-sensitive rapid assessment of · · Sri Lanka Social Security Board (SLSSB) vulnerabilities prior to the development · Save the Children of emergency and preparedness plans and · the implementation of programs. · Plan International · World Vision · Building capacity among the service pro- · Hemas (Pvt.) Ltd viders (skills/knowledge/experiences) to · UNICEF address issues and needs of women and girls. 8. Implementation and Coordination Arrangements and Mechanisms Coordination and implementation will be led with the cooperation of the following institu-

10. Sector Recovery Chapters and Sector Recovery Matrices 153 tions and divisions. Additionally, through the · The Ministry of Women and Child Affairs initiation of combined circulars, all field offi- annually prepares an integrated Women cers at district and divisional levels are made and Child Development Action Plan part of the coordination mechanism and the for each administrative district includ- incorporation of the Divisional and District ing disaster-hit districts. Identified key Women’s Federations under the MWCA for activities could appear on relevant plan relief and recovery work. for addressing Women and Child issues of affected families. The District Plan · Presidential Task Force on Disaster Man- will be implemented with the guidance agement of District Secretaries and Divisional Secretaries. Implementation works may · Disaster Management Centre be monitored on a monthly and quarterly basis. · Disaster Management Unit within the Ministry of Women and Child Affairs · Gender-based disaster management priorities and programmes will be in- · District Disaster Management Coordina- corporated in district women and child tion Committee development plans.

· Divisional Disaster Management Coor- · A system to document the impact of dinating Committee specific disasters and the interventions carried out will be implemented. 9. Monitoring frameworks: · Gender-sensitive Disaster Audit A number of district-level frameworks will be developed to monitor and measure protection issues and concerns of women and girls during emergencies and in post-disaster recovery.

· The Ministry of will take action to assess immediate needs of disaster-hit wom- en and children. Based on the analysis, available funds, human resources and in-kind provisions will be diverted to the relevant areas. The needs and issues will also be referred to identified government, non-government and private agencies for assistance. The Ministry will make sure to appoint field officers to fulfil psychosocial and livelihood needs.

· Gender-specific indicators for ensuring women’s and girl’s needs will be de- veloped and integrated into the sector recovery plans.

154 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan

Derived from needs _ Preparation of MoWCA to MoWCA to provide Refer to Needs table, table #: table for Culture LKR 5 Mn per Negotiations inititiated to take guidelines to support the advisory support 68 of PDNA document. (page and Heritage sector. district on MoWCA to support the lead ministries support from donor agencies follow-up lead Ministry and guidance 147) (Table #: 72 of PDNA average Remarks document, pg: 164-165)

_ Strengthened coordination. MoWCA to with network the National Disaster Force Task on disaster management Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women) _ District secretariats, Divisional Secretariat Partner Partner Support Potential Potential UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD

MoE, MoHealth, MoDM,NDRSC MoWCA,NCPA Support Agencies MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC Lead Agencies MoWCA NDRSC,DMC MoWCA MoDM MoWCA, Child Protection Authority, NCW, Women’s Bureau MoDM MoWCA, NCPA, DCPS MoDM MoWCA MoWCA MoDM MoDM MoWCA MoWCA MoDM Women’s Women’s Bureau / District Secretariat MoWCA Ministry of Housing MoWCA MoWCA MoWCA MoDM, NCPA MoWCA Ministry of Housing MoDM MoDM, NDRSC MoDM MoWCA MoWCA, Ministry of Home Affairs MoWCA MoDM MoDM MoWCA MoWCA MFP, MFP, MNPEA MFP, MFP, MNPEA MED MoWCA, Women’s Bureau Ministry of Housing MoWCA MoDM MoDM 1.10 MoWCA DMC _ _ UNICEF UNDP 1 _ _ _ _ 1.00 0.20 MoWCA 0.20 _ 0.05 6.00 Government Donor Unmet Gov Gov Gov 0.20 0.20 0.20 0.50 0.05 6.00 0.00 0.00 0.00 0.00 Total Total Budget (LKR Mn) 100.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 1.00 _ 0.00 _ 0.00 _ 0.10 _ 0.20 _ 1.00 _ 0.00 _ 0.00 _ 30.00 _ 0.00 _ 0.00 _ 0.00 Annual Budget (LKR Mn) ______Annual Budget (LKR Mn) ______0.10 0.10 0.10 0.10 0.10 0.10 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 10.00 30.00 Annual Budget (LKR Mn.) _ _ _ 0.10 _ _ 0.10 0.10 _ _ _ 1.00 1.00 5.00 1.00 0.60 0.25 182.60 69.20 2.60 1.35 255.75 2017 2018 2019 2020 Annual Budget (LKR Mn) 75.00 25.00 1.00 1.00 102.00 102.00 100.00 Target Annual Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle ernment v Programme Use the forum of National Disaster Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job opportunities Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task agencies. Form gender- based disaster response circles in all go Provide for more Provide recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services In areas of return, establish children’s to clubs/networks continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies assistance, recovery specific attention pay to female headed households Establishment of shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing Women’s economic Women’s – floods, recovery landslides and drought Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women requirements clothes and (sanitary, other material) and appropriate friendly spaces. Establish women- friendly spaces (as needed) in long-term shelter locations Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular practice. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s security. allocated children Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Total RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 155

Derived from needs Derived from needs

_ _ Preparation of MoWCA to MoWCA to provide Refer to Needs table, table #: table for CulturePreparation LKR of 5 MnMoWCA per to MoWCA to provide Refer to Needs table, table #: table for Culture LKR 5 Mn per Negotiations inititiated to take Negotiations inititiated to take guidelines to support the advisory support 68 of PDNA document. (page and Heritage sector.guidelines district to supporton the MoWCA to support theadvisory lead ministries support 68 of PDNA document. (page and Heritage sector. district on MoWCA to support the lead ministries support from donor agencies support from donor agencies follow-up lead Ministry and guidance 147) (Table #: 72 of PDNAfollow-up averagelead Ministry and guidance 147) (Table #: 72 of PDNA average ork with Remarks Remarks document, pg: 164-165) document, pg: 164-165) w

_ Strengthened coordination. MoWCA to with network the National Disaster Force Task on disaster management Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women) _ Strengthened coordination. MoWCA to net the National Disaster Force Task on disaster management Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women)

_ _ District secretariats, District secretariats, Divisional Secretariat Divisional Secretariat Partner Partner Partner Partner Support Support Potential Potential Potential Potential UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD

MoE, MoHealth, MoE, MoHealth, MoDM,NDRSC MoDM,NDRSC MoWCA,NCPA MoWCA,NCPA Support Support Agencies Agencies MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC Lead Lead Agencies Agencies MoWCA NDRSC,DMC MoWCA MoDM MoWCA, Child Protection Authority, NCW, Women’s Bureau MoDM MoWCA, NCPA, DCPS MoDM MoWCA MoWCA MoDM MoDM MoWCA MoWCA MoDM MoWCA Ministry of Housing Women’s Women’s Bureau / District Secretariat MoWCA MoWCA MoWCA MoDM, NCPA MoWCA Ministry of Housing MoDM MoDM, NDRSC MoDM MoWCA MoWCA, Ministry of Home Affairs MoWCA MoDM MoDM MoWCA MFP, MFP, MNPEA MFP, MFP, MNPEA MoWCA, Women’s Bureau MoWCA MED Ministry of Housing MoWCA MoDM MoDM MoWCA NDRSC,DMC MoWCA MoDM MoWCA, Child Protection Authority, NCW, Women’s Bureau MoDM MoWCA, NCPA, DCPS MoDM MoWCA MoWCA MoDM MoDM MoWCA MoWCA MoWCA Ministry of Housing Women’s Women’s Bureau / District Secretariat MoWCA MoDM MoWCA MoWCA MoDM, NCPA MoWCA Ministry of Housing MoDM MoDM, NDRSC MoDM MoWCA MoWCA, Ministry of Home Affairs MoWCA MoDM MoDM MFP, MFP, MNPEA MFP, MFP, MNPEA MoWCA, Women’s Bureau MoWCA MoWCA MED MoWCA MoDM Ministry of Housing MoDM 1.10 MoWCA DMC 1.10 MoWCA DMC _ _ _ UNICEF UNDP _ UNICEF UNDP 1 1 ______1.00 1.00 0.20 MoWCA 0.20 _ 0.05 0.20 _ 0.20 MoWCA 6.00 0.05 6.00 Government Donor Unmet Government Donor Unmet Gov Gov Gov Gov Gov Gov 0.20 0.20 0.20 0.50 0.05 0.20 0.20 6.00 0.20 0.50 0.05 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Total Total Total Budget Budget (LKR Mn) (LKR Mn) 100.00 100.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 1.00 _ 0.00 _ 0.00 _ 0.10 _ 0.20 _ 1.00 _ 0.00 _ 0.00 _ 30.00 _ 0.00 _ 0.00 _ 0.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 0.10 _ 1.00 _ 0.00 _ 0.00 _ 0.20 _ 1.00 _ 0.00 _ 0.00 _ 30.00 _ 0.00 _ 0.00 _ 0.00 Annual Annual Budget Budget (LKR Mn) (LKR Mn) ______Annual Annual Budget Budget (LKR Mn) (LKR Mn) ______0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 10.00 10.00 30.00 30.00 Annual Annual Budget Budget (LKR Mn.) (LKR Mn.) _ _ _ _ 0.10 _ _ 0.10 0.10 _ _ _ _ 0.10 _ _ _ 0.10 0.10 _ _ _ 1.00 1.00 1.00 1.00 5.00 1.00 0.60 0.25 5.00 1.00 0.60 0.25 182.60 69.20 2.60 1.35 255.75 182.60 69.20 2.60 1.35 255.75 2017 2018 2019 2020 2017 2018 2019 2020 Annual Annual Budget Budget (LKR Mn) (LKR Mn) 100.00 75.00 25.00 1.00 1.00 102.00 102.00 100.00 75.00 25.00 1.00 1.00 102.00 102.00 Target Target Annual Annual Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Programme Programme Use the forum of National Disaster Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job opportunities Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task Form gender- based disaster response circles in all government agencies. Provide for more Provide recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services In areas of return, establish children’s to clubs/networks continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. Establishment of shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing assistance, recovery specific attention pay to female headed households Women’s economic Women’s – floods, recovery landslides and drought Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women requirements clothes and (sanitary, other material) and appropriate friendly spaces. Establish women- friendly spaces (as needed) in long-term shelter locations Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular practice. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s security. Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for children Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely allocated Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Use the forum of National Disaster Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job opportunities Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task Form gender- based disaster response circles in all government agencies. Provide for more Provide recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. continue providing continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may In areas of return, establish children’s to clubs/networks As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. requirements clothes and (sanitary, other material) and appropriate friendly spaces. Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing assistance, recovery specific attention pay to female headed households Women’s economic Women’s – floods, recovery landslides and drought Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies temporary shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women Establish women- friendly spaces (as needed) in long-term shelter locations Establishment of Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular practice. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s security. Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for children Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely allocated Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Total Total RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE

156 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan

Derived from needs _ Preparation of MoWCA to MoWCA to provide Refer to Needs table, table #: table for Culture LKR 5 Mn per Negotiations inititiated to take guidelines to support the advisory support 68 of PDNA document. (page and Heritage sector. district on MoWCA to support the lead ministries support from donor agencies follow-up lead Ministry and guidance 147) (Table #: 72 of PDNA average Remarks document, pg: 164-165)

_ Strengthened coordination. MoWCA to with network the National Disaster Force Task on disaster management Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women) _ District secretariats, Divisional Secretariat Partner Partner Support Potential Potential UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD

MoE, MoHealth, MoDM,NDRSC MoWCA,NCPA Support Agencies MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC Lead Agencies MoWCA NDRSC,DMC MoWCA MoDM MoWCA, Child Protection Authority, NCW, Women’s Bureau MoDM MoWCA, NCPA, DCPS MoDM MoWCA MoWCA MoDM MoDM MoWCA MoWCA MoDM MoWCA Ministry of Housing Women’s Women’s Bureau / District Secretariat MoWCA MoWCA MoWCA MoDM, NCPA Ministry of Housing MoDM MoDM, NDRSC MoDM MoWCA MoWCA, Ministry of Home Affairs MoWCA MoDM MoWCA MoDM MoWCA MFP, MFP, MNPEA MFP, MFP, MNPEA MoWCA, Women’s Bureau MoWCA MoWCA MoDM Ministry of Housing MoDM MED 1.10 MoWCA DMC _ _ UNICEF UNDP 1 _ _ _ _ 1.00 0.20 MoWCA 0.20 _ 0.05 6.00 Government Donor Unmet Gov Gov Gov 0.20 0.20 0.20 0.50 0.05 6.00 0.00 0.00 0.00 0.00 Total Total Budget (LKR Mn) 100.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 1.00 _ 0.00 _ 0.00 _ 0.10 _ 0.20 _ 0.00 _ 0.00 _ 30.00 _ 1.00 _ 0.00 _ 0.00 _ 0.00 Annual Budget (LKR Mn) ______Annual Budget (LKR Mn) ______0.10 0.10 0.10 0.10 0.10 0.10 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 10.00 30.00 Annual Budget (LKR Mn.) _ _ _ 0.10 _ _ 0.10 0.10 _ _ _ 1.00 1.00 5.00 1.00 0.60 0.25 182.60 69.20 2.60 1.35 255.75 2017 2018 2019 2020 Annual Budget (LKR Mn) 100.00 75.00 25.00 1.00 1.00 102.00 102.00 Target Annual Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Programme Use the forum of National Disaster Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job opportunities Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task Form gender- based disaster response circles in all government agencies. recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Provide for more Provide Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services In areas of return, establish children’s to clubs/networks continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. Establishment of shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing assistance, recovery specific attention pay to female headed households Women’s economic Women’s – floods, recovery landslides and drought Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women requirements clothes and (sanitary, other material) and appropriate friendly spaces. Establish women- friendly spaces (as needed) in long-term shelter locations Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. practice. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular security. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for children Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely allocated Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Total RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 157

Derived from needs Derived from needs

_ _ Preparation of MoWCA to MoWCA to provide Refer to Needs table, table #: table for Culture LKR 5 Mn per Preparation of MoWCA to MoWCA to provide Refer to Needs table, table #: table for Culture LKR 5 Mn per Negotiations inititiated to take Negotiations inititiated to take guidelines to support the advisory support 68 of PDNA document. (page and Heritage sector. district on MoWCA to support the lead ministries guidelines to support the advisory support 68 of PDNA document. (page and Heritage sector. district on MoWCA to support the lead ministries support from donor agencies support from donor agencies follow-up lead Ministry and guidance 147) (Table #: 72 of PDNA average follow-up lead Ministry and guidance 147) (Table #: 72 of PDNA average Remarks Remarks document, pg: 164-165) document, pg: 164-165)

_ Strengthened coordination. MoWCA to with network the National Disaster Force Task on disaster management Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women) _ Strengthened coordination. MoWCA to with network the National Disaster Force Task on disaster management Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women)

_ _ District secretariats, District secretariats, Divisional Secretariat Divisional Secretariat Partner Partner Partner Partner Support Support Potential Potential Potential Potential UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD

MoE, MoHealth, MoE, MoHealth, MoDM,NDRSC MoDM,NDRSC MoWCA,NCPA MoWCA,NCPA Support Support Agencies Agencies MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC Lead Lead Agencies Agencies MoWCA NDRSC,DMC MoWCA MoDM MoWCA, Child Protection Authority, NCW, Women’s Bureau MoDM MoWCA, NCPA, DCPS MoDM MoWCA MoWCA MoDM MoDM MoWCA MoWCA MoDM MoWCA Ministry of Housing Women’s Women’s Bureau / District Secretariat MoWCA MoWCA MoWCA MoDM, NCPA MoWCA Ministry of Housing MoDM MoDM, NDRSC MoDM MoWCA MoWCA, Ministry of Home Affairs MoWCA MoDM MoDM MoWCA MFP, MFP, MNPEA MFP, MFP, MNPEA MoWCA, Women’s Bureau MoWCA MED Ministry of Housing MoWCA MoDM MoDM MoWCA NDRSC,DMC MoWCA MoDM MoWCA, Child Protection Authority, NCW, Women’s Bureau MoDM MoWCA, NCPA, DCPS MoWCA MoDM MoDM MoWCA MoDM MoWCA MoWCA MoDM MoWCA Ministry of Housing Women’s Women’s Bureau / District Secretariat MoWCA MoWCA MoWCA MoDM, NCPA Ministry of Housing MoDM, NDRSC MoDM MoWCA MoWCA MoDM MoWCA MoWCA, Ministry of Home Affairs MoDM MoDM MoWCA MFP, MFP, MNPEA MFP, MFP, MNPEA MoWCA, Women’s Bureau MoWCA MED MoWCA MoDM Ministry of Housing MoDM 1.10 MoWCA DMC 1.10 MoWCA DMC _ _ _ UNICEF UNDP _ UNICEF UNDP 1 1 ______1.00 1.00 0.20 MoWCA 0.20 _ 0.05 0.20 MoWCA 0.20 _ 6.00 0.05 6.00 Government Donor Unmet Government Donor Unmet Gov Gov Gov Gov Gov Gov 0.20 0.20 0.20 0.50 0.05 0.20 6.00 0.20 0.20 0.50 0.05 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Total Total Total Budget Budget (LKR Mn) (LKR Mn) 100.00 100.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 1.00 _ 0.00 _ 0.00 _ 0.10 _ 0.20 _ 1.00 _ 0.00 _ 0.00 _ 30.00 _ 0.00 _ 0.00 _ 0.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 1.00 _ 0.00 _ 0.00 _ 0.10 _ 0.20 _ 0.00 _ 1.00 _ 30.00 _ 0.00 _ 0.00 _ 0.00 _ 0.00 Annual Annual Budget Budget (LKR Mn) (LKR Mn) ______Annual Annual Budget Budget (LKR Mn) (LKR Mn) ______0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 10.00 10.00 30.00 30.00 Annual Annual Budget Budget (LKR Mn.) (LKR Mn.) _ _ _ _ 0.10 _ _ 0.10 0.10 _ _ _ _ _ 0.10 _ _ 0.10 0.10 _ _ _ 1.00 1.00 1.00 1.00 5.00 1.00 0.60 0.25 5.00 1.00 0.60 0.25 182.60 69.20 2.60 1.35 255.75 182.60 69.20 2.60 1.35 255.75 2017 2018 2019 2020 2017 2018 2019 2020 Annual Annual Budget Budget (LKR Mn) (LKR Mn) 100.00 75.00 25.00 1.00 1.00 102.00 102.00 100.00 75.00 25.00 1.00 1.00 102.00 102.00 Target Target Annual Annual Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Programme Programme Use the forum of National Disaster Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job opportunities Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task Form gender- based disaster response circles in all government agencies. Provide for more Provide recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services In areas of return, establish children’s to clubs/networks continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. Establishment of shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing assistance, recovery specific attention pay to female headed households Women’s economic Women’s – floods, recovery landslides and drought Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women requirements clothes and (sanitary, other material) and appropriate friendly spaces. Establish women- friendly spaces (as needed) in long-term shelter locations Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular practice. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s security. Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for children Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely allocated Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Use the forum of National Disaster Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job opportunities Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task Form gender- based disaster response circles in all government agencies. Provide for more Provide recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services In areas of return, establish children’s to clubs/networks continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. Establishment of shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing assistance, recovery specific attention pay to female headed households Women’s economic Women’s – floods, recovery landslides and drought Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women requirements clothes and (sanitary, other material) and appropriate friendly spaces. Establish women- friendly spaces (as needed) in long-term shelter locations Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular practice. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s security. Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for children Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely allocated Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Total Total RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE

158 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan

Derived from needs _ Preparation of MoWCA to MoWCA to provide Refer to Needs table, table #: table for Culture LKR 5 Mn per Negotiations inititiated to take guidelines to support the advisory support 68 of PDNA document. (page and Heritage sector. district on MoWCA to support the lead ministries support from donor agencies follow-up lead Ministry and guidance 147) (Table #: 72 of PDNA average Remarks document, pg: 164-165)

_ Strengthened coordination. MoWCA to with network the National Disaster Force Task on disaster management Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women) _ District secretariats, Divisional Secretariat Partner Partner Support Potential Potential UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD

MoE, MoHealth, MoDM,NDRSC MoWCA,NCPA Support Agencies MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC Lead Agencies MoWCA, Child Protection Authority, NCW, Women’s Bureau MoWCA NDRSC,DMC MoWCA MoDM MoDM MoWCA, NCPA, DCPS MoDM MoWCA MoWCA MoDM MoDM MoWCA MoWCA MoDM MoWCA Ministry of Housing Women’s Women’s Bureau / District Secretariat MoWCA MoWCA MoWCA MoDM, NCPA MoWCA Ministry of Housing MoDM MoDM, NDRSC MoDM MoWCA MoWCA, Ministry of Home Affairs MoWCA MoDM MoDM MoWCA MFP, MFP, MNPEA MFP, MFP, MNPEA MoWCA, Women’s Bureau MoWCA MED MoWCA MoDM Ministry of Housing MoDM 1.10 MoWCA DMC _ _ UNICEF UNDP 1 _ _ _ _ 1.00 0.20 MoWCA 0.20 _ 0.05 6.00 Government Donor Unmet Gov Gov Gov 0.20 0.20 0.20 0.50 0.05 6.00 0.00 0.00 0.00 0.00 Total Total Budget (LKR Mn) 100.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 1.00 _ 0.00 _ 0.00 _ 0.10 _ 0.20 _ 1.00 _ 0.00 _ 0.00 _ 30.00 _ 0.00 _ 0.00 _ 0.00 Annual Budget (LKR Mn) ______Annual Budget (LKR Mn) ______0.10 0.10 0.10 0.10 0.10 0.10 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 10.00 30.00 Annual Budget (LKR Mn.) _ _ _ 0.10 _ _ 0.10 0.10 _ _ _ 1.00 1.00 5.00 1.00 0.60 0.25 182.60 69.20 2.60 1.35 255.75 2017 2018 2019 2020 Annual Budget (LKR Mn) 100.00 75.00 25.00 1.00 1.00 102.00 102.00 Target Annual Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Programme Use the forum of National Disaster Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job opportunities Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task agencies. Form gender- based disaster response circles in all government Provide for more Provide recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services In areas of return, establish children’s to clubs/networks continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. Establishment of shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing assistance, recovery specific attention pay to female headed households Women’s economic Women’s – floods, recovery landslides and drought Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women requirements clothes and (sanitary, other material) and appropriate friendly spaces. Establish women- friendly spaces (as needed) in long-term shelter locations Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular practice. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s security. Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for children Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely allocated Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Total RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE

10. Sector Recovery Chapters and Sector Recovery Matrices 159

Derived from needs Derived from needs

_ _ Preparation of MoWCA to MoWCA to provide Refer to Needs table, table #: table for Culture LKR 5 Mn per Preparation of MoWCA to MoWCA to provide Refer to Needs table, table #: table for Culture LKR 5 Mn per Negotiations inititiated to take Negotiations inititiated to take guidelines to support the advisory support 68 of PDNA document. (page and Heritage sector. district on MoWCA to support the lead ministries guidelines to support the advisory support 68 of PDNA document. (page and Heritage sector. district on MoWCA to support the lead ministries support from donor agencies support from donor agencies follow-up lead Ministry and guidance 147) (Table #: 72 of PDNA average follow-up lead Ministry and guidance 147) (Table #: 72 of PDNA average Remarks Remarks document, pg: 164-165) document, pg: 164-165)

_ Strengthened coordination. MoWCA to with network the National Disaster Force Task on disaster management Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women) MoWCA to with network the National Disaster Force Task on disaster management _ Strengthened coordination. Should be done with the assistance of DCS and Forces MoWCA to strengthen awareness capacity MoWCA to support in advisory capacity 75% Completed. Implementation combined with 1 Programme & 3 (Economic empowerment of women)

_ _ District secretariats, District secretariats, Divisional Secretariat Divisional Secretariat Partner Partner Partner Partner Support Support Potential Potential Potential Potential UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD UDA, MM&WPD, MHC&CD, Provincial Councils MM&WPD MSEW&KH, MoWCA, MoDM MSEW&KH, MoWCA MM&WPD

MoE, MoHealth, MoE, MoHealth, MoDM,NDRSC MoDM,NDRSC MoWCA,NCPA MoWCA,NCPA Support Support Agencies Agencies MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC MoDM _ MoDM D.S. OfficeD.S. - MoDM, MoWCA MoWCA MoWCA, NCPA, Women’s Bureau IBSL, SLSSB MoDM MSEW&KH MoDM MoDM, MoWCA MoWCA, MoDM, DCS, DMC Lead Lead Agencies Agencies MoWCA NDRSC,DMC MoWCA MoDM MoWCA, Child Protection Authority, NCW, Women’s Bureau MoDM MoWCA, NCPA, DCPS MoDM MoWCA MoWCA MoDM MoDM MoWCA MoWCA MoDM MoWCA Ministry of Housing Women’s Women’s Bureau / District Secretariat MoWCA MoWCA MoWCA MoDM, NCPA MoWCA Ministry of Housing MoDM MoDM, NDRSC MoDM MoWCA MoWCA, Ministry of Home Affairs MoWCA MoDM MoDM MoWCA MFP, MFP, MNPEA MFP, MFP, MNPEA MoWCA, Women’s Bureau MoWCA MED Ministry of Housing MoWCA MoDM MoDM MoWCA MoDM MoWCA NDRSC,DMC MoWCA, Child Protection Authority, NCW, Women’s Bureau MoDM MoWCA, NCPA, DCPS MoDM MoWCA MoWCA MoDM MoDM MoWCA MoWCA MoDM MoWCA Ministry of Housing Women’s Women’s Bureau / District Secretariat MoWCA MoWCA MoWCA MoDM, NCPA MoWCA Ministry of Housing MoDM MoDM, NDRSC MoDM MoWCA MoWCA, Ministry of Home Affairs MoWCA MoDM MoDM MoWCA MFP, MFP, MNPEA MFP, MFP, MNPEA MoWCA, Women’s Bureau MoWCA MED MoWCA MoDM Ministry of Housing MoDM 1.10 MoWCA DMC 1.10 MoWCA DMC _ _ _ UNICEF UNDP _ UNICEF UNDP 1 1 ______1.00 1.00 0.20 MoWCA 0.20 _ 0.05 0.20 _ 0.20 MoWCA 6.00 0.05 6.00 Government Donor Unmet Government Donor Unmet Gov Gov Gov Gov Gov Gov 0.20 0.20 0.20 0.50 0.05 0.20 6.00 0.20 0.20 0.50 0.05 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Total Total Total Budget Budget (LKR Mn) (LKR Mn) 100.00 100.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 1.00 _ 0.00 _ 0.00 _ 0.10 _ 0.20 _ 1.00 _ 0.00 _ 0.00 _ 30.00 _ 0.00 _ 0.00 _ 0.00 _ 0.20 _ 0.00 _ 10.00 _ 0.85 _ 0.00 _ 1.00 _ 0.00 _ 0.00 _ 0.10 _ 0.20 _ 1.00 _ 0.00 _ 0.00 _ 30.00 _ 0.00 _ 0.00 _ 0.00 Annual Annual Budget Budget (LKR Mn) (LKR Mn) ______Annual Annual Budget Budget (LKR Mn) (LKR Mn) ______0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 0.20 0.50 0.50 0.10 1.10 0.50 0.20 0.10 0.05 0.35 0.50 0.30 0.10 0.90 0.05 0.50 0.30 0.10 0.90 10.00 10.00 30.00 30.00 Annual Annual Budget Budget (LKR Mn.) (LKR Mn.) _ _ _ _ 0.10 _ _ 0.10 0.10 _ _ _ _ _ 0.10 _ _ 0.10 0.10 _ _ _ 1.00 1.00 1.00 1.00 5.00 1.00 0.60 0.25 5.00 1.00 0.60 0.25 182.60 69.20 2.60 1.35 255.75 182.60 69.20 2.60 1.35 255.75 2017 2018 2019 2020 2017 2018 2019 2020 Annual Annual Budget Budget (LKR Mn) (LKR Mn) 100.00 75.00 25.00 1.00 1.00 102.00 102.00 100.00 75.00 25.00 1.00 1.00 102.00 102.00 Target Target Annual Annual Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Colombo, Kalutara, Ratnpura, Galle, Matara, Kegalle Programme Programme Use the forum of National Disaster Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job opportunities Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task Form gender- based disaster response circles in all government agencies. Provide for more Provide recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services In areas of return, establish children’s to clubs/networks continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. Establishment of shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing assistance, recovery specific attention pay to female headed households Women’s economic Women’s – floods, recovery landslides and drought Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women requirements clothes and (sanitary, other material) and appropriate friendly spaces. Establish women- friendly spaces (as needed) in long-term shelter locations Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular practice. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s security. Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for children Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely allocated Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Coordination Committee (NDMCC) for awareness building of the DRM stakeholders on gender and social inclusion. Use the forum of National Disaster Enhance coordination between international, national and local level stakeholders including the MoWCA and relevant gender related actors stakeholders including the MoWCA and relevant international, national and local level Enhance coordination between considerable address To coordination gaps and at local level for ensuring gender and social inclusion measures, divisional and district level officers from Ministries varying (MoDM, MoWC, CPA, Samurdhi Officers, etc.) to be organized into a core team to function in planning for early warning, preparedness for response, emergency management and early recovery. Donor (including INGO) sensitizing long- term for providing programme assistance for affected people –construction of housing, job Village/Grama Niladhari Village/Grama committees for level floods and landslide preparedness, ensuring the inclusion of women in community-level preparedness, EWS and response opportunities Promote coordination the NDRSC, between DMC, MoWC officials at the divisional and with district levels a view to engaging MoWCA with a stronger role and strengthen Revive Include the Ministry of Women Include the Ministry of Women and Child Affairs into the National Force Disaster Task Form gender- based disaster response circles in all government agencies. Provide for more Provide recreational activities for children in camps to promote social skills, peer support, team and leadership play, skills amongst adolescents. Create a specific fund ready to release in disaster situations to promote gender-oriented recovery. As a DRR measure, consider home-based income generation activities and enterprises in housing designs to safeguard future losses Ensure adequate camp safety officers in the camps, available particularly female officers, and establish monitoring and reporting mechanisms for children that are at- risk or victims of abuse and violence to support with appropriate care and protection services In areas of return, establish children’s to clubs/networks continue providing psychosocial support; facilitating child and adolescent engagement and participation, and identifying and addressing child protection issues that arise. may Conduct gender analysis to inform the in strategies recovery all sectors –productive and social Prepare checklists and simplified guidelines in local languages to address on how children, gender, and social inclusion issues in disaster risk management preparedness, covering response emergency, and recovery Deploy Child Protection Officers and counselling officers volunteers and trained basic who can provide psychological first aid for children and women living in the camps and facilitate referrals to more specialized services when required. Establishment of shelter temporary management committees engaging affected people, ensuring the inclusion of women with in collaboration and MoDM (awareness programmes training for WDO and committee leaders, and monitoring process) Assess financial status of women entrepreneurs for potential debt in livelihoods providing assistance and take appropriate action in livelihood providing assistance, recovery specific attention pay to female headed households Women’s economic Women’s – floods, recovery landslides and drought Support economic resilient recovery with a gender focus Support economic resilient recovery economic Women’s in post empowerment floods and landslides – strategy as a recovery subsidies Establish child-friendly spaces (as needed) in long-term shelter locations Support the care giving role of displaced with adequate women requirements clothes and (sanitary, other material) and appropriate friendly spaces. Establish women- friendly spaces (as needed) in long-term shelter locations Implement the Child- existing NCPA Friendly Spaces (CFS) guidelines, child friendly camp management guidelines and guidelines for and aid volunteers with working workers children. Participation of women in decision making in the recovery process in decision making the recovery of women Participation Include the participation of women in the emergency response with a view to making it a regular practice. Providing tuition Providing facilities to prepare children (who are in shelters) for temporary exams. Engage affected in re- location women planning discussions in Consult women housing designs, ensure cooking, latrines and garbage disposal arrangements and meet the practical safety requirements Ensure a disaggregated information management oriented to monitoring and decision making Set up a system in coordination with the National Census and Statistics Department to collect sex, age and disability dis- aggregated data Standardize the data collection formats used for baseline, emergency and post-disaster needs. Conduct a mobile service programme to monitor recovery three months after the disaster at divisional level approach Strengthening capacities in disaster response considering a gender-sensitive with NDRSC to include Advocate procedure and make the following the related budget allocation: Set up a system to enable access to immediate relief items such as for women sanitary and underwear and requirements for infants, using for baseline data without waiting real-time data on the emergency (items required in the first 24 hours of an emergency) – Identify groups and non- most vulnerable more accessible groups and pay attention to them. Build the capacity of relevant officials of MoDM, MoWC, District and Divisional Authorities etc. on Sphere minimum standards in emergency and temporary shelter and take measures for implementation of minimum standards by introducing relevant policies and directives Conduct awareness Conduct awareness building and training on gender inclusion and Sphere Standards to all governmental and non-governmental stakeholders actively engaged in the emergency response. Set up vigilant teams within the community for safety and security with specific functions, build their awareness on the key issues and related to women’s safety and children’s security. Promote market linkages for enterprises women-based Support relief assistance adopting a gender and child protection approach Immediate relief – e.g. program education support for children Introduce insurance schemes Introduce insurance for potential future losses of assets, build awareness livelihood on protecting income generation/ business from flooding Install measures for debt nullification for SMEs, female- headed households which are affected: funds to be severely allocated Include women officers Include women and community in the representatives discussions for pre- planning emergency shelters (through village and divisional committees) level Total Total RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE RECOVERY PLAN MATRIX – GENDER SECTOR 28: RECOVERY PLAN MATRIX TABLE

160 SRI LANKA FLOODS AND LANDSLIDES / Post-Disaster Recovery Plan ANNEX: CERF ALLOCATIONS

ANNEX: CERF ALLOCATIONS IOM’s allocation of USD 1.0 million was made under the ‘Emergency Shelter and Non Food Items (NFI) support for the Flood and Landslide Affected Total allocation: USD 4,021,325. Population in South-Western and Central Provinces’ project, to the Emergency Shelter and NFI sec- Implementing agencies and description: tor. The target population reached under this project is 74,750 (41,860 female and 31,890 UNICEF allocated USD 1.0 million to the male) in the districts of Matara and Ratnapura. WASH Sector under a project titled ‘Communi- ties affected by floods and landslides have access to UN-Habitat allocated a sum of USD 675,000, safe water supply and adequate sanitation services under a project titled ‘Emergency shelter relief for together with best hygiene practices’, through the flood and landslide affected households in Kalutara Ministry of City Planning and Water Supply. and Galle Districts of Sri Lanka’ to the Emergen- The target population supported under this cy Shelter and NFI. The target population sup- project is 120,000 (72,000 female and 48,000 ported under this project is 9,750 (5,031 female male), in all four districts. and 4,719 male) in the two districts.

WHO and UNFPA allocated sums of USD WFP allocated USD 825,000 under the 415,160 and USD 105,595, respectively, to the ‘Life-saving cash assistance to the most Health sector under a project titled ‘Addressing vulnerable households affected by floods and lifesaving health needs of the communities affected landslides’ project for the Food and Nutrition by the Sri Lanka floods and landslides’through the sector. The target population reached under Ministry of Health, Nutrition and Indigenous this project is 21,648 (11,257 female and 10,391 Medicine. The target population reached under male) in all four districts. this project is 73,561 (37,561 female and 36,000 male) in all four districts.

ANNEX: CERF Allocations 161