Reviewer’s Report for Application

for Recertification to the Low

Impact Hydropower Institute from EBH – Middle Raquette River

Gary M. Franc Franc Logic 1/6/2015 Middle Raquette River Reviewer’s Report January 6, 2015

Table of Contents 1. INTRODUCTION ...... 4 2. PROJECT LOCATION ...... 5 3. PROJECT DESCRIPTION ...... 6 3.1 Major Project Works –Higley Development ...... 6 3.2 Major Project Works – Colton Development ...... 7 3.3 Major Project Works – Hannawa Falls Development ...... 7 3.4 Major Project Works – Sugar Island Development ...... 8 3.5 Mode of Operation for Power ...... 8 3.6 Mode of Operation for Impoundment Fluctuation ...... 9 3.7 Mode of Operation for Minimum Flow Releases ...... 9 3.8 Mode of Operation for Whitewater Flow Releases ...... 10 3.9 Mode of Operation for Downstream Fish Passage ...... 11 3.10 Mode of Operation for Upstream Fish Passage ...... 12 4. REGULATORY STATUS ...... 12 4.1 Summary of Project Redevelopment and Agency Consultation Process ...... 12 4.2 License and Compliance Issues ...... 13 5. PUBLIC COMMENTS RECEIVED ...... 14 6. CONSISTENCY WITH LIHI CRITERIA AND ISSUES IDENTIFIED ...... 16 6.1 Summary of the Reviewer’s Findings ...... 16 Criterion A – Flows ...... 16 Criterion B – Water Quality ...... 19 Criterion C – Fish Passage and Protection ...... 20 Criterion D – Watershed Protection ...... 20 Criterion E – Threatened and Endangered Species Protection ...... 21 Criterion F – Cultural Resources ...... 21 Criterion G – Recreation ...... 22 Criterion H – Dam Removal ...... 22 6.2 Recommendations of the Reviewer ...... 22 7. DETAILED CRITERIA EVALUATION ...... 24 7.1 Flows ...... 24

Page 2 Middle Raquette River Reviewer’s Report January 6, 2015

7.2 Water Quality ...... 25 7.3 Fish Passage and Protection ...... 26 7.4 Watershed Protection ...... 28 7.5 Threatened and Endangered Species Protection ...... 29 7.6 Cultural Resources ...... 30 7.7 Recreation ...... 31 7.8 Dam Removal ...... 31 APPENDIX A ...... 32

Page 3 Middle Raquette River Reviewer’s Report January 6, 2015

REVIEW OF APPLICATION FOR RECERTIFICATION BY THE LOW IMPACT HYDROPOWER INSTITUTE (LIHI) OF THE MIDDLE RAQUETTE RIVER PROJECT

Prepared by: Gary M. Franc January 6, 2015

1. INTRODUCTION

The newly defined Middle Raquette River Project (MRRP or Project) is comprised of the Federal Energy Regulatory Commission’s (FERC) license 2320 that includes Erie Boulevard Hydro’s (EBH) Higley, Colton, Hannawa and Sugar Island hydro developments. EBH is a wholly owned subsidiary of Brookfield Renewable Energy Group (BREG).

Prior to this review, the MRRP was certified as part of the larger Raquette River Project (RRP or LIHI certificate #14), which was comprised of fourteen hydro developments in FERC licenses 2060, 2084, 2320 and 2330.1 LIHI #14’s second five year recertification for the RRP ended on July 9, 2014.

EBH submitted a third application to LIHI for recertification of the RRP on May 12, 2014. Based on review comments by the U.S. Fish and Wildlife Service (USFWS) on May 27, 20142, EBH resubmitted a revised LIHI application for recertification on July 28, 2014.

In reviewing this latest application package, LIHI determined that the RRP needed to be separated into three smaller LIHI certificates to help reduce the overall size and complexity of the issues, and to make the application more manageable. A logical approach was to segment the prior LIHI project by FERC licenses, as described here. This solution was arrived at after discussions with EBH. The applicant agrees with this new approach.

The MRRP will now be defined as LIHI Project #14B going forward. The developments in FERC licenses 2060 and 2084 will now be defined as the Upper Raquette River Project (URRP or LIHI #14A). The developments in FERC license 2330 will now be defined as the Lower Raquette River Project (LRRP or LIHI #14C). 3 This report reviews the applicable portions of the latest application for recertification of the MRRP.4

1 FERC licenses – 2060 (Carry Falls), 2084 (Stark Falls, Blake Falls, Rainbow Falls, Five Falls, and South Colton), 2330 (Higley, Colton, Hannawa and Sugar Island), 2320(Norwood, East Norfolk, Norfolk and Raymondville). 2 USFWS LIHI application request, “ … Brookfield should update the entire LIHI Application to reflect current conditions, not those that existed at the time of the 1998 Settlement or the original application to LIHI. In addition, they should provide photo-documentation that demonstrates that all of the eel ladders have been successfully installed and are operating as designed. Finally, Brookfield should indicate which fish protection and downstream passage facilities have been completed and which are yet to be completed (along with proposed installation dates) …” 3 FERC issued separate licenses for the Carry Falls Project (P-2060), the Upper Raquette River Project (P-2084), the Middle Raquette Project (P-2320) and the Lower Raquette River Project (P-2330) on February 13, 2002. The term for each license was for 31 years and 11 months ending on December 31, 2033. In December of 2006, FERC amended the Lower Raquette River Project as a means of accelerating the fish protection and downstream passage schedule. 4 EBH – Daniel Daoust, Compliance Specialist - (315.598.6130 – [email protected]).

Page 4 Middle Raquette River Reviewer’s Report January 6, 2015

2. PROJECT LOCATION

The Project consists of four hydro developments, Higley, Colton, Hannawa and Sugar Island, along the Raquette River in St. Lawrence County, New York.

The Raquette River, with a total drainage basin of 1,269 square miles at its month, originates in the Adirondack highlands at Blue Mountain Lake, Raquette Lake and Long Lake, flows generally north- northwest for more than 120 miles, through Potsdam, New York and empties into the St. Lawrence River, near Massena, New York into the St. Lawrence River/Seaway at the St. Regis Indian Reservation in Franklin County.

The area experiences cold, snowy winters and short summers. Annual precipitation is about 40 inches. As the river flows north, it transitions from cold water habitat to a cool water aquatic fishery as the river reaches the lower gradients.

Most of the basin is sparsely populated, with much of the land forested and brush land. The Project is in a largely rural, forested area that is dependent on forestry, some agriculture, wood products, and tourism. Historically, the river has been developed for water power for sawmills, paper mills, tanneries, and other industry. Figure 1 - Location Map

In the Raquette River headwaters, the Carry Falls development, located at river mile (RM) 68 impounds 877 square miles (sq. mi.) of upstream drainage. This development’s seasonal storage pond is the largest on the Raquette River (RM 76 to 68) and is used to store and regulate the majority of this upstream flow to the downstream MRRP developments. Flows below the MRRP’s most downstream project (Sugar Island) travel an additional ten miles before reaching the most upstream development in the LRRP (Norwood).

Four other FERC projects are located within this ten mile stretch of the Raquette River. They include the Potsdam Project (FERC-2869) (RM 35), owned by the Village of Potsdam, Sissonville Limited Partnership’s (SLP) Sissonville Project (FERC-9260) (RM 33) and EBH’s Hewittville (FERC-2499) (RM 32) and Unionville (FERC-2498) (RM 31) Projects, acquired in March of 2007. All of these projects have individual dams/spillways that receive inflow from the MRRP for power production. Project outflows are passed through each project and eventually become inflow for the LRRP.

Page 5 Middle Raquette River Reviewer’s Report January 6, 2015

3. PROJECT DESCRIPTION

The MRRP is located on the Raquette River from RM 47 to 38 in St. Lawrence County, NY about five miles below the URRP. This project consists of four developments, Higley, Colton, Hannawa, and Sugar Island, as shown in Table 1. Each development has a dam, reservoir, and powerhouse. In 2003, EBH redeveloped the Higley development and increased the installed capacity from 4.97 to 7.3 MW.

On December 13, 2011, EBH notified FERC of its initial powerhouse rehabilitation construction for its Hannawa Falls development. No changes were made to the powerhouse’s turbines or generators. The final construction report was submitted to FERC on October, 22, 2013.

Table 1 – Middle Raquette River Project Developments River Latitude of Longitude Generation Dam Crest Elevation Development Mile Dam of Dam (MW) (feet) Higley 47 44.53053 -74.93198 7.3 880.6 Colton 45 44.55520 -74.93935 30.1 835.0 Hannawa Falls 39 44.61185 -74.97466 7.2 548.5 Sugar Island 38 44.7433 -75.0053 4.8 470.0 Total 49.4

3.1 Major Project Works –Higley Development

The Higley development has a total drainage area of 979 sq. mi. with an intervening drainage area of 37 sq. mi. between the Higley and the upstream URRP’s South Colton development. Higley operates as a re- regulating development to provide steadier flows for the downstream hydroelectric facilities. The other three developments of the MRRP operate in a pulsing mode. The Higley development consists of: (1) A 34-foot-high concrete gravity dam with; a. 3-foot-high wooden flashboards; b. A 209-foot-long concrete gravity ogee-crested spillway; c. Two flood gates, d. Eight steel forebay gates each measuring 12-feet high by 5-feet, 9-inches wide; e. A trashrack, and; f. Two 10-feet high by 8-foot wide waste gates; (2) A 160-foot long by 50-foot wide flume formed by concrete retaining walls on each side; (3) A retired in-place powerhouse measuring 64-feet a side by 38-feet high, containing three generating units with a total generating capacity of 4.972 MW; (4) A new intake structure with a 14 x 14-foot head gate, a 13-foot diameter, 225-foot long steel pipeline directly inflow to a new powerhouse; (5) A new redeveloped powerhouse measuring 90-feet long and 53-feet wide containing a single 7.3 MW generator; (6) Appurtenant electrical and mechanical facilities, and; (7) A reservoir with a 742-acre surface area and a 4,400-acre-foot usable storage capacity at normal maximum pool elevation 883.6 feet mean sea level (MSL).

Page 6 Middle Raquette River Reviewer’s Report January 6, 2015

3.2 Major Project Works – Colton Development

The Colton development has a total drainage area of 981 sq. mi. with an intervening drainage area of 2 sq. mi. between the Colton and the upstream Higley development. The Colton development consists of: (1) a 27-foot high concrete gravity dam with; a. 2-foot-high flashboards; b. An 8-foot wide log flume; c. A trash gate, and; d. A 204.67-foot long ogee-crested spillway equipped with a single taintor gate measuring 10-feet high and 25-feet wide; (2) A reservoir with a 195-acre surface area and a 620-acre-foot usable storage capacity at normal maximum pool elevation of 837.0 feet MSL; (3) A concrete intake structure with a brick superstructure, which measures 50-feet wide by 30- feet long by 12-feet high overall, equipped with a motor driven, 16-foot high by 25.5-foot wide taintor gate; (4) A steel pipeline, 11,090-feet long with a diameter of 13.5-feet transitioning to a 2,100-feet long steel pipeline with a diameter of 12-feet; (5) An 80-foot-high Johnson differential surge tank; (6) Three penstocks of lengths 160-feet, 140-feet, and 125-feet, and diameters of 7.5-feet, 7.5-feet, and 9-feet respectively; (7) A brick and structural steel powerhouse measuring 165-feet long and 46-feet wide, containing three generating units with a total capacity of 30.1 MW. (8) Appurtenant electrical and mechanical facilities.

3.3 Major Project Works – Hannawa Falls Development

The Hannawa Falls development has a total drainage area of 993 sq. mi. with an intervening drainage area of 12 sq. mi. between the Hannawa Falls and the upstream Colton development. Hannawa Falls consists of: (1) A 38-foot high stone and concrete dam with: a. 3.5-foot-high wooden flashboards; b. A log chute; c. A motor operated taintor gate measuring 14-feet high by 28-feet wide; d. An ogee-crested spillway, and; e. A sluice gate; (2) A reservoir with a 204-acre surface area and a 690-acre-foot usable storage capacity at normal maximum pool elevation of 552.0 feet MSL; (3) A headworks structure with five sliding timber gates, all 18-feet high, with three 9.7-feet wide, one 9-feet wide, and one 8.8-feet wide; (4) A 2,700-foot long canal measuring 30-feet wide at the bottom, 120-feet wide at the top, with an average depth of 22-feet, equipped with trashracks that completely cover the canal entrance; (5) Two 10-foot diameter penstocks 190-feet long, and; (6) A sandstone and structural steel powerhouse measuring 66-feet wide by 248-feet long by 40- feet high containing two generating units with a total capacity of 7.2 MW, and; (7) Appurtenant electrical and mechanical facilities.

Page 7 Middle Raquette River Reviewer’s Report January 6, 2015

3.4 Major Project Works – Sugar Island Development

The Sugar Island development has a total drainage area of 994 sq. mi. with an intervening drainage area of 1 sq. mi. between the Sugar Island and Hannawa Falls developments. Sugar Island consists of: (1) A 37-foot high concrete gravity dam with; a. two taintor gates, and; b. a 192-foot long spillway; (2) An earth saddle dike; (3) A concrete and brick intake structure with trashracks and a steel head gate measuring 14-feet wide by 16-feet high; (4) A 4,700-foot long steel pipeline; (5) A 71-foot high surge tank; (6) Two 8-foot-diameter penstocks; (7) A brick and structural steel powerhouse measuring 35-feet wide by 67-feet long by 30-feet high containing two generating units with a total capacity of 4.800 MW (8) A reservoir with a 29-acre surface area and a 55-acre-foot usable storage capacity at normal maximum pool elevation of 470.0 feet MSL; (9) Appurtenant electrical and mechanical facilities.

3.5 Mode of Operation for Power

The MRRP operation is coordinated with EBH’s other LIHI projects on the Raquette River, the URRP and the LRRP. As described in the Raquette River Project Offer of Settlement (RRPSO), submitted to FERC on April 22, 19985 and the 2002 FERC license6, the MRRP’s most upstream development, Higley, operates as a re-regulating development to provide steadier flows for the downstream hydroelectric facilities within the MRRP and LRRP.

Each of the MRRP developments below Higley are allowed to operate in a pulsing mode that limits the normal reservoir fluctuation at Colton and Hannawa to no more than 0.4 feet, and at Sugar Island to no more than 1.0 foot.

Each development generates when total inflow is available to pass the minimum bypass flow plus run one turbine at its minimum turbine limit. Once a development’s net inflow (inflow available after passing minimum flow) exceeds the powerhouse’s hydraulic capacity, the powerhouse is run at full hydraulic capacity and all excess water is passed over the spillway or top of flashboards.

The MRRP developments have an overall installed capacity of 49.4 MW and produce an average annual energy (AAE) of 299.31 GWh (Plant factor of 69.1%).

5 The RRPSO - http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&doclist=1845587

6 Copy of February 13, 2002 FERC License - http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13707261

Page 8 Middle Raquette River Reviewer’s Report January 6, 2015

3.6 Mode of Operation for Impoundment Fluctuation

As described in the RRPSO, the Section 401 Water Quality Certificate (WQC)7 and the 2002 FERC license, the MRRP developments operate in a pulsing mode that limits impoundment fluctuations while providing minimum flows and whitewater releases.

Higley serves dual purposes of providing re-regulation of peaking flows from the URRP, as well as providing significant recreational opportunities during summer months. To facilitate these dual purposes, EBH limits impoundment fluctuations at Higley by season.

From the end of Labor Day weekend to start of Memorial Day weekend a 2.5 foot impoundment fluctuation limit is used as needed to facilitate reregulation (883.6 feet MSL to 881.1 feet MSL).

For the remainder of the year (Memorial Day weekend through the Labor Day weekend):

From 6:00 am on Mondays through 10:00 pm on Fridays - A 2.5 foot impoundment fluctuation is used as needed to facilitate reregulation (883.6 feet MSL to 881.1 feet MSL); • From 10:00 pm on Fridays through 6:00 am on Mondays - By 10:00 pm on Friday, the impoundment should be at, or near, top of flashboards (883.6 feet MSL). Over the course of the weekend •EBH can utilize a 2.0 foot drawdown. By 6:00 am Monday, the impoundment should be at, or near, 2.0 feet below top of flashboards (881.6 feet MSL).

The developments downstream of Higley are allowed to operate in a pulsing mode that limits the normal impoundment fluctuation to 0.4 foot at Colton and Hannawa Falls and to 1.0 feet at Sugar Island. Normal impoundment fluctuations are measured from permanent dam crest or top of flashboards.

The impoundment fluctuation limitations may be curtailed or suspended if required by operating emergencies beyond the control of EBH, including security, and for short periods upon mutual agreement between EBH and the New York State Department of Environmental Conservation (NYSDEC). If the limitations are so modified, EBH notifies the FERC as soon as possible, but no later than ten business days after each such incident.

For construction and maintenance activities that require lowering the level of an impoundment below the normal operating limits, EBH’s operating procedure (HOP 202) requires notification of NYSDEC and compliance with drawdown rates specified in the WQC.

3.7 Mode of Operation for Minimum Flow Releases

EBH is required to supply minimum flows8 as follows: (1) From Higley, a 20-cubic-feet-per-second (cfs) year-round flow through the stop log section of the dam; (2) From Colton, 110-cfs from November 1 through the start of walleye spawning season9, 200-cfs

7 A copy of the WQC issued by the New York State Department of Environmental Conservation on June 11, 1998 was submitted to FERC by EBH on June 23, 1998 - http://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=55629 8 All minimum flows actual release at any given time may be slightly above or below the required value. The degree of variation is a function of head pond impoundment fluctuation. EBH must determine the appropriate gate settings for the provision of minimum flows at each development based upon the midpoint of the normal impoundment fluctuation of each development. For example, if the normal impoundment fluctuation is 1.0 foot, and the instream flow is 45 cfs, the gate setting to provide 45 cfs shall be based upon a drawdown of 0.5 feet.

Page 9 Middle Raquette River Reviewer’s Report January 6, 2015

during the walleye spawning season w (3) When no spring spillage is occurring or 240-cfs during the walleye spawning season when spring spillage is occurring, 200-cfs from the end of the walleye spawning season through June, 125-cfs from July 1 to August 15, 90-cfs from August-16 to September 15, and 125-cfs from September 16 through October 31. The development’s intake structure was rehabilitated 1998. A butterfly flap gate located immediately adjacent to the pipeline intake serves as a trash sluice. This gate empties to a short channel which merges with the bypass reach and is retrofitted to serve as the primary downstream fish movement point. Additionally, a plunge pool has been provided. EBH will pass at least 20-cfs of the instream flow through this gate. Secondary gates will provide any remainder of the instream flow. EBH is not required to provide safe fish movement and/or downstream plunge pools at the secondary gates; (4) From the stop log section of the Hannawa dam, 50-cfs from October 31 through the start of walleye spawning season, 90-cfs for the walleye spawning season through June 30, and 65-cfs from July 1 through October 31; and (5) From Sugar Island, 300-cfs year-round from the minimum flow pipe, with an increase to 400-cfs from the start of the walleye spawning season through June 30, through a instream flow release structure that empties into a pool of adequate depth for fish.

No base flow requirements are defined for the MRRP.

Minimum flows may be curtailed or suspended if required by operating emergencies beyond the control of EBH, including security, and for short periods upon mutual agreement between EBH and the NYSDEC. If the limitations are so modified, EBH notifies the FERC as soon as possible, but no later than ten business days after each such incident.

3.8 Mode of Operation for Whitewater Flow Releases

EBH provides releases for whitewater recreation at the Colton, Hannawa and Sugar Island developments.

In order to keep abreast of changing conditions that may affect river flows and management objectives, the Raquette River Advisory Council (RRAC) was created as part of the 2002 FERC license. Initially, the signatories of the RRPSO were invited to serve on the RRAC. Current participants include the NYSDEC, Trout Unlimited, NYS Conservation Council, St. Lawrence County and EBH. The NYSDEC chairs the RRAC.

Whitewater activities of the MRRP are managed by a Whitewater Subcommittee (WS) of the RRAC. At a minimum, the WS consists of EBH, NYSDEC, Adirondack Mountain Club, a representative of local boater interests and a representative of local government. Any member of the RRAC may elect to participate on the WS each year or only during specific years.

In general, the WS is charged with the responsibility of developing a whitewater release schedule. The WS meets at least once by February 1st of the year to determine how to schedule and allocate the whitewater budget among the three MRRP developments. EBH is required to provide a report of the WS's determination of the release schedule for the upcoming whitewater season to the RRAC by March

9 The walleye spawning season at all of the MRRP developments is based on water temperature readings taken in the vicinity of the tailrace of the South Colton development, which is a development within the URRP. Walleye spawning season starts when water temperature reaches 4 degrees Celsius (39.2 degrees F) for four consecutive days after March 15 of each year and ends 30 days after water temperature has reached 10 degrees Celsius (50 degrees F) for four consecutive days.

Page 10 Middle Raquette River Reviewer’s Report January 6, 2015

1st of each year. This report contains: the release schedule for the upcoming season, a summary of energy losses associated with the release schedule, a summary of the previous year’s use records, and rationale for the release schedule and any changes in ramping rates.

Every five years, beginning in 2005, the WS reviews whitewater use records to determine if variations in the magnitude of the whitewater budget are warranted. The WS may select an annual whitewater budget between 400 MWh and 1,080 MWh. The rationale for any changes in magnitude of the whitewater budget must be included in the WS's annual report submitted to the RRAC for that year.

The whitewater season runs from July 1 through September 30 of the year. The approximate peak whitewater flows are: 1250-cfs at Colton, 800-cfs at Hannawa and 1,500-cfs at Sugar Island. Ramping flows are an hourly doubling of the instream flows in Section 3.7 when ascending to the peak flow and an hourly halving when descending.

An associated maximum seasonal energy loss total is also part of the whitewater budget. Every five years since 2005, this maximum seasonal energy loss total is reviewed by a WS. Upon mutual agreement, the 800-MWh whitewater budget may be increased up to a maximum of 1,080 MWh (six full days each, at Colton, Hannawa, and Sugar Island). Conversely, the whitewater budget may also be decreased to a minimum of 400-MWh (three full days at Colton).

Whitewater releases may be curtailed or suspended if required by operating emergencies beyond the control of EBH, including security, and for short periods upon mutual agreement between EBH and NYSDEC. If the limitations are so modified, EBH notifies the FERC as soon as possible, but no later than ten business days after each such incident.

3.9 Mode of Operation for Downstream Fish Passage

As defined in the 2002 FERC license, EBH provides for safe downstream fish movement and protection at all of the MRRP developments coincident with the release of minimum flows and modifications to the structures and streambed in order to make the flows more “fish friendly”10.

For the MRRP developments, with the exception of Sugar Island, l-inch clear spacing physical barriers were to be installed by the end of 2011. The Sugar Islands development’s trashracks were not replaced since the much larger instream flow through a special release structure that empties into a pool of adequate depth for fish satisfies the need for safe downstream fish passage.

Higley (completed in 2003) and Hannawa Falls (completed in 2013 as part of powerhouse rehabilitation) have l-inch clear spacing physical barriers installed immediately above their existing trashrack structure. As stated in an August 27, 2014 to notice FERC, “… Colton should have l-inch clear spacing physical barriers installed immediately above their existing trashrack structure by the end of 2014 …”11 Although currently not notice in the FERC docket, Dan Daoust has informed me that the new installation of the trashracks at Colton was completed on November 6, 2014.

10 Fish-friendly flow is a flow that is released in a manner that is not expected to injure fish through contact with hard or rough surfaces. 11 August 27, 2014 notice from EBH - http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13623741

Page 11 Middle Raquette River Reviewer’s Report January 6, 2015

Downstream fish passage may be curtailed or suspended if required by operating emergencies beyond the control of EBH, including security, and for short periods upon mutual agreement between EBH and the NYSDEC. If the limitations are so modified, EBH will notify the FERC as soon as possible, but no later than ten business days after each such incident.

3.10 Mode of Operation for Upstream Fish Passage

No upstream fish passage requirements are currently part of the FERC license. However, Article 403 of the license reserves the FERC's authority to require EBH to construct, operate, and maintain fishways as the U.S. Department of Interior (USDOI) may prescribe.

4. REGULATORY STATUS

4.1 Summary of Project Redevelopment and Agency Consultation Process

The original license for the Middle Raquette River Project (P-2320) was issued in 1964, with an expiration date of December 31, 1993. From January 1, 1994 until the issuance of the 2002 FERC license, the project operated under annual licenses. Niagara Mohawk Power Company (NMPC), the predecessor of EBH12, filed a new license application in 1991.

Notice of the relicense application was issued, soliciting comments, protests, and motions to intervene. The USDOI, Adirondack Mountain Club (AMC), New York State Adirondack Park Agency (NYSPA), NYSDEC, New York Rivers United (NYRU), American Whitewater (AW), American Rivers (AR), the Adirondack Council (AC), the Association for the Protection of the Adirondacks (APA), the National Audubon Society of New York (NASNY) and the Natural Heritage Institute (NHI) filed motions to intervene in the proceeding.

In 1995, parties to the pending FERC relicense proceedings for the Lower Raquette River Project (P- 2330) and the Middle Raquette River Project (P-2320) requested that all proceedings be combined with the FERC relicense proceedings for the Carry Falls and the Upper Raquette River Project. On December 13, 1995, the FERC approved the request and Niagara Mohawk Power Company (NMPC), the predecessor of EBH agreed to accelerate the FERC relicensing of the Carry Falls and Upper Raquette River Projects13.

On April 22, 1998, NMPC filed the RRPSO that addressed issues pertaining to all four FERC licenses on the Raquette River, signed by seventeen participants14. Shortly thereafter, the NYSDEC issued the WQC for the Raquette River on June 11, 1998.

The RRPSO provides for minimum flows releases, limitations on impoundment fluctuations, and fish

12 In 1999, NMPC sold their entire hydropower portfolio to Orion Power. EBH was created as a subsidiary of the newly formed company dealing with the operation of the hydropower assets. Orion Power was eventually acquired through a secession of sales and purchases by the BREG, current owner of EBH. 13 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=8299440:1 14 RRPSO signatories include EBH, the NYSDEC, USFWS, AMC, NYSPA, NYRU, American Canoe Association (ACA), AR, AW, NASNY, the National Park Service (NPS), New York State Conservation Council (NYSCC), North Country Raquette River Advocates (NCRRA), St. Lawrence County, The Adirondack Council (AC), APA, and the Jordan Club. The New York Power Authority (NYPA) and the New York Council of Trout Unlimited (TUNY) participated in the proceeding and had no objections, but chose not to become signatories.

Page 12 Middle Raquette River Reviewer’s Report January 6, 2015

passage and protection measures to protect and enhance the water quality and fishery resources of the Raquette River. It also provides for enhanced recreational opportunities in a manner that is consistent with the undeveloped nature of the surroundings.

On February 10, 1999, NMPC filed notice of a new license application which reflected the provisions of the RRPSO and the WQC15, soliciting comments, protests, and motions to intervene. The USDOI, AMC and the NYSPA filed motions to intervene in the proceeding.

On June 16, 2000, the FERC issued for comment a draft Multiple Project Environmental Assessment (DEA) that evaluated the potential environmental impacts of the continued operation of the four projects16. The USDOI, NYSDEC, the St. Regis Mohawk Tribe, AMC, and EBH filed comments on the DEA.

On April 18, 2001, Commission staff issued a final EA (EA)17. The EA concludes that relicensing the four projects will not have a significant adverse impact on the quality of the human environment and recommends issuance of new licenses as proposed in the applications.

On February 13, 2002, the FERC issued separate licenses for the Carry Falls Project (P-2060)18, the Upper Raquette River Project (P-2084)19, the Middle Raquette Project (P-2320)20 and the Lower Raquette River Project (P-2330)21. The term for each license was for 31 years and 11 months ending on December 31, 2033.

4.2 License and Compliance Issues

In addition, to protect and enhance project-related environmental resources, EBH agreed to: (1) Limit normal reservoir fluctuations, according to a seasonal regime at Higley to provide regulating flows and recreational opportunities; (2) Limit normal reservoir fluctuations at Colton and Hannawa to no more than 0.4 feet, and at Sugar Island to no more than 1.0 foot; (3) Provide additional measures to facilitate downstream fish movement at the Higley, Colton, and Hannawa developments; (4) Provide a 1-inch clear spacing physical barriers at the location of the existing trashrack structures at Higley, Colton, and Hannawa; (5) Provide scheduled whitewater releases, a flow notification system, and access trails at Colton, Hannawa, and Sugar Island; (6) Develop a recreation plan to provide a canoe portage at each development, a whitewater access at Colton, Hannawa, and Sugar Island, a car-top boat launch with overnight parking at Colton, a scenic overlook, picnic facilities, and roadside parking at Hannawa, and a day use area at Sugar Island, and; (7) Modify the project boundary to include all EBH lands that will be occupied by these recreational facilities.

15 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=3150004 16 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=8057323:1 17 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=164819:1 18 FERC license for (P-2060) - http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13707255 19 FERC license for (P-2084) - http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=11860652 20 FERC license for (P-2320) - http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13707261 21 FERC license for (P-2330) - http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=11860653

Page 13 Middle Raquette River Reviewer’s Report January 6, 2015

5. PUBLIC COMMENTS RECEIVED

EBH submitted a third application to LIHI for recertification of the RRP on May 1, 2014. LIHI notified and requested public comment on EBH’s application for LIHI certification on May 12, 2014. LIHI policy is for all comments to be posted to the web site and for EBH to have an opportunity to respond. Any EBH responses are also posted. Public comments needed to be received on or before 5 pm Eastern time on July 1, 2014, to be considered.

Review comments from the USFWS were received on May 27, 2014. In this letter the USFWS stated, “… The LIHI Application filed by Brookfield is incorrect and incomplete under Section C: Fish Passage and Protection. … Brookfield should update the entire LIHI Application to reflect current conditions, not those that existed at the time of the 1998 Settlement or the original application to LIHI. In addition, they should provide photo-documentation that demonstrates that all of the eel ladders have been successfully installed and are operating as designed. Finally, Brookfield should indicate which fish protection and downstream passage facilities have been completed and which are yet to be completed (along with proposed installation dates).” In response to these comments, EBH resubmitted a revised LIHI application for recertification on July 28, 2014.

On May 22, 2014, LIHI received a letter from Mr. John Omohundro. In this letter he stated, “…I wish to comment on the performance of Brookfield Renewable (Erie Hydropower) in these Raquette licenses. I participated in the settlement agreement in the late 1990s and have been a regular member of the Raquette River Advisory Council (RRAC) since then. I designed, built and manage a hiking trail on Brookfield land in the Middle Raquette area. So I am familiar with the licensee’s performance on recreation and cultural preservation.

I give the licensee good marks for the recreational opportunities it maintains in the new license, for paddlers, walkers, and soon (we expect) cyclists. Fishing platforms have been built, and, when damaged by storms, rebuilt. Enhancement of whitewater events at Stone Valley with improved safety, information, and viewing has also nearly at the construction phase. The licensee sets aside money each year in the RRAC for applicants who wish to enhance or introduce recreational or preservation features. Historic preservation, particularly along the Stone Valley recreation area in the Middle Raquette, has been addressed as illustrated by its support for the plans to interpret with signage the old mills like the tannery in the Stone Valley area.

The licensee has fallen behind on repairs on features built when the new license began and before, such as picnic facilities and signage at boat launches on the upper and lower Raquette, but I remain optimistic it will perform those eventually.”

Resource agency contacts contained within the LIHI certification application that have been acknowledged to be knowledgeable on the operational issues with the Project are:

1. Stephen Patch - USFWS, 3817 Luker Road, Cortland, NY 13045 - (607.753.9334 - [email protected]) , 2. Mark Woythal - NYSDEC, 625 Broadway, 5th Floor, Albany, NY 12233-4756 - (518.402.8847 - [email protected])

On July 22, 2014, this reviewer emailed Mr. Stephen Path with the USFWS. In my email I stated, “I am the LIHI reviewer tasked with determining whether Brookfield Renewable Energy Group (BREG)’s Beaver, Salmon, Raquette and Hoosic River Hydroelectric Project should be LIHI recertified. I am emailing you today because you have been identified in the application by the owner as resource agency and non-

Page 14 Middle Raquette River Reviewer’s Report January 6, 2015

governmental organization contacts familiar with the project. I would appreciate your perspective regarding the project’s proposed operation with regard to satisfying its licensed environmental obligations (FERC articles). Without your input my review can only be based on the documents found in the FERC docket. Thank you for your time in this matter.”

To date, other than their May 27, 2014 letter, no additional USFWS comments have been received.

On November 5, 2014, this reviewer emailed Mr. Mark Woythal with the NYSDEC. In my email I stated, “I am the LIHI reviewer tasked with determining whether Erie Boulevard Hydropower’s (EBH’s) Raquette River Projects should be LIHI recertified. I am emailing you today because you have been identified in the application by the owner as resource agency familiar with the project. I would appreciate your perspective regarding the project’s operation with regard to satisfying its licensed environmental obligations (FERC articles). Any other views or concerns on the operation of the Projects are welcome. Without your input my review can only be based on the documents found in the FERC docket. Thank you for your time in this matter.

To date, no NYSDEC comments have been received.

Page 15 Middle Raquette River Reviewer’s Report January 6, 2015

6. CONSISTENCY WITH LIHI CRITERIA AND ISSUES IDENTIFIED

Recertification review focuses primarily on determining the answers to the following two questions: 1) Has there been a material change in circumstances since the original certification was issued? For purposes of recertification review, a “material change in circumstances” will mean one or both of the following:

(a) Non-compliance: Since receiving its last certification from LIHI, the certificate holder/applicant has not implemented, or has delayed implementing, or has done an inadequate job of implementing obligations at or near the facility that are of relevance to LIHI’s criteria. These obligations could be in the form of terms and conditions of license(s), settlement agreements, resource agency recommendations or agreements, LIHI conditions of certification including annual notifications, agreements with local municipalities or other third parties or similar relevant obligations; or

(b) New or renewed issues of concern that are relevant to LIHI’s criteria: Since receiving its last certification from LIHI, either new issues of concern and relevance to LIHI’s criteria have emerged that did not exist or were not made known to LIHI at the time of certification, or there continues to be ongoing problems with previously known issues that appeared to LIHI to be resolved or on the road to resolution at the time of certification but in fact are not resolved, and are ongoing at the time of the recertification application.

If a new license, settlement agreement, prescription, biological opinion or other similar regulatory decision has been made since the original recertification, these documents will be evaluated to determine if new or renewed issues have been raised.

2) Have any of LIHI’s criteria, or the Board’s interpretation of one or more criterion, changed in meaningful ways since original certification that are applicable to the circumstances of the facility seeking re-certification?

The following section summarizes the record for LIHI recertification.

6.1 Summary of the Reviewer’s Findings

Criterion A – Flows

Agency recommendations for environmental flow requirements and agreements and coordination with other projects on the Raquette River are well established in the FERC proceedings for this project.

The MRRP’s most upstream development, Higley, operates as a re-regulating development to provide steadier flows for the downstream hydroelectric facilities within the MRRP and LRRP. Each of the MRRP developments below Higley are allowed to operate in a pulsing mode that limits the normal reservoir fluctuation at Colton and Hannawa to no more than 0.4 feet, and at Sugar Island to no more than 1.0 foot.

Each development generates when total inflow is available to pass the minimum bypass flow plus run one turbine at its minimum turbine limit. Once a development’s net inflow (inflow available after passing minimum flow) exceeds the powerhouse’s hydraulic capacity, the powerhouse is run at full hydraulic capacity and all excess water is passed over the spillway or top of flashboards.

Page 16 Middle Raquette River Reviewer’s Report January 6, 2015

Each year EBH files documentation with FERC confirming compliance with flow and impoundment level conditions22.

A multitude of impoundment fluctuation limit and flow deviations have occurred at the MRRP developments since 2009. EBH reported deviations occurring on January 2, 2009 (Hannawa Falls)23, March 3, 2009 (Hannawa Falls)24, November 16, 2009 (Hannawa Falls)25, January 17, 2012 (Hannawa Falls)26, August 17, 2012 (Sugar Island)27, June 16, 2013 (Colton)28, July 7, 2013 (Higley)29, October 10, 2013 (Colton)30, December 9, 2013 (Hannawa Falls)31, and October 25, 2014 (Hannawa Falls)32.

The first five notifications of deviations from January 2, 2009 through August 17, 2012 were eventually determined by FERC as events caused by unusual circumstances beyond the control of EBH personnel and that the proposed measures to avoid similar occurrences were appropriate. In all these cases, FERC deemed these deviations as not violating the license.

On August 1, 201333, FERC ruled that EBH’s June 16, 2013 and July 7, 2013 deviations from operational requirements at the Middle Raquette River Project were violations of the license.

FERC stated the June 16, 2013 deviation is similar to a November 16, 2009 deviation that EBH reported on November 30, 2009. In that prior report, EBH committed to preventing similar deviations by opening gates prior to trashrack cleaning events. The June 16, 2013 report indicates the deviation was the result of the operator’s failure to follow the proper procedure.

FERC stated the July 7, 2013 report indicates the impending deviation at Higley was identified almost 90 minutes prior to its occurrence; however, the action taken to prevent it took much longer to become effective. Instead of adjusting flows at the Higley Development (i.e. backing off on turbine flow), flows were increased at the URRP’s Stark Development, requiring the increased flows to pass through four intervening developments before having any effect on the water level at Higley. Although the operators took timely actions after identifying the problems, the actions were inadequate to prevent the deviations.

FERC concluded that in both cases the deviations could have been prevented by following proper procedures or making adjustments that would rectify the problem more quickly. The violations were added to the compliance history of the project and no further enforcement action was pursued.

On November 12, 201334, FERC ruled that EBH’s October 10, 2013 deviation from operational requirements at Colton is a violation of their license. FERC stated that although EBH instituted and is

22 The latest annual minimum flow compliance report for 2013 was filed by EBH on January 21, 2014 - http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13493651 23 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=11953574 24 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=11962613 25 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=12210443 26 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=12876498 27 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13048065 28 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13294402 29 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13305389 30 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13376581 31 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13421253 32 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13676083 33 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13320060 34 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13391488

Page 17 Middle Raquette River Reviewer’s Report January 6, 2015

investigating measures to prevent future deviations of a similar nature (slack in taintor gate chains) the deviation is the result of the operator failing to follow proper procedures. EBH was also reprimanded for not reporting the incident within the required 10 days window. The violation was added to the compliance history of the project and no further enforcement action was pursued.

No FERC response was found in the docket for EBH’s December 9, 2013 notification of a deviation at Colton. EBH stated that, “… an excursion occurred on December 9, 2013. Specifically, the impoundment elevation at the Colton Hydro Development dropped below its low limit. Erie has included an "Environmental License Excursion Report" which provides detail of the event …” This report was submitted to FERC separately using CEII (privileged status) therefore details of this event are unknown.

Also, no FERC response has been filed as yet with regard to the October 25, 2014 deviation at Hannawa Falls. EBH’s notice states the station was operating normally with alarms on low pond level at 3.25 and 3.15 ft. Due to a river flow change, river conditions were in a transitional state and required further attention. The system operator, remotely located at their National System Control Center (NSCC) in Marlborough, MA, failed to recognize and respond appropriately to a low pond level alarm contributing to the time delay of the traveling operator’s response. The violation duration was for 8 hours and 18 minutes.

EBH’s corrective measure to prevent future occurrences was to review the alarm display to ensure the alarm functioned properly and required remedial training of the system operator related to flow change procedures and alarm response.

In summary, a total of ten impoundment fluctuation deviations occurred since issuance of the last LIHI certification. Of those, at least three have been deemed a license violation by FERC. The October 25, 2014 incident will likely be found as a violation of the license due to the extensive duration of the deviation and the fact that proper procedures were once again not followed. Since operator error is a common cause of the deviations, it is reasonable to assume that additional deviations will occur without taking a more proactive approach. To certify the MRRP as “Low Impact”, LIHI needs assurance that these operational deviations will cease or be significantly reduced in the future.

Although not recommended at this time, I believe operational deviations would be significantly reduced if EBH installed a programmable logic controller (PLC) within the powerhouses at each development in the MRRP. If a PLC is already installed it would need to be enhanced such that: • It has its own power backup and is capable of running the plant compliant with current license operational constraints in the event of a temporary loss of communication with the NSCC; • It issues an audible alarm to the NSCC operator whenever the PLC discovers an operational constraint is about to be violated near-term (to be determined); • In the event that proper procedures are not initiated within a reasonable time (to be determined) after an alarm is sent to the NSCC, the PLC will take control of the plant and start emergency procedures.

One option I recommend is to enhance the alarm annunciation within the NSCC’s remote control system for all the MRRP developments by having an audible alarm component added to complement screen display alerts (For example, flashing red values). This will reduce the chance that the alarm is overlooked and increases the odds that the system operator is more quickly notified of a violation.

Page 18 Middle Raquette River Reviewer’s Report January 6, 2015

Additionally, I recommend EBH submit a draft Deviation Reduction Plan (DRP) to LIHI no later than the three months after LIHI certification of the Project. The DRP will propose more aggressive approaches to implement as a means of reducing the likelihood of operational deviations occurring in the future (i.e. local audible alarms, PLCs, etc.). LIHI and EBH may need to enter into discussions on the plan before LIHI can agreed to a final DRP and its implementation schedule going forward. The final DRP needs to be completed and agreed to by both EBH and LIHI no later the six months after LIHI certification.

Lastly, I recommend that EBH provide annual reports to LIHI documenting operational deviations that occurred throughout the year whether unintentional or planned due to construction or maintenance. The report will include all deviations that actually occurred, whether or not the deviations were eventually deemed as not violating the license by FERC. The report will be due at the same time as the annual compliance statement and payment of the annual certification fee. Based on LIHI’s review of this annual report, and at LIHI’s sole discretion, certification may be modified or rescinded.

Given EBH’s agreement and adherence to these conditions, it is my view that this LIHI criterion is satisfied.

Criterion B – Water Quality

The MRRP is in compliance with conditions pursuant to the WQC issued by the NYSDEC. The WQC includes and incorporates the terms of the RRPSO. Therefore, compliance with the WQC implies compliance with the entire RRPSO. The WQC contains standard provisions related to erosion and sediment control for project maintenance and construction activities. The NYSDEC has confirmed that EBH has properly consulted when there has been any construction at the projects that triggers WQC conditions.

The NYSDEC classifies the project area based on their designated best use. Water classifications for the project areas include Class B (Coldwater fishery) (Best use is primary contact recreation and other uses except as a source of water supply for drinking and culinary or food processing purposes), Class C (T) (Coldwater fishery that supports trout) (best use is fishing and all other uses except as a source of water supply for drinking, culinary or food processing purposes and primary contact recreation), and Class D (warm water fishery) (best use is secondary contact recreation).The NYSDEC identified several areas of the Raquette River and associated tributaries in their June 3, 2002 Section 303 (d) List. Carry Falls Reservoir is on the 303(d) list of waterbodies that fail to meet one or more applicable water quality standards. The NYSDEC Section 303(d) List indicates atmospheric deposition (acid rain) is common within the entire length of the Upper Raquette River causing pH to be elevated in the Adirondacks and associated tributaries identified under Section 303 (d). The river’s ecosystem is generally low in nutrients and fine sediments. The list indicates that the Carry Falls Reservoir is classified as not meeting the water quality standard for fish consumption due to mercury contamination from atmospheric deposition. The NYSDEC believes there are no indications that the MRRP contributes to this water classification.

Since EBH is in compliance with water quality aspects of the WQC and the FERC license, this LIHI criterion is satisfied.

Page 19 Middle Raquette River Reviewer’s Report January 6, 2015

Criterion C – Fish Passage and Protection

The 1998 RRPSO and the 2002 FERC license contain requirements by Resource Agencies for downstream fish passage in the form of required downstream passage flows, modifications to the structures and streambed in order to make the flows fish-friendly, and scheduled installation of 1 inch clear spaced bar trashracks to prevent/reduce entrainment.

For the MRRP developments, with the exception of Sugar Island, l-inch clear spacing physical barriers were to be installed by the end of 2011. The Sugar Islands development’s trashracks were not replaced since the much larger instream flow through a special release structure that empties into a pool of adequate depth for fish, satisfies the need for safe downstream fish passage.

Higley had l-inch clear spacing physical barriers installed immediately above their existing trashrack structure in 2003 as part of the powerhouse redevelopment. Hannawa Falls had l-inch clear spacing physical barriers installed in 2013, following a time extension request on December 23, 2011, as part of the powerhouse rehabilitation. As discussed back in section 3.9, EBH confirmed installation of the new trashrack scheme at Colton was completed on November 6, 2014.

A review of the FERC docket indicates EBH installed the required trashracks about fours ahead of schedule at one location (Higley) and fell behind schedule by about three years at the remaining two locations (Hannawa Falls and Colton). No other outstanding issues have surfaced regarding fish passage and protection aspects of its FERC license for MRRP.

The upstream passage for anadromous or catadromous fish was not a management objective of the RRPSO. However, the USDOI reserved their authority to prescribe fish passage facilities for the MRRP in Article 403 of the 2002 FERC license. The Article also reserved FERC authority to require construction, operation and maintenance of any such prescribed fish passage facilities.

Upstream passage of American eel became a management goal during the 2006 license amendment proceedings for the LRRP. The FERC issued an Order Amending License and Accelerating Fish Protection and Downstream Passage Schedule on December 5, 2006 for the LRRP. In response, EBH filed a Final Eel Passage Plan on December 14, 2007.

Given that EBH requests for time extensions at Hannawa Falls and Colton were reviewed and justified by FERC and that since installation no new issues pertaining to their operation has been documented, I conclude that EBH is in compliance with all fish passage and protection aspects of its license, and this LIHI criterion is satisfied.

Criterion D – Watershed Protection

No documentation has been provided in the LIHI application to verify that more than 50% of the project impoundments have dedicated buffer zones for conservation purposes that extend 200-feet from the high water mark.

In 1996, NMPC developed a plan for divestiture of over 12,000 acres of land within the Raquette River watershed. None of these lands were within the FERC project boundaries associated with the Carry Falls, Upper Raquette River, Middle Raquette River, or Lower Raquette River Hydroelectric Projects.

Page 20 Middle Raquette River Reviewer’s Report January 6, 2015

NMPC presented maps of this plan to the State and to the RRPSO signatories. In response, the State prepared maps indicating which parcels were of interest to the State. The signatories reviewed and commented on the maps prepared by the State. For the most part, the two sets of maps identified the same parcels. NMPC held the conveyance of only those lands identified by the State, until October 1, 1997, the scheduled close of the RRPSO negotiations.

This land conveyance process between NMPC and the State pertained to lands outside of the FERC boundaries associated with the projects of RRPSO, and therefore was outside the jurisdiction of the FERC relicensing process. However, this land conveyance process was included as part of the RRPSO because certain aspects of the land transfer affected the outcome of certain aspects of the RRPSO.

The vast majority of this land transfer to the State pertained to property associated with the nearby URRP. Please refer to the URRP recertification review report for details.

Within the MRRP license, EBH committed lands for inclusion within the FERC boundary that were associated with recreation facilities within applicable FERC boundaries but not currently within the FERC boundary. These lands include: • Portions of the canoe portage routes at Hannawa Falls; • The intermediate access point to the east bank of the Colton bypass reach off Lenny Road; • Portions of the Stone Valley Trail system at Colton that were not currently within the FERC boundary; • All lands associated with the development of the Red Sandstone Trail system.

No material change in circumstances has occurred since the last recertification of this Project. Therefore, the Project in compliance with all requirements regarding watershed protection and passes this criterion.

Criterion E – Threatened and Endangered Species Protection

The threatened bald eagle is known to pass within the boundaries of the MRRP only as a transient species. The NYSDEC has determined that the bald eagle will not be affected by operations of the MRRP.

The yellow lampmussel exists in the vicinity of the MRRP and is considered a species of concern/interest by the USFWS and NYSDEC. The FERC’s EA notes that two state-listed species have been documented in the vicinity of the project: the common loon (a protected wildlife/special concern species), and the spruce grouse (a threatened species). Erie surveyed reaches of the river and the final EA concluded no further studies required at this time. The FWS and DEC did not provide any comments on the final EA conclusions.

Given compliance with all threatened or endangered species protection aspects of the FERC license, this LIHI criterion is satisfied.

Criterion F – Cultural Resources

On February 6, 2002, EBH signed a fully revised Programmatic Agreement (PA) with FERC, the Advisory Council on Historic Preservation (ACHP), and the New York State Historic Preservation Officer (SHPO) for the four of its FERC licenses on the Raquette River, with the St. Regis Tribe and the USDOI as concurring parties. By letter dated February 11, 2002, the ACHP filed with FERC the executed agreement that amended the previous 1996 PA.

Page 21 Middle Raquette River Reviewer’s Report January 6, 2015

On April 14, 2003, Erie submitted its required Historic Property Management Plan35 (HPMP) to FERC. On September 28, 2004, FERC issued an order approving the HPMP.36 As part of the HPMP, EBH is required to file an annual report. EBH has successfully complied with this requirement. The latest filing occurred on February 12, 2104.37

Given EBH is in compliance with all aspects regarding cultural resource protection, mitigation or enhancement, this LIHI criterion is satisfied.

Criterion G – Recreation

On April 10, 2004, EBH submitted its final Raquette River Recreation Plan in accordance with the License article 404 and the RRPSO. On November 17, 2004, FERC issued an order approving the plan.38

Facilities provided as part of the plan included: • At Higley - Canoe portage; • At Colton - Canoe portage, whitewater access and car-top boat launch with overnight parking; • At Hannawa Falls - Canoe portage, scenic overlook and picnic facilities, Red Sandstone trail – (southern end), whitewater access and roadside parking; • At Sugar Island - Canoe portage, day use area, Red Sandstone trail – (northern end) and Clear Pond Wild Forest trail;

Land & Water Associates (LWA), the LIHI reviewer for the prior certification of the RRP, confirmed that the recreation facility improvements were completed according to schedule in a timely manner, in consultation with parties to the RRPSO. All facilities have both access to the reservoir and downstream reaches free of charge.

Additionally, the RRAC can advise EBH on issues related to recreation, and other resource enhancements.

The MRRP is in compliance with recreational access, accommodation, and facilities conditions in the FERC license and passes this criterion.

Criterion H – Dam Removal

No state or federal agencies have recommended that dam to be removed. Therefore, the project passes this criterion.

6.2 Recommendations of the Reviewer

The application for LIHI recertification was adequate to allow for LIHI review. However, I needed to rely consistently on reference of FERC docket documents, a complete copy of the RRPSO and multiple discussions with EBH to complete my review. No material change in circumstances has occurred since the last recertification of this project.

35 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=10473424 36 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=10255973 37 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=13468931 38 http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=10295185

Page 22 Middle Raquette River Reviewer’s Report January 6, 2015

Based on my review of information submitted by the applicant, the additional documentation noted herein, public comments submitted in writing or other communications with resource agencies and other entities, I recommend that the Middle Raquette River Project be conditionally certified, with a certification term of five years.

A concern that I have with regard to LIHI recertification pertains to minimum flow and impoundment fluctuation deviations. A total of ten deviations occurred since issuance of the last LIHI certification. Of those, at least three have been deemed a license violation by FERC. The October 25, 2014 incident will likely be found as a violation of the license due to the extensive duration of the deviation and the fact that proper procedures were once again not followed. Since operator error is a common cause of the deviations, it is reasonable to assume that additional deviations will occur without taking a more proactive approach. To certify the MRRP as “Low Impact”, LIHI needs assurance that these operational deviations will cease or be significantly reduced in the future.

Therefore, I am recommending that the following conditions be included in the next LIHI certification:

1. Alarm annunciation within the NSCC’s remote control system for all the MRRP developments needs to have an audible alarm component added to complement screen display alerts.

2. EBH needs to develop and submit a draft Deviation Reduction Plan (DRP) to LIHI no later than three months after LIHI certification of MRRP. The DRP will propose more aggressive approaches to implement as a means of reducing the likelihood of operational deviations occurring in the future (i.e. local audible alarms, PLCs, etc.). LIHI and EBH may need to enter into discussions on the plan before LIHI can agreed to a final DRP and its implementation schedule going forward. The final DRP needs to be completed and agreed to by both EBH and LIHI no later the six months after LIHI certification.

3. EBH needs to provide annual reports to LIHI documenting operational deviations that occurred throughout the year of certification whether unintentional or planned due to construction or maintenance. The report will include all deviations that actually occurred, whether or not the deviations were eventually deemed as not violating the license by FERC. The report is due at the same time as the annual compliance statement and payment of the annual certification fee. Based on LIHI’s review of this annual report, and at LIHI’s sole discretion, certification may be modified or rescinded.

Page 23 Middle Raquette River Reviewer’s Report January 6, 2015

7. DETAILED CRITERIA EVALUATION

7.1 Flows

LIHI Goal: The Flows Criterion ensures that healthy flows for fish, wildlife and water quality are provided downstream of the project and in all bypassed reaches, including, where appropriate, seasonal flow fluctuations characteristic of a natural system. A.1 Is the Facility in Compliance with Resource Agency Recommendations issued after December 31, 1986 regarding flow conditions for fish and wildlife protection, mitigation and enhancement (including in‐ stream flows, ramping and peaking rate conditions, and seasonal and episodic instream flow variations)

Reviewer Analysis: A number of impoundment fluctuation limit and minimum flow deviations have occurred at the MRRP developments since 2009. Three conditions have been recommended to allow for a conditional satisfaction of this criterion.

Alarm annunciation within the NSCC’s remote control system for all the MRRP developments needs to have an audible alarm component added to complement screen display alerts. Also, EBH needs to develop and submit a draft Deviation Reduction Plan (DRP) and EBH needs to provide annual reports to LIHI documenting operational deviations that occurred throughout the year of certification.

Conclusion: Conditional Pass A.1; go to the Water Quality Criterion.

A.2 If there is no flow condition recommended by any Resource Agency for the Facility, or if the recommendation was issued prior to January 1, 1987, is the Facility in Compliance with a flow release schedule, both below the tailrace and in all bypassed reaches, that at a minimum meets Aquatic Base Flow standards or “good” habitat flow standards calculated using the Montana‐Tennant method?

Reviewer Analysis and Conclusion: N/A. A.3 If the Facility is unable to meet the flow standards in A.2., has the Applicant demonstrated, and obtained a letter from the relevant Resource Agency confirming that demonstration, that the flow conditions at the Facility are appropriately protective of fish, wildlife, and water quality?

Reviewer Analysis and Conclusion: N/A.

Page 24 Middle Raquette River Reviewer’s Report January 6, 2015

7.2 Water Quality

LIHI Goal: The Water Quality Criterion ensures that water quality in the river is protected.

B.1 Is the Facility either: a) In Compliance with all conditions issued pursuant to a Clean Water Act Section 401 water quality certification issued for the Facility after December 31, 1986? Or b) In Compliance with the quantitative water quality standards established by the state that support designated uses pursuant to the federal Clean Water Act in the Facility area and in the downstream reach?

Reviewer Analysis: The WQC for the Project includes and incorporates the RRPSO and is conditioned on compliance with the terms of the RRPSO. The Project is in compliance with all conditions of the WQC issued to the Project after December 31, 1986.

Conclusion: YES, Pass B.1(a); Go to B.2 B.2 Is the Facility area or the downstream reach currently identified by the state as not meeting water quality sta ndards (including narrative and numeric criteria and designated uses) pursuant to Section 303(d) of the Clean Water Act?

Reviewer Analysis: The NYSDEC identified several areas of the Raquette River and associated tributaries in their June 3, 2002 Section 303 (d) List. Carry Falls Reservoir is on the 303(d) list of waterbodies that fail to meet one or more applicable water quality standards. The NYSDEC Section 303(d) List indicates atmospheric deposition (acid rain) is common within the entire length of the Upper Raquette River causing pH to be elevated in the Adirondacks and associated tributaries identified under Section 303 (d). The river’s ecosystem is generally low in nutrients and fine sediments. The list indicates that the Carry Falls Reservoir is classified as not meeting the water quality standard for fish consumption due to mercury contamination from atmospheric deposition.

Conclusion: YES; Go to B.3

B.3 If the answer to question B.2 is yes, has there been a determination that the Facility does not cause, or contribute to, the violation?

Reviewer Analysis: The NYSDEC believes there are no indications that the MRRP contributes to this water classification.

Conclusion: YES; Pass on B.3; Go to Fish Passage Criterion.

Page 25 Middle Raquette River Reviewer’s Report January 6, 2015

7.3 Fish Passage and Protection

LIHI Goal: The Fish Passage and Protection Criterion ensure that, where necessary, the Facility provides effective fish passage for Riverine, anadromous and catadromous fish, and protects fish from entrainment.

C.1 Is the Facility in Compliance with Mandatory Fish Passage Prescriptions for upstream and downstream passage of anadromous and catadromous fish issued by Resource Agencies after December 31, 1986?

Reviewer Analysis: The 1998 RRPSO and the 2002 FERC license contain requirements by Resource Agencies for downstream fish passage in the form of required downstream passage flows, modifications to the structures and streambed in order to make the flows fish-friendly, and scheduled installation of 1 inch clear spaced bar trashracks to prevent/reduce entrainment. These installation were scheduled from and 2007 to 2011.

The Sugar Islands development’s trashracks were not replaced since the much larger instream flow through a special release structure that empties into a pool of adequate depth for fish, satisfies the need for safe downstream fish passage.

Higley had l-inch clear spacing physical barriers installed immediately above their existing trashrack structure in 2003 as part of the powerhouse redevelopment. Hannawa Falls had l-inch clear spacing physical barriers installed in 2013, following a time extension request on December 23, 2011, as part of the powerhouse rehabilitation. EBH confirmed installation of the new trashrack scheme at Colton was completed on November 6, 2014.

The upstream passage for anadromous or catadromous fish was not a management objective of the RRPSO. However, the USDOI reserved their authority to prescribe fish passage facilities for the MRRP in Article 403 of the 2002 FERC license. The Article also reserved FERC authority to require construction, operation and maintenance of any such prescribed fish passage facilities.

Conclusion: Yes; go to C.2 C.2 Are there historic records of anadromous and/or catadromous fish movement through the Facility area, but anadromous and/or catadromous fish do not presently move through the Facility area (e.g., because passage is blocked at a downstream dam or the fish run is extinct)?

Reviewer Analysis: No historical records were found of migratory fish in the project vicinity prevented from passage due to downstream blockage of fish extinction.

Finding: NO; Go to C.3

Page 26 Middle Raquette River Reviewer’s Report January 6, 2015

C. If, since December 31, 1986: 3 a) Resource Agencies have had the opportunity to issue, and considered issuing, a Mandatory Fish Passage Prescription for upstream and/or downstream passage of anadromous or catadromous fish (including delayed installation as described in C2a above), and b) The Resource Agencies declined to issue a Mandatory Fish Passage Prescription, c) Was a reason for the Resource Agencies’ declining to issue a Mandatory Fish Passage Prescription one of the following: (1) the technological infeasibility of passage, (2) the absence of habitat upstream of the Facility due at least in part to inundation by the Facility impoundment, or (3) the anadromous or catadromous fish are no longer present in the Facility area and/or downstream reach due in whole or part to the presence of the Facility?

Reviewer Analysis: The agencies have issued a prescribe fish passage as discussed in C.1. None of the C.3.b or C.3.c factors apply to the MRRP.

Conclusion: N/A; Go to C.4

C.4 If C3 was not applicable: a) Are upstream and downstream fish passage survival rates for anadromous and catadromous fish at the dam each documented at greater than 95% over 80% of the run using a generally accepted monitoring methodology? OR b) If the Facility is unable to meet the fish passage standards in 4.a, has the Applicant either demonstrated, and obtained a letter from the U.S. Fish and Wildlife Service or National Marine Fisheries Service confirming that demonstration, that the upstream and downstream fish passage measures (if any) at the Facility are appropriately protective of the fishery resource, or committed to the provision of fish passage measures in the future and obtained a letter from the U.S. Fish and Wildlife Service or the National Marine Fisheries Service indicating that passage measures are not currently warranted?

Reviewer Analysis:

Finding: N/A; Go to C.5

C.5 Is the Facility in Compliance with Mandatory Fish Passage Prescriptions for upstream and/or downstream passage of Riverine fish?

Reviewer Analysis: Covered in response to C.1. No compliance issues are documented.

Finding: N/A; Go to C.6

C.6 Is the Facility in Compliance with Resource Agency Recommendations for Riverine, anadromous and catadromous fish entrainment protection, such as tailrace barriers?

Reviewer Analysis: The USFWS has reserved their authority to set mandatory conditions for migratory fish entrainment protection measures under the license and WQC.

Finding: N/A; PASS and go to the Watershed Protection Criterion.

Page 27 Middle Raquette River Reviewer’s Report January 6, 2015

7.4 Watershed Protection

LIHI Goal: The Watershed Protection criterion is designed to ensure that land resources are being protected within and around the facility boundary. The term of certification is extended from five to eight years for projects that have either a shoreline buffer zone or a watershed enhancement fund. D.1 Is there a buffer zone dedicated for conservation purposes (to protect fish and wildlife habitat, water quality, aesthetics and/or low-impact recreation) extending 200 feet from the high water mark in an average water year around 50 - 100% of the impoundment, and for all of the undeveloped shoreline?

Reviewer Analysis: No licensee article designates a formal buffer zone around the project impoundments.

In 1996, NMPC developed a plan for divestiture of over 12,000 acres of land within the Raquette River watershed. None of these lands were within the FERC project boundaries associated with the Carry Falls, Upper Raquette River, Middle Raquette River, or Lower Raquette River Hydroelectric Projects.

This land conveyance process between NMPC and the State pertained to lands outside of the FERC boundaries associated with the projects of RRPSO, and therefore was outside the jurisdiction of the FERC relicensing process. However, this land conveyance process was included as part of the RRPSO because certain aspects of the land transfer affected the outcome of certain aspects of the RRPSO.

The vast majority of this land transfer to the State pertained to property associated with the URRP.

Conclusion: No, Go to D.2

D.2 Has the facility owner/operator established an approved watershed enhancement fund that: a) could achieve within the project’s watershed the ecological and recreational equivalent of land protection in D.1.,and b) has the agreement of appropriate stakeholders and state and federal resource agencies?

Reviewer Analysis/Conclusions: N/A.

Conclusion: No Go to D.3

D.3 Has the facility owner/operator established through a settlement agreement with appropriate stakeholders and that has state and federal resource agencies agreement an appropriate shoreline buffer or equivalent watershed land protection plan for conservation purposes (to protect fish and wildlife habitat, water quality, aesthetics and/or low impact recreation).

Reviewer Analysis: N/A

Conclusion: YES, Go to D.4

D.4 Is the facility in compliance with both state and federal resource agencies recommendations in a license approved shoreline management plan regarding protection, mitigation or enhancement of shoreline surrounding the project?

Page 28 Middle Raquette River Reviewer’s Report January 6, 2015

Reviewer Analysis: See response to D.1. No agency concerns have surfaced.

Conclusion: Yes; pass and Go to Threatened/Endangered Species Criterion.

7.5 Threatened and Endangered Species Protection

LIHI Goal: The Threatened and Endangered Species Protection Criterion is designed to ensure that the Facility does not negatively impact state or federal threatened or endangered species. E.1 Are threatened or endangered species listed under state or federal Endangered Species Acts present in the Facility area and/or downstream reach?

Reviewer Analysis: The yellow lampmussel exists in the vicinity of the MRRP and is considered a species of concern/interest by the USFWS and NYSDEC. The FERC notes that two state-listed species have been documented in the vicinity of the project: the common loon (a protected wildlife/special concern species), and the spruce grouse (a threatened species). Erie surveyed reaches of the river and the final EA concluded no further studies required at this time. The FWS and DEC did not provide any comments on the final EA conclusions.

Conclusion: YES; Go to E2.

E.2 If a recovery plan has been adopted for the threatened or endangered species pursuant to Section 4(f) of the Endangered Species Act or similar state provision, is the Facility in Compliance with all recommendations in the plan relevant to the Facility? Reviewer Analysis: There are no formal recovery plans for the threatened and endangered species at the Project.

Conclusion: N/A; Go to E3. E.3 If the Facility has received authorization to incidentally Take a listed species through: (I) Having a relevant agency complete consultation pursuant to ESA Section 7 resulting in a biological opinion, a habitat recovery plan, and/or (if needed) an incidental Take statement; (ii) Obtaining an incidental Take permit pursuant to ESA Section 10; or (iii) For species listed by a state and not by the federal government, obtaining authorization pursuant to similar state procedures; is the Facility in Compliance with conditions pursuant to that authorization? Reviewer Analysis: There are no formal incidental take permits for the threatened and endangered species at the Project.

Conclusion: N/A; Go to E4.

E.4 If a biological opinion applicable to the Facility for the threatened or endangered species has been issued, can the Applicant demonstrate that: a) The biological opinion was accompanied by a FERC license or exemption or a habitat conservation plan? Or b) The biological opinion was issued pursuant to or consistent with a recovery plan for the endangered or threatened species? Or c) There is no recovery plan for the threatened or endangered species under active development by the relevant Resource Agency? Or d) The recovery plan under active development will have no material effect on the Facility’s operations?

Page 29 Middle Raquette River Reviewer’s Report January 6, 2015

Reviewer Analysis: There are no formal incidental take permits for the threatened and endangered species at the Project.

Conclusion: N/A; Go to E5 do not apply.

E.5 If E.2 and E.3 are not applicable, has the Applicant demonstrated that the Facility and Facility operations do not negatively affect listed species?

Reviewer Analysis: The RRPSO declared that project facilities and operations consistent with the agreement will have no adverse effect on federal or state listed threatened or endangered species.

Conclusion: Yes; Pass - Go to Cultural Resource Protection Criterion.

7.6 Cultural Resources

LIHI Goal: The Cultural Resource Protection Criterion is designed to ensure that the Facility does not inappropriately impact Cultural Resources. F.1 If FERC-regulated, is the Facility in Compliance with all requirements regarding Cultural Resource protection, mitigation or enhancement included in the FERC license or exemption?

Reviewer Analysis: On February 6, 2002, EBH signed a fully revised Programmatic Agreement (PA) with FERC, the Advisory Council on Historic Preservation (ACHP), and the New York State Historic Preservation Officer (SHPO) for the four of its FERC licenses on the Raquette River, with the St. Regis Tribe and the USDOI as concurring parties. By letter dated February 11, 2002, the ACHP filed with FERC the executed agreement that amended the previous 1996 PA.

On April 14, 2003, Erie submitted its required Historic Property Management Plan (HPMP) to FERC. On September 28, 2004, FERC issued an order approving the HPMP. As part of the HPMP, EBH is required to file an annual report. EBH has successfully complied with this requirement. The latest filing occurred on February 12, 2104.

Finding: PASS and go to Recreation Criterion.

Page 30 Middle Raquette River Reviewer’s Report January 6, 2015

7.7 Recreation

LIHI Goal: The Recreation Criterion is designed to ensure that the Facility provides access to the waters and accommodates recreational activities. G.1 If FERC-regulated, is the Facility in Compliance with the recreational access, accommodation (including recreational flow releases) and facilities conditions in its FERC license or exemption?

Reviewer Analysis: Erie filed a recreation plan in accordance with the 2002 License and RRPSO. A Raquette River Advisory Council advises EBH on issues related to recreation, and other resource enhancements.

Land & Water Associates, the prior LIHI reviewer, confirmed that the recreation facility improvements required in the FERC license were completed according to schedule in a timely manner, in consultation with parties to the RRPSO.

EBH also makes whitewater releases as defined within the RRPSO.

Finding: YES; Go to G.3 G.3 Does the Facility allow access to the reservoir and downstream reaches without fees or charges?

Reviewer Analysis: Access is provided without charge within the limited Project boundaries.

Finding: YES; PASS and go to Dam Removal Criterion.

7.8 Dam Removal

LIHI Goal: The Dam Removal Criterion is designed to ensure that the Facility is not certified if a Resource Agency has recommended that a dam associated with the Facility should be removed. H.1 Is there a Resource Agency Recommendation for removal of the dam associated with the Facility?

Reviewer Analysis: There is no evidence that any agencies have requested that the Project dam be removed.

Conclusion: NO, pass H.1 and pass on all LIHI criteria.

Page 31 Middle Raquette River Reviewer’s Report January 6, 2015

APPENDIX A

FERC CORRESPONDENCE

FERC documents listed in reverse chronological order. Click on the hyperlink in the table to view the referenced FERC documents in FERC’s library. You need to be connected to the web. The initial click will return the file’s properties (author, recipient, etc.). Clicking on the [File List] tab will return a document list. Clicking on a document name will open the document for viewing.

Page 1 Gendale_Docket.xlsm

Click To Go To FERC elibrary. Click To Clear Out Click To ReFilter List (Must Be Connected To Web.) Records VERSION 7/23/2014 Program Functionality Ends On [Sunday Mar 01, 2015]

Date FERC ID Category Subject Class Type Availability Info

Request for Delay of Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/30/2014 P-2320-000 Submittal Brookfield Renewable Energy Group, HNW Extension Request under P-2320. Action/Extension of Public Correspondence clist=14285841 Time

Request for Delay of Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/30/2014 P-2320-000 Submittal Brookfield Renewable Energy Group, HNW Extension Request under P-2320. Action/Extension of CEII Correspondence clist=14285842 Time

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2014 P-2320-000 Submittal SGI 2014 DSSMP Revision of Brookfield Renewable Energy Group under P-2320. Report/Form Public Compliance Report clist=14283000

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2014 P-2320-000 Submittal SGI 2014 DSSMP Revision of Brookfield Renewable Energy Group under P-2320. Report/Form CEII Compliance Report clist=14283001

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/16/2014 P-2320-000 Submittal Middle Raquette PSP 2014 Update of Brookfield Renewable Energy Group under P-2320. Report/Form Public Compliance Report clist=14281000

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/16/2014 P-2320-000 Submittal Middle Raquette PSP 2014 Update of Brookfield Renewable Energy Group under P-2320. Report/Form CEII Compliance Report clist=14281001

Request for Delay of Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/21/2014 P-2320-000 Submittal Middle Raquette Extension Request/Updates under P-2320. Action/Extension of Public Correspondence clist=14272618 Time

Request for Delay of Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/21/2014 P-2320-000 Submittal Middle Raquette Extension Request/Updates under P-2320. Action/Extension of CEII Correspondence clist=14272619 Time

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/7/2014 P-2320-000 Submittal HGL 2014 DSSMP Revision under P-2320. Report/Form Public Compliance Report clist=14268506

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/7/2014 P-2320-000 Submittal HGL 2014 DSSMP Revision under P-2320. Report/Form CEII Compliance Report clist=14268507

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/7/2014 P-2320-000 Submittal HNW 2014 DSSMP Revision under P-2320 Report/Form Public Compliance Report clist=14268508

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/7/2014 P-2320-000 Submittal HNW 2014 DSSMP Revision under P-2320 Report/Form CEII Compliance Report clist=14268509

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/4/2014 P-2320-069 Submittal HNW Potential Pond Level Excursion - 10.25.14 under P-2320. Report/Form Progress Report Public clist=14267042

Part 12 Consultant Erie Boulevard Hydropower LP submits the Tenth Independent Consultant's Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal Report/Form Safety Inspection CEII Inspection Report for the Middle Raquette River Hydro Project under P-2320. clist=14280023 Reports

Part 12 Consultant Erie Boulevard Hydropower, LP submits the tenth independent consultant's safety inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal Report/Form Safety Inspection CEII report for the Middle Raquette River Hydroelectric Project under P-2320. clist=14279932 Reports

Part 12 Consultant Erie Boulevard Hydropower, LP submits the tenth independent consultant's safety inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal Report/Form Safety Inspection CEII report for the Middle Raquette River Hydroelectric Project under P-2320. Part 1 of 2. clist=14279982 Reports

Erie Boulevard Hydropower LP submits the Tenth Independent Consultant's Safety Part 12 Consultant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal Inspection Report for the Hannawa Development for the Middle Raquette River Hydro Project Report/Form Safety Inspection CEII clist=14279993 under P-2320. Part 2 of 2 Reports

1 Page 2 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal HGL 2014 Part 12 Safety Inspection Report under P-2320. Report/Form Public Compliance Report clist=14266668

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal HGL 2014 Part 12 Safety Inspection Report under P-2320. Report/Form CEII Compliance Report clist=14266669

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal HNW 2014 Part 12 Safety Inspection Report under P-2320. Report/Form Public Compliance Report clist=14266672

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal HNW 2014 Part 12 Safety Inspection Report under P-2320. Report/Form CEII Compliance Report clist=14266673

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal HGL 2014 STID Revision under P-2320. Report/Form Public Compliance Report clist=14266690

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal HGL 2014 STID Revision under P-2320. Report/Form CEII Compliance Report clist=14266691

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal HNW 2014 STID Revision under P-2320. Report/Form Public Compliance Report clist=14266694

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/3/2014 P-2320-000 Submittal HNW 2014 STID Revision under P-2320. Report/Form CEII Compliance Report clist=14266695

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/31/2014 Multiple Submittal Erie Boulevard Hydro - Compliance Accountability under P-2318. Pleading/Motion Procedural Motion Public clist=14265881

Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/30/2014 Multiple Submittal Statement of Annual Generation 2013 - 2014 under P-2330 et.al.. Report/Form Public Report clist=14265589

Erie Boulevard Hydropower, LP submits Statement of Generation in kWh for Hydropower Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/30/2014 Multiple Submittal Report/Form Public Annual Charges for the period of 10/1/13 to 9/30/14 under P-2330 et al. Report clist=14267756

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/12/2014 P-2320-000 Submittal Middle Raquette 2014 Safety Inspection Follow-Up under P-2320. Report/Form Public Compliance Report clist=14251083

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/12/2014 P-2320-000 Submittal Middle Raquette 2014 Safety Inspection Follow-Up under P-2320. Report/Form CEII Compliance Report clist=14251084

Erie Boulevard Hydropower, LP submits the plan and schedule to address follow-up items re Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/12/2014 P-2320-000 Submittal CEII the 2014 Dam Safety Inspection for the Higley Development et al under P-2320. Correspondence nal Information clist=14254012

Dam Safety Dam Safety Inspection Report by New York Regional Office for Erie Boulevard Hydropower Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/28/2014 P-2320-000 Issuance L.P's Midle Raquette River Project for the period September 18, 2012 to September 24, 2013 FERC Report/Study Public Report/Operation clist=14247061 under P-2320. Report Dam Safety Dam Safety Inspection Report byNew York Regional Office for Erie Boulevard Hydropower Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/28/2014 P-2320-000 Issuance L.P's Midle Raquette River Project for the period September 18, 2012 to September 24, 2013 FERC Report/Study CEII Report/Operation clist=14247062 under P-2320. Report

Erie Boulevard Hydropower, LP submits the 2-D HEC-RAS models for the Norfolk and East Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/27/2014 Multiple Submittal Report/Form CEII Norfolk breaches of the Lower Raquette Project under P-2330 et al. Compliance Report clist=14249160

Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, L.P. 1" Trash- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/27/2014 P-2320-000 Submittal Report/Form CEII rack submission to NYRO under P-2320 Compliance Report clist=14246436

2 Page 3 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, L.P. 1" Trash- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/27/2014 P-2320-000 Submittal Report/Form Public rack submission to NYRO under P-2320 Compliance Report clist=14246437

Hannawa August 2014 DSSMP Submittal of Brookfrield Renewable Energy Group under P- Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/25/2014 P-2320-000 Submittal Report/Form Public 2320.. Compliance Report clist=14245529

Hannawa August 2014 DSSMP Submittal of Brookfrield Renewable Energy Group under P- Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/25/2014 P-2320-000 Submittal Report/Form CEII 2320.. Compliance Report clist=14245530

Letter requesting Brookfield Renewable Power Inc to provide a plan and schedule to submit a FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/18/2014 P-2320-000 Issuance revised DSSMP for the Colton Development re the Middle Raquette River Project under P- Compliance Directives CEII With Applicant clist=14249048 2320.

Letter requesting Brookfield Renewable Power Inc to provide the plan and schedule to FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/15/2014 Multiple Issuance address comments w/in 60 days re the Middle Raquette River Project et al under P-2320 et Compliance Directives CEII With Applicant clist=14249044 al.

Letter requesting Brookfield Renewable Power Inc to provide a plan and schedule to address FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/15/2014 P-2320-000 Issuance comments w/in 60 days re the dam safety inspection for the Middle Raquette River Project Compliance Directives CEII With Applicant clist=14249039 under P-2320. Dam Safety Project Safety-Related Submission to NYRO of NEW YORK REGIONAL OFFICE under P- Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/7/2014 P-2320-000 Issuance FERC Report/Study Public 2320-NY, Middle Raquuette River, Dam Safety Inspection Report Report/Operation clist=14241025 Report Dam Safety Project Safety-Related Submission to NYRO of NEW YORK REGIONAL OFFICE under P- Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/7/2014 P-2320-000 Issuance FERC Report/Study CEII 2320-NY, Middle Raquuette River, Dam Safety Inspection Report Report/Operation clist=14241026 Report Dam Safety Project Safety-Related Submission to NYRO of NEW YORK REGIONAL OFFICE under P- Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/4/2014 P-2320-000 Issuance FERC Report/Study Public 2320-NY, Middle Raquette River, Dam Safety Inspection Report Report/Operation clist=14240114 Report Dam Safety Project Safety-Related Submission to NYRO of NEW YORK REGIONAL OFFICE under P- Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/4/2014 P-2320-000 Issuance FERC Report/Study CEII 2320-NY, Middle Raquette River, Dam Safety Inspection Report Report/Operation clist=14240115 Report

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/1/2014 P-2320-000 Submittal Brookfield Renewable Energy Group Colton July 2014 DSSMP Update under P-2320. Report/Form Public Compliance Report clist=14239394

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/1/2014 P-2320-000 Submittal Brookfield Renewable Energy Group Colton July 2014 DSSMP Update under P-2320. Report/Form CEII Compliance Report clist=14239395

Erie Boulevard Hydropower LP submits the July 2014 Dam Safety Surveillance & Monitoring Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/31/2014 P-2320-000 Submittal Report/Form CEII Plan for the Colton Development for the Middle Raquette River Hydro Project under P-2320. Compliance Report clist=14244201

Letter to Brookfield Renewable Power Inc re their review of the inflow Design Flood Study for FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/29/2014 P-2320-000 Issuance CEII the Raquette River Project under P-2320. With Applicant Correspondence clist=14248805

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/28/2014 P-2320-000 Submittal Hannawa Falls Penstock Inspection Report under P-2320. Report/Form Public Compliance Report clist=14237879

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/28/2014 P-2320-000 Submittal Hannawa Falls Penstock Inspection Report under P-2320. Report/Form CEII Compliance Report clist=14237880

Erie Boulevard Hydropower LP's 2013 DSSMR Carry Falls, Upper & Middle Raquette Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/23/2014 Multiple Submittal Report/Form Public Submittal under P-2060. Compliance Report clist=14227970

Erie Boulevard Hydropower LP's 2013 DSSMR Carry Falls, Upper & Middle Raquette Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/23/2014 Multiple Submittal Report/Form CEII Submittal under P-2060. Compliance Report clist=14227971

3 Page 4 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Erie Boulevard Hydropower, LP submits correspondence to document conversations re non- Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/17/2014 Multiple Submittal CEII reportable events at New York Hydroelectric Facilities under. Correspondence Correspondence clist=14229204

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/6/2014 Multiple Submittal Raquette 2014 Gate Certification of Brookfield Renewable Energy Group under P-2060, et al Report/Form Public Compliance Report clist=14223616

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/6/2014 Multiple Submittal Raquette 2014 Gate Certification of Brookfield Renewable Energy Group under P-2060, et al Report/Form CEII Compliance Report clist=14223617

Erie Boulevard Hydropower, LP submits letter notifying FERC of the installation status of Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/23/2014 Multiple Submittal Report/Form CEII seasonal boater safety devices for the Stewarts Bridge Project et al under P-2047 et al. Compliance Report clist=14228762

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/23/2014 Multiple Submittal Season Boater Safety Device Schedule 2014 Report/Form Public Compliance Report clist=14219324

Letter order accepting Brookfield Renewable Energy Group's 12/11/13 submittal of the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/19/2014 P-2320-000 Issuance Order/Opinion Delegated Order Public updated Public Safety Plan for the Middle Raquette River Project under P-2320. clist=14228887

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/16/2014 P-2320-000 Submittal Colton DSSMP Submittal for 2014 of Brookfiled Renewable Energy Group under P-2320. Report/Form Public Compliance Report clist=14216889

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/16/2014 P-2320-000 Submittal Colton DSSMP Submittal for 2014 of Brookfiled Renewable Energy Group under P-2320. Report/Form CEII Compliance Report clist=14216890

Interruptions in SCADA Network Outages of Brookfield Renewable Energy Group under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/16/2014 Multiple Submittal Report/Form Public 309, et al Compliance Report clist=14216916

Interruptions in SCADA Network Outages of Brookfield Renewable Energy Group under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/16/2014 Multiple Submittal Report/Form CEII 309, et al Compliance Report clist=14216917

Letter to Erie Boulevard Hydropower L.P. acknowledging receipt of the 2013 Minimum Flow FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/8/2014 Multiple Issuance and Pond Level Compliance Report for 2013 for the Stewarts Bridge Project et al under P- Public With Applicant Correspondence clist=14214329 2047 et al.

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/17/2014 Multiple Submittal Section 12.10(a) Report; SCADA Communications Outage under P-2084 et. al. Report/Form Public Compliance Report clist=14205986

Brookfield Renewable Energy Group submits the Section 12.10 report for a Supervisory Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/2014 Multiple Submittal Control & Data Acquisition communication outage between for the Blake & Higley Hydro Report/Form CEII Compliance Report clist=14217237 Project et al under P-2084 et al.

Letter requesting Brookfield Renewable Energy Group to provide a revised Dam Safety FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/27/2014 P-2320-000 Issuance Surveillance & Monitoring Plan w/in 45 days for the Middle Raquette River Project under P- Compliance Directives CEII With Applicant clist=14204435 2320.

Letter order accepting Brookfield Renewable Energy Group's 1/27/14 plan and schedule to http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/27/2014 P-2320-000 Issuance address findings re the 2013 Dam Safety Inspection of the Middle Raquette River Project Order/Opinion Delegated Order CEII clist=14204440 under P-2320.

Letter to Brookfield Renewable Energy Group providing the 2013 Dam Safety Inspection FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/21/2014 Multiple Issuance CEII Reports for the Raymondville Project et al under P-2330 et al. With Applicant Correspondence clist=14204379

Letter requesting Brookfield Renewable Power Inc to submit w/in 60 days a plan and FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/19/2014 Multiple Issuance schedule to provide a redundant communication system for the Black River Project et al Compliance Directives CEII With Applicant clist=14199176 under P-2569 et al.

Letter order approving Brookfield Renewable Energy Partners's 1/17/14 filing of the Bryce N. http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/27/2014 P-2320-000 Issuance Mochrie as the independent consultant to be responsible for the tenth Part 12D safety Order/Opinion Delegated Order Public clist=14190331 inspection for the Middle Raquette River Project under P-2320.

4 Page 5 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Letter requesting Brookfield Renewable Power Inc to address comments within 30 days re FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/20/2014 Multiple Issuance the review of revised Raquette River Inflow Design Flood and Hazard Classification Study Compliance Directives CEII With Applicant clist=14194908 under P-7387. Cultural Resources Erie Boulevard Hydropower, LP submits the 2013 Historic Properties Management Plan, Inventory - http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/12/2014 Multiple Submittal Report/Form Public Annual Report required by Article 405 for the Carry Falls Project et al under P-2060 et al. Report/Archaeological clist=14189054 Study

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/12/2014 Multiple Submittal Annual HPMP Report as required by Article 405 of Project Licenses under P-2060 et al. Report/Form Public Compliance Report clist=14186180

Updated 12.10(a) (including Project numbers) for the November NSCC SCADA Outage Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/11/2014 Multiple Submittal Report/Form Public under P-2482, et al. Compliance Report clist=14185722

Filing 12.10(a); SCADA Network Communication Outage Between National System Control Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/10/2014 Multiple Submittal Report/Form Public Center (NSCC) and 65 Hydroelectric Stations under P-2701, et al. Compliance Report clist=14185385

Erie Boulevard Hydropower LP submits a report FERC requested following our in-person Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/28/2014 Multiple Submittal CEII notification to FERC re this event on 1/15/14 for the Trenton Project et al under P-2701 et al. Correspondence Correspondence clist=14194553

Erie Boulevard Hydropower, LP's response to FERC letter dated 11/7/13 relating to the Dam Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/24/2014 P-2320-000 Submittal CEII Safety Inspection of the Raquette River Hydroelectric Project under P-2320. Correspondence nal Information clist=14187036

Other Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/24/2014 P-2320-000 Submittal Middle Raquette River (P-2320) 2013 Dam Safety Inspection Follow-Up Response Report/Form CEII Report clist=14180337

Other Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/24/2014 P-2320-000 Submittal Middle Raquette River (P-2320) 2013 Dam Safety Inspection Follow-Up Response Report/Form Public Report clist=14180338

Erie Boulevard Hydropower LP submits the minimum flow releases, headpond levels, and Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/21/2014 Multiple Submittal special water releases and similar requirements in calendar years 2013 for the Stewarts Report/Form Public Quality/Minimum Flow clist=14197860 Bridge Project under P-2047 et al.

Erie Boulevard Hydropower, LP submits the resume of Bryce Mochrie, P.E. requesting Part 12 Consultant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/17/2014 P-2320-000 Submittal approval as the Independent Consultant to perform the Part 12 Inspection for the Higley Report/Form Safety Inspection Public clist=14180978 Development of the Middle Raquette Hydroelectric Project under P-2320. Reports

Request for approval of Bryce Mochrie as the Tenth Independent Consultant for the Higley Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/17/2014 P-2320-000 Submittal Report/Form Public Development; part of the Middle Raquette River License (P-2320-NY) Compliance Report clist=14178089

Letter order approving Mr. Bryce N. Mochrie as the Independent Consultant responsible for http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/15/2014 P-2320-000 Issuance theTenth Part 12D Safety Inspection for Brookfield Renewable Energy Partners, Middle Order/Opinion Delegated Order Public clist=14177730 Raquette River Project under P-2320.

Letter reminding Erie Boulevard Hydropower, L.P. of their license obligation to gather FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/13/2014 P-2320-000 Issuance recreation use data for a 12-month period beginning no later than March 15, 2014, re Public With Applicant Correspondence clist=14176515 Revised Form 80 for the Middle Raquette River Hydroelectric Project under P-2320.

Brookfield Renewable Energy Group submits High Flow Operations Plan EAP updates to Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/2013 Multiple Submittal Report/Form Public FERC-NYRO under P-2645 et. al. Plan clist=14173475

Brookfield Renewable Energy Group submits High Flow Operations Plan EAP updates to Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/2013 Multiple Submittal Report/Form CEII FERC-NYRO under P-2645 et. al. Plan clist=14173476

Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/2013 Multiple Submittal Time Sensitive EAP - Alternative Analysis Extension Request under P-2060, et al. Report/Form Public Plan clist=14173624

Erie Boulevard Hydropower, L.P. Report of impoundment level excursion 12-9-2013 under P- Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2013 P-2320-000 Submittal Report/Form Public 2320. Compliance Report clist=14171149

5 Page 6 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Erie Boulevard Hydropower, L.P. Report of impoundment level excursion 12-9-2013 under P- Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2013 P-2320-000 Submittal Report/Form CEII 2320. Compliance Report clist=14171150

Erie Boulevard Hydropower, LP notifies FERC of the removal status of the seasonal boater Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/17/2013 Multiple Submittal Report/Form Public safety devices for the Stewarts Bridge Project under P-2047 et al. Compliance Report clist=14174032

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/11/2013 P-2320-000 Submittal Middle Raquette 2013 Public Safety Plan Update under P-2320. Report/Form Public Compliance Report clist=14168167

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/11/2013 P-2320-000 Submittal Middle Raquette 2013 Public Safety Plan Update under P-2320. Report/Form CEII Compliance Report clist=14168168

November 2013 NSCC Comm Outage 12.10a of Brookfield Renewable Energy Group under Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/22/2013 Multiple Submittal Report/Form Public P-2482, et al Compliance Report clist=14163988

Erie Boulevard Hydropower LP submits the report FERC requested summarizing our Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/21/2013 Multiple Submittal CEII telephone discussion on 11/12/13 for the Spier Falls Project under P-2482 et al. Correspondence Correspondence clist=14194552

Letter informing Brookfield Renewable Energy Partners that its October 10, 2013 deviation FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/12/2013 P-2320-068 Issuance from the run-of-river requirements at the Middle Raquette River Project will be deemed a Public With Applicant Correspondence clist=14160954 violation of license Article 402 under P-2320.

Brookfield Renewable Energy Group October 2013 NSCC Comm Outage 12.10a under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/7/2013 Multiple Submittal Report/Form Public 2482, et al. Compliance Report clist=14160398

Letter requesting Brookfield Renewable Energy Group to provide a plan and schedule to FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/7/2013 P-2320-000 Issuance Compliance Directives CEII address the comments w/in 60 days for the Middle Raquette River Project under P-2320. With Applicant clist=14166579

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/22/2013 P-2320-068 Submittal Brookfield Renewable Energy Group submits Colton Head Pond Excursion under P-2320. Report/Form Public Compliance Report clist=14156236

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/22/2013 P-2320-000 Submittal Brookfield Renewable Energy Group submits Colton Head Pond Excursion under P-2320. Report/Form CEII Compliance Report clist=14156237

Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, L.P. CEII filing Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/11/2013 P-2320-000 Submittal Report/Form Public for corrected access drive issues reported on 8/29/13 under P-2320. Compliance Report clist=14153307

Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, L.P. CEII filing Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/11/2013 P-2320-000 Submittal Report/Form CEII for corrected access drive issues reported on 8/29/13 under P-2320. Compliance Report clist=14153308

Part 12 Consultant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/23/2013 Multiple Submittal Part 12D Safety Inspection 2014 - 2016 Proposed Schedule Change Report/Form Safety Inspection Public clist=14148164 Reports

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/6/2013 P-2320-000 Submittal Brookfield Renewable Energy Group Colton Stranding 2.10(a) Report under P-2320. Report/Form Privileged Compliance Report clist=14144156

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/6/2013 P-2320-000 Submittal Brookfield Renewable Energy Group Colton Stranding 2.10(a) Report under P-2320. Report/Form Public Compliance Report clist=14144157

Letter transmitting CD for Brookfield Renewable Energy Group entitled, "Determination of Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/3/2013 Multiple Submittal Inlfow Design Flood" for the Lower Raquette River Project et al under P-2330 et al. Dated: Report/Form CEII Compliance Report clist=14142818 April 2012 - Updated August 2013.

Brookfield Renewable Energy Group's CD containing the"Determination of Inlfow Design Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/3/2013 Multiple Submittal Flood" for the Lower Raquette River Project et al under P-2330 et al. (Files not loadable - rst, Report/Form CEII Compliance Report clist=14144361 g05, p05, et al)

6 Page 7 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Hannawa Falls Electrical Shock 12.10(b) of Brookfield Renewable Energy Group under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/21/2013 P-2320-000 Submittal Report/Form Public 2320. Compliance Report clist=14139597

Hannawa Falls Electrical Shock 12.10(b) of Brookfield Renewable Energy Group under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/21/2013 P-2320-000 Submittal Report/Form CEII 2320. Compliance Report clist=14139598

Letter informing Brookfield Renewable Energy Partners that its June 16 and July 7, 2013 FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/1/2013 Multiple Issuance deviations from the run-of-river requirements at the Middle Raquette River Project will be Public With Applicant Correspondence clist=14134481 deemed a violation of its license under P-2320.

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/15/2013 P-2320-067 Submittal Higley Excursion Plan of Brookfield Renewable Energy Group under P-2320. Report/Form Public Compliance Report clist=14129747

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/15/2013 P-2320-067 Submittal Higley Excursion Plan of Brookfield Renewable Energy Group under P-2320. Report/Form CEII Compliance Report clist=14129748

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/28/2013 P-2320-066 Submittal Colton Pond Level Excursion of Brookfield Renewable Energy Group under P-2320. Report/Form Public Compliance Report clist=14126144

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/28/2013 P-2320-066 Submittal Colton Pond Level Excursion of Brookfield Renewable Energy Group under P-2320. Report/Form CEII Compliance Report clist=14126145

Request to Update Information of U.S. Fish & Wildlife Service/NYFO Updating Service List & http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/28/2013 Multiple Submittal Pleading/Motion Procedural Motion Public Mailing List for Middle Raquette River under P-2320, et al. clist=14126148

Erie Boulevard Hydropower LP submits notification of the installation of the boater warning Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/20/2013 Multiple Submittal Report/Form Public devices for the Stewarts Bridge Project et al under P-2047 et al. Compliance Report clist=14117849

Brookfield Renewable Energy Group submits Seasonal Boat Ball & Danger Buoy Installation Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/20/2013 Multiple Submittal Report/Form Public Notice for 2013 under P-2047 et al. Compliance Report clist=14116233

Brookfield Renewable Energy Group TSEAP Alternatives Analysis for the Middle Raquette Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/26/2013 P-2320-000 Submittal Report/Form Public under P-2320. Plan clist=14110308

Memo dated 4/17/13 from Tara Perry re the Telephone Conversation Record re the Historic Telephone http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/17/2013 Multiple Issuance Property management Plan annual reports filed for several licensed hydro projects under P- FERC Memo Conversation or Public clist=14107343 2616 et al. Electronic Mail Memo

Letter acknowledging Brookfield Renewable Energy Partners' 1/7/13 filing of the 2012 Annual FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/1/2013 Multiple Issuance Public Statement of Compliance Report for the EJ West Project et al under P-2318 et al. With Applicant Correspondence clist=14102710

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/2013 Multiple Submittal Submittal of the 2012 DSSMR Report/Form Public Compliance Report clist=14094489

Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/2013 Multiple Submittal Submittal of the 2012 DSSMR Report/Form CEII Compliance Report clist=14094490

Brookfield Renewable Energy Group Carry Falls & Raquette River HPMP Annual Report Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/14/2013 Multiple Submittal Report/Form Public under P-2060, et al. Compliance Report clist=14090475

Brookfield Renewable Energy Partners submits notification of its compliance with the license Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/2/2013 Multiple Submittal requirements for minimum flow, pond level and other miscellaneous flow releases re the E.J. Report/Form Public Compliance Report clist=14080140 West Project et al under P-2318.

Compliance with minimum flow, pond level, and other miscellaneous flow release Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/2/2013 Multiple Submittal Report/Form Public requirements during calendar year 2012, under P-2318. Quality/Minimum Flow clist=14078931

7 Page 8 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Letter requesting Brookfield Renewable Power Inc. to provide a plan and schedule w/in 30 FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/18/2012 Multiple Issuance days to address comments noted from the Determination of Infow Design Flood Report re the Compliance Directives CEII With Applicant clist=14080633 Raquette River System under P-7387 et al.

Brookfield Renewable Energy Group Annual Statement of Generation - 2012 under P-2330, Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/22/2012 Multiple Submittal Report/Form Public et al. Report clist=14060974

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/10/2012 P-2320-000 Submittal Middle Raquette TSEAP Plan & Schedule of Brookfield Renewable Energy Group in P-2320. Report/Form Public Compliance Report clist=14050571

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/6/2012 P-2320-000 Submittal Brookfield Renewable Energy Group Colton Planned Pipeline De-Watering under P-2320. Report/Form Public Compliance Report clist=14049694

Letter order accepting Brookfield Renewable Power's 7/12/12 filing of the contractor http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/30/2012 P-2320-000 Issuance designed cofferdam desgin report and cofferdam design technical information for the Order/Opinion Delegated Order Public clist=14059190 Hannawa Project under P-2320.

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/17/2012 P-2320-000 Submittal Brookfield Renewable Energy Group Sugar Island Pond Level Excursion under (P-2320) Report/Form Public Compliance Report clist=14045598

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/17/2012 P-2320-000 Submittal Brookfield Renewable Energy Group Sugar Island Pond Level Excursion under (P-2320) Report/Form CEII Compliance Report clist=14045599

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/31/2012 Multiple Submittal Upper and Middle Raquette River TSEAP Analysis in P-2084, et al. Report/Form Public Compliance Report clist=14041563

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/31/2012 Multiple Submittal Upper and Middle Raquette River TSEAP Analysis in P-2084, et al. Report/Form CEII Compliance Report clist=14041564

Erie Boulevard Hydropower, LP submits approval of Cofferdam Design for the Middle Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/12/2012 P-2320-000 Submittal Report/Form CEII Raquette River Hydroelectric Project under P-2320. Compliance Report clist=14042006

Hannawa Falls Powerhouse Rehabilitation; Cofferdam Design Review Approval under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/12/2012 P-2320-000 Submittal Report/Form Public 2320. Compliance Report clist=14037608

Hannawa Falls Powerhouse Rehabilitation; Cofferdam Design Review Approval under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/12/2012 P-2320-000 Submittal Report/Form CEII 2320. Compliance Report clist=14037609

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/27/2012 Multiple Submittal Brookfield Renewable Energy Group Receipt of annual letter under P-2318, et al. Report/Form Other Utility Report Public clist=14034022

Erie Boulevard, Hydropwer, LP submits the updated pages of the public safety plans for the Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/6/2012 P-2320-000 Submittal Report/Form CEII Middle Raquette River Hydroelectric Project under P-2320. Compliance Report clist=14036362

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/6/2012 P-2320-000 Submittal Middle Raquette 2012 Public Safety Plan Updates under P-2320. Report/Form Public Compliance Report clist=14028232

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/6/2012 P-2320-000 Submittal Middle Raquette 2012 Public Safety Plan Updates under P-2320. Report/Form CEII Compliance Report clist=14028233

Erie Boulevard Hydropower, LP submits a schedule to provide the time sensitive analysis re Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/17/2012 P-2320-000 Submittal Public the Middle Raquette Hydroelectric Project under P-2320. Correspondence nal Information clist=14028304

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/17/2012 P-2320-000 Submittal Middle Raquette River TSEAP Analysis Schedule in P-2320. Report/Form Public Compliance Report clist=14022600

8 Page 9 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Brookfield Renewable Energy Group submits seasonal boat ball & danger buoy installation Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/14/2012 Multiple Submittal Report/Form Public notice for 2012 re Stewarts Bridge Project under P-2047 et al. Compliance Report clist=14023603

Brookfield Renewable Energy Group Season Boater Warning Device Installation for 2012 Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/14/2012 Multiple Submittal Report/Form Public under P-2047, et al. Compliance Report clist=14021697

Letter informing Erie Boulevard Hydropower, LP that the 1/17/12 deviation from the FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/4/2012 P-2320-065 Issuance headwater elevation will not be considered a violation, pursuant to Article 402 re the Middle Public With Applicant Correspondence clist=14020063 Raquette Project under P-2320.

Applicant Deficiency Letter/Data http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/20/2012 P-2320-000 Submittal Hannawa Falls Powerhouse Rehabilitation Project; Final ESA Determination under P-2320. Public Correspondence Response clist=14015202

Applicant Deficiency Letter/Data http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/20/2012 P-2320-000 Submittal Hannawa Falls Powerhouse Rehabilitation Project; Final ESA Determination under P-2320. CEII Correspondence Response clist=14015203

Brookfield Renewable Energy Group Annual 401 filing for the Raquette River; 2012 under P- Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/13/2012 Multiple Submittal Report/Form Public 2060, et al. Compliance Report clist=14012500

Letter order accepting Brookfield Renewable Power Inc's 3/6/12 submittal of a response to http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/20/2012 P-2320-000 Issuance Order/Opinion Delegated Order CEII FERC's 12/30/11 letter re the Middle Raquette River Project under P-2320. clist=14009745

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/6/2012 P-2320-000 Submittal Letter and plan addressing Colton surge tank Report/Form Public Compliance Report clist=14001112

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/6/2012 P-2320-000 Submittal Letter and plan addressing Colton surge tank Report/Form CEII Compliance Report clist=14001113

Letter to Brookfield Renewable Power re the proposed powerhouse rehabilitation at the FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/22/2012 P-2320-000 Issuance CEII Hannawa Project under P-2320. With Applicant Correspondence clist=14009562

Erie Boulevard Hydropower LP submits request to identify the chief engineers in the New Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/2/2012 Multiple Submittal Report/Form CEII York Regional Office for the New York Hydroelectric Projects under P-2318 et al. Compliance Report clist=14000360

Brookfield Renewable Power Inc submits excursion report with FERC concerning a license Other Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/27/2012 P-2320-000 Submittal deviation from the required pond level limits etc at the Hannawa Falls Hydro Project under P- Report/Form CEII Report clist=13993534 2320.

Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/27/2012 P-2320-065 Submittal Summary of excursion from licensed flows at Hannawa in P-2320. Public Correspondence nal Information clist=13991394

Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/27/2012 P-2320-000 Submittal Summary of excursion from licensed flows at Hannawa in P-2320. CEII Correspondence nal Information clist=13991395

Cultural Resources Erie Boulevard Hydropower, LP submits 2011 Historic Properties Management Plan Annual Inventory - http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/25/2012 Multiple Submittal Report/Form CEII Report for the Upper Raquette River Project et al under P-2084 et al. Report/Archaeological clist=13993042 Study

Brookfield Renewable Power, Inc.HPMP for the Upper and Middle Raquette and Carry Falls Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/25/2012 Multiple Submittal Report/Form Public hydroelectric projects under P-2060, et al. Compliance Report clist=13990835

Erie Boulevard Hydropower LP submits the minimum flow releases headpond levels and Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/23/2012 Multiple Submittal special water releases and similar requirements throughout calendar year 2010 etc under P- Report/Form Public Quality/Minimum Flow clist=13995405 2060 et al.

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/23/2012 Multiple Submittal Report/Form Public under P-2060, et. al.. Operation & Compliance Certification Compliance Report clist=13989677

9 Page 10 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Notification of Project shut-down and start-up at Hannawa Falls Hydroelectric Project under P- Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/10/2012 P-2320-000 Submittal Report/Form Public 2320. Compliance Report clist=13986146

Notification of Project shut-down and start-up at Hannawa Falls Hydroelectric Project under P- Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/10/2012 P-2320-000 Submittal Report/Form CEII 2320. Compliance Report clist=13986147

Letter to the parties addressed discussing a wide variety of recreation issues in conjunction FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/9/2012 Multiple Issuance Public with licensing and operation hydropower projects under P-2652 et al. With Applicant Correspondence clist=13991781

Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/6/2012 Multiple Submittal Summary of primary contacts for Brookfield's NY East region under P-2318, et al. Public Correspondence nal Information clist=13985757

Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/6/2012 Multiple Submittal Summary of assets for Brookfield's NY East region under P-2318, et al. Public Correspondence nal Information clist=13985771

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/5/2012 Multiple Submittal Contact information update for Brookfield Power's NY East region in P-2318. Report/Form Public Compliance Report clist=13985076

Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/5/2012 Multiple Submittal Contact information update for Brookfield Power's NY East region in P-2318, et al Public Correspondence nal Information clist=13985080

Letter order accepting Brookfield Renewable Power Inc's schedule but would like more FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/30/2011 P-2320-000 Issuance information on the deteriorated shotcrete within 30 days of this letter re the Colton Compliance Directives CEII With Applicant clist=13990836 Development under P-2320.

Request for Delay of Request for time extension for trash rack installation at Hannawa Falls hydroelectric project, Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/23/2011 P-2320-000 Submittal Action/Extension of Public as required under the settlement agreement. Also filed with NYRO. Correspondence clist=13982743 Time

Request for Delay of Request for extension of trash rack installation at Hannawa Falls Hydroelectric Project under Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/22/2011 P-2320-000 Submittal Action/Extension of Public P-2320. Correspondence clist=13982625 Time

Summary of Brookfield's current point of contacts and managing officials for NY East in P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/16/2011 Multiple Submittal Report/Form Public 2318, et al Compliance Report clist=13980365

Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/12/2011 Multiple Submittal Request for FERC annual report Report/Form Public Compliance Report clist=13978868

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/1/2011 P-2320-000 Submittal Report/Form Public Colton Surge Tank Shotcrete Rehab under P-2320. Compliance Report clist=13975894

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/1/2011 P-2320-000 Submittal Report/Form CEII Colton Surge Tank Shotcrete Rehab under P-2320. Compliance Report clist=13975895

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/21/2011 Multiple Submittal Report/Form Public under P-2060, et. al.. Raquette River-EAP-IDF & GIS Mapping Plan & Schedule Update Compliance Report clist=13972658

Brookfield Power annual report of generation for Brookfield's New York East Hydroelectric Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/14/2011 Multiple Submittal Report/Form Public Projects in P-2047, et al. Report clist=13970808

Brookfield Power annual report of generation for Brookfield's New York East Hydroelectric Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/14/2011 Multiple Submittal Report/Form CEII Projects in P-2047, et al. Report clist=13970809

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/2/2011 P-2320-000 Submittal Report/Form Public Erie Plan and Schedule Addressing FERC Dam Inspection Concerns - Colton under P-2320. Compliance Report clist=13968225

10 Page 11 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Erie Boulevard Hydropower, LP submits the updated list of the New York East Operating Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/11/2011 Multiple Submittal Region generation assets and the respective contact persons for the EJ west Project et al Report/Form Public Compliance Report clist=13966008 under P-2318 et al.

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/27/2011 Multiple Submittal Report/Form Public under P-2060, et. al.. Submittal of 2010 DSSMRs P-2060, P-2084, P-2320 Compliance Report clist=13923909

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/27/2011 Multiple Submittal Report/Form CEII under P-2060, et. al.. Submittal of 2010 DSSMRs P-2060, P-2084, P-2320 Compliance Report clist=13923910

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/4/2011 Multiple Submittal Report/Form Public under P-2060, et. al.. Acknowledgement of Receipt of Annual Letter Compliance Report clist=13917308

Letter order accepting Erie Boulevard Hydropower, LP's 2/10/11 filing of the Annual Historic http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/17/2011 Multiple Issuance Order/Opinion Delegated Order Public Properties Management Plan Report re the Carry Falls Project et al under P-2060 et al. clist=13894822

Brookfield Power NY Hydro Services LLC Article 405 - Historic Properties Management Plan - Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/10/2011 Multiple Submittal Report/Form Public 2010 Report under P-2060, et. al.. Compliance Report clist=13890560

Project Safety-Related Submission to NYRO of Brookfield Power NY Hydro Services LLC Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/29/2011 Multiple Submittal Report/Form Public under P-2060, et. al.. Statement of Minimum Flow and Pond Level Compliance - 2010 Quality/Minimum Flow clist=13886722

Project Safety-Related Submission to NYRO of Brookfield Renewable Power, Inc. under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/15/2010 P-2320-000 Submittal Report/Form Public 2320. Compliance Report clist=13874056

Report of Erie Boulevard Hydropower, L.P. concerning annual generation for 10/1/09 - Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/20/2010 Multiple Submittal Report/Form Public 9/30/10 under P-2047, et. al. . Report clist=13857871

Project Safety-Related Submission to NYRO of Brookfield Renewable Power Inc. under P- Annual Spill Gate http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/21/2010 Multiple Submittal Report/Form Public 2060, et. al.. Testing Report clist=13833740

Project Safety-Related Submission to NYRO of Brookfield Renewable Power Inc. under P- Annual Spill Gate http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/21/2010 Multiple Submittal Report/Form CEII 2060, et. al.. Testing Report clist=13833741

Order approving 2010 Annual Report pursuant to Articles 401 re Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/15/2010 Multiple Issuance Order/Opinion Delegated Order Public Inc's Carry Falls Project under P-2060 et al. clist=13825249

Letter to Brookfield Renewable Power discussing the assessment of the adequacy of time FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/10/2010 Multiple Issuance CEII sensitive EAP's re Carty Falls Project et al under P-2060 et al. With Applicant Correspondence clist=13820019

Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, LP under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/5/2010 Multiple Submittal Report/Form Public 2047, et. al. 2010 Buoy Installation Status Report. Compliance Report clist=13814884

Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/13/2010 Multiple Submittal Report of Erie Boulevard Hydropower, LP under P-2060, et. al. Report/Form Recreational Public clist=13807864 Compliance Report

Erie Boulevard Hydropower, LP's CD to their submittal of the Potential Failure Modes Part 12 Consultant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/8/2010 P-2320-000 Submittal Analysis Report for the Colton Development re the Middle Raquette River Project under P- Report/Form Safety Inspection CEII clist=13811006 2320 . Reports

Part 12 Consultant Erie Boulevard Hydropower, LP submits Potential Failure Modes Analysis Report for the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/8/2010 P-2320-000 Submittal Report/Form Safety Inspection CEII Colton Development re the Middle Raquette River Project under P-2320. clist=13809840 Reports

Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, LP 2009 Annual Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/9/2010 Multiple Submittal Report/Form Public Compliance Filing for minimum flows and headponds level requirements under P-2060, et al. Quality/Minimum Flow clist=13799180

11 Page 12 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Letter order accepting Erie Boulevard Hydropower, LP's Annual Historic Properties http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/26/2010 Multiple Issuance Order/Opinion Delegated Order Public Management Plan report for the Carry Falls Project et al under P-2060 et al. kg clist=13796880

Erie Boulevard Hydropower, LP's Annual Article 405 Historic Properties Management Plan Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/10/2010 Multiple Submittal Report/Form Public Compliance Report under P-2060, P-2084, P-2320, P-2330. Compliance Report clist=13791890

Letter requesting Erie Boulevard Hydropower, LP to submits w/in 60 days a plan and FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/12/2010 Multiple Issuance schedule for designing and carrying out any proposed corrective measures re the Hannawa Public With Applicant Correspondence clist=13785132 et al Development under P-2320 et al.

Letter informing Erie Boulevard Hydropower, LP that the Headpond Elevation Deviation that FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/28/2009 P-2320-064 Issuance occurred on 11/16/09 will not be considered a violation of Article 402 re the Middle Raquette Public With Applicant Correspondence clist=13781320 River Project under P-2320.

Environmental and Erie Boulevard Hydropower, LP under P-2320, Notification of excursion of headpond http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/30/2009 P-2320-064 Submittal Report/Form Recreational Public fluctuation limit on 11-16-09 and event report. clist=13774040 Compliance Report

Order approving 2009 Annual Report pursuant to Articles 401 re Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/10/2009 Multiple Issuance Order/Opinion Delegated Order Public L.P. under P-2060 et al. clist=13768182

Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, LP under P- Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/30/2009 Multiple Submittal Report/Form Public 2084, et. al. Request for an extension of time to file 31 DSSMPs and DSSMRs. Compliance Report clist=13733329

Letter to Brookfield Renewable Power confirming arrangements made during recent FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/17/2009 Multiple Issuance telephone conversation concerning the inspection of the Parishville and Allen Falls Public With Applicant Correspondence clist=13734175 developments of West Branch St. Regis River Project under P-2320 et al.

Environmental and Erie Boulevard Hydropower, LP under P-2060, et. al. License Article 401 - 2008 Annual http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/2009 Multiple Submittal Report/Form Recreational Public Report. clist=13707543 Compliance Report

Letter informing Erie Boulevard Hydropower, LP that the Reservoir Elevation Deviation that FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/9/2009 P-2320-061 Issuance occurred 3/3/09 will not be considered a violation of Article 402 for the Middle Raquette River Public With Applicant Correspondence clist=13707120 Project under P-2320.

Request for Delay of Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, LP under P- Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/31/2009 Multiple Submittal Action/Extension of Public 2060, et. al.. Request for Extenion of time to file 2008 DSSM Reports. Correspondence clist=13703041 Time Form 80 - Licensed Project Safety-Related Submission to NYRO of Erie Boulevard Hydropower, LP under P- Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/30/2009 Multiple Submittal Report/Form Public 7387, et al. 2008 Form 80 Recreation Reports for the St. Lawrence Operations Area (NY). Development clist=13702536 Recreation Report

Report of Erie Boulevard Hydropower, L.P. under P-2320, Notice of Event of Headpond limit Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/11/2009 P-2320-061 Submittal Report/Form Public excursion, Hannawa Project Quality/Minimum Flow clist=13697537

Letter order accepting Erie Boulevard Hydropower, LP's 2/17/09 filing of their annual http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/10/2009 Multiple Issuance monitoring report summarizing activities performed pursuant to Article 405 re Carry Falls Order/Opinion Delegated Order Public clist=13697747 Project et al under P-2060 et al.

2008 Minimum Flow Compliance Report Submission to NYRO of Erie Boulevard Hydropower, Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/9/2009 Multiple Submittal Report/Form Public L.P. under P-2060, et al. Quality/Minimum Flow clist=13696793

Letter to Erie Boulevard Hydropower, LP discussing 1/14/09 letter providing notification of a FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/26/2009 P-2320-059 Issuance deviation from the requirements of Article 402 of the license for the Middle Raquette River Public With Applicant Correspondence clist=13693669 Project, Hannawa Development under P-2320.

Erie Boulevard Hydropower, LP submits Notice of Change of Contact Information and Update http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/25/2009 Multiple Submittal Pleading/Motion Procedural Motion Public to FERC Mailing List for the Carry Falls Project et al under P-2060 et al. clist=13701618

Erie Boulevard Hydropower, LP submits notice of change of contact information and update http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/25/2009 Multiple Submittal Pleading/Motion Procedural Motion Public to FERC mailing list re the Carry Falls Project et al under P-2060 et al. clist=13694524

12 Page 13 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info Cultural Resources Erie Boulevard Hydropower, LP submits 2008 Historic Properties Management Plan Annual Inventory - http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/13/2009 Multiple Submittal Report/Form Public Report re the Carry Falls Project et al under P-2060 et al. Report/Archaeological clist=13691584 Study Erie Boulevard Hydropower, LP submits the Streamflow Monitoring Plan Reservoir Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/13/2009 P-2320-059 Submittal Fluctuation Limits at Hannawa Development in compliance with License Article 402 & 406 re Report/Form Recreational Public clist=13680618 the Middle Raquette River Project under P-2320. Compliance Report

Order approving Streamflow Monitoring Plan re Erie Boulevard Hydropower, LP under P- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/30/2008 P-2320-057 Issuance Order/Opinion Delegated Order Public 2320. clist=13659331

Erie Boulevard Hydropower LP requests for certification necessary for EBH to seek a Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/9/2008 P-2320-058 Submittal renewable energy production tax credit from the Internal Revenue Service for the Colton Public Correspondence Correspondence clist=13648011 Hydro Project under P-2320.

Environmental and Erie Boulevard Hydropower, LP submits an updated Streamflow Monitoring Plan for the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/27/2008 P-2320-057 Submittal Report/Form Recreational Public Middle Raquette River Proj-2320. clist=13643930 Compliance Report

Letter to Erie Boulevard Hydropower, LP's informing that FERC received their letter reporting FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/18/2008 P-2320-055 Issuance a head pond elevation deviation on 3/20/08 at Colton Development of the Middle Raquette Public With Applicant Correspondence clist=13639594 River Project under P-2320.

Letter requesting Erie Boulevard Hydropower LP to submit within 30 days an updated stream FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/28/2008 P-2320-000 Issuance Compliance Directives Public monitoring plan for the Middle Raquette River Project under P-2320. With Applicant clist=13634322

Letter requesting Erie Boulevard Hydropower, LP to submit a copy of the consultants report, FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/23/2008 P-2320-000 Issuance and a plan and schedule for completing the consultants recommendations re the 2007 Compliance Directives Public With Applicant clist=13634084 inspection of the Middle Raquette River Proj-2320.

Order approving 2008 Annual Report pursuant to Article 401 re Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/9/2008 Multiple Issuance Order/Opinion Delegated Order Public L.P. under P-2060 et al. clist=13628479

Letter order accepting Brookfield Power New York Hydro's 2/13/08 filing of annual monitoring http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/23/2008 Multiple Issuance report summarizing activities performed in accordance with Article 405 for the Carry Falls Order/Opinion Delegated Order Public clist=13624623 Project et al under P-2060 et al.

Erie Boulevard Hydropower LP submits an Annual Report summarizing license mearsures Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/16/2008 Multiple Submittal implemented in the previous year 2007 and license measures to be undertaken in the Report/Form Recreational Public clist=13602152 calendar year 2008 for the Carry Falls Proj-2060 et al. Compliance Report

Erie Boulevard Hydropower LP informs FERC of an event where the impoundment elevation Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/31/2008 P-2320-055 Submittal was lowered below elevations established by Article 402 at the Hannawa Development at the Report/Form Recreational Public clist=13595483 Middle Requette River Proj-2320. Compliance Report

Environmental Inspection Report by New York Regional Office for Erie Boulevard http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/31/2008 P-2320-000 Issuance Hydropower, LP's Middle Raquette River Project's inspection conducted on 9/12/07 under P- FERC Report/Study Environmental Report Public clist=13612884 2320.

Erie Boulevard Hydropower, LP responses to FERC's 1/11/08 letter requesting a plan and Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/20/2008 Multiple Submittal schedule for submitting breach analyses and revised EAPs for the Raquette River Proj-7387 Public Correspondence nal Information clist=13593046 et al.

Environmental and Erie Boulevard Hydropower LP submits the 2007 HPMP Annual Report for the Carry Falls http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/12/2008 Multiple Submittal Report/Form Recreational Public and Raquette River Projects et al under P-2060 et al. clist=13583288 Compliance Report

Erie Boulevard Hydropower, LP submits the Real Property Conveyance Report for calendar Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/6/2008 Multiple Submittal Report/Form Public year 2007 for the Carry Falls Project under P-2060 et al. Compliance Report clist=13580337

Erie Boulevard Hydropower, LP reports compliance with the minimum flow releases etc at the Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/6/2008 Multiple Submittal Report/Form Public Carry Falls Project et al for the calendar year 2007 under P-2060 et al. Quality/Minimum Flow clist=13580768

Letter providing quidelines for filing a Licensed Hydropower Development Recreation Report FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/7/2008 Multiple Issuance (Form 80) for each development within their project in compliance with FERC's Section 8.11 Public With Applicant Correspondence clist=13569092 regulations under P-5 et al.

13 Page 14 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Erie Boulevard Hydropower LP submits a statement of generation for period from 10/1/06 to Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/29/2007 Multiple Submittal Report/Form Public 9/30/07 for its Sacandaga River Project et al under P-2047 et al. Report clist=13552094

Erie Boulevard Hydopower LP informs FERC that Breacan Power has officially changed its Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/26/2007 Multiple Submittal name to Brookfield Power which will not have any effect on its license status regarding the Report/Form Public Compliance Report clist=13541980 hydroelectric projects under P-2047 et al.

Erie Boulevard Hydropower LP informs FERC that Brascan Power has officially changed its Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/24/2007 Multiple Submittal name to Brookfield Power which will have no impact on its (Erie's) license status etc under P- Report/Form CEII Compliance Report clist=13543295 2047 et al. Dam Safety Operation Report by New York Regional Office for Erie Boulevard Hydropower, LP's Middle Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/6/2007 P-2320-000 Issuance Raquette River - Higley Development Project for the period of 6/27/05 - 6/26/07 under P- FERC Report/Study CEII Report/Operation clist=13539061 2320. Report Letter to Brookfield Power New York confirming arrangements made with Thomas M Skutnik, FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/3/2007 Multiple Issuance P.E. on 6/15/07 for the Environmental Inspections to be conducted on 9/11, 9/12, & 9/13/07 Public With Applicant Correspondence clist=13524895 re Middle Raquette River Proj-2320 et al.

Letter to Erie Boulevard Hydropower LP confirming the arrangements made during a FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/30/2007 Multiple Issuance telephone conversation on 5/29/07 re the inspection of the Hannawa development et al at Public With Applicant Correspondence clist=13516604 Middle Raquette River Proj-2320 et al.

Order approving 2007 Annual Report pursuant to Articles 401 re Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/25/2007 Multiple Issuance Order/Opinion Delegated Order Public LP's Carry Falls Project under P-2060 et al. clist=13498685

Erie Boulevard Hydropower, LP's 2006 Annual Report summarizing license measures Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/13/2007 Multiple Submittal implemented in the previous year (2006) and the license measures to be undertaken in the Report/Form Public Compliance Report clist=13497015 currect calendar year (2007) re Carry Falls Proj-2060 et al.

Letter to Erie Boulevard Hydropower, LP concluding that the 1/28/07 deviation of Article 402 FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/11/2007 P-2320-050 Issuance Public does not constitute a violation of their license re Middle Raquette River Project under P-2320. With Applicant Correspondence clist=13495484

Letter to Erie Boulevard Hydropower, LP concluding that the 1/18/07 deviation of Article 402 FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/11/2007 P-2320-049 Issuance Public does not constitute a violation of their license re Middle Raquette River Project under P-2320. With Applicant Correspondence clist=13495485

Letter order accepting Erie Boulevard Hydropower, LP's Annual Historic Properties http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/23/2007 Multiple Issuance Management Plan Report for the Carry Falls, Upper Raquette River, Middle Raquette River Order/Opinion Delegated Order Public clist=13489621 Projects et al under P-2060 et al.

Environmental and Erie Boulevard Hydropower, LP submits their Historic Properties Management Plan Annual http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/13/2007 Multiple Submittal Report/Form Recreational Public Report for the Carry Falls Project et al under P-2060 et al. clist=12880626 Compliance Report

Erie Boulevard Hydropower LP advises FERC that they have complied with minimum flow Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/7/2007 Multiple Submittal releases, heaedpond levels, special water releases and similar miscellaneous requirements Report/Form Public Quality/Minimum Flow clist=4878454 in calendar year 2006 under P-309 et al.

Erie Boulevard Hydropower LP informs FERC of an event where the impoundment elevation Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/7/2007 P-2320-050 Submittal was lowered below the elevations established by License Article 402 at the Colton Report/Form Recreational Public clist=11879614 impoundment at its Middle Raquette River Proj-2320. Compliance Report

Erie Boulevard Hydropower, LP informs FERC of an event where the impoundment elevation Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/29/2007 P-2320-049 Submittal was lowered below the elevation established by License Article 402 at the Hanawa Reservoir Report/Form Recreational Public clist=4476106 at the Middle Raquette River Proj-2320. Compliance Report Dam Safety Photos to the Operation Report by the NYRO for Erie Boulevard Hydropower LP's Middle Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2006 P-2320-000 Issuance FERC Report/Study CEII Raquette River Project for period 5/18/05 to 5/30/06 under P-2320. Part 4 of 4. Report/Operation clist=4469876 Report Dam Safety Photos to the Operation Report by the NYRO for Erie Boulevard Hydropower LP's Middle Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2006 P-2320-000 Issuance FERC Report/Study CEII Raquette River Project for period 5/18/05 to 5/30/06 under P-2320. Part 3 of 4. Report/Operation clist=4469877 Report Dam Safety Photos to the Operation Report by the NYRO for Erie Boulevard Hydropower LP's Middle Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2006 P-2320-000 Issuance FERC Report/Study CEII Raquette River Project for period 5/18/05 to 5/30/06 under P-2320. Part 2 of 4. Report/Operation clist=4469878 Report

14 Page 15 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info Dam Safety Photos to the Operation Report by the NYRO for Erie Boulevard Hydropower LP's Middle Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2006 P-2320-000 Issuance FERC Report/Study CEII Raquette River Project for period 5/18/05 to 5/30/06 under P-2320. Part 1 of 4. Report/Operation clist=4469879 Report Dam Safety Operation Report by the NYRO for Erie Boulevard Hydropower LP's Middle Raquette River Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/19/2006 P-2320-000 Issuance FERC Report/Study CEII Project for period 5/18/05 to 5/30/06 under P-2320. Report/Operation clist=4469881 Report

Erie Boulevard Hydropower, LP submits Revised Emegency Action Plans (EAPs) in response Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/6/2006 Multiple Submittal Report/Form CEII to all of FERC's comments on the 2004 EAPs for EJ West Project under P-2318 et al. Plan clist=4463208

Letter informing Erie Boulevard Hydropower LP that based on its 8/9/06 notification report FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/2/2006 P-2320-048 Issuance FERC has determined that the 7/29/06 deviation from Article 402 does not constitute a Public With Applicant Correspondence clist=4444079 violation of license for its Middle Raquette Proj-2320.

Order approving 2006 Annual Report pursuant to Article 401 re Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/1/2006 Multiple Issuance Order/Opinion Delegated Order Public LP's Carry Falls Project et al under P-2060 et al. clist=4435265

Letter informing Erie Boulevard Hydropower, LP that their Annual Historic Properties FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/31/2006 Multiple Issuance Management Plan Report fulfills the requirements of Article 405 and the Programmatic Public With Applicant Correspondence clist=4436671 Agreement for 2005 re the Carry Falls Proj-2060 et al.

American Rivers requests that changes be made to the official service and mailing list re the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/22/2006 Multiple Submittal Pleading/Motion Procedural Motion Public Lundy Project et al under P-1390 et al. clist=4432347

Erie Boulevard Hydropower, LP informs FERC of an event where the impoundment elevation Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/8/2006 P-2320-000 Submittal was lowered beyond the elevations established by License Article 402 at the Colton Report/Form Public Compliance Report clist=4429862 impoundment re Middle Raquette River Proj-2320.

Erie Boulevard Hydropower, LP informs FERC of an event where the impoundment elevation Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/8/2006 Multiple Submittal was lowered beyond the elevations established by License Article 402 at the Colton Report/Form Public Compliance Report clist=4429863 impoundment re Middle Raquette River Proj-2320.

Erie Boulevard Hydropower, LP's CD containing Exhibit F-1 drawing for the Higley Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/2/2006 P-2320-043 Submittal Report/Form CEII Development of the Middle Raquette River Proj-2320. Compliance Report clist=4430893

Erie Boulevard Hydropower, LP submits the 35mm microfilm reproducible exhibit drawings for Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/2/2006 P-2320-043 Submittal Report/Form Public the Middle Raquette River Project under P-2320. Compliance Report clist=4430363

Erie Boulevard Hydropower, LP submits the 35mm microfilm reproducible exhibit drawings for Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/2/2006 P-2320-043 Submittal Report/Form CEII the Middle Raquette River Project under P-2320. Compliance Report clist=4430364

Letter informing Erie Boulevard Hydropower, LP that their letter filed on 3/17/06 providing FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/6/2006 P-2320-045 Issuance notification of deviations from the requirements of Article 402 for the Middle Raquette River Public With Applicant Correspondence clist=4411749 Project does not constitute violation under P-2320.

Letter informing Erie Boulevard Hydropower, LP that the deviation that occurred on 1/15/06 Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/2/2006 P-2320-044 Submittal was the result of warm temperatures & significant precipitation, which caused increased Public Correspondence Correspondence clist=4401134 flows, & will not be considered violation of license Article 402.

Erie Boulevard Hydropower LP et al submits its notice of change of contact information re the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/20/2006 Multiple Submittal Pleading/Motion Procedural Motion Public Hydraulic Race Project et al under P-2424 et al. clist=4399552

Brrofield Power gives notice of a change information for the Hydraulic Race Project et al http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/20/2006 Multiple Submittal Pleading/Motion Procedural Motion Public under P-2424 et al. clist=4401410

Erie Boulevard Hydropower, LP submits its 2006 Annual Report on the status of license Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/18/2006 Multiple Submittal measures to be undertaken in the current calendar year re the Carry Falls Project et al under Report/Form Public Compliance Report clist=4396569 P-2060 et al.

Erie Boulevard Hydropower, LP informs FERC that it has complied with minimum flow Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/12/2006 Multiple Submittal releases, headpond levels, special water releases etc in the calender year 2005 except as Report/Form Public Quality/Minimum Flow clist=4397253 previously advised re Piney Dam Proj-309 et al.

15 Page 16 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Erie Boulevard Hydropower, LP informs FERC of an event where the impoundment elevation Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/16/2006 P-2320-000 Submittal was lowered beyond the elevation establlished by License Article 402 at the Middle Raquette Report/Form Public Compliance Report clist=4387059 River Project under P-2320.

Environmental and Erie Boulevard Hydropower, LP submits the 2005 Historic Properties Management Plan http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/16/2006 Multiple Submittal Report/Form Recreational Public Annual Report for the Carry Falls Project et al under P-2060 et al. clist=4379963 Compliance Report

Erie Boulevard Hydropower, LP informs FERC of an event where the impoundment elevation Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/1/2006 P-2320-044 Submittal Report/Form Public was lowered beyond elevations established re Middle Raquette River Project under P-2320. Compliance Report clist=4375649

Letter to James R Adams Director, Department of Utilities & Energy Management, Cornell FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/30/2005 Multiple Issuance University et al enclosing a summary of some of the requirements (primarily from Parts 8 and Public With Applicant Correspondence clist=4367882 12 of FERC's Regulations) under P-2323 et al.

Erie Boulevard Hydropower, LP submits the revised Exhibits A and F following completion of Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/9/2005 P-2320-000 Submittal the redevelopment project re Middle Raquette River Project in accordance with Article 305 Report/Form Public Compliance Report clist=4355182 under P-2320.

Erie Boulevard Hydropower, LP submits the revised Exhibits A and F following completion of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/9/2005 P-2320-000 Submittal the redevelopment project re Middle Raquette River Project in accordance with Article 305 Drawing/Maps Drawing/Maps clist=4355186 under P-2320.LARGE FORMAT ONLYAvailability: Public

Erie Boulevard Hydropower, LP submits the revised Exhibits A and F following completion of Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/9/2005 P-2320-000 Submittal the redevelopment project, denoting the as-built conditions for the development re the Middle Report/Form CEII Compliance Report clist=4355183 Raquette River Proj-2320.

Erie Boulevard Hydropower, LP submits the revised Exhibits A and F following completion of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/9/2005 P-2320-000 Submittal the redevelopment project, denoting the as-built conditions for the development re the Middle Drawing/Maps Drawing/Maps clist=4355187 Raquette River Proj-2320. LARGE FORMAT ONLY .Availability: CEII Dam Safety Operation Report by New York Regional Office for Erie Boulevard Hydropower, LP's Middle Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/29/2005 P-2320-000 Issuance Raquette River : Hannawa, Colton & Higley Developments Project for the period of 6/21/04 - FERC Report/Study CEII Report/Operation clist=4343730 5/16/05 under P-2320. Report Letter requesting Erie Boulevard Hydropower, LP to submit a certification by the design FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/21/2005 P-2320-000 Issuance Engineer that the project was constructed in accordance with the design intent etc re Middle Compliance Directives Public With Applicant clist=4325179 Raquette Project under P-2320.

Letter order accepting Erie Boulevard Hydropower's plan and schedule to implement the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/21/2005 P-2320-000 Issuance consultant's recommendations for the Middle Raquette River Project, Higley Development Order/Opinion Delegated Order Public clist=4327622 under P-2320.

Letter to Erie Boulevard Hydropower, LP making a correction to the 10/18/04 letter which FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/7/2005 P-2320-000 Issuance incorrectly referenced P-2554 etc re Public Saftey Plans for the Middle Racquette Project Public With Applicant Correspondence clist=4311074 under P-2320.

Letter requesting Erie Boulevard Hydropower, LP to submit within 30 days a plan and FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/3/2005 Multiple Issuance schedule to address the outstanding items noted during the operarion inspection of the Compliance Directives Public With Applicant clist=4310200 Middle & Lower Raquette River Projects, P-2320 et al.

Order approving 2005 Annual Report pursuant to Articles 401 regarding Erie Boulevard http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/5/2005 Multiple Issuance Hydropower, LP, Carry Falls, Upper Raquette River, and Middle Raquette River Projects Order/Opinion Delegated Order Public clist=4300175 under P-2060 et al.

Adirondack Mountain Club submits complaint in the matter of recent changes in the service http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/21/2005 Multiple Submittal Pleading/Motion Procedural Motion Public lists under P-2539 et al. clist=4299955

Adirondack Mountain Club submits complaints regarding the service list for hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/21/2005 Multiple Submittal Comments/Protest Comment on Filing Public projects under P-2539 et al. clist=4303820

Erie Boulevard Hydropower, LP submits its 2005 Annual Report for the Carry Falls Project et Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/15/2005 Multiple Submittal Report/Form Public al, pursuant to Article 401 under P-2060 et al. Compliance Report clist=4293518

Erie Boulevard Hydropower, LP advises that the Piney Dam Project et al, have complied with Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/22/2005 Multiple Submittal minimum flow releases, headpond levels, special water releases and similar requirements Report/Form Public Quality/Minimum Flow clist=4280034 during year 2004 under P-309 et al.

16 Page 17 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Erie Boulevard Hydropower, LP's et al 2004 Conveyance Report in conformance with the Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/14/2005 Multiple Submittal annual filing requirement under Paragraph (c) of the standard license Article etc re the Report/Form Public Report clist=4269876 Stewards Bridge Project et al under P-2047 et al.

Letter order accepting Erie Boulevard Hydropower LP's revised Public Safety Plans for the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/14/2004 Multiple Issuance Oswegatchie and Upper Raquette projects dated 11/15 and 11/19/04 as satisfying the Order/Opinion Delegated Order Public clist=4261441 requirements of Section 12.4 under P-2713 et al.

Order modifying & approving Recreation Plan pursuant to Article 404 re Erie Boulevard http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/17/2004 Multiple Issuance Order/Opinion Delegated Order Public Hydropower, LP's Carry Falls Project et al under P-2060 et al. clist=4253029

Ernest Hutchins submits pictures & comments of ATV abuse on Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/11/2004 P-2320-000 Submittal Comments/Protest Comment on Filing Public LP's Project under P-2320. clist=4245476

Order approving Historic Properties Management Plans re Erie Boulevard Hydropower, LP in http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/28/2004 Multiple Issuance Order/Opinion Delegated Order Public accordance with Article 405 re its Upper Raquette River Project et al under P-2060 et al. clist=4240500

The Law Offices of GKRSE forwards a letter from Peter C Kissel to Michael Porter stating http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/20/2004 P-2320-000 Submittal that their office has been retained to represent the Burtwood Park Drive Residents etc re Erie Comments/Protest Comment on Filing Public clist=4238230 Boulevard Hydropower, LP's Middle Raquette River Proj-2320. Dam Safety Operation Report by New York Regional Office for Erie Boulevard Hydropower, LP's Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/7/2004 P-2320-000 Issuance (Hannawa, Colton and Higley Developments) Middle Raquette River Project for the period of FERC Report/Study CEII Report/Operation clist=4235288 4/30/03 - 6/21/04 under P-2320. Report

Comments of Ernest Hutchins regarding Reliant Energy securing a hydro property in the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/1/2004 Multiple Submittal Comments/Protest Comment on Filing Public Town of Cottonwood, NY under P-2060 et al. clist=4234714

Erie Boulevard Hydropower, LP submits revised Public Safety Plans for the Sugar Island Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/30/2004 P-2320-000 Submittal Report/Form CEII Development of the Middle Raquette River Project under P-2320. Compliance Report clist=4233357

Erie Boulevard Hydropower, LP submits revised Public Safety Plans for the Sugar Island Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/30/2004 P-2320-000 Submittal Development of the Middle Raquette River Project under P-2320. LARGE FORMATS ONLY Report/Form Compliance Report clist=4233654 .Availability: CEII

Erie Boulevard Hydropower, LP submits revised Public Safety Plans for the Sugar Island Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/30/2004 P-2320-000 Submittal Development of the Middle Raquette River Project under P-2320. LARGE FORMATS Report/Form Compliance Report clist=4233652 ONLY.Availability: CEII

Erie Boulevard Hydropower, LP submits revised Public Safety Plans for the Sugar Island Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/30/2004 P-2320-000 Submittal Development of the Middle Raquette River Project under P-2320. LARGE FORMAT Report/Form Compliance Report clist=4233650 ONLY.Availability: CEII

Letter accepting Reliant Energy's 8/16/04 submittal of a plan and schedule in response to FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/20/2004 P-2320-000 Issuance their inspection follow-up letter dated 7/14/04 for the Hannawa Development et al of the Public With Applicant Correspondence clist=4230683 Middle Raquette River Proj-2320 et al.

Erie Boulevard Hydropower, LP responds of the 2004 Inspection Follow-Up Letter for the Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/16/2004 Multiple Submittal Report/Form Public Middle Raquette River Project under P-2320 et al. Compliance Report clist=4230023

Letter requesting the Advisory Council on Historic Preservation to submt within 30 days its FERC Correspondence FERC http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/13/2004 Multiple Issuance concurrence on Erie Boulevard's 4/15/03 Historic Properties Management Plan for the Carry With Government Correspondence With Privileged clist=4230058 Falls Project et al under P-2060 et al. Agencies Government Agencies

Letter requesting Erie Boulevard Hydropower LP to submit within 30 days, a plan and FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/14/2004 Multiple Issuance schedule to address the items noted during the inspections at the Middle Rquette River Compliance Directives Public With Applicant clist=4221397 Project et al under P-2320 et al.

Letter order accepting Reliant Energy's Seventh Consultant's Report & supplements http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/2/2004 Multiple Issuance Order/Opinion Delegated Order CEII regarding the Middle & Lower Raquette River projects under P-2320 et al. clist=4221373

Order granting extension of time to 6/18/04 to comply with Article 405 of the license re Erie http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/16/2004 Multiple Issuance Order/Opinion Delegated Order Public Boulevard Hydropower, LP's Raquette River Hydroelectric Proj-2060 et al. clist=4213244

17 Page 18 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Order approving 2004 Annual Report, pursuant to Articles 401 re Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/14/2004 Multiple Issuance Order/Opinion Delegated Order Public LP's Carry Falls, Upper Raquette River, & Middle Raquette River Projects under P-2060 et al. clist=4212088

Request for Delay of Erie Boulevard Hydropower, LP requests an extension of time for to comply with Article 409 Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/28/2004 Multiple Submittal Action/Extension of Public et al under P-2047 et al. Correspondence clist=4209088 Time

Letter informing Erie Boulevard Hydropower, LP that the deviations of Article 402 & 406 at FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/12/2004 P-2320-038 Issuance the Colton & Hannawa Developments do not constitute a violation of the license re the Middle Public With Applicant Correspondence clist=4206111 Raquette River Proj-2320.

Environmental and Erie Boulevard Hydropower LP submits its 2004 Annual Report in letter format for its Carry http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/11/2004 Multiple Submittal Report/Form Recreational Public Falls Project et al in accordance to Article 401 under P-2060 et al. clist=4204201 Compliance Report

Erie Boulevard Hydropower, LP 's environmental license non-compliance report re the Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/6/2004 P-2320-038 Submittal minimum flow, base flow or impoundment fluctuation non-compliance re Middle Raquette Report/Form Recreational Public clist=4193064 River Project, pursuant to Article 402 under P-2320. Compliance Report

Environmental Inspection Report by the New York Regional Office for Erie Blvd Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/26/2004 P-2320-000 Issuance FERC Report/Study Environmental Report Public LP's Sugar Island Development et al, part of the Middle Racquette Project under P-2320. clist=4186982

Letter acknowledging Erie Boulevard Hydropower, LP's 12/23/03 filing regarding their third FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/12/2004 P-2320-037 Issuance status report on fish movement measures as part of the Higley Redevelopment Project for the Public With Applicant Correspondence clist=4178264 Middle Raquette River Proj-2320.

Erie Boulevard Hydropower, LP advises that it has complied with minimum flow releases, Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/6/2004 Multiple Submittal headpond levels, special water releases etc in calendar year 2003 except as previously Report/Form Public Quality/Minimum Flow clist=4177514 advised re Piney Dam Project et al under P-309 et al.

Erie Boulevard Hydropower, LP et al submitsthe Annual Spillway Gate Operation Certification Annual Spill Gate http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/22/2004 Multiple Submittal Report/Form CEII Test for the Stewarts Bridge Development et al under P-2047 et al. Testing Report clist=4174517

Erie Boulevard Hydropower, LP et al submits its 2003 Conveyance Report for the Stewarts Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/13/2004 Multiple Submittal Report/Form Public Bridge Project et al under P-2047 et al. Report clist=4174509

Erie Boulevard Hydropower, LP's et al Real Property Conveyance Report for Year 2003 re Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/13/2004 Multiple Submittal Report/Form Public the Schaghitocke Development of the Hoosic River Project under P-2616 et al. Report clist=4169783

Erie Boulevard Hydropower, LP submits the third Status Report on the fish movement Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/26/2003 P-2320-037 Submittal Report/Form Public measures to be constructed as part of the Higley Redevelopment Proj-2320. Compliance Report clist=4164191

Letter requesting Reliant Energy to submit revised public safety plans to install all existing FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/19/2003 Multiple Issuance Compliance Directives Public and newly installed safety devices by 4/30/04 under P-2713 et al. With Applicant clist=4154657

Letter inviting Carolina Power & Light et al to attend the FERC's workshop which will be held FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/14/2003 Multiple Issuance at the Alden Research Laboratory, Holden, Massachusetts on 11/13/03 re the Fish Passage Public With Applicant Correspondence clist=4155209 Draft Report under P-18 et al.

Letter providing Carolina Power & Light et al with a copy of the draft report on fish passage FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/30/2003 Multiple Issuance entitled "Evaluation of Mitigation Effectiveness at Hydropower Projects, Fish Passage & Public With Applicant Correspondence clist=4155208 inviting review and comments etc under P-18 et al.

Letter acknowledging Erie Boulevard Hydropower LP's 6/23/03 second status report on fish FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/23/2003 P-2320-035 Issuance movement measures as part of the Higley Redevelopment Project for the Middle Raquette Public With Applicant Correspondence clist=4138890 River Project under P-2320.

Letter order accepting Erie Boulevard Hydropower, LP's plan and schedule for the Sugar http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/31/2003 Multiple Issuance Island, Hannawa, Colton and higley Developments for the Middle Raquette River Project Order/Opinion Delegated Order Public clist=4126462 under P-2320 et al. Dam Safety Operation Report by New York Regional Office for Erie Boulevard Hydropower, LP's Middle Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/31/2003 P-2320-000 Issuance FERC Report/Study CEII Raquette River Project for the period of 8/7/02 to 4/30/03 under P-2320. Report/Operation clist=4129742 Report

18 Page 19 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Atlantic Testing Laboratories, Limited submits the Daily Concrete Report regarding the Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/24/2003 P-2320-000 Submittal Report/Form Public Highley Hydro Project under P-2320. Compliance Report clist=4128708

Order approving 2003 Annual Report pursuant to Articles 401 re Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/18/2003 Multiple Issuance Order/Opinion Delegated Order Public LP's Carry Falls Project under P-2060 et al. clist=4112241

Erie Boulevard Hydropower, LP provides the second status report on the fish movement Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/10/2003 P-2320-035 Submittal measure to be constructed as part of the Higley Redevelopment of the Middle Raquette River Report/Form Public Compliance Report clist=4116611 Project under P-2320.

Letter order accepting Erie Boulevard Hydropower, LP revised schedule for the barriers http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/3/2003 Multiple Issuance Order/Opinion Delegated Order Public installations at the projects under P-2047 et al. clist=4109592

Letter requesting Erie Boulevard Hydropower LP to provide with 30 days a plan & schedule to FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/14/2003 Multiple Issuance address items noted following the 04/28/03 through 05/04/03inspections of Middle Raquette Compliance Directives Public With Applicant clist=4105498 Project et al under P-2320 et al.

Erie Boulevard Hydropower LP, submits the 2003 Annual Report for the Carry Falls, Upper Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/16/2003 Multiple Submittal Raquette River, Middle Raquette River and Lower Raquette River Projects pursuant to Article Report/Form Public Compliance Report clist=4094799 401/402 under P-2060 et al.

Erie Boulevard Hydro Power LP's response to License Article 405 entitled Confidential Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/2003 Multiple Submittal Historic Properties Management Plan for the Four Raquette River Projects under P-2060 et Report/Form Recreational Public clist=4098336 al. Compliance Report

Environmental and Erie Boulevard Hydro Power's response to License Article 405 entitled Confidential Historic http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/2003 Multiple Submittal Report/Form Recreational Privileged Properties Management Plan for the Four Raquette River Projects under P-2060 et al. clist=4098337 Compliance Report

Erie Boulevard Hydro Power's response to License Article 405 entitled Confidential Historic http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/2003 Multiple Submittal Properties Management Plan for the Four Raquette River Projects under P-2060 et al. Drawing/Maps Drawing/Maps clist=4098443 LARGE FORMATS ONLY.Availability: Privileged

Environmental and Erie Boulevard Hydropower, LP submits its final Raquette River Recreation Plan for License http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/10/2003 Multiple Submittal Report/Form Recreational CEII Article 404 of the Carry Falls Project et al etc under P-2060 et al. clist=4093091 Compliance Report

Erie Boulevard Hydropower, LP submits its final Raquette River Recreation Plan for License Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/10/2003 Multiple Submittal Article 404 of the Carry Falls Project et al etc under P-2060 et al. LARGE FORMAT Report/Form Recreational clist=4120825 ONLY.Availability: CEII Compliance Report

Letter to Erie Boulevard Hydropower LP confirming the arrangements during the 4/3/03 FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/4/2003 Multiple Issuance conversation to conduct Inspections of the Sugar Island Development et al for the Middle Public With Applicant Correspondence clist=4095116 Raquette River Project et al under P-2320 et al. Form 80 - Licensed Erie Boulevard Hydropower, LP's FERC Form 80 - Licensed Hydropower Development Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/3/2003 Multiple Submittal Recreation Report for the Stewarts Bridge Project et al for period 3/15/02 through 3/15/03 Report/Form Public Development clist=4089775 under P-2047 et al. Recreation Report

Erie Boulevard Hydropower, LP submits Real Property Conveyance Report for year 2002 for Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/24/2003 Multiple Submittal Report/Form Public the Piney Dam Project et al under P-309 et al. Report clist=4069351

Erie Boulevard Hydropower LP advises FERC that the Piney Dam, Stewarts Bridge, and Annual Water http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/24/2003 Multiple Submittal Carry Falls Projects et al has complied with the minimum flow releases et al requirments in Report/Form Public Quality/Minimum Flow clist=4072004 calender year 2002 etc under P-309 et al.

Memo dated 12/20/02 discussing the review of the Higley Development-Powerhouse Internal Transmittal http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/20/2002 P-2320-000 Issuance Reconstruction, Middle Raquette River Project's Psedu-Dynamic analysis for new bulkhead FERC Memo Privileged Memo clist=4061204 wall under P-2320.Non-Public.

Erie Boulevard Hydropower, LP submits status on the fish movement measures to be Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/2/2002 P-2320-000 Submittal constructed as part of the Highley Redevelopment of the Middle Raquette River Project under Report/Form Public Compliance Report clist=4055808 P-2320.

Erie Boulevard Hydropower, LP's memo summarizing the field discussion between NYSDEC Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/6/2002 P-2320-000 Submittal & USFWS regarding the proposed pipeline tap project at the Sugar Island Developement for Public Correspondence nal Information clist=4051805 the Middle Raquette River Proj-2320.

19 Page 20 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Lettre order informing Erie Boulevard Hydropower, LP that the request for an extension of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/22/2002 Multiple Issuance Order/Opinion Delegated Order Public time to submit items by 11/18/02 is granted under P-2320 et al. clist=4044697

Erie Boulevard Hydropower, LP submits pseudo-dynamic analysis for the bulkhead wall Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/6/2002 P-2320-000 Submittal across the existing intake at the Higley Development-Higley Redevelopment Project re Middle Report/Form Public Compliance Report clist=4033299 Raquette River Project under P-2320.

Erie Boulevard Hydropower, LP submits its final Streamflow Monitoring Plan for the Middle Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/5/2002 P-2320-000 Submittal Report/Form Public Raquette River Proj-2320. Compliance Report clist=4029994

Letter requesting Erie Boulevard Hydropower, LP to provide within 15-days, a report of FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/3/2002 P-2320-000 Issuance Public Section 12.10(b) and any proposed modifications to the public safety plan etc under P-2320. With Applicant Correspondence clist=4031730

Letter requesting Erie Boulevard Hydropower LP to provide a plan and schedule for an FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/15/2002 Multiple Issuance inspection, evaluation and a proposal for remediation to the turbine scroll casing within 30 Compliance Directives Public With Applicant clist=4025005 days re Middle Raquette River Project et al under P-2320 et al.

Order approving annual implementation report, Article 401 re Erie Boulevard Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/30/2002 Multiple Issuance Order/Opinion Delegated Order Public under P-2060 et al. clist=4018466

Order approving annual implementation report, Article 401 re Erie Boulevard Hydropower's http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/30/2002 Multiple Issuance Order/Opinion Delegated Order Public Carry Falls Proj-2060 et al. clist=2302522

Informational Response to Senator Hillary Rodham Clinton's 6/1/02 letter on behalf of her constituent Informational Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/24/2002 P-2320-000 Issuance Theron Hogle whom is requesting FERC's expedited review and approval re the proposed Public Correspondence (Miscellaneous clist=2301677 Middle Raquette River Project under P-2320. Issuances)

Erie Boulevard Hydropower, LP submits an updated Project Schedule fof the Higley Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/12/2002 P-2320-000 Submittal Report/Form Public Development of the Middle Raquette River Project under P-2320. Compliance Report clist=4107572

Senator Hillary Clinton forwards a correspondence from International Union of Operating Congressional http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/1/2002 P-2320-000 Submittal Engineers dated 5/21/02 regarding Erie Boulevard Hydropower, LP's Middle Raquette River Other Submittal Public Submittal clist=2297739 Project for FERC's assistance or consideration under P-2320.

New York State Department of Environmental Conservation requests address changes to the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/26/2002 Multiple Submittal Pleading/Motion Procedural Motion Public service lists for Micheal Stankiewicz et al re Green Island Project et al under P-13 et al. clist=2294717

Memo discussing the review of plans & specifications Site Redevelopment re Erie Boulevard Internal Transmittal http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/30/2002 P-2320-000 Issuance FERC Memo Privileged Hydropower, LP's Upper Raquette River Project under P-2320.Non-Public. Memo clist=4025253

Order modifying & approving erosion & sediment control plan pursuant to Article 304 re Erie http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/24/2002 P-2320-028 Issuance Order/Opinion Delegated Order Public Boulevard Hydropower, LP under P-2320. clist=4000959

Order modifying and approving erosion and sediment control plan pursuant to Article 304 http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/24/2002 P-2320-028 Issuance Order/Opinion Delegated Order Public regarding Erie Boulevard Hydropower, LP under Proj-2320. clist=2280803

Letter order accepting Erie Boulevard Hydropower, LP's revisions to the Quality Control http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/24/2002 P-2320-000 Issuance Inspection Program & the revised quality control & inspection program is approved for the Order/Opinion Delegated Order Public clist=4106752 Higley Powerhouse Proj-2320.

Erie Boulevard Hydropower LP submits the coferdam design to satisfy the requirements of Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/20/2002 P-2320-000 Submittal Report/Form Public Article 302 as required by 2/12/02 Order under P-2320. Compliance Report clist=2280196

Erie Boulevard Hydropower LP submits the coferdam design to satisfy the requirements of Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/20/2002 P-2320-000 Submittal Article 302 as required by 2/12/02 Order under P-2320. LARGE FORMATS Report/Form Compliance Report clist=4208864 ONLY.Availability: Public

Erie Boulevard Hydropower, LP submits revised Quality Control and Inspection Program Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/10/2002 P-2320-000 Submittal incorporating comments received from staff re the Highley Development of the Middle Report/Form Public Compliance Report clist=2276895 Raquette River Project under P-2320.

20 Page 21 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Ltr to Erie Boulevard Hydropower, LP discussing the owner approved Temporary Constr FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/9/2002 P-2320-000 Issuance EAP, Quality Control & Inspection Program & manufactures info for the precast concrete wall Public With Applicant Correspondence clist=2276597 units for constr of the Middle Raquette Proj Redevel of Highley Devel.

Memo dated 05/06/02 discussing plan & specification review of the Higley Development- Internal Transmittal http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/6/2002 P-2320-000 Issuance Powerhouse Redevelopement re Erie Boulevard Hydropower, LP's Middle Raquette River FERC Memo Privileged Memo clist=2275193 Project under P-2320.Non-Public.

Letter order granting Erie Boulevard Hydropower, LP's request to classify the tainter gates as http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/3/2002 Multiple Issuance Order/Opinion Delegated Order Public Category 2 for the Carry Falls Project under P-2047 et al. clist=2275256

Reliant Energy submits copies of the Department of Army permission to dredge approx 5800 Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/19/2002 P-2320-000 Submittal cubic yards of material from the Raquette River pursuant to Section 10 of the Rivers & Public Correspondence Correspondence clist=4024555 Harbors Act 3 March 1899 for the Middle Raquette River Proj-2320.

Untyped during http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/18/2002 P-2320-000 Issuance Erie Boulevard Hydropower, L.P. Errata Notice Order/Opinion Public conversion clist=3137626

Errata notice to 2/13/02 Order Issuing New License regarding Erie Boulevard Hydropower, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/18/2002 Multiple Issuance Order/Opinion Delegated Order Public LP under Proj-2320. clist=2268062

Erie Boulevard Hydropower, LP submits 2002 Annual Report for the Carry Falls Project in Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/15/2002 Multiple Submittal Report/Form Public compliance with License Article 401 under P-2060 et al. Compliance Report clist=2267269

Erie Boulevard Hydropower, LP submits aperture careds of the approved exhibit drawings for http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/15/2002 Multiple Submittal Drawing/Maps Drawing/Maps CEII the Carry Falls Project et al pursuant to Article 203 etc under P-2060 et al. clist=2267826

Erie Boulevard Hydropower, LP submits the Soil Erosion and Sedimentation Control Plan and Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/12/2002 P-2320-000 Submittal Eroison Control System re the Higley Redevelopment Project to meet the requirements of Report/Form Compliance Report clist=4104279 Article 304 under P-2320. LARGE FORMAT ONLY.Availability: CEII

Erie Boulevard Hydropower, LP submits the stability analyses for the new intake structure, Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/1/2002 P-2320-000 Submittal intake abutment and the closure dam across the existing intake at the Higley Development of Report/Form Recreational Public clist=4118201 the Middle Raquette Project under P-2320. Compliance Report

Erie Boulevard Hydropower, LP submits the stability analyses for the new intake structure, Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/1/2002 P-2320-000 Submittal intake abutment and the closure dam across the existing intake at the Higley Hydro Project Report/Form Compliance Report clist=4124999 under P-2320. LARGE FORMAT ONLY.Availability: CEII

Letter to Erie Boulevard Hydropower, LP forwarding guidelines to help maintain compliance FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/28/2002 Multiple Issuance Public with the license requirements for the Middle Raquette River Project under P-2320. With Applicant Correspondence clist=2260543

Erie Boulevard Hydropower, LP submits plan & specifications for the redevelopment of the Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/27/2002 P-2320-000 Submittal Report/Form Public Higley Hydro under P-2320. Compliance Report clist=2266829

Erie Boulevard Hydropower, LP submits plans/specifications for redevelopment of the Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/27/2002 Multiple Submittal Highley Hydro, & a project schedule & the New York State Department of Environmental Report/Form Public Compliance Report clist=2704114 Conservation water quality certificate issued on 6/11/98.

Erie Boulevard Hydropower, LP submits plans/specifications for redevelopment of the Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/27/2002 P-2320-000 Submittal Highley Hydro, & a project schedule & the New York State Department of Environmental Report/Form Public Compliance Report clist=2261997 Conservation water quality certificate issued on 6/11/98.

Erie Boulevard Hydropower, LP submits its Headwater/ Tailwater curves for the Hannawa, Annual Headwater http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/24/2002 Multiple Submittal Sugar Island & Norwood Developments re the Middle Raquette River Project et al under P- Report/Form Public Benefits Compliance clist=4083893 2320 et al.

Erie Boulevard Hydropower, LP submits its classification of tainter gates as Category 1 or Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/11/2002 Multiple Submittal Report/Form Public Category 2 re the Stewarts Bridge Project under P-2407 et al. Compliance Report clist=2256224

US Fish & Wildlife Service discusses the review of the licenses recently issued by FERC for Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/26/2002 Multiple Submittal the Carry Falls et al Projects which appears to be consistent with the Settlement Offer of Other Submittal Public Submittal clist=2253469 3/13/98 etc re the Implementation Schedule under P-2320 et al.

21 Page 22 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

American Whitewater request FERC to add Kevin Colburn to their mailing list for Harris Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/22/2002 Multiple Submittal Public Project et al under P-2142 et al. Correspondence Correspondence clist=2260055

INGENCO request that Charles J Packard, 2250 Dabney Road, Richmond Va 23230 be http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/20/2002 Multiple Submittal removed from the mailing list applicable to Hydropower Projects in the State of Washington Pleading/Motion Procedural Motion Public clist=2260052 under P-719.

Untyped during http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/13/2002 P-2320-000 Issuance Erie Boulevard Hydropower, L.P.. 98 FERC 61,149;Order Issuing New License Order/Opinion Public conversion clist=3134728

Commission http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/13/2002 Multiple Issuance Order issuing new license regarding Erie Boulevard Hydropower, LP under P-2320. Order/Opinion Public Order/Opinion clist=2245571

Order approving settlement offer and issuing new license re Erie Boulevard Hydropower, LP Commission http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/13/2002 Multiple Issuance Order/Opinion Public under P-2330 et al. Order/Opinion clist=2245546

Letter forwarding the fully executed Amendment to the 1996 Programmatic Agreement for the FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/12/2002 Multiple Issuance Public Carry Falls Proj-2060 et al. With Applicant Correspondence clist=2245149

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/11/2002 Multiple Submittal Erie Boulevard Hydropower, LP submits a list of projects under P-2060 et al. Report/Form Public Compliance Report clist=2244656

Advisory Council on Historic Preservation submits fully executed amendments to the 1996 Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/11/2002 Multiple Submittal Other Submittal Public Programmatic Agreement for Carry Falls Project et al under P-2060. Submittal clist=2245908

Comments of the Adirondack Mountain Club on the draft amended programmatic agreement http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/7/2002 P-2320-000 Submittal Comments/Protest Comment on Filing Public for historic properties to Appendix A, Section VI re Middle Raquette Project under P-2320. clist=2248512

The Advisory Council on Historic Preservation requests that FERC provide a copy of the Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/7/2002 Multiple Submittal Programmatic Agreement to the New York State Historic Preservation Officer, et al re the Other Submittal Public Submittal clist=2244494 Carry Falls Projects et al under P-2060 et al. Informational Letter thanking Arizona Public Service Company & Cascade River Hydro et al for participatinf Informational Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/6/2002 Multiple Issuance Public in the December 11-12, 2001, hydro licensing status workshop under AD02-5 et al. Correspondence (Miscellaneous clist=2243468 Issuances) Summary of January 24, 2002 telephone conference between US Department of the Interior Telephone http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/30/2002 Multiple Issuance et al & FERC to discuss concerns re consultation with the St Regis Mohawk Tribe for the FERC Memo Conversation or Public clist=2241842 Carry Falls Pooject et al under P-2060 et al. Electronic Mail Memo

Erie Boulevard Hydropower, LP advises FERC that there have no conveyances of real Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/23/2002 Multiple Submittal property interests during the calendar year, 2001 re Stewarts Bridge Project et al under P- Report/Form Public Report clist=2245025 2047 et al. Memoranda of Niagara Mohawk Pwr Corp submits the draft amended programmatic agreement among the Agreement/Understand Understanding(MOU)/ http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/23/2002 Multiple Submittal Commission, The Advisory Council on historic Preservation, and The New York State Historic Public ing/Contract Memoranda of clist=2239474 Preservation Officer for Managing Properties etc udner P-2645 et al. Agreement (MOA) Summary of the January 18, 2002 teleconference between US Department of the Interior, Telephone http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/18/2002 Multiple Issuance Advisory Council on Historic Preservation et al and Erie Boulevard Hydropower, LP re the FERC Memo Conversation or Public clist=2245196 Carry Falls Project et al under P-2060 et al. Electronic Mail Memo

Notice of teleconference to be held on 1/24/02 re Erie Boulevard Hydropower, LP under P- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/18/2002 Multiple Issuance Notice Formal Notice Public 2060 et al. clist=2238168

Letter to Domtar Maine Corp forwarding summary of some of the requirements (primarily from FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/10/2002 Multiple Issuance Public Parts 8 and 12 of the FERC Regulations) for the Wood Mill Projectet al under P-7254 et al. With Applicant Correspondence clist=2275983

US Department of Interior comments relating to the Raquette River Projects relicensing, Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/10/2002 Multiple Submittal Other Submittal Public Carry Falls Project et al under P-2060 et al. Submittal clist=2235812

22 Page 23 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Notice of the teleconference scheduled for 1/18/02 re Erie Boulevard Hydropower, LP under http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/10/2002 Multiple Issuance Notice Formal Notice Public P-2060 et al. clist=2235688

American Whitewater requests that FERC add Kevin colburn to the mail list for all notices http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/7/2002 Multiple Submittal Pleading/Motion Procedural Motion Public pertaining to FERC projects under P-2142 et al. clist=2249779

Draft Amended Programmatic Agreement among the Federal Energy Regulatory Settlement Agreement Agreement/Understand http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/11/2001 Multiple Submittal Commission, the Advisory Council on Historic Preservation, & the New York State Historic (Stipulation and Public ing/Contract clist=2229139 Preservation Officer etc under P-2320 et al. Agreement)

Transcript of December 11,2001 workshop in Washington DC re Hydro Licensing Status Conference/Meeting http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/11/2001 Multiple Issuance Transcript Public Workshop & Erie Boulevard Hydropower LP under AD02-5 et al. Pp 1-11. Transcript clist=2231602

Department of the Interior's supplemental response in opposition to motion of Erie Boulevard Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/5/2001 P-2320-000 Submittal Other Submittal Public for bifurcation of order amending license under P-2320. Submittal clist=2228569

Letter order accepitng Orion Power New York's 10/24/01 revised Public Safety Plan, as http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/3/2001 Multiple Issuance satisfying the requirements of Section 12.4 of FERC's Regulations re Middle Raquette River Order/Opinion Delegated Order Public clist=4120553 Project et al under P-2320 et al.

American Whitewater request that Risa Shirmoda's name be removed from docket P-2385, P- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/16/2001 Multiple Submittal Pleading/Motion Procedural Motion Public 2342 of P-2320 on the official mailing list under P-2385 et al. clist=2250464

Notice of Hydro licensing status workshop re Arizona Public Service Company et al under P- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/8/2001 Multiple Issuance Notice Formal Notice Public 2069 et al. clist=2222714

Advisory Council on Historic Preservation requests FERC consider amending the 1996 Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/5/2001 Multiple Submittal Programmatic Agreement to afford the St Regis Mohawk Tribe et al an opportunity to Other Submittal Public Submittal clist=2240977 participate in the development & implementation of its terms under P-2060 et al.

Letter informing Orion Power New York that their plan & schedule adequately address items FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/31/2001 Multiple Issuance of concern in response to FERC's 8/2/01 inspection follow-up letter for the Sugar Island Proj- Public With Applicant Correspondence clist=4035440 2320 et al.

Erie Boulevard Hydropower, LP certifies that during the period from 10/1/00 to 9/30/01 the Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/30/2001 Multiple Submittal Report/Form Public attached report constities the gross amount of power generated under P-2047 et al. Compliance Report clist=2220833

Erie Boulvard Hydropower, LP submits a notice of the covening of a conference for the week Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/29/2001 P-2320-005 Submittal of November 26, 2001, to address the remaining issues for the Higley rehabilitation activities Public Correspondence Correspondence clist=2235494 re Middle Raquette River Project under P-2320.

Erie Boulevard Hydropower, LP submits an update regarding the operational status of the Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/29/2001 P-2320-005 Submittal Public Highley Development et al under P-2320. Correspondence Correspondence clist=2221022

Erie Boulevard Hydropower, LP informs that the safety sign at the powerhouse tailrace was Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/24/2001 Multiple Submittal replaced on 9/7/01 & submits a public safety plan drawing for the Middle Raquette River Report/Form Public Compliance Report clist=2704001 Project et al under P-2320 et al. Dam Safety Operation Report, by NYRO for Erie Boulevard Hydropower LP's Middle Raquetter River Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/22/2001 P-2320-000 Issuance Project, P-2320-NY for the period 1999 August 11 to 2000 August 28 and from 2000 August FERC Report/Study CEII Report/Operation clist=2224872 30 to 2001 July 27 Report

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/3/2001 Multiple Submittal Comment on Filing of US Department of the Interior under P-2060 ET AL. Comments/Protest Comment on Filing Public clist=2212534

Letter order denying Orion Power NY's request for a reclassification to Category 2 for tainter http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/28/2001 Multiple Issuance Order/Opinion Delegated Order Public gates under P-2047 et al. clist=2245047

Letter thanking interested parties for their participation in the working task group to develpop FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/21/2001 Multiple Issuance Public a Performance Monitoring Program under P-13 et al With Applicant Correspondence clist=2247937

23 Page 24 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Order denying rehearing of FERC's July 13, 2001 order re Appalachian Power Co et al under Commission http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/12/2001 Multiple Issuance Order/Opinion Public P-1982 et al. Order/Opinion clist=2206922

Letter informing that FERC finds no need to amend either the existing Programmatic FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/10/2001 Multiple Issuance Agreement or the current appendices for the Upper Raquette River Project et al under P- Public With Applicant Correspondence clist=2206585 2060 et al.

Erie Boulevard Hydropower, LP submits report entitled Results of Slope Stability Analysis, Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/6/2001 P-2320-000 Submittal Report/Form Public Hannawa Canal Dike etc regarding the Middle Raquette Proj-2320. Compliance Report clist=2278280

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/31/2001 Multiple Submittal Comment on Filing of US Department of the Interior under P-2060 et al. Comments/Protest Comment on Filing Public clist=2204284

Advisory Council on Historic Preservation advises FERC that they will participate in the Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/29/2001 P-2320-000 Submittal Other Submittal Public consultation re Erie Boulevard, LP'e Middle Raquette River Project under P-2320. Submittal clist=2210342

Advisory Council on Historic Preservation provides comments regarding the Carry Falls, Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/29/2001 Multiple Submittal Other Submittal Public Upper Raquette, Middle Raquette and Lower Raquette Projects under P-2060 et al. Submittal clist=2205592

Comments of St Regis Mohawk Tribe urging FERC to amend the PA with generic language http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/28/2001 Multiple Submittal that would ensure Tribal consultation & concurrence in the development of CRMPs & Comments/Protest Comment on Filing Public clist=2205442 appendices for all the remaining unlicensed projects under P-26D et al.

Letter requesting comments from St Regis Mohawk Tribe et al regarding the summary of the FERC Correspondence Request for Additional http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/16/2001 Multiple Issuance Public July 31, 2001 meeting with the St Regis Mohawk Tribe under P-2060 et al. With Applicant Information clist=2199493

Erie Boulevard Hydropower, LP requests that the Commission waive Rule 213 of its Rules of Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/16/2001 P-2320-000 Submittal Practice and Procedure and convene a meeting of the parties at its earliest convenience for Public Correspondence Correspondence clist=2200227 the purpose of discussing any substantive evidence etc P-2320.

US Department of the Interior Office of the Solicitor's response in opposition to Erie Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/1/2001 P-2320-005 Submittal Other Submittal Public Boulevard's motion to bifurcate re the Middle Raquette River Project under P-2320. Submittal clist=2194266

Motion of Erie Boulevard Hydropower, LP for bifurcation of license proceeding and issuance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/17/2001 P-2320-005 Submittal of order amending license to authorize redevelopment pertaining to the Middle Raquette Pleading/Motion Procedural Motion Public clist=2190339 River Project under P-2320.

Erie Boulevard Hydropower LP submits the Tainter Gate Initiative Electrical Testing/Category Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/16/2001 Multiple Submittal Evaluation Reclassification for the Spier Falls, Prospect, Bennetts Bridge Projects et al uinder Report/Form Public Compliance Report clist=4106201 P-2047 et al.

Letter to Orion Power New York confirming the inspection rescheduling arrangements made FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/11/2001 Multiple Issuance during a telephone conversation of 7/5/01with Thomas Skutnik concerning the 7/24-7/27/01 Public With Applicant Correspondence clist=4108266 re the Middle Raquette River Proj-2320 et al.

Letter order informing Erie Boulevard Hydropower, LP that the proposal to submit the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/25/2001 Multiple Issuance documentation by July 16,2001 for the Category 2 classification for those Tainter gates not Order/Opinion Delegated Order Public clist=2256111 already recommended for Category 2 is acceptable under P-2047 et al.

Notice of meetings schedule for 7/30/01 & 6/31/01 to discuss issues arising under Section http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/22/2001 Multiple Issuance Notice Formal Notice Public 106 of the National Historic Preservation Act etc re Carry Falls Project under P-2060 et al. clist=2172394

Second Comment on Filing of US Department of the Interior under p-2060 ET AL, containing http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/29/2001 Multiple Submittal Comments/Protest Comment on Filing Public sub-docket numbers in the document text. clist=2156784

Advisory Council on Historic Preservation recommend FERC host a meeting between the Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/11/2001 Multiple Submittal consulting parties including the council, the New York SHPO, the project licensee, et al re Other Submittal Public Submittal clist=2154129 Carry Falls et al under P-2060 et al.

Letter requesting Erie Boulevard Hydropower, LP to provide within 30-days, a plan & FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/10/2001 Multiple Issuance schedule for either electrical gate teating or a request for reclassification to Category 2 re Compliance Directives Public With Applicant clist=2212667 Stewart Bridge Project et al under P-2047 et al.

24 Page 25 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Notice of availability of final multiple project environmental assessment for the Carry Falls http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/18/2001 Multiple Issuance Notice Formal Notice Public Project et al re Erie Boulvard Hydropower LP et al under P-2060 et al. clist=2143644

Environmental Final Multiple Project Environmental Assessment for Raquette River Projects, Carry Falls Assessment (EA) and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/16/2001 Multiple Issuance FERC Report/Study Public Project et al under P-2060 et al. Environmental Impact clist=2143687 Statement (EIS) Letter informing Orion Power New York that the request to submit the supplement in its FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/29/2001 P-2320-000 Issuance entirety by 6/29/01 is acceptable & request that a draft copy of the PMF/IDF reassessment, is Compliance Directives Public With Applicant clist=2201448 forwarded to FERC w/in two weeks.

Letter asking Advisory Council on Historic Preservation for comments on the application to FERC Correspondence FERC http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/21/2001 Multiple Issuance renew the licensing of four projects re Erie Boulevard Hydropower, LP's Carry Falls Project et With Government Correspondence With Public clist=2135291 al under P-2060 et al. Agencies Government Agencies

Comments of the US Department of the Interior on Appendix A to Programmatic Agreement http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/9/2001 Multiple Submittal Comments/Protest Comment on Filing Public under p-2060 Et al. clist=2131507

Comments of the St Regis Mohawk Tribe on the programmatic agreement re Erie Boulevard http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/6/2001 Multiple Submittal Comments/Protest Comment on Filing Public Hydropower LP's Carry Falls Project et al under P-2060 et al. clist=2132372

Informational Letter to St Regis Mohawk Tribe forwarding a copy of the 11/27/00 transmittal providing draft Informational Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/8/2001 Multiple Issuance appendices to be added to the July 1996 Programmatic Agreement for the proposed Public Correspondence (Miscellaneous clist=2123704 relicensing of four Raquette River Projects etc,P-2060 et al. Issuances) Erie Boulevard Hydropower LP submits a short response to the comments of the US Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/1/2001 Multiple Submittal Department of the Interior et al on the proposal attach to the programmatic agreement re Public Correspondence Correspondence clist=2123689 Carry Falls Project et al under P-2060 et al.

Erie Boulevard Hydropower, LP advises FERC that they had no conveyances of real property Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/29/2001 Multiple Submittal Report/Form Public interests for the calendar year, 2000 re Stewarts Bridge Project et al under P-2047 et al. Report clist=2122594

Letter to Erie Boulevard Hydropower LP discussing license amendment under Article 2 under FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/22/2001 Multiple Issuance Public P-2320. With Applicant Correspondence clist=2141460

Comments of The Saint Regis Mohawk Tribe on FERC's November 27, 2000 letter approving http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/12/2001 Multiple Submittal Comments/Protest Comment on Filing Public Appendix A to the programmatic agreement re Carry Falls Proj-2060 et al. clist=2118029

Comments of the Department of the Interior, Office of Environmental Policy and Compliance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/12/2001 Multiple Submittal concerning the November 27, 2000, letter regarding Appendix A to the Programmatic Comments/Protest Comment on Filing Public clist=2116132 Agreement on the Raquette River Projects -P-2060, P-2084, P-2320, & P-2330

Letter informing Erie Boulevard Hydropower, LP that FERC plan to amend the license for the FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/9/2001 P-2320-024 Issuance Middle Raquette River Project to reflect as built conditions for the Higley, Colton, & Sugar Public With Applicant Correspondence clist=2131183 Island developments etc under P-2320.

Ltr advising Orion Power New York that if they incorporate FERC's comment into the Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/3/2001 Multiple Submittal proposed inspection & monitoring program FERC will accept their 12/5/01 response to the Public Correspondence Correspondence clist=2129708 9/11/00 insp follow-up letter, as satisfying their concerns etc.

Erie Boulevard Hydropower, LP submits additional information as requested concerning Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/28/2000 P-2320-024 Submittal Higley, Colton & Sugar Island Developments discrepancy between authorized capacity & Public Correspondence nal Information clist=2114003 installed capacity re Middle Raquette River Project under P-2320.

Letter to Adirondack Hydro Development Corp et al forwarding summary of some of the FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/27/2000 Multiple Issuance requirements of Part 8 and 12 of the FERC Regulations to assist in ensuring compliance with Public With Applicant Correspondence clist=2252412 the requirements under P-4244 et al.

Erie Boulevard Hydropower, LP comments on the sections in Appendix A of the Multi-Project http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/26/2000 Multiple Submittal Comments/Protest Comment on Filing Public Agreement under P-2060 et al. clist=2113995

Adirondack Mountain Club discusses the historic properties & anticipated effects of the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/21/2000 P-2320-000 Submittal Comments/Protest Comment on Filing Public Middle Raquette Proj-2320. clist=2113055

25 Page 26 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

FERC Correspondence FERC Letter to Advisory Council on Historic Preservation et al providing Sections VI et al to http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/27/2000 Multiple Issuance With Government Correspondence With Public Appendix A for the Middle Raquette River Project under P-2060 et al. clist=2106483 Agencies Government Agencies

Mass mailing to Adirondack Hydro Development Corp informing that FERC will now recognize FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/8/2000 Multiple Issuance Public two categories of Tainter gates under P-2205. With Applicant Correspondence clist=2111726

Letter requesting Erie Boulevard Hydropower, LP to submit information w/in 30 days FERC Correspondence Request for Additional http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/27/2000 P-2320-024 Issuance concerning the Sugar Island, Colton, & Higley Developments, to enable FERC to determine if Public With Applicant Information clist=2125075 the project's license needs to be amended re Middle Raquette River P-2320.

Erie Boulevard Hydropower, LP reports the gross amount of power generated during the Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/25/2000 Multiple Submittal Report/Form Public period 991001 to September 30, 2000 for Proj-2047 et al. Report clist=2099641

Letter advising Orion Power New York to respond to the corrective measures required for FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/12/2000 P-2320-000 Issuance structures on all developments etc within 60-days re Middle Raquette River Project under P- Compliance Directives Public With Applicant clist=2105354 2320.

American Rivers request changes in the service list re Bartletts Ferry Project et al under P- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/14/2000 Multiple Submittal Pleading/Motion Procedural Motion Public 485 et al. clist=2117549

Letter order accepting Erie Boulevard Hydropower, LP's revised public safety plans for the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/14/2000 P-2320-000 Issuance Order/Opinion Delegated Order Public Colton and Sugar Island Developments of the Middle Raquette River Project under P-2320. clist=2095352

Internal Transmittal http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/11/2000 P-2320-024 Issuance Discusses installed capacity discrepancy at the Middle Raquette River Proj-2320. FERC Memo Privileged Memo clist=2089099

Erie Boulevard Hydropower, LP submits revised public safety plans for the Colton & Sugar Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/5/2000 P-2320-000 Submittal Report/Form Public Island Developments of the Middle Raquette River Proj-2320. Compliance Report clist=2094283

New York State Department of Environmental Conservation request to add Micheal Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/29/2000 Multiple Submittal Other Submittal Public Stankiewicz to the service list under P-13 et al. Submittal clist=2085983

Order approving Erie Boulevard Hydropower, LP's April 28, 2000 filing of revised Exhibit G http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/28/2000 P-2320-022 Issuance Order/Opinion Delegated Order Public Drawings for Middle Raquette River Project under P-2320. clist=2084303

US Department of Interior's comments of Draft Environmental Assessment issued June Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/31/2000 Multiple Submittal Other Submittal Public 16,2000 re e Carry Falls Project et al under 2060 et al. Submittal clist=2077059

Erie Boulevard Hydropower's comments pertaining to FERC's draft multiple project Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/27/2000 Multiple Submittal Public environmental assessment for Erie's Carry Falls Proj-2060 et al. Correspondence nal Information clist=2076172

Letter order accepting Orion Power New York's April 14,2000 and May 15,2000 plan and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/27/2000 P-2320-000 Issuance schedule with exceptions and comments.Response to applicable comments due within 30 Order/Opinion Delegated Order Public clist=2082433 days under P-2320.

Saint Regis Mohawk Tribe comments on notice of availability of draft multiple project http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/24/2000 Multiple Submittal Environmental Assessment for the Raquette River & Potsdam Water Power Projects under P- Comments/Protest Comment on Filing Public clist=2075913 2084 et al.

The New York State Department of Environmental Conservation submits comments re Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/20/2000 Multiple Submittal Other Submittal Public environmental assessment of Carry Falls Project et al under P-2060 et al. Submittal clist=2075449

Letter accepting Orion Power New York's revised Public Safety Plans & requesting the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/18/2000 Multiple Issuance submission of revised public safety plans within 30 days for the Sugar Island & Colton Order/Opinion Delegated Order Public clist=2081152 Developments for the Middle Raquette River Project-2084 et al.

US Fish & Wildlife Service comments on the proposed Yellow Lampmussel survey, sent on Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/14/2000 Multiple Submittal July 7, 2000 to New York State Department of Environmental Conservation in Watertown, NY Other Submittal Public Submittal clist=2073942 to address relicensing of Middle/Lower Raquette River P-2320 et al.

26 Page 27 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Comments of Adirondack Mountain Club on the draft environmental assessments of the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/11/2000 Multiple Submittal Comments/Protest Comment on Filing Public Carry Falls Proj-2060 et al. clist=2073796

Notice of availability of draft multiple project enviornmental assessment re Erie Boulevard http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/16/2000 Multiple Issuance Notice Formal Notice Public Hydropower LP et al under P-2060 et al. clist=2065457

Environmental Draft Multiple Project Environmental Assessment for Hydropower Licenses for Raquette River Assessment (EA) and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/16/2000 Multiple Issuance FERC Report/Study Public Projects under P-2060 et al. Environmental Impact clist=2065795 Statement (EIS)

Erie Boulevard Hydropower, LP submits revised Public Safety Plans for the Stark, Blake & Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/15/2000 Multiple Submittal Report/Form Public South Developments of the Upper & Middle Raquette River Projects under P-2084 et al. Compliance Report clist=2068169

Orion Power New York informs FERC that a majority of Erie Boulevard Hydropower LP's Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/31/2000 Multiple Submittal boater safety devices have not been installed due to flow conditions preventing safe Report/Form Public Compliance Report clist=2076443 installation at many of their sites, P-8606.

Letter finding that Erie Boulevard Hydropower,LP's April 28,2000 filing for the instruments of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/31/2000 Multiple Issuance conveyance and signed acceptance sheets of paragraph (D) as amended January 13,2000 Order/Opinion Delegated Order Public clist=2075740 fulfills requirements under P-13 et al.

Erie Boulevard Hydropower, LP forwards signed acceptance sheets pursuant to FERC's Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/28/2000 Multiple Submittal Public order approving transfer of licenses etc for Proj-13 et al. Correspondence Correspondence clist=2051771

Erie Boulevard Hydropower, LP's signed acceptance sheet & bargain & sale deed with lien Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/28/2000 P-2320-021 Submittal Public convenant with Niagara Mohawk Power Corp for Proj-2320. Correspondence Correspondence clist=2051773

Erie Boulevard Hydropower LP submits revised FERC Exhibit G drawings, sheets 5A and 6A Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/24/2000 P-2320-022 Submittal Report/Form Public re Middle Raquette River Proj-2320. Compliance Report clist=2051878

Erie Boulevard Hydropower Lp submits revised FERC Exhibit G drawings, sheets 5A and 6A Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/24/2000 P-2320-022 Submittal Report/Form Public re Middle Raquette River Proj-2320. Compliance Report clist=2052714

Erie Boulevard Hydropower LP submits plan and schedule addressing each recommendation Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/2000 P-2320-000 Submittal Report/Form Public of the Seventh Inspection Report for the Middle Raquette River Proj-2320. Compliance Report clist=2051050

Erie Boulevard Hydropower,LP requests for authorization to proceed with corrections Application/Petition/Re Application To Amend http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/22/2000 P-2320-000 Submittal necessary to revise Exhibit G maps filed with application for amendment of license for Middle Public quest License or Exemption clist=2042044 Raquette River Proj-2320.

Order granting Niagara Mohawk Power Corp & Erie Boulevard Hydropower, LP extension of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/17/2000 Multiple Issuance time until April 28, 2000 for submitting certified copies of all instruments of conveyance under Order/Opinion Delegated Order Public clist=2039992 P-13 et al.

Letter requesting Erie Boulevard Hydropower LP to submit by April 16, 2000, plan and FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/14/2000 P-2320-000 Issuance schedule for designing and carry out any proposed corrective measures & addendum re Compliance Directives Public With Applicant clist=2064892 Seventh Consultant's Report for Middle Raquette River Proj-2320.

Untyped during http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/2000 P-2320-000 Issuance Erie Boulevard Hydropower, L.P.. 90 FERC 62,147; Order Amending License Order/Opinion Public conversion clist=3100522

Untyped during http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/2000 P-2320-000 Issuance Orion Power New York. Notice Of Availability Of Environmental Assessment Order/Opinion Public conversion clist=3100523

Notice of availability of Environmental Assessment re Orion Power New York's Middle http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/2000 P-2320-016 Issuance Notice Formal Notice Public Raquette River Proj-2320. clist=2034543

Order amending license re Erie Boulevard Hydropower, LP's Middle Raquette River Proj- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/2000 P-2320-016 Issuance Order/Opinion Delegated Order Public 2320. clist=2034544

27 Page 28 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Petition of Oswego,New York in DC Court of Appeals for review of FERC's 990726 Order http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/28/2000 Multiple Submittal Pleading/Motion Petition for Review Public under P-7320,et al. clist=2042812

St Lawrence County board of legislators request to make changes to the mailing list under P- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/23/2000 Multiple Submittal Pleading/Motion Procedural Motion Public 13 et al. clist=2040801

Request for Delay of Erie Boulevard request an additional extension of time to file instruments of conveyance and Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/17/2000 Multiple Submittal Action/Extension of Public acceptance sheets re transfer of licenses for P-13 et al. Correspondence clist=2030684 Time

Order granting extension of time re Niagara Mihawk Power Corporation and Erie Boulevard http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/11/2000 Multiple Issuance Order/Opinion Delegated Order Public Hydropower LP under P-13. clist=2029488

Order denying rehearing re Niagara Mohawk Power Corporation and Eric Boulevard Commission http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/11/2000 Multiple Issuance Order/Opinion Public Hydropower LP under P-13 et al. Order/Opinion clist=2029492

New York State Department of Environmental Conservation submits update of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/28/2000 Multiple Submittal Pleading/Motion Procedural Motion Public representatives on the service list re Carry Falls Project,et al under P-2060,et al. clist=2039824

Erie Boulevard Hydropower, LP wish to amend its extension request dated 991229 & make Request for Delay of Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/26/2000 Multiple Submittal revisions to EAP's, print & mail the plans to appropriate agencies, run drills & file the reports Action/Extension of Public Correspondence clist=2058284 by June 1, 2000 under P-2474 et al. Time

City of Oswego,NY submits response to Erie Boulevard Hydropower,LP's fourth requests for http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/24/2000 Multiple Submittal extension of time to submit certified copies of instruments of convenyance and accpetance Comments/Protest Comment on Filing Public clist=2024468 sheets re Green Island Proj-13 et al.

Request for Delay of Erie Boulevard Hydropower,LP request an additional extension of time until February Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/21/2000 Multiple Submittal Action/Extension of Public 28,2000 to file instruments & acceptance sheets under P-13 et al. Correspondence clist=2025077 Time

Provides Adirondack Hydro Development Corp,et al with summary of requirements of Parts 8 FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/14/2000 Multiple Issuance Public & 12 of FERC Regulations under P-4244,et al. With Applicant Correspondence clist=2028786

Order granting Niagra Mohawk Power et al an extension of time until January 26, 2000 to http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/10/2000 Multiple Issuance comply with ordering paragraph (H) of order approving transfer of licenses, etc under P-13 et Order/Opinion Delegated Order Public clist=2020414 al.

Letter order accepting Orion Power New York's plan & schedule dated 991109, in response http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/5/2000 Multiple Issuance Order/Opinion Delegated Order Public to concerns found during inspections of P-2060 et al. clist=2044984

Request for Delay of Erie Boulevard Hydropower, LP requests additional extension of time until January 26, 2000 Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/22/1999 Multiple Submittal Action/Extension of Public to file instruments of acceptances under P-13 et al. Correspondence clist=2016417 Time

Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/8/1999 Multiple Submittal Erie Boulevard Hydropower,LP submits contact person for Y2K Rollover re Proj-13,et al. Public Correspondence Correspondence clist=2039811

Order granting Erie Boulevard Hydropower, LP et al extension of time until 991226 to submit http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/24/1999 Multiple Issuance certified copies of all instruments of conveyance & signed acceptance sheets to comply with Order/Opinion Delegated Order Public clist=2008820 ordering Paragraph (H) etc under P-13 et al.

FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/23/1999 Multiple Issuance Mass mailing to Adirondack Hydro Development Corp et al re Y2K readiness matters. Public With Applicant Correspondence clist=2024199

Request for Delay of Erie Boulevard Hydropower, LP requests additional extension of time until December 26, Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/19/1999 Multiple Submittal Action/Extension of Public 1999 to file instruments of conveyance & acceptances for P-13 et al. Correspondence clist=2007998 Time

Erie Boulevard Hydropower, LP submits status of some items identified in FERC's 990708 Environmental and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/9/1999 Multiple Submittal follow-up letter re Environmental & Public Use inspection during June 22-23, 1999 at Carry Report/Form Recreational Public clist=2030933 Falls Proj-2060 et al. Compliance Report

28 Page 29 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Orion Power New York submits report of repairs performed at Higley Development in period Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/2/1999 P-2320-000 Submittal Report/Form Public of 990913 to 991014 re Middle Raquette River Proj-2320. Compliance Report clist=2029168

E-mail from Orion Power New York requesting that Jerry L Sabattis be added to service list http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/29/1999 Multiple Submittal Pleading/Motion Procedural Motion Public under P-13 et al. clist=2011055

Erie Boulevard Hydropower, LP submits gross amount of power generated under Green Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/27/1999 Multiple Submittal Report/Form Public Island Proj-13 et al. Report clist=2003297

Erie Boulevard Hydropower LP submits responsible official notification forms for Green Island Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/21/1999 Multiple Submittal Public Proj-13 et al. quest Application clist=2010920

Dam Safety Operation report of New York Regional Office re Erie Boulevard Hydropower LP's Middle Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/21/1999 P-2320-000 Issuance FERC Report/Study CEII Raquette River et al under Proj-2320 for period 980602 to 990811 . Report/Operation clist=2020469 Report

Correction to errata notice issued on 991014 order granting extension of time re Niagara http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/19/1999 Multiple Issuance Order/Opinion Delegated Order Public Mohawk Power Corp et al under P-13 et al. clist=1998840

Errata notice to order granting extension of time issued on 990930 re Niagara Mohawk Power http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/15/1999 Multiple Issuance Order/Opinion Delegated Order Public Corp et al under P-13 et al. clist=1998044

EPUI Report, by NYRO, for Erie Boulevard Hydro Inc's Middle Raquette Project P-2320-NY EPUI and Public http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/13/1999 P-2320-000 Issuance FERC Report/Study Public for the period 1992 September 23 to 1999 June 22 Safety Report clist=2005815

Erie Boulevard Hydropower LP's response to respective letters dated 990909 from US http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/13/1999 Multiple Submittal Comments/Protest Comment on Filing Public Department of Interior, Office of Environmental Policy and Compliance under P-2060 et al. clist=1997460

New York Rivers United advises of change of mailing address on all service lists re Proj-13 et Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/12/1999 Multiple Submittal Public al. Correspondence Correspondence clist=2000211

Environmental Letter advising that Commission Staff is preparing multiple project environmental assessment Assessment (EA) and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/7/1999 Multiple Issuance FERC Report/Study Public (EA) for Raquette River Projects including Carry Falls et al under P-2320 et al. Environmental Impact clist=1996309 Statement (EIS)

Orion Power New York submits confirmation of consultation with State Historic Preservation Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/5/1999 P-2320-016 Submittal Public Officer etc re Middle Raquette River Proj-2320. Correspondence nal Information clist=1997419

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/30/1999 Multiple Issuance Order granting extension of time re Niagara Mohawk Power et al under P-13 et al. Order/Opinion Delegated Order Public clist=1994421

Order granting rehearing for futher consideration re Niagara Mohawk Power Corp et al under http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/21/1999 Multiple Issuance Order/Opinion Delegated Order Public P-13 et al. clist=1991152

Request for Delay of Erie Boulevard Hydropower,LP's request for extension of time to submit Certified Copies of Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/20/1999 Multiple Submittal Action/Extension of Public Instruments of Conveyance & Acceptance Sheets under P-13 et al. Correspondence clist=1991463 Time

New York State Department of Environmental Conservation submits comments re Middle Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/14/1999 P-2320-005 Submittal Other Submittal Public Raquette River Proj-2320. Submittal clist=1991035

New York State Department of Environmental Conservation strongly urges Commission to Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/13/1999 Multiple Submittal incorporate terms of water quality certificate & settlement agreement re Lower Raquette River Other Submittal Public Submittal clist=1989824 Proj-2330 et al.

Comments of US Department of Interior on notice of application ready for environmantal Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/9/1999 P-2320-005 Submittal Other Submittal Public analysis for Middle Raquette River Hydroellectric Proj-2320. Submittal clist=1986522

29 Page 30 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/7/1999 P-2320-005 Submittal Adirondack Mountain Club submits comments re Middle Raquette River Proj-2320. Comments/Protest Comment on Filing Public clist=1986346

Motion to supplement prior motion to intervene by US Department of Interior re Niagara Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/3/1999 P-2320-005 Submittal Intervention Public Mohawk Power Corp Middle Raquette River Proj-2320. Intervention clist=1982621

Comments of DE Chauvin strongly urging FERC to approve Niagara Mohawk Power Corp's http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/31/1999 P-2320-016 Submittal Comments/Protest Comment on Filing Public Sugar Island Proj-2320 boundary amendment. clist=1983804

Comments of Lloyd A Mayville strongly urging FERC to approve Niagara Mohawk Power http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/30/1999 P-2320-016 Submittal Comments/Protest Comment on Filing Public Corp's Sugar Island Proj-2320 boundary amendment. clist=1983904

New York United & American Rivers,Inc's petition for rehearing or order approving transfer of Request for http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/25/1999 Multiple Submittal Pleading/Motion Public licenses re Niagara Mohawk Corp & Fire Boulevard Hydropower,LP under P-13 et al. Rehearing or Appeal clist=1978934

City of Oswego's request for rehearing of FERC's 990726 delegated order approving Request for http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/24/1999 Multiple Submittal auctioning & transfer of licenses & license applications re Niagara Mohawk Power Corp et al Pleading/Motion Public Rehearing or Appeal clist=1978601 under Proj-13 et al.

Letter requesting Orion Power New York to provide additional information regarding FERC Correspondence Request for Additional http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/24/1999 P-2320-016 Issuance application for non-capacity amendment to remove two parcels of non-essential project etc Public With Applicant Information clist=1996739 for Middle Raquette River Proj-2320.Due within 45 days.

Comments of JP Hassett regarding Arbuckle Acres Subdivision project boundary relocation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/20/1999 P-2320-016 Submittal Comments/Protest Comment on Filing Public etc Proj-2320. clist=1980026

Comments of JR Regan regarding Niagara Mohawk's request to have project boundary http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/20/1999 P-2320-016 Submittal Comments/Protest Comment on Filing Public change for P-2320. clist=1982033

Higley Association,Inc informs that D Sitterley Vice President used the Association to http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/16/1999 P-2320-000 Submittal advance his own agenda, & in no way represents the interests or legal intentions of Higley Comments/Protest Comment on Filing Public clist=1976658 Association etc.

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/10/1999 P-2320-016 Submittal Vendees of Arbuckle Acres Subdivison comments on boundary change re Proj-2320. Comments/Protest Comment on Filing Public clist=1982030

Comments of R Mace on behalf of Vendees of Arbuckle Acres Subdivision on lands which http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/10/1999 P-2320-016 Submittal they were contracted to purchase more than 2 years ago re Niagara Mohawk Power's Sugar Comments/Protest Comment on Filing Public clist=1976577 Island Proj-2320.

Comments of D Chauvin et al in an effort to provide one unified voice of concern re lands http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/10/1999 P-2320-016 Submittal Comments/Protest Comment on Filing Public which they contracted to purchase more than 2 years ago etc under P-2320. clist=1976568

New York State Department of Environmental Conservation advises of change of legal Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/9/1999 Multiple Submittal Other Submittal Public respresentation re Niagara Mohawk Power Corp et al's Proj-13 et al. Submittal clist=1975452

US Fish & Wildlife Services submits Federally Listed & Proposed Endangered & Threatended Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/5/1999 Multiple Submittal Other Submittal Public Species in New York re Carry Falls Reservoir Project,et al under P-2060,et al. Submittal clist=1974814

Letter to Higley Shoreowners Association discussing 990211 letter, concerning alleged FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/4/1999 P-2320-015 Issuance Public access problem involving Niagara Mohawk Power Corp's Middle Racquette Proj-2320. With Applicant Correspondence clist=1982255

Order approving transfers of licenses, partial transfer of license, and subsitution of applicants http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/26/1999 Multiple Issuance Order/Opinion Delegated Order Public re Niagara Mohawk Power Corp et al under Proj-13 et al. clist=1967595

Untyped during http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/15/1999 P-2320-000 Issuance Niagara Mohawk Power Corp.. Notice Of Application Ready For Environmental Anal Order/Opinion Public conversion clist=3089981

30 Page 31 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Notice of Niagara Mohawk Power Corp's 911224 filing of an application for new major http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/15/1999 P-2320-005 Issuance license, ready for environmental analysis & soliciting comments, recommendations, terms & Notice Formal Notice Public clist=1964312 conditions, & prescriptions re Middle Raquette River Proj-2320.

Letter requesting Niagara Mohawk Power Corp to submit plan & Schedule to resolve FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/8/1999 Multiple Issuance Compliance Directives Public upstream warning signs under P-2060 et al,within 21 days. With Applicant clist=1964789

Letter to US Fish & Wildlife Service discussing effects of Niagara Mohawk Power Corp's FERC Correspondence FERC http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/29/1999 Multiple Issuance proposed Raquette River Hydroelectric Projects on threatened or endangered species & their With Government Correspondence With Public clist=1961020 critical habitats under P-2060 et al. Agencies Government Agencies

Dick Sitterley submits response to Niagara Mohawk Power's 990526 letter re right of way at http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/19/1999 Multiple Submittal Comments/Protest Comment on Filing Public Proj-2320. clist=1957758

US Department of Interior submits comments on application for amendment of license for the Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/11/1999 Multiple Submittal Other Submittal Public Middle Raquette River Hydroelectric Proj-2320. Submittal clist=1956216

Motion to intervene & for clarification of Fourth Branch Associates (Mechanicville) re Niagara Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/11/1999 Multiple Submittal Intervention Public Mohawk Power Corp,et al under P-13,et al. Intervention clist=1955730

City of Oswego,NY's motion to intervene, protest & request for other relief including recission Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/9/1999 Multiple Submittal of licenses, dismissal of notices of intent & commencement of competitive licensing Intervention Public Intervention clist=1954734 proceedings re Niagara Mohawk Power Corp,et al in P-13,et al.

US Department of Interior's motion to intervene in opposition, protest, & comments re Niagara Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/8/1999 Multiple Submittal Intervention Public Mohawk Power Corp et al under P-2641 et al. Intervention clist=1953994

Motion of New York River United to intervene in partial opposition to applications for transfer Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/7/1999 Multiple Submittal Intervention Public of licenses of Proj-13 et al. Intervention clist=1953894

New York State Department of Environmental Conservation re Petition for intervention of Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/4/1999 Multiple Submittal Intervention Public Niagara Mohawk Power Corp et al under P-13 et al. Intervention clist=1953997

Niagara Mohawk Power Corp submits comments regarding proposed amendment of the Application/Petition/Re Application To Amend http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/2/1999 Multiple Submittal Higley Development's Project Boundary for Area 2 for the Middle Raquette River Proj-2320 et Public quest License or Exemption clist=1952308 al.

Niagara Mohawk Power Corp submits Addendum #2 Specification for 99-011 for Wheel Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/28/1999 Multiple Submittal Flume Gate Replacement at Highley Hydro Development in St Lawrence County,NY dated Report/Form Public Compliance Report clist=2701215 May 1999 under P-2330,et al.

Niagara Mohawk Power Corp submits Addendum #2 Specification for 99-011 for Wheel Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/28/1999 Multiple Submittal Flume Gate Replacement at Highley Hydro Development in St Lawrence County,NY dated Report/Form CEII Compliance Report clist=1953149 May 1999 under P-2330,et al.

Niagara Mohawk Power Corp's response to FERC's 990326 letter seeking additional Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/26/1999 P-2320-015 Submittal Public information re Middle Raquette River Proj-2320. Correspondence nal Information clist=1954267

Dam Safety Operation Report of New York Regional Office re Niagara Mohawk Power Corp's Sugar Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/21/1999 P-2320-000 Issuance FERC Report/Study CEII Island Development,et al for Middle Raquette River Proj-2320 for period 970909 to 980602. Report/Operation clist=1956882 Report

Untyped during http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/13/1999 P-2320-000 Issuance Niagara Mohawk Power Corp.. Notice Of Application For Amendment Of Project Bou Order/Opinion Public conversion clist=3086577

Notice of Niagara Mohawk Power Corp's 990415 filing of application for an amendment of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/13/1999 Multiple Issuance license to revise project boundary, soliciting comments, motions to intervene, & protests re Notice Formal Notice Public clist=1947594 Middle Raquette River Hydroelectric Proj-2320.

Notice of Niagara Mohawk Power Corp et al 990208 tranfer of licenses for Proj-13 et al and http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/5/1999 Multiple Issuance Notice Formal Notice Public soliciting comments, motions to intervene and protests. clist=1944762

31 Page 32 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

New York Rivers United's petition for intervention re Niagara Mohawk Power Corp,et al's Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/3/1999 P-2320-005 Submittal Intervention Public Middle Raquette River Hydroelectric Proj-2320. Intervention clist=1944877

Hudson River Power Transmission Co discusses joint petition of Niagara Mohawk Power http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/30/1999 Multiple Submittal Corp et al for authority under Public Service Law Section 70 to transfer certain generating Comments/Protest Comment on Filing Public clist=1946044 assets & for related approvals re Proj-13 et al.

Transfer of Niagara Mohawk Power Corp et al submits amended joint application for approval of transfer Application/Petition/Re http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/1999 Multiple Submittal Hydropower License Public of licenses & exemptions, partial transfer of licenses etc re Proj-13 et al. quest clist=1937766 or Exemption

Transfer of Niagara Mohawk Power Corp et al submits amended joint application for approval of transfer Application/Petition/Re http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/1999 P-2320-005 Submittal Hydropower License Public of licenses & exemptions etc under P-2320. quest clist=1938024 or Exemption

Niagara Mohawk Power Corp's application for non-capacity amendment of license to the Application for Application/Petition/Re http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/13/1999 P-2320-016 Submittal Middle Raquette River Power Proj-2320, amendment to project boundary of Highley Change in Land & Public quest clist=1938028 Development to exclude 2 areas of land from project boundary. Water Rights

New York Department of Environmental Conservation informs of no objection to proposed Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/12/1999 P-2320-000 Submittal Other Submittal Public changes in license boundary re Middle Raquette River Proj-2320. Submittal clist=1940341

Transfer of Niagara Mohawk Power Corp and Erie Boulevard Hydropower LP submits copies of the joint Application/Petition/Re http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/2/1999 Multiple Submittal Hydropower License Public transfer application for Proj-13 et al. quest clist=1934347 or Exemption

Letter to Niagara Mohawk Power Corp to submit documentation in transfer proceeding FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/30/1999 Multiple Issuance showing that Fourth Branch et al are co-applicants to transfer application in Project 6032 et al Deficiency Letter Public With Applicant clist=1936321 etc within 30 days under P-13.

Letter requesting Niagara Mohawk Power Corp to provide site-specific information that FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/26/1999 P-2320-015 Issuance addresses trespassing allegations raised in Dick Sitterley's 990216 letter w/in 30 days re Compliance Directives Public With Applicant clist=1934181 Middle Racquette Proj-2320.

US Fish & Wildlife Service advises that they do not oppose alteration of Middle Raquette Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/18/1999 P-2320-000 Submittal Other Submittal Public River Proj-2320 boundary. Submittal clist=1933937

Dick Sitterley submits comments on proposed Niagara Mohawk River Project-2320 in the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/11/1999 Multiple Submittal Comments/Protest Comment on Filing Public town of Colton, St. Lawrence County, New York. clist=1922965

Niagara Mohawk Power Corp responds to FERC's 990208 letter re dam rehabilitation & Other Dam Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/10/1999 P-2320-000 Submittal Report/Form CEII tainter gate refurbishment at Middle Raquette River Proj-2320. Report clist=1923358

Joint application of Niagara Mohawk Power Corp & Erie Boulevard Hydropower,LP for Transfer of Application/Petition/Re http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/8/1999 Multiple Submittal approval of transfer of licenses & exemptions, partial transfer of licenses & substitution under Hydropower License Public quest clist=1921898 ER99-1764, P-13 et al. or Exemption

Letter order authorizing Niagara Mohawk Power Corporation to start gate installation after http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/5/1999 P-2320-000 Issuance Order/Opinion Delegated Order Public making necessary modifications to gate design re Sugar Island Project-2320. clist=1923251

Niagara Mohawk Power Corp submits tainter gate design report consisting of design Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/22/1999 P-2320-000 Submittal calculations w/installation drawing by Steel-Fab, Inc of Fitchburg re Colton Development of Report/Form Public Compliance Report clist=2700842 Middle Raquette River Proj-2320.

Niagara Mohawk Power Corp submits tainter gate design report consisting of design Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/22/1999 P-2320-000 Submittal calculations w/installation drawing by Steel-Fab, Inc of Fitchburg re Colton Development of Report/Form CEII Compliance Report clist=1919798 Middle Raquette River Proj-2320.

Ltr advising Nigara Mohawk Power that FERC concurs with proposed emergency operating FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/20/1999 P-2320-000 Issuance procedures for lifting temporary steel sheetpile bulkhead in event of high flood flow event as Public With Applicant Correspondence clist=1919078 tainter gate was removed for replacement at Proj-2320.

Letter advising Niagara Mohawk Power Corp of no objection to proposal to replace Tainter FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/13/1999 P-2320-000 Issuance Public Gate at Colton development of Middle Raquette Proj-2320. With Applicant Correspondence clist=1918692

32 Page 33 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Niagara Mohawk Power Corp responds to St Regis Mohawk Tribe's 981202 letter re Raquette Applicant General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/11/1999 Multiple Submittal Public River Projects under P-2060 et al. Correspondence Correspondence clist=1914168

Niagara Mohawk Power submits additional information re new dam rehabilitation & tainter Annual Spill Gate http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/6/1999 P-2320-000 Submittal Report/Form CEII gate refurbishment re Middle Raquette River Proj-2320. Testing Report clist=1918324

Letter providing Adirondack Hydro Development Corp et al with summary of some FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/16/1998 Multiple Issuance Public requirements of Parts 8 & 12 of FERC Regulations for Proj-4244 et al. With Applicant Correspondence clist=1908096

FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/11/1998 Multiple Issuance Mass mailing regarding Y2K and water control and conveyance issues. Public With Applicant Correspondence clist=1907844

US Dept of Interior Bureau of Indians Affairs submits comments on settlement offer for the Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/3/1998 Multiple Submittal Other Submittal Public Carry Falls Proj et al under P-2060 et al. Submittal clist=1904383

Ltr order granting Niagara Mohawk Power's 980922 request for extension of time under P- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/29/1998 Multiple Issuance Order/Opinion Delegated Order Public 2320 et al. clist=1887238

Comments of LH Turner concerning condition of boat ramp at north end of Carry Falls http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/17/1998 Multiple Submittal Reservoir, located at Niagara Mohawk Power Corp's Sugar Island Proj-2320, Middle Comments/Protest Comment on Filing Public clist=1885328 Raquette River, St Lawrence County, NY.

Niagara Mohawk Power Corp submits addl info concerning new lic applications w/FERC for Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/4/1998 Multiple Submittal Public relicensing of Carry Falls Proj-2060 et al. Correspondence nal Information clist=1884068

Comments of US Bureau of Indian Affairs on applications for relicensing & settlement Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/24/1998 Multiple Submittal Other Submittal Public agreement re Carry Falls Proj-2060 et al. Submittal clist=1880585

Ltr approving Niagara Mohawk Power Corp's request to start cofferdam installation at http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/17/1998 P-2320-000 Issuance Order/Opinion Delegated Order Public proposed dam rehabilitation of Colton Dam under P-2320. clist=1877771

Ltr requesting original document submittals for the purpose of RIMS scanning process under FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/11/1998 Multiple Issuance Public P-4244, et al. With Applicant Correspondence clist=1876718

Niagara Mohawk Power Corp request that operating inspections sched for August be delayed Request for Delay of Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/7/1998 Multiple Submittal until September, after completion of auction site visit re Franklin Falls Proj et al under P-13 et Action/Extension of Public Correspondence clist=1876157 al. Time

Discusses review of plans & specifications for dam rehabilitation & Unit #1 & #2 turbine valve Internal Transmittal http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/3/1998 P-2320-000 Issuance FERC Memo Public installation at Colton Development of Middle Raquette River Proj-2320. Memo clist=1874322

Niagara Mohawk Power Corp submits info concerning quarterly progress rept on hearings Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/23/1998 Multiple Submittal before NY State Dept of Environmental Conservation (NYSDEC) on denial of Sect 401 water Public Correspondence nal Information clist=1871628 quality appl for EJ West Proj-2318 et al, "Class of 1993" projects.

Niagara Mohawk Power Corp submits plans & specifications for dam rehab and turbine valve Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/14/1998 P-2320-000 Submittal Report/Form Public installation re Middle Raquette River Proj-2320. Compliance Report clist=2700385

Niagara Mohawk Power Corp submits plans & specifications for dam rehab and turbine valve Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/14/1998 P-2320-000 Submittal Report/Form CEII installation re Middle Raquette River Proj-2320. Compliance Report clist=1878074

Niagara Mohawk Power Corp submits 401 water quality certification for (Middle) Raquette Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/23/1998 P-2320-005 Submittal Report/Form Public River Proj-2320. Compliance Report clist=1862147

Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/5/1998 Multiple Submittal Niagra Mohawk Power Corp submits general review of tainter gate design under P-2047 et al. Report/Form Public Compliance Report clist=1860478

33 Page 34 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Ltr granting Niagara Mohawk Power Corp extension of time until 980605 to submit response http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/1/1998 Multiple Issuance Order/Opinion Delegated Order Public to tainter gate initiative for Proj-2047 et al. clist=1850435

Niagara Mohawk Power Corp et al submits settlement offer along w/separate explanatory Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/22/1998 Multiple Submittal Public statement re new lic appl for Middel Raquette River Proj-2320 et al. Correspondence nal Information clist=1845587

Niagara Mohawk Power Corp submits report on flooding experienced in January 1998 at Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/16/1998 Multiple Submittal Report/Form Public Black River Basin et al under P-2538 et al. Compliance Report clist=1847129

Request for Delay of Niagara Mohawk Power Corp requests extension of time to 980605 to submit response to Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/3/1998 Multiple Submittal Action/Extension of Public concerns re tainter gate initiative for Proj-2047 et al. Correspondence clist=1846970 Time

Delegated ltr order granting Niagara Mohawk Generation Business Group extension of time http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/3/1998 Multiple Issuance Order/Opinion Delegated Order Public until 980416 in preparing the report on January 1998 flood under P-2060, et al. clist=1844415

Ltr advising Niagara Mohawk Power that regulations temporarily suspended by 980227 ltr are FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/1/1998 Multiple Issuance now waived & of modification of new schedule per applications for Stewart Proj et al under P- Compliance Directives Public With Applicant clist=1844961 2047 et al.

Request for Delay of Niagara Mohawk Power Corp requests further extension of time until 980416 to file report on Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/30/1998 Multiple Submittal Action/Extension of Public January 1998 flood at Proj-2060 et al. Correspondence clist=1841230 Time

Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/5/1998 Multiple Submittal Niagara Mohawk Power Corp submits quarterly progress report re E.J.West Proj-2318,et al. Public quest Application clist=1831517

Dam Safety Operation rept re Niagara Mohawk Power Corp,Sugar Island,Hannawa,Colton & Higley Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/4/1998 P-2320-000 Issuance FERC Report/Study CEII Devels of Middle Raquette River Proj for period 960828 to 970909 under P-2320. Report/Operation clist=1840242 Report

Ltr granting Niagara Mohawk Power Corp extension of time to 980330 to submit repts on http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/12/1998 Multiple Issuance Order/Opinion Delegated Order Public January 1998 flood re Carry Falls Proj-2060 et al. clist=1828157

Request for Delay of Niagara Mohawk Power Corp requests extension of time in which to submit report on January Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/11/1998 Multiple Submittal Action/Extension of Public 1998 flood at Proj-2060 et al. Correspondence clist=1831540 Time

Informs Niagara Mohawk Power Corp that FERC will require review of design FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/3/1998 Multiple Issuance criteria,insp,maintenance, & lubrication procedures for all tainter gates at high/significant Public With Applicant Correspondence clist=1823940 hazard potential dams re Stewarts Bridge Proj-2047 et al.

Ltr requesting Niagara Mohawk Power Corp to provide report on January 7-12, 1998 flood FERC Correspondence http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/20/1998 Multiple Issuance Compliance Directives Public event etc at Carry Falls Proj-2060 et al w/in 30 days. With Applicant clist=1819549

Ltr submitting to Adirondack Hydro Development Corp summary of requirement of Parts 8/12 FERC Correspondence General http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/5/1998 Multiple Issuance Public of FERC Regulations to assist in ensuring compliance under P-4244 et al. With Applicant Correspondence clist=1828544

Niagara Mohawk Power Corp submits quarterly progress rept on hearings before NYSDEC Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/5/1997 Multiple Submittal Report/Form Public on denial of Sect 401 Water Quality Certif appls for E.J. West Proj-2318 et al. Compliance Report clist=1806380

Ltr order granting Niagara Mohawk Generation Business Group to proceed w/installation of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/31/1997 P-2320-005 Issuance Order/Opinion Delegated Order Public rubber dam at Colton Dam Proj-2320. clist=1799521

Niagara Mohawk Generation Business Group responds to 970822 ltr re installtion of rubber Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/7/1997 P-2320-005 Submittal Public dam flashboards for Middle Raquette River Proj-2320 of Colton Development. Correspondence nal Information clist=1794682

Niagara Mohawk Generation Business Group submits crack monitoring repts re Middle Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/16/1997 P-2320-000 Submittal Report/Form Public Raquette River Proj-2320. Compliance Report clist=1831541

34 Page 35 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Niagara Mohawk Power Corp submits quarterly progress rept on hearings before NYSDEC Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/5/1997 Multiple Submittal Report/Form Public on denial of Sect 401 Water Quality Certif appl for EJ West Proj-2318 et al. Compliance Report clist=1783611

Niagara Mohawk Power Corp submits manufacturer's drawings (Bridgestone Engineered Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/18/1997 P-2320-005 Submittal Product) & design rept entitled "Installation of Rubber Dam Flashboards" etc for Middle Report/Form Public Compliance Report clist=2700005 Raquette River Proj-2380.

Niagara Mohawk Power Corp submits manufacturer's drawings (Bridgestone Engineered Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/18/1997 P-2320-005 Submittal Product) & design rept entitled "Installation of Rubber Dam Flashboards" etc for Middle Report/Form CEII Compliance Report clist=1780017 Raquette River Proj-2380.

Ltr authorizing Niagara Mohawk Power Corp to proceed w/constr of pipeline improvements & http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/9/1997 P-2320-005 Issuance Order/Opinion Delegated Order Public repairs at Raquette River-Sugar Island Devel under P-2320. clist=1768930

Niagara Mohawk Power Corp submits Quarterly Progress Reports on the Denial of Section Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/6/1997 Multiple Submittal Report/Form Public 401 Water Quality Certification under P-2318 et al. Compliance Report clist=1755255

Niagara Mohawk Power Corp submits plans & specifications for modifications to steel Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/28/1997 P-2320-005 Submittal pipeline to restore pipe shell roundness, repairs to anchors blocks etc re Middle Raquette Report/Form Public Compliance Report clist=1770219 River Proj-2320.

Advises Niagara Mohawk Power Corp of holding of process of cases for 9 month period to FERC Correspondence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/28/1997 Multiple Issuance Public allow settlement discussions to proceed w/o distractions etc re P-2318. With Applicant II Conversion clist=196507

Niagara Mohawk Power requests that Village of Potsdam be required to conduct addl Application/Petition/Re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/24/1997 Multiple Submittal scientific studies for West Dam Proj, P-11289, due to impact on Middle Raquette Proj, P- Public quest II Conversion clist=193488 2320

Niagara Mohawk Power Corp provides status of Section 401 water quality certification Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/11/1997 Multiple Submittal Public proceedings for Allen Falls Proj et al under P-2318 et al. Correspondence II Conversion clist=192742

Form 80 - Licensed Niagara Mohawk Power Corp forwards FERC Form 80,recreation report for Hoosic River Proj- Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/1/1997 Multiple Submittal Report/Form Public 2616 et al. FORM 80 Development clist=195885 Recreation Report Form 80 - Licensed Niagara Mohawk Power Corp's FERC Form 80,recreation report for Blake Development et al Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/24/1997 P-2320-000 Submittal Report/Form Public at Middle Raquette River Proj-2320. FORM 80 Development clist=195897 Recreation Report

Ltr notice requesting Niagara Mohawk Power Corp to advise w/in 30-days, when it expects http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/14/1997 Multiple Issuance Notice Formal Notice Public state to act on Sect 401 WQC proceedings re EJ West Proj-2318 et al. clist=196184

Niagara Mohawk Power Corp submits quarterly progress rept responding to FERC's 921210 Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/3/1997 Multiple Submittal Public ltr re Sect 401 Water Quality Certif Appls for E.J. West Proj-2318,et al. Correspondence II Conversion clist=183011

Niagara Mohawk Power Corp submits quarterly progress report of Section 401 Water Quality Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/27/1996 Multiple Submittal Public Cert Appls re EJ West Proj-2318 et al. Correspondence II Conversion clist=158412

Niagara Mohawk Power submits quarterly progress rept on hearings before NYSDEC on Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/29/1996 Multiple Submittal Public denial of Section 401 water certification appl for EJ West & 6 other projs, P-2318 et al Correspondence II Conversion clist=136164

Memoranda of Advisory Council on Historic Preservation submits executed prgrammatic agreement for 14 Agreement/Understand Understanding(MOU)/ http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/26/1996 Multiple Submittal Public hydroelec projs in Upstate New York, P-2645 et al. ing/Contract Memoranda of clist=128879 Agreement (MOA) Memoranda of PA among FERC et al for managing historic properties that may be affected by lic issuing to Agreement/Understand Understanding(MOU)/ http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/23/1996 Multiple Submittal Public niagara Mohawk Power Corp for continued operation of 14 Hydroelec Projs. ing/Contract Memoranda of clist=124526 Agreement (MOA) Memoranda of Programmatic Agreement w/FERC et al for managing historic properties etc re Beaver River Agreement/Understand Understanding(MOU)/ http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/3/1996 Multiple Submittal Public Proj #2645 et al. ing/Contract Memoranda of clist=158519 Agreement (MOA)

35 Page 36 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Niagara Mohawk Power Corp submits plans & specifications to perform repairs to anchor Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/17/1996 P-2320-000 Submittal Public blocks & expansion joints per 5th safety insp rept for Middle Raquette River Proj-2320. Correspondence II Conversion clist=117053

Niagara Mohawk Power submits list of hydroelec projs where boater safety devices were not Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/24/1996 Multiple Submittal Public installed as of 960524 due to high flows, P-2047 et al. Correspondence II Conversion clist=123080

Niagara Mohawk Power's quarterly progress rept on hearings before NY State Dept of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/23/1996 Multiple Submittal Public Environ Conservation on denial of Sect 401 water quality certif appls for EJ West Proj et al. Correspondence II Conversion clist=109947

Niagara Mohawk Power Corp submits 13th progress rept on hearing before NYSDEC on Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/28/1996 Multiple Submittal Public denial of Section 410 water quality certif appls for Beaver River P-2645 et al. Correspondence II Conversion clist=87475

Niagara Mohawk Power transmits various correspondences & filings re relicensing of Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/16/1996 Multiple Submittal Public hydroelec projs on Raquette River, P-2060 et al.Sent to various county govt entities. quest Application clist=77612

Niagara Mohawk Power Corp's 1995 annual spillway gate operation certification for Higley Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/5/1996 P-2320-000 Submittal Public Devel of Middle Raquette P-2320. Correspondence II Conversion clist=82456

Niagara Mohawk Power Corp's 1995 annual spillway gate operation certification for Colton Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/5/1996 P-2320-000 Submittal Public Devel of Middle Raquette P-2320. Correspondence II Conversion clist=82457

Niagara Mohawk Power Corp's 1995 annual spillway gate operation certification for Hannawa Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/5/1996 P-2320-000 Submittal Public Devel of Middle Raquette P-2320. Correspondence II Conversion clist=82458

Niagara Mohawk Power Corp's 1995 annual spillway gate operation certification for Sugar Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/5/1996 P-2320-000 Submittal Public Island Devel of Middle Raquette P-2320. Correspondence II Conversion clist=82459

Niagara Mohawk Power Corp submits response to FERC ltrs dtd 950613 & 950913 re addl Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/15/1995 Multiple Submittal Public info request for Piercefield Proj-7387,et al. Correspondence nal Information clist=71957

Ltr notice informing Niagara Mohawk of approval of proposal re relicense for Raquette River http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/13/1995 Multiple Issuance Notice Formal Notice Public Proj-2330 et al. clist=77526

Petition to intervene of NY State Dept of Environ Conserva- tion re appl for Niagara Mohawk Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/5/1995 P-2320-005 Submittal Intervention Public Power Corp,Middle Raquette River Hydropower Proj-2320. Intervention clist=69790

Niagara Mohawk Power Corp submits info concerning 12th pro- gress rept on hearings Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/28/1995 Multiple Submittal Public before NY State Dept of Environ Con- servation etc re Beaver River Proj-2645 et al. Correspondence II Conversion clist=67991

Niagara Mohawk Power Corp submits eleventh quarterly progress rept per addl info request Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/13/1995 Multiple Submittal Public dtd 930210 re Hoosic River Proj-2616,et al. Correspondence II Conversion clist=64207

Memorandum informing of decisions re further processing of applications for Niagara FERC Correspondence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/13/1995 Multiple Issuance Public Mohawk Power Corp et al EJ West P-2318 et al. With Applicant II Conversion clist=66868

Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/9/1995 Multiple Submittal Niagara Mohawk Power Corp's written critique for Raquette River Proj-2060 et al EAP. Report/Form CEII Plan clist=129536

Comments of NY Rivers United in response to FERC ltr on 950913 re air for Middle & Lower Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/23/1995 Multiple Submittal Comments/Protest Public Raquette Proj-2320,et al. II Conversion clist=62218

Niagara Mohawk Power Corp submits final study rept on fish entrainment & mortality for Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/3/1995 P-2320-011 Submittal Middle Raquette River Proj-2320.Availability: Public Correspondence II Conversion clist=1746002

36 Page 37 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/25/1995 P-2320-005 Submittal Comments of TJ Hall concerning Potsdam impoundment of Raquette River Proj-2320. Comments/Protest Public II Conversion clist=63642

Ltr notice requesting Niagara Mohawk Power Corp to submit by 950927,response to addl info http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/13/1995 Multiple Issuance Notice Formal Notice request dtd 950613 re Middle Raquette Proj-2320 et al.Availability: Public clist=1748128

Niagara Mohawk Power's 11th Progress Rept on hearings before NY State Dept of Environ Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/29/1995 Multiple Submittal Public Conservation on denial of Section 401 water quality certif appls for P-2645 et al. Correspondence II Conversion clist=1744016

Niagara Mohawk Powr Corp submits quarterly progress rept on fish entrainment/mortality Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/15/1995 Multiple Submittal Public study re Hoosic River P-2616 et al. Correspondence II Conversion clist=1742829

Comments of LH Turner re McNeil Campsite,Blake Reserviors St Lawrence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/13/1995 P-2320-005 Submittal Comments/Protest County,NY,Middle Raquette River Proj-2320.Availability: Public II Conversion clist=1744902

FERC Correspondence FERC Discusses ltr of 950526 concerning sched for Commission review fo Niagara Power Corp http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/26/1995 Multiple Issuance With Government Correspondence With pending new lic appls under P-2645,et al.Availability: Public clist=1740325 Agencies Government Agencies

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/13/1995 P-2320-000 Issuance NIAGARA MOHAWK POWER CORP.. Order/Opinion Delegated Order Public clist=3009108

Ltr notice requesting Niagara Mohawk Power Corp to submit addl info to complete evaluation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/13/1995 Multiple Issuance of license application for Middle Raquette River Proj-2320 et al w/in 90 days.Availability: Notice Formal Notice clist=1740219 Public

Comments of American Rivers on Niagara Mohawk's hydropower relicensing negotiations for Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/2/1995 Multiple Submittal Comments/Protest Proj-2645 et al.Availability: Public II Conversion clist=1740603

Comments of NY State Conservation Council,Inc on Niagara Mohawk hydropower relicensing Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/1/1995 Multiple Submittal Comments/Protest negotiations for Proj-2645 et al.Availability: Public II Conversion clist=1740604

Comments of NY State Legislature on Niagara Mohawk's hydropower relicensing Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/31/1995 Multiple Submittal Comments/Protest negotiations for Proj-2645 et al.Availability: Public II Conversion clist=1740602

Comments of NY State Dept of Environ Conservation on shared concerns of parties to Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/30/1995 Multiple Submittal Niagara Mohawk hydropower relicensing negotiations for Beaver River Proj-2645 et Comments/Protest II Conversion clist=1738994 al.Availability: Public

Comments of NY State Dept of Environ Conservation re review sched for Niagara Mohawk Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/26/1995 Multiple Submittal Comments/Protest hydropower relicensing for Beaver River Proj-2645 et al.Availability: Public II Conversion clist=1738990

Niagara Mohawk Power submits 10th progress rept on hearings re denial of Section 401 Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/26/1995 Multiple Submittal water quality cert appl for Beaver River & 8 other projs (P-2645 et al).Availability: Public Correspondence II Conversion clist=1738773

Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/26/1995 Multiple Issuance Scoping Document 2 for Middle & Lower Raquette River Projs (P-2320,P-2330). FERC Report/Study Public II Conversion clist=1739721

Comments of US Fish/Wildlife Service on fish entrainment & mortality studies for EJ West Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/22/1995 Multiple Submittal Comments/Protest Public Proj-2318 et al. II Conversion clist=1738548

Niagara Mohawk Power Corp submits quarterly progress rept filed in accordance w/Addl Info Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/11/1995 Multiple Submittal Public Request dtd 930210 for Hoosic River Proj-2616 et al. Correspondence II Conversion clist=1737411

Comments of Adirondack Mountain Club re relicensing of Middle Raquette and Lower Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/20/1995 Multiple Submittal Comments/Protest Public Raquette Projs (P-2320,P-2330). II Conversion clist=1736001

37 Page 38 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Fish & Wildlife Serv comments re scoping document J for oswego River Proj under P-2320 et Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/19/1995 Multiple Submittal Comments/Protest Public al. II Conversion clist=1736028

Comments of Fish & Wildlife Serv on Scoping Document 1 for devel of EIS re Middle & Lower Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/19/1995 Multiple Submittal Comments/Protest Public Raquette River Proj-2320,et al. II Conversion clist=1736413

Advises Niagara Mohawk Power Corp to send copy of draft entrainment study repts for Higley FERC Correspondence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/10/1995 P-2320-005 Issuance Public & Colton Devels at the time draft repts are sent to agencies re P-2320. With Applicant II Conversion clist=1735073

Comments of S Omohundro & J Omohundro re Middle Racquette River & Lower Racquette Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/29/1995 Multiple Submittal Comments/Protest Public River Projs (P-2320,P-2330). II Conversion clist=1734060

Comments of NY Rivers United re Scoping Document 1 for Middle & Lower Raquette River P- Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/28/1995 Multiple Submittal Comments/Protest Public 2320 et al. II Conversion clist=1733682

Comments of Environmental Protection Agency re scoping document for Middle Racquette Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/22/1995 Multiple Submittal Comments/Protest River & Lower Racquette River Projs under P-2320 et al.Availability: Public II Conversion clist=1733528

Ltr order accepting Niagara Mohawk Power Corp's 950203 request for extension of time to http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/1995 P-2320-005 Issuance Order/Opinion Delegated Order Public complete Sugar island penstock maintenance repairs at Middle Racquette River Proj. clist=1738359

Niagara Mohawk Power's 9th quarterly progress repts on action being undertaken to resolve Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/28/1995 Multiple Submittal denials(w/o prejudice) of water quality certification for Beaver River P-2645 et al.Availability: Correspondence II Conversion clist=1732000 Public

Comments of NY State Office of Parks,Recreation/Historic Preservation on Scoping Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/22/1995 Multiple Submittal Document 1 dtd Feb 1995 for Middle Raquette River Proj-2320/Lower Raquette River Proj- Comments/Protest II Conversion clist=1731589 2330.Availability: Public

Niagara Mohawk Power Co submits rev Type A/B flowcharts(EAP) dated 950215 re Raquette Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/17/1995 P-2320-005 Submittal Report/Form CEII River P-2320. Plan clist=101995

Niagara Mohawk Power Corp submits 8th quarterly progress rept re Hoosic River Proj under Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/8/1995 Multiple Submittal Public P-2616 et al. Correspondence II Conversion clist=1730324

Untyped during http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/3/1995 P-2320-000 Issuance THE RAQUETTE RIVER PROJECTS. SCOPING DOCUMENTS Order/Opinion Public conversion clist=3003471

Notice of 950321 sched public scoping meeting re Niagara Mohawk Power Corp, http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/27/1995 Multiple Issuance Notice Formal Notice Public Higley,Raquette River Proj & Lower Raquette River Proj under P-2330. clist=1728089

Niagara Mohawk Power Corp's responsible official notification form for Middle Raquette River Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/20/1995 P-2320-000 Submittal Proj under P-2320.Availability: Public Correspondence II Conversion clist=1728795

Comments of Fish & Wildlife Serv on review of 941117 quarterly progress rept & request for Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/29/1994 Multiple Submittal Comments/Protest Public extension of time to file final repts re Niagara Mohawk Power (P-2616),et al. II Conversion clist=1723965

Niagara Mohawk Power Corp has conducted required training etc re Racquette River Proj Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/30/1994 Multiple Submittal Report/Form under P-9222 et al.Availability: CEII Plan clist=1725714

Niagara Mohawk Power submits eighth progress rept on hearings before NY State Dept of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/30/1994 Multiple Submittal Public Environmental Conservation on denial of Section 401 water quality certif appl. Correspondence II Conversion clist=1717988

Comments of NY State Dept of Environmental Conservation re fish entrainment & mortality Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/29/1994 Multiple Submittal Comments/Protest Public study for Niagara Mohawk Power Corp Hoosic River Proj et al under P-2616 et al. II Conversion clist=1718745

38 Page 39 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Request for Delay of Niagara Mohawk Power submits quarterly progress rept & request for extension of time until Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/17/1994 Multiple Submittal Action/Extension of 941231 to file final repts for Hoosic Proj et al (P-2616 et al).Availability: Public Correspondence clist=1715846 Time

Notice of intent to prepare EIS and to conduct site visits for Middle Raquette River and Lower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/2/1994 Multiple Issuance Notice Formal Notice Public Raquette River Proj (P-2320,P-2330) re Niagara Mohawk Power. clist=1712412

Niagara Mohawk Power Corp submits update of long run avoided cost superseding prior Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/1/1994 Multiple Submittal Public update in reference to ltr dtd 940329 re EJ West Proj-2318,et al. quest Application clist=1712653

Niagara Mohawk Power Corp submits minutes of 941017 meeting re fish entrainment & Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/21/1994 Multiple Submittal mortality study for Hoosic River Proj-2616 et al.Availability: Public Correspondence II Conversion clist=1710641

Discusses correction to significant error on page two & three of minutes for October 11 FERC Correspondence FERC http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/21/1994 Multiple Issuance settlement discussion re Niagara Mohawk Power Corp Beaver River Proj-2645,et With Government Correspondence With clist=1712422 al.Availability: Public Agencies Government Agencies

Ltr order ack receipt of Niagara Mohawk Power Corp 940830 ltr re maintenance remedial http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/6/1994 P-2320-005 Issuance action at Middle Raquette River Proj under P-2320.Concerns have been satisfied.Availability: Order/Opinion Delegated Order clist=1702594 Public

Niagara Mohawk Power Corp responds to FERC 931212 et al addl info request of FERC re Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/6/1994 P-2320-005 Submittal Public Middle Raquette River Proj under P-2320. Correspondence II Conversion clist=1699960

Niagara Mohawk Power submits 7th progress rept on hearings before NYSDEC on denial of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/1/1994 Multiple Submittal Public Section 401 water quality certif for Beaver River & 8 other projs (P-2645 et al). Correspondence II Conversion clist=1699355

Niagara Mohawk Power Corp responds to 940728 ltr re maintenance items noted during Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/30/1994 P-2320-005 Submittal 940721 operation insp of Middle Raquette River Proj-2320.Availability: Public Correspondence II Conversion clist=1701939

Comments of Fish & Wildlife Serv on Niagara Mohawk Power Corp ltr dtd 940601 requesting Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/18/1994 Multiple Submittal Comments/Protest Public info relating to FERC addl request of 940210 under P-2645,et al. II Conversion clist=1696466

Niagara Mohawk Power fish entrainment & mortality study sixth quarterly progress rept re Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/15/1994 Multiple Submittal Public Hoosic River Proj etc under P-2616 et al. Correspondence II Conversion clist=1694582

Ltr order accepting Niagara Mohawk Power Corp's materials filed 940407 to comply w/ http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/15/1994 P-2320-009 Issuance paragraph (C) of Order approving boat launch for Higley Devel of Raquette River Proj- Order/Opinion Delegated Order clist=1690259 2320.Availability: Public

Fish & Wildlife Serv has completed fisheries enhancement plan for Raquette River in St Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/7/1994 Multiple Submittal Other Submittal Public Lawrence County,NY for Middle Raquette River Proj et al under P-2320 et al. Submittal clist=1680943

Niagara Mohawk Power submits 6th progress rept on hearings before NYSDEC on denial of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/2/1994 Multiple Submittal Public Section 401 water quality certif appl for Beaver River & 8 other projects (P-2645 et al). Correspondence II Conversion clist=1678359

Niagara Mohawk Power Corp submits quarterly rept in accordance w/Add Informational Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/17/1994 Multiple Submittal Public Request dtd 930210 for fish entrainment etc re Hoosic River Proj-2616 et al. Correspondence II Conversion clist=1674667

Responds to Niagara Mohawk Power Corp 9400126 ltr about 931210 Addl Information FERC Correspondence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/19/1994 P-2320-005 Issuance Request (AIR) addressing whitewater concerns on Raquette River re Middle Raquette Proj- With Applicant II Conversion clist=1671456 2320.Availability: Public

Niagara Mohawk Power Corp submits Higley Development boat launch & recreation area as Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/7/1994 P-2320-009 Submittal built drawings for Middle Raquette River Proj-2320.Availability: Public Correspondence II Conversion clist=1663716

Niagara Mohawk Power Corp submits info re value of proj power for Middle Raquette River Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/29/1994 Multiple Submittal Public Proj-2318 et al. Correspondence II Conversion clist=1662075

39 Page 40 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Ltr notice requesting Niagara Mohawk Power Corp to submit as-built drawing of trailer- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/18/1994 P-2320-008 Issuance mounted boat launch & recreation area by 940131,etc for Raquette Proj-2320.Due w/in 20 Notice Formal Notice clist=1666891 days.Availability: Public

Niagara Mohawk Power Corp submits rept summarizing outcome of 940302 meeting re Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/11/1994 Multiple Submittal Public ongoing fish entrainment & mortality study for Hoosic River Proj-2616 et al. Correspondence II Conversion clist=1662085

Niagara Mohawk Power submits quarterly progress repts re actions to resolve denials of Sec Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/3/1994 Multiple Submittal 401 water quality certif for Beaver River & 8 other projs (P-2645 et al).Availability: Public Correspondence II Conversion clist=1654707

Comments of NY State Dept of Environmental Conservation re response to Niagara Mohawk Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/1994 Multiple Submittal Power Corp submittal concerning addl info request of 931220 re Hoosic River Proj-2616 et Comments/Protest II Conversion clist=1654481 al.Availability: Public

Niagara Mohawk Power submits correspondence re fish entrainment & mortality study for Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/1994 Multiple Submittal Hoosic River & 7 other projects (P-2616 et al).Availability: Public Correspondence II Conversion clist=1653160

FERC ack receipt of Niagara Mohawk Power Corp 940210 Fish Entrainment & Mortality FERC Correspondence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/1994 Multiple Issuance Study Quarterly Rept re P-2318 et al.Availability: Public With Applicant II Conversion clist=1662939

Niagara Mohawk Power Corp submits responsible official notification form for Middle Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/18/1994 P-2320-005 Submittal Public Raquette River under P-2320. Correspondence II Conversion clist=1663425

Advises LH Turner et al that meeting has been scheduled for 940302 discussing fish FERC Correspondence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/15/1994 Multiple Issuance entrainment/mortality at EJ West P-2318 et al.Availability: Public With Applicant II Conversion clist=1658012

Niagara Mohawk Power submits 4th quarterly rept re progress in design & execution of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/10/1994 Multiple Submittal entrainment & mortality study for Hoosic River & 7 other projects (P-2616 et al).Availability: Correspondence II Conversion clist=1648290 Public

Comments of US Fish & Wildife Service related to water quality for proposed Station 160 Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/26/1994 Multiple Submittal Comments/Protest Public Hydroelec Proj-2596 et al. II Conversion clist=1647105

Niagara Mohawk Power's questions & concerns re 931210 addl info request re Middle Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/26/1994 P-2320-005 Submittal Raquette River Proj (P-2320).Availability: Public Correspondence II Conversion clist=1646208

Niagara Mohawk Power's response to 940118 inquiry re Hannawa & Sugar Island Devel, Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/25/1994 P-2320-005 Submittal Middle Raquette River Proj (P-2320).Availability: Public Correspondence II Conversion clist=1650062

Notice of Niagara Mohawk Power Corp 911224 filing authori- zation for continued proj http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/24/1994 P-2320-000 Issuance Notice Formal Notice Public operation for Raquette Proj under P-2320. clist=1642966

Niagara Mohawk Power Corp submits Attachment A addl info request re ongoing fish Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/20/1994 Multiple Submittal entrainment & mortality study for Hoosic River Proj,et al under P-2616,et al.Availability: Public Correspondence II Conversion clist=1643011

Comments of Niagara Mohawk Power Co re EJ West Proj,et al under P-2318,et Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/14/1994 Multiple Submittal Comments/Protest al.Availability: Public II Conversion clist=1644254

Comments of Fish & Wildlife Serv re Beaver River Proj,et al under P-2596,et al.Availability: Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/11/1994 Multiple Submittal Comments/Protest Public II Conversion clist=1641760

Niagara Mohawk Power Corp response to addl info request re Middle Raquette River Proj Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/4/1994 P-2320-005 Submittal under P-2320.Availability: Public Correspondence II Conversion clist=1638033

Niagara Mohawk Power response to 931220 ltr requesting addl info re fish entrainment & Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1993 Multiple Submittal mortality study for Hoosic River & 7 other projects (P-2616, et al).Availability: Public Correspondence II Conversion clist=1636828

40 Page 41 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Comments of Fish & Wildlife Serv on study plan for fish entrainment re EJ West Proj,et al Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/20/1993 Multiple Submittal Comments/Protest Public under P-2318,et al. II Conversion clist=1635337

Ltr notice requesting Niagara Mohawk Power Corp to submit addl info based on 931210 http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/20/1993 Multiple Issuance Notice Formal Notice meeting for Beaver River Proj,et al under P-2645,et al.Due w/in 30 days.Availability: Public clist=1636140

Niagara Mohawk Power Corp submits 931124 proof-of-concept repts & 931216 interim Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/16/1993 Multiple Submittal progress rept discussing fish entrainment/mortality study for Hoosic River Proj-2616 et Correspondence II Conversion clist=1633277 alAvailability: Public

Ltr order granting Niagara Mohawk Power extension of time to provide addl info Item #8 per http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/16/1993 P-2320-005 Issuance Order/Opinion Delegated Order 920807 ltr re Middle Raquette River Proj (P-2320).Due 931222.Availability: Public clist=1636816

Ltr notice to Niagara Mohawk Power requesting addl info re lic appl for Middle Raquette River http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/10/1993 P-2320-005 Issuance Notice Formal Notice Proj (P-2320).Due in 180 days.Availability: Public clist=1632961

Comments of NY State Dept of Environ Conservation on fish entrainment & morality study for Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/9/1993 Multiple Submittal Comments/Protest Hoosic River Proj,et al under P-2616,et al.Availability: Public II Conversion clist=1631471

Ltr notice requesting Niagara Mohawk Power Corp to resubmit safety plans w/in 60 days for http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/8/1993 Multiple Issuance Notice Formal Notice Green Island Proj,et al under P-13,et al.Availability: Public clist=1634137

Niagara Mohawk Power Corp submits 4th progress rept on hear- ings requested on denial of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/3/1993 Multiple Submittal Section 401 water quality certif for Beaver River Proj-2645 et al.Availability: Public Correspondence II Conversion clist=1628515

Niagara Mohawk Power Corp submits fish entrainment & mortality study plan at East Norfolk Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/1/1993 Multiple Submittal Proj under P-2616 et al.Availability: Public Correspondence II Conversion clist=1628893

Notice of 931210 meeting to discuss fish entrainment & mortality at EJ West and 8 other http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/26/1993 Multiple Issuance Notice Formal Notice Niagara Mohawk Power projs (P-2318).Availability: Public clist=1629492

Niagara Mohawk Power's notice change to 931210 for meeting to review progress in fish Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/24/1993 Multiple Submittal entrainment & mortality study for Hoosic River Proj et al (P-2616,et al).Availability: Public Correspondence II Conversion clist=1625159

Kleinschmidt Associates transmitts 931119 ltr to consulted agencies on Hoosic River Proj- Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/22/1993 Multiple Submittal 2616 et al.Availability: Public Correspondence II Conversion clist=1624434

Niagara Mohawk Power's response to 920807 addl info request re Middle Raquette River Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/18/1993 P-2320-005 Submittal Public Proj (P-2320). Correspondence II Conversion clist=1623197

Comments of Fish & Wildlife Serv re Hoosic River Proj et al under P-2616 et al.Availability: Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/16/1993 Multiple Submittal Comments/Protest Public II Conversion clist=1624561

Niagara Mohawk Power Corp submits quarterly progress rept for Hoosic River Proj-2616 et Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/15/1993 Multiple Submittal Public al. Correspondence II Conversion clist=1621746

Ltr notice to Niagara Mohawk Power requesting data re Upper Raquette River & 12 other http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/15/1993 Multiple Issuance post-tensioned projects, to develop post-tensioning data base (P-2084,et al).Due Notice Formal Notice clist=1624838 931231.Availability: Public

Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/8/1993 P-2320-005 Submittal Comments of Fish/Wildlife Serv re Middle Raquette River Hydroelec P-2320. Comments/Protest Public II Conversion clist=1621077

Niagara Mohawk Power's annual statement of kwh generated at Green Island & 27 other Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/31/1993 Multiple Submittal Report/Form projects during FY93 (P-13,et al).Availability: Public Report clist=1618436

41 Page 42 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Niagara Mohawk Power Corp submits 3rd quarterly rept documenting progress towards Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/29/1993 P-2320-005 Submittal completion of addl info re- quests re Middle Raquette River Hydroelec Proj-2320.Availability: Correspondence II Conversion clist=1617357 Public

Niagara Mohawk Power Corp submits response to 930812 ltr from NY Rivers United re Lower Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/15/1993 Multiple Submittal Racquette River Proj,et al under P-2320,et al.Availability: Public Correspondence II Conversion clist=1613755

Ltr order granting Niagara Mohawk Power Corp for extension of deadline for submission of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/13/1993 P-2320-005 Issuance Order/Opinion Delegated Order addl info re Middle Raquette River Proj under P-2320.Availability: Public clist=1613248

Niagara Mohawk Power Corp submits response to 920807 addl info request re Sched B Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/29/1993 P-2320-005 Submittal Public items 1 thru 23 for Middle Raquette River Proj under P-2320. Correspondence II Conversion clist=1608201

Niagara Mohawk Power Co reponds to 920807 addl info request re Middle Raquette River Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/29/1993 P-2320-005 Submittal Public Proj-2320. Correspondence II Conversion clist=1608618

Request for Delay of Niagara Mohawk Power requests extension until 931124 for submittal of response to Sched Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/23/1993 P-2320-005 Submittal Action/Extension of B AIR Item #8,Run-of-River Operation re Middle Raquette River P-2320.Availability: Public Correspondence clist=1606583 Time

Niagara Mohawk Power Corp submits response to 930921 ltr from Director,Div of Proj Review Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/22/1993 Multiple Submittal Public re Hoosic River Proj,et al under P-2616,et al. Correspondence II Conversion clist=1606465

Niagara Mohawk Power submits 930909 ltr to NY State Dept of Environ Conservation et al re Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/15/1993 Multiple Submittal Public Hoosic River P-2616 et al. Correspondence II Conversion clist=1604993

Niagara Mohawk Power submits draft programmatic agreement for management of historic Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/14/1993 Multiple Submittal properties re Beaver River Proj et al (P-2645, et al).Availability: Public Correspondence II Conversion clist=1605048

Niagara Mohawk Power submits 3rd progress rept on hearings requested on denial of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/8/1993 Multiple Submittal Public Section 401 water quality certifica- tions re Beaver River Proj et al (P-2645 et al). Correspondence II Conversion clist=1603198

Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/7/1993 P-2320-005 Submittal Comments of Fish/Wildlife Serv re Middle Raquette River Hydroelec P-2320. Comments/Protest Public II Conversion clist=1603389

Comments of NY Rivers United on relicensing re Niagara Mohawk Power Co for Lower Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/12/1993 Multiple Submittal Comments/Protest Public Raquette River Proj,et al under P-2320,et al. II Conversion clist=1596708

Niagara Mohawk Power Corp submits results of investigation into feasibility of conducting Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/11/1993 Multiple Submittal Public proposed fish entrainment & mortality studies etc re Hoosic River Proj-2616 et al. Correspondence II Conversion clist=1594706

Niagara Mohawk Power submits draft programmatic agreement for management of Historic Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/29/1993 Multiple Submittal Public Properties re Beaver River P-2645 et al. Correspondence II Conversion clist=1593482

Niagara Mohawk Power Corp submits requested info re 2nd quarterly rept documenting Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/29/1993 P-2320-005 Submittal progress towards completion of addl info requests for Middle Raquette River Proj- Correspondence II Conversion clist=1592039 2320.Availability: Public

Comments of Fish & Wildlife Serv,NY on Niagara Mohawk Power entrainment & mortality Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/23/1993 Multiple Submittal Comments/Protest study plan for Beaver River Proj-2645 et al.Availability: Public II Conversion clist=1590512

Order approving Niagara Mohawk Power Corp request to construct trailer-mounted boat http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/18/1993 P-2320-006 Issuance Order/Opinion Delegated Order Public launch to accommodate motorized boats at Higley Devel of Raquette Proj-2320. clist=1581764

Niagara Mohawk Power Co submits fish entrainment & mortality study rept plan filed Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/15/1993 Multiple Submittal Public w/Commission on 930510 re EJ West Proj,et al under P-2318,et al. quest Application clist=1580138

42 Page 43 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

NY State Dept of Environmental Conservation responds to 930528 ltr of Niagara Mohawk re Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/11/1993 Multiple Submittal Other Submittal Public fish entrainment etc studies for Middle Racquette River Proj et al. Submittal clist=1580679

Niagara Mohawk Power's response to 930526 ltr from US Fish & Wildlife Service requesting Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/9/1993 Multiple Submittal Public restriction of planned constr activities on EJ West & 8 other projects (P-2318 et al). Correspondence II Conversion clist=1579613

Niagara Mohawk Power submits 2nd progress rept on hearings requested on denial of Sec http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/8/1993 Multiple Submittal Report/Form Progress Report Public 401 water quality certifications re Beaver River P-2645 et al. clist=1578838

Comments of NY Rivers United re Niagara Mohawk EJ West Proj et al under P-2318 et Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/3/1993 Multiple Submittal Comments/Protest al.Availability: Public II Conversion clist=1578439

Niagara Mohawk Power comments re NYSDEC denials of requests for water quality sertif for Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/2/1993 Multiple Submittal Comments/Protest relic of Beaver River Proj et al under P-2645 et al.Availability: Public II Conversion clist=1578296

Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/26/1993 Multiple Submittal Comments of Fish & Wildlife re relicensing process for EJ West Proj,et al under P-2318,et al. Comments/Protest Public II Conversion clist=1577459

Ltr notice requesting Niagara Mohawk Power to briefly address concerns re study plan dated http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/21/1993 Multiple Issuance Notice Formal Notice Public 930510 re EJ West P-2318 et al. clist=1575322

Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/19/1993 P-2320-005 Submittal Comments of Fish/Wildlife Serv re Middle Raquette River Hydroelec P-2320. Comments/Protest Public II Conversion clist=1575244

Niagara Mohawk Power submits suppl to fish entrainment/ mortality study plan for EJ West P- Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/10/1993 Multiple Submittal 2318 et al expiring in 1993.Availability: Public quest Application clist=1571861

Niagara Mohawk Power Corp submits initial quarterly progress rept of fish Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/7/1993 Multiple Submittal Public entrainment/mortality study plan for EJ West Proj-2318 et al. Correspondence II Conversion clist=1571417

Niagara Mohawk Power Corp submits 1st quarterly rept re progress toward completion of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/29/1993 P-2320-005 Submittal addl info request on Middle Racquette River Hydroelectric Proj under P-2320.Availability: Correspondence II Conversion clist=1568925 Public

Notice/motion for intervention of NY State Adirondack Park Agency re Niagara Mohawk Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/29/1993 P-2320-005 Submittal Intervention Power,Middle Raquette River P-2320.Availability: Public Intervention clist=1569581

Motion of NY Rivers United et al to intervene;request for preparation of comprehensive Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/29/1993 P-2320-005 Submittal basinwide plan etc re Niagara Mohawk Power,Middle Raquette River P-2320.Availability: Intervention Intervention clist=1569589 Public

Motion to intervene in opposition by US Dept of Interior re Niagara Mohawk Power Corp appl Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/28/1993 P-2320-005 Submittal Intervention Public for new lic under P-2320. Intervention clist=1568246

Niagara Mohawk Power Corp invites FERC staff to 930522 observation of Whitewater Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/26/1993 P-2320-005 Submittal paddling study for Colton Bypassed Reach Proj under P-2320.Availability: Public Correspondence II Conversion clist=1578316

Motion of Adirondack Mountain Club to intervene re Niagara, Mohawk Power Corp for Middle Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/26/1993 P-2320-005 Submittal Intervention Public Raquette River under P-2320. Intervention clist=1568225

Niagara Mohawk Power Corp discusses addl info requests re appl to relicense projects under Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/26/1993 Multiple Submittal Public P-2318 et al. Correspondence nal Information clist=1568305

Comments of NY State Dept of Environ Conservation re sedimentation/erosion control plan Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/16/1993 P-2320-005 Submittal Comments/Protest for Middle Raquette P-2320.Availability: Public II Conversion clist=1567062

43 Page 44 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Niagara Mohawk Power submits paddling feasibility study plan for bypassed reach of Colton Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/15/1993 P-2320-000 Submittal Devel, Middle Raquette River Proj (P-2320).Availability: Public Correspondence II Conversion clist=1564870

Niagara Mohawk Power Corp submits comments on Colton Padding Proj-2320 feasibility Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/14/1993 P-2320-005 Submittal study plan.Availability: Public Correspondence II Conversion clist=1565777

Niagara Mohawk Power Corp submits fish entrainment & mortality study plan under P-2318 et Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/2/1993 Multiple Submittal Public al. Correspondence II Conversion clist=1561848

Notice of Niagara Mohawk Power Co 930305 filing of approval of plan for constr of recreation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/12/1993 P-2320-006 Issuance Notice Formal Notice Public facils appl for Raquette Proj-2320.Comment date:930503. clist=1556357

Comments of National Marine Fisheries Service re Middle Raquette River Hydro Project Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/10/1993 P-2320-005 Submittal Comments/Protest under P-2320.Availability: Public II Conversion clist=1556861

Niagara Mohawk Power submits draft(Paddling Feasibility Study Plan for Bypassed Reach of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/8/1993 P-2320-007 Submittal Niagara's Colton Hydro Devel Proj-2320,930520-23).Availability: Public Correspondence II Conversion clist=1556719

NY State Dept of Environmental Conservation petition for intervention under P- Motion/Notice of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/8/1993 P-2320-005 Submittal Intervention 2320.Availability: Public Intervention clist=1568009

Niagara Mohawk Power Corp submits progress rept on hearings requested on denial of Sec Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/4/1993 Multiple Submittal Public 401 water quality certifications re Beaver River Proj-2645 et al. Correspondence II Conversion clist=1555245

Niagara Mohawk Power discusses proposed Higley Boat Launch at Middle Raquette River Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/25/1993 P-2320-006 Submittal Public Proj (P-2320). Correspondence II Conversion clist=1555143

Notice of Niagara Mohawk Power's 911224 appl for new lic for Middle Raquette River Hydro http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/23/1993 P-2320-005 Issuance Notice Formal Notice Public Proj (P-2320). clist=1552240

Ltr notice directing Niagara Mohawk Power Corp to submit exhibit drawings re Middle http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/11/1993 P-2320-005 Issuance Racquette River Hydro Proj under P-2320 w/in 45 days & accepting lic appl.Availability: Notice Formal Notice clist=1551319 Public

Ltr order granting Niagara Mohawk Power Corp 921203 request for extension of deadline to http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/1/1993 P-2320-005 Issuance Order/Opinion Delegated Order Public provide addl items requested in 920807 ltr for Middle Raquette River Hydro Project. clist=1547927

Niagara Mohawk Power Corp files information re 921201 letter relicensing program for Middle Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/6/1993 P-2320-005 Submittal Public Raquette River Project under P-2320. quest Application clist=1540598

Exemption From Niagara Mohawk Power Corp submits request to NY State Dept of Environ Conservation for Application/Petition/Re http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/23/1992 Multiple Submittal License - Public DEC hearing on 921119 denial of 401 water quality certif for Beaver River Proj-2645 et al. quest clist=1537198 Conduit/5MW

Niagara Mohawk Power discusses denials of request for water quality certif re Beaver River Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/16/1992 Multiple Submittal Public Proj et al under P-2645 et al. Correspondence II Conversion clist=1535917

Niagara Mohawk Power submits additions to distribution list under heading special interest Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/10/1992 P-2320-005 Submittal groups re Raquette River comprehensive environmental plan (P-2320).Availability: Public Correspondence II Conversion clist=1534252

Niagara Mohawk Power Co submits denial of request for Sect #401 water quality certif re Application/Petition/Re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/7/1992 Multiple Submittal Beaver River Proj et al under P-2645 et al.Availability: Public quest II Conversion clist=1532424

Request for Delay of Niagara Mohawk Power Corp files request for extension of time to submit addl info re 920807 Applicant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/3/1992 P-2320-005 Submittal Action/Extension of request for Middle Raquette River Project under P-2320.Availability: Public Correspondence clist=1530315 Time

44 Page 45 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Niagara Mohawk Power Corp files responses to questions re Middle Raquette River, Lower Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/2/1992 Multiple Submittal Raquette River & Piercefield Projects under P-2320 et al.Availability: Public Correspondence II Conversion clist=1532221

Ltr notice requesting Niagara Mohawk Power to submits plan & schedule for submittal of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/23/1992 Multiple Issuance Notice Formal Notice requested materials for Middle Raquette River Proj-2320 et al w/in 10 days.Availability: Public clist=1530071

NY State Dept of Environ Conservation requests for 401 water quality certif for Beaver River Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/19/1992 Multiple Submittal Other Submittal Public Proj-2645 et al. Submittal clist=1528216

Ltr notice requesting Niagara Mohawk Power Corp to provide plan & sched for installing http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/18/1992 Multiple Issuance Notice Formal Notice Public boater restraining barrier for Carry Falls et al w/in 30 days under P-2060 et al. clist=1528783

Niagara Mohawk Power Corp responds to Sched A deficiency re appl for relic of Middle Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/4/1992 P-2320-005 Submittal Raquette River P-2320,NY.Availability: Public quest Application clist=1521207

Niagara Mohawk Power Corp submits 1992 comprehensive environ plan for Raquette River Environmental Study http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/4/1992 Multiple Submittal Report/Form corridor Piercefield P-7387 et al.Availability: Public & Report clist=1521216

US National Park Serv comments re Middle Racquette River Proj et al under P-2320 et Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/2/1992 Multiple Submittal Comments/Protest al.Availability: Public II Conversion clist=1532588

Niagara Mohawk Power Corp files statement of gross kilowatt hours generated for period Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/31/1992 Multiple Submittal 911001 through 920930 for Green Island, Stewarts Bridge Projects under P-13 et Report/Form Report clist=1521192 al.Availability: Public

Ltr notice to Niagara Mohawk Power to submit sched for implementing NYRO http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/9/1992 Multiple Issuance recommendations re recreation/environ/ safety insp of Middle & Upper Raquette & Carry Falls Notice Formal Notice clist=1516540 Projs.Availability: Public

Niagara Mohawk Power submits info re east abutment wall rehab & spillway repairs at Higley Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/7/1992 P-2320-005 Submittal Devel (P-2320).Availability: Public Correspondence II Conversion clist=1519643

Comments of American Whitewater Affiliation on FERC study determinations concerning Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/7/1992 P-2320-005 Submittal recreation at Middle Racquette River Proj of Niagara Mohawk Power (P-2320).Availability: Comments/Protest II Conversion clist=1512611 Public

Ltr notice requesting Niagara Mohawk Power to submit w/in 30 days,sched for http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/7/1992 Multiple Issuance implementation of recommendations re 920723 features etc for Middle Raquette Proj-2320 et Notice Formal Notice Public clist=1516039 al.

Niagara Mohawk Power Corp fwds responses to addl info requests for P-2318 et Applicant Supplemental/Additio http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/6/1992 Multiple Submittal al.Availability: Public Correspondence nal Information clist=1514411

Niagara Mohawk Power Corp submits field investigation for Middle Raquette River P- Application/Petition/Re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/6/1992 P-2320-000 Submittal 2320.Availability: Public quest II Conversion clist=1514414

Ltr order accepting Niagara Mohawk Power Corp revised plans & specifications for east http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/29/1992 P-2320-005 Issuance Order/Opinion Delegated Order Public abutment wall repair et al re Higley Devel et al of Middle Raquette Proj-2320. clist=1511875

Ltr notice informing Niagara Mohawk Power Corp of amending of addl info Item 22 in Sched http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/11/1992 P-2320-005 Issuance Notice Formal Notice Public B re Middle Raquette River Proj-2320. clist=1513962

Niagara Mohawk Power Corp responds to comments re canal repairs,penstock intake & Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/8/1992 P-2320-005 Submittal Public penstock maintenance work for Hannawa Devel P-2320,NY. Correspondence II Conversion clist=1507669

Niagara Mohawk Power revised plans/specs for east abutment wall rehab & spillway repairs Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/3/1992 P-2320-005 Submittal Public for Higley Development P-2320 Correspondence II Conversion clist=1505652

45 Page 46 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Ltr order approving Niagara Power Corp rev plan & sched for Middle Raquette & Higley Devel http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/26/1992 P-2320-005 Issuance Order/Opinion Delegated Order Public P-2320,NY,proceed w/const. clist=1503952

Ltr notice requesting Niagara Mohawk Power Corp to furnish response to comments w/in 10- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/26/1992 P-2320-005 Issuance Notice Formal Notice Public days re canal repairs etc for Hannawa Devel of Middle Raquette River Proj-2320. clist=1504155

Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/21/1992 P-2320-005 Submittal Comments of American Whitewater Affiliation re Middle Raquette River Proj under P-2320. Comments/Protest Public II Conversion clist=1501098

Notice of rejection of Long Lake Power Corp 920629 motion to withdraw from proceedings re http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/19/1992 P-2320-005 Issuance Notice Formal Notice Public Niagara Mohawk Corp under P-2320. clist=1500428

Niagara Mohawk Power Corp submits set of rev plans & specifications for Higley Devel of Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/13/1992 P-2320-005 Submittal Raquette River Proj-2320.Availability: Public Correspondence II Conversion clist=1499973

Ltr to US Fish & Wildlife Service discusses request for EIS and fish mortality studies at FERC Correspondence FERC http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/7/1992 Multiple Issuance Niagara Mohawk Power's Middle and Lower Raquette River Projs (P-2320 & P- With Government Correspondence With clist=1499347 2330).Availability: Public Agencies Government Agencies

Ltr to New York State Dept of Environmental Conservation discusses request for addl studies FERC Correspondence FERC http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/7/1992 Multiple Issuance at Niagara Mohawk Power's Middle and Lower Raquette River Projs (P-2320 & P- With Government Correspondence With clist=1499355 2330).Availability: Public Agencies Government Agencies

Advises American Whitewater Affiliation/American Rivers Re- licensing Coalition that FERC FERC Correspondence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/7/1992 P-2320-000 Issuance Public declines to order requested addl studies re Middle Raquette River Proj #2320. With Applicant II Conversion clist=1499415

Ltr notice requesting Niagara Mohawk Power Corp to submit w/in 5-days in order to complete http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/7/1992 P-2320-005 Issuance Notice Formal Notice Public review of lic appl filed on 911224 for Middle Raquette River Hydro Proj-2320. clist=1499682

Niagara Mohawk Power submits quality control program and plans & specs for penstock, Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/5/1992 P-2320-005 Submittal intake and canal rehabilitation at Hannawa Hydro Devel, Middle Raquette River Proj (P- Correspondence II Conversion clist=1497849 2320).Availability: Public

Niagara Mohawk Power Corp responds to 920626 ltr re Middle Raquette River P-2320 et Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/24/1992 Multiple Submittal al.Availability: Public Correspondence II Conversion clist=1497945

Niagara Mohawk Power submits Systemwide Hydropower Projs- Public Plan for Sugar Island Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/30/1992 P-2320-005 Submittal Public Devel of Raquette River P-2320. Correspondence II Conversion clist=1491437

Ltr notice requesting Niagara Mohawk Power Corp to submit response to comments w/in http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/26/1992 Multiple Issuance Notice Formal Notice Public thirty days under P-2320 et al. clist=1488466

Notice of withdrawal of pleadings of Long Lake Energy Corp re Niagara Mohawk Power Corp Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/26/1992 P-2320-000 Submittal Pleading/Motion under P-2320.Availability: Public II Conversion clist=1486604

Niagara Mohawk Power Corp response to 920603 ltr confirming 920527 converation on Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/16/1992 P-2320-005 Submittal proposes to monitor seepage at toe of east abutment wall,etc for Raquette River Proj under P- Public Correspondence II Conversion clist=1486938 2320.

American Whitewater Affiliation answer to response of Niagara Mohawk Power to request for Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/10/1992 P-2320-005 Submittal Comments/Protest Public addl studies at Middle Raquette River Hydroelec Proj (P-2320). II Conversion clist=1482581

Niagara Mohawk Power confirms conversation with J Wing of NYRO re remedial work at Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/8/1992 P-2320-005 Submittal Public Higley Development, Raquette River Proj (P-2320). Correspondence II Conversion clist=1485542

Niagara Mohawk Pwr Corp submits plans,specifications & proj report for Raquette River Proj- Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/19/1992 P-2320-005 Submittal 2320.Availability: Public Correspondence II Conversion clist=1476803

46 Page 47 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Higley Corp submits rept on scope of proposed stabilization of east abutment wall and Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/6/1992 P-2320-000 Submittal Public spillway repairs at Higley Hydro Devel, Raquette River Proj (P-2320). Correspondence II Conversion clist=1476930

Niagara Mohawk Pwr Corp et al submits rept on status of parties negotiations etc re Proj- Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/22/1992 Multiple Submittal Public 5276 et al. quest Application clist=1459911

Ltr order granting Niagara Mohawk Power Corp request for extension of time to 920520 re http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/21/1992 P-2320-000 Issuance Order/Opinion Delegated Order Higley Project under P-2320.Availability: Public clist=1461258

Niagara Mohawk Pwr submits response to 920305 request for scientific studies by US Fish & Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/3/1992 P-2320-005 Submittal Wildlife Svc re Middle Raquette River Proj under P-2320.Availability: Public quest Application clist=1453673

Niagara Mohawk Pwr Corp responds to 920304 request for scientific studies by NY Dept of Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/2/1992 P-2320-005 Submittal Environ Conservation/sub- mits evaluation of study re Middle Raquette River Proj- quest Application clist=1453314 2320.Availability: Public

Niagara Mohawk Power Corp submits response & evaluation to American Whitewater Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/31/1992 P-2320-005 Submittal Afilliation et al 920229 request for scientific studies re Middle Raquette Rvr Proj under P- quest Application clist=1452515 2320.Availability: Public

Niagara Mohawk Power Corp submits response & evaluation to New York Rivers 920228 Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/31/1992 P-2320-005 Submittal request for scientific studies re Middle Raquette Rvr Proj under P-2320.Availability: Public quest Application clist=1452518

NY State submits Section 401 relicense application re Middle Racquette River Project under Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/10/1992 Multiple Submittal Other Submittal P-2320 et al.Availability: Public Submittal clist=1450045

Comments of US Dept of Interior Fish & Wildlife Service re Lower & Middle Raquette River Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/6/1992 P-2320-005 Submittal Comments/Protest Hydroelectric Project under P-2320.Availability: Public II Conversion clist=1445780

Comments of American Whitewater Affiliation re relicensing of Middle Raquette River Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/29/1992 P-2320-005 Submittal Comments/Protest Hydroelectric facilities under P-2320.Availability: Public II Conversion clist=1442786

Comments of NY State Dept of Environ Conservation re notice of filing of appl for Middle Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/28/1992 P-2320-005 Submittal Comments/Protest Raquette River Hydro Proj-2320.Availability: Public II Conversion clist=1443908

Comments of NY Rivers re relicensing of Middle Raquette River Hydro Proj- Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/28/1992 P-2320-005 Submittal Comments/Protest 2320,NY.Availability: Public II Conversion clist=1442900

Niagara Mohawk Pwr Corp submits table summarizing filing of new lic appls for Black River Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/14/1992 Multiple Submittal Proj 2569 et al.Availability: Public quest Application clist=1440388

Niagara Mohawk Power Corp submits applications for new license for hydro projects under P- Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/14/1992 Multiple Submittal Public 2318, et al. quest Application clist=1440993

Niagara Mohawk Power Corp submits information re Raquette River Project Higley Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/12/1992 P-2320-000 Submittal Public Development under P-2320. Correspondence II Conversion clist=1443768

Niagara Mohawk Pwr submits rept of no conveyances at Green Island Proj & 26 other listed Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/30/1992 Multiple Submittal Report/Form projs in CY91 under P-13 et al.Availability: Public Report clist=1433467

Comments by R Morrow re Niagara Mohawk Pwr Hydro relicensing for Black River Proj et al Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/13/1992 Multiple Submittal Comments/Protest under P-2569 et al.Availability: Public II Conversion clist=1427922

NY State Dept of Environmental Conservation submits errata to 920108 ltr re status of water Government Agency http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/9/1992 Multiple Submittal Other Submittal quality certifications for projs subject to relicensing under P-2569 et al.Availability: Public Submittal clist=1429094

47 Page 48 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Comments by MJ Phalen re Niagara Mohawk Pwr Corp's hydro plant relicensing efforts for Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/8/1992 Multiple Submittal Comments/Protest Beaver River Proj et al under P-2645 et al.Availability: Public II Conversion clist=1427929

Niagara Mohawk Power annual spillway tests for Carry Falls Project under P-2060 Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/3/1992 Multiple Submittal etc.Availability: Public Correspondence II Conversion clist=1452983

Comments of P Close on Niagara Mohawk Pwr relic re Black River Proj et al under P-2569 et Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1991 Multiple Submittal Comments/Protest al.Availability: Public II Conversion clist=1424352

Comments of DW Peckliam on Niagara Mohawk Pwr relic program re Black River Proj et al Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1991 Multiple Submittal Comments/Protest under P-2569 et al.Availability: Public II Conversion clist=1424357

Niagara Mohawk submits supporting design repts for Colton Proj et al per 910606 ltr under P- Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/30/1991 Multiple Submittal 2320 et al.Availability: Public Correspondence II Conversion clist=1428075

Niagara Mohawk Pwr Corp requests for 401 water quality cert re appl for new lic for Middle Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/27/1991 P-2320-005 Submittal Raquette River Proj 2320.Availability: Public quest Application clist=1424241

Niagara Mohawk Power Corp support design rept for lic appl re Middle Raquette River Proj Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/23/1991 P-2320-005 Submittal under P-2320.Availability: Public quest Application clist=1423664

Niagara Mohawk Power Corp submits appl for new lic for Middle Raquette River Proj- Application/Petition/Re License/Relicense http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/23/1991 P-2320-005 Submittal 2320.Availability: Public quest Application clist=1422301

Niagara Mohawk Power Corporation submits the Exhibit C Project Schedule re the Middle Project Operations http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/23/1991 P-2320-000 Submittal Report/Form Public Raquette River Project under P-2320. Compliance Report clist=14193791

Niagara Mohawk Power Corporation submits the Environmental Report for the Middle Environmental Study http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/23/1991 P-2320-000 Submittal Report/Form Public Raquette River Project under P-2320. & Report clist=14193808

Niagara Mohawk Power Corporation submits Exhibit F General Design Drawings for the http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/23/1991 P-2320-000 Submittal Exhibit Exhibit Public Middle Raquette River Project under P-2320. clist=14194382

Niagara Mohawk Power Commission submits the Environmental Report re the Middle Environmental Study http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/21/1991 P-2320-000 Submittal Report/Form Public Raquette River Project under P-2320. & Report clist=14193795

Niagara Mohawk Pwr Corp submits rept of KWH generated in FY91 at Green Island Proj 13 Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/31/1991 Multiple Submittal Report/Form et al.Availability: Public Report clist=1410609

Niagara Mohawk Pwr Corp submits summary of all boater safety devices on licensed hydro Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/24/1991 Multiple Submittal projects routinely removed for winter ice & annual flooding problems etc under P-2047 et Correspondence II Conversion clist=1405904 alAvailability: Public

Niagara Mohawk Pwr submits (2) blank VHS video tapes for copying of projects filmed earlier Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/20/1991 Multiple Submittal this year re Raquette River Proj-2320 et al.Availability: Public Correspondence II Conversion clist=1395247

Ltr order accepting proposed submittal dates for Colton Proj et al of Niagara Mohawk Pwr http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/13/1991 Multiple Issuance Order/Opinion Delegated Order Public Corp under P-2320.et al. clist=1388281

Niagara Mowhawk Pwr Corp advises that evaluations will be forwarded for Colton Proj,et al Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/30/1991 Multiple Submittal under P-2320,et al.Availability: Public Correspondence II Conversion clist=1386581

Dam Safety Operation rept for Raquette River Proj 2320(Higley,Colton, Hannawa & Sugar Island) of Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/25/1991 P-2320-000 Issuance FERC Report/Study Niagara Mohawk Pwr Co for period from 891101 to 910710.Availability: CEII Report/Operation clist=1384770 Report

48 Page 49 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Comments of Fish & Wildlife Svc discussing issues of disagreement on Middle Raquette Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/24/1991 P-2320-000 Submittal Comments/Protest River Proj under P-2320.Availability: Public II Conversion clist=1382621

Comments of US Fish & Wildlife Svc re Middle Raquette River Proj,NY under P- Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/17/1991 P-2320-000 Submittal Comments/Protest 2320.Availability: Public II Conversion clist=1380752

Ltr notice requesting Niagara Mohawk Power Corp evaluate hazard potential & furnish w/in http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/6/1991 Multiple Issuance Notice Formal Notice 60 days sched for submitting rept re Colton Proj 2320 et al.Availability: Public clist=1369075

Niagara Mohawk advises of joint agency meeting for Middle Raquette River Project on Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/9/1991 P-2320-000 Submittal 910603 under P-2320.Availability: Public Correspondence II Conversion clist=1361981

Comments of NY State Office of Parks,Recreation & Preservation re draft lic appl for Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/1/1991 P-2320-000 Submittal Comments/Protest Raquette River Proj under P-2320.Availability: Public II Conversion clist=1358020

Niagara Mohawk Pwr Corp submits info re boater safety at Raquette River Proj,NY under P- Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/9/1991 P-2320-000 Submittal 2320.Availability: Public Correspondence II Conversion clist=1351697

Ltr order accepting Niagara Mohawk Pwr Corp boater safety system for Raquette River Proj http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/22/1991 P-2320-000 Issuance Order/Opinion Delegated Order under P-2320.Availability: Public clist=1346042

Niagara Mohawk Pwr Corp submits plan,sched & details for required safety measures re Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/1/1991 P-2320-000 Submittal boater safety for Raquette River proj under P-2320.Availability: Public Correspondence II Conversion clist=1346896

Niagara Mohawk Power Corp response to GD Patten's 910206 ltr re Black River Hydro Proj- Application/Petition/Re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/22/1991 Multiple Submittal 2569 et al.Availability: Public quest II Conversion clist=1337278

Comments of US Dept of Interior Fish & Wildlife Svc re Black River Proj et al under P-2569 et Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/20/1991 Multiple Submittal Comments/Protest al.Availability: Public II Conversion clist=1336760

Comments of US Dept of Interior Natl Park Svc re Niagara Mohawk Power Corp draft appls Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/6/1991 Multiple Submittal Comments/Protest for Black River Hydro Proj et al under P-2569 et al.Availability: Public II Conversion clist=1333142

Niagara Mohawk submits Conveyance rept for CY90 Green Island Proj & other proj listed in Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/30/1991 Multiple Submittal Report/Form attached Sched 1 under P-13 et al.Availability: Public Report clist=1329229

Discusses ECPA compliance history for Niagara Mohawk Pwr Corp re Raquette River Proj Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/25/1991 P-2320-000 Issuance FERC Memo 2320-NY.Availability: Privileged II Conversion clist=1332104

Rep Martin requests info on lic renewals for area projs,P-2230,P-2320 & P-2330.Availability: Congressional http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/21/1990 Multiple Submittal Other Submittal Public Submittal clist=1327020

Annual rept by Niagra Mohawk of KHW generated for Green Island Proj,et al in FY90 under P- Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/31/1990 Multiple Submittal Report/Form 13, et al.Availability: Public Report clist=1297508

Ltr notice directing Niagara Mohawk Power Corp to submit info for plan & location of barrier http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/12/1990 P-2320-000 Issuance Notice Formal Notice system re Colton et al Developments under P-2320.Availability: Public clist=1215934

Rept of Niagara Mohawk Power Corp of no conveyance made during CY89 re Raquette River Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/6/1990 P-2320-000 Submittal Report/Form Proj under P-2320.Availability: Public Report clist=1212710

Ltr order granting Niagara Mohawk Power Corp request for extension of time to 900202 to http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/6/1990 P-2320-000 Issuance submit suppl rept on field investigation for Middle Raquette River Proj under P- Order/Opinion Delegated Order clist=1213505 2320.Availability: Public

49 Page 50 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Ltr notice requesting Niagara Mohawk Power to submit speci- fic plan/sched for installing http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/8/1989 P-2320-000 Issuance Notice Formal Notice boater restraining sys etc for P-2320 by 891215.Availability: Public clist=1188289

Finds Niagara Mohawk Power Corp plan of action re 5th consultants safety insp rept for FERC Correspondence Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/1/1989 P-2320-000 Issuance Raquette River Proj,Norwood Devel under P-2320 satisfactory.Availability: Public With Applicant II Conversion clist=1184626

Niagara Mohawk response to Adirondack Boardsailing Club 890812 ltr re recreational facils Application/Petition/Re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/5/1989 Multiple Submittal available at P-2330 et al.Availability: Public quest II Conversion clist=1175328

Motion of Niagara mohawk Power for waiver of certain public meeting recording obligations re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/2/1989 P-2320-000 Submittal Pleading/Motion raquette River Proj under P-2320.Availability: Public II Conversion clist=1173085

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/26/1989 Multiple Submittal Inspection of Proj nos 2320 ,2330 & 9222 re Niagara Mohawk Power Corp .Availability: Public Report/Form Progress Report clist=1143212

Comments of St Lawrence Valley Trout Unltd re relic of Niagara Mohawk's Middle Raquette Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/8/1989 P-2320-000 Submittal Comments/Protest River Hydro Proj,NY.Availability: Public II Conversion clist=1139538

Niagara Mohawk Power Corp Raquette River Proj:Exhibit L-8B plan,elevation & sections of http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/11/1989 P-2320-000 Submittal Drawing/Maps Drawing/Maps dam,surge tank & powerhouse. FERC NO. 2320-30Availability: CEII clist=1118465

http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/7/1989 P-2320-000 Issuance Notice of intent to file appl for new lic re Niagara Mohawk Power.Availability: Public Notice Formal Notice clist=1105672

Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/21/1989 P-2320-000 Submittal Comments of Trout Unlimited to Niagara Mohawk on relicensing of P-2320.Availability: Public Comments/Protest II Conversion clist=1100868

Niagara Mohawk notice of intent to file appl for relicensing of Middle Requette River Application/Petition/Re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/29/1988 P-2320-000 Submittal Hydroelectric Project.Availability: Public quest II Conversion clist=1081821

Niagara Mohawk Power submits innundation map drawings for Sugar Island Devel,Raquette Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/18/1988 P-2320-000 Submittal River Proj per NYRO 880811 ltr.Availability: Public Correspondence II Conversion clist=1038995

Ltr order accepting Niagara Mohawk Powr 4th consultant safe- ty insp rept re Raquette River http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/15/1988 P-2320-000 Issuance Order/Opinion Delegated Order Proj. 880715Availability: Public clist=1026145

Dam Safety Operation rept for Higley,Colton,Hannawa & Sugar Island Devel of Raquette River Proj for Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/12/1988 P-2320-000 Issuance FERC Report/Study 870414-880615 period.Availability: CEII Report/Operation clist=1025987 Report

Comments of US Fish/Wildlife re study for Middle/Lower Raquette River projs.Availability: Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/8/1988 P-2320-000 Submittal Comments/Protest Public II Conversion clist=1025941

Niagara Mohawk Power Raquette River Proj:Exhibit L,Sheet 5B, exist Hannawa Devel- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/12/1988 P-2320-000 Submittal Drawing/Maps Drawing/Maps plan,elev/sect of dam,canal intake,etc. FERC NO. 2320-30 P-2320Availability: CEII clist=1020370

Order approving Niagara Mohawk Corp As Built Exhibit L draw- ing re Raquette River Proj,P- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/12/1988 P-2320-004 Issuance Order/Opinion Delegated Order 2320-004.Availability: Public clist=1004054

Niagara Mohawk Power submits as-built Exhibit L drawings for Hannawa Devel of Raquette Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/2/1988 P-2320-004 Submittal River Proj.Availability: Public Correspondence II Conversion clist=981001

Niagara Mohawk Power submits resumes of JJ Devine/J Northrop for FERC approval re Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/9/1987 Multiple Submittal safety insp repts for P-2047 et al.Availability: Public Correspondence II Conversion clist=895822

50 Page 51 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Order denying rehearing of 861223 order denying appls for prelim permits for Projs 9556- Commission http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/28/1987 Multiple Issuance Order/Opinion 001,9557-001,9564-001,etc. 870528Availability: Public Order/Opinion clist=887688

Dam Safety Operation rept re Niagara Mohawk Power Corp for Raquette River Proj.Inspected by F Lee Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/19/1987 P-2320-000 Issuance FERC Report/Study on 870414.Availability: CEII Report/Operation clist=885210 Report

Niagara Mohawk Power submits revised pages to EAPs for P-2047,et al.Requests extension Emergency Action http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 3/30/1987 Multiple Submittal Report/Form until 870430 for P-13,et al.Availability: CEII Plan clist=877162

Order denying appl for prelim permit for Kamargo Corp et al for P-9556 etc. Commission http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/23/1986 Multiple Issuance Order/Opinion 861223Availability: Public Order/Opinion clist=836781

Comment that NY agency review indicates relicensing of Lower & Upper Raquette River Proj Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/20/1986 Multiple Submittal Comments/Protest will not affect historic sites.Availability: Public II Conversion clist=737980

Request of Niagara Mohawk for attendance at 860313 meeting re adequacy of data for initial Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 2/14/1986 Multiple Submittal stage of consultation.Availability: Public Correspondence II Conversion clist=736745

Order approving revised Exhibit L drawing re Niagara Mohawk Power Corp under P-2320- http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 7/9/1985 P-2320-003 Issuance Order/Opinion Delegated Order 003. 850709-01Availability: Public clist=648538

Fwds suppl to 4th consultant's safety insp rept for Raquette River Proj of Niagara Mohawk Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/10/1985 P-2320-000 Submittal Power.Availability: Public Correspondence II Conversion clist=618010

Submits revised exhibit L,Sheet 6A for Carry Falls Proj & Sheet 8B for Raquette River Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/10/1985 Multiple Submittal Proj.Availability: Public Correspondence II Conversion clist=617423

Part 12 Consultant Suppl to 4th consultant's safety insp rept for Raquette River Proj of Niagara Mohawk http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 4/5/1985 P-2320-000 Submittal Report/Form Safety Inspection Power.Availability: CEII clist=618017 Reports

Niagara Mohawk Power Corp certifies gross amount of power generated at listed projs for Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/25/1985 Multiple Submittal Report/Form CY84.Availability: Public Report clist=587089

Niagara Mohawk Power reports no conveyances for CY83 re lis- ted projs.W/encl.Availability: Annual Conveyance http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/23/1984 Multiple Submittal Report/Form Public Report clist=504806

Submits Niagara Mohawk Power Corp statement re gross amount of power generated under Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/27/1984 Multiple Submittal Report/Form listed license projs for CY83.Availability: Public Report clist=459723

Submits Niagara Mohawk Power revised Exhibit L as-built drawing re license for Raquette Application/Petition/Re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/17/1983 P-2320-000 Submittal River Proj.Availability: Public quest II Conversion clist=441167

Niagara Mohawk Power Exhibit L Sheet 8A:Raquette River Proj existing Sugar Island Devel http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/17/1983 P-2320-000 Submittal Drawing/Maps Drawing/Maps plan/sections. 831117Availability: CEII clist=443481

Niagara Mohawk submita revised pages to the Public Safety Plan makred September 1993 Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/29/1983 Multiple Submittal Report/Form Public for its Green Island Project et al under P-13 et al. Compliance Report clist=13489514

Niagara Mohawk submita revised pages to the Public Safety Plan makred September 1993 Project Safety http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 10/29/1983 Multiple Submittal Report/Form for its Green Island Project et al under P-13 et al. LARGE FORMAT ONLY.Availability: Public Compliance Report clist=13489812

Part 12 Consultant http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/31/1983 P-2320-000 Submittal Fourth safety insp report for Niagara Mohawk Power Raquette River Proj.Availability: CEII Report/Form Safety Inspection clist=416899 Reports

51 Page 52 Gendale_Docket.xlsm

Date FERC ID Category Subject Class Type Availability Info

Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 8/30/1983 P-2320-000 Submittal Forwards Niagara Mohawk Power 4th insp report re Raquette River Proj.Availability: Public Correspondence II Conversion clist=416898

Submits statement of gross kilowatt-hours generated at Green Island Station,et al,during Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/28/1983 Multiple Submittal Report/Form CY82 by Niagara Mohawk Power.Availability: Public Report clist=351617

Form 80 - Licensed Licensed hydropower devel recreation rept re Niagara Mohawk Power Corp,Raquette River Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1982 P-2320-000 Submittal Report/Form Proj,P-2320A. FORM 80Availability: Public Development clist=376707 Recreation Report Form 80 - Licensed Licensed hydropower devel recreation rept re Niagara Mohawk Power Corp,Raquette River Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1982 P-2320-000 Submittal Report/Form Proj,P-2320B. FORM 80Availability: Public Development clist=376709 Recreation Report Form 80 - Licensed Licensed hydropower devel recreation rept re Niagara Mohawk Power Corp,Raquette River Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1982 P-2320-000 Submittal Report/Form Proj,P-2320C. FORM 80Availability: Public Development clist=376710 Recreation Report Form 80 - Licensed Licensed hydropower devel recreation rept re Niagara Mohawk Power Corp,Raquette River Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1982 P-2320-000 Submittal Report/Form Proj,P-2320D. FORM 80Availability: Public Development clist=376712 Recreation Report

Submits 3 35mm microfilm reproducibles for listed drawings re Raquette River Proj,per Application/Petition/Re Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 6/9/1982 P-2320-000 Submittal 820511 order approving Exhibit G.Availability: Public quest II Conversion clist=284065

Order approving Exhibit G filed on 810924 by Niagara Mohawk Power Corp,consisting of 12 http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 5/11/1982 P-2320-001 Issuance Order/Opinion Delegated Order text pages & listed drawings.Availability: Public clist=273851

Statement certifying gross amts of power generated under listed license projs during Annual Generation http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 1/28/1982 Multiple Submittal Report/Form CY81.Availability: Public Report clist=244870

Dam Safety Operation rept of Higley,Colton,Hannawa & Sugar Island Pro- jects on 800930 on dams, Inspection http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 11/19/1981 P-2320-000 Issuance FERC Report/Study power plants & waterways.Availability: CEII Report/Operation clist=235041 Report

Fwds data requested in 810920 & 810915 ltrs re operation of spillway gates.Availability: Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/21/1981 Multiple Submittal Public Correspondence II Conversion clist=235006

Applicant Untyped During RIMS http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 9/21/1981 Multiple Submittal Forwards ltr re operation of spillway gates.Availability: Public Correspondence II Conversion clist=233195

Form 80 - Licensed Licensed hydropower devel recreation rept re Niagara Mohawk Power Corp(NY)Raquette Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1980 P-2320-000 Submittal Report/Form River Proj & Hannawa Devel,P-2320C. FORM 80Availability: Public Development clist=323276 Recreation Report Form 80 - Licensed Licensed hydropower devel recreation rept re Niagara Mohawk Power Corp(NY)Raquette Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1980 P-2320-000 Submittal Report/Form River Proj & Sugar Island Dev,P-2320D FORM 80Availability: Public Development clist=323277 Recreation Report Form 80 - Licensed Licensed hydropower devel recreation rept re Niagara Mohawk Power Corp(NY)Raquette Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1980 P-2320-000 Submittal Report/Form River Proj & Higley Devel,P-2320A. FORM 80Availability: Public Development clist=323280 Recreation Report Form 80 - Licensed Licensed hydropower devel recreation rept re Niagara Mohawk Power Corp(NY)Raquette Hydropower http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_info=yes&do 12/31/1980 P-2320-000 Submittal Report/Form River Proj & Colton Devel,P-2320B. FORM 80Availability: Public Development clist=323281 Recreation Report