Sr. DME Sri Vineet Singhal

Total Page:16

File Type:pdf, Size:1020Kb

Sr. DME Sri Vineet Singhal ORGANISATION PROFILE Sr. DME Sri Vineet Singhal DME CDO Sri G.S. Reddy Sri Ch. V. Ramana ADME ADME ADME ADME Sri M. T. Kumar Sri Masum Ali Sri D. Nandi Sri D.C. Appala Naidu at WAT at KRPU at WAT at VSPS Mechanical Department is headed by Senior Divisional Mechanical Engineer. He is assisted by Divisional Mechanical Engineer (DME), Coaching Depot Officer (CDO) & 4 Assistant Divisional Mechanical Engineers (ADMEs). Out of four ADMEs, two are based at Visakhapatnam (VSKP), one at Visakhapatnam Steel Plant Siding (VSPS) & another at Koraput (KRPU) of Waltair Division. GAZETTED Name Desig. Duties DOT (O) Rly. (O) (0891) (085) Branch Officer. Over all in-charge of Shri Vineet Singhal Sr. DME 2746270 82270 Mechanical Branch. Shri G.S. Reddy DME In-charge of Operation & maintenance of BD cranes, ART, ARME, Loco operations etc., 2702664 82276 Shri Ch. V. Ramana CDO In-charge of Carriage & Wagon activities, Coaching Depot/Visakhapatnam, Vizianagram - 82476 & Rayagada, monitors works matters, WILD, weighbridges etc. Shri M. Trinadh ADME-I In-charge of Carriage & Wagon depots at Ore Kumar Exchange Complex and Reception & Dispatch - 82058 Yard. In-charge of Carriage & Wagon depot at Shri D. Nandi ADME-II - 82474 Central Sick Line and Reception Yard. Sri D.C. Appala ADME- VSPS In-charge of Carriage & Wagon depot at - 83058 Naidu Visakhapatnam Steel Plant Siding. In-charge of Carriage & Wagon depots at Shri Masum Ali ADME-KK LINE - - Kirandul, Bacheli, Koraput & Damanjodi. STAFF STRENGTH Non-Gaz. Sr. No Branch Sanctioned Strength Group ‘C’ Group ‘D’ Total 1 Mech (C&W) 1555 666 2221 2 Mech (Power) 112 53 165 3 Running Staff 153 - 153 GRAND TOTAL 1820 719 2539 ACTIVITIES AT A GLANCE CARRIAGE & WAGON Freight Maintenance Facilities Visakhapatnam Complex Ore Exchange Complex Routine Overhauling (ROH) and Closed Circuit (CC) rakes Preventive Maintenance (OEC) Examination (PME), Premium examination of BOXN, BOBRN & BOY wagons, sick wagon attention. Central Sick Line Routine Overhauling of BTPN & general sick repairs to all Non-CC stock & heavy (CSL) panel patch repairs. Reception Yard Train Examination & Preventive Maintenance Examination of BTPN closed circuit (RYD) rakes & BOBRN rakes, BCN rakes premium. Intensive examination of freight trains like BOX,BCX, BOXN and 4 Wheeler Tank wagons etc. Reception & Despatch Premium & Intensive train examination & exchange check with Port Train Examiner. Steel Plant complex Raw Material Unloading BOXN Closed Circuit Rake Preventive Maintenance Examination, end to end Yard Premium Examination of BOXN & BOY rakes, Intensive Train Examination, Routine Overhauling of BOXN, BOY & Sick Line repairs. Finished Products Yard Train examination/Intensive Examination. Outside Visakhapatnam Kirandul Loading of Iron Ore.(terminal examination & continuity check) Bacheli Loading of Iron Ore. (terminal examination& continuity check) Koraput Train Examination & sectional sick attention Rayagada Train Examination & sectional sick attention. Vizianagaram Train Examination & sectional sick attention. Damanjodi Brake Power Certification for National Aluminum Company Limited’s BTAP & BTCS rakes. This division maintains around 115+ closed circuit rakes, turns out approximately 420 routine overhauls of wagons per month and gives repair attention at Ore Exchange Complex (OEC), Visakhapatnam Steel Plant Siding (VSPS) & Central Sick Line (CSL). Different types of train examinations like preventive maintenance examination (PME), Intensive etc., as per prescribed schedule are carried out in these maintenance facilities using modern equipments and manpower under strict supervision to ensure trouble free and safe operation. Coach Maintenance Facilities The New Coaching Complex, Visakhapatnam is equipped with modern infrastructural facilities for maintenance of coaching stock. 38 rakes/ 550 coaches are maintained to service 7 Superfast, 7 Mail/Express and 6 Passenger trains. Watering of coaches, intermediate overhauling (IOH) of primary coaches, terminal as well as through pass coaching trains examination are given for comfortable and safe travel for the travelling public. Visakhapatnam Complex Facilities Integrated Pit: 5Nos. of 600 meters length each, Sick line / IOH of 34 m x 76 m. Primary Maintenance Samata(12807/08), Visakhapatnam-Hazrat Nizamuddin Link(12861/62), Swarnajayanthi(12803/04), Korba Express(18518/17), Hirakud(18507/08), Janmabhoomi(12805/06), Nanded Express (18509/10), Visakhapatnam-Digha Express(22874/73), Lokmaniya Tilak Nagar Terminus(22819/20) Express via Vijayawada, Lokmaniya Tilak Nagar Terminus(22847/48) Express via Raipur, Visakhapatnam- Bhubaneswar (18412/11) Intercity Express, Visakhapatnam-Koraput (18512/11) Intercity Express, Visakhapatnam-Manmad 5 slip coaches attached to Puri- Tirupathi Express (17479/80) & 6 sets of Passenger trains IOH Intermediate overhauling for primary coaches. Outside Visakhapatnam Complex Rayagada Through pass coaching trains attention, watering of coaches, terminal maintenance of (57271/72)Vijayawada-Rayagada Passenger. Koraput Through pass attention to 58501/02 – Visakhapatnam- Kirandul Passenger trains & terminal attention of (18005/06)Samleswari Express, (18447/48)Hirakhand Express, (18107/08)Rourkela–Koraput Express & (58538/58542-58537/58541) Visakhapatnam-Rayagada- Koraput Passenger. Kirandul Terminal attention to 58501/02 - Visakhapatnam-Kirandul Passenger Vizianagram Through pass attention and watering of trains not touching Visakhapatnam Clean Train Station (CTS): Visakhapatnam has been nominated as ‘CLEAN TRAIN STATION’. During the halt period at station between 0600 and 2200 hours, the toilets and inside of coaches are cleaned by advanced equipments for comfortable and hygienic travel by the public of train. On daily basis, 500+ coaches of through trains are cleaned, 725 are watered and 96 platform returned coaches are attended at Visakhapatnam station. On-Board House Keeping Services of VSKP based trains: To maintain cleanliness of the train while on run, seven long distance trains are provided with on board housekeeping service. This has ensured cleanliness of toilets and interiors etc. throughout the journey to the passengers’ satisfaction. The trains are: 12803/04 – Visakhapatnam – Hazrat Nizamuddin, Swarnajayanti Express 12807/08 – Visakhapatnam – Hazrat Nizamuddin, Samata Express 12861/62 – Visakhapatnam – Hazrat Nizamuddin, Link Express 18507/08 – Visakhapatnam – Amritsar, Hirakud Express 18509/10 – Visakhapatnam – Nanded Express 18518/17 – Visakhapatnam – Korba Link Express 22819/20 – Visakhapatnam – Lokmaniya Tilak Nagar Terminus Express via BZA Pest and rodent control measures are taken to eliminate the menace cockroaches and rodents in trains. ART’s & ARMEs : To meet any emergencies / accidents/ disasters, this Department maintains ARMEs & ARTs with a quick response team. These are equipped with modern rescue equipments, medical facilities, cranes, IMMARSAT telephones etc. to carry out rescue and relief operations efficiently and in quick time. Sl. No. Type Location Class Facilities 1 ARME VSKP Scale-I Self propelled ARMV 2 ARME KRPU Scale-I 2 conventional ARME coaches. 3 ART VSKP “A” 120 T & 140T D/cranes with Lukas re-railing equipment. 4 ART RGDA “A” 120 T Diesel Crane with LUKAS re-railing equipment. 5 ART KRDL “A” 120 T Diesel Crane with LUKAS re-railing equipment. 6 ART KRPU “B” MFD re-railing equipment In-motion Weighbridges: 4 Nos. of In-motion weighbridges (1 at Bhansi, 2 at Simhachalam North & 1 at Ore Exchange Complex) are being maintained by this department. LOCO OPERATIONS Mechanical Department looks after crew lobby at Rayagada, Running Rooms at Damanjodi & Rayagada. It also maintains two Railway Consumer Depots (RCDs) at Departure Yard/Visakhapatnam & Rayagada. Daily issues of HSD oil from these two RCDs is around 180 Kilolitres. Crew Management System(CMS) developed by CRIS is functional at Rayagada. Running Rooms: The department maintains Loco Pilots & Guard running rooms at Rayagada (77 beds) & Damanjodi (15beds). These are maintained as per Railway Board guidelines to provide proper rest to running staff. “Being part of the “Lifeline of the Nation”, this department is striving hard and will continuously upgrade itself to meet the growing demands and challenges”. For further information related to tenders or bills etc., please visit http://www.eastcoastrail.indianrailways.gov.in and http://www.tenders.gov.in/ .
Recommended publications
  • LOK SABHA ___ SYNOPSIS of DEBATES (Proceedings Other Than
    LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Tuesday, July 15, 2014 / Ashadha 24, 1936 (Saka) ______ STATEMENT BY MINISTER Re: Reported meeting of an Indian journalist with Hafiz Saeed in Pakistan. THE MINISTER OF EXTERNAL AFFAIRS AND MINISTER OF OVERSEAS INDIAN AFFAIRS (SHRIMATI SUSHMA SWARAJ): On the issue which was raised yesterday in the House, I, with utmost responsibility and categorically and equivocally would like to inform this House that the Government of India has no connection to the visit by Shri Ved Prakash Vaidik to Pakistan or his meeting with Hafiz Saeed there. Neither before leaving for Pakistan nor at his arrival there, he informed the Government that he was to meet Hafiz Saeed there. This was his purely private visit and meeting. It has been alleged here that he was somebody‟s emissary, somebody‟s disciple or the Government of India had facilitated the meeting. This is totally untrue as well as unfortunate. I would like to reiterate that the Government of India has no relation to it whatsoever. *MATTERS UNDER RULE 377 (i) SHRI BHARAT SINGH laid a statement regarding need to start work on multipurpose project for development of various facilities in Ballia Parliamentary constituency, Uttar Pradesh. (ii) SHRI BHANU PRATAP SINGH VERMA laid a statement regarding need to extend Shram Shakti Express running between New Delhi to Kanpur upto Jhansi. (iii) SHRIMATI JAYSHREEBEN PATEL laid a statement regarding need to expedite development of National Highway No. 228 declared as a Dandi Heritage route. (iv) SHRI DEVJI M. PATEL laid a statement regarding need to provide better railway connectivity in Jalore Parliamentary Constituency in Rajasthan.
    [Show full text]
  • New Delhi/NDLS to Mathura/MTJ - 67 Trains - India Rail Inf
    New Delhi/NDLS to Mathura/MTJ - 67 Trains - India Rail Inf... http://indiarailinfo.com/search/664/0/249 2 PNR Posts Wed Sep 19, 2012 08:44:09 IST Home Trains ΣChains Atlas PNR Forum Gallery News FAQ Trips Members Login Feedback from station via station to station Search train Disclaimer All Departures from New Delhi Search Return Journey All Arrivals at Mathura 67 Trains / 1 ΣChains from New Delhi/NDLS to Mathura Junction/MTJ Filter this Search Date of Travel Quota: General Get Seat Availability 2S SL CC Ex 3A FC 2A 1A 3E Adult (12 and above) Refresh Total Seats All Trains Morning Afternoon Evening Exact Match Switch to Trains at a Glance View Try these Via Stations: Shoranur No. Name Type Zone From Dep ↑↑ To Arr Duration Halts Dep Days Classes Distance Speed 04012 Nizamudin - Sai Naga... Exp NR NZM* 00:20 MTJ 02:30 2h 10m 0 F II SL 3A 2A 1A 134 km 61 km/hr 18238 Chhattisgarh Express Exp SECR NZM 04:40 MTJ 07:05 2h 25m 4 S M T W T F S II SL 3A 2A 1A 134 km 55 km/hr 18238-Slip Chhattisgarh Express... Exp SECR NZM 04:40 MTJ 07:05 2h 25m 4 S M T W T F S II SL 3A 2A 1A 134 km 55 km/hr 12138 Punjab Mail SF CR NDLS 05:15 MTJ 07:50 2h 35m 2 S M T W T F S II SL 3A 2A 1A 141 km 54 km/hr 12782 Nizamuddin-Mysore Sw..
    [Show full text]
  • History of Indian Railways in Orissa (A Lot of It Borrowed from the SER Web Pages and Rest Compiled by Chitta Baral, [email protected])
    History of Indian Railways in Orissa (a lot of it borrowed from the SER web pages and rest compiled by Chitta Baral, [email protected]) 1887 The Bengal Nagpur Railway was formed. 6th Oct 1890 The East Coast Railway was inaugurated. 1893 to 1896 800 miles of East Coast Railway line was built and opened for traffic. 1893 to 1896 East Coast Railway built some of the largest bridges viz. Brahmani, Mahanadi, Katjuri, Kuakhai and Birupa during the period. 1st Feb 1897 Khurda Road-Puri (27 miles) section was opened for traffic. 1898-99 Kharagpur-Cuttack was opened for traffic. 1st Jan 1899 BNR’s Line to Cuttack was opened. March 1901 The construction of a bridge on River Mahanadi near Cuttack was completed. 1911 A 40 mile branch line from Tatanagar to Gurumahisarani where plenty of iron ores are available was opened for traffic. 1922 BNR Hotel at Puri was established 1922 Tatanagar-Gurumahisani line was extended upto Badampahar. Feb 1925 Extension to Gua was completed. 1929-31 Parlakmedi-Gunupur section was opened in two portions in 1929 and 1931. 1st Oct 1944 The management of Bengal Nagpur Railway was taken by Government of India. 1955 B N R Emerged as South Eastern Railway. 1960 The Dandakaranya-Bolangir-Kiriburu Railway Project. [Kottavalasa- Koraput-Jeypore-Kirandul Construction (Dandakaranya Project), Titlagarh-Bolangir-Jharsuguda Project and Rourkela-Kiriburu Project; all these 3 projects put together were popularly known as DBK Project - Dandakaranya-Bolangir-Kiriburu Project.] 31st Jan 1962 Foundation stone of Cuttack-Paradip line was laid by the then Prime Minister, Late Jawarlal Nehru.
    [Show full text]
  • C O N T E N T S
    04.01.2018 1 C O N T E N T S Sixteenth Series, Vol. XXVIII, Thirteenth Session, 2017-2018/1939 (Saka) No. 12, Thursday, January 04, 2018/Pausha 14, 1939 (Saka) S U B J E C T P A G E S ORAL ANSWERS TO QUESTIONS Starred Question Nos. 241 to 245 13-70 WRITTEN ANSWERS TO QUESTIONS Starred Question Nos. 246 to 260 71-124 Unstarred Question Nos. 2761 to 2990 125-594 The sign + marked above the name of a Member indicates that the Question was actually asked on the floor of the House by that Member. 04.01.2018 2 PAPERS LAID ON THE TABLE 596-607 MESSAGE FROM RAJYA SABHA AND BILL AS PASSED BY RAJYA SABHA 608 COMMITTEE ON VIOLATION OF PROTOCOL NORMS AND CONTEMPTUOUS BEHAVIOUR OF GOVERNMENT OFFICERS WITH MEMBERS OF LOK SABHA 1st to 3rd Reports 609 COMMITTEE ON ABSENCE OF MEMBERS FROM THE SITTINGS OF THE HOUSE Minutes 609 COMMITTEE ON THE WELFARE OF SCHEDULED CASTES AND SCHEDULED TRIBES 15th to 17th Reports 610 COMMITTEE ON GOVERNMENT ASSURANCES 67th to 72nd Reports 611 STANDING COMMITTEE ON LABOUR 33rd Report 611 STANDING COMMITTEE ON RAILWAYS 18th Report 612-613 04.01.2018 3 STANDING COMMITTEE ON URBAN DEVELOPMENT 21st Report 613 STANDING COMMITTEE ON COAL AND STEEL 37th Report 613 STANDING COMMITTEE ON SCIENCE AND TECHNOLOGY, ENVIRONMENT AND FORESTS 302nd to 308th Reports 614-615 STANDING COMMITTEE ON TRANSPORT, TOURISM AND CULTURE 256th Report 615 STATEMENT CORRECTING REPLY TO STARRED QUESTION NO. 55 DATED 19.12.2017 REGARDING RISE IN PRICES OF PULSES ALONGWITH REASONS FOR DELAY 615-618 STATEMENTS BY MINISTERS 619-622 (i) Status of implementation
    [Show full text]
  • Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______
    LOK SABHA ___ SYNOPSIS OF DEBATES* (Proceedings other than Questions & Answers) ______ Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______ SUBMISSION BY MEMBERS Re: Farmers facing severe distress in Kerala. THE MINISTER OF DEFENCE (SHRI RAJ NATH SINGH) responding to the issue raised by several hon. Members, said: It is not that the farmers have been pushed to the pitiable condition over the past four to five years alone. The miserable condition of the farmers is largely attributed to those who have been in power for long. I, however, want to place on record that our Government has been making every effort to double the farmers' income. We have enhanced the Minimum Support Price and did take a decision to provide an amount of Rs.6000/- to each and every farmer under Kisan Maan Dhan Yojana irrespective of the parcel of land under his possession and have brought it into force. This * Hon. Members may kindly let us know immediately the choice of language (Hindi or English) for obtaining Synopsis of Lok Sabha Debates. initiative has led to increase in farmers' income by 20 to 25 per cent. The incidence of farmers' suicide has come down during the last five years. _____ *MATTERS UNDER RULE 377 1. SHRI JUGAL KISHORE SHARMA laid a statement regarding need to establish Kendriya Vidyalayas in Jammu parliamentary constituency, J&K. 2. DR. SANJAY JAISWAL laid a statement regarding need to set up extension centre of Mahatma Gandhi Central University, Motihari (Bihar) at Bettiah in West Champaran district of the State. 3. SHRI JAGDAMBIKA PAL laid a statement regarding need to include Bhojpuri language in Eighth Schedule to the Constitution.
    [Show full text]
  • 392 Government [RAJYA SABHA] Bill It Is a State Subject
    392 Government [RAJYA SABHA] Bill K : K ह, It is a State subject. ...(Interruptions)... A notice has to be given ...(Interruptions ह ह ह, ह ह H ह ....()... K ह : , ह ह ह ....()... ह ह^ # ह ह ....()... K : , ....()... K ह : , ....()... K : , ....()... K Z ह (4 Z): ह c ह ....()... MR. DEPUTY CHAIRMAN: Please allow the Business to go on. ... (Interruptions)... K ह : , ह ह z ह ....()... K ^W (4 Z): ह ह ह ....()... K : ....()... K ह :^X ह K ....()... K : ह , , ....()... Please allow the Business. ...(Interruptions)... __________ GOVERNMENT BILL The Appropriation (Railways) No. 3 Bill, 2007 U (K Z): ह, Z ह “ ZG 4 G 2007-2008 # Z , > H , The question was proposed. K ^W (): ^ ह, ह # ह ह ह, c ह # ह a# Government [29 AUG., 2007] Bill 393 , EU # ह U ह ^ ह $ P ह U ह H ह - ह G ह ह ह, ] U ] EU# ह ह ह EU ह ह a ह ह, ह ह ह ह H ह ह ह ह ह ह ह U ह G ह हह ह ह c ह, ह ह EU ह ह ह G ह ह EU# ह , G ह ह, ह ह ह c , ह घ . ह # ह ह, ह P ह ह ह ह, ह ह ह ह H G ह ह ह ह, ह ह, ह ह ह P ZK ह ZK -ह ह ह, ह ^ ] ह, ह Zc G # ह ह, ह P G ह ह U ह ह, Z EU ह, EU# ह, ह, 15 20 c ह, ह ह ह, ] ह, ] ह ह ह ह ह ह ह ^ ह ह ह ह, हz ह ह ह,
    [Show full text]
  • 5V]YZ Rzc Y`Gvcd
    * , > %? %? ? !"# 4- 0 56 786 4 , $%&' !() !"# (31, ,+9, =3 1..= +0=3,, (+,39:02, -==1 =,-,0 =3-- :, = .,3+)3,=3 +;-<!5 $ $ % &' $ &() !* !+!7 ! "$% !& " # $ Q R R ,,-.+ O international human right law, fter a short respite from especially with regards to Apollution during the day Articles 9 and 14 of the on Saturday, the Average AIR International Covenant on Quality Index (AAQI) marked Civil and Political Rights severe with pollutants measur- (ICCPR). ing 402 microgram per cubic “In particular, provide metre on the National Ambient information about the evi- Air Quality Index (NAAQI) in ,,-.+ dence used to substantiate the the evening. charges of incitement to vio- !"# Meanwhile, Environment aking note of arrest of six lence and the charge of $ % Pollution Control Authority Tprominent human rights attempting to assassinate the & ' !( (EPCA) on Saturday extended defenders and lawyers — Prime Minister. Please explain ) the ban on construction activ- branded “Urban Naxals” — the reasoning behind the sub- % ities and entry of heavy vehicles the Special Rapporteurs of jection of Mahesh Raut, Sudhir *# in the national Capital till Human Rights Council (HRC) Dhawale, Roma Wilson to soli- +, !- Monday. Also, more than 450 has written to Permanent tary confinement and how this % # heavy and medium goods vehi- Mission of India (PMI) in is compatible with interna- # cles were sent back from Delhi Geneva seeking information tional human rights norms # P Q borders due to the ban, author- about Surendra Gadling, Rona and standards. We would like ) 1 # ities said. Wilson, Shoma Sen, Sudha to have information concern- 2+3# The AQI during the day Bhardwaj, Mahesh Raut and ing the arrest and detention of 4+ 5 time was 394 that falls under Sudhir Dhawale.
    [Show full text]
  • As Part of Continuous Efforts to Establish Rail Connectivity With
    Bhubaneswar, 13.10.2014: As part of continuous efforts to establish rail connectivity with Visakhapatnam from Bhubaneswar, a Passenger Special train will run between Bhubaneswar and Visakhapatnam leaving Bhubaneswar at 1400hrs. (02.00P.M) today, i.e. on 13.10.2014 (Monday). This Special Train will stop at all Stations between Palasa & Visakhapatnam. Passengers may take advantage of this Special Train to go up to Visakhapatnam. As the Railway Emergency Staff deployed at sensitive locations between Bhubaneswar & Visakhapatnam are in work on war footing basis to repair the works in the affected areas, it is expected that the resumption of track upto Visakhapatnam from Palasa will be done at the earliest. However, some of the regular trains will be cancelled, short terminated and diverted as per the following :- DIVERSION: 01. 11020 Bhubaneswar-CSTM (Mumbai) Konark Express scheduled to leave Bhubaneswar today will be diverted via Vizianagaram, Raipur, Nagpur & Ballarshah. 02. 18645 Howrah-Hyderabad East Coast Express scheduled to leave Howrah today will be diverted via Kharagpur, Jharsuguda, Nagpur & Ballarshah. th 03. 15906 Dibrugarh-Kanyakumari Vivek Express left Dibrugarh on 11 October 2014 will be diverted via Kharagpur-Jharsuguda-Nagpur instead of its normal path. 04. 13351 Dhanbad-Alleppy Express scheduled to leave Alleppey today will be diverted via Kharagpur-Jharsuguda-Titilagarh-Raipur-Nagpur. SHORT TERMINATION :- 01.18447 Bhubaneswar-Jagadalpur Hirakhand Express scheduled to leave Bhubbaneswar today will be short terminated at Rayagada and will remain cancelled between Rayagada and Jagadalpur. 02.18448 Rayagada-Bhubaneswar Hirakhand Express scheduled to leave Jagadalpur on 14.10.2014 will originate from Rayagada instead of Jagadalpur and will remain cancelled between Jagadalpur & Rayagada on 14.10.2014.
    [Show full text]
  • Indian Railways Budget Speech 1996-97 (Final) 604 Speech of Shri
    Indian Railways Budget Speech 1996-97 (Final) Speech of Shri Ram Vilas Paswan Introducing the Railway Budget, for 1996-97, 16th July, 1996 Mr. Speaker, Sir, I rise to present the Budget Estimates for 1996-97 for the Indian Railways. 2. On 27th February, 1996, the previous Government had presented an interim budget. At that time, approval for 'Vote-on-Account' for the first four months of this financial year for railways' expenditure was obtained. 3. Mr. Speaker, this is the first Railway Budget of the United Front Government. On the one hand, I praise the vastness of the railways, its contribution to the nation's progress alongwith the efficiency of railway employees; on the other hand I would like to present before the august House the challenges and difficulties which the railways face. 4. The United Front Government assumed office on 1st June, 1996. As a result, I had very less time to present the Railway Budget. During this short period, I tried to talk to more and more Hon'ble members and visit various States to know their problems. But despite my best efforts, I could not discuss the problems with all the Hon'ble members. However, I have tried to understand and solve their problems. I assure the Hon'ble members that these efforts would continue and those important projects which could not be taken up due to technical difficulties and want of time, I would definitely consider them in the Supplementary Demands for Grants in the next session. 5. On 16th April, 1853, a railway train reached Thane from Bombay after negotiating a small distance.
    [Show full text]
  • Indian Railway : New Train Time Table 2016 - 2017 Announced
    8/12/17 NEW TRAIN TIME TABLE 2017 - 2018 Details | IRCTC Help Ads by Google Train Time Table Train List Train Schedule Live Running Status Train INDIAN RAILWAY : NEW TRAIN TIME TABLE 2016 - 2017 ANNOUNCED Public Timetable’ and ‘Trains At a Glance’ Extended up to 30th September 2017 www.irctchelp.in/2016/06/train-time-table-2016.html 1/39 8/12/17 NEW TRAIN TIME TABLE 2017 - 2018 Details | IRCTC Help Updated 05.07.2017South Central Railway announced that the validity of the present ‘Southern Zone Public Timetable 2016-17’ and ‘Trains At a Glance 2016-17’ is extended up to 30th September, 2017. Accordingly, the new Zonal Railway ‘Public Timetable’ and ‘Trains At a Glance’ will come into effect from 1st October, 2017. SALIENT FEATURES OF TRAIN TIME TABLE 2016 - 2017 Ladies Special Train Time : Mumbai Local Trains (http://www.irctchelp.in/2017/05/ladies-special-trains- timing-mumbai.html) Indian Railway announced New Train Time Table 2016 - 2017. Here we are giving the highlights of all the 17 Railway zones's Time Table. Monsoon Train Time Table 2017 : Booklet Download (http://www.irctchelp.in/2017/03/monsoon- train-time-table-2017-konkan.html) Also Read :GST : IRCTC Food Menu Rates Revised (http://www.irctchelp.in/2012/12/irctc-food- menu-rates-revised.html) EAST COAST RAILW AY (EcoR) : NEW TRAIN TIME TABLE 2016 - 2017 (http://www.irctchelp.in/2016/06/train-time-table-2016.html#ECoR1617) NORTHERN RAILW AY (NR) : NEW TRAIN TIME TABLE 2016 - 2017 (http://www.irctchelp.in/2016/06/train-time-table- 2016.html#NR1617) SOUTH CENTRAL RAILW AY (SCR)
    [Show full text]
  • Booking Train Ticket Through Internet Website: Irctc.Co.In Booking
    Booking Train Ticket through internet Website: irctc.co.in Booking Guidelines: 1. The input for the proof of identity is not required now at the time of booking. 2. One of the passengers in an e-ticket should carry proof of identification during the train journey. 3. Voter ID card/ Passport/PAN Card/Driving License/Photo Identity Card Issued by Central/State Government are the valid proof of identity cards to be shown in original during train journey. 4. The input for the proof of identity in case of cancellation/partial cancellation is also not required now. 5. The passenger should also carry the Electronic Reservation Slip (ERS) during the train journey failing which a penalty of Rs. 50/- will be charged by the TTE/Conductor Guard. 6. Time table of several trains are being updated from July 2008, Please check exact train starting time from boarding station before embarking on your journey. 7. For normal I-Ticket, booking is permitted at least two clear calendar days in advance of date of journey. 8. For e-Ticket, booking can be done upto chart Preparation approximately 4 to 6 hours before departure of train. For morning trains with departure time upto 12.00 hrs charts are prepared on the previous night. 9. Opening day booking (90th day in advance, excluding the date of journey) will be available only after 8 AM, along with the counters. Advance Reservation Through Internet (www.irctc.co.in) Booking of Internet Tickets Delivery of Internet Tickets z Customers should register in the above site to book tickets and for z Delivery of Internet tickets is presently limited to the cities as per all reservations / timetable related enquiries.
    [Show full text]
  • SYNOPSIS of DEBATES (Proceedings Other Than Questions & Answers) ______
    Not for Publication For Members only LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Monday, March 15, 2021 / Phalguna 24, 1942 (Saka) ______ ANNOUNCEMENT BY THE SPEAKER HON. SPEAKER: On my own behalf and on behalf of the hon. Members of the House, I have great pleasure in welcoming His Excellency, Shri Duarte Pacheco, the President of the Inter-Parliamentary Union (IPU) who is on a visit to India as our hounoured guest. He arrived in India on Sunday, 14th March, 2021. Today he is seated in the Special Box. Apart from Delhi, he will visit Agra and Goa also before departing from India on Saturday, 20th March 2021. We wish him a happy and fruitful stay in our country. Through His Excellency, we convey our greetings and best wishes to all the hon. members in the IPU, the Government and the great people of Portugal. ________ STATEMENT BY THE MINISTER Re: Recent Developments Pertaining To The Welfare Abroad Of Indians, Non-Resident Indians And Persons Of Indian Origin In The Covid Situation THE MINISTER OF EXTERNAL AFFAIRS (DR. SUBRAHMANYAM JAISHANKAR): I rise to apprise this august House of recent developments pertaining to the welfare abroad of Indians, Non-Resident Indians and Persons of Indian Origin in the COVID situation. This is a subject on which many hon. Members have expressed deep interest. We in the Ministry of External Affairs also regularly receive communications relating to individual cases and respond to the best of our ability. Such concern is natural and I take this opportunity, to place before the House a comprehensive picture on the global state of affairs as a result of COVID, its impact on our people and the Government‘s response to the challenges that have emerged.
    [Show full text]