PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 1

ORDINARY EARTH EXCAVATION PROJECT OF

Mr. ANILAN T. S.

PROJECT FEASIBILITY REPORT ( PFR )

PROJECT SITE AT SURVEY Nos. 28/1, 28/5, ELAVALLY VILLAGE & PANCHAYAT, TALUK, DISTRICT,

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 2

INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 4 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 5 2.(i) Identification of project and project proponent 5 2.(ii) Brief description of the Nature of the project 5 2.(iii) Need for the project and its importance to the Country and or Region 5 2.(iv) Demand – Supply Gap 6 2.(v) Imports Vs. Indigenous Production 6 2.(vi) Export Possibility 6 2.(vii) Domestic / Export Markets 6 2.(viii) Employment generation (Direct & Indirect) due to the project 6 3.0 PROJECT DESCRIPTION 6 3.(i) Type of project including interlinked and interdependent projects 6 3.(ii) Location (map showing General Location, Specific Location & Project boundary & 7 Project site layout) with coordinates 3.(iii) Details of Alternate sites considered and the basis of selecting the proposed site, 7 particularly the environmental considerations 3.(iv) Size or magnitude of operation 7 3.(v) Project description with process details (a schematic diagram / flow chart showing 7 the project layout, components of the project etc should be given) 3.(vi) Raw material required along with estimated quantity, likely source, marketing area 8 of final products, mode of transport of raw materials and financial provisions 3.(vii) Resource optimization / recycling and reuse envisaged in the project 8 3.(viii) Availability of water its source, energy / power requirement & source 8 3.(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their 9 management / disposal 4.0 SITE ANALYSIS 9 4.(i) Connectivity 9 4.(ii) Land form, land use and land ownership 9 4.(iii) Topography (along with map) 9 4.(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies 10 (including area under CRZ)), shortest distances from the periphery of project. 4.(v) Existing Infrastructure 10 4.(vi) Soil Classification 10 4.(vii) Climatic Data 11 4.(viii) Social Infrastructure Available 11 5.0 PLANNING BRIEF 12 5.(i) Planning Concept (Type of industries, facilities, transportation etc.) Town & 12 Country Planning / Development Authority Classification 5.(ii) Population Projection 12 5.(iii) Land Use Planning (Break-up along with green belt etc.) 12 5.(iv) Assessment of Infrastructure Demand (Physical & Social) 12 5.(v) Amenities / Facilities 12

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 3

6.0 PROPOSED INFRASTRUCTURE 13 6.(i) Industrial Area (Processing Area) 13 6.(ii) Residential Area (Non-processing area) 13 6.(iii) Green belt 13 6.(iv) Social Infrastructure 13 6.(v) Connectivity (Traffic & Transportation Road / Rail etc.) 13 6.(vi) Drinking Water Management (Source & Supply of water) 13 6.(vii) Sewerage system 13 6.(viii) Industrial Waste Management 13 6.(ix) Solid Waste Management 13 6.(x) Power Requirement & Supply / Source 13 7.0 Rehabilitation and Resettlement (R & R Plan) 13 7.(i) Policy to be adopted (Central / State) in respect of the project affected persons 13 including home oustees, land oustees and landless 8.0 PROJECT SCHEDULE AND COST ESTIMATES 14 8.(i) Likely date of start of production and likely date of completion (time schedule for 14 the project will be given) 8.(ii) Estimated project cost along with analysis of economic viability of project 14 9.0 ANALYSIS OF PROPOSAL 14 9.(i) Financial and Social Benefits with special emphasis on the benefits to the local 14 people including tribal population

LIST OF ANNEXURE

Annexure No. Particulars

1. Possession Certificate from Village Officer

2. Location map of the site approved from Village Officer

3. Land Tax Receipt

4. Site Photographs

5. Route map showing the site location to nearest town route

6. Google Image superimposed with Project Boundary

7. Key Map showing the surrounding features of the site

8. Contractual Agreement between Land Owners & Applicant

9. I.D. Proof of the Applicant

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 4

1.0 EXECUTIVE SUMMARY The Ordinary Earth excavation project of Mr. Anilan T. S. is situated at Survey Nos. 28/1, 28/5 of Elavally Village & Panchayat, Chavakkad Taluk, , Kerala in area of 0.4653 hectare. The land for the proposed project is private owned land and the copy of possession certificate is attached at Annexure No. 1 Ordinary Earth project, having lease area less than 5 hectares, as per Office Memorandum vide No.L-110:1/47/2011-I.A.-II (M) dated: 24/06/2013 Ministry of Environment & Forests, Govt. of classified as Category B2. Further, as per Notification S.O. 141 (E) dated 15/01/2016 of Ministry and Environment, Forests & Climate Change all the application of mining projects for Environment Clearance of Category B2 will be appraised by District Expert Appraisal Committee (DEAC) and approved by District Environment Impact Assessment Authority (DEIAA).

1.1 SALIENT FEATURES & ENVIRONMENTAL SETTING OF THE PROJECT Particulars Details Geographical Location Latitude (N) 10° 34 ' 53" N Longitude (E) 76° 05 ' 04"E

Total Mine Lease area 0.4653 hectare Local name of the project area Elavally North Project Site Toposheet No. 58 B/2 Production Excavation for 90,000 Tons of Ordinary Earth Estimated project cost Rs. 30 Lakhs Man Power 8 Persons Nearest Town Chavakkad, 6 km, West Nearest Highway / Major Roads NH-17, Chvakkad about 8 km, West SH-49 (-Choondal ), 3.50 km, N Chittattukara-Ellavaly Rd., 500m, East Nearest Railway Station Guruvayur Station, 6 km, toward NW Power supply Diesel Engine Water and its Source Domestic water requirement will be fulfilled by water jars / tankers / containers. Nearest Hospital / dispensary Elavally, 2 km, S Education facility Elavally, 2 km, S Police Station Chavakkad, 8 km,W Fire Station Thrissur, 20 km, SE Ambulance Chavakkad, 8 km,W Church / temple / mosque Church – St. Sebastian, 1 km, SW Temple – Paranganattu, 250m, SW Mosque – Noor Mosque, Elavally, 2 km, S Electrical installation like transformer Electric line for personal use is available at site. /HT or LT line

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 5

Ecological sensitive zone (National None within 5 km radius Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve) Interstate Boundary None within 5 km radius Critically Polluted Area as identified None within 5 km radius by CPCB Defense installations None within 5 km radius Archeological Features None within 5 km radius Nearest Forests None within 5 km radius Nearest streams/ rivers/ water bodies Water body: (from mine boundary) Chowaloorpadi thode, 1.20 km, SW Aloor River, 4.50 km, East Chettuva Lake, 5.50 km, SW HLWG Report status Not in ESA

1.2 PRODUCTION & RESERVE The estimated ordinary earth to be excavated will be 90,000 Tons from the site. It is expected to employ about 8 persons for the excavation work.

2.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 2.(i) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT The project is for obtaining Environment clearance for ordinary earth excavation project. The project is proposed by Mr. Anilan T. S. as owner / applicant. The lease area is private own land at Survey Nos. 28/1, 28/5 of Elavally Village & Panchayat, Chavakkad Taluk, Thrissur District, Kerala in area 0.4653 hectares. Name and : Mr. ANILAN T. S. (Owner & Applicant), address of the Thekkoot House, Puttekara P.O., Anjoor-Mundoor, Chavakkad, Applicant Thrissur, Kerala - 680541 Mobile No. 9495225208 E-mail : [email protected]

2.(ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT The project is for ordinary earth mining of 90,000 Tons and excavation is carried out in lease area of 0.4653 hectare. The excavated soil will be used for site levelling development work.

2.(iii) NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION Though the project is a small ordinary earth mining project, the excavated earth will be used for site leveling. The basic objective of the project is the effective utilization of mineral wealth in the country or region. Further, the ordinary earth is the most commonly

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 6

used in roads, railway lines & building construction development projects. The excavated earth will be used only for the utilization of other economic growth activities near the project site.

2.(iv) DEMAND – SUPPLY GAP During last few years, due to sudden increase in real estate activities and in other infrastructural development activities, the demand of ordinary earth in the area is highly increased. Therefore, there is a large requirement of ordinary earth in the project vicinity to meet the demand supply chain.

2.(v) IMPORTS VS. INDIGENOUS PRODUCTION Ordinary earth product is an indigenous production. Therefore, this product is neither exported nor imported.

2.(vi) EXPORT POSSIBILITY The ordinary earth is an indigenous product and hence there are no possibilities of export. The excavated ordinary earth will be sale out within the domestic market only.

2.(vii) DOMESTIC / EXPORT MARKETS The final product will be sold out in local market only as per requirement and there is no export of ordinary earth is proposed.

2.(viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT The total numbers of employees including skilled, semi skilled and un-skilled workers for the project is expected to be about 8 persons in which includes workers for mine. The details of the employees / workers including their position in the organization are also given below:- Table 1: List of Employees and their Designations Sr. No. NAME OF THE POST NOS. 1 Workers 3 2 Drivers & Helpers 5 TOTAL 8

3.0 PROJECT DESCRIPTION 3.(i) TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS. This is a semi mechanized open cast ordinary earth excavation project. Though the project is a small ordinary earth project, the excavated earth will be used for site leveling. The basic objective of the project is the effective utilization of mineral wealth in the country or region.

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 7

3.(ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY AND PROJECT SITE LAYOUT) WITH COORDINATES The proposed ordinary earth quarry is in private owned land at Survey Nos. 28/1, 28/5, Elavally Village & Panchayat, Chavakkad Taluk, Thrissur District, Kerala for area of 0.4653 hectares. The geographical location of the mine with respect to the boundary pillars of the lease area (extreme most points) is given below:- Latitude (N) 10° 34 ' 53" N Longitude (E) 76° 05 ' 04"E

The map showing the project site with surrounding features and approved by Village Officer is attached as Annexure No. 2 and the copy of land tax receipt is attached at Annexure No. 3 . The photographs of the site will be taken from different locations and directions are provided at Annexure No. 4. The route map showing location of the lease area is provided at Annexure No. 5. The google map superimposed with project boundary showing location of the lease area is provided at Annexure No. 6. The Key map of the project site showing the location of ordinary earth excavation site is attached at Annexure No. 7.

3.(iii) DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS. The proposed ordinary earth area is a site specific project hence no alternate site was examined. Moreover, the land is a private owned land and hence no alternate site considered.

3.(iv) SIZE OR MAGNITUDE OF OPERATION The size and magnitude of the lease area is as given below:- Table 2 : Size or Magnitude of operation Sr. No. Particulars Details 1. Lease Area 0.4653 hectares 2. Ordinary Earth Reserve 90,000 Tons 3. Total Man Power (Nos.) About 8 persons

3.(v) PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC DIAGRAM / FLOW CHART SHOWING THE PROJECT LAYOUT, COMPONENTS OF THE PROJECT ETC.). In the proposed earth excavation project, mechanized excavation of ordinary earth will be done. Excavation activities will be carried out through excavator and transported to the designated place or end user site.

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 8

3.(vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCT/S, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT No raw material will be required for excavation of ordinary earth. The final product will be sent to consumer site on their demand. The mode of transportation of raw material and finished product will be by road only. Tippers/ trucks will be used for transportation to the end users. MINERAL TRANSPORTATION Loading of mineral from the site will be done by excavator and will be sent to the end users in Trucks / Tippers. It is expected that 18-20 trips will be required on daily basis. For this, movement of truck per hour will be 2-3 only. Thus, the impact due to movement of trucks from excavation site will be marginal and well within the carrying capacity of the roads. 3.(vii) RESOURCE OPTIMIZATION / RECYCLING AND REUSE ENVISAGED IN THE PROJECT Excavated earth will be utilized and sent for use to different end users for road and building construction works. The water requirement for sprinkling on sources of dust emission, roads and for landscaping purposes can be met from the stored rain water pond and thereby conserve the fresh water. 3.(viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY / POWER REQUIREMENT AND SOURCE WATER The total water requirement for the proposed mining activity is 2 KLD. The detailed breakup of the same is given below:- Table No. 4 – Water Requirement Calculation S. No. Particulars Quantity (KLD) Source 1. Domestic purpose (workers req.) 1 Water Jars / container 2. Dust Suppression at site 1 Water tanker / stored rain water Total 2

The water required will be sourced from the storm water pond / treated water from STP through tankers. However, the drinking water will be sourced from public supply and stored the water jars / containers confirming the National Standards for Drinking Water.

POWER The power used for running the compressor which will be through Diesel Engine.

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 9

3.(ix) QUANTITY OF WASTES TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT / DISPOSAL.

• No effluent will be generated from the ordinary earth excavation site, as the water will be used for domestic consumption (drinking & hand / mouth washing) & sprinkling purposes only. • Dust during excavation & loading will be generated from the site and will be managed through water sprinklers • No solid waste will be generated from the project site as the fully excavated material will be outsourced to the end user. • No domestic solid or liquid waste generated from the site as no accommodation will be provided to the workers, as the workers will be hired locally for limited hours only.

3.(x) SCHEMATIC REPRESENTATION OF THE FEASIBILITY DRAWING WHICH GIVE INFORMATION OF EIA PURPOSE. Not Applicable for ordinary earth Category B2 projects.

4.0 SITE ANALYSIS 4.(i) CONNECTIVITY Table No. 5 – Site Connectivity S. No. Particulars Distance & Direction 1. Nearest town Chavakkad, 6 km, West 2. Connecting Road 6 m wide tarred road 3. Nearest Highway NH-17, Chvakkad about 8 km, West SH-49 (Guruvayur-Choondal ), 3.50 km, N Chittattukara-Ellavaly Rd., 500m, East 4. Nearest Railway Station Guruvayur Station, 6 km, toward NW

4.(ii) LAND FORM, LAND USE AND LAND OWNERSHIP LANDFORM The proposed ordinary earth site is covering an area of 0.4653 ha. The lease area is private own land. The lease area is devoid of any transmission lines, streams / nallahs, forests, habitation, etc.

LAND OWNERSHIP The land as per revenue records is a private own land.

4.(iii) TOPOGRAPHY (ALONG WITH MAP) The land of the proposed project is containing large quantity of ordinary earth, the topography of the site is almost flat land with grass, climbers, bushes etc.

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 10

4.(iv) EXISTING LAND USE PATTERN (AGRICULTURE, NON-AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)), SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO THE PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ IN CASE OF NOTIFIED INDUSTRIAL AREA.

Land Use Pattern: The lease area is situated at Survey Nos. 28/1, 28/5 of Elavally Village & Panchayat, Chavakkad Taluk, Thrissur District, Kerala in area of 0.4653 hectares.

DISTANCES FROM THE PERIPHERY OF THE PROJECT TO THE PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES, NOTIFIED INDUSTRIAL AREAS, CRZ AREA ETC. Particula rs Name & Distance to quarry site Ecological sensitive zone (National Park, Sanctuary, None within the study area Habitat for Migratory Birds, Tiger Reserve) Critically Polluted Area as identified by CPCB None within the study area Defense installations None within the study area Archeological Features None within the study area Nearest Forests None within the study area Nearest streams/ rivers/ water bodies Chowaloorpadi thode, 1.20 km, SW Aloor River, 4.50 km, East Chettuva Lake, 5.50 km, SW Notified Industrial Area None within the study area CRZ Area Not in CRZ Area

4.(v) EXISTING INFRASTRUCTURE The existing infrastructure around the project site includes tarred roads, electricity supply from Kerala Electricity Board, water supply from Kerala Water Authority / Panchayat supply, storm water drains along the roads available within 500m radius.

4.(vi) SOIL CLASSIFICATION Ordinary earth is the common name used for the soils. Soil is made up of three main components – minerals that come from rocks below or nearby, organic matter which is the remains of plants and animals that use the soil, and the living organisms that reside in the soil. The proportion of each of these is important in determining the type of soil that is present. But other factors such as climate, vegetation, time, the surrounding terrain, and even human activities (eg. farming, grazing, gardening, landscaping, etc.), are also important in influencing how soil is formed and the types of soil that occur in a particular landscape.

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 11

Classification of soils (ordinary earth) found in the district The topo-lithosequence along with variation in rainfall, temperature and alternate wet and dry conditions particularly from the western coast to high ranges in the east and swift flowing rivers lead to the development of different types of natural vegetation and soil. The soils can be broadly grouped into coastal alluvium, mixed alluvium, acid saline, kari, laterite, red, hill, black cotton and forest soils.

4.(vii) CLIMATIC DATA The Thrissur district is characterized by wet type of climate and four types of seasons are identified. The hot summer season from March to May, the southwest monsoon season from June to September, the northeast monsoon season from October to December and a general cool and salubrious climate period during climate period during January and February. The average annual rainfall ranges between 2310.1 and 3955.3 mm in the district with mean annual rainfall of 3198.133 mm. The maximum rainfall occurs during the period June to September (SW monsoon) and nearly 71.24% of the total rainfall is received during the season. 16.27% of the total rainfall is received during North East monsoon between October and December, 12.1% of the total rainfall is received during March to May and the balance 0.37% is accounted for during January and February months. The maximum temperature ranges from 29.3 to 36.2 0C where as the minimum from 22.1 to 24.9 0C. The average annual maximum temperature is 32.30 0C and minimum temperature 23.3 0C. Generally March and April months are the hottest and November, December, January and February months are the coldest. (Source: District Survey Report, Department of Mining & Geology, Govt. of Kerala )

4.(viii) SOCIAL INFRASTRUCTURE AVAILABLE Table 6 : Social Infrastructure Details S. No. Particulars Name, Distance & Direction from the quarry site 1. Land use Private own Land 2. Nearest Town Chavakkad, 6 km, West 3. Width of access road to site 6 m wide tarred road 4. Nearest Highway / Major roads NH-17, Chvakkad about 8 km, West SH-49 (Guruvayur-Choondal ), 3.50 km, N Chittattukara-Ellavaly Rd., 500m, East 5. Nearest Railway Station Guruvayur Station, 6 km, toward NW 6. Power supply Diesel Engine for excavation work 7. Nearest Hospital / dispensary Elavally, 2 km, S 8. Education facility Elavally, 2 km, S 9. Police Station Chavakkad, 8 km,W 10. Fire Station Thrissur, 20 km, SE 11. Ambulance Chavakkad, 8 km,W 12. Church / temple / mosque Church – St. Sebastian, 1 km, SW Temple – Paranganattu, 250m, SW Mosque – Noor Mosque, Elavally, 2 km, S

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 12

5.0 PLANNING BRIEF 5.(i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING / DEVELOPMENT AUTHORITY CLASSIFICATION. The excavation will be done by open cast semi-mechanized method of mining. Excavated material is transported to the end users. The proposed mine will be excavated about 90,000 Tons of ordinary earth. It will be used for construction projects & roads for site leveling. Excavated earth will be transported by trucks / tippers to the end users.

5.(ii) POPULATION PROJECTION About 8 persons of employees proposed for the quarrying operation. Most of the person will be sourced from local areas. Thus there will be no increase in population due to the project.

5.(iii) LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.) The land for the proposed project is private own land with some rubber and native tree plantation and after the excavation work the site will be restored through native tree plantation. 5.(iv) ASSESSMENT OF INFRASTRUCTURE DEMAND ( PHYSICAL AND SOCIAL ) The mining site has approach road and well connected to the nearest public road / highway, which will help in commutation of workers and transportation of product. As such there is no major infrastructure facilities planned in this project and does not call for importance. Job opportunities are limited and newer avenues of skill development for income generation are required.

5.(v) AMENITIES/ FACILITIES Following facilities are provided for the smooth working of the mine:-  Parking area for vehicles  Storm water collection pond  Canteen / Mess for workers  First aid room  Toilet facility  Drinking water facilities  Rest shelters: Rest shelter to take lunch and rest for the workers.

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 13

6.0 PROPOSED INFRASTRUCTURE 6.(i) INDUSTRIAL AREA (PROCESSING AREA) The project site area is not located in an industrial area. The project is an ordinary earth mining project and is a site specific project. 6.(ii) RESIDENTIAL AREA (NON PROCESSING AREA) As the local person will be given priority in employment, no permanent residential area / housing is proposed only temporary rest rooms will be provided. 6.(iii) GREEN BELT The programme of eco-restoration will be made and priority to native fruit bearing & medicinal plants will be given. 6.(iv) SOCIAL INFRASTRUCTURE The Social Infrastructure facility available around the site is provided at Table No. 6.

6.(v) CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO / WATER WAYS ETC.) The site is very well connected by road network to the mine, district headquarter and to the nearest towns. The area is self sufficient to cater the needs of the project. 6.(vi) DRINKING WATER MANAGEMENT (SOURCE AND SUPPLY OF WATER) The water required for the project will be sourced from the storm water reservoir and from well. The drinking water to a tune of 1 KLD will be sourced from the open well which will be treated / disinfected before consumption. 6.(vii) SEWERAGE SYSTEM The domestic sewage generated from the site office will be diverted to the septic tank followed by soak pit. 6.(viii) INDUSTRIAL WASTE MANAGEMENT There will be no industrial waste generation due to proposed project. 6.(ix) SOLID WASTE MANAGEMENT There will be no solid waste generated from the site. The whole excavated product will be outsourced to the end users. 6.(x) POWER REQUIREMENT AND SUPPLY / SOURCE The power requirement for excavation purposes will be fulfilled by Diesel Engine.

7.0 REHABILITATION AND RESETTLEMENT (R & R PLAN) 7.(i) POLICY TO BE ADOPTED (CENTRAL/ STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABOUR (A BRIEF OUTLINE TO BE GIVEN) The proposed site is private own land and hence there is no rehabilitation and resettlement. It is an ordinary earth excavation project and there is no habitation in the lease area, therefore rehabilitation & resettlement plan is not required for this project.

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT

APPLICANT : Mr. ANILAN T. S. 14

8.0 PROJECT SCHEDULE AND COST ESTIMATES 8.(i) LIKELY DATE OF START OF PRODUCTION AND LIKELY DATE OF COMPLETION (TIME SCHEDULE FOR THE PROJECT WILL BE GIVEN). Table 7 : Expected Time Schedule for the Project S. Particulars Time Schedule (in month)* Remark If any No. 1st 2nd 3rd 4th 5th 1. Environmental Clearance 2. Approval from local authorities Project Establishment Period 3. Project operation Production Start Period *Time line may vary; subjected to rules & regulation / & other unforeseen circumstances

8.(ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT The proposed project cost will be about Rs. 30 Lakhs and the profit of Rs. 17.50/- per ton is estimated and hence the project is quite economic viable.

9.0 ANALYSIS OF PROPOSAL 9.(i) FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFITS TO THE LOCAL PEOPLE INCLUDING TRIBAL POPULATION, IF ANY, IN THE AREA. The project site is private own land and no tribal population is residing in the study area. There will be social benefits from the mining operations to the local people. Being a very small mining project the implementation of the project will not affect much the occupational pattern of the people. Main objective of the project is to provide raw material to the developmental activities in the area.

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant

March , 2017 Mr. ANILAN T. S.

SITE PHOTOGRAPHS – ORDINARY EARTH SITE OF Mr. ANILAN T. S. Annexure No. 4 SITE PHOTOGRAPHS – ORDINARY EARTH SITE OF Mr. ANILAN T. S. Annexure No. 5 ROUTE MAP – SHOWING PROJECT SITE OF Mr. ANILAN T. S. Annexure No. 6 GOOGLE MAP – SHOWING PROJECT SITE OF Mr. ANILAN T. S. KEY MAP – SHOWING PROJECT SITE OF ANILAN T. S. Annexure No. 7