Ordinary Earth Excavation Project of Mr. Anilan T. S. Is Situated at Survey Nos
Total Page:16
File Type:pdf, Size:1020Kb
PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT APPLICANT : Mr. ANILAN T. S. 1 ORDINARY EARTH EXCAVATION PROJECT OF Mr. ANILAN T. S. PROJECT FEASIBILITY REPORT ( PFR ) PROJECT SITE AT SURVEY Nos. 28/1, 28/5, ELAVALLY VILLAGE & PANCHAYAT, CHAVAKKAD TALUK, THRISSUR DISTRICT, KERALA ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant March , 2017 Mr. ANILAN T. S. PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT APPLICANT : Mr. ANILAN T. S. 2 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 4 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 5 2.(i) Identification of project and project proponent 5 2.(ii) Brief description of the Nature of the project 5 2.(iii) Need for the project and its importance to the Country and or Region 5 2.(iv) Demand – Supply Gap 6 2.(v) Imports Vs. Indigenous Production 6 2.(vi) Export Possibility 6 2.(vii) Domestic / Export Markets 6 2.(viii) Employment generation (Direct & Indirect) due to the project 6 3.0 PROJECT DESCRIPTION 6 3.(i) Type of project including interlinked and interdependent projects 6 3.(ii) Location (map showing General Location, Specific Location & Project boundary & 7 Project site layout) with coordinates 3.(iii) Details of Alternate sites considered and the basis of selecting the proposed site, 7 particularly the environmental considerations 3.(iv) Size or magnitude of operation 7 3.(v) Project description with process details (a schematic diagram / flow chart showing 7 the project layout, components of the project etc should be given) 3.(vi) Raw material required along with estimated quantity, likely source, marketing area 8 of final products, mode of transport of raw materials and financial provisions 3.(vii) Resource optimization / recycling and reuse envisaged in the project 8 3.(viii) Availability of water its source, energy / power requirement & source 8 3.(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their 9 management / disposal 4.0 SITE ANALYSIS 9 4.(i) Connectivity 9 4.(ii) Land form, land use and land ownership 9 4.(iii) Topography (along with map) 9 4.(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies 10 (including area under CRZ)), shortest distances from the periphery of project. 4.(v) Existing Infrastructure 10 4.(vi) Soil Classification 10 4.(vii) Climatic Data 11 4.(viii) Social Infrastructure Available 11 5.0 PLANNING BRIEF 12 5.(i) Planning Concept (Type of industries, facilities, transportation etc.) Town & 12 Country Planning / Development Authority Classification 5.(ii) Population Projection 12 5.(iii) Land Use Planning (Break-up along with green belt etc.) 12 5.(iv) Assessment of Infrastructure Demand (Physical & Social) 12 5.(v) Amenities / Facilities 12 ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant March , 2017 Mr. ANILAN T. S. PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT APPLICANT : Mr. ANILAN T. S. 3 6.0 PROPOSED INFRASTRUCTURE 13 6.(i) Industrial Area (Processing Area) 13 6.(ii) Residential Area (Non-processing area) 13 6.(iii) Green belt 13 6.(iv) Social Infrastructure 13 6.(v) Connectivity (Traffic & Transportation Road / Rail etc.) 13 6.(vi) Drinking Water Management (Source & Supply of water) 13 6.(vii) Sewerage system 13 6.(viii) Industrial Waste Management 13 6.(ix) Solid Waste Management 13 6.(x) Power Requirement & Supply / Source 13 7.0 Rehabilitation and Resettlement (R & R Plan) 13 7.(i) Policy to be adopted (Central / State) in respect of the project affected persons 13 including home oustees, land oustees and landless 8.0 PROJECT SCHEDULE AND COST ESTIMATES 14 8.(i) Likely date of start of production and likely date of completion (time schedule for 14 the project will be given) 8.(ii) Estimated project cost along with analysis of economic viability of project 14 9.0 ANALYSIS OF PROPOSAL 14 9.(i) Financial and Social Benefits with special emphasis on the benefits to the local 14 people including tribal population LIST OF ANNEXURE Annexure No. Particulars 1. Possession Certificate from Village Officer 2. Location map of the site approved from Village Officer 3. Land Tax Receipt 4. Site Photographs 5. Route map showing the site location to nearest town route 6. Google Image superimposed with Project Boundary 7. Key Map showing the surrounding features of the site 8. Contractual Agreement between Land Owners & Applicant 9. I.D. Proof of the Applicant ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant March , 2017 Mr. ANILAN T. S. PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT APPLICANT : Mr. ANILAN T. S. 4 1.0 EXECUTIVE SUMMARY The Ordinary Earth excavation project of Mr. Anilan T. S. is situated at Survey Nos. 28/1, 28/5 of Elavally Village & Panchayat, Chavakkad Taluk, Thrissur District, Kerala in area of 0.4653 hectare. The land for the proposed project is private owned land and the copy of possession certificate is attached at Annexure No. 1 Ordinary Earth project, having lease area less than 5 hectares, as per Office Memorandum vide No.L-110:1/47/2011-I.A.-II (M) dated: 24/06/2013 Ministry of Environment & Forests, Govt. of India classified as Category B2. Further, as per Notification S.O. 141 (E) dated 15/01/2016 of Ministry and Environment, Forests & Climate Change all the application of mining projects for Environment Clearance of Category B2 will be appraised by District Expert Appraisal Committee (DEAC) and approved by District Environment Impact Assessment Authority (DEIAA). 1.1 SALIENT FEATURES & ENVIRONMENTAL SETTING OF THE PROJECT Particulars Details Geographical Location Latitude (N) 10° 34 ' 53" N Longitude (E) 76° 05 ' 04"E Total Mine Lease area 0.4653 hectare Local name of the project area Elavally North Project Site Toposheet No. 58 B/2 Production Excavation for 90,000 Tons of Ordinary Earth Estimated project cost Rs. 30 Lakhs Man Power 8 Persons Nearest Town Chavakkad, 6 km, West Nearest Highway / Major Roads NH-17, Chvakkad about 8 km, West SH-49 (Guruvayur-Choondal ), 3.50 km, N Chittattukara-Ellavaly Rd., 500m, East Nearest Railway Station Guruvayur Station, 6 km, toward NW Power supply Diesel Engine Water and its Source Domestic water requirement will be fulfilled by water jars / tankers / containers. Nearest Hospital / dispensary Elavally, 2 km, S Education facility Elavally, 2 km, S Police Station Chavakkad, 8 km,W Fire Station Thrissur, 20 km, SE Ambulance Chavakkad, 8 km,W Church / temple / mosque Church – St. Sebastian, 1 km, SW Temple – Paranganattu, 250m, SW Mosque – Noor Mosque, Elavally, 2 km, S Electrical installation like transformer Electric line for personal use is available at site. /HT or LT line ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant March , 2017 Mr. ANILAN T. S. PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT APPLICANT : Mr. ANILAN T. S. 5 Ecological sensitive zone (National None within 5 km radius Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve) Interstate Boundary None within 5 km radius Critically Polluted Area as identified None within 5 km radius by CPCB Defense installations None within 5 km radius Archeological Features None within 5 km radius Nearest Forests None within 5 km radius Nearest streams/ rivers/ water bodies Water Body: (from mine boundary) Chowaloorpadi thode, 1.20 km, SW Aloor River, 4.50 km, East Chettuva Lake, 5.50 km, SW HLWG Report status Not in ESA 1.2 PRODUCTION & RESERVE The estimated ordinary earth to be excavated will be 90,000 Tons from the site. It is expected to employ about 8 persons for the excavation work. 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 2.(i) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT The project is for obtaining Environment clearance for ordinary earth excavation project. The project is proposed by Mr. Anilan T. S. as owner / applicant. The lease area is private own land at Survey Nos. 28/1, 28/5 of Elavally Village & Panchayat, Chavakkad Taluk, Thrissur District, Kerala in area 0.4653 hectares. Name and : Mr. ANILAN T. S. (Owner & Applicant), address of the Thekkoot House, Puttekara P.O., Anjoor-Mundoor, Chavakkad, Applicant Thrissur, Kerala - 680541 Mobile No. 9495225208 E-mail : [email protected] 2.(ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT The project is for ordinary earth mining of 90,000 Tons and excavation is carried out in lease area of 0.4653 hectare. The excavated soil will be used for site levelling development work. 2.(iii) NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION Though the project is a small ordinary earth mining project, the excavated earth will be used for site leveling. The basic objective of the project is the effective utilization of mineral wealth in the country or region. Further, the ordinary earth is the most commonly ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner & Applicant March , 2017 Mr. ANILAN T. S. PROJECT : Ordinary Earth Excavation Project PRE - FEASIBILTY REPORT APPLICANT : Mr. ANILAN T. S. 6 used in roads, railway lines & building construction development projects. The excavated earth will be used only for the utilization of other economic growth activities near the project site. 2.(iv) DEMAND – SUPPLY GAP During last few years, due to sudden increase in real estate activities and in other infrastructural development activities, the demand of ordinary earth in the area is highly increased. Therefore, there is a large requirement of ordinary earth in the project vicinity to meet the demand supply chain. 2.(v) IMPORTS VS. INDIGENOUS PRODUCTION Ordinary earth product is an indigenous production. Therefore, this product is neither exported nor imported. 2.(vi) EXPORT POSSIBILITY The ordinary earth is an indigenous product and hence there are no possibilities of export. The excavated ordinary earth will be sale out within the domestic market only. 2.(vii) DOMESTIC / EXPORT MARKETS The final product will be sold out in local market only as per requirement and there is no export of ordinary earth is proposed.