Early Warning System

ADB-48055-001 Jiangxi Kongmu River Watershed Flood Control and Environmental Improvement Early Warning System ADB-48055-001 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement

Quick Facts

Countries Specific Location Xinyu Financial Institutions Asian Development Bank (ADB) Status Active Bank Risk Rating U Voting Date 2015-07-15 Borrower Government of People's Republic of China Sectors Infrastructure, Water and Sanitation Investment Type(s) Grant Investment Amount (USD) $ 0.60 million Project Cost (USD) $ 0.75 million

Early Warning System https://ews.rightsindevelopment.org/ [email protected] Early Warning System ADB-48055-001 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement

Project Description

The TA will (i) assess the technical feasibility of the project; (ii) conduct due diligence on the economic and financial feasibility of the project; (iii) review safeguard requirements; (iv) conduct social survey and consultations; (v) develop capacity of the XCG for project management; and (vi) prepare project documents, including feasibility study reports (FSR), safeguard documents, and ADB's draft report and recommendations of the President (RRP).

PROJECT RATIONALE AND LINKAGE TO COUNTRY/REGIONAL STRATEGY The Government of the People's Republic of China (PRC) requested the Asian Development Bank (ADB) to provide lending support to demonstrate integrated and climate-resilient flood and environmental management with harmonized with realistic urban planning, in Kongmu River watershed in Xinyu City that is a manageable size watershed for project level intervention. The proposed project is included in ADB's country operations business plan, 2015 2017 and the ensuing loan in ADB's 2017 lending pipeline for the PRC. Since the executing agency, Xinyu city government (XCG) is not familiar with ADB's project preparation requirements, it is necessary to provide a project preparatory technical assistance (TA) to help the XCG prepare the project that complies with ADB's requirements and includes best international practices.

CONSULTING SERVICES The TA will be carried out by a team of consultants. A total of 12.5 person-months of international and 32.0 person-months of national consulting services will be required. The consulting firm will be selected by (i) inviting simplified technical proposals; and (ii) using the quality- and cost-based selection method, with a quality-cost ratio of 90:10. Consultants will be hired following ADB's Guidelines on the Use of Consultants (2013, as amended from time to time).

Early Warning System https://ews.rightsindevelopment.org/ [email protected] Early Warning System ADB-48055-001 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement

Investment Description

Asian Development Bank (ADB)

Early Warning System https://ews.rightsindevelopment.org/ [email protected] Early Warning System ADB-48055-001 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement

Contact Information

Xinyu City Government No. 1388, Yanjiang Road, Xinyu City Jiangxi Province, PRC

ACCOUNTABILITY MECHANISM OF ADB The Accountability Mechanism is an independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by an Asian Development Bank-financed project. If you submit a complaint to the Accountability Mechanism, they may investigate to assess whether the Asian Development Bank is following its own policies and procedures for preventing harm to people or the environment. You can learn more about the Accountability Mechanism and how to file a complaint at: http://www.adb.org/site/accountability-mechanism/main

Early Warning System https://ews.rightsindevelopment.org/ [email protected] Early Warning System ADB-48055-001 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement

Bank Documents

Jiang Xi Xin Kong Mu Jiang Yu Shui Fang Kong Ji Huan Jing Zhi Xiang Mu : Xiang Mu Sh [Original Source] Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement: Project Preparator [Original Source] Project Disclosure PDF

Early Warning System https://ews.rightsindevelopment.org/ [email protected] Early Warning System ADB-48055-001 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement

Other Related Projects

ADB-48055-002 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement

Early Warning System https://ews.rightsindevelopment.org/ [email protected]