JIANGXI PROVINCE Public Disclosure Authorized

International Bank for Reconstruction and Development 1818 H Street, NW Washington, DC 20433 United States of America

Re: : Loan No. 8256 IN (Jiangxi Sanqingshan Airport Project) Indicators Public Disclosure Authorized Dear Sirs and Mesdames:

We refer to Section II. A. of the Schedule to the Project Agreement of even date herewith between the International Bank for Reconstruction and Development (the Bank), and the JIANGXI PROVINCE for the Jiangxi Shangrao Sanqingshan Airport Project.

Unless otherwise agreed with the Bank,' the JIANGXI PROVINCE shall monitor and evaluate implementation of the Project in accordance with the Indicators attached to this letter.

Very truly yours, Public Disclosure Authorized

JIANGXI PROVINCE

By _ _ )__ _ Authorized Representative Public Disclosure Authorized Attachment 5 Results Framework

Projct Development Objective (PDM: To improve airline connectivity in Nortlieastern Jiangxi Province and (emonstrate the environment sustainability of the developnent and operation of the Shangrao Sangingshan Airport. i Target Values Data Responsib Description PDO Level Results Vnitof Baseine Freque Source ' ility for (indicator Indicatørs easure VRR i YR 2 VR3 YR 4 YR5 ncy Methodo Data definition Igy Colicetion etc.) A irIport trave Operational Air Line Srice Indicator One: Reduction Rcquird Staff Staffiraing Agreement SurCys in travel time between edti one and Equipent ad capacity Negotiated with 27 Annual Periodic Shangrao and major cities. idenified and building selected airline Reporting percentpprogram starts service provides aee put in place:

Indicator Two: Shangrao Airport recognized a Green Award Recogniti "Green Airport" through L None Application on Annual established recognition Submitted Received iprocess. IN'ERMEDIA'E RESULTS

Intermediate Result (Component Construction of Shangrao airport. /nfermediae Resuli INone Construcl ion indicar / I (ireen airport [ Design (lovernment carried out design put in place and Carried outl approval according to Pm ene. _ design None Construction d / lPlanand 50 perceilt of 00 e tiaorTely,;i thst- Detailed Cost project percent effective construction ofthe estimate milestone milestone airport Prepared and reached reached

Internediate Result (Component Four): Institutional and capacity building.

Intermecdiate Result None Study Recommendat indiador2: A irport comipleted and to operation model developed endorsed by implemnentati Ana andotdyShangra government on started