List of Finalised Tenders (Month Wise Position) S. No. Description of Work Awarded on Agt. Value (In Rs.) Agency 1 2 3 4 5 Apri
Total Page:16
File Type:pdf, Size:1020Kb
List of finalised Tenders (Month wise Position) S. No. Description of Work Awarded on Agt. Value Agency (in Rs.) 1 2 3 4 5 April,2015 1. Between Hajipur-Chapra Kacheri(ex) : Repiarsto leaky & damaged 01.04.2015 1943590.00 Sri Shyam Kishore Prasad roof of service& residential building under ADEN/Line/Sonpur. 2. Between Bachhwara-Hajipur-Chappa Kacheri(ex) : Counseling of 06.04.2015 837675.00 Sri Rajiv Kumar Singh road users at 09 nos. of un-mannedL-xing gate by deploying Gate Counselors Gate Mitra” under DEN/I/Sonpur 3. Between Hajipur(Ex)-Muzaffarpur(Ex) – Bachhwara (Ex) : : 06.04.2015 139615.00 Sri Rajiv Kumar Singh Counseling of road users at 15 nos. of un-mannedL-xing gate by deploying Gate Counselors Gate Mitra” under DEN/III/Sonpur 4. At Muzaffarpur : Replacement of existing PF surfaceof PF No. 2 & 06.04.2015 2558911.00 Kumar Cnstruction 5. 5. At Muzaffarpur : Repairs to PF surface on PF No. 1, 3 & 4. 07.04.2015 1637563.00 M/S Fatah Const. Company 6. Between Barauni(ex)-Katihar (Ex) : Counseling of road users at 30 08.04.2015 2901750.0 Sri Rajiv Kumar Singh nos. of un-mannedL-xing gate by deploying Gate Counselors Gate Mitra” under Sr. DEN/II/Sonpur 7. At Sonpur : Replacement of damaged septic tank, sanitary fittings, 13.04.2015 3798040.15 Hare Krishan Telecom Pvt. Ltd. floor, wall plaster, roof slab, doors & windows etc in Accounts colony. 8. Hiring of road vehicle for carting of all types of P.Way materials 17.04.2015 3234421.00 Sri Aditya Kumar (P.Way, Works, Bridge etc.) for any distane for day to day maintenance work for the period of one year for SSE/P.Way, Sonpur, Dighwara & Shahpur Patoree under ADENLineSonpur. 9. At Sonpur : Repairsto leaky roof of Hospital,runnig room, waiting 20.04.2015 2559930.89 J.M.D. Water Profing room & refreshment room building on station & other servicebuilding. 10. At Sopr Repairs & changing of old corroded / damaged pipe line 27.04.2015 2005425.24 Sri Shyam Kishore Prasad from Paharichak to RCCtak in PI office campus. 11. At Barauni : Provision of battery cum charger room & store room 28.04.2015 586461.00 Rina Kumari etc. in AC depot. 12. Between Barauni-Samastipur Section : (Only Civil Engg. Works) 28.04.2015 614750.00 Sri Ajay Kumar Singh ,interlocking & upgradation of L-Xing No. 38 C classto B-I classbetween Nazirgang-Dalsing Sarai. S. No. Description of Work Awarded on Agt. Value Agency (in Rs.) 1 2 3 4 5 13. At Mufaffarour : Improvement to drainage system of station area. 28.04.2015 1077612.00 Sri Sunil Kumar May, 2015 1. Between Barauni-Katihar Section : Proposed new halt “Sameli” 07.05.2015 2601489.00 Ajay Vijay Construction Pvt. stain between Kursela-bahari station at Km. 35/0. Ltd. 2. Between Barauni-Katihar Section) (Only Civil Engg. Works) 26.05.2015 2037435.30 Sri Ram Badan Kumar 1. Interlocking & upgradation of Level Crossing No. 21 “C” class to “B” class between Khagaria-Mansi. 2. Interlocking & upgradation of Level Crossing No. 23 “C” class to “A” class between Maheshkhunt-Pasraha. 3. Interlocking of Level Crossing No. 26 “C” class & 27 “C” class between Maheshkhunt-Pasraha. 3. Between Bachhwar-Hajipur-Chapra kachery : Urgent replacement 27.05.2015 1577813.00 Sri Ratan Dubey of damaged& rosted steel chequred plate in between guardrail on major Bridge No. 15 (Up & dn), 19 (Up & Dn) in Chapra Kachery- Sonpur and Bridge No. 7A & 11 in Bachhwara-Hajipur secion. June, 2015 1. At Hajipur : (1) 2 nd entry, raising of extended portion to high level 17/06/2015 34590261.27 M/S Jogendra Prasad Singh (Platform No. 2 & 3), extension of FOB & full length PP shelter (2) Provision of one no. deep tube well with dia 360/200 mm. 2. At Sonpur : Improvement to DRM offive and campus. 30/06/2015 1233184.85 Smt. Mamta Devi 3. Barauni(Ex.)-Katihar(Ex.) Section : Improvement & provision of 08/06/2015 2068826.97 Sri Rupak Kumar minimum essential amenities at Begusarai, Sahibpur Kmal, Khagaria,Maheshkhunt, Gowchari,Lakhminia, Karhagola Road & Semapur. 4. At Khagaria : Replacement of damaged & leaky tank by RCC tank 18/06/2015 9357675.10 Aditya Arav Dev Construction (50000 Gallons capacity) each in colony under CWP (One No.) Co. Pvt. Ltd. 5. Barauni – Katihar (Ex.) Section : Manning of unmanned Level 19/06/2015 31641537.77 Raksha Associates Crossing 12 Nos. (List attached) (120 Nos. in E. C. Railway under Sonpur Division – 18 Nos. only. 6. Hiring of non AC multy utility road vehile new diesel 18/06/2015 212170.00 M/S Rajesh & Co. Cheverlt/Tavera or similar for r. DPO/Sonpur 7. At Barauni – Replacement of existing goods shed failed tube well 19/06/2015 2170890.00 Sri Abhijit Kumar Singh by 350x200mm dia new tube well pump house & pipe line connection to over head tank. S. No. Description of Work Awarded on Agt. Value Agency (in Rs.) 1 2 3 4 5 July,2015 1. Mufazzarpur – Barauni Section Improvement & provision of 02.07.2015 1056722.00 Trupti Contract minimum essential amenities at Muzaffarpu, Dholi, Kuddiram Bose Pusa & Dalsing Sarai station. 2. At Barauni : Proposed repairs to old & badly damaged washable 23.07.2015 17460749.00 M/S Anil Kumar apron on Line No. 4. 3. At Muzaffarpur : Provision of 2 nos. RCC over head tank of 50000 27.07.2015 24789156.00 M/S A. K. Choudhary Gallons capacity each with tube well & connected pipe lines on replacement account under CWP. August,2015 1. Hajipur-Bachhwara Section : Improvement & Provision of 07.08.2015 432205.00 Sri Hari Bansh Singh minimum essential amenities at Hajipur, Desari & Shahpur Patoree. September,2015 1. Barauni-Katihar Section : Provision of Low cost shed & seating 04.09.2015 3581730.46 Shravani arrangement under shed @ 01 each Platform at stations & 02 each at halts. 2. Samastipur(Ex.)-Muzaffarpur Section : Provision of passenger 04.09.2015 629093.00 S. R. Enterprises amenities at “Vishunpur Bathua Halt” station between Khudiram Bose Pusa – Dubha station. 3. At Sonpur : Provision of 01 No. RCC overhead tank of 50000 07.09.2015 13026055.00 Aditya Aeav Dev Const. Co. Gallons capacity with tube Well and connected pipe lines. Pvt. Ltd. 4. At Hajipur : Provision of 01 No. RCC overhead tank of 50000 07.09.2015 13718189.00 Aditya Aeav Dev Const. Co. Gallons capacity with Tube Well & connected pipie lines. Pvt. Ltd. 5. Barauni - Muzaffarpur-Hajipur : Provision of Toilet at “B”, “D” & 10.09.2015 776204.00 S. R. Enterprises “E” class station at DSS, KRBP & BNR. 6. At Thamnabihpur : Improvement o Officer Rest House. 15.09.2015 452175.79 Sri Ankit Kumar Singh 7. Katihar-Barauni Section : Provision of Toilets at “B” , “D” & “E” 15.09.2015 1638653.10 Sri Ankit Kumar Singh class stations at SMO, CRR, KUE, LKN, MSK & SKJ. 8. Supply of portion of SKV Welding equipment & other allied items 18.09.2015 5664250.00 The India Thermit Corp. Ltd. related to SKV welding under jurisdiction of Sr. DEN./II/Sonpur in Sonpur Division. 9. Barauni-Samastipur-Muzaffarpur-Hajipur Section : Removing the 21.09.2015 1099788.00 Disa Enterprises seized, corroded & broken Rail , Plate Screw from Turnout sleeper under DEN/III/Sonpur. S. No. Description of Work Awarded on Agt. Value Agency (in Rs.) 1 2 3 4 5 10. Sonpur Division : Manning of unmanned Level Crossing 14 Nos. 23.09.2015 25910619.24 Raksha Associates between Mansi – Katareah station under Jurisdiction of Sr. DEN/II/Sonpur. 11. Hiring of Raod vehicle for carting of all type of Railway materials 24.09.2015 1803677.00 Sri Aditya Kumar (P.Way, Works etc.) for any distance for day to day maintenance work for the period of one year for SSE/P.Way/Barauni & East/Samastipur under ADEN/West/Barauni. 12. At Muzaffarpur : Replacement of badly corroded pipe line on 24.09.2015 3614488.00 M/S Durga Construction platform hydrant. 13. Proviosion of Foot Over Bridge at Dalsinghsarai from Platform No. 28.09.2015 7813319.00 M/S Chandrashekhar Singh & 2/3 including widening of island platform. Co 14. Extension of platform to the required length to accommodate the 28.09.2015 2154760.26 M/S Chandradeo Singh longest stopping trains at Semapur, Karhagola Road, Pasraha, Maheshkhunt, Lakhminia & Danauli Phulwaria station. 15. Bachhwara-Hajipur-Chapra kacheri Section : Provision of Low cost 30.09.2015 4613793.00 Shravani shed seating arrangement & hand pump at 16 stations. October,2015 1. At Narayanpur Anant Yard : Slewing of line Ni. 11 towards 01.10.2015 6078323.00 Sri Pankaj Kumar carriage building (Way Side) (Left over work). 2. (i) Repairing & changing of V bracing by X frame & provision of 06.10.2015 996442368.00 M/S Jai Mangla Construction lateral bracing with guest plate in all welded girder of 12.2 m clear span in Sonpur Division (ii) Changing & replacement of corroded / pitted member of Bridge No. 15 Up, 15 Dn, 26 Up, 26 Dn, 28 Up, 28 Dn, 33 Up, 33 Dn, 44 Up, 44 Dn, 14, 15, 21, 22, 23, 38, 7 & 11 between station Bachhwara-Hajipur in Sonpur Division. 3. Bachhwara- Chapra Kacheri Section : Provision of Toilets at “B”, 08.10.2015 912280.00 M/S C.M. Construction “D” & “E” class stations at Mahnar, Mohiuddinnagar, Vidyapatinagar & Shahpur Patoree. 4. Chapra Kacheri -Bachhwara Section : Recoupment & provision of 08.10.2015 577362.00 Sri Hari Bansh Singh standard boundary pillar , standard P.Way board etc. in the section of ADEN/Line/Sonpur. 5. At Hajipur : Provision of drain & boundary wall at back side of 09.10.2015 3161787.00 Sri Rajesh Kumar Singh staff quarter. S.