KEPUTUSAN PEROLEHAN LPP BAGI TAHUN 2009

SURAT SETUJU TERIMA NILAI KONTRAK BIL. LPP NAMA PROJEK KONTRAKTOR / PEMBEKAL / TARIKH MILIK TAPAK (RM)

KERJA-KERJA DI PROJEK TANAMAN CILI AMS DESA ENTERPRISE FERTIGASI PPNJ DI LEMBAH BIOTEK, SUNGAI NO 59 JALAN ANTOI, 1 9-Jun-09 167,500.00 LEBAK KAMPUNG MAJIDI BARU (LPP. JHR (SH) BIL 16/2009) 81100

KERJA MEMBEKAL DAN MEMBINA UNTUK TERNAKAN IKAN MARIN DALAM KOLAM PPK BUMI GEMILANG CONSTRUCTION 2 JOHOR JOHOR BAHRU SELATAN DI , NO 32-02, JLN ROSMERAH 3/2 20-Apr-09 201,800.00 MUKIM , JOHOR BAHRU 81100 JOHOR BAHRU SEBUTHARGA LPPJ 8/2009

KERJA-KERJA DI PROJEK JAGUNG MANIS DI VITA CEKAP GEMILANG ENTERPRISE FRUITS PARK BANDAR PENAWAR TANJUNG NO 39 B -16 & 17 TINGKAT ATAS 3 JOHOR 15-Jun-09 92,300.00 SURAT KOTA TINGGI BANGUNAN ARKED MARA (LPP. JHR (SH) BIL 18/2009) 81900 KOTA TINGGI

MEMBEKAL DAN MENGHANTAR 1 UNIT LORI BDM 5 TON BERBADAN KAYU KE PPK UTARA DAIHATSU (M) SDN BHD TERMASUK INSURAN COMPREHENSIVE DAN 4 JOHOR NO 32, JALAN LARKIN 3-Feb-09 78,474.26 CUKAI JALAN UNTUK TEMPOH SATU TAHUN DI 80200 JOHOR BAHRU BAWAH SSPTF LEMBAGA PERTUBUHAN PELADANG (SEBUT HARGA LPPJ 2/2009)

KERJA-KERJA DI PROJEK TANAMAN CILI DIDI CONSTRUCTION & TRADING FERTIGASI PPK DI KOMPLEKS 138 JALAN PULASAN 5 JOHOR PEJABAT PARIT RAJA LOT PTD 9128 JALAN 22-Jun-09 69,500.00 TAMAN PANTAI BESAR, PARIT RAJA 83000 BATU PAHAT (LPP. JHR (SH) BIL 20/2009) SURAT SETUJU TERIMA NILAI KONTRAK BIL. LPP NAMA PROJEK KONTRAKTOR / PEMBEKAL / TARIKH MILIK TAPAK (RM)

KERJA-KERJA DI PROJEK TANAMAN CILI GADING EMAS PERDANA FERTIGASI PPK UTARA DI KOMPLEKSS NO 49 JALAN TERATAI 2 6 JOHOR PEJABAT PPK MUAR UTARA JALAN PAYAMAS TAMAN TERATAI 15-Jun-09 66,850.00 JALAN HAJI JAIB LPP. JHR (SH) BIL 19/2009) 84000 MUAR

MEMBEKAL & MENGHANTAR 28 EKOR KAMBING HAMLIS SALES & SERVICE PEJANTAN BAKA BOER TULEN DAN 700 KAMBING NO. 1905, JLN PULAI JAYA 52 7 JOHOR BOER KACUKAN BOER UNTUK TUJUAN BAKA DAN 5-Aug-09 676,200.00 BANDAR PULAI JAYA PEMBIAKAN LPP JOHOR 81300 JOHOR TENDER LPP JOHOR BIL 2/2009

KERJA BEKALAN TO SUPPLY, DESIGN, FABRICATE AND COMMISSIONING CIP SYSTEM(2 UNIT WATER HEATER + PIPE & FITTINGS) FEEDING & GRADING FLAT RUBBER CONVEYER (24') 1 UNIT HSM SEPADU ENTERPRISE SLURRY COLLECTING TANK AND 1 UNIT NO 14, JALAN MELOR 8 JOHOR 1-Sep-09 183,000.00 ELEVATED RUBBER BELT CONVEYER C/W MAJIDEE BARU CARRIER (FOR WASTE DISPOSAL) UNTUK KILANG 81100 JOHOR BAHRU PEMPROSESAN MAKANAN PPNJ DI LOT 1292 1292,, , KLUANG, JOHOR SEBUTHARGA LPPJ 28/2009

KERJA-KERJA MEMBINA BANGUNAN TAMBAHAN KBS GEMILANG ENTERPRISE (GRADING AREA) BERSEBELAHAN BANGUNAN LOT 2211, KG DATO IBRAHIM SEDIA ADA (BLOK B) BERUKURAN 25'x50' UNTUK 9 JOHOR MAJID 1-Sep-09 156,250.00 KILANG PEMPROSESAN MAKANAN PPNJ DI LOT SIMPANG 1292, MACHAP, KLUANG, JOHOR 86200 KLUANG SEBUTHARGA LPPJ 27/2009

KEKATONG ENTERPRISE KERJA-KERJA DI PROJEK TERNAKAN IKAN MERIN NO 14 JALAN MELOR, MAJIDI 10 JOHOR PPK JOHOR BAHRU SELATAN 22-Jun-09 45,100.00 BARU (LPP. JHR (SH) BIL 24/2009) 81100 JOHOR BAHRU SURAT SETUJU TERIMA NILAI KONTRAK BIL. LPP NAMA PROJEK KONTRAKTOR / PEMBEKAL / TARIKH MILIK TAPAK (RM)

KERANJI UTAMA KERJA-KERJA DI PROJEK TERNAKAN KAMBING NO 25 A JALAN 11 JOHOR BIAK BAKA PPN JOHOR 12-Jun-09 62,000.00 TAMAN DAMAI JAYA (LPP. JHR (SH) BIL 17/2009) 85400 , JOHOR

KERJA PEMBERSIHAN KAWASAN DAN PENYEDIAAN TANAH, MEMBINA SISTEM PERPARITAN SERTA MEMBINA JLN LADANG DAN MAHURA ENTERPRISE 12 JOHOR JAMBATAN KONTRIK UNTUK PROJEK JAGUNG PPK NO 42, , BAKRI 20-Apr-09 190,450.80 MUAR DALAM PTD 7845/HS(D) B 15718 MUKIM 84000 MUAR JORAK, MUAR SEBUTHARGA LPPJ 7/2009

MANNZA CONSTRUCTION KERJA DI PROJEK TANAMAN CILI FERTIGASI PPK NO 88 TINGKAT ATAS JALAN 13 JOHOR KOTA TINGGI MANGGA 1 9-Jun-09 180,400.00 (LPP. JHR (SH) BIL 15/2009) TAMAN KOTA JAYA 81900 KOTA TINGGI KERJA PEMBERSIHAN KAWASAN DAN MANSOR CONSTRUCTION & PENYEDIAAN TANAH DI TAPAK PROJEK ENTERPRISE 14 JOHOR 21-May-09y 65,500.00, CENDAWAN PPK MUAR SELATAN , MUAR , JOHOR NO 9 JALAN IBRAHIM (LPP. JHR (SH) BIL 12/2009) 84000 MUAR

KERJA-KERJA MEMBINA & MENYIAPKAN SATU MOHD YASIN BIN ABDUL RAHMAN UNIT KANDANG KAMBING JENIS KAYU SAIZ 30' x 1203,BLOK10, FELDA 15 JOHOR 160' DI ATAS LOT PTD 180, LADANG BUKIT 20-Apr-09 186,351.00 TIMUR CERAKAI, MAWAI, KOTA TINGGI 81909 KOTA TINGGI SEBUTHARGA LPPJ 6/2009

KERJA-KERJA DI PROJEK TERNAKAN UDANG PANDU SELATAN ENTERPRISE MERIN DAN IKAN MERIN PPK SELATAN NO 75 TINGKAT BAWAH 16 JOHOR 22-Jun-09 395,250.00 JOHOR JALAN GAJUS TAMAN KOBENA (LPP. JHR (SH) BIL 25/2009) 81200 JOHOR BAHRU SURAT SETUJU TERIMA NILAI KONTRAK BIL. LPP NAMA PROJEK KONTRAKTOR / PEMBEKAL / TARIKH MILIK TAPAK (RM)

KERJA MEMBEKAL DAN MENGHANTAR PADDLE PEMBINAAN AIR TAWAR WHELL DAN METER KUALITI AIR PROJEK NO 99 BLOK BLOK 05 17 JOHOR TERNAKAN IKAN MERIN DALAM KOLAM GELANG 21-May-09 111,100.00 FELDA AIR TAWAR 05 PATAH PPK JOHOR BAHRU SELATAN 81920 KOTA TINGGI (LPP. JHR (SH) BIL 13/2009)

KERJA-KERJA DI PROJEK TERNAKAN KAMBING PEMBINAAN DESA WAWASAN BIAK BAKA PPK KOTA TINGGI TIMUTR DI LADANG NO 46 KG TANAH PUTIH 18 JOHOR 22-Jun-09 95,000.00 BUKIT CERAKAI, MAWAI KOTA TINGGI JOHOR TANJUNG (LPP. JHR (SH) BIL 22/2009) 81910 KOTA TINGGI

MEMBEKAL BAHAN BINAAN DAN MEMBINA SATU PENGURUS BESAR UNIT BENGKEL JENTUAI PADI BERUKURAN PPK MUAR UTARA 19 JOHOR 25'x35' DI PUSAT PERKHIDMATAN KEJENTERAAN 17-Mar-09 31,000.00 JALN PAYAMAS LADANG (PPNJ JENTERA MUAR) 84900 TANGKAK SEBUTHARGA LPPJ 3/2009

MEMBEKAL DAN MENGHANTAR JENTERA DAN PERALATAN KECIL DI BAWAH SKIM PEMILIKAN JENTERA DAN PERALATAN KECIL LADANG TAHUN 2008 FASA2 2 SATU UNIT TREKTOR 85-95, 1 UNIT PENGURUS BESAR 20 JOHOR 3-Feb-09 99,999.00 NEW HARROW DAN 1 UNIT DISH PLOUGH UNTUK PPK MUAR SELATAN PESERTA PPK MUAR SELATAN ( KELOMPOK 5 ORANG) SEBUTHARGA LPPJ 1/2009

MEMBEKAL BAKA KAMBING BOER JANTAN DAN PENGURUS BESAR BAKA BOER BETINA PROJEK PEMBANGUNAN 21 JOHOR PPK 10-Aug-09 330,900.00 KAWASAN PAGOH 2009 BATU PAHAT SEBUTHARGA LPPJ 26/2009 SURAT SETUJU TERIMA NILAI KONTRAK BIL. LPP NAMA PROJEK KONTRAKTOR / PEMBEKAL / TARIKH MILIK TAPAK (RM)

MEMBEKAL DAN MENGHANTAR MAKANAN PENGURUS BESAR RUMUSAN IKAN SIAKAP UNTUK PROJEK PPN JOHOR TERNAKAN IKAN MARIN DALAM KOLAM PPK 7,9& 11, JALAN PERSIARAN 22 JOHOR 3-Nov-09 290,640.00 JOHOR BAHRU SELATAN DI MUKIM TANJUNG TANJUNG SUSUR 1, KUPANG, GELANG PATAH JOHOR TAMAN ALIF, (LPP. JHR (SH) BIL 31/2009) 81200 JOHOR BAHRU

KERJA-KERJA DI PROJEK TERNAKAN KAMBING PPK MERSING UTARA BIAK BAKA UNTUK PPK MERSING SELATAN DI 23 JOHOR JALAN DATO MOHD ALI 22-Jun-09 193,830.00 TENGLU MERSING JOHOR 86900 (LPP. JHR (SH) BIL 21/2009)

KERJA-KERJA DI TAPAK PROJEK TERNAKAN PUNCAK ALAM BINA KAMBING BIAK BAKA DI SUNGAI LEBAK UNTUK NO 44-01 JALAN SRI PERKASA 1/3 24 JOHOR 22-May-09 443,497.00 PPN JOHOR TAMAN TAMPOI UTAMA (LPP. JHR (SH) BIL 14/2009) 81200 JOHOR BAHRU

KERJA-KERJA MEMBINA DAN MENYIAPKAN SATU (UNIT) KANDANG KAMBING JENIS KAYU SAIZ (30' SEPAKAT JAYA ENTERPRISE 25 JOHOR x 160')), DI ATAS LOT PTD 2016, KG TENGLU 20-Apr-09p 187,190.00, 934, JLN ENDAU 86800 MERSING BESAR, 86800 MERSING SEBUTHARGA LPPJ 5/2009 SURAT SETUJU TERIMA NILAI KONTRAK BIL. LPP NAMA PROJEK KONTRAKTOR / PEMBEKAL / TARIKH MILIK TAPAK (RM)

MEMBEKAL DAN MENGHANTAR 5 UNIT KENDERAAN PRIME MOVER (BDM 36 MT) Tan Chong Industrial Equipment BESERTA GENERAL KARGO UNTUK PPK 1 Sdn. Bhd UNIT DAN PPN JOHOR 4 UNIT TERMASUK 26 JOHOR Plo 157, Jalan Angkasa Mas 6 28-Jul-09 1,371,354.90 INSURAN COMPREHENSIVE DAN CUKAI JALAN Kawasan Perindustrian 2 SELAMA SATU TAHUN UNTUK LPP JOHOR DALAM 81100 Johor Bahru. TEMPOH 24 MINNGU TENDER LPP JOHOR BIL 1/2009

KERJA-KERJA DI PROJEK TERNAKAN KAMBING TEKNO TULIN ENTERPRISE 27 JOHOR BIAK BAKA PPN JOHOR 1312 BLOK-1 FELDA ADELA 22-Jun-09 115,000.00 (LPP. JHR (SH) BIL 23/2009) 81900 KOTA TINGGI

KERJA PEMBERSIHAN KAWASAN DAN YASNON ENTERPRISE PENYEDIAAN TANAH DI TAPAK PROJEK TANAMAN NO. 16, BATU 30, PANGKALAN 28 JOHOR NENAS N36 PPK PONYIAN TIMUR DIGSA ULU ARA RAJA 5-May-09 166,760.00 PASONG, MK. API-API, PONTIAN JOHOR PEKAN NENAS, PONTIAN (LPP. JHR (SH) BIL 9/2009) JOHOR

KERJA PEMBERSIHAN KAWASAN DAN PENYEDIAAN TANAH DI TAPAK PROJEK JAMBU 29 JOHOR BATU DAN BETIK PPK MUAR TENGAH DI ZPM Medan Bina 21-May-09 91,200.00 CHEMPELAK, , JOHOR (LPP. JHR (SH) BIL 11/2009)