District Plan Report(2010-2011), District, ORISSA District Plan Report 2010-2011

______District : GANJAM ORISSA

District Plan Report(2010-2011), , ORISSA

Table of Contents Introduction

Introduction Overview of The District

Overview of The District Vision

Vision SWOT Analysis

SWOT Analysis Proceedings(Minutes of Meeting/List of Participants)

Proceedings ( Minutes of Meeting/ List of Participants Annexure I District Plan Summary District Plan Panchayat Component Municipal Component Line Department Component Annexure II Sectoral View Tied Component : Sector Wise Expected Allocation v/s Planned Outlay (Consolidated RLB/ULB/Line Department) Untied Component : Expected Allocation (Consolidated RLB/ULB/Line Department) Untied Component : Planned Outlay Tied Component : Sector Wise Expected Allocation v/s Planned Outlay : Panchayat Component Untied Component : Expected Allocation : Panchayat Component Untied Component : Planned Outlay :Panchayat Component Untied Component : Expected Allocation : Municipal Component Untied Component : Planned Outlay : Municipal Component Tied Component : Sector Wise Expected Allocation v/s Planned Outlay : Line Department Component Annexure III Scheme Wise Expected Allocation v/s Planned Outlay (Consolidated RLB/ULB/Line Department) Scheme Wise Expected Allocation v/s Planned Outlay : Panchayat Component Scheme Wise Expected Allocation v/s Planned Outlay : Municipal Component Scheme Wise Expected Allocation v/s Planned Outlay : Line Department Component Annexure IV Work Details Scheme Wise Expected Allocation v/s Planned Outlay : Panchayat Component Scheme Wise Expected Allocation v/s Planned Outlay : Municipal Component Scheme Wise Expected Allocation v/s Planned Outlay : Line Department Component Annexure V Process Checklist Introduction

Accelerated development, integrated and inclusive process of planning availability and accessibility to resources and peoples participation on implementation and social audit will decide the future development path of Ganjam. The district has taken a very bold step in formulating district plan starting from below both in rural and urban area. Comprehensive District Plan is prepared in a participatory and consultative process. It takes into account the requirement of all the departments of the district, all the blocks/ULBs. Needs assessment are done through discussion and consultation with each unit. This process includes all desirable schemes giving importance to flagship programmes including Bharat Nirman. Convergence of plan and programme is one of the major aims of this planning process.

Ganjam is the leading district in Orissa in terms of agriculture. In the process, it has tried to develop its human resources as well as natural resources through Comprehensive District Plan. With the inception of the district planning process, there is ample scope and opportunity to bring the desired development at the GP/Block and ULB level. This is essential for the development; as it is participatory, consultative and inclusive in nature. With proper perspective tourism sector can give a boost both to employment and income generation in rural and urban areas.

1.1: Methodology 1.1.1: Workshop/Training

For the preparation of the plan, strategies were planned at different levels. In order to bring the high level officials of the district together for the planning process, a district level sensitization workshop was organized where all the BDOs, heads of the district level line departments and also functionaries of ULBs were present. In this workshop, particulars for the Block/ULB level sensitization workshop were decided. The workshops were organized successfully on the scheduled date. In the block level workshops all PRI members, Government officials and member of the Civil Society Organizations were trained how to prepare plan at the grassroot level with a vision on the priorities. The schedule of sensitization workshops and consolidated profile of the participants is presented in table 1.1 and 1.2. Planning officials from Ganjam district were present in the sensitization workshops at Block as well as ULB level. Hardcopies of Oriya write-up (Ama Yojana Ama Hatare) regarding planning and priority was circulated to each participant in both the first & second rounds of the sensitization meetings both in Blocks and ULBs for better planning for the district.

District Plan Report Page 1 of 192 Table 1.1: Details of district Level workshop on formulation of Annual Plan 2010-11

Sl. Name of the No. of Date Place Key Participants No. Block & ULB Participants Orientation APD, DRDA, Sub-collector Workshop on Conference 1 25-08-2009 Ganjam, DDP, Ganjam, 120 CDP Ganjam Hall, DRDA MD,DJRC (TSI) 2009-10 DPC Chairperson, DPC Members, Collector and Conference 2 DPC meeting 02-06-2010 DM, Ganjam, PD, DRDA, 82 Hall, DRDA DDP Ganjam, UNO Volunteers

Table 1.2: Block/ULB level Sensitization workshops-Consolidated Profile of the Participants

Sl. Name of the Block & No. of Date Place No. ULB Participants Aska Block 1 07-09-2009 Block Conference Hall 53 Aska NAC Beguniapada Block 2 17-09-2009 BDO’s Office 31 NAC Bellaguntha Block 3 04-09-2009 Block Conference Hall 72 Bellaguntha NAC Block 4 05-09-2009 Block Conference Hall 30 Bhanjanagar NAC Block 5 04-09-2009 Block Conference Hall 33 Buguda NAC Block 6 09-09-2009 Block Conference Hall 39 Chikiti NAC 7 Block 05-09-2009 Block Conference Hall 29 Block 8 08-09-2009 Block Conference Hall 26 Digapahandi NAC 9 Jagannath Prasad 04-09-2009 Nodal U.P. School 40 K.S. Nagar Block 10 10-09-2009 Block Conference Hall 44 K.S. Nagar NAC 11 07-09-2009 Block Conference Hall 49 Polosara Block 12 03-09-2009 Block Conference Hall 38 Polosara NAC Block 13 03-09-2009 Block Conference Hall 50 Purusottampur NAC Rangeilunda Block 14 09-09-2009 Block Conference Hall 59 Gopalpur NAC 15 Sanakhemundi 08-09-2009 Block Conference Hall 40 Block 16 05-09-2009 Block Conference Hall 33 Surada NAC 17 Sheragarh 08-09-2009 Block Conference Hall 60 Chatrapur Block 18 02-09-2009 Block Conference Hall 26 Chatrapur NAC Ganjam Block 19 Ganjam NAC 02-09-2009 Block Conference Hall 24 NAC Block 20 07-09-2009 Block Conference Hall 22 Hinjilicut NAC Khalikote Block 21 02-09-2009 Block Conference Hall 17 Khalikote NAC

District Plan Report Page 2 of 192 Sl. Name of the Block & No. of Date Place No. ULB Participants 22 Block 09-09-2009 Block Conference Hall 26 23 Municipality 02-09-2009 Conference Hall of BMC 5 Total 846 1.2: Major issues raised at the workshops

Various issues relating to the development of the district were raised and discussed at the workshops. The participants agreed that effective training and awareness activities should be organized at regular intervals. Numbers of issues have been raised by the PRI members attended in these workshops and the same were discussed. People became aware about planning, priority, vision and also how to plan in grass-root level. However, the following commonly agreed issues are developed through consultation.

• Education: Girl children discontinuing their studies is a major issue of concern in Ganjam District. This is more in case of Tribal Blocks like Patrapur, Soroda and Bhanjanagar. Lack of awareness amongst parents for educating their girl child is one of the major contributing factors, which needs urgent attention –as per the view of some of the PRI members who had attended the sensitization meetings organized at the Block level.

• Health: Due to various reasons there is occasional brake of Gastro- intestinal diseases like diarrhea and jaundice in some of the Blocks. Therefore there is need for more funds for the provision of safe drinking water and better sanitation in the district. There are inadequacy of Doctors and other health care providing personnel at various places of the district. Inadequate accommodation facility at remote rural areas is a bigger hindrance for provision of better health care.

• AIDS: HIV/AIDS/STDs have become a major threat in the District. Since number of Youths are migrating to big cities like Mumbai, Ahemedabad, Surat and to other cities in pursuit of better and additional income are spreading HIV/AIDS/STDs due to their risky sexual behavior at the cost of their social life. This has become a matter of great concern in some of the pockets. Although many Non Governmental Organizations (NGOs) are involved in this issue, but it is not sufficient to combact the issue and there is need for more and more sensitization programs at the Government level. More funds should be earmarked for addressing the issue.

• Peoples demand more funds on development of road and communication.

• People of the district are more conscious about sanitation and safe drinking water and the present fund is not sufficient to meet the local demand. So they are demanding additional funds to fulfill the requirement.

District Plan Report Page 3 of 192 • Additional funds should be provided for development of irrigation sector

• Provision of adequate funds to take up over head tanks under rural as well urban piped water supply schemes

• Taking up revival of LI points under BRGF

Proof of evidence in shape of relevant photographs is incorporated.

Photographs of Orientation Workshop at different levels Orientation Workshop of CDP Ganjam 2009-10 held on 25-08-09 in the Conference Hall of DRDA, Chatrapur

Block and ULB level workshop

District Plan Report Page 4 of 192 District Plan Report Page 5 of 192 District Plan Report Page 6 of 192 1.3: Data Collection

Planning demands the most relevant data as well as information of various directions. The required information has been collected from GPs, Blocks/ULBs and from the line departments through specific format. At the time of data collection, some valuable information like constraints and prospects has been collected through discussions which are reflected by the respective departments in the Plan document. Project proposals have been collected from GPs, Blocks/ULBs and from the line departments in the specified format to find out their requirements and resource gap in the district level.

1.3.1: Plan Compilation

The data or information gathered from different sectors and various sources have been compiled to have a clear idea about the development scenario of the district. Data from rural, urban as well as line departments have been scaled up to measure the success of various schemes and programmes. Specific frameworks had been designed for the collection of data, making it easier for the process of compilation and analysis. The data have been compiled sector-wise, year-wise, scheme-wise, beneficiary-wise etc. in order to draw an easy conclusion of the developmental process in the district.

District Plan Report Page 7 of 192 DISTRICT PROFILE

1.4: History of Ganjam 1.4.1: Historical Background

1.4.2: Ancient Ganjam -The Ganjam area was a part of ancient Kalinga empire which was occupied by Ashok in 261 B.C During this period it was the main route of South and East for shipping. Its huge number of black elephants attracted king Ashok for invading Kalinga.

1.4.3: Mediaeval Ganjam-The district was named after the old township and European fort of Ganjam situated on the northern bank of river Rushikulya, which was the headquarter of the district. In 1757 it was French Commander Bussy, who marched into Ganjam and realized areas of tribute from feudal chiefs. It was the English who ultimately defeated the French in the Deccan and annexed Ganjam in 1759.

1.4.4: Modern Ganjam–The modern Ganjam carved out of the Vizag district of and came into existence on 31.03.1936. The office of the Collector, Ganjam was established in 1794. Ganjam was a part of the then Vizag District of Madras Presidency till 31.03.1936. The district got separated from Madras Presidency and formed a part of the newly created state of Orissa with effect from 1.4.1936. The re-organized district comprises the whole of Ghumusor, Chatrapur and Baliguda divisions, part of old Berhampur taluk, part of old Ichapur taluk, part of Parlakhemundi plains and the whole of Parlakhemundi agency area in the old Chicacola division.

As per recent, the 1992 reorganized plan of Ganjam by Government of Orissa, the 7 blocks of Parlakhemundi subdivision were separated and the new district of Gajapati came into being. As such Ganjam at present constitutes of 3 subdivisions, 22 blocks, 14 Tahasils and 18 urban areas.

1.5: TOPOGRAPHY

Spreading over an area of 8206.0 Sq.km, it is surrounded by Kandhamal in the North-West, in the North, Khurda in the North-East, in the West and in the South-East. On its Southern periphery the district borders the state of . (See Map 1.1)

1.5.1: LAND AND SOIL

Broadly, physiographic features of the district can be divided into two parts namely, the coastal plains in the East and the hills and table land in the West. While the former is fertile and close to irrigation sources, the latter is rocky and

District Plan Report Page 8 of 192 lacks irrigation facilities. The plains lying between the Eastern Ghats and the Bay of Bengal are narrow. Since the hills are close to the sea, the rivers flowing from hills are not very long and are subject to sudden flood. The rock pattern of Ganjam district indicates that there are brown and laterites, Gondwanas, Cuddapah, newer Dolerites and Archus comprising of igneous metamorphic rocks. The chief rock types are Khandalite, Granitoieo and Granitifrious. Generally the soil of Ganjam has three types; Sandy loam (yellow) 2-Clay loam (alluvial) 3-Latraitie (red). (See Map 1.2)

1.5.2: Land Holding Pattern

Ganjam has total geographical area of 8206.00 sq.km., having forest area of 3149.9 sq.km and total cultivable area of 434000 ha. The permanent pasture and grazing land comprises 20,000 ha. area out of the total area. The barren and un-cultivable waste land comprises 37,000 ha. area and total fallow land 28,000 ha.

1.6: Demography

Ganjam is also the largest populous district (3160635 as per 2001 census) of Orissa. Ganjam district has a population of 3160635 people, 1581986 no. of male and 1578649 no. of female. Out of the total population, SC constitutes of 586798 numbers and ST constitutes of 90919 numbers.

Table 1.3: Demographic profile of the district Population Growth rate Sex ratio U/R/ Total Females/ Persons Male Female Number % 1000males Urban 556359 286900 269459 132606 31.29 939

Rural 2604276 1295086 1309190 323973 14.21 1011

Total 3160635 1581986 1578649 456579 16.88 998 Source: Census 2001

Table 1.4: Scheduled Castes & Scheduled Tribes Population Urban/ Scheduled Castes Population. Scheduled Tribes Population % to Total % to Total Rural/ Population Population Total Persons Male Female Persons Male Female

Urban 68763 34379 34384 12.36 3608 1958 1650 0.65

Rural 518036 257303 260732 19.89 87311 43885 43426 3.35

Total 586798 291682 295116 18.57 90919 45843 45076 2.88 Source: Census 2001

District Plan Report Page 9 of 192 1.7: PRODUCTIVITY 1.7.1: Agriculture

Agriculture is the backbone of the economy and around 80% people of Ganjam district depend on Agriculture and Allied Activities. Gross cropped area of Ganjam is estimated at 6.4 lakh ha.The total irrigated area so far surveyed is 293192 ha. for Kharif and 58730 ha. for Rabi crops. Therefore nearly 50% of the gross cropped area has got the possibility of getting irrigation facilities. As against this potential only 2.83 lakh ha. get actual irrigation facility to grow various crops. Therefore only 41.54% crops get irrigation facility. Different crops are sown under rainfed condition in nearly 58% of the cultivated areas. Except Jagannath Prasad block all the blocks of Ganjam have more than 35% of the cultivable land having irrigation facility from various sources. A variety of crops like paddy, groundnut, sugarcane, maize, oil seeds, millets, green gram, black gram, horse gram etc. are grown in the district.

Table 1.5: Agriculture Sl. No. Particulars Unit (,000 ha.) 1 Total Cultivable Area 406 2 Net Area Sown 381 3 Current Fallow 25 4 Other Fallow 6 5 Barren & Uncultivable Waste Land 20 6 Land Put to Non-Agricultural Use 21 7 Cultivable Waste Land 11 8 Misc. tree & Groves 22 9 Permanent Pasture 20 10 Area Under Principal Crops (Kharif & Rabi) 664.09 11 Forest Area 315 Source : Orissa Agricultural Statistics 2007-08

Table 1.6: Production of Major Agricultural Crops Sl. No. Particulars Yield Kg/ha. Production in '000 MT 1 Rice 2280 621.02 2 Wheat 1660 0.12 3 Maize 1353 12.66 4 Ragi 939 42.73 5 Total Cereals 2058 677.70 6 Mung 408 50.61 7 Biri 460 22.47 8 Kulthi 404 5.63 9 Cowpea 635 3.53 10 Arhar 770 9.22 11 Field pea 675 1.13 12 Groundnut 1539 36.86 13 Sesame 401 12.13

District Plan Report Page 10 of 192 Table 1.6: Production of Major Agricultural Crops Sl. No. Particulars Yield Kg/ha. Production in '000 MT 14 Caster 621 0.87 15 Mustard 537 0.47 16 Total condiments & 1035 5.32 spices 17 Sugarcane 77405 245.37 18 Total Vegetables total 11521 534.57 Source: Orissa Agricultural Statistics 2007-08

Table 1.7: Consumption of Fertilizer Unit (MT) Unit (MT) Particulars Orissa Ganjam Nitrogenous 272104 25067 Phosphatic 116766 5195 Potas 63033 3905 Total 451903 34167 Gross Cropped Area (in ,000 ha.) 8668.73 664.09 Fertilizer Consumption (Kg/ ha.) 52 51 Source: Orissa Agricultural Statistics 2007-08

1.8: FOREST AND CLIMATE

The district is rich in mountains and forests, some valuable wood like Sal, Teak, Gambhari are found in plenty in the forests. Forest products like Bamboo, Medicinal plants of various types, Jhuna, Mahul, Lakha, Sal leaves influence its economy. The total coverage of the present forest area is 3149.9 sq.km. in Ganjam out of which the area of reserved forests is 1485.69 sq.km. demarcated forest is 143.54 sq.km., un-classified forest is 0.86 sq.km. and un- demarcated protected forest area is 1167.36 sq.km. The district is characterized by an equitable temperature all through the year, particularly in the coastal regions. The average annual rain fall of the district is 129.60cms. The rainfall generally increases from the coast towards the interior hilly tracks of the district. The relative humidity is high throughout the year specifically in coastal areas. Winds are fairly strong particularly in coastal regions in summer and monsoon months. 1.9: NATURAL RESOURCES

Ganjam is very rich in natural resources like abrasives and grinding materials, limestone (kankar), manganese, monazite, sand and talc. Garnetiferous granitic gnashes and charanokites are used for manufacturing of grinding stones in the district. White clay deposits are also found in different areas of the district.

District Plan Report Page 11 of 192 Table1.8: Mining Sl. No. Particulars Units 1 Name of the Ore Mineral Sand 2 No. of Working Mines 1 3 Area Covered (in ha.) 2464.05 4 Output (in ,000 MT) 243 5 Value of Output (Rs. in Lakh) 1041.85 6 Quantity of Export abroad (in ,000MT) 284 7 No. of Workers Employed 954 Source: District Statistical Handbook Ganjam, 2007

1.10: WATER RESOURCES

The Bay of Bengal touches the Eastern coast of Ganjam and which extends more than 60 km, it provides unique opportunity for fishing port facilities at Gopalpur for trade.

1.10.1: Rivers, Lakes and Streams

There are a number of perennial streams and rivers flowing through this district, flourishing its cultivation-culture and agricultural economy. Among them, the river Rushikulya, Badanadi, Baghua, Dhanei, Bahuda and Ghodahad are the prominent ones that provide opportunities for the irrigation facility. The vast river basin of Rushikulya offers potential for exploration of ground water. These rivers provide opportunity for fishing which is the chief livelihood of many people in the district. Brakish water lagoon Chilika attracts tourists from every corner of country and from around the globe. The perennial streams Nirmaljhar and contain medicinal sulphuric water.

1.11: MARINE RESOURCES

The long sea and Chilika coast line is the source of rich marine products in the district. Besides this the coastline serves as a rich resource for lime shells. As a consequence this district supplies sizable portion of total lime needs of the state. Ganjam and Humma near the mouth of river Bahuda and Rushikulya are rich sources of salt production, which caters not only to the needs of the district but also of the state. The total salt producing area of the district is about 5500 acres, out of which 1238 acres are under co-operative societies fold and the rest are on private lease basis. On an average about 50000 to 60000 tons of salt are produced annually. About 2000 acres in Ganjam have been identified as suitable for salt farming in the state, but only 50% of the area is utilised. The rest is not being used due to various reasons including siltation, unfavourable topography despite this; Ganjam remains as the major salt-producing district in the state.

District Plan Report Page 12 of 192 1.12: MEANS OF LIVELIHOOD

Most of its people depend on agriculture as their means of livelihood. About 50% people survive on daily wages. Domestic animal resource, marine products and forest products help to add additional income for the people of Ganjam. Only about 30% people are service holders in Government as well as Non-Government/private sectors. Most of the working population is working in the private sector outside the district.

1.13: SOCIO-ECONOMIC STATUS

Social life is the indicator of economic status of a community. Though the district has rich socio-cultural background, the economic status of the community is not sound. Poverty stands as a barrier in the path of progress. Alcoholic practices of people, which also gets transmitted to other people ruins the social life of the district.

The district’s cultural heritage is dominated and influenced by Telugu people. Its cultural heritage is obviously glamorous. They do not prohibit traditional practices and have not abandoned many of their traditional cultural practices. They are less aware of harmful sexual behaviors due to illiteracy and ignorance. As a result HIV/AIDS is highly prevalent in the district.

1.14: LANGUAGE

Language is the mirror of socio-cultural profile means of communication and symbol of progress. Language is a great vehicle not only in exchange of thought but also in cementing close bonds of friendship and affinity that is essential for social mobilization. Oriya is the mother tongue of the people of Ganjam. However, some people in this district speak Telugu and Schedule tribe population speaks Tribal language.

1.15: Social Group Composition

Most of the inhabitants of this district belong to Hindu religion. The following table gives the clear picture of the social group composition in the district.

Table 1.9: Social Group Composition Sl. No. Social Group Male Female Total (in No.) % 1 SC 291682 295116 586798 18.57 2 ST 45843 45076 90919 2.88 3 Hindu 3132628 99.11 4 Muslim 10910 0.35 5 Christian 14818 0.47 6 Buddhist 39 0.00 7 Sikh 325 0.01 8 Other 1915 0.06

District Plan Report Page 13 of 192 9 All social groups 1581986 1578649 3160635 Source: District Statistical Handbook Ganjam 2007

1.16: OCCUPATIONAL PATTERN

Agriculture is the primary occupation of inhabitants of this district. However due to inadequate irrigation and less fertile land, output of agro products falls short of expectation in this district. Barring a few, the labour class is also engaged in other occupations such as factory work, construction, collection of forest materials, grazing of cattle’s etc. Most of the working population is migrating to outside the state in search of employments and income. Ganjam witnesses a high degree of migration in the state. Very few people are engaged in business or in employment. Only a few are engaged in petty trades.

1.16.1: Occupational Distribution

This district has a large workforce of 927739 persons. The occupational pattern of the work force with percentage to total workers is as under:

Table 1.10: Occupational Distribution No. of % of total Sl. No. Category workers workers 1 Cultivator 1332523 42.16

2 Agricultural labourers 1025626 32.45

Household Industries 3 107147 3.39 (Manufacturing,processing servicing & repairing)

Other workers (Livestock, Forestry, Fisheries, 4 Plantation, Mining, Construction, Trade & Transport 695339 22.00 etc.) Total 3160635 100.00 Source: District Socio Economic Survey Profile 2006-07

1.17: TRIBAL COMMUNITIES The physiography of Ganjam gives a prefect platform for the tribals in sustaining their ethno-cultural identity in the district. Forest area covers an area of 315000 ha. out of which 92228.98 ha. consists of reserved forest. The tribal community comprises 2.88% of the total population in Ganjam. The district has been the homeland of various tribal communities with their sub- tribes. The Kondhs and its subsection constitute the major percentage of tribal population in the district and the Souras stand second. There are also other tribal communities who are, however, negligible in number but definitely contribute to the exotic intermingling culture of the district.

District Plan Report Page 14 of 192 Map 1.3: Map of Ganjam District

District Plan Report Page 15 of 192 Table 1.11: District-An Overview Sl. No Particulars Value 1 Geographical Area in Sq.km. 8206 2 Total Forest Area (Lakh ha.) 3.15 3 Cultivable Area (Lakh ha.) 4.34 4 Irrigated Area (Lakh ha.) 2.83 5 Population as per Census, 2001 3160635 A Male 1581986 B Female 1578649 C Tribal Male 45843 D Tribal Female 45076 E Percentage Tribal of Population 2.88 F Schedule Caste Population 586798 G SC Male 291682 H SC Female 295116 I Percentage of SC Population 18.57 6 Population Growth rate 1991-2001 (in %) 16.88 7 Density of population as per Sq.km. 385 8 Total No. of B.P.L. Families 301581 9 Percentage of literacy 60.77 A Male 75.22 B Female 46.44 10 No. of Sub-divisions 3 11 No. of Tahasils 14 12 No of CD Blocks 22 13 No. of Municipal Corporation 1 14 No. of NAC 17 15 No. of GP 475 16 No. of R.I. Circles 198 17 No. of Revenue Villages 3229 18 No. of Medical College 1 19 No. of Hospitals 12 20 No. of P.H.C with M.H.O 15 21 No. of Beds in Hospitals 154 22 No. of C.H.C 10 23 No. of Homeopathy Dispensary 38 24 No. of Ayurvedic Dispensary 42 25 Normal Rainfall (in MM) 1295.6 No. of Irrigation Project A Major 1 B Medium 10 C Minor 1015 Source: Census 2001, District Statistical Hand Book Ganjam 2007, www.ganjam.nic.inDistrict Plan Report Page 16 of 192 1.18: HUMAN DEVELOPMENT INDICATORS

Taking into perspective the three basic components that Human Development Index (HDI) takes into account viz., Health, Education, Infrastructure and basic services. A comparative analysis between Ganjam and Orissa is presented in the following table.

Table 1.12: Human Development Indicators in Orissa and Ganjam Rank of Indicators Orissa Ganjam Ganjam

Health Index 0.468 0.404 21 Income Index 0.545 0.532 13 Overall Literacy Rate Index 0.636 0.629 17 CGER (6-14 Years) Index 0.896 0.894 15 Education Index 0.723 0.718 17 Human Development Index 0.579 0.551 20 Equally Distributed Health Index 0.471 0.378 21 Equally Distributed Education Index 0.713 0.704 17 Equally Distributed Income Index 0.455 0.473 12 Gender Development Index 0.546 0.518 15 Reproductive Health Index 0.549 0.526 20 Source: Human Development Report 2004 pp. 194-202

Overall position of Ganjam District, as far as human development indicators are concerned depicts a moderate picture and in certain indicators better than the state. For instance ‘Equally Distributed Income Index (EDI) Ganjam figures 0.473, whereas state figure is 0.455. Similarly Equally Distributed Education Index: EDEI is nearer to Orissa state figure. State figure is 0.713 whereas the district figure of Ganjam is 0.714. Income index of the district is 0.532, whereas the state figure is 0.545. This is little lower than the state figure. In case of CGER (6-14 years) index the district figure is (0.894) is close proximate to the state figure (0.896). From the above table it is observed that the development indicators of the district exhibits closer to state indicators.

Table 1.13: Development Indicators Development Indicators Ganjam Orissa Data Source Sex Ratio 998 972 Census, 2001 Percentage of BPL families 55 47 Panchayatiraj Deptt. Literacy Rate (%) 60.77 63.08 Census, 2001 Female Literacy Rate (%) 46.44 50.51 Census, 2001 Total Fertility Rate (TFR) 2.6 2.48 RCH-2 Death Rate (per 1000) 7.1 9.3 RCH-2 Pupil Teacher Ratio (Primary level) 48 39 OPEPA, CTS 2007

District Plan Report Page 17 of 192 Ganjam district is in better position in case of sex ratio and pupil teacher ratio (at primary level) while comparing to the State.

1.18.1: Health

Health care system in Ganjam needs substantial improvement. The strength of doctors is not as per allocation. Besides, due to insecure and inadequate communication system, the doctors are unable to render services to patients and at most times it becomes impossible on their part to attend for follow-up actions in inaccessible and interior parts of the district.

Hence, adequate steps are necessary to provide qualitative, preventive, promotive and curative health care services to all people, especially the vulnerable and disadvantaged groups. Ganjam district has 30 CHCs and 92 PHCs. It has also one Medical college with advanced and modern health care facilities. There are 365 doctors working in different DHH, CHC and PHCs. There are 99 Ayurvedic and Homeopathic doctors working for providing better health and alternative care service in Ganjam.

1.18.2: MKCG Medical College

The MKCG Medical College, Berhampur was started at first as an extension wing of SCB Medical College, in the year 1961 with an annual intake of 40 students. Subsequently in the year 1962 this college started functioning at Berhampur in some of the Revenue Buildings near the present city hospital which have been taken over for the purpose. Thereafter, for some time the college was functioning in the Ex.R.D.C. building and later shifted to the present building in the year 1968. The medical college providing teaching and training programme to the medical students and experts. The MBBS degree of the college under Berhampur University has been recognised by the Medical Council of in the year 1969. The college also imparts training in some of the para-medical courses, viz: Laboratory Technician Training, Ophthalmic Assistant Training and Radiographic Training.

Table 1.14: Health & Medical facilities Sl. No. Particulars (In No.) 1 Medical college 1 2 Allopathic Institutions 118 3 District Head Quarter Hospital 1 4 Sub-divisional Hospital (SDH) 2 5 Area Hospital 2 6 Community Health Centre 17 a Community Health Centre (CHC) 5 b Community Health Centre (CHC-I) 5 c Community Health Centre (CHC-II) 7

District Plan Report Page 18 of 192 Table 1.14: Health & Medical facilities Sl. No. Particulars (In No.) 7 Up-graded Primary Health Centre (UGPHC) 1 8 PHC 8 9 PHC (N) 87 10 Total Allopathic Institutions 118 11 Post Mortem Centre(PMC) 6 12 First Referral Units (FRU) 8 13 Blood Bank 3 14 ILR Point 72

15 Voluntary Confidential Counseling & Testing 2 Centre(VCCTC) 16 Prevention of Parent to Child Transmission centre (PPTCT) 1 17 Integrated Counseling & Testing Centre (ICTC) 4 18 STD CLINICS (RTI-STI) 1 19 P M Center 4 20 Drug Distribution Centre (DDC) 2704 21 Fever Treatment Deport (FTD) 379 22 Malaria Link Volunteers (MLVs) 52 23 Angan Wadi Workers (AWW) involved 2611 24 Sub Centers 460 25 X-Ray Unit 10 26 Ambulance 33 27 Private Doctor 81 28 Nursing Homes 22 29 SHGs involved in Health programme 15531 30 NGOs (Health Sector) 21 31 Orphanages 8 32 Special Schools 6 33 Old age Home 2 34 Government Homeopathy Medical College 1 35 Ayurvedic Medical college, Ankushpur 1 36 Homoeopathic Institutions 37 37 Ayurvedic Institution 48 38 Family Counseling Centre 1 39 Working Women hostel 1 40 Observation Home (Boys) 1 41 Observation Home (Girls) 1 42 Short stay Home (women) 1 43 ASHA Appointed 2725 44 AYUSH Doctors 20 45 Homoeopathic Doctors 11 46 Ayurvedic Doctors 8 47 Maternity Aid Centre 2

District Plan Report Page 19 of 192 Table 1.14: Health & Medical facilities Sl. No. Particulars (In No.) 48 Leprosy Eradication Units 6 49 Urban Leprosy Centre 1 Source: www.ganjam.nic.in

1.18.3: Education

The literacy rate of the district as per the 2001 census is 62.94%. Further the female literacy rate is even lower at 47.7%. These are aimed to increase up to 90% and 80% respectively.

There are 3311 government primary schools, 1235 government upper primary schools and 502 government high schools in Ganjam. Besides, there are only 3 Upper Primary aided Schools in the district. The total number of colleges in Ganjam is 79 (both aided and non-aided); out of this only five are government colleges.7853 teachers are working in Primary schools and 2207 teachers are working in Upper Primary Schools against the sanctioned post of Shikshya Sahayak and other regular posts. 4103 teachers are working in government high schools.

Education is the harbinger of development and the teachers are the mascots of school education, discipline and administration. It fosters rational thinking in children, hones their skills and prepares them with a more sound future. It is the medium through which socio-economic transformation is possible.

Table 1.15: Literacy Urban/ Rural/ No. of Literates Rate of literacy in percentage Total Persons Male Female Persons Male Female Urban 391352 223138 168214 79.66 88.24 70.56 Rural 1240370 782447 457923 56.54 72.19 41.25 Total 1631722 1005585 626137 60.77 75.22 46.44 Source: Census 2001

Table 1.16: Educational Institutions (2007-08) Sl. No. Particulars Unit (In No.) 1 Primary Schools 3311 2 ME Schools 1235 3 High Schools 502 4 Teachers in Primary Schools 7853 5 Teachers in ME Schools 2207 6 Teachers in High Schools 4103

District Plan Report Page 20 of 192 Table 1.16: Educational Institutions (2007-08) Sl. No. Particulars Unit (In No.) 7 Students in Primary Schools 372849 8 Students in ME Schools 131275 9 Students in High Schools 97478 10 Government College 5 11 Women’s Government College(out of total 5) 2 12 Aided College 33 13 Women’s Aided College(out of total 33) 2 14 Private Un-Aided College 41 15 Women’s Un-Aided College (out of total 41) 9 16 Self Financing College (out of 41) 10 17 Total No. of General College (5+33+41) 79 Source: www.ganjam.nic.in 1.18.4: Women & Child Welfare

Women constitute 49.94% of the total population of the district and the sex ratio is 998 females for 1000 males. The successive annual and five-year plan periods consistently and incessantly attempted to emphasize to bring women on par with men in socio-economic and political arenas. Therefore, the objective behind the series of schemes is to empower women and their children to become self-reliant and independent. The Integrated plan envisages a position of empowered women in the district along with a high quality of life for their children.

1.18.5: Self Help Group (SHG)-A leap forward in Women empowerment Achievement- SHG in Ganjam district, Oct-2009

Table 1.17: Self Help Groups in Ganjam No. of Self help group formed 19897 No. of members 247374 Saving amount of SHG Members 5157.46 lakh No. of district level federation formed 1 No. of block level federation formed (22 23 rural and 1 urban) No. of SHG enrolled in B’ MASS 19138 No. of SHG members enrolled in B’ MASS 230920 Saving amount of SHG enrolled in B’ MASS 465.18 lakh Total Bank linkages through B’ MASS Group 8085 Amt: Rs.6344.80 lakh Loan repayment SHG-MASS 84% Loan repayment MASS-Bank 100% No. of women welfare center constructed 66% by the WSHG Source: DSWO, Ganjam 2009

1.18.6: ICDS

District Plan Report Page 21 of 192 The ICDS programme is being implemented in 22 nos. of rural ICDS (Block) and one Urban ICDS (Berhampur Municipality) in 2882 Anganwadi Centers across the district. There are 2827 Angan Wadi Workers and 2871 Angan Wadi Helpers working in the district.

Table 1.18: ICDS Programme No. of ICDS Projects 23 No. of AWCs 2882 No. of AW Workers 2827 No. of AW Helpers 2871 Source: DSWO, Ganjam 2009

1.18.7: Ensure Gender Equality Currently the Gender Ratio in Ganjam is 998. But this figure is affected to an extent by male out-migration. A better measure in terms of gender ratio is of the 0-6 year age group which is 928. The district should aim to increase this to 960 by 2015. Sex determination test through ultrasound and amniocentesis techniques should be prohibited.

1.18.8: Infrastructures and Basic Services Amenities Human Resource Development requires the removal of several societal, economical, infrastructural and other issues such as; poverty, poor economic opportunities, social deprivation, etc. The objective is to provide each individual the opportunity to live a long and healthy life participating in the development process as real agents of change. Provision of safe drinking water is one of the major aims that all households can avail of by 2020. This will help in reducing water borne diseases.

1.18.9: Road and Transportation

This district has good network of roads extending over 3455.57 km. As detailed below:

Table 1.19: Road & Transport (Communication)

Sl. No. Particulars No. of Road Length (In km.)

1 National Highway 2 200.63

2 State Highway 11 550.15

3 Major District Highway 8 144.32

4 Other District Road 59 477.23

5 Rural Roads 436 2226.98

6 Gram Panchayat Road 2636 4024.24

District Plan Report Page 22 of 192 Table 1.19: Road & Transport (Communication)

Sl. No. Particulars No. of Road Length (In km.)

7 Panchayat Samiti Road 471 1104.66

8 Forest road 29 219

9 Railway Route Length - 86

10 Port (Minor) 1

Source : Executive Engineer R.W. Division-II Ganjam, Berhampur

1.18.10: Railways

The total coverage of railway line in the district is 85.64 km. (Howrah-Madras line) starting from Khalikote in the North to Sorla Road in the South. Berhampur is the main railway station of the district.

1.18.11: Port

Gopalpur is the only minor and seasonal port of the district. It has been decided to convert it to a major and all season port (in view of 2 major steel plants coming in this area). At present this port is utilized for import of fertilizer, food grains, minerals and export of Indian Rare Earths products.

1.18.12: Electricity

Electricity is one of the prime inputs for both the economic development and well being of the people. Increase in power generation has cascading effects on all sectors leading to increased growth particularly in industry, agriculture and other ancillary trade and business activities.

Table 1.20: Electricity (2007) Sl. No. Particulars Unit (In No.) 1 Towns Electrified 18 2 Total Villages 3215 3 Total Inhabited Villages 2812 4 Villages Electrified 2510 5 % of (inhabited) villages electrified 89 6 Total (inhabited) villages not Electrified 302 7 Total Habitations 4286 8 Total Habitations electrified 2541 9 Total Hamlets 1125 10 Total No. of Hamlets Electrified 209 11 % of hamlets electrified 18.58 Source: GRIDCO,

District Plan Report Page 23 of 192

1.18.13: Irrigation Facilities

Agriculture undoubtedly, is the dominant factor for the growth of district economy, but, ‘Irrigation’ holds the key for raising agricultural productivity and production. Inadequacy of irrigational infrastructure in the district has inhabited the agriculture sector. Hence much importance has been attached to the irrigation sector (both flow and lift) in present plan strategy. Irrigation is most essential input for agricultural production and productivity. Double and triple cropping in the district is feeble due to lack of adequate irrigation facilities.

Table 1.21: Irrigation (2007-08)

Potential (In ‘000 ha.) Sources Kharif Rabi Major and Medium Irrigation 130.08 13.68 Minor (Flow) Irrigation 103.93 6.80 Minor Lift 25.09 14.71 Other sources 35.26 35.26 Total 294.36 70.45 Source: DDA, Agriculture. Berhampur

1.18.14: Fisheries Resources

Ganjam is potentially rich in inland and Brackish Water Fisheries. It has coastline of 60 km. with 26 fishing villages and 14 fish landing centers. There are about 20000 fishermen population dependent on inland, Brackish Water and marine fisheries. The available inland water resources are 27686 ha. out of which 8321.33 ha. are ponds and 19364.91 ha. are reservoirs. The area developed till 31st March 1994 was 5005.42 ha. (pond) and 1910 ha (reservoirs).

The brackish water fisheries development agency had surveyed the area suitable for brackish water prawn culture in the 5 coastal blocks viz. Chatrapur, Ganjam, Khalikote, Rangeilunda and Chikiti and found that 2845.26 ha. are available for development; of this 2394.35 ha. belongs to government and 450.90 ha. belongs to private owners. The area developed till 31st March 1994 under brackish water fisheries was 1284.28 ha.

Table 1.22: Fishery (2006-07) Sl. No. Particulars Units (in MT) Production of Fish 1 Fresh water 21789.92 2 Brackish water 1756.34 3 Total 23546.26 4 Marine water 10100.60

District Plan Report Page 24 of 192 Grand Total 33646.86 Source: www.ganjam.nic.in

1.18.15: Animal Husbandry

A robust growth of Animal Resources with adequate food and fodder will perpetuate the income of the farmers. The Government has peaked white revolution with establishment of OMFED outlets. The present scenario of Animal Husbandry and Veterinary sector of Ganjam is briefly reflected below:

Table 1.23: Animal Husbandry 2008 Sl. No. Particulars Units (In No.) 1 Veterinary Hospital 1 2 Veterinary Dispensaries 38 3 Livestock Aid Centers 245 4 Livestock Inspectors 240 5 Artificial Insemination Centre 244 6 V.A.S 39 7 Additional V.A.S & Junior Veterinary Officer 22 8 SDVO 3 9 Total animals treated 322009 10 No. of castration done 13974 11 In fertility camp organized 77 12 Health camp organized 30 13 Heat induction camp organized 134 14 D-Worming of animals 19957 15 Vaccination (In No.) 16 H.F.V 339650 17 B.Q.V 272900 18 A.R.V 218 19 FMD 101270 20 PPR 160900 21 RDV 46600 22 Others 35280 Total 956818 23 Artificial insemination made 42914 24 Private Mega Layer Farm 22 25 Private Broiler Farm 158 26 Private dairy Farm 608 27 Live Stock Population Census (2003) (In No.) 28 Cattle 831156 29 Buffalo 127858 30 Sheep 141731 31 Goat 215152 32 Pig 9757

District Plan Report Page 25 of 192 Table 1.23: Animal Husbandry 2008 Sl. No. Particulars Units (In No.) 33 Poultry 1652764 34 Breedable Cattle Population Census 2003 (In No.) 35 Indigenous 255710 36 Cross Breed 9525 37 Total 265235 38 Buffalo(Desi) 39517 39 Buffalo (Improved) 3296 Total 42813 Grand Total 380048 40 Total Progeny Born (In No.) 41 Male 8458 42 Female 7165 Total 15623 Source: www.ganjam.nic.in 43 Production (For the Year 2007-08) a Milk (in 000 MT) 101.65 b Egg (No. in Millions) 352.42 c Meat (in 000 MT) 5.3 Source: CDVO, Ganjam

District Plan Report Page 26 of 192 1.18.16: Postal Services

As per the available statistics total no. of Post Offices in Ganjam district are 690.

Table 1.24: Post Offices in Ganjam (2007) Sl. No. Facility Units (In No.) 1 Sub-Post Offices 114 2 Branch Post Offices 572 3 Total Post Offices 690 Source: District Statistical Handbook Ganjam 2007

1.18.17: Public Distribution System (PDS)

Basic minimum commodities are being supplied in a subsidized rate to consumer, this system called as PDS, the price of commodities are difference in open market price there is a scope of diversion of subsidized PDS commodities. To maintain transparency and accountability Government has been providing support to CSO, CBO, PRI members and women SHG to operate PDS dealership in their local areas. The Government of Orissa is now implementing new programmes along with other commodities. PDS rice is being supplied @Rs.2.00 kg to all the BPL families. Ganjam has 301581 BPL households. 35 kg. rice per family per month is being provided for AAY families @Rs.2/- per kg. from August, 2008. 79620 are Antodaya cardholders and 5534 are Annapurna cardholders in the district.

Table 1.25: BPL (as per Survey 1997) No. of Rural Families (1997) 548308 No. of Rural BPL Household 301581 % of Rural BPL Families 55 BPL Families (SC) 100343 BPL Families (ST) 21624 BPL Families (Women) 17255 BPL Families (Physical Handicapped) 14681 BPL Families (Small Farmer) 16478 BPL Families (Marginal Farmer) 25936 BPL Families (Rural Artisan) 6394 BPL Families (Agricultural Labour) 96488 No. of Households as per 2002 BPL Survey 631411 Source: www.ganjam.nic.in

1.18.18: Housing and Sanitation

District Plan Report Page 27 of 192 Housing is one of the three most essential and basic needs, the other two being food and clothing. As an outcome of unequal development and distribution of income, assets and resources, there is mushrooming of slums in and around all major towns urban areas in Ganjam. In rural areas, people residing in Kutcha sheds live adjacent to cattle sheds. People live in small houses with poor sanitation in Ganjam. As per 1991 Census there were a total of 5983250 households and the number of residential houses was 5300570. This shows a shortage of 682680 (11.41%) residential houses. In respect of rural Orissa the shortage was estimated to be 633200 i.e. 12.25%. Since independence, out of 3160635 of the total population, 175417 households have sanitary latrines which are not adequate to meet the sanitary needs. School and other community latrines are not in use. Most of the households use the open field as their common latrine.

Table 1.26: Sanitation (2008) Sl. No. Particulars Achievement (In No.) 1 Household Latrines (BPL) 125579 2 Household Latrines (APL) 49838 3 Latrine for Schools 2110 4 Common Sanitary Complex 1 5 Latrines for Anganwadi etc. 786 6 RSM/RSPC 93 Source: www.ganjam.nic.in

1.18.19: Industry and Employment

The district has three medium scale industrial units namely, M/S Jayashree Chemicals (P) Ltd., M/S Aska Cooperative Sugar Industries and M/S Indian Rare Earths Ltd. Jayashree Chemicals located in Ganjam produces caustic soda, hydrochloric acid and chlorine with an investment of Rs.28.37 crore and has 580 employees. The Sugar Mill in Aska produces sugar, rectified spirit and Carbon dioxide and employs 2526 people with an investment of Rs.17.78 crore. Indian Rare Earths produces Illuminite, Silliminite, Zircon, Rutil and Garnet. It is located in Matikhal and employs 1398 people with an investment of Rs.220.15 crore. Aska Spinning Mill, which was earlier under public sector, has been privatized and runs as a private unit.

Table 1.27: Industry (2006-07) Particulars Units (In No.)

A. LARGE & MEDIUM SCALE INDUSTRY No. of Units Established 5 Total Capital Investment (Rs. in Lakh) 28216 Employment Generated 5802 B. SMALL SCALE INDUSTRY

District Plan Report Page 28 of 192 Table 1.27: Industry (2006-07) Particulars Units (In No.) No. of SSI Units Established 7776 Total Capital Investment (Rs. in Lakh) 17553 Employment Generated 36006 C. COTTAGE INDUSTRY No. of Cottage Industry Set up 4221 Total Capital Investment (Rs. in Lakh) 783 Employment Generated 7312 D. HANDLOOM INDUSTRY No. of Handloom Weaver Co-Operative Society 37 No. of Members 4865 No. of Looms 3019 No. of Working Looms 1190 Employment Generated 2380 Total Production (as on Feb 2008) (in Lakh meter) 16.59 Value of total Production (Rs. in Lakh) 472.36 Monthly Production (in Lakh meter) 1.20 Value of Monthly Production (Rs. in Lakh) 37.00 Source: GM, DIC & Asst. Director, Textile, Berhampur

1.18.20: Human Resource of the District

At the outset, development aspect of human resource is one of the need based resources for the integrated development of the district. Ganjam is one of the highly populous districts of the state. It contributes towards a major part of human resources in both skilled and unskilled categories. Human resources of the district, mostly assisted by women, contribute in different eco- developmental activities like, farming, business, domestic-animal rearing, fishery, horticulture, handicrafts, cottage industry etc.

1.18.21: District Income

The district per capita income with population base year as 2001 and total Gross District Domestic Product (GDDP) year as 2004-05 was Rs.15,434 per month. The district has shown an average growth rate of 5.88% during the same period. It has also achieved a higher than 4% annual growths (4.45%) in Agriculture and Animal Husbandry sector much ahead of Orissa. Mining and quarrying had achieved above 20% growth rate while forestry is growing under 1% per annum.

1.18.22: Tourism

District Plan Report Page 29 of 192 It is one of the important sectors of district and state economy. It has great potential to stimulate economy growth and generate substantial employment. Ganjam has high potential in tourism spots in comparison to other districts. It is rich in temples, monuments and heritages. The district has more than twenty tourism spots with encircling green hills, streams and wide sea beach at Gopalapur. Asia’s largest brackish water lagoon Chilika at Rambha, beautiful surroundings of Taratarini hill and river Rushikulya, Budhakhola and Biranchi Narayan Wooden Temples at Buguda are also present. Dense forest cover Sinhasini at Polasar, Eco-tourism forest at Bhettnoi and Babanpur with Black Buck, magnificient flowing streams at Nirmalajhar with old temple, gateway goddess Narayani at khalikote, Ghodahada dam, Sapneswar temple, Parsuram Kunda at Tumba hill range, Panchama, Sidhhavaiarbi at Rangeilunad are some of the key tourism features. It can contribute more towards the district and state income if properly developed as tourism spots of significance at the state and the national level. With proper perspective tourism sector can give a boost both to employment and income generation in rural and urban areas.

Table 1.28: Tourist Spots & Distance from District Headquarter (in km.) Distance from District Headquarter Sl. No. Name of the Tourist Spot (in km.) 1 Arjipally 8 2 Athagarh Patna 55 3 Berhampur 22 4 Buguda 85 5 (Rambha) 26 6 Girisola 40 7 Gopalpur Sea Beach 33 8 Huma Kantiaguda 20 9 31 10 Kulada (Byaghra Devi) 110 11 Mahuri Kalua 36 12 Mantridi (Bhairabi) 36 13 Narayani 48 14 Nirmaljhar 37 15 Patisonapur 52 16 Potaguda 12 17 Taratarini 33 Source: www.ganjam.nic.in

1.18.23: Handicrafts of Ganjam

The stone sculptures at Mathura village of Ganjam district are of high artistic and aesthetic value. The sculptors have immense talent which has been handed to them through generations.

Plastic sculptures in masks or different shapes, prepared at Huma made out of trivial items like waste paper, tamarind seeds, cow dung, etc. helps them make a living.

District Plan Report Page 30 of 192 Bellaguntha is globally famous for its artisan expertise on preparation of flexible fish with brass metal. The metal forms of the plastic sculptures are seen in Buguda and . Mathura and Belaguntha showcase brass and bell-metal sculptures. Their artistic range covers daily-use items, temple items, snake moulds and utensils.

Berhampur is known as the silk city because of its “pata” sarees. These sarees are famous at national and global level.

1.18.24: Annual Growth Rate

Comparative growth rate of various sectors in Orissa and Ganjam is provided in table 1.23

Table 1.29: Sector-wise Growth Rate (1999-2000 and 2004-05)

Sectors Orissa Ganjam Agriculture & A.H. 2.58 4.45 Forestry 0.87 0.87 Fishery 3.4 4.49 Mining & Quarrying 14.16 24.81 Manufacturing Regd. 13.22 13.83 Manufacturing Un-Regd. 2.96 1.96 Electricity, Gas & Water supply 8.76 9.77 Construction 1.13 2.43 Trade, Hotel & Restaurant 10.22 8.67 Railway 6.09 3.46 Transport by Other means 15.24 14.29 Storage 13.2 22.17 Communication 12.33 12.04 Banking & Insurance 8.99 8.86 Real Estate, Business & Legal services 4.72 8.01 Public Administration 2.48 1.73 Other Services 3.98 3.53 Total GDP 6.28 5.88 Source: DJRC Estimates on the basis of the data from DES.

1.18.25: Weather, Climate and Disaster Vulnerability of the District

Ganjam district lies between 19º to 20º 17' N latitude and longitude lies between 84º 9' to 85º 11' E. Thus it reflects an agro-based climatic condition of the district throughout the year and during all seasons. May is the hottest month, the average temperature being 32.8º Celsius and December is the coldest month with an average temperature of 16.2º Celsius. The normal annual precipitation in Ganjam is 1189.22 mm. The South-West monsoon

District Plan Report Page 31 of 192 brings nearly 66% of the total precipitation in the district. Maximum precipitation occurs in the months of June, July, August and September.

In context of disaster, Ganjam is a disaster prone district of Orissa. The cyclone of 1999 and the flood in 1982 were among the major disasters of the district. Flood, drought, cyclone, tidal wave and other epidemics occur frequently in the district. From 100 years of statistics it is found that in every alternative year this district faces a natural calamity. In 1999, cyclone affected all the blocks in the district. Since then Ganjam has experienced flood for 4 years and drought for 4 years.

Table.1.30: Crop Loss due to Drought/Flood in Terms of No. of Villages Affected

Year crop loss 50 to 74% crop loss >75%

2001 5 0

2002 1784 527

2003 172 35

2004 548 295

2005 457 311

2006 2786 Source: District Disaster Management Authority, 2008

1.18.26: Drinking Water

The people, very often, do consume polluted water and suffer from various diseases. It is because of the non-availability and inaccessibility to the safe water sources, especially in the villages and remote and inaccessible pockets. Hence, supply of piped waters and digging of sanitary wells are necessary to make the availability of safe and clean drinking water. Awareness should sprawl among the vulnerable groups to understand the benefits of consuming the clean waters.

Table 1.31: Water Supply Covered Under DWSM & RWSS (2008)

No. of Tube wells/Sanitary well/ No. of Habitations Covered Total Pipe water supply Particulars TW/ RWSS RWSS RWSS RWSS Habita DWSM DWSM SW/ BAM. Bhanj. BAM. Bhanj. tion Pipe W.

Tube Well 633 7172 3305 633 2610 3015 11110 6258 Sanitary Well 70 403 151 70 147 238 624 455

District Plan Report Page 32 of 192 Piped water 217 142 158 217 157 269 517 643 supply Tube well in 427 0 427 0 Schools Sanitary well 41 0 41 0 in Schools Total 1388 7717 3614 920 2914 3522 12719 7356 Source: www.ganjam.nic.in

District Plan Report Page 33 of 192 1.18.27: Banking Services

Ganjam District is having many nationalized and private banks spread over 22 blocks and 18 Urban Local Bodies to cater to the needs of the people of the District. There are 250 no. of Banks and 451 no. of co-operatives operating in the District. There are 145 no. of Scheduled Commercial Banks. The following tables give an idea about the present position of the banking & co-operative facilities of the district.

Table 1.32: Banks Sl. Co-operative Particulars LDBs RRBs CBs Total No. Banks 1 No. of Banks 3 1 1 26 31 2 No. of Branches (i) Rural 9 - 51 71 135 (ii) Semi Urban 17 3 10 28 58 (iii) Urban 6 1 8 46 61 Total 32 4 69 145 250 Source: Annual Credit Plan, Andhra Bank (Lead Bank of Ganjam District), 2009-10

Table 1.33: Co-operatives Sl. No. Particulars Unit (In No.) 1 Primary Agricultural Co-Operative Societies 451 2 Co-operative Urban Banks 4 3 House Building Co-op Societies 4 4 House Building Co-op Societies (Employees’ 146 Cooperative Society, Labour Contract Co-op Societies & Co-operative Stores etc.) 5 Wholesale Co-operative Stores 4 6 Co-operative Sugar Industry 1 7 Co-operative Cold Storage 1 8 Utkal Ayurvedic Co-op Pharmacy 1 9 ARCS Circle (Berhampur, Chatrapur & Aska) 3 10 Co-operative Mini Bank opened by AC’s 22 10 RCMS (Regional Co-operative Marketing Societies) 4 11 Members enrolled in co-operative societies 2.54 lakh Source: Annual Credit Plan, Andhra Bank (Lead Bank of Ganjam District), 2009-10

1.18.28: Social Justice, Law and Order of Ganjam

After creation of the modern Ganjam to an existence on 31.03.1936, a separate Police District was created. There are 29 Police Stations and 20 Out Posts in the district. Protection and preservation of Human Rights is of utmost importance at all times.

District Plan Report Page 34 of 192 Table 1.34: Law & Order (Police Administration) Sl. No. Particulars Units (In No.) 1 Sub-divisional Police Offices 2 2 Police Circles 5 3 Police stations 29 4 Out Posts 20 5 Town Out posts 9 6 Beat Houses 8 7 Mahila Police stations 1 Source: District Statistical Handbook Ganjam 2007

1.18.29: Judicial System of Ganjam

Apart from One Chief Judicial Magistrate (CJM), there are 7 session judges in Ganjam District. There are 5 sub judges and 3 Sub Divisional Judicial Magistrates and 17 no. of Munsifs and Magistrates are in position in the District. A total number of 2531 no. of Advocates are in profession in the District.

Table 1.35: Law & Order (Judicial administration) Sl. No. Particulars Units (In No.) 1 District sessions and additional district Judges 7 2 Chief and additional Chief Judicial Magistrates 1 3 Sub-Judges 5 4 Sub-Divisional Judicial Magistrates 3 5 Munsif and Magistrates 17 6 Advocates 2531 Source: District Statistical Handbook Ganjam 2007

The fact sheet of GPs, Blocks and ULBs is presented in Annexure-G of this report for ready reference.

District Plan Report Page 35 of 192 District Plan Report Page 36 of 192 DISTRICT VISION: 2020 CORRESPONDING TO ANNUAL PLAN 2010-11

People living with dignity and reasonable comfort with high level of literacy, knowledge and skills, good health and gender equity is the Vision 2020 for Ganjam. Accelerated and inclusive growth with high rate of employment, income and nutrition will be the key to reach various goals envisioned. Capacity building, adopting improved technology across sectors, improving management and coordination, increasing investment and its efficiency in key sectors, ensuring high level of participation in a decentralized set-up, and improving processing and marketing and public governance with social audit are the strategic interventions to reach various development goals. Vision 2020 of Ganjam is summarized below:

1. Reduce poverty line up to 12% of total population and promote a zone free from hunger and starvation 2. Reduce poverty to 12% of total population and ensure freedom from hunger and malnutrition 3. Balanced, inclusive and complementary growth of rural and urban areas 4. Improve Human Development Index to 0.75 and well-being 5. Reduce disparity across regions (Blocks and Panchayats) and socio- economic groups and ensure gender equity and sustainability

Poverty reduction entails convergence of all sectors in both urban and rural areas. This requires concerted efforts with inbuilt application and flexibility to spread poverty mitigating strategies in all sectors. Thus if potential for growth in a particular sector is saturated, then resources can be diverted to generate growth and employment in other sectors where such investments would be better utilized. Inclusive Growth which emphasizes rural non-agricultural activities (mineral and agro-processing, hotels and tourism, and miscellaneous services), accelerated agricultural growth, increased labour productivity (attitude, knowledge and technology-based), transparency in public distribution system and welfare activities would create a conducive environment for poverty reduction.

Details regarding interventions in major sectors to achieve the Vision 2020 have been provided in the Perspective Plan document 2008-09.

3.1: Agriculture

Accelerated agricultural growth and labour productivity would contribute considerably in reducing poverty. The major thrust areas for the development of the sector by 2020 include:

• Improve performance of traditional agriculture through technology intervention

District Plan Report Page 37 of 192 • Use advanced technology including bio-technology in potential areas • Identify high potential areas for multi crops and new crops to be introduced • Improve and strengthen agro-products marketing • Introduce IT in market and weather information dissemination • Modification of prices of agricultural produce • Agricultural research and development policy • Implement water resource use plan • Agro-processing for high value addition

Productivity of Different Crops and Expected for 2012-13 (Productivity in Kg/ha) Name of the Major Crops At present 2012-13

Paddy 3383 4500

Maize 1425 2500

Ragi 970 1200

Pulses 532 1200

Oilseeds 1287 1300

Condiments & Spices 1459 1600

Sugarcane 78500 95000

Indicators At Present By the End of 2013 Fertilizer Consumption 51 (Kg/ha.) 105 (Kg/ha.)

Cropping Intensity 184% 210%

3.2: Horticulture

Horticultural crops like fruits, vegetables and medicinal plants have high market value and provide higher returns to farm investment as compared to agricultural produce. Growth in horticulture at 10% per annum is feasible considering the resources of the district. The major thrust areas in this activity are as follows

• Training and orientation of farmers, women SHGs for horticulture • Ensuring supply of quality planting materials • Strengthening information and extension service • Emphasis on plantation of medicinal and aromatic plant • Emphasis on floriculture

District Plan Report Page 38 of 192 • Capacity building on post-harvest management of the horticulture produces • Infrastructure development in PPP mode on packaging, processing and marketing

Indicators At present By end of 2013 Vegetables (Average Yield) 10200 Kg/ ha 13500 kg/ha Fruits (Area) 23160 ha 29000 ha Flower (Area) 25.5 ha 40 ha

3.3: Fishery

Developing fisheries is an alternative means to generate employment and to reduce the pressure on agriculture. Ganjam has the potential for increasing fish production especially due to the presence of Chilika Lake and large number of fresh water bodies as well as Bay of Bengal.

The major thrust for this growth would come from marine and inland fishing that are listed below:

• Conservation of Chilika Lake • Technological up gradation for marine fishermen • Skill up-gradation of fish farmers • Promoting loan facilities and credit linkages through banks, Co- operatives and increasing involvement of SHGs in economic improvement and income generation through fisheries activities. • Infrastructure development in the form of establishment of fish-seed hatcheries, cold-storages and ice-plants • Promotion of Public-Private Partnerships (PPP) for fish processing, packaging and transportation

Indicators At present 2006-07 By end of 2013 Fish production (in M.T.) 33646.86 40000.00 MT Per capita consumption of fish 10.64Kgs/annum 12.65Kgs/annum

3.4: Animal Husbandry and Poultry Animal resource is a supplement to the living standard of many households including small and marginal farmers. The major thrust areas in this sector are as follows

• Up-gradation of the livestock • Skill up-gradation of Animal-Rearing farmers • Promoting loans and credit linkage through banks and increase involvement of SHGs

District Plan Report Page 39 of 192 • Infrastructure development for health services for the animals. • Processing and cold-storage facilities • Promotion of Public-Private Partnership (PPP) on processing, packaging and transportation infrastructures/facilities

Indicators At present 2006-07 By end of 2013 Milk Production (in ‘000 MT) 101.65 140.00 Meat Production (in ‘000 MT) 5.3 6.8 Egg Production (Figures in million nos.) 352.42 450.00

3.5: Forestry

Forests comprise 39% of the total geographical area of the district consisting of Reserve Forests and Demarcated Protected Forests. These forests are rich in NTFP. Many people in the forest fringe areas depend on the NTFP collection. This is one of the major sources of livelihood in this region. The major thrust areas in forestry are to:

• Strengthen Vana Surakshya Samiti (VSS) for better forest management/conservation • Plantation programs of medicinal and aromatic plants • Value addition to NTFP and marketing facilities • ANR, SMC, silviculture, Block plantation, coastal plantation etc.

3.6: Employment Generation

The present status of employment generation of the district shows large scale employment in farm sector i.e. agriculture on a seasonal basis. During the lean period it needs to reduce unemployment and generate self employment. NREGS is a ray of hope in this situation. Over the years, attempts will be made to improve the quality of employment, productivity of workers and their income. Besides this, Self-employment programmes would be implemented in the district.

3.7: Industry

Ganjam has vast potential for agro based as well as mineral industry. There is scope and opportunity for small and cottage industries that is dependent on bamboo, wood and stone craft. There is also a good opportunity for Kewda processing, Ayurvedic drugs manufacturing, fish-feed production, fodder processing and dry fish processing units in Ganjam. Better financial support for cottage and small-scale industries would create better employment

District Plan Report Page 40 of 192 opportunities and check out-migration to a great extent. Support required for for all small, micro, cottage and handloom industries are as follows:

• Better financial support • Marketing facilities • Setting up of training centers in the district on all types of artwork and handicrafts • Promotion of products through organization of fairs and exhibitions • Organizing skill up-gradation workshop • Entrepreneurship Development Programme • Convergence with other Central Government organizations such as the Khadi and Village Industries Commission (KVIC) for training and financial support

Indicators At present By the end of 2013 No. of SSI Units 7776 9981 No. of Employment Generation 36006 50000

3.8: Energy

Indicators At present By the end of 2013 No. of village electrified 2511 All villages % of village electrified 89% 100%

89% of the villages of the district have been electrified. By the end of 2013 all the villages will be electrified.

3.9: Rural Development

Indicators At present By the end of 2013 Poverty Ratio 40 25 No. of IAY Beneficiaries 6896 9865 Total work days (in lakh) under 26.51 120 MGNREGS

3.10: Irrigation and Flood Control

Indicators At present By the end of 2013 Irrigation facility (in ha.) 247900 ha 300000 ha

At present irrigation facility is available in 247900 ha. land and by the end of 2013 it has been estimated that irrigated area will be 300000 ha.

District Plan Report Page 41 of 192 3.11: Rural Drinking Water and Sanitation

Indicators At present By the end of 2013 Tube Well 1 per 137 people 1 per 100 people Piped Water Supply 517 600

3.12: Social Services

Indicators At present By the end of 2013 Infant Mortality Rate 77 37 Maternal Mortality Rate 358 120 Total Fertility Rate 2.6 2.0

3.12.1: Women Development

Indicators At present By the end of 2013 Sex Ratio 998 1010 Literacy rate (female) 47.70 80 Women SHG 19897 25000

3.12.2: SC/ST Welfare

Indicators At present By the end of 2013 Literacy Rate SC 44.56 65 Literacy Rate ST 35.54 55

The present literacy rate of Scheduled Caste and Scheduled Tribe are 44.56% & 35.54% respectively.

3.13: Balanced, inclusive and complementary growth of rural and urban areas:

Rural-Urban Link up

• Growth of infrastructure like road, school, hospital etc. is the pre- condition to have rural-urban link up. Along with these infrastructures, reliable and uninterrupted electric power supply is a must to achieve this goal. Only 685 villages are left to be electrified. 100% electrification has to be achieved • Steps should be taken to use solar power as alternative source of energy at affordable cost. All weather roads should be created in all villages by 2020. Every village should have a knowledge center with computer and internet facility. Unemployed youth including women can be appointed in these centers. They will act in liaison with the local political

District Plan Report Page 42 of 192 representatives to take steps on various development issues of the village • Urban development with gender sensitiveness • Likewise, infrastructure facility should be created in the slums of the urban areas. Education and health care facilities in the slums can be developed with PPP mode • The economic empowerment of women in urban areas especially in the slum dwellers is necessary. Involvement of women in the various unorganized sectors will provide alternative sources of income • Reduction of Impact of disaster • Technological interventions such as vulnerability information mapping system should be in place to reduce the impact of disasters

3.14: Human Development and Wellbeing

Taking into perspective the three basic components that Human Development Index (HDI) takes into account viz., Education, Health and Livelihood, Vision 2020 entails the increase of the Human Development Index from 0.551 to 0.750.

3.15: Education

The literacy rate of the district as per the 2001 census is 62.94%. The Female literacy rate is even lower at 47.7%. These are aimed at increasing up to 90% and 80% respectively. • One of the primary strategies is to ensure that all children below the age of 14 get quality education. The Mid-day meal programme should aim for 100% coverage of potential beneficiaries. This can be achieved if the quantity, quality and regularity of the meals are ensured. The aim should be to deliver the meals in such a manner that children find it appealing to receive meals in schools. Once regularity in attendance is achieved the quality of the teaching can be upgraded. To ensure quality education, the teachers should be least involved in other programmes of the government like census work, voter list preparation etc. • The rate of dropouts should be reduced in the primary, secondary and higher secondary education. In tribal pockets, Oriya tribal bi-language books and teaching aids can provide a motivation to reduce dropout rate. The families should inculcate the value of learning in the minds of their children. Besides, the teacher-student ratio should be increased • There should be one vocational education institution for each block in the district. The vocational training centre should aim at making the

District Plan Report Page 43 of 192 youth self reliant by imparting training on employment generation activities • Awareness generation among mothers in the family on the importance of primary education especially in context to the girl child

3.16: Women Participation

• Better participation in decision making process at all level • The female literacy level of the district is 47.70%. Once the education level and earning of the women folk is developed, they can better participate in the decision making not only in their households but in the society at large. Total literacy along with some financial support can go a long way in this regard • Effective functioning of Women SHGs and income generation. To make SHGs more efficient, the members of the WSHGs should be given trainings. The capacity building of the SHGs can be achieved by exposure visit to other successful SHGs of the state as well as national NGOs

3.17: Health

3.17.1: Reduce MMR and IMR Strategies to reduce maternal mortality and infant mortality include

1. Motivating pregnant women for institutional delivery 2. Provision of health kits to the pregnant women 3. Free of cost institutional deliveries and follow-up consultations by the doctors 4. Free of cost immunization for the new born (though very nominal charge is being taken) 5. Immunization should reach to remote areas 6. Nutritional food support during pregnancy and lactation 7. Prohibition of early marriage/teen marriage 8. Increase in awareness of women to take special care to maintain balanced diet during pregnancy to avoid low birth weight babies

To reduce maternal mortality, malnutrition especially during the period of pregnancy has to be curbed. Besides promotion of healthy eating habits malnutrition has to be reduced. This would take place with

• Poverty alleviation so that more income is available for avoiding malnutrition not only of women but also for all

District Plan Report Page 44 of 192 • Removing biases against women so that they receive their fair share of the food in the household diet

3.17.2: Panchavyadhi Chikischa

There should be 50% lowering of the five common communicable diseases i.e. malaria, leprosy, diarrhea, acute respiratory infections and scabies by 2015 and subsequent reduction thereafter. Provisions for mobile hospital service to remote areas of the district should be made.

3.17.3: Combating HIV/AIDS

Ganjam district is having high prevalence of HIV/AIDS in the state. HIV/AIDS has reached endemic proportions in Ganjam primarily due to the migrant population of the district. Ganjam had more than thousand cases of HIV/AIDS. The plan should envision no new cases of the disease after 2020. This needs:

• Awareness programme to educate people about the modes of transmission of the disease and its fatal nature • Sensitizing vulnerable communities especially migrants about safe sex behavior and practice. 3.18: Reduce disparity across regions (Blocks and Panchayats) and Socio-Economic Groups

There is disparity in the sectoral growth across the blocks in the district. There are a number of factors that leads to imbalance growth across the district such as industrial set up, availability of raw materials, method of production in agriculture, fertilizer consumption, stock of animal resources, infrastructures like roads, bridges, electricity, schools, colleges, hospitals etc. The reasons for the backwardness of the blocks should be found out and region specific strategies should be adopted accordingly (Vide the table below).

Table 3.1: Monitorable Indicators on General and Human Development

Sl. No. Monitorable Indicators Current Level Perspective Plan Goal

1 Growth Rate 4.87♣ 10

12742 (Yr. 2 Per Capita DDP/Income 20000 2004/05)

3 Work Participation Ratio (WPR) 41.62 50

. BY: 1999/00, CY: 2004/05 at Constant Price Yr. 1999/00

District Plan Report Page 45 of 192 4 Human Development Index (HDI) 0.551 0.750

Employment for at least 200 days 5 80% including all forms

6 Poverty Ratio (HCR) 40 12

7 IMR 77 37

8 MMR 358 120

9 Total Fertility Rate 2.6 2.0

10 Children Malnutrition (0-3years) 54.4 27

11 Sex Ratio 998 1010

12 Literacy Rate Total 62.94 90

13 Literacy Rate Female 47.70 80

14 Gender Gap in Literacy 10

District Plan Report Page 46 of 192 District Plan Report Page 47 of 192 SWOT ANALYSIS OF THE DISTRICT AND INDIVIDUAL SECTORS

Ganjam District is richly endowed with immense (i) natural resources like river/stream water, forests and some mineral resources, (ii)human resources with social mobilization of women SHGs & NGOs and (iii) physical resources such as MIPs/LIPs, watershed micro projects, WHS/DWs etc. State of progress, opportunities for development and identification of critical gaps can be measured and understood through an in-depth SWOT analysis of the district and its sectors.

SWOT Analysis of the District

STRENGTHS

• Agro-climatic conditions of Ganjam are very congenial and suitable for agriculture and horticulture crops like paddy, mango, cashew, banana, spices, cotton, til, kandul, maize, screw pine etc. • The soil type is skeletal, red, yellow and alluvial and is potentially fertile for cultivation • Ganjam is the largest producer of paddy in the state • Annual average rainfall of the district is 1296 mm. suitable in stabilizing the production and productivity of the district • Irrigation potential of the district is higher than many other districts of the state • Potential for handicraft works like straw, stone-carving, wood and brass metal • Fishery related activities are well developed in district, marine-fishing and fishing from Chilika lagoon. Individual & group fishing activities from village common tank is another fishing potential in the district • The district has many tourism spots like temples, historical monuments, and natural beauty spots • Ganjam is rich in natural resources with large forest coverage and rivers such as Rushikulya, Badanadi, Ghodahada and Baghua. Besides the district has large number of reservoirs, ponds, tanks and dug wells. Ghodahada and Baghua Dam reservoir are major water harvesting structures in the district • Chilika Lake offers great scope for fishing, salt production and eco- tourism • The district has 255710 breedable indigenous cattle and 9,525 crossbred cattle. Goat keeping, sheep rearing, and also poultry comprise of major domestic animal potential in the district

District Plan Report Page 48 of 192 • There are plenty of mineral deposits like Bauxite, Graphite, Quartz, Manganese, Granite, red Oxide etc. available • Minor Forest produces viz, tamarind, hill brooms, fibers, oilseeds, kendu leaves, medicinal plants, fruits, roots, gums, tuber, flowers and jhunas etc. in addition to timbers, sal and firewood are available in plenty • Ganjam has rich cultural heritage like different folk dances, (Prince Group of Ganjam was awarded in Delhi recently). The inhabitants found in this district are very hard working and progressive in nature • Development of ‘Social Capital’ in the form of SHGs (by NGOs and government agencies) provides conducive atmosphere for rapid economic development. Increased credit absorption both in non-farm and farm sectors is a healthy sign • There are a number of perennial streams in the backward hilly areas of the district, which would be harnessed through construction of check- dams, hedgerows, WHS and Micro-watershed projects which have been proposed to create increased irrigation Ayacut, prevent drought situations, soil erosion and re-charge underground water level

WEAKNESSES

• Inadequate basic amenities at the urban areas/growth centers • Inadequate irrigation facilities in undulating and interior terrain of the district • Inadequate technical skills in manpower results in underutilized extension facilities in agriculture & allied sector • High prevalence of HIV/AIDS/STD in certain pockets

OPPORTUNITIES

• Integration of agriculture and horticulture can be taken up in a big way • Scope for Agro, food processing and mineral based industrial units • Marine based industrial units can be set up • The Chilika Lake can be better managed to exploit its full potential • Irrigation facilities are much better developed in comparison to other districts. Opportunities exist in efficiently utilizing the full potential or irrigation infrastructures • Opportunity for export and import of agricultural products through rail and road infrastructure that is relatively better developed than in many parts of the state • Major Industries: good scope for ancillary and downstream small-scale units

District Plan Report Page 49 of 192 • Excellent scope for developing and marketing the products of the tribal artisans and marine products • Excellent scope for promoting Eco-tourism • Availability of good natural, human and forest resources • Progressive and hard-working farming communities • Perennial nallas in backward areas for WHS/hedgerows and check-dams • The district has 244 artificial insemination centres which can help in increasing the crossbred population of cattle, which in turn would increase production and productivity of derived products. Similarly there are 517 breedable indigenous buffaloes and 3296 crossbreed buffaloes that would add to the increase in yield rate of milk and milk derivatives like Ghee, butter, cheese etc.

THREATS

• Inadequate market facilities for agricultural, horticultural, marine and forest products including NTFPs and handicrafts • Frequent natural calamities like drought, flood, cyclone etc. affecting the economic backbone of the people in the district • With inter-state migration of labourers from the district to Gujarat and Mumbai the menace of HIV ‘+’/AIDS has risen to alarming proportions

SWOT Analysis of the Individual Sectors

• In order to have better accessibility, rural connectivity and market connectivity to the growth centers, connectivity projects have been identified and incorporated in the Integrated District Plan • Major focus on ‘Integrated district plan’ has been attached mainly to the health, education and common infrastructure development sectors, which are found to be the keys for the integrated development of the district by the year 2020 • Besides irrigation, food and agriculture creation and formation of markets for trade and development, have also been given priority

Sectoral SWOT Analysis

2.1 Agriculture Strength Weakness

• Fertile agricultural land with • Undulated topography skeletal, red and yellow, and • Erratic rainfall alluvial soil • Fragmented land holding pattern • Irrigation potential is higher than • Majority of farmers are marginal

District Plan Report Page 50 of 192 2.1 Agriculture many districts of Orissa and small land holders and are • Surplus agricultural labour below poverty line. • Presence of research and • High weed and pest infestation development institution like Pulses • Rainfed agriculture Research Center, RITE, Krushi • Low productivity in non-irrigated Vigyan Kendra areas • Poor marketing strategy of agriculture produces • Inadequate market and storage facility

Opportunity Threat

• Good prospect for crop • Ganjam district is prone to diversification cyclones, floods and droughts due • Immense scope for increase in to climatic change irrigation potential • No comprehensive crop insurance • Intensive and commercial farming to cover all crops • Farm mechanization and use of HYV • A strong credit structure for financial assistance to marginal and small farmers • Establishment of village level mandis • Potential to upgrade knowledge and skills of farmers • Scope for export of the agro- products

2.2 Horticulture

Strength Weakness

• National Horticulture Mission is • Poor infrastructure facility availing Quality Planting Materials • Scattered plantation of fruit bearing • Good climate and saline soil is trees much favourable for coconut • Inadequate knowledge on off and plantation. on season vegetable cultivation • High potential for betel leaves • High value vegetable crops not cultivation grown according to market demand • cashew production • Lack of proper conservation and • Eastern Ghat upland suitable for storage facility. horticultural development • Potential areas for vegetable cultivation • Potential for screw pin scent/Kewada cultivation and essence extraction Opportunity Threat

District Plan Report Page 51 of 192 • Good Market demand for coconut and tender coconut • • Good prospect for floriculture with Poor storage and marketing marigold, jasmine, rose, gladioli • Individual farmer do not have and assured marketing adequate land for plantation • Promotion of mushroom cultivation • Pest infestation • Contract farming for horticulture • Exploitation of local trader • Growing market demand for vegetable, flowers both within and outside the state • Good scope for export and value addition

2.3 Animal Husbandry

Strength Weakness

• Positive growth rate in productivity • Inadequate Livestock Aid Centre of milk, meat and egg • Genetic up-gradation of livestock • Potential for goat, sheep, cattle, for better productivity is limited to pig poultry rearing dairy sector only • Vast pasture land and forest for • Outreach of the functionary of the grazing Animal Husbandry department is • Interest of farmers for animal restricted due to non availability of husbandry mobility, inadequate allowance and extension material. The service is not properly reachable in remote areas Opportunity Threat

• Increased demand for meat, egg • Inadequate animal insurance milk, and milk products facility • Establishment of farms through • Non-availability of improved milch private participation breed in sufficient numbers • Forward and backward linkage • Communicable diseases of support to farmers with financial livestock may affect the livestock assistance keepers • Replacement of indigenous cattle • Ban order of the Forest Department population with crossbred to graze in the forest area • Promotion of dairy “White Revolution” in corporate with OMFED.

2.4 Fishery

Strength Weakness

• 60 km of coast line touches the • Inadequate awareness regarding

District Plan Report Page 52 of 192 eastern frontier of Ganjam aquaculture in interior areas • Chilika Lake • Water bodies are used for domestic • Large number of reservoirs, rivers, purposes ponds • Inadequate storage and fish • Institutional support processing facility Opportunity Threat

• Good market demand • Embankment in Chilika Lake • Navigation support for fishing by • Encroachment of the water bodies ISRO • Inappropriate use of pesticide and • Increasing fish seeds, fingerlings fertilizer diminishing the quality of • New water bodies constructed by water for aquaculture. government line department • Lack of insurance policy • Renovation of water bodies • Erratic rainfall • Better infrastructure for • Involvement of large scale aquaculture industrial house in aquaculture Basing on the above SWOT analysis Rs.3059.24 lakh is need for Agriculture and allied sector.

2.5 Rural Development

Strength Weakness

• Multiple benefits from flagship • Poor infrastructure in hinter programmes pockets • Power devolution and bottom up • High gender literacy gap planning process • High labour migration among the • Community participation in productive age group development programme. • Inadequate supervision, monitoring • Employment generation scheme and evaluation and provision of 60:40 share for • Sustainable assets can not be manual work and material cost in created without increasing the NREGS. share in material cost in various • Creation of sustainable infrastructure development development for landless, marginal projects and small farmers • Support from CSOs. Opportunity Threat

• Creation of employment • Some village conflict during opportunity for all implementation of the schemes • Industrialization • Forest fringe area • Improvement in communication • Lack of supply and transportation facility of quality material for construction • Plantation program to be taken up of IAY to hilly area • Timely completion of rural development programme • Connectivity of GP to all revenue villages • Natural resource mapping

District Plan Report Page 53 of 192 Basing on the above SWOT analysis Rs.26905.91 lakh is need for Rural Development sector. 2.6 Irrigation

Strength Weakness

• Supplementary irrigation through • Many Minor Irrigation Projects canal (MIP) are in a defunct situation • Use of various water bodies for (currently being revived) irrigation • Many lift irrigation points remain • Facility for lift irrigation defunct • Poor maintenance of water distributaries and drainage system • Electricity scarcity for lift irrigation (LI) Opportunity Threat

• Diversification of water for • Excessive use of ground water irrigation leads to decrease in water table in • Construction and renovation of the certain pockets LI Points and MIPs • Private participation in maintenance of LI points • Ground water utilization Basing on the above SWOT analysis Rs.12269.11 lakh is need for Irrigation & Flood Control.

2.7 Energy

Strength Weakness

• Strategic natural resource for • Low voltage in rural area energy generation • Inadequate electricity supply to • High performance transformer hilly region • Customer care • Lack of awareness among people about effective use of electricity and power saving • Poor service delivery system

Opportunity Threat

• Tidal energy • Erratic climate and natural calamity • Wind-mill energy • Theft of electricity • solar energy • Transmission loss • bio-diesel plantation • biogas

Basing on the above SWOT analysis Rs.8690 lakh is need for Energy sector.

2.8 Industry and Mining

District Plan Report Page 54 of 192 Strength Weakness

• Salt production • Lack of proper R&R Policy • Fish production • Lack of R&D programme • Sugarcane production • Labour force is unskilled • Availability of raw material such as • No financial assistance to farmer rare earth material and for screw pin flower infrastructure • Gopalpur sea port • Low labour cost • Production of Kewda flower, lemon grass, fruits etc.

Opportunity Threat

• Scope for food processing • Heavy tax burden discourage industries further investment • Scope for fishing and fish • Farmers do not get good return processing and packaging from sugarcane, screw pin flower, industries hence reluctant to cultivate tease • Scope for processing of rare earth crop materials • Value addition to agro-forest produces

2.9 Textile and Handloom

Strength Weakness

• Availability of large variety of • Non-availability of working capital cotton and silk fiber • Traditional technology causes low • Availability of skilled man power productivity • Growing economy and domestic • Low level of income among weaver and international demand for community handloom products • Lack of continuous quality improvement program

Opportunity Threat

• Demand of the handloom would be • Competition with power loom and more in case of introduction of the international market product in school uniform • Fluctuation in international and • Explore demand and designed domestic market based products • Value addition on handloom product

District Plan Report Page 55 of 192 2.10 Handicraft

Strength Weakness

• Rich and diversified culture • Inadequate institutional support for producing wide array of handicrafts handicrafts • Famous for bell metal, brass metal • Price fluctuation in brass metal work • Replacement of handicrafts with • Abundance of cane and skills for synthetic material in home décor cane-craft • Unstructured and individualized • High potential for empowerment of production system women and youth • Insufficient market information on • Improved economic condition of export, opportunity and prices the people due to implementation of development programmes

Opportunity Threat

• Increasing inflow of tourists • Competition from fake handicrafts provide market for the products products • High employment potential • Changing attitude toward • Tapping unexploited handicrafts handicraft products markets • Introduction of plastic and synthetic material in place of handicrafts

Basing on the above SWOT analysis Rs.106.82 lakh is need for Industry and Mineral sector.

District Plan Report Page 56 of 192 2.11 Road and Buildings

Strength Weakness

• Wide spread road network • Poor road infrastructure in certain • Facility for water transportation interior pockets • Connected by Railway • Poor maintenance of road and • Well connected through PMGSY building

Opportunity Threat

• Creation of employment • Heavy traffic on national highway opportunity leads to accidents • Connectivity of GP with all habitations • All weather road connectivity

2.12 Forest

Strength Weakness

• Large area cover with bamboo • Poor maintenance of new forestry plantation • Potential for exploitation and value • Frequent forest fire addition of NTFP • No legal right is given to user • Community involvement if forest community over NTFP management • Poor forest protection

Opportunity Threat

• Bamboo craft • Protection of forest from the mafias • Eco-tourism • Negative attitude toward forest • Wildlife sanctuary reserve • Vast area for fruit bearing • Maoist activity in forest fringe plantation areas • Promotion of eco-tourism

2.13 Education Strength Weakness

• Launching of Sarva Sikshya • Poor literacy rate among rural Abhiyan women • Inclusive Policy for Child with • Gender gap in literacy rate is high Special Needs (CWSN) • Female and male teacher ratio is • Literacy mission low in rural areas • Effective child tracking system • Lack of bilingual teacher (Oriya and through OPEPA Telugu, Tribal and Oriya)

District Plan Report Page 57 of 192 2.13 Education

Opportunity Threat

• Creation of awareness for girl child • Shortage of teachers education • Non availability of bilingual teacher • Provision for girls hostel in SSS teacher cadets • Residential facility for teacher and • Poor connectivity to school from staffs certain habitations • Women friendly approach of the literacy mission

2.14 Health

Strength Weakness

• Launching of National Rural Health • Acute shortage of doctors, nurse Mission and paramedical staff. • Involvement of CSOs in health • Inadequate monitoring and service evaluation staffs at block and • Regular health camp district level • MKCG Medical College Hospital for • No proper cold chain supply unit to specialized health care services remote part of the district for • Implimention of Janani Suraksha storage of life saving drugs Yojana • Excessive dependency on quack • Inclusion under Global Funds for and traditional healers in tribal AIDS, TB and Malaria (GFATM) areas

Opportunity Threat

• Strengthening Sub-Centre by • Early motherhood providing labour room • Absenteeism of the medical and • Regular capacity building paramedical staff programme for paramedical staffs • Risk taking tendency and • Basic training to traditional healer ignorance of quack and quack • Under reporting of vital statistics • Residential facility for medical and • Prevalence of HIV/AIDS paramedical staffs • Provision of Social audit in case of maternal death and infant death • Strengthening IEC unit in each block • Supply of proper equipments to Sub-centers • Mapping of the health service provision in each GP

Basing on the above SWOT analysis Rs.44618.26 lakh is need for Social Service sector.

District Plan Report Page 58 of 192 2.15 Rural Water Supply and Sanitation

Strength Weakness

• Convergence programs • Poor sanitation facility in rural implemented areas • Basic awareness program on RWSS • Inadequate management of exiting • Involvement of Women Self Help water resources Group • Poor maintenance and cleanliness • Women participation in Total of latrines Sanitation Campaign • Involvement of the civil society organizations in Water Supply and Sanitation Mission Opportunity Threat

• Safe solid waste disposal • No space left for toilets during • Integrated water and sanitation construction of house management • People are not aware about the • Attitudinal change among people negative effect of open defecation for sanitation and personal hygiene on the road side • Active participation of women and • Poor disposal of waste water PRI member in Sanitation Mission • Attached home with cattle shed • Provision of Community Toilets with water supply and maintenance • School Sanitation and hygiene education

2.16 SC/ST Welfare

Strength Weakness

• Improved socio-economic status of • Low literacy rate among SC/ST SC/STs community • Scholarship to SC/ST students • Inadequate awareness of some • Schools and hostels facility for communities on various schemes/ SC/STs provision for SC/ ST development • Tumba Tribal Development Agency • Lack of bilingual teacher (tribal • Legal provision to safeguard from language-Odia) atrocity • Non-involvement of the village • Land rights level institutions • Forest rights • Involvement of CSOs in SC/ST development

District Plan Report Page 59 of 192 Opportunity Threat

• Protection and development of • Unemployment and poverty leads primitive tribal group to social disorder • Timely implementation of the • Increasing dependency on ST/SC schemes government • Extension of Forest Right Act • Heavy liquor addiction leads to • Procurement centre for NTFP health and livelihood problems

District Plan Report Page 60 of 192 District Plan Report Page 61 of 192 District Plan Report Page 62 of 192 District Plan Report Page 63 of 192 District Plan Report Page 64 of 192 District Plan Report Page 65 of 192 District Plan Report Page 66 of 192 District Plan Report Page 67 of 192 District Plan Report Page 68 of 192 District Plan Report Page 69 of 192 District Plan Report Page 70 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure I Planunit Abstract

District Block Panchayat Village Corporation Municipality Notified Area Town Area Line Department Panchayat Panchayat Council

Total no. of 1 22 475 0 1 17 1 22 Planunits

No. of Planunits 1 22 119 0 1 17 0 0 included in Report District Plan

District Panchayat Block Panchayat Village Panchayat ULB Line Department Total

Expected Planned Expected Planned Expected Planned Expected Planned Expected Planned Expected Planned Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay

4,62,00,000 4,62,00,000 6,93,00,000 6,93,00,000 11,45,00,00 11,45,00,00 11,18,00,00 11,18,00,00 0 0 34,18,00,00 34,18,00,00 0 0 0 0 0 0

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 1 of 29 District Plan Report Page 71 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Proposed works and Planned Outlay

S.No. Sector Works Planned Outlay

1 Roads 346 11,13,70,000

2 Women and child development 285 8,16,77,000

3 Capacity Building 98 3,31,51,000

4 Education 92 2,51,39,000

5 Roads and bridges 117 2,48,54,000

6 Urban Planning including town planning 15 2,16,44,000

7 Promotion of cultural 17 1,17,23,000

8 Markets and fairs 3 59,20,000

9 Technical training and vocational education 5 41,88,000

10 Public amenities including street lighting 2 38,70,000

11 Health and sanitation 12 36,00,000

12 Water supply for domestic 3 31,50,000

13 General Expenditure 15 27,46,000

14 Rural housing 6 20,17,000

15 Family welfare 5 15,50,000

16 Drinking water 4 13,50,000

17 Social welfare 6 12,00,000

18 Animal husbandry 7 11,06,000

19 Minor irrigation 2 5,50,000

20 Regulation of land-use and construction of buildings 3 4,45,000

21 Agriculture 1 3,00,000

22 Planning for economic and social development 1 2,50,000

Total 1,045 34,18,00,000

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 2 of 29 District Plan Report Page 72 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 3 of 29 District Plan Report Page 73 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 4 of 29 District Plan Report Page 74 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 5 of 29 District Plan Report Page 75 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

** - Plan not available Panchayat Component

District Panchayat Block Panchayat Village Panchayat

Plan Unit Name Expected Planned Outlay Plan Unit Name Expected Planned Outlay Plan Unit Name Expected Planned Outlay Availability Availability Availability

GANJAM 4,62,00,000 4,62,00,000 ASKA 34,52,000 34,52,000 ALLIPUR ** **

BABANPUR 10,00,000 10,00,000

BADAKHOLI ** **

BALICHAI ** **

BALISIRA ** **

BANGARADA ** **

BARAGAM ** **

BENAPATTA ** **

BHETANAI ** **

CHADHYAPALL ** ** I

DEBABHUMI ** **

GAHANGU ** **

GANGAPUR ** **

GUNTHAPADA ** **

HARIDAPADAR 10,00,000 10,00,000

JAYAPUR ** **

KALASANDHAP ** ** UR

KAMAGADA ** **

KENDUPADAR ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 6 of 29 District Plan Report Page 76 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

KHANDA DEULI 10,00,000 10,00,000

KHARIA ** **

MANGALPUR 10,00,000 10,00,000

MUNIGADI ** **

NALABANTA ** **

NIMINA 10,00,000 10,00,000

PANDIAPATHA ** ** RA

SIDHANAI ** **

BEGUNIAPADA 29,51,000 29,51,000 ANGARAGAM ** **

BADAKHAIRAK ** ** HAMA

BARIDA 10,00,000 10,00,000

BEGUNIAPADA 10,00,000 10,00,000

BERUHABADI 10,00,000 10,00,000

BUIRAGHARI 10,00,000 10,00,000

CHANDANPUR ** **

CHUNGUIDIKH ** ** OLA

DIGAPADA 10,00,000 10,00,000

KALIMAGHI ** **

KHANDIANAI 10,00,000 10,00,000

KUMBARGAM ** **

MATHASARASI 10,00,000 10,00,000 NGI

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 7 of 29 District Plan Report Page 77 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

MORDA 10,00,000 10,00,000 MEKHA

MORDAKHOLA 10,00,000 10,00,000

PHASI 10,00,000 10,00,000

SANA- ** ** USTRAPADA

SANDHAMULA ** **

SANKUDA ** **

SAURA ** ** CHACHINA

SUMANDALA ** **

TALASARA ** **

BELLAGUNTHA 26,06,000 26,06,000 AMBAPUA 10,00,000 10,00,000

BADA ** ** BARSINGI

BADAPADA 10,00,000 10,00,000

BANKA ** **

BENIPALLI 10,00,000 10,00,000

DHUMACHAI ** **

GANGAPUR ** **

GOBARA 10,00,000 10,00,000

INGINATHI ** **

JANARADA ** **

KHAIRAPUTI ** **

KHATRIBRAHM ** ** APUR

MANGALPUR ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 8 of 29 District Plan Report Page 78 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

NATANGA` 10,00,000 10,00,000

NUAGAM ** **

PAILIPADA ** **

SYASAN ** **

UDRA ** **

BHANJANAGA 33,50,000 33,50,000 BADAKODAUD ** ** R A

BAIBILI ** **

BARUDA 10,00,000 10,00,000

BAUNSALUNDI ** **

BRAHAMAUPA ** ** DAR

DADARALUND ** ** A

DAMAKAMPA ** **

DIHAPADHAL 10,00,000 10,00,000

DOMUHANI ** **

GALLARY ** **

GOLLAPADA 10,00,000 10,00,000

HARIGADA ** **

JILISINGI ** **

JILUNDI ** **

JURUMU ** **

KULADA 10,00,000 10,00,000

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 9 of 29 District Plan Report Page 79 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

LALSINGI ** **

LAMBAI 10,00,000 10,00,000

MUGAGADA ** **

SANAKODAND 10,00,000 10,00,000 A

BUGUDA 28,07,000 28,07,000 ANTARAPADA 10,00,000 10,00,000

ARAKHAPUR ** **

ASHRAMKARA 10,00,000 10,00,000 DABADI

BALIPADAR 10,00,000 10,00,000

BHAGABANPU ** ** R

BHAMASILI 10,00,000 10,00,000

BIRANCHIPUR ** **

BIRANCHIPUR ** ** KARADABADI

GOLABANDHA 10,00,000 10,00,000

GOLLIA ** **

GOUDA 10,00,000 10,00,000 GAERADA

KALAMBA ** **

KARACHULI ** **

KHOLAKHANI ** **

MANITARA ** **

MATABADI ** **

PAHALUNDI ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 10 of 29 District Plan Report Page 80 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

PANGIDI 10,00,000 10,00,000

SANKURU ** **

THAKARADA ** **

CHATRAPUR 34,34,000 34,34,000 AGASTINUAGA 10,00,000 10,00,000 M

ARGIPALLI ** **

BADA 10,00,000 10,00,000 MADHAPUR

BAULAGAM ** **

BHIKARPALLI ** **

BIPULINGI 10,00,000 10,00,000

CHAMAKHANDI 1,00,000 1,00,000

CHIKALAKHAN ** ** DI

KALIPALLI ** **

KANAMANA ** **

LAXMIPUR ** **

MAHANDPUR ** **

NARANDRAPU 10,00,000 10,00,000 R

PODAPADAR 10,00,000 10,00,000

POTALAMPUR ** **

SUNDARPUR ** **

TANGONAPALL ** ** I

CHIKITI 26,14,000 26,14,000 ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 11 of 29 District Plan Report Page 81 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

EAKASINGI ** **

GIRISOLA 10,00,000 10,00,000

GOBINDANAGA ** ** R

JHATIPADAR 10,00,000 10,00,000

K.NUAGAM ** **

KALABADA ** **

KATURU ** **

KOTHINGI 10,00,000 10,00,000

L.LAXMINARAY ** ** ANPUR

NUAPADA 10,00,000 10,00,000

PITATALI ** **

R.SUBANI ** **

RAMACHANDR ** ** APUR

RAMPA 10,00,000 10,00,000

SUNAPUR ** **

SURALA ** **

DHARAKOTE 27,16,000 27,16,000 BAHARPUR ** **

BALARAMPUR ** **

BARADABILI ** **

DHARAKOTE ** **

DHAUGAM 10,00,000 10,00,000

GOLLA 10,00,000 10,00,000

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 12 of 29 District Plan Report Page 82 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

DAMODARPAL LI

JAGA MOHAN ** **

JAHADA 10,00,000 10,00,000

JHADABANDHA ** **

JHARAPARI ** **

MACHHAKOT ** **

MANIKYAPUR ** **

MUNDAMARAI ** **

RUGUMU ** **

SALIA ** **

SARADHAPUR ** **

SUNGIPUR ** **

DIGAPAHANDI 36,08,000 36,08,000 ANKORADA ** **

BADA-DUMULA ** **

BASUDEBAPU ** ** R

BHAMARPUR ** **

BHISMAGITRI ** **

BIJAYA ** ** LAXMINARAYA NPUR

BOMAKAI ** **

CHASA ** ** NIMAKHANDI

CHOUDHRY ** ** TIKARAPADA

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 13 of 29 District Plan Report Page 83 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

GADA 10,00,000 10,00,000 GOBINDAPUR

GAUDAGAM ** **

GOKHARANAP ** ** UR

JAKAR ** **

KAITHADA ** **

KAITHAKHANDI ** **

KARAPADA 10,00,000 10,00,000

KHAMARIGAM ** **

KUSAPADA ** **

NIMAKHANDIP 10,00,000 10,00,000 ENTHA

PADMANAVAP ** ** UR

PHASIGUDA ** **

SAHADEVA ** ** TIKARAPADA

SIDHESWAR 10,00,000 10,00,000

TURUBUDI ** **

GANJAM 22,08,000 22,08,000 HUMMA 10,00,000 10,00,000

KAIMUHAPUR ** **

KARAPADA ** **

KHANDADAULI ** **

MALADA 10,00,000 10,00,000

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 14 of 29 District Plan Report Page 84 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

PALIBANDHA ** **

POIRASI ** **

POLANGA ** **

RAJAPUR 10,00,000 10,00,000

RAMAGADA ** **

S.RAMACHAND 10,00,000 10,00,000 RAPUR

SANTHSOHAP ** ** UR

SDABULIA ** **

U.D.S.PUR ** **

HINJILICUT 28,42,000 28,42,000 BADAKHANDI 10,00,000 10,00,000

BELLAGAM ** **

BHABANDHA 1,00,000 1,00,000

BURUPADA ** **

CHANDALI ** **

DAYAPALLI ** **

DHOBADI ** **

DURABANDHA ** **

DURABHADRA 1,00,000 1,00,000

GANDOLA ** **

KANCHURA ** **

KHARIDA ** **

MAKARJHOLA ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 15 of 29 District Plan Report Page 85 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

NAUDIKA 10,00,000 10,00,000

PATTIAPADAR 10,00,000 10,00,000

POCHILIMA 1,00,000 1,00,000

RELABA 10,00,000 10,00,000

SARU ** **

SIKIRI ** **

SOHAPUR ** **

SYASAN 10,00,000 10,00,000 AMBAGAM

JAGANNATHPR 32,38,000 32,38,000 ADHAIGAM 10,00,000 10,00,000 ASAD

ALASUGUMA ** **

ALEDI 10,00,000 10,00,000

BARAGAM 10,00,000 10,00,000

BIJAYA 10,00,000 10,00,000 DHANURIJAYA PUR

BUDURANGA 10,00,000 10,00,000

CHATHIPALLI ** **

CHEMUNDA ** **

GANDADHAR 10,00,000 10,00,000

GARADA ** **

GAYAGOUDA ** **

JAGANNATH ** ** PRASAD

JHADABHUMI 10,00,000 10,00,000

KADUA ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 16 of 29 District Plan Report Page 86 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

KHAMARPALLI ** **

KHATAMUNDA ** ** LI

KOKALABA ** **

KUDUTAI ** **

KUMPALADA ** **

PANCHABHUTI ** **

PRATAPUR ** **

ROUTI ** **

RUDHAPADAR ** **

TARASINGI 1,00,000 1,00,000

KABISURYANA 26,30,000 26,30,000 AMBAPUR ** ** GAR

ATHAGADAPAT ** ** NA

BADAMAHURI ** **

BALISARA ** **

BARIDA(A) ** **

BAUSIA ** **

BORASINGI ** **

BUDHAMBA ** **

DOLASARA ** **

GANGAPUR 10,00,000 10,00,000

GUDIALI 10,00,000 10,00,000

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 17 of 29 District Plan Report Page 87 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

JARADA ** **

KANIARI ** **

KHAJAPALLI 10,00,000 10,00,000

NANDIAGUDA ** **

PAIKAJAMUNA ** **

RISHIPUR ** **

SIALIA ** **

SUBALAYA 10,00,000 10,00,000

SUNAPALLI 10,00,000 10,00,000

SUNARIJHOLA ** **

KHALLIKOTE 37,16,000 34,16,000 AITTIPUR 10,00,000 10,00,000

BADAPALLI ** **

BADHA ** ** NALINAKHAPU R

BADHINUAPAL ** ** LI

BENIE ** **

BHIKAPADA ** **

BIKRAMPUR ** **

CHIKILLI 10,00,000 10,00,000

DANAPUR 10,00,000 10,00,000

DIMIRIA ** **

KAIRASI 10,00,000 10,00,000

KANAKA ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 18 of 29 District Plan Report Page 88 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

KANCHANA ** **

KANHAIPUR ** **

KESAPUR ** **

KHAGAPALLI ** **

KOMONDA ** **

LANGALESWA ** ** R

MATHURA 10,00,000 10,00,000

NAIKANIPALLI ** **

PATHARA ** **

SABULIA ** **

SRIKRUSHNA ** ** SARANPUR

TALAPADA 10,00,000 10,00,000

TENTULIAPALL ** ** I

TULASIPUR 10,00,000 10,00,000

KUKUDAKHAN 34,18,000 34,18,000 ANANTAI ** ** DI

ANKUSHAPUR 10,00,000 10,00,000

BAGHALATI ** **

BALIPADA ** **

BARIGAM ** **

BAULASHOLI ** **

BONTHAPALLI ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 19 of 29 District Plan Report Page 89 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

BUGULAPATA 10,00,000 10,00,000

DAKHINAPUR 10,00,000 10,00,000

DENGAPADAR ** **

GUERUNTHI ** **

JAGADALPUR ** **

KANKIA ** **

KUKUDAKHAN 10,00,000 10,00,000 DI

LATHI ** **

MASIAKHALI 10,00,000 10,00,000

MOHADA ** **

NIMAKHANDI ** **

ROHIGAM ** **

SAHOLA ** **

PATRAPUR 32,34,000 32,34,000 AMBAPUR ** **

ANKULI ** **

BADAPUR ** **

BARANGA ** **

BRAHMAN 10,00,000 10,00,000 NUAGAM

BURUTALA ** **

GUDIPADAR 10,00,000 10,00,000

GUNDARA ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 20 of 29 District Plan Report Page 90 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

JAYANTIPUR 10,00,000 10,00,000

KESARIPADA ** **

KHAMARIGAM 10,00,000 10,00,000 (Community Contribution :3,50,000)

KHARIAGUDA ** **

KHARINIPADA ** **

MANDARADA ** **

PADADIGI 10,00,000 10,00,000

PATRAPUR ** **

SAMANTARPU ** ** R

SAMANTIAPAL ** ** LI

SARADAGADA ** **

SURANGIGADA ** **

TANDIPUR ** **

TUMBAGADA ** **

TURUBUDI ** **

POLOSARA 30,00,000 30,00,000 BADAPANKALA ** ** BADI

BALICHAI ** **

BANTHAPALLI ** **

BARTANI 10,00,000 10,00,000

BELLAGAM ** **

BHABARADA ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 21 of 29 District Plan Report Page 91 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

BUDHAISUNI ** **

CHIRIKIPADA ** ** SASAN

DHUMKAPADA ** **

GHODAPALAN ** ** A

GOCHABADI ** **

HATIOTA ** **

J.DENGAPADA ** ** R

JAKAR 10,00,000 10,00,000

KALAMBA ** **

KANACHAI ** **

KENDUBADI ** **

KHANDURU 10,00,000 10,00,000

MADHUPALLI 10,00,000 10,00,000

MALA- ** ** TENTULIA

MANDAR ** **

MATHURA ** **

NIMINA ** **

PANDRIPADA ** **

RUMAGADA 10,00,000 10,00,000

SADAKA ** **

PURUSHOTTA 35,17,000 35,17,000 ACHULI ** ** MPUR

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 22 of 29 District Plan Report Page 92 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

ANTARIGAM ** **

ARAKHAPUR 10,00,000 10,00,000

BAAGHALA ** **

BADA ** ** BARAGAM

BADAKHARIDA ** **

BHATAKUMAR ** ** ADA

BHIMAPUR ** **

BHUTASARASI ** ** NGI

CHANGUDIPAD ** ** AR NUAGAON

CHUNGIGHAI ** **

GANGA- ** ** DAHANI

HANDIGHAR 10,00,000 10,00,000

JAGANNATHPU ** ** R

JAMUNI ** **

JHADABAI ** **

KAMA ** ** NALINALKHAP UR

PANDIA 10,00,000 10,00,000

PATRAPUR ** **

RAIPUR ** **

RANAJHALI ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 23 of 29 District Plan Report Page 93 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

SAMMA ** **

SIKULA 10,00,000 10,00,000

SOLAGHAR ** **

SUNATHARA ** **

TANKACHAI 10,00,000 10,00,000

RANGEILUNDA 36,38,000 36,38,000 BADAKUSASTH ** ** ALLI

BISWAMATHPU 10,00,000 10,00,000 R

BOXIPALLI ** **

CHIKARADA 10,00,000 10,00,000

DURA 10,00,000 10,00,000

GANJU ** **

GOLABANDHA ** **

GOLANTHARA ** **

INDRAKLHAI 10,00,000 10,00,000

KALAMPUR 10,00,000 10,00,000

KANISI ** **

KARAPALLI ** **

KELUAPALLI ** **

KOLATHIGAM ** **

KOTHARSINGI ** **

LUHAJHAR 10,00,000 10,00,000

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 24 of 29 District Plan Report Page 94 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

MANTRIDI ** **

NARAYANPUR ** **

PADAMAPUR ** **

PHULTA ** **

RANDHA ** **

RANGIPUR ** **

SASANAPADA ** ** R

SATRAKUTANI ** **

SANAKHEMUN 37,83,000 37,83,000 ADAPADA 10,00,000 10,00,000 DI

CHANAMARI 10,00,000 10,00,000

CHUDANGAPU ** ** R

DAYANIDHIPU ** ** R

DENG ADI ** **

ERANDRA ** **

GANGAPUR ** **

GOUTAMI ** **

JURA ** **

KANAKARADA 10,00,000 10,00,000

KAUDDIA ** **

KHALLANNGI ** **

MAULABHANJA ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 25 of 29 District Plan Report Page 95 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

PADAMARI ** **

PATIGUDA ** **

PATTAPUR ** **

RAMACHANDR ** ** APUR

SAHAPUR 10,00,000 10,00,000

SATAPENTHA ** ** GOPALPUIR

SDINGIPUR 10,00,000 10,00,000

TAPTAPANI ** ** GOVINDAPUR

SHERAGADA 30,40,000 30,40,000 ALARIGADA ** **

BANDHAGUDA ** **

BARA ** ** MUNDALI

BRAHAMANCH 10,00,000 10,00,000 AI

DENGAPADAR ** **

DHABALPUR ** **

DHANTARA ** **

GOTRHIGAM ** **

GOVINDAPUR 10,00,000 10,00,000

KARADAKANA ** **

KHIRIDA ** **

KRUSHNACHAI 10,00,000 10,00,000

KULAGADA ** **

KUMARPANI ** **

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 26 of 29 District Plan Report Page 96 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

KURULA 10,00,000 10,00,000

MAHUPADAR ** **

NARENDRAPU ** ** R

PITALA ** **

SHARAGADA ** **

TAHARA ** **

TAKARADA 10,00,000 10,00,000

THURUKURAI ** **

SURADA 34,98,000 34,98,000 AMURUTULU ** **

ASURABANDH ** ** A

BADA ** ** BADANGI

BADAGADA ** **

BADAGOCHHA ** **

BORADA ** **

BORASINGI ** **

EKALAPUR ** **

GAJALABADI ** **

GANGAPUR ** **

GENJA ** **

GOCHHA ** **

GOPALAPUR ** ** SASAN

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 27 of 29 District Plan Report Page 97 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

GOUDA ** ** GOTHA

HINJALAKUDA ** **

HUKUMA ** **

KULANGI ** **

LATHIPADA ** **

MERRIKOTA ** **

NUAGADA ** **

PALKATU ** **

RAIBANDHA ** **

SARABADI ** **

SIDHAPUR ** **

SURAMANI ** **

Municipal Component

Plan Unit Name Expected Allocation Planned Outlay

Brahmapur 5,97,60,000 5,97,60,000

Asika 44,26,000 44,26,000

Bellaguntha 21,14,000 21,14,000

Bhanjanagar 42,66,000 42,66,000

Buguda 26,97,000 26,97,000

Chhatrapur 40,56,000 40,56,000

Chikiti 24,29,000 24,29,000

Digapahandi 23,22,000 23,22,000

Ganjam 25,79,000 25,79,000

Gopalpur 12,72,000 12,72,000

Hinjilicut 46,97,000 46,97,000

Kavisurjyanagar 32,46,000 32,46,000

Khalikote 21,78,000 21,78,000

Kodala 24,27,000 24,27,000

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 28 of 29 District Plan Report Page 98 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Polasara 40,03,000 40,03,000

Purusottampur 31,50,000 31,50,000

Rambha 26,55,000 26,55,000

Surada 35,23,000 35,23,000 Line Department Component

District Line Department Name Expected Allocation Planned Outlay

No data available

Report generated through PlanPlus on Thu Sep 16 16:58:11 IST 2010 Annexure-I : Page 29 of 29 District Plan Report Page 99 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure II:Sectoral View Tied Component : Sector Wise Expected Allocation v/s Planned Outlay (Consolidated RLB/ULB/Line Department)

S.No. Sector RLB ULB Line Department Total

Expected Planned Expected Planned Expected Planned Expected Planned Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay

No data available Untied Component : Expected Allocation (Consolidated RLB/ULB/Line Department)

From RLB ULB Line Department Total

Expected Allocation Expected Allocation Expected Allocation Expected Allocation

Own Fund 0 0 0 0

From all Schemes 23,10,00,000 11,18,00,000 0 34,28,00,000

Total 23,10,00,000 11,18,00,000 0 34,28,00,000 Untied Component : Planned Outlay

Sector RLB ULB Line Department Total

Planned Outlay Planned Outlay Planned Outlay Planned Outlay

General Expenditure 21,74,000 5,72,000 0 27,46,000

Capacity Building 3,25,28,000 6,23,000 0 3,31,51,000

Agriculture 3,00,000 0 0 3,00,000

Rural housing 20,17,000 0 0 20,17,000

Drinking water 8,50,000 5,00,000 0 13,50,000

Roads 5,40,41,000 5,73,29,000 0 11,13,70,000

Education 2,30,16,000 21,23,000 0 2,51,39,000

Technical training and 41,88,000 0 0 41,88,000 vocational education

Markets and fairs 1,54,000 57,66,000 0 59,20,000

Health and sanitation 36,00,000 0 0 36,00,000

Family welfare 15,50,000 0 0 15,50,000

Women and child 7,71,77,000 45,00,000 0 8,16,77,000 development

Social welfare 12,00,000 0 0 12,00,000

Minor irrigation 5,50,000 0 0 5,50,000

Animal husbandry 11,06,000 0 0 11,06,000

Urban Planning including 0 2,16,44,000 0 2,16,44,000 town planning

Promotion of cultural 0 1,17,23,000 0 1,17,23,000

Public amenities including 0 38,70,000 0 38,70,000 street lighting

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 1 of 14 District Plan Report Page 100 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Regulation of land-use and 4,45,000 0 0 4,45,000 construction of buildings

Planning for economic and 2,50,000 0 0 2,50,000 social development

Roads and bridges 2,48,54,000 0 0 2,48,54,000

Water supply for domestic 0 31,50,000 0 31,50,000

Total 23,00,00,000 11,18,00,000 0 34,18,00,000

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 2 of 14 District Plan Report Page 101 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 3 of 14 District Plan Report Page 102 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 4 of 14 District Plan Report Page 103 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Tied Component : Sector Wise Expected Allocation v/s Planned Outlay : Panchayat Component

Sector District Panchayat Block Panchayat Gram Panchayat Total

Expected Planned Expected Planned Expected Planned Expected Planned Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay

No data available

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 5 of 14 District Plan Report Page 104 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Untied Component : Expected Allocation : Panchayat Component

From District Panchayat Block Panchayat Gram Panchayat Total

Expected Allocation Expected Allocation Expected Allocation Expected Allocation

Own Fund 0 0 0 0

From all Schemes 4,62,00,000 6,93,00,000 11,55,00,000 23,10,00,000

Total 4,62,00,000 6,93,00,000 11,55,00,000 23,10,00,000 Untied Component : Planned Outlay :Panchayat Component

From District Panchayat Block Panchayat Gram Panchayat Total

Planned Outlay Planned Outlay Planned Outlay Planned Outlay

General Expenditure 2,00,000 6,94,000 12,80,000 21,74,000

Capacity Building 16,00,000 50,73,000 2,58,55,000 3,25,28,000

Agriculture 0 3,00,000 0 3,00,000

Rural housing 17,00,000 3,17,000 0 20,17,000

Drinking water 7,00,000 0 1,50,000 8,50,000

Roads 83,55,000 74,91,000 3,81,95,000 5,40,41,000

Education 1,42,45,000 74,71,000 13,00,000 2,30,16,000

Technical training and 0 41,88,000 0 41,88,000 vocational education

Markets and fairs 0 1,54,000 0 1,54,000

Health and sanitation 4,00,000 18,00,000 14,00,000 36,00,000

Family welfare 0 0 15,50,000 15,50,000

Women and child 26,00,000 3,44,97,000 4,00,80,000 7,71,77,000 development

Social welfare 11,00,000 0 1,00,000 12,00,000

Minor irrigation 0 0 5,50,000 5,50,000

Animal husbandry 0 11,06,000 0 11,06,000

Regulation of land-use and 0 4,45,000 0 4,45,000 construction of buildings

Planning for economic and 0 0 2,50,000 2,50,000 social development

Roads and bridges 1,53,00,000 57,64,000 37,90,000 2,48,54,000

Total 4,62,00,000 6,93,00,000 11,45,00,000 23,00,00,000

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 6 of 14 District Plan Report Page 105 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 7 of 14 District Plan Report Page 106 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 8 of 14 District Plan Report Page 107 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 9 of 14 District Plan Report Page 108 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Tied Component : Sector Wise Expected Allocation v/s Planned Outlay : Municipal Component

Sector Muncipality Corporation Town Area Notified Area Council Total

Expected Planned Expected Planned Expected Planned Expected Planned Expected Planned Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay

No data available

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 10 of 14 District Plan Report Page 109 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Untied Component : Expected Allocation : Municipal Component

From Muncipality Corporation Town Area Notified Area Total Council

Expected Allocation Expected Allocation Expected Allocation Expected Allocation Expected Allocation

Own Fund 0 0 0 0 0

From all Schemes 5,97,60,000 0 0 5,20,40,000 11,18,00,000

Total 5,97,60,000 0 0 5,20,40,000 11,18,00,000

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 11 of 14 District Plan Report Page 110 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Untied Component : Planned Outlay : Municipal Component

From Muncipality Corporation Town Area Notified Area Total Council

Planned Outlay Planned Outlay Planned Outlay Planned Outlay Planned Outlay

General Expenditure 0 0 0 5,72,000 5,72,000

Capacity Building 0 0 0 6,23,000 6,23,000

Drinking water 5,00,000 0 0 0 5,00,000

Roads 3,89,50,000 0 0 1,83,79,000 5,73,29,000

Education 7,00,000 0 0 14,23,000 21,23,000

Markets and fairs 0 0 0 57,66,000 57,66,000

Women and child 30,00,000 0 0 15,00,000 45,00,000 development

Urban Planning 1,29,40,000 0 0 87,04,000 2,16,44,000 including town planning

Promotion of cultural 0 0 0 1,17,23,000 1,17,23,000

Public amenities 36,70,000 0 0 2,00,000 38,70,000 including street lighting

Water supply for 0 0 0 31,50,000 31,50,000 domestic

Total 5,97,60,000 0 0 5,20,40,000 11,18,00,000

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 12 of 14 District Plan Report Page 111 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 13 of 14 District Plan Report Page 112 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Tied Component : Sector Wise Expected Allocation v/s Planned Outlay : Line Department Component

Sector District Line Department Expected Allocation Planned Outlay

No data available

Report generated through PlanPlus on Thu Sep 16 16:59:59 IST 2010 Annexure-II : Page 14 of 14 District Plan Report Page 113 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure III:Scheme View Scheme Wise Expected Allocation v/s Planned Outlay (Consolidated RLB/ULB/Line Department)

Scheme RLB ULB Line Department Total

Expected Planned Expected Planned Expected Planned Expected Planned Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay

1.Backward 23,10,00,000 22,93,50,000 5,97,60,000 5,97,60,000 0 0 29,07,60,000 28,91,10,000 Region Grant Funds

Total 23,10,00,000 22,93,50,000 5,97,60,000 5,97,60,000 0 0 29,07,60,000 28,91,10,000

Report generated through PlanPlus on Thu Sep 16 17:01:57 IST 2010 Annexure-III : Page 1 of 3 District Plan Report Page 114 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Scheme Wise Expected Allocation v/s Planned Outlay : Panchayat Component

Scheme District Panchayat Block Panchayat Gram Panchayat Total

Expected Planned Expected Planned Expected Planned Expected Planned Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay

1 .Backward 4,62,00,000 4,62,00,000 6,93,00,000 6,90,00,000 11,45,00,000 11,41,50,000 23,00,00,000 22,93,50,000 Region Grant Funds

Total 4,62,00,000 4,62,00,000 6,93,00,000 6,90,00,000 11,45,00,000 11,41,50,000 23,00,00,000 22,93,50,000

Report generated through PlanPlus on Thu Sep 16 17:01:57 IST 2010 Annexure-III : Page 2 of 3 District Plan Report Page 115 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Scheme Wise Expected Allocation v/s Planned Outlay : Municipal Component

Scheme Muncipality Corporation Town Area Notified Area Council Total

Expected Planned Expected Planned Expected Planned Expected Planned Expected Planned Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay

1 5,97,60,00 5,97,60,00 0 0 0 0 5,20,40,00 0 11,18,00,0 5,97,60,00 .Backward 0 0 0 00 0 Region Grant Funds

Total 5,97,60,00 5,97,60,00 0 0 0 0 5,20,40,00 0 11,18,00,0 5,97,60,00 0 0 0 00 0

Report generated through PlanPlus on Thu Sep 16 17:01:57 IST 2010 Annexure-III : Page 3 of 3 District Plan Report Page 116 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.General Expenditure

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of recreational center at Mahurikalua Backward Region Grant Funds 2,00,000

Block Panchayat BELLAGUNTHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of High School Building at Badapada Backward Region Grant Funds 3,00,000

Block Panchayat CHIKITI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF CLASS ROOM AT OM SRI GURU ABASIKA Backward Region Grant Funds 3,94,000 RESIDENTIAL SCHOOL AT BAHINIPATI

Gram Panchayat CHAMAKHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Incentive award out of BRGF in Convergence with Backward Region Grant Funds 1,00,000 NREGS Porjects

Gram Panchayat DURABHADRA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Incentive award out of BRGF in Convergence with Backward Region Grant Funds 1,00,000 NREGS Porjects

Gram Panchayat BHABANDHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Incentive award out of BRGF in Convergence with Backward Region Grant Funds 1,00,000 NREGS Porjects

Gram Panchayat POCHILIMA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Incentive award out of BRGF in Convergence with Backward Region Grant Funds 1,00,000 NREGS Porjects

Gram Panchayat ADHAIGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Cement Slab over the drain infront of AWC and Backward Region Grant Funds 50,000 Excavation of earth

Gram Panchayat TARASINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Incentive award out of BRGF in Convergence with Backward Region Grant Funds 1,00,000 NREGS Porjects

Gram Panchayat MATHURA

S.No. Work Name Sources of Funding Outlay Under the Scheme

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 1 of 74 District Plan Report Page 117 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

1 Const. of Guard wall at Deul Bandha Road Backward Region Grant Funds 1,50,000

2 Const. of Guard Wall at Masani Bandha Road Backward Region Grant Funds 1,00,000

3 COnst. of Steps at Thakurani Temple Bandha Backward Region Grant Funds 80,000

Gram Panchayat TULASIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Reno. of GP Office Building Backward Region Grant Funds 2,50,000

Gram Panchayat TAKARADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Takarada High School furniture Backward Region Grant Funds 1,50,000

Notified Area Council Gopalpur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Boating Terminal at Goplpur Backward Region Grant Funds 5,72,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 2 of 74 District Plan Report Page 118 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Capacity Building

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of Additional GP building at Backward Region Grant Funds 4,00,000

2 Const of Additional GP building at Sasanpadar Backward Region Grant Funds 4,00,000

3 Const of Additional GP building at Backward Region Grant Funds 3,00,000

4 Const. of Recreational Center at Jaleswarkhandi Backward Region Grant Funds 3,00,000

5 Const. of Class Room at Talasara High School Backward Region Grant Funds 2,00,000

Block Panchayat ASKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of GP office building Backward Region Grant Funds 3,00,000

Block Panchayat BEGUNIAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Commnity hall Backward Region Grant Funds 9,51,000

Block Panchayat DHARAKOTE

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Addl. GP building Backward Region Grant Funds 2,00,000

Block Panchayat DIGAPAHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC Building at Tundra Backward Region Grant Funds 3,00,000

Block Panchayat PURUSHOTTAMPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of KGVB Hostel building Backward Region Grant Funds 5,17,000

Block Panchayat RANGEILUNDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Complete of incomplete GP office cum Godown at Backward Region Grant Funds 50,000 Baxipalli

2 Completion of incomplete GP Office Backward Region Grant Funds 2,50,000

3 Complete of incomplete GP office at Ranipur Backward Region Grant Funds 1,50,000

4 Com. of incom. building SBR Womens college, Backward Region Grant Funds 1,50,000 Berhampur

Block Panchayat SHERAGADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC at Sadangipalli Backward Region Grant Funds 3,15,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 3 of 74 District Plan Report Page 119 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

2 Construction of AWC at Kulagada Backward Region Grant Funds 3,15,000

3 Construction of AWC at Punanda Backward Region Grant Funds 3,15,000

4 Construction of AWC at Lanjiapali Backward Region Grant Funds 3,15,000

5 Construction of AWC at Karadakana Backward Region Grant Funds 3,15,000

6 Const. of AWC Building at Kurula Backward Region Grant Funds 3,15,000

7 Const. of AWC Builiding at Pakidi Backward Region Grant Funds 3,15,000

Gram Panchayat BABANPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of GP building Babanpur Backward Region Grant Funds 3,00,000

Gram Panchayat HARIDAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building VR Palli Backward Region Grant Funds 2,00,000

Gram Panchayat MANGALPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Mangalpur Govt. High School building Backward Region Grant Funds 7,00,000

Gram Panchayat NIMINA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Nimina GP office Backward Region Grant Funds 3,00,000

Gram Panchayat BARIDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Competion. Of incomplete GP market building. Backward Region Grant Funds 5,00,000

Gram Panchayat BEGUNIAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of GP building Backward Region Grant Funds 2,00,000

Gram Panchayat BERUHABADI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building Backward Region Grant Funds 2,50,000

Gram Panchayat BUIRAGHARI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of GP office Backward Region Grant Funds 5,00,000

Gram Panchayat DIGAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of GP building Backward Region Grant Funds 2,00,000

Gram Panchayat KHANDIANAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 4 of 74 District Plan Report Page 120 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

1 Construction of GP office Backward Region Grant Funds 5,00,000

Gram Panchayat MORDA MEKHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of GP Office building Backward Region Grant Funds 3,00,000

Gram Panchayat MORDAKHOLA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of GP Office building Backward Region Grant Funds 4,00,000

Gram Panchayat PHASI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office Backward Region Grant Funds 2,50,000

Gram Panchayat AMBAPUA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building Backward Region Grant Funds 4,00,000

Gram Panchayat BADAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completation of inComplete Badapada School play Backward Region Grant Funds 1,50,000 ground

Gram Panchayat BENIPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building at Benipalli Backward Region Grant Funds 4,50,000

Gram Panchayat GOBARA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of GP building at Gobara Backward Region Grant Funds 4,50,000

Gram Panchayat NATANGA`

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of GP office building at Natanga Backward Region Grant Funds 4,50,000

Gram Panchayat GOLLAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of Addl Room at GP Building Backward Region Grant Funds 2,00,000

Gram Panchayat KULADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of ADDL Room at GP Building Backward Region Grant Funds 2,00,000

2 Const of ADDL Room at High School Backward Region Grant Funds 2,50,000

Gram Panchayat LAMBAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of ADDL Room at GP Building Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 5 of 74 District Plan Report Page 121 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat SANAKODANDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of ADDL Room at GP Building Backward Region Grant Funds 2,00,000

Gram Panchayat ANTARAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const .of GP Office Building at Antarapada Backward Region Grant Funds 4,00,000

Gram Panchayat ASHRAMKARADABADI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of GP office Building Of N.Patana Backward Region Grant Funds 5,00,000

Gram Panchayat BALIPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const . Of GP office Building at Balipadar Backward Region Grant Funds 3,00,000

Gram Panchayat GOLABANDHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of GP Office Building at Golabandha Backward Region Grant Funds 5,00,000

Gram Panchayat GOUDA GAERADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion .of Incomplete GP Office Building at Backward Region Grant Funds 3,00,000 G.Borada

Gram Panchayat AGASTINUAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete GP building Backward Region Grant Funds 1,00,000

Gram Panchayat BIPULINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of GP office building Backward Region Grant Funds 2,00,000

Gram Panchayat PODAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building Backward Region Grant Funds 2,00,000

Gram Panchayat GIRISOLA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of GP building at Girisola Backward Region Grant Funds 3,00,000

Gram Panchayat KOTHINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. GP office building at Kotilingi Backward Region Grant Funds 2,00,000

Gram Panchayat

S.No. Work Name Sources of Funding Outlay Under the Scheme

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 6 of 74 District Plan Report Page 122 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

1 Const. of GP office building at Nuapada Backward Region Grant Funds 4,50,000

Gram Panchayat JAHADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Comple. Of incomplete GP Building Backward Region Grant Funds 4,50,000

Gram Panchayat SIDHESWAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of new GP office building at Sidheswara Backward Region Grant Funds 4,00,000

Gram Panchayat RAJAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Addl GP building Backward Region Grant Funds 2,00,000

Gram Panchayat NAUDIKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of GP office ,Nandika Backward Region Grant Funds 2,00,000

Gram Panchayat PATTIAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Rest. And extention of GP office Building Backward Region Grant Funds 2,00,000

Gram Panchayat RELABA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. GP Office at Ralaba Backward Region Grant Funds 2,00,000

Gram Panchayat SYASAN AMBAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of GP office at S.Ambagam Backward Region Grant Funds 2,50,000

Gram Panchayat ADHAIGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Community Center At Maa Kandhuni Devi Pitha Backward Region Grant Funds 2,00,000

Gram Panchayat ALEDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of G.P. Office Building Backward Region Grant Funds 7,00,000

Gram Panchayat BARAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of G.P office building Backward Region Grant Funds 2,50,000

Gram Panchayat BIJAYA DHANURIJAYAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of G.P office buiding Backward Region Grant Funds 4,00,000

Gram Panchayat BUDURANGA

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 7 of 74 District Plan Report Page 123 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of GP office Backward Region Grant Funds 3,00,000

Gram Panchayat GANDADHAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of Gram Panchayat office building Backward Region Grant Funds 4,00,000

Gram Panchayat JHADABHUMI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of G.P office buiding Backward Region Grant Funds 10,00,000

Gram Panchayat GANGAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of GP ghar Backward Region Grant Funds 2,50,000

2 Const. of Addl. Class room of Sri Rameswara High Backward Region Grant Funds 2,50,000 School at Bada Agala

Gram Panchayat GUDIALI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP building , Gudiali Backward Region Grant Funds 2,00,000

2 CC road from Jaganatha Temple to Dhoba street Backward Region Grant Funds 2,00,000

Gram Panchayat KHAJAPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Addl Class room at R.K High School Backward Region Grant Funds 4,50,000

Gram Panchayat SUBALAYA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building Backward Region Grant Funds 5,00,000

Gram Panchayat SUNAPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building Backward Region Grant Funds 4,50,000

Gram Panchayat CHIKILLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of GP Office building ,Chikili Backward Region Grant Funds 3,05,000

Gram Panchayat KAIRASI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP Office Building at Kairasi Backward Region Grant Funds 5,00,000

Gram Panchayat MATHURA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Addl GP Office Building,Mathura Backward Region Grant Funds 2,50,000

Gram Panchayat TALAPADA

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 8 of 74 District Plan Report Page 124 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Reno.of GP Office Building at Talapada Backward Region Grant Funds 5,00,000

Gram Panchayat ANKUSHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of GP Office building at Ankushpur Backward Region Grant Funds 4,00,000

Gram Panchayat DAKHINAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of GP Office building Backward Region Grant Funds 2,50,000

Gram Panchayat GUDIPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of GP building at Gudipadara Backward Region Grant Funds 4,50,000

Gram Panchayat JAYANTIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP building Jayantipur Backward Region Grant Funds 3,00,000

Gram Panchayat PADADIGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of Addl GP Office Backward Region Grant Funds 2,00,000

Gram Panchayat BARTANI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of additional GP Office building at Bartini Backward Region Grant Funds 3,00,000

Gram Panchayat MADHUPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of GP Office building with extentions Backward Region Grant Funds 5,00,000

Gram Panchayat RUMAGADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete GP Office Building at Backward Region Grant Funds 4,00,000 Rumagada

Gram Panchayat ARAKHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building at Arakhpur Backward Region Grant Funds 5,00,000

Gram Panchayat ADAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 const. of addl room of GP office building Backward Region Grant Funds 2,50,000

Gram Panchayat KANAKARADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of GP office building on the roof of Godown Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 9 of 74 District Plan Report Page 125 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat SAHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building at Sahaspur Backward Region Grant Funds 3,50,000

Gram Panchayat SDINGIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of GP office building Backward Region Grant Funds 5,00,000

Gram Panchayat BRAHAMANCHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of GP office building Backward Region Grant Funds 3,00,000

Gram Panchayat GOVINDAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Addl Class room of Govindapur High School Backward Region Grant Funds 4,50,000

Gram Panchayat KRUSHNACHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of OBB school, K Chhai Backward Region Grant Funds 1,50,000

Gram Panchayat KURULA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of GP office building Backward Region Grant Funds 2,50,000

Notified Area Council Surada

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Jagannath Pathagar in NAC Office Backward Region Grant Funds 6,23,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 10 of 74 District Plan Report Page 126 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Agriculture

Block Panchayat SANAKHEMUNDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF AWC BUILDING AT DANAPUR Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 11 of 74 District Plan Report Page 127 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Rural housing

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Kalyan Mandap Backward Region Grant Funds 6,00,000

2 Const. of Addl GP building Backward Region Grant Funds 2,00,000

3 Completion of incomplete building of Dhanantara high Backward Region Grant Funds 3,00,000 School

4 Const. of AWC Backward Region Grant Funds 3,00,000

5 Const. of AWC at Pantikhari Matiasahi Backward Region Grant Funds 3,00,000

Block Panchayat KUKUDAKHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC at Lochapada-I Backward Region Grant Funds 3,17,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 12 of 74 District Plan Report Page 128 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Drinking water

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of new tank over head tank on RWSS point of Backward Region Grant Funds 5,00,000 village Gopalpur

2 Supply of drinking water to block office through the PHD Backward Region Grant Funds 2,00,000

Gram Panchayat BRAHAMANCHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Bathing steps guard wall of Pitamber sahi tank Backward Region Grant Funds 1,50,000

Muncipality Brahmapur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Sinking of Hand pump tube wells in different wards of Backward Region Grant Funds 5,00,000 Berhampur municipal C

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 13 of 74 District Plan Report Page 129 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Roads

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 RCC Culvert and Imp. Of road Benapata to Backward Region Grant Funds 2,00,000 Hanumantiapalli

2 RCC small culvert and Imp. Of road Nimina to saluapali Backward Region Grant Funds 2,00,000 road

3 RCC small culvert and Imp. Of Gahangu Backward Region Grant Funds 2,00,000 Thakuranimandira road to Canal road

4 Const. of culvert with CC plate, Village road Backward Region Grant Funds 2,00,000

5 Const. of Culvert and Drain on the road from Pandara Backward Region Grant Funds 2,00,000 sahi to Badakhala Nala

6 Const. of CC road and Drain from Sitalapalli to Backward Region Grant Funds 2,00,000 Harijansahi

7 Const of culvert from Kendupali road to Nepapedhi road Backward Region Grant Funds 2,00,000

8 Const of culvert at Subarnapur Abhayapur Road Backward Region Grant Funds 2,00,000

9 Const of culvert at Bahuda River S.B.Jagdevpur Backward Region Grant Funds 2,00,000

10 Const of culvert at Bileinala Jiranga Backward Region Grant Funds 2,00,000

11 Const of culvert at Batabandha Buda road Backward Region Grant Funds 2,00,000

12 Const. of Khari Nala Culvert at Arakhapur Backward Region Grant Funds 3,00,000

13 Const. of Jama Ghai Nala Culvert Backward Region Grant Funds 3,00,000

14 Const. of CD work with culvert of Sahu Bandha to Madan Backward Region Grant Funds 2,00,000 road of Dakarabadi

15 Const. of Bridge or Culvert over Sana Nala at Nagudu Backward Region Grant Funds 2,00,000

16 Const of CD work on Kholamal road to high school at Backward Region Grant Funds 2,00,000 Sankuru

17 Const.of Cause way of Haridachira road Backward Region Grant Funds 1,00,000

18 Const.of Bridge Dahanipalli road Backward Region Grant Funds 2,00,000

19 Const. of Culvert with road Pichhuli Backward Region Grant Funds 2,00,000

20 Const of culvert and approach road to Siva temple at Backward Region Grant Funds 2,05,000 Pochilima

21 Const of culvert and guardwall approach road to Sikiri Backward Region Grant Funds 2,50,000 high school

22 Const of culvert approach road at Godorapalli Backward Region Grant Funds 2,00,000

23 Const of C.C Road and drain from Gopinathmandir Backward Region Grant Funds 2,00,000 square to Keutapatana Harij

24 Const of culvert on the Thakurani Mandira Road Backward Region Grant Funds 1,00,000

25 Const. of Saluapalli CC road Backward Region Grant Funds 1,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 14 of 74 District Plan Report Page 130 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

26 Const. of Cc road with drain from TATA colony Dhoba Backward Region Grant Funds 2,00,000 Sahi to Post office

27 Const of culverton the road from Harijan sahi to Backward Region Grant Funds 1,50,000 Thakurani Temple

28 Const of Sunamohi Culvert Tirishi (30) Bhaga to Backward Region Grant Funds 2,00,000 Totamala

29 Const of culvert Kamasasan Bauri sahi Backward Region Grant Funds 1,00,000

30 Const. of Culvert over Nala near Bishram Paida of Backward Region Grant Funds 6,00,000 Bhimnagar

31 Const of culvert and surplus on bedha bandha of village Backward Region Grant Funds 3,00,000 P.Samantapur

32 Const of Culvert on the road Bhaliajhola of R.Ch.Pur Backward Region Grant Funds 2,00,000

33 Construction of Culvert near Godess Kali Mandira Backward Region Grant Funds 3,00,000

34 Const. of Culvert at Staion Sahi of Narasinghpur Backward Region Grant Funds 2,00,000

35 Completion of incomplete culvert on road form Matha Backward Region Grant Funds 2,50,000 Tentulia to M Dhia Sahi

36 Const of 2 Nos of road from PWD road to Damodarpalli Backward Region Grant Funds 2,00,000 Village

37 Const. of CD work on Padambati Sundarapur road Backward Region Grant Funds 7,00,000

Block Panchayat ASKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of culvert from Mangalpur to Mamudhia Backward Region Grant Funds 2,00,000 road

Block Panchayat BELLAGUNTHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of Incomplete indanapur CC Road with drain Backward Region Grant Funds 3,00,000 at Khairaputi

2 Completion of incomplete CC Road at Bankilidi Backward Region Grant Funds 2,00,000

3 COMPLETION OF INCOMPLETE C C ROAD Backward Region Grant Funds 4,00,000 PAILIPADA AT PAILIPADA

Block Panchayat BUGUDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC road at Salabani Backward Region Grant Funds 2,00,000

2 CONST OF DRAINAGE SYSTEM WITH RCC PLATE Backward Region Grant Funds 2,00,000 COVER OF PS ROAD

3 CONST OF C C ROAD AT MANIKAPALLI Backward Region Grant Funds 2,00,000

4 CONST OF C C ROAD AT BARADA SAHI Backward Region Grant Funds 2,00,000

5 CONST OF CC ROAD AT BADAPADA SAMALEI SAHI Backward Region Grant Funds 2,00,000

6 CONST OF CD WORK ON KALUBHUTI NALA ON Backward Region Grant Funds 3,00,000 GOLIA TO TALASARA ROAD

7 CONST OF CD WORK ON RD ROAD SANKURU Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 15 of 74 District Plan Report Page 131 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

8 CONST OF CC ROAD BADADANDA CANAL SANKHA Backward Region Grant Funds 2,00,000 TO SAMELIE

9 CONST OF C D WORK ON RD ROAD TO HS AT Backward Region Grant Funds 2,57,000 SANKRU

10 COMPLETION OF INCOMPLETER C C ROAD AT N Backward Region Grant Funds 1,50,000 PANIKESWARI

Block Panchayat CHATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC road Backward Region Grant Funds 2,00,000

2 Completion of Incomplete CC road Backward Region Grant Funds 50,000

3 Construction of CC road in village Backward Region Grant Funds 2,00,000

Block Panchayat DHARAKOTE

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road from Tahasil office to Backward Region Grant Funds 2,00,000 Kotharisahi

2 Completion of incomplete village CC road at Khairaputti Backward Region Grant Funds 2,00,000

3 Construction of cc road Keuta patna Harijana sahi to river Backward Region Grant Funds 2,79,000 Khadala sahi

Block Panchayat

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF CULVERT INCLUDING PROTECTION Backward Region Grant Funds 2,00,000 WALL AT SIDHESWAR TANK

2 COMPLETION OF INCOMP CULVERT AT SAMSANA Backward Region Grant Funds 1,35,000 ROAD

3 COMP OF INCOMPLLETE C C ROAD Backward Region Grant Funds 1,35,000

4 COMP OF CULVERT INCLUDING THE APPROCH OF Backward Region Grant Funds 1,40,000 HARIJANA SAHI WESTERN SIDE OF B NU

5 CONST OF CULVERT INCLUDING THE APPROCH OF Backward Region Grant Funds 1,35,000 HARIJANA SAHI

6 COMPLETION OF INCOMPLTE CULVERT AT Backward Region Grant Funds 1,35,000 LOHARADHEPA TO RD ROAD

7 COMPLETION OF INCOMPLTE CULVERT AT Backward Region Grant Funds 1,35,000 SAMASANA ROAD TO GUDIAAPALLI

8 COMP OF INCOMP C C ROAD AT ADUSAHI Backward Region Grant Funds 1,35,000 BOLASASRA AND CONST OF CONST OF CULVERT

Block Panchayat PATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC road at Subarnapur Backward Region Grant Funds 3,00,000

2 Construction of CC road at Puhundi village Backward Region Grant Funds 2,00,000

3 Construction of CC road at Somonathapur Backward Region Grant Funds 2,00,000

4 Construction of CC road at Samantarapur Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 16 of 74 District Plan Report Page 132 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Block Panchayat RANGEILUNDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of culvert with CC road at Belakudi Backward Region Grant Funds 2,50,000

2 Construction of culvert CC road from Mahasaipenha to Backward Region Grant Funds 2,00,000 school

Block Panchayat SHERAGADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF OF CULVERT OF BETA SINGI ROAD Backward Region Grant Funds 5,55,000

Gram Panchayat BABANPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road Babanpur Backward Region Grant Funds 2,00,000

Gram Panchayat HARIDAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road Mantapada R.M sahi Backward Region Grant Funds 2,00,000

Gram Panchayat NIMINA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Ninima Kalinga road to main road CC Backward Region Grant Funds 2,00,000

Gram Panchayat BARIDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of culvert from Kunda Backward Region Grant Funds 2,50,000

2 Completion. of incomplete CC road at Biribatia dakhina Backward Region Grant Funds 2,50,000 sahi to Sanabandha

Gram Panchayat BEGUNIAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn.of culvert at Balia pata Backward Region Grant Funds 2,50,000

2 Const. of CC road from Badadera Backward Region Grant Funds 2,50,000

Gram Panchayat BERUHABADI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Consst of CC road from RD road to Masani Backward Region Grant Funds 2,00,000

2 Const. of road and culvert at Nua Sahi, Ramapalli Backward Region Grant Funds 2,50,000

Gram Panchayat BUIRAGHARI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of CC road from Baruia Backward Region Grant Funds 2,00,000

Gram Panchayat DIGAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road at J.Chachina Backward Region Grant Funds 2,00,000 Nuabandha road

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 17 of 74 District Plan Report Page 133 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat KHANDIANAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CC road from Kareisuni Thakurani temple to Backward Region Grant Funds 2,00,000 Nilakantheswara temple

Gram Panchayat MATHASARASINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road from Matha Backward Region Grant Funds 1,00,000 Bramhapur danda to pahada tala

Gram Panchayat MORDA MEKHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of CC road from Radhakrushna Matha to Backward Region Grant Funds 2,00,000 Gupteswara mandir

2 Constn. of culvert at Kumbhara sahi,B.Gudiali Backward Region Grant Funds 2,00,000

Gram Panchayat PHASI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of CC road from Bilipada R.D road to Backward Region Grant Funds 2,00,000 Labaneswar temple

2 Construction of culvert at Betarapalli senapati khuntia Backward Region Grant Funds 2,50,000 ghara to Ranatola B

Gram Panchayat AMBAPUA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completation of incomplete Tikarapada RD road to Backward Region Grant Funds 1,50,000 village CC road

2 Const. of CC road with Drain Chandisahi (Chadhiapalli) Backward Region Grant Funds 1,50,000

Gram Panchayat BADAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completation of incomplete Kusapalli Thakurani Temple Backward Region Grant Funds 2,50,000 to Siba Mandir CC roa

Gram Panchayat BENIPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completation of inComplete Madhabarida Nuasahi CC Backward Region Grant Funds 1,50,000 road

2 Completation of inComplete M karagadia Grama CC Backward Region Grant Funds 1,00,000 road

Gram Panchayat GOBARA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road at Khadalasahi Backward Region Grant Funds 50,000 Gobara

2 Completion of incomplete Jayantigada village CC road Backward Region Grant Funds 1,00,000

3 Completion of incomplete Dengapadara Thakurani Backward Region Grant Funds 1,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 18 of 74 District Plan Report Page 134 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

temple CC road and Completio

Gram Panchayat NATANGA`

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completation of incomplete Nettanga village CC road. Backward Region Grant Funds 1,50,000

2 Completation of incomplete Gobindapur village CC road Backward Region Grant Funds 1,00,000

Gram Panchayat BARUDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road Backward Region Grant Funds 2,00,000

Gram Panchayat DIHAPADHAL

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road at Dihapadhal Backward Region Grant Funds 2,00,000

Gram Panchayat GOLLAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road at Kharapalli Backward Region Grant Funds 2,50,000

Gram Panchayat KULADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC Road Backward Region Grant Funds 2,50,000

Gram Panchayat LAMBAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road at Lembhi Backward Region Grant Funds 2,00,000

Gram Panchayat SANAKODANDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road At Bahadapadara Backward Region Grant Funds 2,00,000

Gram Panchayat ANTARAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road from Manikapur Gopinatha Mandir to Backward Region Grant Funds 2,00,000 Dakhinasahi road

Gram Panchayat ASHRAMKARADABADI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Complition of Incomplete Work from RD road to Medical Backward Region Grant Funds 2,50,000

2 Const. of road from A. Karadabadi to Benapalli Backward Region Grant Funds 2,50,000

Gram Panchayat BALIPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of PWD road to daily market CC road at Balipadar Backward Region Grant Funds 2,00,000

2 Const . Of PWD road to Hatapada Drain Culvert at Backward Region Grant Funds 3,00,000 Balipadar

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 19 of 74 District Plan Report Page 135 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

3 Const .of PWD road to Balipadar High school CC road at Backward Region Grant Funds 2,00,000 Balipadar

Gram Panchayat BHAMASILI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of Karanasahi CC road at Bhamasyali Backward Region Grant Funds 2,00,000

Gram Panchayat GOLABANDHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road from Golabandha Bada Danda Backward Region Grant Funds 2,50,000

Gram Panchayat GOUDA GAERADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road with Drain from Bhagabata Ghar to Backward Region Grant Funds 2,50,000 Santoshi Mandira

2 Completion of incomplete CC road at Gandhigram Backward Region Grant Funds 2,00,000

3 Const. of culvert and drain at Patharapalli Backward Region Grant Funds 2,50,000

Gram Panchayat PANGIDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of villgae CC road at Kanchuru Backward Region Grant Funds 2,50,000

Gram Panchayat AGASTINUAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road from Majhi Sahi to Backward Region Grant Funds 1,50,000 Gouda Sahi

2 Completion of incomplete CC road from Majhi Sahi to Backward Region Grant Funds 1,50,000 Digu Sahi

Gram Panchayat BADA MADHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Culvert at Goba Backward Region Grant Funds 4,00,000

2 Completion of incomplete of CC Road from Bireswara Backward Region Grant Funds 1,00,000 Temple to Bada Sahi

3 Completion of incomplete CC Road from Khajuri Bandha Backward Region Grant Funds 2,00,000 to Bada Sahi

Gram Panchayat BIPULINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road from Hajabandhadei Backward Region Grant Funds 1,00,000 to Katuru

2 Completion of incomplete CC road from RD road to Backward Region Grant Funds 1,00,000 Gedalapalli

Gram Panchayat NARANDRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC road of village main road at Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 20 of 74 District Plan Report Page 136 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Raghunathpur

2 Construction of culvert on Raghunathpur-Narendrapur Backward Region Grant Funds 2,00,000 village road

Gram Panchayat PODAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road from RD road to Balibandha end Backward Region Grant Funds 2,00,000

Gram Panchayat GIRISOLA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road at Krushnanagar, R Backward Region Grant Funds 2,00,000 Ch Palli and Girisola

2 Consrtuction of culvert at Girisola to Danapur road Backward Region Grant Funds 2,00,000

Gram Panchayat JHATIPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road at Govindpur Backward Region Grant Funds 1,50,000

2 Completion of incomplete CC road at Jhatipadar Backward Region Grant Funds 1,00,000

3 Completion of incomplete culvert from Jhatipadar to Backward Region Grant Funds 3,20,000 Chiparpali road (3 No)

4 Construction of culvert at Haripur Barisahi road Backward Region Grant Funds 1,00,000

Gram Panchayat KOTHINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC road at Kotilingi Backward Region Grant Funds 2,00,000

Gram Panchayat NUAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road at Sila Sahi, Backward Region Grant Funds 2,50,000 Khadisahi at Nuapada and at

Gram Panchayat RAMPA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road at Dhoba sahi Backward Region Grant Funds 1,00,000

Gram Panchayat DHAUGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road from Pankalbadi to Backward Region Grant Funds 1,25,000 Runikyanadi

2 CC Road from Pankalbadito Puruna Dhaugam Backward Region Grant Funds 1,25,000

Gram Panchayat GOLLA DAMODARPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC Road to GP Office Backward Region Grant Funds 1,50,000

Gram Panchayat JAHADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 21 of 74 District Plan Report Page 137 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

1 CC Road in Muktapunji Village Backward Region Grant Funds 2,50,000

Gram Panchayat GADA GOBINDAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road from RD road to Tala Dakhina Sahi of Backward Region Grant Funds 2,00,000 G.G. Pur

Gram Panchayat KARAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of culvert across Sana Nala at Nuabandha Palli Backward Region Grant Funds 2,00,000

2 Const. of CC road at Utara Sahi of Karapada Backward Region Grant Funds 2,00,000

Gram Panchayat NIMAKHANDIPENTHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road at Panada near R.K Temple side Backward Region Grant Funds 2,50,000

2 Const. of 6nos culvert at Nk Pentha to Baigana Badipalli Backward Region Grant Funds 2,50,000 road

3 Completion of incomplete GP office building at NK Backward Region Grant Funds 2,00,000 Pentha

Gram Panchayat HUMMA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Culvert with drain and approach road Backward Region Grant Funds 2,50,000

2 Const. of CC road with drain at Brahman Sahi Backward Region Grant Funds 2,50,000

3 Const. of culvert with drain from MDR- 66 to Borigam Backward Region Grant Funds 2,00,000 Thakurani Temple

Gram Panchayat MALADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Culvert with drain at Kusapalli Backward Region Grant Funds 2,00,000

2 Const. of Culvert with drain at Mallada Backward Region Grant Funds 2,50,000

3 Const. of Barisahi CC road Barada Backward Region Grant Funds 2,50,000

Gram Panchayat RAJAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Thakurani Mandir to Kalimandir CC road Backward Region Grant Funds 2,00,000

Gram Panchayat S.RAMACHANDRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road from Thakurani Temple to Backward Region Grant Funds 2,50,000 Gourangapatana Village road

2 Const. of Culvert with drain and approach road Backward Region Grant Funds 2,50,000

3 Const. of Culvert with drain at Diandein Backward Region Grant Funds 2,00,000

Gram Panchayat BADAKHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 22 of 74 District Plan Report Page 138 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

1 Construction of culvert over Khandianala Backward Region Grant Funds 2,50,000

2 Construction ofculvert at Rangunipalli Backward Region Grant Funds 2,00,000

3 Construction ofCC Road at Adua sahi ,Samarjholla Backward Region Grant Funds 2,50,000

Gram Panchayat NAUDIKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CCroad at Badhei Sahi Backward Region Grant Funds 2,50,000

Gram Panchayat PATTIAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC Road from Gram Devti temple to bridge via Backward Region Grant Funds 2,00,000 Nadi sahi at B.K.Pur

Gram Panchayat RELABA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC Road at Bada Sahi Allapur Backward Region Grant Funds 2,50,000

2 Construction of culvert and approach guard wall on GP Backward Region Grant Funds 2,50,000 office road, Ralaba

Gram Panchayat SYASAN AMBAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC Road at Khatadi Sahi at S.Ambagam Backward Region Grant Funds 2,50,000

2 Constrution of culvert and road at Badapadar Sahi Backward Region Grant Funds 2,50,000

Gram Panchayat ADHAIGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 C.C Road at Adheigam Majhidanda CC road at Hadi Backward Region Grant Funds 2,60,000 Sahi and CC road at Dandasi

2 Const. of CC Road at SIba Mandira of Village Lunijiholo Backward Region Grant Funds 70,000

Gram Panchayat ALEDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of C.C Road at Alladi Backward Region Grant Funds 3,00,000

Gram Panchayat BARAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of C.C Road from PWD Road to High School Backward Region Grant Funds 2,00,000

Gram Panchayat BIJAYA DHANURIJAYAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of C.C Road at B.D.Pur Backward Region Grant Funds 2,50,000

Gram Panchayat BUDURANGA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of C.C Road at Dhodapalli Backward Region Grant Funds 2,50,000

Gram Panchayat GANDADHAR

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 23 of 74 District Plan Report Page 139 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of C.C Road at Uttarasahi of Jamagorada Backward Region Grant Funds 2,50,000

Gram Panchayat GANGAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CC road from RD road to PWD road Backward Region Grant Funds 2,00,000

Gram Panchayat KHAJAPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CC road from PWD road to Primary School Backward Region Grant Funds 2,50,000

Gram Panchayat SUBALAYA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Subalaya PWD road to Gudi Bandha Guard wall CC Backward Region Grant Funds 2,00,000 road

Gram Panchayat SUNAPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CC raod from Gunthapada Siva Mandir to Gangapur Backward Region Grant Funds 2,50,000

Gram Panchayat AITTIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. CC road from Aitipur village to Smasana Backward Region Grant Funds 2,50,000

2 Const.of Culvert on at L.N.Street at Aitipur and Culvert Backward Region Grant Funds 4,00,000 on Jamua Street

3 Const. of culvert on the road at Thakurani temple, Backward Region Grant Funds 1,00,000 Ustapada

4 Const.of Culverton on Dhoba bandha,Badakheta, Culvert Backward Region Grant Funds 2,50,000 on the road at Thakur

Gram Panchayat CHIKILLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road at Badadanda Sahi Backward Region Grant Funds 1,50,000 North side of Chikili

2 Completion of incomplete CC road at N.Saurapalli Tala Backward Region Grant Funds 1,00,000 Sahi

3 Cost. Of Culvert on the road from Kalinjipalli Thakurani Backward Region Grant Funds 80,000 Mandira Anicut

4 Const. Of Culvert on the road from Lodhabandha to Backward Region Grant Funds 75,000 Dhimiri Sahi

5 Cost. Of Culvert on the road from High School to Backward Region Grant Funds 75,000 Thakurani temple

6 Cost. Of Culvert on the road from B.Nuapalli Tala Sahi to Backward Region Grant Funds 75,000 Uppara Sahi

7 Const. of Drain From Majhi sahi Talapata to Badadanda Backward Region Grant Funds 70,000 sahi of Talapata Vill

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 24 of 74 District Plan Report Page 140 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

8 Const. of Drain from Jagannath Mandir to Tala sahi Backward Region Grant Funds 70,000

Gram Panchayat DANAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Culvert on the road at Phasipada-Bhadua road Backward Region Grant Funds 5,00,000

2 Completion of incomplete CC road at Dengapadar village Backward Region Grant Funds 1,00,000 road

3 Const.of 2 Nos.ofCulvert on the road RD road to Backward Region Grant Funds 4,00,000 Danapur road, Addl GP offi

Gram Panchayat KAIRASI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of Ustamunda Culvert and protection wall Backward Region Grant Funds 2,50,000

2 Const.of CC road from Sri Radhakrishna Mandira to RD Backward Region Grant Funds 2,50,000 road

Gram Panchayat MATHURA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC Road from Danhar- Kharipalli Road CC Backward Region Grant Funds 2,00,000 Road from Village to Siv

Gram Panchayat TALAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of CC road from K.Banjar to Chanagiri Sahi Backward Region Grant Funds 2,50,000

2 Const.of Culvert at Baritala Sahi ,Talapada Backward Region Grant Funds 2,50,000

Gram Panchayat TULASIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road from village East side Backward Region Grant Funds 1,25,000 to Thakurani mandir

2 Const.of Culvert on the road from Pitanapalli to Backward Region Grant Funds 2,50,000 Solabandha road

3 Const.of Culvert on the road from Pitanapalli to Sidhapalli Backward Region Grant Funds 2,50,000 road

4 Completion of incomplete CC road from Chari Chaka to Backward Region Grant Funds 1,25,000 Totagam

Gram Panchayat ANKUSHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC Road from Ankushpur Pandara street Backward Region Grant Funds 2,50,000 to No. 10 canal

Gram Panchayat BUGULAPATA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC Road at Balajipalli Harijan Sahi to Backward Region Grant Funds 2,50,000 R.C.Canal via Baga

Gram Panchayat DAKHINAPUR

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 25 of 74 District Plan Report Page 141 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC Road at Lanjia Bada Sahi Backward Region Grant Funds 2,50,000

Gram Panchayat KUKUDAKHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Improvement of Road at Ghosada, Kukudakhandi Backward Region Grant Funds 2,50,000

Gram Panchayat MASIAKHALI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC Road from RD Road Backward Region Grant Funds 1,25,000 Dandasi Sahi

2 Completion of incomplete CC Road Backward Region Grant Funds 1,25,000

Gram Panchayat BRAHMAN NUAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road at Bada Sahi new Sahi of Backward Region Grant Funds 2,00,000 Sabardeipeta

2 Const. of RCC culvert at Jeypor Backward Region Grant Funds 2,00,000

Gram Panchayat GUDIPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road at Panduranga street Gudipadara Backward Region Grant Funds 2,50,000

Gram Panchayat JAYANTIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road Boribada Backward Region Grant Funds 2,00,000

Gram Panchayat KHAMARIGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road at Khambarigam Backward Region Grant Funds 3,00,000

Gram Panchayat PADADIGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road at Ambagam Backward Region Grant Funds 2,00,000

Gram Panchayat BARTANI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of culvert at Kusuminala with guard wall Backward Region Grant Funds 2,00,000 near Siva Mandir

2 Construction of CC Road at Dakhina Sahi Badadanda Backward Region Grant Funds 2,50,000 Sahi at Kuanada

3 Const. of Culvert near Badabandha near Bartini Backward Region Grant Funds 2,50,000

Gram Panchayat JAKAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC Road at Gai Sahi of Jakar Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 26 of 74 District Plan Report Page 142 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

2 Construction of 2 Nos.of culvert over ME School to Canal Backward Region Grant Funds 2,00,000 Road at Jakar

Gram Panchayat KHANDURU

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Saradhapur Bramhana Sahi CC road Backward Region Grant Funds 2,50,000

2 Construction of culvert over Kankorada-J.Dengapadar Backward Region Grant Funds 4,00,000 Road

Gram Panchayat MADHUPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of culvert over Madhupalli-S.Buguda Road Backward Region Grant Funds 2,50,000 with guard wall

2 Construction of CC Road at Jilunda Nua Sahi Backward Region Grant Funds 2,50,000

Gram Panchayat RUMAGADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC Road at Patana Sahi of Rumagada Backward Region Grant Funds 2,50,000

Gram Panchayat ARAKHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC road in New Pandara Sahi Arkhapur Backward Region Grant Funds 2,00,000

Gram Panchayat HANDIGHAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of Bathing Steps in River Rushikulya Backward Region Grant Funds 2,00,000

2 Const. of CC road from RD road to Hata Sasan Backward Region Grant Funds 2,00,000

Gram Panchayat PANDIA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road with drain in Jaugada street Backward Region Grant Funds 2,00,000

2 Const. of CC road from Brahamn street to Nandighat Backward Region Grant Funds 2,00,000

Gram Panchayat SIKULA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road from Dhoba Sahi to Bauri Sahi Backward Region Grant Funds 2,00,000

Gram Panchayat TANKACHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Drain in Jhadabandha Village Backward Region Grant Funds 1,00,000

Gram Panchayat INDRAKLHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road old road to village Backward Region Grant Funds 1,50,000 tank

2 Const. of culvert on drain Backward Region Grant Funds 1,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 27 of 74 District Plan Report Page 143 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat BISWAMATHPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Biswanathpur Backward Region Grant Funds 2,50,000

Gram Panchayat CHIKARADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of culvert on road from Chikrada to patapur Backward Region Grant Funds 2,00,000

Gram Panchayat DURA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incompete CC road at Penthapalli. Backward Region Grant Funds 1,00,000

Gram Panchayat LUHAJHAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC road culvert from Thakurani Mandir Backward Region Grant Funds 3,00,000 Sindhigam

Gram Panchayat ADAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 const. of CC road from PWD road to Thana Backward Region Grant Funds 2,50,000

Gram Panchayat CHANAMARI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CD work from PWD road to Srharampur Backward Region Grant Funds 3,00,000

2 Const. of CD work from D. Khandadeuli to Tundura Backward Region Grant Funds 2,00,000

3 Impv. Of CD work on road from east side of Kalua Backward Region Grant Funds 3,00,000 Mandira.

4 Const. of CC road at Manideipentha and Khandadeuli Backward Region Grant Funds 2,00,000

Gram Panchayat KANAKARADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. Of culvert near Gambhari guda sara Backward Region Grant Funds 3,00,000

2 Const. CC road at Dhoba Sahi Backward Region Grant Funds 2,00,000

3 Const. of CC road at Kankorada Nua Bauri Sahi Backward Region Grant Funds 2,00,000

Gram Panchayat SAHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC road at Chakrapur Backward Region Grant Funds 2,50,000

2 Const. of Bridge and approach road at Kantadadhia Backward Region Grant Funds 2,00,000

Gram Panchayat SDINGIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of CC road at Kansamari Backward Region Grant Funds 2,50,000

2 Construction of one culvert with protection wall on Kharia Backward Region Grant Funds 2,50,000 Padar to Sulia N

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 28 of 74 District Plan Report Page 144 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat BRAHAMANCHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road Backward Region Grant Funds 2,50,000

Gram Panchayat GOVINDAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Balaji sahi Bali sahi CC road, Govindapur Backward Region Grant Funds 2,50,000

2 Const. of culvert on Baliarsinghpur road Backward Region Grant Funds 3,00,000

Gram Panchayat KRUSHNACHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 const. of culvert on Kamanala, Andarasingi Backward Region Grant Funds 3,50,000

2 Const. of CC road B. Berampur village Backward Region Grant Funds 2,00,000

Gram Panchayat KURULA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CC road (Balance work) Backward Region Grant Funds 2,50,000

Gram Panchayat TAKARADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Bhandari sahi CC road Backward Region Grant Funds 2,50,000

Muncipality Brahmapur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Improvement of road and drain at Narayan Nagar 4th Backward Region Grant Funds 7,70,000 lane in Ward No.3

2 Improvement of Dandakali road in Ward no 4 Backward Region Grant Funds 7,55,000

3 Improvement of road from N.H -217 to Keuta Sahi Backward Region Grant Funds 12,64,000 (Beside Taluka Tank) in War

4 Improvement of roads of L.N.street in Ward no 2 Backward Region Grant Funds 7,60,000

5 Improvement of road at Acharya Sahi, Haradakhandi in Backward Region Grant Funds 5,40,000 Ward no.1

6 Improvement of road at Shanti Nagar 4th line in Ward Backward Region Grant Funds 8,58,000 no.1

7 Improvement of road drain at Hill Patana 1st Line in Backward Region Grant Funds 6,80,000 Ward no 25

8 Improvement of Gopabandhu Nagar main road in Ward Backward Region Grant Funds 10,00,000 No 25

9 Improvement of road and drain at Hill Patana Laxmi Backward Region Grant Funds 7,71,000 Nrusingha nagar in Ward

10 Const. of Sidhartha Nagar 2nd line roads in ward no 31 Backward Region Grant Funds 12,40,000

11 Const. of Alekha Nagar road near Tota Sahi in Ward no Backward Region Grant Funds 4,50,000 36

12 Const of Road at Saradhabali in Ward no 36 Backward Region Grant Funds 9,52,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 29 of 74 District Plan Report Page 145 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

13 Const of road from Jagannath Mandira to Reserve police Backward Region Grant Funds 7,58,000 ground in ward no 37

14 Const. of CC road at Niladri Bihar in ward no 17 Backward Region Grant Funds 7,88,000

15 Improvement of road at Gandhi Nagar 9th line Backward Region Grant Funds 8,30,000

16 Const. of Cc road at Ambika Nagar 1st lane in ward no Backward Region Grant Funds 6,50,000 21

17 Improvement of Ananda Nagar 2nd line road in ward Backward Region Grant Funds 4,80,000 no.4

18 Improvemement of road at Gajananpeta in Ward no.7 Backward Region Grant Funds 12,66,000

19 Improvement of road at Pandava nagar in Ward no.8 Backward Region Grant Funds 13,16,000

20 Improvement of road from Herohonda Service center to Backward Region Grant Funds 10,70,000 Dharma Nagar in Ward n

21 Improvement of road at Bishnu Nagar in Ward no 18 Backward Region Grant Funds 13,46,000

22 Improvement of road at Badriraj Nagar I II in Ward no.23 Backward Region Grant Funds 13,56,000

23 Const. of drain at Balaji Nagar in ward no 22 Backward Region Grant Funds 4,40,000

24 Const of Drain at Neelakantha Nagar 5th Lane in ward Backward Region Grant Funds 4,95,000 no.22

25 Const. of Drain at Sastri Nagar 1st line in Ward no 22 Backward Region Grant Funds 4,15,000

26 Const. of drain and culvert at Chanchadiapadia in Backward Region Grant Funds 5,76,000 Biswanath Nagar inWard n

27 Improvement of road at Nigama Nagar 2nd and 3rd line Backward Region Grant Funds 13,42,000 in ward no.35

28 Const. of road at Cooperative colony 1st line and khala Backward Region Grant Funds 14,10,000 sahi in ward no.28

29 Const. of road at Chandra sekhar sahu lane at Goilundi Backward Region Grant Funds 7,50,000 in Ward no.30

30 Const. of road at Krushna Nagar in Ward no 30 Backward Region Grant Funds 4,22,000

31 Const. of road at Shree nagar in Ward no 30 Backward Region Grant Funds 7,36,000

32 Const. of road and drain at Gajapati Nagar 6th lane in Backward Region Grant Funds 4,22,000 ward no 31

33 Const. of road at Baidyanath Nagar in ward no 32 Backward Region Grant Funds 4,35,000

34 Const of road at Gayatri Nagar in Ward no.37 Backward Region Grant Funds 4,38,000

35 Const. of road at Panda Colony 2nd lane in ward no 32 Backward Region Grant Funds 6,00,000

36 Const. of road at Seva shree Colony in Ward no 32 Backward Region Grant Funds 4,20,000

37 Improvement of road and drain at Dhoba Sahi, Backward Region Grant Funds 4,63,000 Chanchadapadia in Ward no 24

38 Improvement of main road at Bapuji Nagar in Ward no 33 Backward Region Grant Funds 17,16,000

39 Improvement of road from Keshaba nagar to Burial Backward Region Grant Funds 13,58,000 ground in ward no 34

40 Const of road at Tualsi nagar 3rd lane in Ward no.16 Backward Region Grant Funds 7,21,000

41 Const of road at Padma Nagar in Ward no 20 Backward Region Grant Funds 8,44,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 30 of 74 District Plan Report Page 146 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

42 Const. of road at Bada Khemundi Sahi in Ward no.19 Backward Region Grant Funds 7,92,000

43 Const. of road from Girls high School chhak to Reddy Backward Region Grant Funds 8,54,000 Garrage chhak via beng

44 Const of road and drain at Ramakrushna nagar 1st line in Backward Region Grant Funds 4,93,000 ward no. 27

45 Const of road and drain from Ashok Nagar 2nd line to Backward Region Grant Funds 5,40,000 Godavarisha nagar 4th

46 Improvement of road at Bijipur Laxmi Nagar in Ward no Backward Region Grant Funds 5,00,000 21

47 Const of drain from Ganesh Temple to Railway Drain Via Backward Region Grant Funds 5,64,000 Ananta nagar in ward

48 Const. of Drain between Aurobindo Nagar 1st line Backward Region Grant Funds 4,10,000 lingaraj nagar in ward n

49 Improvement of Drain wth culverts from Chandra Sekher Backward Region Grant Funds 6,54,000 Temple chhak to the S

50 Construction of CC Road and Culvert at Bimala Nagar Backward Region Grant Funds 2,40,000

Notified Area Council Buguda

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Improvement of Road from Kadapada Village to PMRY Backward Region Grant Funds 4,00,000 road.

2 Improvement of Dharmasala at main road, Buguda Backward Region Grant Funds 6,97,000

Notified Area Council Surada

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of road and drain from Apu house Chhaka to Backward Region Grant Funds 3,00,000 Board School

Notified Area Council

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Improvement of Road from Balaji Mandir to Rathadanda Backward Region Grant Funds 5,00,000 Sahi under Aska NAC

2 Improvement of Road from Jagannath Temple to Pump Backward Region Grant Funds 3,00,000 house under NAC, Aska

3 Improvement of road from Kumbhar Sahi Chhaka to Backward Region Grant Funds 6,00,000 words High School Chhaka un

4 Improvement of Road from Palli Chhaka towards Backward Region Grant Funds 7,00,000 Budhima Thakurani Temple unde

5 Improvement of Road from Medical Chhaka to High Backward Region Grant Funds 12,00,000 School Chhaka under Aska NA

6 Improvement of road from Cinema Hall to-wards Backward Region Grant Funds 9,00,000 Hatapada Chhaka and co

7 Improvement of road from Gayatri Mandir to Tulabhina Backward Region Grant Funds 2,26,000 Chhaka under Aska NAC

Notified Area Council Kavisurjyanagar

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 31 of 74 District Plan Report Page 147 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Road returning wall near Jateswar tank road from Backward Region Grant Funds 4,00,000 Banamali swain house to Br

2 Road returning wall near Ranatank from Grama devi Backward Region Grant Funds 4,00,000 temple to end (Karana sah

3 C.C. road at Gopinath pattna, Karana Sahi, Jena Sahi Backward Region Grant Funds 7,00,000

4 Imrpovement of road retaining wall at swapneswar tank Backward Region Grant Funds 4,00,000 road to via- swapnes

5 Improvement of road retuning wall from Kenta thala Kali Backward Region Grant Funds 4,00,000 temple to Dhoba tha

6 Improvement of road at Mapuni Sahi Mahamayee Bazar Backward Region Grant Funds 2,46,000 culvert to Desi Bhera sa

Notified Area Council

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Development of Drainage system of polasara NAC Backward Region Grant Funds 7,03,000

Notified Area Council Kodala

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of road from - Aska PHD road Backward Region Grant Funds 24,27,000 to/Belapada

Notified Area Council

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CC road at Prasgnt Nagar Backward Region Grant Funds 2,50,000

2 CC road at Sri Nagar Backward Region Grant Funds 2,50,000

3 CC road at Ekamra Nagar Backward Region Grant Funds 3,00,000

4 CC road from Daldamill Agasahi upto Naidia house Backward Region Grant Funds 2,50,000

5 CC road at Ramnagar Backward Region Grant Funds 2,00,000

6 CC road Harijan Colony Backward Region Grant Funds 2,00,000

7 CC road at Gauttom Nagar first line Backward Region Grant Funds 2,60,000

8 CC road from LIC colony to NGO colony Backward Region Grant Funds 2,10,000

9 From DRDA Chhaka to Pattanayak Colony (CC road) Backward Region Grant Funds 2,16,000

10 Const. of Drain and Road in NAC Area Backward Region Grant Funds 2,10,000

Notified Area Council Digapahandi

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of drain at Jagili street Backward Region Grant Funds 1,16,000

2 Construction of Culvert at Nimapalli Village Road Backward Region Grant Funds 96,000

3 Construction of Drain CC road from Bidyaratna Street to Backward Region Grant Funds 1,45,000 New street (Raju

4 Construction of (link) C.C road from House of V. S. Raju Backward Region Grant Funds 90,000 to Raj Nagar stree

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 32 of 74 District Plan Report Page 148 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

5 Improvement of CC road drain with cover at Dhoba Backward Region Grant Funds 95,000 street

6 Construction of CC road from Sanabrahmin street Backward Region Grant Funds 95,000 chhaka to Phulasundari Temp

7 Improvement of CC road and culvert at Neelakantha Backward Region Grant Funds 1,60,000 Nagar (Balance portion)

8 Improvement of CC road at Phulasundari Mandir towards Backward Region Grant Funds 1,40,000 Barika Street

9 Improvement of CC road at Tentulia Street Backward Region Grant Funds 75,000

10 Completion of incomplete drain at Arnnapurna Street Backward Region Grant Funds 25,000

Notified Area Council Hinjilicut

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of road and drain Marika Nagar and Gayatri Backward Region Grant Funds 12,00,000 Nagar Wad-16

2 Imp. Of road drain at Thana tota sahi Word-11 Backward Region Grant Funds 5,50,000

3 Const. of road from Radha Krishna marga to dandasi Backward Region Grant Funds 5,47,000 Sahi Word-1 2

4 Const of dranage system of Mohan Colony Ward-7 Backward Region Grant Funds 12,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 33 of 74 District Plan Report Page 149 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Education

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Addl Class room Of Sidheswara High School at Backward Region Grant Funds 2,00,000 Blisira

2 Const. of Addl Class room Of Jagadalpur High school Backward Region Grant Funds 2,00,000

3 Const. of Anganwadi Centre Backward Region Grant Funds 3,00,000

4 Const. of Anganwadi Centre Backward Region Grant Funds 3,00,000

5 Const. of AWC building at Humiki village Backward Region Grant Funds 3,00,000

6 Const. of AWC building at sandhinuapalli (Saibabagada) Backward Region Grant Funds 3,00,000

7 Compl. Of incomplete Girls High School at Gautami Backward Region Grant Funds 4,00,000

8 Compl. Of incomplete Panchayat High School building at Backward Region Grant Funds 2,00,000 Sahasapur

9 Const. of Addl. Classroom at Sindurapur High School Backward Region Grant Funds 2,00,000 under Pamighat

10 Additional class room MAA Bahuti Bidyapitha at Dimiria Backward Region Grant Funds 2,00,000 GP

11 Const. of AWC 2 building at Kanaka under Kanaka GP Backward Region Grant Funds 3,00,000

12 Const. of Add.Class room of Sri Nilakantheswar Backward Region Grant Funds 2,00,000 Bidyapitha at kairasi

13 Const. of AWC Backward Region Grant Funds 3,00,000

14 Const. of Addl Class room Of Dhabaleswar Bidyapitha, Backward Region Grant Funds 2,00,000 Sankuda, GM under Begu

15 Const. of Addl. Class room Govt. High School Backward Region Grant Funds 2,00,000

16 Const. of Addl Class room building at chidananda Swami Backward Region Grant Funds 4,00,000 Mahavidyalaya, Bomak

17 Const. of Addl. Class room at Bankeswari Bidyapitha Backward Region Grant Funds 2,00,000

18 Const. of Addl. Class room at R.D. Girls High School Backward Region Grant Funds 2,00,000

19 Const of Boundary wall to the primary School, Kanisi Backward Region Grant Funds 6,00,000 Hata

20 Completation of in complete Boripadara Sakambari High Backward Region Grant Funds 2,00,000 School

21 Const. of Addl. Class room of Sundarada High School Backward Region Grant Funds 4,00,000

22 Const. of Addl. Class room of Jaya Harachandi High Backward Region Grant Funds 2,00,000 School

23 Const. of Addl. Class room of Om Sri Guru Abasika Backward Region Grant Funds 4,00,000 Residential School at Bah

24 Const. of Addl Class room of Mukteswar Bidya Pitha Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 34 of 74 District Plan Report Page 150 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

25 Const. of Addl. Class room of regional science college at Backward Region Grant Funds 3,00,000 surula Junction.

26 Completion of incomplete building Saibani High School Backward Region Grant Funds 3,00,000

27 Const. of Addl. Class room of Kabisurya Baladev Vigyan Backward Region Grant Funds 3,00,000 Maha vidyalaya at Ka

28 Const. of Addl Class room of Nua pentho High School Backward Region Grant Funds 2,00,000

29 Const.of Addl. Class room of Balunkeswar High School Backward Region Grant Funds 2,00,000 at Khatia Ramachandrap

30 Const.of Addl. Class room of Pallanga High School at Backward Region Grant Funds 2,00,000 Pallanga

31 Completion of incomplete M.E.School building at Poirasi Backward Region Grant Funds 2,00,000

32 Const.of New Class room at Lawana Sramika High Backward Region Grant Funds 6,00,000 School at Niladripur

33 Addl. Class room of Ch. Nuagam High School Backward Region Grant Funds 3,00,000

34 Addl. Class room of Bhimpur High School Backward Region Grant Funds 3,00,000

35 Completion of class room of R.N High School Backward Region Grant Funds 2,00,000

36 Const. of Addl. Class room at Arakhapur High School Backward Region Grant Funds 2,00,000

37 Const. of Addl. Class room of Bhutasarasingi High Backward Region Grant Funds 2,00,000 School

38 Completion of incomplete Additional class Room of Backward Region Grant Funds 2,00,000 S.S.S.D.High School at Ru

39 Const of Additional class Room of Radha Krushna High Backward Region Grant Funds 3,00,000 School at Kenubadi

40 Const of Addl Class Room of Maa Sinhasani High Backward Region Grant Funds 3,00,000 School at Jagapalli

41 Addl class room of Maa Sihasini High School at Ichapur Backward Region Grant Funds 3,00,000

42 Const of Addl class room at Podingi High School Backward Region Grant Funds 2,10,000

43 Completion of incomplete rest portion of P.P.N.Pur Backward Region Grant Funds 1,00,000 school

44 Completion of incomplete rest of class room of Backward Region Grant Funds 85,000 Badakhandi High School

45 Const of Addl class room of Sapuapalli High School Backward Region Grant Funds 2,50,000

46 Completion of incomplete school building of Nadika Backward Region Grant Funds 1,00,000

47 Completion of incomplete high school building Backward Region Grant Funds 2,00,000

48 Cost of cuvert approach road at S.N.Pur Backward Region Grant Funds 2,00,000

49 Const of High School building at Ghodadei High School Backward Region Grant Funds 1,50,000 Dakibaza

50 Completion of incomplete building of Dharanidhar High Backward Region Grant Funds 2,00,000 School

51 Const. of Addl Class room Budhakendu High School Backward Region Grant Funds 2,00,000

52 Const. of Gopinath Swami Bidya Pitha Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 35 of 74 District Plan Report Page 151 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

53 Const.of Adddl. Class room of Jarada High School Backward Region Grant Funds 2,00,000

54 Const. of Addl. Class at Smarka Bidya Pitha Backward Region Grant Funds 2,00,000

55 Const. of Addl. Class room of Yuga Nirman Hish School, Backward Region Grant Funds 2,00,000 Inginathi

56 Const of Girls High School Building Backward Region Grant Funds 3,50,000

Block Panchayat CHATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete of OBB School building Backward Region Grant Funds 1,50,000

2 Construction of Rikapalli UP school under KGBV Backward Region Grant Funds 2,80,000

Block Panchayat CHIKITI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMPLETION OF INCOMPLETE KGBV BUILDING Backward Region Grant Funds 2,00,000

2 COMPLETION OF INCOMPLETE SCHOOL BUILDING Backward Region Grant Funds 1,00,000 AT BAHINIPATI

Block Panchayat DHARAKOTE

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete Ghodadei high school Backward Region Grant Funds 1,00,000

2 Improvement of Kasturaba High school at Mundamarei Backward Region Grant Funds 1,37,000

Block Panchayat DIGAPAHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF ADDLI CLASS ROOM BUILDING Backward Region Grant Funds 2,00,000

2 comp of incomp college building up under apcmrf at Backward Region Grant Funds 2,50,000 bhismagiri

3 CONST OF GP OFFICE BUILDING AT B TURUBUDI Backward Region Grant Funds 4,38,000

Block Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete Panchayat High school Backward Region Grant Funds 5,00,000 building

2 Completion of incomplete Langaleswar High school Backward Region Grant Funds 5,00,000 building

3 Completion of incomplete Kasruraba gandhi balika Backward Region Grant Funds 3,08,000 bidyalaya building

4 Completion of incomplete OBB school building Backward Region Grant Funds 1,00,000

5 Completion of incomplete OBB school building Backward Region Grant Funds 1,00,000

Block Panchayat KABISURYANAGAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMPL OF INCOMP KASTURA GANDHI BALIKA Backward Region Grant Funds 2,00,000 AWASIKA

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 36 of 74 District Plan Report Page 152 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Block Panchayat KHALLIKOTE

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of BRGF Training centre a Block Backward Region Grant Funds 10,00,000

2 Kasturaba Gandhi UP school Pathara in Pathara GP Backward Region Grant Funds 4,85,000

Block Panchayat KUKUDAKHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF KGBV BUILDING NUPS KUKUDAKHANDI Backward Region Grant Funds 2,75,000

Block Panchayat PATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of Kasturaba Gandhi Valika Vidyalaya at Backward Region Grant Funds 3,00,000 Rankuda

Block Panchayat RANGEILUNDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Addl. class room at Korapalli High school Backward Region Grant Funds 2,00,000

2 Improvement of old School building at Venkataraipur Backward Region Grant Funds 2,00,000

3 Construction of Vivekananda High school building at Backward Region Grant Funds 2,00,000 Golabandha

4 Completion of incomplete high school bilding at Backward Region Grant Funds 1,50,000 Biswanathapur

Block Panchayat SURADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Addl. class room of Sidhara High school Backward Region Grant Funds 2,48,000 Building

2 Construction of Addl. class room building at Barada high Backward Region Grant Funds 2,00,000 school

3 Construction of Addl. class room at UNS Bidyapitha Backward Region Grant Funds 2,50,000

4 Completiom of incomplete KGBV high school Backward Region Grant Funds 4,00,000

Gram Panchayat BABANPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. Of High School, Babanpur Backward Region Grant Funds 2,00,000

Gram Panchayat NIMINA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Nimina Sarvodaya Sikhya Shram (School) Backward Region Grant Funds 2,00,000

Gram Panchayat BHAMASILI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of Addl. Class room School Building At Backward Region Grant Funds 2,00,000 Bhamasyali

Gram Panchayat LUHAJHAR

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 37 of 74 District Plan Report Page 153 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of additional class room high school Backward Region Grant Funds 7,00,000 building at Sindhigam

Muncipality Brahmapur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Improvement of K. C High School building and premishes Backward Region Grant Funds 7,00,000 at Goshaninuagaon, B

Notified Area Council Bellaguntha

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of Incomplete library - cum - study room. Backward Region Grant Funds 6,23,000

Notified Area Council Kavisurjyanagar

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete building of KBV maha Backward Region Grant Funds 1,00,000 vidyalaya

Notified Area Council Digapahandi

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of repair restoration of old Khemundi Backward Region Grant Funds 5,00,000 College building for pro

Notified Area Council Hinjilicut

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of cycle stand/Rest shed NAC hic school Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 38 of 74 District Plan Report Page 154 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Technical training and vocational education

Block Panchayat ASKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete Training cum Reaserch centre Backward Region Grant Funds 5,00,000

Block Panchayat BEGUNIAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Training Production centre Backward Region Grant Funds 20,00,000

Block Panchayat CHATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 BRGF Training centre cum resource centre Backward Region Grant Funds 10,00,000

Block Panchayat JAGANNATHPRASAD

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Complete of incomplete Training cum Research centre Backward Region Grant Funds 5,38,000

Block Panchayat KABISURYANAGAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMPLETION OF INCOMPLETE TRAINING AND Backward Region Grant Funds 1,50,000 RESEARCH CENTER

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 39 of 74 District Plan Report Page 155 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Markets and fairs

Block Panchayat CHATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of Incomplete Commercial Market complex Backward Region Grant Funds 1,54,000

Notified Area Council Bhanjanagar

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constrction of Market complex building at main road Backward Region Grant Funds 42,66,000

Notified Area Council Surada

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of market Complex in the daily Market Backward Region Grant Funds 15,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 40 of 74 District Plan Report Page 156 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Health and sanitation

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of A.N.M center building with compoud wall Backward Region Grant Funds 4,00,000

Block Panchayat BELLAGUNTHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OFANM CENTER AT SASAN Backward Region Grant Funds 4,00,000

2 CONST OF ANM CENTER AT GANGAPUR Backward Region Grant Funds 4,00,000

Block Panchayat JAGANNATHPRASAD

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of ANM Building Backward Region Grant Funds 3,00,000

2 Construction of ANM Building Backward Region Grant Funds 3,00,000

3 Construction of ANM Building Backward Region Grant Funds 3,00,000

Block Panchayat RANGEILUNDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete ANM building at Backward Region Grant Funds 1,00,000 Biswanathapur

Gram Panchayat HARIDAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 ANM building at Mantapada village Backward Region Grant Funds 3,00,000

Gram Panchayat NIMINA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Ninima ANM building Backward Region Grant Funds 3,00,000

Gram Panchayat GADA GOBINDAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete ANM Quarter and CC drain at Backward Region Grant Funds 2,00,000 Gadagobindapur

Gram Panchayat SUNAPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of LI centre at Guathapada Backward Region Grant Funds 3,00,000

Gram Panchayat TAKARADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of ANMcenter Sovachandrapur (Bhusunda) at Backward Region Grant Funds 3,00,000 Taratarini

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 41 of 74 District Plan Report Page 157 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Family welfare

Gram Panchayat BARUDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const ANM Building Backward Region Grant Funds 3,00,000

Gram Panchayat DIHAPADHAL

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of ANM Centre at Dihapadhal Backward Region Grant Funds 3,00,000

Gram Panchayat SANAKODANDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of ANM Centre at Mahaguda Backward Region Grant Funds 3,00,000

Gram Panchayat JAYANTIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of ANM center Jayantipur Backward Region Grant Funds 3,00,000

Gram Panchayat KHAMARIGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of ANM center at Khambarigam Backward Region Grant Funds 3,50,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 42 of 74 District Plan Report Page 158 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Women and child development

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC Backward Region Grant Funds 3,00,000

2 Const. of AWC building Backward Region Grant Funds 3,00,000

3 Const. of AWC Backward Region Grant Funds 3,00,000

4 Const. of AWC Backward Region Grant Funds 3,00,000

5 Const. of Addl Class room of High School Building at Backward Region Grant Funds 2,00,000 Adivasi Vidyapitha

6 Const. of AWC building at N. Dadarakhola Backward Region Grant Funds 3,00,000

7 Const of A.W.C building Center No -8 at Mathura Backward Region Grant Funds 3,00,000

8 Const of A.W.C at Harapriyapur Backward Region Grant Funds 3,00,000

9 Const of A.W.C. building at Dhaugam Backward Region Grant Funds 3,00,000

Block Panchayat ASKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC centre Backward Region Grant Funds 3,00,000

2 Construction of AWC building Backward Region Grant Funds 3,00,000

3 Construction of AWC building Backward Region Grant Funds 3,00,000

4 Construction of AWC building-4 Backward Region Grant Funds 3,00,000

Block Panchayat BELLAGUNTHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF AWC AT KHUMUNDI Backward Region Grant Funds 3,00,000

Block Panchayat BHANJANAGAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

2 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

3 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

4 COMPLETION OF INCOMP AWC Backward Region Grant Funds 1,00,000

5 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

6 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

7 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

8 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

9 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

10 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 43 of 74 District Plan Report Page 159 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

11 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

12 CONST OF AWC BUILDING Backward Region Grant Funds 2,50,000

13 CONST OF TRAINING CUM RESERCH CENTER Backward Region Grant Funds 5,00,000

Block Panchayat BUGUDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Ghodapada Backward Region Grant Funds 3,00,000

2 Construction of AWC building at Arakhapur Backward Region Grant Funds 3,00,000

Block Panchayat CHATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC Building at Katuru Backward Region Grant Funds 3,00,000

2 Construction of AWC Building Backward Region Grant Funds 3,00,000

3 Construction of AWC Centre Backward Region Grant Funds 3,00,000

4 Completion of incomplete of AWC building at Backward Region Grant Funds 50,000 Dibyasinghapur

5 Construction of AWC building Backward Region Grant Funds 3,00,000

Block Panchayat CHIKITI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 PAID TO AWC AT PATISUNAPUR Backward Region Grant Funds 3,00,000

2 CONST OF AWC AT KHARADHARA Backward Region Grant Funds 3,00,000

3 PAID TO AWC AT NIMAKUDIA Backward Region Grant Funds 3,00,000

4 CONST OF AWC AT DALAPALANKA Backward Region Grant Funds 3,00,000

5 CONST OF AWC AT HARIPUR Backward Region Grant Funds 3,00,000

6 COMP OF INCOMP AWC BUILDING AT SUMANDI Backward Region Grant Funds 30,000

7 COMPLETIONOF INCOMPLETE AWC BUILDING Backward Region Grant Funds 30,000 SUMANDI

8 COMPLETION OF INCOMPLETE AWC BUILDING Backward Region Grant Funds 30,000

9 COMPLETION OF INCOMPLETE ANM CENTER AT Backward Region Grant Funds 30,000 KATURU

10 CONST OF AWC BUILDING AT P MAISANA PUR Backward Region Grant Funds 3,00,000

Block Panchayat DHARAKOTE

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incopmplete of AWC building at Saba Backward Region Grant Funds 50,000

2 Completion of incomplete of AWC building Backward Region Grant Funds 50,000

Block Panchayat DIGAPAHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF AWC BUILDING AT KHARAPANKA Backward Region Grant Funds 3,00,000

2 CONST OF AWC BUILDING AT S TIKARAPADA Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 44 of 74 District Plan Report Page 160 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

3 const of awc building at kusapada Backward Region Grant Funds 3,00,000

4 Const of awc building at chanchda palli Backward Region Grant Funds 3,00,000

5 const of awc building at jakar Backward Region Grant Funds 3,00,000

6 CONST OF BUILDING AT CHAITANYAPUR Backward Region Grant Funds 3,00,000

7 COMP OF INCOMPLETE KGBV BUILDING AT P N PUR Backward Region Grant Funds 1,20,000

8 construction of AWC building Backward Region Grant Funds 3,00,000

Block Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete OBB school building Backward Region Grant Funds 2,00,000

2 Completion of incomplete AWC building Backward Region Grant Funds 1,00,000

3 Completion of incomplete OBB school building Backward Region Grant Funds 1,00,000

4 Construction of AWC building at Satrusola odia sahi Backward Region Grant Funds 3,00,000

Block Panchayat HINJILICUT

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF AWC BUILDING AT PODANGI Backward Region Grant Funds 3,00,000

2 CONST OF AWC AT SAHAPUR Backward Region Grant Funds 3,00,000

3 COMP OF INCOMPLETE ANM CENTER Backward Region Grant Funds 50,000

4 CONST OF AWC BUILDING AT SIKULAPALLI Backward Region Grant Funds 3,00,000

5 CONST OF AWC BUILDING AT AT GINA Backward Region Grant Funds 3,00,000

6 COMP OF INCOMPLETE AWC BUILDING AT Backward Region Grant Funds 75,000 BELLAGAM

7 COMPLETION OF INCOMPLETE AWC AT PALASI Backward Region Grant Funds 75,000

8 COMPLETION OF INCOMPLETE OF AWC BUILDING Backward Region Grant Funds 52,000 AT BELLAGAM

9 COMPLETIN OF INCOMPLETE AWC AT KANCHURU Backward Region Grant Funds 50,000

10 CONST OF KGBV AT GOPINATH PUR Backward Region Grant Funds 2,90,000

11 CONST OF AWC BUILDING SIKIRI Backward Region Grant Funds 3,00,000

12 CONST OF BUILDING AT BALARAM PUR Backward Region Grant Funds 3,00,000

13 AWC AT INDIRA NAGAR Backward Region Grant Funds 3,00,000

Block Panchayat JAGANNATHPRASAD

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC Building Backward Region Grant Funds 3,00,000

2 Construction of AWC Building Backward Region Grant Funds 3,00,000

3 Construction of AWC Building Backward Region Grant Funds 3,00,000

4 Construction of AWC Building Backward Region Grant Funds 3,00,000

5 Construction of AWC Building Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 45 of 74 District Plan Report Page 161 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

6 Construction of AWC Building Backward Region Grant Funds 3,00,000

Block Panchayat KABISURYANAGAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMPLETION OF INCOMPLETE C C ROAD KARAN Backward Region Grant Funds 1,35,000 SAHI

2 CONST OF INCOMPLTER AWC BUILDING Backward Region Grant Funds 40,000

3 CONST OF AWC BUILLDING Backward Region Grant Funds 1,00,000

4 COMP OF INCOMLETE AWC Backward Region Grant Funds 1,35,000

5 CONST OF C C ROAD AT SMANATARA SAHI Backward Region Grant Funds 1,35,000

Block Panchayat KHALLIKOTE

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC Building at Manapalli in BN Palli Backward Region Grant Funds 3,00,000 GP

2 Construction of AWC Building at Bikrampur Backward Region Grant Funds 3,00,000

3 Construction of AWC Building at Barasara Backward Region Grant Funds 3,00,000

4 Construction of AWC Building at Kandigoan in Backward Region Grant Funds 3,00,000 Kanheipur GP

5 Construction of AWC Buildind at Ranipada at Kanchana Community Contribution 3,00,000 GP

6 Construction of AWC Building at Phasidi in Keshpur GP Backward Region Grant Funds 3,00,000

7 Construction of AWC Building at N.Gurunthi in SKS Pur Backward Region Grant Funds 3,00,000 GP

8 Completion of incomplete AWC at Khojapalli Backward Region Grant Funds 1,31,000

Block Panchayat KUKUDAKHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC at Chandanpur Backward Region Grant Funds 3,14,000

2 Construction of AWC at MM Pur Backward Region Grant Funds 3,14,000

3 Construction of AWC at Ramapalli Backward Region Grant Funds 3,14,000

4 Construction of AWC at Lathi-v Backward Region Grant Funds 3,14,000

5 Construction of AWC at Gurunti-I Backward Region Grant Funds 3,14,000

6 Construction of AWC at Borigam-II Backward Region Grant Funds 3,14,000

7 Construction of AWC at Mahuda-I Backward Region Grant Funds 3,14,000

8 Construction of AWC at Banthapalli-II Backward Region Grant Funds 3,14,000

9 Construction of AWC at Nalihada-II Backward Region Grant Funds 3,14,000

Block Panchayat PATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC Building at Narayanpur Backward Region Grant Funds 3,00,000

2 Construction of AWC Centre at Samantipalli Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 46 of 74 District Plan Report Page 162 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

3 Construction of AWC Building at Badapur Backward Region Grant Funds 3,00,000

4 Construction of AWC Building at Sumandi Backward Region Grant Funds 3,00,000

5 Construction of AWC Building at Gurusethy sahi Backward Region Grant Funds 3,00,000

6 Construction of AWC Building at Antarasingi Backward Region Grant Funds 3,00,000

Block Panchayat POLOSARA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Bartini Backward Region Grant Funds 3,00,000

2 Construction of AWC building at Beilagam Backward Region Grant Funds 3,00,000

3 Construction of AWC building at Ch.Sasan Backward Region Grant Funds 3,00,000

4 Construction of AWC building at Budheisuni Backward Region Grant Funds 3,00,000

5 Construction of AWC building at Ghodapalana Backward Region Grant Funds 3,00,000

6 Construction of AWC building at Kendubadi Backward Region Grant Funds 3,00,000

7 Construction of AWC building at Rumaguda Backward Region Grant Funds 3,00,000

8 Construction of AWC building at J.Dengapadar Backward Region Grant Funds 3,00,000

9 Construction of AWC building at Kalmba Backward Region Grant Funds 3,00,000

10 Construction of AWC building at Mandara Backward Region Grant Funds 3,00,000

Block Panchayat PURUSHOTTAMPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building Backward Region Grant Funds 3,10,000

2 Construction of AWC building Backward Region Grant Funds 3,10,000

3 Construction of AWC building Backward Region Grant Funds 3,10,000

4 Construction of AWC building Backward Region Grant Funds 3,10,000

5 Construction of AWC building Backward Region Grant Funds 3,10,000

6 Construction of AWC building t Bauribagadai Backward Region Grant Funds 3,10,000

7 Construction of AWC building Backward Region Grant Funds 3,10,000

8 Construction of AWC building at BBS Pur Backward Region Grant Funds 3,10,000

9 Construction of AWC building Backward Region Grant Funds 3,10,000

10 Completion of incomplee of AWC building Backward Region Grant Funds 70,000

11 Completion of incomplee of AWC building Backward Region Grant Funds 70,000

12 Completion of incomplee of AWC building Backward Region Grant Funds 70,000

Block Panchayat RANGEILUNDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete AWC building at Kolathigam Backward Region Grant Funds 1,00,000

2 Completion of incomplete AWC building at Rangipur-I Backward Region Grant Funds 1,00,000

3 Completion of incomplete AWC building at Rangipur-II Backward Region Grant Funds 1,00,000

4 Completion of incomplete AWC building at Ganju Backward Region Grant Funds 1,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 47 of 74 District Plan Report Page 163 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

5 Completion of incomplete AWC building at T.Dasipur Backward Region Grant Funds 1,00,000

6 Completion of incomplete of AWC building Backward Region Grant Funds 1,00,000

7 Construction of AWC Building at Panchama-I Backward Region Grant Funds 3,00,000

8 Construction of AWC building at Phulta-III Backward Region Grant Funds 3,00,000

Block Panchayat SANAKHEMUNDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CONST OF GP OFFICEBUILDING Backward Region Grant Funds 5,00,000

2 CONST OF AWC BUILDING Backward Region Grant Funds 3,00,000

3 COMPLETION OF INCOMPLETE KASTURABA Backward Region Grant Funds 2,83,000 GANDHI BALIKA VIDYALAYA

4 CONST OF AWC BUILDING Backward Region Grant Funds 3,00,000

5 CONST OF AWC BUILDINMG AT D DHARAMAPUR Backward Region Grant Funds 3,00,000

6 CONST OF AWC 1 Backward Region Grant Funds 3,00,000

7 CONST OF AWC Backward Region Grant Funds 3,00,000

8 CONST OF AWC BUILDING KHEMUNDIKHOLLA Backward Region Grant Funds 3,00,000

9 CONST OF AWC BUILDING Backward Region Grant Funds 3,00,000

10 CONST OF AWC BUILDING AT DHBASAHI Backward Region Grant Funds 3,00,000

11 PAID TO AWC BUILDING AT GANGAPUR Backward Region Grant Funds 3,00,000

Block Panchayat SHERAGADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMPLETION OF KGBV BUILDING AT KHAMARA Backward Region Grant Funds 2,80,000

Gram Panchayat BABANPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC centre Babanpur Backward Region Grant Funds 3,00,000

Gram Panchayat HARIDAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 AWC building at Haridapadar village Backward Region Grant Funds 3,00,000

Gram Panchayat KHANDA DEULI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC at Kurnoli Backward Region Grant Funds 3,00,000

2 Const. of AWC K.Naugam Backward Region Grant Funds 3,00,000

3 Const. of AWC Khandadeuli Backward Region Grant Funds 3,00,000

Gram Panchayat MANGALPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Nabaratnapur AWC centre Backward Region Grant Funds 3,00,000

Gram Panchayat BEGUNIAPADA

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 48 of 74 District Plan Report Page 164 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of AWC at Jagati Backward Region Grant Funds 3,00,000

Gram Panchayat BERUHABADI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC at Satanala Backward Region Grant Funds 3,00,000

Gram Panchayat BUIRAGHARI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of AWC Backward Region Grant Funds 3,00,000

Gram Panchayat DIGAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of AWC building Backward Region Grant Funds 3,00,000

2 Constn. of AWC building Backward Region Grant Funds 3,00,000

Gram Panchayat KHANDIANAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC at Deuliapada Backward Region Grant Funds 3,00,000

Gram Panchayat MATHASARASINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of AWC Building Backward Region Grant Funds 3,00,000

2 Constn. of AWC Building Backward Region Grant Funds 3,00,000

3 Constn. of AWC building Backward Region Grant Funds 3,00,000

Gram Panchayat MORDA MEKHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of AWC Backward Region Grant Funds 3,00,000

Gram Panchayat MORDAKHOLA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of AWC at Odanai Backward Region Grant Funds 3,00,000

Gram Panchayat PHASI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn. of AWC Backward Region Grant Funds 3,00,000

Gram Panchayat AMBAPUA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Ambapua AWC biuilding Backward Region Grant Funds 3,00,000

Gram Panchayat BADAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Sirikoi AWC building Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 49 of 74 District Plan Report Page 165 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

2 Const. of Badapada AWC building Backward Region Grant Funds 3,00,000

Gram Panchayat BENIPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Barapalli AWC building Backward Region Grant Funds 3,00,000

Gram Panchayat GOBARA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC building at Dangapadar Backward Region Grant Funds 3,00,000

Gram Panchayat NATANGA`

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Nettanga AWC Building-II Backward Region Grant Funds 3,00,000

Gram Panchayat BARUDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC Buillding Backward Region Grant Funds 2,50,000

2 Const of AWC Buillding Backward Region Grant Funds 2,50,000

Gram Panchayat DIHAPADHAL

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC Centre at Dihapadhal Backward Region Grant Funds 2,50,000

2 Const of AWC Center at Jamapalli Backward Region Grant Funds 2,50,000

Gram Panchayat GOLLAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const AWC Centre at K Saranapur Backward Region Grant Funds 2,50,000

Gram Panchayat KULADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC Building Backward Region Grant Funds 3,00,000

Gram Panchayat LAMBAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC Building Backward Region Grant Funds 3,00,000

2 Const of AWC Buliding Backward Region Grant Funds 3,00,000

Gram Panchayat SANAKODANDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC Building Backward Region Grant Funds 3,00,000

Gram Panchayat BHAMASILI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC Building At Satrusola Backward Region Grant Funds 3,00,000

2 Const .of AWC Building-(II) At Kuanala Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 50 of 74 District Plan Report Page 166 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat PANGIDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const .of AWC Building At Panklabadi Backward Region Grant Funds 2,50,000

2 Const .of AWC Building At Pangidi Backward Region Grant Funds 2,50,000

3 Const .of AWC Building At Tikarapada Backward Region Grant Funds 2,50,000

Gram Panchayat AGASTINUAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC at T. Nuagaon Backward Region Grant Funds 3,00,000

2 Const of AWC at B.N. Nuagaon Backward Region Grant Funds 3,00,000

Gram Panchayat BADA MADHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC at Backward Region Grant Funds 3,00,000

Gram Panchayat BIPULINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AW centre building Tudakapalli Backward Region Grant Funds 3,00,000

2 Const. of AWC building at Karatali No 4 Backward Region Grant Funds 3,00,000

Gram Panchayat NARANDRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Narendrapur Backward Region Grant Funds 3,00,000

2 Construction of AWC building at Jagannathpur Backward Region Grant Funds 3,00,000

Gram Panchayat PODAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC at K B Palli Backward Region Grant Funds 3,00,000

2 Construction of AWC at Humar Backward Region Grant Funds 3,00,000

Gram Panchayat GIRISOLA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Errendra Backward Region Grant Funds 3,00,000

Gram Panchayat JHATIPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. AWC at Govindpur Backward Region Grant Funds 3,00,000

2 Completion of incomplete AWC at Khuntapali Backward Region Grant Funds 30,000

Gram Panchayat KOTHINGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC at K.K pur Backward Region Grant Funds 3,00,000

2 Construction of AWC building at Kotilingi Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 51 of 74 District Plan Report Page 167 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat NUAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Baringinsahi at Nuapada Backward Region Grant Funds 3,00,000

Gram Panchayat RAMPA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Rampa Backward Region Grant Funds 3,00,000

2 Construction of AWC building at Barada Backward Region Grant Funds 3,00,000

3 Costruction of AWC Deulamadali Backward Region Grant Funds 3,00,000

Gram Panchayat DHAUGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constuction of AWC Centre at Pankalbadi with Backward Region Grant Funds 3,75,000 compound wall

2 Construction of Dhaugan AWC Centre with compound Backward Region Grant Funds 3,75,000 wall

Gram Panchayat GOLLA DAMODARPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete CC Road from NH-217 toR D Backward Region Grant Funds 1,50,000 Pally

2 Construction of AWC with compound wall Backward Region Grant Funds 3,50,000

3 Construction of AWC at Kameswar with compound wall Backward Region Grant Funds 3,50,000

Gram Panchayat JAHADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Kanabhaga AWC Center Backward Region Grant Funds 3,00,000

Gram Panchayat GADA GOBINDAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of AWC building at Dhanarashi Backward Region Grant Funds 3,00,000

2 Const.of AWC building at Dabarasingi Backward Region Grant Funds 3,00,000

Gram Panchayat KARAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC building at Dekhali Backward Region Grant Funds 3,00,000

2 Const. of AWC building at Chudangapur Backward Region Grant Funds 3,00,000

Gram Panchayat NIMAKHANDIPENTHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC building at Meghajholi Backward Region Grant Funds 3,00,000

Gram Panchayat SIDHESWAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of AWC building at Sidheswara Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 52 of 74 District Plan Report Page 168 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

2 Const. of AWC building at Dankari Backward Region Grant Funds 3,00,000

Gram Panchayat HUMMA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Anganawadi center at Humma tala sahi Backward Region Grant Funds 3,00,000

Gram Panchayat MALADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC at Mallada Backward Region Grant Funds 3,00,000

Gram Panchayat RAJAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC Kanchara Backward Region Grant Funds 3,00,000

2 Const. of AWC Rajapur Backward Region Grant Funds 3,00,000

Gram Panchayat S.RAMACHANDRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC center at Madhurachuan Backward Region Grant Funds 3,00,000

Gram Panchayat BADAKHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWCbuiding at Gopinathpur Backward Region Grant Funds 3,00,000

Gram Panchayat NAUDIKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Nandika-IV Backward Region Grant Funds 3,00,000

Gram Panchayat PATTIAPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC Building at B.K Pur Backward Region Grant Funds 3,00,000

2 Construction of AWC building Backward Region Grant Funds 3,00,000

Gram Panchayat RELABA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC Building Backward Region Grant Funds 3,00,000

Gram Panchayat ADHAIGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of AWC at Rajanapalli Backward Region Grant Funds 3,00,000

Gram Panchayat BARAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of AWC at Baragam Backward Region Grant Funds 3,00,000

Gram Panchayat BIJAYA DHANURIJAYAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 53 of 74 District Plan Report Page 169 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

1 Const.of ANM centre at B.D.Pur Backward Region Grant Funds 3,50,000

Gram Panchayat BUDURANGA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of ANM centre Backward Region Grant Funds 4,50,000

Gram Panchayat GANDADHAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const.of AWC at Haripur with compound wall Backward Region Grant Funds 3,50,000

Gram Panchayat GANGAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AW centre at Pithapur Backward Region Grant Funds 3,00,000

Gram Panchayat GUDIALI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC centre at Bramhan Street Backward Region Grant Funds 3,00,000

2 Const. of AWC centre at Balyalitasahi Backward Region Grant Funds 3,00,000

Gram Panchayat KHAJAPALLI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of of AW centre at Bahalpali Backward Region Grant Funds 3,00,000

Gram Panchayat SUBALAYA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AW centre at M. Tentulia Backward Region Grant Funds 3,00,000

Gram Panchayat ANKUSHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC Centre at Ankushpur-1 Backward Region Grant Funds 3,50,000

Gram Panchayat BUGULAPATA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC at Hugulapatta with compound wall Backward Region Grant Funds 3,50,000

Gram Panchayat DAKHINAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Baghajhari Backward Region Grant Funds 2,50,000

2 Construction of AWC building at Bhagabanpur Backward Region Grant Funds 2,50,000

Gram Panchayat KUKUDAKHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at old Ramachandrapur Backward Region Grant Funds 3,75,000 with compound wall

2 Construction of AWC building at Behera Bandha Sahi Backward Region Grant Funds 3,75,000 with compound wall

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 54 of 74 District Plan Report Page 170 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat MASIAKHALI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at PKCh Pur with Backward Region Grant Funds 3,75,000 compound wall

2 Construction of AWC at Masiakhalli - II with compound Backward Region Grant Funds 3,75,000 wall

Gram Panchayat BRAHMAN NUAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC at B. Nuagam Backward Region Grant Funds 3,00,000

2 Const. of AWC at C. Sanadhapur Backward Region Grant Funds 3,00,000

Gram Panchayat GUDIPADAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC building at Balarampur Backward Region Grant Funds 3,00,000

Gram Panchayat KHAMARIGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC center at Khandudeuli Community Contribution 3,50,000

Gram Panchayat PADADIGI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC centre at Puruna Telisahi Nuapentho Backward Region Grant Funds 3,00,000

2 Const of AWC centre at Ambagam Backward Region Grant Funds 3,00,000

Gram Panchayat JAKAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Costruction of AWC building with compound wall at Jakar Backward Region Grant Funds 3,00,000

2 Costruction of AWC building wall at Jenapur Backward Region Grant Funds 3,00,000

Gram Panchayat KHANDURU

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Costruction of AWC building with compound wall at Backward Region Grant Funds 3,50,000 Khanduru

Gram Panchayat RUMAGADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Costruction of AWC building with compound wall at Backward Region Grant Funds 3,50,000 Rumagada

Gram Panchayat ARAKHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC center at Arakhapur Backward Region Grant Funds 3,00,000

Gram Panchayat HANDIGHAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 55 of 74 District Plan Report Page 171 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

1 Const. of AWC at Mulakumari Backward Region Grant Funds 3,00,000

2 Const. of AWC building in Handighara Backward Region Grant Funds 3,00,000

Gram Panchayat PANDIA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of AWC building in Pandia Backward Region Grant Funds 3,00,000

2 Const. of AWC building in Pandarakholi Backward Region Grant Funds 3,00,000

Gram Panchayat SIKULA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC building in Sikula Backward Region Grant Funds 3,00,000

2 Const. of AWC at Ladkapalli Backward Region Grant Funds 3,00,000

Gram Panchayat TANKACHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC building Backward Region Grant Funds 3,00,000

2 Const. of AWC building Backward Region Grant Funds 3,00,000

3 Const. of AWC building Backward Region Grant Funds 3,00,000

Gram Panchayat INDRAKLHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building Backward Region Grant Funds 3,00,000

2 Construction of AWC building at Markandi Backward Region Grant Funds 3,00,000

Gram Panchayat BISWAMATHPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC building at Sanabiswanathpur Backward Region Grant Funds 2,50,000

2 Construction of AWC building at Bahadurpentha Backward Region Grant Funds 2,50,000

3 Construction of AWC building at Mahasai Pentha Backward Region Grant Funds 2,50,000

Gram Panchayat CHIKARADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC centre, Chikarada No-1 with Backward Region Grant Funds 4,00,000 compound wall

2 Construction of AWC centre, Chikarada No-2 with Backward Region Grant Funds 4,00,000 compound wall

Gram Panchayat DURA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC at Pathara (Tota Sahi) Backward Region Grant Funds 3,00,000

2 Construction of AWC at Dura Backward Region Grant Funds 3,00,000

3 Construction of AWC at Bahadurpeta Backward Region Grant Funds 3,00,000

Gram Panchayat KALAMPUR

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 56 of 74 District Plan Report Page 172 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of AWC centre, Nuagolabandha Backward Region Grant Funds 3,00,000

2 Const. of AWC centre, Kamalapur Backward Region Grant Funds 3,00,000

Gram Panchayat BRAHAMANCHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC at Gudisara Backward Region Grant Funds 3,00,000

Gram Panchayat KRUSHNACHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC at Kamaladapur Backward Region Grant Funds 3,00,000

Gram Panchayat KURULA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC for centre No-1 Backward Region Grant Funds 3,00,000

Gram Panchayat TAKARADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of AWC, Takarada Backward Region Grant Funds 3,00,000

Muncipality Brahmapur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Copnst of 6 nos of Angawanwadi centers inside Backward Region Grant Funds 30,00,000 Berhampur Municipal Corporati

Notified Area Council Kavisurjyanagar

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const, of Anganawadi centre at Chaityana Sahi in ward Backward Region Grant Funds 3,00,000 No 02

2 Const.of Anganawadi centre at I.B. Road in ward No 17 Backward Region Grant Funds 3,00,000

Notified Area Council Polasara

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of 2 nos. of Angana wadi centre of Polasara Backward Region Grant Funds 6,00,000 NAC

Notified Area Council Gopalpur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of 2nos Anganawadi Centers Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 57 of 74 District Plan Report Page 173 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Social welfare

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion. of incomplete Ayurvedic Medical building Backward Region Grant Funds 2,00,000

2 Const. of Cause way wth incomplete massonary wall of Backward Region Grant Funds 2,00,000 Bandha of Ball

3 Const. of Arya Kanya Gurukula Ashrama Tanarada Backward Region Grant Funds 4,00,000

4 const. High School building and purchase of furniture Backward Region Grant Funds 2,00,000

5 Completation of incomplete ANM ( Previously taken Backward Region Grant Funds 1,00,000 under SGSY )

Gram Panchayat KHANDA DEULI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of incomplete school building Backward Region Grant Funds 1,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 58 of 74 District Plan Report Page 174 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Minor irrigation

Gram Panchayat GOLLAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of LI Centre at Gollpada Backward Region Grant Funds 3,00,000

Gram Panchayat BARAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of Life stock centre ( L.I ) at Baragam Backward Region Grant Funds 2,50,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 59 of 74 District Plan Report Page 175 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Animal husbandry

Block Panchayat BELLAGUNTHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMPLETION OF LI CENTER AT BANKA GP Backward Region Grant Funds 2,06,000

Block Panchayat CHATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete LI centre Backward Region Grant Funds 1,00,000

2 Completion of incomplete LI centre Backward Region Grant Funds 50,000

Block Panchayat HINJILICUT

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMPLETION OF LI CENTER Backward Region Grant Funds 1,00,000

2 COMP OF INCOMP AWC BUILDING AT SARU Backward Region Grant Funds 50,000

Block Panchayat SURADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of LI building Backward Region Grant Funds 3,00,000

2 Construction of LI centre Backward Region Grant Funds 3,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 60 of 74 District Plan Report Page 176 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Urban Planning including town planning

Muncipality Brahmapur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Skid Steel loader with accessories for lifting of Garbage, Backward Region Grant Funds 28,00,000 road side deposi

2 Road sweeping machine for road dust cleaning 1 nos Backward Region Grant Funds 24,00,000

3 Dozer for spreading of solid wastes at dumping treatment Backward Region Grant Funds 56,00,000 sites

4 Improvement of Power lane in Ward No.6 Backward Region Grant Funds 12,80,000

5 Improvement of Munucipality colony from Durga Mandap Backward Region Grant Funds 8,60,000 to B.N UP school in Wa

Notified Area Council Buguda

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Improvement of street light at Kadapada Village Backward Region Grant Funds 2,00,000

2 Improvement of Daily Market Backward Region Grant Funds 10,00,000

3 Improvement of Street light at Badadanda from Baladev Backward Region Grant Funds 4,00,000 Temple to Biranchinar

Notified Area Council Chhatrapur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Guard wall and stone pitihing of line Bandha Backward Region Grant Funds 8,00,000

2 Guard wall and stone pitihing of line Bandha Backward Region Grant Funds 4,00,000

Notified Area Council Ganjam

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of stadium at play ground of Bharati Backward Region Grant Funds 25,79,000 Bidyapeetha, Ganjam

Notified Area Council Chikiti

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of a new Bus-Stand in Chikiti NAC Backward Region Grant Funds 21,00,000

Notified Area Council Digapahandi

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Guard wall Bathing Ghat at Nelia Backward Region Grant Funds 1,30,000 Bandha

2 Drain and culvert at Kumbhara Street near Gundicha Backward Region Grant Funds 95,000 Mandap

Notified Area Council Hinjilicut

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Repair and renovation of Jogi bandha Ankorada Word-21 Backward Region Grant Funds 10,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 61 of 74 District Plan Report Page 177 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 62 of 74 District Plan Report Page 178 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Promotion of cultural

Notified Area Council Bellaguntha

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of children park in front of the recreation - Backward Region Grant Funds 14,91,000 cum-cultural cent

Notified Area Council Surada

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Rcreation cultural Centre in the middle of the Ward No. 8 Backward Region Grant Funds 3,00,000 9

2 COnstruction of kine house Backward Region Grant Funds 5,00,000

3 Construction of stall near Bus-stand Backward Region Grant Funds 1,00,000

Notified Area Council Polasara

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of children park at Oirani Tan Huda, of back Backward Region Grant Funds 12,00,000 side of Fish Ma

2 Construction of Park at Block Tank (Incluiding Backward Region Grant Funds 15,00,000 construction of retaing wall

Notified Area Council Khalikote

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Improvement of Mardaraj Children Park, under Khallikote Backward Region Grant Funds 8,00,000 NAC Phase-1

2 Improvement of Mardaraj Children Park, under Khallikote Backward Region Grant Funds 8,00,000 NAC Phase-2

3 Improvement of Mardaraj Children Park, under Khallikote Backward Region Grant Funds 5,78,000 NAC Phase-3

Notified Area Council Rambha

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction Rope Way from Ghantasila Hill to Panth Backward Region Grant Funds 26,55,000 Nivas Jetty.

Notified Area Council Chhatrapur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Compound wall of Muslim Grave Yard Backward Region Grant Funds 2,50,000

2 Cremation Rest-shed Backward Region Grant Funds 2,60,000

Notified Area Council Gopalpur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion incompleted community work shed, Gopalpur Backward Region Grant Funds 4,00,000

Notified Area Council Chikiti

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 63 of 74 District Plan Report Page 179 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Development and constraction of the Cultural Centre at Backward Region Grant Funds 3,29,000 Karabalua (S.C.villa

Notified Area Council Digapahandi

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Completion of incomplete Kalyan Mandap spill over Backward Region Grant Funds 3,00,000

2 Construction of Sahi Mandap at Chikitia Street Backward Region Grant Funds 1,00,000

3 Construction of Rest Shed at Narasingha Bandha for Backward Region Grant Funds 1,60,000 Funeral function

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 64 of 74 District Plan Report Page 180 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Public amenities including street lighting

Muncipality Brahmapur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Improvement of Street lighting arrangement along main Backward Region Grant Funds 36,70,000 roads, providing stre

Notified Area Council Surada

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Electrification at Kaibarta Nagar in NAC, Surada Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 65 of 74 District Plan Report Page 181 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Regulation of land-use and construction of buildings

Block Panchayat KABISURYANAGAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMP OF INCOMPLETE GP BUILDING Backward Region Grant Funds 1,65,000

2 CONST OF OFFICE BUILDING Backward Region Grant Funds 1,50,000

3 COMP OF INCOMP G P OFFICE Backward Region Grant Funds 1,30,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 66 of 74 District Plan Report Page 182 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Planning for economic and social development

Gram Panchayat SYASAN AMBAGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of playground at B.Ambagam School Backward Region Grant Funds 2,50,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 67 of 74 District Plan Report Page 183 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Roads and bridges

District Panchayat GANJAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of culvert at sri Rama nagar under T. Gobindapur Backward Region Grant Funds 2,00,000 GP

2 Completion of incomplete bridge Kaudia approch road Backward Region Grant Funds 2,00,000 (On Spill over Projects

3 Const. of Anicut and drain over Rajakhama Nala at Backward Region Grant Funds 2,00,000 Hansaralli Under Khalingi

4 Const. of culvert and drain school of Patharapunji under Backward Region Grant Funds 2,00,000 Dengadi GP

5 Const. of culvert on the village road Sandhepa of Backward Region Grant Funds 2,00,000 Gangapur GP

6 Const. of culvert in the road Village S. Gopalpur to Backward Region Grant Funds 2,00,000 Uttama

7 Const. of culvert on NREGS road at Chundangapur Backward Region Grant Funds 2,00,000 under Chundangapur GP

8 Construction of CD work on Kalajhara Nala culvert at Backward Region Grant Funds 1,00,000 Sabulia under Sabulia

9 Const.of 2nos of Culvert on the road from Patrapeta to Backward Region Grant Funds 2,00,000 RD road Talapada

10 Const.of 2nos of Culvert on the road from RD road Backward Region Grant Funds 2,00,000 Talapada to Gobarghai Na

11 Const.of 2nos of Culvert on the road from RD road Backward Region Grant Funds 2,00,000 Talapada to Nuasahi Tala

12 Const. of RCC Culvert on Chanchnai road in Bikhapada Backward Region Grant Funds 1,00,000

13 Const. of culvert on road from Kumaripari Utara Sahi Backward Region Grant Funds 2,00,000

14 Const. of RCC Slab Culvert at Kadamba Nala Backward Region Grant Funds 4,00,000

15 Const. of Surplus at Kantaikoli Nala Backward Region Grant Funds 2,00,000

16 Const. of Culvert across Basudevpur to Bajapali road Backward Region Grant Funds 2,00,000

17 Const. of Culvert across Khajuripali to Basudevpur road Backward Region Grant Funds 2,00,000

18 Const. of Culvert across Dandasi sahi to Tala sahi road Backward Region Grant Funds 2,00,000

19 Const. of Small Bridge across Dhimbiri Nala Backward Region Grant Funds 2,00,000

20 Const. of small Bridge across Kanya Nala at Balipata to Backward Region Grant Funds 4,00,000 Gupteswar temple ro

21 Const. of RD road to Smasan rasta Culvert at Sitalapalli Backward Region Grant Funds 4,00,000

22 Const. of Culvert on road from Redy Tulu to Markandi Backward Region Grant Funds 2,00,000 Bridge

23 Completion of culvert on the new road from Golabandha Backward Region Grant Funds 2,00,000 to Garam peta

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 68 of 74 District Plan Report Page 184 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

24 Const. of culvert from D.Balapanka to Pankalgaon Backward Region Grant Funds 2,00,000

25 Const. of culvert at Jamabania Backward Region Grant Funds 2,00,000

26 Const. of Culvert over Karanjai Nala at Village road Backward Region Grant Funds 2,00,000 Ganja

27 Const. of Culvert from Balasi Village to Parsuram Nagar Backward Region Grant Funds 2,00,000 road

28 Const. of culvert over Ranjamatia to Gudipali Backward Region Grant Funds 2,00,000

29 Const. of Culvert from Banaya Nagar to Khajuridiha Backward Region Grant Funds 2,00,000

30 Const. of culvert at Gundibira village road Backward Region Grant Funds 2,00,000

31 Const. of Culvert at kaithaguda village road Backward Region Grant Funds 2,00,000

32 Const. of Culvert and Drain from Naliguda road to Backward Region Grant Funds 2,00,000 Sindhakumpa Batanala ( Pu

33 Const. of Culvert Kesara Ranikaitha to Nagapur road Backward Region Grant Funds 2,00,000

34 Const. of culverts in Bada Agula road at Gangapur Backward Region Grant Funds 2,00,000

35 Const. of culverts at Ananteswar Temple at Barata Backward Region Grant Funds 2,00,000

36 Const. of culvert Dahimundali to Dhanapunja road Backward Region Grant Funds 2,00,000

37 Const. of culvert with incomplete drain of Podhamahara Backward Region Grant Funds 2,00,000 ghai Near Balidanda

38 Const. of culvert at Khusabadi road Backward Region Grant Funds 2,00,000

39 Const. of Culvert at Bypass road to Dhudhua Backward Region Grant Funds 2,00,000

40 Const. of Culvert on road from Duma kumpa to Rampalli Backward Region Grant Funds 2,00,000 road

41 Const. of Culvert on PWD road to Jampalli Backward Region Grant Funds 2,00,000

42 Const of Culvert at Nuapalli Sriramnagar Road Backward Region Grant Funds 2,00,000

43 Const. of Culvert at Baiball Nuasahi Road Backward Region Grant Funds 2,00,000

44 Const. of Culvert at Badakodanda Rajkundu Road Backward Region Grant Funds 2,00,000

45 Const. of Culvert on PWD road to Tillisingi Backward Region Grant Funds 2,00,000

46 Const. of Culvert on Swapnaswari Temple road Backward Region Grant Funds 2,00,000

47 Const. of Culvert at Kirajhola to Gunduribadi road Backward Region Grant Funds 2,00,000

48 Culvert near Badei Bandha of village - Rajanapalli Backward Region Grant Funds 5,00,000

49 Culvert near Malai nala of village - Rukunigam Backward Region Grant Funds 1,00,000

50 Const. of drain with Culvert Backward Region Grant Funds 2,00,000

51 Const. of Culvert at Sikharapali to Dhamaka road Backward Region Grant Funds 4,00,000

52 Const. of Culvert on the road P.Karadakana to Backward Region Grant Funds 6,00,000 Patharaghai

53 Construction of incomplete Culvert at Nandini Nala ( Backward Region Grant Funds 1,00,000 Previously taken under

54 Const. of Culvert over Kanjiama Chaduli road Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 69 of 74 District Plan Report Page 185 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

55 Const. of Culvert on road from B. Manohara to Backward Region Grant Funds 1,50,000 Sanakusumi

56 Const. of Culvert at Chandabada Sahi Backward Region Grant Funds 1,50,000

57 Const. of Culvert Guard wall at RD road to Swasan at Backward Region Grant Funds 2,00,000 Raijhola

58 Const. of Culvert Guard wall at RD road to Backward Region Grant Funds 2,00,000 Badheibandha at Naidupali

59 Const. of Culvert Guard wall at 10th distributary Backward Region Grant Funds 2,00,000 Irrigation cannel to Ch

60 Construction of Culvert on road from Alaidi to Backward Region Grant Funds 2,00,000 Kandarsingh road

61 Const. of Culvert at Singipur Backward Region Grant Funds 3,00,000

62 Completion of incomplete culvert at Khata road Backward Region Grant Funds 3,00,000 Sidhaswar at Paikajamuna hil

63 Const. of AWC Backward Region Grant Funds 3,00,000

64 Const. of Pipe Culvert across the NREGS road from Backward Region Grant Funds 1,00,000 Gudiali to Bada Aguala Vi

65 Const. of Culvert Over Sanga Ghai Nala near S. Backward Region Grant Funds 2,00,000 Nuagaon village

66 Const. of Culvert near Sidheswar of Sialia village Backward Region Grant Funds 1,00,000

67 Const of culverts on Kesaripada to KR Pur Road Backward Region Grant Funds 3,00,000

68 Completion of incomplete culvert at Chidupudi Nala Backward Region Grant Funds 1,00,000

69 Const. of Culvert with RCC protection wall from Backward Region Grant Funds 2,00,000 Bhadrasahi to Canal

70 Const. of Culvert with RCC protection wall from Medical Backward Region Grant Funds 2,00,000 road to Surya Nagar

71 Const. of RCC Protection wall with culvert from NH 217 Backward Region Grant Funds 2,00,000 to A. Rghunathpur

Block Panchayat ASKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of culvert from Kaibalyapur to Kandhuni Backward Region Grant Funds 3,52,000 devi

2 Construction of culvert from Balarampalli to Ramapalli Backward Region Grant Funds 2,00,000

3 Construction of Culvert from Sameguda to Ambaguda Backward Region Grant Funds 2,00,000 tota road

4 Consruction of culvert from Hanumantapalli to Backward Region Grant Funds 2,00,000 Ramanapalli

5 Construction of culvert from Radhakrishna mandir to Backward Region Grant Funds 3,00,000 Badanadi

Block Panchayat BELLAGUNTHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Culvert at Palaksandha Backward Region Grant Funds 1,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 70 of 74 District Plan Report Page 186 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Block Panchayat DHARAKOTE

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Culverts Hirakhandi to Balinala road Backward Region Grant Funds 2,00,000

2 Construction of culvert of Dharasa road at Saradhapur Backward Region Grant Funds 2,00,000

3 Construction of culverts Bahrpur to village Olamba road Backward Region Grant Funds 2,00,000 to Dhobabandha

4 Construction of culvert at Similiapalli to Athagharia road Backward Region Grant Funds 2,00,000

5 Construction of culverts Khairapalli Khadalasahi to Backward Region Grant Funds 1,00,000 Lundabandha

6 Cunstruction of culvert chaka road at Jagamohan Backward Region Grant Funds 2,00,000

7 Construction of culverts at Gambhariguda to Thakurani Backward Region Grant Funds 2,00,000 Mandir road

8 Construction of culvert at NH 217 to Gaiguhal road Backward Region Grant Funds 2,00,000

Block Panchayat DIGAPAHANDI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 const of culvert at dhobasahi to puruna bandha road of Backward Region Grant Funds 2,00,000 gokarnapur

Block Panchayat KABISURYANAGAR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 COMPLETION OF INCOMPLETE CULVERT AND Backward Region Grant Funds 1,40,000 PROTECTION WALL

Block Panchayat PATRAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Protection wall at Deulibandha at Backward Region Grant Funds 2,34,000 Solabhagapentho

Block Panchayat RANGEILUNDA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of Culvert CC road Backward Region Grant Funds 2,00,000

2 Complete of incomplete culvert CC road at Dura Backward Region Grant Funds 50,000

3 Construction of culvert on Ghadakanala on Road Bauri Backward Region Grant Funds 2,88,000 sahi to Railway Statio

Block Panchayat SURADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of culvert over Ghingisibadi to Nepapedhi Backward Region Grant Funds 2,00,000 road under NREGS roa

2 Construction of culvert over Gunakhala to Khariguda nala Backward Region Grant Funds 2,00,000 under NREGS road

3 Completion of incomplete culvert over badanala at Backward Region Grant Funds 2,00,000 Raibandha to Choulakhia r

4 Construction of culvert over NH-217 to Dhaugam road Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 71 of 74 District Plan Report Page 187 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

5 Construction of culvert from Chakunda PWD road to Backward Region Grant Funds 2,00,000 Kolisahi under NREGS road

6 Construction of culvert over Bisarada angula nala at Backward Region Grant Funds 2,00,000 Sanagochha

7 Construction of culvert over Lambakompa to Rd road Backward Region Grant Funds 2,00,000

8 Construction of culvert over Bhailapalli ti Baghapalli road Backward Region Grant Funds 2,00,000

9 Construction of culvert over S.Pipala panka to Backward Region Grant Funds 2,00,000 Badabodangi road

Gram Panchayat MORDAKHOLA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Constn.of culvert from Kantapada Backward Region Grant Funds 3,00,000

Gram Panchayat ANTARAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const of CC Road from PWD road to Agula Tala road Backward Region Grant Funds 2,00,000 Culvert

2 Const Of CC Road with Culvert from Ekadal Harijansahi Backward Region Grant Funds 2,00,000 to Pokhari Road

Gram Panchayat GOLABANDHA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Bari Sahi Culvert at Solandi Backward Region Grant Funds 1,50,000

2 Const. of Culvert at Bhetara singi Nuasahi Backward Region Grant Funds 1,00,000

Gram Panchayat NAUDIKA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of 2 nos of culverts at Batia nala, Nandika Backward Region Grant Funds 2,50,000

Gram Panchayat ADHAIGAM

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Drain from PWD Road to Village Backward Region Grant Funds 1,20,000

Gram Panchayat MATHURA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 CC road from Bharasa Odiya Sahi to Gam Bandha, Backward Region Grant Funds 2,20,000 culvert at Pradhan Sahi and

Gram Panchayat BUGULAPATA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Construction of RCC Culvert over outlet of Bada Bandha Backward Region Grant Funds 4,00,000 at O.Chandipadar

Gram Panchayat JAYANTIPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 const. of culvert of Chidipudi Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 72 of 74 District Plan Report Page 188 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Gram Panchayat SIKULA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of CD on Karana Nalla Backward Region Grant Funds 2,00,000

Gram Panchayat INDRAKLHAI

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Tulu Bus stand to Berenda Drain Backward Region Grant Funds 1,50,000

Gram Panchayat KALAMPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of Culvert and CC road from Kamalapadar road to Backward Region Grant Funds 2,00,000 GP office

2 Const. of 4 number of culverts (bridge) at Kamalapur Backward Region Grant Funds 2,00,000

Gram Panchayat ADAPADA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 const. of new culvert of and Impv. Of old culvert over Backward Region Grant Funds 5,00,000 Penduralundi to Kank

Gram Panchayat SAHAPUR

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of bridge and approch road at Titikhandi Backward Region Grant Funds 2,00,000 Kanianala

Gram Panchayat KURULA

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Const. of canal way culvert on Budalundi road Backward Region Grant Funds 2,00,000

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 73 of 74 District Plan Report Page 189 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure IV:Work Details District Plan Report:GANJAM

1.Water supply for domestic

Notified Area Council Purusottampur

S.No. Work Name Sources of Funding Outlay Under the Scheme

1 Mini piped water supply system to Kaumari Bauri Sahi, Backward Region Grant Funds 10,50,000 Das Sahi

2 Mini piped water supply system to Amunia Sahi Dhoba Backward Region Grant Funds 10,50,000 Sahi, Block colony, Kam

3 Mini piped water supply system to Kanaka Bada Bauri Backward Region Grant Funds 10,50,000 Sahi

Report generated through PlanPlus on Thu Sep 16 17:06:35 IST 2010 Annexure-IV : Page 74 of 74 District Plan Report Page 190 of 192 District Plan Report(2010-2011), GANJAM District, ORISSA

Annexure V:Process Checklist Process Checklist

S.No. Check List Status Remark

1 Has District Undertaken a baseline survey of the district, Y in accordance with the guidelines issued by the State ?

2 Have meetings been held at the level of gram sabhas, Y gram panchayat, intermediate panchayat, district panchayat to approve their respective plans ?

3 Is a diagnostic study of district’s backwardness Y undertaken ?

4 Is allocations to each Panchayat/ULB of the funds Y available to them under various programmes through a district link book indicated ?

5 Is professional planning support for DPCs and Y Panchayats/ULBs Enlisted ?

6 Is the prioritized plan based on the diagonistic study and Y critical gaps from base line survey ?

7 Is the visioning workshops, in which the district vision is Y developed taking into account identified priorities, held ?

Report generated through PlanPlus on Thu Sep 16 17:06:38 IST 2010 Annexure-V : Page 1 of 1 District Plan Report Page 191 of 192