About Suspension of Some Trains
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Yamanaka Onsen Niigata Fukushima
Tourist map of Yamanaka Onsen Niigata Fukushima and Hokuriku area Nagaoka Joetsumyoko Sta. Itoigawa Echigoyuzawa Sta. Shintakaoka Sta. Iiyama Kurobe Kanazawa Unazukionsen Sta. Nagano Toyama Tateyama/Kurobe Kaga Onsen Sta. Komatsu Annakaharuna Sta. Utsunomiya Kenrokuen Garden Ueda Tojinbo Takasaki Awaraonsen Sta. Shirakawago Sakudaira Sta. Karuizawa Fukui Yamanaka Onsen Omiya The aroma of the Onsen has been healing travelers Nanjo Eiheiji Temple Tokyo since its inauguration 1300 years ago. Tsuruga Maibara Tottori Nagoya Kyoto Shizuoka Kobe Okayama Shinosaka Sta. Access to Yamanaka Onsen Train To JR Line Kaga Onsen Station ◎ Tokyo – Hokuriku Shinkansen (Kagayaki or Hakutaka) – Kanazawa – Hokuriku line express (Shirasagi or underbird) – Kaga Onsen station Approx 2 hours 55 minutes ◎ Tokyo – Tokaido Shinkansen (Hikari) – Maibara – Hokuriku line express (Shirasagi) – Kaga Onsen station Approx 3 hours 50 minutes ◎ Kyoto – Hokuriku line express (underbird) – Kaga Onsen station Approx 1 hour 45 minutes ◎ Osaka – Hokuriku line express (underbird) – Kaga Onsen station Approx 2 hours 20 minutes ◎ Nagoya – Tokaido Shinkansen (Hikari) – Maibara – Hokuriku line express (Shirasagi) – Kaga Onsen station Approx 2 hours 10 minutes ◎ Kanazawa – Hokuriku line express (Shirasagi or underbird) – Kaga Onsen station Approx 25 minutes * Time calculated for the fastest trains available. * Transportation services available from Kaga Onsen Station. * 20 minutes from Kaga Onsen Station by taxi. Hokuriku Shinkansen running between Kanazawa and Tokyo was put into service on March 14th 2015. Hokuriku Shinkansen made it 1 hour and 20 minutes faster to travel from Tokyo to Kanazawa. Airplane To Komatsu airport ◎ From Haneda Approx 1 hour ◎ From Narita Approx 1 hour 20 minutes ◎ From Sapporo Approx 1 hour 45 minutes ◎ From Sendai Approx 1 hour 10 minutes ◎ From Fukuoka Approx 1 hour 30 minutes * Approx 30 minutes by Can Bus from Komatsu airport to Kaga Onsen. -
East Japan Railway Company Shin-Hakodate-Hokuto
ANNUAL REPORT 2017 For the year ended March 31, 2017 Pursuing We have been pursuing initiatives in light of the Group Philosophy since 1987. Annual Report 2017 1 Tokyo 1988 2002 We have been pursuing our Eternal Mission while broadening our Unlimited Potential. 1988* 2002 Operating Revenues Operating Revenues ¥1,565.7 ¥2,543.3 billion billion Operating Revenues Operating Income Operating Income Operating Income ¥307.3 ¥316.3 billion billion Transportation (“Railway” in FY1988) 2017 Other Operations (in FY1988) Retail & Services (“Station Space Utilization” in FY2002–2017) Real Estate & Hotels * Fiscal 1988 figures are nonconsolidated. (“Shopping Centers & Office Buildings” in FY2002–2017) Others (in FY2002–2017) Further, other operations include bus services. April 1987 July 1992 March 1997 November 2001 February 2002 March 2004 Establishment of Launch of the Launch of the Akita Launch of Launch of the Station Start of Suica JR East Yamagata Shinkansen Shinkansen Suica Renaissance program with electronic money Tsubasa service Komachi service the opening of atré Ueno service 2 East Japan Railway Company Shin-Hakodate-Hokuto Shin-Aomori 2017 Hachinohe Operating Revenues ¥2,880.8 billion Akita Morioka Operating Income ¥466.3 billion Shinjo Yamagata Sendai Niigata Fukushima Koriyama Joetsumyoko Shinkansen (JR East) Echigo-Yuzawa Conventional Lines (Kanto Area Network) Conventional Lines (Other Network) Toyama Nagano BRT (Bus Rapid Transit) Lines Kanazawa Utsunomiya Shinkansen (Other JR Companies) Takasaki Mito Shinkansen (Under Construction) (As of June 2017) Karuizawa Omiya Tokyo Narita Airport Hachioji Chiba 2017Yokohama Transportation Retail & Services Real Estate & Hotels Others Railway Business, Bus Services, Retail Sales, Restaurant Operations, Shopping Center Operations, IT & Suica business such as the Cleaning Services, Railcar Advertising & Publicity, etc. -
About Suspension of Some Trains
About suspension of some trains Some trains will be suspended considering the transport of passengers due to the outbreak of the Novel Coronavirus. *Please note that further suspension may be subject to occur. 【Suspended Kyushu Shinkansen】 (May 11 – 31) ○Kumamoto for Kagoshima-Chūō ※Service between Kumamoto and Shin-Osaka is available. Name of train Kumamoto Kagoshima-Chūō Day of suspension SAKURA 545 10:34 11:20 May 11~31 SAKURA 555 15:23 16:10 May 11~31 SAKURA 409 12:18 13:15 May 11~31 ○Kagoshima-Chūō for Kumamoto ※Service between Kumamoto and Shin-Osaka is available. Name of train Kagoshima-Chūō Kumamoto Day of suspension SAKURA 554 11:34 12:20 May 11~31 SAKURA 562 14:35 15:20 May 11~31 SAKURA 568 17:18 18:03 May 11~31 MIZUHO 612 18:04 18:48 May 11~31 【Suspended Hokuriku Shinkansen】 (May 1 – 31) ○Tōkyō for Kanazawa Name of train Tōkyō Kanazawa Day of suspension KAGAYAKI 521 8:12 10:47 May 1~31 KAGAYAKI 523 10:08 12:43 May 2. 9. 16. 23. 30 KAGAYAKI 525 10:48 13:23 May 1~4. 9. 16. 23. 30 KAGAYAKI 527 11:48 14:25 May 2. 3. 5. 6 KAGAYAKI 529 12:48 15:26 May 2~6 KAGAYAKI 531 13:52 16:26 May 1. 3~6. 8. 15. 22. 29. 31 KAGAYAKI 533 14:52 17:26 May 1. 8~10. 15~17. 22~24. 29~31 KAGAYAKI 535 17:04 19:41 May 2~6 KAGAYAKI 539 19:56 22:30 May 1~6. -
West Japan Railway Group Integrated Report 2019 —Report on Our Value for Society—
Continuity Progress Making Our Vision into Reality West Japan Railway Group Integrated Report 2019 —Report on Our Value for Society— West Japan Railway Company Contents 2 On the publication of “JR-West Group Integrated Report 2019” 3 Values held by the JR-West Group Our Starting Point 5 The derailment accident on the Fukuchiyama Line 11 Recovering from heavy rain damage through cooperation and think-and-act initiatives 13 Business activities of JR-West Group 15 The president’s message 17 The value we seek to provide through the non-railway business —Messages from group company Presidents Strategy of 21 Steps toward our vision 21 JR-West Group Medium-Term Management Plan 2022: approach & overview Value Creation 23 Toward long-term sustainable growth for Our Vision 25 Progress on Groupwide strategies—example initiatives 27 Promoting our technology vision 29 Special Three-Way Discussion The challenge of evolving in the railway/transportation field in an era of innovation 33 Fiscal 2019 performance in priority CSR fields and fiscal 2020 plans for priority initiatives 37 Safety 47 Customer satisfaction 51 Coexistence with communities A Foundation 55 Human resources/motivation Supporting 59 Human rights Value Creation 61 Global environment 67 Risk management 71 Corporate governance 73 Special Three-Way Discussion The role of the Board of Directors in achieving sustainable growth and enhancing corporate value 77 Initiatives in each business 81 Consolidated 10-year financial summary Data 83 Financial statements 87 Recognizing and responding to risks and opportunities 88 Data related to human resources and motivation (non-consolidated) Corporate profile (as of March 31, 2019) Scope As a rule, JR-West Group (including some Company name West Japan Railway Company initiatives at the non-consolidated level). -
H. Dutterall. (C.Japonica), Hazelwood & Jessep, 1972, Checklist - Camellia Cultivars from Nursery Catalogues, P.100: Plum Coloured, Double
H. H. Dutterall. (C.japonica), Hazelwood & Jessep, 1972, Checklist - Camellia Cultivars from Nursery Catalogues, p.100: Plum coloured, double. Originated in USA. H. Giogello. de Bisschop Nursery Catalogue, 1937, p.10. Orthographic error for Il Gioiello. H. Roberto. Le Texnier, 1911, Le Camellia, essais sur l’histoire de quelques fleurs d’ornement, p.36. Orthographic error for Robertii. H. Guichard. Torsanlorenzo Catalogue, 1984-1985. Abbreviation for ‘Souvenir de Henri Guichard’, synonym for Hikarugenji. H.A. Downing. (C.japonica), Bailey & Miller, 1900, Cyclopedia of American Horticulture, ed.1, vol.1, p.225 with black and white illustration: Blood red semi-double, 10 cm across. Central stamens, showy yellow filaments tipped with brown anthers. Petals 4 cm x 3.5 cm, notched, curled and twisted. Leaves, long pointed, medium size, lanceolate,10 cm x 4 cm, shallowly, widely serrate on a slow growing, low, bushy, spreading plant. Originated in USA. Synonyms: ‘Helen of Troy’, ‘Lady Mulberry’, ‘Lauren Bacall’, ‘Long’s Chandleri Rubra’. Sport H.A. Downing Variegated. See colour plate, p.101, Gerbing, G.G., 1945, Camellias. H.A. Downing Variegated. (C.japonica), Valley Garden Centre Catalogue, 1946-1947: Rose red, marked white. Large semi-double with 3 rows of very broad petals and long, yellow stamens in the centre. A new, variegated sport of H.A. Downing with the same form and habit as its parent. Mid-season blooming. Synonyms: ‘Mardi Gras’, ‘Helen of Troy Variegated’. See p.163, Hertrich, 1954, Camellias in the Huntington Gardens, vol.I. H.B. Sheather. Nairn & Son Catalogue, 1892. Abbreviation for Harriet Beecher Sheather. H. -
Uredas, URGENT EARTHQUAKE DETECTION and ALARM SYSTEM, NOW and FUTURE
13th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 908 UrEDAS, URGENT EARTHQUAKE DETECTION AND ALARM SYSTEM, NOW AND FUTURE Yutaka NAKAMURA 1 SUMMARY UrEDAS, Urgent Earthquake Detection and Alarm System, can realize the real-time early earthquake detection and alarm system in the world. There is a local government that has realized a tsunami warning system using real-time estimated earthquake parameters as magnitude and location, distributed by UrEDAS. On 26th May 2003, the Miyagiken-Oki Earthquake was occurred. It was so large that the maximum acceleration of about 600 Gal was observed along the Shinkansen line and 23 columns of the rigid frame viaducts (RC) were severely cracked. This earthquake occurred on the business hours of the Shinkansen. As expected, coastline “Compact UrEDAS” along the Shinkansen took out the early P-wave alarm before the destructive earthquake motion and the validity of this system was proved for the first time. INTRODUCTION UrEDAS is the only real time P-wave alarm system over the world on practical use. It is characterized to be able to process digitized waveform step by step without saving. Amount of procedure does not differs either earthquake occurs or not, so failure because of over load will not occur. The 2003 Miyagiken-Oki earthquake (Mj 7.1) occurred on 26th May, Compact UrEDAS worked as expected. It was for the first time that the validity of the early warning system was verified under circumstances of big earthquake such as rigid frame viaducts of Shinkansen were damaged. In this paper, the present condition of P-wave early detection system UrEDAS will be viewed referring to cases at work, also result of test observation where faults exists will be reported. -
About Suspension of Some Temporary Trains(Translation:PDF76KB)
About suspension of some temporary trains Some temporary trains will be suspended considering the transport of passengers due to the outbreak of the Novel Coronavirus. *Please note that further suspension may be subject to occur. 【Suspended Sanyo Shinkansen】 (April 1 – May 6) ○Tōkyō for Hakata Name of train Tōkyō Hakata Day of suspension NOZOMI 135 7:12 12:14 May 6 NOZOMI 137 7:21 12:19 May 3. 4 NOZOMI 139 8:12 13:14 May 3 NOZOMI 145 9:12 14:14 May 3. 6 NOZOMI 149 10:12 15:14 May 3 NOZOMI 151 10:42 15:47 May 2. 4 NOZOMI 155 11:42 16:47 May 3 NOZOMI 159 12:42 17:47 May 2 NOZOMI 163 13:42 18:47 May 2. 6 NOZOMI 169 14:42 19:47 May 4 NOZOMI 173 15:21 20:19 May 2. 3. 5. 6 NOZOMI 181 16:42 21:46 May 6 NOZOMI 183 17:12 22:14 May 1. 6 NOZOMI 185 17:21 22:19 May 4 NOZOMI 189 18:12 23:14 May 1. 5 ○Hakata for Tōkyō Name of train Hakata Tōkyō Day of suspension NOZOMI 136 7:58 13:03 May 3 NOZOMI 138 8:31 13:33 May 1 NOZOMI 140 8:58 14:03 May 2. 3. 5. 6 NOZOMI 144 9:58 15:03 May 2. 3. 5. 6 NOZOMI 150 11:31 16:33 May 2. 5 NOZOMI 152 11:58 17:03 May 4 NOZOMI 156 12:58 18:03 May 3 NOZOMI 160 13:31 18:33 May 4 NOZOMI 170 15:31 20:33 May 2. -
Student Formula Japan Formula SAE® Series C Ompetition Site 至 東名掛川 シャトルバス運行区間 Shuttle Bus to Tomei EXPWY Kakegawa I.C
7 1 0 2 2017 Student Formula Japan Formula SAE® Series C ompetition Site 至 東名掛川 シャトルバス運行区間 Shuttle Bus To Tomei EXPWY Kakegawa I.C. EV充電 指定車両以外 P4 ~ エコパアリーナ ~ P11 ~ エコパアリーナ ~ P4 EV Charge 動的エリア 車両通行止 Parking4 ~ Ecopa Arena ~ Parking11 ~ Ecopa Arena ~Parking4 シ ャト ル バ ス Road Blocked バス停 Except 至 国道1号 Bus Stop Appointment Car To Route1 グ ラ ウ ンド1 トイレ Toilet グ ラ ウ ンド 2 至JR愛野駅 救護所 First Aid P11(Parking11) チーム待機エリア To JR Aino Road Blocked Approved Tearm Station シ ャト ル バ ス Shuttle Bus Waiting Area Road Blocked 芝生 Competition Winner 階段 Stairs 観覧エリア 広場3 Spectator Viewing Area 2016 Student Formula Japan 指定車両以外 遊歩道 車両通行止 Pedestrian Way Road Blocked プラクティストラック Practice Tracks Kyoto Institute of Technology Except Appointment Car 給油 動的イベント Fuel Station Dynamic Events 17 Monozukuri Design Competition Since 2003 関係者以外立入禁止エリア 20 スタッフ関係者駐車場 アクセラレーション Acceleration Off Limits Area Staff Parking ス キ ッド パ ッド Skid-pad Japan オ ート ク ロ ス Autocross エンデュランス Endurance Enlargement Formula 至 東名掛川 Student Official Program To Tomei EXPWY COPA Guide Map Kakegawa I.C. 掛川ゲート Ogasayama Sports Park E Kakegawa Gate 至 国道1号 指定車両以外 グ ラ ウ ンド1 To Route1 車両通行止 SAT グ ラ ウ ンド2 Road Blocked -ECOPA- Except TUE Appointment Car - デザインファイナル、 9 交流会、表彰式 シ ャト ル バ ス バス停 芝生 グ ラ ウ ンド 5 Bus Stop . Design Final, Networking event, 広場3 3 9 Awards Ceremony 指定車両以外 車両通行止 動的イベント Road Blocked Dynamic Events Except Appointment Car エコパ出入口 スタッフ関係者駐車場 ECOPA Entrance Staff Parking 至JR愛野駅 袋井ゲート To JR Aino Station Fukuroi Gate 歩行者 ゲ ート By Car エコパ アリーナ シ ャト ル バ ス バス停 大 阪 名古屋 袋井 I.C. -
Shinkansen Bullet Train
Jōetsu Shinkansen (333.9 km) Train Names: TOKI, TANIGAWA Max-TOKI, Max-TANIGAWA JAPAN RAIL PASS Can also be Used for Shinkansen Jōetsu Shinkansen "Max-TOKI"etc. “bullet train” Travel Akita Shinkansen "KOMACHI" Akita Shinkansen (662.6 km) Train Name: KOMACHI Akita Shin-Aomori Yamagata Shinkansen "TSUBASA" Hokuriku Shinkansen (450.5 km) Yamagata Shinkansen Train Names: KAGAYAKI, HAKUTAKA, (421.4 km) Shinjo¯ Morioka TSURUGI, ASAMA Train Name: TSUBASA Niigata Yamagata Sendai Kanazawa Toyama Nagano Hokuriku Shinkansen "KAGAYAKI"etc. Fukushima Takasaki Omiya¯ Sanyō & Kyūshū Shinkansen "SAKURA" Sanyō Shinkansen (622.3 km) Train Names: NOZOMI*, MIZUHO*, Tōhoku Shinkansen "HAYABUSA "etc. Tōkaidō & Sanyō Shinkansen "HIKARI" HIKARI (incl. HIKARI Rail Star), SAKURA, KODAMA Tōkaidō Shinkansen (552.6 km) (Tōkyō thru Hakata, 1,174.9km) Train Names: NOZOMI*, HIKARI, KODAMA Hakata Kokura Hiroshima Okayama Shin-Osaka¯ Kyōto Nagoya Shin-Yokohama Shinagawa Tokyo¯ ¯ * There are six types of train services, “NOZOMI,” “MIZUHO,” “HIKARI,” “SAKURA,” “KODAMA” and “TSUBAME” trains on the Tōkaidō, Sanyō and Kyūshū Shinkansen, and the stations at which trains stop vary with train types. The JAPAN RAIL PASS is only valid for “HIKARI,” “SAKURA,” “KODAMA” Tōhoku Shinkansen "HAYATE," "YAMABIKO,"etc. and “TSUBAME” trains, and not valid for any seats, reserved or non-reserved, on “NOZOMI” and “MIZUHO” trains. To travel on the Tōkaidō, Sanyō and Kyūshū Shinkansen, the pass holders must take Tōhoku Shinkansen (713.7 km) “HIKARI,” “SAKURA,” “KODAMA” or “TSUBAME” trains, or -
Interaction of Lifecycle Properties in High Speed Rail Systems Operation
Interaction of Lifecycle Properties in High Speed Rail Systems Operation by Tatsuya Doi M.E., Aeronautics and Astronautics, University of Tokyo, 2011 B.E., Aeronautics and Astronautics, University of Tokyo, 2009 Submitted to the Institute for Data, Systems, and Society in partial fulfillment of the requirements for the degree of Master of Science in Engineering Systems at the Massachusetts Institute of Technology June 2016 © 2016 Tatsuya Doi. All rights reserved. The author hereby grants to MIT permission to reproduce and to distribute publicly paper and electronic copies of this thesis document in whole or in part in any medium now known or hereafter created. Signature of Author: ____________________________________________________________________ Institute for Data, Systems, and Society May 6, 2016 Certified by: __________________________________________________________________________ Joseph M. Sussman JR East Professor of Civil and Environmental Engineering and Engineering Systems Thesis Supervisor Certified by: __________________________________________________________________________ Olivier L. de Weck Professor of Aeronautics and Astronautics and Engineering Systems Thesis Supervisor Accepted by: _________________________________________________________________________ John N. Tsitsiklis Clarence J. Lebel Professor of Electrical Engineering IDSS Graduate Officer 1 2 Interaction of Lifecycle Properties In High Speed Rail Systems Operation by Tatsuya Doi Submitted to the Institute for Data, Systems, and Society on May 6, 2016 in Partial Fulfillment of the Requirements for the Degree of Master of Science in Engineering Systems ABSTRACT High-Speed Rail (HSR) has been expanding throughout the world, providing various nations with alternative solutions for the infrastructure design of intercity passenger travel. HSR is a capital-intensive infrastructure, in which multiple subsystems are closely integrated. Also, HSR operation lasts for a long period, and its performance indicators are continuously altered by incremental updates. -
As Traduções De Kokoro, De Natsume Soseki, Para As Línguas Inglesa E Portuguesa
UNIVERSIDADE FEDERAL DE JUIZ DE FORA FACULDADE DE LETRAS AS TRADUÇÕES DE KOKORO, DE NATSUME SOSEKI, PARA AS LÍNGUAS INGLESA E PORTUGUESA Marcionilo Euro Carlos Neto JUIZ DE FORA 2014 1 UNIVERSIDADE FEDERAL DE JUIZ DE FORA FACULDADE DE LETRAS AS TRADUÇÕES DE KOKORO, DE NATSUME SOSEKI, PARA AS LÍNGUAS INGLESA E PORTUGUESA Marcionilo Euro Carlos Neto Monografia submetida ao Departamento de Letras Estrangeiras Modernas da Faculdade de Letras da Universidade Federal de Juiz de Fora como parte dos requisitos para a obtenção do grau de Bacharel em Letras: Ênfase em Tradução – Inglês. Orientadora: Profª. Drª Maria Clara Castellões Oliveira JUIZ DE FORA 2014 2 BANCA EXAMINADORA _____________________________________________________________________ Profª. Drª. Maria Clara Castellões de Oliveira – Orientadora _____________________________________________________________________ Prof. Dr. Rogério de Souza Sérgio Ferreira _____________________________________________________________________ Profª. Drª. Sandra Aparecida Faria de Almeida Data da defesa: ____________________ Nota: _______________________ Faculdade de Letras Universidade Federal de Juiz de Fora Juiz de Fora, Fevereiro de 2014. 3 AGRADECIMENTOS Ao Wataru Miyoshi, Ter o privilégio de tê-lo conhecido foi primordial para que esse trabalho fosse possível, uma vez que, por causa de nosso encontro, despertei o interesse pela língua e cultura japonesa, estudando-a com persistência, conseguindo realizar meu desejo de estudar e morar no Japão. À família Tsuruta, Ser acolhido por vocês foi essencial -
The Bulletin 2017-06
ERA BULLETIN — JUNE, 2017 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 60, No. 6 June, 2017 The Bulletin STATEN ISLAND’S 157-YEAR-OLD RAILROAD Published by the Electric Staten Island’s trains have been providing quate service with only one locomotive, it Railroaders’ Association, regular service for more than a century, but decided to buy another one. When the trains Incorporated, PO Box most people living in the other boroughs are were running less than a year, it was unable 3323, New York, New York 10163-3323. not aware that the railroad exists. to pay for the locomotives and the creditors The Staten Island Rail Road Company was threatened to seize the property. To protect incorporated on October 18, 1851 to con- the assets, the company declared bankrupt- For general inquiries, or struct a railroad from the easterly shore of cy and Cornelius Vanderbilt’s son, William, Bulletin submissions, contact us at bulletin@ Staten Island between Quarantine and Clif- was appointed receiver. erausa.org. ERA’s ton to a point nearly opposite Amboy, New Meanwhile, the company bought the pri- website is Jersey. Construction began in November, vately-owned ferries, which provided unrelia- www.erausa.org. 1855 and was completed in 1860. This 13- ble service between South Ferry (Manhattan) mile route extended from Townsend’s Dock and Staten Island. Also bought and operated Editorial Staff: Editor-in-Chief: at Vanderbilt’s Landing to Tottenville. An in- until 1948 was the Perth Amboy to South Bernard Linder spection trip from Vanderbilt’s Landing to Ferry route, which was rerouted from Perth Tri-State News and Eltingville was held for officials and stock- Amboy to Tottenville.