E-mail: A J - 6020Rum - Innsbruck .

K RISMER

[email protected] Fig. 1:Fig. Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J. ChannelLining (Upward view from viewfrom river) (Upward Stabilised terrain - lower-terrain section Stabilised

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 i n Schleißheimn nearWels() Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) on Bank on ofRiver thethe P roject Reportroject DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN 1 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation J. KRISMER Handelsgesellschaft m.b.H A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819 E-mail: [email protected] | http://www.krismer.com

General project data Slope/ EmbankmentSlope/Stabilisation

Client Oberösterreich () Energy Company AG A-4020 , Oberösterreich (Upper Austria)

Design Horst Felbermayr Bau GmbH Hydraulic Engineering/ Drainage Machstraße 7 A-4600

J. Krismer Handelsgesellschaft m.b.H.

Installation Horst Felbermayr Bau GmbH Machstraße 7

A-4600 Wels Retaining Structures

Assignments Lining of a deeply eroded trench that runs from the ditch of the Weißkirchen country road down to the Traun River, near Schleißheim/Wels

Constructing a stabilised drainage channel fastened to a steep slope, to drain off surface water from the road down to the Traun River

Construction method The existing erosion trench was converted into a drainage channel which was reinforced with the Krismer® System and filled Rockfall/Avalanche Protection with crushed gravel. Then, to guarantee stabilization and drainage, the surface was given the form of a funnel which was also secured with the Krismer® System.

Execution PERIOD Spring - Summer 2000 Special Constructions Project volume Total channel length (measured on slope): ~ 117 m Width of the drainage channel: ~ 0.6 - 1.2 m Total surface Krismer® System (funnel): ~ 700 m² Total width of the funnel: ~ 6 m Gradient of slope and channel: ~ 40° Vertical height (difference of river/road level): ~ 75 m Services

DRAINAGE CHANNEL LINING ON THE BANK OF THE TRAUN RIVER 2 / 18

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. J. KRISMER Handelsgesellschaft m.b.H A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819 E-mail: [email protected] | http://www.krismer.com

Initial Situation Slope/ EmbankmentSlope/Stabilisation

To maintain roadways securely, rainwater must be properly drained away. This is done by building roads with a slight lateral inclination to lead water to roadside ditches where drainage troughs or gutters are installed.

Current legislation makes returning drainage water to the natural water cycle mandatory. Where possible, this usually happens immediately, by allowing water to seep out into the surrounding terrain where it is absorbed into the ground. Hydraulic Engineering/ Drainage

In recent times, global climate changes have caused an increase in severe weather conditions. The frequency and intensity of extreme rain and snowfall have grown steadily in many parts of Europe during the past years. Roadway drainage installations are directly affected by this since they were not originally designed to cope with the quantities of water brought on by new and higher degrees of precipitation; therefore they can no longer control drainage adequately to avoid heavy erosion damage to surrounding terrain. Retaining Structures In the “Traunufer, Wels” project described here, the uncontrolled draining of water from the roadway into a surrounding wooded area caused a deep vertical erosion trench to form. Over time, the trench grew continuously due to the large quantities of the surface water that flowed over it.

The eroded trench that developed along the steep terrain between the road and the Traun River was 117 m in length and had a depth of up to 1,50 m. Half of an adjacent forest maintenance trail was swept away by the water and access to the forest was limited.

In this area, close to the town of Wels, the Traun River is used for energy production and is hence dammed up to supply a hydroelectric power station. Through embankment erosion, the water often became muddy and the washing of fine sediment into the turbines caused Rockfall/Avalanche Protection damage to the power station.

Consequently the main tasks included the repair of the deeply eroded trench, the reconstruction of the forest maintenance trail so that it could be used again, and to convert the trench into a stabilised drainage channel with proper capacity to, in future, remove excess water from the road above, the forest trail and the entire slope surface.

The first solution that was considered was to line the trench with a rock filling made out of coarse river stones with an individual weight of approx. 1.000 up to 2.000 kg per stone. Special Constructions

The coarse rock fill would have started at the bank of the Traun River and run up at least to the level of the forest trail. For the section in between the forest trail and the road above, the installation of a drain pipe was planned, which would have allowed water to flow from the road directly into the coarse rock fill channel.

This option was deemed to be too complicated, due to the logistics involved in transporting such large blocks of stone with very limited access to the work site. The installation of the drainage pipe was also considered to be too complex and expensive. Services

DRAINAGE CHANNEL LINING ON THE BANK OF THE TRAUN RIVER 3 / 18

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. chosen as the most favourable alternative to meet the requirements of this requirementsinstallation.of tomeet the alternative the favourable as chosen most “ the requirements, these meet To - Krismer® the with funnel whole the of stabilising - - - Fig. 2 Fig. - Constructi job this that problems different the solve to solution the presented. as System Krismer® the offered the prompted This area. a recreation as citizens local by used is which landscape, the of value natural high the account into taking the addition, In E-mail: A J - 6020Rum - Innsbruck . Filling the drainage channel with easy to deliver stone material, crushed tocrushed size32 material, easy stonegravel the with mm deliver to drainage channel Filling Applying humus and greening of the areas that are not permanently inundated with water, with inundated permanently not are that areas the of greening and humus Applying river landscape. river natural surrounding the into work construction the of reintegration perfect the guarantee to of case flooding. excess water in 6m) width approx. (opening forming ground funnel soilnails, a terrain tothe with anchored mm(max.) 60 1.0 m m; 1.50 to depth minimum Conversion of the existing erosion trench to a drainage channel, width 0.60 m to 1.20m, to m 0.60 width channel, drainage a to trench erosion existing the of Conversion

tblsn f te dann ufc ih tredmninl sel sre aes (J.K.S.), panels screen steel three-dimensional with surface draining the of Stabilising K RISMER :

[email protected] ok ws dn ih a l-eri xaao n, i part, in and, excavator all-terrain an manually. with done was Work drainagechannel. newof the construction and trench eroded the clean to work Excavation Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft on proposal with the © 2007 J. KRISMER KRISMER © 2007 J. entire project was to be executed with a minimum environmental impact, environmental minimum a with executed be to was project entire

| | http://www.krismer.com ebrar Cntuto opn o sbi seii rpsl that proposal specific a submit to Company Construction Felbermayr Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document Krismer® System Krismer System |

Tel. (0043) 512/ 263800 Tel.512/ (0043)

System ® ® DRAINAGE

for Drainage and Channel Protection” was Protection” Channel and Drainage for System | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN

as additional surface drainage for drainage surface additional as

4 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation J. KRISMER Handelsgesellschaft m.b.H A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819 E-mail: [email protected] | http://www.krismer.com

Drainage Channel and Funnel Construction with the Krismer® System - Slope/ EmbankmentSlope/Stabilisation System Structure

Construction – Drainage Channel (after the slope surface was prepared)

- cover net: wire netting, type Maccaferri, mesh size 50/70 mm, wire size 2 mm, galvanised, fixed with steel clamps type Spenax 11 G 40

- first layer (top layer) Krismer® System: three-dimensional steel screen panels laid diagonally Hydraulic Engineering/ Drainage to the vertical fall line, type J.K.S. A02-80|1,5-FEZ, height = 80 mm, fixed with special T-steel nails (with welded-on hook and point), reinforced with galvanised distribution rods Ø 10 mm, type R10/2500 or R10/3700

- approx. 50 – 60 cm deep stone filling of the trench underneath the first layer of steel screen panels, stone size 32 to 60mm, quantity per running metre approx. 0,50 m³

- second layer Krismer® System: three-dimensional steel screen panels laid vertically to drop Retaining Structures line of the slope, type J.K.S. A02-80|1,5-FEZ, height = 80 mm, fixed with special T-steel nails (with welded-on hook and point), reinforced with galvanised distribution rods Ø 10 mm, type R10/1200

- crushed stone filling, approx. 50 – 60 cm deep - quantity per running metre approx. 0,50 m³

- third layer Krismer® System: same as second layer (vertical)

- geotextile, weight approx. 200g/m²

Construction – Drainage Funnel (Integration of the Channel into the Landscape) Rockfall/Avalanche Protection (after the slope surface was prepared)

- approx. 3 cm humus with seeding to develop a compact layer of turf

- cover net: wire netting, type Maccaferri, mesh size 50/70 mm, wire size 2 mm, galvanised, fixed with steel clamps type Spenax 11 G 40

- top layer Krismer® System: three-dimensional steel screen panels laid diagonally to the

vertical fall line, type J.K.S. A02-80|1,5-FEZ, height = 80 mm, fixed with special T-steel nails Special Constructions (with welded-on hook and point), reinforced with galvanised distribution rods Ø 10 mm, type R10/2500 or R10/3700

- stone filling of the three-dimensional J.K.S. steel screen panels with crushed gravel - stone size 32 to 60 mm, volume approx. 5 to 6 m³ per 100 m²

- geotextile, weight approx. 200g/m² Services

DRAINAGE CHANNEL LINING ON THE BANK OF THE TRAUN RIVER 5 / 18

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. J. KRISMER Handelsgesellschaft m.b.H A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819 E-mail: [email protected] | http://www.krismer.com

Project Execution Slope/ EmbankmentSlope/Stabilisation Hydraulic Engineering/ Drainage Retaining Structures Rockfall/Avalanche Protection

Fig. 3: Drainage Channel – View from Above + trench excavation finished + geotextile placed + lowest layer of three-dimensional steel screen panels positioned (in line vertically

with the channel) at the base of the channel, width approx. 0,60 m, fixed with Special Constructions special T-steel nails + first layer of stone filling

To increase the compound effect of the Krismer® System with the stable ground, additional distribution rods were systematically pushed into the three-dimensional screen panels. The distribution rods were manually cut to the corresponding length for installation in the channel (e.g. trench width = 0.60 m - length of distribution rod = 0.55 m) Services

DRAINAGE CHANNEL LINING ON THE BANK OF THE TRAUN RIVER 6 / 18

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. layer of stone filling ( filling stone of layer second the Installing Fig E-mail: A J To increase the the increase To – line 1.20m the 2.40 width verticalslope, fall of approx. following downthe 1.20 m - length of distribution rod = 1.10 m) distribution= 1.10 rod m of 1.20 length - = width channel The (e.g. channel the panels. of width the fit screen to cut manually three-dimensional were with rods the distribution into pushed systematically were rods distribution - 6020Rum - Innsbruck .

K . 4: Uphill view – partial gravel filling and vertical fall line placement of of screen.verticalfall 4:partial filling placement viewJ.K.S. –graveland line . Uphill RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J. compound effect of the the of effect compound

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 approx. 50 – 60 cm deep), deep), cm 60 – 50 approx. (middle) layer of three-dimensional steel screen panels on top of the first the of top on panels screen steel three-dimensional of layer (middle) Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) Krismer® three-dimensional steel screen panels are are panels screen steel three-dimensional DRAINAGE

System | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN with the stable ground, additional ground, stable the with laid

7 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation width of 1.0 m - 1.5 m. Along the marginal zones the steel screen panels were fastened with 1m.apart. at approx. placed soil nailsof a distance fastened were panels screen steel the zones marginal the Along m. 1.5 - a m to 1.0 terrain of width firm into anchored was construction complete the funnel the of sides the Along attachment. R 10/2500 R rods distribution with reinforced fixed galvanised and with T soil nails T 25/1500 -25/1800. slope) the of line drop the (=almost of channel run the the to diagonally panels J.K.S. the of laying deep, m 0.50 approx. filling stone of layer first the of Installing a Creating Fig E-mail: A J - 6020Rum - Innsbruck . amming of soil nails was done with a manual guided jack hammer with a special percussion special a with hammer jack guided manual a with done was nails soil of amming

K . 5: Funnel seen looking uphill – J.K.S. panels placed diagonally to the fall line of the slope. line the tothe – 5: uphillpanelsplaced looking fall of J.K.S. diagonally . seen Funnel RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft funnel, opening width approx. 6 m width funnel, approx. opening © 2007 J. KRISMER KRISMER © 2007 J.

| (top) layer of three-dimensional steel screen panels on top of the second the of top on panels screen steel three-dimensional of layer (top) | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN

8 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation water in combination with a deeper lying drainage channel for frost-resistant gathering of gathering frost-resistant for channel water. slope drainage lying deeper a with combination in water of use The net entire down and humus surface. was laid the with a cover was topped over terrain c the of sides both On Fig E-mail: A J - 6020Rum - Innsbruck .

K . 6: Drainage funnel seen looking downhill from the forest trail to river forestthe to traildownhillfrom looking6:the seen funnel . Drainage RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft the the © 2007 J. KRISMER KRISMER © 2007 J. Krismer®

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23

ompleted channel the three dimensional screen that covers stable covers that screen dimensional three the channel ompleted System Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document to construct the funnel enables effective drainage of surface of drainage effective enables funnel the construct to |

Tel. (0043) 512/ 263800 Tel.512/ (0043) DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN

9 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation quick plant germination and establishment of the root system, which leads to additionally to leads which system, root protection. erosion strengthened the of establishment and germination plant quick S Fig E-mail: A J eeding was done with quick releasing mineral and biological long-term fertilizers. This ensures This fertilizers. long-term biological and mineral releasing quick with done was eeding - 6020Rum - Innsbruck .

K . 7: View from the forest trail down to the tothe traildown riverthe 7: forest . View from RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J.

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN

10 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation This was done to form a stronger and thicker layer ofastronger layer and vegetation. thicker toform This was done anadditionaldrainagechannel stabilised was given fertilizing. after year One Fig E-mail: A J - 6020Rum - Innsbruck .

K . 8: Bank stabilisation with with 8: stabilisation the . Bank RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J. osrcin wr a opee, te srae o h the of surface the completed, was work construction

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document Krismer® |

Tel. (0043) 512/ 263800 Tel.512/ (0043) System DRAINAGE (2000) | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN Krismer®

System

11 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation J. KRISMER Handelsgesellschaft m.b.H A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819 E-mail: [email protected] | http://www.krismer.com

Results EmbankmentSlope/Stabilisation

The Krismer® System was used to line and stabilise the terrain of a drainage channel on the bank of the Traun River.

The following are the results of this construction project:

• long-lasting protection of the bank surface against all types of erosion Hydraulic Engineering/ Drainage

• the deep reaching compound effect of all the system’s components combined with the durable construction of the three-dimensional steel screen panels optimally resist hydraulic drag forces

• the surface stabilisation is water permeable and prevents an excessive build up of flow pressure

• the stone filling of the drainage channel significantly reduces the rate of water flow Retaining Structures

• apart from the installed system nails no other foundations or anchoring were necessary

• the flexible construction allows for later settling or consolidation of the subsoil

• all system components, including the filling material, may be transported easily to the jobsite despite difficult access

• the stabilised top soil layer forms the basis for long-lasting plant growth

• Using the Krismer® System enabled us to optimally stabilise the channel on a steep slope (inclination 40°). Using this ecologically favourable system that allows planting of new

vegetation, valuable natural landscape could be saved and an erosion devastated Rockfall/Avalanche Protection surface could be re-cultivated again. Special Constructions Services

DRAINAGE CHANNEL LINING ON THE BANK OF THE TRAUN RIVER 12 / 18

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. J. KRISMER Handelsgesellschaft m.b.H A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819 E-mail: [email protected] | http://www.krismer.com

Appendix: Additional Photos EmbankmentSlope/Stabilisation Hydraulic Engineering/ Drainage Retaining Structures Rockfall/Avalanche Protection Special Constructions Services

DRAINAGE CHANNEL LINING ON THE BANK OF THE TRAUN RIVER 13 / 18

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. E-mail: A J - 6020Rum - Innsbruck .

K RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J.

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN 14 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation E-mail: A J - 6020Rum - Innsbruck .

K RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J.

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN 15 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation E-mail: A J - 6020Rum - Innsbruck .

K RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J.

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN 16 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation E-mail: A J - 6020Rum - Innsbruck .

K RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J.

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN 17 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation Constructions Special

E-mail: A J - 6020Rum - Innsbruck .

K RISMER

[email protected] Handelsgesellschaft m.b.H m.b.H Handelsgesellschaft © 2007 J. KRISMER KRISMER © 2007 J.

| | http://www.krismer.com Bundesstrasse 23 Bundesstrasse 23 Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved. by law. m.b.H. copyright This is AllHandelsgesellschaft protected rights • document |

Tel. (0043) 512/ 263800 Tel.512/ (0043) DRAINAGE | Fax. 263819Fax. CHANNEL LINING ON CHANNEL LINING THE THE RIVER BANK OF TRAUN 18 / / 18

Services Special Constructions Rockfall/ Avalanche Protection Retaining Structures Hydraulic Engineering/ Drainage Slope/ Embankment Stabilisation