Construction Update August 2020
Total Page:16
File Type:pdf, Size:1020Kb
TH E PHIL IPPINE’ S FIR S T RESID ENTIA L EDEN Construction Update August 2020 Artist’s illustration only. The Residences at Azure North Site Updates as of August 2020 Monaco and Bali unit completions to commence Q1 2021 Following more than 3 months of no construction works due to pandemic-triggered lockdowns, the unit completions for Monaco and Bali Towers at the Residences at Azure North will commence in the first quarter of 2021. Unit turnover will also start in the first quarter of next year. Architectural works for Monaco and Bali, the first and second towers, respectively, are in progress from the ground to the 29th floor, including masonry, drywall partitioning and ceiling works, tiling and water proofing, painting, and windows and doors works. Mechanical, Electrical, Plumbing, Fire Protection & Sanitary (MEPFS) works are ongoing as are the installation of service and passenger elevatorsfor Monacotower. Land development and STP works are in full swing and will be completed in the fourth quarter of 2020 and first quarter of 2021, respectively. The construction and installation of the back of house area, electric lamp posts, entrance feature, and several Azure North amenities, including the clubhouse and wave pool, will begin in the fourthquarter of 2020 and will be delivered in phases starting the third quarter of 2021. The Residences at Azure North is part of a 7.8-hectare mixed-use development of Century Limitless Corporation, a subsidiary of Century Properties Group. It is located in North Luzon Expressway (NLEX) near Gapan-Olongapo Road, Brgy. San Jose, City of San Fernando, Pampanga. The two towers as viewed from a different angle Monaco and Bali towers as of end of August 2020 Hallway works Photos as of September 1-2, 2020 Hallway works Photos as of September 1-2, 2020 Photos as of September 1-2, 2020 Installation of doors Photos as of September 1-2, 2020 Painting and tiling works are ongoing Monaco tower as seen from NLEX Photos as of August 25, 2020 Monaco tower’s ground to third floors are for final painting works. The ground perimeter sidewalk and drop offs are for final finishing. Photos as of August 25, 2020 A hallway and elevator lobby of the Monaco tower Photos as of August 25, 2020 Bali tower exterior painting works Photos as of August 25, 2020 (Right) Second-third floor parking podium for final painting works; (left) Hallway ceilings of lower residential floors are complete and for final painting works TH E PHIL IPPINE’ S FIR S T RESID ENTIA L EDEN Construction Update August 2020 Artist’s illustration only..