Ceylon Electricity Board

Total Page:16

File Type:pdf, Size:1020Kb

Ceylon Electricity Board INVITATION TO BID CEYLON ELECTRICITY BOARD 1 2 3 4 5 6 7 8 9 10 11 12 Type of Region / Place of Purchase of Price of the Bids will be opened Price of the Information Bid closing Procurement Value of Bid Bond Bids should be Bid Division / Bid No. / Item Description & Quantity Bidding Documents Bid at information Copy date & Time Committee (Rs) deposited at ICB/ Province TP. Nos. Document copy Download NCB (Rs) (Rs) Link Materials Transmission Extension of bid closing date for the advertisement published Extended Date Transmission Chief Engineer (Material 2,500/= 112,000.00 Bid Box available in the Office of the DGM N/A ICB Please refer (AM&CM) on February 20, 2020 in reference to the same Bid No. & Time : Divisional Management), office of the DGM (Asset (Asset Management- previous Procurement Transmission Asset management-Tr.), Tr.), CEB, Kent Road, advertiseme TR(AM&CM)/ICB/2019/53/D Supply and Delivery of 40 Nos. of 10.00 hr on Committee Management & Transmission Asset Colombo 09, Sri Lanka nt published 33kV Surge Arresters with Surge Counters. 24/06/2020 Condition Monitoring Management Branch, on February Branch, C.E.B., Kent CEB, Kent Road, Colombo 20, 2020 Road, Colombo 09., Sri 09, Sri Lanka Lanka Tel: 011-2669738, 011-2669823, Fax: 011-2669738 Transmission Extension of bid closing date for the advertisement published Extended Date Ministry Same as above 20,000/= 1,500,000.00 Bid Box available in the Office of the DGM N/A ICB* Please refer (AM&CM) on February 20, 2020 in reference to the same Bid No. & Time: Procurement office of the DGM (Cor. & (Cor. & R.R.) Branch, previous Committee R.R.) Branch, CEB, 6th CEB, 6th Floor, Sir advertiseme TR/AM&CM/ICB/2018/55/M 10.00 hr on Floor, Sir Chittampalam A. Chittampalam A. nt published Supply and Delivery of nineteen(19) 72.5 kV circuit breakers for 01/07/2020 Gardiner Mw, Colombo 02, Gardiner Mw, on February the Capacitor banks at Kotugoda and Matugama GSS and for Sri Lanka Colombo 02, Sri Lanka 20, 2020 the feeder bays at Nuwara Eliya GS DD 01 DD1/P&D/ICB/2019/026/D 2020-07-08 Divisional Planning & Development 3,500.00 500,000.00 Planning & Development Conference Room, 1,000.00 ICB Click Here (P&D) Supply & Delivery of Wire - Stay G.S. (7/3.25mm (Grade 700) - 10.00hrs Procurement Branch (DD1), Fourth Branch (DD1), Planning & 175 MT and 7/4.00mm (Grade 700) - 100 MT) Committee Floor, CEB Head Fourth Floor, Development Branch – Quarters, No.50, Sir CEB Head Quarters, (DD1) , Fourth Floor, , Chittampalam A. No.50, Sir Chittampalam CEB Head Quarters, Gardiner Mw, A. Gardiner Mw, No.50, Sir Colombo 02. Colombo 02. Chittampalam A. T.P No. 011-2430473 Gardiner Mw, Colombo 02. DD 01 DGM(CC)/EE(MM)/PPC/2019/226 17th Provincial Office of 1,000.00 39,500.00 Tender Box at the Office of Conference Room, - NCB Click Here (Colombo City) June Procurement Deputy General (By Cash) (By Cash/ Deputy General Manager Deputy General Supply & Delivery of 2020 Committee Manager (Colombo City), Bank draft / Bank (Colombo City), Manager (Colombo i) LV Protective Gloves – 160 Nos. 10.00 hrs 4th Floor, Lakshmans guarantee) 4th Floor, City)’s Office ii) MV Protective Gloves 11kV -10 Nos. Building, 340, R.A. De Lakshmans Building, iii) Protective Gloves Against Mechanical Risks – 175 Nos. Mel Mw, Colombo 03 340, R.A. De Mel Mw, iv) Safety Belts for Work Pisitionting -75 Nos. until 16.06.2020 Colombo 03 v) Full Body Harnesses – 08 Nos. 011-2575923, vi) Gum Boots -200 Nos. 011-2575930 vii) Safety Helmets (With Visor) –Yellow -15 Nos. viii) Safety Helmets (Without Visor) –Yellow – 250 Nos. White – 30 Nos. Green – 15 Nos. Orange – 25 Nos. 1 DD 01 DGM(CC)/EE(MM)/PPC/2020/012 17th Provincial Same as above 1,000.00 25,000.00 Same as above Same as above - NCB Click Here (Colombo City) June Procurement (By Cash) (By Cash/ Supply & Delivery of 2020 Committee Bank draft / Bank 10.00 hrs guarantee) i) 12V, 90Ah, Lead Acid Batteries – 50Nos. ii) DC Power Supply Units 24V, 15A - 20 Nos. DD 01 DGM(CC)/EE(MM)/PPC/2020/038 17th Provincial Same as above 1,000.00 48,600.00 Same as above Same as above - NCB Click here (Colombo City) June Procurement (By Cash) (By Cash/ Supply & Delivery of 2020 Committee Bank draft / Bank 10.00 hrs guarantee) i) PVC Pipe 4’’ PNT 7 (6m Length) – 100 Nos. ii) PVC Pipe 6’’ PNT 7 (6m Length) – 500 Nos. DD 01 DGM(CC)/EE(MM)/PPC/2020/051 17th Provincial Same as above 1,000.00 40,400.00 Same as above Same as above - NCB Click Here (Colombo City) June Procurement (By Cash) (By Cash/ Supply & Delivery of 2020 Committee Bank draft / Bank 10.00 hrs guarantee) Cable Cu. PVC Insulated,PVC Sheathed – Single (37/2.25) 150Sqmm -1,250 Mtrs. DD 01 DGM(CC)/EE(MM)/PPC/2020/052 17th Provincial Same as above 1,000.00 43,250.00 Same as above Same as above - NCB Click Here (Colombo City) June Procurement (By Cash) (By Cash/ Supply & Delivery of 2020 Committee Bank draft / Bank 10.00 hrs guarantee) i) End Termination Kit H.S. Indoor 11kV/95Sqmm/3C/ XLPE/ SWA UG Cable (Without Sockets) - 300 Nos. ii) End Termination Kit H.S. Indoor 11kV/ 95Sqmm/ 3C/ PILC/ SWA UG Cable (Without Sockets)- 20 Nos. iii) Straight Through Joint H.S. for 33kV/ 400Sqmm/ 1C/ XLPE/Lead Sheat/ SWA (Without Ferrules) -20 Nos. DD 01 DGM(CC)/EE(MM)/PPC/2020/053 17th Provincial Same as above 1,000.00 18,600.00 Same as above Same as above - NCB Click here (Colombo City) June Procurement (By Cash) (By Cash/ Supply & Delivery of 2020 Committee Bank draft / Bank 10.00 hrs guarantee) i) End Termination Kit H.S. Indoor LV/35Sqmm/4C/PILC/SWA UG Cable (Without Sockets) -120 Nos. ii) End Termination Kit H.S. Indoor LV/95Sqmm/4C/PILC/SWA UG Cable (Without Sockets) - 60 Nos. iii) Jointing Kit Straight Through H.S. LV/16Sqmm/2C/XLPE/ SWA Cable (Without Ferrules)- 275 Nos. iv) End Termination Kit H.S. Indoor LV 16Sqmm/2C/PILC/SWA UG Cable (Without Sockets) – 350 Nos. DD 01 DGM(CC)/CE(C&CS)/PPC/2020/047 17th Provincial Same as above 1,000.00 10,000.00 Same as above Same as above - NCB Click Here (Colombo City) June Procurement (By Cash) (By Cash/ Supply & Delivery of 125 Pairs of Gum Boots to Colombo City 2020 Committee Bank draft / Bank 10.00 hrs guarantee) 2 DD 01 DGM(CC)/CE(C&CS)/PPC/2020/049 17th Provincial Same as above 1,000.00 3,000.00 Same as above Same as above - NCB Click Here (Colombo City) June Procurement (By Cash) (By Cash/ Supply & Delivery of 73 Pairs of Safety Shoes for Chief 2020 Committee Bank draft / Bank Engineer(P&D) Unit of Colombo City 10.00 hrs guarantee) DD 01 DGM(CC)/CE(C&CS)/PPC/2020/056 17th Provincial Same as above 1,000.00 5,000.00 Same as above Same as above - NCB Click Here (Colombo City) June Procurement (By Cash) (By Cash/ Tailoring & Delivery of Staff Uniforms for Chief Engineer(P&D) 2020 Committee Bank draft / Bank Unit of Colombo City 10.00 hrs guarantee) DD 01 DGM/NWP/CEECM/T/2020/55 17th June Provincial Chief Engineer 1,000.00 20,000.00 Deputy General Manager’s Deputy General NCB Click Here (NWP) 2020 Procurement (Commercial) Branch Office Manager’s Office Supply & Installation of 14.00 hrs Committee. CEB CEB CEB Air Conditioners for Electrical Engineer (Narammala) Office. Narammala Road, Narammala Road, Narammala Road, Split Type Non Inverter Ceiling Mounted 60,000 BTU - 03 Nos Kuliyapitiya. Kuliyapitiya Kuliyapitiya Split Type Non Inverter Wall Mounted 24,000 BTU - 02 Nos Split Type Non Inverter Wall Mounted 9,000 BTU - 01 Nos 037 - 2281892 Split Type Non Inverter Ceiling Mounted 36,000 BTU - 01 Nos * (This refers to the above tender which was scheduled to be closed on 18.03.2020. The closing date is rescheduled on 17.06.2020 Due to Covied-19.) DD 02 CP/CE(COM)/PPC/2019/415 2020-06-17 Provincial Chief Engineer 1000/= Chief Engineer Chief Engineer N/A NCB Click Here (Central) At Procurement (Commercial) , CEB, No. 56,000/= (Commercial) , CEB,No. (Commercial), Supply & Delivery of Tyres (with Sizes) for Crew Cabs in 14.00hrs Committee 04, Asgiriya Road, 04, CEB,No. 04, Central Province. Kandy. Asgiriya Road, Asgiriya Road, Tyre Size : 700 x 15 x 10 - 300 Nos. T.P 081-2234324 Kandy. Kandy. 081-4472724 DD 02 CP/CE(COM)/PPC/2020/033 2020-06-17 Provincial Same as above 3500/= 412,500/= Same as above Same as above N/A NCB Click Here (Central) At Procurement Supply & Delivery of Multiple Aerial Connection Boxes for 14.00hrs Committee Central Province – 1000 Nos. DD 03 DD3/P&D/ICB/2019/092/D 08 Jul 2020 Divisional Office of the DGM (P&D 12,500.00 800,000.00 Office of the DGM (P&D – Auditorium, 3rd Floor, - ICB Click Here (P &D ) 10.00 AM Procurement – DD3) ,CEB DD 3 Head DD3) ,CEB DD 3 Head CEB,DD3 Head Office, Bid for Supply & Delivery of, Committee. Office, 3rd Floor, No. Office, 3rd Floor, No. 644, No.644, Sri 644, Sri Sri Jayawardanapura Mw , Jayawardenepura Aerial Bundled Conductor Alu. (ABC) 230/400V 1 x 50 Jayawardanapura Mw , Ethul kotte. Road, Ethul kotte.
Recommended publications
  • CHAPTER 4 Perspective of the Colombo Metropolitan Area 4.1 Identification of the Colombo Metropolitan Area
    Urban Transport System Development Project for Colombo Metropolitan Region and Suburbs CoMTrans UrbanTransport Master Plan Final Report CHAPTER 4 Perspective of the Colombo Metropolitan Area 4.1 Identification of the Colombo Metropolitan Area 4.1.1 Definition The Western Province is the most developed province in Sri Lanka and is where the administrative functions and economic activities are concentrated. At the same time, forestry and agricultural lands still remain, mainly in the eastern and south-eastern parts of the province. And also, there are some local urban centres which are less dependent on Colombo. These areas have less relation with the centre of Colombo. The Colombo Metropolitan Area is defined in order to analyse and assess future transport demands and formulate a master plan. For this purpose, Colombo Metropolitan Area is defined by: A) areas that are already urbanised and those to be urbanised by 2035, and B) areas that are dependent on Colombo. In an urbanised area, urban activities, which are mainly commercial and business activities, are active and it is assumed that demand for transport is high. People living in areas dependent on Colombo area assumed to travel to Colombo by some transport measures. 4.1.2 Factors to Consider for Future Urban Structures In order to identify the CMA, the following factors are considered. These factors will also define the urban structure, which is described in Section 4.3. An effective transport network will be proposed based on the urban structure as well as the traffic demand. At the same time, the new transport network proposed will affect the urban structure and lead to urban development.
    [Show full text]
  • Pre-Feasibility Study Inland Water Based Transport Project (Phase I) Western Province Sri Lanka
    GOVERNMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Ministry of Megapolis and Western Development Sri Lanka Land Reclamation and Development Corporation in collaboration with Western Region Megapolis Planning Project Draft Report Pre-Feasibility Study Inland Water Based Transport Project (Phase I) Western Province Sri Lanka April 2017 1 PRE-FEASIBILITY STUDY TEAM Name Designation Institute Dr. N.S. Wijayarathna Team Leader, Sri Lanka Land Reclamation and Deputy General Development Corporation Manager (Wetland Management) Dr. Dimantha De Silva Deputy Team Leader, Western Region Megapolis Planning Transport Specialist, Project Senior Lecturer Transportation Engineering Division, Department of Civil Engineering, University of Moratuwa Mr. R.M. Amarasekara Project Director, Ministry of Megapolis and Western Transport Development Development Project Dr. W.K. Wimalsiri Infrastructure Department of Mechanical Specialist Engineering Head of the University of Moratuwa Department Dr. H.K.G. Punchihewa Safely Specialist, Department of Mechanical Senior Lecturer Engineering University of Moratuwa Sri Lanka Mr. Nayana Mawilmada Head of Investments Western Region Megapolis Planning Project Mr. Thushara Procurement Western Region Megapolis Planning Sumanasekara Specialist Project Ms. Disna Amarasinghe Legal Consultant Sri Lanka Land Reclamation and Development Corporation Mrs. Ramani Ellepola Environmental Western Region Megapolis Planning Specialist Project Mr. Indrajith Financial Analyst Western Region Megapolis Planning Wickramasinghe Project
    [Show full text]
  • Sri Lanka's Middle Path to Sustainable Development 'Mahinda Chintana
    Sri Lanka’s Middle Path to Sustainable Development through ‘Mahinda Chintana - Vision for the Future’ Country Report of Sri Lanka United Nations Conference on Sustainable Development / (Rio +20) 20-22 June 2012, Rio de Janeiro, Brazil SUSTAINABLE DEVELOPMENT DIVISION MINISTRY OF ENVIRONMENT - SRI LANKA June 2012 I Sri Lanka’s Middle Path to Sustainable Development through ‘Mahinda Chintana – Vision for the Future’ Country Report of Sri Lanka United Nations Conference on Sustainable Development / (Rio +20) 20-22 June 2012, Rio de Janeiro, Brazil 2012 edition Copyright : Ministry of Environment, 82, “Sampathpaya”, Rajamalwatta Road, Battaramulla, Sri Lanka ISBN :978-955-567-000-5 Prepared by : EML Consultants (Pvt) Ltd. No 68, Davidson Rd, Colombo 4, Sri Lanka Printed by : Vistart Advertising (Pvt) Ltd Published by : Ministry of Environment, 82, “Sampathpaya”, Rajamalwatta Road, Battaramulla, Sri Lanka Funded by : United Nations Development Programme, Sri Lanka Cover page : Ayoma Jayasinghe - Sanikna Art House Sustainable development ensures the prosperity of the earth: the cover page describes the importance of interlinking the land and the ocean ecosystems for achieving sustainable development and conserving inland ecosystems as well as enriching the ocean and marine ecosystems. ii SRI LANKA COUNTRY REPORT WRITING TEAM Advisors Mr. B.M.U.D. Basnayake, Secretary, Ministry of Environment Dr. B.M.S. Batagoda, Deputy Secretary to the Treasury, Ministry of Finance and Planning Mr. Gamini Gamage, Addl. Secretary (Environment and Policy), Ministry of Environment Dr. R.D.S. Jayathunga, Director (Sustainable Development), Ministry of Environment Ms. Indu Weerasuri, Dy. Director General, Urban Development Authority Ms. R.H.M.P. Abeykoon, Dy. Director, (Sustainable Development), Ministry of Environment Dr.
    [Show full text]
  • Census Codes of Administrative Units Western Province Sri Lanka
    Census Codes of Administrative Units Western Province Sri Lanka Province District DS Division GN Division Name Code Name Code Name Code Name No. Code Western 1 Colombo 1 Colombo 03 Sammanthranapura 005 Western 1 Colombo 1 Colombo 03 Mattakkuliya 010 Western 1 Colombo 1 Colombo 03 Modara 015 Western 1 Colombo 1 Colombo 03 Madampitiya 020 Western 1 Colombo 1 Colombo 03 Mahawatta 025 Western 1 Colombo 1 Colombo 03 Aluthmawatha 030 Western 1 Colombo 1 Colombo 03 Lunupokuna 035 Western 1 Colombo 1 Colombo 03 Bloemendhal 040 Western 1 Colombo 1 Colombo 03 Kotahena East 045 Western 1 Colombo 1 Colombo 03 Kotahena West 050 Western 1 Colombo 1 Colombo 03 Kochchikade North 055 Western 1 Colombo 1 Colombo 03 Jinthupitiya 060 Western 1 Colombo 1 Colombo 03 Masangasweediya 065 Western 1 Colombo 1 Colombo 03 New Bazaar 070 Western 1 Colombo 1 Colombo 03 Grandpass South 075 Western 1 Colombo 1 Colombo 03 Grandpass North 080 Western 1 Colombo 1 Colombo 03 Nawagampura 085 Western 1 Colombo 1 Colombo 03 Maligawatta East 090 Western 1 Colombo 1 Colombo 03 Khettarama 095 Western 1 Colombo 1 Colombo 03 Aluthkade East 100 Western 1 Colombo 1 Colombo 03 Aluthkade West 105 Western 1 Colombo 1 Colombo 03 Kochchikade South 110 Western 1 Colombo 1 Colombo 03 Pettah 115 Western 1 Colombo 1 Colombo 03 Fort 120 Western 1 Colombo 1 Colombo 03 Galle Face 125 Western 1 Colombo 1 Colombo 03 Slave Island 130 Western 1 Colombo 1 Colombo 03 Hunupitiya 135 Western 1 Colombo 1 Colombo 03 Suduwella 140 Western 1 Colombo 1 Colombo 03 Keselwatta 145 Western 1 Colombo 1 Colombo
    [Show full text]
  • Name List of Sworn Translators in Sri Lanka
    MINISTRY OF JUSTICE Sworn Translator Appointments Details 1/29/2021 Year / Month Full Name Address NIC NO District Court Tel No Languages November Rasheed.H.M. 76,1st Cross Jaffna Sinhala - Tamil Street,Ninthavur 12 Sinhala - English Sivagnanasundaram.S. 109,4/2,Collage Colombo Sinhala - Tamil Street,Kotahena,Colombo 13 Sinhala - English Dreyton senaratna 45,Old kalmunai Baticaloa Sinhala - Tamil Road,Kalladi,Batticaloa Sinhala - English 1977 November P.M. Thilakarathne Chilaw 0777892610 Sinhala - English P.M. Thilakarathne kirimathiyana East, Chilaw English - Sinhala Lunuwilla. S.D. Cyril Sadanayake 26, De silva Road, 331490350V Kalutara 0771926906 English - Sinhala Atabagoda, Panadura 1979 July D.A. vincent Colombo 0776738956 English - Sinhala 1 1/29/2021 Year / Month Full Name Address NIC NO District Court Tel No Languages 1992 July H.M.D.A. Herath 28, Kolawatta, veyangda 391842205V Gampaha 0332233032 Sinhala - English 2000 June W.A. Somaratna 12, sanasa Square, Gampaha 0332224351 English - Sinhala Gampaha 2004 July kalaichelvi Niranjan 465/1/2, Havelock Road, Colombo English - Tamil Colombo 06 2008 May saroja indrani weeratunga 1E9 ,Jayawardanagama, colombo English - battaramulla Sinhala - 2008 September Saroja Indrani Weeratunga 1/E/9, Jayawadanagama, Colombo Sinhala - English Battaramulla 2011 July P. Maheswaran 41/B, Ammankovil Road, Kalmunai English - Sinhala Kalmunai -2 Tamil - K.O. Nanda Karunanayake 65/2, Church Road, Gampaha 0718433122 Sinhala - English Gampaha 2011 November J.D. Gunarathna "Shantha", Kalutara 0771887585 Sinhala - English Kandawatta,Mulatiyana, Agalawatta. 2 1/29/2021 Year / Month Full Name Address NIC NO District Court Tel No Languages 2012 January B.P. Eranga Nadeshani Maheshika 35, Sri madhananda 855162954V Panadura 0773188790 English - French Mawatha, Panadura 0773188790 Sinhala - 2013 Khan.C.M.S.
    [Show full text]
  • The Democratic Socialist Republic of Sri Lanka Ministry of Railways and Transport Ministry of Highways Road Development Authority
    No. THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA MINISTRY OF RAILWAYS AND TRANSPORT MINISTRY OF HIGHWAYS ROAD DEVELOPMENT AUTHORITY THE STUDY ON THE URBAN TRANSPORT DEVELOPMENT OF THE COLOMBO METROPOLITAN REGION FINAL REPORT APPENDIX October 2006 JAPAN INTERNATIONAL COOPERATION AGENCY PADECO Co., Ltd. Oriental Consultants Co., Ltd. SLO JR 06-011 THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA MINISTRY OF RAILWAYS AND TRANSPORT MINISTRY OF HIGHWAYS ROAD DEVELOPMENT AUTHORITY THE STUDY ON THE URBAN TRANSPORT DEVELOPMENT OF THE COLOMBO METROPOLITAN REGION FINAL REPORT APPENDIX October 2006 JAPAN INTERNATIONAL COOPERATION AGENCY PADECO Co., Ltd. Oriental Consultants Co., Ltd. Urban Transport Development of the Colombo Metropolitan Region Appendix APPENDIX Appendix 1 Long List of Projects and Proposals from Previous Studies and Working Groups..................................................... A1-1 Appendix 2 Socio-Economic Activities of Western Province............................................... A2-1 Appendix 3 Land Use Data................................................................................................... A3-1 Appendix 4 Trip Demand Distribution in CMR ................................................................... A4-1 Appendix 5 Daily Traffic Distribution.................................................................................. A5-1 Appendix 6 Freight Traffic ................................................................................................... A6-1 Appendix 7 Road Design Standards ....................................................................................
    [Show full text]
  • Colombo Urban Regeneration Project
    MINISTRY OF MEGAPOLIS AND WESTERN DEVELOPMENT RESETTLEMENT POLICY FRAMEWORK FOR COLOMBO URBAN REGENERATION PROJECT COLOMBO URBAN REGENERATION PROJECT (DRAFT) RESETTLEMENT POLICY FRAMEWORK 25 September 2018 MINISTRY OF MEGAPOLIS AND WESTERN DEVELOPMENT RESETTLEMENT POLICY FRAMEWORK FOR COLOMBO URBAN REGENERATION PROJECT CONTENTS List of acronyms i Executive Summary ii CHAPTER 01: Background 1 CHAPTER 02: Analysis of alternatives 1 CHAPTER 03: Description of the affected population 3 CHAPTER 04: Legal framework 5 CHAPTER 05: Institutional framework and procedures for land acquisition and 8 resettlement CHAPTER 06: Eligibility criteria, entitlements and definitions 14 CHAPTER 07: Consultation and stakeholder engagement 35 CHAPTER 08: Arrangements for moving and transitional arrangements 37 CHAPTER 09: The housing contract, contractual conditions and ability to pay 38 CHAPTER 10: Post-resettlement programs 39 CHAPTER 11: Conflict resolution and grievance procedures 42 CHAPTER 12: Monitoring and Evaluation 47 CHAPTER 13: Preparation and approval of the Resettlement Action Plans 50 CHAPTER 14: Timetable 52 CHAPTER 15: Budget 54 ANNEXURES ANNEX 1: UDA Board of Management approved selection criteria 55 ANNEX 2: Installment transfer agreement 58 MINISTRY OF MEGAPOLIS AND WESTERN DEVELOPMENT RESETTLEMENT POLICY FRAMEWORK FOR COLOMBO URBAN REGENERATION PROJECT List of acronyms AIIB Asian Infrastructure Investment Bank CBO Community Based Organization CSO Civil Society Organisation CMC Condominium Management Committee DDG Deputy Director General
    [Show full text]
  • Introduction to Light Rail Transit Project Colombo– Sri Lanka
    Light Rail Transit Project – JICA Ministry of Megapolis and Western Development INTRODUCTION TO LIGHT RAIL TRANSIT PROJECT COLOMBO– SRI LANKA 1 CONTENT LIGHT RAIL TRANSIT FOR COLOMBO IN A NUT SHELL PROPOSED LRT NETWORK FIANCING FOR THE LRT PROJECT LIGHT RAIL TRANSIT PROJECT FINANCED BY JICA ISSUES, CONSTRAINTS AND CHALLENGES Social Environmental Technical Legal Light Rail Transit Project – JICA Ministry of Megapolis and Western 2 1 Development LIGHT RAIL TRANSIT FOR COLOMBO CURRENT STATUS OF MEGAPOLIS TRANSPORT INTRODUCTION OF COLOMBO MASTER PLAN LRT • 10 Million Passenger Daily Trips within CMR • • One of the key public transport • 1.9 million Daily Passengers The Western Region Megapolis improvements identified in the Entering the CMC limits each Day. Transport Master Plan was Megapolis Transport Master is the • Average Travel Speed in CMR developed encompassing all aspects introduction of a LRT system as a 17km/h of transportation to provide a new mode of public transport in the • Average Travel Speed within CMC framework for urban transport CBD and extended to the out of CBD 12km/h development in Western Region up of the Western Region • With Population Increase the to 2035 while giving high priority to Need of Travel is going to Increase improve public transportation in the Western Region Light Rail Transit Project – JICA Ministry of Megapolis and Western 3 2 Development PROPOSED LRT NETWORK Kelaniya Elevated RTS – Line 1 (Green) Fort –Kollupitiya-Bambalapitiya- Borella-Union Place- Maradana (15km) Fort MMH Elevated RTS
    [Show full text]
  • 2020 Telephone Directory 2016
    www.ceb.lk 2020 TELEPHONE DIRECTORY 2016 TELEPHONE DIRECTORY Published by Desinged & Printed by Ceylon Printers PLC Publicity Unit, Business & Operational Strategy Branch Ceylon Electricity Board II CEYLON ELECTRICITY BOARD GENERAL NUMBERS 011-2324471 – 8 (With Extensions to Branches in Head Office Building) CONTENTS PAGE Branch Index ...................................................................................................................................................................................................... iv - x Ministry of Power & Renewable Energy ................................................................................................................................................... 01 - 02 Members of the Board .................................................................................................................................................................................... 03 - 05 General Manager .............................................................................................................................................................................................. 06 - 08 Asset Management Division ........................................................................................................................................................................ 09 - 15 Corporate Strategy Division ........................................................................................................................................................................
    [Show full text]
  • Sri Lanka Sri Lanka - Japan Friendship Bridge Widening Project Report Date: February 2003 Field Survey: November 2002 1
    Sri Lanka Sri Lanka - Japan Friendship Bridge Widening Project Report Date: February 2003 Field Survey: November 2002 1. Project Profile and Japan’s ODA Loan India Sri Lanka Project Site Colomboコロンボ Sriスリジャヤワルダナプラコッテ Jayewardenepura Kotte The New Sri Lanka - Japan Friendship Bridge Project location map constructed under the project 1.1 Background Northern Colombo is an emerging commercial and industrial area. It is home to the Katunayake Export Processing Zone, the largest of its kind in Sri Lanka, and the Katunayake international airport, the only international airport in the country. It has attracted public attention as the most rapidly developing area in Greater Colombo. In northeast Colombo, meanwhile, there is the Biyagama Export Processing Zone, which forms a part of Greater Colombo and is expected to develop further in the future. Roads linking the city of Colombo with these areas cross the Kelani River, which runs through the northern end of the city. Initially, the three bridges over the Kelani were the Sri Lanka - Japan Friendship Bridge (four lanes), Victoria Bridge (two lanes for one-way traffic to Colombo) and New Kelani Bridge (six lanes), which is located approximately 1 km upriver. These bridges alone were inadequate and traffic was becoming increasingly congested. The traffic volume crossing the Kelani, which was 80,700 vehicles a day in 1993, was projected to increase at an annual rate of 4% in subsequent years and exceed the traffic capacity by 2001, thus further traffic congestion was expected. In addition, one of the major reasons for traffic congestion was the vehicle weight restriction which was applied on the 95-year-old superannuated Victoria Bridge.
    [Show full text]
  • APPENDIXES V/Ardo Un Its Families Population 1. Mattakkuliya 183 240
    APPENDIXES V/ardo Units Families Population 1. Mattakkuliya 183 240 1440 2. Modern 319 403 2418 3- Mahawatta 86 95 570 4. Aluthmawatha 492 580 3480 5« Lunupokuna 307 399 2394 6. Bloemondhal 150 186 1116 7. Kotahena East 79 89 534 8. Kotahena VIest 545 696 4176 9. Kochchikado North 1031 1137 6822 10-Jinthupitiya Road 611 803 4818 11.Masangasweediya 488 1053 6318 12.Now Bazaar 615 841 5046 13.0randpass North 279 342 2052 14.Grandpass South 549 628 3768 15-Maligawatta West 262 346 2076 16.Aluthkade East 723 988 5928 17.Aluthkade West 817 1132 6792 18.Kehelwatta 689 1022 6132 19.Koohchikade South 729 976 5856 20.Fort 01 01 06 21 .K0inpannaweediya 537 823 4938 22.Wekanda 595 867 5202 23.Hunupitiya 517 762 4572 24.Suduwella 311 365 2190 25.Ponchikawatta 1075 1517 9102 Wards Units Families Population 26. Maradana 536 650 3900 27. Maligakanda 305 391 2346 28. Maligawatta Bast 344 480 2880 29. Dematagodo 555 661 3966 30. Wanathaiaulla 437 540 3240 31• Kuppiyawatta East 292 372 2232 38. Kuppiyawatta West 426 568 3408 35. Bjjrella North 413 513 3078 34. Narahenpita 178 243 1458 35- B0rella South 327 477 2862 36. Cinnamon Garden 106 129 774 37. K0llupitiya 236 360 2160 38. Banbalapitiya 103 141 846 39. Milagiriya 64 68 408 40. Thimbirigasyaya 173 245 1470 41. Kirula 194 249 1494 42. Havelock flown 89 129 774 43. Wellawatta North 62 87 522 44. Kirillapona 194 244 1464 45. Pamankada East 73 87 522 46. Pamankade West 83 124 744 47.
    [Show full text]
  • Tranche 1 | 45148-007
    Environmental Monitoring Report February 2020 SRI: Greater Colombo Water & Wastewater Management Improvement Investment Program (Tranche 1 and 2) Prepared by National Water Supply and Drainage Board for the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area ADB ASSISTED GREATER COLOMBO WATER AND WASTEWATER MANAGEMENT IMPROVEMENT INVESTMENT PROGRAM Environmental Management and Monitoring Report of Colombo Water Supply Service Improvement Project Table of Contents LIST OF FIGURES ................................................................................................................... i LIST OF TABLES .................................................................................................................... i LIST OF ABBREVIATIONS ................................................................................................... i 1. Introduction ................................................................................................................... 1 1.1. Basic
    [Show full text]