APPENDIX I FORM 1 Basic Information Sr No. Item Details 1
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX I FORM 1 Basic Information Sr No. Item Details 1. Name of the project/s Proposed SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties (Kondhwa project). 2. S. No. in the schedule 8(a) Building and Construction project. 3. Proposed Total Plot Area: 15200 m2 capacity/area/length/tonnage Total FSI area: 18437.24 m2 handled/command area/lease Total Non FSI area: 16132.27m2 area/number wells to be drilled Total Built up area(FSI + Non FSI): 34569.51m2 4. New/proposed/Modernization New Slum rehabilitation project under SRA 5. Existing Capacity/Area etc. Small Hutments present on site which will be demolished 6. Category of Project. e.' A' or 'B' Project category B2; Activity under Item 8 (a) of the EIA Notification dated 14 th September 2006 as amended on 1st December , 2009 does not require scoping and public consultation. 7. Does it attract general conditions? Not Applicable If yes, please Specify 8. Does it attract specific condition? Not Applicable If 'yes, please Specify 9. Location Kondhwa khurd, Pune Refer: Appendix 1 Location Map Plot/Survey/Khasra No. C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4- A/1A/1/12A+B Village Kondhwa Tehsil Haveli District Pune State Maharashtra 10. Nearest railway station/airport Pune Railway Station (Approximate Distance 5.67 along with distance in km. km) Pune International Airport (Approximate distance of 10.98 km) Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 1 Sr No. Item Details 11. Nearest Town, city, District Pune city - Approximate 5.7 Km from proposed Headquarters along with distance site in kms. 12. Village Panchayats, Zilla PMC Parishad Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Mr. Rohit Mohan Joshi Partner, Oxford properties (Kondhwa project). 14. Registered Address Office No. 112 floor 1, Mangalmurti complex, Behind hirabauge ganpati mandir, Tilak road Pune-30. 15. Address of correspondence Office No. 112 floor 1, Mangalmurti complex, Behind hirabauge ganpati mandir, Tilak road Pune -30 . Name Mr. Rohit Mohan Joshi Designation(Owner/Partner/CEO) Partner, Oxford properties (Kondhwa project). Address Office No. 112 floor 1, Mangalmurti complex, Behind hirabauge ganpati mandir, Tilak road Pune-30. Pin Code 411 030 E-mail [email protected] Telephone No. +91 7028000486 Fax No. - 16. Details of Alternative Sites No alternative options have been examined. examined if any. Location of these sites should be shown on a toposheet. 17. Interlinked Projects Not Applicable 18. Whether separate application of Not Applicable interlinked project has been submitted 19. If yes, date of submission Not Applicable 20. If no, reason --------- 21. Whether the proposal involves approval/ clearance under: if yes, Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 2 Sr No. Item Details details of the same and their status to be given: (a) The Forest (Conservation) Not Applicable Act – 1980? (b) The Wildlife (Protection) act – Not Applicable 1972? (c) The C.R.Z. Notification, Not Applicable 1991? 22. Whether there is any government No order/ policy relevant/ relating to the site? 23. Forest land involved (hectare) No forest land involved 24. Whether there is any litigation pending against the project and /or the land in which the project is Not Applicable proposed to be set up? (a)Name of the Court (b)Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data 1.1 Permanent or temporary The project is Slum Rehabilitation project (SRA). change in land use, land NO The site is zoned as ‘Slum’. as per DP cover or topography No change in land-use or land-use intensity. including increase in intensity of land use Project comprises of 2 buildings – (with respect to local Rehabilitation building and Sale building land use plan) Details of the proposed builds are as under: 1. Rehabilitation building: 236 flats with 28 shops, welfare center, balwadi and samaj madir are proposed No of floors : B+G/Stilt+ 11 floors. 2. Sale building: 144 flats with 18 shops, club house are proposed No of floors : B+LG+UG+2 P+ 12 floors 1.2 Clearance of existing NO 2 trees exist at site which will be retained. land, vegetation and buildings? Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 3 S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data 1.3 Creation of new land NO The proposed project is a SRA project. The land is uses? zoned as Slum as per DP and no change shall be created in the land use. 1.4 Pre-construction YES Soil testing will be carried out. investigations e.g. bore houses, soil testing? 1.5 Construction works? YES General civil construction, construction of apartments, common utilities & amenities. Project comprises of 2 buildings - Rehabilitation building and Sale building 1. Rehabilitation building: 236 flats with 28 shops, welfare center, balwadi and samaj madir are proposed No of floors : B+G/Stilt+ 11 floors. 2. Sale building: 144 flats with 18 shops, club house are proposed No of floors : B+LG+UG+2 P+ 12 floors Total proposed BUA: 34569.51 sqm (FSI+ Non FSI area) Type of Construction = RCC work Refer Appendix 2 Area Statement and Appendix 3 Master Layout 1 .6 Demolition works? YES Small Hutments present on site which will be demolished 1.7 Temporary sites used for YES Total No. of temporary workers ~100 No.s construction works or housing of construction Temporary labour camps shall be provided for the workers? construction workers. 1.8 Above ground buildings, YES Project comprises of 2 buildings - Rehabilitation structures or earthworks building and Sale building including linear structures, cut and fill or 1. Rehabilitation building: 236 flats with 28 shops, excavations welfare center, balwadi and samaj madir are proposed No of floors : B+G/Stilt+ 11 floors. 2. Sale building: 144 flats with 18 shops, club house are proposed No of floors : B+LG+UG+2 P+ 12 floors The top soil layer of 200 mm shall be recovered during excavation work and shall be used for landscaping. Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 4 S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data Excavated material shall be used for back filling, road leveling, and filling during site development. 1.9 Underground works NO The proposed development work does not include any including mining or mining or tunneling. tunneling? 1.10 Reclamation works? NO Not applicable 1.11 Dredging? NO Not applicable 1.12 Offshore structures? NO Not applicable 1.13 Production and NO Not applicable manufacturing processes? 1.14 Facilities for storage of NO During construction the building materials will be goods or materials? temporarily stored within site premises. Covered storage shall be provided for materials susceptible to fugitive dust emissions. 1.15 Facilities for treatment or YES Construction Phase: disposal of solid waste or Solid wastes such as empty bags, packaging material, liquid effluents will be properly segregated and send it to authorized recyclers. Operation Phase: The solid waste generated will be treated through onsite organic waste converter system. Sewage will be treated through proposed onsite sewage treatment plant. 1.16 Facilities for long term NO The proposed development shall have temporary housing of operational workers only during construction phase. workers? 1.17 New road, rail or sea YES There will be some increase in road traffic: traffic during Construction phase: Trucks and JCB may commute construction or once or twice a day. operation? Operation phase: The development will not have major impact on traffic pattern. Internal roads will be well constructed to manage internal traffic. 1.18 New road, rail, air NO Not Applicable. waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 5 S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data 1.19 Closure or diversion of NO Not Applicable. existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted NO Not Applicable. transmission lines or pipelines? 1.21 Impoundment, damming, NO Not Applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? NO Not Applicable 1.23 Abstraction or transfers NO No ground water extraction of water from ground or surface waters? Water requirement in the construction phase will be supplied by tanker.