Sr No. Item Details 1. Name of the project/s Proposed SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties (Kondhwa project).

2. S. No. in the schedule 8(a) Building and Construction project.

3. Proposed Total Plot Area: 15200 m2 capacity/area/length/tonnage Total FSI area: 18437.24 m2 handled/command area/lease Total Non FSI area: 16132.27m2 area/number wells to be drilled Total Built up area(FSI + Non FSI): 34569.51m2 4. New/proposed/Modernization New Slum rehabilitation project under SRA 5. Existing Capacity/Area etc. Small Hutments present on site which will be demolished 6. Category of Project. e.' A' or 'B' Project category B2; Activity under Item 8 (a) of the EIA Notification dated 14 th September 2006 as amended on 1st December , 2009 does not require scoping and public consultation. 7. Does it attract general conditions? Not Applicable If yes, please Specify 8. Does it attract specific condition? Not Applicable If 'yes, please Specify 9. Location Kondhwa khurd, Refer: Appendix 1 Location Map Plot/Survey/Khasra No. C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4- A/1A/1/12A+B Village Kondhwa Tehsil Haveli District Pune State 10. Nearest railway station/airport Pune Railway Station (Approximate Distance 5.67 along with distance in km. km)

Pune International Airport (Approximate distance of 10.98 km)

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 1 Sr No. Item Details 11. Nearest Town, city, District Pune city - Approximate 5.7 Km from proposed Headquarters along with distance site in kms. 12. Village Panchayats, Zilla PMC Parishad Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Mr. Rohit Partner, Oxford properties (Kondhwa project).

14. Registered Address Office No. 112 floor 1, Mangalmurti complex, Behind hirabauge ganpati mandir, Tilak road Pune-30. 15. Address of correspondence Office No. 112 floor 1, Mangalmurti complex, Behind hirabauge ganpati mandir, Tilak road Pune -30 . Name Mr. Rohit Mohan Joshi

Designation(Owner/Partner/CEO) Partner, Oxford properties (Kondhwa project).

Address Office No. 112 floor 1, Mangalmurti complex, Behind hirabauge ganpati mandir, Tilak road Pune-30. Pin Code 411 030 E-mail [email protected] Telephone No. +91 7028000486

Fax No. - 16. Details of Alternative Sites No alternative options have been examined. examined if any. Location of these sites should be shown on a toposheet. 17. Interlinked Projects Not Applicable 18. Whether separate application of Not Applicable interlinked project has been submitted 19. If yes, date of submission Not Applicable 20. If no, reason ------21. Whether the proposal involves approval/ clearance under: if yes,

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 2 Sr No. Item Details details of the same and their status to be given: (a) The Forest (Conservation) Not Applicable Act – 1980? (b) The Wildlife (Protection) act – Not Applicable 1972? (c) The C.R.Z. Notification, Not Applicable 1991? 22. Whether there is any government No order/ policy relevant/ relating to the site? 23. Forest land involved (hectare) No forest land involved 24. Whether there is any litigation pending against the project and /or the land in which the project is Not Applicable proposed to be set up? (a)Name of the Court (b)Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project

Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data

1.1 Permanent or temporary The project is Slum Rehabilitation project (SRA). change in land use, land NO The site is zoned as ‘Slum’. as per DP cover or topography No change in land-use or land-use intensity. including increase in intensity of land use Project comprises of 2 buildings – (with respect to local Rehabilitation building and Sale building land use plan) Details of the proposed builds are as under: 1. Rehabilitation building: 236 flats with 28 shops, welfare center, balwadi and samaj madir are proposed No of floors : B+G/Stilt+ 11 floors. 2. Sale building: 144 flats with 18 shops, club house are proposed No of floors : B+LG+UG+2 P+ 12 floors

1.2 Clearance of existing NO 2 trees exist at site which will be retained. land, vegetation and buildings?

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 3 S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data

1.3 Creation of new land NO The proposed project is a SRA project. The land is uses? zoned as Slum as per DP and no change shall be created in the land use.

1.4 Pre-construction YES Soil testing will be carried out. investigations e.g. bore houses, soil testing? 1.5 Construction works? YES General civil construction, construction of apartments, common utilities & amenities.

Project comprises of 2 buildings - Rehabilitation building and Sale building 1. Rehabilitation building: 236 flats with 28 shops, welfare center, balwadi and samaj madir are proposed No of floors : B+G/Stilt+ 11 floors. 2. Sale building: 144 flats with 18 shops, club house are proposed No of floors : B+LG+UG+2 P+ 12 floors

Total proposed BUA: 34569.51 sqm (FSI+ Non FSI area)

Type of Construction = RCC work

Refer Appendix 2 Area Statement and Appendix 3 Master Layout 1 .6 Demolition works? YES Small Hutments present on site which will be demolished 1.7 Temporary sites used for YES Total No. of temporary workers ~100 No.s construction works or housing of construction Temporary labour camps shall be provided for the workers? construction workers.

1.8 Above ground buildings, YES Project comprises of 2 buildings - Rehabilitation structures or earthworks building and Sale building including linear structures, cut and fill or 1. Rehabilitation building: 236 flats with 28 shops, excavations welfare center, balwadi and samaj madir are proposed No of floors : B+G/Stilt+ 11 floors. 2. Sale building: 144 flats with 18 shops, club house are proposed No of floors : B+LG+UG+2 P+ 12 floors

The top soil layer of 200 mm shall be recovered during excavation work and shall be used for landscaping.

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 4 S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data

Excavated material shall be used for back filling, road leveling, and filling during site development.

1.9 Underground works NO The proposed development work does not include any including mining or mining or tunneling. tunneling? 1.10 Reclamation works? NO Not applicable

1.11 Dredging? NO Not applicable

1.12 Offshore structures? NO Not applicable

1.13 Production and NO Not applicable manufacturing processes? 1.14 Facilities for storage of NO During construction the building materials will be goods or materials? temporarily stored within site premises.

Covered storage shall be provided for materials susceptible to fugitive dust emissions. 1.15 Facilities for treatment or YES Construction Phase: disposal of solid waste or Solid wastes such as empty bags, packaging material, liquid effluents will be properly segregated and send it to authorized recyclers.

Operation Phase: The solid waste generated will be treated through onsite organic waste converter system. Sewage will be treated through proposed onsite sewage treatment plant. 1.16 Facilities for long term NO The proposed development shall have temporary housing of operational workers only during construction phase. workers? 1.17 New road, rail or sea YES There will be some increase in road traffic: traffic during Construction phase: Trucks and JCB may commute construction or once or twice a day. operation? Operation phase: The development will not have major impact on traffic pattern. Internal roads will be well constructed to manage internal traffic. 1.18 New road, rail, air NO Not Applicable. waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 5 S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data

1.19 Closure or diversion of NO Not Applicable. existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted NO Not Applicable. transmission lines or pipelines? 1.21 Impoundment, damming, NO Not Applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? NO Not Applicable

1.23 Abstraction or transfers NO No ground water extraction of water from ground or surface waters? Water requirement in the construction phase will be supplied by tanker.

Source of water for occupants during operational phase: PMC 1.24 Changes in water bodies NO No change in the water bodies or the land use surface or the land surface affecting natural drainage ways. affecting drainage or run- off? 1.25 Transport of personnel or YES Road traffic of the area will increase temporary materials for during construction and permanently during operation construction, operation phase or decommissioning? Construction Phase: Transportation of material will be undertaken within the site through lorries/dumpers.

Transportation of labour will be undertaken on the site through transport vehicles.

Operational Phase: Residents or commuters during the operation phase will use self-owned/ public transportation facilities. 1.26 Long-term dismantling NO Not Applicable or decommissioning or restoration works? 1.27 Ongoing activity during NO Not applicable decommissioning which could have an impact on

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 6 S. No Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data

the environment?

1.28 Influx of people to an YES There will be temporary influx of labours during the area in either temporarily construction phase and permanent influx of occupants or permanently? during the operational phase.

The estimated permanent influx due to residential units = 1900

1.29 Introduction of alien NO The proposed landscape trees are all indigenous in species? nature.

1.30 Loss of native species NO 2 trees exist at site which will be retained. Proposed or genetic diversity? landscape includes native and local flora- this will enhance local biodiversity

1.31 Any other actions? NO Not applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Details there of (with approximate quantities S.No. Information/checklist Yes/No /rates, wherever possible) with source of confirmation information data

2.1 Land especially YES Proposed site does not fall under Agriculture or undeveloped or Non-Development Zone. agricultural land (ha) Area of Plot :15,200 m2 Total BUA: 34569.51 m2

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 7 Details there of (with approximate quantities S.No. Information/checklist Yes/No /rates, wherever possible) with source of confirmation information data

2.2 Water (expected source YES Construction Phase & competing users) unit: KLD Source : Tanker

Total water requirement for construction activity ~ 3 KLD

Labour water consumption = 4.5 KLD

Operational Phase Source: PMC • Fresh water: 189.43 m3/day • Recycled water: 107.1m 3/day 3 ò Waste water generation : 262.6 m /day • Total Water Requirement: 296.5 m3/day including landscaping. Two STP’s of 160 kld and 110 kld respectively are provided for Rehabilitation building and sales building separately. Treated water shall be used for landscaping & flushing.

Refer Appendix 4 Water Balance Chart 2.3 Minerals (MT) NO Not Applicable

2.4 YES Construction materials such as cement, steel, metal Construction material sand and bricks will be procured from authorized stone, aggregates, sand / dealers. soil (expected source – MT

2.5 Forests and timber NO Not Applicable (source – MT) 2.6 Energy including YES Construction phase: electricity and fuels Total Demand Load:150 kW (source, competing DG set : 35 kVA users) Unit: fuel (MT), energy (MW) Operational Phase -Connected Load : 1382 KW -Total Demand load = 553 KW -2 No. of DG set of 62.5 kvA each are provided separately to Rehabilitation and Sale building respectively.

Name of Local Authority for Supply Provision : Maharashtra State Electricity Distribution Company Limited (M.S.E.D.C.L.)

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 8 Details there of (with approximate quantities S.No. Information/checklist Yes/No /rates, wherever possible) with source of confirmation information data

2.7 Any other natural NO No other natural resources will be used for the resources (use construction purpose. appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 3.1 Use of substances or NO Not Applicable. materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of NO All the waste generated will be managed properly disease or affect disease and no conditions will prevail to affect vectors (e.g. insect or epidemiology. water borne diseases) 3.3 Affect the welfare of YES There will be economic growth and improved people e.g. by changing quality of life with additional employment. The living conditions? project will not have any negative impact on human welfare. Amenities will get better developed due to this kind of development. 3.4 Vulnerable groups of NO Not Applicable people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes NO No such activity or use of material will be done which will affect the environment or human health.

4. Production of solid wastes during construction or operation or decommissioning S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or NO No mine waste involved as this is Residential mine wastes project. Excavated material shall be reused for backfilling purposes on site.

4.2 Municipal waste YES Construction Phase

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 9 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data (domestic and or commercial wastes) Total expected labour ~ 100 at peak time of project

Dry waste (Kg/day): 10 kg/day -Wet waste (Kg/day): 15kg/day -Total waste generated:25kg/day

Operational Phase:

For Rehabilitation building: 672 kg/day -Wet waste (Kg/day): 386 kg/day -Dry waste (Kg/day): 286 kg/day

For Sale building: 420 kg/day -Wet waste (Kg/day): 240 kg/day -Dry waste (Kg/day): 180 kg/day

Two OWC’s are provided separately for Rehabilitation building and sales building. Refer Appendix 5 Solid Waste Management Plan. 4.3 Hazardous wastes (as NO Not Applicable per Hazardous Waste Management Rules) 4.4 Other industrial process NO Not Applicable wastes

4.5 Surplus product NO Not Applicable

4.6 Sewage sludge or other YES Sludge generated from STP will be used as manure sludge from effluent on site. Sludge drying beds shall be provided on site. treatment 4.7 Construction or YES Construction waste and debris will be used for back demolition wastes filling and leveling of roads and pathway. 4.8 Redundant machinery or NO Not Applicable equipment 4.9 Contaminated soils or NO Not Applicable other materials 4.10 Agricultural wastes NO Not Applicable

4.11 Other solid wastes NO Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 10 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 5.1 Emissions from YES Vehicular movement and DG sets will be point combustion of fossil sources of air pollution. fuels from stationary or mobile sources It will be managed appropriately during construction phase & operational phase. 5.2 Emissions from NO Not Applicable production processes 5.3 Emissions from NO Not applicable. The material transport, storage & materials handling handling will be undertaken in an appropriate including storage or manner; avoiding air, water and soil pollution. transport 5.4 Emissions from YES Dust will be generated from excavation and other construction activities construction activities. Measures will be taken to including plant and reduce/ control the emissions. equipment 5.5 Dust or odours from YES Dust will be generated during transport and handling of materials Handling of material. Measures will be taken to including construction reduce/ control the emissions. materials, sewage and waste 5.6 Emissions from NO No incineration activities are involved in the incineration of waste proposed development.

5.7 Emissions from burning NO No material will be burnt within the project of waste in open air (e.g. premises. slash materials, construction debris) 5.8 Emissions from any NO Not Applicable. No other activities apart from other sources construction & transportation are involved which would generate emissions.

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of YES Construction phase equipment e.g. engines, The machinery, equipment and vehicles used ventilation plant, during construction activities will generate noise. crushers Appropriate control measures will be undertaken to reduce the noise during construction phase.

Operation phase Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 11 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data This phase will involve noise generation due to the use of mechanical equipment, vehicular traffic and DG sets.

Appropriate control measures will be undertaken to reduce the noise during construction and operation phase. 6.2 From industrial or NO Not applicable similar process ’s 6.3 From construction or YES Demolition activities involved. For Noise demolition generation during construction activity - Measures will be taken to minimize the impacts of the noise.

6.4 From blasting or piling YES There will be temporary and intermittent noise generation from drilling activity during foundation.

6.5 From construction or YES Temporary noise influx during construction phase operational traffic due to vehicles like trucks, tractors, lorries etc. During construction activities.

Permanent marginal noise disturbance due to traffic during operational stage

6.6 From lighting or cooling NO Not applicable systems 6.7 From any other sources NO Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, NO Not Applicable use or spillage of hazardous materials 7.2 From discharge of NO Sewage generated within the project will be treated sewage or other within the project premises. The recycled water will effluents to water or the be reused for landscaping and flushing. land (expected mode and place of discharge) Proposed (Residential) : Expected waste water from proposed Project = 262.61m 3/day

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 12 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data Two STP’s of 160 kld and 110 kld respectively are provided for Rehabilitation building and sales building separately.

Total waste water recovered for reuse from proposed buildings = 236.3 m3/day (@ 90% STP treatment efficiency) Use of treated water for flushing purpose in proposed project = 102.36 m3/day

Use of treated water for landscaping purpose = 4.8 m3/day Quantity of excess treated waste water = 129.2 m3/day

Refer Appendix 4 Water Balance Chart 7.3 By deposition of NO Not Applicable pollutants emitted to air into the land or into water 7.4 From any other sources NO Not applicable

7.5 Is there a risk of long NO Not applicable term build \up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, NO No use of explosives and hazardous material during spillages, fires etc. construction / operational phase. from storage, handling, use or production of hazardous substances 8.2 From any other causes NO Not applicable

8.3 Could the project be NO The project area falls under Zone III as per Map affected by natural showing Seismic Zones of India. Zone III is of disasters causing moderate Seismic Intensity. The building design environmental damage has been planned accordingly. (e.g. floods, earthquakes,

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 13 S. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 9.1 Lead to development of YES Proposed project is a SRA project conducive to supporting utilities, the land use. ancillary development or development Infrastructure that accompanies proposed stimulated by the project development include: which could have impact on the environment e.g.: ° STP for treatment and recycling of waste water generated on site. • Supporting ° Provision for treatment of organic waste infrastructure (roads, generated on site by OWC. power supply, waste or ° Common amenity areas, landscaping and green waste water treatment, belt development. etc.) ° Rainwater harvesting system • Housing ° Solar Water Heaters, use of Renewable energy development and DG Sets for backup.

• Extractive industries The proposed supporting infrastructure would lead to development of sustainable habitat. • Supply industries

• Other 9.2 Lead to after-use of the NO Not applicable site, which could have an impact on the environment 9.3 Set a precedent for later NO Not Applicable. developments

9.4 Have cumulative effects NO Not Applicable due to proximity to other existing or planned projects with similar effects

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 14 S. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data

(III) Environmental Sensitivity S.No. Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary 1 Areas protected under NONE Not Applicable international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are Yes Mula - Mutha river flows on the northen side of important or sensitive the project at approx distance of 6.5 km. for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by NONE No protected, important or sensitive species of protected, important or flora & fauna has been observed during the sensitive species of ecological survey. flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine NO Not applicable or underground waters 5 State, National NO Not applicable boundaries 6 Routes or facilities used NO Not applicable by the public for access to recreation or other tourist, pilgrim areas 7 Defense installations NO Not applicable 8 Densely populated or NO The site is not located in densely populated or built-up area built-up area.

9 Areas occupied by NO Educational Facilities: Schools sensitive man-made land Rose bud’s Pre-primary school - 0.55 km uses (hospitals, schools, RIMS international School - 1.00 km

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 15 S.No. Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary places of worship, Lady halima school - 1.6 km community facilities) VIBGYOR High School - 1.93 km Rasiklal M. Dhariwal school - 3.90 km Sinhgad Nursary and School - 3.84 km

Educational Facilities: College St.Mathews junior College - 0.6 km RIMS Jr. College - 1.00 km Rasiklal M. Dhariwal Jr.College - 3.90 km Hillgrin High school and Junior college - 2.96 km Smt. Kashibai Navale institute of education - 1.96 km Vishwakarma intitute of information technology - 3.00km Sinhagad institute of engineering - 4.08 km

Hospitals: Inamdar Multispeciality Hospital - 0.17 km Lifeline hospital - 0.97 km Satyanand hospital - 1.31 km Wnkhede hospital - 1.44 km Market: Rajkamal Market – 0.8 km Mega super market – 0.4 km Khurshana super market – 0.5 km Hari Om super market – 0.5 km Big Bazzar – 0.8 km D Mart – 2.07 Km Gera mall – 0.6 km 10 Areas containing NO Not Applicable important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected NO Not applicable to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to NO Earth Quake Zone III natural hazard which could cause the project Therefore, all relevant design parameters as per to present environmental zone III have been considered for RCC design of problems the buildings. Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 16 S.No. Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions )

Form 1- Proposed amalgamation of SRA project at kondhwa (KH), C.T.S no. 393(P), S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B by oxford properties(Kondhwa project) 17