Environmental Clearance to SEIAA
Total Page:16
File Type:pdf, Size:1020Kb
Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:September 18, 2018 To, Mr. Rohit Mohan Joshi at S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B Environment Clearance for Proposed SRA Project at S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B kondhwa (KH) Subject: By Oxford Properties (Kondhwa Project). Sir, This has reference to your communication on the above mentioned subject. The proposal was considered as per the EIA Notification - 2006, by the State Level Expert Appraisal Committee-III, Maharashtra in its 64th meeting and recommend the project for prior environmental clearance to SEIAA. Information submitted by you has been considered by State Level Environment Impact Assessment Authority in its 138th meetings. 2. It is noted that the proposal is considered by SEAC-III under screening category Building & construction project as per EIA Notification 2006. Brief Information of the project submitted by you is as below :- Proposed SRA Project at S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B kondhwa (KH) By Oxford 1.Name of Project Properties (Kondhwa Project). 2.Type of institution Private 3.Name of Project Proponent Mr. Rohit Mohan Joshi 4.Name of Consultant VK:e Environmental LLP Pune. 5.Type of project SRA scheme 6.New project/expansion in existing project/modernization/diversification New Project in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project 8.Location of the project S.No. 4A/1A/1/10+11 & 4-A/1A/1/12A+B 9.Taluka Haveli 10.Village Kondhwa Correspondence Name: Mr. Rohit Mohan joshi Oxford Properties (Kondhwa Project). Room Number: Office No. 112 Floor: floor 1 Building Name: Mangalmurti Complex Road/Street Name: Behind Hirabaug Ganpati Mandir Locality: Tilak road City: Pune 11.Whether in Corporation / PMC Municipal / other area SEIAA Meeting No: 138 Meeting Date: August 27, 2018 ( SEIAA- STATEMENT-0000000912 ) SEIAA-MINUTES-0000000634 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000000429 Page 1 of 14 SEIAA) In process 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: PMC Approval Number Approved Built-up Area: 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) 15200 sqm 16.Deductions Road widening area:1399.43 sqm, Park reservation area:6943.16 sqm 17.Net Plot area 6857.41 sqm FSI area (sq. m.): 17558.34 18 (a).Proposed Built-up Area (FSI & Non FSI area (sq. m.): 13996.44 Non-FSI) Total BUA area (sq. m.): 31554 Approved FSI area (sq. m.): 18 (b).Approved Built up area as per Approved Non FSI area (sq. m.): DCR Date of Approval: 08-06-2018 19.Total ground coverage (m2) 1972.22 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open 28 % on Net Plot Area to sky) 21.Estimated cost of the project 481900000 SEIAA Meeting No: 138 Meeting Date: August 27, 2018 ( SEIAA- STATEMENT-0000000912 ) SEIAA-MINUTES-0000000634 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000000429 Page 2 of 14 SEIAA) 22.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 23.Total Water Requirement Source of water PMC Fresh water (CMD): 174 Recycled water - 89 Flushing (CMD): Recycled water - 5 Gardening (CMD): Swimming pool 0.5 make up (Cum): Dry season: Total Water Requirement (CMD) 269 : Fire fighting - Underground water 75000 tank(CMD): Fire fighting - Overhead water 20000 tank(CMD): Excess treated water 169 Source of water PMC Fresh water (CMD): 174 Recycled water - 89 Flushing (CMD): Recycled water - 0 Gardening (CMD): Swimming pool 0 make up (Cum): Wet season: Total Water Requirement (CMD) 264 : Fire fighting - Underground water 75000 tank(CMD): Fire fighting - Overhead water 20000 tank(CMD): Excess treated water 174 0.5 kld water will be required for makeup. Details of Swimming a) PH-7.0 to 7.6 pool (If any) b)Chlorine Content -0.8 to 1.0 ppm Residual Chlorine in pool c) Disinfection Treatment - With Ozone SEIAA Meeting No: 138 Meeting Date: August 27, 2018 ( SEIAA- STATEMENT-0000000912 ) SEIAA-MINUTES-0000000634 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000000429 Page 3 of 14 SEIAA) 24.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Not Not Not Not Not Not Not Not Not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable Level of the Ground Pre monsoon : 9m bgl Post monsoon : 12 m bgl water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 25.Rain Water 4 recharge pits Harvesting pits: (RWH) Size of recharge pits 1m x 1m x 2m depth : Budgetary allocation 400000 (Capital cost) : Budgetary allocation 60000 (O & M cost) : Details of UGT tanks Total UGT capacity :200500 lit if any : Natural water drainage pattern: The storm water drainage will be Natural water designed according to contours. The storm water collected through the drainage pattern: 26.Storm water storm water drains of adequate capacity will be led to recharge pits. Quantity of storm drainage 2867.25 m3/year water: Size of SWD: 200-400 mm Sewage generation 263 in KLD: STP technology: MBBR Capacity of STP 2 STP's STP 1 170 kld for Rehab building STP 2 110 kld for Sale (CMD): building 27.Sewage and Location & area of On ground Waste water the STP: Budgetary allocation STP 1: Capital Cost: Rs. 44.00 lakhs/- STP 2: Capital Cost: Rs. 38.00 (Capital cost): lakhs/- Budgetary allocation STP 1 : O & M Cost: Rs. 5.00 lakhs/- STP 2 : O & M Cost: Rs. 4.50 (O & M cost): lakhs/- SEIAA Meeting No: 138 Meeting Date: August 27, 2018 ( SEIAA- STATEMENT-0000000912 ) SEIAA-MINUTES-0000000634 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000000429 Page 4 of 14 SEIAA) 28.Solid waste Management Waste generation in Waste generation: Total solid waste: 10 kg/day the Pre Construction Disposal of the The Construction and demolition waste generated shall be segregated, and Construction construction waste reused on site and surplus shall be led to scrap dealers for recycling. phase: debris: Dry waste: 398 kg/day Wet waste: 559 kg/day Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry 100 kg/day sludge): Others if any: E waste: 3.2 kg/day Dry waste: will be handed over to SWaCH. Wet waste: will be treated in Organic Waste Converter (OWC). Hazardous waste: NA Mode of Disposal Biomedical waste (If NA of waste: applicable): STP Sludge (Dry Dried sludge from STP will be used as manure. sludge): Others if any: Will be handed over to authorized recyclers Location(s): On ground Area Area for the storage of waste & other OWC 1: 12 sqm, OWC 2: 10 sqm requirement: material: Area for machinery: OWC 1: 36 sqm, OWC 2: 30 sqm Budgetary allocation Capital cost: OWC 1: 12,50,000 OWC 2 : 11,50,000 (Capital cost and O&M cost): O & M cost: OWC 1 :2,84,778, OWC 2: 2,57,926 SEIAA Meeting No: 138 Meeting Date: August 27, 2018 ( SEIAA- STATEMENT-0000000912 ) SEIAA-MINUTES-0000000634 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000000429 Page 5 of 14 SEIAA) 29.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable SEIAA Meeting No: 138 Meeting Date: August 27, 2018 ( SEIAA- STATEMENT-0000000912 ) SEIAA-MINUTES-0000000634 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000000429 Page 6 of 14 SEIAA) 30.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 31.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 32.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 33.Source of Fuel Not applicable 34.Mode of Transportation of fuel to site Not applicable 35.Energy Source of power MSEDCL supply : During Construction Phase: (Demand 116.44 KVA Load) DG set as Power back-up during 62.5 KVA construction phase During Operation phase (Connected 1382.70 KW load): Power During Operation requirement: phase (Demand 553.08 KW load): Transformer: 1 no. of 630 kva DG set as Power back-up during 2 no. of 62.5 KVA operation phase: Fuel used: HSD Details of high tension line passing No through the plot if any: Energy saving by non-conventional method: Using LED in parking & common area 36.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Solar water heater & solar PV 119700 kwh SEIAA Meeting No: 138 Meeting Date: August 27, 2018 ( SEIAA- STATEMENT-0000000912 ) SEIAA-MINUTES-0000000634 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000000429 Page 7 of 14 SEIAA) 37.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not applicable Not applicable applicable Budgetary allocation Capital cost: 11.30 lakhs (Capital cost and O&M cost): O & M cost: 0.56 lakhs/annum 38.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs.