Kristi Rhude e

From: Online Comment Form < [email protected]> 4 _-,- Sent: Tuesday, May 07,2013 3:OS PM c',-r,ETAfi\, OF f,gF.'*.. To: socmaster Subject: Online Public Comment for Docket: 13-041-U ]fi13 HAY -1 P 3: 58

Public Comment made on 5/7/2013 3:07:31 PM from: Megan Wood 730 West Magnolia Avenue Auburn, Alabama 36830 7862810470 meaanIeighwood@,aol.com IP Address: 108.9O.150.19

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES,

Comments: By destroying this land you destroy a piece of famous modern architecture. Kristi Rhude

ARK.$UBLiC t3JI-J' ' From: Online Comment Form < Cranefamily337@yahoo.~om~ mv*

Sent: Tuesday, May 07,20133:15 PM _c--,-?:.erhRY OF co''8FA To: socmaster Subjeck Online Public Comment for Docket: 13-0414 2013 MY -7 p 3 58

PubIic Comment made on 5/7/2013 3:14:48 PM from: i ,-- L- ",NED Allison crane 5749 e stephie lane Lake Charles, Louisiana 70605 337-489-6614 Cranefamily33 7@yahoo .corn IP Address: 174.238.2.149

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED RINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I'm originally from FayetteviIIe but currently live in Louisiana. I would like to ask that the land surrounding this building not be disturbed. It is such a beautiful place to visit, been to many weddings and events in this area and would hate to see that destroyed. Thanks, Allison Crane

1 From: Online Comment Form cjschnei4@gmu,edu> .<+,FslpJy OF CWtJ;. sent: Tuesday, May 07,2013 3:11 PM 2.. ., . .. To: socmaster Subj e&: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 3:11:15 PM from: Julie C Schneider 26 16 Checkerberry Ct. Reston, Virginia 201 9 1 5713381752 jschnei4@mu. edu IP Address: 173.66.69.233

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Cutting down the Thorncrown Chapel and the surrounding wooded area would only serve to demonstrate a carelessness and lack of creativity that the pubIic will not soon forget. It's time for Southwestern Electric to realize that most of us know better than to value efficacy over sustainable solutions.

2 Kristi Rhude

From: Online Comment Form ARK. WfA,#€ 3ERVkCONH Sent: Tuesday, May 07,2013 3:15 PM _- , To: socmaster .( .+.I ~,P:T/wv II Of rSdP!M. Subject: Online Public Comment for Docket: 13-0414 2013 HAY -1 P 3 54 Public Comment made on 5/7/2013 3:15:02 PM from: Lindsay McKissick :-(c c E I VE D 160 Belleau Woods Drive Newnan, Georgia 30263 678850773 8 lindsav.mckissick@,mail.com IF Address: 66.2 16.209.6

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION ANI) MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please, please take care of the beautiful chapel you have in the woods in your state. It is good and pure and should be protected. It’s on my Placed To Go list because it is so lovely and tranquil. It would be such a shame for its area to be destroyed.

3 Kristi Rhude

From: Online Comment Form [email protected]> Sent: Tuesday, May 07,2013 398 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 3:17:34 PM from: Jan Eckardt Butler 7803 S. 28th West Ave Tulsa, Oklahoma 74132 9 I 8-69 1-3020 ianeckardtbutler@,,nail. corn JT Address: 64.149.33.189

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I have been to this mazing chapel. What a travesty should a high electric wire go through the beautiful Arkansas woads at this point. Please go visit this chapel yourself and you will agree that re-routing the Iine is the only solution.

4 Kristi Rhude

From: Online Comment Form < [email protected]> Sent: Tuesday, May 07,20133:24 PM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 3:24:21 PM from: matt condron 2083 Nw Johnson St. #40 porltand, Oregon 97209 5036864877 matvcee@yahoo,com IP Address: 24.22.98.78

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED lN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please find another route. Sure, we need upgraded technology, but we also need places like the Thorncrown Chapel when technology keeps crowding in around us closer and closer day aRer day. Please, find the Human being in you and find another route for your lines.

1 Kristi Rhude

From: Online Comment Form

I 1LCEIVED Public Comment made on 5/7/2013 2:00:55 PM from: Will Watson 3257 S. City Lake Rd Fayetteville, Arkansas 7270 1 501 8605004 [email protected] IP Address: 70,178.170.162

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KTNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Dear Public Service Commission: Please consider denying approval of the application submitted by SWEPCO to construct power lines and operating stations anywhere near Thorncrown Chapel. This is a scenic and architectural treasure in our region, and should not be disrupted or permanently devalued by the construction of unsightly power lines and all the other ramifications of development around this pristine natural area. Thorncrown is an architecturaljewel of the Ozarks and brings in tourists and visitors from across the country - its prominence is irreplaceable and the beauty of the site invaluable. Please deny this application and preserve a unique piece of Arkansas history and natural beauty.

1 Kristi Rhude

From: Online Comment Form ,;5hzW4C JWV. C'um Sent: Tuesday, May 07,20132:OO PM - To: socmaster ...-- <,!-;!?FlAR'f QF CV~ Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 1:59:46 PM from: D. Blake Wagner 141 East Ohio Street Indianapolis, Indiana 46204 3 17-263-9655 bwagner@,interdesim.com IP Address: 74.194.93.2 14

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: One of the world's most exquisite examples of organic architecture, the Thorncrown Chapel in Eureka Springs, Arkansas was built in 1980 by E. Fay Jones, an apprentice of . A stunning glass and steel structure surrounded by a thick patch of trees, the chapel has become a beloved architectural monument for the local community architecture enthusiasts across the world. While going through architectural school, I studied and admired Thorncrown Chapel for it's structural design, but more importantly the relationship to the site. I would recommend routing the 3345 KV transmission line around the Thorncrown property to preserve its landscape and be able to maintain the notoriety and keep Arkansas on the map for architects around the world. Kristi Rhude

From: Online Comment Form < [email protected]> Sent: Tuesday, May 07,20132:02 PM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 2:01:37 PM from: Marjory Singher 1 86 1 Berkeley Ave. St. Paul, Minnesota 55 105 65 1 -695042 1 [email protected] IP Address: 24.245.40.57

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTR C POWER CO {PA J7 FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPER4TION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This chapel and it's setting are one of the truly sacred places in North America. Please do not desecrate this setting-there have to be alternatives for a power line; there me none to replace the serenity of this place. I'm betting you all call yourseIf Christians. I don't and having been there, I recognize a spiritual rarity when I am given the blessing of experiencing it. Please save this special place.

3 Kristi Rkude

From: Online Comment Form Sent: Tuesday, May 07,2013 2:57 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 25651 PM from: Margaret Miles 1530 N. Poinsettia Place Apt. 339 Los Angeles, California 90046 91 66165814 ablithelifefome@yahoa, corn IP Address: 76.170.132.15 1

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SC JTHWESTERP ELECTRIC POWER COMPA IY FOR A CERTIF?CATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEICATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: A place as unique and beautiful would prompt me to make a trip to Arkansas just to see it. Beyond this building's place in its community and the general importance of preserving works of art such as this, the draw for visitors makes threatening the essence of this place a bad choice. It will be both sad and upsetting to see a place like this threatened, I urge you to not allow construction of the transmission line.

1 Kristi Rhude

From: Online Comment Form < [email protected]> Sent: Tuesday, May 07,2013256 PM TO: socmaster Subject Online Pubtic Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 2:56:16 PM from: Matthew Kaftor 1XECEIVED 340 Capp St #2 San Francisco, CaIifarnia 94 110 41 53 126878 rnatthaze@,gmail.com IP Address: 199.188.192.170

Public Comments submitted for Docket: 13-041-U IN THE MATER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow this modern masterpiece and tourist attraction be sullied by Big Power. Reroute the power lines so they do not interfere withthe beautiful chapel! Thank you.

2 Kristi Rhude

From: Online Comment Form - r.r---- 79 --?cygF cqw. Sent: Tuesday, May 07,2013256 PM ,- F : +.!,- To: socmaster Subject: Online Public Comment for Docket: 13-041-U IQ13 p,Al -1 ’58

Public Comment made on 5/7/2013 25542 PM from: Constance Gill 80 Grove Street Montclair, New Jersey 07042 973-746-7576 architectgill@,optimum,net IP Address: 69.126.1.145

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLlCATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED lN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I don’t live in Arkansas and I’ve never seen this building, but I’ve known about it from the time it was completed. It is a gem and deserves specid consideration. Move your lines. Do something good. Feel better about yourselves. Please.

3 Kristi Rhude

From: Online Comment Form < [email protected]> Sent: Tuesday, May 07,2013 2:44 PM To: socmastter Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 2:43:46 PM from: Clarence Fraher 1530 N Maplewood Chicago, Illinois 60622 7737823 189 [email protected] IP Address: 108.71.172.174

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED JN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I think it is a terrible and short-sighted decision they have made to destroy Thorncrown Chapel. This space is unique and beautiful. Please take a different route that will not threaten this wonderful structure.

4 Kristi Rhude PUBLIC smv. CCM:; From: Online Comment Form < [email protected] -- Sent: Tuesday, May 07,2013 2:30 PM __-+c'' 1::r- . ,,... IARY 9r CDWY To: socmaster Subjeck Online Public Comment for Docket: 13-0414 2013 MAY -7 P 3 58

Public Comment made on 5/7/2013 2:30:28 PM from: Brittney Hansen 819 Holton Street SAINT PAUL, Minnesota 55 104 50735 I548 1 [email protected] IP Address: 23.25.148.157

Public Comments submitted €or Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments; Please protect this are filled with historic architecture and natural beauty.

1 Kristi Rhude

From: Online Comment Form Sent Tuesday, May 07,2013 229 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/20132:28:44 PM from: Yolanda Michaels 9726 W. Sleepy Hollow Lane Garden City, Idaho 83714 208-440-3694 vl hoff@,yahoo .corn IP Address: 132.178.2.65

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please find an alternative route for the transmission line proposed by Southwest Power Company (SWEPC0)referenced in 13-041-U. The environmental and aesthetic impact of such placement would be destructive to the Thorncrown Chapel and its surrounding area. It is also completely unncessary. I understand that Southwest Power believes the line is needed; however, with acres to work with away from the chapel, it is entirely feasible to place it out of sight of the chapel and its surrounding area. Thorncrown chapel is non- denominational and is an extremely unique building with sweeping views in all directions of the surrounding Ozark habitat and is beloved by the public. Its Architect, E. Fay Jones, specifically asked that no construction element in that area be larger than what two people could carry through the woods by hand. Please take into consideration the will of the people who live both in and outside the area and cherish the Chapel and it's natural setting. Please use an alternative placement for the lines. Choosing to do differently will only prove, once again, to an already weary American public that they have no voice and that our sacred spaces mean nothing to big business. Thank you.

2 Kristi Rhude ARj(,pilEltlC SER\I'. COHH From: Online Comment Form

Public Comment made on 5/7/2013 2:23:50 PM from: :I: E 1 VE U Jeff Bowman C E 1312 Cane Creek Dr. Gamer, North Carolina 27529 9 1 9-4 12- 1 070 [email protected] IP Address: 174.109.124.223

Public Commeats submitted for Docket: 13 -041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Arkansas, If you have a national treasure, preserve it! It will cost too much to ruin this architectural treasure, and the views from there. If you put the power lines in, everyone will talk about Arkansas's stupidity from henceforth when they visit this tourist attraction. Or worse, they will stop visiting. Can you afford the lost in tourist revenue because of a power line? The power lines can be diverted over more unseemly places.

3 sLe,$ERV.Krisfi Rhude OOMM _-- From: Online Comment Form - . , ':;"if,Zf,'{ DF cr 'Y. Sent: Tuesday, May 07,20132:22 PM To: socmaster 2013 MAY -7 P 5* Subject: Online Public Comment for Docket: 13-041-U 3

-'. .-ur E I VE Public Comment made on 5/7/2013 2:21:49 PM from: Staci 125 NW 15th St. Edmond, Oklahoma 730 13 4059351140 staci.campbell@,chk.com IP Address: 204.16,64.3

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATIC, J OF SO ITH' ESTER ELECTRIC POWER COh PP J? FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The thought of such a landmark of the mixture of America's architecture and natural beauty being threatened by power lights is not only disgusting, but it's frightening. First this remarkable location, then what's next? I'm not from Arkansas, nor do I live there now, but I heard this news online and I'm sickened. If this happens, all hope is lost for the beauty and location of this remarkable chapel. I beg you, don't let this happen.

4 Kristi Rhude Irm. From: Online Comment Form .------.y*pTA;{y QF LkL'rd:. sent: Tuesday, May 07,2013 2:21 PM To: socmaster Subject. Online Public Comment for Docket: 13-041-U MAY -7 p '*

Public Comment made om 5/7/2013 2:21:07 PM from: Susan Bosko 223 14 Covella Court San Antonio, Texas 78259 2 10-488-1 428 s.bosko@,,rrmail .corn IP Address: 75.1.21 8.66

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KTNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I understand the need for electricity - it's one of life's necessities - but so is beauty and the uplift of the spiritual. The proposed power line that would cut through the woods next to the Thorncrown Chapel, barging into the forest serenity with its structure and noise, would essentially destroy this national treasure, just as surely as if you took sledgehammer and bulldozer to the delicate structure. Please, if there is any way a compromise could be reached between these two necessities, I beg you to find it! (Perhaps by using one of the alternate routes under consideration?) True beauty and majesty are disappearing from out world at such a rapid pace that sometimes it seems as though our great-grandchildren, when they twn on their lights and look out their windows, will have nothing beautiful to see.

5 Kristi Rhude

From: Online Comment Form < [email protected] > iiW.PU3tE 5ERV, COHM Sent: Tuesday, May 07,2013 2:16 PM -* To: socmaster $;:rg'F_TfjRyQF cc;'.' Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 2:16:13 PM from: Melanie Allen VED 193 Grant 589 Redfield, Arkansas 721 32 5019930546 melli 195 7@,yahoo.com IP Address: 67.142.167.26

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not approve the SWEPCO application which will impact Thorn Crown Chapel. The area needs to be preserved to keep the architecture of this chapel intact in it's peaceful setting. Encroaching modernization would detract from the overall feeling of the chapel. Thank you for your consideration in this matter.

6 Kristi Rhude '? < i; ;"% From: Online Comment Form

Public Comments submitted for Docket: 13-041-u N THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow this treasure to be impacted negatively with the construction of power lines.

7 Kristi Rhude

From: Online Comment Form < [email protected]> Sent: Tuesday, May 07,2013 2:04 PM To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 2:04:17 PM from: Holly Bratkovich 2225 Stinson Blvd St Paul, Mjnnesota 55 112 65 1-63 8-91 3 5 hollybratkovichGdwhoo.corn IP Address: 152.13 1.10.71

Public Comments submitted for Docket: 13-041 -u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KCNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please consider rerouting the power lines to avoid disrupting Thorncrown Chapel in Eureka Springs, Arkansas to preserve this important piece of architecture and the solace of the environment it has created.

8 Kristi Rhude Am*p&Li&&tPij. cartr( From: Online Comment Form Sent: Tuesday, May 07,2013 3-06PM To: socrnaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 51712013 3:05:47 PM from: JOAN W BURR 210 Lyle Drive Mountain Home,Arkansas 72653 8704244213 j oanwburr~:vahoo.corn IP Address: 184.1 56.240.4 1

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED EN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please protect the beauty of ThornCrown chapel by routing powerlines away from what many consider to be in the top four of best architecture of the 20th century in the U.S. This is a jewel for Arkansas.

1 Kristi Rhude 1 ,\tc?W- I.'GMH From: Online Comment Form

Sent: Tuesday, May 07,2013 1:44 PM 2FC;ET,IRY 0s l-,l?'*'. TO: socmaster Subject: Online Public Comment for Docket: 13-041-U 1013 HAY -1 P 3 59

Public Comment made on 5/7/2013 1:44:17 PM from: Judy Lee Flowers 1024 West 15th St Hope, Arkansas 71801 8707770696 [email protected] IP Address: 69.154.61.2

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTEFW ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED JN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I would hate to see Thorncrown Chapel harmed in anyway or View obstructed. It means so much to so many. I realize progress and change are always good and we must have them. But do we have to at the expense of all things beautiful. Is there no cornprimise that could be reached. I think APSC could move over a few miles and miss them .....Arkansas is known for this architectural design. It has been published in many magazines over the years. We want to keep this tradition going. Kristi Rhude

From: Online Comment Form ,i$p*. P&LIC: seii;. LL4+?? Sent Tuesday, May 07,2013 1:44 PM .- To: so cma ste r Subject: Online Public Comment for Docket: 13-0414 2013 MAY -7 P 3 59 Public Comment made on 5/7/2013 1:44: 11 PM from: Steven Kinsley RECEIVED 67 Pearce Pkwy Pearl river, New York 10965 845-735-4161 [email protected] IP Address: 199.168.243.252

Public Comments submitted far Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RlVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHmGTON COUNTIES, ARKANSAS

Comments: Thorncrown Chapel, designed by E. Fay Jones and built in 1980 was voted by the AIA in the early 2000s as the 4th most significant contribution to 20th Century American architecture. this is a site of architectural wonder that can't be ruined.

2 From: Vincent Reynolds < reya nd [email protected]> ...- Sent: Tuesday, May 07,2013150 PM "FCZ."Tfi,RY OF xli+i, To: socmaster Subject: SWEPCO powerlines in Carroll County

.,$ E Iv E n SOC Contact Form submitted on 5/7/2013 1:50:05 PM from: Vincent Reynolds ;Ec Email: [email protected] IP Address: 66.204.4.1 Subject: SWEPCO powerlines in Carroll County

Comments: I am a concerned citizen living in rural Carroll County near Eureka Springs. J am extremely worried about the prospects of the transmission lines to be run through Northern Carroll County. They will dramatically effect the environment through herbicide pollution, loss of habitat, and aesthetic degradation. This area of the state is heavily (and happily) dependent upon the tourist trade and the beautiful hills and woods directly effect the economic well-being of the citizens. These lines will come very close to some well-known landmarks such as the Passion Play, Lake Leathemood, and the Thorncrown Chapel. Please assist the citizens in Carroll County in blocking this project. Many Sincere MS.Vincent Reynolds Kristi Rhude . I: 1.1, Am. .. From: Online Comment Form

Sent: Tuesday, May 07,20131:59 PM -m .~;I-C:FT~~RS- OF i:tM6'' To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 1:58:55 PM from: Ainslie Gilligan 25 Strand Ave Brattleboro, Vermont 05301 802-254-1017 ainslie.gillinan@,mnail.com IP Address: 71.18 1.17.5 1

Public Comments submitted for Docket: 13 -04 1 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TMNSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I lived on the Buffalo River for six years and still own my farm there and visit two months a year so I feel I have a stake in Arkansas. If such travesties as building power lines next to the Thornwood Chapel in Eureka Springs are allowed, we will find ourselves in two or three decades with nothing of beauty and quality left. Please do not mar an historic landmark-there are always alternatives. Kristi Rhude

Sent: Tuesday, May 07,2013 158 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 1:58:07 PM from: ,? ECE NED michaelangelo monteleone 11 18 st Charles place atlanta, Georgia 3 03 06 404-464-353 9 michaeIan~;e~o.monteleone~~ail.corn IP Address: 166.147.88.16

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS NVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I recently read that the Thorn Crown Chapel is under threat by a proposed power line. I urge you not to let this happen. A powerline can be built anywhere, a natural treasure and architectural wonder cannot. While I dont have enough money and resources to stop this, I do have the ability to vote with my feet. If the chapel is compromised I will never, ever visit Arkansas by my own accord. If the chapel is spared then I pledge a pilgimage to the chapel and a stay in the lovely state of Arkansas.

2 From: Online Comment Form [email protected]> Sent: Tuesday, May 07,2013 1:38 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 1:37:37 PM from: Max Dana 82 Clinton Avenue #3 Brooklyn, New York 11205 3476337248 rnch63gmail.com IP Address: 38.88.151.98

Public Comments submitted for Docket: 13 -04 1-U IN THE MA7TER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPE‘RATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I can’t believe anyone would deforest the area around Thorncrown Chapel in order to run power transmission lines. It is a rare gem and I would come to Arkansas just to see it. You should protect the area around this site so that future generations may enjoy it. I think there is enough intelligence at both Southwestern Electric and at the Public Service Commission to find an elegant solution to this that addresses both the needs of the business and the public.

1 Kristi Rhude

From: Online Comment Form . :Ij,. j,UBFIC SEfiY. CUHtl Sent: Tuesday, May 07,2013 1:37 PM ... -- .c,.,-.c To: socmaster c_ "y,-t'!;sy gF r tyi.: Subject: Online Public Comment for Docket: 13-0414 2113 HAY -7 P 3 59 Public Comment made on 5/7/2013 1:37:03 PM from: Joe Burger 12681 Remie Rd. Centralia, Missouri 65240 573-696-3269 ioe222@,centurvtel.com IP Address: 72.161.200.150

Public Comments submitted for Docket: 13-041-u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reroute the powerline. To spoil something this beautiful is a thoughtless imprudent desecration.

2 From: Sent: To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2!!3 NAY m7 ’’’

Public Comment made on 5/7/2013 1:35:54 PM from: Rev. Roger Mays 8674 Brenstuhl Park Dr. Blacklick, Ohio 43004 740-973 -060 1 char>lainrr@,prnail.com IP Address: 24.92.136.3 8

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I find it objectionable to route the new powerlines in such a manner as to threaten the serenity of the Thorncrown Chapel in Arkmas. Surely you can find a less intrusive path and respect the existing structure and it’s original intention of providing this chapel for all who visit with the undisturbed natural views surrounding Thorncrown. Please reconsider this proposal and look for the alternative path and solutions which grant respect to all who have or will benefit from this chapel. Respectfully objecting, Rev. Roger L. Mays

3 Kristi Rhude

From: Online Comment Form c [email protected]> ,-,- .,- .,- ,.:r,7?~T;j~y9: c- -:?,- Sent: Tuesday, May 07,2013 1:36 PM To: socmaster 5 ubj ect: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 1:35:45 PM from: Merry McLoryd 308 Orchard Drive Monroe, New York 10950 8457835125 rnoocowmerry@,grnail.com IP Address: 24.1 87.174.34

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATIOF OF SOUTHWESTERN ELECTI? C POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please deny this app1ication.h addition to Thorncrown, several scenic vistas and wildlife habitats stand to be ruined by these lines, and seeing as tourism is the town's primary industry, any loss of our natural beauty has an impact.

4 From: Online Comment Form - c;.-l:,:-Ti\qy 9r C.”7 Sent: Tuesday, May 07,2013 1:35 PM , ... To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment macle on 5/7/2013 1:35:12 PM from: JOSE REYES 1952 OPTIMUS RIVER ROAD CALICO ROCK, Arkansas 725 19 8702974867 jossosan@,outlook.com JP Address: 200.124.225.74

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MATNTENANCE OF THE PROPOSED 345 KV TMNSMISSION LTNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHTNGTON COUNTIES, ARKANSAS

Comments: They should build it around or through some other way. That chapel is beautiful becasuse of nature.., Think twice before the construction starts. The human being is nature too.

5 Kristi Rhude

..,: Sent: Tuesday, May 07,2013 1:33 PM ,. -.+--__c -. To: socmaster 'i ;!?:'i'$Jy r$- T$'',;y, Subject: Online Public Comment for Docket: 13-0414 ZUt3 HAY -7 P E 59 Public Comment made on 5/7/2013 1:33:15 PM from: Laura Nemeth 4009 Cleveland Rd. E Huron, Ohio 44839 4 19-602- 1246 Lauranemeth6@,msn.com IP Address: 66.61.19.78

Public Comments submitted for Docket: 13-041-u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARICANSAS

Comments: Please bury or reroute the power lines around Thorncrown Chapel. Thank you for your time.

6 From: Online Comment form Sent: Tuesday, May 07,2013 1:33 PM .- To: socmaster Subject: Online Public Comment for Docket: 13-041-U WJ -1 P 3 59

Public Comment made on 5/7/2013 1:32:47 PM from: Ashley Gagnon H Street Blaine, Washington 98230 778-834-9703 [email protected] IP Address: 216.208.32.210

Public Comments submitted for Docket: 13-04 1 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Hello, I am actually from Canada, near Vancouver. I recently read about the Thorncrown Chapel, via Colossal (http://www.thisiscolossal.coml2O1 3/05/tharncrown-chapel-under-threat/).I felt I should write to you not because I am an artist, though I am,which is why I am normally inspired to visit the Colossal website. Not because I am a lover of design, though I am,and this building is absolutely remarkable! Not even because I want to visit the Thorncrown Chapel and surrounding Ozark Habitat one day, though I do. I am writing my appeal for the proposed transmission line because I am greatly saddened by the increase in profit over nature. Examples can easily be found: The Amazon, previously untouchable, has been clearcut, flooded, and otherwise tampered with. The Boreal forest in Canada is under constant threat from businesses and law makers who are not interested in preserving it. These are merely off the top of my head, though I know there are many more. My plea is this: there is no undo button for our planet. Please, please, use your role as leaders to make the right decision, to look ahead to the long-term effects this will have on that area of the woods and all those who frequent it. I live in the greater Vancouver area of BC and it has come to this: I remark each time I see greenspace, because there is so little of it left here. Please don't do the same thing where you live; preserve what you have! Please oppose the destruction, in whole or in part, of the Ozark habitat. Please do not accept the application for power transmissian through that area, thank you Ashley Gagnon

7 Kristi Rhude

From: Online Comment Form __--- Sent: Tuesday, May 07,2013 1:29 PM -,~"- :.4. '-:

Public Comments submitted far Docket: 13-04 I-U TN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATlBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHTPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Could the power company bury the lines or build them farther away from the chapel? It would be terrible to have them interfere with such an architectural masterpiece.

8 Kristi Rhude

Sent: Tuesday, May PM 07,2013 1:25 _^I -_ .-.. ,.- . To: socrnaster , ~ -,.r,'#,,-- (, :,y 01; r: - ',':-! Subject Online Public Comment for Docket: 13-041-U 2013 MAY -1 P 3: 59 Public Comment made on 5/7/2013 1:25:06 PM from: Natalie Cawley H E C E IV E 13 1931 N. Leavitt St. Chicago, Illinois 60647 3 128359611 natal iecawleY0,mailmm IP Address: 12.151.244.130

Public Comments submitted for Docket: 13-041-U M THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: These lines wiil disrupt and violate the views from the chapel. They should not be allowed to install them within sight of the chapel.

9 Kristi Rhude

,: y'JGL\c5ti3Y. COM from: Online Comment Form t>t'i '. Sent: Tuesday, May 07,2013 1:24 PM ------. +.- To: socmaster +-+?\y 7:. KT,' e' Subject: Online Public Comment for Docket: 13-0414 2113 MAY -7 P 3 59 Public Comment made on 5/7/2013 1:24:22 PM from: Holly Copeland 6800 Tudor Drive plano, Texas 75023 97280 I 83 83 [email protected] IP Address: 7 1.244.62.174

Public Comments submitted for Docket: 13-041 -U M THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL CQMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Do not build the transmission line here. There is plenty of room in Arkansas for power transmission lines. There is no need to a one-of-a-kind historic landmark.

10 Kristi Rhude kli<;,4 ~311~SEiiV. CflPZM From: Online Comment Form

Public Comment made on 5/7/2013 1:24:15 PM from: Suzanne Donnelly 2548 W Balrnoral Ave Chicago, Illinois 60625 773-520-3 103 [email protected] IP Address: 4.30.169.30

Public Comments submitted for Docket: 13-0414 lN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MATNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow this line to go through this area destroying the entire purpose of Frank Lloyd Wright's work in creating the Thorncrown Chapel. While I may not be a religious individual, I appreciate the thoughtful concept and architectural achievement put into creating this chapel. Please keep the area surrounding it as was intended by the architect and loved by all those who come to this spot to enjoy it.

11 Kristi Rhude

From: Online Comment Form [email protected]> Sent: Tuesday, May 07,20131:24 PM . .. To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 1:24:06 PM from: -7 :-,, c E 1V E n J.W. . \L 4540 42nd Ave SW Seattle, Washington 98 1 16 2069545454 jp4 [email protected] IP Address: 63.233.130.238

Public Comments submitted for Docket: 1 3 -04 1-U JN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Speaking from half way across the country. From a man who hopes to visit his oasis, it would truly be a crime to both mankind, art, and US hisotry if this glorious sanctuary were polluted by public utility equipment. There are endless ammounts of land and the expense to re-route the power line is well worth the majestic beauty offered by this piece of priceless, hctional art.

12 Kristi Rhude

A 1 ,pmr IC smv . COW From: Online Comment Form Sent: Tuesday, May 07,2013 1124 PM - .. To: socmaster Subject: Ontine Public Comment for Docket: 13-041-U

Public Comment made om 5/7/2013 1:23:40 PM from: Gray Whitley 2002 Winoca Road Wilson, North Carolina 27893 252 243-5026 photography .gray@,mn ail.com IP Address: 66.25 1.2 14.2 17

Public Comments submitted for Docket: 1 3 -041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTTON OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: As an obvious matter of the Public Service Commission; This note, reflecting the culturally aware, the conscious public and purveyors of future education - say "pleaseprogress a better plan than to install intrusive (ugly ass) transmission lines near a proven property of historical significance,"The area in question, Thorncrown Chapel in Eureka Springs, Ark., is a proven architectural masterpiece that should be given the civilized decency of preservation and respect. Thank You. Gray Whitley

13 Kristi Rhude

From: Ontine Comment Form < [email protected]> Sent: Tuesday, May 07,2013 120 PM .- To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 1:20:01 PM from: Pamela DeRossitEe 1263 W. Mt. comfort Rd #2 18 Fayetteville, Arkansas 72703 479-287-1 793 [email protected] IP Address: 72.204.27.63

Public Comments submitted for Docket: 13 -041 -U JN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: SWEPCO: Thorncrown Chapel is an award-winning structure, built on the foundations of organic architecture that Mr. E. Fay Jones learned from his mentor Frank Lloyd Wright. Organic architecture was the precursor to today’s sustainability movement. To disturb the property will not only cause an unnecessary disruption to the property’senvironment, but is highly disrespectful to the spirit of the architectural design. Sure you can find a different route, Fay Jones, Thorncrown Chapel, and the multitude of visitors deserve better. Thank you.

14 Kristi Rhude

From: Online Comment Form [email protected]> Sent: Tuesday, May PM 07,2013 1:17 .- to: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 1:16:52 PM from: Naoko Oguro i?ECEIVED 100 Maspeth Avenue Brooklyn, New York 112 11 9 1 747023 77 [email protected] IP Address: 69.38.174.170

Public Comments submitted for Docket: 13-0414 IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TMNSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I am not a resident of Arkansas nor religious, but you have a very special building in Eureka Springs, Arkansas - Thorncrown Chapel must be protected. I am all for growth and expansion to meet the needs of the people however, there are some things that must be appreciated and thought harder to come up with a work-around. Please, for your own sakes, protect the Chapel. Thanks for listening.

15 From: Online Comment Form < [email protected]> -- Sent: Tuesday, May 07,2013 1:16 PM . --- 8jrrTli3Y OF !-.(-!'w. To: socmaster Subject Online Public Comment for Docket: 13-041-U 2113 MAY -1 P 3:

Public Comment made on 5/7/2013 1:16:06 PM from: r3 E c E IVE: a NATHAN MARION 4272 FREMONT AVE N SEATTLE, Washington 98 103 206-414-8325 [email protected] IP Address: 75.145.28. I58

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow the power company to build lines anywhere near the Thorncrown Chapel and it's lands. The buzz and electrical interference would not only pose a health problem but also would conflict with the Historical preservation of this building and the area.

I6 Kristi Rhude

From: Sent: To: Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 1:13:10 PM from: Betsy Pontious 8321 E 100 StN Owasso, Oklahoma 74055 9188501689 pontiousmom~,yahoo.com JP Address: 70.184.1 7.92

Public Comments submitted for Docket: 13-04 I -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reconsider the plan to destroy the beauty of nature so close to the Thorncrown Chapel. If it is so necessary to run a a high voltage line for that many miles, than it seems you could do it a safe and reasonable distance from the Chapel. This chapel is one of the most beautiful ones I have been to, and it would be such a shame to destroy it with something that could be rerouted.

17 Kristi Rhude pgK:c 5Ef-N-CclMrr From: Online Comment Form Sent Tuesday, May 07,2013 1:11 PM + * ; If'if13y (7: rrm:% To: socmaster , .. ... Subject: Online Public Comment for Docket: 13-041-U 1013 NAY -7 p 3

Public Comment made on 5/7/2013 1:10:50 PM from: David Ellis 15 Park Row, Apt. 11D New York, New York 10038 3 14-753-3072 [email protected] IP Address: 72.80.65.12

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: As much as I support Southwestern Electric Power's desire to deliver power to the surrounding Arkansas region, I would hate to see the project disrupt what I and many others deem to be a state treasure in the Thorncrown Chapel in Eureka Springs. By constructing the power line in the region it would not only disrupt the views and tranquility offered by this structure, that is treasured by those who have visited. I wonder: isn't some sort of workaround solution possible that could meet Southwestern's needs and that of the Thorncrown Chapel?

18 Kristi Rhude

Sent: Tuesday, May 07,2013 1:lO PM To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 1:10:29 PM from: ;L;E € IVE D Jill Curran 6209 Kavanaugh Blvd Little Rock, Arkansas 72207 50 1 -603-9544 4currans@,comcast.net XP Address: 76.125.75.1 8 1

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I am writing as a concerned citizen to ask that the proposed power line through the Ozarks near Thorncrown Chapel be stopped. Thank you.

19 Kristi Rhude

From: Online Comment Form [email protected]> Sent: Tuesday, May 07,2013 1:05 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 1:04:39 PM from: eli z 1620 grant st Denver, Colorado 80203 8027630880 zcc@,zwillinger.org IP Address: 97.1 18.36.238

Public Comments submitted for Docket: 1 3-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED TN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: save thorncrown chapel

20 Kristi Rhude

From: Online Comment Form ,\#~.Pt&IC SEKV. m9t.l Sent: Tuesday, May 07,2013 1:41 PM . .. To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2013 MAY -1 P 2 59 Public Comment made on 5/7/2013 1:41:14 PM from: Elizabeth Rains 2229 South Clay Springfield, Missouri 65807 417-886-3323 gumbo 196lvahoo.com IF Address: 173.30.106.145

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I am concerned about the destruction of the trees near Thorncrown Chapel near Eureka Springs. I have been there several times over the years to enjoy its beauty and tranquility. I have taken friends from other areas of the country there, also. It would be a sheif the basic essence of the chapel were destroyed by cutting the forest nearby. I'm sure there are other areas where the power line could go where there would be less impact on the beauty of the chapel. Thank you for taking my comments into consideration.

1 From: Online Comment Form _*___.------. .-“iTE‘~,iy y I‘d‘*‘ Sent Tuesday, May 07,2013 12:26 PM To: socrnaster Subjett Online Public Comment for Docket: 13-041-U 2013 MAY -7 P 3 59 i3 Public Comment made on 5/7/2013 122552 PM from: EC E IVE E Lisa Russell 1715 B Siri Dharma Ct. Santa Fe, New Mexico 87501 5053160819 Iernonsuaarhem@&maiI.corn IP Address: 76.26.100.177

Public Comments submitted for Docket: 1 3-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please respect the artist’s vision and statement made by this chapel and keep the area pristine. I hope to visit it someday-but not with a power line destroying the ambiance.

1 Kristi Rhude

From: Online Comment Form c mariamamino32 @yahoo.com> Sent: Tuesday, May PM .---_IX*- 07,201312:24 --;'f-fi\?y ftc '',?:a?. To: socrnaster Subject: Online Public Comment for Docket: 13-041-U 2011 HAY -1 P 3: 59

Public Comment made on 5/7/2013 12:23:33 PM from: Maria Mannino 3 lakeside street Prescott , Arizona 86305 480-307-1442 mariamannino32~yahoo.com IP Address: 174.124.236.157

Public Comments submitted for Docket: 13 -04 1 -U lN THE MAIITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LJNE BETWEEN THE SWIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Is there nothing free and sacred for our weary spirits and heart to rest. Please don't defile this sacred place ....asit might be the last vestige of hope for our humanity.

2 Kristi Rhude

From:

Sent: Tuesday, May 07,2013 12:28 PM _..r- ---- .I 7.,E',y?y 7r ;r>-.IW, To: socmaster Subject: Online Public Comment for Docket: 13-041-U zflt] MAY -1 P 3 5'

Public Comment made on 5/7/2013 12:28:12 PM from: Karol Mora 10036 1 /2 Culver Blvd. Culver City, California 90232 3102020311 karoLmara@,sbcglobal.net TP Address: 68.183.134.192

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please preserve this beautiful spot for generations to come.

3 From: Online Comment Form .,, . Sent: Tuesday, May 07,201312:29 PM To: socrnaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 12:28:52 PM from: Jason Miller 423 W 9th Newton, Kansas 671 14 6207470290 jasonamilier@nmail .corn IP Address: 99. I5 I .47.69

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LNE 3ETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not put a transmission line near the Thorncrown Chapel. The incredible atmosphere would be irrevocably disturbed, and the views would be ruined. This chapel is an amazing building that offers a beautiful experience for all visitors. Thank you for considering my opinion.

4 From: Online Comment Form . _-- -::,, ('qET4RY flF -"-T f' :. Sent: Tuesday, May 07,2013 12:32PM To: socmaster 1\13 MY P Subject: Online Public Comment for Docket: 13-0414 -1 3: 59

Public Comment made on 5/7/2013 12:31:50 PM from: Vivian 1950 N Austin Dr Fayetteville, Arkansas 72703 479-442-4300 vivianrhi I I @,mai1. corn IP Address: 130.184.28. I54

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMFATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KJNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please don't allow this to happen. I understand the power isn't even for Arkansas but to service Missouri customers. Arkansas is becoming famous for being "the Natural State" but powerlines over one of our most tranquil, sacred and beautiful tourist attractions is unreasonable. Utilities do not run the world. We don't have to do this. Please vote no.

5 :-*>I From: Online Comment Form --YF;C-T~~?'~ '5' Sent: Tuesday, May 07,2013 12:35 PM To: socmaster Subject: Online Public Comment for Docket: 13-041-U -

Public Comment made on 5/7/2013 12:34:31 PM from: Robert Kelly 1355 St Francis Rd Bel Air, Maryland 21014 4436557314 [email protected] IP Address: 108.3.186,S

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I am writing as 1 am concerned for sanctity of the Thorncrown Chapel and the place of peace it has become for so many. Please reconsider your power routing option! There are so many of us whose lives have been touched by God at this place. The trees... the quiet serenity. Since the beginning of the world God's invisible qualities and divine nature can be clearly seen in what has been made. This chapel provides a way to connect with him in an inspiring regenerative context. I thank you kindly in advance for your earnest consideration.

6 Kristi Rhude

From: Online Comment Form . -- -__------?--”- Sent: Tuesday, May 07,2013 12:37 PM -- [,jcJli\;y QF b’r -- ’ ’,. To: socmaster Subject: Online Public Comment for Docket: 13-041-U lfj\]NAY -7 p 3 59

Public Comment made on 5/7/2013 12:37:20 PM from: i< E c E 1v E 0 cindy napp 149 YelIowbrook Rd Fanningdale, New Jersey 07727 732.938.2666 cnapp63ksi-pexorn IP Address: 96.57.123.138

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KJNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED TN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please find an alternative location for the transmission line

7 Kristi Rhude I. . .?%* From: Online Comment Form Sent: Tuesday, May 07,2013 12:39 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 12:38:38 PM from: Ann Linstrom 95 11 Caroline Avenue Silver Spring, Maryland 20901 202-329- I796 alinstrorn@,skbarch.com IP Address: 1 73.166.160.153

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This should go down in history as one of the biggest marketing blunders EVER. Do you think that just because this intensely beautiful chapel is close by you in Arkansas that it isn't something to hold dear, to cherish, to treasure, to PROTECT for all the world to enjoy? We live in a global society. Everyone who comes to and sees the chapel is struck by its beauty and serenity which is only achieved by the amazing tree canopy. How dare you think of disturbing that. How dare you. Your group has to be full of engineers and attorneys. Be smart and figure out a different way to do this without disturbing anyhng close to Thorncrown Chapel. Ann Linstrom

8 Kristi Rhude

From: Online Comment Form c [email protected]> _.-- ?F -.I -;*y [,;' r,x -d. Sent: Tuesday, May 07,201312:40 PM _., -*$ ' To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 12:39:35 PM from: J. Heckerman 525 Timber Meadow Lake Drive Fuquay-Varina, North Carolina 27526 9 193 3 70086 heckerOO1 @,ml.com IP Address: 98.122.132.141

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I feel an alteration of the proposed route for this transmission line is in order, Et should be possible to alter the route enough to keep it invisible from the Thorncrown Chapel without significant additional expense. This structure and its relationship to nature are are treasures which should not be compromised.

9 From: Online Comment Form /---I +C.. [‘,‘.a --c.c {!A,+ Sent: Tuesday, May 07,2013 12:M PM . C’:: *.:::TjV.\)’ :!I TO: socmaster Subject Online Public Comment for Docket: 13-041-U MAY -7 p ’’’

Public Comment made on 5/7/2013 12:40:01 PM from: melissa bridgman 7 19 dickinson st memphis, Tennessee 33 107 901 722 8905 bridmanpotter y@,vahoo.com IF Address: 74.177.6.32

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR WE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED TN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: please save the Thorncrown Chapel. I remember visiting it as a child and being awed by Row it fit in with the landscape around it. Please allow my child to have the same experience. sincerely, Melissa Bridgrnan

10 Kristi Rhude

Sent: Tuesday, May 07,201312:41 PM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 12:40:57 PM from: Natalie Ensminger 1939 Evelyn Avenue Memphis, Tennessee 38 104 90 1-8 5 7-9301 naturallvmemphis~mnail.com IP Address: 128.169.2.73

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: My aunt lives in Eureka Springs, and we go to Thorncrown Chapel every time we visit. I cannot imagine seeing anything but trees and nature when looking through those beautiful glass wdls.

11 Kristi Rhude

From: Online Comment Form ,;r.5.pgEL;: 5w.LljL. -I Sent: Tuesday, May 07,2013 1246 PM - -+-CL------,-<. ..-r,.-'*.I.- r. ?, !-, To: socrnaster '>- L': ,+: [!.+:-. .,' Subject: Online Public Comment for Docket: 134414 lot3 HAY -7 P 3 59 Public Comment made on 5/7/2013 12:46:15 PM from: Virginia Yanoff 4E c E IVED 8614 Onyx Dr SW Unit A Lakewood, Washington 98498 253-584-0106 wan0 [email protected], IP Address: 63.229.7.250

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHNGTON COUNTIES, ARKANSAS

Comments: The line should not run anywhere near the Thorncrown Chapel. Any towers should be INVISIBLE from the chapel, and far enough way that the construction sounds, sights, and smells should be imperceptible. The chapel is Unique, and to build power towers anywhere near it would be destructive. Kristi Rhude

From: Online Comment Form [email protected]> ,::K.BIJf+tIC SktiV. co?:!i Sent: Tuesday, May 07,2013 12:46 PM To: socmaster . ---?rPzrTt\T*J,. ?; Pi?Rly Subject: Online Public Comment for Docket: 13-0414 2013 MAY -7 P B 00 Public Comment made on 5/7/2013 12:46:03 PM from: John ONeal il( i, c E IVED 10400 Florian Rd Louisville, Kentucky 40223 502-889-8424 [email protected] IP Address: 74.130.237.150

Public Comments submitted for Docket: 13-041-U M THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please don't allow the power company to spoil the Thorncrown Chapel environment. Visiting this landmark is one of the items on my bucket list and 1 would hate to have to view power lines outside the chapel while meditating. Thanks John

2 Kristi Rhude \ 9%

From: Online Comment Form

Public Comment made on 51712013 12:49:10 PM from: Nancy J. Griffrn 2305 Skyline Drive Russellville, Arkansas 72802 479-968-1659 ingriffin@,suddenlink.net IP Address: 74.194.7.194

Public Comments submitted for Docket: 13 -041 -U IN THE MATER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KJNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow this power line to be constructed next to Thorncrown Chapel in Eureka Springs, AR. This is a beautiful structure and any construction near by will compietely destroy the serenity of the chapel. It's location is enhanced by the trees, etc that surround the area. Let's keep it that way. I live in Russellville and I always visit the chapel every time I visit the Eureka Springs area. Please put the line through another area.

1 c From: Online Comment Form [email protected] .--- q:E(::J,:* . $.r.* ,;,?*J Sent: Tuesday, May 07,2013 12:54 PM To: socmaster 00 Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 12:53:49 PM from: Mike McLarty 1120 Forest Lane El Dorado, Arkansas 71730 801-4034647 ho~ld752~aol.corn IP Address; 24,10.223.240

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MAJJISON AND WASHINGTON COUNTIES, ARJWNSAS

Comments: Please reroute the power lines out of sight from Thorncrown Chapel. This is a significant and important architectural building. Disturbing the area around the Chapel would have a significant effect on the chapel.

1 c L From: Online Comment Form ,. I --x-Tij7ty 9~ Cqt ?:. Sent: Tuesday, May 07,201312:53 PM 4- To: socrnaster l$oo Subject Online Public Comment for Docket: 13-041-U 1113 MI -7 p

Public Comment macle on 5/7/2013 12:53:24 PM from: David Hearn 345 E Fairway Lane Fayetteville, Arkansas 72701 7275807129 hem.hogsOgmail.com IP Address: 72.204.54.87

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments : Running a high voltage power line anywhere in the view fro Thorncrown Chapel is completely unacceptable.

2 Kristi Rhude ;;;;.fi,pWL!C smv.L"r?' From: Online Comment Form Sent: Tuesday, May 07,2013 la4 Ph ,- To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 1:04:28 PM from: Jason Patrylo 2645 Timberlake St. Louis, Missouri 63043 314-606-41 12 jpatrvIo@e;mail.com IP Address: 199,36.33.40

Public Comments submitted for Docket: 13-04 1-u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAJNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The Thorncrown Chapel is talked about all over the country in architectural education as an amazing example of Organic Architecture. (Architecture that is not being intrusive but harmonizing with the environment.) Letting the power company to cut through and destroy the wooded area near by to put up massive electric lines will disrupt the view and not only destroy the woods, but destroy the essence of this chapels design. Please do not allow SOUTHWESTERN ELECTRIC POWER COMPANY to destroy such a beautiful thing. Thank You

1 Kristi Rhude , ,&* PVBL1C mv*aMn From: Online Comment Form Sent: Tuesday, May 07,2013 11:11 AM TO: sacmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 11: 11:13 AM from: Mariana Pickering 9015 Pinewood Drive Dallas, Texas 75243 214414657 [email protected] IP Address: 84.222.62.21

Public Comments submitted for Docket: 1 3 -041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I'm writing to express my concern and disapproval for the plans to install power lines and use herbicides in the area immediately surrounding Thorncrown Chapel. This chapel is one of the few architectural pieces of its kind - truly in harmony With the nature around it. We went there as architecture students at Washington University in St. Louis, and all of use were greatly impressed by the setting. The architecture of the chapel cannot be fully understood without this setting. It would be a great loss to America's stock of truly sustainable architecture if it's natural setting were further compromised. Sincerely, Mariana Pickering

1 Kristi Rhude

From: Sent 70: Subject:

Public Comment made on 5/7/2013 11:09:49 AM from: James Barnes 455 Avenue G Bushton, Kansas 67427 6205 62343 9 jamesl aw-rencebarnes@,mail. corn IP Address: 63.245.135.202

Public Comments submitted for Docket: 13-041-U lN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON,CARROLL AND/OR MADISON ANI) WASHINGTON COUNTIES, ARKANSAS

Comments: We have got to stop destroying the environment for outdated technology. Transmission lines are an unnecessary eye sore.

2 Kristi Rhude ,4f;KQ?f&lGSEW. COm From: Online Comment Form < [email protected]> Sent: Tuesday, May 07,2013 11:12 AM To: socmaster Subject Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 11:12:04 AM from: Linda Sisson PO Box 3517 SoIdotna, Alaska 99669 (907)252-02 17 hang1 [email protected] IP Address: 66.230.1 18.4 1

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The Thorncrown Chapel is one of your state's treasures. Please do not destroy it by putting the transmission line next to it.

3 From: Online Comment Form [email protected]> Sent: Tuesday, May 07,2013 11:13 AM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 11:12:39 AM from: Dexter 4632 trailwood st Chattanooga, Tennessee 37416 6636373839 Dex32 1 @,aol.com XP Address: 174.237.226.89

Public Comments submitted for Docket: 13 -041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTTFICATE OF ENVIRONMENTAL COMPATIBILITY AND PDLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIFE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED N BENTON, CARROLL AND/OR MADISON AND WASHTNGTON COUNTIES, ARKANSAS

Comments: Power companies need to show more thought in the way the do Business, by taking care of landscapes and structures others build for we are all here at the same time and through history. Our children should be able to look at the works of every generation as it was made. Power companies don’t need to take larg swaths of land and put up Hideous power lines so tacky and such a waste and not to mention high powre lines have been know to cause Cancer in people living near or under them.

4 Kristi Rhude qii,r;,p2jB.LtCSERV. CWM From: Online Comment Form [email protected] > Sent: Tuesday, May AM c--- 07,2013 11:16 -, _.c,.Eyfi-- .'{ ,>F r,-;*t,:. TO: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 11: 1551 AM from: Eloise Keeter 408 E 9th St Claremore, Oklahoma 740 17 91 8-283-2855 eloisekeeterG9,sbcgIobal.net ZP Address: 70.128.97.44

Public Comments submitted for Docket: 1 3 -04 1-U IN THE MATER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This is a beautiful place and a piece of God! Please don't destroy what they have worked SO hard to achieve.

5 From: Online Comment Form < [email protected] z - Sent: Tuesday, May 07,2013 1138 AM .- ::!iETh:’y :yf 7+’Y, To: socmaster Subject: Online Public Comment for Docket: 13-0414 2013 NAY -1 P 4: 00

Public Comment made on 5/7/2013 11:18:26 AM from: Robert Bishop 3 14 West Spring Street Fayetteville, Arkamas 72701 4792873458 robertbishopl 1@,ym ai1,com IP Address: 99.73.182.93

Pablic Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I think allowing a power company to build so close to this historic church is a tragedy, Not only will it ruin the natural bdance of the site but it will taint the beauty of Eureka. A town that is held in high regard when it comes to beauty in Arkansas. Please do not do this, The power Iines can go in somewhere else.

6 Kristi Rhude . ..a 11.1 I- * From: Online Comment Form [email protected]> Sent: Tuesday, May 07,2013 11:24 AM To: socmaster & 00 Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 11:24:16 AM from: Scott Cahill 12 Charles St. Woburn, Massachusetts 01801 978-270-5715 scottmcahill@,nmaii.com IP Address: 134.241.2.60

Public Comments submitted for Docket: 13-041-U TN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPER4TION AND MAINTENANCE OF THE PROPOSED 345 KV TFXNSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED JN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I have visited the Thorncrown Chapel and I implore you to not let this amazing landmark's property be developed on by SW Elec Power Co. I know years from now, if it passes, many will look back and say what a tragedy it was to let industry destroy something created to elicit contemplation and connection to God through nature and human ingenuity. The land around it is gorgeous and it would be a terrible thing all together. Thank you for your time and consideration. Scott M. Cahill Woburn, MA

7 Kristi Rhude A hr. .r v From: Online Comment Form v .I ---lqyp\’*y..------*+m- i>r 4 .. ?, , Sent: Tuesday, May 07,2013 11:25 AM ..’ TO: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 112434 AM from: Patricia Young 5509 Oakbrook Alexander, Arkansas 72002

, 501-681-1831 tri shayoung 1 O@,amail.corn IP Address: 99.15.1 12.100

Public Comments submitted for Docket: 13-041 -U JN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAJNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: To disturb the serenity and natural beauty surrounding the Thorncrown Chapel masterpiece would be a tragedy if allowed to happen, as many fellow Arkansans and visitors alike can attest to. I realize the great service you provide our state in supplying power, however, please consider the added service you would offer and the respect of the people you would garner by not destroying the beauty of one of the most scenic spots in our NATURAL STATE.Please reroute or bury any power lines that would forever mar this amazing view.

8 Kristi Rhude ;,f ;,f ;;*wLiL GLq'-* - - From: Online Comment Form c [email protected] ,

Sent: Tuesday, May 07,2013 11:25 AM ' 7 F#fTj\ry*.1." I. nt C?"% TO: socmaster Subject: Online Public Comment for Docket: 13-041-U

' >I I, :-CE\VECI Public Comment made on 5/7/2013 11:24:57 AM from: Lyuba Bogan 18 Stonebridge Cir. Apt. 1827 Little Rock, Arkansas 72223 501-773-1 854 lyubabog;[email protected] IP Address: 97.65.36.130

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Thorncrown Chapel is a National Treasure and a major tourist attraction in Arkansas. Its amazing architecture can only be perceived in harmony with the surrounding nature. An ugly power line cutting through the woods nearby, in view of the Chapel, would destroy this harmony. In addition, the monetary value that tourism to the Chapel brings to the area would be jeopardized. Do we want to be known as a state that doesn't value its cultural and artistic heritage? I think the answer is clearly NO. Surely there must be an alternative solution to the power line that doesn't involve damaging one of the top tourism attractions in the state.

9 Kristi Rhude

Aht:, $UBW 5tKV. Lul " ' From: Online Comment Form < [email protected]> Sent: Tuesday, May AM 07,2013 11:30 - '7.c~

Public Comment made on 5/7/2013 11:30:14 AM from: renee sparks 123 springwood valley rd stockbridge, Georgia 3028 1 678-429-4286 creativesparks@charter .net IP Address: 68.1 90.50.25 1

PubIic Comments submitted for Docket: 1 3-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please please do not allow this travesty to happen. Surely in a state as large as Arkansas there has to be SOMEWHERE other than here to run the lines. If you allow this to happen you will be committing a travesty that would be nothing short of tearing down the Sistine Chapel to put up parking deck. This place is sacred, a consecrated, beloved place of worship and serenity. I am praying that surely there is someone in a place of authority in Arkansas that has better sense than to just idly let one of your state treasures be desecrated. Please please do not do this. Surely I am not the only one that thinks this is madness of the highest degree. Shame on you.

10 Kristi Rhude ;4p.8. PUBLIC SERV. CmH From: Online Comment Form Sent: Tuesday, May 07,2013 11:32 AM . -. TO: socmaster r -cp r'yjt 'I y 0F 2b' 5, Subject: Online Public Comment for Docket: 13-0414 2113 MAY -1 P 4: 00 Public Comment made on 5/7/2013 11:31:32 AM from: Steven 18 Cherry Laurel Ln. Swannanoa, North Carolina 28778 9 102299759 [email protected] IP Address: 68.153.245.77

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LJNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I disapprove of the proposed 345 KV transmission line. I believe it would affect the area in a negative way, particularly the Thorncrown Chapel. Please reconsider this option. Thank you for your time and consideration.

11 Kristi Rhude

From: Online Comment Form e [email protected]> _- Sent: Tuesday, May 07,201311:35 AM To: socmaster Sw bject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 11:35:21 AM from: Stephanie West 770 Lingering Pine Dr N W lssaquah , Washington 98027 425 65 70626 [email protected] IP Address: 50,135.100.252

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUWWESTERE ELECTRIC POWER COMP, FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPER4TION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHTNGTON COUNTIES, ARKANSAS

Comments: Please do not allow the Thorncrown Chapel and the surrounding area to be destroyed or obstructed. As someone who grew up in Northwest Arkansas, this was a favorite place of mine to visit. It is such a beautiful and peaceful place and Arkansas should be proud to have it. We need to preserve and cherish the things that make Arkansas unique.

12 Kristi Rhude

From: Online Comment Form < Krista@ mapleacrefarm.com> Sent: Tuesday, May 07,2013 11:36 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 11:35:51 AM from: Krista Meyer 13 E c E t V E D 4689 shanghai rd Sodus, Michigan 49126 269-932-1 027 [email protected] IP Address: 98.220.20.15 1

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I am among those who would like to encourage the power company to reroute in a way that would preserve the original views provided at the chapel.

13 Kristi Rhude PLb Bl ,I ],>

From: Karen Holt < [email protected] .. Sent Tuesday, May 07,2013 11:38 AM TO: socmaster Subject: Thorncrown Chapel 28I3 MAY -1 P 4: 00 !"

Comments: Please, please, PLEASE rethink your planned new transmissi line route so not to disturb the environment around this mazing landmark. It is a structure of historical, architectural and culturd value, and all of this is tied together by it's unique and peaceful surroundings. Tens - perhaps hundreds - of thousands transmission lines criss-cross the country, and their numbers will probably only continue to grow. There is only one Thorncrown Chapel. Regards, Karen Holt

1 From: Online Comment Form < [email protected]> ---- -,-,I , Sent: Tuesday, May 07, 2013 1057 AM a,RY rlF ’ To: socmaster Subject: Online Public Comment for Docket: 13-041-U 1 pwoo IN3 w -

.-IL” (-F\VED Public Comment made on 5/7/2013 105654 AM from: j’\ 7- -J + Liz Bradley 8 Palmer Avenue Swampscott, Massachusetts 01907 781-598-5343 1izziebradley~comcast.net IP Address: 71.233.8.84

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEUTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I just read of the application by SEPC to put a high voltage transmission line in the same area as the historically registered Thorncrown Chapel in Eureka Springs, Arkansas. Don’t allow this to happen. There are so few places of such beauty and refuge for people to use nowadays - we need places like Thorncrown Chapel more than ever! Please require the applicants to redraw their transmission lines so that they do not effect this wonderful, serene and historically important location. Respectfully, Liz Bradley

1 Kristi Rhude

-~ ,q*p~-&$5ERV. toMt? From: Online Comment Form Sent: Tuesday, May 07,2013 10:57AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:56:39 AM from: Day Burns 8037 US Hwy 64 W Russellville, Arkansas 72802 4795 679006 daydreeemers@,gmail.com IP Address: 74.194.7.47 fublic Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAJNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I recently learned that this power company has applied to build a 48-mile high voltage transmission line through Northwest Arkansas that will cut through the woods next to the Thorncrown Chapel in Eureka Springs. My husband and I were married in this chapel. It was placed on the National Register of Historic Places in 2000. We are concerned about how the transmission line would affect this site. Can you comment on how the transmission line would affect the view and serenity of this historic site?

2 Kristi Rhude p,,:nrr From: Online Comment Form q: Y' * i:,Tp\nY T?, Sent: Tuesday, May 07,2013 10:57 AM '. " To: socmaster 11.: Subject: Online Public Comment for Docket: 13-041-U 2013 -7 OQ

Public Comment made on 5/7/2013 10:57:14 AM from: Adam C Prichard PO Box 1318 Benton, Arkansas 72018 501-985-4515 [email protected] IP Address: 173.160.1 1.45

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROFOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments : I would strongly urge the PSC to reconsider this certificate and would ask that SEPC please consider other options for routing this transmission line around the area of the Thorncrown Chapel.

3 II From: Online Comment Form r,P'$'!,. ---Fr-fi&Ey-- Senk Tuesday, May 07,2013 10:59 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:58:57 AM from: Jon mobley 414s. Mashbum Fayetteville, Arkansas 7270 1 4794447773 [email protected] IP Address: 65.102.185.119

Public Comments submitted for Docket: 13 -041 -U IN THE MATIER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAJNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reconsider rerouting your swath elsewhere! This is an architectural icon for the state. I understand that this wont even enter yow thoughts. It is important to at least visit the sight to understand what it is that you will be doing.

4 From: Online Comment Form Sent: Tuesday, May 07,201311:03 AM .r." To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 11:02:45 AM from: Steven A. Anderson 521 West Lane Geneva, Illinois 601 34 630-232-462 1 [email protected] IP Address: 75.150.220.126

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND TIE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: As an out of state member of the public who has traveled to your state specifically for the purpose of enjoying the Thorncrown Chapel located at Eureka Springs, Arkansas, I would ask that any plans be adjusted to re-route the proposed line to avoid interrupting the views form the park site. While delivery of energy in the least expensive fashion is an important mandate, it must be balanced against the interest of all members of the public to benefit from sacred spaces. There must be a reasonable way to accornpiish both task herein. I have faith that your staff can balance both needs. Thank you for the opportunity to be heard.

5 From: Online Comment form . _.+- --- Sent: Tuesday, May 07,2013 11:03 AM ':-yz"j\,"y pF P.l?",tA. To: socmaster Subject: Online Public Comment for Docket: 13-0414 2[\] NAY -1 P tr: oo

Public Comment made on 5/7/2013 11:03:16 AM from: Eileen Clarke 1022 Stonybrook Dr. 0 Fallon, Illinois 62269 6185305951 doddfam457@,aol.com IP Address: 99.1 16.132.240

PubPc Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF EWIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not destroy this amazing structure which stands as a tribute to the Universal One and the glory of nature. Isn't there enough ugliness in the world already. Leave the forest alone and find another way to get your job done - aren't those lines going to be obsolete soon anyway. Bury them somewhere where they won't be seen and leave the beautiful that we have alone. Sincerely, Eileen M Clarke

6 Kristi Rhude

From: Online Comment Form < [email protected]> _-.I- -+- - Sent: Tuesday, May 07,2013 11:04 AM --~~rJ#qy(I)' P''? Pi. To: socmaster Subject: Online Public Comment for Docket: 13-041-U Z[13 MAY -7 P tc: 00

Public Comment made on 5/7/2013 11:04:09 AM from: Rev. David Snyder 525 Washington St Sebewaing, Michigan 48759 9898832350 [email protected] IP Address: 64.90.218.13

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATIOP. OF SOUTHWESTERN E ECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: SW Electric can afford to move their transmission line a couple hundred feet so as not to impinge upon the chapel or the enjoyment of visitors! I personally don't like the architecture, but value the setting and purpose. Someone needs to understand that economics do NOT need to drive every decision in the private or public spheres!

7 .cr'11< From: Online Comment Form

Public Comment made on 5/7/2023 11:05:04 AM from: Katie Fletcher 6410 Simms St. Apt 28 Arvada, Colorado 80004 3033582996 [email protected] IP Address: 66.1 80.1 1 1.94

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TWSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I would like to ask you to please avoid building his transmission line within sight distance of the Thorncrown Chapel in Eureka Springs, Arkansas. Though admittedly I have not been to Arkansas, this chapel has always intrigued me and is one of the places on my list of things to see when I do go there. The architect's philosophy when he built it was to put it on an isolated piece of land where people had not touched the environment surrounding the space. If the transmission line is rur~in an area that is close to the chapel, it will detract from the value and the feeling of the place. I urge you to keep this place and the surrounding area intact. Sincerely, Katie Fletcher

8 .. ---;>** 7 From: Online Comment Form c [email protected]~yF~~,F- I- Sent: Tuesday, May 07,2013 11:06 AM To: socmaster & 00 Subject. Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 11:05:59 AM from: M,Mortenson 12 Denison St. Newark, Deleware 1971 1 302-7384455 bets_v ma desi m@,ho tmai I. corn XP Address: 173.62.205.48

Public Comments submitted for Docket: 13-041-U IN THE MAITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not build the poet lines by Thorncrown Chapel. We visit it each year and stay in a local hotel when we are in town, and it would be a shame to loose the serenity of this church.

9 0- From: Online Comment Form , , ,,- r ?.-.SM .drr?F-ljii~'<3t !.,'-', Sent: Tuesday, May 07,2013 11:06 AM .- - To: socmaster Subject: Online Public Comment for Docket: 13-041-U 1!\3 HLY " O0

Public Comment made on 5/7/2013 X1:06:26 AM from: Ruth Reynoso 1821 putnam ave Ridgewood, New York 11385 3475039126 cosmth@&mail.com IP Address: 74.73.1 16.248

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY ANI) PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATlON AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reconsider this endeavor. This chapel exemplifies what we as a civilization should be moving towards. There must be another way, another route that can be taken. Please don't ruin this national treasure.

io Kristi Rhude ARi<,pljBtltw-- Lw19' From: Online Comment Form [email protected]~ - Sent: Tuesday, May 07,2013 11:46 AM -- -~ m? t.1. To: socmaster Subject Online Public Comment for Docket: 'Ir 13-0414 l~ljMAY -7 p

Public Comment made on 5/7/2013 11:46:15 AM from: Susan Schott 209 Sidney St. Dundee, Michigan 48 1 3 1 734-529-3913 smschott [email protected] IP Address: 50.127.252.46

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SO JTHWESTER ELECTRIC POWER COMPi IY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I am not a native of Ahnsas, but I became aware of this issue through "Colossal". It seems as though there are so few things of beauty left in our world, it would be tragic indeed for this beautiful structure and setting to be destroyed by technological intrusion. I'm sure there are other ways for progress to be made other than desecrating this beautiful sanctuary. It deserves another option.

2 From: Online Comment Form

.< ECElVED Public Comment made on 5/7/2013 11:52:10 AM from: Amanda Robinson 500 jarnagam Ln Fayetteville, Arkansas 7270 1 479422 1 885 darobinsons2001 @,yahoo.com IP Address: 70.178.171.22

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN 3ENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please don't allow this to happen. There are so few places of pristine beauty in this country. To aIIow one to be destroyed for something like a power company is, in my opinion, criminal!

3 --xt4 From: Online Comment Form OF Ci: ,I .. -7~y$zq.fI. .. Sent: Tuesday, May 07,2013 11:55 AM To: socmaster 1\13 NAY -7 Subject: Online Public Comment for Docket: 13-041-U

1:- - CE\VED T -- Public Comment made on 5/7/2013 11:55:20 AM from: Chad Olson 112 Braniff Place SW Calgary, Alabama T2 W 1R9 4032318679 chad.olson@,shaw.ca IP Address: 209.90.165.86

Public Comments submitted for Docket: 13-041 -u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTTFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSTON LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I recognize the need for reliable power infrastructure, however I would sincerely hope that accommodation could be made to avoid being within sight of the Thorncrown Chapel. It truly would be a shame to disturb the views offered from within this historic building.

4 From: / Online Comment Form *- -7qE: ,k?Y OF cg3E. Sent: Tuesday, May 07,2013 11:58 AM To: socmaster & 01 Subject: Online Public Comment for Docket: 13-041-U 1\13 -1

Public Comment made on 5/7/2013 115751 AM from: Karen Holt 102 Slade Drive Longwoad, Florida 32750 407-3 3-5454 karen.holt@,mail.com IP Address: 83.83.239.127

Public Comments submitted for Docket: 13 -041 -U IN THE MATTER OF TEE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: We have tens of thousands - perhaps hundreds of thousands - power transmission lines and towers throughout the country. There is only one Thorncrown Chapel, with its significant historical, architectural, cultural and spiritual value - all of it directly related to and tied together by its idyllic surroundings. There MUST be another option. Send SWEPCO back to the drawing board - please!!!

5 ,. -. From: Online Comment Form [email protected]> Sent Tuesday, May 07,20131158 AM To: socmaster Subject: Online Public Comment for Docket: 13-0.41-U 2\13 flhj

Public Comment made on 5/7/2013 11:58:21 AM from: P Pazdral 981 7 SVL Box Victorville, California 92395-5 143 760-952-3443 [email protected] IP Address: 98.1 19.50.146

Public Comments submitted for Docket: 13-041-U Dl THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Surely you coulod find a route that does not affect the serenity of this chapel.

6 Kristi Rhude n< ?,VI From: Online Comment Form < [email protected]> . -+z- Sent: Tuesday, May 07,2013 1299 PM TO: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 12:19:29 PM from: Katana B. King 108 Lone Maple Drive Castle Rock, Washington 9861 1 360-43 1-83 18 [email protected] IP Address: 75.164.198.236

Public Comments submitted for Docket: 13-04 I -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TMNSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: My family is from Arkansas, and I frequently visit there. The Thorncrown Chapel is one of the jewels of Arkansas that I cherish, and have sent many people to visit from around the country. I ask you to consider alternatives to the routing of this power line, so that it will not interfere with the beauty and uniqueness of this beautiful piece of architecture, and Arkansas. Thank you, Katana B. King From: Online Comment Form [email protected]> .p Sent: c.'3?5, Tuesday, May 07,2013 1219 PM I. -- -,72*<.,. To: socmaster Subject Ontine Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 12:18:58 PM from: Millie Minor-Gibson 43 1 1 Sycamore DR Roeland Park, Kansas 66205 xxx-xxx-xxxx [email protected] IP Address: 208.89.140.1 1

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Do not let powerlines ruin Thorncrown Chapel.

2 From: Online Comment Form < [email protected] > Sent: Tuesday, May 07,2013 12:18 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 12:18:07 PM from: Maddie Logan 705 Douglas Ave Fayetteville, Arkansas 72701 2144354062 melogan@,uark.edu IP Address: 72.204.52.74

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MANTENANCE OF THE PROPOSED 345 KV TRANSMISSION LJNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please don't put the voltage cable through Thorncrown Chapel!

3 From: Online Comment Form [email protected]> .------y-y+ GF P,? A?’!. 4 r,-.;?,gh\’\ Sent: Tuesday, May 07,2013 12:16 PM To: socmaster -7 P 1;1. Subject: Online Public Comment for Docket: 13-041-U MAY

Public Comment made on 5/7/2013 12:16:21 PM from: Ashia Lane PO Box 6138 Sitka, Alaska 99835 90773 80662 [email protected] IP Address: 24.237.1 14.16

Public Comments submitted far Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reroute the construction project to avoid Thorncrown Chapel,

4 Kristi Rhude W*RV. mrtH fl'"' '1

From: Online Comment Form [email protected]> ---- ?C (-1;' ::f **-r: ;.;~~~+!lY Sent: Tuesday, May 07,20131207 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414 "ay ''

Public Comment made on 5/7/2013 12:06:37 PM from: Adam 91 93 Heritage Estate Affton, Missouri 63 123 3 15-605-7041 ai [email protected] IP Address: 108.216.85.22

Public Comments submitted for Docket: 13-041-u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: DO NOT wreck such a beautiful, ground breaking, icon of architecture. There are other paths to take, what specific reason does it have to be right by this superb building. Americans should always have the community commenting on city development. The community obviously will have a problem putting this electric power company near this meaningful architecture. Consider a designer to solve this problem in a different way.

5 From: Online Comment Form -+--. , .*.- I!; n-,.. , rlr.. r.?5J%. .. Sent: Tuesday, May 07,201312:W PM TO: socmaster Subject: Online Public Comment for Docket: 13-041-U

'{ , F.CEIV€Dc- Public Comment made on 5/7/2013 12:03:36 PM from: Emily Harvey 902 West Cleveland Fayetteville, Arkansas 72701 870 761 4779 ekharvey3~mnail.com IP Address: 12.160.1 14.250

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED I?l BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The Thorncrown Chapel is one of the most breath-taking and unique places in Arkansas and it would be a travesty for the beauty of this building to be taken away!

6 Kristi Rhude

From: Online Comment Form ;?

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do whatever it takes to preserve this specid spot, I would think there has to be a way to reroute the lines so that this gorgeous location can be maintained for our htwe generations.

7 Kristi Rhude

iil, zc- Sent Tuesday, May 07,2013913 AM .+.- --. 1,: :',S ! 3F CC'4tJI. To: socmaster iq Sw bject: Online Public Comment for Docket: 13-0414 lot3 NhV - 1 p 4' '

Public Comment made on 5/7/2013 9: 13:23 AM from: IECEIVED Brian McMahon 1 Heather Lane Basking Ridge, New Jersey 07920 908-766-3504 peconicx@ahoo, co, uk IP Address: 69.1 19.1.153

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Preserve this masterpiece and it's envorons!

1 From: Online Comment Form [email protected]~ 7..--:y71 - _..+:,F r-’% .. %>( Sent: Tuesday, May 07,20139:36 AM To: socmaster Subject: Online Public Comment for Docket: 13-0424

Public Comment made on 5/7/2013 9:36:22 AM from: Joy D Jones 1611 South Pierce St Little Rock, Arkansas 72204 5015399457 j dmcveY66@mail .corn IP Address: 1 @.30,0.22 1

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please protect the beauty, tranquility and environment of one of Arkansas’ treasures, Thorncrown Chapel, from being destroyed with the placement of new power lines. This is not in the public’s best interest - the lines should be rerouted. Kristi Rhudt ,- ,

From: Online Comment Form Sent: Tuesday, May 07,20139:36 AM To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 9:36:16 AM from: Loren Jones 29 19 Alamo Ave Fort Collins, Colorado 80525 9702236197 lorenbob@,hotmail.corn IP Address: 67.162.15 1-151

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Seriously!?! Look at this building! It is absolutely unique. It is a treasure for your state. Please consider rerouting your power lines. Thanks in advance!

2 Sent: Tuesday, May 07,20139:33 AM To: sacmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 9:33:29 AM from: Corrianna Childers 600 Woods Dr Centerton, Arkansas 727 19 479-200-79 19 helIo~,ricordiphotogrhy.corn IP Address: 70.178.249.52

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTR C POWER COMP. IY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHTNGTON COUNTIES, ARKANSAS

Comments: What st shame it would be to change the area where this chapel has offered peace, beauty and serenity to it's visitors for so many years. Tell the power company to come up with a different plan. Preserving the Thorncrown chapel and it's environment is so much more important than anything the power company is setting out to do!

3 Kristi Rhude

From: Online Comment Form Sent: Tuesday, May 07,2013 9:37 AM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 9:37:01 AM from: Gail Dragon XCEIVED 114 East Street Fuquay Varina, North Carolina 27526 9196126021 gaidragon@,whoo.com ZP Address: 199.90.92.4

Public Comments submitted for Docket: I 3 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MATNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE RUAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: To put a power transmission line in this area would be a crime. It would take away from the art that is this building. We have to draw the line and this seems like a good place to start.

1 Kristi Rhude

Agi;, COMH From: Online Comment Form PU%% ?mw* Sent: Tuesday, May 07,2013 9:3& AM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 9:38: 15 AM from: ii Jennifer Burton E CElVE D 5508 E 76th St Tulsa, Oklahoma 741 36 9 1 8-493- 1259 [email protected] IP Address: 68.0.74.241

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Oh, please do not destroy the serene beauty of the Thorncrown Chapel! It is a unique national treasure. Please come up with a different plan for your power transmission line. From: Online Comment Form < [email protected]> CF c?v~~l~- Sent: Tuesday, May 07,2013 9:38 AM - -7 .?&JJY,, , r. . To: socrnaster Subject: Online Public Comment for Docket: 13-0414 1013 RAY -7 P O2

, i 1-,- CE\VECI Public Comment made on 5/7/2013 9:38:14 AM from: Chuck Wy 927 North Queens Ave Lindenhurst, New York 11757 5 16-987-6789 ki 1ling sky pr oduction@yaho 0. corn IP Address: 137.139.134.1

Public Comments submitted for Docket: 1 3 -041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR WE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: absolutely disgusting. the thorncrown chapel is a shining achievement in architecture. and destroying any part of the chapel or the land surrounding it would be one of the worst things imaginable.

2 Kristi Rhude

From: Online Comment Form < [email protected] > Sent: Tuesday, May 07,20139:44 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 9:43:40 AM from: David 1159 Madrid Road Waynesboro, Virginia 22980 5402414237 Faokfar3 @a01 .corn IP Address: 71.62.155.153

Public Comments submitted €or Docket: 13 -041 -U IN THE MATTER OF THE APPLICATIOF OF SO ITHWESTERE ELECTRIC POWER COMPA JY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THl2 PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Any fool who destroys the environment around Thorncrown Chapel should be forced to get a large tattoo saying "I AM OWNED BY SWEPCO" right on their forehead. I find it completely unbelievable that there isn't an alternative come for power lines than through the serene forest around the chapel. A plague on everyone's house that even brought up the idea that this was a good thing to do. Jesus wept.

1 Kristi Rhude

From: Online Comment Form _..-.- Sent: Tuesday, May 07,2013 9:42 AM ~':~.;$~''[p,l~'( f,Qy'-j. To: socmaster Subject: Online Public Comment for Docket: 13-0414 2013 HAY -1 P 4: 02

Public Comment made on 5/7/2013 9:42:07 AM from: -?Ec€Ivm KELLYTOLLEY 138TWIN OAKS DR JONESBOROugh, Tennessee 37659-5704 42373 73764 [email protected] IP Address: 50.142.83.97

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: You've got to be kidding me! How could you even consider endangering that beautiful place? Please, make a different plan. That chapel needs to be left alone.

2 Kristi Rhude A%!, FgRlo3Ew, CBBPI From: Online Comment Form [email protected]> Sent: Tuesday, May 9:41 AM -- I 07,2013 T:’E*,’,RY OF Y9!4!-i To: socmaster Subject: Online Public Comment for Docket: 13-0414 2013 HAY -1 P tr: 02

Public Comment made on 5/7/2013 9:41:14 AM from: Maia Tress PO Box 2624 Amarillo, Texas 79 105 8065 843 868 mttokvo@,mwil.com IP Address: 65.249.226.1 1

Public Comments submitted for Docket: 13 -04 1 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Is nothing sacred?? The forest, the chapel, Please, if SWEPCO indeed needs to cross this forest for delivery of electricity, please have them re-route AWAY from this chapel such that no one can see or HEAR anything but nature as God intended.

3 From: Online Comment Form

Public Comment made on 5/7/2013 9:41:01 AM from: Dale Grados 710 Argonne Ave #4 Atlanta, Georgia 30308 4 04-702 - 5 27 5 dsale.grados6krr1aiil.corn XP Address: 24.98.196.91

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, QPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LJNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED TN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Corn m en t s : Please deny application, What a travesty to shatter the serenity of this special place.

4 From: Online Comment Form

Public Comment made on 5/7/20139:38:47 AM from: Russell 48 Merrie Circle Richardson, Texas 7508 1 469.222.3694 [email protected] IP Address: 129.1 19.221.14

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This is a gorgeous building, the Thromcrown Chapel, please don't let SWEPCO interfere with the symbiotic relationship between nature of this amazing building.

5 Kristi Rhude ." 1 .'fa I:' From: Online Comment Form -- I" Sent: Tuesday, May 07,2013 9147 AM ''!t?TARY OF r,g,ybq, I To: socmaster Subject: Online Public Comment for Docket: 13-0414 2013 HAY -3 p t$ 02

Public Comment made on 5/7/2013 9:47:16 AM from: Sandi Gardner 13 18 Richelieu Ln Houston, Texas 770 18 713-682-3082 [email protected] IP Address: 70.138.136.31

Public Comments submitted for Docket: 13-04 1-U IN THE MAmROF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, AWSAS

Comments: I'm astonished that your plans bring this transmission line so close to Thorncrown Chapel. This is an important architectural treasure. It is very much a part if the environment in which it resides, and to change or destroy that environment is simply irresponsible. Thank you. Please, do the right thing and reconsider your plans.

1 From: Online Comment Form < [email protected]> .--" ./. Sent: Tuesday, May 07,2013 946 AM r.-ETARy 07 50rh'. To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 9:45:58 AM from: IECEIVED linda willbur 20700 pine lake rd battle creek, Michigan 490 I4 2695655337 nanaofl 1O@,vahoo.com IP Address: 98.209.194.199

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TTWNSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED TN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: another shining example of what is wrong with people "pushing pencils" !!! seriously.. why cant a 20 mile curve be put into the plans, it is just sad that a petition has to be circulated and signed just to save something so beautiful and peaceful ! !! ! shame on you mr. rnulti million dollar electric company. .. SHAME ON YOU ! ! !! !

2 Kristi Rhude hti3*WbUt' JrRv. CI]HM From: Online Comment Form [email protected]> --- Sent: Tuesday, 9:44 AM ' May 07,2013 -:-%ETi43Y ---CF rQtiktA TO: socmaster Subject Online Public Comment for Docket: 13-041-U ZOf3 HAY -7 p 4: 02

Public Comment made on 5/7/2013 9:44:08 AM from: WCEIVED Mark Eisenbies 202 Halton Rd. Syracuse, New York 13224 315-308-1049 iii bbb@,hotmail .corn IF Address: 149.1 19.156.72

Public Comments submitted for Docket: I 3-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LTNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I believe the power line should be rerouted to avoid Thorncrown Chapel.

3 Kristi Rhude

;-A%.PUSL~C: Mfv I LUl’trn. From: Online Comment Form [email protected]> Sent: Tuesday, May 07,2013 950 AM ._-.- 4’ 4’ -vRET{\g’f ’3F ro!-?:. To: socmaster Subject Online Public Comment for Docket: 13-0414 20!3 MAY -1 P 02

Public Comment made on 5/7/2013 9:50:14 AM from: w’\!- -CE.IVED Jonathan Saint 3832 Hale Haven Dr Paducah, Kentucky 4200 1 7133968740 j0nathan.a.saint@qmail,com IP Address: 144.191.148.5

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED TN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I’ve been to the beautiful Thorncrown Chapel that is being irreversibly impacted by the new transmission line being considered - this is a travesty given the fact this special building is on the National Register of Historic Places. You must reconsider the placement of this line in order to preserve this American treasure.

1 Kristi Rhude -8" M['I

From: Online Comment Form

Public Comment made on 5/7/2013 9:50:04 AM from: Grace Sanchez 489 SW Seminole Dr. Aloha, Oregon 97006 503-645-9149 gracein@,vahoo.com IP Address: 50.53.208,152

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROFOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I am a native Arkansan. Having lived around the world and now settled in Oregon I have always attempted to bend the stereotype of Arkansas and give the true account of the immense diversity of the state, from its diverse communities (I grew up in Pine Bluff), to how its people value its natural resources. This monument to art and nature is symbolic of how the state will preserve both for the future. I consider the people of the state of Arkansas to be forthright, courageous and wise. The kind of people that will not let big corporations tell them what to do ...I'm holding out hope for the Mayflower debacle. This icon to the nafxral world puts Arkansas on the map and is in keeping with our states values. I still am a proud Arkansan!

2 Kristi Rhude

, 8fiaPtJEklc StRVd COMM From: Online Comment Form < michel lestonephoto@g mail.com P Sent: Tuesday, May 07,2013 10:17AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

PubIic Comment made on 5/7/2013 10:16:35 AM from: Michelle Stone 3530 Woodmont Cove Horn Lake, Mississippi 3 8637 90 13264039 [email protected] IP Address: 174.50.46.113

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please please please do not approve this! It is not needed and will disrupt something so incredibly beautiful and moving. It is a place of serenity and peace, to be one with nature and God and power lines are NOT a part of that.

1 Kristi Rhude n.

.*,,.,&PtiWtJL.'r " '?r *$ From: Online Comment Form -/- Sent: Tuesday, May AM ' " .7,: 07,201310:16 .,, :*ow To: socmaster Subject @ 03 Online Public Comment for Docket: 13-041-U 21113 NAY -7 p

) :I- E\V Public Comment made on 5/7/2013 10:15:41 AM from: n t- c ED Mauriahh Beezley 140 s hill ave. fayetteville, Arkansas 7270 1 4793 a77760 [email protected] IP Address: 167.246.61.1

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: There are few things so sacred and beautiful left in this world. Please think about the bigger picture of what all will be hurt by the power line going up and taking away the beauty and purity of the chapel. I remember as a kid going there with my family and thinking it was one of the best things I'd ever seen. I still feel the same way about the chapel to this day and go there every time I'm in the area. I hope to take my child there one day and be able to share that moment.

2 Kristi Rhude

From: Online Comment Form < [email protected]>-r-r.-/----q5F ZJ;,?,) L- Sent: Tuesday, May 07,2013 10:16 AM 03 To: socmaster b: Subjeck Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:15:38 AM from: Kate Good-Smith 4349 30th Ave. W. Seattle, Washington 98 199 206-2 84-5574 kgmdsrnith@,nrnail.corn IP Address: 7 1 227.1 88.223

Public Comments submitted for Dacket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHTPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please please don't allow this. This glorious serene Iovely spot DOES NOT NEED power lines next to it. Surely they can be moved somewhere else? It's wrong on many levels. Thank you.

3 From: Online Comment Form Sent: Tuesday, May 07,2013 10:14 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2013 MAY -1 P 4: 03 i-t 1 VE Public Comment made on 5/7/201310:13:36 AM from: E c E D A Besser 514 S Wood St Neosho, Louisiana 64850 20324092 5 6 [email protected] IP Address: 184.190.83.66

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: SWEPCQ should reconsider running large-scale power lines that cut the land's natural scape, and devalue the attraction to this area. To execute this project, just to power more short-term profitable development, will eventually drive the area to be nothing more than a worthless landscape of suburban development and subdivisions, where people will eventually want to leave because the original draw of living somewhere picturesque has been destroyed by shortsightedness. Thorncrown Chapel draws thousands of visitors to the mea for both tourism and weddings in a desirable and beautiful setting. To devalue that by running these lines is to add to the eventual demise of the draw of this area, Perhaps a better plan would be to run the lines from a different direction or different manner, less invasive to the aesthetics that define this part of Arkansas. Or maybe take a step forward and invest in a renewable energy source closer to the desired end-location. Not only would that put SWEPCO in good standing with the environment, but also with the locals and non-locals who cherish the area as is.

4 Kristi Rhude

From: Online Comment Form

--A :-??ZT&RY DlF(P.YP::, -I-' Sent: Tuesday, May 07,20131093 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:13:28 AM from: John Jasso 40 Builtmore troy, Michigan 48084 248 269-0236 wpsacstudio@,nmail.corn XP Address: 76.1 12.225.1BO

Public Comments submitted for Docket: 13-041-U IN THE MATER OF TWE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please don't. There's always an alternative.

5 From: Online Comment Form < emi [email protected]>

-" r E\v E Public Comment made on 5/7/2013 10:11:36 AM from: .I,CV Emily Allen 1 102 Turner St Jonesboro, Arkansas 7240 1 870-5 3 0-2205 emil~esmith76~~ahoo.com IP Address: 173.219.152.33

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN "€€E SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The Thorncrown Chapel in Eureka Springs, AR, is on my "top ten favorite places on earth" list. Being in this transcendental space moved me. Perfection in lines nestled in nature. Silent room ringing with etherealness (!). And I hope it has the chance to move many more. But it's more than just a space that moved me. It is historical design and brilliant architecture. And I hope it has the chance to continue to inspire. Please DO NOT ruin this Godly place with the new power line project. We must hold dear to this treasure space. Thank you, Emily Allen Jonesboro, AR

6 Kristi Rhude

From: Online Comment Farm r .- Sent: Tuesday, May 07,2013 10:ll AM :I C~F,T,~~YQT CGtdr?. To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2013 MAY -7 p m

Public Comment made on 5/7/2013 1O:ll:Zl AM from: Donna Ramsey 1 1 16 Bluebonnet Lane Austin, Texas 78704 5.12-447-7 164 justdopen@sbcdobal .net IP Address: 97.77.45.86

Public Comments submitted for Docket: 13-041-U IN THE MAIITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLlC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LlNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKAPJSAS

Comments: Thorncrown Chapel is a national treasure. One rarely sees modem architecture so seamlessly integrated into the surrounding landscape. The combination of a place of worship and the forest is beautifully realized. I strongly urge you to find another pathway for the transmission Iines. Donna Ramsey Austin Texas

7 Kristi Rhude

From: Online Comment Form ---yPeQF .p 7’ T+..r_!:’.SY of cow. Sent: Tuesday, May 07,2013 10:07AM To: socrnaster 2013 HAY Subject: Online Public Comment for Docket: 13-0414 -1 P b 04

Public Comment made on 5/7/2013 10:07:29 AM from: Virginia padilla 669 ridgewood dr. Daphne, Alabama 36526 25 13673971 vm~adilla32~,~mail.com IP Address: 108.207.14.92

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please don’t spoil the beauty of this architectural wonder that celebrates the nature in your part of the country. Put the utility lines elsewhere, please! ! ! Thank you

8 Kristi Rhude

From: Online Comment Form Sent: Tuesday, May 07,2013 10:06 AM >- To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made OB 5/7/2013 10:06:29 AM from: Stephanie Tholand 38 Orchard Terrace Burlington, Vermont 0540 1 4152059821 [email protected] IP Address: 23.30.155.189

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: There are so few opportunities and spaces left in our world to enjoy truly serene moments. Do not ruin this one. Find a way to give the Thorncrown Chapel in Eureka Springs a wide berth that preserves the sanctity and serenity of a national1y -recognized historic and special place.

9 From: Online Comment Form [email protected]> .-'-+a~-r+gI' gr: CW~~~ Sent: Tuesday, May 07,2013 1O:OS AM L,-.- To: socmaster Subject: Online Pubtic Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:04:43 AM from: Elizabeth Allen 302 Ninth Street Prairie Farm, Wisconsin 54762 1-715-455-1555 lizallenart@,chibard un.net IP Address: 216.41.204,134

Public Comments submitted for DockeE: I 3 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This building needs protection. Someone in a position to save it, needs to summon the humanity and intelligence it takes to stand up to economic and corporate greed as a priority, and do the right thing. DO NOT ALLOW THIS LlNE TO BE INSTALLED!

10 From: Online Comment Form r?!l.t'4 '* --5-mgy T-,f s.s* ' Sent: Tuesday, May 07,2013 10:03 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:02:37 AM from: Elsie Warnock 2406 Gale Place El Dorado, Arkansas 7 1730 870 863-9500 j ew~ock8~suddenlinIc.net IP Address: 173.216.56.37

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTTES, ARKANSAS

Comments: Please reconider this proposal so that Thorncrown Chapel is protected.

11 From: Online Comment Form < [email protected]> Sent: Tuesday, May 07,20131O:OO AM ..+c . ;3 '-,Tj,

Public Comment made on 5/7/2013 10:00:05 AM from: Lex Park 7300 Major Ave Norfolk, Virginia 23505 75762 1 7775 thefoonshoe@&gnail.com ZP Address: 128.82.248.113

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN 'BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please work to preserve the area around The Thorncrown Chapel instead of building this power line through it.

12 Kristi Rhude - From: Online Comment Form .- -' pF C"Uy Sent: Tuesday, May 07,20139:59 AM ' -7r,,.4-pr;:-y;RY d TO: socmaster & 0.Zq Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 9:59:13 AM from: Elaine St Louis 1621 S Pennsylvania St Denver, Colorado 802 10 303 722 1081 eistlouis@,,msn.com IP Address: 71.208.171. I38

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: There MUST be a better way to get power from one place to another without destroying the ambiance of this serene and historic place. Ark, architecture and nature all working so well together for all of these years. Please please PLEASE find a solution that does not affect this structure and the area around it.

13 From: Online Comment Form __ __- w Sent: Tuesday, May 07,20139:59 AM '-Gj;:*'rflgg QF C??! To: socmaster Subject: Online Public Comment for Docket: 13-041-U 1013 HAY -7 P rt: 04

Public Comment made on 5/7/2013 95859 AM from: iiECElVED Josef Tracy 205 Wilbur Ave Atalanta , Georgia 303 16 61 7-33 1-7707 jtracv2@,student .g,su.edu IP Address: 24.98.66.68

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LTNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Thorncrown Chapel is national treasure because of its architectural significance and beauty. Its magnificence would be compromised if its views were blemished. In routing the powerline, please preserve the tranquility and grace of this location. Please also consider the (potential) value of this site in tourist dollars as you weigh the decision. Sincerely, Josef Tracy

14 Kristi Rhude 4K,yl)#Ljc SETrV. cwfi From: Online Comment Form Sent: Tuesday, May 07,2013957 AM ../- To: ,.-d ;yFETi3y OF 1':*""I. socmaster _.- Subject: Online Public Comment for Docket: 13-041-U 2013 WRY -1 0' Public Comment made on 5/7/2013 957~22AM from: Jessica Atkinson nECE\\IED 1019 E. Pike St. Unit S Seattle, Washington 98 I22 206-595-841 1 [email protected] IP Address: 184.78.184.120

Public Comments submitted for Docket: 13-04 1-U TN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LJNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I understand the matters of growth and the need for the power company, but please don't destroy this serene place. There has to be other options to not interfere? We live in a country that places importance on replacing what was rather than embracing what is. I love this space as do many others because it is so much a symbol of modern but also embraces the beauty of the south.

15 From: Online Comment Form < [email protected]> Sent: Tuesday, May 07,2013 957 AM To: socmaster l&w Subject: Online Public Comment for Docket: 13-041-U

Public Comment made OB 51712013 9:57:03 AM from: Mark L. Groves 14639 W. 151st Terrace Olathe, Kansas 66062 9 13-390-8509 [email protected] IP Address: 64.126.1 8.196

Public Comments submitted for Docket: 13-04 1-U lN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Nature is not only a beauty and respite in Eureka Springs and the surrounding area, it's a monetary resource and part of the vibrant- and necessary- towjsrn industry. A major draw to the area is, explicitly, the natural environment. This huge power line, and the swathe of destruction it will inflict on the forests and scenery of the area, is counterproductive to the future of northern Arkansas as a leading "natural"resource and industry. Please do NOT build this along the route you intend.

16 Kristi Rhude

From: Online Comment Form

Public Comment made on 5/7/2013 95544 AM from: Michael G Nabors Jr 235 S. McLean Blvd., Apt. 15 Memphis, Tennessee 38 1 04 (901) 590-6094 [email protected] IP Address: 50.130.43.98

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Having had the pleasure to attend two weddings at this wonderful place and visiting it over a dozen times in journeys to Eureka Springs, I am appalled at the possibility that power lines may be built in proximity to Thorncrown Chapel. I hlly understand the need for power transmission lines in a rapidly developing region; however, SEP can surely find an alternative mute that does not devastate this Arkansas treasure. Please reconsider the location ofthis and leave Thorncrown and its surrounding environs alone. Thank you . . .

17 From: Online Comment Form [email protected]~ cc- Sent: -.-- r P 47b', , Tuesday, May 07,2013 9:55AM +ppq-:..8? Qr To: socmaster Subjeck Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 9:55:16 AM from: Amy Root 10402 N 88th E Ave Owasso, Oklahoma 74055 9 1 89780292 Amvroot007@,gmail.corn IP Address: 166.137.156.42

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow power lines to be built around the Thorncrowne chapel! We travel there every year and it would literally ruin this historical site. Kristi Rhude tr From: Online Comment Form '** .:.>qrT&?.r OF 7,-& v , Sent: Tuesday, May 07,2013 9:55 AM .- To: socmaster Subject: Online Public Comment for Docket: 13-0414 2113 Nh'f -7 p @ ''

Public Comment made on 5/7/2013 95457 AM from: Maggie Mills 1604 E. Peters Colony Road Carrollton, Texas 75007 4047757978 mag;niemiIIs@y ahoo.com IP Address: 208.86.13 I.129

Public Comments submitted for Docket: 13-0414 IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: As a child, my family and I would travel from Tulsa, OK to Eureka Springs for vacation, and one of our stops was always the Thorncrown Chapel. I've always had a special place in my heart for this unique and wonderous manmade creation. It's a rare, shining example of architecture that's in tune with the nature surrounding it, and for many people like me, it's as close to feeling at home and at peace in a church as we've ever come. Permitting SWEPCO to build transmission lines so close to this sacred, beautifid place wouldn't just destroy the landscape around the chapel. It would also be a slap in the face to all that the church and its builder stood for. It would disrespect the original intent, and for many like me, would tarnish the experiences and memories I cherish. Finding God in everyday life is difficult in today's world, and this is one of those rare, peaceful, manmade places on earth where it's still possible. Please do not allow SWEPCO to ruin this beautiful place!

19 Kristi Rhude

:, #frm P.MLK0 3 EW- From: Online Comment Form Sent: To: Subjeck

Public Comment made on 5/7/2013 9:54:36 AM from: Alex Chino-Hurt 2035 SE Stone Corvallis, Oregon 97333 7039466 160 alex.cimino.hurt~mail.com IP Address: 128.193S2.84

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: With regards to placing a power line near the "horncrown Chapel, please don't. There are numerous paths to send power lines but fewer and fewer uninterrupted views that warrant as much protection as this one does. Electric power Will always be an issue that is prioritized in our country because of how important it is for our economic, energy, and national security but don't let this be just one more in a long line of decisions that is slowly but surely breaking apart the serene spaces in this country. And if this doesn't serve as sufficient rationale, simply consider how often you see a view of nature uninterrupted by human devices and do your best to minimize the impact of this decision. Regards, Alex Cknino-Hurt

20 Kristi Rhude

From: Online Comment form < [email protected]>

Sent Tuesday, May 07,20139:53 AM 4. To: socmastter 5 ubj ect: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 9:53:15 AM from: Linda Harris 15963 CR IS9 West Flint, Texas 75762 903-52 1-6984 [email protected] LP Address: 24.54.117.178

Public Comments submitted for Docket: I 3-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OFEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow SWEPCO to construct this power line! Big money is draining our resources and our souls!! "Arkansas:It's a Natural." Remember that phrase? My family has enjoyed the splendor of this region of Arkansas many times. This news sickens me. I myself am about to lose my waterfront via a massive pipeline sending 150 million gallons of water per day to Dallas. Plus, a huge timeshare resort will soon be flowing their aerobic sewer effluent into the lake as well. The little people are becoming powerless.

21 Kristi Rhude

FrQm: Online Comment Form ,J%, Pg%&+c §mv*taw Sent Tuesday, May 07,20139:53 AM To: socmaster ;FC?CTfiR)' OF CPY??. Subject: Online Public Comment for Docket: 13-0414 1013 HAY -1 P k Oh Public Comment made on 5/7/2013 9:53:00 AM from: firsten E CEIVE a 1 5 12 Spruce Place Minneapolis, Minnesota 55403 7153098525 Kirsten.zache~,yafioo.com IP Address: 23.30,229.153

Public Comments submitted for Docket: 13-041-u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATlBILITY AND PUBLIC NEED FOR THE CONSTRUCTJON OWNERSHIP, OPEICATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I haven't even seen this in person but I almost cried from how awesome this place is. Please do not destroy it.

22 From: Online Comment Form -" --- -$ OF f-,~5? Sent: Tuesday, May 07,20139:53 AM :T.CfrETii 5 ' To: socmaster Subject Online Public Comment for Docket: 13-041-U Ig\3 MAY -7 P 0: 0'

Public Comment made on 5/7/2013 9:52:56 AM from: Rev. David Chapman 6624 Scott St. Allendale, Michigan 49401 616-723-3727 dbchapman@,gmail .corn IP Address: 148.61 -42,166

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED TN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Dear Sirmadam, In regards to the application of the SW Electric Power Company to run their transmission line in near proximity to the Thorncrown Chapel, I am writing to ask the Commission to alter their request so that the line does not come within any view of the Chapel. Preservation of this precious structure's opportunity to worship and commune with the Creator in this beautiful setting should be of the highest priority, as it was built with the purpose of creating harmony between the natural world and humanity, free from the produce of human hands other than itself. I would consider this as important as the preservation of national parks or any other testament to the Creation itself, in that within its natural setting, man, in a community setting, can still soak in the presence of the Almighty without the constraint of commercial invasion. Thank you for your time and consideration. Regards, David Chapman Rose Ministries

23 From: Online Comment Form [email protected]> --oyOF f-$?! Sent: Tuesday, May "I-?;-Fzq\>% 07,2013 9:53 AM ,..d'%A To: socmaster 0s Subject: Online Public Comment for Docket: 13-041-LI '1013 MhY -7

Public Comment made on 5/7/2013 9:52:37 AM from: Erin Cline 725 B Pointe Cowt Tallahassee, Florida 32308 85098039 13 anisesassafras~~maiI.com IP Address: 199.250.17.35

Public Comments submitted for Docket: 13-041-U TN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LTNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: To Whom it May Concern, Do not shatter the surrounding landscape that makes up the total experience of the Thorncrown Chapel. Allow future generations to enjoy the serene beauty of the historical Thorncrown Chapel, by NOT constructing high voltage power lines near the Chapel. Thank you, Erin Cline

24 Kristi Rhude

,I :&. Ffl@ turn7

From: Online Comment Form

Sent: Tuesday, May AM "4 07,2013 9:52 ~-(:~:.'ETfq~Yc' r,;; i4'. To: socrnaster Subject: Online Public Comment for Docket: 13-041-U 2!J13 WAY -7 p Q otr

Public Comment made on 5/7/2013 95221 AM from: Geoffrey Keller 606 Overlin #3 Glenwood Springs, Colorado 8 160 I 9703093091 peoffk sopris(iilvahoo.com IP Address: 50.194.149.129

Public Comments submitted for Docket: 13 -04 1 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC WEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do NOT let the new transmission line wreck the Thorncrown Chapel.

25 Kristi Rhude

,G#,?rn@ stm- Froill: Online Comment Form < [email protected]> Sent: Tuesday, May 07,2013951 AM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 9:51:04 AM from: ;-;E c E iv E D Laura make 9027 Coral Drive St. Louis, Missouri 63 123 3 14-638-55 19 lthake@,swbelI.net IP Address: 75.132.5.149

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRJC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHJPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This place should remain sacred and free from ugly power lines. A place of worship deserves the dignity that was chosen for it, when it was constructed. I would love to visit this place, and attend a service there, but not if there are huge power lines above it, ruining the intended view of the architect and benefactors. Find another way, think outside the box, and you will be praised for your ingenuity.

26 ,: 3 Kristi Rhude

From: [email protected] on behalf of Michael William- , .’ :-’”>- &: .- *-ox.net> Sent: Tuesday, May 07,2013 10:08 AM -. To: Kristi Rhude Subject: Public Comment on 13-041-U

To Whom it May concern:

I am writing regarding Docket 13-04 1-U, appIication of Southwestern Electric Power Company for a proposed power transmission line.

It is my understanding that the proposed power line construction zone abuts the site of Thorncrown Chapel. I am opposed to any power line construction that would impact the visual integrity of this architecturally and historically significant building and grounds, I‘m not an Arkansan, but I think the Chapel is of such architectural importance that we all have an interest in preserving this treasure. In the case ofthe Thorncrown Chapel, the setting is integral to the design of the whole, and is worthy of protection. No power line, please.

I will be gratefd for your consideration of my comment.

Respectfully yours, Thomas Michael Williams 404 Mimosa Road Portsmouth, Virginia 23701 (757) 362 441 8 email: [email protected]

1 From: Online Comment Form -q- Sent: Tuesday, May 07,201310:19 AM +l --g:;gETp,nY m ' To: socmaster b: ou Subject: Online Public Comment for Docket: 13-041-U 2\\3 Hhl

Public Comment made on 5/7/2013 10:18:41 AM from: Cindy Wexler 10404 Renfaire Dr Plantersville, Texas 77363 9368942705 [email protected] IP Address: 76.6.79.127

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCUTED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow the huge power lines to demolish the forest around this beautiful place. Let the utilities add another few miles to go around Thorncrown Chapel I a treasure in Arkansas, and on the National Historic Register. Save the forest that surrounds it. From: Online Comment Form [email protected]> *--3>c.?hm-dCy Sent: Tuesday, May 07,2013 10:41 AM To: socmaster Subject: Online Pubfic Comment for Docket: 13-041-U lb\3 HR’

Public Comment made on 5/7/2013 10:41:05 AM from: Cheri LangIois PO Box 1286 Mendocino, California 95460 nonyur [email protected] IP Address: 1 84.63.206.201

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TMNSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Seriously, power lines here? There has to be a better place to put those lines.

8 Kristi Rhude w,~&d~fi

From: Online Comment Form c elieceh @yahoo.com> 9. n- Or CW Sent: Tuesday, May 07,2013 10:40AM ..- -T++-f To: socmaster Subject: Online Public Comment for Docket: 13-0414 2\13 MhI -1 ''' :pLCEIVED Public Comment made on 5/7/2013 10:40:04 AM from: Eliece Horton 1781 Calypso Drive Aptos, California 95003-5806 83 1-688-6979 [email protected] IP Address: 107.3.185.174

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION ANI) THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHJNGTON COUNTIES, ARKANSAS

Comments: Please deny the application of Southwestern Electric Power Company for a certificate of environmental cornpatability as it threatening the Thorncrown Chapel in Eureka Springs, Arkansas, considered one of the crowning examples of organic architecture. http://www.thorncrown.coml

9 Kristi Rhude

From: Online Comment Form _- Sent: Tuesday, May 07, 2013 10:39 AM mcTJ$R?OF cow. To: socmaster Subject: Online Public Comment for Docket: 13-0414 2fl\3 MAY -1 p 4: o4

Public Comment made on 5/7/2013 10:38:59 AM from: CElVED Victoria Johnson P.O. Box 11315 915 E. Market Ave. Searcy, Arkansas 72 143 33 9-23 5-9664 tori .iohns0~7~,~ahoo .cam IF Address: 192.133.129.154

Public Comments submitted for DockeE: 13 -04 1 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This line should not go up!! It will destroy the serenity and grace that is the chapel. It will ruin an artist’s work and a gorgeous attraction for tourists.

10 Kristi Rhude

Sent: Tuesday, May 07,2013 10:39 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:38:39 AM from: Nancie Mills Pipgras 4722 Golf View Court Santa Rosa, California 95405 916 715 3284 ntpipm@,nmail.com IP Address: 50.152.178.30

Public Comments submitted for Docket: 13-041-U IN THE MA'ITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED TN BENTON,CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Sometimes, the shortest route between Point A and Point E3 is NOT acceptable. Please do not desecrate what is both a place of worship and an architectural wonder. Kristi Rhude

From: Online Comment Form

Public Comment made on 5/7/2013 10:32:56 AM from: Alma Williams 2816 N. 29th Place Phoenix, Arizona 85008 602-956-1546 dmahwO,q.com IP Address: 97.1 17.185.48

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV rrCANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reroute the power line. This structure and its surrounds warrant preserving in the name of Beauty, Sometimes form does indeed trump function.

12 Sent: Tuesday, May 07,2013 1054 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U -i c E\V E @ Public Comment made on 5/7/2013 10:54:02 AM from: Mario Lopez 667 W. Hancock #308 Detroit, Michigan 48201 3138331951 3 1 3dude@,rnnail.com IP Address: 173.162.54.1 13

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTFX POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN WESHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow this architectural gem in your state to be “uglied”by a power line. Why don’t you give the power company some “funding” so they can go around the site. Thanks

1 Kristi Rhudc

From: Online Comment Form Ji8k PUBLIC 3ERV. t0HH Sent: Tuesday, May 07,201310:25 AM _* TO: socrnaster "C"Th.?Y cr CQXy. * Subject: Online Public Comment for Docket: 13-0414 2013 HAY -1 P 4: 05 Public Comment made on 5/7/2013 10:24:52 AM from: Christine Wolfe iL: CC E1VED 1909 Winnemucca Ln Sugar Grove, Ohio 43 1 55 740-746-9188 wolfe.262@osu,edu XP Address: 75,185.33.204

Public Comments submitted for Docket: 13-04 1-U IN THE MATIER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KTNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I hope you will take care to avoid encroaching on the views and serenity that surround Thorncrown Chapel. This is a beautiful special place of respite and contemplation that would be lessened by nearby construction and the existence of power lines. Please consider giving it a wide berth when you plan the placement of the lines.

1 Kristi Rhude .. ~ ' .. , *.-. From: Online Comment Form __- rbF corn. Sent: Tuesday, May 07,2013 1024 AM To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/201310:24:00 AM from: James 130 NE Knott Portland, Oregon 972 12 5037892514 [email protected] IP Address: 72.37.244. I24

Public Comments submitted for Docket: 13 -04 1-U IN THE MAITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please save the Thorncrown Chapel and deny the application far the powerline.

2 Kristi Rhude

From: Online Comment Form .. _- _---- Sent Tuesday, May 07,2013 10:23 AM ... *-,-n-T:, ,?,!t ..\ *y1 ?f f,?:?~, To: socmaster Subjeck Online Public Comment for Docket: 13-041-U Rl3 MAY -1 P IC: OS

Public Comment made on 5/7/2013 102253 AM from: Amy Figure1 501 Rayburn Ave. St. Louis, Missouri 63 126 3 14-560-9082 [email protected] IP Address: 2 16.114.70.162

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAJNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please consider the impact this proposed project has not only on the natural environment, but a piece of historical architecture that is sacred to many. My sister is one of likely thousands that have been married in the Thorncrown Chapel. It is a wonderful place of peace and beauty that should be preserved for future generations.

3 -& From: Online Comment Form [email protected]> -q-~~9; CJ&, >_ . Sent: Tuesday, May 07,2013 10:23 AM - To: socmaster ,zt1\3 HAY P 0s Subject: Online Public Comment for Docket: 13-041-U -1 11:

Public Comment made on 5/7/2013 10:22:42 AM from: Kristen Darbyshire 305 Oriole Lane Shreveport, Louisiana 71 105 5 1 828 11 3 1 1 kdarbvcoupon@,hotmaiI.corn IP Address: 174.50.24.113

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTTON OWNERSHIP, OPERATION AND MAINTENANCE OF lXE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please don't destroy the serenity of the Thorncrown Chapel with this line. Please consider an alternative route. Thank you for your consideration.

4 From: Online Comment Form

Public Comment made on 5/7/2013 10:21:00 AM from: Laura Konkol 402 Harvest Ln Sun Prairie, Wisconsin 53590 608 9574422 1konkol @wisc.edu IP Address: 72.33.91.227

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I have grown up touring Taliesin and attending weddings at the Monana Terrace. Frank Lloyd Wright’s work is unbelievable and cannot be replicated. This chapel is undoubtedly a work by Jones inspired by Frank Lloyd Wright. We need to be preserving work like this. A power hewould take away from its serenity, exactly what Jones was trying to create.

5 Kristi Rhude

From; Online Comment Form [email protected]> -- . Sent: Tuesday, May 07,2013 10:29 AM To: socmaster Subjeck Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:29:21 AM from: Shannen Noark 8410 Bridgetown Dr. Austin, Texas 78753 7134786668 shannen74@,mnail.com IF Address: 99.30.221.62

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHTNGTON COUNTIES, ARKANSAS

Comments: Please do not allow the proposed transmission line to disrupt the amazing beauty of Thorncrown Chapel. This chapel has been referenced in a recent CNN article about the coolest places in America to get married: http://www. buzzfeed.com/peggy/coolest-places-to-get-rnarried-in-america Destroying the woods surrounding this chapel would be a tragic degrading of a beautiful work by one of America's best Architects, and it would devalue an asset as it could be promoted more as a venue. Kristi Rhude

From: Online Comment Form Senk Tuesday, May 07,2013 1053 AM .* . To: socrnaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:53:14 AM from: Warren Dietzel PO Box 64 Greenland, Arkansas 72737 4794439033 endwarrmyahoo.com IP Address: 70.178.169.213

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: To whom it may concern, I have to say tht I am not pleased at all to discover that SWEPCO plans to run a massive 345 KV Transmission Line across the valley overlooked by Thorncrown Chapel. As you may and should know, Thorncrown Chapel was placed on the National Register of Historic Places in 2000. This proposed powerline would disrupt the pristine beauty of the valley that this remarkable chapel has for so long sat witness to. It would be in the worst interest for this state and the region if this were to go through. Thank you for your time. I hope you will all make the right decision on this one and not simply follow the money. Sincerely, Warren P, Diekl

1 Kristi Rhude

From: Online Comment Form Sent: -- Tuesday, May 07,2013 1052 AM 4- ,iTp,ET,jR-!' FF c:t53. To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2013 MAY -7 P k 0s

Public Comment made on 5/7/2013 105158 AM from: Gregory Carey 10048 S. 9lst E. Ave Tulsa, Oklahoma 74 133 91 8 254-2360 gcarevG2hollandhall.org IP Address: 64.207.252.254

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Many tourists from around the country have visited this remarkable architectural wonder in the words and have been deeply moved by their experience, Why tarnish that experience by putting up an ugly transmission line, so close to the Chapel? There are fewer and fewer wooded areas of our country where families can go to find peace and solitude, and to commune with God and nature. Surely, those wanting to preserve the pristine nature surrounding Thorncrown Chapel and those wanting to construct a transmission line near it can find some reasonable compromise

3 Kristi Rhude <-,k5*pljstrc sew, CO?w From: Online Comment Form < [email protected]>

Sent: Tuesday, May 07,2013 10:48 AM I* ?fF!:E+:Jy cF Cph:. To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2013 WAY -1 P k OS

Public Comment made on 5/7/2013 10:47:49 AM from: FECEIVET! Catherine Hammill 35 Hale Road Stow, Massachusetts 01775 9785689788 hamfam66&nail .corn IP Address: 173.76.109.16

Public Comments submitted for Docket: 1 3-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, AWSAS

Comments: This is one of my top bucket list places to visit and I know that there are many others much like me. To ruin such a breathtaking and historic site would be a disservice to your state and our country. Find another route for the power line. This is a national treasure.

4 Kristi Rkude

From: Online Comment Form [email protected]> , ,,-?j’, PiISLIC SEW. cwl Sent Tuesday, May 10:48 AM 07,2013 I To: socmaster -:-Fi*E:;!gy.. . $7 f”E, Subject: Online Public Comment for Docket: 13-0414 2013 MAY -1 P b 09 Public Comment made on 5/7/2013 10:47:41 AM from: i -? E 1 E Caleb Clark EI c v D 2140 S. Clover Dr Fayetteville, Arkansas 72701 479-466-0418 taotehue@,nmail .corn IP Address: 140.101$4.2

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: No lines should be built that threaten the Thorncrown Chapel. Thorncrown is a tourist destination, and architectural beauty that should not be jeopardized in any way. Part of the beauty of the chapel is it incorporates its surrounding Nature scape into what it is. Putting a high voltage line within that, damages the economy of Eureka Springs which basis its economy on Art Destinations and Weddings. The base of the matter is that Thorncrown Chapel is a treasure to the State of Arkansas and should not be diminished in any way.

5 Kristi Rhude

, ?%. puBtlC SEW ernrr From: Online Comment Form -. Sent: Tuesday, May 07,2013 3:26 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414 2013 MAY -1 p ' PubIic Comment made on 5/7/2013 3:26:05 PM from: ::< Ec E \VE D Mike Bayne 2539 Landeau Circle Tucker, Georgia 30084 7703600703 j unauemaele@,bellsouth.net IP Address: 72.152.247,109

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF UTHWESTERN ELECTR C POWER COMPA ry FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not build this so close to Fay Jones' Thorncrown Chapel. This is one of the true sacred places representing American architecture at its finest. Building so close to it and the forest that is its setting would destroy the character of a great historical building. Please preserve the integrity of the site; find an alternative. Thank you, Mike Bayne Kristi Rhude .-

From: Online Comment Form [email protected]> Sent: Tuesday, May 07,2013 3:37 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414 '2013 HAY -1 P b 1 I Public Comment made on 5/7/2013 3:36:36 PM from: Dana Gould 26 Boston St. Apt. 4 Boston, Massachusetts 02 127 802-522-6037 depegee@,gmail.corn IP Address: 96.237.2.93

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reconsider the application of the Southwetsern Electric Power Company. The Thorncrown Chapel is one of the crowning examples of organic architecture, a philosophy credited to Frank Lloyd Wright, one of America's most well known and respected architects. The general philosophy promotes the idea of harmony between the natural world and human habitation, something particularly poignant in this time where gIobaI warming is a generally accepted environmental tragedy. Over a decade ago in 2000, the Thorncrown Chapel was placed on the National Register of Historic Places. In 2006 it was awarded the AIA 25 Year Award. The application to build a 48-mile high voltage transmission line through Northwest Arkansas is proposing to cut through the woods right next to the chapel, This will shatter the views and serenity offered by this unique place of worship. In additionjt will compromise several wildlife habitats.

1 .n-...._-. From: Online Comment Form - ___1 :r.S.’:ET:?:’! 3: ;;!;:,, Sent: Tuesday, May 07,2013 3:29 PM To: socmaster Subject: Online Public Comment for Docket: 13-041-U :-?.- ;:-I c E I VE D Public Comment made on 5/7/2013 312853 PM from: Michael Napoli 267 sprucewood drive Levittown, New York 1 1756 516-660-5161 [email protected] IP Address: 69.1 19.144.222

Public Comments submitted for Docket: 13-04 1-u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The Thorncrown Chapel in Eweka Springs is a true treasure, and compromising the beauty it offers to the people of the area and any travelers who come to visit would be a shame. I’d hope that perhaps a compromise could be reached - perhaps in the form of subterranean power Iines in the area near the Chapel?

2 From: Online Comment form [email protected]> __c ,i? .,2y + fc:A,~"I. Sent: Tuesday, May 07,2013 3:41 PM ,-w LL.. L To: socmaster Subjeck Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 3:40:33 PM from: Shane Griffin 1351A 5th Avenue San Francisco, California 94122 650-455-6298 shnmchlp;[email protected] IP Address: 50.0.81.243

Public Comments submitted for Docket: 13-041-U IN THE MAITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KJNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The Thorncrown chapel must be preserved. To degrade the nature surrounding the chapel is to tarnish the building itself. The design is one that integrates man's architectwe and nature. If there is any plausible way to avoid building power lines near this magnificent site, please implement the alternate plans. In the long term, the value of the chapel in conjunction with its' untouched surroundings will outweigh the value of this proposed project.

3 Kristi Rhude

From: Online Comment Form

1 i.XEIV€D Public Comment made on 5/7/2013 3:40:46 PM from: Maria Hicks 2024 Freedom PL Fayetteville, Arkansas 72704 479-422-9273 [email protected] IP Address: 170. I 18.29.21

Public Comments submitted for Docket: 13-04 I -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHTNGTON COUNTIES, ARKANSAS

Comments: Why in the world would we consider destroying the pristine forest surrounding Thorncrown Chapel? How can this even be a consideration? There are many other ways to get electrical conduit to where it needs to go without having to tamper with the area within view of the chapel. Choose that becuase it is in the interest of preservation -even if SWEPCO needs to spend a couple more dollars on wire and poles!

4 ,, ~, ._... - . --I P’ , ‘.V From: 5 ;‘,‘,‘,y Online Comment Form

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Sometimes progress isn’t worth destroying what we can’t replace. Thorncrown Chapel is a jewel. I’ve sat in the chapel and it’s truly transcendent. A gift of creative genius that reflects, although dimly, our Creator. The beauty of the surrounding landscape is as much a part of the experience of Thorncrown as the architecture it is in harmony with. The power lines would more than likely destroy that harmony. We can do better. We can protect what we can’t replace. Please consider alternative locations for the power lines. Take care I Allen Weaver Go Hogs.

5 From: Online Corn ment Form -C letsgogetsometacos@gmeit,rm:-~+~-r~ .. Sent: Tuesday, May 07,20133:51 PM To: socmaster 2[13 MAY -7 P 4: I I Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 3:50:44 PM from: April Blankenship 127 Rock Road Kamiah, Idaho 83536 2089355069 letsgogetsometacos@gm&l.corn IP Address: 184.97.64.205

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATTON OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCT€ONOWNERSHIP, OPEICATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SWIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Surely the power company can find a way to install their line without ruining the surroundings of the gorgeous, one-of-a-kind Thorncrown Chapel? Not to mention the scenic vistas and wildlife habitats that stand to be ruined by these lines. The trees and natural surroundings are part of the majesty of this structure! Please do not allow the power line construction to ruin it.

6 From: Online Comment Form \. nr r.* l__l # ,!> . Id, KY. Sent: Tuesday, May 07,2013 3:52 PM To: socmaster p13 p &: ! 1 Subject Online Public Comment for Docket: 13-0414 Wh'!' -1

Public Comment made on 5/7/2013 35154 PM from: James Wilson 8331 HWY 115 Pocahontas, Arkansas 72455 5019410366 [email protected] IP Address: 67.167.157.232

Public Comments submitted for Docket: 13 -04 1-u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I do not support Southwestern's attempt to put a line through this part of the Omrks. We are the natural state and we should go to acceptable lengths to protect what ecological beauty we have. This line is unnecessary and would only serve to damage the economy of the region. No one wants to visit st power line.

7 From: Sent: TO: Subject:

Public Comment made on 5/7/2013 3:55:01 PM from: Ira Fedder 1222 Ridge Avenue Philadelphia, Pennsylvania 19 123 5704282 866 ira.fedder~nmai1.com IP Address: 69.249.204.147

Public Comments submitted for Docket: 13-041-U IN THE MAIITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED lN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, AFXANSAS

Comments: If all else fails, and the line is passing through, it will serve as a good chance to show off the adaptability of the structures design. From what I read in the article it sounds like a prime opportunity to have the chapel moved to an even more scenic location in the Ozarks, and if the power company could be lobbied to finance the operation in the name of preserving a historic public artifact it would be free. of cost. The move could even serve as a temporary aid to the local unemployed population, who can be hired for the simple labor of transporting the building to it's new home.

8 From: Online Corn ment Form < lisaanndavenport@gmail,cqmT~~ + 'F, -"I4 { 2; ~[lY,F. Sent: Tuesday, May 07,2013 3:57 PM To: socmaster Subject: Online Public Comment for Docket: 13-041-u 2013 -7 '

Public Comment made on 5/7/2013 3:56:47 PM from: Lisa 6 Main Street Unit F Durham, Connecticut 06422 8603 1657 1 8 lisaanndavenport@,mnail.corn IP Address: 50.138.20 1.194

Public Comments submitted for Docket: 13-04 1-U TN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TUNSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please...... reconsider the power transrnision line location

9 Kristi Rhude

From: Online Comment Form < [email protected] . - ---_ I. r-c-7r Sent: Tuesday, May 07,2013 3:59 PM .. I!,'' 1' Qr[i <-;.. To: socrnaster Subjert: Online Public Comment for Docket: 13-0414 2'313 MY-7 P Ir: I 1

PubIic Comment made on 5/7/2013 3:58:41 PM from: Karen Montgomery 971 1 Shiloh Dr Richmond, Virginia 23237 8043 642469 kinskimont@,yahoo. corn IP Address: 76.104.48.255

Public Comments submitted for Docket: 13-04 1-U lN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The Thorncrown Chapel is a landmark of beauty and architectural expertise, co-designed by one of our country's most accomplished artisans! There must be a way for your Electric Power Construction team to re=calculate the direction of your proposed powerlines to avoid the sacred space around this holy shrine to our Creator. Please reconsider your plan, if, at the least, work to negotiate paying to move this work of sacred art to a safer place. Sincerely, Karen Montgomery, President, Virginia Art Therapy Association, Richmond, VA.

10 from: Online Comment Form I --:- : :' .LT,,,?y Q' t:FyPj. Sent Tuesday, May 07,20134:Ol PM . . *I To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2013 HAY -7 P I I

Public Comment made on 5/7/2013 4:01:17 PM from: Chance Hughes 1205 Pine Circle Smackover, Arkansas 71762 8708 146202 Chance.huFhesG!kmaiI.com IP Address: 166.147.120.26

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I do not support approving this proposal. It is of great value that today we have the ability, mindset, and power to protect the natural beauty around us, It is a great tragedy that near the entirety of the native growth trees west of the Rocky Mountains has been cut down during and since the founding of our country. Here in the Natwal State let's continue to treasure the beauty of our scenic landscape and stop sacrificing its heritage for unnecessary, isolated economic capitalization.

11 From: Online Comment Form I .1 ..?:- * .f ..i$,"'{ Jf rru?. Sent: Tuesday, May 07,2013 4:02 PM To: Subject:

Public Comment made on 5/7/2013 4:02:23 PM from: Chance Hughes 1105 Pine Circle Smackover, Arkansas 7 1 762 8708146202 Chance.hughes@,pail .corn IP Address: 166.147.120.26

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MATNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I do not support approving this proposal. It is of great value that today we have the ability, mindset, and power to protect the natural beauty around us. It is a great tragedy that near the entirety of the native growth trees east of the Rocky Mountains has been cut down during and since the founding of our country. Here in the Natural State let's continue to treasure the beauty of our scenic landscape and stop sacrificing its heritage for unnecessary, isolated economic capitalization.

12 Kristi Rhude

From: Online Comment Form _..+--- Sent Tuesday, May 07,2013 4:03 PM C,':[:3Ef!I!?Y CF CDKY. To: socmaster Subject: Online Public Comment for Docket: 13-0414 2013 MAY -7 P 4: I 1

Public Comment made on 5/7/2013 4:02:52 PM from: I? EC E IVE3 Chance Hughes 1105 Pine Circle Smackover, Arkansas 7 1762 8708 146202 Chance.hughesmgrnai 1.com IP Address: 166.147.120.26

Public Comments submitted for Docket: 13 -041 -U JN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LlNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I do not support approving this proposal. It is of great value that today we have the ability, mindset, and power to protect the natural beauty around us. It is a great tragedy that near the entirety of the native growth trees east of the Rocky Mountains has been cut down during and since the founding of our country. Here in the Natural State let's continue to treasure the beauty of our scenic landscape and stop sacrificing its heritage for unnecessary, isolated economic capitalization.

13 Kristi Rhude -:,;, .:I;,'pgJD;IFSERY. @OHM From: Online Comment Form [email protected] Sent: Tuesday, May 07,20134:04 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/7/2013 4:03:51 PM from: Scott Feaster 305 Morning Mist Coppell, Texas 75019 4693639200 [email protected] IP Address: 74.202.252.162

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL, COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I grew up in NWA in the town of Siloam Springs. As a long-time resident of Texas, I have missed the beauty of Arkansas a lot. One thing that has gotten me through the bleakness of living in Texas is the knowledge that my beloved Arkansas is still there and still beautifid. I have great memories of a Fall wedding in the Thorncrown Chapel. It's a special place, a national treasure if you will. I can truly believe that the beauty of Arkansas is unrivaled and must be protected, as it is one of our greatest assets that can't be replaced or recreated. The peace and tranquility of that location must be protected at whatever cost. Giant power lines would destroy this place.

14 .- From: Online Comment Form Sent Tuesday, May 07,201310:47 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 10:47:29 AM from: Robin Doughty 24 Sunset Ave. Chelmsford, Massachusetts 01 824 5 85-727-6290 rldouphty0,m ail.com IP Address: 129.63.195.28

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please maintain the integrity of the Thorncrown Chapel, Historic Site, by NOT approving construction of the proposed power line in the vicinity of this historic site.

6 Kristi Rhude 8-A pQ8LlC stRV. Lrn

From: Online Comment Form C$.i, I.. ,I _, .,.,L I- Sent: Tuesday, May 07,2013 lot47 AM To: socmaster 2613 RAY -1 P 4: f 2 Subject. Online Public Comment for Docket: 13-041-U

, I- n 0 1 ILEtVED Public Comment made on 5/7/2013 10:47:00 AM from: Bob Barnett 371 8 Oakley Ave Memphis, Tennessee 381 11 901 -628-0546 rbarntt [email protected] IP Address: 75.64.144.201

Public Comments submitted for Docket: 13 -04 1 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow this project to damage the surroundings of Thorncrown Chapel- one of the architectural masterpieces, not just of Arkansas, but of the United States. I have visited this chapel many times from my residences in Tennessee and Arkansas and would hate to see it negatively affected by this (or any) project.

7 Sent: Tuesday, May 07,20138:16 AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U ;:;ECEIVELJ

Public Comment made on 5/7/2013 8:15:44 AM from: Gaetan Lepage 4704 Robinwood Terrace Boynton Beack, Florida 33436 561 -734-9284 [email protected] IP Address: 92.226.181.7

Public Comments submitted for Docket: 13-041-U IN THE MAITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I would like to state my opposition to the powerline route which will adversely affect, forever, the site and view of one of the worlds treasures of architecture and spiritual spaces.

1 From: Online Comment Form Sent Tuesday, May 07,2013 8:04 AM TO: socmaster Subject: Ontine Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 8:04:04 AM from: Dana Daufeldt 5150 SW 89 Ave Cooper City, Florida 33328 9549995109 [email protected] IP Address: 1 07.20 1.166.30

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CAmOLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I may have just found the chapel to get married in! I oppose anyone trying to destroy it or put power lines in the immediate area

2 From: Online Comment Form e [email protected]> Sent: Tuesday, May 07,20138:Ol AM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/7/2013 8:00:40 AM from: Ruth Wills 53 North Main St. Eureka Springs, Arkansas 72632 479-330-1672 ruthw004@,yahoo.com IP Address: 99.1 10.194.73

Public Comments submitted for Docket: 13-04I -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TMNSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTOM, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments; I am vehemently opposed to any transmission lines being constructed in Carroll, Benton, Washington andor Madison counties. The negative impact that this action would have wodd be devastating to our land, waterways, wildlife and many individuals who own land in the proposed areas. This section of Arkansas depends almost solely upon tourism and to obliterate the pristine views and pollute the numerous bodies of water in our area is beyond unacceptable.

3 From: Sent: TO: Subject:

,-I ::- c E\\lEg , 4L Public Comment made an 5/7/2013 6:17:04 AM from: James F. Wright 1471 CR222 Eureka Springs, Arkansas 7263 1 479-253 a292 evenvrinht@,mnail.com IP Address: 166.137.156.37

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: NO to SWEPCO. Another blight on our "Natural"State

I From: Online Comment Form Sent: Tuesday, May 07,2013 3:55 AM 2013 MAY -7 P 4: I2 To: socmaster Subject: Online Public Comment for Docket: 13-041-U * ,- - ' i i:.u t 1 V E 0

Public Comment made on 5/7/2013 3:54:46 AM from: Crisallyn Lundberg 1430 Watson P1#15 Manhattan, Kansas 66502 7853 172233 [email protected] IP Address: 129.130A4.35

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEm THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

1 -..:%31r.. ' From: r ..'I. Online Comment Form [email protected]>- , -... ..,la :y ,,: .ryf.l. Sent: Tuesday, May 07, 2013 2:16 AM To: socmaster 2f\3 yAY -1 P b I2 Subject: Online Public Comment for Docket: 13-041-U ;.,; -:-c E 1 // E rJ i -- Public Comment made on 5/7/2013 21945 AM from: Christopher Barta 3202 West Bell Road #2193 Phoenix, Arizona 85053 6232oa9599 lessismoreorless~,~mail.corn IP Address: 71.36.165.50

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MATNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Regarding the construction of a high voltage power line near Thorncrown Chapel: If one of your alternate plans is to build it near the chapel, please find a better path! I learned about this chapel in college, and while I have never visited it, it is clear why it is such a masterpiece of craftsmanship and architectural brilliance. It was built in the wilderness to be part of the wilderness. Had the architect intended for it to co-exist near high voltage power lines, then it would have been built as such. Please consider a better option that does not intrude on this sanctuary. Thank you,

2 /-- From: Online Comment Form

Public Comment made on 5/7/2013 1:56:09 AM from: Stephanie erickson 30 Willard str Ward, Arkansas 72176 5013519828 Stephmieerickson84~,vahoo.com IP Address: 174.237.227.82

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS FWER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please save this beautiful chapel's beautiful view/area.

3 . - _--- From: Online Comment Form -rC':i,'.Jy 5: CQY?! Sent: Tuesday, May 07,2013 1:35 AM To: socmaster 2013 HAY -7 P Ir: 12 Subject: Online Public Comment for Docket: 13-0414

4 *;rrCEIVED Public Comment made on 5/7/2013 1:34:48 AM from: Rena jones 4 18 front street Cash, Arkansas 7242 1 870-897-4853 [email protected] IP Address: 166.137.156.45

Public Comments submitted for Docket: 13-04I -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEFL4TION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CAMOLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please don't do this. Are family love this place

4 From: Online Comment Form

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TWSMISSION LJNE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Do not destroy any trees in view of Thorncrown Chapel.

1

From: __c Form + Online Comment I ..--*.- r C,;;.ET~~~;’nF :‘GUM Sent: Monday, May 06,201311:05 PM To: socmaster ?013 #BY -7 P 4: 12 Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/6/2013 11:05:00 PM from: Ross Elfline 748 Ashland Ave. St. Paul, Minnesota 55104 612-61 6-2959 [email protected] IP Address: 75.16 1.1 85.72

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES ‘ro BE LOCATED m BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not destroy the beauty of this exquisite work of architecture. My cousin and his wife got married at this marvelous site, and while sitting in the chapel I was struck not by the glass and beams, but by the surrounding thicket of trees and underbrush. To mar the landscape is to harm the building itself.

2 From: Online Comment Form < [email protected]>,-..,..- w ,- rcp,r.Jt'Rq a? ?.?+f Sent: Monday, May 06,201311:M PM -. To: socmaster Subject: Online Public Comment for Docket: 13-0.41-U 2113 MAY * Ir:

Public Comment made on 5/6/2013 11:03:59 PM from: Christina Knight 582 St. Marks Ave #3 Brooklyn, New York 1 12 16 6174609586 knight.christina@,gmail .corn IP Address: 69.120.91.190

Public Comments submitted for Docket: 13-04 1-u IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Such a beautiful landmark. Please don't destroy it!

3 Kristi Rhude

From: Online Comment Form < [email protected]~ .;r,$..pg*+.rc 55AVncOnH Sent: Monday, May 06,2013 10:45 PM TO: socmaster Subject: Online Public Comment for Docket: 13-041-U 2013 MAY -7 P It: r2 Public Comment made on 5/6/2013 10:45:00 PM from: April Carway i3 E C E IV E D 141 Robert Taylor Drive Marianna, Arkansas 72360 8703178878 babeedoll2266ikmail.corn IP Address: 206.255.164.244

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHTNGTON COUNTIES, ARKANSAS

Comments: Keep it natural. No powerlines.

4 From: Online Comment Form ' ' '+-TmL-r c .< I. I . Sent: Monday, May 06,2013 10:40 PM To: socrnaster 2013 MY p 12 Subject: Online Public Comment for Docket: 13-041-U -1 Lp : ZCEIVEC Public Comment made on 5/6/2013 10:40:07 PM from: Eve Sinaiko 300 Riverside Drive I OF New York, New York 10025 2127495516 evesinaiko@,p,mail.com IP Address: 64.33 1.136.29

Public Comments submitted for Docket: 13-04 1 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This is a great work of architecture. I visited it some years ago and was deeply moved and impressed. Arkansas should be proud to possess a world-class work of art like this one. Preserving it should not be a matter of doubt. It's a shame this petition is even needed.

5 From: Online Comment Form Sent: Monday, May 06,2013 10:25 PM To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/6/2013 10:24:53 PM from: Donna Compton 82 Mirror Lake Court Lyons, Colorado 80540 303-823-9762 [email protected] IP Address: 75.107.116.54

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATTON OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not destroy a treasured monument for the sake of a transmission line.

6 Kristi Rhude

?- , ?- From: Online Comment Form c [email protected]> - -_-_.,._- .------Sent: PM Monday, May 06,201310:20 :-c$f yigy ,;. ’,G%,?a To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2013 MAY -7 P 4: I2

Public Comment made on 5/6/2013 10:19:50 PM from: Patricia Morton 4400 Brunswick Ave Los Angeles, California 90039 95 1-827-2698 patricia.morton@,ucr .edu IF Address: 99.2.21 1.43

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRlC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TMNSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I encourage you to preserve the landscape around E. Fay Jones’ Thorncrown Chapel, one of the great works of twentieth-century architecture. It would be senseless to let SWEPCO destroy one of the most unique works in Arkansas, a building that has brought great reknown to the state. Please be visionary and deny SWEPCOs application, thereby preserving Thorncrown Chapel and the Ozarks. Patricia Morton Associate Professor of Architectural History UC Riverside

7 Kristi Rhude eruu fnHM

From: Online Comment Form [email protected]> _..- -- - - _d Sent: Monday, May 06,2013 10% PM yt.cy:C~i&Y F t ” -‘I To: socrnaster Subject: Online Public Comment for Docket: 13-041-U - 7 P I i,CEIVEI? Public Comment made on 5/6/2013 10:14:57 PM from: Alyssa Jang 1 15 eckford street #1 L Brooklyn ,New York 1 I222 6468 12 123 3 A1yssa.i arig@,gmai l.com XP Address: 72.225.192.252

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Save architectural treasure!

8 ----- From: Online Comment Form -~7;~c5;T~?~lhf ~7 -?,,p', Sent: Monday, May 06,2013 10:15 PM To: socmaster Subjeck Online Public Comment for Docket: 13-0414

. \ .rrEiVED1- u Public Comment made on 5/6/2013 10:14:42 PM from: Alyssa Jang 1 15 eckford street #1 L Brooklyn ,New York 1 1222 6468121233 A1yssa.i ang@),~mail.corn IP Address: 72.225.192.252

Public Comments submitted for Docket: 1 3 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Save architectural treasure!

9 From: Online Comment Form < [email protected]> _.._- . -.- "?*y.'. '- n*,y.:Tji5Y I-- Sent: Monday, May 06,20139:27 PM To: socmaster Subject Online Public Comment for Docket: 13-041-U 2013 MAY -1 P 12

Public Comment made on 5/6/2013 9:27:24 PM from: K. Gilman PO Box 975 Jackson, New Jersey 08527 732-806-1027 kat [email protected] IP Address: 68.199.23.233

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTMC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Thorncrown Chapel is an architectural masterpiece, and it, as well as the site around it, should be protected from any form of construction or development.

io Kristi Rhude . ., 5,

From: Online Comment Form - .-.--,. ,*3!?+. Sent: Monday, May 06,20139:26 PM To: socrnaster Subject: Online Public Comment for Docket: 13-041-U - 7 *

Public Comment made on 5/6/2013 9:26:08 PM from: Curtis Burns 4807 Boice Dr. North Brunswick, New Jersey 08902 201-564-01 13 Curtisburns@,mac.com IP Address: 68.199.23.233

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KJNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Do not tear down the chapel. Kristi Rhude

From: Online Comment Form c [email protected] Sent: Monday, May PM -- 06,2013921 _+ -.- To: socmaster y+f-RETARY cr tCr3bl. Subject: Ontine Public Comment for Docket: 13-041-U 1013 MY -7 P 12

Public Comment made on 5/6/2013 9:21:23 PM from: b3 E IV D Sara Kalashian E c E 15 S Four Bridges Rd Chester, New Jersey 07930 9088404690 Skkm, kal as hi s n .co m IP Address: 69.14 I ~30.226

PubIic Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR TEdE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Haven't yet gotten the chance to go there. This is a masterpiece of the woods, not just a building in the woods! Kristi Rhude :.:!md!Wl$$!FW. c ZpfM

From: Online Comment Form

PubIic Comment made on 5/6/2013 9:16:20 PM from: Sarah Thawley 327 Academy Avenue Denton, Maryland 2 I629 4104793403 j aney Mav79~,vahoo.com IP Address: 108.8.61.76

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATTON AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CaOLLAND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I feel as if destroying the Thorn Crown Chapel is unnecessary! This is a beautiful place!

13 Kristi Rhude 1' . PUEi WRV.CC;?M

From: Online Comment Form - ---::.r- - .I. ~,[i~fj~~{)'i 'I L3;b/P4. Sent: Monday, May 06,20139:08 PM TO: socmaster Subject Online Public Comment for Docket: 13-041-U 2013 KAY -7 P b I2 '7 E c E I v E Q Public Comment made on 5/6/2013 9:08:27 PM from: Doug Stowe 412 Sandrock Rd. PO Box 247 Eureka Springs, Arkansas 72632 479-253-73 87 douglasstowe@,mail .corn IP Address: 70.196.2.253

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The "Environmental Impact Assessment" for this project is such a deeply flawed document, SWEPCO should be embarrassed. Each of the lines proposed defies common sense and human justice. Examples of this fiasco include one route that goes across Dunnagan's farm at the Pea Ridge Battleground, and my own proposed line 91 which besides having its right of way 75 feet from my deck, would mar the view from historic Spring St. before damaging the experience of Thorncrown Chapel. Lines going into Bentonville damage a wonderful bike trail and destroy over half a billion dollars in real estate investment, SWEPCO believes they can get away with anythmg, and do whatever they want with impunity. There is no proposed line in this project that any of us should find acceptable. This whole project should be shoved back to the drawing board, and SWEPCO should be brought down to earth to actually examine what they've pIanned to destroy. My own hope is that this project becomes st public relations nightmare for the directors of SWEPCO and AEP. I urge SWEPCO customers to make your own feelings known.

14 From: Online Comment Form f.'*. L-. T:i\I)' ?!- yy)!, Sent: Monday, May 06,2013 9:08 PM rr,!, To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/6/2013 9:07:55 PM from: Dr. N.S. Goodman 3 11 Sondra Ave Columbia, Missouri 65202-1417 573-443-3110 drgoodma@;aiI.com IP Address: 2 16 106.5 1.96

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This must not be done to one of the few remaining pristine areas.

15 Kristi Rhude

From: Online Comment Form

~ ..- Sent Monday, May 06,20138:58 PM ~,~u-~::.Tj~,J*!rF CQ!;~. To: socmaster Subjeck Online Public Comment for Docket: 13-041-U 20t3 MAY -1 P 4: I2

Public Comment made on 5/6/2013 8:57:42 PM from: Teresa Revell 53 Spring Hill Ave Nonvalk, Connecticut 06850 203-585-71 67 teresa@silverg,riffm.com IP Address: 47.23.187.21 8

Public Comments submitted €or Docket: 1 3 -041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, AFXANSAS

Comments: I got married at Thorncrown Chapel before relocating from Maumelle to Connecticut. I chose Thorncrown for its unique beauty and location. Please don’t allow this lovely place to be affected.

16 Kristi Rhude

1.11 ul, rus~ir,XKV. LuI";m From: Online Comment Form - -.-._ Sent: < "',C',O -- Monday, May 06,20138:28 PM Ids .fi.tr\Y 7~ TQ", To: socmaster Subject: Online Public Comment for Docket: 13-041-U ZOf3 HAY - 7 p b: 12

Public Comment made on 5/6/2013 8:28:20 PM from: Debra Amerson PO Box 391 Forest Knolls, Caiifornia 94933 415-250-9622 debra@deeperp;reen.org IP Address: 24.5.117.205

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED lN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This building is a work of art. Preserve, cherish and share this exquisite building. Find another route for the power lineS. Really, this is speci al... don't even think about destroying this masterpiece. SHARE IT WITH TOURISTS.

17 Krirti Rhude :. t"UMLtt YtRY. LUl'lfl From: Online Comment Form < [email protected]> . .- Sent: Monday, May 06,20138:27 PM ;-E-r

Public Comment made on 5/6/2013 8:27:09 PM from: i< E C E IVE 3 David Storey 705 Parker St Fuquay Varina ,North Carolina 27526 9 195576546 Dstorey @Jc .rr.com IP Address: 65.190.142.220

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF TJ3E APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEICATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please preserve the chapel and its landscape.

18 From: Online Comment Form

Public Comment made om 5/6/2013 8:18:44 PM from: JEFF KURCZEK 3 187 AUSTIN BAYSIDE DRIVE SHERWOOD, Arkansas 72 I20 501-454-6554 rebel 42mdx@,Yahoo.corn IP Address: 76.125.1 16.255

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTXUC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION ANI) ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL ANDIOR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I just purchased property on Hwy 187 that overlooks TCC.

19 From: Online Comment Form --~-",~7ZTA~~5c c~I..~P!. Sent: Monday, May 06,2013 8:05 PM To: socmaster 1113 MY -7 p I* Subject: Online Public Comment for Docket: 13-041-U 11: .-, r i V E :-iL LJr E 9 Public Comment made on 5/6/2013 8:04:43 PM from: Natalie Monroy 1162 Dick Smith St. Springdale, Arkansas 72764 479-87 1-6466 ncmonroy0,uark.edu IP Address: 130.1 34.253.28

Public Comments submitted far Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHNGTON COUNTIES, ARKANSAS

Comments: Please leave this area untouched.

20 From: Online Comment Form -,.. F;,;;; :A!Iy CF c,!lv~?!, Sent: Monday, May 06,2013 8:03 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414 2013 MAY -7 P 12

Public Comment made on 5/6/2013 8:03:03 PM from: Jodi Dubyoski 3020 N. ROBINSON AVE. #2 OKLAHOMA CITY, Oklahoma 73 103 410-294-650 1 [email protected] IP Address: 68.12.76.184

Public Comments submitted for Docket: 13 -04 1 -U N THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRJC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEMTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: I oppose the construction of a power line that would infringe on the beauty of the site of the Thorncrown Chapel, in accordance with the AIA’s position on this matter.

21 From: Online Comment Form < [email protected] .,- ,_X,_, - __-_- ---' .... .,, ,---,.7-4 ':F !?\#!1.. Sent: Monday, May 06,20138:02 PM .. ,, \: ,?C.i - C. . To: socrnaster Subject: Online Public Comment for Docket: 13-041-U 2913 - 7 p b ;~~~ljE? Public Comment made on 5/6/2013 8:02:24 PM from: Kathy Denzer 33 East 29th Circle Fayetteville, Arkansas 7270 1 479 443 9226 kdenzer@,aol.com IP Address: 99.1 13.62.138

Public Comments submitted for Docket: 13-042-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Thorncrown has been an architectural gem for the area for years and should be for years to come. It has long been a favorite attraction for the area. I am proud that it is in Northwest Arkansas-so much so that my husband and I chose it as the place for our wedding back in 1986. It is not just the building itself, but the setting that is picture perfect. We have so few truly beautiful mixes of nature and architecture, I think we have to do all we can to preserve the ones we do have.

22 ______- _c From: Online Comment Form ... "',-TAxy 5; c:li,-,*-' Sent: Monday, May 06,20137:28 PM TO: socmaster 2011 NAY -7 13 Subject: Online Public Comment for Docket: 13-w1-u P

Public Comment made on 5/6/2013 7:27:35 PM from: Holly Boyd 291 0 Mimosa Drive Newport, Arkansas 72 1 12 8702179337 ylloh.star@,mail.com IP Address: 173.2 16.209.165

Public Comments submitted for Docket: 13-041-U IN THE MAITER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: SAVE THE CHAPEL

23 --- From: Online Comment Form --..&-- ' .. . - :T{j,7y 5: z?!Jh:. Sent: Monday, May 06,20137:16 PM To: socmaster #AI 13 Subject: Online Public Comment for Docket: 13-041-U -1 P

Public Comment made on 5/6/2013 7:16:25 PM from: Carole Day 14 Emanuel Drive Hot Springs Village, Arkansas 7 1909 501-91 5-9208 [email protected] IP Address: 108.86.41.138

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The are surrounding Thorncrown Chapel must be preserved.

24 --- From: --, ry--)py ,-; !-I>',?! Online Comment Form < [email protected]> - 41 ,... . Sent: Monday, May 06,2013 7:12 PM To: socmaster 2113 MAY -7 P b 13 Subject: Online Public Comment for Docket: 13-0414 ,:JzCEiVED Public Comment made on 5/6/2013 7:12:12 PM from: gail penix 409 east 7th street fayetteville, Arkansas 7270 1 479-601 -5763 gaiIpenix@,nmail.com IP Address: 70.178.23 1 -160

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATTBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please save this magical place!

25 Kristi Rhude , _.

From: Online Comment Form e [email protected]> - ,,------I <;;:,:>>+?!' <,' c, :i ?I. Sent: Monday, May 06,20136:40 PM TO: socmaster Subjecet: Online Public Comment for Docket: 13-041-U 2013 MY -1 p 13

Public Comment made on 5/6/2013 6:39:49 PM from: Ryan Taylor Garcia 2310 Haverhill Dr Apt 212 Tyler, Texas 75707 9032531254 [email protected] IP Address: 74.192.127.21

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTQN, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: do not do this

26 Kristi Rhude

A;:t;.pmb;@%E*T;m', 'r From: Online Comment Form Sent: Monday, May 06,20136:39 PM To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/6/2013 6:38:41 PM from: i',TCE1VEU Seth Stogner 1533 Buncomb Wac0 Rd. Waco, Georgia 30 182 770714343 1 stogner.seth@,nrnaiI.com IP Address: 74.232.61.78

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: PLease save the land

27 " -"------+------f ".?A ry.1u,. I 'L. From: Online Comment Form [email protected]~ ~ *-r i I . UK - Sent: Monday, May 06,20136:31 PM To: socmaster 2013 MY -7 P 4: I3 Subject: Online Public Comment for Docket: 13-041-U ; 7 r< c E 1 v 9 Public Comment made on 5/6/2013 6:30:43 PM from: Melissa Sauenvein 191 1 N Caton Dr Fayetteville ,Arkansas 72704 4792998314 Gohons32O~vahoo.com IP Address: 107.204.245.31

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Leave Thorn Crown Chapel & its surroundings alone

28 From: Online Comment Form Sent: Monday, May 06,2013 6:20PM frJ[! !-!AT -1 P 4: 13 To: socmaster Subject: Online Public Comment for Docket: 13-041-U .. -. T? 1 ;.:--tlVED

Public Comment made on 5/6/2013 6:20:20 PM from: Rick Millard 205 Dam Road Dardanelle, Arkansas 72834 4798860984 [email protected] IP Address: 166.137.156.18

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KlNGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reconsider yow position in cutting down forrest land near Thorncrown Chapel.

29 From: Online Comment Form < [email protected]> ' -' Sent: Monday, May 06,20136:04 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made an 5/6/2013 6:03:41 PM from: Jennifer burns 2566 Hilburn ct Springdale, Arkansas 72762 479-236-78 1 7 Burnsmcllc@,yahoo.com IP Address: 70.178.30.29

Public Comments submitted for Docket: 13-041-U JN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COLJNTIES, ARKANSAS

Comrnen ts: Please stop the destruction of our beautiful countryside. The view is part of what makes the chapel.

30 Kristi Rhude

From: Online Comment Form sent: Monday, May 06,20135:50 PM Z?Jl] :'ljJ -7 Q: 1 3 To: socmaster P Subject Online Public Comment for Docket 13-0414 -7 ::'CEl/;E'3 I .-

Public Comment made on 5/6/2013 5:50:07 PM from: Kathleen O'Brien 618 Lewis Street €€awede Grace, Maryland 2 1078 4 10-939-2388 katelake65 @:nmail.corn IP Address: 72.7 1.177.43

Public Comments submitted for Docket: 1 3 -04 1 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: The destruction of the areas around the Thorncrown Chapel must not be destroyed. This chapel should be on the UNESCO World Heritage Sites list. It's awful to think this could happen to one of the finest things that Arkansas has ever given the world. Arkansas and its people should strive to preserve this church, a holy place, its holy land all around it. This move by the power company to clear woodlands around the chapel is a disaster plan and is totally unworthy of consideration. Please progress and not regress. Save this chapel and all of the surrounding areas for fume Arkansasonians and the nation. Let Arkansas be proud to save one of the nation's most treasured sacred places!

31 Sent: Monday, May 06,2013 5:47 PM To: socrnaster

Subject: Online Public Comment for Docket: 13-0414 +:" 7' L- I \; ,,VL' 59 Public Comment made on 5/6/2013 5:47:05 PM from: Morgan Starnes 1050 W. Dickson St Fayetteville , Arkansas 72701 2149088901 Mornanstarnes4@maihom IP Address: 70.1 78.185.199

Public Comments submitted for Docket: 13 -04 1-U JN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRTC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Thorn crown is too beautiful of a place to be interrupted by the forces of man. There are other ways to supply the demands of a modern world. Leave this area uninterrupted and peaceful as it was designed to be.

32 Kristi Rhude

Sent: Monday, May 06,2013 5:40 PM To: socmaster Subject: Online Public Comment for Docket: 13-041-U ".--. .-rq{/Tg ', .*dL Public Comment made on 5/6/2013 5:39:39 PM from: Lara Hinojosa 2426 E. Onyx Tr. #10 Fayetteville, Arkansas 72701 5125543729 [email protected] IP Address: 130,184.253.28

Public Comments submitted for Docket: 13-04 I -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITTES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please keep this area free from construction and destruction!

34 From: Online Comment Form Sent: Monday, May 06,2013 5:35 PM .^ ..crrEy;tRy 3F r:t:’LF”I. To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/6/2013 5:34:48 PM from: -iECEIVED Tylee Tracer Monette, Arkansas 72247 870-595-4164 tyleetracerO5~yahoo,com IP Address: 74.82.64.144

Public Comments submitted for Docket: 13-04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEUTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Commea ts: Leave Thorn Chapel and Carroll County alone. It’s part of the beauty of Arkansas.

35 From: Online Comment Form .. ,. Sent: Monday, May 06,2013 934 PM To: socmaster Subject Online Public Comment for Docket: 13-041-U

Public Comment made on 5/6/2013 53350 PM from: Michael Jak 725 Santa Clara Avenue Alarneda, California 9450 I 415-3364510 [email protected] IP Address: 50.197.135.177

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please reconsider any development that would compromise one of the great architectural treasures this country has. Its surroundings are integral to the quality of the chapel. Thank you.

36 From: Online Comment Form < hagi3ken3@hotmail,com> rA Sent: Monday, May 06,2013 5:34 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/6/2013 5:33:39 PM from: Kenichi Hagiwara 533 W144th St. Apt. #5 New York, New York 10031 347-581-3791 ha~i3ken3 @,hotmai1 .corn IP Address: 115.37.193.136

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This architectural achievement is supposed to be preserved far the future references. We should not allow any of brutal acts to devastate our culture through destroying such treasure of the world.

37 NAY 4: From: Online Comment Form < [email protected] > 2013 -1 P I2 Sent: Monday, May 06,20134:15 PM --- n c To: socmaster c; II L L I v E D Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/6/2013 4:15:03 PM from: Kyie Sulli PO Box 6601 Charlottesville, Virginia 22906-660 1 949-547-1 849 k [email protected] JP Address: 205.166.218.67

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not approve this application by SWEPCO. The natural area surrounding the Thorncrown Chapel should be preserved to prevent unsightly views of power lines ruining the chapel's aesthetic integrity. Thank you for your consideration.

6 .-

From: Online Comment Form < [email protected]> Sent: Monday, May 06,20134:12 PM To: socmaster Subjeck Online Public Comment for Docket: 13-0414

Public Comment made on 5/6/2013 4:12:26 PM from: Haley Lane 2860 E Coy Kaylor Dr Apt 2 Fayetteville, Arkansas 72703 9724679065 [email protected] IP Address: 70.178.254.99

Public Comments submitted for Docket: 13-041 -U JN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPEUTION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Please do not allow Southwestern Electric Power Company to construct the line in order to preserve this beautiful structure so that future visitors can enjoy the chapel as the architect intended when he designed it over 30 years ago,

7 Sonya Robertson

From: Online Comment Form [email protected]> Sent: Monday, May 06,20134:26 PM To: socmaster Subject: Online Public Comment for Docket: 13-0414

Public Comment made on 5/6/2013 4:25:45 PM from: steve wood 4627 hwy 392 w harrison, Arkansas 7260 1 870-741-1 5 17 wood82 1 1@,gmail.com IP Address: 162.40.1 1.226

Public Comments submitted for Docket: 13-04 I -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: save thornecrowne chapel

5 Sonya Robertson AR3, PQ’BtESERV. imw From: Online Comment Form

Public Comment made on 5/6/2013 4:27:41 PM from: Troy 2045 Lee Road 137 Auburn, Alabama 36832 77089 15678 1leb.i .yort@,mail.com IP Address: 72.152.74.200

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: Thorncrown‘s beauty not only comes from the structure, but it’s seamless transition into the surrounding area. Southwestern should strongly consider it‘s transmission line placement to avoid the destruction of the overall beauty of this magnificent structure.

4 From: Online Comment Form -*c -- ..--lc-~Ry (ll ?4:?!:. Sent: Monday, May 06,20134:30 PM >: :,’.,-. To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2113 - 1 P I

;-I :-CE\VE:l Public Comment made on 5/6/2013 4:30:14 PM from: : \L Jack Bobo 220 Clark Street Clarkshle, Mississippi 386 14 90 1-3 3 8-5402 j ncbobo(&mail .corn IP Address: 1 84.155.242.152

Public Comments submitted for Docket: 13-041-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MATNTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE WIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: this chapel needs to be protected as it is a beautiful , serene part of history!

3 Sonya Robertson

*i,:~;-#.rwDLic. xnt. clui 1% From: Online Comment Form < [email protected]> Sent: Monday, May 06,2013 4:36 PM _- r-. CRFThflY ?:-- cy,k,. To: socmaster Subject: Online Public Comment for Docket: 13-041-U 2313 MAY -1 P 4: I4

Public Comment made on 5/6/2013 4:36:24 PM from: Bettye Ann Cooper 135 Hillview Drive Faifield Bay, Arkansas 72088 (479) 84 1-8 142 [email protected] IP Address: 174.241.1.84

Public Comments submitted for Docket: 13 -04 1-U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHlPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, ARKANSAS

Comments: This is as bad as a hog farm approved in the Buffalo River watershed. I believe somehow we have lost the ability to how right from wrong. NO TO SWEPCO AND THEIR POWER LINE ...... ABSOLUTELY STOP THIS ENDEAVOR.

2 Sonya Robertson

From: Online Comment Form LI Sent: Monday, May 06,20134:42 PM A"--T;-cp,C?AgY0': co~.p~ To: socmaster Subject: Online Public Comment for Docket: 13-041-U

Public Comment made on 5/6/2013 4:42:17 PM from: Joseph Case 234 N Church Street Fayetteville ,Arkansas 72543 50 1-250-5971 icase.cc&mail .corn IP Address: 71.222.148.164

Public Comments submitted for Docket: 13-041 -U IN THE MATTER OF THE APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED FOR THE CONSTRUCTION OWNERSHIP, OPERATION AND MAINTENANCE OF THE PROPOSED 345 KV TRANSMISSION LINE BETWEEN THE SHIPE ROAD STATION AND THE PROPOSED KINGS RIVER STATION AND ASSOCIATED FACILITIES TO BE LOCATED IN BENTON, CARROLL AND/OR MADISON AND WASHINGTON COUNTIES, AICKANSAS

Comments: This is an outrage

1