RAIL INFRASTRUCTURE ALLIANCE Eastern Portal Development Plan
Total Page:16
File Type:pdf, Size:1020Kb
RAIL INFRASTRUCTURE ALLIANCE Eastern Portal Development Plan RIA-MGA-EPZ-ZWD-PLA-XEV-NAP-X0001 Revision: 021 Package: 000-134-20 Date: 09 July 2020 DOCUMENT INFORMATION Document Field Description RPV Document No. RIA-MGA-EPZ-ZWD-PLA-XEV-NAP-X0001 File Name RIA-AEC-PLA-210-134-20-0001 Package Name Eastern Portal – Development Plan DOCUMENT RECORD Submission Date Revision Prepared By Reviewed By Approved By Status Phase 23/04/2019 00 Gabrielle Noel Rachel Issued for Final Coddington Matthews Harding use and Kaity Munro 25/05/2020 01 Andy Choi Aime Bigornia Kaity Munro Issued for Final use 09/07/2020 02 Andy Choi Aime Bigornia Kaity Munro Issued for Draft review The Rail Infrastructure Alliance (the Alliance) has prepared this document for the sole use of the Alliance, Rail Projects Victoria and Metro Trains Melbourne. No other party should rely on this document without the prior written consent of the Alliance, Rail Projects Victoria and Metro Trains Melbourne. The foregoing undertakes no duty, nor accepts any responsibility, to any third party who may rely upon or use this document. This document has been prepared based on a particular set of requirements and assumptions for the purposes of the Melbourne Metro Rail Infrastructure Alliance project. The Alliance, Rail Projects Victoria and Metro Trains Melbourne may also have relied upon information provided by other third parties to prepare this document, some of which may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety. Metro Tunnel | Rail Infrastructure Alliance Uncontrolled when printed 2 RIA-MGA-EPZ-ZWD-PLA-XEV-NAP-X0001| Revision 02 TABLE OF CONTENTS ABBREVIATIONS AND DEFINITIONS ............................................................................................. 5 FOREWORD ...................................................................................................................................... 8 1 Introduction ................................................................................................................................ 9 1.1 Purpose ................................................................................................................................ 9 1.2 Metro Tunnel Project ............................................................................................................ 9 1.3 Delivery of the Metro Tunnel Project .................................................................................. 10 2 Approvals Framework ............................................................................................................. 11 2.1 Incorporated Document ...................................................................................................... 11 2.2 Incorporated Document Conditions.................................................................................... 11 2.3 Approved Plans .................................................................................................................. 12 2.3.1 Metro Tunnel Project Plans .................................................................................. 12 2.3.2 Eastern Portal Early Works and Development Plan ......................................... 12 2.3.3 Eastern Portal Development Plan Approval and Amendments ...................... 13 3 Community and Stakeholder Engagement ........................................................................... 14 3.1 Overview of Stakeholders .................................................................................................. 14 3.2 Eastern Portal RIA Development Plan 2019 ...................................................................... 15 3.3 Eastern Portal RIA Development Plan Amendment June 2020 ........................................ 15 3.4 Eastern Portal RIA Development Plan Amendment July 2020 (SER/CER) ...................... 16 4 Site Context .............................................................................................................................. 17 4.1 The Eastern Portal precinct and the Development Plan Area ........................................... 17 4.2 Existing Conditions ............................................................................................................. 17 4.3 Strategic Context ................................................................................................................ 20 5 Scope of Works ....................................................................................................................... 22 6 Design Response .................................................................................................................... 24 6.1 Design Overview ................................................................................................................ 25 6.2 Consistency with the Urban Design Strategy Key Directions ............................................ 27 6.3 Consistency with Precinct Specific Design Issues ............................................................. 29 6.4 Aspect Specific Design ...................................................................................................... 30 6.4.1 Architecture ............................................................................................................. 30 6.4.2 Community Experience ......................................................................................... 32 6.4.3 Access ..................................................................................................................... 34 6.4.4 Safety and Crime Prevention Through Environmental Design ....................... 36 6.4.5 Street Furniture and Integrated Art ..................................................................... 37 6.4.6 Lighting .................................................................................................................... 37 6.4.7 Signage and Wayfinding ....................................................................................... 37 6.4.8 Materials and Finishes .......................................................................................... 37 6.4.9 Landscape and Water Sensitive Urban Design ................................................ 40 6.4.10 Managing Construction Impacts .......................................................................... 41 6.5 Consistency with Environmental Management Framework ............................................... 41 Metro Tunnel | Rail Infrastructure Alliance Uncontrolled when printed 3 RIA-MGA-EPZ-ZWD-PLA-XEV-NAP-X0001| Revision 02 6.5.1 Managing Construction Impacts .......................................................................... 43 7 Conclusion ............................................................................................................................... 45 APPENDIX A EASTERN PORTAL SITE LAYOUT PLANS ............................................................... A APPENDIX B EASTERN PORTAL ARCHITECTURAL, LANDSCAPE, PUBLIC REALM AND URBAN DESIGN PLANS AND ELEVATIONS ......................................................... B APPENDIX C EASTERN PORTAL URBAN DESIGN STRATEGY RESPONSE ............................. C APPENDIX D EASTERN PORTAL ENVIRONMENTAL PERFORMANCE REQUIREMENTS DESIGN RESPONSE .............................................................................................. D TABLE OF FIGURES Figure 1 Metro Tunnel Project ................................................................................................. 10 Figure 2 Site Context Plan ....................................................................................................... 19 Figure 3 Site Concept Plan ...................................................................................................... 26 Figure 4 Indicative design intent.............................................................................................. 32 Figure 5 Movement Map ........................................................................................................... 35 Figure 6 Indicative materials and finishes palette, demonstrating the design intent ....... 39 Figure 7: Indicative materials and finishes palette for the SER/CER compound................. 39 Figure 8 Indicative landscaping solution ................................................................................ 40 TABLE OF TABLES Table 1 Abbreviations, Terms and Definitions ....................................................................... 5 Table 2 Incorporated Document Conditions relevant to the Plan ..................................... 11 Table 3 Integration of the UDS during the development .................................................... 27 Table 4 Precinct 8: Eastern Portal (South Yarra) Precinct Specific Issues ..................... 29 Table 5 Risk and impact mitigation strategies associated with the design response .... 43 Table 6 Eastern Portal Urban Design Strategy Objectives ................................................ 48 Table 7 Eastern Portal EPRs Design Response ................................................................. 84 Metro Tunnel | Rail Infrastructure Alliance Uncontrolled when printed 4 RIA-MGA-EPZ-ZWD-PLA-XEV-NAP-X0001| Revision 02 ABBREVIATIONS AND DEFINITIONS Table 1 Abbreviations, Terms and Definitions Abbreviation Term Definition BNV Bicycle Network Victoria’s biggest bike riding organisation that aims to Victoria build places to ride, change behaviours and support riders. BSGC Metro Tunnel