MAG SILVER CORP.

TECHNICAL REPORT ON THE MINERAL RESOURCE UPDATE FOR THE JUANICIPIO JOINT VENTURE, STATE,

NI 43-101 Report

Qualified Persons: David Ross, P.Geo. Jason Cox, P.Eng. Holger Krutzelmann, P.Eng.

June 12, 2014 Amended June 30, 2014

RPA Inc. 55 University Ave. Suite 501 I Toronto, ON, Canada M5J 2H7 IT + 1 (416) 947 0907 www.rpacan.com

Report Control Form

Document Title Technical Report on the Mineral Resource Update for the Juanicipio Joint Venture, Zacatecas State, Mexico

Client Name & Address MAG Silver Corp. #770 - 800 West Pender Street Vancouver, British Columbia

V6C 2V6

Document Reference Status & Final Project #2264 Issue No. Version R1

Issue Date June 30, 2014

Lead Author David Ross (Signed)

Peer Reviewer Luke Evans (Signed)

Project Manager Approval David Ross (Signed)

Project Director Approval William Roscoe (Signed)

Report Distribution Name No. of Copies Client

RPA Filing 1 (project box)

Roscoe Postle Associates Inc. 55 University Avenue, Suite 501 Toronto, ON M5J 2H7 Canada Tel: +1 416 947 0907 Fax: +1 416 947 0395 [email protected]

www.rpacan.com

TABLE OF CONTENTS

PAGE

1 SUMMARY ...... 1-1 Executive Summary ...... 1-1 Technical Summary ...... 1-5 2 INTRODUCTION ...... 2-1 3 RELIANCE ON OTHER EXPERTS ...... 3-1 4 PROPERTY DESCRIPTION AND LOCATION ...... 4-1 5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ...... 5-1 6 HISTORY ...... 6-1 Prior Ownership ...... 6-1 Exploration History ...... 6-2 Previous Mineral Resource Estimates ...... 6-2 Scoping Study - 2009...... 6-4 7 GEOLOGICAL SETTING AND MINERALIZATION ...... 7-1 Regional Geology ...... 7-1 Property Geology ...... 7-5 Mineralization ...... 7-9 8 DEPOSIT TYPES ...... 8-1 9 EXPLORATION ...... 9-1 10 DRILLING ...... 10-1 11 SAMPLE PREPARATION, ANALYSES AND SECURITY ...... 11-1 Sampling Method and Approach ...... 11-1 Sample Preparation and Analysis ...... 11-2 Quality Assurance and Quality Control ...... 11-3 Core Storage and Security ...... 11-7 12 DATA VERIFICATION ...... 12-1 Site Visit and Core Review...... 12-1 Independent Check Samples ...... 12-1 Assay Table Review ...... 12-2 13 MINERAL PROCESSING AND METALLURGICAL TESTING ...... 13-1 Metallurgical Testing ...... 13-1 Implications for Process Design ...... 13-5 Recoveries and Concentrate Grades ...... 13-6 Metallurgical Study Update ...... 13-6 14 MINERAL RESOURCE ESTIMATE ...... 14-1 Resource Database ...... 14-1

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page i www.rpacan.com

Geological Interpretation and 3D Solids ...... 14-2 Statistical Analysis ...... 14-6 Cutting High-Grade Values ...... 14-7 Compositing ...... 14-11 Interpolation Parameters ...... 14-13 Density ...... 14-19 Block Model ...... 14-20 NSR Cut-off Value ...... 14-20 Classification ...... 14-21 Mineral Resource Reporting ...... 14-22 Mineral Resource Validation ...... 14-24 Comparison to Previous Estimate ...... 14-25 15 MINERAL RESERVE ESTIMATE ...... 15-1 16 MINING METHODS ...... 16-1 Geotechnical Considerations ...... 16-1 Mining Method ...... 16-3 Production Rate ...... 16-4 Backfilling Method ...... 16-4 Haulage ...... 16-4 Access Development ...... 16-5 Ventilation ...... 16-5 Stoping ...... 16-6 Tonnage and Grade of Material to be Mined and Milled ...... 16-9 Underground Mobile Equipment ...... 16-10 Update Since the 2012 PEA ...... 16-14 17 RECOVERY METHODS ...... 17-1 Processing Plant and Operations ...... 17-1 18 PROJECT INFRASTRUCTURE ...... 18-1 Site Layout ...... 18-1 Access Road ...... 18-1 Power Supply ...... 18-1 Water Supply ...... 18-3 Stockpiles ...... 18-4 Paste Fill Plant ...... 18-4 Tailings Storage ...... 18-4 Other Surface Facilities ...... 18-7 19 MARKET STUDIES AND CONTRACTS ...... 19-1 Metal Prices ...... 19-1 Marketing ...... 19-1 20 ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT ...... 20-1 21 CAPITAL AND OPERATING COSTS ...... 21-1 Capital Costs ...... 21-1

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page ii www.rpacan.com

Operating Costs ...... 21-6 22 ECONOMIC ANALYSIS...... 22-1 Overview and Modelling Assumptions ...... 22-1 Taxes ...... 22-2 Revenue Assumptions ...... 22-3 Analysis of Project Economics ...... 22-3 Life-of-Mine Cash Flow ...... 22-5 Revenue ...... 22-7 Off-site Costs ...... 22-9 Sensitivity to Metal Prices and Costs ...... 22-9 23 ADJACENT PROPERTIES ...... 23-1 24 OTHER RELEVANT DATA AND INFORMATION ...... 24-1 Project Development Schedule ...... 24-1 Mine Development Schedule ...... 24-1 Mill Feed Schedule ...... 24-2 Waste Rock Production ...... 24-4 Run-of-Mine Stockpile ...... 24-5 Vertical Development ...... 24-5 Trucking Schedule ...... 24-5 Concentrate Production Schedule...... 24-5 25 INTERPRETATION AND CONCLUSIONS ...... 25-1 2014 Mineral Resource Estimate Interpretation and Conclusions ...... 25-1 2012 PEA Interpretation and Conclusions ...... 25-2 26 RECOMMENDATIONS...... 26-1 27 REFERENCES ...... 27-1 28 DATE AND SIGNATURE PAGE ...... 28-1 29 CERTIFICATE OF QUALIFIED PERSON ...... 29-1 30 APPENDIX 1 ...... 30-1 List of Drill Holes ...... 30-1

LIST OF TABLES

PAGE Table 1-1 Mineral Resources By Metal Zone (100% Basis) ...... 1-3 Table 1-2 Juanicipio Joint Venture Mineral Resources (100% Basis) ...... 1-4 Table 1-3 Proposed Budget (100% Basis) ...... 1-5 Table 1-4 Mill Recoveries and Concentrate Grades ...... 1-10 Table 1-5 Tonnage of Material Mined and Processed as a Basis for the Preliminary Economic Assessment ...... 1-12 Table 1-6 Summary of Financial Results ...... 1-14 Table 4-1 Tenure Data ...... 4-1

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page iii www.rpacan.com

Table 7-1 Stratigraphy of the District ...... 7-4 Table 7-2 Select Drill Hole Intersections ...... 7-11 Table 12-1 Check Sample Results ...... 12-2 Table 13-1 Metallurgical Balance from General Composite Sample ...... 13-3 Table 13-2 Summary of Flotation Tests on General and Section Composites...... 13-4 Table 13-3 Flotation Reagent Suites ...... 13-5 Table 13-4 Head Grades Used for Test Work and for Process Design ...... 13-5 Table 13-6 Mill Recoveries and Concentrate Grades ...... 13-6 Table 14-1 Descriptive Statistics of Resource Assay Values ...... 14-6 Table 14-2 Descriptive Statistics of Cut Resource Assay Values ...... 14-10 Table 14-3 Descriptive Statistics of Composite Values ...... 14-12 Table 14-4 Block Estimate Search Strategy ...... 14-13 Table 14-5 Comparison Statistics of Density Measurements and Block Estimates ...... 14-19 Table 14-6 Juanicipio Joint Venture Mineral Resources (100% Basis) – December 31, 2013 ...... 14-23 Table 14-7 Mineral Resources By Metal Zone – December 31, 2013 ...... 14-24 Table 14-8 Tonnage and Grade by Cut-off – December 31, 2013 ...... 14-24 Table 14-9 Volume Comparison ...... 14-25 Table 14-10 Comparison to RPA 2011 Resource Estimate ...... 14-26 Table 14-11 Comparison of RPA and Strathcona Results...... 14-27 Table 16-1 Tonnage of Material Mined and Processed as a Basis for the Preliminary Economic Assessment ...... 16-9 Table 16-2 Design Assumptions ...... 16-10 Table 16-3 Underground Mobile Equipment Fleet ...... 16-11 Table 18-1 Estimated Site Power Demand ...... 18-3 Table 18-2 Estimate of Site Water Usage ...... 18-3 Table 19-1 Lead Concentrate Treatment Terms ...... 19-2 Table 19-2 Zinc Concentrate Treatment Terms ...... 19-2 Table 19-3 Concentrate Transport Costs ...... 19-3 Table 21-1 Summary Capital Costs ...... 21-1 Table 21-2 Mine Capital Costs (Direct Costs) ...... 21-2 Table 21-3 Mill Capital Costs (Direct Costs)...... 21-3 Table 21-4 Infrastructure Capital Costs (Direct Costs) ...... 21-4 Table 21-5 Indirect Capital Cost Summary ...... 21-5 Table 21-6 Owners and EPCM Costs ...... 21-5 Table 21-7 Details of Capitalized Operating Costs ...... 21-6 Table 21-8 Capital Contingency ...... 21-6 Table 21-9 Summary of Life-of-Mine Site Operating Costs ...... 21-7 Table 21-10 Operating Costs per Tonne Milled ...... 21-8 Table 21-11 Average Total Employment Costs per Person per Year ...... 21-8 Table 21-12 Life-of-Mine Underground Mine Operating Costs ...... 21-9 Table 21-13 Life-of-Mine Mill Operating Costs ...... 21-9 Table 21-14 Life-of-Mine General and Administration Operating Costs ...... 21-10 Table 21-15 Estimated Annual Power Costs (Year 10) ...... 21-11 Table 21-16 Estimated Employee Numbers ...... 21-11 Table 22-1 Summary of Project Physical Parameters ...... 22-4 Table 22-2 Summary of Project Costs ...... 22-4 Table 22-3 Summary of Financial Results ...... 22-5 Table 22-4 Revenue by Concentrate Type and by Metal ...... 22-7 Table 22-5 Off-site Concentrate Treatment Costs ...... 22-9 Table 22-6 Comparison of Economic Parameters to Changes in Metal Prices ...... 22-11 Table 22-7 Sensitivity of NPV to Changes in Prices and Discount Rates ...... 22-12

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page iv www.rpacan.com

Table 22-8 Sensitivity to the Silver Refining Charge ...... 22-12 Table 24-1 Key Scheduling Parameters ...... 24-1 Table 24-2 Total Mine Development Quantities ...... 24-2 Table 24-3 Project Development Milestones ...... 24-2 Table 24-4 Mill Feed Schedule ...... 24-3 Table 24-5 Development Waste Production ...... 24-4 Table 26-1 Proposed Budget (100% Basis) ...... 26-1

LIST OF FIGURES

PAGE Figure 4-1 Location Map ...... 4-3 Figure 4-2 Claim Map ...... 4-4 Figure 7-1 Regional Geology ...... 7-2 Figure 7-2 Regional Stratigraphy ...... 7-3 Figure 7-3 Property Geology ...... 7-8 Figure 10-1 Drill Hole Plan Map ...... 10-2 Figure 11-1 Blank Results for Silver ...... 11-4 Figure 11-2 Control Chart for CRM AL222542 ...... 11-5 Figure 11-3 Control Chart for CRM BL ...... 11-5 Figure 11-4 Control Chart IPL Versus ALS Duplicates ...... 11-6 Figure 11-5 Control Chart ACME Versus ALS Duplicates ...... 11-6 Figure 14-1 3D View of Wireframe Models ...... 14-4 Figure 14-2 3D View of Block Model Silver Grades...... 14-5 Figure 14-3 Histogram of Silver Resource Assays (n=1120) ...... 14-8 Figure 14-4 Histogram of Gold Resource Assays (n=1120) ...... 14-8 Figure 14-5 Histogram of Lead Resource Assays (n=1120) ...... 14-9 Figure 14-6 Histogram of Zinc Resource Assays (n=1120) ...... 14-9 Figure 14-7 Histogram of Sample Lengths (n=1120) ...... 14-11 Figure 14-8 Vertical Section 2200SE ...... 14-14 Figure 14-9 Vertical Section 2400SE ...... 14-15 Figure 14-10 Level Plan 1740Z ...... 14-16 Figure 14-11 Level Plan 1590Z ...... 14-17 Figure 14-12 Inclined Longitudinal Section ...... 14-18 Figure 16-1 Plan of the Mine Development Layout ...... 16-7 Figure 16-2 Sectional View of the Mine Development ...... 16-8 Figure 16-3 Schematic of the Proposed Valdecañas/Desprendido Pumping System .... 16-13 Figure 17-1 Process Flow Sheet ...... 17-2 Figure 17-2 Plant General Arrangement ...... 17-3 Figure 17-3 Plant Sections ...... 17-4 Figure 18-1 Site Layout Concept ...... 18-2 Figure 18-2 Concept Design of Tailings Storage Facility ...... 18-6 Figure 21-1 Schedule of Site Operating Costs ...... 21-7 Figure 21-2 Schedule of Estimated Employee Numbers ...... 21-12 Figure 22-1 Life-of-Mine Costs and Net Cash Flow after Tax (Undiscounted) ...... 22-6 Figure 22-2 Costs and Cumulative Net Cash Flow after Tax (Undiscounted) ...... 22-6 Figure 22-3 Revenue by Concentrate Type ...... 22-7 Figure 22-4 Total Revenue by Metal ...... 22-8 Figure 22-5 Life-of-Mine Revenue by Metal ...... 22-8

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page v www.rpacan.com

Figure 22-6 Sensitivity of after Tax NPV to Changes in Metal Prices and Costs ...... 22-10 Figure 22-7 Sensitivity of NPV after Tax to Changes in Silver and Gold Prices ...... 22-10 Figure 23-1 Adjacent Properties ...... 23-2 Figure 24-1 Production Schedule by Period ...... 24-3 Figure 24-2 Mill Feed Grade by Year ...... 24-4 Figure 24-3 Lead and Zinc Concentrate Production – Tonnage Schedule ...... 24-6

LIST OF APPENDIX FIGURES & TABLES

PAGE Table 30-1 Summary of Drilling ...... 30-2

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page vi www.rpacan.com

1 SUMMARY

EXECUTIVE SUMMARY

Roscoe Postle Associates Inc. (RPA) was retained by MAG Silver Corp. (MAG) to update the Mineral Resource estimate and prepare an independent Technical Report on the Juanicipio Joint Venture in Zacatecas State, Mexico. This Technical Report conforms to National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101). MAG requires this report to support the updated Mineral Resource estimate for the property prepared by RPA and disclosed in a press release. RPA has visited the property several times, most recently on May 27, 2014. This Technical Report was amended as of June 30, 2014, to include enhanced cautionary language.

The Juanicipio property is owned by Minera Juanicipio S.A. de C.V. (Minera Juanicipio), a joint venture between Fresnillo plc (Fresnillo, 56%) and MAG (44%), with Fresnillo acting as the operator. The major asset associated with the Juanicipio Joint Venture is a silver-gold- lead-zinc epithermal vein deposit.

An updated Preliminary Economic Assessment (PEA) was carried out by AMC Mining Consultants (Canada) Ltd. (AMC) in 2012 (2012 PEA). The study defined Juanicipio as an economically robust, high-grade underground silver project exhibiting minimal financial or development risks that will produce an average of 15.1 million payable ounces of silver over the first full six years of commercial production and 10.3 million payable ounces per year over a 14.8 year total mine life. The 2012 PEA did not take into account any potential mining, processing, or infrastructure synergies from any association with the adjoining property owned by Fresnillo. The 2012 PEA was based on the resource estimate and model developed by Strathcona Mineral Services (Strathcona) dated November 2011.

The economic analysis in the PEA is preliminary in nature and is based, in part, on Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-1 www.rpacan.com

On October 28, 2013, MAG announced that the Joint Venture had commenced underground development. The ramp advancement work is being conducted by a contractor using a conventional drill and blast method and a continuous miner where possible.

CONCLUSIONS MAG and joint venture partner Fresnillo have made a major discovery of low-sulphidation epithermal vein mineralization, located in the southwest part of the world-class Fresnillo silver mining district. The discovery is located in the northeast corner of the property and consists of two silver-gold-lead-zinc epithermal structures known as the Valdecañas and Juanicipio vein systems. Most exploration on the property has focused on these two vein systems. There is good exploration potential remaining at the Juanicipio Vein and elsewhere on the property, which remains largely underexplored. A significant exploration budget is warranted.

The updated Mineral Resource estimate reflects the drill results available as of December 31, 2013 including 40 new infill diamond drill holes completed since the previous resource estimate. The new estimate demonstrates a conversion of previously classified Inferred Resources into the Indicated category and reports a deep lower grade resource separately. The Mineral Resources on the Juanicipio Property are contained within the Valdecañas Vein system and the Juanicipio Vein. The updated resource estimate uses a cut-off of US$70/tonne Net Smelter Return (NSR), which includes values for silver, gold and base metals.

The Valdecañas and Juanicipio Veins display the vertical grade transition from upper silver rich zones to deep gold and base metal dominant areas that is typical of Fresnillo District veins, and epithermal silver veins in general. Previous resource estimates were largely based on the upper silver rich zones with limited influence from the deep base metal dominant zone. The recent infill drilling has greatly improved discrimination of the vertical compositional zonations, allowing the updated Mineral Resource estimate reported here to be manually divided into the upper Bonanza Grade Silver Zone (BGS Zone) and the Deep Zone (Tables 1-1 and 1-2). This division highlights both the improved confidence in the BGS Zone, through conversion of previously categorized Inferred Resources into Indicated Resources, and the initial definition of the Deep Zone.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-2 www.rpacan.com

The increased drill density provides a better understanding of the vein geometry and indicates that that the Valdecañas Vein comprises two overlapping “en-echelon” veins rather than a single vein offset by a fault. This reveals an area of overlap, with incrementally increased tonnage, especially in the BGS Zone. A number of new holes, targeted below the limits of the previous resource estimate, intersected significant widths (10.5 m to 25.8 m true thickness) of lower grade mineralization, which combined with previous deep intercepts led to the definition of the new Deep Zone resource.

TABLE 1-1 MINERAL RESOURCES BY METAL ZONE (100% BASIS) MAG Silver Corp. - Juanicipio Joint Venture

Grade Contained Metal Zone/Classification Tonnage Ag Au Pb Zn Ag Au Pb Zn (Mt) (g/t) (g/t) (%) (%) (M oz) (k oz) (M lb) (M lb) Bonanza Grade Silver Zone

Indicated 8.3 601 1.7 2.0 3.7 160 448 365 676 Inferred 2.4 626 1.9 1.4 2.2 48 146 74 114 Deep Zone

Indicated 1.8 93 1.7 1.4 2.6 5 97 54 102 Inferred 2.7 146 2.0 2.1 3.4 13 173 128 203

Notes: 1. CIM definitions were followed for the classification of Mineral Resources. 2. Mineral Resources are estimated at an incremental NSR cut-off value of US$70/tonne 3. NSR values are calculated in US$ using factors of $0.57 per g/t Ag, $30.11 per g/t Au, $9.07 per % Pb, and $12.21 per % Zn. These factors are based on metal prices of US$21.50/oz Ag, US$1,250/oz Au, $0.91/lb Pb, and $0.99/lb Zn and estimated recoveries and smelter terms. 4. The Mineral Resource estimate uses drill hole data available as of December 31, 2013. 5. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. 6. Totals may not add correctly due to rounding.

Combining the BSG Zone and the Deep Zone into a total resource by category, results in an overall increase in tonnage and a lower overall silver grade (Table 1-2).

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-3 www.rpacan.com

TABLE 1-2 JUANICIPIO JOINT VENTURE MINERAL RESOURCES (100% BASIS) MAG Silver Corp. - Juanicipio Joint Venture

Grade Contained Metal

Classification Tonnage Ag Au Pb Zn Ag Au Pb Zn (Mt) (g/t) (g/t) (%) (%) (M oz) (k oz) (M lb) (M lb)

Indicated 10.1 511 1.7 1.9 3.5 166 544 419 778 Inferred 5.1 372 2.0 1.8 2.8 61 319 202 317

Notes: 1. CIM definitions were followed for the classification of Mineral Resources. 2. Mineral Resources are estimated at an incremental NSR cut-off value of US$70 per tonne. 3. NSR values are calculated in US$ using factors of $0.57 per g/t Ag, $30.11 per g/t Au, $9.07 per % Pb, and $12.21 per % Zn. These factors are based on metal prices of $21.50/oz Ag, $1,250/oz Au, $0.91/lb Pb, and $0.99/lb Zn and estimated recoveries and smelter terms. 4. The Mineral Resource estimate uses drill hole data available as of December 31, 2013. 5. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. 6. Totals may not add correctly due to rounding.

In RPA’s opinion the Juanicipio project has the potential to be developed into an economically robust, high-grade underground silver project. Further drilling and investigation work aimed at upgrading Inferred Mineral Resources and increasing the geotechnical and hydrogeological understanding of the deposit is required to form a firm base for the next stage of project design and evaluation.

RPA notes several changes since the 2012 PEA that would have an insignificant impact on the overall economic results:

• Updated Mineral Resource as described in this report • Metal Prices • Payment Terms for concentrate • Cost Escalation • New Gold and Silver Tax (0.5% Gross Revenue) • New Mining Tax (7.5% on EBITDA) • Increased Corporate Tax rate (30% from 28%) • Increase in cut-off grade used to report Mineral Resources

RPA would expect an updated PEA to have similar economic results as the 2012 PEA, and believes that the 2012 PEA remains a reasonable representation of the property’s economic potential.

RECOMMENDATIONS The Juanicipio property hosts a significant silver-gold-lead-zinc deposit and merits considerable additional exploration and development work. RPA recommends a budget of

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-4 www.rpacan.com

US$22.6 million (Table 1-3) for 2014 to advance the access ramp to the Valdecañas vein system and to explore elsewhere on the property. Work should include:

• Continuing to advance the underground access ramp. The budget in the 2012 PEA estimates this work to be $11.4 million with MAG’s 44% share being $5 million.

• 10,000 m of drilling at the Valdecañas vein system to obtain a drill hole spacing no greater than 100 m in both the along-strike and up- and down-dip directions.

• 10,000 m of drilling for a property-wide exploration program including mapping, and drilling of new targets. Key criteria should be known mineralization, lineaments, and alteration.

In addition to the ramp advancement and continued drilling, RPA recommends the continuation of the environmental, engineering, and metallurgical studies as recommended in the 2012 PEA.

TABLE 1-3 PROPOSED BUDGET (100% BASIS) MAG Silver Corp. - Juanicipio Joint Venture

Item US$ M Ramp advancement 11.4 Drilling (~20,000 m) 3.6 Interpretation, resource update, etc. 0.1 Geotechnical and Engineering Studies 1.2 Metallurgical and Mill Design Studies 1.1 Permitting and Environmental Work 0.9 Operating Costs / Office 1.2 Infrastructure Studies 1.0 Sub-total 20.5 Contingency (10%) 2.1 Total 22.6

TECHNICAL SUMMARY

PROPERTY DESCRIPTION AND LOCATION The Juanicipio Joint Venture consists of a single concession covering 7,679.21 ha in central Zacatecas State, Mexico. It is centred at approximately 102° 58’ east longitude and 23° 05’ north latitude.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-5 www.rpacan.com

LAND TENURE The Juanicipio 1 exploitation concession has a 50 year life from the date it was issued and will expire on December 12, 2055. The Juanicipio Joint Venture holds the surface ownership over the area of interest in the northeast portion of the property which encompasses the Valdecañas Vein system, Juanicipio Vein, and the proposed tailings storage site north of the Juanicipio 1 mining concession.

SITE INFRASTRUCTURE Site infrastructure consists of the following items: • a series of roads used to access drill sites, the decline and the mill site, • an underground access portal, and the start of an underground access ramp, • a surface explosive magazine, and • interim power lines.

HISTORY Silver mineralization in the Fresnillo area was discovered in 1554. Although no records exist prior to the 1970s, the Juanicipio property was likely prospected sporadically over the years because of its proximity to the Fresnillo mining area.

Industrias Peñoles S.A. de C.V. (Peñoles) drilled several holes to the northeast of the property in the 1970s and 1980s. Detailed exploration of the areas adjoining the Juanicipio property was initiated by Fresnillo in 2006 based on results from the Valdecañas Vein discovery.

From 1998 to 2001, Minera Sunshine S.A. de C.V. (Minera Sunshine) completed an exploration program consisting of property-wide geological mapping, preliminary rock chip sampling, and Landsat image and air photo analysis. This was followed by more detailed geological mapping in areas of interest, additional Landsat image analysis, detailed geochemical sampling, and a limited Natural Source Audio Magnetotelluric (NSAMT) geophysical survey. Drilling targets were identified, prioritized and fully permitted but never drilled due to Minera Sunshine’s bankruptcy.

In July 2002, Minera Lagartos S.A. de C.V. (Minera Lagartos) optioned the Juanicipio 1 concession. On August 8, 2002, MAG entered into an agreement whereby it could acquire

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-6 www.rpacan.com

98% of the issued and outstanding shares of Minera Lagartos. This agreement was later amended such that MAG could acquire a 99% interest in Minera Lagartos and a beneficial ownership of the remaining 1% interest.

From May 2003 to June 2004, MAG completed 10 drill holes for a total of 7,595 m and during this exploration program, discovered the Juanicipio Vein and cut what would later be discovered to be the upper and deep parts of the Valdecañas Vein outside of the thick and high grade Bonanza Zone.

On April 4, 2005, MAG announced that it had entered into a joint venture agreement with Peñoles whereby Peñoles could earn a 56% interest in the property. Fresnillo, then Peñoles’ wholly-owned operating division, and MAG formed a new company, Minera Juanicipio, to operate the joint venture.

On July 25, 2008, MAG filed a Technical Report on the Juanicipio Project which included an initial Mineral Resource estimate. That report covered work on the property to December 31, 2007. The Mineral Resource estimate was then updated by RPA (then Scott Wilson RPA) in early 2009 based on drill hole results available to January 29, 2009. On September 14, 2009, MAG announced the results of the independent preliminary assessment by Tetra Tech WEI Inc. for development of the Valdecañas Vein as a potential stand-alone silver mine. On December 1, 2010, MAG announced a Juanicipio resource estimation and update prepared by RPA (then Scott Wilson RPA). A NI 43-101 Technical Report to support the resource update was filed on SEDAR on January 14, 2011. On November 10, 2011, MAG announced an updated Juanicipio resource estimate prepared by Strathcona on behalf of Minera Juanicipio. On December 19, 2011, MAG announced an updated resource estimate by RPA. On June 14, 2012, MAG announced an updated PEA study prepared by AMC on behalf of Minera Juanicipio. The 2012 PEA was based on the resource model prepared by Strathcona.

GEOLOGY The Juanicipio property lies on the western flank of the Central Altiplano, just east of the range. Basement rocks underlying the western Altiplano are a late Palaeozoic to Mesozoic assemblage of marine sedimentary and submarine volcanic rocks belonging to the Terrane that were obducted onto older Palaeozoic and Precambrian continental rocks during the early Jurassic. These were then overlapped by a

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-7 www.rpacan.com

Jurassic-Cretaceous epi-continental marine and volcanic arc sequence that in the Fresnillo area is represented by the Proaño and Chilitos formations. The late Cretaceous to early Tertiary Laramide Orogeny folded and thrust faulted the basement rocks in the entire area and preceded the emplacement of mid-Tertiary plutons and related dykes and stocks.

On the Juanicipio property, the dominant structural features are: (i) 340° to 020°, or north- south structures; (ii) 290° to 310° trending, steeply dipping faults; and (iii) lesser 040° to 050° structures. From field observations, the north-south structures appear to be steeply dipping normal faults that cut and down-drop blocks of silicified tuff, especially in the vicinity of Linares Canyon. More important to the silicification appears to be the 290° to 310° trending, steeply to moderately dipping faults. These faults occur where silicification and advanced argillic alteration are most intense and may have served as major hydrothermal fluid pathways.

The two significant silver-gold epithermal structures discovered to date on the Juanicipio property are known as the Valdecañas and Juanicipio vein systems. Both veins strike east- southeast and dip 35o to 55o southwest. The Valdecañas structure hosts the majority of the Mineral Resources currently estimated on the property.

Mineralization consists of precious metal rich, banded, or brecciated quartz-pyrargyrite- acanthite-polybasite-galena-sphalerite veins. The veins have undergone multiple mineralizing events as suggested by various stages of brecciation and quartz sealing, local rhythmic microcrystalline quartz-pyrargyrite banding, and open-space cocks-comb textures and vuggy silica. The vein exhibits the characteristic metal zoning of the principal veins in the Fresnillo district, observed as a change from silver and gold rich zones at the top to increased base metals in the deeper intersections.

MINERAL RESOURCES A set of cross sections and plan views were interpreted to construct three-dimensional wireframe models of the mineralized veins using the descriptive logs, a minimum NSR value of approximately US$70 per tonne, and a minimum thickness of two metres. Prior to compositing to two metre lengths, high grades were cut to 6,000 g/t Ag, 16 g/t Au, and 15% for both lead and zinc. Classification into the Indicated and Inferred categories was guided by the drill hole density and the apparent continuity of the mineralized zones.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-8 www.rpacan.com

The updated Mineral Resource estimate dated December 31, 2013 is listed in Table 1-1.

The following summary sections are summarized from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012. In RPA’s opinion, these sections remain reasonable for this stage of study.

GEOTECHNICAL CONSIDERATIONS Cretaceous sedimentary rocks, which host the veins, are overlain by Tertiary volcanic rocks across the majority of the project site, except for two surface outcrops located southwest of the Valdecañas Vein. Rock quality in moderate to slightly weathered Cretaceous sedimentary rocks typically consist of poor to fair quality rocks with localized zones of high fracture frequency. Rock quality within the Tertiary volcanic rocks varies greatly from extremely poor to good. Veins are characterized by typically good rock quality, but geotechnical data relating to the veins is extremely limited.

Hydrogeological information on the project area has not yet been collected. The study assumes that the rock mass in the project area will be generally dry except in fault zones, which have been assumed to produce medium inflows.

MINING METHODS AMC considered use of the following stoping methods at the project:

• Down-hole benching with uncemented rockfill (modified Avoca). • Long-hole open stoping (LHOS) with cemented backfill. • Cut-and-fill with uncemented backfill.

In AMC’s opinion, LHOS with cemented backfill is the most suitable method for the veins, mainly because of the higher recovery achievable using this method. LHOS with cemented backfill can be used in both steeply dipping and shallow dipping parts of the deposit. It is envisaged that some steeper dipping lower grade parts of the veins will be mined using the lower cost Avoca method.

Truck haulage, shaft hoisting, and conveying were considered for transferring ore and waste from the mine workings to surface. The trucking option was selected on the basis of its lower up-front capital cost and lower overall net present cost. However, there are relatively small

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-9 www.rpacan.com cost differences between the options and the trucking option is sensitive to future increases in fuel and labour costs. In AMC’s opinion ongoing consideration is warranted on the option of constructing a hoisting shaft to a depth of about 450 m.

It is envisaged that access to the mine will be via a decline driven at a nominal gradient of 1:7. The access decline will connect to a number of internal declines providing access to stoping levels positioned at either 15 m or 20 m vertical intervals, depending on the dip of the vein. It is envisaged that mining will be carried out using modern trackless mining equipment. The proposed mine ventilation circuit will include a number of ventilation shafts, raise bored from surface.

MINERAL PROCESSING Two sets of metallurgical test work were carried out in 2008 and 2009, on metallurgical samples composited from drill holes samples taken from the Valdecañas Vein. No metallurgical test work has yet been carried out relating to the Juanicipio Vein.

The proposed process plant consists of a comminution circuit followed by the sequential flotation of a silver-rich lead concentrate, a zinc concentrate, and a gold-rich pyrite concentrate.

It is envisaged that the process plant will commence operation at a throughput rate of 850,000 tpa, which will be increased to 950,000 tpa when production from the Juanicipio Vein commences.

Estimated mill recoveries and concentrate grades are summarized in Table 1-4.

TABLE 1-4 MILL RECOVERIES AND CONCENTRATE GRADES MAG Silver Corp. - Juanicipio Joint Venture

Gold Silver Lead Zinc

Recoveries to lead concentrate 69% 81% 93% 8% Lead concentrate grades 30.3 g/t 10,265 g/t 43.0% 6.7% Recoveries to zinc concentrate 3% 7% 1% 87% Zinc concentrate grades 0.95 g/t 637 g/t 0.33% 52.0% Recovery to pyrite concentrate 19% 6% – –

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-10 www.rpacan.com

PROJECT INFRASTRUCTURE A 9.8 km access road, mostly over hilly terrain, will be required to access the site. A two- lane unsealed road suitable for use by heavy vehicles hauling concentrates is proposed.

Power would be supplied to a main substation at the site via a 115 kV overhead power line from an existing power line and substation located to the north of the property. The line would have a length of approximately 5.2 km. The average power demand for the site is estimated at 11.9 MW.

Three water catchment dams are envisaged for the site. The dams would be used to store water from the mine dewatering system and from rainfall. A hydrogeological study will be carried out during further studies.

The Joint Venture has purchased 125 ha of relatively flat-lying land suitable and adequate for the proposed five million cubic metres tailings storage facility (TSF). This land lies to the northeast of the proposed mill site along the proposed access road from the JV area to the regional highway. The necessary detailed environmental and geotechnical studies for this TSF site have been outlined but not yet initiated.

PROJECT DEVELOPMENT AND PRODUCTION SCHEDULE Following satisfactory completion of further studies, and subject to the application for and grant of the necessary permits and licences, it is estimated that it will take approximately three and a half years to develop the project from the start of the box cut and portal to mill start-up.

The estimated tonnage and grade of material mined and processed that forms the basis for the economic assessment is set out in Table 1-5. Mill feed from vein development comprises approximately 19% of total mill feed, with the remainder from stoping operations.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-11 www.rpacan.com

TABLE 1-5 TONNAGE OF MATERIAL MINED AND PROCESSED AS A BASIS FOR THE PRELIMINARY ECONOMIC ASSESSMENT MAG Silver Corp. - Juanicipio Joint Venture

Grade Contained Metal Million Au Ag Pb Zn Au Ag Pb Zn Tonnes (g/t) (g/t) (%) (%) (koz) (Moz) (Mlb) (Mlb) Material derived from 5.3 1.88 667 2.1 4.1 318 113 242 472 Indicated Resources Material derived from 4.9 1.46 408 1.6 2.9 230 65 169 311 Inferred Resources External dilution 0.2 1.80 209 1.8 3.0 9 1 6 11 Waste 3.0 0 0 0 0 0 0 0 0

Note: The tonnage and grades of the material mined and processed were derived from the 2011 Strathcona Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability

The tonnages and grades shown in Table 1-5 do not reflect the 2014 updated Mineral Resource estimate that includes 40 new infill diamond drill holes completed since the previous resource estimate, but rather have been derived from the Mineral Resource estimate and vein model prepared in 2011 by Strathcona by applying a $65 NSR cut-off grade to the resource model and then allowing for dilution, and design and mining losses. Metal prices used in the NSR calculation were $1,210 per ounce gold, $22.10 per ounce silver, $0.94 per pound lead, and $0.90 per pound zinc and an exchange rate of 12.50 Mexican pesos to one US dollar. In developing the tonnage and grade estimates, stope blocks that were in contact with the property boundaries were excluded and zero grades have been assumed for the dilution material.

CAPITAL AND OPERATING COSTS Project capital is estimated at $302 million, inclusive of capitalized operating costs (costs usually related to the operation of the mine, but incurred prior to first concentrate production). Sustaining capital of $267 million results mainly from the need for ongoing mine development after concentrate production commences, including development of the Juanicipio Vein, and the need for mobile equipment replacements over the mine life.

Total site operating costs have been estimated at approximately $67/t milled. The unit costs are broken down as follows:

 Mining: $43.92/t milled.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-12 www.rpacan.com

• Milling: $19.18/t milled. • General and Administration: $3.46/t milled.

PROJECT REVENUE Project economics have been analyzed using the following metal prices (Base Case Prices), which are based on the three year trailing average prices to the year ending December 2011:

• Silver price = $23.39/oz • Gold price = $1,257/oz • Lead price = $0.95/lb • Zinc price = $0.91/lb

It is envisaged that silver rich zinc concentrate will be sold primarily to smelters in the Asian region. Lead concentrate could potentially be sold to a smelter in Mexico or exported to offshore smelters. The gold-rich pyrite concentrate will be sold to a customer able to recover the gold and silver values.

ECONOMIC ANALYSIS The economic analysis in the PEA is preliminary in nature and is based, in part, on Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

Table 1-6 summarizes the results of the economic analysis. Employee profit sharing (PTU) is not included in the financial estimates and the net present value (NPV) and internal rate of return (IRR) of the project may fluctuate depending on how the project is structured once it is in operation.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-13 www.rpacan.com

TABLE 1-6 SUMMARY OF FINANCIAL RESULTS MAG Silver Corp. - Juanicipio Joint Venture

Item Units Value Revenue $M 4,992 Cash flow before tax $M 3,013 Tax $M 851 Cash flow after tax $M 2,162 Discount rate % 5% NPV before tax (5% discount rate) $M 1,762 IRR before tax % 54% NPV after tax (5% discount rate) $M 1,233 IRR after tax % 43% Peak debt $M (302) Payback from Year 1 (approximate) yrs 5.6 Payback from mill start-up (approximate) yrs 2.1 Project life from Year 1 yrs 19

Note: PTU is not included in the financial estimates.

SENSITIVITY The NPV of the project is most sensitive to changes in the silver price and will have similar sensitivity to silver head grade. The NPV is less sensitive to costs. The project maintains a positive NPV over the range of sensitivities tested.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 1-14 www.rpacan.com

2 INTRODUCTION

Roscoe Postle Associates Inc. (RPA) was retained by MAG Silver Corp. (MAG) to update the Mineral Resource estimate and to prepare an independent Technical Report on the Juanicipio Joint Venture in Zacatecas State, Mexico. This Technical Report conforms to National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101). MAG requires this report to support the updated Mineral Resource estimate for the property. This Technical Report was amended as of June 30, 2014, to include enhanced cautionary language.

MAG is listed on the Toronto Stock Exchange and on the NYSE Amex Equities. MAG’s major assets are the Juanicipio Joint Venture Project, the subject of this report, and the Cinco de Mayo Project located in State, Mexico. The Juanicipio property is owned by Minera Juanicipio S.A. de C.V. (Minera Juanicipio), a joint venture between Fresnillo plc (Fresnillo, 56%) and MAG (44%), with Fresnillo acting as the operator. The major asset associated with the Juanicipio Joint Venture is a silver-gold-lead-zinc epithermal vein deposit.

An updated Preliminary Economic Assessment (PEA) was carried out by AMC in 2012. The study planned production at an average of 15.1 million payable ounces of silver over the first full six years of commercial production and 10.3 million payable ounces per year over a 14.8 year total mine life. The 2012 PEA did not take into account any potential mining, processing, or infrastructure synergies from an association with the adjoining property owned by Fresnillo. The PEA is based on the resource estimate and model developed by Strathcona dated November 2011.

The economic analysis in the PEA is preliminary in nature and is based, in part, on Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

SOURCES OF INFORMATION The most recent site visit to the property was carried out by David Ross, M.Sc., P.Geo., Principal Geologist with RPA, on May 27, 2014. Other site visits were carried out in 2010

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 2-1 www.rpacan.com and 2011. Mr. Ross examined core from numerous drill holes (M40, KE, M22, KG3, 18-R, NA, NF2, PD, and JC), visited active drill sites and underground development, and reviewed logging and sampling methods. Discussions have been held with: • Mr. George Paspalas, President and CEO, MAG • Dr. Peter Megaw, C.P.G., President of IMDEX, Director of MAG • Lyle Hansen, Geotechnical Director, MAG • Mr. Dan MacInnis, former President and CEO, MAG • Mike Petrina, P.Eng., former Vice President Business Development, MAG • Gabriel Arredondo, Geologist, Minera Cascabel • Carlos Altamirano Morales, Fresnillo • Jonathan Franco, Project Geologist, Fresnillo • Polo Gonzalez, Geologist, Fresnillo

RPA has visited the property several times since the discovery of Juanicipio and Valdecañas vein systems. In December 2010, drill core from boreholes NA, NF2, PD, and JC was reviewed and compared with assay results and descriptive log records were made by Fresnillo geologists. RPA visited the core shack again in May 2011, and reviewed core from KG3 and again from NA. RPA visited the property and core shack most recently on May 27, 2014 and reviewed core from holes M40, KE, M22, and 18-R. In addition to reviewing core, RPA examined outcrops, drill rigs, sampling procedures, and other general exploration protocols in use by the Joint Venture.

The documentation reviewed, and other sources of information, are listed at the end of this report in Section 27, References.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 2-2 www.rpacan.com

LIST OF ABBREVIATIONS Units of measurement used in this report conform to the metric system. All currency in this report is US dollars (US$) unless otherwise noted. a annum kWh kilowatt-hour A ampere L litre bbl barrels lb pound btu British thermal units L/s litres per second °C degree Celsius m metre C$ Canadian dollars M mega (million); molar cal calorie m2 square metre cfm cubic feet per minute m3 cubic metre cm centimetre µ micron cm2 square centimetre MASL metres above sea level d day µg microgram dia diameter m3/h cubic metres per hour dmt dry metric tonne mi mile dwt dead-weight ton min minute °F degree Fahrenheit µm micrometre ft foot mm millimetre ft2 square foot mph miles per hour ft3 cubic foot MVA megavolt-amperes ft/s foot per second MW megawatt g gram MWh megawatt-hour G giga (billion) oz Troy ounce (31.1035g) Gal Imperial gallon oz/st, opt ounce per short ton g/L gram per litre ppb part per billion Gpm Imperial gallons per minute ppm part per million g/t gram per tonne psia pound per square inch absolute gr/ft3 grain per cubic foot psig pound per square inch gauge gr/m3 grain per cubic metre RL relative elevation ha hectare s second hp horsepower st short ton hr hour stpa short ton per year Hz hertz stpd short ton per day in. inch t metric tonne in2 square inch tpa metric tonne per year J joule tpd metric tonne per day k kilo (thousand) US$ United States dollar kcal kilocalorie USg United States gallon kg kilogram USgpm US gallon per minute km kilometre V volt km2 square kilometre W watt km/h kilometre per hour wmt wet metric tonne kPa kilopascal wt% weight percent kVA kilovolt-amperes yd3 cubic yard kW kilowatt yr year

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 2-3 www.rpacan.com

3 RELIANCE ON OTHER EXPERTS

This report has been prepared by RPA for MAG. The information, conclusions, opinions, and estimates contained herein are based on: • Information available to RPA at the time of preparation of this report;

• Assumptions, conditions, and qualifications as set forth in this report; and

• Data, reports, and other information supplied by MAG and other third party sources.

For the purpose of this report, RPA has relied on ownership information provided by MAG, including an independent opinion by Creel, García-Cuéllar, Aiza y Enríquez, of México, Mexico, dated September 5, 2012. RPA has not researched property title or mineral rights for the Juanicipio Joint Venture and expresses no opinion as to the ownership status of the property.

Except for the purposes legislated under provincial securities laws, any use of this report by any third party is at that party’s sole risk.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 3-1 www.rpacan.com

4 PROPERTY DESCRIPTION AND LOCATION

The Juanicipio Joint Venture property is located in central Zacatecas State, approximately 70 km by road northwest of the state capital of Zacatecas City (Figure 4-1). Zacatecas City has a population of approximately 255,000 and is located about 550 km northwest of . Zacatecas City is serviced by daily flights from Mexico City. The property is accessible by Federal Highway 49 northwest from Zacatecas City to Fresnillo, then six kilometres to the southwest along paved and dirt roads. The centre of the property is located at approximately 102° 58’ east longitude and 23° 05’ north latitude.

LAND TENURE The property consists of a single mining concession measuring 7,679.21 ha (Figure 4-2). Table 4-1 lists the tenure information for the Juanicipio concession. All concessions in Mexico are classified as exploitation concessions and have a 50 year life from the date of issue, renewable for another 50 years if desired.

TABLE 4-1 TENURE DATA MAG Silver Corp. – Juanicipio Joint Venture

Concession Date Issued Expiry Date Area (ha) Title No. Owner Juanicipio 1 13-Dec-2005 12-Dec-2055 7,679.21 Tx 226339 Minera Juanicipio S.A.

The property is owned by Minera Juanicipio, a joint venture company 56% held by Fresnillo and 44% held by MAG, with Fresnillo acting as the operator. Industrias Peñoles S.A. de C.V. (Peñoles) holds a 77% interest in Fresnillo and therefore a beneficial 43% interest in the property.

Surface ownership over the area of interest in the northeast portion of the property was held by the Valdecañas Ejido and Ejido Saucito de Poleo. The joint venture has purchased the surface rights of that area for US$1.40 million (Figure 4-2).

MAG provided an independent opinion by Creel, García-Cuéllar, Aiza y Enríquez, of México, dated September 5, 2012, which is in agreement with the above land tenure information.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 4-1 www.rpacan.com

Since that time the Joint Venture has purchased 125 hectares of surface rights north of the mining concession for a tailings storage facility and access roads.

With the exception of liabilities related to the reclamation of exploration drill roads and sites, RPA is not aware of any outstanding environmental liabilities. MAG reports that all applicable permits required to conduct mineral exploration, drive the decline, prepare the millsite and improve or construct access roads and powerlines have been granted.

RPA is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the proposed work program on the property.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 4-2 www.rpacan.com

104° 102° 100° To N NUEVO To Torreó n Cedros LEON Concepción El Salvador Est. Camacho del Oro San Felipe Juan Aldama Norias Nuevo Mercurio Miguel Auza San 24° General Tiburcio 24° Francisco Murguia Flores To Gracia Rio Grande 49 Est. Cañitas 54 45 de Felipe Pescador DURANGO Sombrerete ZACATECAS El Rucio La Legend: Chicharrona SAN LUIS POTOSI Plateros State Capital City Jiménez Fresnillo de Teúl JUANICIPIO City/Town Highway Victor Rosales JOINT VENTURE Zacatecas Road Valparaiso Jerez Troncoso de Garcia Guadalupe Espiritu Santo State Boundary Potrero Salinas 49 de Gallegos Ojo Caliente Luis Moya Villanueva Loreto Pinos Monte 54 Escobedo To San Luis Tayahua Pososí 22° 22° AGUASCALIENTE 70 Tlaltenango 45 51 Tepechitián Jalpa JALISCO To Queretaro Juchipila To Lagos de Moreno Moyahua &

104° To Guadalajara 102° 100° 02040 60 80 100 32° United States Kilometres June 2014

Gulf of MexicoCoahuila Figure 4-1 Nuevo Gulf of Mexico Leon 24° Durango Zacatecas State Mag Silver Corp. San Luis Nayarit Potosi Aguascaliente Bahía de Jalisco Pacific Ocean Juanicipio Joint Venture Mexico City Belize Zacatecas State, Mexico 16° Guatemala Honduras Location Map

El Salvador 112° 104° 96° 88°

4-3 www.rpacan.com 700,000 E 705,000 E 710,000 E

N SAN CARLOS SAN CARLOS II EXP. 24,813 EXP. 93/24,818 Surface Rights EL FIERRO

ARANZAZU EXP. 21,355 ARANZAZU EXP. Area EXP. 8-1.3/837

2,560,000 N

Valdecañas Vein System

EL RETAQUE

2,560,000 N Las Venadas Structure EXP. 14,343

Juanicipio Vein System

REYNA I EXP. 15,206

2,550,000 N

2,550,000 N JUANICIPIO I T-226339 ALIANZA 2 7679.21 ha. EXP. 93/27,290 2,555,000 N

010002000 3000 4000 REYNA IV Metres EXP. 8-1.3/1307

2,555,000 N UTM NAD 27 Mexico, Zone 13 Coordinate System Figure 4-2

Mag Silver Corp. L. SAN JUAN

EXP. 15,896 Juanicipio Joint Venture TERRENO LIBRE EL Zacatecas State, Mexico MINERITO 2,545,000 N EXP. 16,731 EXP. 14,051 PROVIDENCIA

EXP. 27,340 EXP.

ALIANZA 3 TERRENO Claim Map LIBRE LAS PIRAMIDES ALIANZA 2

2,545,000 N EXP. 16,893 EXP. 93/27,290

June 2014 Source: Mag Silver Corp., 2011. 4-4 www.rpacan.com

5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

ACCESSIBILITY The Juanicipio Joint Venture is located 70 km by road northwest of Zacatecas City in central Zacatecas State. The property is accessible by taking Federal Highway 49 northwest from Zacatecas City to Fresnillo and then six kilometres to the southwest along paved and dirt roads.

CLIMATE The climate is warm and arid. Temperatures vary from 0°C to 41°C and average 21°C. The average annual precipitation is 290 mm, with the period from June to September being the rainiest. Exploration and development can be carried out twelve months a year.

LOCAL RESOURCES The closest full service town is Fresnillo, located eight kilometres from the property. Fresnillo has a population of approximately 255,000 and has all the services required to support a mining operation including a trained workforce, hospital, and accommodations.

The closest airport with daily air service to Mexico City is located at Zacatecas City. Both Zacatecas City and Fresnillo are serviced by rail.

There is an electric power substation in Fresnillo.

INFRASTRUCTURE Site infrastructure consists of the following items: • a series of roads used to access drill sites, the decline and the mill site, • an underground access portal, and the start of an underground access ramp, • a surface explosive magazine, and • interim power lines.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 5-1 www.rpacan.com

Section 23 describes infrastructure located immediately outside the property boundary.

PHYSIOGRAPHY The Juanicipio property lies within the Mexican Mesa Central or Altiplano. This region is flanked to the west by the Sierra Madre Occidental and to the east by the Sierra Madre Oriental mountain ranges. The Altiplano in this region is dominated by broad alluvium filled valleys between mountain ranges with an average elevation of approximately 1,700 MASL. Local mountain ranges reach 3,000 MASL. Elevations on the Juanicipio property itself range from 2,050 MASL to 2,450 MASL and the terrain is moderate to rugged.

Vegetation is sparse and consists mainly of grasses, low thorny shrubs, and cacti with scattered oak forests at higher elevations. Surface water is rare, but groundwater is available.

At this stage of the project, there are sufficient surface rights and available power, water, and personnel to carry out the exploration.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 5-2 www.rpacan.com

6 HISTORY

PRIOR OWNERSHIP

The Juanicipio 1 concession was originally staked in 1996, with title eventually granted in 1998. It was held under the name of Juan Antonio Rosales and covered an area of approximately 28,000 ha. The concession was later acquired by Martin Sutti, who optioned it to Minera Sunshine de Mexico S.A. de C.V. (Minera Sunshine) until 2001.

In July 2002, Minera Lagartos S.A. de C.V. (Minera Lagartos) optioned the Juanicipio 1 concession from Mr. Sutti. On August 8, 2002, MAG entered into an agreement whereby it could acquire 98% of the issued and outstanding shares of Minera Lagartos. This agreement was later amended such that MAG could acquire a 99% interest in Minera Lagartos and a beneficial ownership of the remaining 1% interest.

On April 4, 2005, MAG announced that it had entered into a joint venture agreement with Peñoles whereby Peñoles could earn a 56% interest in the property by spending US$5 million on or before the end of year four of the agreement. Peñoles committed to a minimum expenditure of US$750,000 including at least 3,000 m of drilling in the first year of the agreement. Peñoles subscribed for US$500,000 in MAG shares at the market price on signing and an additional US$500,000 in MAG shares if the contract continued into the second year. All earn-in requirements have been met.

In 2007, Peñoles’ precious metals assets were assigned to a wholly owned subsidiary, Fresnillo plc.

On December 21, 2007, Fresnillo and MAG announced the formation of a new company incorporated in Mexico, Minera Juanicipio, to operate the joint venture. Minera Juanicipio is 56% held by Fresnillo and 44% held by MAG, with Fresnillo acting as the operator.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 6-1 www.rpacan.com

EXPLORATION HISTORY

Silver mineralization in the Fresnillo area was discovered in 1554. Although no records exist prior to the 1970s, the Juanicipio property was likely prospected periodically over the years because of its proximity to the Fresnillo mining area.

Peñoles drilled several holes to the northeast of the property in the 1970s and 1980s, prior to the discovery of the nearby San Carlos Vein. Concerted exploration of the areas adjoining the Juanicipio property was begun by Fresnillo in 2006 based on results from the Valdecañas and San Carlos veins.

From 2000 to 2001, Minera Sunshine contracted IMDEX Inc./Cascabel S.A. de C.V. (IMDEX/Cascabel) to complete property-wide (1:50,000 scale) geological mapping, preliminary rock chip sampling, and Landsat image and air photo analysis. This was followed by more detailed (1:5,000 scale) geological mapping in areas of interest, additional Landsat image analysis, detailed geochemical sampling, and a limited amount of Natural Source Audio Magnetotelluric (NSAMT) geophysical surveying. The NSAMT survey was used to define structures, mainly in the northeastern part of the property. Minera Sunshine obtained drill permits to test this area but was not able to undertake drilling before they went bankrupt in 2001 (Megaw and Ramirez, 2001).

PREVIOUS MINERAL RESOURCE ESTIMATES

In April 2008, Fresnillo reported an initial Mineral Resource estimate for the Valdecañas deposit. In June 2008, MAG retained SRK Consulting (Canada) Inc. (SRK) to prepare a NI 43-101 Technical Report documenting the initial Mineral Resource estimate prepared by Fresnillo and audited by SRK (Chartier et al., 2008).

In 2009, RPA, then Scott Wilson RPA, prepared a Mineral Resource estimate based on drill hole results available to January 29, 2009. This work was done independently of the modelling and estimation work by Fresnillo (Ross and Roscoe, 2009).

RPA updated the resource in late 2010 based on data available to September 10, 2010 (Ross, 2011). Fresnillo prepared a parallel estimate using similar drill hole data. The Fresnillo estimate was audited by SRK (Brown et al., 2011). The two estimates differed in

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 6-2 www.rpacan.com the silver grade, which led to studies by additional consultants (Srivastava, 2011; Leuangthong et al., 2011).

On November 10, 2011, MAG announced an updated Mineral Resource estimate made by Strathcona on behalf of the Minera Juanicipio Joint Venture. The estimate was based on drill results available as of June 1, 2011, and used a cut-off grade of 100 g/t Ag. Indicated Mineral Resources were estimated to total 5.7 million tonnes at 702 g/t Ag, 1.9 g/t Au, 2.2% Pb, and 4.2% Zn. Total contained metals in the Indicated Resource were 128 million ounces of silver, 346,000 ounces of gold, 268 million pounds of lead, and 521 million pounds of zinc. Inferred Mineral Resources were estimated to total 4.3 million tonnes at 513 g/t Ag, 1.4 g/t Au, 1.6% Pb, and 3.0% Zn. The Inferred Resources contained an additional 71 million ounces of silver, 192,000 ounces of gold, 152 million pounds of lead, and 280 million pounds of zinc.

On December 19, 2011, MAG announced an updated resource estimate by RPA (Ross, 2011). Using drill hole data available as of August 5, 2011 and a net smelter return (NSR) cut-off value of US$55/t, Indicated Mineral Resources were estimated to total 6.2 million tonnes of 728 g/t Ag, 1.9 g/t Au, 1.9% Pb, and 3.9% Zn. Inferred Mineral Resources were estimated to total 7.1 million tonnes of 373 g/t Ag, 1.6 g/t Au, 1.5% Pb, and 2.6% Zn. The contained metals in the Indicated Resource were estimated to total 146 million ounces of silver, 384,000 ounces of gold, 267 million pounds of lead, and 539 million pounds of zinc. The Inferred Resources were estimated to total 85 million ounces of silver, 370,000 ounces of gold, 236 million pounds of lead, and 400 million pounds of zinc.

On June 14, 2012, MAG announced an updated PEA Study prepared by AMC on behalf of Minera Juanicipio (Thomas et al., 2012). The updated PEA was based on the resource model prepared by Strathcona dated November 2011.

All Mineral Resource estimates reported in this section are superseded by the current Mineral Resource estimate contained in Section 14 of this report.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 6-3 www.rpacan.com

SCOPING STUDY - 2009

In May 2009, Tetra Tech WEI Inc., formerly Wardrop Engineering (Wardrop), was retained by Minera Juanicipio to carry out an initial scoping level study on the Valdecañas deposit. The study (Ghaffari et al., 2009) was filed on SEDAR on November 6, 2009.

The study was completed on the basis that the joint mine/mill project would be conducted on a "stand alone" basis, independent of any other regional mining operations or related infrastructure. It was based on Mineral Resource estimates made by Strathcona. It was also assumed that the most economical and efficient access to the mine would be via a ramp. The estimates were to an accuracy of + 35%. All costs were in US$ and the Wardrop Base Case utilized the Energy and Metals Consensus Forecasts (EMCF) quarterly reports in calculating Wardrop/EMCF prices.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 6-4 www.rpacan.com

7 GEOLOGICAL SETTING AND MINERALIZATION

The following is modified from Megaw and Ramirez (2001). Figure 7-1 shows the regional geology and Figure 7-2 depicts the regional stratigraphy.

REGIONAL GEOLOGY

The Juanicipio property lies on the western flank of the Central Altiplano, just east of the Sierra Madre Occidental range. Basement rocks underlying the western Altiplano are a late Palaeozoic to Mesozoic assemblage of marine sedimentary and submarine volcanic rocks belonging to the Guerrero Terrane (Simmons, 1991) that were obducted onto older Palaeozoic and Precambrian continental rocks during the early Jurassic. These were then overlapped by a Jurassic-Cretaceous epi-continental marine and volcanic arc sequence that in the Fresnillo area is represented by the Proaño and Chilitos formations (Simmons, 1991; Wendt, 2002). The late Cretaceous to early Tertiary Laramide Orogeny folded and thrust faulted the basement rocks in the entire area and preceded the emplacement of mid-Tertiary plutons and related dykes and stocks (Ruvalcaba-Ruiz and Thompson, 1988). Mesozoic marine rocks are host to the San Nicolas volcanogenic massive sulphide (VMS) deposit and Francisco Madero sedimentary exhalative (Sedex) deposit (Wendt, 2002).

Unconformably overlying the Mesozoic basement rocks in the western Altiplano are units from the late Cretaceous to Tertiary, Sierra Madre Occidental magmatic arc. These rocks consist of a lower assemblage of late Cretaceous to Tertiary volcanic, volcaniclastic, conglomerate and locally limestone rocks, the “lower volcanic complex”, and a Tertiary (~25 to 45 Ma) “upper volcanic supergroup” of caldera related, rhyolite ash flow tuffs and flows. Eocene to Oligocene intrusions occur throughout the Altiplano and are related to the later felsic volcanic event. Locally, these two units are separated by an unconformity (Ruvalcaba- Ruiz and Thompson, 1988; Wendt, 2002).

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-1 www.rpacan.com

FRESNILLO Legend:

Fortuna Shaft Alluvium General Shaft Basalt San Carlos Valdecañas Vein San Luis Shaft Rhyolite Las Venadas Structure Jarillas Shaft Jarillas Juaniaipio Vein Shale

Saucito Limestone Saucito Shaft Argillite Juanicipio JV Andesite Property RAMÓN LOPEZ VELARDE Vein Mantos Shaft Major Road Urban Area

N

MADERO

Figure 7-1

0510 15 20 Mag Silver Corp. Kilometres Juanicipio Joint Venture Zacatecas State, Mexico Regional Geology

June 2014 Source: Mag Silver Corp., 2012. 7-2 www.rpacan.com

(40 SSE of Fresmillo)

(90 NNW of Fresmillo)

Figure 7-2

Mag Silver Corp.

Juanicipio Joint Venture Zacatecas State, Mexico Regional Stratigraphy

June 2014 Source: Albinson, 1998. 7-3 www.rpacan.com

A late northeast-southwest extensional tectonic event accompanied by major strike-slip fault movement affected the Altiplano starting ca. 35 Ma. This extension was most intense during the Miocene and developed much of the current basin and range topography. Calcrete cemented alluvial material covered the basins within the Fresnillo area.

The Fresnillo district’s lowest stratigraphic unit is the early Cretaceous greywacke and shale units of the Proaño Group (Table 7-1). The Proaño Group is broken into two formations: the “lower greywacke” Valdecañas Formation, comprising thinly bedded greywacke and shale, and the “upper greywacke” Plateros Formation, comprising carbonaceous and calcareous shale at the base grading to immature sandstone units (Ruvalcaba-Ruiz and Thompson, 1988).

TABLE 7-1 STRATIGRAPHY OF THE FRESNILLO DISTRICT MAG Silver Corp. – Juanicipio Joint Venture

(Modified after Ruvalcaba-Ruiz et al., 1988 and Wendt, 2002)

Laramide thrust faulting complicates the stratigraphy of the overlying limestone units, called the Cerro Gordo and Fortuna units in the Fresnillo district, and the Chilitos Formation

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-4 www.rpacan.com volcanic and volcaniclastic rocks. Regionally, the Cerro Gordo and Fortuna limestone units appear to be the stratigraphic equivalents of the Cuesta del Cura Formation and are probably early Cretaceous in age and overlie the Proaño Group clastic sedimentary rocks (Megaw and Ramirez, 2001). In this case, volcanic and volcaniclastic rocks of the Chilitos Formation are likely late Cretaceous in age and represent the earliest phase of volcanism identified in the area, and possibly correlate to the base of the “lower volcanic complex” of the Sierra Madre volcanic arc.

Overlying the Chilitos Formation are Tertiary volcanic rocks of the Fresnillo Formation (> 29 Ma), which consists of conglomerate, welded rhyolitic ash-flow tuff and flow domes, later (< 29 Ma) conglomerate, rhyolitic ash-flow tuff, and finally upper Tertiary olivine basalt flows.

Within this stratigraphy is a quartz-monzonite stock/dyke that intruded the Fresnillo mine area in mid-Tertiary (~32.4 Ma) and is associated with the introduction of silver-lead-zinc mineralized skarn and argillic alteration within surrounding greywacke and calcareous units.

PROPERTY GEOLOGY

Geological mapping on the Juanicipio property was conducted by IMDEX/Cascabel on behalf of Minera Sunshine from 1999 to 2001. The results of this mapping are detailed in a company report by Megaw and Ramirez (2001) and are summarized in the following subsections. Figure 7-3 shows the property geology.

MESOZOIC ROCKS The oldest rocks observed in the Juanicipio area are fragments of greywacke found in dumps on the Cerro Colorado area south of the property and presumably belong to the Proaño Group. The oldest rocks observed in outcrop are calcareous shale and andesitic volcaniclastic rocks of the Chilitos Formation at the base of Linares Canyon. They are highly deformed and sheared and are locally boudinaged and dip shallowly to moderately northeast.

The upper contact of the Chilitos Formation forms an irregular unconformity to the overlying Tertiary volcanic and volcaniclastic rocks. Drilling in 2002 and 2003 intersected significant

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-5 www.rpacan.com sections of the Chilitos and Proaño formations, including polymictic intermediate volcanic breccias with exhalite layers.

TERTIARY IGNEOUS ROCKS Tertiary igneous rocks are divided into the Linares and Altamira volcanic assemblages that are separated by an unconformity.

The lower assemblage, informally named the Linares volcanic package (Megaw and Ramirez, 2001) consists of volcaniclastic sedimentary units, welded and non-welded crystal lithic tuff, flow breccia, and rhyolite flow domes. The basal unit is composed of 5 m to 20 m of epiclastic volarenites and arkoses overlain by 20 m to 100 m of variably welded, rhyolite to dacite, composite ash-flow tuff that resembles, and may correlate with, Fresnillo Formation volcanic rocks (Megaw and Ramirez, 2001). This unit generally hosts the pervasive silicification “sinter”, advanced argillic alteration (kaolinite-alunite) and iron-oxide alteration found on the Juanicipio property. Textural variation and Landsat interpretation within this unit suggests several eruptive centres (calderas) for these volcanic rocks in the Sierra Valdecañas range.

Overlying the ash-flows is a well bedded volarenite layer and then 100 m to 150 m of welded ash-flow tuff, which are less silicified than the lower unit. Locally, several rhyolite domes occur between Linares Canyon and the Cesantoni Kaolinite Mine.

The Linares volcanic rocks are block-faulted along north-northwest trending faults with shallow to moderate southwest dips. Silicification appears to post-date the faulting as the faults only locally cut or displace silicified units (Megaw and Ramirez, 2001).

Megaw and Ramirez (2001) also describe and informally name the Altamira volcanic package after the tallest peak in the area, Cerro Altamira, where the thickest section of these volcanic rocks outcrop. These volcanic rocks overlie the Linares volcanic package across an angular unconformity overlain by a 20 m to 50 m thick layer of well bedded conglomerate and coarse volarenite. Rounded fragments of silicified Linares volcanic rocks occur within the conglomerate. Overlying these clastic rocks is a 20 m to 350 m thick section of welded rhyolite to rhyodacite ash-flow tuff. Several caldera complexes have been identified within this package. This unit is post-alteration and presumably post-mineralization and does not appear to contain any alteration.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-6 www.rpacan.com

UPPER TERTIARY ROCKS These rocks are composed of olivine basalt flows that locally overlie the felsic mid-Tertiary volcanic and volcaniclastic rocks on the property.

STRUCTURAL GEOLOGY Regional satellite image interpretation suggests that the Sierra Valdecañas range is a topographically high, but structurally down-dropped block that is bounded by several major orthogonal northeast and northwest structures. The most notable of these is the more than 200 km long Fresnillo strike-slip fault and its parallel structure, the San Acacio-Zacatecas fault to the east of the Juanicipio property. Also, it appears that the San Acacio-Zacatecas structure traverses the northeast corner of the Juanicipio property and coincides with the Valdecañas and Juanicipio veins.

On the Juanicipio property, the dominant structural features are: (i) 340° to 020°, or north- south structures; (ii) 290° to 310° trending, steeply dipping faults; and (iii) lesser 040° to 050° structures. From field observations, the north-south structures appear to be steeply dipping normal faults that cut and down-drop blocks of silicified tuff, especially in the vicinity of Linares Canyon. More important to the silicification appears to be the 290° to 310° trending, steeply to moderately dipping faults. These faults occur where silicification and advanced argillic alteration are most intense and may have served as major hydrothermal fluid pathways. NSAMT surveys on the Juanicipio property appear to confirm the presence of these northwest trending structures and they were the primary drill targets for the 2003 and 2004 drilling program.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-7 www.rpacan.com

200

75° 200

706000 mE

710000 mE

712000 mE 714000 mE 716000 mE

704000 mE 85° 708000 mE 0 Qal 220 SD-859 TR SD-830 0 V CestoiKoM an n a lin ine 25 a 2562000 mN 2 ldeca N ñas

SS 0 aa 0 F

3 aa 2 a aanCnnCn CC ul aarrllololo t lololooss VV VVeeiiniiniinnn 0 8° 5 3 2 2 30 0

2 2 5 0 d 2 65°

2 78°

2 0 5

5 2 2 0 0.5 1.0 1.5 2.0 0 TB

2 80°

0 35°

0 0

3

2 5 SD-879

2

30 2 80° 0 2

250 TR SD-892

0 SD-887 0

2560000 mN 3

TR 2 Kilometres

0

5 SD-889

3

2

2 0

30° 0 Valdecañas Vein 4

TIg-3 2 UTM NAD 27 for Mexico 2

0

5 4 2 Las Venadas Structure

2 0

0 0

0

4 0 0 3 2

10° 2 2

3 Zone 13 0

5 2 3

2 0 3 SD-844

0 0 5 2

5 0 4

0

3 0

0 2 2 0

4 4 SD-847

2 0

0

5 0

3 2 SD-854 2 SD-853

3

0 5 2

4 4 2 0 0 0 0 0

3 SD-862 0

2 LITHOLOGY 6°

SD-875 0

5 Juanicipio Vein 3

2 6° SD-879 Qal Alluvium

0

5

4 0 SD-883

2 0 4

2 SD-867

0 SD-876 5

4 SD-878

2

2 0

45 0

0 5

2558000 mN 2 Rhyodacite: Upper Volcanics, unaltered: Massive,

SD-849

0

0

2550 4 TtRd

0 2

5

2 4 light-brown lithic-rich variably welded ignimbrite

2 4502 SD-834

50 240

0 0 0 EE

5 EE 2 3

0 EE

2 lll SD-845

0 lll

4 lll SS

4 SS

0 SS

2 aa

0 0 aauu

5 uucc 0

4 cc

0 cciii 4 2 iiitt 2 iiitt

2 SD-856 tttoo

3

0 VV

5 0 VVee 5 e

0 eeiii 2 Olivine Basalt:iiinn Vesicular and flow-banded, light

00 TB SD-837 0 4

2 SD-864

55 gray to green in color. 2

0

0

6

JuanicipioJuanicipio PropertyProperty 0 2

JuanicipioJuanicipio PropertyProperty 0 5 5 4 6 2

2 0

0

0

5 2

6

5 4

0 2

2 2

0 Rhyolite: Series of variably welded tuffaceous

0 4

0 5 0 TtR

7

2 ignimbrites erupted from the "La Estañera Caldera”

2

7 0

0

0 5 0 2

2 Rhyolite Vitrophyre: Green to black glassy border

6

0 TVi 0 TtRd 2 6° zone of rhyolite flow dome. 5

0 2556000 mN 0 2 2 4 4 5 0 0 300 0 Rhyolite flow domes: Reddish gray to tan, flow TR 2 4 0 banded, autobrecciated and locally vesicular.

2 Dacite: Weakly to moderately welded eutaxitic TIg-3 2 ignimbrite 35 0 Dacite: Light yellow, poorly welded, massively 0 TIg-2 0

5

2 bedded crystal-rich ignimbrite.

2 4

0 0

2 4 50

2500

2

5 2

0 2

0 6 5

0 5

0

0 Rhyodacite: Glassy, moderately welded massive 2

7

0 TIg-1 2

0

6

5 0 15° ignimbrite.

2554000 mN

2

2

7 0

5 0 Andesite: Upper Chilitos Formation (?): Purplish, 0 0 5 7 7 2 2 KA red and green flows and tuffs with locally prominent 0 65 2 plagioclase phenocrysts. Limy shale and Graywacke: Main Chilitos Kc Formation: Alternating, thin-bedded gray to green 30°

TB limy shales and greywacke. Weakly folded.

0 0

0 6

5 2 5

2

0

0 0

5 5 2 4 MINERALIZATION AND ALTERATION

2 Pieds ra Kao li n Mine Kaolin Mine 25° Pit or Prospect 2552000 mN Quarry

Fault interpreted from Air Photo

Fault and breccia

2 52

5 5

0 0

0 Fault 00 2 6 6 2 0 0 2 6 5

0 2

2550 7 0

0 5 6

0

0 Fault and Silicification

2

0

7 2

50 6 2 2 SIMBOLOGY Silicification on structure 2550000 mN 2650 600 Pervasive Silicification 80° Bedding of sedimentary rocks 0 55 2 Specularite on structure 0 0 5 2 8° Bedding of volcanic rocks Specularite widespread 6°

0 Foliation orientation

15 0° 4 2 Kaolin Peñoles diamond drillhole

2400 Source: Mag Silver Corp., 2012. 2548000 mN Qal

400 June 2014

2350 Figure 7-3

Mag Silver Corp.

2546000 mN 25

5 0

500

2 0

5 45 0 2 0 Juanicipio Joint Venture 2500 Zacatecas State, Mexico 400

500

2500 24 Property Geology 5 0 0 240

2 4 0 0

2544000 mN 2

0

0

4

2

0 5 4 2

2

4 0 2 0 5 5

5 2

0 0

2 7-8 www.rpacan.com

MINERALIZATION

The two significant silver-gold epithermal structures discovered to date on the Juanicipio property are known as the Valdecañas and Juanicipio veins. Both veins strike east-southeast and dip 35° to 70° with an average of about 58° southwest. Both display the metal zonation typical of the Fresnillo District and epithermal veins in general, of an upper precious metal “Bonanza” zone grading downwards into a deeper base metal zone. Representative assay intervals for both vein structures are listed in Table 7-2. The Valdecañas structure hosts the majority of the Mineral Resources currently estimated on the property.

VALDECAÑAS VEIN As of December 31 2013, 142 drill holes had tested the lateral and depth extensions of the Valdecañas structure, with 132 holes being used for vein modelling. The vein extends beyond the Juanicipio property boundaries in both the northwest and southeast directions. It varies in true thickness from less than one metre up to 25.8 m, averaging approximately five metres. Generally, the precious metals rich zone is 400 m to 450 m in vertical extent with an additional 50 m vertical extent of base metal dominant zone. The vein structure is made up of one main vein and three parallel to subparallel smaller veins. Descriptions of the geometry, location, and grades are presented in Section 14. The various vein panels making up the overall Valdecañas vein structure are now referred to as: V1E, V1W, V2W, and HW1.

The naming convention of the individual veins within the Valdecañas vein structure has evolved over the last few years. The older names used in the 2012 PEA are maintained in this Technical Report for sections derived directly from that study. A summary of changes to the naming convention is listed below:

• V1E is approximately equivalent to the eastern part of the Valdecañas Vein and parts of the eastern Desprendido Vein as defined in the 2012 PEA. V1E was formerly known as the eastern part of the Main Valdecañas Vein in previous RPA reports.

• V1W is approximately equivalent to the western part of the Valdecañas Vein as defined in the 2012 PEA. V1W was formerly known as the western part of the Main Valdecañas Vein in previous RPA reports.

• V2W is approximately equivalent to the western part of the Desprendido Vein as defined by the 2012 PEA. V2W was formerly known as the combined Footwall Vein 1 and Footwall Vein 2 in previous RPA reports.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-9 www.rpacan.com

• HW1 was not included as part of the 2012 PEA. HW1 was formerly known as Hanging Wall Vein 1 in previous RPA reports.

Mineralization consists of precious metal rich, banded, or brecciated quartz-pyrargyrite- acanthite-polybasite-galena-sphalerite veins. The Valdecañas veins have undergone multiple mineralizing events as suggested by various stages of brecciation and quartz sealing, local rhythmic microcrystalline quartz-pyrargyrite banding, and open-space cocks- comb textures and vuggy silica. The veins exhibit the characteristic metal zoning of the principal veins in the Fresnillo district, observed as a change from silver and gold rich zones at the top to increased base metals in the deeper intersections. Notably, the gold rich mineralization cuts across the silver rich zones, which in turn cut earlier base-metal dominant stages indicating complex multi-stage mineralization as is seen separately in other parts of the district.

Within 10 m to 20 m of the vein, the wall rocks are progressively and pervasively silicified and cut by quartz veinlets carrying pyrite-sphalerite-galena sulphide minerals. Alteration in the volcaniclastic/sedimentary host rock farther away from the vein is characterized by weak pyritization, moderate clay alteration, and calcite veining.

JUANICIPIO VEIN The Juanicipio Vein was discovered in 2003 by MAG prior to the discovery of the Valdecañas system, which is located 1,100 m to the north. Discovery hole JI03-01 intersected two metres averaging 630 g/t Ag and 11.4 g/t Au at a vertical depth of approximately 515 m. Thirty-five drill holes contributed to the definition of this vein and the current Mineral Resource estimate includes the Juanicipio Vein. In general, the zone averages greater than 530 g/t Ag, 4.00 g/t Au with low Pb and Zn values. The Juanicipio Vein is referred to as JV1 most statistical and modelling examinations.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-10 www.rpacan.com

TABLE 7-2 SELECT DRILL HOLE INTERSECTIONS MAG Silver Corp. - Juanicipio Joint Venture

True Vein Borehole From To Length Ag Au Pb Zn Thickness (m) (m) (m) (m) (g/t) (g/t) (%) (%)

V1E IE 816.35 821.65 5.30 4.11 1,843 3.70 3.54 5.96 V1E NG 732.25 735.25 3.00 2.17 1,703 5.78 3.47 5.50 V1E 16P 680.90 687.25 6.35 4.67 1,798 2.91 3.43 5.51 V1E PD 619.00 624.20 5.20 4.17 1,021 3.32 4.79 7.20 V1E NA 728.09 730.18 2.09 1.96 1,157 1.11 0.77 0.87 V1E MC 625.20 636.25 11.05 7.86 1,046 0.44 1.00 2.05 V1E M28 731.35 741.05 9.70 6.91 768 1.90 2.59 6.60 V1E M41 736.90 751.90 15.00 7.11 706 2.88 2.66 4.86 V1E M45 709.00 711.06 2.06 1.82 942 0.82 0.01 0.01 V1E NF2 757.60 762.80 5.20 3.91 523 2.94 2.23 5.67 V1E PE2 652.10 660.95 8.85 7.08 448 3.20 1.68 4.21 V1E M7 686.45 696.70 10.25 9.12 580 0.98 0.71 1.33 V1E M34 712.20 722.50 10.30 7.54 261 0.68 3.53 9.15 V1E M19 870.25 873.45 3.20 2.46 290 1.31 1.02 2.72 V1E JU5 802.47 805.37 2.90 2.73 136 0.24 4.37 6.03 V1E M43 687.85 694.10 6.25 5.04 178 1.45 0.69 2.55 V1E JD 690.85 693.00 2.15 1.87 225 0.16 0.24 0.53 V1E QG 637.60 639.90 2.30 1.78 86 0.15 2.72 3.81 V1W J04B 656.45 659.90 3.45 3.23 1,905 8.50 0.21 0.21 V1W GD 802.80 823.90 21.10 17.57 1,032 2.97 6.21 5.77 V1W JC 748.80 759.80 11.00 9.52 535 4.54 0.91 2.59 V1W GA 669.50 676.85 7.35 5.55 562 0.55 0.80 1.92 V1W J05 733.10 736.45 3.35 3.15 516 1.73 0.05 0.11 V1W M13 649.05 655.50 6.45 5.01 420 1.89 1.24 0.81 V1W M5 948.30 960.65 12.35 10.45 294 2.06 2.94 4.81 V1W J02 827.60 839.75 12.15 10.52 138 4.80 1.25 3.32 V1W KG3 782.55 801.70 19.15 15.59 302 1.02 1.72 1.91 V1W M17 700.70 706.95 6.25 4.68 196 2.30 1.35 2.54 V1W M24 955.20 958.25 3.05 2.22 165 0.86 2.55 4.50 V1W HE 774.85 778.20 3.35 2.99 145 1.64 0.92 3.68 V1W M21 806.85 815.80 8.95 8.09 110 1.88 0.49 1.19 V1W KC 647.89 650.16 2.27 2.15 184 0.10 0.01 0.06 V2W GE 838.05 847.20 9.15 7.95 771 1.51 2.21 1.85 V2W M13 690.65 693.25 2.60 2.01 730 0.46 0.49 0.83 V2W JA 741.80 751.25 9.45 8.34 1,182 0.25 1.02 2.30 V2W ID2 864.89 866.93 2.04 1.88 773 0.56 3.39 3.38 V2W NA 751.75 753.50 1.75 1.62 518 0.15 0.03 0.09 V2W MC 684.80 692.25 7.45 5.29 487 0.30 0.11 0.18 V2W J06 712.06 714.00 1.94 1.82 169 0.23 0.80 0.09 HW1 FE 652.74 655.56 2.82 2.46 1,166 0.15 1.47 0.64

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-11 www.rpacan.com

True Vein Borehole From To Length Ag Au Pb Zn Thickness (m) (m) (m) (m) (g/t) (g/t) (%) (%)

HW1 GE 685.20 688.15 2.95 2.48 728 0.25 1.41 4.60 HW1 HG 751.25 754.65 3.40 2.92 210 0.08 0.30 1.08 JV1 17.5R 888.60 890.35 1.75 1.63 1,597 6.92 0.82 2.06 JV1 19R 920.00 923.20 3.20 2.27 149 0.42 2.02 1.56 JV1 JU1 596.45 598.45 2.00 1.76 630 11.44 0.07 0.21 JV1 19P 656.55 660.60 4.05 2.42 133 2.66 0.03 0.10 Notes: 1. Prior to compositing, Ag was cut to 6,000 g/t, Au cut to 16 g/t, and both Pb and Zn were cut to 15%. 2. True thickness was calculated using an average strike of 120° and an average dip of -55°.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 7-12 www.rpacan.com

8 DEPOSIT TYPES

The following is taken from Chartier et al. (2008).

The Fresnillo district is a world-class silver mining district located in the centre of the 800 km long Mexican Silver Belt including mining districts Sombrerete (San Martín, Sabinas Mines), Zacatecas, Real de Angeles, , and . Fresnillo owns and operates the Proaño silver mine which has been in production since 1554. From 1554 to 2010, the district had produced more than 850 million ounces of silver at an average grade of approximately 400 g/t Ag, with substantial gold, lead, and zinc credits (Megaw, 2010). According to the Silver Institute (http://www.silverinstitute.org), the Proaño mine produced 26.38 million ounces of silver in 2012, ranking second in the world. Also according to the Silver Institute, the Saucito mine produced 7.5 million ounces of silver.

The deposits in the district consist of low-sulphidation epithermal quartz-carbonate veins forming an extensive array of stacked steeply dipping, west to west-northwest-trending veins, crosscutting Cretaceous and Jurassic age rocks, mostly of sedimentary origin.

The veins are laterally very extensive and, although the structures are quite persistent with depth, the silver-gold rich section of each structure is typically limited to a 300 m to 400 m range of elevation corresponding to the boiling zone of the fossil hydrothermal system. Metal distributions show a subhorizontal zoning, with base metal abundance increasing with depth. The main veins in the district have been mined continuously over lateral distances ranging from one kilometre to eight kilometres.

The epithermal mineralization is characterized by quartz-adularia-carbonate veins, stockworks, and breccias exhibiting classical epithermal textures such as colloform banding, druzy, and vuggy cockade infilling, suggesting repeated episodes of hydrothermal deposition in open structures. Mineralization includes sphalerite, galena, pyrite, pyrrhotite, silver sulphosalts, and gold. The hydrothermal veins are associated with minor clay alteration.

Epithermal deposits comprise a wide range of hydrothermal deposits associated with volcanic and magmatic edifices and formed at shallow crustal levels by the circulation of

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 8-1 www.rpacan.com magmatic-related hydrothermal fluids into fractured rocks. These deposits are typically related with arrays of regional structures developed in extensional tectonic settings.

Low sulphidation epithermal deposits are related with the circulation of reduced, near neutral, dilute fluids developed by mixing of hot magmatic fluids with deep circulating groundwater. Metal deposition typically occurs during fluid ascent along open deep-seated structures through a combination of processes including fluid mixing, cooling, degassing, and transient boiling. The hydrothermal deposits exhibit strong vertical zoning about the transient boiling zone, with precious metals generally enriched above the boiling zone and base metals abundances increasing with depth.

These hydrothermal deposits are important supply of silver, gold, and base metals such as lead, zinc, and occasionally copper.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 8-2 www.rpacan.com

9 EXPLORATION

Exploration on the Juanicipio property prior to MAG’s involvement is documented in Section 6 of this report. Drilling on the Juanicipio property is documented in Section 10 of this report.

In 2007, MAG completed a helicopter-borne geophysical survey using Aeroquest’s AeroTEM II time domain electromagnetic system employed in conjunction with a high-sensitivity caesium vapour magnetometer. Ancillary equipment included a real-time differential GPS navigation system, radar altimeter, video recorder, and a base station magnetometer. Full- waveform streaming electromagnetic data were recorded at 36,000 samples per second. The total survey coverage presented was 351 line kilometres. The survey was flown at 100 m line spacing in a north-south flight direction.

The survey was successful in mapping the magnetic and conductive properties of the geology throughout the survey area. Additional reprocessing, interpretation, and follow-up work are recommended.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 9-1 www.rpacan.com

10 DRILLING

Drilling on the property has been contracted to various companies since 2004. All the drilling has been diamond core. Fresnillo currently contracts drilling to Perfoservice S.A. de C.V. (Perfoservice), an agent of Boart Longyear, headquartered in , Mexico. Perfoservice currently operates two drill rigs on the property. Diamond drill holes are commonly collared using HQ (64 mm core diameter) equipment and reduced to NQ (48 mm core diameter) or BQ (37 mm) as drilling conditions dictate.

Fresnillo uses a Datamine database and 3D model to plan borehole locations and orientations. Spacing varies from 70 m to 100 m along strike and 50 m to 100 m down dip in the plane of mineralization. All drill hole collars are surveyed using differential GPS or a transit system. Downhole deviation is monitored using a Reflex Flexit instrument with readings at intervals ranging from 50 m to 150 m. Drilling by MAG recorded surveys every 15 m. Once a drill hole is completed, casing is pulled and collars are identified with cement monuments with the drill hole number engraved. The site is then revegetated according to local law.

As of December 31, 2013, 262 holes have been completed on the Juanicipio property for a total of 211,040.5 m. Figure 10-1 shows drill hole locations and Appendix Table 30-1 lists the drill holes on the property. From May 2003 to June 2004, MAG completed nine core holes for a total of 7,346 m. From August 2005 to December 31, 2013, Fresnillo completed 253 core holes for a total of 203,694.5 m.

Drill hole UE includes unusual downhole survey records that show the hole turns westerly and steepened abruptly, intersecting the Valdecañas Vein on the Juanicipio property rather than on the Fresnillo property to the east of the property boundary. RPA checked the raw Flexit data and these correspond to the resource database records.

Drill hole 13P was lost due to poor ground conditions and was also removed from resource modelling work.

There are no known drilling, sampling, or recovery factors that could materially affect the accuracy and reliability of the results.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 10-1 www.rpacan.com

709,000 E 709,500 E 710,000 E 710,500 E 711,000 E

6 0 N 2 560 500

,, CD OB CE VP3

C E F C V1W M1

,, 1 JU 2 560 500 N E GH 7 D FA E V2W E GA M E 14 F J04B GCGB M 11 IB _DE SV J J M01 M13 04 B GD J02GE J03 71P GAF_M02 FE M HD 2 A M J0 3 _ ICII3C34 J05 K OC M M12 C5M 6 C 0 HH H 1 J 4 EG F 7 J C M ID ZJ 2 6 5M1 2 A 5P 6 M0 P M 06 16 JD N 2 560 000 73P M15 M22

HW1 M ,, IC2 A 6 M2 4 IG A_FX-1 1 P JE ID MB NA 6 J 3P KD M Q-1D T 7 1 OD 6 JI 0 C P 1P JU 9 M 5 9 KG 6 6 9 3 62P M M1 V1E 0P C 18 A_ M IIF2 17 K M M2 LE M8P 9 3 E E 25 6 2 16 M M320 O MH A ,, 1 M E J FX- I M OE2 M312 2 560 000 N P6C J20 47P BJ16 KF ND J14 R M24 7 37 A_M20 2 F 28 N P M M M 0 FE2 4 E1 C17-2 M 5 8 KG NE M35 7 2P J Q J18 0 P M 45 K LE 3 OF 13 E RC P G2 1 2 NG JU G M34 M45 6 M M3 P P 9 M 2 E2 Q D M F F 4 3 N RD 6P R 1 SD 4 M 9 - PE P 1 G PF J19 41P P C 2 O M UD 0 1 9 Q E 4 5 9 R 4 4P G 3 3 4 - J 3P IFSHAFT-2 M38 J M46 22 N 2 559 500 R M U 4 M37 Q 5

H ,, 2P M M33 4 4 22M A_ 1 8P SE 58 J21 P TE UE 2 8P F1 _M44 5 N M A 6 4 P 2

,, 38 2 559 500 N P 5 J 1 U2 P -2 31P MR

5 0 N 2 559 000

,,

3 9P 12P 5 9P JV1 10P 54P 2P ,, 2 21P 11P 2 2 559 000 N 3R R 22 JU P 18P 1 20P 9 21Q 1 16 3 17.5P Q Q 9 Q 1 19 2 18Q 21R 1 7P

R 19R .5 1 2 9 P 1 181 9 5P 0 . 1 1 R 5 7 R 18R Q

2 17.5Q N 2 558 500 Q 17.5 9 R ,, 1 17 Q R .5 9 1 1 6 R 19.5S 1 7S JU 3 1 6S 55P 53P

,, 1 6 2 558 500 N T

2 4P

JU8

5 0 N 2 558 000

,, 57P

JU4

,,

2 558 000 N 0 205 500 750 10 00 Figure 10-1 Metres Mag Silver Corp.

5 0 N 2 557 500

,,

3 3 5 3P P 3 6 JuanicipioP Joint Venture Zacatecas State, Mexico

,, 2 557 500 N Drill Hole Plan Map

June 2014 10-2 www.rpacan.com

11 SAMPLE PREPARATION, ANALYSES AND SECURITY

SAMPLING METHOD AND APPROACH

SAMPLING BY MAG Drill core was delivered to a core logging facility in Fresnillo where it was labelled, photographed, logged, and sampled under the supervision of MAG geologists. Core recovery was generally greater than 90% except in extremely fractured near-surface rock, argillite, or wider fault structures.

Samples were collected from half core and split lengthwise with a manual wheel splitter. Sample intervals ranged from 0.1 m to more than 3.0 m in length, and mostly honour geological, alteration, and mineralization contacts. Several metres were also sampled above and below mineralized zones. Sampling intervals were marked by a geologist and core was typically sampled continuously between sampling marks.

Samples were shipped to BSI Inspectorate laboratories in Durango, Mexico, an independent laboratory for sample preparation, and pulps were then sent to Reno, , for analysis. Some duplicate sample pulps were sent to ALS Chemex in Vancouver, Canada, an independent laboratory (Wetherup, 2006).

In RPA’s opinion, the MAG sampling method and approach is appropriate for the style of mineralization and for estimation of Mineral Resources.

SAMPLING BY FRESNILLO Drill core was transported by Fresnillo personnel once daily to a core handling facility located near the Saucito minesite. Geotechnicians checked the depth markers and box numbers, reconstructed the core, and calculated recoveries. Fresnillo geologists logged, marked out sample intervals, and assigned sample numbers. Descriptive information was collected including recovery, lithology, alteration, structure, mineralization, and rock quality designation (RQD). Sample intervals ranged from three centimetres to twelve metres. One blank and one of two different standards were submitted into each batch of 20 or 30 samples.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 11-1 www.rpacan.com

Core was split using either a diamond saw or mechanical splitter. The splitter was cleaned regularly to avoid potential cross-sample contamination. Samples were placed in pre- numbered plastic sample bags, boxed, and stored in a secure facility prior to shipping. Sample batches commonly contained 20 or 30 samples. Samples were shipped to the ALS Chemex preparatory laboratory in Zacatecas, Mexico, for preparation and pulps were then forwarded to ALS Chemex Assay Laboratory in Vancouver, Canada, an independent laboratory for analysis. Coarse and pulp reject materials were returned to the core handling facility.

Density was measured using a water displacement method. Volume was estimated to the nearest 10 mL using a beaker with graduations of 100 mL. Mass was measured using a triple beam balance to the nearest half gram. The core was sealed in cellophane when required. At the time of the 2014 site visit, Fresnillo was in the process of duplicating previous density measurements using the Archimedes’ principle whereby core is weighed in air and again in water. Statistical comparisons were not yet available, however, Fresnillo geologist report good correlation.

The procedures outlined by Fresnillo staff during all site visits were found to meet generally accepted industry practices.

SAMPLE PREPARATION AND ANALYSIS

MAG SAMPLES Technicians at MAG’s core facility in Fresnillo split, sealed, and labelled samples into plastic sample bags. Batches of samples were packed in rice bags for shipment. Samples were then transported to BSI Inspectorate preparatory laboratory in Durango, Mexico, by courier. The preparatory laboratory crushed, split, and pulverized the subsamples. Pulps were then flown to Reno, Nevada, in the United Sates for analysis (Wetherup, 2006). No sample preparation was conducted by MAG personnel, and the laboratories are independent of MAG.

Samples were analyzed for silver, arsenic, antimony, copper, mercury, lead, and zinc by aqua regia digestion and flame atomic absorption analysis. A standard fire assay was used for gold. The procedures used by BSI Inspectorate and the detection limits of each method can be found in the appendix of Wetherup (2006).

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 11-2 www.rpacan.com

FRESNILLO SAMPLES Samples were shipped to the ALS Chemex preparatory laboratory in Guadalajara, Mexico, for preparation and pulps were then forwarded to ALS Chemex Assay Laboratory in Vancouver, Canada, for analysis. No sample preparation was conducted by Fresnillo personnel.

The ALS Chemex Vancouver laboratory is accredited to ISO 9001 by QMI-SAI Global and ISO 17025 by the Standards Council of Canada for a number of specific test procedures, including fire assay for gold with an atomic absorption and gravimetric finish, multi-element inductively coupled plasma optical emission spectroscopy (ICP-AES), and atomic absorption assays for silver, copper, lead, and zinc.

At ALS Chemex in Guadalajara, core samples were prepared using industry standard preparation procedures. After receipt, samples were organized into batches and weighed (method code LOG-22). Samples were then crushed to 70% passing below two millimetre mesh screen (CRU-31). A subsample of up to 1,500 g was prepared using a riffle splitter (SPL-21) and pulverized to 85% passing below 75 µm (PUL-31).

Each sample was analyzed for a suite of elements including silver, lead, and zinc by ICP- AES analysis (method ME-ICP41m) and standard fire assay for gold (Au-AA23). In the case where the silver ICP-AES upper limit of 100 ppm was reached, the sample was tested using a gravimetric analysis method (Ag-GRA21).

In RPA’s opinion, the sample preparation and analysis procedures at the Juanicipio project are adequate for use in the estimation of Mineral Resources. ALS Chemex is independent of MAG.

QUALITY ASSURANCE AND QUALITY CONTROL

Quality assurance/quality control (QA/QC) programs provide confidence in the resource database and help ensure that the database is reliable for resource estimation purposes. Programs include measures and procedures to monitor the precision and accuracy at each stage of the sampling and analysis process. Fresnillo’s QA/QC program calls for a blank, one of two standards and a pulp duplicate in each batch of 20 or 30 samples. Fresnillo also compiles results from the laboratory’s own internal blanks, standards, and duplicates. RPA received and reviewed a database of Fresnillo’s QA/QC results dated December 2013.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 11-3 www.rpacan.com

The regular submission of blank material is used to assess contamination during sample preparation and to identify sample numbering errors. Fresnillo submits blank samples at a rate of one in every 20 samples. Blanks were initially sourced from barren drill core and later from construction materials.

Figure 11-1 plots the results for silver values. The noticeable increase in results at sample 227644 and another at sample 242760 may mark changes in the source material. Several blanks return unacceptable grades, leading to batch reanalyses. Recent results of blank material for produced acceptable results.

Similar data and graphs are available for gold, lead, and zinc. Earlier blanks returned unexpected high values for both zinc and lead suggesting that the material submitted as blanks is inappropriate for these metals. Recent results for zinc and lead were acceptable. Most results for gold were acceptable.

FIGURE 11-1 BLANK RESULTS FOR SILVER

30

25

20

15 Ag (g/t) 10

5

0 866 125 1250 1465 8000 12508 12113 19291 14920 16324 14466 13874 12362 29625 27081 26731 25558 25154 27824 27376 17395 25462 23427 22910 22600 17000 17508 17282 19403 222284 223008 227644 233199 234850 233999 240615 241589 242760 243723 247825 246327 246341 246236 Sample Number

Results from the regular submission of standards are used to identify problems with specific sample batches and long-term biases associated with the regular assay laboratory. RPA reviewed results from five different standards, for a total of 154 analyses (Figures 11-2 and 11-3). Results are acceptable.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 11-4 www.rpacan.com

FIGURE 11-2 CONTROL CHART FOR CRM AL222542

2 x Std. Dev.

2 x Std. Dev.

FIGURE 11-3 CONTROL CHART FOR CRM BL

2 x Std. Dev.

2 x Std. Dev.

Pulp duplicates of mineralized samples have been submitted to various laboratories to make an additional assessment of laboratory bias. Figures 11-4 and 11-5 illustrate results for silver. With the exception of several analyses, Figure 11-4 shows good correlation between International Plasma Labs Ltd. (IPL) and ALS Chemex. Figure 11-5 may indicate that the ACME laboratory may be understating the silver grades in some cases. These results do not preclude estimating Mineral Resources; however, further investigation is required.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 11-5 www.rpacan.com

FIGURE 11-4 CONTROL CHART IPL VERSUS ALS DUPLICATES

FIGURE 11-5 CONTROL CHART ACME VERSUS ALS DUPLICATES

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 11-6 www.rpacan.com

RPA recommends that Fresnillo’s QC program include crushed reject duplicates and field duplicates. Field duplicates assess the variability introduced by selecting one half of the drill core versus the other, sampling disordering, and the nugget effect. Reject duplicates consist of a second split of the crushed sample. The split should be taken using a similar method, have the same weight, and be analyzed at the same laboratory as the original sample. Results from the reject duplicate QC program will determine if the splitting procedures are applied consistently and are appropriate. If the results are satisfactory, the coarse reject duplicate program can be discontinued.

In RPA’s opinion, the QA/QC program as designed and implemented by Fresnillo is adequate and the assay results within the database are suitable for use in a Mineral Resource estimate.

CORE STORAGE AND SECURITY

Drill core from the Juanicipio drilling was previously stored in two locations. Mineralized intercepts were stored in a locked shed located at the Fresnillo core handling facility near the Saucito minesite. Other core was stored alongside core from other Fresnillo projects in a large core storage facility located on Fresnillo’s private land near the Saucito mine shaft. All Juanicipio drill core was moved to a secure facility dedicated to Juanicipio drill core.

Split core that has been bagged and readied for shipment is securely stored in the dedicated facility prior to shipping.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 11-7 www.rpacan.com

12 DATA VERIFICATION

The resource database was reviewed and verified during three site visits, a series of digital queries, checks of laboratory certificates, and review of Fresnillo’s QA/QC results. RPA considers the resource database reliable and appropriate to prepare a Mineral Resource estimate.

MAG provided RPA a Dassault Systèmes GEOVIA GEMS (GEMS) project containing updated drill hole database, core recovery and density measurement files. Wireframes models of the veins were provided in ARANZ Geo Limited’s Leapfrog software. Copies of the assay certificates were also provided.

RPA visually inspected the drill hole traces, performed GEMS database validation procedures, and reviewed the interpreted vein wireframe models.

SITE VISIT AND CORE REVIEW

RPA has visited the property several times since the discovery of Juanicipio and Valdecañas vein systems. In December 2010, drill core from boreholes NA, NF2, PD, and JC was reviewed and compared with assay results and descriptive log records were made by Fresnillo geologists. RPA visited the core shack again in May 2011, and reviewed core from KG3 and again from NA. RPA visited the property and core shack most recently on May 27, 2014 and reviewed core from holes M40, KE, M22, and 18-R. In addition to reviewing core, RPA examined outcrops, drill rigs, sampling procedures, and other general exploration protocols in use by the Joint Venture.

INDEPENDENT CHECK SAMPLES

During the visit to the core shack in May 2011, David Ross of RPA selected and marked out four samples of split core for duplicate analysis. The specified intervals were quarter split by Fresnillo technicians under the supervision of David Ross. The samples were bagged, tagged, and sealed in plastic bags and shipped to ALS Chemex. Sample preparation and analyses were similar to the standard procedures used by the Joint Venture.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 12-1 www.rpacan.com

The independent sampling by RPA confirms that there is significant mineralization in the drill holes sampled (Table 12-1). Zinc and lead mineralization was confirmed visually for a number of drill hole intervals.

TABLE 12-1 CHECK SAMPLE RESULTS MAG Silver Corp. - Juanicipio Joint Venture

Original Sample Results RPA Independent Check Samples Hole ID From To Ag Au Pb Zn Ag Au Pb Zn (m) (m) (g/t) (g/t) (%) (%) (g/t) (g/t) (%) (%) NA 728.30 728.95 282 2.54 0.45 0.58 259 2.40 0.41 0.50 NA 748.80 749.60 656 0.17 0.13 0.06 1,020 0.18 0.15 0.06 KG3 796.70 797.70 663 2.99 11.55 3.42 712 2.13 12.75 3.37 KG3 797.70 798.70 253 0.83 0.88 5.12 264 0.76 0.74 5.09

ASSAY TABLE REVIEW

Prior to 2011, RPA compared database assay values against both digital and hardcopy results provided by ALS Chemex and BSI Inspectorate. These included hardcopy assay certificates from ALS Chemex for holes 16P, 14P, 12P, MC, 21R, 22R, 23R, 33P, 37P, FA, and KG3 provided by MAG, and certificates for holes JU1, JU2, and JU5 from BSI Inspectorate found in Wetherup, 2006. MAG also supplied edited copies of digital assay results provided by the laboratory in MS Excel format. These files were not originals from the laboratory as a number of formulas and formatting edits were evident. Nevertheless, RPA compiled the files and compared the silver, gold, lead, and zinc results against the assay values in the resource database. No significant discrepancies were found.

In August 2011, RPA received twenty-six assay certificates in PDF format from MAG. These included holes J05, J21, J20, 17.5R, 18.5R, 18R, 20R, and J09. A total of 759 assay records were compared to the drill hole database, including 79 assays with silver values greater than 50 g/t. No significant discrepancies were identified.

In April 2014, RPA received twenty-four assay certificates in PDF format. RPA verified the silver, gold, lead, and zinc results for ten of the certificates (663 samples), with 73 of these samples located within the resource wireframe models. In addition, RPA randomly selected ten of the highest grade samples and verified analytical results. No discrepancies were

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 12-2 www.rpacan.com found. RPA did observe, however, that the protocol for rounding a lead or zinc analytical result ending in “50” to the nearest hundred ppm was inconsistent.

RPA recommends that MAG be directly copied on all assay results provided by the laboratory.

In RPA’s opinion, the sample preparation, analysis and QA/QC procedures as designed and implemented by MAG are adequate and the assay results within the database are suitable for use in a Mineral Resource estimate.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 12-3 www.rpacan.com

13 MINERAL PROCESSING AND METALLURGICAL TESTING

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 and is based on the Mineral Resource estimate by Strathcona dated November 2011.

METALLURGICAL TESTING

The metallurgical test work reports received consist of the following two reports in Spanish:

1. The May 2008 Interim Report (Proyecto Juanicipio, 2008) describes the initial tests on samples from the G, I+K, and M sections of the Valdecañas Vein.

2. The June 2009 Final Report (Proyecto Juanicipio, 2009) describes additional tests from a more representative suite of samples from the G, H+I+J, K+L+M+N+O, and Q+R+S+T+U sections of the Valdecañas Vein.

The May 2008 Interim Report included mineralogical characterization, basic work index determinations, and selective flotation tests for lead, zinc, and pyrite. The test work was carried out on an overall composite sample prepared from 79 individual samples obtained from 10 drill holes on the G, I, K, and M sections of the Valdecañas Vein, as well as separate flotation test composites from sections G, I+K, and M.

No metallurgical test work has been reported relating to the Desprendido or Juanicipio veins.

The test work determined that the gangue matrix consisted mainly of quartz, pyrite, and calcite hosting the base metal sulphides of galena and sphalerite, with silver occurring variously as sulphides (acanthite ([argentite] and aguilarite), sulphosalts (mainly pyrargyrite), and minor amounts of native silver and electrum. The mineralogical texture was found to be fine, especially with respect to the silver minerals, requiring a fine grind of 80% passing 40 µm to achieve adequate liberation for effective recovery by flotation. Comminution test work was limited to ball mill work index (BWI) tests, which showed the mineralization to be hard with a BWI of 17.4. Even at the fine grind size, a significant proportion of gold, and to a lesser extent silver, remained finely disseminated in pyrite in the 5 µm size range; hence the

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 13-1 www.rpacan.com tests included production of a pyrite concentrate in order to achieve acceptably low levels of gold and silver in the final tailings.

The main conclusions were that the Valdecañas Vein mineralization responded favourably to a selective flotation process for lead-zinc with high recoveries and acceptable concentrate grades being achieved. Some preliminary tests on pyrite flotation and subsequent cyanidation of the pyrite concentrate indicated the potential for recovering an additional 12% of gold and 5% silver, although insufficient test work was carried out to confirm an economically viable processing route. The presence of small amounts of native gold and silver suggested that there could be merit in including a gravity separation stage in the grinding circuit.

The June 2009 Final Report was built on the previous work and included additional tests on a more representative suite of samples from recent exploration. An overall composite was prepared from 190 m of mineralized intersections from 27 drill holes on sections G, H, I, J, K, L, M, N, O, P, Q, R, S, T, and U, and in addition, four composites from sections G, H+I+J, K+L+M+N+O, and Q+R+S+T+U were prepared and subjected to flotation tests to determine any metallurgical variability across the mineralized zones.

The flotation tests were carried out under the optimum conditions determined in the 2008 test work program where the principal requirement was for a fine grind to approximately 80% passing 40 µm. The concentrate grades and recoveries were considered satisfactory and were generally consistent with the earlier work, taking into account that the sample grades were significantly lower, but also more representative of potential mill head-grades.

Table 13-1 presents the four-product metallurgical balance calculated from the optimum conditions of open-circuit flotation testing on a general composite head sample assaying 1.6 g/t Au, 383 g/t Ag, 1.48% Pb, 2.82% Zn, 0.09% Cu, and 8.69% Fe. No locked-cycle tests have been carried out to date. Note that this balance includes a pyrite concentrate to indicate the potential for improving gold and silver recovery through a process of pyrite concentrate production and treatment, in addition to the lead-zinc selective flotation.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 13-2 www.rpacan.com

TABLE 13-1 METALLURGICAL BALANCE FROM GENERAL COMPOSITE SAMPLE MAG Silver Corp. - Juanicipio Joint Venture

Weight Assays (g/t, %) Distribution (%) Product % Au Ag Pb Zn Cu Fe Au Ag Pb Zn Cu Fe Head 1.60 383 1.48 2.82 0.09 8.69 Pb Conc 3.2 34.67 9,767 43.43 6.86 1.32 8.69 69.0 81.0 93.1 7.7 44.8 3.2 Zn Conc 4.7 1.07 567 0.39 52.00 0.54 10.20 3.2 7.0 1.2 87.0 27.3 5.5 Py Conc 10.2 2.94 225 0.14 0.16 0.02 41.50 18.8 6.0 1.0 0.6 2.4 48.7 Final Tail 81.9 0.18 28 0.08 0.16 0.03 4.52 9.1 6.0 4.7 4.7 25.4 42.6 Total 100 1.60 383 1.48 2.82 0.09 8.69 100 100 100 100 100 100 Pb-Zn Tail 92.1 0.48 50 0.09 0.16 0.03 8.61 27.9 12.0 5.6 5.2 27.9 91.3

Table 13-2 shows a summary of the flotation tests on the four section composites as well as the general composite shown above.

There is a reasonable level of consistency across the various section composites. However, from an analysis of concentration ratio versus recovery (i.e., to normalize for head grade variations) it is worth noting that:

Section Q+R+S+T+U shows inferior silver concentration efficiency, whereas section K+L+M+N+O has inferior lead concentration efficiency, implying that silver concentration performance does not always correlate with that for lead. In fact, there is only a moderate correlation between silver head assays and lead head assays which may be a reflection of the abundance of silver sulphosalts.

Concentration efficiency of gold and silver into the pyrite concentrate appears quite variable, but this is principally related to the recovery of these metals into the lead concentrate and small differences there being magnified, in a relative sense, in the residual feed to the pyrite circuit.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 13-3 Technical Report – June NI 43-101 MAG SilverCorp. –JuanicipioProject, Project#2264

TABLE 13-2 SUMMARY OF FLOTATION TESTS ON GENERAL AND SECTION COMPOSITES MAG Silver Corp. - Juanicipio Joint Venture

Au Ag Pb Zn Fe Au Ag Pb Zn Fe Au Ag Pb Zn Fe Au Ag Pb Zn Fe Sections 30, 2014 Heads (g/t,%) Final Pb Concentrate (g/t,%) Final Zn Concentrate (g/t,%) Final Py Concentrate (g/t,%) General 1.60 383 1.48 2.82 8.69 34.7 9,767 43.4 6.9 10.2 1.1 567 0.4 52.0 10.2 2.9 225 0.1 0.2 41.5 G 2.22 454 1.40 2.64 7.20 45.8 10,043 35.5 8.0 10.1 2.8 809 0.3 52.2 10.1 2.1 207 0.1 0.2 37.5 H+I+J 2.09 240 1.60 2.97 8.15 41.7 5,853 43.8 10.2 11.0 1.4 468 0.4 58.7 11.0 6.0 152 0.2 0.2 42.1 K+L+M+N+O 1.54 540 1.58 3.73 12.34 29.7 12,331 38.4 9.9 12.6 0.7 484 0.6 55.2 12.6 1.7 176 0.2 0.3 39.3 Q+R+S+T+U 1.20 342 1.59 2.63 8.23 20.3 6,111 35.5 9.9 9.8 0.9 635 0.5 52.2 9.8 1.8 450 0.2 0.1 39.4 Average 1.73 392 1.53 2.96 8.92 34.4 8,821 39.3 9.0 10.7 1.4 593 0.4 54.1 10.7 2.9 242 0.18 0.18 40.0 Final Pb Concentrate (Distribution,%) Final Zn Concentrate (Distribution,%) Final Py Concentrate (Distribution,%) General 69 81 93 8 3 3 7 1 87 6 19 6 1.0 0.6 49 G 76 82 94 11 5 5 7 1 83 6 7 3 0.7 0.4 37 H+I+J 67 82 92 12 5 3 8 1 82 6 17 4 0.8 0.4 30 K+L+M+N+O 72 86 91 10 5 3 5 2 85 6 11 3 1.3 0.7 32 Q+R+S+T+U 71 75 94 16 6 3 7 1 78 5 15 13 1.2 0.5 48

Average 71 81 93 11 5 3 7 1 83 6 14 6 1.0 0.5 39 www.rpacan.com Page 13- 4

www.rpacan.com

Another key test work outcome was the development of a reagent suite for the differential flotation process, as summarized in Table 13-3. Reagent addition rates were also determined and have been used by AMC to estimate mineral processing costs.

TABLE 13-3 FLOTATION REAGENT SUITES MAG Silver Corp. - Juanicipio Joint Venture

Stage pH Modifier/Depressant Collector 8.5 ZnSO4/NaCN Dithiophosphates Grinding/Pb Flotation (soda ash also added) NaMBS Aerofine Zn Flotation 10.5 CuSO4 Aerofine Pyrite Flotation 9.0 Potassium Amyl Xanthate

IMPLICATIONS FOR PROCESS DESIGN

Table 13-4 shows the test work head grades, plus the initial estimate of head grades on which the processing design criteria have been developed. The table also shows the final average life-of-mine (LOM) head grades from the mine plan.

TABLE 13-4 HEAD GRADES USED FOR TEST WORK AND FOR PROCESS DESIGN MAG Silver Corp. - Juanicipio Joint Venture

Au (g/t) Ag (g/t) Pb (%) Zn (%) Test work sample head grades 1.60 383 1.48 2.82 Process design head grades 1.90 548 2.00 3.60 Average LOM plan grades 1.30 416 1.42 2.70

Table 13-5 shows the metal distribution (Dist) to concentrates for the head grades shown in Table 13-4, assuming the metal distributions in Table 13-2. To maintain some conservatism and to allow for actual plant operating results being slightly inferior to laboratory results, no enhanced grade-recovery performance has been assumed in the cleaner circuit design (a common bottleneck), despite the process design grades being significantly higher than the test work grades. The average LOM grades are expected to be lower than process design grades, and therefore closer to the test work grades. In the absence of resource grades for pyrite, the metal recoveries to pyrite concentrate in the metallurgical test work results have been used for design purposes.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 13-5 www.rpacan.com

TABLE 13-5 METAL DISTRIBUTION TO CONCENTRATES MAG Silver Corp. - Juanicipio Joint Venture

Wt Gold Silver Lead Zinc Grade Dist. Grade Dist Grade Dist Grade Dist % of feed g/t % g/t % % % % % Test work Pb Concentrate 3.2 34.70 69% 9,767 81% 43.4 93.1% 6.9 7.7% Zn Concentrate 4.7 1.07 3.2% 567 7% 0.4 1.2% 52 87% Py Concentrate 10.2 2.94 18.8% 225 6% Design grades Pb Concentrate 4.3 30.3 69% 10,265 81% 43 93% 6.7 8% Zn Concentrate 6.0 0.9 3% 637 7% 0.33 1% 52 87% Plan grades Pb Concentrate 3.1 29.2 69% 10,972 81% 43 93% 7.0 8% Zn Concentrate 4.5 0.9 3% 645 7% 0.31 1% 52 87%

RECOVERIES AND CONCENTRATE GRADES

A summary of the design criteria mill recoveries and concentrate grades is shown in Table 13-6.

TABLE 13-6 MILL RECOVERIES AND CONCENTRATE GRADES MAG Silver Corp. - Juanicipio Joint Venture

Gold Silver Lead Zinc

Recoveries to lead concentrate 69% 81% 93% 8% Lead concentrate grades 30.3 g/t 10,265 g/t 43.0% 6.7% Recoveries to zinc 3% 7% 1% 87% Zinc concentrate grades 0.95 g/t 637 g/t 0.33% 52.0% Recoveries to pyrite concentrate 19% 6% – – Pyrite concentrate Au/Ag content 2.94 g/t 225 g/t – –

At present, there are no known processing factors or deleterious elements that could have a significant effect on potential economic extraction.

METALLURGICAL STUDY UPDATE

A division of Peñoles (CIDT) has been contracted to run the recommended metallurgical tests, with almost 254 kg of mineralized material collected systematically along the deposit for metallurgical studies to be carried out.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 13-6 www.rpacan.com

14 MINERAL RESOURCE ESTIMATE

RPA estimated Mineral Resources for the Valdecañas and Juanicipio vein systems using drill hole data available as of December 31, 2013. At an NSR cut-off of US$70/t, Indicated Mineral Resources are estimated to total 10.1 million tonnes of 511 g/t Ag, 1.7 g/t Au, 1.9% Pb, and 3.5% Zn. Inferred Mineral Resources are estimated to total 5.1 million tonnes of 372 g/t Ag, 2.0 g/t Au, 1.8% Pb, and 2.8% Zn. There are no Mineral Reserves estimated on the property. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

The total contained metals in the Indicated Mineral Resource are 166 million ounces of silver, 544,000 ounces of gold, 419 million pounds of lead, and 778 million pounds of zinc. The Inferred Mineral Resource contains 61 million ounces of silver, 319,000 ounces of gold, 202 million pounds of lead, and 317 million pounds of zinc.

RESOURCE DATABASE

As operator, Fresnillo maintains the resource database and provides MAG with Microsoft Excel files when requested. MAG provided most drill hole data and wireframe models in a Dassault Systèmes GEOVIA GEMS Version 6.5 software package (GEMS) project. Drill core recovery and density data were provide as Microsoft Excel files.

Listed below is a summary of records for all drilling on the property, the vast majority of which targeted the Valdecañas and Juanicipio vein systems:

• Holes: 262 • Surveys: 2,657 • Assays: 22,868 • Composites 856 • Lithology: 8,779 • Full vein width composites: 170 • Density measurements: 7,277

Failed hole 13P was also removed from the database. Hole J20 was removed due to low core recovery in the area of the vein.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-1 www.rpacan.com

Section 12, Data Verification, describes the verification steps made by RPA. In summary, no discrepancies were identified and RPA is of the opinion that the GEMS drill hole database is valid and suitable to estimate Mineral Resources for the project.

GEOLOGICAL INTERPRETATION AND 3D SOLIDS

MAG generated wireframe models in ARANZ Geo Limited’s Leapfrog Geo software version 1.4.1 (Figures 14-1 and 14-2). The veins were modelled as logged, however, narrow intercepts were “bulked out” to two metres true thickness where required. The veins were initially modelled in their entirety, despite areas of low grade or exceptionally narrow intersections.

RPA created southeast looking vertical sections spaced 50 m apart, level plans spaced 10 m apart, and inclined longitudinal sections parallel to veins. Geologic continuity was checked using the longitudinal section and level plans.

A description of each modelled vein follows:

• V1E, formerly known as the southeastern part of the Main Valdecañas Vein, is intersected by 91 drill holes. It is en echelon with V1W with an overlap zone. The previous interpretation had the east and west part of the Main Vein cut and offset by a fault with no overlap. The well mineralized part of the vein extends from approximately 400 m to more than 900 m below surface and has a strike length of 1,200 m within the property boundary. It appears to extend into Fresnillo’s properties to the north and east. V1E is approximately equivalent to the eastern part of the Valdecañas Vein and parts of the eastern Desprendido Vein as defined in the 2012 PEA.

• V1W is the northwest section of the Valdecañas Vein. It spans more than 700 m towards northwest and continues beyond the property limit, with a vertical extent of approximately 600 m. It was defined based on 71 drill holes. V1W is approximately equivalent to the western part of the Valdecañas Vein as defined in the 2012 PEA.

• V2W, formerly known as Footwall Vein 1 and Footwall Vein 2. It is intersected by 56 drill holes and is lower grade and narrower than the Valdecañas Vein and discontinuous. The vein spans 700 m along strike and 400 m vertically. It was modelled as two lenses. V2W is approximately equivalent to the western part of the Desprendido Vein as defined by the 2012 PEA.

• HW1, formerly known as Hanging Wall Vein 1, is located northwest of the fault. It varies from 20 m to 100 m above the Valdecañas Vein due to a steepening dip towards the southeast. Silver grades are commonly greater than 500 g/t Ag. HW1 was not included as part of the 2012 PEA.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-2 www.rpacan.com

• JV1, also known as the Juanicipio Vein, is located 750 m south of the Valdecañas structure. The vein has a strike length of 900 m and vertical extent of 500 m.

Intercept grade, true thickness, and grade times thickness (GT) values were plotted on inclined longitudinal sections. Manual contouring of grades indicates that most zones are oriented as horizontally elongated tabular bodies with shallow silver rich areas and deeper base metal rich areas. Sharp decreases in grade and/or thickness suggest that block grades would be best estimated within “resource panels” using hard boundaries. Using an NSR cut- off value of US$70/t, resource panels were outlined on the inclined longitudinal section and the wireframe models were clipped where required.

As noted above, the veins were modelled as logged and RPA notes that there is additional mineralization in the walls with NSR values above the breakeven cut-off value of US$70/t. This material will become important when estimating the grade of diluting material in future Mineral Reserve estimates. RPA recommends that additional wireframe models be constructed in order to determine the grade of the diluting material.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-3 www.rpacan.com

Figure 14-1

Mag Silver Corp.

Juanicipio Joint Venture Zacatecas State, Mexico 3D View of Wireframe Models

June 2014 14-4 www.rpacan.com

Legend: Ag (g/t) <100 100 - 200 200 - 300 Figure 14-2 300 - 400 400 - 500 Mag Silver Corp. 500 - 600 >600 Juanicipio Joint Venture Zacatecas State, Mexico 3D View of Block Model Silver Grades June 2014 14-5 www.rpacan.com

STATISTICAL ANALYSIS

Assay values located inside the wireframe models were tagged with domain identifiers and exported for statistical analysis. Results were used to help verify the modelling process. Basic statistics by rock type are summarized in Table 14-1. Note that some descriptive statistics can be misleading where the number of assays is low.

TABLE 14-1 DESCRIPTIVE STATISTICS OF RESOURCE ASSAY VALUES MAG Silver Corp. - Juanicipio Joint Venture

Length Ag Au Pb Zn Statistic (m) (g/t) (g/t) (%) (%) V1E No. of Cases 473 473 473 473 473 Minimum 0.45 2 0.01 0 0 Maximum 2.4 8,530 38.1 20 29.8 Median 1 201 0.65 0.91 2.46 Arithmetic Mean 0.95 602 1.91 2.04 4.18 Weighted Mean 618 1.96 2.11 4.25 Standard Deviation 0.24 1,026 3.82 2.91 4.75 Coef. of Variation 0.25 1.7 2 1.43 1.14 V1W No. of Cases 455 455 455 455 455 Minimum 0.45 1 0.01 0 0 Maximum 3.7 15,026 42.9 30 20.1 Median 1 99 0.78 0.46 1.21 Arithmetic Mean 0.96 358 1.96 1.77 2.6 Weighted Mean 385 2.02 1.72 2.49 Standard Deviation 0.28 1,023 3.78 3.61 3.41 Coef. of Variation 0.29 2.9 1.93 2.04 1.31 V2W No. of Cases 130 130 130 130 130 Minimum 0.6 4 0.01 0 0.01 Maximum 2.2 8,930 10.05 14.75 25.1 Median 1 173 0.41 0.46 1.05 Arithmetic Mean 0.96 641 0.89 1.71 2.91 Weighted Mean 619 0.89 1.73 2.96 Standard Deviation 0.23 1,348 1.38 3 4.07 Coef. of Variation 0.24 2.1 1.55 1.75 1.4 HW1 No. of Cases 31 31 31 31 31 Minimum 0.6 1 0.01 0 0.01 Maximum 3.65 10,000 9.69 6.83 11.95 Median 0.8 114 0.14 0.05 0.17 Arithmetic Mean 0.99 789 0.76 0.64 1.15 Weighted Mean 575 0.56 0.49 1

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-6 www.rpacan.com

Length Ag Au Pb Zn Statistic (m) (g/t) (g/t) (%) (%) Standard Deviation 0.69 2,061 2.01 1.46 2.29 Coef. of Variation 0.7 2.6 2.64 2.28 1.99 JV1 No. of Cases 31 31 31 31 31 Minimum 0.6 7 0.01 0 0.01 Maximum 2.7 4,370 15.45 10.5 11.25 Median 1 121 0.52 0.3 0.54 Arithmetic Mean 1.05 745 1.81 1.14 2.39 Weighted Mean 1.22 627 2.14 0.95 2.26 Standard Deviation 0.43 1,339 3.39 2.04 3.16 Coef. of Variation 0.41 1.8 1.88 1.79 1.32

CUTTING HIGH-GRADE VALUES

Where the assay distribution is skewed positively or approaches log-normal, erratic high- grade assay values can have a disproportionate effect on the average grade of a deposit. One method of treating these outliers in order to reduce their influence on the average grade is to cut or cap them at a specific grade level. In the absence of production data to calibrate the cutting level, inspection of the assay distribution can be used to estimate a “first pass” cutting level.

Review of the resource assay histograms within the wireframe domains (Figures 14-3 to 14- 6) and a visual inspection of high-grade values on vertical sections suggest cutting erratic values to 6,000 g/t Ag, 16 g/t Au, and 15% for both lead and zinc. By cutting high values to 6,000 g/t Ag, the coefficient of variation values are mostly less than two and the average silver grade in the V1 has been reduced from 602 g/t to 594 g/t (Table 14-2).

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-7 www.rpacan.com

FIGURE 14-3 HISTOGRAM OF SILVER RESOURCE ASSAYS (N=1120)

200 100%

180 90%

160 80%

140 70%

120 60%

100 50%

Frequency 80 40%

60 30%

40 20%

20 10%

0 0% 0 5000 10000 15000 20000 Ag (g/t)

FIGURE 14-4 HISTOGRAM OF GOLD RESOURCE ASSAYS (N=1120)

200 100%

180 90%

160 80%

140 70%

120 60%

100 50%

Frequency 80 40%

60 30%

40 20%

20 10%

0 0% 0 10 20 30 40 Au (g/t)

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-8 www.rpacan.com

FIGURE 14-5 HISTOGRAM OF LEAD RESOURCE ASSAYS (N=1120)

200 100%

180 90%

160 80%

140 70%

120 60%

100 50%

Frequency 80 40%

60 30%

40 20%

20 10%

0 0% 0 5 10 15 20 25 30 35 Pb (%)

FIGURE 14-6 HISTOGRAM OF ZINC RESOURCE ASSAYS (N=1120)

200 100%

180 90%

160 80%

140 70%

120 60%

100 50%

Frequency 80 40%

60 30%

40 20%

20 10%

0 0% 0 5 10 15 20 25 30 35 Zn (%)

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-9 www.rpacan.com

TABLE 14-2 DESCRIPTIVE STATISTICS OF CUT RESOURCE ASSAY VALUES MAG Silver Corp. - Juanicipio Joint Venture

Ag Au Pb Zn Statistic (g/t) (g/t) (%) (%) V1E No. of Cases 473 473 473 473 Minimum 2 0.01 0 0 Maximum 6,000 16 15 15 Median 201 0.65 0.91 2.46 Arithmetic Mean 594 1.77 2.02 4.01 Weighted Mean 609 1.82 2.09 4.08 Standard Deviation 971 2.96 2.81 4.2 Coef. of Variation 1.6 1.67 1.39 1.05 V1W No. of Cases 455 455 455 455 Minimum 1 0.01 0 0 Maximum 6,000 16 15 15 Median 99 0.78 0.46 1.21 Arithmetic Mean 332 1.82 1.67 2.56 Weighted Mean 359 1.89 1.61 2.46 Standard Deviation 748 2.75 3.01 3.27 Coef. of Variation 2.3 1.52 1.81 1.28 V2W No. of Cases 130 130 130 130 Minimum 4 0.01 0 0.01 Maximum 6,000 10.05 14.75 15 Median 173 0.41 0.46 1.05 Arithmetic Mean 616 0.89 1.71 2.83 Weighted Mean 593 0.89 1.73 2.88 Standard Deviation 1,217 1.38 3 3.71 Coef. of Variation 2 1.55 1.75 1.31 HW1 No. of Cases 31 31 31 31 Minimum 1 0.01 0 0.01 Maximum 6,000 9.69 6.83 11.95 Median 114 0.14 0.05 0.17 Arithmetic Mean 660 0.76 0.64 1.15 Weighted Mean 496 0.56 0.49 1 Standard Deviation 1,519 2.01 1.46 2.29 Coef. of Variation 2.3 2.64 2.28 1.99 JV1 No. of Cases 31 31 31 31 Minimum 7 0.01 0 0.01 Maximum 4,370 15.45 10.5 11.25 Median 121 0.52 0.3 0.54 Arithmetic Mean 745 1.81 1.14 2.39 Weighted Mean 627 2.14 0.95 2.26 Standard Deviation 1,339 3.39 2.04 3.16 Coef. of Variation 1.8 1.88 1.79 1.32

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-10 www.rpacan.com

COMPOSITING

Sample lengths range from 45 cm to 3.75 m within the wireframe models. Approximately 50% of the samples were taken at one metre intervals, and 80% of the samples are one metre or less (Figure 14-7). Given these distributions, and considering the width of the mineralization, RPA chose to composite to two metre lengths. Assays within the wireframe domains were composited starting at the first mineralized wireframe boundary from the collar and resetting at each new wireframe boundary. Composites less than 0.5 m, located at the bottom of the mineralized intercept, were removed from the database.

FIGURE 14-7 HISTOGRAM OF SAMPLE LENGTHS (N=1120)

700 100%

90% 600 80%

500 70%

60% 400 50%

Frequency 300 40%

200 30%

20% 100 10%

0 0% 0 1 2 3 4 Sample length (m)

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-11 www.rpacan.com

TABLE 14-3 DESCRIPTIVE STATISTICS OF COMPOSITE VALUES MAG Silver Corp. - Juanicipio Joint Venture

Length Ag Au Pb Zn Statistic (m) (g/t) (g/t) (%) (%) V1E No. of Cases 241 241 241 241 241 Minimum 0.55 0 0 0 0 Maximum 2 4,705 11.29 12.86 15 Median 2 268 0.82 1.23 3.33 Arithmetic Mean 1.86 584 1.73 2.02 3.96 Weighted Mean 1.92 607 1.82 2.06 4.04 Standard Deviation 0.35 782 2.31 2.32 3.49 Coef. of Variation 0.19 1.3 1.34 1.15 0.88 V1W No. of Cases 232 232 232 232 232 Minimum 0.5 2 0.01 0 0.01 Maximum 2 6,000 14.85 13.63 14.62 Median 2 131 1.01 0.53 1.56 Arithmetic Mean 1.87 352 1.87 1.59 2.43 Weighted Mean 1.93 360 1.9 1.62 2.47 Standard Deviation 0.34 679 2.37 2.38 2.63 Coef. of Variation 0.18 1.9 1.27 1.5 1.08 V2W No. of Cases 69 69 69 69 69 Minimum 0.5 5 0.01 0.02 0.03 Maximum 2 4,468 5.11 9.99 15 Median 2 322 0.45 0.63 1.46 Arithmetic Mean 1.81 598 0.85 1.7 2.83 Weighted Mean 1.91 587 0.88 1.72 2.85 Standard Deviation 0.41 894 1.08 2.42 3.34 Coef. of Variation 0.23 1.5 1.27 1.42 1.18 HW1 No. of Cases 19 19 19 19 19 Minimum 0.65 0 0 0 0 Maximum 2 1,643 1.96 2.07 5.75 Median 2 178 0.16 0.11 0.37 Arithmetic Mean 1.66 385 0.44 0.43 0.91 Weighted Mean 1.8 442 0.48 0.47 0.96 Standard Deviation 0.49 512 0.6 0.64 1.36 Coef. of Variation 0.3 1.3 1.37 1.46 1.5 JV1 No. of Cases 21 21 21 21 21 Minimum 0.51 9 0.02 0.01 0.02 Maximum 2 3,458 11.44 2.65 10.75 Median 2 164 0.58 0.61 1.29 Arithmetic Mean 1.67 570 1.78 0.92 2.27 Weighted Mean 1.81 581 1.98 0.88 2.09 Standard Deviation 0.51 816 2.74 0.9 2.96 Coef. of Variation 0.31 1.4 1.54 0.99 1.31

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-12 www.rpacan.com

INTERPOLATION PARAMETERS

Grade interpolations for silver, gold, lead, zinc, and density were made using inverse distance cubed (ID3) with a minimum of one to a maximum of five composites per block estimate. The search ellipse varied slightly by vein (Table 14-4). Hard boundaries were used to limit the use of composites between veins. Figures 14-8 to 14-12 illustrate the results.

TABLE 14-4 BLOCK ESTIMATE SEARCH STRATEGY MAG Silver Corp. - Juanicipio Joint Venture

Z Y Z Long Inter. Short Domain within each Rock Type (o) (o) (o) (m) (m) (m) V1E 00 -55 -45 150 150 50 V1W -05 -65 00 150 150 50 V2W -05 -55 00 150 150 50 HW1 20 -70 00 150 150 50 JV1 10 -55 45 220 220 50

* Note: GEMS ZYZ rotation nomenclature is used above. Positive rotation around the X axis is from Y towards Z, around the Y axis is from Z toward X, and around the Z axis is from X toward Y.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-13 www.rpacan.com

I C3

400 200 600 I J C403 M 1000 1200 12 M I15 NOTE: Topographic surface is located at 2,300m Elev. C2 J0 M16 4B ID 2200 Elev 2200 Elev

800

J A IF

2000 Elev 2000 Elev ID IG P 2 51

182 172

191 175 155

192 179 162

172 182 172

180 169 144 MR-3 156 168 154 IE IF2 131 293 167

133 187

154 169

263 168 179

444 195 217 1800 Elev 326 38711381236 1800 Elev 324 316 256 242 80812701243 V1W 49 M 324 315 197 177 269 573 478 7631277 P 2 3 214 181 273 64412971879 517 7061281 285 428 90816292244247724032106 515 513 669 223 232 241J J 1331200223732588272424671810 527 515 811 198 213 222 229D 1740m Elev. 06 220723272529290228322241612 482 504 545 750 198 216 220 211118813315308626021505 420 612 627 638 161 189 203 Figure 14-10 207118452272294926811938 490 608 610 602 123 145 171

JB V2W 21132315254325302111 449 634 601 599 90 97 107

1819191019641976 352 662 607 603 91 9472 M 1030103712051416 331 555 617 606 9485 86 -1 22 762 708 799 400 512 604 314 110 90 93 FX 701 668 633 442 501 380 102 120 112 99 99 663 652 590 603 375 277 100 123 115 102 99 V1E 46 556 483 385 183 189 97 120 130 109 104 P 450 426 371 168 91 94 113 120 112 106 56P 1600 Elev 390 353 361 113 80 94 107 145 133 313 1590m Elev. 1600 Elev J0 354 359 373 112 85 95 267 414 173 161 441 5 336 334 371 387 441 488 540 530 198 463 539 229 230 230 497 549 591 602J586E 211 4861013 Figure 14-11 236 238 239 237 553 580 641 639 612 415 766 962

242 243 240 569 659 645 606 623 747 928 M2 244 246 243 237 553 629 621 582 413 115 200 751 1 246 246 241 562 593 585 538432 27 116 240 180

242 243 241 237555 563 537432 28 28 98 234

236 235 231534 519424 173 28 28 60

220498 216173189 170 29 29 28 39 JC 198150 145 14429 29 29 28 27 V2W 128 128257 131251 154 32 31 120141 120251 123 240 227 223

138117256 120 236124 215 214

60 119268229123 200 209 1400 Elev 61 121267102 233 202 214 224 -2 1400 Elev 63 237 253 224 225 229 7 C1 64 134 257 239 235 235

60 256 246 241

M18

600 200 400 800 1000 1200

1200 Elev Silver Grade (g/t) 1200 Elev < 100 Figure 14-8 100 200 200 300 300 400 Mag Silver Corp. 400 500 500 600 Juanicipio Joint Venture > 600 1000 Elev Zacatecas State, Mexico 1000 Elev Valdecañas Deposit 050100 150 200 Vertical Section 2200SE Metres June 2014 14-14 www.rpacan.com

MR-3 2200 Elev 400 600 2200 Elev

1000 1200 NOTE: Topographic surface is located at 2,300m Elev. J- M 11 25

A_M K2F0 J 09

800 LE1 M19 -2 2000 Elev MR 2000 Elev

M24

102410371043

993100710371058

1007100310101048

1006996 10251063 MB1024992 9831028 1800 Elev 992 934 907 889 1800 Elev 512 512 967 676 568 584

508 511 513 1282701 554 577 601

508 511 13091150536 557 594

500 504 505 1182817 538 573 22M 489 493 495 11151216826 557 581 1740m Elev. 2 483 487 488 103711481147840 463 8 P 481 488 486 11302561110 257 995 978 Figure 14-10 476 499 482 10882541273 253 759 861

402 598 450 780248 961234 653 815 M7 332 293 525 808 762 129910641034 388 399 475 L 955 989 112211271086 E2 419 429 454 417 888108711081099 V2W 399 436 449 423 394 373 384 902 795 M 379 396 415 381 442 530 967 754 H M C 443 422 432 491 904 773 403 445 480 454 650 595 441 V1E 1600 Elev 411 527 403 412 422 1590m Elev. 1600 Elev 306 330 346 362 340

259 253 242 279

175 135 157 246 Figure 14-11

178 197 257 370

243 308 398 414

295 377 414 426

390 413 429 430

394 411 422 424

107 106 395 404 408 406 440

V1W 107 105 333 378 384 385 434

112 103 105 147 33 214 215 215

129 101 105 154 139 214 214 215

722 738 124 111 106 39 147 213 213 214 214

712 745 756 116 110 104 98 39 238 213 213 MF 683 723 764 754 105 99 94 1400 Elev 669 731 744 98 93 90 1400 Elev V2W 676 701 723 730 89 87 M27 698 712 720 87 85

600 800 400 1000 1200

1200 Elev Silver Grade (g/t) 1200 Elev < 100 Figure 914- 100 200 200 300 300 400 Mag Silver Corp. 400 500 500 600 Juanicipio Joint Venture > 600 Zacatecas State, Mexico

1 00 Elev0 Valdecañas Deposit 050100 150 200 Vertical Section 2 00SE4 Metres June 2014

14-15

www.rpacan.com

711600 E 711600 711600 E 711600 N

2560400 N 2560400 N 2560200 N 2560000 N 2559800 N 2559600 N 2559400 N 2559200

711400 E 711400 711400 E 711400

D

U

8

5 2

2

2

7 Figure 14-10

2

2

9

2 2 E

2 9

2

8

8 J2

U

0 7

2

9

0 7

2

3 8

2

1

8

2 2 2 5 2 711200 E 711200

J E 711200

9 6

2

5 6

2

9

0

1

9 Mag Silver Corp.

3

1 Level Plan 1740Z 6

2 8 1

1

2 5

1

9 3

1

4

J 5 6 1

6

7 E 1

0 Deposit Valdecañas Zacatecas State, Mexico 9 1

4 T

9

2 M

< 100 2 0

4

> 600 2

1 6

2

3 9 1

D

S

0

1 3

2

3 Juanicipio Joint Venture 3

2

8

0

2

2

J

9

7 1

2

2

1

2

1 8 0

2

5

0

2

J

3

100200300400 200 500 300 400 500 600 1 E

2

0 1

2

3 8

3

2

5

7 S

Silver Grade (g/t)

8 9

6

2 4

7

3 6

7

7 0

8

9

0

9

7

0 0

1

1 3

7

0 0

7

2 0

6

2

9

5

0

2

3 2

1 5

D

9

0

1

5 3

1 0

1

711000 E 711000 711000 E 711000 4

R

1 M 4

7

3 M4 4

8

6 E

7

9

5

0 0

1

5

3

9

7

3

3

R V1E 1

8 1

8

4 0

9

9 4

9

4 7

9

5

1

8 1

6

9 4

2

3 M

1

5

5

5

0

0

1

1 5 4

7

0 9

2

4

1

9

2

E 6 9

2 U

2 0 3

M J

1

Q 8

9

5 5

9

5 6

6

9 8

2

4 9

2

6 0

3

6

2 9

9

0

9

9

9

1 1

1

3

5 3

9

6 7

4

4 9

2

4 9

8

0 4 M

9

7

7

9

1

2 1

4 1

1 1

1 D G

5 2

9

4

4

9 P

4

5 Q

C 9

2 1 2 F

1 1 H 1 P Q J Q 6

3

M

8 7

3 3 3 710800 E 710800 710800 E 710800 C 1 M

J 2 M

O 2 E U E P J

A 2 P

F

5

O E

D

3

P

3

O

O 3

M

M

4 _

3

0

A

F

3

M

O

M

G

D

O

Q 1 2

1 - F

J D

N

2 N

9 3

M E

M

N

G

8

2

8 1 N

710600 E 710600

710600 E 710600 V2W

6

8

5

E

1

9

4

6

1

8

4 7

1

8 M

etclScin2400SE Section Vertical A

M

6 2

8

9

4

1 1

9

5

3

1

2

4

N 6

1 2

9

9 8

7 M 4

2

1 P M

2

9

7 4

4

9 4 6

G

U 5

6 0

1 1 1

F

3

0

1

6

9

6

J 8

2

M

4

1

2

1

0 9

0

4

1

2 9 M

4

9 8

4

3 3 3

4 8 8 9

6

4 4 4

5

9

1 7 7 5

3 8 8 8 9 9

C

2

4 4 4 4

1

1

8 8 8

8 8 8

8 1 2

0

4 4 4

1

3 6

8

8 3 9 4 M 7

M M

2

7

3

0

1

8

4

1

1

7 M

4 1

1

0

4

7 8

3

6 4 2 I

M E

4 4 6 6

2 4

5 6

6 9

2 4

7 L M 3

5

4 8

5

9 1

6

M

9

1

3

V1W 1 7

92

7

6

2

2

6

C A 4 6

1

0 9

7

1

2

2

6

0 1

K J 5

I4 6

M T 3

4 8

2

9 6

2

8 4

6

5

8

5

2

7 3

4

2

5

7

3

3 3

9

2

1

4

2 3

7

2

3

7

7 2 etclScin2200SE Section Vertical 5

H

9

6 2

6

0

2

3

3 8

0

2

9

B 8

2 0

9 3

4 710400 E 710400 710400 E 710400 9

4 2

8

2

7 1

6

3

7

9

1 2

2

J 3 M 6

3 M 6 2

D 200 300 400

6

3

9

6

0 2

5

1

6

7

3

8 2

8

2

2

6

3 1

4

5

5

2

4

2

2

J 2

1 K

2

3

0 F

2

9

5

2

3

8

0 V1E Metres

3

3

3

2

2

3

6

6 3

2

8 2

4 4 K

2 6

1 2 6

7

3

1

0

3

2

2 1

0

7

2 2

3

2

7 1

0

7

5

0 G

6 3

1

2

2 3

2

7 2

1 2

4

2 1

3

2 6

2 6

2

2 E

9

2

7

2

5 8

5 2

8

7

2 3

2

2

7

0 0

9 9

3 K

2

2 6

2

1 2

8

3

4

8

3

0

3

2

1 1 0 1

1 K

2 4

3 2

1

2 3 M

9

2 9 4

1

1 0

3

6

1 1

9

8 J 5

1

4

2

8

8

1

4

2

5 2

4 8

7

0

3 6

9

5 7

7 2

1

3 5

9 5 4

2

2 5

9

0

2 5

5

7

5 3

6

2 1 0

9

4 1

1

9 M

0

1

7

5

1

1

0

4 2 2 3

1 3

2

7

M

3

1 1

2 2

3

V2W 4

4

9

8 8

7

0

C 9 2 P

1 8 2

1

4

1

A 0 1

9 1

6 6

8

1 8

2

1

1 J

3 5

2 6

1

J 2 2

7 M 2

B 3

5 1

4

8

9

4 1

6 1

2

5

0 1

2

3

2

8 3

0 3

6 0 4

J D

1

4

2

4

7 5

2

3

2

3 J

1 6

5

3

2

1

3

4 8

1

3 2

6 1 -

2 E

1

4 0

3

2 X

9 7

5 8

3

2 J

4

0

8 8

9 -

2

1 2 6 3

1

1 5

0

6

2

3

F

1

0

2

2 7

V1W 0 1

2

3

9 D

M 3 M

1

7

3 I

0 1

6

3

8

M 0 8 4

9

7

3

6

3

9

7

1 C

3

2

1

9 2

1 3 1

9

6 6

4 3

1

3

4

2

0 9 1

9

6 710200 E 710200

710200 E 710200 4 0100 1

1 1 4 B 0 2 M

I

5 J 1

8

9 9

3

5

6 3

9

4

1

5

3

5

9 1

4

1 1

3

0 P 9

1

M 0

3 1 2 8

1 C1

M

3

6

3 4

E

7

5

4 D

5 I M 5 D

4

M 1

I 1 9

5

3 2

6

7

2

H 8 4

3

0

5

4 G

3 3 I

4

9 2

4

7

1 4 2 HW1 F

F I

5 5

3

6 7

2

1

2 0 2 E H

1 H

9

8 P 1

6 5

2

6

5 M 2 6

G 4

0 5

4

0 H

0 6

9

4

8

8

2 0

3 3 9 6

0 A

2 0

5

3

5 9

8

4 F

7

1 M

7 3 8

3

3 B HW1 8

0 7

8 1 G

C E

8

1

7

A

2 1

8

8

G 2 0

1 E

G E 2 9

P

G P

0

F 0

2

7 U 0

5 7

4 P 7 710000 E 710000 710000 E 710000 J D J 5 6

3 5 P

H G 1 P

2 1

G 4

0 3

_M

F A

1 P G 5

0 M 4

4 M

P

ED 7 4 4 EE 0

M June 2014 _ P P 2560400 N 2560400 N 2560200 N 2560000 N 2559800 N 2559600 N 2559400 1 N 2559200 F A 5 5 E P 4 8 3 14-16

www.rpacan.com

711400 E 711400 711400 E 711400

2560400 N 2560400 N 2560200 N 2560000 N 2559800 N 2559600 N 2559400 N 2559200

711200 E 711200 711200 E 711200

6

6

8

6

1

7

5

7

4

5

2

E 7

3

7

7

T 7

3

6

8

6

5

7

9

8

7 0

1

4

9

8 0

1

7 1

1

3

3

1

1

2 1

1

6

1

2

1

9 2

1

1

3

1

J

7 2

1

2 2

1

3 2

1

3

2

1

3 2 2

1

5

4 1 E

M 1

S

1 2

1

1 2

1

0

2

Figure 14-11 1

2 1

1

8 0

1

4 0

1

2

4

< 100 1 0

3

> 600 1

1

1

1

2 1

1

8 1

1

9 2 1

711000 E 711000 711000 E 711000

0 3

1

0

5

1 2 1 7

5 1

Mag Silver Corp. 8

6

Level Plan 1590Z 1 4 2 5

U 1

J M

6 8

1

1 8

1

7 4

1

Valdecañas Deposit Valdecañas 9 Zacatecas State, Mexico 4 1

100200300400 200 500 300 400 500 600

1 0

2

9 4

1

6

3

Silver Grade (g/t) 1 9 2

M41 1

5

5

0

3

Juanicipio Joint Venture 2

7

9

7

5

2

8

2

0

7

3

9

3

0 F 1

H

7

Q 2

9 6

4

9

Q5 0

1 V1E 8

6 9

1

3 7 9

7

8 6

1

3 4

3

0

9 M 3

2

1

5

8 2 0 2

2

4

5

2 U

0 3 3

4 J

M

4

3 7

2

4 7

2

710800 E 710800

710800 E 710800 6

8

4

0

7

4

1 3 4 6

3

5

4

2 8 2

C

4

0

7

6

M

E 3 1

8 O 0

1

6 4 7 1

4 1

9 4

6 3

3 P 1

5

9

4 4

6 6

1

4 F 9

8

5 0 1

8

D 8

0

5 8

9

3 P

2 6

3 2 7 9

1

2 2

1

7 9

6

8 2

9 5

O 2

2 5

2

2

M 6

1

2 8 6 2 3

2 1

1 8

2

1 8

2

3 3 7

2

6 4

2

2 3

2

8

7 9

3

2

2

7 M 3

2

6 1

3

7

8 4

2

_

3 8

2

1 3

2

9 3 1

2

6 A 7

1

5 2

2

1

5 F

2 2

9 1 M

3

4

7

3 2

1

6

2

O

2 9

M 1

7 2

2

7 3

2

6 5

2

5 5

4

7 1

4

8 0

5

9

3

6

G

3 3

8

0 9

3 2

O

7 F 6

9

5 9

8

1

9

7

7

D 8

7 N

N

5

5

1

1

6

9 1

1

9

3

7 6

2 7 6 E 710600 E 710600

710600 E 710600 U

9

N

4 G 0

1

J 6 8

9

3 1

8

4

5

7 N

8 4

9

2 2

7

2 7

7

1 0

8

4

0 8

E 9 9

9

5 2

2

1

4 1

4

3 M

8 3

M

8 8 3

8

1

2

8 M 8 2

M

9 4

6

3

5

6

9 M 3

3

M 7

7 8

7

6

9 2 7

etclScin2400SE Section Vertical

6 0

7

8

1

I 7

0 4

7

0 6

7

6 9

M 6 G

4

8 M

3

7

0

F 5

7

4

5

6

6

6

4

8

M 6

1 1

7

0

1

4

3

3

3

M

6

8

3

8 8

I 7

T 3

6

5 2 7

2

2

6 0 M

3

0 3

3

6 4

3

2 6

3

0 4 3

H

1 7

3

1

9

3

7 7

M 3

710400 E 710400

710400 E 710400 3 3

3

1 5

3

5 6

3

1 3

9 F 1

5 200 300 400

3 5

5 9

5 K

0

9

0 1

6

6

1

1

G 2

0

7

4 Metres 1 2

J 3 2

E 1

K 7 5

6

0 1

3

5

1

4

K 3

2 1

2 6

4

1

1

7

7 6 1

1

3

4

6 0 4

6 1

1 4

3

3

9 4 3

3

3 6

5

2 5 1 3

8 2

6

4

1 2

4 9

8

1

C 1

9

9

9

7

M 0 1

J 1

5

1

1 M 6

3 1

2

7

3

7

7 9 7

1

4 9

etclScin2200SE Section Vertical 0

8

2

4

2

4 5

0

0

3

1

2

M

9

9 5

0

3

1

3

2 7

1

3 1

2 1

1

6 5

9

8

1

5

6 9

9

1

7 1

1 6 3

9

2 3

1

4 3 1 3

4 3

1

D 6 3

7 4

4

1

3

J 4

8 5

4

8

3 8

7

6

1

0

1 9

6

2

1

7

1 9

4

2

4

9

8 E 6

7 5

3 5

8 6

5

6

5

1 1

3

7 1 5 J

2

2

2 6

4 7

2

0

9 2

7 2

M 8

8

6 8

4

1

9

5 5 4

0 8

D 5

0 2 6

6 1 V1E

6

3

I 5

4

4 2 1

3 5

7

1 7 - 8

3 2

9

1 6

6

7

2 0

4 1

3 1

2 4 6 7

3 1

7

9 4

3

6

M 1

0 4

8

3

5 5

1

3

2 1

3 5

8 M

5

1

5 6

5

6

1

7

9 0

3

0 7

1

0

710200 E 710200

710200 E 710200 8 C

2 0

2

4 0100

1

8

3

3

7

6 5

1

2

J 3

7

2 6

7

4

1

2

4

4

7 7

5

8 1

5

6 0

6

2

0

1

6 1 9

8 5

7

1

1

3 3

5

8

0 1

0

4

4

9 1

1 1

V2W 5 1

2

7

M 2

8 8

1

5

8

8

6

7

1

1

9

0 E 9

0

7 1

5

1

1

F1

7 M

6 I 6

1

4

1

3 D 5

1

4 4

1 I

4 H 5

0 6

1

1 2

9 2

8

6

1

3 0

9

7

E 1

9

4

7

1 F G 2

1

7

1 I

H I

4

9

2 9 0 0

1 2

8 8

1

9 2

7 1

2

2 2

2

7 5 G

4

6

3

02

4

7

1 H

2

1 3

2

7

V2W 2 2

6

9 0

1

6

2

8

5 9

3

2

2

3

5

1

5

6

2 M 6

0

4 1

3

2 2

9

9

1 0

1

0 4

4

6

2

1 3

9 4 3

4

2 2

2

3

8 3 M

7

4

2

5 1

2

9 9

1

9

3

4 2

5

4 2

0 6

3

5

2

1 HW1 0

2

9

7

C 1

4

3

4 2

5

H 3

2

6

2

5 P

5

2 E

G 7 2

2

3

8 E

G 1 7

2

6

1 G

1

6

0

2

4

2 F 3

5

5

3 0

3 2

1 7 5 3

3 2

3 2

2 J 8

6 9

710000 E 710000

710000 E 710000 2

3

D 4 1

8

1

9

3 5 2

7 2 V1W

8 M E

G

1 2

3

1 5

3

4

8

8

4

8

6

1

3

3 3

1

4 4

3

4 5

3

5

7

3

8

5

6

1

3

6 4 1

P

0 6

3

9 6

3

1

8 F 4

3

6

7 6 1

1 4

G 0

EE M

EF

709800 E 709800 709800 E 709800

P 51

E

C

P 1 N F 7 C June 2014 2560400 N 2560400 N 2560200 N 2560000 N 2559800 N 2559600 N 2559400 N 2559200

14-17

www.rpacan.com

D U

2000 N 2000 N 1800 N 1600 N 1400 N 1200 1200 E 1200 E

U 244 294 315 292 282 292 288 273 287 279 281 254 251 277 227 249 219 267 105 109 106 72 99 104 107 71 71 101 70 71 71 100 70 69 2 70 69 75 70 71 71 73 70 68 73 70 72 66 68 71 67 71 75 70 75 70 75 81 82 77 89 82 89

2 84 89 96 90 94 94 98 277 258 272 286 244 292 287 201 292 303 223 288 292 320 287 J 281 292 284 286 292 259 284 277 274 284 108 103 110 275 112 105 99 101 107 99 107 101 103 72 98 110 99 71 89 100 71 76 70 70 75 71 70 65 72 74 76 54 74 74 72 63 73 69 77 70 76 87 77 80 88 89 99 91

E 98 97 104 97 103 102 106 273 105 277 102 107 277 270 279 0 104 279 280 259 283 276 276 266 284 281 280 252 282 27 281 274 282 107

T 255 109 100 121 113 93 119 103 98 110 122 91 116 97 119 106 110 6 94 98 112 103 106 97 84 71 99 103 102 80 71 72 73 67 79 75 80 63 72 77 68 75 90 67 74 89 89 77 107 90

U 106 104 116 102 113 109 117 114 106 116 111 108 113 111 114 270 288 108 112 287 279

J 270 270 110 113 287 111 269 255 140 267 134 265 253 142 109 119 111 139 126 116 119 98 108 125 115 89 97 122 141 68 65 142 131 70 145 85 134 107 120 85 95 117 102 108 99 109 102 72 104 96 80 86 78 88 97 83 96 95 106 108 94 109 120 108 106 117 133 108 123 109 114 134 114 124 125 118 121 115 117 121 118 114 256 270 248 289 115 166 6 116 159 116 176 113 185 177 109 111 172 107 185 152 160 7 178 194 4 139 137 154 194 176 138 197 129 129 120 190 149 128 10 76 146 10 104 84 77 139 72 149 138

88 4 113 124 86 102 127 94 91 119 111 95 100 96 106 86 103 106 88 100 102 107 113 108 115 121 108 115 120 121 112 124 116 0 126 129 127 107 131 118 1 113 131 127

M 128 123 118 123 125 122 122 119 119 116 117 114 313 364 114 341 219 112 106 292 96

2 218 104 271 109 107 102 95 216 253 221 101 95 89 224 222 210 228

218 2 236 229 8 199 240 227 225 152 203 207 261 193 152 223 151 213 144 J 175 92 144 110 109 146 91 138 107 142 137 91

107 J 94 140 108 109 91

1 140 91 110 91 109 103 140 114 115 117 150 117 119 118 120 120 121 122 896 123 920 122 122 123 882 823 862 123

J 123 780 123 121 123 819 720 894 749 123 122 853 660 119 873 120 115 777 117 112 793 669 114 109 102 98 552 1 789 670 531 106 656 95 354 94 86 103 501

333 D 93 85 469 218 308 85 79 93 216 272 211 318 86 80 22 82 81 218 204 228 206 193 219 230 233 220 192 219 208 219 196 248 214 239 254 189 180 246 219 186 234 230 197 202

S 210 186 186 176 181 187 166 171 181 140 153 180 141 151 156 139 158 154 151 145 155 138 138 160 906 138 128 902 926 121 925 125 146 943 130 123 946 864 121 127 143

911 952 121 137 948 963 875 137 120 919 964

150 E 114 963 112

853 945 104 99 108 99 754 947 882 95 86 93 104 773 887

84 84 645 860 773 80 80 3 83 750 634 76 80 500 612 85 74 76 586 474 291 252 74 77 454 76 80

215 272 76 78 210 273 217 213 217 206 212 215 207

204 222 204 208 202 263 186 267 205 203 285 159 S 185 246 4 196 166 247 189 186 8 215 194 200 184 226 201 9 205 184 162 180 177 170 1000 E 1000 173 168 173 15 166 174

153 166 192 151 153 0 149 164 154 153 204

153

5 178 890 205 163 912 925

1 191 934 153 175 908 16 M 177 936 950 150 186 169 957 956 178 150 947 966 184 149 142 966 963 165 122 130 943 965 128 111 107 98 867 945 773 93 89 112 137 913 870 92 81 774 118

4 846 97 129 75 77

693 J 766 73 72 617 693 754 80 68 615 73 689 70 75 73 611 0 528 71 73 603 465 175 76 74 73 335 464 75 392 6 719 213 305 213 709 21 697 212 213 208 383 767 219 206 335 752 207 70 283 395 215 779 251 308 216 733 804

M 181 200 671 Figure 14-12 173 176 433 2 171 266 329 168 182 569 249 165 398 246 153 188 510 265 205 151 324 151 135 256 452 304 303 131 432 262 180 869 885 254 165 213 318 241 184 894 886 298 185 899 876 502 172 285 894 883 4 526 190 867 890 416 172 879 186 867 337 334 168 801 860 256 142 798 840 206 161 809 130 729 679 171 775 150 158 87 171 118 728 807 657 696 168 139 90 777 154 152 74 736 686 78 73 106 680 150 706 752 122 92 74 649 681 81 75 640 659 623

695 91 106 79 934 679 86

871 730 916 826 5 698 870 822 909 419 742 763 711 866 666 807 742 M 725 909 779 758 841 692 742 827 1007 936 401 990 779 895 901 972 349 262 324 377 1282 1117 785 274 6 1317 1259 458 744 297 1270 1250 385

1347 1247 271 583

1281 1249 0 921 371 1373 U 1264 45 238 475 772 1318 812 745 467 312 772 1333 772 462 470 294 765 774 469 655 507 772 76 761 460 469 763 465 478 660 729 764 410 438 675 762 751 298 227 717 327 780

215 237 587 820

193 184 939 835 482 186 J 151 926 592 601 181 148 902 166 147 737 170 640 830 157 142 149 759 676 143 147 110 92 695 827 648 138 117 99 644 670 90 120 928

6 681 969 118 94 104 905 848 97 106 931 843 747 731 765 904 Mag Silver Corp. 809 700 602 695 1011 631 592 1126 724 692 1185 757 971 1320 865 810 1095 878 973 1015 1024

1 1135 1257 1336 1124 1280 1245 1231 1201 1422 1229 1239 1468 1229 1236 1369 1146 1225 925 1445 1463 1215 1241 711 475 475 1277 1360 614 484 748 692 1213 703 857 511 478 698 678 735 603 480 751 695 692 654 491 704 478

J 678 697 451 703 477 687 700 644 661 471 464 690 709 689 449 459 729 672 660 358 546 613 756 714 267 293 772 736 669 631 201 226 809 333 727 141 772 618 149 770 138 136 144 770 704 701 124 129 125 667 723 732 107 106 90 89 683 668 818 77 93 86 665 869 133 641 56 31 77 933 969 Zacatecas State, Mexico 72 30 34 858 905

B 952 31 848 29 919 30 949 883 789 812

C 953 D 927 741 988 843 779 976 1006 897 1009 935 865 1131 971 1005 958 1127 1337 1322 1264 1361 1282 1243 1389 1238 1346 1 1399

1282 E R 1228 1386 1407 R 1234 7 878 1324 1408 1239 3

R 474 881 686 1346 1333 454 736 717 72 499 635 602 730 465 735 481 61 746 676 485 714 603 70 455 692 476 728

626 1 465 655 688 7 648 604 677 650 668 450 465 703 638 649 456 666 602 650 447 80 87 273 661 638 646 677 55 42 676 636 R 77 596 30 75 26 640 66 639 679 72 81 27 665 643 589 31 25 675 79 624 608 28 75 25 731 549 667 26 42 83 691 659 654 26 30 77 988 622 877 72 27 28 743 4 28 31 920 758 1178 30 74 789 1187 42 978 1027 792 829 1047 818 969 1007 904 1029 998 894 828 949 608 944 974 815 296 1116 853 513 1313 1283 298 Juanicipio Joint Venture 1296 527 1324 1278 522 299 1300 529 1145 1283 545 900 448 525 1311 657 686 555 M 450 678 693 656 693 677 452 2 646 676 652 627 462 687 645 451 608 628 642 538 567 458 653 610 562 416 601 601 31 51 240 549 85 633 567 615 29 73 561 79 566 42 25 79 669 592

4 530 28 78 85 648 741 570 555 21 70 89 568 601 668 569 93 621 616 28 515 18 82 19 20 642 762 724 42 20 103 792 741 906 27 23 86 107 823 879 26 72 906 92 923 843 31 81 27 953 74 29 913 1017 42 78 1062

1 912 1092 1041 Inclined Longitudinal Section 1078 761 1097 1062 1055 1037 706 741 610 290 294 291 9 447 296 287 302 289 408 301 282

525 290 H 280 0

J 284 63 311 300 286 581 521 653 294 301 589 277 51 248 197 496 320 233 152 281 644 160 147 643 623 139 182 612 612 56 146 147 588 213 63 79 578 571 82 30 611 531 73 28 475 87 726 528 42 79 85 644 451 77 27 85 784 433 527 656 583 69 89 91 20

526 Q 94 94 26 17 615 692 599 82 17 714 834 645 41 19 98 105 874 896 26 87 962 111 924 71 26 92 994 100 859 81 27 31 89 982 1033 29 74 83 886 1110 867 78 42 74 1134 974 1144 1063 1105 Valdecañas Deposit - Main Zone Valdecañas 955 981 870 1035 1078

762 955

294 665 289 G 627 1083 412 719 294 306 278 589 296 260 222 529 485

443 248 669 287 411 1007

502 288 809 463 351 618 E 589 382 362 236

563 9 85 123 385 75 113 98 234 612 622

138

559 608 122 66 200 586 603 123 Q 39 546 73 617 583 83 271 583 585 42

0 293 618 570 533 173 75 358 507 603 590 71 608 329 753

703 30 79 786 168 641 366

706 3 74 327 729

877 833 83 168 386 42 877 954 855 77 29 915 343 Q 72 76 174 699 1050 69 30 153 54 969 629 1125 67 58 12 374 1254 58 38 758 60 4 1530 54 963 1255 1282

926 1247

990 1146 1110 860 915 1138 953

1119

855 476 761 1057 294 846 677 427 D 856 830 663 994 298 694 788 285 965

309 M 618

468 913 F 1073 541 586 716 518 613 443 527 585 438 M 501 387 322 416 269 572 555

276 219

800 E 800 560 E 800 643 229 295 544 619 P 193 639 159 523 549 261 314 527 657 315 6 279 652 644 694 700 301 772 351 700 284 303 409 712 798 257 329

850 868 834

251 531 205 859 876 892 Q 220 88 951 341 81 124 853 254 944 35 56 124 430 878 1016 42 133 53 997 837 1047 32 39 848 909 34 42 50 885 114 1140 32 35 894 981 1064 940 1140 907 977 1083 909 1121 818

1121 8 948 930 1050 1114 860 783 811 852 886 792 939 887 973 983 919 935 755 919 629 815 672 838 534 568 486 599 486 557 524 3 484 472 451 427 499 408 401 342 365 190 252 515 300 339 729 518 738 301 328 687 305 348 793 751 301 767 816 401 830 264 331 856 842 236 873 477 888 902 234 346 924 940 898 274 543 110 30 914 931 408 982 29 40 932 114 970 31 967 176 47 917 33 42 943 38 37 925

976 M 1009 944 954 910 6 1072 906

821 7 1121 832 986 1060 855 1028 828 0 794 877 86 817 887 771 903 870 784 902 874 84 816 782 699 676 444 437 455 571 3 557 605 452 562 461 443 551 545 456 460 556 460 549 454 598 456 403 455 388 339 395 303 322 335 303 284 308 323 279 159 371 136 148 108 62 227 65 114 M 63 134 52 74 102 47 59 46 51 48 515 678 770 361 429 2 417 443 419 439 454 406 429 452 465 408 386 474 436 39 485 479 466 492 491 418 481 461 472 481 468 471 451 464 465 461 455 434 455 89 361 448 166 264 151 160 84 142 94 164 122 108 77 88 107 140 77 67 95 68 6 65 72 68 94 112 66 71 77 69 70 60 63 68 85 58 C 68 2 F 67 3 2 783 822 3 821 749

428 3 439 810 747 762 427 850 826 399 454 370 432 583 341 P 505 351 503

502 E 399 509 6 P 401 467 486 472 434 452 1 467 3 461 456 439 365 2 1 44 2 260 268 256 272 262 256 M 267 252 259 25 157 265 16 257 198 263 128 132 P 207 141 J 108 262 115 152 266 268 160 J 127 84 139 200 84 95 149 226 68 116 116 97

M 106 116 117 796 704 906 564 861 597 1008 402 9 1161 760 761 _ 1317 1161 929 1416 441 904 987 1256 930 424 1 70 446 434 829 456 445 428 435 429 275 262 265 281 258 27 261 281 289 246 273 239 246 290 232 267 A 237 238 284 239 260 283 245 250 271 250 261 274 274 257 267 256 262 269 260 161 266 117 263 118 116 124 118 117 118 118 118 116 117 115 5 118 117 791 893 695 895 563 826 587 1006 428 1084 1053 694 1161

1280 3 855 1134 1116 866 734 1048 469 543 381 435 326 247 298 242 264 237 268 316 274 287 319 3 262 297 283 312 231 219 306 312 294 305 216 291 233 26 284 248 276 277 M 262 257 269 268 261 117 263 116 119 215 120 120 114 119 120 121 116 121 121 112 121 4 119 116 120 120 114 119 118 116 118 784 864 738 838 INFERRED RESOURCES 878 801 888 737 879 2 896 677 830 903 753 869 779 719 637 517 353 316 207 163 280 287 194 281 176 225

E 264 251 318 249 319 274 285 287 284 261 272 287 281 257 290 411 267 421 441 258 356 426 449 365 472 M3 119 370 370 122

O 119 95 126 123 110 125 131 126 119 125 108 124 117 123

D 113 121 120 119 116 117 A 119 117 838 805 831 751 856 1308 718 754 1261 712 733

1314 245 550 629 515 453 338 349 234 263 266 269 201 171 236 189 O 256 259 192 250

O 227 237 212 256 455 386 438 F 431 437 C 469 411 486 440 551 586 372 470 599 369 600 E 600 404 564 167 458 452 117 317 104 125 88 311 130 124 126 113 123 105 123 124 116 122 119

O 119 112 121 115 84 119 97 O 117 1147 1113 975 1118 1054 1019 983 1008 1025 930

982 G 1007 965 919 1011 615 892 973 533 405 393 387 460 305 341 226 343 379 380 223 417 229 474 226 508 639 674 833 892 544 390 704 630 583 714 < 100 480 580

433 O 646 346 616 > 600 425 362 661

602 2 392 470 632 371 391 114 480 118 423 396 57 53 116 120 290 112 83 50 119 97 117 49 49 114 48 46 51 112 53 47 114 47 49 47 48 1068 1055 F 1070 1071 1023

1078 1061 1060 1080 1002 983

1051 1074 1062 1051 981 1079 9 1012 971 1085 1064 970 1100 1084 939 823 903 947 851 911 0 770 967 811 725 895 941

791 787 866 N

952 980 1265 3 847 2 1179 915 1107 735 994 1208 991 769 813 671 947 712 837 379 361 91 659 70 81 93 286 52 83 54 49 51 M 80 45 48 51 45 57 43 46 43 54 46 47 44

46 45 46 48

996 1065 Drill Hole Trace 1073 1063

1094 M 976 1083 933

1075 1082 915 746 1079 858 1011 1 1073 1181 973 1014 1094 1089 1071 981 770 991 878 1089 814 938 736 864

672 1018

628 1047 447

1155

639 1196 672 899 1071 934 3 2 776 1333 1066 971 1535 1927

1244 1484 1129 1357 866 826 1152 1126 94 499 425

108 100200300400 200 500 300 400 500 600 90 117 104 115 54 3 101 129 108 48 88 50 48

45 56 48 46

48 47 53 49 48 938 D M 897 1055 934 1070 1092 1066 905 1086 1196

949 1077 1063 865 1084 904 0 1073

D 1083 E 1054 989 884 1414 623 1092 932 836 Silver Grade (g/t) 991 882 M 777 G 98 778 851 713

N 986 713 1049 813 754 1007 905 874 Q 948 1100 1118 1255 1152 1289 1120 1226 N 1269 936 977 1082 1181 701 686 109 399 N 115 105 111 120 105 77 119 72 93 125 113 120 78 89 112 75 116 88 81 74 55 57 63 1643 63 60 1532 1548 1538 1568 1592 1591 01 1633 1600 1554 1678 1605 1705 1647 1550 1589 1734 16 1547 1682 1678 1615 728 1470 1666 1619 746 782 1603 1620 777 799 720 757 807 817 801 722 772 819 740 801 804 772 751 785 753 1089 1121 1162 1135 1094 1209 1187 771 77 657 91 731 1191 80 93 116 78

86 71 84 93 109 61 64 57 99 108

75 121 65 1838 1828 87 71 101 1515 71 87 1831 78 1841 1835 75 82 1893 1846 78 82

1 1928 1346 1692 2074 1645 1534 1914 1937 1578 1826 1642 1581

1593 1393 1645 1628 2216

9 1423 1916 1557 1392 1318 1582 1737 710 899 1 1435 1654 1627 728 787 1625

785 655 812 599 735 846 948

M 412 834 2 895

838 - 695 774 821 742 791 766 819

58 859 867 725 684 INDICATED RESOURCES INDICATED 738 710 690 729 711 671 J 497 156 180 178 71 181 160 1516 176 1493 1990 183 68 176 1586 1529 129 82 172 63 1649 1792 73 66 169 1706 1748 70 81 116 1679 1759 77 76 1876 1850 131 1582 1832 E 106 128 1845 1586 1830 163 1846 1687 909 1492 1796 2012 1750 1753 1096 1563 1442 1196 1771 1861 1421 1757 M 7 1639 1909 1833

1594 8 1548 711 1820 1000 749 1533 686 725 772 1599 681 760 649 717 79 653 784 739 M 810 704 787 796 755 736

715 3 653

729 2 616 705

764 647 773 738 M 782 611 1239 777 668 1233 1251 768 730 1266 1241 712 685 1279 1276 424 430 1384 1299 1262 222 261 1195 1306 220 186 2 1268 1330 1185 157 246 1339 1496 1120 248 175 248 2041 1591

207 250 187 1684 1642 1310

227 207 1872 1613 1792 216 201 1212 2 1743 204 206 219

1649 M 1790 213 206 205 1439 1872 1845 207 210 1399 1837 1485 1523 1366 2293 1725 1337 1755 8 1572 1319 1785 1443 1792 1003 9 386 1688 1364 362 1747 1606 964 392 8

1692 376

1713 580 759 2 1437 42 718 749 766 734 706 7 0 71 755 740 771 728 M 760 644 696 1018 60 667 1048 1020 596 1231 732 1054 657 527 788

118 1045 1102

387 868 1231 1149 1096 787 527 456 1154 1218 506 829 1211 1220 736 787 1236 1211 1215 783 658 1249 1230 1214 443 670 1268 1233 410 422 1239 1328 1232 268 270 246 1060 1162 1259 248 212

1067 971 1155 1014 218 232 1065 1213 226 238 783 206 1031 1290 1052 240 206 1480 1230 1266 198 P 226 1552 1316 1002 205 203 1531 1574 1151 214 205 206 1600 1448 1602 207 210 388 1466 1440 1256 213 209 369 1319 1561 399 414 400 E 400 1649 E 400 1106 363 474 G 1729 386 508 388 A 1310 466

6 325 496 479 360 349 418 547 382 373 406 383 363 415 384 739 750 507 547 681

1 666 640 642 684 1015 1033 711 613 657 1052 1041 1031 609 695 1059 1025 1284 641 739 567 M 1088 1046 561 724 1215 1080 1063

N 761 647

1196 1057 I 1141 798 590 1099 1187 444 442 1155 1045 1213 429 463 1232 1216 1051 391 467 1244 1254 1229 437 1028 1315 438 1246 426 441 464 1113 942 1124 1204 449 299 444 980 1035 1251 564 217 436 878 1015 1010 220 305 213 844 756 1304 210 215 222 606 1239 900 209 211 983 218 941 1014 1081 209 855 213

1003 F 1244 209 210 983 1020 215 1083 956 1159 213 210 1155 1059 989 402 211 214 1061 1140 372 434 1161 1047 380 513 359 1112 331 540 343

1115 M 556 346 278 1026 315 506 328 372 421 337 390 380 381 406 412 403 389

400 406 411 410

387 M 333 406 648 2 676 386 652 388 662 756 1036 1003 642 680 1007 1043 1007 659 701 1037 1003 575 996 686 1010 1006 1058 421 992 450 1024 1048 427 459 983 1025 992 453 447 967 934 1063 483 432 907 676 1028 431 445 445 568 889 1282 701

C 436 554 467 1309 584 448 458 443 536

1150 577 454 449 601 440 817 557 1182 393 449 E 440 1115 538 594 159 213 438 573 1037 826 1216 213 215 432 1148 557 212 214 7 216 840 581 1147 1130 211 212 215 1088 780 1110 463 995 212 211 215 213 808 978 759 1273 961 211 212 214 762 861 955 653 212 213 417 989 815 423 214 888 1299

394 1122 1064

373

M 415 112 1087 1034 384 443 381 1108 L 1086 442 902 422 1099 530 795 432 445 967 491 7 904 480 754 454 773 650 411 403 527 595 403 306 441 412 330 259 346 422 362 253 993 1024 175 340 242 1037 135 279 2 973 1058 1019 178 157 945 1060 197 246 864 1001 1102 243 257 933 1213 370 986 308 830 295 1136 1187 543 377 1137 398 917 390 414 414 532 565 989 1039 902 394 413 426 593 856 537 395 411 429 612 495 585

404 333 422 482

633 488 430 612 7 378 761 424 408 506 461 619 384 33 147 406 499 464 609 568 440 39 535 154 385 496 635 214 139 434 696 537 557 215 147 214 39 606 1106 584 213 214 M 215 1140 1151 594 619 213 238 215 592 1144 1072 565 213 214 1126 1087 1101 213 214 1142 1064 1047 1097 1111 1064 1037 518 970 946 286 795 1178 1048 1111 970 646 971 527 972 971 694 971 971 485 934 972 971 535 971 720 474 961 967 337

677 555 M 556 446 449 469 528 437 486 371 452 479 224 391 461 68 196 377 1026 169 49 1012 28 73 1027 1025 1038 997 40 42 1053 958 1032 89 53 86 1051 1052 24 970 24 1011 1063 102 102 986 1030 893 1045 27 26 128 153 952 1012 876 30 154 39 28 226 903 588 842 138 27 30 579 605 816 30 39 30 148 608 615 539 135 27 40 30 617 509 589 610 39 149 61

H 30 30 601 571 569 595 31 604 138 40 30 624 628 24 30 60 147 804 508 646 39 31 154 30 401 617 791 520 138 27 31 664 469 621 39 147 31 649 620 510 1117 31 565 1101 613 970 1102 966 445 1140 544 971 971 506 554 411 971 806 487 288

F 980 972 443 489 961 681 395 974 978 325 396 361 964 1090 410 821

971 5 370 481 973 411 958 627 335 644 414 M 441 427 460 409 333 439 456 351 B 434 159 53 335 J09 33 40 999 993 134 31 22 52

K 993 20 34 992 1000 996 23 2 25 990 25 24 27 24 27 30 24 28 149 38 30 154 30 30

24

M 64 138 I 31 30 153 62 39 588 27 129 30 60 63 550 688 30 38 62 152 628 624 61 40 30 30 136 614 592 30 24 148 60 557 646 30 154 39 30 648 1456 543 617 138 27 30 585 657 7 31 39 1225 585 547 147 586 1969 31 544 744 567 1936 966 795 542 1937 455 329 557 970 831 332 804

49 M

547 977 7 508 T 2342 259 701 967 425 334 971 998 320 404 973 500 270 814 414 347 972 501 323 202 373 295 203 194 170 243 185 222 190 213 114 257 216 93 240 106 99 82 90 76 93

72 78 94 100 U 74 26 27 27 39 148 31 27 40 133 65 37 152 30 30 37 57 137 31 27 31 66 148 29 31 37 63 82 183 27 58 61 32 62 30 38 170 30 40 60 30 129 24 30

61 151

848 J 2327 38 30 154 777 2541 30 24 2459 139 669 2758 31 155 1541

636 4 2877 803

A 675 690 3057 2922 704 715 2442 3294 222 806 1446 735 3177 333 787 2624 367 319 2312 695 584 439 351 2558 317 580 1919 424 312 306 504 560 419 300 219 290 389 266 126 433

113 2 302 121 102 111 158 107 117 131 3 113 142 E 167 186 167 224 196 229 M 226 237 212 219 222 189 224 208 39 181 27 153 135 94 62 30 64 151 38 30 30 38 58 133 30 65 152 25 30 62 158 37 30 27 63 129 30 62 39 159 27 60 40 M127 61

K 38 30 151 30 40 137

741 G

D 30 24 147 2785 563 2445 547 2964 1486 2896 683 3195 536 3153 905 653 2244 3604 3049 783 3234 715 3593 773 2659 3230 2896 2274 431 842 392 449 2563 2843 610 2071 428 2656 355 489 2087 321 469 648

C 1240 252 386 468 164 418 291 167 130 K 318 K 126 198 116 145 235 123 153 182 168 211 138 184 236 256 246 196 291 337 219 242 235 259

K 231 39 224 64 219 176 39 61 184 148 155 40 123 30 135 30 61 24 9 149 30 61 38 153 60 24 146 157 30 61 39 27 135 64 30 149 39

31 137

147 2627 2786 2536 852 2794 2317 2816 2664 2847 2405 1 2364 2444 2787 839 1543 2633 2237 1595 4

2472 2039 1338

1850 2416 691 1114 445 990 816 1632 1015 432 383 638 278 370 351 34 293 326 231 290 325 196 247 284 148 210 236 156 231 200 E 200 197 E 200 165 236 204 242 247 204 239 237 262 258 258 233

262 M 239 243 248 235 227 197 64 144 224 187 243 166 64 136 138 39 61 148 126 40 138 31 60 24 147 154 39 200 300 400 138 27 2527 2063 1937 879 1486 929 602 1212 1768 352 388 743 1603 192 95 711 213 91 65 804 201 154 190 56 69 62 202 83 110 232 67 155 248 118 188 193 237 145 215 203 159 Metres 199 137 170 170 144 2 173 168 196 136 196 219 167 221 1 232 191 217 236 234 234 231 240 239 233 243 238 228 215 241 159 211

157 187 233 164 130

2 149 243

2

3 2

6 151

582 159 89 432 120

62 172 89 126 64 2 2 14 82 M 47 104 75 57 5 71 64 85 71

85 72

90 86

110

93 99 112

115 - 99

M 0 130 102 99 120 109

145 112 104 173 133 106

161 198 313 463 441

211 486 M 415 539 766

0 623

1 962 200 747

1013

928 240 751

234 180 J 7

B J -

8

1

J 198 223 232 1

213 222 198 241 161 229 216 90 X 123 220 189 91 145 97 203 94 94 17 91 97 98 107

80 99 C 82 103 1 84 103 105 98 107 116

298 112

557 279 155

879 C 316 572

946 645 1173 F 1359 1273 1055

1527 1392 1322 J 1527 1281 1080 1604 1071 1701 1484 1245 1665 1215 1433 1611 1383 E

M 250 282 J 241 299 246 246 277 310 227 241 251 252 258 241 268 285 255 110 98 100 190 269 94 231 103 89 101 D 157 102 100 100 188 137 410 210 223 807 334 481 638 935 1237 1108 1548 1393 1693 1727 1530 1787 1853 1816 1925 1929 1834 J 1792 1998

A 1948 1780 1917 1902 1715 2009 2003 1981 1834 2028 1918

J 5

Z 364 400 43

356 366 398 348 402 359 415 360 365 383 4 315 377

364 335 372 341 357 268

195 338 287 146 221 296 124 168 242

J 139 193 329 443 523 160 885 668 605

846 1047 1328 43 0 1197 1678 1464 1893 1762 1535 2015 1742 6 1954 2113 1866 1668 2 2186 2107 16 2152 2330 2016 1512 2235 1420 2085 2104 2076

2125 2090 2174

2109 2092 2065 J 1 F 372 408 379 368 421 I 373 394 363 391 378 376 364 365 322 364 357 324

2 269 220

280 E 236 179 194 794 915 M 72 1044 1154 1350 I 1424 1626 1461 1647 1822 19 1785 1631 1709 1891 1661 2092 1704 2269 1720 1629 2212 1550 2077

D 2143 2150 1668 2090 2104 1919 2065 I 1998

B 7 4 1

0 5 5 1749 1874 1810 1712

2 1874 1754 1957 1794 2015 1797 1876

2029 1827

J 1936 1973 2026 1876 M 1

C

3 D 4 I C

I 2 I

M

C 3 M 1 G I I 0E 3 0100 0E C M I 0 J

4

1 F

H M 3 D

1

E

G

H

6 B

H

I

V M H 0

0

1 M

ES FERRED

1 M

D 1

_ IN RESOURCES

M 1 June 2014

1 1200 N 1200 2000 N 2000 N 1800 N 1600 N 1400 M

14-18 www.rpacan.com

DENSITY

Fresnillo performed 7,277 density measurements. The spacing and distribution of the measurements allows for density to be estimated throughout the block model for the Valdecañas veins. RPA used ID3, with a minimum of one and a maximum of five composites, to estimate block density. Table 14-5 compares the original density measurements with the results from the block model estimate. Blocks are in general slightly lower than the original measurements due to the spatially closer drill hole spacing in areas of higher grades, and higher density values.

TABLE 14-5 COMPARISON STATISTICS OF DENSITY MEASUREMENTS AND BLOCK ESTIMATES MAG Silver Corp. - Juanicipio Joint Venture

Sample Density Block Density V1E Minimum 2.05 2.12 Maximum 4.38 3.73 Arithmetic Mean 2.91 2.88 V1W Minimum 2.08 2.14 Maximum 4.85 3.33 Arithmetic Mean 2.83 2.79 V2W Minimum 2.29 2.50 Maximum 3.89 3.47 Arithmetic Mean 2.82 2.79 HW1 Minimum 2.24 2.28 Maximum 3.20 2.82 Arithmetic Mean 2.61 2.53 JV1 Minimum 2.30 2.39 Maximum 3.76 3.49 Arithmetic Mean 2.89 2.78

RPA tested weighting of the compositing and block grade estimate procedures. For deposits with a positive correlation between density and grade, density weighting can cause samples with higher densities have greater influence on the results. Results from RPA tests indicated

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-19 www.rpacan.com a minor difference between density-weighted and non-density-weighted results. RPA chose to not weight by density.

BLOCK MODEL

The GEMS block model is rotated 60o and is made up of 332 , 106 rows, and 88 levels for a total of 2,340,250 blocks. The model origin (lower-left corner at highest elevation) is at UTM coordinates 711,181.17 mE, 2,557,649 mN and 2,250 m elevation. Each block is 6 m wide, 12 m high, and 24 m along strike. A partial block model is used to manage blocks partially filled by mineralized rock types, including blocks along the edges of the deposit. A partial model has a parallel block model containing the percentage of mineralized rock types contained within each block. The block model contains the following information:

• domain identifiers with rock type;

• estimated grades of silver, gold, lead, and zinc inside the wireframe models;

• NSR estimates calculated from block grades and related economic and metallurgical assumptions;

• the percentage volume of each block within the mineralization wireframe models;

• tonnage factors, in tonnes per cubic metre;

• the distance to the closest composite used to interpolate the block grade; and

• the resource classification of each block.

NSR CUT-OFF VALUE

NSR factors were developed by RPA for the purposes of geological interpretation and resource reporting. NSR is the estimated value per tonne of mineralized material after allowance for metallurgical recovery and consideration of smelter terms, including payables, treatment charges, refining charges, price participation, penalties, smelter losses, transportation, and sales charges.

Input parameters used to develop the NSR factors have been derived from recent metallurgical test work on the Valdecañas Vein and smelter terms from comparable projects.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-20 www.rpacan.com

These assumptions are dependent on the processing scenario, and will be sensitive to changes in inputs from further metallurgical test work. Key assumptions are listed below:

• Metal prices: US$21.50 per ounce of silver US$1,250 per ounce of gold US$0.99 per pound of lead US$0.91 per pound of zinc

• Recoveries based on preliminary metallurgical testing: 81% Ag recovery to Pb concentrate 69% Au recovery to Pb concentrate 93% Pb recovery to Pb concentrate 7% Ag recovery to Zn concentrate 3% Au recovery to Zn concentrate 87.4% Zn recovery to Zn concentrate 6% Ag recovery to Fe concentrate 19% Au recovery to Fe concentrate

The net revenue from each metal was calculated and then divided by grade to generate an NSR factor. These NSR factors represent revenue (US$) per metal unit (per g/t Ag, for example), and are independent of resource grade. RPA used the following factors to calculate NSR: Ag: $0.51 per g/t Au: $30.11 per g/t Pb: $12.21 per % Zn: $9.07 per %

These NSR factors were multiplied by block grades to calculate an NSR value ($ per tonne) for each block in the block model, which was compared directly to unit operating costs required to mine that block. For the purposes of developing an NSR cut-off value, a total unit operating cost of US$70 per tonne milled was estimated, which includes mining, processing, and general and administrative expenses. The previous RPA Mineral Resource estimate was reported at a US$55 per tonne NSR cut-off value. The higher cut-off value used for the current estimate reflects the cost estimates provided in the 2012 PEA. Tonnage and grades are reported at multiple cut-offs in Table 14-8.

CLASSIFICATION

Definitions for resource categories used in this report are consistent with those defined by CIM (2010) and adopted by NI 43-101. In the CIM classification, a Mineral Resource is

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-21 www.rpacan.com defined as “a concentration or occurrence of natural, solid, inorganic or fossilized organic material in or on the Earth’s crust in such form and quantity and of such grade or quality that it has reasonable prospects for economic extraction”. Mineral Resources are classified into Measured, Indicated, and Inferred categories. A Mineral Reserve is defined as the “economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study”. Mineral Reserves are classified into Proven and Probable categories. No Mineral Reserves have been estimated for the Juanicipio property.

Mineral Resources were classified as Indicated or Inferred based on drill hole spacing and the apparent continuity of mineralization (Figure 14-12). The Indicated Resource in the V1E (eastern and central part of Valdecañas Vein system) displays good continuity of higher grade mineralization and is reasonably well established with drill holes spaced less than 100 m. The Hanging Wall Vein was classified as Indicated because of the good continuity at approximately 100 m drill hole spacing. A large, contiguous part of the V1W Vein was also classified as Indicated given the drill hole spacing and both geologic and grade continuity. A smaller portion of the V2W Vein was also classified as Indicated. The JV1 Vein was classified as Inferred.

Drill holes with documented low core recovery within the mineralized intercepts were reviewed, including holes IB, KE, M12, M16, M17, M22, M23, M40, M45, NG, and RD. Most of them were found to have comparable grades with the nearby holes. The area around hole M3 was downgraded to Inferred because of reported recovery issues in the mineralized intercept and a higher grade relative to surrounding drill holes.

MINERAL RESOURCE REPORTING

RPA estimated Mineral Resources for the Valdecañas and Juanicipio vein systems using drill hole data available as of December 31, 2013 (Table 14-6). At an NSR cut-off of US$70/t, Indicated Mineral Resources are estimated to total 10.1 million tonnes of 511 g/t Ag, 1.7 g/t Au, 1.9% Pb, and 3.5% Zn. Inferred Mineral Resources are estimated to total 5.1 million tonnes of 372 g/t Ag, 2.0 g/t Au, 1.8% Pb, and 2.8% Zn. The Mineral Resources are contained within the Valdecañas vein system and the Juanicipio Vein. The Mineral Resources include all blocks that are contained within a mineralized wireframe that has been clipped using a nominal cut-off grade of $70/tonne. Less than 3% of the total tonnage has a NSR value less than the cut-off value. This material was included as part of the Mineral

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-22 www.rpacan.com

Resource estimate to preserve the mineable continuity. There are no Mineral Reserves estimated on the property. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

The total contained metals in the Indicated Resource are 166 million ounces of silver, 544,000 ounces of gold, 419 million pounds of lead, and 778 million pounds of zinc. The Inferred Resource contains 61 million ounces of silver, 319,000 ounces of gold, 202 million pounds of lead, and 317 million pounds of zinc.

TABLE 14-6 JUANICIPIO JOINT VENTURE MINERAL RESOURCES (100% BASIS) – DECEMBER 31, 2013 MAG Silver Corp. - Juanicipio Joint Venture

Grade Contained Metal Classification/Vein Tonnage Ag Au Pb Zn Ag Au Pb Zn Vein Name (Mt) (g/t) (g/t) (%) (%) (Moz) (koz) (Mlb) (Mlb) INDICATED V1E 5.9 558 1.7 2.1 4.1 105 316 266 533 V1W 3.4 375 1.9 1.7 2.6 41 210 129 191 V2W 0.6 839 0.8 1.6 3.6 17 15 22 50 HW1 0.2 396 0.5 0.4 0.8 3 3 2 4 Total Indicated 10.1 511 1.7 1.9 3.5 166 544 419 778

INFERRED

V1E 0.7 531 2.2 1.6 3.5 11 48 24 52 V1W 2.5 245 2 2.4 3.2 20 159 133 182 V2W 0.7 415 0.9 1.6 2.2 9 21 25 34 JV1 1.2 530 2.4 0.8 1.9 20 91 20 50 Total Inferred 5.1 372 2.0 1.8 2.8 61 319 202 317

Notes: 1. CIM definitions were followed for the classification of Mineral Resources. 2. Mineral Resources are estimated at an incremental NSR cut-off value of US$70 per tonne 3. NSR values are calculated in US$ using factors of $0.57 per g/t Ag, $30.11 per g/t Au, $9.07 per % Pb, and $12.21 per % Zn. These factors are based on metal prices of $21.50/oz Ag, $1,250/oz Au, $0.91/lb Pb, and $0.99/lb Zn and estimated recoveries and smelter terms. 4. The Mineral Resource estimate uses drill hole data available as of December 31, 2013. 5. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. 6. Totals may not add correctly due to rounding.

The Valdecañas and Juanicipio veins display the vertical grade transition from upper silver rich zones to deep gold and base metal dominant areas that is typical of Fresnillo District veins and epithermal silver veins in general. The resource estimate was manually divided into the Bonanza Grade Silver Zone (BGS Zone) and the Deep Zone to reflect this vertical compositional zonation and highlight the definition of the Deep Zone (Table 14-7).

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-23 www.rpacan.com

TABLE 14-7 MINERAL RESOURCES BY METAL ZONE – DECEMBER 31, 2013 MAG Silver Corp. - Juanicipio Joint Venture

Zone Tonnage Ag Au Pb Zn Ag Au Pb Zn (Mt) (g/t) (g/t) (%) (%) (Moz) (koz) (Mlb) (Mlb) Bonanza Grade Silver Zone

Indicated 8.3 601 1.7 2.0 3.7 160 448 365 676 Inferred 2.4 626 1.9 1.4 2.2 48 146 74 114

Deep Zone

Indicated 1.8 93 1.7 1.4 2.6 5 97 54 102 Inferred 2.7 146 2.0 2.1 3.4 13 173 128 203 See Notes on Table 14-6.

Table 14-8 reports tonnage and grade by cut-off value and confirms that the deposit is relatively insensitive to NSR cut-off values up to US$100 per tonne.

TABLE 14-8 TONNAGE AND GRADE BY CUT-OFF – DECEMBER 31, 2013 MAG Silver Corp. - Juanicipio Joint Venture

Class/Cut-off Tonnage Ag Au Pb Zn (US$/t) (Mt) (g/t) (g/t) (%) (%) Indicated 200 6.9 694 1.9 2.4 4.3 150 8.1 612 1.8 2.2 4.0 100 9.1 559 1.7 2.0 3.8 70 10.1 511 1.7 1.9 3.5 Inferred 200 3.1 550 2.2 2.3 3.3 150 4.1 445 2.2 2.0 3.1 100 4.7 400 2.0 1.9 3.0 70 5.1 372 2.0 1.8 2.8 See Notes on Table 14-6.

MINERAL RESOURCE VALIDATION

RPA validated the block model by visual inspection, volumetric comparison, and swath plots. Visual comparison on vertical sections and plan views, and a series of swath plots found good overall correlation between the block grade estimates and supporting composite grades.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-24 www.rpacan.com

The estimated total volume of the wireframe models is 5,340,000 m3, while the volume of the block model at a zero grade cut-off is 5,340,200 m3. Results are listed by vein in Table 14-9.

TABLE 14-9 VOLUME COMPARISON MAG Silver Corp. - Juanicipio Joint Venture

Vein Volume Wireframes Volume Blocks (m3 x 1,000) (m3 x 1,000) V1E 2,262.0 2,262.1 V1W 2,097.3 2,097.3 V2W 472.3 472.3 HW1 88.3 88.3 JV1 420.1 420.1 Total 5,340.0 5,340.2

COMPARISON TO PREVIOUS ESTIMATE

Table 14-10 compares the current and previous estimates by RPA. The additional tonnage classified as Indicated is primarily due to recent drilling.

The decrease in silver grade for the Indicated Resources is due to several contributing factors. The current vein wireframes were modelled at a nominal true thickness of two metres, whereas the previously model used a 1.5 m minimum thickness. The wider minimum thickness was used to align with work in the 2012 PEA which incorporates a minimum two metre mining width. This effectively increases the tonnage, lowers the average grades, and increases the overall contained metal. The resource veins have a similar footprint as before, but with the addition of several deeper intercepts. The additional material with lower silver grades also contributed to lowering the overall silver grade. This effect was more notable for V1E, V1W, and HW1 Indicated Resources. Finally, the metal prices used in the NSR calculation have also been increased; however, this change may have been offset by using a higher cut-off NSR value.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-25 www.rpacan.com

TABLE 14-10 COMPARISON TO RPA 2011 RESOURCE ESTIMATE MAG Silver Corp. - Juanicipio Joint Venture

Grade Contained Metal Tonnage Ag Au Pb Zn Ag Au Pb Zn (Mt) (g/t) (g/t) (%) (%) (M oz) (k oz) (M lb) (M lb) Current Estimate

Indicated 10.1 511 1.7 1.9 3.5 165.7 544 419 778 Inferred 5.1 372 2.0 1.8 2.8 60.9 319 202 317 December 2011

Indicated 6.2 728 1.9 1.9 3.9 146 384 267 539 Inferred 7.1 373 1.6 1.5 2.6 85 370 236 400 Difference

Indicated 3.9 -217 -0.2 0.0 -0.4 19.7 160 152 239 Inferred -2.0 -1 0.4 0.3 0.2 -24.1 -51 -34 -83 Percent Difference

Indicated 63% -30% -12% -1% -10% 13% 42% 57% 44% Inferred -28% 0% 22% 20% 9% -28% -14% -14% -21%

See Notes on Table 14-6 with respect to current estimate.

RPA notes that the 2012 PEA was carried out using the block model and resource estimate created by Strathcona dated November 2011. Table 14-11 compares the current RPA estimate to 2011 Strathcona estimate used as the basis for the 2012 PEA. The differences in two estimates are primarily attributed to:

• The current database includes approximately 65 additional boreholes.

• RPA applied an NSR cut-off value that included Ag, Au, Pb, and Zn; whereas Strathcona used a straight silver cut-off grade of 100 g/t Ag. RPA’s resource estimate includes material grading less than 100 g/t Ag, but above an NSR value of $70/t which in addition to Ag, considers Au, Pb, and Zn. The material in the RPA estimate, but not included in the Strathcona estimate, is mostly located in the base metal rich zone towards the deeper part of the deposit.

• RPA included resources in the Hanging Wall Vein whereas Strathcona did not.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-26 www.rpacan.com

TABLE 14-11 COMPARISON OF RPA AND STRATHCONA RESULTS MAG Silver Corp. - Juanicipio Joint Venture

Tonnage Ag Au Pb Zn Ag Au Pb Zn

(Mt) (g/t) (g/t) (%) (%) (Moz) (koz) (lb) (lb) Strathcona June 2011 (PEA)

Indicated 5.7 702 1.9 2.2 4.2 129 348 276 528 Inferred 4.3 513 1.4 1.6 3.0 71 194 152 284 RPA (current)

Indicated 10.1 511 1.7 1.9 3.5 166 544 419 778 Inferred 5.1 372 2.0 1.8 2.8 61 319 202 317 Difference

Indicated 77% -27% -12% -14% -17% 29% 56% 51% 47% Inferred 18% -28% 39% 12% -6% -14% 65% 33% 11% See Notes on Table 14-6 with respect to current estimate.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 14-27 www.rpacan.com

15 MINERAL RESERVE ESTIMATE

There are currently no Mineral Reserves estimated at the project.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 15-1 www.rpacan.com

16 MINING METHODS

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas at el., 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

GEOTECHNICAL CONSIDERATIONS

Geotechnical assessments by AMC of the veins and the surrounding rock mass have been based on data collected by Minera Juanicipio and site inspections by AMC’s geotechnical consultant. The geotechnical data relates mainly to the Valdecañas Vein. No geotechnical data has been analyzed relating to the Inferred Mineral Resources in the Desprendido or Juanicipio veins.

ROCK CHARACTERIZATION Four geotechnical domains impacting on the mine design have been identified, corresponding to rock types: Tertiary volcanic rocks, Cretaceous sediments, veins, and faults.

The Tertiary volcanic rocks overlie the Cretaceous sediments, which host the veins across the majority of the project site, except for two surface outcrops located southwest of the Valdecañas Vein. The Tertiary volcanic rocks vary in thickness from zero to approximately 350 m, with an average thickness of 150 m to 200 m. Rock quality within the volcanic rocks varies greatly from extremely poor to good (based on derived Q values, Rock Quality Index, after Barton, Lien and Lunde, 1974). A conglomerate unit, immediately underlying the Tertiary volcanic rocks, typically consists of several metres of very poor quality rock with high fracture frequency and/or rubble zones, and is highly to completely weathered.

The Cretaceous sediments comprise predominantly sandstone, shale, and inter-bedded sandstone-shale lithologies. The sediments are also inter-bedded with andesite volcanic rocks. Unweathered Cretaceous sediments typically consist of good quality rocks with local zones of high fracture frequency, often associated with increased intensity of shale laminations. Rock quality in moderate to slightly weathered Cretaceous sediments is

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-1 www.rpacan.com typically poor to fair with localized zones of high fracture frequency, low RQD, and narrow rubble zones up to one metre wide, often associated with lithological contacts. Based on limited data, the depth of weathering appears to vary significantly across the site with the limit of weathering at depths of approximately 250 m in drill hole 28P, and 400 m in drill hole MH. Variation in rock quality in both the Tertiary volcanic rocks and the Cretaceous sediments may be associated, at least in part, with the degree of weathering.

Vein lithologies are characterized by typically good rock quality, but geotechnical data relating to the veins is extremely limited, with only 8.25 m of geotechnical logging and 164 m of RQD logging within the vein (including veinlets and stockworks).

Geotechnical logging of fault zones is limited and there is uncertainty regarding the nature and rock quality within the area formerly interpreted as the ID fault. Additional faults have been identified within the geological logging data, but there is limited geotechnical and RQD logging data in these zones, which generally appear to consist of zones of poor to fair rock quality up to several metres in width.

HYDROGEOLOGICAL ASSESSMENT Hydrogeological information on the project area has not yet been collected. The study assumes that the rock mass in the project area will be generally dry except in fault zones, which have been assumed to produce medium inflows.

STOPE STABILITY An assessment of stable stoping spans indicates that stopes with vertical heights of up to 60 m and strike lengths of 24 m will be stable, although hangingwall support using cable bolts will be required in some stopes.

DEVELOPMENT GROUND SUPPORT Ground support requirements for the study consider the calculated Q value of the rock mass and the proposed use of the excavation. The minimum recommended support standards incorporate surface support (mesh or a minimum 50 mm of shotcrete) in all permanent and long-term development drifts. Solid-bar, fully grouted, or resin encapsulated rock bolts are recommended in all declines and level accesses.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-2 www.rpacan.com

MINING METHOD

AMC has carried out a number of studies to identify suitable design strategies for the project. The studies include identification of the most suitable stoping method, production rate, backfilling method, access, and haulage method.

AMC has investigated the following stoping methods: • Down-hole benching with uncemented rockfill (modified Avoca) • Long-hole open stoping (LHOS) with cemented backfill • Cut-and-fill with uncemented backfill

Methods that provide high recovery and low dilution have a significant advantage over other methods that may be cheaper, but result in greater loss or dilution.

AMC considers that LHOS with cemented backfill is the most suitable method for the veins, mainly because of the higher recovery achievable using this method. LHOS with cemented backfill can be used in both steeply dipping and shallow dipping parts of the deposit, providing benefits of standardization of equipment and mining skills.

Dilution is likely to be significantly lower using the LHOS method than in the cut-and-fill method, mainly because of the amount of waste that must be mined with the latter method to accommodate the mining equipment in shallower dipping narrow stopes, and from mucking off a backfill floor. Mining recovery is expected to be similar.

Any of the three mining methods considered would be suitable in the steeply dipping parts of the vein (dipping at more than 55o). However, the LHOS method is expected to provide higher recovery than the other methods, mainly because of the ability to recover a greater percentage of the sill (crown) pillar, but also because mining losses from other sources are more easily managed with this method.

Dilution is anticipated to be similar to the modified Avoca method and less than the cut-and- fill method. The benefits of higher recovery are expected to more than offset the higher mining cost of the LHOS method. However, it may be more appropriate to use the Avoca method in some of the lower grade areas west of the ID fault. Both the LHOS and Avoca methods expose miners to less risk of rock falls than the cut-and-fill method.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-3 www.rpacan.com

The 2012 PEA considered a total mine life of 14.8 years.

PRODUCTION RATE

In AMC’s opinion, a nominal production rate of 0.85 Mtpa for the combined Valdecañas and Desprendido veins will be achievable. Production from the Juanicipio Vein has the potential to add a further 0.1 Mtpa bringing the overall project production rate to 0.95 Mtpa. The production rates envisaged are based on comparing the mineral resource tonnage within the potential mining areas with benchmark production rates from other operations. The strike length, dip, and thickness of the veins were also analyzed to assess their ability to support the proposed production rates.

BACKFILLING METHOD

The shallow dipping nature of large parts of the veins requires use of a flowable backfill type. Two types of backfill could potentially meet these requirements: • Cemented paste backfill, using the whole tailings size fraction.

• Cemented hydraulically placed backfill, using a coarse, self-draining fraction of the tailings stream.

The cemented paste fill method is proposed because paste fill has a higher instantaneous filling rate, and fill containment structures are easier and cheaper to construct. Greater consistency and predictability can also be achieved in the curing time and strength development of the fill. The metallurgical test work carried out to date indicates that the tailings will contain insufficient coarse particles to create a viable cemented hydraulic fill.

HAULAGE

A number of alternative methods have been considered for transferring ore and waste from the mine workings to surface: trucking, shaft hoisting, and conveying.

The trucking option has been selected on the basis of its lower up-front capital cost and lower overall net present cost. However there are relatively small cost differences between the options and the trucking option is sensitive to future increases in fuel and labour costs. In

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-4 www.rpacan.com

AMC’s opinion ongoing consideration is warranted on the option of constructing a hoisting shaft to a depth of about 450 m.

ACCESS DEVELOPMENT

A main access portal is proposed between the Valdecañas and Juanicipio veins in an area where the underlying sediments crop out at surface. From the portal, a main access decline would spiral down in the sediments before crosscutting to the footwall side of the Valdecañas and Desprendido veins. At the base of the spiral decline a branch would provide access to the Juanicipio Vein.

On October 28, 2013, the Juanicipio Joint Venture commenced the underground development at the Juanicipio project. To date, the entry portal, surface explosive magazines and associated infrastructure have been completed and the ramp decline has advanced primarily utilizing a continuous miner. MAG reports that in mid-March of 2014, the contractor hired by Fresnillo to construct the ramp decline on behalf of Minera Juanicipio, received its full explosives permit from the Mexican Ministry of Defense. Development of the Juanicipio ramp decline is now advancing with conventional drill and blast cycles as well as with the continuous miner.

The Valdecañas and Desprendido veins would be accessed by three sectional declines positioned in the footwall of the veins. Two declines are proposed on the eastern side of the ID fault and one on the western side. The declines would provide access to sublevels, spaced at 15 m intervals in the flatter dipping area to the east of the fault, and at 20 m intervals to the west of the fault.

VENTILATION

It is proposed that the main access decline and an intake air raise, positioned alongside, would provide the main intake airways. Air would be transferred to the footwall side of the Valdecañas and Desprendido veins via the access decline and a parallel intake airway. Exhaust air would be transferred back from the mining areas to a pair of exhaust raises also positioned close to the spiral decline. Separate intake and return raises are proposed for the Juanicipio Vein.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-5 www.rpacan.com

Axial flow ventilation fans would be installed at surface on top of the main exhaust raises. Based on the surface climatic conditions and the depth of the mine workings, no heating or cooling of the ventilating airflow is envisaged.

STOPING

It is envisaged that the veins would be divided into six stoping sections (three pairs) with each pair accessed by a decline. Access crosscuts from the declines to the veins would be positioned approximately in the centre of each pair of stoping sections to enable stope extraction to progress from the end of each stoping section to the central access. Each stoping section would have a maximum strike length of approximately 250 m.

It is envisaged that sill pillars would separate the stoping sections into a number of independently accessed stoping areas providing flexibility in production scheduling and simplifying ventilation, stope mucking, and truck loading arrangements.

Images of the proposed mine design are shown in Figures 16-1 and 16-2.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-6 www.rpacan.com

0205 500 750 100 0 Metres Figure 16-1

Mag Silver Corp. Juanicipio Joint Venture Zacatecas State, Mexico Plan of the Mine Development Layout June 2014 Source:AMC , 2012. 16-7 www.rpacan.com

Looking North W E

0205 500 750 100 0 Metres Figure 16-2

Mag Silver Corp. Juanicipio Joint Venture Zacatecas State, Mexico Sectional View of the Mine Development June 2014 Source:AMC , 2012. 16-8 www.rpacan.com

TONNAGE AND GRADE OF MATERIAL TO BE MINED AND MILLED

Table 16-1 shows the tonnage and grade of material to be mined and milled, which forms the basis of the 2012 PEA.

TABLE 16-1 TONNAGE OF MATERIAL MINED AND PROCESSED AS A BASIS FOR THE PRELIMINARY ECONOMIC ASSESSMENT MAG Silver Corp. - Juanicipio Joint Venture

Grade Contained Metal Million Au Ag Pb Zn Au Ag Pb Zn Tonnes (g/t) (g/t) (%) (%) (koz) (Moz) (Mlb) (Mlb) Material derived from 5.3 1.88 667 2.1 4.1 318 113 242 472 Indicated Resources Material derived from 4.9 1.46 408 1.6 2.9 230 65 169 311 Inferred Resources External dilution 0.2 1.80 209 1.8 3.0 9 1 6 11 Waste 3.0 0 0 0 0 0 0 0 0

Note: The tonnage and grades of the material mined and processed were derived from the 2011 Strathcona Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability

The tonnages and grades shown in Table 16-1 do not reflect the 2014 updated Mineral Resource estimate that includes 40 new infill diamond drill holes completed since the previous resource estimate, but rather have been derived from the Mineral Resource estimation and vein model prepared by Strathcona by applying a $65.00 NSR cut-off grade to the resource model and then allowing for dilution and mine and design losses. Metal prices used in the NSR calculation were US$1,210 per ounce gold, US$22.10 per ounce silver, US$0.94 per pound lead, and US$0.90 per pound zinc and an exchange rate of 12.50 Mexican pesos to one US dollar. The prices used were determined at the commencement of the study and differ slightly from those used in the 2012 PEA. The differences do not materially impact on the tonnage and grade of material used as a basis for the economic assessment.

In developing the tonnage and grade estimates, all stope blocks that were in contact with the Property boundaries were excluded and diluting material was assumed to have “zero” grade. It is noted that in practice, it is likely that the diluting material will contain some minor metal values.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-9 www.rpacan.com

Because the Juanicipio Vein is isolated from the Valdecañas and Desprendido veins, an assessment was carried out of the potential of the Juanicipio Vein to add value to the 2012 PEA. The study indicated that despite the relatively small Inferred Mineral Resource tonnage in the vein, there is a reasonable expectation that it might become economic if extracted together with the Valdecañas and Desprendido veins.

The design parameters including dilution and recovery, used to estimate the tonnage and grade of material, shown in Table 16-1 are summarized in Table 16-2. The recovery and dilution assumptions result in an overall silver recovery from the planned mining outlines of 93%. Dilution totals approximately 3 Mt or 29% of the material mined and milled.

TABLE 16-2 DESIGN ASSUMPTIONS MAG Silver Corp. - Juanicipio Joint Venture

Assumptions Value Design Parameters Stope strike length 24 m Vertical height of stope east of ID Fault and Juanicipio Vein 15 m Vertical height of stope west of ID Fault 20 m Minimum design mining width 2 m Dilution Estimates Approximate true thickness of overbreak added to stopes and crown pillars 1.0 m* Backfill dilution added to stopes and crown pillars 3% Recovery Estimates Recovery of diluted resources from development 100% Recovery of diluted resources from stopes 95% Recovery of diluted resources from crown pillars 65%

*Comprising a nominal dilution skin of 0.5 m on both the stope hangingwall and footwall.

UNDERGROUND MOBILE EQUIPMENT

The required underground mobile equipment fleet will vary over the life of the project. Table 16-3 shows the required fleet during the peak development and production period.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-10 www.rpacan.com

TABLE 16-3 UNDERGROUND MOBILE EQUIPMENT FLEET MAG Silver Corp. - Juanicipio Joint Venture

Equipment Units Indicative Type/Model

Scooptram 4 10 t Capacity/Sandvik LH410 Scooptram 2 20 t Capacity/Sandvik LH621 Haul truck 13 42 t Capacity/Sandvik TH540 Development jumbo 5 2 Boom/Sandvik DD420 Development bolter 3 Diesel-Electric/Sandvik DS310 C/D/E Production drill (long-hole) 3 51-89 mm/Atlas Copco SIMBA M4C Charge-up unit 3 Normet/Charmec 1605B Integrated tool carrier 6 CAT IT38H with bucket/basket/forks Grader 1 CAT 140M motor grader Boom truck 2 Getman A64 Knuckle/Boom Truck Toyota (man-carrier) 5 10 Person/ENS Personnel Carrier Toyota (flat deck) 2 1 t Capacity/ENS FDC Flat Deck Toyota (scissor lift) 3 1 t Capacity/ENS SL7C Scissor Lift Toyota (mechanics truck) 3 1T Capacity/ENS MT7 Mech. Truck Sprayer 3 4-19 m3/h Normet Spraymec 6050WP Transmixer 3 Locally supplied Water truck 1 Locally supplied

Six 15-person self-contained refuge stations together with mine rescue equipment, including self-contained breathing apparatus would be provided. It is envisaged that all persons working underground will carry a self-rescuer capable of protecting employees against exposure to carbon monoxide in the event of an underground fire.

UNDERGROUND SERVICES DEWATERING No provision has been included in the mine design for advance dewatering of the deposit or the overlying strata. To form a basis for the design of the mine pumping system, AMC has assumed a requirement to pump approximately 80 L/s from the Valdecañas/Desprendido area. It has been assumed that one third of this quantity will need to be pumped from the Juanicipio area.

A main pump chamber similar to that installed at the adjacent Saucito Mine is envisaged for the Valdecañas/Desprendido area. The pumps would be installed in a central position at the top of the deposit. Each sectional decline would be equipped with staged pumping systems,

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-11 www.rpacan.com which would be extended as the declines were developed. A number of submersible electric pumps would be used to remove water from the base of the sectional declines. A schematic of the proposed pumping system is shown in Figure 16-3. A similar staged pumping system is envisaged for the Juanicipio Vein.

The proposed staged pumping system comprises Mono type progressing cavity pumps, each complete with a water collection/storage tank, motor, and valves. It is envisaged that a staged pumping system comprising Mono type progressing cavity pumps, each complete with a water collection/storage tank, motor, and valves, will suffice for the Juanicipio area.

UNDERGROUND POWER DISTRIBUTION AND COMMUNICATIONS Power at 13.8 kV would be fed to the underground workings from isolating switchgear located at the portal site. The main supply cable would be installed in the intake raise or in a dedicated borehole. Switchgear will be installed at the base of the raise, and 13.8 kV cables will feed power via the access declines to main sub-stations constructed close to the main pump stations. At this point the voltage would be reduced to 4.16 kV. Power would then be distributed to the pump chamber and to sectional sub-stations positioned close to the sectional declines. Additional transformers and switchgear would be installed as required at suitable locations accessible from the sectional declines. Cables feeding these sub-stations would be routed down raises and boreholes to minimize cable lengths.

It is proposed that a fibre optic cable will provide video and data communication between key underground facilities and a control room on surface. Motor control centres in the pump stations would be monitored and controlled remotely. Video monitors would be installed at appropriate locations. Wireless radio communication would be provided to all underground equipment and to key personnel. Telephones would be installed at key locations.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-12 www.rpacan.com

Figure 16-3

Mag Silver Corp. Juanicipio Joint Venture Zacatecas State, Mexico Schematic of the Proposed Valdecañas/Desprendido Pumping System June 2014 Source:AMC , 2012. 16-13 www.rpacan.com

MAGAZINES Provision has been included in the mine design for a main underground magazine located at the top of the Valdecañas Vein, close to the exhaust airway. A small surface magazine for use during initial decline sinking has been constructed. MAG reports that it is fully approved by the relevant permitting agencies and the Mexican army. It is currently in use and will remain so until such time as the underground magazine can be constructed.

WORKSHOPS AND FUEL STORAGE Provision has been included in the design for an underground workshop located in the Valdecañas/Desprendido area. The workshop would be suitable for the daily and routine maintenance of scoops and drilling equipment. The workshop would be equipped with an overhead crane and wash-down bay, and be suitable for component change-out work, but would not be intended for major maintenance work. Equipment requiring significant maintenance work would be removed to surface.

To reduce the quantity of fuel and oils stored underground, it is envisaged that the truck fleet and the majority of utility vehicles will be fuelled on surface and maintained in a surface heavy equipment workshop. Only equipment not travelling to surface as part of their daily routine will be fuelled underground. It is proposed that a proprietary fuel delivery and storage system be installed underground. Fuel will be delivered underground from the surface fuel tanks in 2.5 kL modules. Underground fuel usage is estimated to be between 1.8 kL and 2.6 kL per day.

A simple maintenance bay and refuelling facility is proposed for the Juanicipio area.

UPDATE SINCE THE 2012 PEA

Minera Juanicipio began the development permitting process in the fall of 2012 and has since begun a variety of development studies. A hydrogeology (water management) study has been commenced. A geotechnical study has been completed with the assistance of Peñoles' (a related party of Fresnillo) Geotechnical & Construction Group, which has included a visit to the nearby Fresnillo Saucito operation in order to analyze rock quality in anticipation of stope preparation and development at Juanicipio.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-14 www.rpacan.com

Further work has been carried out in the development of the mine portal, which is now complete, and the development of the Juanicipio ramp decline is now advancing with conventional drill and blast cycles as well as with the continuous miner.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 16-15 www.rpacan.com

17 RECOVERY METHODS

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas, 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

PROCESSING PLANT AND OPERATIONS

The proposed process plant consists of a comminution circuit followed by the sequential flotation of a silver-rich lead concentrate, a zinc concentrate, and a gold-rich pyrite concentrate.

It is envisaged that run-of-mine (ROM) material will be delivered to a stockpile positioned near the underground mine portal prior to being reclaimed from the stockpile by front-end loader feeding a primary 1,000 mm x 760 mm jaw crusher. An 850 m long conveyor will transfer mill feed material from the crusher to a stockpile ahead of the mill.

The proposed milling circuit comprises a 1.0 MW semi-autogenous grinding (SAG) mill and a 3 MW ball mill, producing feed to the flotation circuit at 80% minus 40 µm. Separate lead, zinc, and pyrite concentrates would be thickened, filtered, and stockpiled for dispatch by road to customers.

It is envisaged that the process plant will commence operation at a throughput rate of 850,000 tpa which will be increased to 950,000 tpa when production from the Juanicipio Vein commences.

The proposed flowsheet is shown in Figure 17-1. The plant layout is shown in Figures 17-2 and 17-3.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 17-1 COMMUNICATION FLOTATION FILTRATION

ROM

Ore Pb Pb Pb Final Pb Conc. Pb Conc. Rghr- Clnrs Pressure Thickener Primary Scav. 3 Stage Filter Crushing

Coarse Ore Stockpile

Zn Zn Zn Final Zn Conc. Zn Conc. Rghr- Clnrs Pressure Thickener SAG Mill Scav. 3 Stage Filter

17-2

o/f 80% - 40µ Cyclones (two-stage) u/f 50% Gravity Concentration Py Py Py Conc. Py Conc. tails Conc. Rghr- Clnrs Thickener Treatment Ball Mill Scav. 2 Stage

To Pb Conc.

Figure 17-1 Tailings Thickener Mag Silver Corp. www.rpacan.com

Juanicipio Joint Venture Zacatecas State, Mexico Process Flow Sheet

June 2014 Source:AMC , 2012. 17-3

Figure 17-2

Mag Silver Corp. www.rpacan.com

Juanicipio Joint Venture Zacatecas State, Mexico Plant General Arrangement

June 2014 Source:AMC , 2012. 17-4

Figure 17-3

Mag Silver Corp. www.rpacan.com

Juanicipio Joint Venture 050100 150 200 Zacatecas State, Mexico Metres Plant Sections

June 2014 Source:AMC , 2012. www.rpacan.com

COMMINUTION It is envisaged that the ROM ore stockpile will be positioned near the underground mine portal with ore reclaimed from the stockpile by front-end loader. The design provides for ore to be fed via a 150-tonne capacity bin and apron feeder to the primary 1,000 mm x 760 mm jaw crusher. Crusher discharge would be via a sacrificial 30 m conveyor with tramp metal protection discharging onto the main 850 m long crushed ore conveyor to the crushed ore stockpile.

Ore withdrawn from the crushed ore stockpile through two reclaim apron feeders would be fed to the 1 MW SAG mill. The SAG mill discharges into the cyclone feed pump-box with slurry pumped to the cyclone classification stage, where the cyclone overflow at 80% minus 40 µm passes to the flotation circuit. The cyclone underflow would be gravity fed into the 3 MW ball mill. The ball mill discharge joins the SAG mill discharge to complete the mill closed circuit.

Although no gravity test work has been carried out, the design includes up to 50% of the cyclone underflow passing through a gravity circuit, based on a 30 in. Knelson concentrator. As well as gravity test work, the next stage of study should include additional comminution testing and simulation to better define the grinding circuit parameters and also to investigate the potential benefits of two-stage cyclone classification.

Reagent additions to the grinding circuit would consist of lime and soda ash for pH modification, as well as sodium cyanide, zinc sulphate, and sodium metabisulphite for pyrite depression, especially considering the possibility of soluble copper ions being present.

LEAD FLOTATION CIRCUIT The cyclone overflow would be fed to the lead rougher conditioning tank where flotation collectors would be added, specifically Aerofloat 31 and Aerofine 3481 to promote precious metal recovery, as well as Aerofloat 238 to enhance recovery of any precious metals associated with the very small amounts of copper in the ore. Final adjustment of the pH to 8.5 would also take place, with milk of lime addition to the conditioning tank.

The proposed lead circuit configuration consists of four rougher and two scavenger Outotec TC30 cells, followed by three stages of cleaning with three OK16s and two OK16s in the first

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 17-5 www.rpacan.com and second cleaners respectively, and four OK3s in the third cleaners. Additional flotation collector and modifier/depressant dosing would take place in the cleaner conditioning tank as well as in each cleaner stage as required.

Cleaner tails and scavenger concentrate would be returned to the head of the circuit.

Final lead concentrate would be thickened in a conventional five metre diameter thickener and then filtered in a Larox PF 12.5/16 MI 60 pressure filter. Because of the high silver content of the concentrate, fine solids lost in the thickener overflow would be recovered in a plate and frame pressure filter. To ensure that concentrate handling capacity does not become a bottleneck, future studies should consider installing the same size pressure filter (Larox PF 22/25) as proposed for the zinc (and pyrite) circuit. The additional capital cost would be less than $200,000, offset to some extent by the benefit derived from commonality of spares.

ZINC FLOTATION CIRCUIT The lead scavenger tails would be pumped to the zinc rougher conditioning tank where sphalerite would be activated with copper sulphate solution and the pH increased with lime to 10.5.

The proposed zinc circuit configuration is identical to the lead circuit, except that the third cleaners would comprise five OK3 cells.

Final zinc concentrate would be thickened in a conventional five metre diameter thickener and then filtered in a Larox PF 22/25 MI 60 pressure filter.

PYRITE FLOTATION CIRCUIT The zinc scavenger tails would be pumped to the pyrite rougher conditioning tank where potassium amyl xanthate would be added to maximise pyrite (and gold) recovery.

Pyrite rougher and scavenger configuration would be similar to the lead and zinc circuits, but only two stages of cleaning are proposed with three OK16s and two OK16s in the first and second cleaners respectively.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 17-6 www.rpacan.com

In the pyrite concentrate treatment circuit, the final pyrite concentrate would be thickened and filtered in an identical fashion to the zinc concentrate.

CONCENTRATE STORAGE AND LOAD-OUT Concentrate discharged from the pressure filters would be stored in separate covered storage areas awaiting load-out to trucks. It is envisaged that concentrates would either be trucked directly to a smelter in Mexico or transferred at a railhead for on-shipment to offshore customers.

REAGENTS AND SERVICES The reagent storage and mixing facilities are mainly designed around the receipt, handling, and mixing of flotation collectors and modifiers/depressants in one-tonne bags/boxes or 220 L drums, with the exception of hydrated lime, the silo for which is assumed to be vendor supplied.

Services will include flotation blowers, plant air and instrument compressors, raw and process water pumps.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 17-7 www.rpacan.com

18 PROJECT INFRASTRUCTURE

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas, 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

SITE LAYOUT

A concept has been developed for the site layout. Because of the topography, the mill complex is separated from the proposed portal area and mine offices by a distance of approximately 600 m. As a consequence, offices and other facilities serving the mine and mill have been separated into two areas. The proposed site layout is shown in Figure 18-1.

ACCESS ROAD

The proposed access road to the site is shown in Table 18-1. The road has a length of approximately 9.8 km, of which approximately 2.5 km will need to be constructed over relatively flat terrain. The remaining 7.2 km will traverse hilly terrain with some steep grades. It is envisaged that the road will be a two-lane unsealed road suitable for use by heavy vehicles hauling concentrates.

POWER SUPPLY

Power would be supplied to a main substation at the site via a 115 kV overhead power line from an existing power line and substation located to the north of the Property. The line would have a length of approximately 5.2 km and a step-down transformer would be installed midway along the line to supply a branch line to the tailings storage facility (TSF). Overhead lines at 13.8 kV would deliver power to the mill, crusher, the mine portal area, and to the workshop and offices. Step down transformers and control switch gear would be positioned at these locations as required. An overhead line at 4.6 kV would transfer power to the surface ventilation fan at the Juanicipio exhaust shaft.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 18-1 N

18-2

Figure 18-1

Property Boundary Return Air Shaft Waste Dump Mag Silver Corp. www.rpacan.com Roads Ore Stockpile Dam Wall Fresh Air Shaft Main Buildings Juanicipio Joint Venture Zacatecas State, Mexico 0100200 300 400 Site Layout Concept Metres

June 2014 Source:AMC , 2012. www.rpacan.com

The estimated power demand for the site is shown in Table 18-1.

TABLE 18-1 ESTIMATED SITE POWER DEMAND MAG Silver Corp. - Juanicipio Joint Venture

Total Installed Power Overall load Average load GWh per Purpose (kW) factor (kW) annum Mine Ventilation 1,750 90% 1,575 13.8 Mine Dewatering 4,280 44% 1,883 16.5 Other Underground 2,866 65% 1,863 16.3 Mill 8,163 78% 6,367 55.8 Infrastructure 300 65% 195 1.7 Total 17,359 68% 11,883 104 *Includes compressors, secondary ventilation fans and mobile equipment

WATER SUPPLY

Three water catchment dams have been planned for the site. The dams would be used to store water from the mine dewatering system and from rainfall. It has been assumed that sufficient water will be obtained from these sources to meet the project’s process and potable water requirements. This assumption is dependent on the findings of a hydrogeological study to be carried out during further studies. It is proposed that potable water be supplied by a water treatment plant using water from the mine dewatering system.

The estimated water usage for the project is shown in Table 18-2.

TABLE 18-2 ESTIMATE OF SITE WATER USAGE MAG Silver Corp. - Juanicipio Joint Venture

Water Usage ML per annum Process plant (0.7 kL/t processed) 595 Potable water 26 Mine 252 Other surface uses 100 Total 973

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 18-3 www.rpacan.com

STOCKPILES

A ROM ore stockpile has been designed to provide a buffer between the mine and mill. A maximum capacity of 150,000 t may be required prior to mill commissioning. After mill commissioning, the ore stockpile is not expected to exceed 50,000 t.

A total of approximately 4.2 Mt of waste rock is expected to be produced over the mine life. It is envisaged that waste rock produced during the initial development period will be used for road and tailings dam construction. Later in the mine life, a portion of the waste produced will be backfilled to stopes and worked out areas. Waste rock dumps have been designed near the portal and to the east of the mill site.

PASTE FILL PLANT

It is proposed that a vacuum filtration plant will be located next to the mine portal to dewater the cycloned tailings pumped from the tailings thickener located at the concentrator. It is expected that approximately 47% of the tailings will be dewatered to a filter cake consistency of approximately 80-85% solids w/w for paste fill production. The dewatered tailings will be fed to a mixing plant that will continuously mix the dewatered tailings with cement and water to create a paste fill that is discharged into a feed hopper. It is proposed that cemented pastefill will be delivered from the feed hopper to one of two 250 mm diameter boreholes for delivery underground. Surplus water from the paste fill plant will be returned to the process water tank at the concentrator.

TAILINGS STORAGE

It is envisaged that tailings not required for pastefill (approximately 53%) will be discharged to a TSF with a total volume of approximately 5 Mm3. Several sites have been considered, including a location in a valley adjacent to the proposed mine and mill site.

Following a brief site inspection of the valley and discussions with personnel from Minera Juanicipio, a potential five million cubic metres tailings storage facility (TSF) site was identified on relatively flat lying land to the northeast of the project site, close to the proposed access road from the Joint Venture area to the regional highway. The Joint Venture has purchased 125 ha of relatively flat-lying land suitable and adequate for the proposed five

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 18-4 www.rpacan.com million cubic metres TSF. The detailed environmental and geotechnical studies for this TSF site have been outlined but are yet to be carried out on the site.

A turkey’s nest construction is envisaged with materials, including clays, for the construction of the dam walls sourced from within the dam and from mine development waste. It is envisaged that the dam would be lined with locally sourced clays, or if necessary a high density polyethylene (HDPE) liner. Because of the high evaporation rate in the region and the plan to pump thickened tailings to the dam, no water reclaim facility has been included in the design. The proposed design has the capacity to hold approximately 5 Mm3 of tailings. The concept design of the facility is shown in Figure 18-2.

It is envisaged that tailings will be delivered to the TSF by a 200 mm inside diameter HDPE pipe installed in a suitable spillage containment ditch alongside the mine access road. A total pipe length of approximately seven kilometres will be required. The TSF will be fenced and provided with security equipment.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 18-5 Cross Section

Volume ~55.0 Mm³

380 m Section through wall

18-6

5.00 2 1

25.00 640 m Original surface

Dam enclosure ~60 ha

Figure 18-2

Mag Silver Corp. www.rpacan.com Juanicipio Joint Venture Zacatecas State, Mexico Concept Design of Tailings Storage Facility June 2014 Source:AMC , 2012. www.rpacan.com

OTHER SURFACE FACILITIES

OFFICES AND CHANGE HOUSE It is envisaged that an office complex located close to the concentrator will accommodate the metallurgical staff, project administration staff, and the site laboratory.

A mine office complex is proposed to accommodate mine engineering staff, geology staff, mining supervisors, and maintenance supervisors. The facility would be air conditioned and equipped with individual offices, a computer room, kitchenette, restrooms, and meeting rooms. Extensions to the office complex would accommodate a mine control room, the mine cap-lamp room, a small first aid room, and a mine rescue station.

A change room and shower facility is proposed to service the mining and maintenance crews. The building will include fresh water showers, toilets, individual lockers, changing areas, and dry basket storage for each person’s clothes and personal equipment.

WORKSHOPS AND FUEL STORAGE A fixed plant maintenance workshop and warehouse facility would be attached to the mill building. The building would also house a small change room and other facilities for the mill operating personnel.

A surface shop would be constructed to facilitate all major and minor mobile fleet repairs. It is expected that equipment which regularly exits the mine, such as the haulage fleet and light vehicles, would be serviced at the surface shop, while equipment such as production scoops, jumbos, and production drills would generally be serviced in the underground workshop. All major overhauls and large component change-outs would be performed in the surface shop.

The shop is envisaged to be a five bay configuration with provisions for a pit in one of the bays and a 10-tonne overhead crane. It is anticipated that one bay would be allocated to tire change-outs, two to lubrication and routine service, and two to general repair work.

A small secure warehouse holding spare parts for mine equipment will be attached to the workshop.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 18-7 www.rpacan.com

It is anticipated that a dedicated light vehicle workshop will be constructed as a separate building and will provide appropriate space and equipment for two light vehicles to be maintained simultaneously.

A 110 kL fuel storage and dispensing facility is proposed. This will allow for approximately ten days fuel storage during normal operations. The tank is planned to be a double-walled tank installed in combination with appropriate pumps, emergency shut-off mechanisms, concrete containment area, and fire suppression equipment.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 18-8 www.rpacan.com

19 MARKET STUDIES AND CONTRACTS

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas, 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

METAL PRICES

Project economics have been analyzed using the following metal prices which are based on the three year trailing average prices to the year ending December 2011 as reported by the Bank of Montreal (MacInnis, 2012). It has been assumed that the prices remain stable over the project life. • Silver price = $23.39/oz • Gold price = $1,257/oz • Lead price = $0.95/lb • Zinc price = $0.91/lb

MARKETING

No detailed market studies have been undertaken at this stage of the project.

It is envisaged that silver-rich zinc concentrate will be sold primarily to smelters in the Asian region. Lead concentrate could potentially be sold to a smelter in Mexico or exported to offshore smelters. If sold to a local smelter, transport costs would be reduced, but it is reasonable to anticipate that these savings would need to be shared with the smelter.

Treatment terms for lead and zinc concentrates used to estimate revenue have been advised by Neil S. Seldon & Associates Ltd (NSA, 2012) and are shown in Tables 19-1 and 19-2. Both lead and zinc concentrates are expected to incur minor treatment penalties for impurities. The Qualified Person responsible for Section 19 has reviewed the advice and the supporting study by NSA and accepts responsibility for use in this report of the treatment terms set out in Tables 19-1 and 19-2.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 19-1 www.rpacan.com

TABLE 19-1 LEAD CONCENTRATE TREATMENT TERMS MAG Silver Corp. - Juanicipio Joint Venture

Treatment Term Value Gold payment terms (% of contained metal in concentrate) 95% Minimum deduction from gold grade 1.0 g Silver payment terms (% of contained metal in concentrate) 95% Minimum deduction from silver grade 50 g Lead payment terms (% of contained metal in concentrate) 95% Minimum deduction from lead concentrate grade 3 units Lead concentrate treatment charge $270/dmt Deduction for penalty elements (per tonne of concentrate) $9.07/dmt Price participation - threshold price per tonne of lead metal in concentrate $2,000/t Price participation for each dollar the metal price is below threshold price $0.04/dmt Price participation for each dollar the metal price is above threshold price $0.06/dmt Gold refining charge applied to payable gold metal $7.00/oz Silver refining charge (% of silver price) applied to payable silver metal 4%

TABLE 19-2 ZINC CONCENTRATE TREATMENT TERMS MAG Silver Corp. - Juanicipio Joint Venture

Treatment Term Value Minimum deduction from gold grade 1.0 g Silver payment terms (% of contained metal in concentrate) 75% Minimum deduction from contained silver in concentrate 3 oz Zinc payment terms (% of contained metal in concentrate) 85% Minimum deduction from zinc concentrate grade 8 units Zinc concentrate treatment charge $245/dmt Deduction for penalty elements (per tonne of concentrate) $2.31/dmt Price participation - threshold price per tonne of zinc metal in concentrate $2,500/t Price participation for each dollar the metal price is below threshold price $0.04/dmt Price participation for each dollar the metal price is above threshold price $0.06/dmt Gold refining charge applied to payable gold metal – Silver refining charge (% of silver price) applied to payable silver metal 0%

Assumed concentrate transport costs are shown in Table 19-3.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 19-2 www.rpacan.com

TABLE 19-3 CONCENTRATE TRANSPORT COSTS MAG Silver Corp. - Juanicipio Joint Venture

Transport Cost Value Lead concentrate moisture content 11% Zinc concentrate moisture content 10% Concentrate transport cost (assumes lead and zinc concentrates $125/wmt are sold to offshore smelters)

The pyrite concentrate is expected to be of relatively low value (3 g/t Au, 225 g/t Ag). Three marketing options are possible for this material:

1. Sale to the Chinese market. 2. Sale to a Mexican smelter. 3. Process the concentrate in an as yet to be built local treatment facility.

Option 1 involves selling into a currently receptive market but is likely to provide a low return because of the high freight costs. Option 2 would reduce the impact of freight costs, but payable metal values are expected to be at the low end of the range. Option 3 would require the establishment of a custom leach treatment facility, possibly designed to also process pyrite concentrates from other mining operations in the Fresnillo District.

AMC's best estimate of payable metal in pyrite concentrate is 60% for both gold and silver.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 19-3 www.rpacan.com

20 ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas, 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

No environmental investigations or studies have yet been carried out on the areas likely to be disturbed by the proposed project. A mine closure plan has not yet been developed.

The project area is located in a region that hosts a number of significant mining operations where the community is accustomed to mining activities. AMC is not aware of any environmental permitting or licensing requirements to which the Property will be subject, other than the normal permitting and licensing requirements as set forth by the Mexican Government prior to undertaking mine development and operations.

The key permits and licences likely to be required by the project are: • Land Purchasing by Minera Juanicipio.

• Environmental Impact Assessment Report required by the Environmental Authority.

• Land Use Change Authorization by the Environmental Authority.

• Justifying Technical Study required by the Environmental Authority.

MAG reports that the operator, Fresnillo, has obtained all the required licences and permits needed for the ramp, access roads and mill site preparation, and is in the process of applying for any additional licences and permits required for production and milling.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 20-1 www.rpacan.com

21 CAPITAL AND OPERATING COSTS

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas, 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

In RPA’s opinion, the assumptions used in the 2012 PEA remain reasonable.

CAPITAL COSTS

Capital expenditure estimates have been prepared for both project and sustaining capital. Project capital has been defined as capital expenditure prior to first concentrate production and occurs in Years 1 to 4. Sustaining capital is subsequent capital expenditure for ongoing mine development and equipment replacement. As development of the Juanicipio Vein is envisaged to take place after Year 4, the cost of developing the vein is included in sustaining capital.

An estimate of the total capital expenditure requirement is shown in Table 21-1. The project capital is estimated at $302M, inclusive of capitalized operating costs (costs usually related to the operation of the mine, but incurred prior to first concentrate production). Sustaining capital of $267M results mainly from the need for ongoing mine development after concentrate production commences, and the need for mobile equipment replacements over the mine life.

TABLE 21-1 SUMMARY CAPITAL COSTS MAG Silver Corp. - Juanicipio Joint Venture

Capital Type ($M) Area Project Sustaining Total Mine 102 234 337 Mill 58 16 74 Infrastructure 34 16 50 Indirects (incl. owners costs and EPCM) 77 <1 77 Contingency 31 – 31 Total 302 267 569

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-1 www.rpacan.com

MINE CAPITAL COSTS Underground mine capital costs have been estimated based on the following methodology: • All underground development, excluding ore development, has been capitalized.

• Quantities and sizes of mobile fleet and capital installations are based on the design concepts outlined in this report.

• Unit costs of equipment and installations have been sourced from suppliers. Where supplier’s quotes were not available, recent costs from comparable projects have been used.

• The installations and mobile equipment required to support the underground mine have been scheduled to match the mine development schedule.

A breakdown of the direct costs of mine development is shown in Table 21-2.

TABLE 21-2 MINE CAPITAL COSTS (DIRECT COSTS) MAG Silver Corp. - Juanicipio Joint Venture

Capital Type ($M) Area Project Sustaining Total Underground excavations 37.2 133.4 170.7 Underground mobile equipment 30.1 66.1 96.2 Mine dewatering 7.0 11.4 18.4 Ventilation 5.5 5.3 10.3 Underground Power supply & distribution 3.0 4.0 7.0 Underground Infrastructure 2.5 4.9 7.4 Paste fill plant and distribution system 11.1 6.5 17.6 Drilling (geotech, exploration & service holes) 5.2 0.9 6.1 Safety 1.3 1.8 3.1 Total 102.3 234.4 336.8

MILL CAPITAL COSTS Mill capital costs have been estimated using the following methodology: • Detailed equipment list per section down to the level of pumps, etc.

• Vendor quotes for major equipment items with sizing based on the design criteria cited, and mass balance calculated for main flows.

• Comparable project estimates for common items e.g. bins, chutes, etc.

• Factors for process piping, platforms and walkways, and electrics/instrumentation.

• Average steel cost of $3,120 per tonne.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-2 www.rpacan.com

• Concrete cost of $520 per tonne.

• Mill capital costs were scheduled based on a two year construction period, with a 10% initial deposit on equipment and a standard “S-curve” spend profile thereafter.

• Mill sustaining capital costs were grouped together as an allowance under “General” at 1% of total mill project capital.

• Project capital cost of surface mobile fleet supporting the mill has been included under Infrastructure.

Table 21-3 shows a breakdown of the direct capital costs for the mill.

TABLE 21-3 MILL CAPITAL COSTS (DIRECT COSTS) MAG Silver Corp. - Juanicipio Joint Venture

Capital Type ($M) Area Project Sustaining Total Crushing 3.7 0.8 4.5 Grinding 11.6 2.5 14.2 Flotation 29.6 6.4 36.0 Reagents 1.0 0.2 1.3 Tailings 2.6 0.6 3.1 Services 3.4 0.7 4.1 Infrastructure 4.3 0.9 5.2 Mill upgrade to 950 ktpa - 2.4 2.4 Mobile equipment 1.5 1.5 2.9 Total 57.7 16.1 73.7

INFRASTRUCTURE CAPITAL COSTS The capital costs of general mine infrastructure have been estimated using the following methodology: • Quantities and sizes of capital installations are based on the design concepts described in this report.

• Unit costs of installations have been sourced from suppliers. Where supplier’s quotes were not available, recent costs from comparable projects have been used.

• Infrastructure capital costs have been scheduled to match the requirements of the mine development schedule and the mill construction schedule.

• No provision has been made for the sale of assets at the end of the mine life. It is assumed that income from the sale of assets would offset the cost of site rehabilitation.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-3 www.rpacan.com

Table 21-4 shows a breakdown of the direct capital cost of project infrastructure.

TABLE 21-4 INFRASTRUCTURE CAPITAL COSTS (DIRECT COSTS) MAG Silver Corp. - Juanicipio Joint Venture

Capital Type ($M) Area Project Sustaining Total Surface mobile equipment 1.3 2.7 4.0 Surface buildings and infrastructure 5.8 2.6 8.3 Water supply 5.2 1.9 7.1 Power supply and site distribution 4.9 1.6 6.4 Technical services 0.4 1.1 1.6 Earthworks 3.0 0.1 3.1 Tailings storage facility and pipeline 13.6 6.3 19.9 Total 34.2 16.2 50.5

INDIRECT CAPITAL COSTS Indirect costs are those relating to engineering, procurement, and construction management (EPCM), the costs associated with servicing and maintaining the mine during the construction period, and operating costs incurred prior to first concentrate production.

Indirect capital costs have been estimated using the following methodology: • The cost of freight and where appropriate the costs associated with importation of goods have been included in the direct costs.

• Management, supervisors, and engineering staff required to engineer and manage the mining of the excavations and much of the general underground construction work have been included in the manpower estimates and are allowed for under “Capitalized Opex (Mine)” and “Capitalized Opex (G&A)”.

• It is envisaged that the majority of spare parts for mobile equipment will be held on a consignment stock basis by equipment suppliers. Only a minor allowance has been included for first fills and spares for the underground mine.

• Indirect costs for the mill have been calculated as a percentage of the direct costs as follows: o Feasibility study and EPCM costs: 16.3%. o First fills and spares: 7%. o Other costs: approximately 2%. o Owner’s costs: 10%.

Table 21-5 shows the summary of indirect capital costs.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-4 www.rpacan.com

TABLE 21-5 INDIRECT CAPITAL COST SUMMARY MAG Silver Corp. - Juanicipio Joint Venture

Indirect Costs ($M) Owners Costs 18.9 EPCM 15.9 Capitalized Opex (Mine) 32.6 Capitalized Opex (G&A) 9.0 Total 76.4

Totals do not necessarily equal the sum of the components due to rounding adjustments

Details of the Owners and EPCM costs are shown in Table 21-6.

TABLE 21-6 OWNERS AND EPCM COSTS MAG Silver Corp. - Juanicipio Joint Venture

Description $(M) Feasibility study 1.6 Environmental studies 0.4 Land acquisition for road, TSF, powerline etc.) 2.1 Permitting and legal fees 0.5 General owners costs (Mine) 3.9 General owners costs (Mill) - including first fill 10.6 Total owners costs 18.9 Mine EPCM 2.1 Mill EPCM 9.2 Infrastructure EPCM 3.1 Temporary mine construction facilities 1.6 Total EPCM costs 15.9

Details of capitalized operating costs are shown in Table 21-7.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-5 www.rpacan.com

TABLE 21-7 DETAILS OF CAPITALIZED OPERATING COSTS MAG Silver Corp. - Juanicipio Joint Venture

Mine Development ($M) Ore development 3.3 Stoping - drill and blast 0.1 Production mucking <0.1 Ore trucking 0.6 Production ground support <0.1 General mine services 11.6 Power 4.8 Mine management and technical services 12.0 Total 32.6 G&A

Site Administration 1.0 Safety and Environment 1.2 Human Resources 1.1 Finance and Purchasing 2.3 General Maintenance 3.0 Power - G&A 0.4 Total 9.0

CAPITAL CONTINGENCY Contingency amounts are shown in Table 21-8. The amounts are based on percentages applied to individual detailed line items. Weighted average contingencies applied to project capital costs are mine 9%, mill 20%, and infrastructure 23%.

TABLE 21-8 CAPITAL CONTINGENCY MAG Silver Corp. - Juanicipio Joint Venture

Contingency ($M) Mine 8.8 Mill 11.3 Infrastructure 7.9 Indirect costs 3.3 Total 31.4

OPERATING COSTS

All expenditure, other than capital expenditure, taking place after the commencement of concentrate production, has been classified as operating expenditure. All mining activities,

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-6 www.rpacan.com including the development of ore drives, have been included in the operating cost estimate. The mining of drawpoints and other waste development have been included in either project or sustaining capital.

Total LOM site operating cost is shown in Table 21-9, and graphically in Figure 21-1.

TABLE 21-9 SUMMARY OF LIFE-OF-MINE SITE OPERATING COSTS MAG Silver Corp. - Juanicipio Joint Venture

Department ($M) Mine 585 Mill 255 G&A 46 Total 886

FIGURE 21-1 SCHEDULE OF SITE OPERATING COSTS

Unit site operating costs have been estimated at $67/t milled. The cost breakdown is shown in Table 21-10.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-7 www.rpacan.com

TABLE 21-10 OPERATING COSTS PER TONNE MILLED MAG Silver Corp. - Juanicipio Joint Venture

Area $M Mine 43.92 Mill 19.18 G&A 3.46 Total 66.56

MINE OPERATING COST Mine operating costs have been estimated using the following methodology: • Detailed first principles estimates were made of the unit costs for mining activities; including backfill, ore development, stope support, production mucking, production trucking, stope drilling, and stope blasting. The unit costs include operating labour (up to, but excluding shift supervision), maintenance labour, equipment maintenance, fuel, and power. The unit costs were then multiplied by the scheduled quantities of each activity.

• Mine management and technical services costs have been estimated from a detailed labour schedule and the labour rates shown in Table 2-11. An allowance has been included in the overall management and technical services costs to cover the cost of materials and consumables used under this cost centre.

• General mine services costs have been based on a schedule of the service personnel required multiplied by the appropriate labour rates. Consumables and materials costs within the general mine services cost centre have been estimated by applying factors to the labour cost and to the capital purchases within the mine services area.

• Mine power consumption was estimated based on underground activities and the estimate of installed power of electrical equipment.

TABLE 21-11 AVERAGE TOTAL EMPLOYMENT COSTS PER PERSON PER YEAR MAG Silver Corp. - Juanicipio Joint Venture

Annual Employment Cost Category ($) Miners 18,000 Mill Operators 17,000 Tradesmen 22,500 Supervision 67,500 Professionals 90,000 Senior Management 170,000

Mine operating costs incurred prior to first concentrate production have been capitalized as owner’s costs.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-8 www.rpacan.com

Table 21-12 shows a summary of the LOM mine operating cost by activity and the unit cost per tonne mined. The costs exclude tonnages mined and costs incurred prior to the mill startup.

TABLE 21-12 LIFE-OF-MINE UNDERGROUND MINE OPERATING COSTS MAG Silver Corp. - Juanicipio Joint Venture

LOM Operating Cost Area $M $/t Ore development 81 6.14 Stoping - drill and blast 84 6.39 Production mucking 24 1.82 Ore trucking 100 7.60 Backfilling 73 5.58 Production ground support 22 1.64 General mine services 83 6.30 Power 57 4.36 Mine management and technical services 61 4.66 Total 585 44.50

MILL OPERATING COST Mill operating costs have been prepared based on the estimated unit costs per tonne milled for reagents, consumables, and power. Labour costs have been based on a detailed labour schedule and the appropriate labour rates. Maintenance costs have been based on 2% of mill capital. A total of $0.624M per annum has been added to cover miscellaneous costs.

Table 21-13 shows the total LOM mill operating costs together with the unit cost per tonne milled.

TABLE 21-13 LIFE-OF-MINE MILL OPERATING COSTS MAG Silver Corp. - Juanicipio Joint Venture

LOM Mill Cost Area $M $/t Stockpile reclaim 0.2 0.01 Power - (mill) 72.4 5.44 Steel liners and media 27.5 2.06 Reagents 83.2 6.25 Wages and salaries 40.7 3.06 Maintenance (per capital cost) 22.1 1.66 Other fixed 9.3 0.70 Total 255.3 19.18

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-9 www.rpacan.com

GENERAL AND ADMINISTRATION OPERATING COST General and administration (G&A) costs have been estimated at $3.46 per tonne milled using the following methodology: • Site administration, safety and environment, human resources, financing, and purchasing have been estimated by developing a labour schedule and applying the appropriate unit labour costs. An allowance has been made to cover materials and consumables used by these departments.

• General services and maintenance costs have been estimated by applying a factor to the cost of capital purchases for infrastructure.

• Power consumption has been estimated based on the installed power of electrical equipment.

Operating costs incurred prior to first concentrate production have been capitalized as owner’s costs.

Table 21-14 shows the total LOM G&A costs.

TABLE 21-14 LIFE-OF-MINE GENERAL AND ADMINISTRATION OPERATING COSTS MAG Silver Corp. - Juanicipio Joint Venture

LOM G&A Cost Area $M $/t Site administration 4.4 0.33 Safety and environment 4.8 0.36 Human resources 4.5 0.33 Finance and purchasing 14.4 1.08 General services & maintenance 15.8 1.19 Power - (G&A) 2.3 0.17 Total 46.1 3.46

POWER Estimated annual power costs for each of the major activities during the main operating period are summarized in Table 21-15. Costs have been based on an assumed unit cost of $0.0936 /kWh. The total power cost represents approximately 16% of the site operating cost.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-10 www.rpacan.com

TABLE 21-15 ESTIMATED ANNUAL POWER COSTS (YEAR 10) MAG Silver Corp. - Juanicipio Joint Venture

Cost Centre $(000) Mine 4.4 Mill 5.2 G&A 0.2 Total 9.7

LABOUR The estimated number of employees in each area of the operation is shown in Table 21-16. Staffing levels are expected to peak in Year 7 and remain at approximately 500 for three years. Staffing levels are expected to drop progressively from Year 10 as underground development reduces.

TABLE 21-16 ESTIMATED EMPLOYEE NUMBERS MAG Silver Corp. - Juanicipio Joint Venture

Mining Mill YEAR Mgt & Tech G&A Total Operations Maint’ce Mill Maint’ce Mgt Serv Yr1 45 17 23 - - - 21 105 Yr2 53 22 23 - - - 21 119 Yr3 124 52 29 - - - 21 226 Yr4 192 71 34 27 16 7 26 372 Yr5 242 92 36 54 32 14 26 496 Yr6 251 94 41 54 32 14 26 511 Yr7 267 100 39 54 32 14 26 532 Yr8 247 99 39 54 32 14 26 512 Yr9 238 97 39 54 32 14 26 500 Yr10 204 85 38 54 32 14 26 454 Yr11 183 77 38 54 32 14 26 424 Yr12 171 75 38 54 32 14 26 410 Yr13 152 69 38 54 32 14 26 384 Yr14 140 67 32 54 32 14 26 365 Yr15 140 63 32 54 32 14 26 361 Yr16 129 57 32 54 32 14 26 343 Yr17 113 53 26 54 32 14 25 318 Yr18 110 52 21 54 32 14 25 308 Yr19 47 30 18 54 32 14 24 219

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-11 www.rpacan.com

FIGURE 21-2 SCHEDULE OF ESTIMATED EMPLOYEE NUMBERS

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 21-12 www.rpacan.com

22 ECONOMIC ANALYSIS

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas, 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

In RPA’s opinion, the assumptions used in the 2012 PEA were reasonable at the time and remain currently valid and relevant as a projection of economic potential for the project. Mineral Resources that are not mineral reserves do not have demonstrated economic viability.

The economic analysis in the PEA is preliminary in nature and is based, in part, on Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

OVERVIEW AND MODELLING ASSUMPTIONS

AMC has prepared a financial model for the project using the following assumptions:

• No allowance has been made for cost inflation or price escalation.

• Annual cash flow projections have been estimated over the project life based on capital expenditures, production costs, and sales revenue. No allowance has been made for corporate costs. The financial indicators examined included after-tax cash flow, net present value (NPV), and internal rate of return (IRR).

• Capital and operating costs are consistent with the values described in Section 21 of this Report.

• The capital structure is assumed on a 100% equity basis, with no debt or interest payments.

• The cost base of the capital and operating costs is January 1, 2012. The model is assessed in constant United States Dollar terms.

• No working capital allowances have been made in the financial analysis. Assuming two month payment terms, working capital would be approximately one sixth of the average annual operating cost of $60M, or approximately $10M. This would be recovered at the end of the mine life.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-1 www.rpacan.com

• The project is assumed to have no terminal value. The assumption has been made that any terminal value would be used to meet the costs of final site rehabilitation.

TAXES

Estimates of taxation payments and other mandatory deductions have been made based on advice from the Mexican Branch of Price Waterhouse Coopers.

The following assumptions have been applied when calculating the corporate tax payable: • It has been assumed Minera Juanicipio is a single business entity for tax purposes and that taxes are paid annually.

• Project assets have been depreciated on a straight line basis over their useful life as follows: o Assets related to the process plant and mine infrastructure, have been depreciated at 6% per year. o Assets related to fixed plant such as pumps, fans, etc., have been depreciated at 12% per year. o Assets such as trucks and mobile equipment have been depreciated at 25% per year.

• With the exception of certain trucks and mobile equipment, depreciation does not commence until the start of concentrate production in Year 4. The trucks and mobile equipment that will carry out the mine development have been depreciated from the time they are purchased.

• Corporate tax has been estimated based on the higher of the following two tax calculation methods. A conventional profit based tax using a tax rate of 28%, being the corporate tax rate planned to apply from 2014, and an alternative flat tax known as IETU, which is based on cash flows. An IETU tax rate of 17.5% has been used.

• Tax losses from previous activities amounting to 282 million Pesos have been carried forward. The tax losses have been converted to US Dollars at a Mexican Peso to US Dollar exchange rate of 12.86. No future tax losses relating to other projects or corporate activities have been assumed.

• Employee profit sharing (PTU) is not included in the financial estimates and the NPV and IRR of the project may fluctuate depending on how the project is structured once it is in operation.

The Mexican Senate approved Tax Reform changes in Mexico that became effective January 1, 2014. The effects of these changes are not reflected in the 2012 PEA, but they would have an insignificant impact on the overall economic results.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-2 www.rpacan.com

REVENUE ASSUMPTIONS

Project economics have been analyzed using the following metal prices (Base Case Prices) which are based on the three year trailing average prices to the year ending December 2011 as reported by the Bank of Montreal (MacInnis, 2012). It has been assumed that the prices remain stable over the project life.

• Silver price = $23.39/oz • Gold price = $1,257/oz • Lead price = $0.95/lb • Zinc price = $0.91/lb

It is envisaged that silver-rich zinc concentrate will be sold primarily to smelters in the Asian region. Lead concentrate could potentially be sold to a smelter in Mexico or exported to offshore smelters. If sold to a local smelter, transport costs would be reduced, but it is reasonable to anticipate that these savings would need to be shared with the smelter.

Both lead and zinc concentrates are expected to incur minor treatment penalties for impurities.

It is envisaged that the gold-rich pyrite concentrate will be sold to a customer able to recover gold and silver using a conventional cyanide leach process.

Treatment terms for lead and zinc concentrates used to estimate revenue have been advised by NSA (2012) and are shown in Section 19.

ANALYSIS OF PROJECT ECONOMICS

A summary of the key physical parameters of the project are shown in Table 22-1, costs are summarized in Table 22-2, and key financial results are shown in Table 22-3.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-3 www.rpacan.com

TABLE 22-1 SUMMARY OF PROJECT PHYSICAL PARAMETERS MAG Silver Corp. - Juanicipio Joint Venture

Item Units Value Drift metres (including waste) km 103 Mineral tonnes (milled) Mt 13.3 Au grade g/t 1.30 Ag grade g/t 416 Pb grade % 1.42 Zn grade % 2.70 Au payable metal Moz 0.43 Ag payable metal Moz 153 Pb payable metal Mlb 362 Zn payable metal Mlb 584

Note: “Mineral tonnes (milled)” was derived from Mineral Resources as shown in Table 16-1. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

TABLE 22-2 SUMMARY OF PROJECT COSTS MAG Silver Corp. - Juanicipio Joint Venture

Item Units Value Project capital $M 302 Sustaining capital $M 267 Operating costs (excludes capitalized operating cost) $M 886 Off-site costs $M 524 Total Costs $M 1,979 Site operating cost $/t 67 Total cash operating costs (on and off-site) $/t 109 Cash cost $/oz Ag (net of by-product credits) $/oz (0.03) Total cash cost* per AgEq**oz payable $/oz 6.61

Notes: *Excludes project and sustaining capital, but includes smelter, refining, and transportation costs. **AgEq is calculated by dividing the total revenue by the Base Case silver price.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-4 www.rpacan.com

TABLE 22-3 SUMMARY OF FINANCIAL RESULTS MAG Silver Corp. - Juanicipio Joint Venture

Item Units Value Revenue $M 4,992 Cash flow before tax $M 3,013 Tax $M 851 Cash flow after tax $M 2,162 Discount rate % 5% NPV before tax (5% discount rate) $M 1,762 IRR before tax % 54% NPV after tax (5% discount rate) $M 1,233 IRR after tax % 43% Peak debt $M (302) Payback from Year 1 (approximate) yrs 5.6 Payback from mill start-up (approximate) yrs 2.1 Project life from Year 1 yrs 19

Note: PTU is not included in the financial estimates

LIFE-OF-MINE CASH FLOW

Figures 22-1 and 22-2 show the LOM costs, net cash flow, and cumulative net cash flow. The project is expected to have a positive cash flow from Year 4 onwards and payback in Year 6.

RPA notes that from the beginning of Year 5 onwards, the projected average annual after tax cash flow over the remaining 14.8 year life of mine is $161.2 million per year, including an average annual after tax cash flow of $228.2 million per year from the beginning of Year 5 until the end of Year 10.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-5 www.rpacan.com

FIGURE 22-1 LIFE-OF-MINE COSTS AND NET CASH FLOW AFTER TAX (UNDISCOUNTED)

FIGURE 22-2 COSTS AND CUMULATIVE NET CASH FLOW AFTER TAX (UNDISCOUNTED)

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-6 www.rpacan.com

REVENUE

Total revenue by concentrate type and by contained metal is shown in Table 22-4 and graphically in Figures 22-3 and 22-4. Table 22-4 shows total revenue by metal over the mine life.

TABLE 22-4 REVENUE BY CONCENTRATE TYPE AND BY METAL MAG Silver Corp. - Juanicipio Joint Venture

By Concentrate $M Pb Concentrate 4,011 Zn Concentrate 751 Py Concentrate 230 By Metal Au metal 540 Ag metal 3,578 Pb metal 343 Zn metal 531 Total Revenue 4,992

FIGURE 22-3 REVENUE BY CONCENTRATE TYPE

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-7 www.rpacan.com

FIGURE 22-4 TOTAL REVENUE BY METAL

FIGURE 22-5 LIFE-OF-MINE REVENUE BY METAL

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-8 www.rpacan.com

OFF-SITE COSTS

Table 22-5 shows the estimated total off-site costs over the mine life.

TABLE 22-5 OFF-SITE CONCENTRATE TREATMENT COSTS MAG Silver Corp. - Juanicipio Joint Venture

Lead Concentrate Charge/Unit $M Treatment $270/dmt conc. 110 Penalties $9.07/dmt conc. 4 Price participation - >1 Refining (silver & gold) - 131 Transport $125/wmt conc. 57 Total Cost 302

Zinc Concentrate Charge/Unit $M Treatment $245/dmt conc. 148 Penalties $2.31/dmt conc. 1.4 Price participation - (10) Refining (silver & gold) - - Transport $125/wmt conc. 83 Total Cost 222

Total Off-site Costs 524

SENSITIVITY TO METAL PRICES AND COSTS

The sensitivity of the project to changes in metal prices and costs is shown in Figure 22-6. The NPV of the project is most sensitive to changes in the silver price and will have similar sensitivity to silver head grade. The NPV is less sensitive to costs. The project maintains a positive NPV over the range of sensitivities tested.

Figure 22-7 shows the sensitivity of the NPV after tax to changes in gold and silver prices where the gold to silver price ratio is maintained at the ratio of the Base Case prices (53.74: 1), and the silver price varies from $18/oz to $48/oz. Prices for lead and zinc have been retained at the Base Case prices of $0.95/lb and $0.91/lb respectively.

Table 22-6 shows the sensitivity of the key economic parameters to changes in the gold and silver prices where the gold to silver price ratio is maintained at 53.74: 1. Prices for lead and zinc have been retained at Base Case prices. A 5% discount rate has been used.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-9 www.rpacan.com

FIGURE 22-6 SENSITIVITY OF AFTER TAX NPV TO CHANGES IN METAL PRICES AND COSTS

Note: PTU is not included in the NPV estimates.

FIGURE 22-7 SENSITIVITY OF NPV AFTER TAX TO CHANGES IN SILVER AND GOLD PRICES

Note: PTU is not included in the NPV estimates.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-10 www.rpacan.com

TABLE 22-6 COMPARISON OF ECONOMIC PARAMETERS TO CHANGES IN METAL PRICES MAG Silver Corp. - Juanicipio Joint Venture

Base Metal Prices Case Au ($/oz) 1,079 1,257 1,344 1,478 1,612 1,747 1,881 Ag ($/oz) 20.00 23.39 25.00 27.50 30.00 32.50 35.00 Economic Parameters

NPV before tax ($M) 1,407 1,762 1,931 2,193 2,455 2,717 2,979 NPV after tax ($M) 976 1,233 1,355 1,544 1,734 1,923 2,113 IRR before tax (%) 47% 54% 57% 61% 65% 69% 73% IRR after tax (%) 37% 43% 46% 50% 53% 57% 60% Cash cost $/oz Ag (net of by-product credits) 0.36 (0.03) (0.21) (0.50) (0.79) (1.08) (1.36) Cash cost* $/AgEq**oz 6.33 6.61 6.72 6.89 7.05 7.19 7.33 Payback (Yrs) after plant start-up (approximate) 2.6 2.1 1.9 1.7 1.5 1.4 1.3

Notes: PTU is not included in the financial estimates. *Excludes project and sustaining capital, but includes smelter, refining, and transportation costs. **AgEq is calculated by dividing the total revenue by the silver price.

Table 22-7 shows the sensitivity of the NPV and IRR to changes in metal prices and discount rates. Prices for gold have been varied using a ratio of 53.74: 1 to the silver price. Lead and zinc have been maintained at Base Case prices.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-11 www.rpacan.com

TABLE 22-7 SENSITIVITY OF NPV TO CHANGES IN PRICES AND DISCOUNT RATES MAG Silver Corp. - Juanicipio Joint Venture

Silver Price Discount NPV before tax IRR before NPV after tax IRR after $/oz Rate ($M) tax ($M) tax 0% 2,435 47% 1,743 37% $20.00 5% 1,407 47% 976 37% 8% 1,032 47% 700 37%

0% 3,013 54% 2,162 43% Base Case 5% 1,762 54% 1,233 43% $23.39 8% 1,304 54% 897 43%

0% 3,288 57% 2,361 46% $25.00 5% 1,931 57% 1,355 46% 8% 1,434 57% 990 46%

0% 3,714 61% 2,670 50% $27.50 5% 2,193 61% 1,544 50% 8% 1,634 61% 1,135 50%

0% 4,140 65% 2,979 53% $30.00 5% 2,455 65% 1,734 53% 8% 1,835 65% 1,280 53%

0% 4,567 69% 3,288 57% 32.50 5% 2,717 69% 1,923 57% 8% 2,036 69% 1,425 57%

0% 4,993 73% 3,579 60% $35.00 5% 2,979 73% 2,113 60% 8% 2,237 73% 1,570 60%

Note: PTU is not included in the financial estimates.

Table 22-8 shows the sensitivity of the NPV at Base Case metal prices and a 5% discount rate to changes in the silver refining charge.

TABLE 22-8 SENSITIVITY TO THE SILVER REFINING CHARGE MAG Silver Corp. - Juanicipio Joint Venture

NPV before tax NPV after tax Silver Refining Charge ($M) ($M) 3.20% 1,778 1,245 4% 1,762 1,233 5% 1,742 1,219 Lead concentrate smelted in Torreon 1,776 1,243

Note: PTU is not included in the NPV estimates

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-12 www.rpacan.com

RPA notes a number of changes since the 2012 PEA that would have an insignificant impact on the overall economic results:

• Updated Mineral Resource as described in this report • Metal Prices • Payment Terms for concentrate • Cost Escalation • New Gold and Silver Tax (0.5% Gross Revenue) • New Mining Tax (7.5% on EBITDA) • Increased corporate tax rate (30% from 28%)

RPA would expect an updated PEA to have similar economic results as the 2012 PEA, and believes that the 2012 PEA remains a reasonable representation of the property’s economic potential.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 22-13 www.rpacan.com

23 ADJACENT PROPERTIES

Fresnillo holds the mining concessions to the north and east of the Juanicipio property. In recent years, Fresnillo has focused exploration activity on tracing the San Carlos Vein to the west from the known Fresnillo mining centre and on exploration for parallel veins, both to the north and south. It has been successful in following the San Carlos Vein for over six kilometres and in discovering several parallel veins lying between the San Carlos and Saucito Veins to the south. This includes the Jarillas Vein, which appears to be the eastern extension of the Valdecañas Vein. Fresnillo initially referred to the veins to the south of San Carlos, including the Juanicipio Joint Venture area as its Fresnillo II development project (Fresnillo, 2009), but since mid-2009 has referred to their 100% owned properties as the Saucito project, separate from the Juanicipio Joint Venture.

The Saucito project lies west of the Fresnillo Mine and east of Juanicipio (Figure 23-1). The project is made up of three main vein structures: El Saucito, Jarillas, and Santa Natalia. Smaller veins include Madroño and Mesquite. Fresnillo reports Measured plus Indicated Resources for Saucito at 10.81 Mt grading 446 g/t Ag, 2.22 g/t Au, 2.00% Pb, and 3.37% Zn. Inferred Resources are reported to be 33.58 Mt grading 336 g/t Ag, 1.19 g/t Au, 1.17% Pb, and 2.07% Zn (Fresnillo, 2013). The operation consists of an underground mine and a flotation plant with a current production rate of 3,000 tpd or 990,000 tpa. Fresnillo is currently building a second plant similar to the one operating at Saucito, but with an additional circuit to produce pyrite concentrates, which will be processed to increase recovery rates of gold and silver.

RPA was unable to verify the information above and the information above may not be indicative of the mineralization on the property that is the subject of this Technical Report.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 23-1 704,000 mE 706,000 mE 708,000 mE 710,000 mE 712,000 mE 714,000 mE 716,000 mE 718,000 mE Figure 23-1 N

2,564,000 mN

Mag Silver Corp. 0 0.5 1.0 1.5 2.0

2,564,000 mN Juanicipio Joint Venture Kilometres Zacatecas State, Mexico NAD27, Zone 13 for Mexico FRESNILLO

2,562,000 mN Adjacent Properties MINE AREA

V. San Carlos

2,562,000 mN

V. Linares JV Boundary

2,560,000 mN V. Valdecañas V. Sta. Natalia

23-2

2,560,000 mN V. Juanicipio

V. Jarillas 2,558,000 mN Madrono 44% MAG / 56% FRESNILLO PLC

Mezquite LEGEND:

2,558,000 mN Drill Holes V. Saucito DDH Trace

2,556,000 mN Veins

Vein www.rpacan.com

Shaft 2,556,000 mN Zona Peridras Jarillas Shaft & Mill

Saucito Shaft

704,000 mE 706,000 mE 708,000 mE 710,000 mE 712,000 mE 714,000 mE 716,000 mE 718,000 mE June 2014 Source: Mag Silver Corp., 2012. www.rpacan.com

24 OTHER RELEVANT DATA AND INFORMATION

Unless otherwise noted, this section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas, 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

PROJECT DEVELOPMENT SCHEDULE

Project development schedules have been prepared as a basis for the cash flow estimates used in the 2012 PEA. The schedules include lateral development, raise boring, stoping, and backfilling.

Key parameters used to develop the schedules are shown in Table 24-1.

TABLE 24-1 KEY SCHEDULING PARAMETERS MAG Silver Corp. - Juanicipio Joint Venture

Scheduling Parameter Maximum Rate Single heading development rate (decline face excluding stockpiles) 115 m/month Raise-bored raises 160 m/month Mucking rate per stope 800 t/day Backfilling rate 1,300 m3/day Minimum delay between end of filling and start of mucking the next stope 37 days

MINE DEVELOPMENT SCHEDULE

The total lateral development requirement over the mine life is estimated at 59 km in waste and 43 km within the veins. Approximately 17,200 m3 of bulk excavation in waste is required to establish the mine infrastructure. Total LOM development quantities are shown in Table 24-2.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 24-1 www.rpacan.com

TABLE 24-2 TOTAL MINE DEVELOPMENT QUANTITIES MAG Silver Corp. - Juanicipio Joint Venture

Lateral development Units Value Access decline km 18.2 Ventilation development km 9.4 Remuck bays and miscellaneous. km 3.1 Sublevel access km 8.1 Footwall drive km 9.8 Drawpoints km 10.9 Ore development km 43.3 Total lateral development km 102.7 Bulk excavation (000)m3 17.2 Vertical development km 7.7

Based on the assumed scheduling parameters, it will take approximately three and a half years to develop the mine from the start of the decline to mill start-up. Key milestones relating to the initial mine development are shown in Table 24-3.

TABLE 24-3 PROJECT DEVELOPMENT MILESTONES MAG Silver Corp. - Juanicipio Joint Venture

Milestone Period Start access box cut and portal Month 1 Start access decline Month 3 Vein development commences Month 33 Commission primary ventilation shafts Month 35 First stope production Month 36 Mill start-up Month 42

MILL FEED SCHEDULE

The mill feed schedule is shown in Table 24-4. The production schedule is shown graphically in Figures 24-1 and 24-2. Mill feed from vein development comprises approximately 19% of total mill feed, with the remainder from stoping operations.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 24-2 www.rpacan.com

TABLE 24-4 MILL FEED SCHEDULE MAG Silver Corp. - Juanicipio Joint Venture

Mill feed Gold Silver Lead Zinc Year (kt) (g/t) (g/t) (%) (%) Years 1 - 3 – – – – – Year 4 425 0.98 438 0.59 1.20 Year 5 850 0.98 449 0.75 1.64 Year 6 896 1.08 437 0.99 2.10 Year 7 916 1.44 655 1.58 3.23 Year 8 950 1.47 641 1.62 3.12 Year 9 950 1.73 635 1.62 3.19 Year 10 950 1.17 736 1.50 3.21 Year 11 950 1.17 441 1.11 2.36 Year 12 950 1.29 247 1.22 2.28 Year 13 929 1.63 290 1.50 2.50 Year 14 851 1.12 163 1.68 2.86 Year 15 851 1.17 214 1.85 3.04 Year 16 851 1.20 206 1.42 2.45 Year 17 854 1.60 358 1.43 3.03 Year 18 851 1.27 305 1.97 3.35 Year 19 290 1.36 311 1.64 3.15 Total 13,314 1.30 416 1.42 2.70

Note: “Mill feed tonnes” was derived from Mineral Resources as shown in Table 16-1. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

FIGURE 24-1 PRODUCTION SCHEDULE BY PERIOD

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 24-3 www.rpacan.com

FIGURE 24-2 MILL FEED GRADE BY YEAR

WASTE ROCK PRODUCTION

The production of waste rock from mine development is shown in Table 24-5. A total of approximately 4.2 Mt of waste is expected to be produced over the mine life. It is envisaged that waste rock produced during the initial development period will be used for road and tailings dam construction. Later in the mine life, a portion of the waste produced will be backfilled to stopes and worked out areas. Waste stockpiles have been designed near the portal and to the east of the mill site.

TABLE 24-5 DEVELOPMENT WASTE PRODUCTION MAG Silver Corp. - Juanicipio Joint Venture

Mine Production Units Value Production from stopes Mt 10.8 Production from development Mt 2.5 Total mine production Mt 13.3 Development waste mined Mt 4.2 Total material mined Mt 17.5

Note: “Total Mine Production” was derived from Mineral Resources as shown in Table 16-1. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 24-4 www.rpacan.com

RUN-OF-MINE STOCKPILE

A ROM stockpile has been designed to provide a buffer between the mine and mill. A maximum capacity of 150,000 t may be required prior to mill commissioning. After mill commissioning, the stockpile is not expected to exceed 50,000 t.

VERTICAL DEVELOPMENT

The mine design includes raise bored ventilation shafts, nominally 3.5 m in diameter. A number of short ore passes are also planned for the upper parts of the deposit. In total 4,330 m of raise boring is planned. A total of 3,370 m of smaller diameter sectional ventilation raises is also planned. It is envisaged that these will mostly be mined using long-hole raising techniques.

TRUCKING SCHEDULE

After allowing for some waste to be backfilled to stopes, the quantity of material mined and hauled to surface over the life of the project is estimated to total 17.2 Mt. The average one way truck haulage distance is estimated at 5.36 km resulting in approximately 94 million tonne-kilometres of truck haulage.

CONCENTRATE PRODUCTION SCHEDULE

The mill has been designed to produce three saleable products; lead concentrate, zinc concentrate, and a gold-rich pyrite concentrate. The production schedule for lead and zinc concentrate is shown in Figure 24-3. As pyrite grades are not currently estimated in the mineral resource model, no detailed schedule of pyrite concentrate production has been prepared.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 24-5 www.rpacan.com

FIGURE 24-3 LEAD AND ZINC CONCENTRATE PRODUCTION – TONNAGE SCHEDULE

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 24-6 www.rpacan.com

25 INTERPRETATION AND CONCLUSIONS

The following interpretation and conclusions have been divided into separate sections for the current 2014 Mineral Resource estimate and the 2012 PEA.

2014 MINERAL RESOURCE ESTIMATE INTERPRETATION AND CONCLUSIONS

MAG and joint venture partner Fresnillo have made a major discovery of low-sulphidation epithermal vein mineralization, located in the southwest part of the world-class Fresnillo silver mining district. The discovery is located in the northeast corner of the property and consists of two silver-gold-lead-zinc epithermal structures known as the Valdecañas and Juanicipio vein systems. Most exploration on the property has focused on these two vein systems. There is good exploration potential remaining at the Juanicipio Vein and elsewhere on the property, which remains largely underexplored. A significant exploration budget is warranted.

RPA estimated Mineral Resources for the Valdecañas and Juanicipio vein systems using drill hole data available as of December 31, 2013. At an NSR cut-off value of US$70/t, Indicated Mineral Resources are estimated to total 10.1 million tonnes of 511 g/t Ag, 1.7 g/t Au, 1.9% Pb, and 3.5% Zn. Inferred Mineral Resources are estimated to total 5.1 million tonnes of 372 g/t Ag, 2.0 g/t Au, 1.8% Pb, and 2.8% Zn. The Mineral Resources are contained within the Valdecañas vein system and the Juanicipio Vein.

The total contained metals in the Indicated Resource are 166 million ounces of silver, 544,000 ounces of gold, 419 million pounds of lead, and 778 million pounds of zinc. The Inferred Resource contains 61 million ounces of silver, 319,000 ounces of gold, 202 million pounds of lead, and 317 million pounds of zinc.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 25-1 www.rpacan.com

2012 PEA INTERPRETATION AND CONCLUSIONS

This section is taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012 (Thomas, 2012) and is based on the Mineral Resource estimate by Strathcona dated November 2011.

The economic analysis in the PEA is preliminary in nature and is based, in part, on Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

In AMC’s opinion, the PEA clearly indicates that the Juanicipio Project has the potential to be developed into an economically robust, high-grade underground silver project. Further drilling and investigation work aimed at upgrading Inferred Mineral Resources and increasing the geotechnical and hydrogeological understanding of the deposit is required to form a firm base for the next stage of project design and evaluation. However, a number of key risks and uncertainties currently exist that will need to be a focus of further studies:

KEY RISKS AND UNCERTAINTIES • Because of the high proportion of Inferred Mineral Resources underpinning the 2012 economic assessment (49% of the tonnage and 36% of the silver content as of the date of the 2012 economic assessment), there is considerable uncertainty surrounding the cash flow projections and other economic projections included in the PEA. It cannot be assumed that Inferred Mineral Resources will be upgraded to a higher Mineral Resource classification with further exploration, or that Mineral Resources will be converted to Mineral Reserves.

• There is currently limited information available on the quality of the rock mass surrounding the veins. If the rock mass is weaker than is currently anticipated, this will increase dilution, causing a reduction in the grade of material that can be recovered from the veins. Uncertainty also exists regarding the quality of the rock mass in the area of the access decline and ventilation raises. Weaker than anticipated rock mass conditions in these areas would result in increased capital development costs.

• Metal prices may vary significantly from those used in the PEA.

• Capital and/or operating costs may be higher than estimated in the economic assessment.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 25-2 www.rpacan.com

• Because limited test work has been carried out on production of a gold-rich pyrite concentrate, there is no certainty that a saleable concentrate can be economically produced.

There is no certainty that all the required regulatory approvals for the project will be granted. There is also no certainty that Minera Juanicipio will be able to acquire the surface tenure to enable construction of the tailings storage facility, roads, power lines, or other infrastructure. RPA notes a number of changes since the 2012 PEA that would have an insignificant impact on the overall economic results:

• Updated Mineral Resource as described in this report • Metal Prices • Payment Terms for concentrate • Cost Escalation • New Gold and Silver Tax (0.5% Gross Revenue) • New Mining Tax (7.5% on EBITDA) • Increased corporate tax rate (30% from 28%)

RPA would expect an updated PEA to have similar economic results as the 2012 PEA, and believes that the 2012 PEA remains a reasonable representation of the property’s economic potential.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 25-3 www.rpacan.com

26 RECOMMENDATIONS

The Juanicipio property hosts a significant silver-gold-lead-zinc deposit and merits considerable additional exploration and development work. RPA recommends a budget of US$22.6 million (Table 26-1) for 2014 to advance the access ramp to the Valdecañas vein system and to and explore elsewhere on the property. Work should include:

TABLE 26-1 PROPOSED BUDGET (100% BASIS) MAG Silver Corp. - Juanicipio Joint Venture

Item US$ M Ramp advancement 11.4 Drilling (~20,000 m) 3.6 Interpretation, resource update, etc. 0.1 Geotechnical and Engineering Studies 1.2 Metallurgical and Mill Design Studies 1.1 Permitting and Environmental Work 0.9 Operating Costs / Office 1.2 Infrastructure Studies 1.0 Sub-total 20.5 Contingency (10%) 2.1 Total 22.6

• Continuing to advance the underground access ramp. The budget in the 2012 PEA estimates this work to be $11.4 million with MAG’s 44% share of $5 million.

• 10,000 m of drilling at the Valdecañas vein system to obtain a drill hole spacing no greater than 100 m in both the along-strike and up- and down-dip directions.

• 10,000 m of drilling for a property-wide exploration program including mapping, and drilling of new targets. Key criteria should be known mineralization, lineaments, and alteration.

In addition to the ramp advancement and continued drilling, RPA recommends the continuation of the environmental, engineering, and metallurgical studies as recommended in the 2012 PEA.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 26-1 www.rpacan.com

The following recommendations are taken from the NI 43-101 Technical Report on the Juanicipio Property prepared by AMC dated July 1, 2012. RPA has reviewed and concurs with AMC’s recommendations.

GEOTECHNICAL AND HYDROGEOLOGY INVESTIGATION AND STUDIES 1. The assumption that sufficient water will be obtained from mine dewatering to meet project requirements is critically dependent on the findings of hydrogeological investigations recommended to be carried out as part of detailed further study. A depression in the contact zone between the Tertiary volcanics and the Cretaceous sediments in the area overlying the Valdecañas Vein is an area that could potentially host a significant aquifer.

2. Further geotechnical data collection is necessary to increase confidence in the estimation of stable stope dimensions and to better define ground support requirements. A program of geotechnical core logging is also recommended for all infill drill holes targeting the Valdecañas, Desprendido, and Juanicipio veins.

3. Geotechnical interval logging of core is recommended from at least ten additional drill holes that intersect the Valdecañas and Desprendido veins at “pierce-points” evenly distributed across the vein. Interval logging should be of “raw” geotechnical parameters to allow rock mass classification by either the Q system (after Barton et al., 1974) or RMR. The number of joint sets and joint surface roughness should also be recorded to enable calculation of Q values. Joint surface roughness should be recorded as a description (e.g., Rough and Undulating) rather than as an index value. If more than one value of each parameter is recorded per interval, it should be explicitly stated what each represents. It is recommended that the entire length of core be logged for approximately half of the drill holes.

4. Of the ten drill holes required for geotechnical interval logging, core from at least five should be oriented to allow detailed structural logging. Structural logging should incorporate collection of orientation data (“alpha” and “beta” angles) together with surface roughness and mineral infill properties for each natural structure in the core.

5. Specific geotechnical drill holes will be required for investigation of planned infrastructure including box cut and portal location, decline route, and ventilation raise/shaft alignments. Other geotechnical drilling will be required for other surface infrastructure, including the mill site and tailings storage facility.

6. Compilation and interpretation of rock mass weathering data is recommended to develop a 3D model of the weathering profile.

7. A structural model should be developed to assist in geological interpretation and geotechnical understanding of the rock mass conditions associated with each fault interpreted.

8. The development of minimum ground support standards is recommended before any mine development commences.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 26-2 www.rpacan.com

MINE DESIGN 1. The option of installing a hoisting shaft to a depth of approximately 450 m should be investigated in more detail, particularly in regard to establishing a reliable cost estimate for constructing the shaft. However, the decision on whether or not to construct a hoisting shaft is not critical to a decision to proceed with the proposed decline trucking option. A decision to proceed with the decline trucking option does not preclude construction of a shaft at a later date.

2. Geotechnical investigations and further cost analysis are required to determine the most cost effective way of constructing the proposed ventilation shafts, either by raise boring at larger diameters than those proposed in the study, or by blind sinking a single exhaust shaft.

3. Test work is recommended to determine the likely tailings sizing curve and to determine the need, or otherwise, to cyclone the tailings stream prior to the paste fill plant. The tailings sizing curve will be required to determine the proportion of the tailings stream that could be used for paste fill.

4. A program of paste fill test work is recommended during the next stage of study. The tests should include: • Uniaxial compressive strengths at 7, 14, and 28 day cure age on test samples containing 3%, 6%, and 9% cement. • Measurement of the shear yield stress of the cemented tailings as a function of solids concentration for shear yield stresses in the range of 50 Pa to 500 Pa. • Measurement of the shear stress (and hence viscosity) as a function of shear rate for the cemented tailings at a solids concentration corresponding to a shear yield stress of 250 Pa.

5. It is recommended that the proposed mine design be updated with the results of the geological, geotechnical, and hydrogeological investigations and other studies described above.

METALLURGY 1. Additional comminution tests are recommended including specific tests such as the JKMRC drop weight test, and simulation to better define grinding and cyclone classification parameters.

2. Gravity test work utilizing centrifugal concentrator devices is recommended to confirm the potential for enhancing gold recovery and provide design parameters for a gravity circuit.

3. A final round of flotation test work, including locked cycle tests, is recommended to confirm design parameters for a full circuit, including cleaners, and re-circulated streams. The test work should include variability testing on high-grade lead and zinc samples to ensure that floatation capacity is sufficient to handle short term peaks in grade.

4. Further studies and test work are recommended to assess technical requirements for producing a gold-rich pyrite concentrate for sale. The studies should include investigations relating to concentrate marketing.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 26-3 www.rpacan.com

5. Discussions with potential customers are recommended to better define likely concentrate payment terms. The discussions should be directed towards establishing provisional concentrate off-take agreements.

INFRASTRUCTURE 1. Detailed studies, including geotechnical investigations will be required leading to the design of the surface infrastructure, (plant site, roads, TSF, water supply, and power supply options).

2. Investigations into sharing of existing infrastructure used by other mines in the district should be carried out.

ENVIRONMENTAL AND PERMITTING 1. Environmental and social impact studies will be required for the proposed mine site access road and TSF.

2. Tenure and access rights to land required for the access road, TSF, and power line route will need to be investigated during further studies.

UPDATE COST ESTIMATION 1. Project cost estimates should be prepared at a level consistent with those required for a detailed feasibility study.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 26-4 www.rpacan.com

27 REFERENCES

Albinson, 1988: Geologic Reconstruction of Paleosurfaces in the Sombrerete, Colorada and Fresnillo Districts, Zacatecas State Mexico. Economic Geology, v. 83, no. 8, pp. 1647- 1667.

Aeroquest International Inc, 2007: Report on a Helicopter-Borne AeroTEM System Electromagnetic & Magnetic Survey, Juanicipio Test Survey, Zacatecas State, Mexico. 32 pp.

Chartier, D., Cole, G., and Couture, J-F., 2008: Mineral Resource Estimation, Valdecañas Silver-Gold Project, Zacatecas State, Mexico. Technical report prepared for MAG Silver Corp. by SRK Consulting.

Canadian Institute of Mining, Metallurgy and Petroleum (CIM), 2010: CIM Definition Standards for Mineral Resources and Mineral Reserves, Prepared by CIM Standing Committee on Reserve Definitions, Adopted by CIM Council, November 27, 2010.

Brown, A, Cole, F., and Couture, J-F, 2011: December 31, 2010 Audited Mineral Resource Statement for Minera Juanicipio S.A. Unpublished memorandum to David Giles of Fresnillo plc. with copy to Dan MacInnis of MAG Silber Corp. by SRK Consulting dated February 8, 2011

Creel, García-Cuéllar, Aiza y Enríquez, 2012: Juanicipio I Mining Concession, September 5, 2012.

Fresnillo plc, 2009: Operations review for the fourth quarter 2008.

Fresnillo plc, 2010b: Fresnillo plc presentation by Jaime Lomelin, CEO, Fresnillo, presented at the Denver Gold Forum, September 21, 2010.

Fresnillo plc, 2013: Annual Report.

Ghaffari, H., Stewart, S.B.V., and Couture, J-F, 2009: Valdecañas Project – Scoping Study NI 43-101 Technical Report, dated August 19, 2009 and filed on SEDAR on November 6, 2009.

Leuangthong, O., Brown, A., and Cole, G., 2011: Response to Benchmark Six Inc. Memorandum on Resource Estimate for Valdecañas. Unpublished memorandum for SRK Consulting addressed to the Joint Venture Committee of Minera Juanicipio S.A. de C.V. dated July 6, 2011

MacInnis, D., 2012: Memorandum Minera Juanicipio: metal prices, discount rates and exchange rate analysis, February 28, 2012.

Megaw, P.K.M., and Ramirez, R.L., 2001: Report on Phase 1 data compilation and geological, geochemical and geophysical study of the Juanicipio Claim, Fresnillo District, Zacatecas, Mexico. Report prepared for Minera Sunshine de Mexico S.A. de C.V.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 27-1 www.rpacan.com

Megaw, P.K.M, 2010: Discovery of the Silver-Rich Juanicipio-Valdecañas Vein Zone, Western Fresnillo District, Zacatecas, Mexico. Society of Economic Geologists, Inc. Special Publication 15, pp. 119–132.

Neil S. Seldon & Associates Ltd, 2012: Report on market implications for lead and zinc concentrates expected to be produced by the joint venture partners in the Juanicipio Project in Mexico, prepared for Minera Juanicipio S.A. de C.V. (January 2012).

Proyecto Juanicipio 002-102606, 2008: Recuperacion de oro,plata,plomo y zinc” reporte de avance no.1, 8 de mayo 2008.

Proyecto Juanicipio 002-OT10-016-09, 2009: Recuperacion de oro,plata,plomo y zinc” reporte final, 30 de junio 2009.

Ross, D.A., 2007: Comments on the Juanicipio Joint Venture Program, Zacatecas, Mexico. Report prepared for MAG Silver by Scott Wilson RPA.

Ross D.A., and Roscoe, W.E., 2009: Technical Report on the Mineral Resource Update for the Juanicipio Joint Venture, Zacatecas State, Mexico. Technical report prepared for MAG Silver Corp. by Scott Wilson RPA and filed on SEDAR.

Ross D.A., 2011: Technical Report on the Mineral Resource Update for the Juanicipio Joint Venture, Zacatecas State, Mexico. Technical report prepared for MAG Silver Corp. by Scott Wilson RPA and filed on SEDAR.

Ruvalcaba-Ruiz, D.C., and Thompson, T.B., 1988: Ore deposits at the Fresnillo Mine, Zacatecas, Mexico. Economic Geology, v. 83, no.8, pp. 1583-1596.

Simmons, S.F., 1991: Hydrologic implications of alteration and fluid inclusion studies in the Fresnillo District, Mexico; evidence for a brine reservoir and a descending water table during the formation of hydrothermal Ag-Pb-Zn ore bodies. Economic Geology, v. 86, no. 8, pp. 1579-1601.

Srivastava, M., 2011: Resource Estimate for Valdecañas. Unpublished memorandum for Benchmark Six Inc. addressed to Michael Petrina of MAG Silver Corp. dated June 3, 2011

Thalenhorst, H., 2011: Mineral Resource Estimate, Minera Juanicipio, S.A. de C.V., Zacatecas, Mexico. Available Strathcona Mineral Services Limited, 20 Toronto Street, Toronto, Canada (November 2011).

Thomas, M., Thalenhorst, H., and Rile, A., 2012: Minera Juanicipio Property, Zacatecas State, Mexico, Technical Report, prepared by AMC Mining Consultants (Canada) Ltd. for Minera Juanicipio S.A. de C.V., dated July 1, 2012 and filed on SEDAR on July 16, 2012.

Valenzuela, C.L., 2008: Proyecto Juanicipio 002-102606 Recuperacion de oro, plata, plomo y zinc. Reporte de avance No. 1. Report prepared for Fresnillo plc by Servicios Industriales Peñoles, S.A. de C.V., Centro de Investigacion y Desarrollo Tecnologico, Procesamiento de Minerales.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 27-2 www.rpacan.com

Wendt, C.J., 2002: The Geology and Exploration Potential of the Juanicipio Property, Fresnillo District, Zacatecas, Mexico. Technical report prepared for Mega Capital Investments.

Wetherup, S., 2006: Independent Technical Report, Juanicipio Silver Project, Zacatecas State, Mexico. Report prepared for MAG Silver Corp. by Caracle Creek International Consulting Inc.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 27-3 www.rpacan.com

28 DATE AND SIGNATURE PAGE

This report titled “Technical Report on the Mineral Resource Update for the Juanicipio Joint Venture, Zacatecas State, Mexico” and dated June 12, 2014, as amended on June 30, 2014, was prepared and signed by the following authors:

(Signed & Sealed) “David Ross”

Dated at Toronto, Ontario David Ross, P.Geo. June 30, 2014 Principal Geologist

(Signed & Sealed) “Jason Cox”

Dated at Toronto, Ontario Jason Cox, P.Eng. June 30, 2014 Principal Mining Engineer

(Signed & Sealed) “Holger Krutzelmann”

Dated at Toronto, Ontario Holger Krutzelmann, P.Eng. June 30, 2014 Principal Metallurgist

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 28-1 www.rpacan.com

29 CERTIFICATE OF QUALIFIED PERSON

DAVID ROSS I, David Ross, P.Geo., as an author of this report entitled “Technical Report on the Mineral Resource Update for the Juanicipio Joint Venture, Zacatecas State, Mexico” (the “Technical Report”), prepared for MAG Silver Corp. and dated effective June 12, 2014, as amended on June 30, 2014, do hereby certify that:

1. I am a Director of Resource Estimation and Principal Geologist with Roscoe Postle Associates Inc. of Suite 501, 55 University Ave., Toronto, ON, M5J 2H7.

2. I am a graduate of Carleton University, Ottawa, Ontario, Canada, in 1993 with a Bachelor of Science degree in Geology and Queen’s University, Kingston, Ontario, Canada, in 1999 with a Master of Science degree in Mineral Exploration.

3. I am registered as a Professional Geoscientist in the Province of Ontario (Reg.#1192). I have worked as a geologist for a total of 20 years since my graduation. My relevant experience for the purpose of the Technical Report is: • Mineral Resource estimation work and reporting on numerous mining and exploration projects around the world; and • Exploration geologist on a variety of gold and base metal projects in Canada, Indonesia, Chile, and Mongolia

4. I have read the definition of "qualified person" set out in National Instrument 43-101 ("NI 43-101") and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

5. I visited the Juanicipio property most recently on May 27, 2014 for one full day.

6. I am responsible for the preparation of Sections 2 to 12, 14, 23, and 30 (Appendix) and share responsibility with my co-authors for Sections 1, 25, 26, and 27 of the Technical Report.

7. I am independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.

8. In 2007, I made an internal review of the Juanicipio Joint Venture exploration program; in 2009, 2010, and 2012, I updated the Mineral Resource estimated and filed NI 43-101 reports.

9. I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 29-1 www.rpacan.com

10. As of the effective date of this Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.

Dated this 30th day of June, 2014

(Signed & Sealed) “David Ross”

David Ross, P.Geo.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 29-2 www.rpacan.com

JASON J. COX I, Jason J. Cox, P.Eng., as an author of this report entitled “Technical Report on the Mineral Resource Update for the Juanicipio Joint Venture, Zacatecas State, Mexico” (the “Technical Report”), prepared for MAG Silver Corp., and dated effective June 12, 2014, as amended on June 30, 2014, do hereby certify that:

1. I am a Principal Mining Engineer and Director, Mining Engineering, with Roscoe Postle Associates Inc. of Suite 501, 55 University Ave Toronto, ON, M5J 2H7.

2. I am a graduate of the Queen’s University, Kingston, Ontario, Canada, in 1996 with a Bachelor of Science degree in Mining Engineering.

3. I am registered as a Professional Engineer in the Province of Ontario (Reg. #90487158). I have worked as a Mining Engineer for a total of 17 years since my graduation. My relevant experience for the purpose of the Technical Report is: • Review and report as a consultant on many mining operations and projects around the world for due diligence and regulatory requirements • Feasibility Study project work on several mining projects, including five North American mines • Operational experience as Planning Engineer and Senior Mine Engineer at three North American mines • Contract Co-ordinator for underground construction at an American mine

4. I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

5. I have not visited the Juanicipio Property.

6. I am responsible for the preparation of Sections 15, 16, 18 to 22, and 24, and share responsibility with my co-authors for Sections 1, 25, 26, and 27 of the Technical Report.

7. I am independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.

8. I have had no prior involvement with the property that is the subject of the Technical Report.

9. I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 29-3 www.rpacan.com

10. At the effective date of the Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Dated this 30th day of June, 2014

(Signed & Sealed) “Jason J. Cox”

Jason J. Cox, P.Eng.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 29-4 www.rpacan.com

HOLGER KRUTZELMANN I, Holger Krutzelmann, P. Eng., as an author of this report entitled “Technical Report on the Mineral Resource Update for the Juanicipio Joint Venture, Zacatecas State, Mexico” (the “Technical Report”), prepared for MAG Silver Corp. and dated effective June 12, 2014, as amended on June 30, 2014, do hereby certify that:

1. I am Vice President, Metallurgy & Environment, and Principal Metallurgist with Roscoe Postle Associates Inc. of Suite 501, 55 University Ave Toronto, ON M5J 2H7.

2. I am a graduate of Queen’s University, Kingston, Ontario, Canada in 1978 with a B.Sc. degree in Mining Engineering (Mineral Processing).

3. I am registered as a Professional Engineer with Professional Engineers Ontario (Reg. #90455304). I have worked in the mineral processing field, in operating, metallurgical, managerial; and engineering functions, for a total of 35 years since my graduation. My relevant experience for the purpose of the Technical Report is: • Reviews and reports as a metallurgical consultant on a number of mining operations and projects for due diligence and financial monitoring requirements • Senior Metallurgist/Project Manager on numerous gold and base metal studies for a leading Canadian engineering company. • Management and operational experience at several Canadian and U.S. milling operations treating various metals, including copper, zinc, gold and silver.

4. I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

5. I have not visited the Juanicipio Property.

6. I am responsible for the preparation of Sections 13 and 17 and share responsibility with my co-authors for Sections 1, 25, 26, and 27 of the Technical Report.

7. I am independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.

8. I have had no prior involvement with the property that is the subject of the Technical Report.

9. I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 29-5 www.rpacan.com

10. At the effective date of the Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Dated this 30th day of June, 2014

(Signed & Sealed) “Holger Krutzelmann”

Holger Krutzelmann, P.Eng.

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 29-6 www.rpacan.com

30 APPENDIX 1

LIST OF DRILL HOLES

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 30-1 www.rpacan.com

TABLE 30-1 SUMMARY OF DRILLING MAG Silver Corp. - Juanicipio Joint Venture

Hole Easting Northing Elevation Orientation Length (m) (m) (m) Azimuth Dip (m) 10P 711,090 2,558,654 2,429 22 -60 822 11P 711,143 2,558,420 2,414 22 -55 961 12P 710,782 2,558,630 2,318 20 -55 823 14P 710,557 2,557,673 2,343 195 -55 861 15P 710,351 2,558,219 2,386 20 -55 843 16P 710,713 2,559,522 2,266 340 -52 738 16Q 710,911 2,558,434 2,338 42 -52 895 16R 710,910 2,558,434 2,338 73 -75 845 16S 710,785 2,558,134 2,329 44 -70 1,023 16T 710,785 2,558,135 2,329 42 -71 983 17.5P 710,909 2,558,436 2,339 3 -64 726 17.5Q 710,909 2,558,436 2,339 359 -74 859 17.5R 710,785 2,558,134 2,329 12 -69 959 17P 710,910 2,558,435 2,339 20 -63 841 17Q 710,910 2,558,435 2,339 31 -76 835 17R 710,784 2,558,134 2,329 29 -63 1,119 17S 710,785 2,558,135 2,329 22 -69 957 18.5R 710,581 2,558,485 2,423 38 -77 947 18P 710,877 2,558,483 2,346 5 -63 841 18Q2 710,909 2,558,434 2,338 344 -66 845 18R 710,878 2,558,483 2,346 330 -79 806 19.5Q 710,907 2,558,435 2,339 291 -77 1,009 19.5R 710,907 2,558,436 2,339 320 -76 923 19.5S 710,784 2,558,135 2,329 3 -70 966 19P 710,782 2,558,630 2,318 316 -66 715 19P1 710,782 2,558,630 2,318 315 -53 90 19Q 710,781 2,558,630 2,318 318 -67 441 19Q2 710,802 2,558,566 2,316 314 -68 124 19Q3 710,891 2,558,588 2,362 302 -64 818 19R 710,581 2,558,485 2,423 9 -78 1,074 20P 710,248 2,558,323 2,376 17 -55 938 20R 710,240 2,558,594 2,348 66 -77 944 21P 710,211 2,558,392 2,365 0 -51 858 21Q 710,211 2,558,393 2,365 1 -61 855 21R 710,211 2,558,394 2,365 0 -68 918 22M 710,425 2,559,987 2,249 168 -70 1,103 22P 710,211 2,558,392 2,365 334 -53 966 22R 710,238 2,558,592 2,348 314 -69 976 23M 710,735 2,559,452 2,268 309 -68 1,034 23R 709,717 2,558,701 2,403 35 -77 928 24P 710,235 2,558,053 2,396 30 -70 895 25P 708,659 2,559,788 2,374 15 -66 897 27P 708,536 2,559,312 2,402 21 -52 919 28P 709,941 2,559,072 2,367 39 -51 854 31P 709,783 2,558,816 2,400 23 -53 911 33P 709,645 2,557,124 2,378 20 -55 841 35P 709,899 2,557,221 2,362 59 -51 936 36P 710,222 2,557,349 2,359 63 -66 900 37P 709,870 2,559,352 2,306 20 -55 859 38P 709,641 2,558,889 2,385 21 -53 853 39P 709,497 2,558,664 2,393 21 -62 859 41P 709,963 2,559,805 2,292 172 -78 672

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 30-2 www.rpacan.com

Hole Easting Northing Elevation Orientation Length (m) (m) (m) Azimuth Dip (m) 42P 709,966 2,559,808 2,292 215 -63 564 43P 709,870 2,559,353 2,306 18 -63 583 44P 709,869 2,559,353 2,306 16 -69 833 45P 709,868 2,559,352 2,306 356 -60 791 46P 709,877 2,559,345 2,307 33 -61 786 47P 709,869 2,559,352 2,306 1 -49 761 48P 709,911 2,559,173 2,350 35 -61 883 49P 709,878 2,559,345 2,307 36 -52 646 50P 709,750 2,559,863 2,333 128 -64 716 51P 710,143 2,559,613 2,322 227 -62 864 52P 709,209 2,559,284 2,363 30 -55 888 53P 709,253 2,559,048 2,383 169 -55 938 54P 709,203 2,559,291 2,362 168 -54 613 55P 709,847 2,558,973 2,375 193 -54 855 56P 709,867 2,559,349 2,306 54 -77 705 57P 709,657 2,558,582 2,407 203 -55 860 58P 709,867 2,559,350 2,306 38 -63 510 59P 709,192 2,559,283 2,360 207 -55 552 60P 709,399 2,559,611 2,386 30 -54 648 61P 709,611 2,559,522 2,381 29 -55 883 62P 709,398 2,559,611 2,386 26 -62 839 63P 709,400 2,559,612 2,386 25 -48 663 64P 709,101 2,559,846 2,358 61 -58 695 65P 709,749 2,559,864 2,333 278 -65 683 66P 709,190 2,559,897 2,362 72 -49 861 67P 708,446 2,559,835 2,392 15 -57 860 68P 708,094 2,560,029 2,403 15 -57 910 69P 709,101 2,559,846 2,358 311 -55 964 70P 709,747 2,559,863 2,333 253 -61 864 71P 709,748 2,559,862 2,333 354 -62 891 72P 707,464 2,560,173 2,229 27 -54 632 73P 709,747 2,559,862 2,334 341 -61 547 A_FX-1 710,203 2,560,235 2,242 179 -60 328 A_M02 709,966 2,559,808 2,292 356 -57 746 A_M04 709,659 2,559,853 2,319 35 -59 809 A_M20 710,345 2,559,568 2,376 359 -59 511 A_M26 710,317 2,559,655 2,372 22 -45 424 A_M33 710,782 2,559,318 2,289 346 -69 780 A_M44 711,138 2,559,316 2,426 353 -58 330 C17 710,259 2,560,237 2,240 190 -58 540 C17-2 710,260 2,560,241 2,240 189 -59 927 C19 710,377 2,560,018 2,245 215 -53 730 CD 709,606 2,560,220 2,382 21 -64 916 CE 709,606 2,560,219 2,382 22 -69 1,012 CF 709,606 2,560,220 2,381 21 -75 966 E18 710,203 2,560,235 2,242 210 -53 873 EC 709,604 2,560,180 2,383 50 -54 733 ED 709,604 2,560,180 2,383 60 -63 836 EE 709,604 2,560,180 2,382 62 -67 856 EF 709,604 2,560,179 2,382 66 -69 894 FA 710,131 2,560,009 2,360 346 -63 731 FE 709,963 2,559,791 2,294 10 -58 851 FE2 709,963 2,559,789 2,294 9 -57 34 FX-1 710,203 2,560,235 2,242 179 -60 648 GA 710,131 2,560,010 2,360 341 -61 731 GB 709,964 2,559,809 2,292 10 -45 833

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 30-3 www.rpacan.com

Hole Easting Northing Elevation Orientation Length (m) (m) (m) Azimuth Dip (m) GC 709,965 2,559,808 2,292 11 -51 851 GD 709,966 2,559,808 2,292 8 -56 852 GE 709,964 2,559,808 2,292 9 -62 970 GF 709,965 2,559,807 2,292 354 -62 960 GH 709,750 2,559,864 2,333 31 -56 953 HD 709,963 2,559,789 2,294 22 -51 799 HE 709,963 2,559,789 2,294 24 -60 869 HF 709,964 2,559,788 2,294 22 -64 895 HG 709,963 2,559,789 2,294 25 -64 1,017 IB 710,093 2,560,045 2,352 15 -69 642 IC2 710,168 2,559,767 2,370 6 -58 601 IC3 710,190 2,559,846 2,369 5 -58 646 IC4 710,180 2,559,810 2,371 8 -54 644 IC5 710,130 2,560,008 2,360 32 -69 556 ID 710,167 2,559,766 2,370 359 -70 884 ID2 710,141 2,559,612 2,322 9 -53 909 IE 710,141 2,559,611 2,322 1 -66 846 IF 710,066 2,559,532 2,311 15 -65 220 IF2 710,060 2,559,525 2,311 16 -65 1,001 IG 710,141 2,559,612 2,322 3 -62 961 J02 709,963 2,559,792 2,294 9 -65 984 J03 710,179 2,559,809 2,371 4 -58 880 J04 710,133 2,560,009 2,360 38 -61 624 J04B 710,173 2,559,771 2,371 12 -53 856 J05 710,187 2,559,668 2,346 23 -51 932 J06 710,179 2,559,809 2,371 32 -58 747 J09 710,318 2,559,658 2,372 26 -63 775 J-11 710,316 2,559,658 2,372 44 -51 800 J12 710,809 2,559,738 2,365 6 -75 677 J13 710,736 2,559,506 2,267 20 -65 671 J14 711,091 2,559,636 2,395 331 -68 625 J16 711,093 2,559,639 2,395 357 -68 615 J18 711,098 2,559,320 2,424 7 -55 902 J19 711,127 2,559,276 2,425 352 -65 869 J20 711,144 2,559,318 2,426 9 -51 960 J21 711,127 2,559,276 2,425 354 -75 960 J22 711,140 2,559,315 2,426 15 -67 805 JA 710,180 2,559,809 2,371 24 -63 768 JB 710,174 2,559,770 2,371 23 -53 844 JC 710,172 2,559,765 2,370 22 -62 990 JD 710,192 2,559,667 2,346 12 -60 942 JE 710,191 2,559,666 2,346 12 -66 972 JU1 710,945 2,558,511 2,365 20 -60 749 JU2 710,654 2,558,951 2,302 20 -62 902 JU3 710,778 2,558,076 2,329 23 -60 840 JU4 710,557 2,557,671 2,343 15 -70 925 JU5 710,826 2,559,163 2,297 20 -62 928 JU6 711,139 2,559,319 2,426 15 -53 743 JU7 710,422 2,559,981 2,249 20 -60 811 JU8 710,817 2,557,887 2,334 20 -68 700 JU9 709,943 2,559,579 2,300 10 -59 748 JZ 710,129 2,560,008 2,360 47 -68 536 KC 710,316 2,559,656 2,372 9 -54 834 KD 710,316 2,559,656 2,372 8 -62 786 KE 710,316 2,559,656 2,372 9 -70 899 KF 710,314 2,559,652 2,372 17 -76 928

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 30-4 www.rpacan.com

Hole Easting Northing Elevation Orientation Length (m) (m) (m) Azimuth Dip (m) KG 710,314 2,559,655 2,372 8 -67 336 KG2 710,312 2,559,655 2,372 8 -67 274 KG3 710,314 2,559,655 2,372 8 -67 885 LE1 710,315 2,559,653 2,372 28 -68 327 LE2 710,316 2,559,656 2,372 28 -68 758 M01 709,965 2,559,807 2,292 345 -64 1,032 M06 709,964 2,559,810 2,292 29 -69 1,020 M10 710,092 2,560,045 2,351 359 -78 825 M11 709,966 2,559,810 2,292 20 -48 920 M11_DESV 709,966 2,559,810 2,292 20 -48 716 M12 710,181 2,559,810 2,372 0 -65 949 M13 710,130 2,560,005 2,360 14 -70 708 M14 710,129 2,560,003 2,360 21 -62 685 M15 710,180 2,559,806 2,371 356 -71 1,014 M16 710,181 2,559,810 2,371 4 -71 1,034 M17 710,129 2,560,003 2,360 40 -75 858 M18 710,141 2,559,613 2,322 16 -70 1,043 M19 710,345 2,559,568 2,376 352 -68 1,102 M21 710,141 2,559,614 2,322 26 -57 923 M22 710,316 2,559,655 2,372 9 -52 832 M23 710,093 2,560,046 2,351 70 -54 690 M24 710,345 2,559,567 2,376 354 -72 1,052 M25 710,315 2,559,655 2,372 24 -68 813 M27 710,711 2,559,522 2,266 310 -62 1,019 M28 710,713 2,559,521 2,265 328 -64 837 M29 710,348 2,559,565 2,376 67 -74 1,034 M3 710,130 2,560,005 2,360 29 -70 623 M30 710,735 2,559,450 2,268 355 -52 732 M31 710,348 2,559,565 2,376 60 -73 1,067 M32 710,358 2,559,598 2,374 48 -60 969 M34 710,735 2,559,451 2,268 355 -72 972 M35 710,783 2,559,317 2,289 352 -53 885 M36 710,736 2,559,506 2,267 20 -61 791 M37 710,825 2,559,164 2,297 357 -63 901 M38 710,784 2,559,316 2,289 7 -64 791 M39 710,784 2,559,317 2,289 22 -54 775 M40 711,088 2,559,642 2,395 316 -71 709 M41 711,088 2,559,641 2,394 250 -78 921 M42 711,092 2,559,639 2,395 216 -78 1,031 M43 710,740 2,559,456 2,268 65 -60 999 M45 711,097 2,559,314 2,424 2 -51 725 M46 711,139 2,559,315 2,426 3 -70 834 M5 709,659 2,559,851 2,319 51 -61 1,100 M7 710,316 2,559,655 2,372 30 -59 777 M8 710,735 2,559,451 2,268 332 -56 876 M9 710,734 2,559,451 2,268 345 -52 711 MA 710,422 2,559,986 2,248 20 -80 523 MB 710,675 2,559,605 2,266 340 -41 666 MC 710,675 2,559,604 2,266 340 -51 754 ME 710,712 2,559,520 2,266 340 -58 841 MF 710,737 2,559,451 2,268 329 -59 963 MG 710,736 2,559,451 2,268 318 -62 929 MH 710,344 2,559,566 2,376 17 -67 951 MI 710,346 2,559,566 2,376 26 -66 860 MR-1 710,142 2,559,616 2,322 65 -42 200 MR-2 710,188 2,559,669 2,346 157 -58 600

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 30-5 www.rpacan.com

Hole Easting Northing Elevation Orientation Length (m) (m) (m) Azimuth Dip (m) MR-3 710,348 2,559,562 2,376 271 -60 644 MS-1 710,263 2,552,573 2,516 7 -52 972 MS-2 710,263 2,552,573 2,516 7 -70 984 MS-3 709,940 2,552,700 2,542 13 -52 925 MS-4 709,940 2,552,700 2,542 13 -70 956 MS-5 709,500 2,553,027 2,575 11 -50 1,012 NA 710,345 2,559,566 2,376 31 -50 848 ND 710,715 2,559,522 2,266 350 -63 787 NE 710,714 2,559,521 2,266 333 -64 842 NF1 710,740 2,559,453 2,268 324 -69 115 NF2 710,737 2,559,451 2,268 324 -69 830 NG 710,713 2,559,522 2,266 319 -72 848 OA 710,713 2,559,519 2,266 8 -51 667 OB 710,678 2,560,132 2,347 360 -47 715 OC 710,809 2,559,735 2,365 360 -57 907 OD 710,713 2,559,520 2,266 10 -57 936 OE2 710,783 2,559,311 2,289 354 -46 884 OF 710,784 2,559,315 2,288 348 -55 878 OG 710,784 2,559,315 2,288 338 -62 942 PC 710,715 2,559,522 2,266 25 -53 663 PD 710,734 2,559,504 2,267 41 -64 690 PE 710,735 2,559,503 2,267 14 -70 597 PE2 710,734 2,559,499 2,267 16 -70 694 PF 710,783 2,559,325 2,289 352 -72 907 QD 710,733 2,559,504 2,267 354 -52 814 QE 710,735 2,559,503 2,267 33 -57 642 QF 710,738 2,559,454 2,267 31 -65 729 QG 710,735 2,559,503 2,267 51 -72 671 QH 710,784 2,559,315 2,288 16 -67 856 RB 711,091 2,559,636 2,395 356 -66 561 RC 711,098 2,559,319 2,424 352 -51 791 RD 711,097 2,559,316 2,424 343 -61 826 RE 711,125 2,559,276 2,425 337 -64 868 SD 711,098 2,559,329 2,423 4 -61 868 SE 711,097 2,559,316 2,424 347 -74 924 SHAFT-2 710,139 2,559,616 2,322 0 -90 500 TE 711,099 2,559,318 2,424 15 -75 913 TI 710,422 2,559,981 2,249 0 -90 666 UD 711,144 2,559,323 2,425 29 -63 839 UE 711,154 2,559,252 2,424 22 -66 808 VP2 708,659 2,559,787 2,373 15 -55 912 VP3 708,726 2,560,032 2,399 15 -55 914 Total 211,041

MAG Silver Corp. – Juanicipio Project, Project #2264 Technical Report NI 43-101 – June 30, 2014 Page 30-6