Saudi Journal of Economics and Finance Abbreviated Key Title: Saudi J Econ Fin ISSN 2523-9414 (Print) |ISSN 2523-6563 (Online) Scholars Middle East Publishers, Dubai, United Arab Emirates Journal homepage: http://saudijournals.com

Original Research Article

Performance of Employees of Public Works and Space Planning in Road Maintenance in North Barito District Rody1*, Ahmad Suriansyah1, Bachrudin Ali Akhmad1

1Master of Governmental Science, Faculty of Social and Political Science, Lambung Mangkurat University, Banjarmasin,

DOI: 10.36348/sjef.2021.v05i02.010 | Received: 09.02.2021 | Accepted: 22.02.2021 | Published: 26.02.2021

*Corresponding author: Rody

Abstract

One of the most important developments in the context of welfare is the construction of road infrastructure; this road infrastructure is carried out by the PUPR Office of the North Barito . However, the results of monitoring in the field found very severe damage, one of which was in the villages of Kandui-Majangkan and Walur-Katapang. Based on the description above, and seeing the road conditions produced by PUPR HR, it is necessary to research the performance of PUPR HR in North Barito Regency. This research approach uses a qualitative research approach. Data collection techniques through interviews, observation, and documentation. The results showed that the performance of the Public Works and Spatial Planning Office in the Maintenance of Regional Roads in North Barito Regency was quite good and could be measured by Quality and Quantity. The performance of the apparatus of the Public Works and Spatial Planning Office shows quite good quality and quantity. Keywords: performance; Qualitative; Service Apparatus. Copyright © 2021 The Author(s): This is an open-access article distributed under the terms of the Creative Commons Attribution 4.0 International License (CC BY-NC 4.0) which permits unrestricted use, distribution, and reproduction in any medium for non-commercial use provided the original author and source are credited.

NTRODUCTION an increase in the human development index as an I indicator of increasing the welfare of the Indonesian Regional autonomy in Indonesia has been held people. for more than a decade. Regional autonomy for the first time came into effect in Indonesia through Law Number The concept of regional autonomy, 22 the Year 1999 concerning Regional Government government, and society in a region has an important which has undergone several date changes. The role in improving the quality of development in their implementation of regional autonomy in Indonesia has respective regions. This is mainly because in regional resulted in changes in the government system in autonomy there is a transfer of authority which was Indonesia which then also has an impact on people's originally administered by the central government lives in various fields. which now becomes the affairs of the respective regional governments. Conceptually, the implementation of regional autonomy in Indonesia is based on three main To realize the objectives of implementing objectives which include political objectives, regional autonomy, several important factors need to be administrative objectives, and economic objectives. considered, among others: human factors which include What is wanted to be realized through political regional heads and ranks and employees, all members objectives in the implementation of regional autonomy of the legislative body, and community participation. include efforts to realize political democratization Regional financial factors, both balancing funds, and through political parties and the Regional People's local revenue will support the implementation of Representative Council. The realization of the regional development programs and activities. administrative objectives to be achieved through the Organizational or bureaucratic management factors that implementation of regional autonomy is the division of are organized effectively and efficiently following the government affairs between the center and the regions, needs of services and regional development. including financial sources and renewal of government bureaucratic management in the regions. Meanwhile, One of the most important developments in the the economic goal to be achieved in the implementation context of welfare is the construction of road of regional autonomy in Indonesia is the realization of

Citation: Rody et al (2021). Performance of Employees of Public Works and Space Planning in Road Maintenance in North 90 Barito District. Saudi J Econ Fin, 5(2): 90-94.

Rody et al., Saudi J Econ Fin, Feb, 2021; 5(2): 90-94 infrastructure; this road infrastructure is carried out by weighbridge equipment so that control of tones entering the PUPR Office of the North Barito Regency. The the North Barito area is maximized. PUPR office is tasked with providing services to the community, a system for providing services to the If the PUPR Apparatus of Barito Utara community that is more accommodating to the needs of Regency shows good performance, it will have a the local community. One of the fields of development positive impact on the speed of development, increase that the implementation of which is handed over to the in health services, improve the economy of the regions following Law no. 38 of 2004 in the field of community, and vice versa if the performance of the public works including, among others, regency roads. PUPR Service Apparatus is very low, it will have an The creation of a road transportation system that impact on services to the community, which will slow ensures the smooth, safe, fast, cheap, and comfortable down development so that of course it will have an movement of people and goods is a development goal impact. To the economic growth of the community, the in the road infrastructure sector. road facilities are not good.

The existence of adequate infrastructure is According to the data shown, there is still a lot needed, such as road and bridge infrastructure. One of of road damage and a lack of available budget, so it the infrastructures most often used by the community is needs to be underlined that the performance of the roads and bridges. Roads and bridges also have a very PUPR Agency Apparatus is still lacking or not optimal. large function for daily activities. Therefore, roads and Lack of budget funds is also a problem in road repair bridges are needed that are following the expectations efforts by the PUPR Office of North Barito Regency of the community. The existence of good roads and which can be seen from the table above in 2019 a bridges will make it easier for people to transport and shortage of Rp. 474,912,757,800, -. Further guidance feel comfortable. and development need to be carried out and also evaluating the performance of the PUPR Office One thing that determines the success of Apparatus in the North Barito Regency. development in the North Barito Regency is the performance of the PUPR Service apparatus itself. Each In the area of North Barito Regency, there are organization always tries to improve the productivity of several road sections which are under the authority of the Apparatus. This is important because performance the Ministry of Public Works and Spatial Planning of reflects deep pleasure in the work done so that work can the Republic of Indonesia for roads that connect be completed more quickly and better results can be between provinces and roads that connect between achieved. districts under the authority of Central Province where the handling of repairs is very Development is of course based on various dependent on the policies of the central and provincial objectives, including maintaining or repairing damaged governments. the financial condition also greatly affects roads and opening new roads as needed. An example of the amount of the road repair budget allocation. road damage that occurred in North Barito Regency on the Kandui road to Muntallat, in Gunung Timang In addition to the limited budget, road damage District, North Barito Regency, has also been influenced since 2017 by an increase in Province was damaged. Some points have been badly the length of the road from 625.74 km to 758.14 km or damaged and until now there has been no repair from 132.40 km or 21.16%, the addition of sections due to the local government. From this media observation in ex-HPH roads that are still functioned by the the field, the damage to Jalan Kandui-Montallat community and has been designated as a regency road occurred at several points with very severe damage. status. One of them is in the villages of Kandui-Majangkan and Walur-Katapang. Performance is very strategic in achieving goals. This is following the opinion of Simamora [1]. According to information from the villagers of Performance is a measure of an organization's success Berangin to the media terbitan.com, they said: in achieving its mission. Meanwhile, Amalia [2] states that performance is useful for achievement or results. "The residents hope that the government can repair it immediately and the road conditions are worsened Various studies have shown that the success of during the rainy season, the road is damaged like a an organization or any institution in achieving its goals buffalo puddle". And "road damage almost occurs is the performance of the human resources in an starting from the causeway to be precise in Liju Village institution. Panjaitan et al. [3] the results of the study to the Benangin highway". concluded that of the three performance indicators of the Public Works Office of Toba Samosir Regency, The damage was also caused by weak namely: Responsiveness, responsibility, accountability, supervision by the Dishub Kab. Barito, where until now two indicators is not good in terms of road and bridge the Transportation Agency does not have to maintenance, namely indicators of responsiveness and © 2021 |Published by Scholars Middle East Publishers, Dubai, United Arab Emirates 91

Rody et al., Saudi J Econ Fin, Feb, 2021; 5(2): 90-94 accountability. This is due to a lack of facilities and "The work carried out by the public works office infrastructure and there are still many shortcomings in and in spatial planning, especially road maintenance, monitoring conditions. has been carried out according to the orders and procedures applied, so that it does not violate the Another study was conducted by Indriyani [4]. applicable rules of the game. However, some Research shows that the PUPR Office of Tulang employees have not carried out their superiors' orders as Bawang Regency has not fully carried out its duties and well as possible, some are still negligent, lack functions. This is indicated by the frequent finding of discipline, and have not developed creativity within the road damage, from minor road damage to heavy road employees themselves. Also, every policy taken is damage on roads in Tulang Bawang Regency. Other following real data in the field and applicable research conducted by Prastyo [5]. The study concluded regulations and it is necessary to have a study or study. that the supervision of road maintenance carried out by On the other hand, efforts to improve service quality are the Highways Division has not been running optimally. also carried out by the public works and spatial This can be seen from the four indicators where there planning office by providing training and technical are still obstacles, namely the process indicators guidance for employees in the context of increasing the running quite well, but in the implementation stage, capacity of the apparatus to improve service quality in there are obstacles in the form of regional topography general, especially with road maintenance "(Interview, and lack of infrastructure. 11 -11-2020).

Based on the description above, and seeing the The same opinion was also conveyed by road conditions produced by PUPR HR, it is necessary Zainnudin, BE, Head of the Highways and Spatial to research the performance of PUPR HR in North Planning Division of North Barito Regency, stating: Barito Regency.

"The superior's order is an obligation that must RESEARCH METHOD be carried out by his servants to complete work within This research approach uses a qualitative an agency. Judging from the real conditions of the research approach. This researcher intends to obtain an public works and spatial planning office, there are in-depth description of the Apparatus Performance of currently some employees who carry out tasks the Public Works and Spatial Planning Agency in Road according to orders such as road maintenance, some Maintenance in North Barito Regency. In this approach, have not carried out their obligations, so the superior's the researcher creates a complex picture, examines the orders have not fulfilled what was desired. Furthermore, words, reports a detailed view of the respondent's view, he said that to improve the quality of road maintenance and conducts studies on natural situations. Bogdan and services it is necessary to conduct a study on road Taylor in Moleong [6] suggest that qualitative maintenance so that maintenance is supported by valid methodology is a research procedure that produces and accountable data. Besides, capacity building and descriptive data in the form of written and spoken division of tasks also need to be improved and words from people and observed behavior. This supervised, so that the quality of services can be research was conducted by the Public Works Office of improved”(Interview, 11-11-2020). the North Barito Regency. To obtain the required data and information, data collection techniques are used From the interview statement above, the through interviews, observation, and documentation. respondent indicated that every employee in the Public

Works and Spatial Planning Office of Road RESULTS AND DISCUSSION Administration in North Barito Regency has worked or The focus observed in this study is the carried out his duties as instructed by his superiors. Performance of the Public Works Agency and the Superiors here also play an important role in achieving Spatial Planning for Road Maintenance in the North the goals of the organization concerned, without Barito Regency. Measuring employee performance coordination or coordination a job can't achieve the according to Dharma [7] says that almost all ways of expected results. Work in any organization before it is measuring performance consider the following: practiced or carried out, employees in addition to 1) Quantity, namely the amount that must be knowing their main tasks and functions must also pay completed or achieved. attention to directions or appeals from superiors which 2) Quality, namely the quality that must be produced can help employees think about their work. So with (whether or not it is good). The qualitative this, it is hoped that the quality of the work produced by measurement of output reflects the measurement or the Public Works and Spatial Planning Office can be level of satisfaction, namely how well it is accepted by the elements in the organization to increase completed. the work targets/targets more optimally in the future.

1. Quality Based on the results of the interview delivered Besides, in carrying out their work, employees by Ir. Iwan Rusdani, MP, Head of the North Barito must do it following accurate data and information Regency Public Works and Spatial Planning Office. concerning the organization concerned which also plays © 2021 |Published by Scholars Middle East Publishers, Dubai, United Arab Emirates 92

Rody et al., Saudi J Econ Fin, Feb, 2021; 5(2): 90-94 a very important role in supporting the achievement of enough to complain about the community and hopefully optimal quality of work. With accurate data and it will be handled by the Government. We are quite information, the targets/goals and objectives of the satisfied and understand the difficulties of the organization can be achieved. government budget in the budget and hope that the government can improve further completing the road Thus, based on the data obtained, it can be repair plan so that the existing road access is no longer concluded that employees who are equipped with damaged at several points and is completely cast in knowledge in carrying out their work can affect the concrete and even plans to be covered with asphalt later quality of the work produced and the knowledge they "(Interview, 11 -12-2020). have based on their respective duties will support the implementation of their duties in a professional position Opinions were also conveyed by Roby and with extensive knowledge an employee is expected Cahyadi, SH, the former chairman of PWI who stated: able to do a good job and be productive. Because the knowledge is following the field and work done by "As a result of damaged roads, it has greatly employees, it can help in the process of completing affected agricultural products such as bananas, work. Where knowledge is the accumulation of the vegetables, and livestock, because residents have results of the educational process, whether obtained difficulty marketing their crops and livestock, due to the formally or non-formally that contributes to someone in obstruction of damaged roads." preventing problems, creativity is included in doing or completing work. People often complain to me, hoping that the district government will immediately improve it so that Based on the results of the interview delivered road access will run smoothly and the people's economy by the Head of the Technical Planning Section for is not disturbed. Highways, Mr. Puryani, ST stated: "After receiving an explanation from the "Increasing the capacity of the apparatus, Regent who was accompanied by the Head of PUPR, especially in the field of Road Maintenance, really we understand that our region has a limited budget and needs to be improved. It is recognized that the limited must be shared with other regions in terms of our understanding and knowledge causes the less optimal opinion on the government's performance is quite implementation of road maintenance services, so it is satisfied. In the future, the government can further hoped that in the future the capacity of the apparatus increase the budget allocation for road repairs so that needs to be increased by following formal training and there is no more damage. which is too severe and education as well as special technical guidance in the agricultural products can be marketed ”(Interview, 11- field of road maintenance" (Interview, 11-11-2020). 12-2020).

Education and training are also part of the From the interview statement above, the investment in human resource development, the longer respondent shows a dissatisfied attitude because there a person spends education and training the higher their are still roads that are damaged so that it has an impact ability or competence and knowledge in doing work and on high transportation rates and the respondent hopes thus the higher their performance. that road repairs will become the main priority scale.

Then the respondents also convey that road damage Based on the results of the interview delivered greatly affects agricultural output because it is blocked by the Chairperson of the North Barito Regency by damaged roads. Organda (Hj. Murul Ainy, S.Pd) stated:

"Quite satisfied even though there are still Quantity roads that are damaged so that the effect of land The quantity of work is related to the transportation is not smooth which results in high number/volume of tasks (jobs) that are completed at a transportation rates, Organda hopes that the Barito specified time. Quantity of work can be obtained from regency government can make road repairs a top the results of work measurement or participatory goal priority scale so that transportation becomes and setting. Determining the quantity of work can be done transportation rates can be cheaper" (Interview, 11-12- through discussions between superiors and 2020). subordinates, where the discussion material includes job objectives, its role in relationships with other jobs, The same opinion was also conveyed by organizational requirements, and employee needs. Thus community leaders as well as religious leaders (Ustad this quantity aims to determine how many personnel H. Rusmadi Darsani, Lc), the leader of the Yasin Muara and how many responsibilities or workloads can be Teweh Islamic boarding school who stated: delegated to an employee. In determining the quality of work that must be done is to identify both the number "There are several points of road that have not of employees and the job qualifications needed to been handled, although a little, but due to damage, it is achieve organizational goals. © 2021 |Published by Scholars Middle East Publishers, Dubai, United Arab Emirates 93

Rody et al., Saudi J Econ Fin, Feb, 2021; 5(2): 90-94 To get good work results in an organization, CONCLUSION one of the elements that must be considered is that the Based on the research results, it can be organization must be able to adjust the amount/volume concluded that the performance of the Public Works of work with a predetermined period, in other words, and Spatial Planning Office in the Maintenance of the other tasks should not interfere with each other. Regional Roads in North Barito Regency is quite good Regarding the problem, in other words, the other duties and can be measured by quality, quantity, and do not interfere with each other. Regarding the timeliness. As well as the factors that affect arrangement between the volume (quantity) of work performance can be seen from the factors of discipline, with the timeframe/schedule that has been found, authority, and responsibility, efficiency, and initiative. according to the Head of the Office of Public Works The results of the research prove that the results of and Spatial Planning, North Barito Regency, Mr. Ir. measuring the performance of the Public Works and Iwan Rusdani, MP. Says that: Spatial Planning Officials show that the quality, quantity, and timeliness of completion can be "The time for completing the duties and categorized as "Good Enough". responsibilities of road maintenance is on time. Employees have done their job, but from a budget point of view, there are still shortcomings, so that it becomes REFERENCE an obstacle in road maintenance”(Interview, 11-11- 1. Simamora, H. (2004). Manajemen Sumber Daya 2020). Manusia. Yogyakarta, Sekolah Tinggi Ilmu Ekonomi YKPN. This was also confirmed by Mr. Andriano, ST. 2. Amalia, K., (2012). Pengaruh Kepuasan Kerja Head of the Road and Bridge Preservation Section who terhadap Kinerja Karyawan pada Agen PT. said that: Jasaraharja Putera Cabang Jakarta. Skripsi. Universitas Indonesia. Depok. "In road maintenance, there is still a lack of 3. Panjaitan, A.P., Darmawan, A., Purba, I.R., budget for road maintenance, so that it greatly affects Rachmad, Y., & Simanjuntak, R., (2014). Korelasi the implementation of road maintenance activities or in Kebudayaan dan Pendidikan: Membangun other words, the tasks and responsibilities are often not Pendidikan Berbasis Budaya Lokal. Yayasan on time" (Interview, 11-11-2020). Pustaka Obor Indonesia. 4. Indriyani, V., Asri, Y., & Ramadhan, S. (2018, Based on the results of the interview above, it December). Learning module design writing can be concluded that the number of employee jobs is argumentative text based problem-based learning. completed based on a predetermined schedule, in which In International Conference on Language, the work does not collide with each other because it has Literature, and Education (ICLLE 2018) (pp. 194- been included in the workload of each employee so that 200). Atlantis Press. more work programs are implemented And it cannot be 5. Prastyo, R. (2011). Prosedur Pengelolaan Arsip separated from the number of employees who have pada Bagian Tata Usaha dan Kepegawaian Dinas been assigned to work on each work target which is Pekerjaan Umum Kabupaten Sukoharjo. divided according to each so that the number of 6. Moleong, L. J. (2005). Metodologi Penelitian workloads with the number of employees working can Kualitatif. Bandung: PT. Remaja Rosdakarya. be balanced so that each job can be completed 7. Agus, D. (2003). Manajemen Supervisi: Petunjuk according to schedule. However, the completion of Praktis Bagi Para Supervisor. Jakarta: Raja duties and responsibilities, especially road maintenance, Grafindo Persada. is strongly influenced by the budgetary factor that is still lacking in road maintenance.

© 2021 |Published by Scholars Middle East Publishers, Dubai, United Arab Emirates 94