PLAZA SHELL a NEW CITY SKYLINE in KOTA KINABALU by Property Hunter
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
NICORP-Annualreport2011
NAIM INDAH CORPORATION BERHAD (Company No. 19727-P) ANNUAL REPORT 2011 1 NAIM INDAH CORPORATION BERHAD ANNUAL REPORT 2011 CONTENTS CORPORATE PROFILE 3 LIST OF PROPERTIES 40 CHAIRMAN’S STATEMENT 4 DIRECTORS’ REPORT 41 CHIEF EXECUTIVE OFFICER’S STATEMENT 6 STATEMENT BY DIRECTORS 46 SHARE PERFORMANCE 7 STATUTORY DECLARATION 46 CORPORATE STRUCTURE 8 INDEPENDENT AUDITORS’ REPORT 47 BOARD OF DIRECTORS 10 STATEMENTS OF FINANCIAL POSITION 49 AUDIT COMMITTEE 19 STATEMENTS OF COMPREHENSIVE INCOME 50 NOMINATION AND REMUNERATION 20 STATEMENTS OF CHANGES IN EQUITY 53 COMMITTEE STATEMENTS OF CASHFLOW 54 CORPORATE EVENTS 21 NOTES TO THE FINANCIAL STATEMENTS 56 CORPORATE GOVERNANCE STATEMENT 23 NOTICE OF ANNUAL GENERAL MEETING 127 STATEMENT OF INTERNAL CONTROL 28 PROXY FORM ENCLOSED AUDIT COMMITTEE REPORT 31 ANALYSIS OF SHAREHOLDINGS 37 Property Development Property Management 2 CORPORATE PROFILE NAIM INDAH CORPORATION BERHAD (NICORP) is predominantly engaged in the business of investment holding, theprovision of management and administrative services to its subsidiaries. It is listed on the Main Market of Bursa Malaysia Securities Berhad. Round Log Timber Extraction [email protected] 3 NAIM INDAH CORPORATION BERHAD ANNUAL REPORT 2011 CHAIRMAN’S STATEMENT Dear Shareholders, On behalf of the Board of Directors, I am pleased to present to you the 2011 Annual Report together with the Audited Financial Statements for the financial year ended 31 December 2011. Financial Review For the financial year ended 31 December 2011, we have achieved a turnover of RM14.88 million as compared to RM12.52 million in year 2010. This increment of turnover was mainly contributed by our focused efforts in the timber production segment, as well as, a marginal increment from our property investment segment. -
Malaysia Real Estate Highlights
RESEARCH REAL ESTATE HIGHLIGHTS 1ST HALF 2016 KUALA LUMPUR PENANG JOHOR BAHRU KOTA KINABALU HIGHLIGHTS KUALA LUMPUR HIGH END CONDOMINIUM MARKET The residential market continues to remain lacklustre with lower volume and value of transactions recorded. ECONOMIC AND MARKET INDICATORS Limited project completions and new Malaysia’s economy expanded at a launches of high end condominiums / slower pace in 2015 with Gross Domestic residences during the review period. Product (GDP) growing at an annual rate of 5.0% (2014: 6.0%). For 2016, the Government has trimmed the country’s Growing pressure on rentals amid GDP growth forecast to 4 - 4.5% due to strong supply pipeline (existing and the volatility in crude oil prices and other new completions) and a challenging economic challenges. GDP continued rental market while prices in to moderate in the first quarter of 2016, the secondary market generally posting 4.2% growth, its slowest since continue to remain resilient. 3Q2009 (4Q2015: 4.5%), driven by domestic demand. Private consumption expanded by 5.3% while private Developers adopt innovative ‘push investment moderated to 2.2%. marketing’ strategies to boost Headline inflation for April 2016 registered at sales of selected projects and 2.1%. It is expected to be lower at 2% to 3% improve revenue. this year, compared to an earlier projection Aria of 2.5% to 3.5% and will continue to remain stable in 2017. (432 units) and The Residences at The Meanwhile, labour market conditions St. Regis Kuala Lumpur (160 units). continued to weaken with more retrenchment of workers, particularly in By the second half of 2016, the scheduled the manufacturing, mining and services completions of another five projects will sectors. -
The Financial Year 2012 Was, Without Doubt, Another Challenging Period for Tenaga Nasional Berhad (Tnb)
KEEPING THE LIGHTS ON YOU SEE Tenaga Nasional Berhad www.tnb.com.my No. 129, Jalan Bangsar, 59200 Kuala Lumpur Tel: 603 2180 4582 Fax: 603 2180 4589 Email: [email protected] Annual Report Annual 2012 Tenaga Nasional Berhad Tenaga 200866-W annual report 2012 WE SEE... OUR COMMITMENT TO THE NATION >OH[ `V\ ZLL PZ Q\Z[ VUL ZTHSS WPLJL VM [OL IPN WPJ[\YL 6\Y YVSL PZ [V WYV]PKL TPSSPVUZ VM 4HSH`ZPHUZ ^P[O HMMVYKHISL YLSPHISL LMMPJPLU[ HUK \UPU[LYY\W[LK HJJLZZ [V LSLJ[YPJP[` -YVT WV^LYPUN [OL UH[PVU»Z HKTPUPZ[YH[P]L JHWP[HS [V SPNO[PUN \W OV\ZLOVSKZ HUK LTWV^LYPUN HSS ZLJ[VYZ VM [OL LJVUVT` ^L OH]L OLSWLK YHPZL [OL X\HSP[` VM SPML PU [OL JV\U[Y` HUK ZW\Y [OL UH[PVU»Z WYVNYLZZ V]LY [OL `LHYZ 4VYL [OHU Q\Z[ SPNO[PUN \W OVTLZ HUK Z[YLL[Z ;5) PZ JVTTP[[LK [V LUZ\YPUN [OH[ L]LY` 4HSH`ZPHU PZ HISL [V LUQV` [OL ILULMP[Z VM LSLJ[YPJP[` LHJO HUK L]LY` KH` VM [OL `LHY I` RLLWPUN [OL SPNO[Z VU KEEPING THE LIGHTS ON INSIDEwhat’s TO BE AMONG THE LEADING VISION CORPORATIONS IN ENERGY AND RELATED BUSINESSES 4 Notice of the 22nd Annual General Meeting 7 Appendix I 9 Statement Accompanying Notice GLOBALLY of the 22nd Annual General Meeting 10 Financial Calendar 11 Investor Relations 14 Share Performance WE ARE 15 Facts at a Glance 16 Chairman’s Letter to Shareholders COMMITTED TO 22 President/CEO’s Review 33 Key Highlights 34 Key Financial Highlights EXCELLENCE 35 Five-Year Group Financial Summary MISSION IN OUR 36 Five-Year Group Growth Summary PRODUCTS AND SERVICES KEEPING THE LIGHTS ON Corporate Framework Operations Review 40 About Us 135 Core Businesses 42 Corporate Information 136 Generation 1 44 Group Corporate Structure 142 Transmission 5 46 Organisational Structure 146 Distribution 47 Awards & Recognition 153 Non-Core Businesses 51 Key Past Awards 154 New Business & Major Projects 54 Media Highlights 160 Group Finance 56 Calendar of Events 163 Planning 62 Milestones Over 60 Years 168 Corporate Affairs & Services 175 Procurement Performance Review Other Services 179 Sabah Electricity Sdn. -
Business Name Business Category Outlet Address State 2020 Motor
Business Name Business Category Outlet Address State 2020 Motor Automotive TB 12186 LOT A 13 TAMAN MEGAH JAYA,JALAN APASTAWAU Sabah 616 Auto Parts Co Automotive Kian yap Industrial lot 113 lorong durians 112 Lorong Durian 5 88450 Kota Kinabalu Sabah Malaysia Sabah 88 Bikers Automotive D-G-5, Ground Floor, Block D, Komersial 88/288 Marketplace, Ph.10A, Jalan Pintas, Kepayan RidgeSabah Sabah Alpha Motor Trading Automotive Alpha Motor Trading Jalan Sapi Nangoh Sabah Malaysia Sabah anna car rental Automotive Sandakan Airport Sabah Apollo service centre Automotive Kudat Sabah Malaysia Sabah AQIQ ENTERPRISE Automotive Lorong Cyber Perdana 3 Penampang Sabah Malaysia 89500 Sabah ar rizqi Automotive Beaufort, Sabah, Malaysia Sabah Armada KK Automobile Sdn Bhd Automotive Ground Floor, Lot No.46, Block E, Asia City, Phase 1B Sabah arsy hany car rental Automotive rumah murah peringkat 1 no 54 Pekan Beaufort Sabah Atlanz Tyres Automotive Kampung Keliangau, Kota Kinabalu, Sabah, Malaysia Sabah Autocycle Motor Sdn Bhd Automotive lot 39, grd polytechnic, 8, Jalan Politeknik, Tuaran, Sabah, Malaysia Sabah Autohaven Superstore Automotive kg sin san peti surat 588 Kudat Sabah Malaysia Sabah Automotive Electrical Tec Automotive No 3, Block H, Hakka Building, Mile 5,5, Tuaran Road, Inanam, Kota Kinabalu, Sabah, Malaysia Sabah Azmi Sparepart Automotive Papar Sabah Malaysia Sabah Bad Monkey Garage Automotive Kg Landong Ayang Jln Landong Ayang 2 Kg Landong Ayang Jalan Landong Ayang II Kudat Sabah Malaysia Sabah BANLEE MOTOR Automotive BANLEE MOTORBATU 1 JLN MERINTAMAN98850 -
Kota Marudu/Pitas District Council Instrument 1983
FOR REFERENCE ONLY (September 2011) PUTATAN DISTRICT COUNCIL INSTRUMENT 2010 INSTRUMENT issued by the Yang di-Pertua Negeri under section 3 of the Local Government Ordinance 1961. 1. This Instrument may be cited as the Putatan District Council Instrument 2010. 2. In this Instrument — "Council" means the Putatan District Council established under clause 3; “member” means a member of the Council appointed under clause 6; "Ordinance" means the Local Government Ordinance 1961. 3. There is hereby established a council to be known as the Putatan District Council. 4. (1) The limits of the area under the jurisdiction of the Council are as prescribed in the First Schedule. (2) The area set out in the Second Schedule is declared to be a township to be known as Putatan Township. 5. The seal of the Council shall be the following device: A circle with the words “Majlis Daerah Putatans Sabah Malaysia” around the circumference: Provided that until such time that a seal capable of reproducing the said device can be procured, a rubber stamp bearing the inscription “Majlis Daerah Putatan Sabah Malaysia” may be used in lieu of such seal. 1 FOR REFERENCE ONLY (September 2011) 6. The Council shall be composed of the District Officer, Putatan and not more than eighteen members to be appointed by the Minister of Local Government and Housing. 7. All members of the Council shall be appointed for a period of not exceeding two years. 8. The Chairman of the Council shall be the District Officer, Putatan and the Vice- Chairman shall be elected by all the members of the Council. -
Property Market Review 2018 / 2019 Contents
PROPERTY MARKET REVIEW 2018 / 2019 CONTENTS Foreword Property Northern 02 04 Market 07 Region Snapshot Central Southern East Coast 31 Region 57 Region 75 Region East Malaysia The Year Glossary 99 Region 115 Ahead 117 This publication is prepared by Rahim & Co Research for information only. It highlights only selected projects as examples in order to provide a general overview of property market trends. Whilst reasonable care has been exercised in preparing this document, it is subject to change without notice. Interested parties should not rely on the statements or representations made in this document but must satisfy themselves through their own investigation or otherwise as to the accuracy. This publication may not be reproduced in any form or in any manner, in part or as a whole, without writen permission from the publisher, Rahim & Co Research. The publisher accepts no responsibility or liability as to its accuracy or to any party for reliance on the contents of this publication. 2 FOREWORD by Tan Sri Dato’ (Dr) Abdul Rahim Abdul Rahman 2018 has been an eventful year for all Malaysians, as Speed Rail) project. This move was lauded by the World witnessed by Pakatan Harapan’s historical win in the 14th Bank, who is expecting Malaysia’s economy to expand at General Election. The word “Hope”, or in the parlance of 4.7% in 2019 and 4.6% in 2020 – a slower growth rate in the younger generation – “#Hope”, could well just be the the short term as a trade-off for greater stability ahead, theme to aptly define and summarize the current year and as the nation addresses its public sector debt and source possibly the year ahead. -
IIIIII IVIV 0 75 150 Km
Earthquake Green Shaking Alert M 6.0, SABAH, MALAYSIA Origin Time: Thu 2015-06-04 23:15:43 UTC (07:15:43 local) PAGER o o Location: 6.08 N 116.55 E Depth: 10 km Version 1 Created: 21 minutes, 7 seconds after earthquake Estimated Fatalities Green alert for shaking-related fatalities Estimated Economic Losses and economic losses. There is a low likelihood of casualties and damage. 66% 65% 30% 30% 4% 4% 1 100 10,000 1 100 10,000 10 1,000 100,000 10 1,000 100,000 Fatalities USD (Millions) Estimated Population Exposed to Earthquake Shaking ESTIMATED POPULATION - -* 3,239k 1,679k 263k 7k 0 0 0 0 EXPOSURE (k = x1000) ESTIMATED MODIFIED MERCALLI INTENSITY PERCEIVED SHAKING Not felt Weak Light Moderate Strong Very Strong Severe Violent Extreme Resistant none none none V. Light Light Moderate Moderate/Heavy Heavy V. Heavy POTENTIAL Structures DAMAGE Vulnerable Structures none none none Light Moderate Moderate/Heavy Heavy V. Heavy V. Heavy *Estimated exposure only includes population within the map area. Population Exposure population per ~1 sq. km from Landscan Structures: Overall, the population in this region resides in structures that are vulnerable to 114°E 116°E 118°E earthquake shaking, though some resistant structures exist. Historical Earthquakes (with MMI levels): Date Dist. Mag. Max Shaking BalabacBalabac BalabacBalabac 8°N (UTC) (km) MMI(#) Deaths 2001-07-31 233 5.4 VI(9k) 0 1994-11-02 247 5.7 VII(6k) 0 IIIIIIIII 1976-07-26 228 6.3 IX(2k) 0 CagayanCagayan 7°N KudatKudat KotaKota BeludBelud TaganakTaganakTaganak IVIV KotaKotaIVIVIVIV -
Property Market Review | 2020–2021 3
2021 2020 / MARKET REVIEW MARKET PROPERTY 2020 / 2021 CONTENTS Foreword | 2 Property Market Snapshot | 4 Northern Region | 7 Central Region | 33 Southern Region | 57 East Coast Region | 75 East Malaysia Region | 95 The Year Ahead | 110 Glossary | 113 This publication is prepared by Rahim & Co Research for information only. It highlights only selected projects as examples in order to provide a general overview of property market trends. Whilst reasonable care has been exercised in preparing this document, it is subject to change without notice. Interested parties should not rely on the statements or representations made in this document but must satisfy themselves through their own investigation or otherwise as to the accuracy. This publication may not be reproduced in any form or in any manner, in part or as a whole, without writen permission from the publisher, Rahim & Co Research. The publisher accepts no responsibility or liability as to its accuracy or to any party for reliance on the contents of this publication. 2 FOREWORD by Tan Sri Dato’ (Dr) Abdul Rahim Abdul Rahman Executive Chairman, Rahim & Co Group of Companies 2020 came through as the year to be remembered but not in the way anyone had expected or wished for. Malaysia saw its first Covid-19 case on 25th January 2020 with the entrance of 3 tourists via Johor from Singapore and by 17th March 2020, the number of cases had reached above 600 and the Movement Control Order (MCO) was implemented the very next day. For two months, Malaysia saw close to zero market activities with only essential goods and services allowed as all residents of the country were ordered to stay home. -
Memorandum to Penampang District Land Use Planning Scheme
STATE OF SABAH TOWN AND COUNTRY PLANNING ORDINANCE (SABAH CAP. 141) MEMORANDUM TO PENAMPANG DISTRICT LAND USE PLANNING SCHEME INTRO Development trends in Penampang District PART I General purposes and application of the Land Use Planning Scheme PART II Development Plans PART III Application Procedures and Administration PART IV General standards and regulations Schedule 4.1. Standards and regulations for buildings Schedule 4.2. Car parking standards Schedule 4.3. Road standards and regulations Schedule 4.4. Riverine standards Schedule 4.5. Construction of hill slope standards and regulations Schedule 4.6. Activities requiring EIA Schedule 4.7. Site clearing and earthworks standards and regulations Schedule 4.8. Mineral extraction regulations PART V Specific land use zone regulations Schedule 5.1. Village zones Schedule 5.2. Countryside zones Schedule 5.3. Hill zones Schedule 5.4. Water catchment zones Schedule 5.5. Protected Areas MAPS Map 1: Satelitte image (Spot 4) of the District of Penampang, Sabah Map 2: General zoning of the Penampang District Land Use Planning Scheme Map 3: The Village and Countryside zones Map 4: Water Catchment Zone, Sg Babagon Map 5: Protected Areas in Penampang and surrounding districts Accompaying detailed maps: As produced by the RTCPD TABLES Table 1: Zoning and development types ANNEXES Annex 1: Specimen Application Form Annex 2: Specimen Decision Form Annes 3: Glossary Annex 4: Method for determination of slope degree Annex 5: Maps used for analysis and zoning 1 Name of Local Authority …………………………………………………………….…….….……… Notification of Intention to Prepare a Draft Scheme G.N. ……………………………………….. Notification of Preparation of Draft Scheme G.N. -
2015 Annual Report CONTENTS
2015 Annual Report CONTENTS 01 Album 18 Profile 19 Message from the Chairman and CEO 20 Corporate governance 21 Corporate management structures 22 New directions and strategy 25 Stock market and shareholder base 28 Sustainable development 41 CONCESSIONS 44 VINCI Autoroutes 56 VINCI Highways 62 VINCI Airports 70 VINCI Railways 72 VINCI Stadium 74 Other public amenities 77 CONTRACTING 78 VINCI Energies 90 Eurovia 100 VINCI Construction 114 VINCI Immobilier 117 GENERAL & FINANCIAL ELEMENTS 118 Report of the Board of Directors 216 Report of the Chairman of the Board on corporate governance and internal control procedures 222 Report of the Vice-Chairman and Senior Director of the Board of Directors 224 Consolidated financial statements 303 Parent company financial statements 320 Special report of the Statutory Auditors on regulated agreements and commitments 322 Persons responsible for the registration document 324 Cross-reference table for the registration document 326 Cross-reference table for the annual financial report 327 Cross-reference table for workforce-related, environmental and social information Cover photo – The Arturo Merino Benitez Airport in Santiago de Chile will double its capacity to 30 million passengers by 2020. Key data Key data Group Revenue (1) 280,000 €38.5 billion projects (2) Market capitalisation at 31 December 2015 185,452 €34.8 billion employees worldwide (3) Net income attributable to owners of the parent €2,046 million Revenue (1) Ebitda (4) Operating income (in €m) (in €m and as a % of revenue (1) ) from ordinary -
Enhancing the Service Experience Through Technology
KDN No. PP 14872/01/2013 (032037) New Secure Parking Car Parks Bedford Business Park VOL.9, NO.3, 3Q 2015 NEWS AND INFORMATION FROM SECURE PARKING Multi-storey Car Park KUALA LUMPUR Location Old Klang Road Parking Bays 204 Type Standalone Commencement Enhancing the Service Experience August 1, 2015 through Technology Aman Central KEDAH One can expect Debbie Chang to be Secure Parking has, to date, introduced Location Alor Setar running in and out of the office everyday numerous e-services to provide Parking Bays with hardly any breathing space in between. convenience to its customers, but two, in 1636 Such is the daily routine for Secure Parking particular, stand out – ParkCharge and Type Commercial Malaysia’s chief operating officer (COO) – ParkAide. Commencement meetings with building owners during the October 1, 2015 day and ‘housekeeping’ meetings with staff ParkCharge is a parking management and paperwork in the late afternoons and system for automated card management, Komtar evenings. billing and payment system. Multi-storey Car Park “ParkCharge is the embodiment of the PENANG As COO, Chang oversees Secure Parking’s best of today’s web-based information Location human capital development, quality technology to standardise and centralise Georgetown assurance, business operations, customer a total management system for car parks Parking Bays Chang: Your parking 679 pass cards’ accounts,” Chang said. service, business development as well experience will never be the Type Commercial / Government as technical and facility maintenance -
Lampiran a Senarai Syarikat Berdaftar Dengan
LAMPIRAN A SENARAI SYARIKAT BERDAFTAR DENGAN KEMENTERIAN KEWANGAN MALAYSIA DALAM MEMBELI BARANG LUSUH DI NEGERI SABAH DAERAH KATEGORI BI SYARIKAT TEMPOH SAH L PENDAFTARAN MULAI HINGGA Kota (221301) 1 Sin Kong Enterprise 27.08.2008 26.08.201 Kinabalu Jalan Tuaran By Pass 1 Tidak P. O. Box 326, Tanjung Perlu Aru Permit 88858 Kota Kinabalu, Telefon : 088 – 499888 Status : Bukan Bumiputera 2 Hyperware Systems 18.01.2008 17.01.201 Engineering Sdn. Bhd. 1 Unit 130A, 1st Floor, Wisma Sabah 88000 Kota Kinabalu. Telefon : 088 – 256044 Status : Bumiputera 3 Syarikat Usaha Sama 27.09.2007 26.09.201 Blok D, Lot 3, Tingkat 3 0 Sadong Jaya Karamunsing 88100 Kota Kinabalu Telefon : 012 – 8206059 Status : Bumiputera 4 Teraju Unggul 18.09.2007 17.09.201 Construction 0 Unit No. 6 - 8 -10D, Menara MAA, Api-Api Centre 88800 Kota Kinabalu. Telefon : 016 – 8494969 Status : Bumiputera 5 Syarikat Perniagaan 08.09.2008 07.09.201 Monongkeso, 1 No.3, 1st Floor, Taman Mesra, Phase1, Jalan Penampang P.O. Box 12346 88826 Kota Kinabalu. Telefon: 014 – 8597348 Status: Bumiputera 6 Haip Loong Sdn. Bhd. 15.10.2008 14.10.201 Lot 4, Taman Mesra, 1 Phase 1 Mile 2 ¾, Penampang Road Kota Kinabalu P.O. Box 10731 88808 Kota Kinabalu. Telefon: 088 – 210150 Status: Bukan Bumiputera DAERAH KATEGORI BI SYARIKAT TEMPOH SAH L PENDAFTARAN MULAI HINGGA Kota (221301) 7 Swakaya Sdn. Bhd. 02.06.2010 01.06.201 Kinabalu Block 1, Lot 1-49-5 3 Tidak Signature Office, Perlu KK Times Square, Permit Off Coastal Highway, 88100 Kota Kinabalu. Telefon : 088 – 486373 Status : Bumiputera 8 Wira Waris Enterprise 24.05.2009 23.05.201 Shoplot No.