APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information

S. No. Item Details 1. Name of the Project M/s. Saiteja Drugs and Intermediates Pvt Ltd Active Pharmaceutical Ingredients (APIs) Manufacturing Unit 2. S.No. in the Schedule 5 (f) 3. Proposed capacity / area / length / Existing unit tonnage to be handled / command area / Application for Extension of Validity of lease area / number of wells to be drilled Environmental Clearance (EC). 4. New/ Expansion / Modernization Existing unit, Application for Extension of Validity of Environmental Clearance (EC) only. 5. Existing Capacity / Area etc. Permitted capacity : 108 TPA (Any 3 products out of 6 products will be manufactured at a time); Existing total area: 2.4 Ha. 6. Category of Project i.e., ‘A’ or ‘B’ Category ‘A’ 7. Does it attract the general Condition? If No Yes, Please specify 8. Does it attract the specific condition? If No Yes, Please specify 9. Location Plot/Survey/Khasra No. Sy. No. 543 / A , 544 / A Village Seetavani Gudem Tehsil District Yadadri (formerly ) State 10. Nearest railway station / Railway Station – 14 Km (N) airport along with distance in km. Rajiv Gandhi International Airport, Shamshabad – 36 (WSW) 11. Nearest Town, City, Bhoodan Pochampally – 2.37 Km (E) District Headquarters along with distance District Headquarters– – 20 Km (NNE) in km. (ORR) – 13.65 Km (W) 12. Village Panchayats, Zilla Parishad, Village Panchayat address (local body): Municipal Corporation, Local body Gram Panchayat Office, (complete postal addresses with Seetavani Gudem Village, telephone nos. to be given) Bhoodan Pochampally Mandal, Yadadri District (Formerly )Telangana State 13. Name of the applicant Authorized signatory: Mr. K. Chandrasekhara Reddy Managing Director

1

S. No. Item Details 14. Registered Address M/s. Saiteja Drugs and Intermediates Pvt Ltd Sy No. 543/A, 544/A Seetavani Gudem (Village) Bhoodan Pochampally (Mandal) Yadadri District (Formerly Nalgonda District) Telangana State 15. Address for correspondence: M/s. Saiteja Drugs and Intermediates Pvt Ltd H. No. 8-3-333/154, Flat No. 101, Sapphire Apartment, Kamalapuri Colony, Phase-III, Srinagar Colony, Hyderabad – 500073 Telangana State Name Mr. K. Chandrasekhara Reddy Designation (Owner/Partner/ CEO) Managing Director Address M/s. Saiteja Drugs and Intermediates Pvt Ltd Sy No. 543/A, 544/A Seetavani Gudem (Village) Bhoodan Pochampally (Mandal) Yadadri District (Formerly Nalgonda District Telangana State Pin Code 508284 E-mail [email protected] Telephone No. 9949169990 / 040-40153151 Fax No. -- 16. Details of Alternative Sites examined, if Not Applicable as this application for extension any, Location of these sites should be of EC validity. shown on a topo sheet. 17. Interlinked projects Nil 18. Whether separate application of Not Applicable interlined project has been submitted 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable as this application for extension of EC validity. 21. Whether the proposal involves Nil approval/clearance under: if yes, details of the same and their status to be given (a) The Forest (Conservation)Act, 1980 (b) The Wildlife (Protection) Act, 1972 (c) The C.R.Z Notification, Act, 1991 22. Whether there is any Government Nil Order/Policy relevant/relating to the site 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending Nil against the project and / or land in which the project is propose to be set up (a) Name of the Court (b) Case No.

2

S. No. Item Details (c) Orders / directions of the Court, if any and its relevance with the proposed project. *Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No This application is for extension of EC land use, land cover or topography validity. including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No Permitted Industry is having EC & CFE vegetation and buildings? and are enclosed as Annexures I & II respectively. 1.3 Creation of new land uses? No Not envisaged 1.4 Pre-construction investigations e.g. No Not envisaged. bore houses, soil testing? 1.5 Construction works? No Not envisaged 1.6 Demolition works? No Not envisaged 1.7 Temporary sites used for No Not envisaged construction works or housing of construction workers? 1.8 Above ground buildings, structures No Not envisaged or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No Not envisaged mining or tunneling? 1.10 Reclamation works? No Not envisaged 1.11 Dredging? No Not envisaged 1.12 Offshore structures? No Not envisaged. 1.13 Production and manufacturing No This application is for extension of EC processes? validity. 1.14 Facilities for storage of goods or No This application is for extension of EC materials? validity. 1.15 Facilities for treatment or disposal Yes Will be provided as per EC & CFE of solid waste or liquid effluents? 1.16 Facilities for long term housing of No Most of the workers are locals and nearby operational workers? villages. 1.17 New road, rail or sea traffic during No Not envisaged. construction or operation? 1.18 New road, rail, air waterborne or No Not envisaged. other transport infrastructure

3

S. No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with source of information data including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not envisaged. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not envisaged or pipelines? 1.21 Impoundment, damming, No Not envisaged culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not envisaged 1.23 Abstraction or transfers of water No This application is for extension of EC from ground or surface waters? validity. 1.24 Changes in water bodies or the No Not envisaged. land surface affecting drainage or run-off? 1.25 Transport of personnel or materials No This application is for extension of EC for construction, operation or validity. decommissioning? 1.26 Long-term dismantling or No Not envisaged decommissioning or restoration works? 1.27 Ongoing activity during No Not envisaged. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either No This application is for extension of EC temporarily or permanently? validity. 1.29 Introduction of alien species? No Nil. 1.30 Loss of native species or genetic No Nil. diversity? 1.31 Any other actions? No -

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S. Information/checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No This application is for extension of EC agricultural land (ha) validity. 2.2 Water (expected source & No This application is for extension of EC competing users) unit: KLD validity. 2.3 Minerals (MT) No Not envisaged

2.4 Construction material – stone, No Not envisaged aggregates, sand / soil (expected source – MT) 2.5 Forests and timber (source – MT) No Not applicable. 2.6 Energy including electricity and No Not envisaged

4

S. Information/checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible) with source of information data fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use No This application is for extension of EC appropriate standard units) validity.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information / Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, Yes Complying with CFE/EC conditions which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No Not envisaged. or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No This application is for extension of EC changing living conditions? validity. 3.4 Vulnerable groups of people who No Not envisaged. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No -

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No. Information/Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not applicable. 4.2 Municipal waste (domestic and or Yes Permitted APIs manufacturing unit and commercial wastes) submitting for extension of EC validity. 4.3 Hazardous wastes (as per Yes Permitted APIs manufacturing unit and Hazardous Waste Management submitting for extension of EC validity. Rules) 4.4 Other industrial process wastes Yes Permitted APIs manufacturing unit and submitting for extension of EC validity. 4.5 Surplus product No This application is for extension of EC validity. 4.6 Sewage sludge or other sludge Yes Permitted APIs manufacturing unit and from effluent treatment submitting for extension of EC validity. 4.7 Construction or demolition wastes No This application is for extension of EC validity.

5

S.No. Information/Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data 4.8 Redundant machinery or No Not envisaged. equipment 4.9 Contaminated soils or other No Not envisaged. materials 4.10 Agricultural wastes No Not envisaged. 4.11 Other solid wastes No Not envisaged.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. No. Information / Checklist Yes / Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of No This application is for extension of EC fossil fuels from stationary or validity. mobile sources 5.2 Emissions from production No This application is for extension of EC processes validity. 5.3 Emissions from materials handling No Permitted APIs manufacturing unit and including storage or transport submitting for extension of EC validity. 5.4 Emissions from construction No Not applicable. activities including plant and equipment 5.5 Dust or odours from handling of No Not envisaged. materials including construction materials, sewage and waste 5.6 Emissions from incineration of No Not applicable waste 5.7 Emissions from burning of waste in No Not envisaged. open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not envisaged.

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. No Permitted APIs manufacturing unit and engines, ventilation plant, crushers submitting for extension of EC validity.

6.2 From industrial or similar No Permitted APIs manufacturing unit and processes submitting for extension of EC validity.

6.3 From construction or demolition. No Permitted APIs manufacturing unit and submitting for extension of EC validity.

6

S.No. Information/Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data with source of information data 6.4 From blasting or piling No Not envisaged. 6.5 From construction or operational No This application is for extension of EC traffic validity. 6.6 From lighting or cooling systems No Nil 6.7 From any other sources No Nil

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No. Information / Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or Yes Complying as per EC / CFE. Permitted spillage of hazardous materials APIs manufacturing unit and submitting for extension of EC validity. 7.2 From discharge of sewage or other No Complying as per EC/ CFE. Permitted effluents to water or the land APIs manufacturing unit and submitting (expected mode and place of for extension of EC validity. discharge) Process effluents will be pumped to the above ground level R.C.C lined tanks for storage and neutralization then sent to ETP – ZLD. 7.3 By deposition of pollutants emitted No This application is for extension of EC to air into the land or into water validity. 7.4 From any other sources No Nil 7.5 Is there a risk of long term build up No Not envisaged. of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No. Information/Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires Yes This application is for extension of EC etc. from storage, handling, use or validity. production of hazardous All safety precautions will be taken by substances the industry to avoid such accidents. 8.2 From any other causes Yes - 8.3 Could the project be affected by No Not envisaged. natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

7

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. No. Information/Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

• Supporting infrastructure (roads, No • This application is for extension of EC power supply, waste or waste validity. water treatment, etc.)

• housing development No • All employees are coming from nearby villages. • extractive industries No • Not envisaged. • supply industries No • Not envisaged. • other No • Not envisaged. 9.2 Lead to after-use of the site, which No This application is for extension of EC could have an impact on the validity. environment 9.3 Set a precedent for later No This application is for extension of EC developments validity.

9.4 Have cumulative effects due to No Permitted APIs manufacturing unit and proximity to other existing or submitting for extension of EC validity. planned projects with similar effects

(III) Environmental Sensitivity

S. Areas Name/ Aerial distance (within 15 km) Proposed No. Identity project location boundary 1. Areas protected under Yes Jalapur RF – 0.75 Km (SW) international conventions, national Meharnagar RF – 2.0 Km (SSW) or local legislation for their Malkapuram RF – 6.4 (SSE) & 8.6 (SSE) ecological, landscape, cultural or RF – 13 Km (SE) other related value RF – 8.7 Km (SE) RF near Choutuppal – 12.4 Km (SE) 2. Areas which are important or No Not envisaged sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3. Areas used by protected, No Not envisaged. important or sensitive Species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or Yes Pochampally Cheruvu – 2.84 Km (ENE) underground waters Pond near Jagathpalle – 1.27 Km (N)

8

S. Areas Name/ Aerial distance (within 15 km) Proposed No. Identity project location boundary Pond near Abdulla Nagar – 5.66 Km (NE) Pond near Badravathi colony road – 1.4 Km (NE) Mukhtapuram Cheruvu -2.42 Km (NNE) Rangareddy Cheruvu – 4.14 Km (NNW) Rama Swamy Cheruvu – 4.4 Km (NNW) Pond near Pillai Palle – 4.51 Km (NNW) Pond near Jalalpur – 1.14 Km (SSE) Peetara kunta – 4.43 Km (NNW) Pond near Revanpally – 4.75 Km (ENE) Kapraipally Cheruvu – 5.7 Km (N) Musi River - 6.0 Km (NW) Chinna Musi River – 2.43 Km (S) 5. State, National boundaries No Nil 6. Routes or facilities used by the Yes National Highway – 65 (previously NH-9) : public for access to recreation or 7.18 Km (SW) (Hyderabad -Vijayawada) other tourist, pilgrim areas MG Road – 1.42 Km (S) Badravathi Colony Road (Adj)

7. Defence installations No Nil 8. Densely populated or built-up Yes Bhoodan Pochampally – 2.37 Km (E) area District Headquarters – Bhongir – 20 Km (NNE) 9. Areas occupied by sensitive man- Yes Hospitals, schools, temples and other made land uses general community facilities exist in the (hospitals, schools, places of settlements in the study area. worship, community facilities) 10. Areas containing important, high No Not applicable quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas already subjected to No Not applicable. pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12. Areas susceptible to natural No The project area falls under seismic zone II hazard which could cause the as per IS: 1893 (Part1):2002. project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) (IV). Proposed Terms of Reference for EIA studies:

Not applicable as this is Permitted industry and submitting Form 1 application for extension of EC validity.

9

Annexures

S.No. Contents Page No. 1. EC Order 22-08-2007 12-16 2. CFE Order : 18-8-2016 17-22 3. Topographical Map (10 Km Buffer) 23

11

ANNEXURE - I

12 ANNEXURE - I

13 ANNEXURE - I

14 ANNEXURE - I

15 ANNEXURE - I

16 ANNEXURE - II

17 ANNEXURE - II

18 ANNEXURE - II

19 ANNEXURE - II

20 ANNEXURE - II

21 ANNEXURE - II

22 Topographical Map – 10 Km radius ANNEXURE - III

Project Site

23