FORM 1 (I) Basic Information
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. No. Item Details 1. Name of the Project M/s. Saiteja Drugs and Intermediates Pvt Ltd Active Pharmaceutical Ingredients (APIs) Manufacturing Unit 2. S.No. in the Schedule 5 (f) 3. Proposed capacity / area / length / Existing unit tonnage to be handled / command area / Application for Extension of Validity of lease area / number of wells to be drilled Environmental Clearance (EC). 4. New/ Expansion / Modernization Existing unit, Application for Extension of Validity of Environmental Clearance (EC) only. 5. Existing Capacity / Area etc. Permitted capacity : 108 TPA (Any 3 products out of 6 products will be manufactured at a time); Existing total area: 2.4 Ha. 6. Category of Project i.e., ‘A’ or ‘B’ Category ‘A’ 7. Does it attract the general Condition? If No Yes, Please specify 8. Does it attract the specific condition? If No Yes, Please specify 9. Location Plot/Survey/Khasra No. Sy. No. 543 / A , 544 / A Village Seetavani Gudem Tehsil Bhoodan Pochampally District Yadadri (formerly Nalgonda) State Telangana 10. Nearest railway station / Bibinagar Railway Station – 14 Km (N) airport along with distance in km. Rajiv Gandhi International Airport, Shamshabad – 36 (WSW) 11. Nearest Town, City, Bhoodan Pochampally – 2.37 Km (E) District Headquarters along with distance District Headquarters–Bhongir – 20 Km (NNE) in km. Hyderabad (ORR) – 13.65 Km (W) 12. Village Panchayats, Zilla Parishad, Village Panchayat address (local body): Municipal Corporation, Local body Gram Panchayat Office, (complete postal addresses with Seetavani Gudem Village, telephone nos. to be given) Bhoodan Pochampally Mandal, Yadadri District (Formerly Nalgonda District)Telangana State 13. Name of the applicant Authorized signatory: Mr. K. Chandrasekhara Reddy Managing Director 1 S. No. Item Details 14. Registered Address M/s. Saiteja Drugs and Intermediates Pvt Ltd Sy No. 543/A, 544/A Seetavani Gudem (Village) Bhoodan Pochampally (Mandal) Yadadri District (Formerly Nalgonda District) Telangana State 15. Address for correspondence: M/s. Saiteja Drugs and Intermediates Pvt Ltd H. No. 8-3-333/154, Flat No. 101, Sapphire Apartment, Kamalapuri Colony, Phase-III, Srinagar Colony, Hyderabad – 500073 Telangana State Name Mr. K. Chandrasekhara Reddy Designation (Owner/Partner/ CEO) Managing Director Address M/s. Saiteja Drugs and Intermediates Pvt Ltd Sy No. 543/A, 544/A Seetavani Gudem (Village) Bhoodan Pochampally (Mandal) Yadadri District (Formerly Nalgonda District Telangana State Pin Code 508284 E-mail [email protected] Telephone No. 9949169990 / 040-40153151 Fax No. -- 16. Details of Alternative Sites examined, if Not Applicable as this application for extension any, Location of these sites should be of EC validity. shown on a topo sheet. 17. Interlinked projects Nil 18. Whether separate application of Not Applicable interlined project has been submitted 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable as this application for extension of EC validity. 21. Whether the proposal involves Nil approval/clearance under: if yes, details of the same and their status to be given (a) The Forest (Conservation)Act, 1980 (b) The Wildlife (Protection) Act, 1972 (c) The C.R.Z Notification, Act, 1991 22. Whether there is any Government Nil Order/Policy relevant/relating to the site 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending Nil against the project and / or land in which the project is propose to be set up (a) Name of the Court (b) Case No. 2 S. No. Item Details (c) Orders / directions of the Court, if any and its relevance with the proposed project. *Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No This application is for extension of EC land use, land cover or topography validity. including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No Permitted Industry is having EC & CFE vegetation and buildings? and are enclosed as Annexures I & II respectively. 1.3 Creation of new land uses? No Not envisaged 1.4 Pre-construction investigations e.g. No Not envisaged. bore houses, soil testing? 1.5 Construction works? No Not envisaged 1.6 Demolition works? No Not envisaged 1.7 Temporary sites used for No Not envisaged construction works or housing of construction workers? 1.8 Above ground buildings, structures No Not envisaged or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No Not envisaged mining or tunneling? 1.10 Reclamation works? No Not envisaged 1.11 Dredging? No Not envisaged 1.12 Offshore structures? No Not envisaged. 1.13 Production and manufacturing No This application is for extension of EC processes? validity. 1.14 Facilities for storage of goods or No This application is for extension of EC materials? validity. 1.15 Facilities for treatment or disposal Yes Will be provided as per EC & CFE of solid waste or liquid effluents? 1.16 Facilities for long term housing of No Most of the workers are locals and nearby operational workers? villages. 1.17 New road, rail or sea traffic during No Not envisaged. construction or operation? 1.18 New road, rail, air waterborne or No Not envisaged. other transport infrastructure 3 S. No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with source of information data including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not envisaged. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not envisaged or pipelines? 1.21 Impoundment, damming, No Not envisaged culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not envisaged 1.23 Abstraction or transfers of water No This application is for extension of EC from ground or surface waters? validity. 1.24 Changes in water bodies or the No Not envisaged. land surface affecting drainage or run-off? 1.25 Transport of personnel or materials No This application is for extension of EC for construction, operation or validity. decommissioning? 1.26 Long-term dismantling or No Not envisaged decommissioning or restoration works? 1.27 Ongoing activity during No Not envisaged. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either No This application is for extension of EC temporarily or permanently? validity. 1.29 Introduction of alien species? No Nil. 1.30 Loss of native species or genetic No Nil. diversity? 1.31 Any other actions? No - 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No This application is for extension of EC agricultural land (ha) validity. 2.2 Water (expected source & No This application is for extension of EC competing users) unit: KLD validity. 2.3 Minerals (MT) No Not envisaged 2.4 Construction material – stone, No Not envisaged aggregates, sand / soil (expected source – MT) 2.5 Forests and timber (source – MT) No Not applicable. 2.6 Energy including electricity and No Not envisaged 4 S. Information/checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible) with source of information data fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use No This application is for extension of EC appropriate standard units) validity. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information / Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, Yes Complying with CFE/EC conditions which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No Not envisaged. or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No This application is for extension of EC changing living conditions? validity. 3.4 Vulnerable groups of people who No Not envisaged. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No - 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not applicable. 4.2 Municipal waste (domestic and or Yes Permitted APIs manufacturing unit and commercial wastes) submitting for extension of EC validity. 4.3 Hazardous wastes (as per Yes Permitted APIs manufacturing unit and Hazardous Waste Management submitting for extension of EC validity. Rules) 4.4 Other industrial process wastes Yes Permitted APIs manufacturing unit and submitting for extension of EC validity. 4.5 Surplus product No This application is for extension of EC validity.