Ryan Ruthven Professional Profile Project Engineer
Total Page:16
File Type:pdf, Size:1020Kb
RYAN RUTHVEN PROFESSIONAL PROFILE PROJECT ENGINEER PROJECT RESPONSIBILITIES Education As Project Engineer, Mr. Ruthven will serve as the conduit through which all Pratt Institute of Technology B.S., Construction Management information flows – to and from the Owner, the design team, Turner, consultants, governmental regulatory agencies, and the subcontractors. He will manage Industry Experience the submittal process to ensure that construction details are confirmed and 10 Years functional; contiguous trades are coordinated; and materials are reviewed, approved, fabricated, and delivered to the site when they are required on the job. REFERENCES Mr. Ruthven will also lead and document all team meetings. He will manage and Mr. Ernesto Bacalzo control all cost-related issues encountered during the construction phase and Director, Construction Brookfield Office Properties will be responsible for the management of subordinate Project Engineers that 250 Vesey Street, 15th Floor have specific project discipline responsibilities. New York, NY 10281-1023 (212) 417-7494 SELECT PROJECT EXPERIENCE Mr. Karminder Raj Singh Leader - Global Space Planning and Projects CNN Newsrooms at Time Warner Center | Project Superintendent Symantec Corporation This assignment involves providing field leadership for the 81,000 s.f. CNN One Penn Plaza, 54th Floor newsrooms at Time Warner Center. The newsrooms have the flexibility to serve as a New York, NY 10001 busy newsroom as well as a broadcast studio for up-to-the-minute reporting from (650) 527-5005 a desk. The newsroom has slab heights in excess of 26 feet, bringing in a large Mr. Michael Fanelli, LEED AP amount of natural light. Mr. Ruthven is working on renovations to the 5th floor. Time Warner Real Estate One Time Warner Center, 11-161 Lexis Nexis at 230 Park Avenue | Project Engineer New York, NY 10019 This assignment involved providing engineering services for a 65,000 s.f. single- (212) 484-6415 story commercial fit-out for Lexis Nexis headquarters location at the Helmsley Building. The scope of the project includes an RPX room with teleconferencing technology, board rooms with projector screens, various conference centers, and open area office space with executive offices to showcase a picturesque view of Park Avenue. The project requires coordination with neighboring tenants within an occupied building. Symantec at One Penn Plaza | Project Engineer This assignment involved providing engineering services for a 20,000 s.f. fit-out for Symantec on the 54th Floor at One Penn Plaza. The space will house Symantec’s new East Coast Client Conference Center and Executive Suite. Designed by IA Interior Architects, the space includes meeting rooms of varying sizes as well as workstations and interior executive offices that will be used as touchdown rooms. The fast tracked project was completed within an occupied building. Deliveries were coordinated to minimize freight elevator trips to the building’s top floor. RYAN RUTHVEN PROFESSIONAL PROFILE PROJECT ENGINEER Bloomberg at 731 Lexington Avenue | Project Engineer This assignment involved providing engineering services for the nine-floor, 300,000 s.f. fit-out at 731 Lexington Avenue for Bloomberg. The interiors in- clude new offices, conference rooms, multi-purpose rooms, a training facility and a pantry. High-end IT and audio-visual capabilities were included on all floors. A unique curved stair was constructed to unify the space. Brookfield Office Space at 250 Vesey Street | Project Engineer This assignment involved providing engineering services for this 120,000 s.f. fast track interior fit-out. The project consists of the relocation of Brookfield Properties to Floors 12, 14, and 15 at 250 Vesey Street. The scope of work includes open office space, private offices, conference rooms, pantries, bathrooms, infrastructure and an interconnecting stair. K&L Gates at 599 Lexington Avenue | Project Engineer This assignment involved providing engineering services for the demolition and 8,000 s.f. office fit-out for K&L Gates at 599 Lexington Avenue. The completed space includes high-end finishes with millwork, ceramic tiles, glass glazing, ornamental metals and stone. Wells Fargo at 100 Park Avenue | Project Engineer This assignment involved providing engineering services for the fit-out of the third floor at 100 Park Avenue to accommodate Wells Fargo, a financial services company. The space included a lobby reception area, a boardroom, conference areas, working pantries and open plan office space. While ceiling heights ranged from 7’ to 9’ as a result of duct work and light fixtures, the design aligned all lights, sprinkler heads, speakers and diffusers throughout the finished space. Turner Interiors | Estimating Engineer Mr. Ruthven was responsible for the development of the project cost estimate from the very early stages of conceptual documentation to the final cost estimate. He worked closely with the Chief Estimator and the Purchasing Manager to confirm that the most current trade contractor pricing trends were reflected in our estimates and that the upcoming bid period of the project was effectively communicated to the subcontractor market. Mr. Ruthven was the Lead Estimator for many projects, including the New York Hilton Hotel Preconstruction, Morgan Stanley at 522 Fifth Avenue and JPMorgan Chase at 4 New York Plaza..