Unpaved Roads BMP Manual

Total Page:16

File Type:pdf, Size:1020Kb

Unpaved Roads BMP Manual The Massachusetts Unpaved Roads BMP Manual A Guidebook on How to Improve Water Quality While Addressing Common Problems Prepared by: Berkshire Regional Planning Commission 33 Dunham Mall, Pittsfield, MA 01201 Prepared for: Massachusetts Department of Environmental Protection Bureau of Resource Protection and U.S. Environmental Protection Agency Region 1 Project 98-06/319 Winter 2001 This project has been partially funded with Federal Funds from the Environmental Protection Agency (EPA) to the Massachusetts Department of Environmental Protection (DEP) under a Clean Water Act, Section 319 grant. The contents do not necessarily reflect the views and policies of the EPA or DEP, nor does the mention of trade names or commercial products constitute endorsement or recommendation for their use. Forward This manual was prepared by the Berkshire Regional Planning Commission for the Massachusetts Department of Environmental Protection and the U.S. Environmental Protection Agency. This manual has been adapted from the Vermont Better Backroads Program Manual Clean Water You Can Afford, a publication of the George D. Aiken and Northern Vermont Resource Conservation and Development Councils, originally prepared by the Windham Regional Commission. Illustrations throughout this manual are credited to Melissa M. Reichert, Senior Planner/Landscape Architect with the Windham Regional Commission and have been reprinted here with permission. During the course of the development of this manual, many individuals supplied technical materials and current information, provided valuable guidance, and reviewed and commented on the drafts. Special thanks go to the following individuals who served as technical advisors, providing important comments and suggestions: Bruce Philbrick, USDA Natural Resource Conservation Service Mike Parker, Executive Office of Environmental Affairs Kevin Case, Farmington River Watershed Association Bruce Anderson, Department of Environmental Management Carl Curtin, Department of Environmental Management Pat Phelps, Massachusetts Highway Department Jane Peirce, Department of Environmental Protection Shep Evans, Town of Stockbridge Special thanks also go out to Bill Elovirta, Becket Highway Superintendent; Ray Strickland, Otis Highway Superintendent; and Ed Riiska, Sandisfield Highway Superintendent for their participation in the demonstration projects that accompanied this project. Important! All road projects that occur within and near areas subject to Massachusetts and Federal environmental regulations cannot be “design-built” in the field; they must be designed and permitted prior to commencement of any work. Limited copies of this report are available at no cost by written request to: Massachusetts Department of Environmental Protection Arthur Screpetis, Division of Municipal Services 627 Main Street Worcester, MA 01608 Disclaimer: The information contained within this manual has been compiled from various reputable sources and reviewed, but has not been verified for engineering integrity. This manual is meant to be a guidance document on unpaved road management, not a set of definitive design specifications. Individual site conditions (i.e. soils, grades, proximity to water bodies, rates of flow, peak discharges, etc.) must be considered when projects are designed. The services of a professional engineer may be required in some instances. INTRODUCTION ..................................................................................................................... 1 THE NEED FOR BMP’S ................................................................................................................................. 2 BMP SELECTION ...................................................................................................................................................................... 2 NONSTRUCTURAL BMP’S ............................................................................................................................. 3 WHAT ABOUT DRAINAGE? ........................................................................................................................................................ 4 FACTORS AFFECTING THE LIFE OF AN UNPAVED ROAD .................................................................................................... 5 ROAD SURFACES ................................................................................................................ 7 IMPORTANCE TO WATER QUALITY ......................................................................................................................................... 7 SURFACE PROFILE & GRADING ............................................................................................................................................. 8 SURFACE MATERIALS .............................................................................................................................................................. 8 SHOULDERS ............................................................................................................................................................................ 10 WATERBARS ........................................................................................................................................................................... 11 UNPAVED ROAD DISTRESS CONDITIONS .......................................................................................................................... 12 MATRIX OF ROAD SURFACE BMP’S FOR MAINTENANCE WORK ................................................................................. 14 DITCHES ................................................................................................................................ 15 IMPORTANCE TO WATER QUALITY ...................................................................................................................................... 15 DITCH PROFILE AND LINING ................................................................................................................................................. 15 DITCH TYPES .......................................................................................................................................................................... 16 DITCH MAINTENANCE ............................................................................................................................................................. 17 CAN YOU ANSWER THESE QUESTIONS ABOUT YOUR DITCHES? ................................................................................. 18 ROUTINE MAINTENANCE AND INSPECTION CHECKLIST .................................................................................................. 18 DIVERSION DITCHES AND BERMS ....................................................................................................................................... 19 TURNOUTS .............................................................................................................................................................................. 20 VELOCITY CONTROLS AND ENERGY DISSIPATERS .......................................................................................................... 21 MATRIX OF DITCH BMP’S FOR MAINTENANCE ................................................................................................................. 25 CULVERTS ............................................................................................................................ 27 IMPORTANCE TO WATER QUALITY ...................................................................................................................................... 27 GENERAL SPECIFICATIONS FOR INSTALLATION ................................................................................................................ 27 INSTALLATION/REPLACEMENT ............................................................................................................................................. 28 ADVANTAGES AND DISADVANTAGES OF VARIOUS PIPE TYPES .................................................................................... 30 HEADERS AND ENDWALLS .................................................................................................................................................... 31 REASONS TO REPLACE OR REPAIR A CULVERT ............................................................................................................... 31 FISH FRIENDLY CULVERTS ................................................................................................................................................... 32 CULVERT MAINTENANCE AND INSPECTION ........................................................................................................................ 34 MATRIX OF CULVERT BMP’S .............................................................................................................................................. 36 OUTLET PROTECTION ....................................................................................................... 37 IMPORTANCE TO WATER QUALITY ...................................................................................................................................... 37 STRUCTURAL OUTLET PROTECTION .................................................................................................................................. 37 NONSTRUCTURAL OUTLET PROTECTION .........................................................................................................................
Recommended publications
  • Oregon Historic Trails Report Book (1998)
    i ,' o () (\ ô OnBcox HrsroRrc Tnans Rpponr ô o o o. o o o o (--) -,J arJ-- ö o {" , ã. |¡ t I o t o I I r- L L L L L (- Presented by the Oregon Trails Coordinating Council L , May,I998 U (- Compiled by Karen Bassett, Jim Renner, and Joyce White. Copyright @ 1998 Oregon Trails Coordinating Council Salem, Oregon All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or any information storage or retrieval system, without permission in writing from the publisher. Printed in the United States of America. Oregon Historic Trails Report Table of Contents Executive summary 1 Project history 3 Introduction to Oregon's Historic Trails 7 Oregon's National Historic Trails 11 Lewis and Clark National Historic Trail I3 Oregon National Historic Trail. 27 Applegate National Historic Trail .41 Nez Perce National Historic Trail .63 Oregon's Historic Trails 75 Klamath Trail, 19th Century 17 Jedediah Smith Route, 1828 81 Nathaniel Wyeth Route, t83211834 99 Benjamin Bonneville Route, 1 833/1 834 .. 115 Ewing Young Route, 1834/1837 .. t29 V/hitman Mission Route, 184l-1847 . .. t4t Upper Columbia River Route, 1841-1851 .. 167 John Fremont Route, 1843 .. 183 Meek Cutoff, 1845 .. 199 Cutoff to the Barlow Road, 1848-1884 217 Free Emigrant Road, 1853 225 Santiam Wagon Road, 1865-1939 233 General recommendations . 241 Product development guidelines 243 Acknowledgements 241 Lewis & Clark OREGON National Historic Trail, 1804-1806 I I t . .....¡.. ,r la RivaÌ ï L (t ¡ ...--."f Pðiräldton r,i " 'f Route description I (_-- tt |".
    [Show full text]
  • Guidelines for Constructing Local Roads in New York's Adirondack Park Edward J
    5 Guidelines for Constructing Local Roads in New York's Adirondack Park Edward J. Kearney, New York state Department of Transportation, Albany The Adirondack Park in upstate New York contains more than 23 000 phasize that aesthetics and engineering are mutually km2 (9000 rniles2) of public and private lands. Most stote·owned land is dependent and that roads can be built that will be designated by the state constitution to remain "forever wild", and de­ operationally safe and efficient and easier and cheaper velopment of private land is closely controlled by the Adirondack Park to maintain and yet will blend attractively into the sur­ Agency, which is part of the executive branch of the state government and also has jurisdiction over construction of new municipal roads and rounding landscape. Figures 1 and 2 show examples of expansions of existing ones. Guidelines that have been developed for use good construction practices in the park, a11d Figure 3 in lieu of review of individual local road projects by the Adirondack Park shows an example of what should be avoided. Agency are presented and discussed. The guidelines are presented in Many researchers have questioned the applicability seven categories: (a) planning, (b), alignment, (c) cross section, (d) road­ of the American Association of state Highway and bed construction, (e) riding surface, (f) bridges and culverts, and (g) gen­ Transportation Officials (AASHTO) Geometric Design eral construction. Their objective is to ensure that local roads are con­ Guide for Local Roads and streets (!) and Highway De­ structed or reconstructed so that they fit harmoniously into the natural surroundings and impart the feeling of being in a park.
    [Show full text]
  • Chapter 8: Transportation - 1 Unincorporated Horry County
    INTRODUCTION Transportation plays a critical role in people’s daily routine and representation from each of the three counties, municipalities, addresses a minimum of a 20-year planning horizon and includes quality of life. It also plays a significant role in economic COAST RTA, SCDOT, and WRCOG. GSATS agencies analyze the both long- and short-range strategies and actions that lead to the development and public safety. Because transportation projects short- and long-range transportation needs of the region and offer development of an integrated, intermodal transportation system often involve local, state, and often federal coordination for a public forum for transportation decision making. that facilitates the efficient movement of people and goods. The funding, construction standards, and to meet regulatory Transportation Improvement Plan (TIP) is a 5 year capital projects guidelines, projects are identified many years and sometimes plan adopted by the GSATS and by SCDOT. The local TIP also decades prior to the actual construction of a new facility or includes a 3 year estimate of transit capital and maintenance improvement. Coordinating transportation projects with future requirements. The projects within the TIP are derived from the MTP. growth is a necessity. The Waccamaw Regional Council of Governments (WRCOG) not The Transportation Element provides an analysis of transportation only assists in managing GSATS, but it also helps SCDOT with systems serving Horry County including existing roads, planned or transportation planning outside of the boundaries of the MPO for proposed major road improvements and new road construction, Horry, Georgetown, and Williamsburg counties. SCDOT partnered existing transit projects, existing and proposed bicycle and with WRCOG to develop the Rural Long-Range Transportation Plan pedestrian facilities.
    [Show full text]
  • Dear Sir: I Have Lived for 15 Years in Dolphin Cove with the Ever Growing Disaster That Is Greenwich Avenue and Southfield Avenue
    To: Rosenson, Valerie Subject: The promised roundabout Date: Monday, December 02, 2019 3:22:46 PM Dear Sir: I have lived for 15 years in Dolphin Cove with the ever growing disaster that is Greenwich Avenue and Southfield Avenue. My husband and I have been to several meetings with various city employees who told us Waterside people that we were eventually going to get a roundabout at the intersection of Pulaski, Greenwich and Davenport. Greenwich would become one way south and Davenport one way north. The roundabout would be speedier than the triangle 3 stop signs are today. We were told to be patient. Over and over. Still, you approved, over our objections, 700 new apartments with nary a change in our favor-just far more traffic than could possibly be reasonably handled on top of an already impossible traffic situation. You did not widen Southfield as far as promised, but you did enlarge the corner at Selleck so a turn to Davenport could avoid the still 2direction Greenwich. We felt hope, but since Davenport still hits the Greenwich northbound traffic before the triangle, it really was of no help. But it gave us a glimmer of hope that the plan was progressing. It was planned that with the roundabout both those roads would be merging out of/into the new roundabout which should slightly improve throughput. Now you have stopped the project in its tracks by not allowing Pulaski to be widened so it can be both an entrance and an exit from the roundabout out! So the congestion at Washington will just back up into the triangle or roundabout.
    [Show full text]
  • Engineering Section Report
    all over the state. Imagine the chaotic conditions we could expect if our snowplows never did get on the road; or, if for some reason all traffic stopped, even for a single day. No mail, no food, no visiting, no living would be the result. Our Department and Its functions are indeed extremely news­ worthy activities. The Public Relations Section news releases are for­ warded to 4 daily papers in this state and to 4 metropolitan newspapers in nearby states. Copy is provided regularly for weekly newspapers, 10 radio stations, and 8 magazines. A total of 331 news releases were issued during the past year, in many cases with photographs. Many other news releases were issued to individual papers for local news. Other news releases appeared a number of times in trade magazines of national circulation. The photographic laboratory supplied the pictures to accompany the news releases. The photo­ graphic personnel also showed films and slides about the Department's work on dirt roads and beach protection work at the request of local civic organizations. A complete photographic record is maintained for the Department of construction work, existing conditions, right­ of-way problems, experimentation, and tests. II. ACTIVITIES OF THE ENGINEERING SECTION PLANNING AND DESIGN DIVISION The Planning and Design Division coordinates the activities of the Road Design Section, the Bridge Section, the Right-of-Way Section, the Planning Section, and the Utilities Section with the other sections of the Department which are concerned with any aspect of contract plan preparation. Upon completion of the plans they are assembled with proposals, special provisions, right-of-way agreements, and other factual information which are then forwarded to the Federal Aid Section.
    [Show full text]
  • ROAD LAW HANDBOOK © 2020 GIVENS PURSLEY LLP Page I 15068836 11.Doc 8
    RRooaadd LLaaww HHaannddbbooookk Road Creation and Abandonment Law in Idaho Christopher H. Meyer, Esq. GIVENS PURSLEY LLP 601 West Bannock Street Boise, ID 83702 Office: 208-388-1236 Fax: 208-388-1300 [email protected] www.givenspursley.com April 14, 2021 CHAPTER INDEX I. PUBLIC ROAD CREATION ...................................................................................................................... 1 A. Overview .................................................................................................................................. 1 1. Methods of public road creation ................................................................................. 1 2. Terminology — roads, highways, and rights-of-way; abandonment and vacation ....................................................................................................................... 5 3. Private prescriptive use rights based on adverse possession ....................................... 6 4. Roads may be administered by cities, counties, or highway districts. ........................ 8 5. Confusion over the label “commissioners.” ................................................................ 9 B. Blanket legislative declaration (aka legislative fiat) (pre-1881 roads)................................... 10 C. Idaho’s public road creation statute (formal declaration and prescription) ............................ 11 1. Overview ................................................................................................................... 11 2.
    [Show full text]
  • Street Directory Web-2
    PW=PRIVATE AREA OF TW =TOWN WAY TOWN STREET NAME AKA STREET NAME LOCATION DESCRIPTION TW YB A STREET 2nd right off Oceanside Ave Ext. from Long Beach, (at Bath House) across from Acorn St PW YV ABATTOIR DRIVE Dirt road at the end of the cul-de-sac off Jeffery Drive which is off South Side TW YB ABBEY ROAD West off Cape Neddick Rd.( Rt. 1A,) 2nd left from jct. of Shore Rd; Dead End PW YB ABENAQUI DRIVE 2nd right off Cape Neddick Rd from Shore Rd PW YV ABIGAIL LANE 1st right off McIntire Road (off Beech Ridge Rd) TW YB ACORN STREET Beacon St from Ridge Rd 1/2 way to Long Beach on left PW CN ADAMS ROAD 2nd left off Intervale Rd from Shore Rd TW CN AGAMENTICUS AVENUE Runs East off Shore Rd opposite River Rd, makes a loop TW YB AIRPORT DRIVE 1st left off Church St Ext from Rt 1A; makes a loop TW YB AIRPORT DRIVE EXTENSION 1st right off Broadway coming from Long Beach Ave PW YB ALDER STREET Paper Road 1st right off Railroad Ave Ext. from Beach Ball Field TW YH ALDIS LANE East off York St.( Rt. 1A ) [near#534]North of Harbor Beach Rd, Dead End PW CN ALGONAC AVENUE 1st right off Shore Rd after Agamenticus Ave. crosses Agamenticus Ave and goes down toward water TW CN ALGONQUIN DRIVE Right off Groundnut Hill Rd, from Mountain Rd PW YB AMHERST AVENUE Left off Reserve St from Beacon St. (toward Lond Bch. end) PW CN ANBELWOLD CIRCUIT End of Wanaque Road to Pint Cove PW YV ANDREWS WAY Off York Street [near#66] 1st left after Hilltop, across from Organug Rd and York Street Baptist Church TW YH ANGEL AVENUE Off Woodbridge Rd; on left after York Water Dist.
    [Show full text]
  • Street Name Location Description
    STREET DIR. DATA WORK SHEET BLUE = New Road PW=PRIVATE AREA GREEN = Paper Road PINK = No Bulk PU TW =TOWN WAY OF SIGN IT W/G TOWN STREET NAME LOCATION DESCRIPTION TRASH DAY TRASH ZONE From Clay Hill Road to North Village Rd approx 4/10 mile on the left, in the area of # PW CN E N CURRIER LANE 17 THUR 1 TW YV EARLINE CIRCLE Right off Graystone Lane; dead-ends; in Bluestone Development THUR 1 PW CN EAST LAKE CIRCUIT West off Shore Rd, loops around the northern end of Lake Caroline MON 2 YH EAST LANE 3rd right off Eastern Point Rd TUES 1 2nd left off Webber Rd past the high school from Ridge Rd, almost across from PW YB EASTERN AVENUE Garrison Ave TUES 2 TW YH EASTERN POINT ROAD 2nd right off the southern end of Norwood Farms Rd; makes a loop TUES 1 YV EATON Camp Eaton, off York St at south end of Long Beach TUES 2 PW CN EBER DRIVE 3rd left off Mountain Rd west of the turnpike; near Groundnut Hill Rd THUR 1 PW YB EDDYS COURT Off High Street (Which is opposite Chases' Garage, York Beach) MON 1 PW YV EDISON DRIVE 1st left off Woodbridge Rd from Long Sands Rd, across from Moulton Lane TUES 1 Off Michael Drive (which is off the lower end of Scituate Road almost opposite TW YH EDWARD CIRCLE Highgate Close) THUR 2 1st left off Chickadee Drive; Whippoorwill Est. Development off Rt.1 near Rodgers TW/PW YB EGRET CIRCLE Rd.
    [Show full text]
  • 06-1 06 1115 Dirt Road Subdivisions
    06-1 06 1115 Dirt road subdivisions. 06-1 06-2 06 1115 Dirt road subdivisions. 06-2 Sec. 72-539 Unpaved Road Subdivisions. (a) Certain subdivisions may be approved on unpaved private roads which meet the design and construction criteria as set forth in Division 4 of this article, upon the following conditions: (1) Such subdivisions shall be platted and approved by the county council. (2) Only one such subdivision shall be allowed per parent parcel existing as of (the date of this ordinance), which shall not be divided into more than ten (10) lots. A parent parcel existing as of (the date of this ordinance) shall not be divided into more than ten (10) lots, including residual lands, unless the roads are paved throughout the subdivision. (3) When an unpaved road is initiated, it may only extend 1,320 feet from a publicly maintained roadway that has a minimum of 24 feet of maintained right of way and which has been established as the beginning point of the project. (4) No additional lots or further subdivision may be created from such unpaved road unless it is paved to county standards as set forth in division 4 of this article. (5) A private unpaved road may connect to an unpaved public road provided said unpaved public road has deeded right-of-way to a paved public road, including right of way to accommodate any design features as set forth in Table II, Section 72-612. (6) The total number of lots served by an unpaved road cannot exceed ten (10).
    [Show full text]
  • Site Addressing and Road Naming Manual
    CITY OF GREAT FALLS SITE ADDRESSING AND ROAD NAMING POLICIES AND PROCEDURES MANUAL OCTOBER 18, 2016 TABLE OF CONTENTS Article I. INTRODUCTION……………………………….……… 1-6 Section 1.01 Title ……………………………………………………... 1 Section 1.02 Purpose and Intent ………………………………….…... 1 Section 1.03 Applicability ………………………………………..…… 2 Section 1.04 Addressing & Mapping Partners ……………………….… 2 Section 1.05 Definitions ……………………………………….……… 2-6 Article II. NUMBERING OF STRUCTURES OR UNITS ……. 6-12 Section 2.01 General …………………………………………………..... 6-7 Section 2.02 Assigning Addresses to Structures ……………………....… 7 Section 2.03 Assignment of Numbers by Addressing Coordinator ……… 8 Section 2.04 Uniform Numbering System Established ………………….. 8 Section 2.05 Numbering Grid …………………………………………... 8-9 Section 2.06 Numbering Procedures ……………………………………. 9-12 Article III. DISPLAY OF ADDRESS NUMBERS ……….….... 13-15 Section 3.01 General Guidelines for Display of Address Numbers …...… 13-14 Section 3.02 Display of Address Numbers for Multi-unit Buildings and Multi-Building Complexes…………………………...…… 14 Section 3.03 Additional Signage Required When Necessary……………. 15 Article IV. ROAD NAMING …………………………………...…….. 15-22 Section 4.01 General ……………………………………………..…… 15 Section 4.02 Roads Requiring Names ………………...……………… 15 Section 4.03 Road Geometric Guidelines ………….………………… 16 Section 4.04 Road Name Guidelines ………………………………… 16-18 Section 4.05 Guidelines for Road Name Suffixes …………………… 19-20 Section 4.06 Road Naming Process ………………………………..… 20-22 Article V. ROAD NAME SIGNS ……………………………… 23-24 Section 5.01 Responsibility for Placing and Maintaining Road Signs... 23-24 Article VI. ADMINISTRATION ……………………………..… 24 Section 6.01 Agencies to Be Notified …………………………..…..… 24 Section 6.02 Procedures and Addressing Standards Compliance ….….. 24 Section 6.03 Effective Date …………………………..………….....… 24 Article I INTRODUCTION Section 1.01 Title This manual shall be known and may be cited as the Site Addressing, Road Naming Policies and Procedures Manual for City of Great Falls, Montana.
    [Show full text]
  • Great River Road Tennessee
    Great River Road Tennessee Corridor Management Plan Corridor Management Plan Recognitions Mayor AC Wharton Shelby County Byway Consultant Mayor Jeff Huffman Tipton County David L. Dahlquist Mayor Rod Schuh Lauderdale County Governor Phil Bredesen President Mayor Richard Hill Dyer County State of Tennessee David L. Dahlquist Associates, L.L.C. Mayor Macie Roberson Lake County State Capitol 5204 Shriver Avenue Mayor Benny McGuire Obion County Nashville, TN 37243 Des Moines, IA 50312 Commissioner Susan Whitaker Pickering Firm, Inc Department of Tourist Development Byway Planning Team Architecture – Engineering – Planning – Surveying Wm. Snodgrass/Tennessee Tower 312 8th Avenue North, 25th Floor Bob Pitts, PE Nashville, TN 37243 Mississippi River Corridor – Tennessee, Inc. Principal Owner Board of Directors Director, Civil Engineering Services Ms. Marty Marbry 6775 Lenox Center Court – Suite 300 West Tennessee – Tourist Development Memphis, TN 38115 Regional Marketing & Public Relations John Sheahan Chairman/CEO John Threadgill Secretary Historical Consultant Commissioner Gerald Nicely Dr. Carroll Van West Tennessee Department of Transportation Jim Bondurant Chair – Obion - Task Force Committe Director 505 Deaderick St. Rosemary Bridges Chair – Tipton - Task Force Committee Center for Historic Preservation James K. Polk Bldg. – 7th Floor Peter Brown Chair – Dyer - Task Force Committee Middle Tennessee State University Nashville, TN 37243 Laura Holder Tennessee Civil War National Heritage Area P.O. Box 80 – MTSU Pamela Marshall Public Affairs
    [Show full text]
  • Meeting Summary
    Documentation of Public Meeting Project Location Midland County IH 20 Improvements – New Interchange at CR 1250 CSJs 0005-14-082 & 0005-14-084 Project Limits FM 1788 to LP 250 Meeting Location Midland County Horseshoe 2514 Arena Trail Midland, TX 79701 Meeting Date and Time January 29, 2019 at 5:00 p.m. Presenters Gene Powell, TxDOT Brad Kwaterski, AECOM Elected Officials in Attendance Robin Donnelly, Midland County Commissioner Total Number of Attendees (approx.) 33 Total Number of Commenters 19 Contents A. Comment/response matrix B. Notices C. Sign-in sheets D. Comments received E. Figures 760.07.TEM A. Comment/Response Matrix Comment Commenter Date Received Source Comment Response Number Name 1 Becky 1/29/19 Public Timeline Copy. [email protected] A copy of the presentation showing the timeline is available at: https://www.txdot.gov/inside-txdot/get- Waldrop Meeting involved/about/hearings-meetings/odessa/012919.html. The link will be provided to Ms. Waldrop. Comment Card 2 Jami Huber 1/29/19 Public Road safety is very important to me. Anything we can do to improve Thank you for your comments. Owen Meeting roads will help reduce accidents. Comment West Texas has limited roads with increasing traffic volume. More roads Card may not be possible – but improved roads are possible. Taxes gained from oil and gas need to be put back into the infrastructure of the Permian Basin. We West Texans are two and one half times more likely to be killed in a car crash than any other place in Texas. If the Permian was a country – we’d be the 4th largest oil producer in the world.
    [Show full text]