Network Manager nominated by the European Commission

EUROCONTROL

European Route Network Improvement Plan

PART 2 European ATS Route Network - Version 2016-2019/20

European Network Operations Plan 2016-2019/20 Edition June 2016

European Route Network Improvement Plan - Part 2 - ATS Route Network ARN Version 2016 - 2019/20 Catalogue of Airspace Projects

Edition Number : 1.0 Edition Date : 28.06.2016 Status : Released Issue Intended for : General Public

ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects ii 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

DOCUMENT CHARACTERISTICS

TITLE European Route Network Improvement Plan ARN Version 2016 - 2019/20 Catalogue of Airspace Projects Publications Reference: Document Identifier Edition Number: 1.0 Edition Date: 28.06.2016

Abstract This document contains the ATS Route Network ARN Version 2016 - 2019/20 Catalogue of Airspace Projects as Part 2 of the European Route Network Improvement Plan (ERNIP). It is in response to the COMMISSION REGULATION (EU) No 970/2014 of 12 September 2014 amending Regulation (EU) No 677/2011 laying down detailed rules for the implementation of air traffic management (ATM) network functions. The ERNIP Part 2 - ARN Version 2016 - 2019/20 provides a consolidated picture of the European airspace structure aimed to deliver a safe and operationally efficient operation of air traffic. It responds to the operational performance targets set for the European ATM network for both RP1 and RP2. It facilitates the development of an airspace structure offering the required level of safety, capacity, flexibility, responsiveness, environmental performance and seamless provision of expeditious air navigation services, with due regard to security and defence needs; ensures regional interconnectivity and interoperability of the European Route Network within the ICAO EUR Region and with adjacent ICAO Regions. Keywords Network Manager Route Network Route Network Plan Efficiency Plan Airspace Design Airspace Utilisation Airspace Functional Blocks Sectors Traffic flow

Authors EUROCONTROL NMD/NOM/OPL Contact Person(s) Tel Division Razvan Bucuroiu + 32 2 729 36 48 NMD / NOM / OPL

STATUS, AUDIENCE AND ACCESSIBILITY

Status Intended for Accessible via

Working Draft  General Public  Intranet 

Draft  Operational Stakeholders  Extranet 

Internet Proposed Issue  Restricted Audience   (www.eurocontrol.int) Released Issue  Printed and electronic copies of the document can be obtained from the Publications Infocentre (see page iv)

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects iii 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

DOCUMENT CHANGE RECORD

The following table records the complete history of the successive editions of the present document.

EDITION EDITION DATE REASON FOR CHANGE PAGES AFFECTED NUMBER

Proposed Issue 0.1 13.05.2016 All RNDSG/88 for agreement

Proposed Issue 0.2 30.05.2016 NETOPS/15 and NDOP/14 for All approval

Released issue - NMB/16 1.0 28.06.2016 All Approved

Publications EUROCONTROL Headquarters 96 Rue de la Fusée B-1130 BRUSSELS

Tel: +32 (0)2 729 1152 Fax: +32 (0)2 729 5149 E-mail: [email protected]

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects iv 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

TABLE OF CONTENT DOCUMENT CHARACTERISTICS ...... iii DOCUMENT CHANGE RECORD ...... iv TABLE OF CONTENT ...... v EXECUTIVE SUMMARY ...... vii ORGANISATION AND CONTENTS ...... ix 1. A CONSOLIDATED EUROPEAN AIRSPACE DEVELOPMENT ...... 1 1.1. OBJECTIVE, SCOPE AND TIMEFRAME...... 1 1.2. DEMANDING PERFORMANCE TARGETS ...... 2 1.2.1. PERFORMANCE SCHEME - SECOND REFERENCE PERIOD (RP2) - 2015 - 2019 . 2 There are no performance indicators/targets set yet for 2020...... 4 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ...... 4 1.4. THE AIRSPACE ACTION PLAN ...... 5 1.5. THE FLIGHT EFFICIENCY PLAN ...... 5 1.6. PREPARATION OF THE ERNIP Part 2 - ARN VERSION 2016 - 2019/20 ...... 6 1.7. FUNCTIONAL AIRSPACE BLOCKS INTEGRATION INTO THE ERNIP Part 2 - ARN VERSION 2016 - 2019/20 ...... 7 1.7.1. FAB Performance Plans and their Relation to the European Route Network Improvement Plan ...... 7 1.7.2. Functional Airspace Blocks/ FABs Main Projects and Performance Evaluations...... 9 2. ARN VERSION 2016 - 2019/20 BENEFITS ...... 18 2.1. TOTAL EXPECTED BENEFITS - ERNIP Part 2 - ARN VERSION 2016 - 2019/20 ...... 18 2.2. CAPACITY ENHANCEMENT BENEFITS OF ERNIP Part 2 - ARN VERSION 2016 - 2019/20 ...... 19 3. EUROPEAN ROUTE NETWORK DESIGN FUNCTION AND FLIGHT EFFICIENCY ACTION PLANS ...... 21 3.1. EUROPEAN ROUTE NETWORK DESIGN FUNCTION ...... 21 3.2. FREE ROUTE AIRSPACE ...... 21 3.3. ASM Solutions ...... 22 3.4. SIMPLIFYING THE RAD ...... 23 3.5. IMPROVING TMA STRUCTURES ...... 23 3.6. THE FLIGHT EFFICIENCY PLAN ...... 24 3.7. THE NETWORK MANAGER FLIGHT EFFICIENCY INITIATIVE ...... 24 4. CONCEPT OF OPERATIONS FOR EUROPEAN AIRSPACE DESIGN ...... 27 4.1. MAIN PRINCIPLES ...... 27 4.2. ERNIP Part 2 - ARN VERSION 2016 - 2019/20 IMPROVEMENTS HIGHLIGHTS ...... 28 4.2.1. Introduction ...... 28 4.2.2. Basic Concept ...... 28 4.2.3. European Network Consistency ...... 28 4.2.4. Airspace Continuum ...... 29 4.2.5. ARN Version 2016 - 2019/20 Components ...... 29 4.2.6. Airspace Classification ...... 29 4.2.7. Airspace Organisation ...... 30 4.2.8. Airspace Development Approach ...... 30 4.2.9. Operating the ERNIP Part 2 - ARN Version 2016 - 2019/20 ...... 32 4.2.10. Military Operations ...... 33 European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects v 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

4.2.11. Airspace Management (ASM) Solutions ...... 33 4.2.12. Network Enablers ...... 35 4.2.13. Impact on Adjacent Areas ...... 35 5. A NETWORK COOPERATIVE DECISION MAKING PROCESS ...... 37 5.1. A NETWORK ORIENTATED APPROACH ...... 39 5.2. AIRSPACE UTILISATION AND MANAGEMENT ...... 40 5.3. MILITARY REQUIREMENTS ...... 40 6. TRAFFIC DEMAND EVOLUTION AND ASSESSMENT ...... 41 6.1. GENERAL ...... 41 6.2. TRAFFIC DEMAND VARIATION - COMPARISON 2008/2015 ...... 41 6.3. WEEK AND WEEK-END DISTRIBUTION ...... 42 6.4. DISTRIBUTION AND EVOLUTION - SHORT HAUL AND MEDIUM/LONG HAUL ...... 44 6.5. VERTICAL DISTRIBUTION (EVOLVING AND CRUISING TRAFFIC) ...... 45 6.6. FLIGHT LEVEL DISTRIBUTION ...... 46 6.7. AIRPORT TRAFFIC INCREASE ...... 46 6.8. TOP 50 AIRPORTS ...... 47 6.9. BUSIEST CITY PAIRS ...... 48 6.10. AIRSPACE USERS ...... 50 6.11. AIRCRAFT TYPES ...... 51 7. MAIN PROJECTS INCLUDED IN ERNIP PART 2 - ARN VERSION 2016 - 2019/20 ..... 53 7.1. FREE ROUTE AIRSPACE ...... 53 ANNEXES ...... 57 Annex A. Reference Documents ...... 59 Annex B. Acronyms and Abbreviations ...... 61 Annex C. Summary of ERNIP PART 2 - ARN VERSION 2016 - 2019/20 Proposals ...... 63 Annex D. List of ERNIP PART 2 - ARN VERSION 2016 - 2019/20 Proposals ...... 70

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects vi 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

EXECUTIVE SUMMARY

In accordance with the COMMISSION REGULATION (EU) No 970/2014 of 12th September 2014 amending Regulation (EU) No 677/2011 laying down detailed rules for the implementation of air traffic management (ATM) network functions the European Route Network Improvement Plan (ERNIP) is a plan developed by the Network Manager in coordination with the operational stakeholders. It includes the result of Network Manager’s operational activities with respect to short and medium term route network design in accordance with the Network Strategy Plan. In response to the same COMMISSION REGULATION (EU) and the EUROCONTROL Provisional Council Airspace Action Plan, the objective of the ERNIP Part 2 - ARN Version 2016 - 2019/20 is the enhancement of European ATM capacity, flight efficiency and environmental performance through the development and implementation of an improved ATS route network, Free Route Airspace and TMA systems structures supported by corresponding improvements to the airspace structure and the optimal utilisation rules. The ERNIP Part 2 - ARN Version 2016 - 2019/20 also responds to the COMMISSION REGULATION (EU) No 390/2013 of 3rd May 2013 (laying down a performance scheme for air navigation services and network functions). It provides a network consolidated picture of network and local/FAB projects and the evaluation of their expected performance in response to the European network performance targets and local environment reference values. As a result of those evaluations it can be derived that the performance targets of the 2nd Reference Period of the Single European Sky Performance Scheme (RP2) will not be met unless the proposed NM measures will be implemented. The ERNIP Part 2 - ARN Version 2016 - 2019/20 will ensure the implementation, in cooperation with the ANSPs and the FABs, of the Airspace Vision agreed by the Network Management Board:  a comprehensive cross-border implementation of Free Route Airspace, at least at and above FL310, in the European airspace;  an optimised route structure below FL310 ensuring efficient connectivity in/out terminal airspace;  a simplification of the RAD;  a harmonisation of the airspace publications;  more efficient Flexible Use of Airspace procedures and the associated system support to enable a better utilisation of the civil/military airspace structures;  a closer cooperation between the Network Manager, the airspace users and the computer flight plan service providers aimed at ensuring a better utilisation of the available airspace structures. The ERNIP Part 2 - ARN Version 2016 - 2019/20:  achieves an European Route Network for the safe and efficient operation of air traffic, taking due account of the environmental impact;  keeps operational consistency of the European airspace organisation;  consolidates into a network approach the Functional Airspace Blocks developments, the wide implementation of airspace projects from Free Route Airspace to TMA developments;  facilitates the development of an airspace structure offering the required level of safety, capacity, flexibility, responsiveness, environmental performance and seamless provision of expeditious air navigation services, with due regard to security and defence needs;  ensures regional interconnectivity and interoperability of the European route network within the ICAO EUR Region and with adjacent ICAO Regions. As from the full implementation of ERNIP Part 2 - ARN Version 2016 - 2019/20 in 2019/2020, flying distances would be reduced year to year by approximately 4 million NMs. When compared to the start of RP2, the total benefits that ENRIP Part 2 - ARN Version 2016 - 2019/20 would bring represent 84 million NMs, i.e. the equivalent of 500 000 tons of fuel saved, or reduced emissions of 1 680 000 tons, or 420 million Euros.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects vii 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects viii 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ORGANISATION AND CONTENTS

This document is identified as European Route Network Improvement Plan - ARN Version 2016 - 2019/20 Catalogue of Airspace Projects.

Structure of the Document Chapter 1 Provides an overview of the consolidated European approach to airspace design. Chapter 2 Provides an overview of ARN Version 2016 - 2019/20 benefits. Chapter 3 Commences with the Airspace Action Plan and depicts its implementation. Chapter 4 Focuses on the consolidated Concept of Operations. Chapter 5 Focuses on the Network Collaborative Decision Making Process. Chapter 6 Provides an assessment of the demand between 2007/2008 and 2013/2015. Chapter 7 Provides a description of the ARN Version 2016 - 2019/20 layers.

Annexes Annex A Reference Documents Annex B Acronyms and Abbreviations Annex C Summary of ARN Version 2016 - 2019/20 Proposals Annex D List of ARN Version 2016 - 2019/20 Proposals

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects ix 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects x 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

1. A CONSOLIDATED EUROPEAN AIRSPACE DEVELOPMENT

1.1. OBJECTIVE, SCOPE AND TIMEFRAME

In response to the COMMISSION REGULATION (EU) No 970/2014 of 12th September 2014 amending Regulation (EU) No 677/2011 laying down detailed rules for the implementation of air traffic management (ATM) network functions and the EUROCONTROL Provisional Council Airspace Action Plan, the objective of the ERNIP Part 2 - ARN Version 2016 - 2019/20 is the enhancement of European ATM capacity, flight efficiency and environmental performance through the development and implementation of an improved ATS route network, Free Route Airspace and TMA systems structures supported by corresponding improvements to the airspace structure and the optimal utilisation rules of both in the European airspace.

In response to the COMMISSION REGULATION (EU) No 390/2013 of 3rd May 2013 (laying down a performance scheme for air navigation services and network functions) the Network Manager shall support the Commission by providing relevant input for the preparation of Union-wide performance targets before the reference periods and for monitoring the achievement of the performance targets during the reference period. This regulation requires that, the Network Manager shall support functional airspace blocks and their air navigation service providers in reaching their performance targets during reference periods by ensuring consistency between performance plans, the Network Strategy Plan and the Network Operations Plan.

In that respect, a close cooperation and synchronisation was ensured between the Network Manager and all the FABs in the preparation of their Performance Plans, of the Network Strategy Plan, of the Network Operations Plan and the ERNIP - Part 2 - ARN Version 2016 - 2019/20. The ERNIP Part 2 - ARN Version 2016 - 2019/20 will contribute to the achievement of the performance targets of the 2nd Reference Period of the Single European Sky Performance Scheme (RP2). The ERNIP Part 2 - ARN Version 2016 - 2019/20 will ensure the implementation, in cooperation with the ANSPs and the FABs, of the Airspace Vision agreed by the Network Management Board that includes:  a comprehensive cross-border implementation of Free Route Airspace, at least at and above FL310, in the European airspace;  an optimised route structure below FL310 ensuring efficient connectivity in/out terminal airspace;  a simplification of the RAD;  a harmonisation of the airspace publications;  more efficient Flexible Use of Airspace procedures and the associated system support to enable a better utilisation of the civil/military airspace structures;  a closer cooperation between the Network Manager, the airspace users and the computer flight plan service providers aimed at ensuring a better utilisation of the available airspace structures. The ERNIP Part 2 - ARN Version 2016 - 2019/20:  achieves an European Route Network for the safe and efficient operation of air traffic, taking due account of the environmental impact;  keeps operational consistency of the European airspace organisation;  consolidates into a network approach the Functional Airspace Blocks developments, the wide implementation of airspace projects from Free Route Airspace to TMA developments;  facilitates the development of an airspace structure offering the required level of safety, capacity, flexibility, responsiveness, environmental performance and seamless provision of expeditious air navigation services, with due regard to security and defence needs;

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 1 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 ensures regional interconnectivity and interoperability of the European route network within the ICAO EUR Region and with adjacent ICAO Regions.  Ensures compliance with the Commission Implementing Regulation (EU) No 716/2014 of 27th June 2014 on the establishment of the Pilot Common Project supporting the implementation of the European Air Traffic Management Master Plan (set target dates for the implementation of DCT and FRA in the ICAO EUR region).

The ERNIP Part 2 - ARN Version 2016 - 2019/20 combines airspace design projects developed in a cooperative manner between the Network Manager and its operational stakeholders aimed for implementation over the period Autumn 2015 - end of 2020. The full development phase including the validation covers the period from Summer 2015 until Summer 2016. The implementation started in Autumn 2015 and continues in stages until the end of 2020. Further updates will be brought through subsequent versions of the ERNIP Part 2.

The ERNIP Part 2 - ARN Version 2016 - 2019/20 includes details on:  Implementation of Free Route Airspace projects;  ATS route network developments;  Re-sectorisation actions;  Actions aimed at simplifying the usage of the ATS route network;  Civil/military airspace structures;  Deployment of the night route network.

The ERNIP Part 2 - ARN Version 2016 - 2019/20 is derived from the following sources:  Proposals covering a cohesive development of the European Airspace Structure;  Solutions developed inside various FAB initiatives;  Proposals originating at national or sub-regional level;  Aircraft operators proposals. The European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 covers a similar geographical area like the Network Operations Plan: . EU member States (Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, ). . EUROCONTROL member States that are not EU members (Albania, Armenia, Bosnia and Herzegovina, Georgia, Moldova, , Norway, , Switzerland, The Former Yugoslav Republic of Macedonia, Turkey, ). In addition, the European Route Network Improvement Plan ensures full coherency of the airspace structure at the interface areas, covering many of the States that have an interface with those mentioned above. These include, amongst other States, Azerbaijan, , Egypt, Iceland, , Jordan, Kazakhstan, Lebanon, Libya, Morocco, Russian Federation and Tunisia. The latest situation of the European route network structure is available and updated at each AIRAC cycle through the publication of EUROCONTROL Regional Charts that could be found at the following link: http://www.eurocontrol.int/articles/eurocontrol-regional-charts

1.2. DEMANDING PERFORMANCE TARGETS

1.2.1. PERFORMANCE SCHEME - SECOND REFERENCE PERIOD (RP2) - 2015 - 2019

In response to the COMMISSION REGULATION (EU) No 390/2013 of 3rd May 2013 (laying down a performance scheme for air navigation services and network functions), a new set of Key Performance Indicators and associated targets have been set for the 2nd Reference Period (RP2).

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 2 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

It includes two important key performance areas and associated indicators, related to the operational performance of the European ATM network for the period 2015 - 2019.

 Environment o average horizontal en-route flight efficiency of the actual trajectory, defined as follows: - the indicator is the comparison between the length of the en-route part of the actual trajectory derived from surveillance data and the corresponding portion of the great circle distance, summed over all IFR flights within or traversing the European airspace; - “en-route” refers to the distance flown outside a circle of 40 NM around the airports; - where a flight departs from or arrives at a place outside the European airspace, only the part inside the European airspace is considered; This KPI is applicable at both network and Functional Airspace Block level.

o average horizontal en-route flight efficiency of the last filed flight plan trajectory, defined as follows: - the difference between the length of the en-route part of the last filed flight plan trajectory and the corresponding portion of the great circle distance, summed over all IFR flights within or traversing the European airspace; - “en-route” refers to the distance flown outside a circle of 40 NM around the airports; - where a flight departs from or arrives at a place outside the European airspace, only the part inside the European airspace is considered; This KPI is only applicable at network level.

 Capacity o minutes of en-route ATFM delay per flight, calculated for the full year and including all IFR flights within European airspace and all ATFM delay causes, excluding exceptional events.

For the second performance Reference Period starting on 1st January 2015 and ending on 31st December 2019, the European Union-wide performance targets will be as follows:

 Environment target:  Actual trajectory (KEA) - an average of 2.6% route extension by 2019, decreasing from 3.17% in 2012 (based on PRB measurements)  Last filed flight plan trajectory (KEP) - an average of 4.1% route extension by 2019, decreasing from 5.15% in 2012 (based on PRB measurements)

 Capacity target: average en route Air Traffic Flow Management (ATFM) delay of 0.5 minutes per flight for each year of the second Reference Period.

The ERNIP Part 2 - ARN Version 2016 - 2019/20 also responds to the targets included in the Network Performance Plan (NPP) 2015 - 2019 as described below:

o Route extension - airspace design  Targets: o achieve an improvement of the DES indicator by 0.57 percentage points between the baseline year of 2012 and 2019.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 3 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

o Route extension - last filed flight plan  Targets: o This is a European-wide indicator in RP2 and the NM target for RP2 is to achieve 4.1% value for KEP indicator by 2019 for the entire SES area and 3.82% for the NM area, fully consistent with the EU-wide target, i.e. a reduction by 1.05 pp (percentage points) between the baseline year of 2012 and 2019 o Route extension - actual trajectory  Targets: o The NM target for RP2 is to achieve 2.6% value for KEA indicator by 2019 for both the SES and NM areas, fully consistent with the EU-wide target o NM direct contributions to flight efficiency savings o The NM objectives is that these FE direct savings will amount to 10% (2015 - 2016) and 5% (2017 - 2019) of the savings required to achieve the annual 0.15 pp reduction (or alternatively 5% of the actual KEP reduction) each year o Increase the CDR1/2 usage o NM objective is to increase the CDR availability (CD-RAI) and CDR usage (CDR-RAU) by 5% between 2015 and 2019

There are no performance indicators/targets set yet for 2020.

1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES

With the development of the ERNIP Part 2 - ARN Version 2016 - 2019/20 of the European Route Network Improvement Plan the Network Manager, States, air navigation service providers as part of functional airspace blocks or individually, applied, within the cooperative decision-making process, the following airspace design principles:  the establishment and configuration of airspace structures was based on operational requirements, irrespective of national or functional airspace block borders or FIR boundaries, and was not bound by the division level between upper and lower airspace;  the design of airspace structures was a transparent process showing decisions made and their justification through taking into account the requirements of all users whilst reconciling safety, capacity, environmental aspects and with due regard to military and national security needs;  the present and forecast traffic demand, at network and local level, and the performance targets were used as an input for the ERNIP Part 2 - ARN Version 2016 - 2019/20 of the European Route Network Improvement Plan with a view to satisfying the needs of the main traffic flows and airports;  vertical and horizontal connectivity, including terminal airspace and the airspace structure at the interface was ensured;  the possibility for flights to operate along, or as near as possible to, user required routes and flight profiles in the en route phase of flight;  the development and inclusion of the vast majority of airspace structures proposals, including Free Route Airspace, multiple route options and CDRs, received from stakeholders having an operational requirement in the European airspace;

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 4 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 the design of airspace structures including Free Route Airspace and ATC sectors took into account existing or proposed airspace structures designated for activities which require airspace reservation or restriction. To that end only such structures that are in accordance with the application of FUA are included. Such structures were harmonised and made consistent to the largest possible extent across the entire European network;  ATC sector design development was based on the required route or traffic flow alignments within an iterative process that ensured compatibility between routes or flows and sectors;  ATC sectors were designed to enable the construction of sector configurations that satisfy traffic flows and are adaptable and commensurate with variable traffic demand;  agreements on service provision are considered in cases where ATC sectors require, for operational reasons, to be designed across national or functional airspace block borders or FIR boundaries. With respect to airspace utilisation and capacity management, the following principles apply:  airspace structures shall be planned to facilitate flexible and timely airspace use and management with regard to routing options, traffic flows, sector configuration schemes and the configuration of other airspace structures;  airspace structures should accommodate the establishment of additional route options while ensuring their compatibility (capacity considerations and sector design limitations).

All principles above were fully considered in the development of the ERNIP Part 2 - ARN Version 2016 - 2019/20 of the European Route Network Improvement Plan.

1.4. THE AIRSPACE ACTION PLAN

The Airspace Action Plan was adopted by the EUROCONTROL PC at its 28th Session, in November 2007. The Airspace Action Plan covers the need for a continued pan-European approach and concrete actions to improve network efficiency and capacity through airspace planning, design and management at network level. This Airspace Action Plan helps in eliminating fragmentation and identifying best options that respond to the recommendations and strategic objectives agreed by the EUROCONTROL Provisional Council (PC) and the high level objectives of the Single European Sky. The development of ERNIP Part 2 - ARN Version 2016 - 2019/20 fully responds to the actions set by the EUROCONTROL Provisional Council in the context of the Airspace Action Plan.

1.5. THE FLIGHT EFFICIENCY PLAN

IATA, CANSO and EUROCONTROL worked in a close partnership along with airlines, airports and ANSPs to identify solutions and launch operational actions that lead to fuel and emissions savings. The Flight Efficiency Plan was commonly agreed in September 2008. The Flight Efficiency Plan builds on the accelerated implementation of the measures already approved by the EUROCONTROL Provisional Council, currently put in place by all ATM actors, and included in the Airspace Action Plan, the Airspace Management Improvement Initiative, the Terminal Airspace Improvement Initiative and the Airport Programme. The adoption and the gradual deployment of the Flight Efficiency Plan proved the benefits expected. Since its adoption, in September 2008, in terms of airspace design efficiency (if all flights would have used the route network without any route restrictions and with all CDRs permanently available), the route extension decreased from 3.65% in January 2008 to 2.45% in December 2015. These achievements came as a result of the implementation of ARN Version-6, ARN Version-7 and ARN Version-8, ERNIP Part 2 - ARN Version 2013 - 2015 as well as from the initial steps of ERNIP Part 2 - ARN Version 2014 - 2018/19 and ERNIP Part 2 - ARN Version 2015 - 2019.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 5 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

1.6. PREPARATION OF THE ERNIP PART 2 - ARN VERSION 2016 - 2019/20

The following steps were followed for the preparation of the ERNIP Part 2 - ARN Version 2016 - 2019/20:  The development of the next European Route Network Improvement Plan - Part 2 edition will cover, as per the requirements of the NMF IR, a 5-years period (2016 - 2019/20).  All ANSPs and FABs will be required to provide their airspace plans until 2020.  The Network Manager will provide the list of all known plans until 2019/20 to all ANSPs and FABs.  The Network Manager will provide the environment/flight efficiency reference values per FAB for the period 2016 - 2019/20, as per the requirement of the Performance Scheme IR.  The following preparation calendar was followed:

Action Date Who

Distribution of all known airspace design plans until October 2015 NM 2019/20 to all ANSPs and FABs

Comments and updates received from all December 2015 NM/ANSPs/FABs ANSPs/FABs on the initial list of airspace projects

Preparation of the first version of the European NM/Ops Route Network Improvement Plan - Part 2 - ARN January 2016 Stakeholders Version 2016 - 2019/20

Initial performance indications per FAB based on the first version of the European Route Network February - March NM to all ANSPs Improvement Plan - Part 2 - ARN Version 2016 - 2016 2019/20

Further updates and synchronisation actions March - April between NM, ANSPs and FABs to ensure the NM/ANSPs/FABs 2016 achievement of RP2 targets

European Route Network Improvement Plan - Part NM/Ops 2 - ARN Version 2016 - 2019/20 consolidation and May - June 2016 Stakeholders approval through the CDM process

Publication of European Route Network Improvement Plan - Part 2 - ARN Version 2016 - June 2016 NM 2019/20

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 6 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

1.7. FUNCTIONAL AIRSPACE BLOCKS INTEGRATION INTO THE ERNIP PART 2 - ARN VERSION 2016 - 2019/20

Since 2007, as part of an overall network development approach, the RNDSG Secretariat worked in close cooperation with all FAB initiatives to provide support to FAB airspace design. Part of SES II, the establishment of FABs has started several years ahead of the nomination of the Network Manager. The Network Manager started a close cooperation with all the FABs from the start of the development of their Feasibility Studies. This close cooperation enabled the development of a number of harmonised operational projects that have the potential to contribute to future network performance, when implemented. They respond to the requirements set for the FABs, set forth in the Article 9a of the (EC) Reg. No 550/2004. Namely, those requirements are:  enable optimum use of airspace, taking into account air traffic flows;  ensure consistency with the European route network established in accordance with Article 6 of the airspace Regulation;  ensure compatibility between the different airspace configurations, optimising, inter alia, the current flight information regions;  facilitate consistency with Community-wide performance targets. Throughout 2012, and before 04/12/2012, nine FABs have submitted the documentation required for their establishment. The Regulation (EC) No 677/2011, in particular Articles 6, 8 and 10, sets a framework for an alignment of FAB operation plans with the Network Operations Plan by ensuring the compatibility of the FAB - level measures with those adopted, through the cooperative decision making process, at the Network level. The NM has established cooperation with most of the FABs to facilitate harmonised developments, operational interconnectivity between the FABs and within the FABs and at European network level. The NM has included FAB perspective in the operational improvements planning processes even before the due date set for the Member States to implement FABs (December 2012). The NM supported a co-ordinated development and, in some cases, deployment of the FAB improvements. This ensured an overall pan-European network consistency, and a uniform application of ASM/ATFCM procedures, a synchronized implementation of new airspace projects or operational concepts and a cohesive view of the performance improvements in relation to the EU-wide targets. The ERNIP Part 2 - ARN Version 2016 - 2019/20 includes contributions from a large number of FABs. This consolidated view responds to the Single European Sky requirements for the FABs: to enable optimum use of airspace, taking into account traffic flows and to ensure consistency with the European route network.

1.7.1. FAB Performance Plans and their Relation to the European Route Network Improvement Plan

It is important to note that the COMMISSION REGULATION (EU) No 390/2013 of 3rd May 2013 (laying down a performance scheme for air navigation services and network functions) defines also the principles for assessing the FAB Performance Plans and targets. In this new framework, FABs will be asked to provide the evidence that they will meet the performance targets. In that respect, the following assessment criteria have been defined in the IR:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 7 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ENVIRONMENT  Average horizontal en route flight efficiency of the actual trajectory: (a) comparison with historical performance achieved in previous years; (b) comparison with a reference value based on information provided by the Network Manager; (c) consistency with the European Route Network Improvement Plan developed by the Network Manager.

CAPACITY  En route delay level. Comparison of the expected level of en route ATFM delay used in the performance plans with: (a) a reference value based on information from the Network Operations Plan of the Network Manager; (b) the capacity plan established by the en route air navigation service provider(s) as reflected in the Network Operations Plan of the Network Manager.

The KEA reference values based on the European-wide target, for each of the Functional Airspace Blocks, are as follows:

2012 Achievement Improvement 2012-2019 2015 2016 2017 2018 2019

SW FAB 4.27% 0.99% 3.85% 3.71% 3.57% 3.43% 3.28% UK-Ireland FAB 3.64% 0.65% 3.36% 3.27% 3.18% 3.09% 2.99% FABEC 3.56% 0.60% 3.30% 3.22% 3.14% 3.05% 2.96% BLUE MED FAB 3.02% 0.57% 2.78% 2.70% 2.62% 2.54% 2.45% FAB CE 2.13% 0.32% 1.99% 1.94% 1.90% 1.85% 1.81% DANUBE FAB 1.69% 0.32% 1.55% 1.50% 1.46% 1.41% 1.37% Baltic FAB 1.61% 0.25% 1.50% 1.47% 1.44% 1.40% 1.36% NEFAB 1.44% 0.22% 1.35% 1.32% 1.29% 1.26% 1.22% DK-SE FAB 1.20% 0.01% 1.20% 1.20% 1.20% 1.20% 1.19%

The evaluations of the expected performance improvements in this document have used the year 2014 as the baseline year. They are based on assigned flight plan situation. By considering 2014 as a baseline year and a macroscopic evaluation not including all flights, they are considered to be conservative. They provide a good estimation of the potential of a FAB to deliver the expected performance to meet European targets. It also shows that the interfaces between FABs will require a very particular attention.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 8 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

1.7.2. Functional Airspace Blocks/ FABs Main Projects and Performance Evaluations Note: The evaluations below do not take into consideration the changes to the CPR transmission frequency. They are intended to evaluate the outlook of the KEA indicator and the additional measures necessary to achieve the Environment RP2 target.

 FAB Europe Central (FAB EC) The main projects taken into consideration in the context of the FABEC are:  FABEC FRA Project with local implementation: o FRA DFS - Germany: o FRA Maastricht FL245+. Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2016 - 2019/20. The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2015 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Reduction of route Extension Analysis REF extension percentage (V2.1) SAAM/NEST points to reference Airport-circle radix All network projects including (NM): 40.00 FABEC FRA -0.19 pp Filter used : Europe Local Implementations plus mediterranean FRA - DFS and MUAC countries and part of the Russian Federation pp = percentage point

2015 2015 Reference Value Actual

3.30% 3.37%

FABEC 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.60 pp 0.19 pp

The 2015 reference value was not achieved and NM evaluation the reduction by 0.19 pp is not sufficient to achieve the network RP2 target.

To implement FRA Project at DSNA - France and skyguide - Switzerland. To expand x- NM proposed border FRA operations with adjacent FABs - measures ACCs (e.g. Denmark / Sweden FAB, UK Ireland FAB). To further Improve interfaces with SW FAB, UK Ireland FAB and Blue Med FAB.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 9 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 Blue Med FAB

The main projects taken into consideration in the context of the Blue Med FAB are:  FRAIT - IT Phase 3 (FRA FL335+).  Malta FRA FL335+. Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2016 - 2019/20. The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2015 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Reduction of route Extension Analysis REF extension percentage (V2.1) SAAM/NEST points to reference Airport-circle radix (NM): 40.00 Filter used : Europe All network projects including plus mediterranean Malta FRA FL335+ -0.45 pp countries and part of FRA IT - Phase 3 - FL335+ the Russian Federation pp = percentage point

2015 2015 Reference Value Actual

2.78% 2.84%

Blue Med FAB 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.57 pp 0.45 pp

The 2015 reference value was not achieved. NM evaluation Reference values might be met with deployment of FRA in Italy initially FL335+, Malta FL335+

Cross-border FRA projects implementation must be considered for the entire Blue Med FAB starting with FRA project for Greece together NM proposed with lowering down of the FL to FL305 by the measures end of 2021. The interface between Blue Med FAB and FABEC needs to be addressed with priority. Timely implementation of projects in line with the ERNIP Part 2.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 10 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 FAB Central Europe (FAB CE)

The main project taken into consideration in the context of the FABCE is the implementation of the FABCE Concept of Seamless operations. This includes the following projects:  Implementation of Free Route Airspace in gradual steps between 2016 and 2020;  Implementation of seamless operations by ensuring: o horizontal connectivity with adjacent FABs; o vertical connectivity through enhanced route network, CDO and CCDs with lower airspace and TMAs.  Appropriate interoperability through gradual ATM systems evolutions to respond to the operational requirements resulting from the implementation of the Concept of Seamless Operations.  FABCE ASM/ATFCM project. Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2016 - 2019/20. The FRA Implementation steps are described in the detailed projects included in the ERNIP Part 2 - ARN Version 2016 - 2019/20.

Route Length Reduction of route Extension Analysis REF extension percentage (V2.1) SAAM/NEST points to reference Airport-circle radix All network projects including -0.36pp (NM): 40.00 FABCE FRA Projects Filter used : Europe plus mediterranean countries and part of the Russian Federation pp = percentage point

2015 2015 Reference Value Actual

1.99% 1.90%

FABCE 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.32 pp 0.36 pp

Plans in line with the expected European NM evaluation targets

Maintain current implementation plans in NM proposed FABCE, including cross-border FABCE measures implementation of FRA with adjacent FABs.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 11 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 UK-Ireland FAB

The projects taken into consideration in the context of the UK/IE FAB are the ones included in the ERNIP Part 2 - ARN Version 2016 - 2019/20, including:  Phase 3 FRA Prestwick ACC FL255+ The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Reduction of route Extension Analysis REF extension percentage (V2.1) SAAM/NEST points to reference Airport-circle radix (NM): 40.00 Filter used : Europe ERNIP Part 2 - ARN Version plus mediterranean 2016 - 2019/20 Projects -0.08 pp countries and part of Phase 3 - FRA Prestwick ACC the Russian FL255+ Federation pp = percentage point

2015 2015 Reference Value Actual

3.36% 3.51%

UK/IE FAB 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.65 pp 0.08 pp

The 2015 reference value was not achieved and the reduction by 0.08 pp is not sufficient to achieve the NM evaluation network RP2 target. Full FRA already implemented in Ireland FRA in Scottish UIR FL255+ has been included in the evaluation.

In order to meet the European target, cross-border FRA projects implementation must be considered for the entire UK/IE FAB. In addition to consider cross-border operations with neighbouring FABs (FABEC, DK/SWE NM proposed measures FAB and NEFAB). The BOREALIS project is included in the NM work programme and will be included in future editions of the ERNIP Part 2. BOREALIS is expected to deliver the fully required performance after the end RP2.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 12 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 Danube FAB

The main projects taken into consideration in the context of the Danube FAB are:  All proposals included in the ERNIP Part 2 - ARN Version 2016 - 2019/20, including cross border night FRA with Hungary;  Danube FAB cross-border FRA FL105+. The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Reduction of route Extension Analysis REF extension percentage (V2.1) SAAM/NEST points to reference Airport-circle radix Proposals included in the (NM): 40.00 ERNIP Part 2 - ARN Version Filter used : Europe 2016 - 2019/20, including plus mediterranean -1.02 pp cross border night FRA with countries and part of Hungary and DANUBE FAB the Russian cross-border FRA FL105 H24 Federation pp = percentage point

2015 2015 Reference Value Actual

1.55% 1.31%

Danube FAB 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.32 pp 1.02 pp

A significant proportion of the reduction is based on impacts from other changes in the network. It is essential that DANUBE FAB ensures NM evaluation implementation above FL105 to ensure the contribution to the achievement of the overall European target.

Implementation of cross-border FRA H24, with NM proposed possibility to expand with adjacent FABs/ACCs measures is recommended. Cross-border FRA projects needs to be included in the ERNIP Part 2.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 13 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 North European (NE) FAB

The main projects taken into consideration in the context of the NE FAB are:  NEFRA Project. Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2016 - 2019/20. The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2015 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Reduction of route Extension Analysis REF extension percentage (V2.1) SAAM/NEST points to reference Airport-circle radix (NM): 40.00 Filter used : Europe Finish airspace re- plus mediterranean organisation -0.42 pp countries and part of NEFRA the Russian Federation pp = percentage point

2015 2015 Reference Value Actual

1.35% 1.46%

NE FAB 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.22 pp 0.35 pp

NM evaluation 2019 European target will be achieved

To implement all projects as planned including NM proposed Borealis Project with Denmark Sweden FAB measures and UK Ireland FAB.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 14 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Denmark/Sweden FAB

The main projects taken into consideration in the context of the DK/SE FAB are:  The cross border FRA implementation in the DK/SE FAB that was already achieved;  The cross-border between DK/SE FAB, NEFAB and NEFRA Project. NM considers that the further adaptations planned by DK/SE FAB will fully respond to the European targets.

2015 2015 Reference Value Actual

1.23% (due to flow 1.20% changes)

DK/SE FAB 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.01 pp 0.25 pp

NM evaluation 2019 European target will be achieved

Ensure cross-border FRA implementation with NM proposed NEFAB and with other neighbouring FABs - measures Expand cross-border operations within Borealis project and in the future with FABEC.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 15 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 Baltic FAB

The main projects taken into consideration in the context of the Baltic FAB are:  Poland and Lithuanian FRA projects Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2016 - 2019/20. The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Reduction of route Extension Analysis REF extension percentage (V2.1) SAAM/NEST points to reference Airport-circle radix (NM): 40.00 Filter used : Europe Poland and Lithuanian FRA plus mediterranean -0.19 pp projects countries and part of the Russian Federation pp = percentage point

2015 2015 Reference Value Actual

1.50% 1.64%

Baltic FAB 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.25 pp 0.19 pp

Target might be achieved with implementation of FRA FL245+ in Baltic FAB. Cross border NM evaluation FRA with neighbouring FABs will be required for full achievement of the target.

NM proposed Initiate cross-border projects with neighbouring measures FABs.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 16 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 South West Portugal Spain FAB

The main projects taken into consideration in the context of the SW FAB are:  Partial implementation of DCTs. Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2016 - 2019/20. The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2015 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Reduction of route Extension Analysis REF extension percentage (V2.1) SAAM/NEST points to reference Airport-circle radix (NM): 40.00 Filter used : Europe All network projects including plus mediterranean Partial implementation of -0.13 pp countries and part of DCTs the Russian Federation pp = percentage point

2015 2015 Reference Value Actual

3.85% 3.42%

SW FAB 2019 2019 Reference Value NM evaluation (pp reduction (pp reduction vs 2012) vs 2015)

0.99 pp 0.13 pp

Full FRA already implemented in Portugal. NM evaluation Additional FRA projects definition required in Spain.

In order to meet the European target, cross- border FRA projects implementation must be NM proposed considered for the entire SW FAB, in line with measures the NSP and the PCP. The interface between SW FAB, FABEC needs to be addressed with priority.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 17 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

2. ARN VERSION 2016 - 2019/20 BENEFITS

2.1. TOTAL EXPECTED BENEFITS - ERNIP PART 2 - ARN VERSION 2016 - 2019/20

The ERNIP Part 2 - ARN Version 2016 - 2019/20 contains, at this stage, more than 480 (four hundred eighty) packages of airspace proposals scheduled for implementation for the Summer seasons 2016 - 2019/20, out of which 147 are implemented by 28th April 2016. These proposals include more than 300 route changes, around 20 re-sectorisation plans, more than 30 TMA projects, more than 60 Free Route Airspace projects, 5 civil/military airspace developments as well as more than 70 improvement measures eliminating unnecessary RAD restrictions or improving flight efficiency. They were or will be implemented as follows:  approximately 210 proposals for the Summer season 2016;  approximately 210 proposals for the Summer season 2017;  approximately 35 proposals for the Summer season 2018;  approximately 10 proposals for the Summer season 2019  approximately 20 proposals from autumn 2019 until the end of 2020. As from the full implementation of ERNIP Part 2 - ARN Version 2016 - 2019/20 in 2019/2020, flying distances would be reduced year to year by approximately 4 million NMs. When compared to the start of RP2, the total benefits that ENRIP Part 2 - ARN Version 2016 - 2019/20 would bring represent 84 million NMs, i.e. the equivalent of 500 000 tons of fuel saved, or reduced emissions of 1 680 000 tons, or 420 million Euros. The implementation of ERNIP Part 2 - ARN Version 2016 - 2019/20 has the potential to significantly improve flight efficiency if all projects are fully implemented. The route extension due to airspace design (if all flights would have used the route network without any route restrictions and with all CDRs permanently available) is expected to decrease from 2.45% in December 2015 to approximately 2.13% by 2020. The graph below shows the expected evolution of flight efficiency between 2008 and 2020 in terms of extension compared to the great circle.

Route Efficiency KPI per AIRAC cycle RTE-DES RTE-FPL

5,5% 1

2012 2013 2014 2015

2011 2008

2010 0,9 2009 5,0%

0,8

4,5% 0,7

0,6 4,0% 3.65% Jan 2008 3.40% 0,5 Sept 2009 3.13% 3,5% Sept 2010 3.05% Sept 2011 2.95% 0,4 Sept 2012 2.69%

Route Extension Route Nov 2013 3,0% 2.54% 0,3 End 2014 2.45% End 2015 0,2 2,5% between 2.10-2.15% 0,1 end 2020

2,0% 0

AIRAC

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 18 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

2.2. CAPACITY ENHANCEMENT BENEFITS OF ERNIP PART 2 - ARN VERSION 2016 - 2019/20

The ERNIP Part 2 - ARN Version 2016 - 2019/20 Catalogue contains around 25 re-sectorisation projects in addition to route network solutions that are aiming at reducing the complexity of the airspace structure. Based on fast time simulations of a number of projects, it is expected that the ARN Version 2016 - 2019/20 would bring an additional 5 - 7% capacity to the European ATM network when fully implemented.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 19 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 20 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

3. EUROPEAN ROUTE NETWORK DESIGN FUNCTION AND FLIGHT EFFICIENCY ACTION PLANS

3.1. EUROPEAN ROUTE NETWORK DESIGN FUNCTION

The ERNIP Part 2 - ARN Version 2016 - 2019/20 responds to the obligations put in accordance with the COMMISSION REGULATION (EU) No 970/2014 of 12 September 2014 amending Regulation (EU) No 677/2011 laying down detailed rules for the implementation of air traffic management (ATM) network functions and amending Regulation (EU) No 691/2010) on the European Route Network Design Function: . The production of the European Route Network Improvement Plan; . Delivering airspace solutions and interfaces required to facilitate operational interconnectivity between FABs; . monitoring and improvement of the overall capacity and environment/flight efficiency performance of the network from an airspace design and utilisation perspective; and . supporting the different operational stakeholders within the obligations that are put to them in the development and deployment of the European Route Network Improvement Plan and in deploying relevant actions in accordance with the European ATM Master Plan.

3.2. FREE ROUTE AIRSPACE

Until 3 March 2016 Free Route Airspace has been fully implemented in the following ACCs: Beograd ACC, Bucuresti ACC, Budapest ACC, Chisinau ACC, Kobenhavn ACC, Lisbon ACC, Malmo ACC, Shannon ACC, Sofia ACC, Stockholm ACC, Tampere ACC, Ukraine (individual UACs) and ACC. Free Route Airspace has been partially initiated but level restricted, on seasonal basis or through DCTs in the following ACCs: Brest ACC, Brindisi ACC, Bordeaux ACC, Karlsruhe UAC, London ACC, Ljubljana ACC, Maastricht UAC, Madrid ACC (SAN and ASI sectors), Malta ACC, Marseille ACC, Milano ACC, Padova ACC, Praha ACC, Prestwick ACC, Reims ACC, Roma ACC, ACC, Warszawa ACC, Wien ACC (see map below).

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 21 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

The following map shows the Free Route Airspace implementation plans proposed until end of RP2 in 2020.

The Free Route Airspace development year by year is presented in chapter 7.1 of this document.

3.3. ASM SOLUTIONS

The implementation of ASM solutions are particularly important in the context of the ERNIP Part 2 - ARN Version 2016 - 2019/20 that will include further solutions to improve network performance for the most penalised city pairs, through further deployment of the European night direct route network, solutions offering to the airspace users several and/or shorter routing options, etc. The ERNIP Part 2 - ARN Version 2016 - 2019/20 will require also to accommodate both civil and military requirements, the ASM solutions will need therefore to be fully exploited. In this context a number of ASM solutions have been tested in 2014. Additional activities have been executed in 2015 in the frame of FREE Solutions Large Scale Demonstration Project to evaluate the application of ASM solutions in a FRA environment. A number of DCTs have been identified in order to promote a better utilisation of airspace based on co-ordination among civil and military. FREES DCTs FIR/UIR GTQ - BEGAR LFFF BEGAR - ODINA LSAS VANAS - GODRA LFFF, LSAS GODRA - DITON LSAS ARKIP - LMG LFFF ERIXU - VALKU LFFF RESIA - BABAG LIMM BZO - ETPUB - TALEP LIMM

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 22 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Based also on the outcome of the FREE Solutions Project, a revision of the ASM handbook has been initiated with the purpose to define a process to be applied in future for similar scenarios. In this respect NETOPS/14 agreed the proposed amendment on ASM solutions for ERNIP Part 3 ASM Handbook.

3.4. SIMPLIFYING THE RAD

A number of RAD restrictions have successfully been tackled and clear flight efficiency improvements achieved with no impact on safety or on capacity. An elimination of further restrictions impacting Croatia, Czech Republic, France, Germany, Italy, Poland, Spain, Turkey and UK is planned until end 2020. There is a clear need to further review the RAD restrictions with the participation of all the interested parties. It is expected the Network Manager to run a Network impact assessment of the RAD restrictions implemented in the States. States will be requested to study if some of the RAD restrictions where put in place to balance capacity during a specific period of the year and therefore can be deactivated during the rest. Furthermore the Network Manager provided input to the States/ANSPs/FABs on the inconsistencies identified in regard to the current allowed DCTs in RAD Appendix 4 and 5. All the required improvements for many areas will be implemented within the context of ERNIP Part 2 - ARN Version 2016 - 2019/20.

3.5. IMPROVING TMA STRUCTURES

Improved Terminal Airspace design projects are or will be implemented in the context of the ARN Version 2016 - 2019/20 at: - Al Hoceima TMA; - Ankara TMA; - Barcelona TMA; - Batumi TMA; - Beograd TMA; - Canarias TMA; - Istanbul TMA; - Izmir TMA; - Ljubljana TMA; - London TMA; - Milano TMA; - Nador El Atoui TMA; - NAPOC TMA; - Oslo TMA (HOPE - Harmonisation of Oslo Procedures and Environment); - Paris TMA (Point Merge TE); - Poznan TMA; - Santorini TMA; - Tbilisi TMA; - Tetouan TMA, - TMA; - Wien TMA. In the time frame of ERNIP Part 2 - ARN Version 2016 - 2019/20 a third at is considered, a new runway at Dublin airport and a new planned for Istanbul.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 23 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

3.6. THE FLIGHT EFFICIENCY PLAN

IATA, CANSO and EUROCONTROL worked in a close partnership along with airlines, airports and ANSPs to identify solutions and launch operational actions that will lead to fuel and emissions savings in the short term to develop a Flight Efficiency Plan that was commonly agreed in September 2008. The Flight Efficiency Plan builds on the accelerated implementation of the measures already approved by the EUROCONTROL Provisional Council, currently put in place by all ATM actors, and included in DMEAN, the Airspace Action Plan, the Airspace Management Improvement Initiative, the Terminal Airspace Improvement Initiative and the Airport Programme. The action points of the Flight Efficiency Plan, relevant for the ERNIP Part 2 - ARN Version 2016 - 2019/20, are: 1. Enhancing European en-route airspace design through annual improvements of European ATS route network, high priority being given to: o Implementation of a coherent package of annual improvements and of shorter routes; o Improving efficiency for the most penalised city pairs; o Implementation of additional Conditional Routes for main traffic flows; o Supporting initial implementation of free route airspace. 2. Improving airspace utilisation and route network availability through: o Actively support and involve aircraft operators and the computer flight plan service providers in flight plan quality improvements; o Gradually applying route availability restrictions only where and when required; o Improving the utilisation of civil/military airspace structures. 3. Efficient TMA design and utilisation, through: o Implementing advanced navigation capabilities o Implementing Continuous Descent Approaches (CDAs), improved arrival/departure routes, optimised departure profiles, etc. The vast majority of the improvements considered in the context of the ERNIP Part 2 - ARN Version 2016 - 2019/20 contribute to the deployment of the Flight Efficiency Plan.

3.7. THE NETWORK MANAGER FLIGHT EFFICIENCY INITIATIVE

A closer cooperation with the airspace users to ensure a better flight planning is essential to ensure the achievement of the RP2 targets. The good progress made over the past years in the airspace design resulted in a European airspace offering, in a dynamic manner, a high number of options for the airspace users. In order to achieve a better utilisation of the European airspace by the airspace users, the network manager launched a Flight Efficiency Initiative that covers the following aspects: . Flight Planning Improvements in the Strategic Phase . An interactive tool was developed to allow all AOs and CFSPs to compare their flight plans with the best filed flight plan accepted by IFPS during the last AIRAC cycle; . The airspace users and the CFSPs will have the possibility to detect new implemented routes, CDRs available during similar periods of time, etc.; . It is expected that the airspace users and the CFSPs will use this interface to improve their flight planning for the “next” AIRAC cycle; . This tool could also be used to assess individual airline flight plans or to detect possible network performance evolutions.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 24 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

. Enhanced utilisation of CDRs through the deployment of ASM solutions . Assessment of traffic demand, ATFM measures, sector configurations and CDRs availability; . Existence of CDRs segments in the FPL; . Route extension compared with the “best option”; flight extension mostly for en- route section (avoid extensive arrival/departure situations); . Search for the flights with the shortest planned route for each city pair having at least one CDR in their planned route; . For each city pair assess the CDR availability requirements if all the flights on that city pair would plan the shortest route; . Proposals to AOs for better routes including CDRs; . Possible coordination with military partners, when required, for coordinated availability of CDRs.

. Flight Planning improvements in the Pre-Tactical/Tactical Phases . Enhance the visibility for aircraft operators on other route network utilisation options, post IFPS flight planning with proposals being displayed to the users; the final choice in accepting a more optimised proposal remains with the airspace users. Those actions are based on: . The Group Rerouting Tool (opportunity tool) - an ETFMS feature allowing a recomputation of the profile considering the wind, the last ATFCM situation, simulated operating costs; . Proposals for flight efficiency improvements for invalid flight plans that require manual corrections; . Network impact assessments resulting in re-routing proposals based on CDR2 routes with the direct involvement of MILO/AOLO; . Repetitive Flight Plans (RPLs) . Proposals for RPL changes that need to be maintained by the airlines for each AIRAC cycle. . Most Penalised City Pairs . Further developments to address the Most Penalised City Pairs . Daily monitoring of the utilisation of the new airspace changes; . Detect improvements based on the latest airspace design or airspace utilisation changes. . Tactical RAD relaxations . Based on existing Crisis Procedures; . Similar procedures could be implemented during normal operations as comparisons between actual trajectories and flight plans show that the RAD is not systematically followed during tactical operations; . Tactical relaxation of RAD could be also envisaged during the night or during period of low demand.

The implementation of this initiative is based on: • A close and continuous cooperation between NM and the airspace users; • A close and continuous cooperation with the computer flight plan service providers; • Appropriate evolutions of the flight planning systems to take into account the past and future evolutions of the airspace concepts.

This initiative will require the strong support and participation of the entire airspace users community. This support is critical for ensuring the achievement of the RP2 environment/flight efficiency target. Without such a support, the positive evolutions made with respect to the European airspace design through co-operative efforts between NM, ANSPs and FABs will not provide their full potential.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 25 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 26 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

4. CONCEPT OF OPERATIONS FOR EUROPEAN AIRSPACE DESIGN

4.1. MAIN PRINCIPLES

Successful European airspace design is achieved through: o The implementation of an advanced and consolidated concept of operations; o A pan-European view treating the European airspace as a continuum and a strategic vision of the European ATS Route Network, designed following main traffic flows and airspace users preferred routes and profiles with optimised supporting ATC sectors unconstrained by national or FIR boundaries; o Gradual elimination of bottlenecks and reasons for flight inefficiency; o Optimised procedures for an enhanced use of airspace; o A balanced approach between European network, regional and local requirements; o A co-ordinated and integrated partnership approach for the collective benefit of airspace users, Member States, Air Navigation Service Providers, civil and military authorities deployed through a collaborative planning process. The diagram below describes the European Route Network Improvement Plan/ ERNIP development.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 27 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

4.2. ERNIP PART 2 - ARN VERSION 2016 - 2019/20 IMPROVEMENTS HIGHLIGHTS

4.2.1. Introduction The performance targets place more demands on the need to enhance the organisation and use of the European ATM network. Additional capacity will need to be delivered, flight efficiency improved and environmental impact reduced, while maintaining or improving safety of operations. Air traffic diversity is expected to become more complex with the emergence of additional civil and military requirements, which will alter the mix and flight profiles of the airspace users. This will lead to additional diversity in the airspace user requirements The solution for meeting the safety, capacity, flight efficiency/cost effectiveness and environmental requirements is the strategic planning and design of “packages” of ATS routes of the ARN, Free Route Airspace, Terminal Routes, airspace reservations and ATC sectors, to respond to the requirements of different strategic objectives. These packages are called Airspace Configurations. The solution for meeting the diversity of user requirements is the effective and dynamic management of airspace configurations through a highly flexible and integrated Cooperative Decision Making (CDM) process at network, regional, national and local level management of the pre-designed airspace configurations through a highly flexible and integrated CDM process at network, regional, national and local level.

4.2.2. Basic Concept In both en-route and terminal airspace, an Airspace Configuration refers to the pre-defined and co-ordinated organisation of ATS routes of the ARN and/or Terminal Routes, Free Route Airspace and their associated airspace structures (including temporary airspace reservations, if appropriate) and ATC sectorisation. In the en-route airspace, airspace configurations are to be comprised of pre-defined fixed and flexible routing options or optimised trajectories and optimum ATC sectorisation capable of being dynamically adapted to traffic demand. Airspace configurations will be activated, through a CDM process, depending upon the driving Strategic Objective(s) for a particular geographic area and/or time period. In terminal airspace, airspace configurations are contained primarily within terminal airspace structures. Airspace configurations may be activated depending upon the runway configuration in use at one or more airports and the driving Strategic Objective(s) of a particular time period. The above is based on a coordinated and systematic approach to selecting and changing airspace configurations across the European ATM System. The ARN Version 2016 - 2019/20 is built on a close co-operation between airspace design, ATFCM and ASM. It supports a close link between airspace design and airspace utilisation.

4.2.3. European Network Consistency The overall European Network Consistency is assured across through the consolidated development of the ERNIP Part 2 - ARN Version 2016 - 2019/20. Co-ordination and consolidation of airspace design, planning and implementation is achieved through Cooperative Decision Making (CDM) at European network level. The ERNIP Part 2 - ARN Version 2016 - 2019/20 is based on a European wide collaborative process by which the major traffic flows, combined with major airspace constraints (airports, military areas etc.) are translated into a basic route structure. Built upon agreed planning principles, the resultant structure provides the basis for more detailed development by States and ANSPs at national or regional/FAB level. The scheme will consider the European airspace in its totality, independent of FIR boundaries.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 28 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

4.2.4. Airspace Continuum An airspace continuum was envisaged in the development of the ERNIP Part 2 - ARN Version 2016 - 2019/20. This means that there is no intended division within en-route airspace or between en-route and terminal airspace. However, the different attributes of en-route and terminal airspace drove specific requirements resulted in changes to various interfaces to improve efficiency. A lateral airspace continuum is ensured through regional airspace configurations in both en-route and Terminal Airspace (e.g. FAB or TAS), where application of various the rules associated with airspace utilisation will be harmonised. A network continuum was ensured through the development of the overall ERNIP Part 2 - ARN Version 2016 - 2019/20 where all aspects related to lateral and vertical interconnectivity, including interconnectivity within and between regional airspace configurations, were thoroughly addressed.

4.2.5. ARN Version 2016 - 2019/20 Components ATS routes continue to characterise the airspace for the most part in the context of the ERNIP Part 2 - ARN Version 2016 - 2019/20, while Free Route Airspace will be used in selected airspaces and/or at selected times. The main characteristic of the ATS routes of the ERNIP Part 2 - ARN Version 2016 - 2019/20 is to offer more routeing options to the airspace users. These routes will be based on principles of route network design and sectorisation independent from national boundaries, adapted to main traffic flows. An airspace structure built on the basis of an ATS route network and Free Route Airspace is capable of being managed more flexibly to permit operators to choose from several strategically designed airspace structures (ATS routes and Free Route Airspace) of the ERNIP Part 2 - ARN Version 2016 - 2019/20. Improvements in the strategic design, planning and management of these 2 components will improve the predictability of the route options. This flexibility is based on principles of the Flexible Use of Airspace Concept. The requirements of GAT and OAT are accommodated by integrating these into the strategic ARN developments. ATC sectors of ERNIP Part 2 - ARN Version 2016 - 2019/20 are adapted to main traffic flows and to an optimum route network and are, when required, independent from national boundaries. More ATC sectors are developed and made available, where required (including vertical divisions), in response to variations in demand and airspace availability. This work was conducted with the full involvement of States and ANSPs as it is their direct responsibility for the final design of ATC sectors supporting the route network structure and Free Route Airspace. To improve the design and management of terminal routes and ATC sectorisation servicing several airports in close proximity, the fusion of two or more terminal airspace structures is envisaged where required. This amalgam is described as a Terminal Airspace System (TAS). These TAS could extend across national borders if necessitated by operational requirements.

4.2.6. Airspace Classification Above FL195, ATS routes, Free Route Airspace and Terminal Routes will be contained within Class C airspace. At and below FL195, ATS routes of the ARN as well as Terminal routes will be contained within airspace where, for safety reasons, there is to be a uniform application of the rules associated with the 7 ICAO airspace classes. At or below FL195, where supplemental rules to the 7 ICAO airspace classes are required to respond to operational and safety requirements, additional rules will be created and applied in a safe manner. European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 29 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

4.2.7. Airspace Organisation The practical airspace organisation features of ERNIP Part 2 - ARN Version 2016 - 2019/20 are:  Multi-option route choice: New route segments and Free Route Airspace were added to the network. These additional airspace structures are compatible with the overall airspace structure. They include 24 hours choices, but also time limited choices (e.g. the European Night Direct Route Network or time-limited application of Free Route Airspace). In the event of airspace restrictions caused by traffic density and/or ACCs/sector configuration or activation of segregated airspace, suitable alternative options are available. The dynamic capacity/route use will be brought about by collaborative decision-making based on the pre- determined set of routing options.  Modular sectorisation: To the largest possible extent and where required, sectors are established across national borders and in accordance with main traffic flows. They will support the pre-defined airspace structures. Reconfiguration of pre-defined modules of airspace (sector modularity) help to adapt the sector configurations to specific traffic flows.  Efficient Terminal/En-route interface: Efficient structures based on segregated arrival/departure routes extending beyond the Terminal Airspace are part of the ERNIP Part 2 - ARN Version 2016 - 2019/20. Where incompatibilities arise, priorities were discussed and given depending on operational requirements to the en-route part or to the terminal structure.

4.2.8. Airspace Development Approach The process for developing an airspace structure was based, in most of the cases on the following sequence:  Determine the Route Network or the Free Route Airspace - improvement of the route network or implementation of Free Route Airspace took into account the users’ preferred routes and inclusion of direct route segments on the largest possible extent whilst meeting the requirements of the military;  Define the Sector Families - areas containing specific air traffic flows and conflict areas which will consist of strongly interdependent sectors;  Define Sectors - definition of the minimum operational elementary volume;  Define Sector configurations - a combination of sectors best placed to satisfy the operational requirements (traffic demand, traffic pattern, staff) and airspace availability;  Define the Modus Operandi 4.2.8.1. Route Network The objective of ERNIP Part 2 - ARN Version 2016 - 2019/20 is to provide Aircraft Operators with their preferred trajectories selected from within the route network, whilst ensuring that the capacity and safety targets defined by the sectorisation are met. The ERNIP Part 2 - ARN Version 2016 - 2019/20 delivers more route choices to the operators when planning a flight. This involves improved access to the existing route network and the creation of new routes, including predefined direct routes available subject to time limitations or ASM conditions. The Route Network design criteria took into account the need to create additional routes that did not exist in the previous network as they caused capacity problems at certain times. The ERNIP Part 2 - ARN Version 2016 - 2019/20 introduced these new routes and made them available for use under specific pre-defined conditions that are made known to all airspace users. As a result, the most direct of the routes choices could be planned at certain times. In other cases, choices will need to be made by the airspace users between the shortest route but with capacity constraints, a slightly longer route will be made European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 30 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

available with no capacity constraints, but involving ASM solutions, or a longer route available with no airspace constraint. The airspace users will, at a pre-determined time, make the decision on the choice of route based on up to date data on the sector constraint and segregated airspace availability. The creation of pre-defined direct routes subject to ASM conditions, should provide benefit to the military users as well as it will be possible to better respond to their requirements when the preferred route is available. This in turn lead to the implementation of a larger number of CDRs 1 or 2.

4.2.8.2. Free Route Airspace The ERNIP Part 2 - ARN Version 2016 - 2019/20 provides an enabling framework for the harmonised implementation of Free Route Airspace in Europe. It is based on the Free Route Airspace Concept developed in the context of the ARN Version-7 and included in ERNIP Part 1.

4.2.8.3. Sectorisation The development of ERNIP Part 2 - ARN Version 2016 - 2019/20 took into account the need to gradually implement Sector Families of interdependent sectors that can be clustered into logical Family Groups. In all the development projects aspects related to areas of weak and strong interaction were considered through the utilisation of the supporting airspace design tools. The criteria for determining Sector Families, Family Groups and elementary sectors were based on:  an optimised route network, integrating direct routes, Free Route Airspace, multiple route options, associated alternatives and military operational requirements;  efficient connectivity with terminal airspace;  design of elementary sectors with strong/complex interaction that necessitate close co-ordination between controllers;  traffic density, conflict density and repartition, traffic profiles, nature of traffic (climbing/descending), crossing flows, close crossing points, etc.  operational considerations for lateral and vertical delineation;  determining variable sizes of sectors with small/specialised low level sectors, deep medium sectors (for evolving traffic) and wider upper sectors;  usage of modular techniques;  time of flying within a sector family;  several combinations of flexible sectors configuration were defined, depending on traffic flows;  enabling sufficient distance for conflict resolution in all routeing options;  maintaining route options, on the largest possible extent within the same sector family;  iterative process for sectorisation considering route network modifications to enable the best possible sectorisation.  the identification of zones of lesser complexity.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 31 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

4.2.8.4. Modus Operandi The Modus Operandi of the ERNIP Part 2 - ARN Version 2016 - 2019/20 includes:  The availability, in terms of time and FL, of route segments (including the direct route segments) or Free Route Airspace in line with the constraints imposed by segregated airspace or by the need to better balance capacity and demand;  The links between-route network, Free Route Airspace airspace and sectorisation including conditions for availability of certain route segments or Free Route Airspace and their dependence on the configuration of ATC sectors to match traffic demand;  Routing scenarios - including all pre-planned alternate routeings to compensate for the temporary unavailability of a certain airspace structures;  Structural constraints - notified constraints, such as, the activation of segregated airspace, sector capacity restrictions, specialised routes for specific traffic flows, profile constraints to skip sectors in a given configuration and modifying capacity depending on the sector configuration;  Recommended practices - proposals derived from operational experience including the process for selecting sector configurations.

4.2.9. Operating the ERNIP Part 2 - ARN Version 2016 - 2019/20 The rationale for the ERNIP Part 2 - ARN Version 2016 - 2019/20 was to ensure that the ATS route network, the Free Route Airspace and the ATC sector planning allow for an improved balance between:  freedom for GAT to choose between-route options, and select their preferred one;  offering greater flexibility for OAT users through more efficient allocation of airspace;  capacity management - relying on fine tuning of route adaptation to optimise the use of available capacity where limitations of capacity occur. Local and Regional/FAB documentation was or will be amended to include the updated rules and procedures. Amongst these are:  National AIPs;  National ATC Regulations;  LoAs;  National ATM Military Documents;  Airspace Management Handbook;  IFPS Users Manual;  ATFM Users Manual. No change was made to the route description. However, specific description and usage was implemented to facilitate flight planning for the usage of direct segments within Free Route Airspace. Flight planning procedures were further improved to take into account the flexibility of route selection offered by the ERNIP Part 2 - ARN Version 2016 - 2019/20. Further initiatives are under way to facilitate improved flight planning and route selection. Airspace users should expect more flexibility in the FPL handling based on planned IFPS system enhancements to allow for the dynamic choice of route and/or re-routeing process. The ERNIP Part 2 - ARN Version 2016 - 2019/20 supports the usage of DCT in the FPL within a consolidated concept and approach. It is expected that operations within the ERNIP Part 2 - ARN Version 2016 - 2019/20 will be facilitated through the deployment of the Airspace Data Repository that will ensure gradually an automated distribution of airspace availability information in order to provide all interested parties with a clear and accurate picture of the airspace structure situation.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 32 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

The ERNIP Part 2 - ARN Version 2016 - 2019/20 enables a more flexible ATFCM system and will ensure the gradual move towards the creation of a system responsive to capacity management. The addition of an optimisation process able to provide routeing alternatives to solve capacity and flight efficiency constraints, while maintaining the balance with the airspace user costs, will enhance the current method of managing airspace capacity.

4.2.10. Military Operations The ERNIP Part 2 - ARN Version 2016 - 2019/20 recognises and supports the responsibilities and requirements of Military airspace users. In order that all airspace users gain benefit from ERNIP Part 2 - ARN Version 2016 - 2019/20, military airspace planners were part of the planning process. An organised collection of military airspace requirements is one of the specific elements that the ERNIP Part 2 - ARN Version 2016 - 2019/20 took into consideration. Through the solutions proposed in ERNIP Part 2 - ARN Version 2016 - 2019/20, the military should be able to have:  freedom to operate in all weather conditions in all areas of the European airspace;  special handling in particular for priority flights and for time-critical missions, but also for military aircraft not fully equipped to the civil standard;  the possibility of operating uncontrolled VFR flights;  temporary airspace reservations (TSAs), situated as close as practicable to the appropriate operating airfield;  airspace restrictions for non-flight related activities;  a more dynamic airspace allocation system with enhanced FUA application. The ERNIP Part 2 - ARN Version 2016 - 2019/20 supports these requirements through greater flexibility in airspace use, the efficient allocation of segregated airspace and associated re-routeing of GAT users. With a route network and sectorisation that adapts to the variation in traffic flows there scope for better application of the Flexible Use of Airspace.

4.2.11. Airspace Management (ASM) Solutions  General Principles The identification and development of the ASM Solutions is a part of the ASM Improvements Initiative. The ASM solutions form an integral part of the ERNIP Part 2 - ARN Version 2016 - 2019/20. They include:  Reviewing the different application of CDR categories at the different stages;  Addressing the potential incompatibility of different CDR categories on segments of the same route with the stakeholders concerned;  Reviewing and improving the design of CDRs in combination with modular TRA/TSA design;  Improving the definition of ASM Solutions to be used at ASM level 2 and 3. The main objective of the ASM Solutions development is to identify hidden airspace capacity or flight efficiency directly related to the area of Airspace Management, i.e. civil-military requirement to use the same portion of airspace at the same time. This activity is aimed at improving the existing practices in order to overcome the capacity constraints and provide efficient flight operations of both, civil and military airspace users. It aims at identifying such airspace use scenarios, which will bring benefits to both - civil and military categories of airspace users. It will provide for a credible balance in meeting the requirements of all the partners in airspace use and its management.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 33 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To deliver extra capacity and flight efficiency, the current ASM processes and procedures related to a particular TRA/TSA are reconsidered, both in their design and associated airspace planning and allocation processes and procedures. The enhanced ASM processes will consider various levels of flexibility, either in time or in spatial location (vertical or horizontal), that are permissible by the planned civil or military flight operations. The civil aircraft operators are to achieve more efficient, less costly and delay-free operations in some portions of airspace that today restrict meeting the demand, using different CDR options that are co-located to each sub-modular configuration of a particular temporary reserved or restricted airspace portion. The military might need to request an enlarged airspace volume to meet the requirements of specific missions. To respond to this request a set of well planned airspace scenarios that are adapted to different mission requirements concerning the airspace size (lateral and vertical) and timing will be available, thus eliminating any requirement for airspace overbooking. Air Navigation Service Providers participation in collaborative decision making on implementation of a particular scenario related to the specific TRA/TSA, will ensure that their needs of sectors’ capacity to accommodate the traffic demand are properly addressed. The final objective of the ASM Solutions development is to identify concrete and consistent solutions for each identified hot-spot, i.e. an interactive civil-military solution. Next step is to extend the activity at the sub-regional level by coordinating interaction between adjacent local options. The process of final ASM Solutions development is expected to be carried out by the civil and military partners responsible for a particular TRA/TSA. At the second stage the coordination is planned to be extended to all those concerned by the interaction in defining and deciding upon different scenarios, resulting in the most suitable sub- regional ASM Scenario. Last but not least, with this optimised local and sub-regional network response, the task of Network Operations should be focused on the global network solutions that can lead, by judicious selection, to less ATFCM measures.  ASM Solutions Methodology The traffic samples to be used in initial scoping and identification of the potential hot-spots, but equally later in developing concrete ASM Scenario(s) will be based on the historical traffic data. The data on TRA/TSA booking will be derived from AUP/UUP/e-AMI information available and their occupation from various sources like CIAM and PRISMIL, or from national ASM tools.  Future Data Collection and Planning The objective of this particular activity is to continually collect information and data on planned introduction and/or change in ASM-related airspace structures and arrangements, i.e. TRAs, TSAs, CBAs, manageability of D and R areas, cross-border airspace sharing arrangements. The information and data collected will enable the assessment and coordination of any planned introduction or change in collaborative manner, enabling consistent solutions planned among neighbouring States, but also at subregional (FABs) and, last but not least, at the European Regional level, thus enhancing the European Network performance. This approach was already agreed and put in place between the parties concerned.  Identification of areas of interest Identification of Hot-Spots that have a potential for capacity and/or flight efficiency improvements through an interactive civil-military solution will be constantly pursued in order to make use of the options made available through the ERNIP Part 2 - ARN Version 2016 - 2019/20. For the purpose of initial scoping and identification of potential benefits the closest to the optimum ATS route traffic sample available will be considered as the reference, i.e. the least constrained by military activity or other events. It will then be put against the traffic sample of the most intense day of civil and military activity. European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 34 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Aircraft Operators that may benefit from the ASM/ATFCM scenarios will be involved at an early stage, to ensure that benefits are realistic and ensure AO utilisation of the scenarios. Once the selected Hot-Spots are identified, the potential benefits will be scoped for different potential solutions based on variation and combination of different parameters:  Vertical A number of vertical configurations will be examined to identify any potential in dynamical managing of a TRA/TSA concerned. The main principle will be to assess if a vertical move of the military activity will contribute to the airspace capacity in particular area.  Lateral Similarly to vertical, a number of lateral configurations, based on current and possible future airspace more sub-modular design will be investigated. It will be based on the larger airspace allocated (as appropriate) through activating different set of sub-modules that are sufficient to accommodate military requirements. Through this assessment it will be confirmed that there is a potential to differently organise airspace planning and allocation in a particular TRA/TSA.  Time-related Possibility to increase the airspace capacity by accommodating both military and civil demand as close as possible to the planned use of airspace will be investigated.  Conditional Routes More conditional routes in a particular TRA/TSA will be simulated as a function of different lateral TRA/TSA configurations to increase capacity and to accommodate military and civil requirements at the same time. The main principle will be that, except when the military requirement is to use the whole TRA/TSA, different sub-module scenarios could accommodate both - military activity planned and the civil traffic demand to pass through the TRA/TSA concerned. The main principle being that there is theoretically at least one CDR along the main traffic flow and within a particular TRA/TSA that can accommodate civil traffic. Following the steps described above a comprehensive initial impact assessment will be performed per each identified Hot-Spot candidate. This assessment is to facilitate the decision that the Hot-Spot identified qualifies to be proposed to potential partners for further work on future ASM Solutions in the particular TRA/TSA.

4.2.12. Network Enablers The main enablers for the efficient implementation of the ERNIP Part 2 - ARN Version 2016 - 2019/20 are:  System Support - Enhancement for the purposes of flight planning and ATFCM;  Procedures - Enhanced procedures where necessary for operations within Free Route airspace and at its interfaces;  Adaptations to airspace structures;  Adaptations to airspace management procedures. There are no additional equipment requirements identified for aircraft operators. Nevertheless, modifications to the flight planning systems might be required to ensure that full benefit of the Free Route Airspace is achieved.

4.2.13. Impact on Adjacent Areas The ERNIP Part 2 - ARN Version 2016 - 2019/20 addresses the interfaces with adjacent areas so that they remain coherent and compatible. Liaison with adjacent States was constantly made at the relevant ICAO groups where the work underway within the RNDSG is presented through working and information papers. Similarly, States, ANSPs and the ICAO secretariat are presenting updates to the RNDSG on the airspace evolutions at the interfaces. This good cooperation at the interfaces of the European airspace is ensuring a consistent airspace structure based on the continuum principle.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 35 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 36 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

5. A NETWORK COOPERATIVE DECISION MAKING PROCESS

The Network Cooperative Decision Making Process for the ERNIP Part 2 is described in the Network CDM Processes document approved by the Network Management Board.

High level Process description

1. Preparation  Input from NSP, previous NOP, NM Annual Report;  Input from all operational stakeholders and ICAO;  NM(D) to prepare ERNIP proposals;  All operational stakeholders to agree on ERNIP proposals;  NETOPS substructure to review proposals;  NM(D) to prepare draft ERNIP.

2. Consultation  Network DOP, for any unresolved issues (if required);  NETOPS to agree on draft ERNIP.

3. Approval  ERNIP Part 2 - ARN Version ARN Version 20xx - 20(xx+3/5) will follow the NOP approval process and goes to ICAO for inclusion in ICAO EANP.

ERND Process

In the execution of the European Route Network Design Function, the Network Manager has to develop, through a cooperative decision making process, the European Route Network Improvement Plan. The European Route Network Improvement Plan will be part of the Network Operations Plan.

The Part 2 of the ERNIP is updated on an annual basis.

The following calendar and CDM process was and will be followed by the Network Manager in close cooperation with the operational stakeholders for every update of the ERNIP Part 2:

October 20xx - Evaluation of the Summer 20xx situation and of the airspace design and utilisation related bottlenecks October 20xx - Presentation of the first version of the ERNIP Part 2 - ARN Version 20xx- 20(xx+3/5) January 20xx+1 - distribution of the draft ERNIP Part 2 to RNDSG; February 20xx+1 - discussion on the draft ERNIP Part 2 at RNDSG and NETOPS; further comments requested; March 20xx+1 - comments received and incorporated in the ERNIP Part 2 and new versions distributed to RNDSG and NETOPS; March 20xx+1 - progress report presented to NMB; April-May 20xx+1 - agreement on final version for ERNIP Part 2 by RNDSG; May-June 20xx+1 - seek approval by NETOPS and N-DOP for ERNIP Part 2; June 20XX+1 - seek approval by NMB of ERNIP Part 2.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 37 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

The Route Network Development Sub-Group (RNDSG) is the co-ordination forum for European rolling airspace design and development, planning and implementation of improved European ATS route network, optimised civil and military airspace structures and ATC sectors. The members of the RNDSG work in a partnership approach and are civil and military experts in airspace design from EUROCONTROL, States, ANSPs, Functional Airspace Blocks, airspace users international organisations, flight planner organisations and other relevant international organisations. Its work is supplemented by other activities which, depending on their nature or complexity, may be either under the auspices of the RNDSG or independent, but bringing their results into the overall network picture through RNDSG processes. Examples are: o Sub-Regional RNDSG Meetings; o Regional co-ordination meetings between States; o Working groups proposing various solutions for specific problem areas; o Special projects (FABs, national re-organisation projects, sub-regional agreements, etc.). Appropriate links are ensured with the Airspace Management Sub-Group to cover civil-military related aspects and with other specific ATFCM groups. The consolidation of the entire development process was ensured through the Network Operations Team. This cooperative planning process responds to the emerging requirements on the setting of cooperative planning and decision making processes on the development of the European route network.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 38 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

5.1. A NETWORK ORIENTATED APPROACH

The Network Orientated Approach takes an European-wide view and is based upon the need to enhance the overall European ATM capacity and flight efficiency. The process progresses from broad proposals towards specific solutions via a number of steps. Step 1: Identify current and foreseen problems. The planning work highlights the capacity and flight efficiency problem areas and their causes in the airspace structure. Step 2: Build generally improved airspace structure proposals (both route segments and ATC sectors) to accommodate major traffic flows and balance ATC workload. Step 3: Within this defined framework, detailed proposals of airspace structure are elaborated with their “modus operandi”, consolidated and validated through regional expert groups. The result of local studies feeds back into the initial proposals in a dialectical and iterative process. Step 4: A phased implementation programme is agreed and carried out.

NETWORK ORIENTED APPROACH

REQUIREMENTS TRAFFIC FLOW MILITARY DEFINITION REQUIREMENTS

ATS ROUTE CONNECTIVITY NETWORK DESIGN TO TMA DESIGN

Adaptations of the route network

ATC SECTOR DESIGN

ATC SECTOR ROUTE NETWORK AIRSPACE CONFIGURATION AVAILABILITY RESERVATION

MANAGEMENT ‘MODUS OPERANDI’ (Airspace Structure Utilisation)

OPTIMAL USE OF ROUTES AND SECTORS

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 39 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

5.2. AIRSPACE UTILISATION AND MANAGEMENT

The full potential of the European airspace structure, including supporting ATC Sectors, is often hindered by the restrictions that are imposed after the routes are implemented. In order to ensure that these airspace structures are used to their full potential, the way in which they are used should be an integral contributor to the rolling airspace design process. The ERNIP Part 2 - ARN Version 2016 - 2019/20 offers a greater number of possible options for its use with airspace configurations combinations facilitating a balanced approach to capacity and flight efficiency. These options were taken into account in the airspace design planning stages. Nevertheless, in order to exploit their full potential, development of appropriate Flight Data Processing Systems, enhanced ATFCM processes, the charging scheme and an enhanced ASM Concept of Operation will need to be applied. By bringing airspace design and airspace management closer together it will enhance the effectiveness of the overall ATM system. The target should be a structure that allows airspace users to fly their preferred routes and profiles, ANSPs to select the most efficient airspace organisation and ATFCM services to manage overall capacity at its optimum.

5.3. MILITARY REQUIREMENTS

To enable the military forces to carry out many of their tasks, airspace of appropriate size and convenient location needs to be readily available. New tasks and scenarios and a more varied operational repertoire are likely to require fewer but larger airspace training areas with more intensive activity at all flight levels. Airspace design processes should take into full account the need to conduct military operations and exercises ideally in close vicinity to the respective airbases. Similar to the development of multiple route options within the ATS Route Network, there is also an equivalent military requirement to develop and implement a set of pre-defined multiple airspace options for temporary use, based on close and flexible co-ordination of the use of the airspace. Nevertheless, military operations and training needs have to be safeguarded to ensure unimpaired, safe and efficient performance.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 40 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6. TRAFFIC DEMAND EVOLUTION AND ASSESSMENT

6.1. GENERAL

This section will assess the traffic demand changes between the start of implementation of ARN Version-6 and the start of implementation of ERNIP Part 2 - ARN Version 2016 - 2019/20. Significant changes of the traffic patterns could be noted between 2008 and 2014 as a result of the economic downturn. The most impacted areas are located in Western Europe, while traffic in Southern and South Eastern Europe continued to increase.

6.2. TRAFFIC DEMAND VARIATION - COMPARISON 2008/2015 The assessment was made for a busy week 25 in 2015 (15 - 21 June 2015) during which lower level of delays were recorded. Comparing the variation in traffic demand between 2008 and 2015 (see Figure 1 below), it can be seen that the Central and Western part of Europe recorded a significant traffic decrease, predominantly in Germany, UK and Spain. A continued traffic growth is recorded in the Southern and South Eastern part of Europe, predominantly on the South-West Axis, South-East Axis, North-South Axis, East-West Axis and in Turkey.

Figure 1: Traffic demand variation 2015 vs 2008

4 Weekdays of Traffic Traffic Demand Variation 2015 vs 2008 Week 25 2015<>2008 Cell size is 20NM x 20NM > 80 Ac/day

Incr 60 to 80 Ac/day 40 to 60 Ac/day 20 to 40 Ac/day 10 to 20 Ac/day 10 to 20 Ac/day 20 to 40 Ac/day 40 to 60 Ac/day

Decr > 60 Ac/day

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 41 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6.3. WEEK AND WEEK-END DISTRIBUTION The assessment was made for a busy week in 2015 (15 - 21 June 2015). The European traffic distribution is similar, with the major part of the traffic concentrated in the North Western part of Europe. The high density areas are concentrating on Central Europe during week-days (see Figure 2 below) and gradually expanding to most of the European airspace and Turkey during weekend traffic (see Figure 3 below). Figure 2: Week-days traffic density (4 days in June 2015)

One Week of Traffic Traffic Density for all Flights 15-21/06/2015

Cell size is 20NM x 20NM > 400 Ac/day 300 to 400 Ac/day 200 to 300 Ac/day 100 to 200 Ac/day 50 to 100 Ac/day 25 to 50 Ac/day

Figure 3: Week-end traffic density (4 week-end days in June 2015)

WeekEnd traffic (Sat-Sun) Traffic Density for all Flights 4 days in June 2015

Cell size is 20NM x 20NM > 400 Ac/day 300 to 400 Ac/day 200 to 300 Ac/day 100 to 200 Ac/day 50 to 100 Ac/day 25 to 50 Ac/day

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 42 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

However the comparison between both (see Figure 4 below) reveals a significant difference between Northern Europe and the South/South-Eastern Europe, as well as the Southern part of UK and the Western part of France and Spain. Figure 4: Comparison Week/Week-end traffic Density in June 2015 Traffic Density Comparison Week <> Weekend 8 Days of Traffic WE <> Week in June 2015 Cell size is 20NM x 20NM WE Week

The map above indicates the following: o Areas where the traffic density is greater during the week are depicted in light to dark blue; o More loaded during week days: - UK, Germany, France, Norway, Sweden, Denmark; - Barcelona - Madrid axis; - Rome - Milan axis; - Europe - Africa axis via Algeria.

o Areas where the traffic density is greater during the week-ends are depicted in green/ yellow to red; o More loaded during week-ends: - “South West Axis”; - “South East Axis”; - Mediterranean area.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 43 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6.4. DISTRIBUTION AND EVOLUTION - SHORT HAUL AND MEDIUM/LONG HAUL The assessment was made for the period 1st July 2007 - 30th June 2008 and 1st July 2014 - 30th June 2015. The short-haul traffic pattern (distances up to 400 NM - see Figure 5 below) shows a decrease of domestic and business traffic for short-haul flights in most of the European airspace, in UK, in Spain - especially for the city pair Barcelona-Madrid and in Northern Italy - especially the city pair Milano-Rome. Compared to 2007/08, a higher density of traffic is noted predominantly in Turkey.

Figure 5: Short-Haul Flights (<400 NM)

Traffic Density Comparison for Short-Haul Flights 365 Days of Traffic Jul to Jun 14/15 <> 07/08 Cell size is 10NM x 10NM

> 50 Ac/day

Incr 25 to 50 Ac/day 10 to 25 Ac/day 5 to 10 Ac/day 0 to 5 Ac/day 0 to 5 Ac/day 5 to 10 Ac/day

> 10 Ac/day Decr

The medium to long-haul traffic pattern (flight distances over 400 NM - see Figure 6 below) shows that the traffic further increases in the whole ECAC area and adjacent non ECAC area, significantly on the South-East Axis, South-West Axis, North-South Axis, East-West Axis, Turkey and parts of the Mediterranean area. Figure 6: Medium-Haul Flights (>400 NM)

Traffic Density Comparison for Other Flights (> 400NM) 365 Days of Traffic Jul to Jun 14/15 <> 07/08 Cell size is 10NM x 10NM

> 50 Ac/day

Incr 25 to 50 Ac/day 10 to 25 Ac/day 5 to 10 Ac/day 0 to 5 Ac/day 0 to 5 Ac/day 5 to 10 Ac/day

> 10 Ac/day Decr

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 44 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6.5. VERTICAL DISTRIBUTION (EVOLVING AND CRUISING TRAFFIC) The assessment of the traffic was made for a busy Friday (19th June 2015). The concentration of climbing/descending traffic (see Figure 7 below) is high in the core area where many of the European airports are closely located and around other busy airports in Europe. The areas of evolving traffic are expanding, indicating a continuous increase of traffic complexity across Europe. Figure 7: Areas of High Density Evolving Traffic

Number of Evolving Flights Traffic of 19 June 2015 Cell size is 20NM x 20NM > 300 Ac/day 200 to 300 Ac/day 100 to 200 Ac/day 50 to 100 Ac/day 25 to 50 Ac/day 10 to 25 Ac/day

The distribution of Cruising Traffic (see Figure 8 below) is more evenly distributed and increases are noted on the South East - North West axis. Figure 8: Areas of High Density Cruising Traffic Number of Cruising Flights Traffic of 19 June 2015 Cell size is 20NM x 20NM > 300 Ac/day 200 to 300 Ac/day 100 to 200 Ac/day 50 to 100 Ac/day 25 to 50 Ac/day 10 to 25 Ac/day

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 45 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6.6. FLIGHT LEVEL DISTRIBUTION With the implementation of RVSM combined with the performance of new generation aircraft, the vertical distribution of traffic has moved up significantly (FL360/FL420 instead of FL330/FL360) with the most popular flight levels at FL370/FL380. Higher traffic levels at FL180/FL190 and FL230/FL240 could also be noted. Figure 9: Flight Level Distribution in EUROPE 2008 / 2015

6.7. AIRPORT TRAFFIC INCREASE The assessment was made for the period 1st July 2007 - 30th June 2008 and 1st July 2014 - 30th June 2015. Figure 10 below indicates that with the exception of airports in Belgium, Latvia, the Mediterranean area, Middle East, Moldova, North Africa, Norway, Portugal, Romania, Russian Federation, Turkey, Ukraine and some low cost operators airports, all the other airports in Europe and the Canaries recorded a significant traffic decrease, the largest was accounted to the UK. Figure 10: Traffic Increase/Decrease for the 200 Busiest European Airports

200 Busiest Airports – Change in Number of Movements from 2015 to 2008

Increase Decrease

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 46 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6.8. TOP 50 AIRPORTS The table below indicates the Top 50 European airports in terms of movements for the period 1st July 2014 - 30th June 2015.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 47 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6.9. BUSIEST CITY PAIRS The following two tables show the Top 50 busiest city pairs/ CPs flown in Europe for the periods July 2007 - June 2008 and July 2014 - June 2015. The table below shows the Top 50 busiest city pairs/CPs in Europe for the period July 2007 - June 2008. AP1 AP2 AD 07-08 % Tot MADRID BARAJAS BARCELONA 44,913 0.4% ROME FIUMICINO MILANO LINATE 27,542 0.3% IZMIR-ADNAN-MENDERES ISTANBUL-ATATURK 19,723 0.2% PALMA DE MALLORCA BARCELONA 19,105 0.2% TOULOUSE BLAGNAC PARIS ORLY 18,905 0.2% OSLO/GARDERMOEN BERGEN/FLESLAND 18,754 0.2% JERSEY GUERNSEY 18,606 0.2% TRONDHEIM/VAERNES OSLO/GARDERMOEN 17,705 0.2% SCHIPHOL AMSTERDAM LONDON/HEATHROW 17,199 0.2% PARIS ORLY NICE 17,123 0.2% MUENCHEN 2 HAMBURG 16,805 0.2% PALMA DE MALLORCA MADRID BARAJAS 16,248 0.2% MAKEDONIA ATHINAI E. VENIZELOS 15,752 0.2% MUENCHEN 2 DUESSELDORF 15,716 0.2% STAVANGER/SOLA OSLO/GARDERMOEN 15,548 0.2% MUENCHEN 2 KOELN-BONN 15,226 0.1% ROME FIUMICINO CATANIA FONTANAROSSA 15,188 0.1% VALENCIA MADRID BARAJAS 15,008 0.1% TEGEL-BERLIN MUENCHEN 2 14,780 0.1% PARIS CH DE GAULLE LONDON/HEATHROW 14,649 0.1% ISTANBUL-ATATURK ANTALYA 14,628 0.1% ISTANBUL-ATATURK ANKARA-ESENBOGA 14,515 0.1% PARIS CH DE GAULLE FRANKFURT MAIN 14,438 0.1% LONDON/HEATHROW DUBLIN 14,395 0.1% LAS PALMAS FUERTEVENTURA 14,124 0.1% OSLO/GARDERMOEN COPENHAGEN KASTRUP 14,033 0.1% TENERIFE NORTE LAS PALMAS 14,011 0.1% NEW YORK LONDON/HEATHROW 13,705 0.1% LAS PALMAS ARRECIFE LANZAROTE 13,591 0.1% TENERIFE NORTE LA PALMA 13,496 0.1% ROME FIUMICINO PALERMO PUNTA RAISI 13,138 0.1% MADRID BARAJAS LAS PALMAS 13,080 0.1% ROME FIUMICINO PARIS CH DE GAULLE 12,663 0.1% LONDON/HEATHROW EDINBURGH 12,656 0.1% PARIS CH DE GAULLE MADRID BARAJAS 12,562 0.1% TEGEL-BERLIN KOELN-BONN 12,542 0.1% STOCKHOLM-ARLANDA COPENHAGEN KASTRUP 12,492 0.1% TEGEL-BERLIN FRANKFURT MAIN 12,482 0.1% MALAGA MADRID BARAJAS 12,373 0.1% LONDON/HEATHROW FRANKFURT MAIN 12,341 0.1% STOCKHOLM-ARLANDA HELSINKI-VANTAA 11,879 0.1% MADRID BARAJAS LISBOA 11,831 0.1% COPENHAGEN KASTRUP AALBORG 11,690 0.1% LONDON/HEATHROW GLASGOW 11,592 0.1% TEGEL-BERLIN STUTTGART 11,401 0.1% PARIS ORLY MARSEILLE PROVENCE 11,392 0.1% NIKOS/KAZANTZAKIS ATHINAI E. VENIZELOS 11,272 0.1% SCHIPHOL AMSTERDAM PARIS CH DE GAULLE 11,101 0.1% PARIS CH DE GAULLE MUENCHEN 2 10,941 0.1% OSLO/GARDERMOEN STOCKHOLM-ARLANDA 10,887 0.1%

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 48 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

The table below shows the Top 50 busiest city pairs/CPs flown in Europe for the period July 2014 - June 2015.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 49 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6.10. AIRSPACE USERS The table below indicates the Top 50 aircraft operators (AO) using the European airspace between July 2014 - June 2015.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 50 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

6.11. AIRCRAFT TYPES The table below indicates the Top 50 aircraft types using the European airspace between July 2014 - June 2015.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 51 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 52 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

7. MAIN PROJECTS INCLUDED IN ERNIP PART 2 - ARN VERSION 2016 - 2019/20

The ERNIP Part 2 - ARN Version 2016 - 2019/20 is an integral package of airspace design and utilisation solutions. It was built on the development of new concepts that were transposed in several layers of airspace developments. These layers are properly interconnected at network level to ensure an appropriate and cohesive airspace utilisation:  between various concepts;  over a 24-hours period, and  over various period of the week or of the year. The further development of the concept of airspace configurations at network level will ensure an enhanced utilisation of these various layers at local, sub-regional, FAB and network levels. The main direction taken by the ERNIP Part 2 - ARN Version 2016 - 2019/20 is towards the implementation of Free Route Airspace. The latest situation of the European route network structure is available and updated at each AIRAC cycle through the publication of EUROCONTROL Regional Charts that could be found at the following link: http://www.eurocontrol.int/articles/eurocontrol-regional-charts

7.1. FREE ROUTE AIRSPACE

The following maps are showing the layer containing the evolution of Free Route Airspace initiatives already in place or planned for implementation year by year, that are currently included in the ERNIP Part 2 - ARN Version 2016 - 2019/20. This layer is supported by a network operational concept for Free Route Airspace Operations. The map below shows the Free Route Airspace implementation plans for summer 2016.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 53 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

The map below shows the Free Route Airspace implementation plans proposed for Summer 2017.

The map below shows the Free Route Airspace implementation plans proposed for Summer 2018.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 54 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

The map below shows the Free Route Airspace implementation plans proposed until end of 2019.

The map below shows the Free Route Airspace implementation plans proposed until end of 2020.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 55 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 56 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ANNEXES

Annex A Reference Documents Annex B Acronyms and Abbreviations Annex C Summary of ERNIP Part 2 - ARN Version 2016 - 2019/20 Proposals Annex D List of ERNIP Part 2 - ARN Version 2016 - 2019/20 Proposals

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 57 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 58 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ANNEX A. REFERENCE DOCUMENTS

In the Development and Implementation of ARN Version 2016 - 2019/20 the following documents, inter alia, are used for reference and guidelines:

Single European Sky II Legislation

EUROCONTROL Airspace Strategy for the ECAC States

ERNIP Part 1

ERNIP Part 3

ERNIP Part 4

ICAO Standards, Recommended Practices and Procedures

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 59 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Left blank intentionally

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 60 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ANNEX B. ACRONYMS AND ABBREVIATIONS ACC Area Control Centre AIP Aeronautical Information Publication AIRAC Aeronautical Information Regulation and Control ANSP Airspace Navigation Service Provider AO Aircraft Operator AoR Area of Responsibility ARN ATS Route Network ARR Arrival ASM Airspace Management ASMSG Airspace Management Sub-Group ATC Air Traffic Control, Air Traffic Control Domain ATFCM Air Traffic Flow and Capacity Management ATFM Air Traffic Flow Management ATM Air Traffic Management ATS Air Traffic Services AUP Airspace Use Plan

CANSO Civil Air Navigation Services Organisation CBA Cross-border Area CDA Continuous Descent Approach CDM Cooperative Decision Making CDR Conditional Route CFSP Computer Flight planning Service Provider CIAM Central flow management unit Interface for Airspace Managers CRAM Conditional Route Availability Message

D Danger Area DCT Direct DEP Departure DMEAN Dynamic Management of European Airspace Network

e-AMI Electronic ASM Information EANP European Air Navigation Plan ECAC European Civil Aviation Conference ERNIP European Route Network Improvement Plan ERND European Route Network Design ETFMS Enhanced Tactical Flow Management System EU European Union EUROCONTROL European Organisation for the Safety of Air Navigation

FAB Functional Airspace Block FIR Flight Information region FL Flight Level FPL Filled Flight Plan FRA Free Route Airspace FUA Flexible Use of Airspace

GAT General Air Traffic

IACA International Air Carrier Association IATA International Air Transport Association ICAO International Civil Aviation Organisation IFPS Initial Flight planning Processing System IFR Instrument Flight Rules

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects 61 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

IR Implementing Rule

kg kilogram KEA Key Performance Environment Indicator based on actual trajectory KEP Key Performance Environment Indicator based on last filed flight plan KPI Key Performance Indicators

LoA Letter of Agreement

min Minute/s

NETOPS Network Operations Team NM Network Manager / Nautical Mile NMD Network Manager Directorate NOP Network Operations Plan NSP Network Strategy Plan

OAT Operational Air Traffic

P Prohibited Area PC Provisional Council P-RNAV Precision Area Navigation Pan-European Repository of Information Supporting Military Key PRISMIL Performance Indicators

R Restricted Area RAD Route Availability Document RNAV Area Navigation RNDSG Route Network Development Sub-Group RP Reference Period RVSM Reduced Vertical Separation Minimum

SAAM System for traffic Assignment and Analysis at Macroscopic level SES Single European Sky SID Standard Instrumental Departure STAR Standard Arrival Route

TAS Terminal Airspace System TMA Terminal Area TRA Temporary Reserved Area TSA Temporary Segregated Area

VFR Visual Flight Rules

WE Weekend

UAC Upper Area Control Centre UIR Upper Flight Information region

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 62 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ANNEX C. SUMMARY OF ERNIP PART 2 - ARN VERSION 2016 - 2019/20 PROPOSALS

This Annex provides an overview of the major improvement projects implemented or planned for implementation Autumn 2015 until 2020:

Autumn 2015 - Winter 2015 / 2016: Projects implemented (until 28 APR 2016)

 Albania / Serbia / Montenegro - New ARR/DEP LATI Phase 4.

 Austria - Free Route Airspace Wien, FRAW, Stage 4b; - Vienna TMA improvements.

 Bulgaria / Turkey / Romania - UDROS / ODERO area re-organization.

 Cyprus - Nicosia Direct Route Airspace - Phase 1A.

 Czech Republic - Optimization of Praha FIR lower airspace structure; - Improved flight planning options between Adriatic coast and Scandinavia.

 FABEC - FABEC FRA Step 1.

 France - Marseille ACC re-organisation, Phase 2.

 Germany: - FRA Germany, Phase 1.

 Germany / Austria - Long Range Direct Routing SE Axis.

 Germany / Switzerland - DFS Karlsruhe - Skyguide Night DCT Package.

 Greece - Night DCTs in Hellas UIR above FL355.

 Italy - Milano TMA, Phase 2.

 Lithuania - Free Route Airspace H24, FL245+.

 Maastricht UAC - Change of DFL in the West sectors of the Brussels Sector Group; - Straighten the boundary between the DECO and the Brussels Sector Group.

 Poland - Polish Airspace Project 2010+, Phase 3a; - FRA Like (DCT) - Phase 2.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 63 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 Serbia/Montenegro - Reshape the geographical boundary between Beograd ACC West and North sectors.

 Slovakia - Free Route Airspace Bratislava - FRABRA Phase 1.

 Spain - Vertically split existing SAN Sector into Lower (SAL) and Upper (SAU) Sectors

 Turkey - SMART Project Phases 2 / 3.

 United Kingdom - Airspace Efficiency improvements towards Paris TMA during the winter months. - LAMP Phase 1a.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 64 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Summer 2016: Projects planned or proposed for implementation

 Albania - Improved ATS route network within Tirana FIR.

 Bulgaria/ Bosnia and Herzegovina / Croatia / Serbia / Slovenia - Long Range Direct Routing SE Axis.

 Cyprus - Nicosia Direct Route Airspace - Phase 1B.

 DK/SE FAB - NEFAB - NEFAB and DK/SE FAB Free Route Airspace - NEFRA.

 FAB NEFAB - NEFAB Free Route Airspace H24.

 The Former Yugoslav Republic of Macedonia - Free Route Airspace Skopje.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 65 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Summer 2017: Projects planned or proposed for implementation

 Albania - FRALB - Free Route Airspace Albania - Phase 1.

 Armenia - Night Free Route Airspace in Yerevan ACC.

 Austria / Slovenia - SAXFRA - Slovenian Austrian X-border Free Route Airspace.

 Bulgaria - Night Free Route Sofia FIR - FRAS, Phase 2.

 Bulgaria / Greece - EVIVI dualisation.

 Bulgaria / Romania - DANUBE FAB FRA - Phase 2.

 Bulgaria / Hungary / Romania - Cross-border Night Free Route operations/ SEEN FRA.

 Croatia - Central sector Zagreb Phase 2b.

 Croatia / Bosnia and Herzegovina / Serbia - Free Route Airspace, Phase 5b - SEAFRA.

 Czech Republic - Free Route Airspace Praha/ FRAPRA, Step 3.

 France - Paris ACC re-organisation - Phase 2. - Marseille ACC re-organisation Phase 3.

 France - New TSA 6.

 Germany - CDO approaches (STARs) at Munich/ EDDM airport; - FRA Germany - Phases 2 / 3.

 Hungary / Bulgaria / Romania - Cross-border Night Free Route operations/ SEEN FRA.

 Italy / Malta - FAIR-IT Free Route Airspace Italy, Phase 3.

 Irland / Island / Norway / UK - Borealis Free Route Airspace, Step 1 - Step 5.

 Norway - HOPE - Harmonisation of Oslo Procedures and Environment - Phase 2.

 Poland

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 66 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

- FRA Like (DCT) Warsaw FIR, Phase 3.

 Portugal - Free Route Airspace Santa Maria FIR.

 Serbia / Montenegro - Lower airspace re-organisation Beograd FIR - Step 2/3.

 Serbia / the Former Yugoslavi Republic of Macedonia - RAXAD and MAKED dualisation.

 Spain / France - LUMAS, Phase 2 and 2b.

 Spain / Portugal / Morocco - Lisbon / Casablanca / Canarias Axis.

 Turkey - SMART, Phases 4;

 Ukraine - Free Route Airspace Ukraine, Step 1 (Sc 1b).

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 67 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Summer 2018: Projects planned or proposed for implementation

 Albania - FRALB - Free Route Airspace Albania - Phase 2.

 Armenia - H24 Free Route Airspace in Yerevan ACC.

 Bulgaria - Common Terminal Airspace System.

 Bulgaria / Romania - DANUBE FAB FRA - Phases 3.

 Cyprus - Free Route Airspace Cyprus – FRANIC, Phase 1.

 France - Brest ACC re-organisation; - S-WAFLE - South West Adaptation Flight Level Evolution Phase 2.

 France / Spain - ESSO - Espace Superieur du Sud Ouest; - Barcelona, Madrid, Bordeaux Interface, BAMBI.

 France / Belgium / Maastricht UAC - Paris Point Merge TE.

 Germany - FRA Germany - Phase 4.

 Maastricht UAC - FRAM2 - Free Route Airspace Maastricht UAC, Phase 1.

 Morocco - Free Route Airspace Casablanca, Phase 1, Phase 2 and Phase 3.

 Poland - Free Route Airspace Warsaw FIR, Phase 4.

 Portugal / Spain / France - Free Route Airspace Madrid / Brest.

 Spain - Barcelona TMA, Phase 1 and Phase 2.

 Turkey - FRA Like (DCT) SMART, Phase 5; - Free Route Airspace Turkey - Phase 1; - Istanbul International Airport - Phase 1.

 United Kingdom - Prestwick Lower Airspace – PLAS.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 68 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Summer 2019: Projects planned or proposed for implementation

 Bosnia and Herzegovina / Croatia / Montenegro /Serbia - BH ATM, Phase 2.

 Bulgaria / Romania - DANUBE FAB FRA – Phase 4 and Phase 5.

 Germany - FRA Germany - Phase 5.

 Maastricht UAC - FRAM2 - Free Route Airspace Maastricht UAC, Phase 2.

 Moldova - Free Route Airspace Moldova - Phase 3;

 Poland - Polish Airspace Project 2010+, Phase 3b;

 Ukraine - Free Route Airspace Ukraine, Step 2 (Sc 2a).

 Turkey - Free Route Airspace Turkey, Phase 2.

End of 2020: Projects planned or proposed for implementation

 Germany - 3rd runway Munich airport; - Berlin Brandenburg International (BER) airport; - Sachsen / SAS Upper sector.

 Italy - Free Route Airspace Italy, Phase 4.

 Maastricht UAC - Free Route Airspace Maastricht UAC, Phase 3.

 Switzerland / Germany / France / Italy - New Cross-Border Coordination Concept; - FRA Switzerland Night, Phase 1.

 UK - Borealis Free Route Airspace, Step 6.

 Ukraine - Free Route Airspace Ukraine, Step 2 (Sc 2b).

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 69 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ANNEX D. LIST OF ERNIP PART 2 - ARN VERSION 2016 - 2019/20 PROPOSALS

The following pages present detailed information about each of the more than 480 improvement proposals developed within the RNDSG which are or will be implemented as part of ERNIP Part 2 - ARN Version 2016 - 2019/20. The description of the proposals is based on the information available from different sources (e.g. AOs, ANSPs and EUROCONTROL). The table includes:  Proposal number: A reference number to identify each proposal allowing to trace at which RNDSG it was initiated.  Description: A detailed description of the planned improvement proposal.  Objective: A brief description of the purpose of the enhancement measure.  Status: The implementation status defined as Proposed, Planned, Confirmed or Implemented.  Project Group: The Functional Airspace Block Group (FAB), Regional Focus Group (RFG), Sub-Group (SG) or any other Project Group(s) involved directly or indirectly by the proposed enhancement measure.  Project Category: The nature of the proposed enhancement measure defined through Project Categories (e.g. ATC sectors, ATS routes, CDRs, DCTs, Free Route Airspace, RAD, TMA, …).  States and Organisations: The States and/or Organisations involved directly or indirectly by the proposed enhancement measure.  Originator(s): The States, Organisations who have originated the proposal.  Comments: The conditions and/or pre-requisites which have to be met in order to implement the proposal or any other relevant comment(s).

The Annex lists all ARN Version 2016 - 2019/20 proposals as they stood after RNDSG/88 (13th May 2016).

The latest situation of the European route network structure is available and updated at each AIRAC cycle through the publication of EUROCONTROL Regional Charts that could be found at the following link: http://www.eurocontrol.int/articles/eurocontrol-regional-charts

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 70 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

General clarifications:

1. Due to the fully automated short-term airspace improvement process in States and Organisations box the following ISO-3 coding of States is used: ALB Albania IRQ Iraq ARM Armenia ISL Iceland AUT Austria ITA Italy AZE Azerbaijan, Republic of LBY Libya BEL Belgium LTU Lithuania BGR Bulgaria LUX Luxembourg BIH Bosnia and Herzegovina LVA Latvia BLR Belarus MAR Morocco CHE Switzerland MDA Moldova, Republic of CYP Cyprus MKD The former Yugoslav Republic of Macedonia CZE Czech Republic MLT Malta DEU Germany MNE Montenegro DNK Denmark NLD Netherlands DZA Algeria NOR Norway EGY Egypt POL Poland ESP Spain PRT Portugal EST Estonia ROU Romania FIN Finland RUS Russian Federation FRA France SRB Serbia GBR United Kingdom SVK Slovakia GEO Georgia SVN Slovenia GRC Greece SWE Sweden HRV Croatia SYR Syrian Arab Republic HUN Hungary TUN Tunisia IRL Ireland TUR Turkey IRN Iran, Islamic Republic of UKR Ukraine MUAC Maastricht UAC

2. BLUMED FAB, DANUBE FAB and FAB CE proposals referenced in proposal number box are coded with a unique identification number abbreviated as BM or DN or CE, respectively, following by four digits (XXXX) (example BM0001 or DN0001 or CE0001). 3. Content of each proposal is an indication of State’s intention to implement the relevant airspace improvement but don't represent a copy of any official publication. For the correctness and verification of the relevant aeronautical information consult official State AIP publication. The data from this document should not be used for operational purposes.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 71 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 85.037 Impl. Status: State(s) & Org. Comments: Project Name: Transfer of Night ATS CDR routes into Night DCT Implemented AUT Relevant RDs to be considered for release in system. 15 OCT 2015 CZE ICARD.

Description: Project Category: DEU To withdraw the existing Night CDR routes UQ119, UQ224, UQ227, AIP POL 1. SVK UQ233, UQ250, UQ374, UQ375 and replace them by Night DCTs in ATS Routes RAD Appendix 4 with same trajectory and availability. CDRs Originator(s):

Objective: DCTs CZE To simplify AIP publication. Night Routes Proposal ID : 83.001 Impl. Status: State(s) & Org. Comments: Project Name: Optimization of LKAA lower airspace structure Implemented CZE 15 OCT 2015 DEU Description: 1. To optimize the Praha FIR lower airspace structure by changing Project Category: AUT division flight level between low sector and APP Brno, Karlovy Vary, Airspace Structure POL 2. SVK Ostrava. ATC Sectors 2. To re-design TMAs Brno, Karlovy Vary, Ostrava and Praha. TMA Originator(s):

Objective: CZE To improve lower airspace structure and to distribute traffic load. Proposal ID : 81.067 Impl. Status: State(s) & Org. Comments:

Description: Implemented CZE Related proposals: To allow DCT option between REGLI - VALPI. 15 OCT 2015 Originator(s):  81.064a 3. Objective: Project Category: IATA  81.064b To further improve ATS route options within Praha FIR. ATS Routes  81.066 RAD  81.068c Proposal ID : 83.023 Impl. Status: State(s) & Org. Comments: Project Name: Removal U prefix Praha FIR Implemented CZE 15 OCT 2015 Description: Originator(s): To remove the distinction between Upper and Lower ATS routes - "U" Project Category: CZE 4. prefix within Praha FIR. Airspace Structure

Objective: To simplify Air Traffic Management in Praha FIR. Proposal ID : 83.053 Impl. Status: State(s) & Org. Comments: 5. Description: Implemented CZE

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 72 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To re-designate the following ATS routes: 15 OCT 2015 Originator(s):

a. UT40 DOPOV - DOKEL as T46; Project Category: EUROCONTROL b. T/UT47 BNO - HLV as L/UL726. Route Objective: Redesignation To simplify the existing RDs and avoid unforeseen RD break within ICAO EUR/NAT Region. Proposal ID : 83.065 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Implemented CZE Currently both CDRs are published with only 15 OCT 2015 weekend time availability. Description: Originator(s): To publish in ENR 3.3 CDRs Z30 and Z37 based on ERNIP publication Project Category: EUROCONTROL 6. requirement to cover the whole period of availability. AIP

Objective: CDRs To resolve airspace data publication inconsistencies in State AIP. Proposal ID : 85.019 Impl. Status: State(s) & Org. Comments:

Description: Implemented CZE Related proposals: To realign existing ATS route UP41 as LEMBI - DOKEL - RODUX. 15 OCT 2015 Originator(s):  85.017 7. Objective: Project Category: IATA To further improve flight planning options for flights between Adriatic ATS Routes coast and Scandinavia. Proposal ID : 84.038 Impl. Status: State(s) & Org. Comments: Description: Implemented ESP . PALME is with double reservation in ICARD To replace existing 5LNC PALME. 15 OCT 2015 for France and USA. It is not used by USA Originator(s): Objective: Project Category: EUROCONTROL and ICAO might consider reservation 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO withdrawal from ICARD. 8. EUR/NAT region; . Point is used in Spain for military purpose. 2. To improve the aeronautical information provided; . Proposal for replacement is based on 3. To be compliant with ICAO Annex 11. “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Spain. Proposal ID : 84.037 Impl. Status: State(s) & Org. Comments: Description: Implemented ESP . PODAS is reserved in ICARD for Russian

To replace existing 5LNC PODAS. 15 OCT 2015 Originator(s): Federation. . Proposal for replacement is based on 9. Objective: Project Category: EUROCONTROL 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO “Common criteria for replacement of EUR/NAT region; duplicated 5LNCs” as point is not reserved 2. To improve the aeronautical information provided; for Spain.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 73 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

3. To be compliant with ICAO Annex 11. Proposal ID : 85.101 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 15 OCT 2015 Description: Originator(s): 1. To remove from ENR 3.1 unnamed significant points from ATS route Project Category: EUROCONTROL 10. L602. AIP 2. To add new 5LNC IPSAD to ATS route L602 ATS Routes

Objective: To further improve AIP publication of aeronautical data. Proposal ID : 85.102 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 15 OCT 2015 Description: Originator(s): 11. To add ASRUS, UNURO, NOVBA and IBOLU to ATS route N864. Project Category: EUROCONTROL

Objective: AIP To further improve AIP publication of aeronautical data. ATS Routes Proposal ID : 85.103 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 15 OCT 2015 Description: Originator(s): 12. To add new 5LNCs RIPNO and OSMEG to ATS route T256. Project Category: EUROCONTROL

Objective: AIP To further improve AIP publication of aeronautical. ATS Routes Proposal ID : 85.108 Impl. Status: State(s) & Org. Comments: Project Name: Airspace Efficiency Implemented GBR 15 OCT 2015 Description: Originator(s): To relax level capping restriction for traffic between Manchester TMA to Project Category: GBR 13. Paris TMA during the winter months. Airspace Structure

Objective: RAD To allow traffic ex MTMA to Paris TMA to flight plan more optimum levels H24 during the winter months. Proposal ID : 86.014 Impl. Status: State(s) & Org. Comments: Description: Implemented GBR . Removal will start with ATS route Q/UQ295. To remove the "U" prefix in the distinction between lower and upper ATS 15 OCT 2015 . If no problems encountered a phased 14. Originator(s): routes within London FIR/UIR and Scottish FIR/UIR - Phase 1. Project Category: GBR removal over the next couple of years will be initiated.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 74 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: ATS Routes To simplify ATS routes designation within London FIR/UIR and Scottish FIR/UIR. Proposal ID : 85.091 Impl. Status: State(s) & Org. Comments: Project Name: RAD Promulgation Implemented MKD 15 OCT 2015 Description: Originator(s): To publish in AIP Macedonia, ENR 1.10 FLIGHT PLANNING under Project Group: EUROCONTROL paragraph 1. Procedures for the submission of a flight plan common text RFG SE 15. for Adherence to Airspace Utilization Rules and Availability - RAD inside Project Category: Skopje FIR. AIP Objective: RAD To harmonize the RAD promulgation via the AIP by the ECAC States. Proposal ID : 85.046 Impl. Status: State(s) & Org. Comments: Project Name: RAD Promulgation Implemented MLT 15 OCT 2015 Description: Originator(s): To publish in AIP Malta, ENR 1.10 FLIGHT PLANNING under paragraph Project Category: EUROCONTROL 1. Procedures for the submission of a flight plan common text for AIP 16. Adherence to Airspace Utilization Rules and Availability - RAD inside RAD Malta FIR.

Objective: To harmonize the RAD promulgation via the AIP by the ECAC States. Proposal ID : 77.078b Impl. Status: State(s) & Org. Comments: Description: Implemented NOR Ekofisk CTA and Balder CTA are located within To implement ATS airspace class D in Balder CTA. 15 OCT 2015 GBR Norway FIR and Scottish FIR and involves "High 17. Objective: Project Category: Originator(s): Seas" airspace. To improve the safety of operations on the continental shelf. Airspace Structure NOR Proposal ID : 85.025 Impl. Status: State(s) & Org. Comments: Description: Implemented SVK

To implement ATS route segment T335 ZLA - BILNA. 15 OCT 2015 Originator(s): 18. Objective: Project Category: SVK To further improve the ATS route network structure within Bratislava FIR. ATS Routes Proposal ID : 84.051 Impl. Status: State(s) & Org. Comments: Description: Implemented CZE . LUMEN is reserved in ICARD for Belgium. 19. To replace existing 5LNC LUMEN. 12 NOV 2015 . Proposal for replacement is based on Originator(s):

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 75 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: Project Category: EUROCONTROL “Common criteria for replacement of 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO duplicated 5LNCs” as point is not reserved EUR/NAT region; for Czech Republic. 2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11. Proposal ID : 85.001 Impl. Status: State(s) & Org. Comments: Description: Implemented DEU . Germany will change the status of that To re-designate the existing ATS route T296 ROSOK - NIKDA - CDA as 12 NOV 2015 DNK route and will allow all traffic to use it.

Q296. Project Category: Originator(s): Normally segregated arrival routes are 20. Objective: Route DEU designated as “T”. To rationalise the existing ATS route designators in order to further Redesignation . Denmark was already informed and facilitate flight planning. coordination is in progress. Proposal ID : 69.064a / 16.035a Impl. Status: State(s) & Org. Comments: Project Name: NEFAB Free Route Airspace Implemented EST ATS routes will be kept. 12 NOV 2015 FIN Description: Related proposals: To implement H24 Free Route Airspace across NEFAB above Project Group: LVA  69.064b / 16.035b NOR 21. FL95/FL135. SG BALTIC

Objective: Project Category: Originator(s): To further improve the airspace structure between Norway FIR, Finland Free Route FAB NEFAB FIR, Tallinn FIR and Riga FIR. Airspace Proposal ID : 83.021 / 20.040 Impl. Status: State(s) & Org. Comments: Description: Implemented FIN To re-designate Y76 ULTIR - BEDSO as new Y75. 12 NOV 2015 Originator(s): Objective: Project Group: EUROCONTROL 22. To rationalize the non-regional ATS route designators. SG BALTIC

Project Category: Route Redesignation Proposal ID : 85.008 Impl. Status: State(s) & Org. Comments: Description: Implemented FIN . Extension of RD P998 currently used in To re-designate the existing ATS route T94 OGTUD - SUTEV - SLU as 12 NOV 2015 SWE Finland FIR.

P998 (release of T94). Project Category: Originator(s): 23. Objective: Route EUROCONTROL To rationalise the existing ATS route designators in order to further Redesignation facilitate flight planning.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 76 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 85.023 Impl. Status: State(s) & Org. Comments: Description: Implemented FIN . Alternate ATS route when TSA and R-areas

To implement new bi-directional ATS route T255 ATPEL - VAXUN - 12 NOV 2015 Originator(s): on both sides of existing ATS route T89 are IXONO. active. 24. Project Category: FIN Objective: ATS Routes . TSA's will also be realigned east of T89 but To further improve the ATS route structure within Finland FIR. restricted areas west of T89 cannot be realigned. Proposal ID : 85.039 Impl. Status: State(s) & Org. Comments: Description: Implemented FIN 1. To implement bi-directional ATS route T225 ATPEL - VAXUN - 12 NOV 2015 SWE IXONO (PERM, FL095 - FL660). RUS Project Category: 2. To realign the following existing ATS-routes: ATS Routes Originator(s): a. L85 as ... BAVMO - ABKEM - BEXUL; FIN b. T99 as ... ERKOM - EROKU - GOSVA - ADEDO; c. P606 as ALAMI - OKEVU - EVADI - RUMEP - NIPIB ... VEPIN - ROKVI - OTKAP ...; d. Y369 as NUNTO - PISOX - REKDO; e. N851 as ... RIRIP - ODESO - LAKUT; f. L24 as ... LAKUT - PEKUX - IBVUT ...; g. Y368 as LAKUT - IPMOT - BEVOM - OTKIL ... ; 25. h. M857 as ... LUSEP - ERNUT - IBOSU ... XEVLO - ABOXU - DODEP - OTBAR ...; i. T83 as LUSEP - OTPAL - NAPRU ...; j. M6 as ... ADOPO - TUSBI - IDEPI ...; k. N850 as ... PENIV - EPAXU - INSOB ...; l. N15 as ... BAVMO - DODEP - DIVEG ...; m. N5 as BAVMO - ABOXU - BAKLA; n. M611 as ... OTKAP - ROKVI - IRLOT ...; o. M854 as KETOL - ROKVI - NITAS ...; p. T351 as KOMEK - ROKVI; q. Y75 as ... OSKEK - ADEDO - MIMRU ... .

Objective: To further improve ATS route network within Finland UIR. Proposal ID : 85.024 Impl. Status: State(s) & Org. Comments: Description: Implemented FRA To allow DCT LELNA - GOBUR (FL195 - FL500), usable whenever zone 12 NOV 2015 Originator(s): 26. EGD023 is active. Project Category: FRA Objective: DCTs FAB EC To provide an additional option when waypoint LORKU is not available RAD

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 77 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

(only when ATS routes UN866/UM195/UN63 are not available). Proposal ID : 85.036 Impl. Status: State(s) & Org. Comments: Description: Implemented FRA 1. To allow the following Direct" flight planning options within France: 12 NOV 2015 ESP

a. TURDO DCT SOSOV; Project Category: Originator(s): b. SOSOV DCT TURDO; DCTs FRA 27. c. LEBRI DCT KORUL. RAD FAB EC 2. To allow proper DCT within FRASAI area within Madrid FIR.

Objective: To further improve ATS route network and flight planning options between France and Spain. Proposal ID : 85.038 Impl. Status: State(s) & Org. Comments: Description: Implemented FRA To implement the following ATS routes: 12 NOV 2015 Originator(s): 3. UN531 UMOXA - MADEK Project Category: FRA 4. UN542 UMOXA - PEVIS - RUSIB; ATS Routes 5. UN533 UMOXA - ROSMU - QPR; 6. UN734 UMLER - UMOXA - KEREB - KURIS; 28. 7. UN535 UMOXA - XIDAN; 8. UN536 TIVLU - COQUE; 9. UN977 BUNAV - TIVLU - NOVAN; 10. UN868 TIVLU - AKEMO; 11. UN749 TIVLU - QPR.

Objective: To further improve ATS route network within France. Proposal ID : 86.026 Impl. Status: State(s) & Org. Comments: Description: Implemented FRA . Currently LF3049 restricts ATS route To reconsider the RAD restriction LF3049 by replacing as start point 12 NOV 2015 UN859 SITET - LGL where the major Originator(s): SITET with ETRAT allowing the use of Night ATS route UQ203 ETRAT - Project Category: EUROCONTROL overflying traffic flow is only allowed to PUMAL. follow via AMB. RAD IACA Objective: . The main issue is that the restricted segment of UN859 is SITET - ETRAT - DVL 29. To further improve flight planning options within France. - LGL which means that UQ203 became unavailable as traffic on SITET - ETRAT shall fly only via AMB. . Proposal to revise restriction to UN859 ETRAT - LGL was send to France end of August 2015.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 78 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 85.104 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 12 NOV 2015 Description: Originator(s): To add 5LNCs UDEGO, DIXOV, RUBOV and UMOPO to ATS route P6 Project Category: EUROCONTROL 30. by replacing existing "unnamed" significant points and deleting all others. AIP

Objective: ATS Routes To further improve AIP publication of aeronautical data. Proposal ID : 85.105 Impl. Status: State(s) & Org. Comments: Project Name: AIP Improvement Implemented GBR 12 NOV 2015 Description: Originator(s): Add existing 5LNCs ATWEL and MULIT used for training flights to ATS Project Category: EUROCONTROL 31. route N864. ATS Routes

Objective: To further improve AIP publication of aeronautical data. Proposal ID : 69.104a / BM0013 Impl. Status: State(s) & Org. Comments:

Description: Implemented GRC Related proposals: To allow NIGHT "Direct" flight planning option SIT - RUTOM. 12 NOV 2015 Originator(s):  71.087 Objective: Project Group: FAB BLUE MED To further imporve flight planning options within Hellas UIR. FAB BLUE MED 32. RFG SE

Project Category: DCTs RAD Proposal ID : 69.105 / BM0014 Impl. Status: State(s) & Org. Comments:

Description: Implemented GRC Related proposals: To allow NIGHT "Direct" flight planning options ABILO - VAXOS - RDS. 12 NOV 2015 Originator(s):  71.087 Objective: Project Group: FAB BLUE MED To further imporve flight planning options within Hellas UIR. FAB BLUE MED 33. RFG SE

Project Category: DCTs RAD Proposal ID : 71.087 Impl. Status: State(s) & Org. Comments: Project Name: Night Free Route Airspace Greece Implemented GRC . Studies ongoing in the context of Blue Med. 34. 12 NOV 2015 . Earlier FRA implementation possible on a

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 79 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Originator(s): national basis. Project Group: To implement Night DCTs for Hellas UIR, FL355 and above (2100 - FAB BLUE MED GRC Related proposals: 0400 UTC). FAB BLUE MED RFG SE  69.104a

Objective: Project Category:  69.105 To allign the airspace structure with real operations. Operational DCT's 50 MPCPEs  71.085a to be made flight plannable Free Route  71.086a Airspace  71.086b  71.089b  74.021 Proposal ID : 74.021 Impl. Status: State(s) & Org. Comments:

Description: Implemented GRC Related proposals: To allow NIGHT "Direct" flight planning option PINDO - LINRO. 12 NOV 2015 Originator(s):  69.163 Objective: Project Group: FAB BLUE MED  71.087 35. To further imporve flight planning options within Hellas UIR. RFG SE

Project Category: DCTs RAD Proposal ID : 85.117 Impl. Status: State(s) & Org. Comments: Project Name: RAD Promulgation Implemented GRC 12 NOV 2015 Description: Originator(s): To publish in AIP Greece, ENR 1.10 FLIGHT PLANNING under Project Category: EUROCONTROL paragraph 1. Procedures for the submission of a flight plan common text AIP 36. for Adherence to Airspace Utilization Rules and Availability - RAD inside RAD Athinai FIR / Hellas UIR.

Objective: To harmonize the RAD promulgation via the AIP by the ECAC States. Proposal ID : 86.040 Impl. Status: State(s) & Org. Comments:

Description: Implemented HUN Related proposals: To change from Exit to Exit/Entry FRA waypoint PESAT. 12 NOV 2015 Originator(s):  87.003 Objective: Project Group: EUROCONTROL 37. To further improve HUFRA utilisation. RFG SE

Project Category: Free Route Airspace Proposal ID : 75.037b Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 80 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Name: Milano TMA, Phase 2 Implemented ITA It consists in change of lateral and vertical limits, 12 NOV 2015 subdivision in zones (with different lower limits), Description: Originator(s): To re-organise Milano TMA. Project Category: ITA reclassification of some portions (from A to D principally) and withdrawal of VFR sectors, this Objective: TMA 38. changes are essentially focused on VFR flights To further improve airspace organisation within Italy. activities and do not have impact on commercial flights.

Related proposals:  75.037a Proposal ID : 85.118 Impl. Status: State(s) & Org. Comments:

Description: Implemented NOR Related proposals: 1. To extend the following existing ATS routes: 12 NOV 2015 Originator(s):  69.064b / 16.035b a. Z275 OKRUB - APTEK; Project Category: NOR b. Z264 / Z272 / Z276 ROGLO - BURIX; ATS Routes c. P621 TUPUV - POKAX; 39. d. Z269 EDURA - DEXES. 2. To realign existing ATS route Z155 OGLOV - EDAPA (new 5LNC) - ISVIG.

Objective: To adapt ATS routes to adjusted ATC sectors. Proposal ID : 85.082 Impl. Status: State(s) & Org. Comments: Project Name: RAD Promulgation Implemented PRT 12 NOV 2015 Description: Originator(s): To publish in AIP Portugal, ENR 1.10 FLIGHT PLANNING under Project Category: EUROCONTROL paragraph 1. Procedures for the submission of a flight plan common text AIP 40. for Adherence to Airspace Utilization Rules and Availability - RAD inside RAD Lisbon FIR.

Objective: To harmonize the RAD promulgation via the AIP by the ECAC States. Proposal ID : 84.081 Impl. Status: State(s) & Org. Comments: Description: Implemented SWE 1. To establish new 5LNC LUKIG at crossing between ATS routes 12 NOV 2015 Originator(s): T400 and T401. Project Category: SWE 41. 2. To change the following ATS route segments from CDR1 to CDRs permanent: a. T400 EGAGO - DIBVA - LUKIG; b. T401 SOLKA - LUKIG.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 81 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: To further improve the airspace structure within ESAA FIR. Proposal ID : 80.021a Impl. Status: State(s) & Org. Comments: Description: Implemented TUR . PBN SID /STAR (P-RNAV ,Based on To introduce P-RNAV SIDs/STARs for Milas/Bodrum (LTFE) airport. 12 NOV 2015 GNSS) procedures for LTFE Airport Originator(s): Objective: Project Group: TUR completed. 42. To further improve the airspace organisation within Istanbul FIR and RFG SE . Implementation after completion of SMART project. Ankara FIR. Project Category: PBN Related proposals: TMA  60.010c Proposal ID : 85.109 Impl. Status: State(s) & Org. Comments: Description: Implemented TUR To implement the following bi-directional ATS routes: 12 NOV 2015 Originator(s): a. T/UT283 OKESA - KAVAK - BALSU; Project Group: TUR 43. b. UT284 SIV - ORI - ARSUG. RFG SE

Objective: Project Category: To further improve ATS route network in Turkey. ATS Routes Proposal ID : 85.083 Impl. Status: State(s) & Org. Comments: Project Name: NAKID Implemented TUR . NAKID is assigned to France in ICARD. 12 NOV 2015 . NAKID is used in Turkey at 402657N Description: Originator(s): To replace existing 5LNC NAKID. Project Category: ICAO 035625E, Terminal Airspace, but is not reserved in ICARD. 44. 5LNC EUROCONTROL Objective: . Per the common criteria for substitution, 1. To avoid 5LNC duplication within the EUR/NAT Region. Turkey shall substitute this code (email from 2. To improve the aeronautical information provided. ICARD Data Manager to Turkey dated 18 3. To be compliant with Annex 11. June 2015 refers). Proposal ID : 85.084 Impl. Status: State(s) & Org. Comments: Project Name: SUDEM Implemented TUR . SUDEM is assigned to The Russian 12 NOV 2015 Federation in ICARD. Description: Originator(s): To replace existing 5LNC SUDEM. Project Category: ICAO . SUDEM is used in Turkey, at 374742N 5LNC EUROCONTROL 0321842E, for terminal airspace, but is not 45. Objective: reserved in ICARD for Turkey. 1. To avoid 5LNC duplication within the EUR/NAT Region. . Per the common criteria for replacement, 2. To improve the aeronautical information provided. Turkey has to substitute SUDEM (email 3. To be compliant with ICAO Annex 11. from ICARD DM dated 18 June 2015 to Turkey refers).

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 82 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 85.092 / 22.043 Impl. Status: State(s) & Org. Comments: Description: Implemented UKR . Optimization of ATS route network within 1. To implement bidirectional ATS route Y179 KOSAK - RAPUL; 12 NOV 2015 CTA/UTA Odesa-North. Originator(s): 2. To realign the following existing ATS routes: Project Group: UKR . To further improve options from/to Kherson a. B492 as ODS - VAKOM - VAPEL; RFG SE AD. b. N191 as NIROV - VAPEL - RIMDA ; SG BLACK c. T219 as ODS - VAPEL – MIMKO; d. N617 as ODS - XONKO - BIKVA - BAREN; Project Category: ATS Routes 46. e. L919 as GOBLI - ODSAN - RATNO; f. L986 as ASMIN - ODSAN - RAPUL; g. P156 as NOLDU - ODSAN - ODS; h. M854 as LAMEX - ODSAN - ODS; i. M856 as GOBLI - ODS; 3. To delete existing ATS route W639 GOBLI - SH.

Objective: To further improve the ATS route network within Ukraine. Proposal ID : 57.018c / CE0082 Impl. Status: State(s) & Org. Comments: Project Name: Vienna TMA Implemented AUT New ATC system plus sectorisation changes for 10 DEC 2015 the TMA planned 27/28 November 2015 (no Description: Originator(s): To re-organise Vienna APP sectors after implementation of a new ATC Project Group: AUT AIRAC date). system for Vienna approach. FAB CE 47. RFG SE Objective: To further improve the airspace structure and increase the capacity Project Category: within Vienna TMA, depending on traffic demand. ATC Sectors TMA Proposal ID : 77.072d Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Wien, FRAW, Stage 4b Implemented AUT Phased implementation: 10 DEC 2015 . Stage 1 implemented 18 October 2012 (37 Description: Originator(s): To extend the DCTs H24/7, FL165+ (parallel operations with ATS routes) Project Group: AUT DCTs). while initialising cross border operations with single States, when FAB CE . Stage 2 implemented 7 MAR 2013. possible between ATC units within FABCE or with adjacent FABs or RFG SE . Stage 3a/b implemented 6 MAR 2014 - 11 48. DEC 2014. ANSPs. Project Category: . Stage 4a implemented 2 April 2015, Stage Objective: DCTs 4b planned autumn 2015. To further improve the flight planning options between Wien FIR and Free Route . Stage 5 planned end 2016. adjacent FIRs/UIRs as a forth step towards FRAW (Free Route Airspace Airspace Wien) implementation. RAD Related proposals:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 83 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 76.047  77.072a  77.072b  77.072c  87.001 Proposal ID : 85.090 Impl. Status: State(s) & Org. Comments: Project Name: RAD Promulgation Implemented BIH 10 DEC 2015 Description: Originator(s): To publish in AIP Bosnia and Herzegovina, ENR 1.10 FLIGHT Project Group: EUROCONTROL PLANNING under paragraph 1. Procedures for the submission of a flight RFG SE 49. plan common text for Adherence to Airspace Utilization Rules and Project Category: Availability - RAD inside Sarajevo FIR. AIP Objective: RAD To harmonize the RAD promulgation via the AIP by the ECAC States. Proposal ID : 86.010 Impl. Status: State(s) & Org. Comments: Description: Implemented BIH . Existing option via Sarajevo FIR is on dog-

To allow “Direct” H24 flight planning option VIBOP DCT SOLGU DCT 10 DEC 2015 Originator(s): leg alignment via KEB. KENEM (FL115 - FL325) for ARR LDSP. . Possible saving could be more than 20NM. Project Group: EUROCONTROL 50. Objective: RFG SE

To further improve flight planning options within Sarajevo FIR. Project Category: DCTs RAD Proposal ID : 84.012 Impl. Status: State(s) & Org. Comments: Project Name: Point Merge Implemented DEU 10 DEC 2015 Description: Originator(s): To create Point Merge arrival route system for Leipzig (EDDP) airport Project Category: DEU and to assure appropriate connections to en-route network by ATS Routes implementing the following unidirectional ATS routes: a. T431 RENDO - NERID; 51. b. T432 BEBKU - NERID; c. T433 LASGA - GERDO; d. T434 TABAT - GERDO; e. T435 PIBAD - GERDO; f. T436 BERDI - TAVSO; g. T437 ADMOS - TAVSO; h. Y225 MAGDA - NENAN - TAMEB.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 84 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: To further improve airspace organization for arrivals to Leipzig (EDDP) airport. Proposal ID : 86.080 Impl. Status: State(s) & Org. Comments: Project Name: RAD Promulgation Implemented DEU 10 DEC 2015 Description: Originator(s): To publish in AIP Germany, ENR 1.10 FLIGHT PLANNING under Project Category: EUROCONTROL paragraph 1. Procedures for the submission of a flight plan common text AIP 52. for Adherence to Airspace Utilization Rules and Availability - RAD inside RAD German FIRs / UIRs.

Objective: To harmonize the RAD promulgation via the AIP by the ECAC States. Proposal ID : 87.002 Impl. Status: State(s) & Org. Comments:

Project Name: DFS Karlsruhe - Skyguide Night DCT Package Implemented DEU Related proposals: 10 DEC 2015 CHE Description:  79.041 FAB EC To allow cross border direct (DCT) routings at the interface Germany - Project Group: 53. Switzerland in a first step mainly at night. FAB EC Originator(s):

Objective: Project Category: CHE To improve flight efficiency within FABEC. DCTs DEU RAD FAB EC Proposal ID : 87.003 Impl. Status: State(s) & Org. Comments:

Project Name: Long Range Direct Routing SE Axis Implemented DEU Related proposals: 10 DEC 2015 AUT Description:  77.072a To allow new route options - missing DCT segments and cross border Project Group: Originator(s):  86.040 direct (DCT) routings along the SE axis and new DCT segments feeding FAB CE DEU 54. the new Hungarian FRA entry/exit point PESAT. FAB EC AUT

Objective: Project Category: FAB EC To improve flight efficiency for major European flows crossing more than DCTs one FAB (at the SE axis from/to UK to/from South East Europe/Middle RAD East). Proposal ID : 81.040 Impl. Status: State(s) & Org. Comments: Description: Implemented ESP . Annex 11 stated that the 5LNCs shall be To replace existing 5LNC BRAVO. 10 DEC 2015 unique. Originator(s): 55. Objective: Project Category: EUROCONTROL . BRAVO is used 7 times worldwide and is To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT 5LNC ICAO allocated in ICARD to Brazil. . ICAO DM sent relevant message to ESP

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 85 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

region, to improve the aeronautical information provided and be (DM23/01 msg 14-022). compliant with ICAO Annex 11. . ESP will co-ordinate through planning unit.

Proposal ID : 84.056a Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Implemented ESP . Coded designator shall contain maximum 7 10 DEC 2015 (seven) characters. Description: Originator(s): Phase 1: To publish the following SIDs for Madrid (LEMD) airport in AIP Project Category: EUROCONTROL . After the validity indicator only 1 (one) letter indicating the route indicator is allowed. Spain, ENR 2 in accordance with Annex 11: AIP a. NANDO1UV as NANDO1E; Related proposals: b. NANDO1VX as NANDO1V;  84.056 c. PINAR1UV as PINAR1E; d. PINAR1VX as PINAR1V; e. RBO1UV as RBO1E; f. RBO1VX as RBO1V; 56. g. SIE1NQ as SIE1N; h. VTB2NF as VTB1N; i. VTB1XE as VTB1K; j. VTB1YD as VTB1T; k. ZMR1BJ as ZMR1B; l. ZMR1NZ as ZMR1N; m. ZMR1SK as ZMR1Q; n. ZMR1XN as ZMR1K.

Objective: To resolve airspace data publication inconsistencies in State AIP. Proposal ID : 79.041 Impl. Status: State(s) & Org. Comments: Project Name: FABEC FRA Step 1 (Ref FABEC FRA RTS 1.1) Implemented FAB EC FABEC FRA RTS 1.1 in DEC 2013 and P-RTS 10 DEC 2015 CHE in APR 2014. Description: To allow around 50 optimized cross border DCTs through Skyguide Project Group: FRA Related proposals: DEU AoR outside of military activity, H24 and/or Night and Weekend. FAB EC  75.081 57. Objective: Project Category: Originator(s):  87.002 To implement FRA Concept and further improve flight efficiency within 50 MPCPEs FAB EC FABEC. Free Route EUROCONTROL Airspace Proposal ID : 85.106 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR

58. 10 DEC 2015 Description: Originator(s): To replace by 5LNCs in ENR 3.1 the unnamed significant points on the Project Category: EUROCONTROL

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 86 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

following ATS routes: AIP a. NANEV on ATS route Y904; ATS Routes b. RISDO, ERDOG and RAVDI on ATS route Y905; c. ENUKU, EDONU, GANKI, NAXIL and OSLEL on ATS route P600.

Objective: To further improve the AIP airspace data promulgation. Proposal ID : 86.061 Impl. Status: State(s) & Org. Comments: Project Name: RAD Promulgation Implemented IRL 10 DEC 2015 Description: Originator(s): To publish in AIP Ireland, ENR 1.10 FLIGHT PLANNING under Project Category: EUROCONTROL paragraph 1. Procedures for the submission of a flight plan common text AIP 59. for Adherence to Airspace Utilization Rules and Availability - RAD inside RAD Shannon FIR.

Objective: To harmonize the RAD promulgation via the AIP by the ECAC States. Proposal ID : 75.040a / 15.042a Impl. Status: State(s) & Org. Comments:

Project Name: Free Route Airspace Vilnius - Phase 1 Implemented LTU Related proposals: 10 DEC 2015 Description: Originator(s):  75.040b / 15.042b To implement H24 Free Route Airspace FL245+ in Vilnius ACC. Project Group: LTU  76.052 / 23.029 60. SG BALTIC Objective: To further improve airspace organisation within Vilnius FIR. Project Category: Free Route Airspace Proposal ID : 86.054 Impl. Status: State(s) & Org. Comments: Description: Implemented NLD . To improve workload by avoiding re-routing To change existing ATS route UZ29 from a CDR1 into a CDR3. 10 DEC 2015 MUAC in case of the activation of the TRA N.

Objective: Project Category: Originator(s): . To have more accurate traffic counts in the DECO sectors. 61. To further improve the airspace structure within Maastricht UAC while ATS Routes MUAC providing an additional configuration enabling a better workload CDRs . To avoid sector clipping through the DECO distribution between sectors in function of the traffic flows in the Brussels sector. Sector Group.

Proposal ID : 86.041 / 22.046 Impl. Status: State(s) & Org. Comments:

Project Name: FRA Like (DCT) Warsaw FIR - Phase 2 Implemented POL Related proposals: 62. 10 DEC 2015 Description: Originator(s):  76.052 / 23.029

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 87 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To allow new 31 "Direct" flight planning options and extend the Project Group: POL  78.028a availability of 4 existing DCTs within Warszawa FIR. SG BALTIC  88.015 / 23.023

Objective: Project Category: To further improve the airspace organisation and flight DCTs efficiency within Warszawa FIR. Free Route Airspace RAD Proposal ID : 86.032 Impl. Status: State(s) & Org. Comments: Project Name: RAD Promulgation Implemented POL 10 DEC 2015 Description: Originator(s): To publish in AIP Poland, ENR 1.10 FLIGHT PLANNING under Project Category: EUROCONTROL paragraph 1. Procedures for the submission of a flight plan common text AIP 63. for Adherence to Airspace Utilization Rules and Availability - RAD inside RAD Warszawa FIR.

Objective: To harmonize the RAD promulgation via the AIP by the ECAC States. Proposal ID : 86.033 Impl. Status: State(s) & Org. Comments: Description: Implemented POL Currently T720 is only available for traffic ARR To reconsider RAD restriction EP2164 allowing other traffic than ARR 10 DEC 2015 LOWW in order to reduce complexity in the Originator(s): 64. LOWW on ATS route T720 MOLIL - REGLI. EPWWT sector. Project Category: IATA Objective: RAD To further improve flight planning options via Warszawa FIR. Proposal ID : 83.007 Impl. Status: State(s) & Org. Comments: Project Name: BARPI area Implemented SVN . BARPI area is special due to State border 10 DEC 2015 shape, none existence of boundary points Description: Originator(s): To withdraw from AIP Slovenia ENR 3.3 the vertical limits of ATS route Project Group: EUROCONTROL between Ljubljana and Milano FIRs on ATS segment M/UM859 BARPI - TUTIV. RFG SE routes M859, Z495, P28 and different lower/upper DFL195/245. Objective: Project Category: . Currently in AIP Italy M/UM859 BARPI - To adapt the AIP publication of ATS routes within cross-border delegated AIP TUTIV is published with limits FL95 - FL195 65. airspace between Slovenia and Italy. - FL460 while in AIP Slovenia these limits are 8000FT AMSL - FL245 - FL660. This double contradicting publication for both lower and upper limits creates difficulties in airspace data systems and flight plan processing. . Similar in that area is ATS route segment

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 88 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Z/UZ495 BARPI - ETAKO for which vertical limits are published only in AIP Italy as FL95 - FL195 - FL460 and covering portion in Ljubljana FIR despite that lower/upper limit is FL245 and top limit FL660. . For the third ATS route segment in that area P28 BARPI - RCH vertical limits are again published only in AIP Italy. . The data maintenance for ATS route segment BARPI - TUTIV for the EAD SDO shall be similarly organized between Italy and Slovenia as for Z495 and P28. Proposal ID : 86.011 Impl. Status: State(s) & Org. Comments: Description: Implemented SVN . Resolution of “Unforeseen” RD break

To withdraw Route Designator Q863 from ATS route segment BEDOX - 10 DEC 2015 Originator(s): reported by Jeppesen. DIPSA also double designated as L863. . As part of Stage 3b of FRAW project Austria Project Group: EUROCONTROL Objective: RFG SE deleted UQ863 DIPSA - ERKIR replacing it To simplify route designation within Ljubljana FIR. by DCT. Project Category: . Currently RD Q863 exists after ERKIR in 66. Route Germany and with dead end as PEROT - Redesignation BEDOX - DIPSA. . Withdrawal of Q863 in Slovenia will not change the designation of existing ATS route segment while existence has no any purpose Proposal ID : 83.040b Impl. Status: State(s) & Org. Comments:

Project Name: ECAC States AIP en-route publication issues Implemented SVN Related proposals: 10 DEC 2015 Description: Originator(s):  83.040a 67. To adapt the upper vertical limit of ATS routes P28 ABLAT - PZ - BARPI. Project Category: EUROCONTROL

Objective: AIP To adapt in State AIP ATS routes vertical limits. Proposal ID : 81.028 Impl. Status: State(s) & Org. Comments: Description: Implemented TUR . DOGAN is used by and is allocated in

To replace existing 5LNC DOGAN 10 DEC 2015 Originator(s): ICARD to Morocco. . ICAO DM sent relevant message to TUR 68. Objective: Project Group: EUROCONTROL To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT RFG SE ICAO (DM 20/01 MSG 14-015). . TUR will enquire with military. region, to improve the aeronautical information provided and be Project Category: compliant with ICAO Annex 11.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 89 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

5LNC Proposal ID : 60.010f Impl. Status: State(s) & Org. Comments:

Project Name: SMART Phase 2/3 Implemented TUR Related proposals: 10 DEC 2015 Description: Originator(s):  60.010b 1. To transfer Istanbul ACC to new Ankara ACC FL245 and above. Project Group: TUR  60.010c 2. To transfer Izmir ACC to new Ankara ACC FL245 and above. RFG SE  60.010g / 15.046g 69. Objective: Project Category:  60.010h / 15.046h To further improve airspace organisation within Istanbul FIR and Ankara Airspace Structure FIR and enhance capacity within the Turkish ACCs in order to cope with the increasing traffic demand. Proposal ID : 86.048 / 23.004a Impl. Status: State(s) & Org. Comments: Description: Implemented ARM ELSIV 403752N 0452214E will be a new To implement bi-directional ATS route P130 BODKA - ELSIV - REBLO. 07 JAN 2016 AZE boundary point.

Objective: Project Group: Originator(s): Related proposals: 70. To further improve ATS route network between Baku FIR and Yerevan SG BLACK ARM  23.004b

FIR. Project Category: AZE ATS Routes TKM Proposal ID : 79.029b / 18.012b Impl. Status: State(s) & Org. Comments: Description: Implemented AZE To implement bi-directional ATS route T916 MATAL - SUBUT - LEYLA. 07 JAN 2016 Originator(s): Objective: Project Group: EUROCONTROL 71. To further improve the ATS route network in Baku FIR. SG BLACK

Project Category: ATS Routes Proposal ID : 86.056a Impl. Status: State(s) & Org. Comments: Project Name: Nicosia Direct Route Airspace - Phase 1A Implemented CYP . DCT options are approved and included in 07 JAN 2016 the Blue Med document “OPS-D2.1 - BLUE Description: Originator(s): To allow 5 (five) NIGHT "Direct" flight planning options above FL285. Project Group: CYP MED BM DCT _AVBL Night Wkend_ Catalogue version Nov 2015_rev 1.2” Objective: FAB BLUE MED FAB BLUE MED RFG SE produced by the BM RNC & FR TF. 72. To further improve flight planning options within Nicosia FIR. . Night period 21:00 - 04:00. Project Category: DCTs Related proposals: RAD  71.088a  71.088b  86.056b

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 90 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 86.056c  86.056d  86.056e

Proposal ID : 86.001 Impl. Status: State(s) & Org. Comments: Project Name: New Apulia CTR Implemented ITA . The change is part of the activities related 07 JAN 2016 to the transit of the provision of Air Description: Originator(s): To modify the organisation of airspace inside Brindisi TMA by: Project Category: ITA Navigation Services (ANS) from Italian Air a. withdrawal of Bari CTR; Airspace Structure Force to ENAV SpA on the airport of Brindisi b. withdrawal of Brindisi CTR; TMA Casale. 73. c. implementation of new APULIA CTR (includes the airspace of above . In order to minimise the impact of this mentioned CTRs plus a new connection area). change on users (both AOs and ATCOs) has been decided not to modify SIDs Objective: and STARs of the related airports To modify the traffic management in particular for inbound/outbound traffic to/from Bari (LIBD) and Brindisi (LIBR) airports. Proposal ID : 86.035 Impl. Status: State(s) & Org. Comments: Project Name: SEE LRDCTs Implemented BGR Some of the DCTs are available in parallel with 04 FEB 2016 BIH relevant FRAs. Description: To allow 11 (eleven) “Direct” “Daily” and “Night” flight planning options. Project Group: HRV SRB 74. Objective: RFG SE SVN To further improve flight planning options between Sofia FIR, Beograd Project Category: FIR, Sarajevo FIR, Zagreb FIR and Ljubljana FIR. DCTs Originator(s): RAD SRB Proposal ID : 86.084 / 23.043 Impl. Status: State(s) & Org. Comments: Description: Implemented BGR To implement new P-RNAV SIDs/STARs for Burgas (LBBG) airport. 04 FEB 2016 Originator(s): Objective: Project Group: BGR 75. To further improve airspace organisation within Sofia FIR. RFG SE SG BLACK

Project Category: Airspace Structure Proposal ID : 86.085 / 23.045 Impl. Status: State(s) & Org. Comments: Description: Implemented BGR 76. To implement new P-RNAV SIDs/STARs for Varna (LBWN) airport. 04 FEB 2016 Originator(s):

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 91 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: Project Group: BGR To further improve airspace organisation within Sofia FIR. RFG SE SG BLACK

Project Category: Airspace Structure

Proposal ID : 69.220a Impl. Status: State(s) & Org. Comments: Description: Implemented CZE . This is the only missing link on H24 To allow the availability during limited day hours for limited 04 FEB 2016 southbound options to Croatia via Czech Originator(s): destinations above FL355 of "Direct" flight planning option MAREM Project Category: IATA Republic, Austria and Slovenia from DCT ABUDO. Scandinavia. DCTs 77. Objective: RAD . Currently under trial till 26 MAY 2016 used H24. To further improve the ATS route network while providing a shorter route option for traffic from Scandinavia to the Adriatic coast. Related proposals:  69.220b  75.033a Proposal ID : 87.004 Impl. Status: State(s) & Org. Comments: Project Name: AMOSA DCT WUR Implemented DEU 04 FEB 2016 Description: Originator(s): To allow H24 Direct flight planning option AMOSA DCT WUR for city pair Project Category: DEU 78. EDDM - ELLX above FL245. DCTs FAB EC

Objective: RAD To offer new short routing within upper airspace and improve flight efficiency within FABEC (higher FL, shortcut). Proposal ID : 59.017e Impl. Status: State(s) & Org. Comments: Project Name: London Airspace Management Program, LAMP Implemented GBR Designs based on P-RNAV routes requiring Phase 1a 04 FEB 2016 considerable regulatory input. Originator(s): Description: Project Category: GBR 1. 5 new RNAV5 STARs into TIMBA (and LUMBA should MAY be out Airspace Structure of service). WILLO and TIMBA remain as conventional holds. ATS Routes 79. 2. A Point Merge arrival structure for Thames Radar incorporating two PBN new holding stacks for London City named JACKO and GODLU TMA with new STARs, new SIDs for departures to the South and additional Controlled Airspace. 3. Re-sectorisation of TCSE, TCSW and AC DVR/WOR sectors to include a solution to address the S17 OPA Hotspot. 4. Re-routeing of Stansted, Cambridge, Luton and Northolt DET

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 92 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

departures into TC EAST (out of TCSE). 5. Re-routeing of Thames arrivals from the North into TC EAST (out of TC MIDS and TCNE). 6. Lowering of CAS over the POMPI Triangle and Isle of Wight within which a new contingency hold for Solent traffic will be located.

Objective: To increase systemisation of the airspace structure in order to provide safety and efficiency enhancements and additional capacity in London TMA through a fundamental review of ATS route and sector structure (London Airspace Management Programme/ LAMP). Proposal ID : 86.037 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 04 FEB 2016 Description: Originator(s): 1. To replace by 5LNCs in ENR 3.1 the "unnamed" significant points Project Category: EUROCONTROL on the following ATS routes: AIP a. OBUNI, VEMAB on ATS route L612; ATS Routes b. IDEXA, UNIGO, ARPUB, EMLIP, OSLOR on ATS route L975; c. OSTUG, UNDUX on ATS route L70; 80. d. EDUXO, ELNOD on ATS route L603; e. ULSAX, ERGAB, UTOGU, IPDOR on ATS route N601; f. ROBVA, NENVO on ATS route N862; g. LOMVO on ATS route Y124. 2. To remove from ENR 3.1 "unnamed" significant points from ATS route L975.

Objective: To further improve AIP publication of aeronautical data. Proposal ID : 85.006 Impl. Status: State(s) & Org. Comments: Description: Implemented HRV To allow “Direct” flight planning option DOLEV DCT NAKIT outside of 04 FEB 2016 BIH SEA FRA. SRB Project Group: 81. Objective: RFG SE Originator(s):

To further improve flight planning options within South East Europe. Project Category: MKD DCTs RAD Proposal ID : 68.060 / BM0070 Impl. Status: State(s) & Org. Comments: Project Name: MABOX - ADEXI Implemented ITA 82. 04 FEB 2016 MLT Description:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 93 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To extend existing ATS route M622 segment MABOX - ADEXI. Project Group: Originator(s): FAB BLUE MED FAB BLUE MED Objective: To further improve the ATS route network while offering the shortest Project Category: route for destination LICT according flow arrangement between Italy and ATS Routes Malta.

Proposal ID : 62.086c / BM0004 Impl. Status: State(s) & Org. Comments: Description: Implemented ITA ATS route exist in Italy as upper one. To implement southbound ATS route M727 GIANO - TRP - SENTI. 04 FEB 2016 Originator(s): Related proposals: Objective: Project Group: FAB BLUE MED  62.086e 83. To further improve the ATS route network within Roma FIR. FAB BLUE MED

Project Category: ATS Routes Proposal ID : 62.086e / BM0075 Impl. Status: State(s) & Org. Comments: Description: Implemented ITA ATS routes exist in Italy as upper one. To implement bidirectional ATS route M742 PAL - ADEXI. 04 FEB 2016 Originator(s): Related proposals: Objective: Project Group: FAB BLUE MED  62.086c 84. To further improve the ATS route network within Roma FIR. FAB BLUE MED

Project Category: ATS Routes Proposal ID : 86.053 Impl. Status: State(s) & Org. Comments: Description: Implemented MUAC . To improve the working procedures of the

To straighten the boundary between the DECO and the Brussels Sector 04 FEB 2016 Originator(s): Brussels West Sectors by reducing the Group. radar working scale. Project Category: MUAC Objective: ATC Sectors . To optimise sector sequence by avoiding 85. To further improve the airspace structure within Maastricht UAC while unnecessary sector clipping providing an additional configuration enabling a better workload . To allow for better direct routeing. distribution between sectors in function of the traffic flows in the Brussels Sector Group.

Proposal ID : 84.006 Impl. Status: State(s) & Org. Comments: Description: Implemented MUAC . Low sectors between FL245 and FL355. To change the DFL, from FL335 to FL355, in the West sectors of the 04 FEB 2016 . Upper sector in the Brussels West Sector 86. Originator(s): MUAC Brussels Sector Group. Project Category: MUAC Group above FL355. . The DFL in the East remains FL335.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 94 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: ATC Sectors . Follow-on projects envisage a 3 layer To further improve the airspace structure within Maastricht UAC while approach in the Eastern part of the Belgian providing an additional configuration enabling a better workload airspace. distribution between sectors in function of the traffic flows in the Brussels Sector Group. Proposal ID : 80.010d Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Implemented NOR RD is not in accordance with Annex 11 and not 04 FEB 2016 coordinated via ICARD. Description: Originator(s): To re-designate existing Helicopter route KY04 as KY994. Project Group: EUROCONTROL Related proposals:

RFG NW  80.010i 87. Objective: To adapt existing RDs in accordance with ICAO requirements. Project Category: AIP Route Redesignation Proposal ID : 80.010a Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Implemented NOR . RDs KY01, KY06 - 09 are not in 04 FEB 2016 accordance with Annex 11. Description: Originator(s): To re-designate the following existing Helicopter routes: KY01, KY06 - Project Category: EUROCONTROL . All RDs are not coordinated via ICARD. 88. KY09, KY10 - KY21, KY30 - KY42, KY50 - KY51, KY53 - KY56, KY70 AIP and KY80 as described in the attached document. Route

Objective: Redesignation To adapt existing RDs in accordance with ICAO requirements. Proposal ID : 80.010e Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Implemented NOR RD is not in accordance with Annex 11 and not 04 FEB 2016 coordinated via ICARD. Description: Originator(s): To re-designate existing Helicopter route KY05 as KY995. Project Group: EUROCONTROL Related proposals:

RFG NW  80.010j 89. Objective: To adapt existing RDs in accordance with ICAO requirements. Project Category: AIP Route Redesignation Proposal ID : 68.012a Impl. Status: State(s) & Org. Comments:

Project Name: Lower airspace re-organisation Beograd FIR - Step 1 Implemented SRB Related proposals: 04 FEB 2016 MNE 90. Description:  68.012b To ajustment of Podgorica TMA horizontal boundaries. Project Group: Originator(s):  68.012c

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 95 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: RFG SE SRB  68.012d

To further improve the airspace structure and ATS route network within Project Category: MNE Beograd FIR. Airspace Structure Proposal ID : 86.042 Impl. Status: State(s) & Org. Comments: Description: Implemented SRB Considering the technical and HR capabilities 1. To reshape the geographical boundary between Beograd ACC West 04 FEB 2016 MNE Beograd ACC will be able to open up to 14

and North sectors. Project Group: Originator(s): sectors during peak hours. 2. To introduce 5 vertical layers which with 4 geographical shapes RFG SE SRB creates 20 airspace volumes as follows: MNE a. Lower FL145 (later FL125) - FL325; Project Category: 91. b. Middle FL325 - FL345; ATC Sectors c. Upper FL345 - FL365; d. Top FL365 - FL385; e. Super top FL385 - FL660.

Objective: To further improve airspace organization within Beograd FIR/UIR. Proposal ID : 86.009 Impl. Status: State(s) & Org. Comments: Description: Implemented SRB Availability required outside of SEAFRA

To allow “Direct” “Daily” flight planning option DONIV DCT ETIDA for 04 FEB 2016 Originator(s): operational hours 05:00 - 23:00 (04:00 - 22:00). DEP LYBE. Project Group: EUROCONTROL 92. Objective: RFG SE

To further improve flight planning options within Beograd FIR. Project Category: DCTs RAD Proposal ID : 86.051a / 23.007a Impl. Status: State(s) & Org. Comments: Description: Implemented AZE . a. DF - TBS - DISKA is an existing bi- 1. To implementation the following ATS routes: 03 MAR 2016 GEO directional ATS route segment M737.

a. L131 GUSLI - DF southbound; Project Group: Originator(s): . b. straitening of existing dog-leg option b. L133 DISKA - LAPTO northbound; SG BLACK EUROCONTROL M737/N82 DISKA - TBS - DF - LAPTO. 93. c. T921 ADEKI - KOTAN - ANAGU - LAPTO northbound. . c. KOTAN - new waypoint on L850. 2. To re-align existing bi-directional ATS route N644 LAGAS - ADEKI Project Category: as LAGAS - BADIR 4129N 04522E - ADEKI. ATS Routes

Objective: Related proposals: To further improve ATS route network between Baku FIR and Tbilisi FIR.  86.051b / 23.007b Proposal ID : 86.034 Impl. Status: State(s) & Org. Comments: 94. Project Name: ECAC States AIP en-route publication issues Implemented CZE

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 96 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

03 MAR 2016 Description: Originator(s): To publish in ENR 3.3 CDRs based on ERNIP publication requirement to Project Category: EUROCONTROL cover the whole period of availability. AIP

Objective: CDRs To resolve airspace data publication inconsistencies in State AIP.

Proposal ID : 80.010b Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Implemented DNK All RDs are not coordinated via ICARD. 03 MAR 2016 Description: Originator(s): To re-designate the following existing Helicopter routes: KY60 - KY66, Project Group: EUROCONTROL KY70 - KY74, KY82, KY85. RFG NW 95. Objective: Project Category: To adapt existing RDs in accordance with ICAO requirements. AIP Route Redesignation Proposal ID : 80.010g Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Implemented DNK . RD is not in accordance with Annex 11 and 03 MAR 2016 GBR not coordinated via ICARD. Description: To re-designate existing Helicopter route KY80 as KY980. Project Group: Originator(s): . In AIP UK Helicopter routes are not published in ENR 3.4 as required by Annex Objective: RFG NW EUROCONTROL 96. 15. It is stated that these routes appear in To adapt existing RDs in accordance with ICAO requirements. Project Category: AD 2, ENR 1.15 and ENR 6 but the AIP information there is not sufficient and Route complete. Redesignation Proposal ID : 80.010j Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Implemented DNK . RD is not in accordance with Annex 11 and 03 MAR 2016 not coordinated via ICARD. Description: Originator(s): To re-designate existing Helicopter route KY05 as KY995. Project Group: EUROCONTROL . Norway re-designated its route as from 4 FEB 2016. RFG NW 97. Objective: To adapt existing RDs in accordance with ICAO requirements. Project Category: Related proposals: AIP  80.010e Route Redesignation Proposal ID : 80.010i Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 97 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Name: ECAC States AIP en-route publication issues Implemented DNK . RD is not in accordance with Annex 11 and 03 MAR 2016 not coordinated via ICARD. Description: Originator(s): To re-designate existing Helicopter route KY04 as KY994. Project Group: EUROCONTROL . Norway re-designated its route as from 4 FEB 2016. RFG NW 98. Objective: To adapt existing RDs in accordance with ICAO requirements. Project Category: Related proposals: AIP  80.010d Route Redesignation Proposal ID : 86.062 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 03 MAR 2016 Description: Originator(s): To further rationalisation of base of ATS route L9 by removing 2 (two) Project Category: EUROCONTROL 99. unnamed Lat/Long points in UK AIP. AIP

Objective: ATS Routes To further improve the AIP airspace data publication. Proposal ID : 86.063 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 03 MAR 2016 Description: Originator(s): Further rationalisation of base of ATS route M140 by removing 2 (two) Project Category: EUROCONTROL 100. unnamed Lat/Long points in UK AIP. AIP

Objective: ATS Routes To further improve the AIP airspace data publication. Proposal ID : 86.064 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 03 MAR 2016 Description: Originator(s): Further rationalisation of base of ATS route N514 by removing 1 (one) Project Category: EUROCONTROL 101. unnamed Lat/Long points in UK AIP. AIP

Objective: ATS Routes To further improve the AIP airspace data publication. Proposal ID : 86.065 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 03 MAR 2016 Description: Originator(s): 102. Further rationalisation of base of ATS route Y76 by removing 1 (one) Project Category: EUROCONTROL unnamed Lat/Long points in UK AIP. AIP ATS Routes

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 98 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: To further improve the AIP airspace data publication. Proposal ID : 86.066 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 03 MAR 2016 Description: Originator(s): Further rationalisation of base of ATS route L980 by removing 1 (one) Project Category: EUROCONTROL 103. unnamed Lat/Long points in UK AIP. AIP

Objective: ATS Routes To further improve the AIP airspace data publication. Proposal ID : 62.091c Impl. Status: State(s) & Org. Comments: Project Name: Polish Airspace Project 2010+, Phase 3a Implemented POL . Depending on training of ATC staff.

Description: 03 MAR 2016 Originator(s): . Max. 10/11 active sectors with vertical splits. To implement a vertical split at FL365 of all current geographical Project Category: POL Warszawa ACC sectors creating LOW and HIGH Sectors respectively. Airspace Structure Related proposals:

104. Objective: ATC Sectors  62.091a To further improve the airspace structure within Warszawa ACC and  62.091b increase capacity while applying vertical splits.  62.091e / 23.035  76.052 / 23.029  76.053 / 18.039 Proposal ID : 84.022 Impl. Status: State(s) & Org. Comments: Description: Implemented POL To re-designate existing ATS route Z136 LAGAR - GODLO as T871 03 MAR 2016 Originator(s): (release of Z136). Project Category: 105. EUROCONTROL Objective: Route To rationalise the existing ATS route designators within Warszawa FIR in Redesignation order to further facilitate flight planning and release RDs. Proposal ID : 85.110 Impl. Status: State(s) & Org. Comments: Description: Implemented CHE To increase the upper limit of ATS route Z64 SPR - MOLUS from FL195 31 MAR 2016 Originator(s): to FL660. Project Category: CHE 106. Objective: ATS Routes To improve connectivity for flights DEP LSGS via UN871 and bring flight planning closer to real trajectories. Proposal ID : 85.093 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 99 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Implemented DEU To implement the following westbound ATS routes: 31 MAR 2016 Originator(s): a. Y263 BRANE - LODRO for DEP EDDT; Project Category: DEU 107. b. Y264 BELID - MAG for DEP EDDB. ATS Routes Objective: To further improve ATS route options for departures from Berlin airports. Proposal ID : 84.042 Impl. Status: State(s) & Org. Comments: Description: Implemented DEU . BANIX is reserved in ICARD for Portugal. To replace existing 5LNC BANIX. 31 MAR 2016 . Proposal for replacement is based on Originator(s): Objective: Project Category: EUROCONTROL “Common criteria for replacement of 108. 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO duplicated 5LNCs” as point is not reserved EUR/NAT region; for Germany. 2. To improve the aeronautical information provided; . OA/D to react accordingly. 3. To be compliant with ICAO Annex 11. Proposal ID : 86.052a Impl. Status: State(s) & Org. Comments:

Description: Implemented DEU Related proposals: To re-designate the following ATS routes: 31 MAR 2016 DNK  86.052c a. Z11 LBU - ABUMO as Z3; Project Category: Originator(s): 109. b. Z16 POVEL - GALMA as Z94. ATS Routes EUROCONTROL Objective: Route To rationalise the existing ATS route designators within Germany in order Redesignation to further facilitate flight planning and release RDs. Proposal ID : 86.060 Impl. Status: State(s) & Org. Comments: Description: Implemented ESP LECMSAL will be never be used alone, and it To vertically split existing SAN Sector into SAN Lower (SAL) and SAN 31 MAR 2016 will be used either with LECMSAU (as current Originator(s): Upper (SAU) Sectors with DFL345. Project Group: ESP LECMSAN sector) or with Asturias Lower, 110. Objective: RFG SW LECMASL (LECMNWL sector).

To further improve airspace organization within Madrid FIR and improve Project Category: capacity of Madrid ACC (LECM) ATC Sectors. ATC Sectors Proposal ID : 86.077 Impl. Status: State(s) & Org. Comments: Description: Implemented FAB To update both AIP Denmark and AIP Sweden with regard to DK-SE 31 MAR 2016 Denmark/Sweden FAB FRA publication. 111. Project Category: Originator(s): a. FRA Flight planning moved from ENR 1.3 to ENR 1.10. AIP DNK b. Sub-section in ENR 4.1 and ENR 4.4 regarding FRA relevant point SWE in "other state" deleted and replaced with text description of FRA

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 100 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

entry/exit to DK-SE FAB FRA in ENR 1.10. c. Update of ENR 6.2-1 map, DK-SE FAB FREE ROUTE AIRSPACE (A/D/I deleted from map).

Objective: To further improve the DK-SE FAB FRA publication. Proposal ID : 83.020a Impl. Status: State(s) & Org. Comments: Description: Implemented FRA To re-designate the existing ATS routes Q169 ROMAK - NARAK as 31 MAR 2016 Originator(s): 112. N869 (same segment with different RDs Q169/UN869). Project Category: EUROCONTROL Objective: Route To adapt the ATS route designation in lower and upper airspace. Redesignation Proposal ID : 83.025a Impl. Status: State(s) & Org. Comments: Project Name: Marseille ACC re-organisation Phase 2 Implemented FRA Frequencies allowing to split all new sectors 31 MAR 2016 progressively during summer 2016. Description: Originator(s): To implement a 4th layer FL375+ for sectors G - Y - A - B in Marseille Project Category: FRA Related proposals: 113. ACC (Zone East). ATC Sectors  83.025b

Objective: To further improve the airspace structure and capacity within Marseille ACC. Proposal ID : 86.076 Impl. Status: State(s) & Org. Comments: Project Name: MEN - ETIDO project Implemented FRA 31 MAR 2016 Description: Originator(s): To implement a CDR3 UZ871 NINUN - ETIDO n order to segregate the Project Category: FRA 114. traffic MEN - ETIDO from the traffic MEN - LTP. ATS Routes

Objective: CDRs To further improve ATS route options within France. Proposal ID : 88.018 Impl. Status: State(s) & Org. Comments: Description: Implemented FRA Availability of UL 10 during high traffic season To create a new CDR 2 UL 10 segment RINTI-LESDO allowing 31 MAR 2016 subject to evaluations during summer 2016 Originator(s): connection of Gatwick departures to CDR2 UL 15 at LESDO. Project Category: FRA before final assessment in winter 2016/2017. 115. Objective: CDRs To further improve the utilisation of existing CDRs while proposing a more direct route for south-east bound Gatwick departures. Proposal ID : 86.015 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 101 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Implemented FRA Required for avoidance of D12 area when To implement bi-directional ATS route UN511 ERPOM - BERAD (FL285 - 31 MAR 2016 active. Originator(s): 116. FL500). Project Category: FRA Objective: ATS Routes To further improve ATS route avoiding options within France. Proposal ID : 84.034 Impl. Status: State(s) & Org. Comments: Description: Implemented FRA . ASMAT is reserved in ICARD for Russian To replace existing 5LNC ASMAT. 31 MAR 2016 Federation. Originator(s): Objective: Project Category: EUROCONTROL . Proposal for replacement is based on 117. 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO “Common criteria for replacement of EUR/NAT region; duplicated 5LNCs” as point is not reserved 2. To improve the aeronautical information provided; for France. 3. To be compliant with ICAO Annex 11. Proposal ID : 80.061 Impl. Status: State(s) & Org. Comments: Project Name: AVANT - TNT Implemented GBR Continuing as a Trial - likely to be amended to 31 MAR 2016 KATHY - TNT FL355+. Description: Originator(s): To establish H24 DCT AVANT - TNT above FL 375 initially and later Project Category: GBR 118. extend CDR/Airway UN863 from AVANT to POL. ATS Routes

Objective: DCTs To further improve efficiency for traffic overflying the London FIR RAD Proposal ID : 86.067 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 31 MAR 2016 Description: Originator(s): To further rationalisation of base of ATS route L10 by removing 3 (three) Project Category: EUROCONTROL 119. unnamed Lat/Long points in UK AIP. AIP

Objective: ATS Routes To further improve the AIP airspace data publication. Proposal ID : 86.059 Impl. Status: State(s) & Org. Comments: Description: Implemented POL Unnamed points are in process of coordiantion To implement the following ATS routes for flights to/from Mazury (EPSY) 31 MAR 2016 with ICAO. Originator(s): airport: Project Category: POL 120. a. T720 GRUDA - VEKAV - ETEDI - IBINO; ATS Routes b. Y564 NIVON - IXIXI; c. Y565 OLILA - UDROV; d. Y566 UDROV - OTMAX - XESNA.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 102 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: To further improve airspace organization within Warszawa FIR. Proposal ID : 86.044 / 22.045 Impl. Status: State(s) & Org. Comments: Description: Implemented POL . Currently N5 is CDR 1 every weekend FRI To change to CDR 1 H24 existing weekend/night CDR 1 N5 VENES - 31 MAR 2016 RUS 2000 (2000) - MON 0600 (0600) and HOL, GITOV. every night 2000 (2100) - 0500 (0600). Project Group: Originator(s): 121. Objective: SG BALTIC POL . As GITOV is boundary point with RUS the To further improve ATS route network within Warszawa FIR. change might have an impact on traffic Project Category: flows in that region. ATS Routes CDRs Proposal ID : 86.043 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented PRT Co-ordination inside Portugal is in progress. 31 MAR 2016 Description: Originator(s): To replace by 5LNC in ENR 3.5 unnamed significant point "4016N" on Project Category: EUROCONTROL 122. ATS route T16 as NAVIX - 4016 - ETESO - GONAN. AIP

Objective: ATS Routes To further improve the AIP airspace data promulgation. Proposal ID : 86.070 Impl. Status: State(s) & Org. Comments: Description: Implemented SWE To re-place BAK VOR with 5LNC ELBUX at same position and re-align 31 MAR 2016 Originator(s): 123. the relevant 3 (three) existing ATS routes. Project Category: SWE Objective: Airspace Structure To enhance the airspace structure in line with NAV strategy. Proposal ID : 85.033a / 22.042a Impl. Status: State(s) & Org. Comments:

Description: Implemented SWE Related proposals: To implement bi-directional ATS route L987 MALIV - SIMEG - ETRUS - 31 MAR 2016 POL  85.033b / 22.042c PENOR. Project Group: Originator(s): Objective: SG BALTIC SWE 124. To further improve airspace options within Sweden FIR. Project Category: ATS Routes DCTs RAD Proposal ID : 84.078 Impl. Status: State(s) & Org. Comments: 125. Project Name: Malmo ACC Implemented SWE

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 103 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: 31 MAR 2016 Originator(s): To split Malmo ACC/ ESMM sector 2. SWE Project Category: Objective: ATC Sectors To further improve the sectorisation within Sweden while balancing traffic and workload, increasing capacity and improving flight efficiency. Proposal ID : 77.001 Impl. Status: State(s) & Org. Comments: Description: Implemented ALB To implement northbound ATS route T6 PINDO - ELBAK for ARR LATI. 28 APR 2016 Originator(s): Objective: Project Group: EUROCONTROL 126. To further improve the ATS route network within Tirana FIR. RFG SE

Project Category: ATS Routes Proposal ID : 71.014d Impl. Status: State(s) & Org. Comments: Project Name: New ARR/DEP LATI Phase 4 Implemented ALB . Independent development but connected to

Description: 28 APR 2016 SRB proposal 71.014 improvements. MNE . Final goal is to achieve round about DEP / To implement southbound ATS route T8 AKIKA - INLOT for ARR LATI. Project Group: ARR system for Tirana airport via Beograd Objective: RFG SE Originator(s): FIR as follows: ALELU - DEP LATI; AKIKA - 127. To further improve the airspace structure between Beograd FIR and Project Category: SRB MNE ARR LATI; RETRA - DEP LATI; PETAK - Tirana FIR. Airspace Structure ARR LATI; EBELA - DEP LATI.

Related proposals:  71.014a  71.014c Proposal ID : 86.002 Impl. Status: State(s) & Org. Comments: Description: Implemented ALB . M127 NIKRO - OVVER lower ATS route up To implement the following northbound ATS routes: 28 APR 2016 to FL285 existing with no penalization, Originator(s): a. UM127 NIKRO - OVVER; Project Group: IATA except that it is compulsory for DEP LGKR / b. UM173 OVVER - ALELU. LGPZ. RFG SE Objective: . RD M173 is already used in Beograd FIR. 128. Project Category: . Proposed option is beneficial for DEP To further improve the ATS route network within Tirana FIR. ATS Routes LGSA, for example and will allow avoidance of MIL, SKP and TSL sectors. . Proposed option is shorter by around 8NM then existing one - KFN UN731 YNN UL604 TRN UM127 ALELU. Proposal ID : 86.003 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 104 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Implemented ALB . FRA evaluation showed that this connection To implement westbound ATS route UP14 PINDO - PAPIZ. 28 APR 2016 is attractive for the AOs. Originator(s): Objective: Project Group: EUROCONTROL . RD P14 is already used in Hellas UIR. 129. To further improve ATS route network within Tirana FIR. RFG SE

Project Category: ATS Routes Proposal ID : 86.069 Impl. Status: State(s) & Org. Comments: Description: Implemented ALB

1. To implement southbound ATS route UP744 PETAK - DIMIS. 28 APR 2016 Originator(s): 2. To re-align existing ATS route UL607 as PETAK - PINDO. Project Group: ALB 130. Objective: RFG SE EUROCONTROL

To further improve the ATS route network within Tirana FIR. Project Category: ATS Routes Proposal ID : 83.010 Impl. Status: State(s) & Org. Comments: Project Name: UDROS / ODERO area re-organization Implemented BGR . Proposed airspace re-organization is

Description: 28 APR 2016 TUR required due to increased traffic flows in ROU that area of the Black Sea following partial 1. To establish new FIR boundary points and re-organize existing ones Project Group: as follow: RFG SE Originator(s): airspace unavailability of Simferopol FIR a. UDROS - swap from westbound to eastbound use to serve EUROCONTROL and Dnipropetrovsk FIR and limited Project Category: airspace use of Damascus FIR and traffic flows to Rostov FIR, Tbilisi FIR, Yerevan FIR and ATS Routes TUR AGINA/DASIS to Tehran FIR; Baghdad FIR. b. ODERO - swap from eastbound to westbound use to serve . The study by all States for the best vertical traffic flows from Rostov FIR, Tbilisi FIR, Yerevan FIR and split of sectors to cope with the new traffic DASIS from Tehran FIR; distribution caused by the crisis situation c. NEGEM - new point South West of ODERO for westbound imposing UDROS / ODERO area 131. traffic flows from Baghdad FIR and BONAM from Tehran FIR; reorganization is required. d. ARTAT- new point South West of NEGEM for eastbound traffic EUROCONTROL to support in reaching the flows to Baghdad FIR and ALRAM to Tehran FIR. best solutions. 2. To implement new ATS routes and re-organize accordingly the For detailed description see RNDSG Airspace existing ATS routes inside/between Bucuresti FIR, Sofia FIR and Improvement Synopsis/ RAIS #5.0. Istanbul / Ankara FIRs. 3. To allow proper DCT options and improse relevant RAD restrictions to balance the traffic flows.

Objective: To further improve ATS route network between Romania, Bulgaria and Turkey. Proposal ID : 87.024 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 105 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Implemented BGR Outcome of DANUBE FAB ADODEG work for

To raise the DFL between controlled Class C and uncontrolled airspace 28 APR 2016 Originator(s): harmonization between Bulgaria and Romania. Class G from FL095 to FL105. Project Group: BGR 132. Objective: RFG SE

To further simplify and harmonize airspace organization within DANUBE Project Category: FAB. Airspace Structure Proposal ID : 86.016 Impl. Status: State(s) & Org. Comments: Description: Implemented BGR . EMLOK, TAKAK were established few

To withdraw the following existing waypoints: EDADA, EMLOK, TAKAK 28 APR 2016 Originator(s): years ago to allow shorter connections and BADKI. mainly for flights to/from LBBG / LBWN Project Group: EUROCONTROL Objective: RFG SE depending on ATS routes availability. . BADKI was established during the initial To further simplify airspace organisation within Sofia FIR and release Project Category: unnecessary waypoints. ATS routes reorganization over the Black 5LNC Sea. 133. . Existing airspace organization within South East Europe allows a lot more new possibilities and existence of these waypoints is not operationally required. . In case being withdrawn these 5LNCs will be release in ICARD as part of simplification project initiated by ICAO and EUROCONTROL. Proposal ID : 86.019 / 23.044 Impl. Status: State(s) & Org. Comments: Description: Implemented BGR To implement new P-RNAV SIDs/STARs for Sofia (LBSF) airport. 28 APR 2016 Originator(s): Objective: Project Group: BGR 134. To further improve airspace organisation within Sofia FIR. RFG SE SG BLACK

Project Category: Airspace Structure Proposal ID : 86.006 Impl. Status: State(s) & Org. Comments: Description: Implemented BGR New alignment of Y505 will be straight line and To re-align existing ATS route Y505 as NISVA - OMENO - NIKTI. 28 APR 2016 avoid zig-zag via DOTAM. Originator(s): Objective: Project Group: EUROCONTROL 135. To further improve the ATS route network within Sofia FIR. RFG SE

Project Category: ATS Routes

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 106 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 86.052b Impl. Status: State(s) & Org. Comments: Description: Implemented DEU To re-designate the following ATS routes: 28 APR 2016 DNK

a. T299 GERGA - PEROM as T239; Project Category: Originator(s): b. T299 PEROM - KOSEB - CDA as T298; Route EUROCONTROL 136. c. T504 KOPEX - MIC as T155 (used south of MIC); Redesignation d. T51 KELOM - KOPEX as T155 (release of T51).

Objective: To rationalise the existing ATS route designators within Germany and Denmark in order to further facilitate flight planning and release RDs. Proposal ID : 87.005a Impl. Status: State(s) & Org. Comments: Project Name: FRA Germany - Phase 1 Implemented DEU For detailed description see RNDSG Airspace 28 APR 2016 Improvement Synopsis/ RAIS #5.0. Description: Originator(s): To initiate preparation Full Free Route Airspace within Germany by: Project Group: DEU Related proposals: a. replacement of most of German UQ routes with DCTs (release of FAB EC FAB EC  87.005b

RDs); Project Category:  87.005c b. lowering of the MIN FL of several existing DCTs; 137. ATS Routes  87.005d c. fine-tuning of some KUAC DCTs (mainly supporting ERL sector DCTs  87.005e flows). Free Route Objective: Airspace To improve flight efficiency within FABEC and obtain more experiences within Munich ACC working with DCTs instead ATS routes without a very advanced ATM system. Proposal ID : 87.006 Impl. Status: State(s) & Org. Comments: Project Name: NTM4 Sector split Implemented DEU 28 APR 2016 Description: Originator(s): 138. To implement 4th layer of NTM sector. Project Category: DEU

Objective: ATC Sectors To improve sector capacity within Karlsruhe UAC. Proposal ID : 86.071 Impl. Status: State(s) & Org. Comments: Description: Implemented DNK To delete route-segment on T53 TUDLO - LUGAS - OSKEV - KORSA. 28 APR 2016 Originator(s): 139. Objective: Project Category: DNK To enhance AIP publication and avoid double designated route ATS Routes segments. Proposal ID : 83.020b Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 107 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Implemented FRA To re-designate the following existing ATS routes: 28 APR 2016 Originator(s): a. T13 DIPER - VESAN - RATUK - SOVAT as L613 (release of T13) Project Category: EUROCONTROL (same segment with different RDs T13/UL613); 140. Route b. T120 KOKOS - BADUR as N585 (same segment with different RDs Redesignation T120/UN858).

Objective: To adapt the ATS route designation in lower and upper airspace. Proposal ID : 84.029 Impl. Status: State(s) & Org. Comments: Description: Implemented FRA . Current arrival option from South is DJL To allow ARR ETAR during the week via point MAKOT by revising 28 APR 2016 DEU UM129 RESPO UM187 POGOL R11 existing RAD restrictions LFED1000, LF2926 and LF7000. OBORN V17 LUPEN T126 SUL Y710 Project Category: Originator(s): Objective: DCTs U.S.A.F.E ESULI N851 LBU Z11 TAGIK Z818 RINEX To allow additional shorter flight plannable option between France and RAD A Z12 XIDOD DCT which is inefficient and Germany. adds 25 minutes of flight time to the more efficient weekend route. 141. . USAF proposes that the weekend route allowed by above RAD restrictions DJL UM129 EPL UL47 GTQ G21 MAKOT Z818 SBN DCT be allowed also during the week. . USAF estimates that safety of flight will increase and it will also save €134,400 per year due to the decrease in flight time. Proposal ID : 84.033 Impl. Status: State(s) & Org. Comments: Description: Implemented FRA . LAGOR is with double reservation in ICARD To replace existing 5LNC LAGOR 28 APR 2016 for Russian Federation and France. Originator(s): Objective: Project Category: EUROCONTROL . Proposal for replacement by France is 142. 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO based on “Common criteria for replacement EUR/NAT region; of duplicated 5LNCs” as point is used on 2. To improve the aeronautical information provided; single ATS route. 3. To be compliant with ICAO Annex 11. Proposal ID : 80.094 Impl. Status: State(s) & Org. Comments: Description: Implemented GRC To facilitate traffic entering Athinai FIR via

1. To re-align existing ATS route J62 MKN - NITSA as RIPLI - NITSA. 28 APR 2016 Originator(s): REDRA with destination LGIR. 2. To implement UJ62, FL245 - FL320. 143. Project Group: GRC Objective: RFG SE

To further improve the ATS route network within Athinai FIR. Project Category:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 108 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ATS Routes Proposal ID : 86.057 Impl. Status: State(s) & Org. Comments: Description: Implemented GRC . ROTAS new FIR/UIR bundary point. To implement the following bi-directional ATS routes: 28 APR 2016 MLT . Vertical Limits FL245 - FL460.

a. UN45 BIRSA - SUDIK - BINKO - RENRA - ROTAS - MONUV; Project Category: Originator(s): 144. b. UN47 RALAK - DIBAK - BINKO. ATS Routes GRC Objective: MLT To further improve ATS route network between Malta FIR and Hellas UIR. Proposal ID : 85.032 / 22.041 Impl. Status: State(s) & Org. Comments: Description: Implemented POL IVGOR new point POL/RUS boundary. 1. To allow "Direct" flight planning options LARMA DCT IVGOR and 28 APR 2016 RUS IVGOR DCT LARMA. SWE Project Group: 145. 2. To implement bi-directional ATS route R235 IVGOR - BALIT. SG BALTIC Originator(s):

Objective: Project Category: POL To further improve ATS route network between Warszawa FIR and ATS Routes Kaliningrad FIR. Proposal ID : 85.033b / 22.042c Impl. Status: State(s) & Org. Comments: Description: Implemented POL VADRU new point RUS/POL boundary.

1. To allow "Direct" flight planning options PENOR DCT VADRU and 28 APR 2016 RUS Related proposals: VADRU DCT PENOR. SWE Project Group:  85.033a / 22.042a 2. To implement bi-directional ATS route R356 VADRU - BALIT. SG BALTIC Originator(s): 146. Objective: Project Category: SWE To further improve airspace options between Warszawa FIR and ATS Routes Kaliningrad FIR. DCTs RAD Proposal ID : 70.018k / CE0014 Impl. Status: State(s) & Org. Comments: Description: Implemented SVK To allow H24 "Direct" flight planning option BABKO DCT ALAMU. 28 APR 2016 Originator(s): Objective: Project Group: FAB CE 147. To further improve the ATS route network within the FAB CE area while FAB CE

providing additional shorter route options. Project Category: Night Routes Proposal ID : 70.019o / CE0055 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 109 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Implemented SVK . Night ATS route: 23.00h - 05.00h (22.00h - To implement eastbound H24 DCT MAKAL - PITOK. 28 APR 2016 04.00h). Originator(s): Objective: Project Group: FAB CE . Will be re-evaluated within FRA H24 in 148. To further improve the ATS route network within the FAB CE area while FAB CE Bratislava FIR.

providing additional shorter route options. Project Category: DCTs RAD Proposal ID : 75.041 Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Bratislava - FRABRA Phase 1 Implemented SVK ATS route network above FL245 will be 28 APR 2016 withdrawn. Description: Originator(s): To allow "Direct" H24 DCT options in Bratislava ACC AoR above FL245. Project Group: SVK Related proposals:

149. FAB CE  88.020 Objective: To further improve airspace organisation within Bratislava FIR. Project Category: Free Route Airspace Proposal ID : 88.020 Impl. Status: State(s) & Org. Comments:

Project Name: Removal U prefix Bratislava FIR Implemented SVK Related proposals: 28 APR 2016 Description: Originator(s):  75.041 To remove "U" prefix for Upper ATS routes within Bratislava FIR, Project Category: SVK 150. FL245+. Airspace Structure

Objective: To simplify Air Traffic Management in Bratislava FIR. Proposal ID : 85.028 / 22.030 Impl. Status: State(s) & Org. Comments: Description: Implemented ARM

The implementation of RNAV GNSS approaches for Gyumri/Shirak 26 MAY 2016 Originator(s): (UDSG) airport. Project Group: ARM 151. Objective: SG BLACK

To further improve airspace organisation within Yerevan FIR. Project Category: Airspace Structure PBN Proposal ID : 87.026 / 23.024 Impl. Status: State(s) & Org. Comments: Description: Implemented BGR Currently TUDBU is used for DEP LTBA/LTFJ 152. 1. To change existing RAD restriction LBLT1001 by allowing point 26 MAY 2016 TUR towards Bucuresti FIR while the overflights are

TUDBU for overflights. Project Group: Originator(s): allowed via VADEN.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 110 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

2. To implement the following westbound ATS routes: RFG SE EUROCONTROL a. N618 VADEN - BAKLO - GOL - ETIDA; SG BLACK

b. T889 BAKLO - DEDIN. Project Category: 3. To re-designate the following existing ATS routes: RAD a. T268 GRN - NAVOD as T226; b. N618 NAVOD - MOPUG as T226. 4. To delete the following ATS route segments: a. N618 VADEN - NAVOD; b. T268 TUDBU - GRN; c. T889 VADEN - UPAMA. 5. To release RD T224. 6. To properly adapt "D" sector of Sofia ACC.

Objective: To further improve the flight planning options and improve airsapce organization between Istanbul FIR and Sofia FIR. Proposal ID : 87.025 / 23.025 Impl. Status: State(s) & Org. Comments: Description: Implemented BGR These ATS routes will be used for routeing To implement the following westbound ATS routes: 26 MAY 2016 scenarios for DEP LTBA/LTFJ during loaded Originator(s): a. T367 BAKLO - GOL; Project Group: BGR periods allowing proper spacing with ARR b. T368 BAKLO - DEDIN. LTBA/LTFJ. 153. RFG SE Objective: SG BLACK

To further improve ATS route network within Sofia FIR. Project Category: ATS Routes Proposal ID : 69.220b Impl. Status: State(s) & Org. Comments: Description: Implemented CZE This is the only missing link on H24 southbound To extend to H24 existing "Direct" flight planning option MAREM DCT 26 MAY 2016 options to Croatia via Czech Republic, Austria Originator(s): ABUDO. Project Category: and Slovenia from Scandinavia. 154. IATA Objective: DCTs Related proposals: To further improve the ATS route network while providing a shorter route RAD  69.220a option for traffic from Scandinavia to the Adriatic coast. Proposal ID : 86.072 Impl. Status: State(s) & Org. Comments: Description: Implemented DNK To re-place VES VOR with 5LNC BAVTA at same position and re-align 26 MAY 2016 Originator(s): 155. existing 21 ATS routes. Project Category: DNK Objective: Airspace Structure To enhance the airspace structure in line with NAV strategy. Proposal ID : 84.016 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 111 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Implemented ESP RDs will be published on 5 MAR 2015 but the To re-designate existing ATS route UZ43 BIPET - ODEGI as UZ27. 26 MAY 2016 RD is reserved in ICARD for Italy. Originator(s): 156. Objective: Project Category: EUROCONTROL To rationalise the existing ATS route designators in Spain in order to Route further facilitate flight planning. Redesignation Proposal ID : 82.055 Impl. Status: State(s) & Org. Comments: Project Name: SID Truncation Implemented GBR 26 MAY 2016 Description: Originator(s): To truncate EGBB Southbound SIDs as follows: Project Category: GBR a. CPT 5D and COWLY 3D Truncated at new waypoint ADMEX and Airspace Structure become ADMEX 1D and use extended Y321 and L612 to get to ATM System 157. CPT and COWLY respectively - new waypoint EMKUK at intersection of extended Y321 and L612; b. DTY 4D Truncated at new point UNGAP and become UNGAP 1D and use P155 to get to BANTO and M189 to get to DTY.

Objective: To reduce portion of flight plan route fuelled at SID Altitude. Proposal ID : 88.001 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Point Implemented GBR 26 MAY 2016 Description: Originator(s): To remove the 2 (two) unnamed points on ATS route L10 published by Project Category: EUROCONTROL 158. NOTAM. AIP

Objective: ATS Routes To further improve the ATS route promulgation in UK AIP. Proposal ID : 86.074 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 26 MAY 2016 FRA Description: To add 5LNC IRKUN to L15/A30 to name unnamed significant point at Project Category: Originator(s): 159. FIR boundary. AIP EUROCONTROL

Objective: ATS Routes To remove unnamed Lat/Long in the UK AIP and AIP France. Proposal ID : 86.075 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Point Implemented GBR 26 MAY 2016 160. Description: Originator(s): To add new 5LNC BETPO to L/UL15 to remove unnamed sigficant point. Project Category: EUROCONTROL

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 112 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: AIP To further improve the ATS route promulgation in UK AIP. ATS Routes Proposal ID : 87.047 Impl. Status: State(s) & Org. Comments: Project Name: Airspace Capacity Implemented GBR 26 MAY 2016 Description: Originator(s): a. To raise the DFL between S10/S11 over North Sea from FL315 to Project Category: MUAC FL335 ATC Sectors GBR b. To allows the following City Pair Level Caps to be raised from not RAD above FL315 to not above FL335: Manchester Group, Vertical FE 161. EGCN/NH/NM/NO/NJ/NT/NV to/from EHAM/GG/HO/LW/TE,LFAV/QI/QO/QQ/QT via KOLAG / LAMSO / RAVLO EGCN/NH/NJ/NM/NO/NT/NV to EB**, EH**, EL**, EDDG/DK/DL/LE/LN/LP/LW/WE/WF /WI EBAW to EGNT/NV.

Objective: To further improve City Pair level caps within UK. Proposal ID : 86.036 Impl. Status: State(s) & Org. Comments: Description: Implemented GBR Same ATS route segment with different RDs Y3 To re-designate existing ATS route Y3 NUMPO - NIGIT as P2 (release of 26 MAY 2016 and UP2. Originator(s): Y3). Project Category: 162. EUROCONTROL Objective: Route To further simplify ATS route designation within London FIR/UIR and Redesignation release RD. Proposal ID : 86.038 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 26 MAY 2016 Description: Originator(s): To replace by 5LNCs in ENR 3.1 the "unnamed" significant points on Project Category: EUROCONTROL 163. ATS route Q41. AIP

Objective: ATS Routes To further improve the AIP airspace data publication. Proposal ID : 86.068 Impl. Status: State(s) & Org. Comments: Project Name: Unnamed Significant Points Implemented GBR 26 MAY 2016 Description: Originator(s): 164. To further ratioanlisation of base of ATS route N859 by removing 3 Project Category: EUROCONTROL (three) unanmed Lat/Long points in UK AIP. AIP

Objective: ATS Routes

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 113 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To further improve the AIP airspace data publication. Proposal ID : 86.012 Impl. Status: State(s) & Org. Comments: Description: Implemented HRV . Resolution of “Unforeseen” RD break To re-designate existing ATS route UQ863 PEROT - BEDOX as UQ856. 26 MAY 2016 reported by Jeppesen. Originator(s): Objective: Project Group: EUROCONTROL . As part of Stage 3b of FRAW project Austria To simplify route designation within Zagreb FIR. RFG SE deleted UQ863 DIPSA - ERKIR replacing it by DCT. 165. Project Category: . Currently RD Q863 exists after ERKIR in Route Germany and with dead end as PEROT - Redesignation BEDOX - DIPSA. . Currently RD Q856 exists as BEDOX - HOC via Slovenia, Austria, Germany and Switzerland. Proposal ID : 87.038 Impl. Status: State(s) & Org. Comments: Project Name: D201 Bypass Route Phase 1 Implemented IRL Redevelopment of Danger Area D201 Complex 26 MAY 2016 GBR to allow greater use of the existing airspace this Description: To convert the existing ATS route M/UM17 STU - VATRY to CDR 1/3 and Project Category: Originator(s): summer requires existing route (U)M17 to establish flight plannable directs (DCTs) STU - LANPI (new point) - ATS Routes GBR become CDR between STU & VATRY. VATRY that will be avilable when M/UM17 is not available to go around IRL 166. Danger Area EG201A.

Objective: To establish DCTs will be the first of three phases (Q63 will now be Phase 2) that will enable VATRY to be used when (U)M17 is not available. Proposal ID : 86.013 Impl. Status: State(s) & Org. Comments: Description: Implemented MKD . FRA evaluation showed that H24 1. To implement southbound ATS route UN137 DOBAR - BITLA. 26 MAY 2016 connection DOBAR - BITLA is attractive for Originator(s): 2. To withdraw ATS route L/UL616 KOGAT - VAROX. Project Group: EUROCONTROL the AOs. It exists as Night DCT between 3. To re-designate existing ATS route N/UN137 KOGAT - BITLA as RFG SE 22:00 - 04:00 which is not loaded. 167. L/UL616. . VAROX is on common boundary Skopje Project Category: FIR - Athinai FIR / Hellas UIR and not Objective: ATS Routes To further improve and simplify ATS route network within Skopje FIR. published in AIP Greece as well as Route continuation of ATS route L/UL616. Redesignation Proposal ID : 87.031 Impl. Status: State(s) & Org. Comments: Description: Implemented NOR Realignment in order to harmonize with CTA. 168. To re-align existing helicopter route KY953 as GALTU - VAVAK - OMIDU. 26 MAY 2016 Originator(s):

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 114 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: Project Category: NOR To further improve ATS route network within Norway FIR. ATS Routes Proposal ID : 79.013 / 18.037 Impl. Status: State(s) & Org. Comments: Project Name: Removal U prefix Bucuresti FIR Implemented ROU Current double designation of ATS route 26 MAY 2016 segments as T74/UP740 and T/UT4 / N/UN616 Description: Originator(s): To remove the distinction between Upper and Lower ATS routes - "U" Project Group: EUROCONTROL to be also considered for resolution. 169. prefix within Bucuresti FIR. RFG SE SG BLACK Objective: To simplify Air Traffic Management in Bucuresti FIR. Project Category: Airspace Structure Proposal ID : 86.081 / 23.009 Impl. Status: State(s) & Org. Comments: Description: Implemented ROU

To re-designate existing ATS route T1 AGMEL - ORA - SAT - RUMUK as 26 MAY 2016 Originator(s): M423 (release of T1). Project Group: ROU Objective: RFG SE 170. To rationalise the existing ATS route designators in Romania in order to SG BLACK

further facilitate flight planning and release RDs. Project Category: Route Redesignation Proposal ID : 86.082 / 23.010 Impl. Status: State(s) & Org. Comments: Description: Implemented ROU To implement eastbound ATS route Z317 MAVIT - EVRIK. 26 MAY 2016 Originator(s): Objective: Project Group: ROU 171. To further improve ATS route network within Bucuresti FIR. RFG SE SG BLACK

Project Category: ATS Routes Proposal ID : 85.029 / 22.031 Impl. Status: State(s) & Org. Comments: Description: Implemented ROU . Option will be used under conditions due to 1. To implement northbound ATS route T745 ARGES - EROMO - 26 MAY 2016 POL military areas with alternative routing along

VADIM. Project Group: UKR existing ATS routes to RUMUK. 2. To re-align existing ATS route P746 VADIM - LUGOL. . EROMO will be new boundary point 172. RFG SE Originator(s): Objective: SG BALTIC UKR between Bucuresti FIR and Lviv FIR. To further improve ATS route network between Kyiv UIR, Bucuresti FIR SG BLACK . LUGOL - POLON in Warszawa FIR will be available as DCT as from begining of 2016. and Warszawa FIR. Project Category:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 115 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

ATS Routes Proposal ID : 84.014 / 21.026 Impl. Status: State(s) & Org. Comments: Description: Implemented ROU 1. To implement bi-directional ATS route L/UL851 ADINA - RIVOS. 26 MAY 2016 Originator(s): 2. To re-designate existing ATS route L/UL851 ADINA - CND - RIVOS Project Group: ROU 173. as L/UL5. SG BLACK

Objective: Project Category: To further improve ATS route network within Bucuresti FIR. ATS Routes Proposal ID : 84.065 / 21.025 Impl. Status: State(s) & Org. Comments: Description: Implemented ROU

To re-designate existing ATS route UP184 SODGO - DEGET as UT139 26 MAY 2016 Originator(s): (release of P184). Project Group: EUROCONTROL Objective: RFG SE 174. To rationalise the existing ATS route designators in Romania in order to SG BLACK

further facilitate flight planning and release RD. Project Category: Route Redesignation Proposal ID : 86.083 / 23.011 Impl. Status: State(s) & Org. Comments: Description: Implemented ROU

To re-align existing ATS route L/UL852 KOMAN - POLUN - VAMON - 26 MAY 2016 Originator(s): SODGO as L852 KOMAN - POLUN - VAMON - DIRER. Project Group: ROU 175. Objective: RFG SE To further improve ATS route network within Bucuresti FIR. SG BLACK

Project Category: ATS Routes Proposal ID : 87.029 / 23.026 Impl. Status: State(s) & Org. Comments: Description: Implemented SWE . Both ATS routes CDR2 FL095 - FL285 / To implement westbound ATS route Z259 KSD - TEKVA - ESEBA. 26 MAY 2016 NOR CDR1 FL285 - FL660.

Objective: Project Group: Originator(s): . Z259 / N623 double designator in segment 176. To further improve ATS route network within Sweden FIR for arrivals to SG BALTIC SWE TEKVA - ESEBA.

ENGM (RWY 19). Project Category: EUROCONTROL ATS Routes CDRs Proposal ID : 86.018 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 116 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Planned BIH . These points are crossings between lower To withdraw the following existing waypoints: NENAD, SUDIM and 23 JUN 2016 HRV and/or upper ATS routes allowing only DRVAR. illogic turns. There is no difference in lower Project Group: Originator(s): Objective: RFG SE EUROCONTROL or upper ATS route limits before and after these points and their existence is not To further simplify airspace organisation within Sarajevo FIR and release Project Category: 177. unnecessary waypoints. operationally required. 5LNC . In case being withdrawn these 5LNCs will be release in ICARD as part of simplification project initiated by ICAO and EUROCONTROL.

Proposal ID : 86.056b Impl. Status: State(s) & Org. Comments: Project Name: Project Name: Nicosia Direct Route Airspace - Phase Planned CYP . DCT options are approved and included in 1B 23 JUN 2016 the Blue Med document “OPS-D2.1 - BLUE Originator(s): Description: Project Group: CYP MED BM DCT _AVBL Night Wkend_ To allow 6 (six) NIGHT "Direct" flight planning options above FL285. FAB BLUE MED FAB BLUE MED Catalogue version Nov 2015_rev 1.2” produced by the BM RNC & FR TF. Objective: RFG SE . Night period 21:00 - 04:00. To further improve flight planning options within Nicosia FIR. Project Category: 178. DCTs Related proposals: RAD  71.088a  71.088b  86.056a  86.056c  86.056d  86.056e Proposal ID : 86.058 Impl. Status: State(s) & Org. Comments: Description: Confirmed DEU To re-designate the existing ATS route Z/UZ713 OSN - SUVOX as 23 JUN 2016 Originator(s): Z/UZ718. Project Category: 179. EUROCONTROL Objective: Route To rationalise the existing ATS route designators within Germany in order Redesignation to further facilitate flight planning and avoid duplicate RDs use. Proposal ID : 86.078 Impl. Status: State(s) & Org. Comments: Project Name: New Waypoint on T718 TRA - RIGVI Confirmed DEU

Description: 23 JUN 2016 CHE 180. FAB EC To establish new waypoint ALINE on ATS route T718 between Project Category: Trasadingen VOR (TRA) and GATPI. ATS Routes Originator(s):

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 117 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: CHE To facilitate "direct to" instructions without the requirement for verbal FAB EC coordination. Proposal ID : 87.007 Impl. Status: State(s) & Org. Comments: Description: Planned DEU 1. To allow new Direct flight planning option BOMBI DCT SIPVU and 23 JUN 2016 Originator(s): change of flow restrictions for ARR ELLX, EBLG, EHBK (and others) Project Category: DEU via OKG (UL984) or UPALA (UL610). DCTs FAB EC 181. 2. To update the flow restrictions within EDUUERL sector. RAD Objective: To improve flight efficiency within FABEC (higher FL, shortcut) by offering better profile (late descent) / new shorter routing and optimizing capacity for ERL sector. Proposal ID : 84.035 Impl. Status: State(s) & Org. Comments: Description: Planned ESP . LEPES does not belong in ICARD to ICAO To replace existing 5LNC LEPES. 23 JUN 2016 EUR/NAT Region. It is NACC Region Originator(s): Objective: Project Category: EUROCONTROL allocated point and requires further action by ICAO DM. 182. 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO EUR/NAT region; . Proposal for replacement by Spain is based 2. To improve the aeronautical information provided; on “Common criteria for replacement of 3. To be compliant with ICAO Annex 11. duplicated 5LNCs” as point is used as FIR boundary in Russian Federation. Proposal ID : 69.064b / 16.035b Impl. Status: State(s) & Org. Comments: Project Name: NEFAB and DK/SE FAB Free Route Airspace - Confirmed FIN . NEFRA: North European Free Route NEFRA Phase 1 23 JUN 2016 EST Airspace (NEFAB plus DK/SE).

Description: Project Group: LVA . ATS routes will be kept. To implement H24 cross border Free Route Airspace between DK-SE FAB DNK . Norway plans to implement cross-border SWE Free Route Airspace spring 2017. FAB and NEFAB, except Norway, above FL285. Denmark/Sweden 183. Objective: FAB NEFAB Originator(s): Related proposals: SG BALTIC FAB NEFAB  67.046 / 16.024 To further improve the airspace structure between Finland FIR, Sweden FIR, Tallinn FIR, Riga FIR and Kobenhavn FIR. Project Category:  69.064a / 16.035a Free Route  85.118 Airspace Proposal ID : 88.007 / 23.021 Impl. Status: State(s) & Org. Comments: Description: Planned GEO . These points will be allowed as Connecting

184. To allow proper flight planning options via RAD Appendix 5 for ARR 23 JUN 2016 Originator(s): Points until proper SIDs/STARs being UGTB via TISOT and DEP UGTB via DISKA. designed.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 118 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: Project Group: EUROCONTROL . By using current ATS route connections to To further improve flight planning options for flights to/from UGTB. RFG SE existing SIDs and STARs penalization SG BLACK varies up to 70NM.

Project Category: . Currently design of SID/STAR is in RAD progress. Proposal ID : 74.011 Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Skopje Planned MKD . Free Route implementation depends on 23 JUN 2016 neighbouring States developments and Description: Originator(s): To introduce H24 Free Route in Skopje ACC above FL245. Project Group: MKD requirements. . Full co-operation should be expected. 185. Objective: RFG SE . ATS route network will remain. To further improve airspace organisation within Skopje FIR. Project Category: Free Route Airspace Proposal ID : 88.015 / 23.023 Impl. Status: State(s) & Org. Comments:

Project Name: FRA Like (DCT) Warsaw FIR - Phase 2 Confirmed POL Related proposals: 23 JUN 2016 Description: Originator(s):  76.052 / 23.029 To allow new 16 "Direct" (DCT) flight planning options within Warszawa Project Group: POL  78.028a FIR: SG BALTIC  86.041 / 22.046

REGLI - DENKO, GRUDA - DEVEL, USTIL - OLILA, LENOV - GOVEN, Project Category: 186. LENOV - BADUP, BADUP - BINKA, RONEX - BINKA, ROLKA - DEVEL, DCTs ELPOL - ROLKA, PIXOR - AMTEK, SORIX - DIBED, KARTI - RILAB, Free Route RILAB - DIBED, ELPOL - LUGOL, LUGOL - BINKA, LUGOL - BABEN. Airspace Objective: RAD To further improve the airspace organisation and flight efficiency within Warszawa FIR. Proposal ID : 88.004 / 23.018 Impl. Status: State(s) & Org. Comments: Description: Confirmed ARM . Very beneficial for flights between Georgia To implement westbound ATS route T926 TAVRO - REBLO for DEP 21 JUL 2016 GEO and Iraq. UGTB. . Saving in distance is around 105NM Project Group: Originator(s): 187. Objective: RFG SE ARM compare to current available option via To further improve ATS route network within Yerevan FIR. SG BLACK GEO NOLGA.

Project Category: ATS Routes Proposal ID : 84.018a Impl. Status: State(s) & Org. Comments: 188. Project Name: S-WAFLE - South West Adaptation Flight Level Planned FRA Phase 2: 5th layer in sectors L and R (FL385+).

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 119 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Evolution Phase 1 21 JUL 2016 Originator(s): Related proposals:

Description: Project Category: FRA  84.018b To create an additional layer in Bordeaux ACC sectors L, R and P, Phase ATC Sectors 1: 4th layer in sector P (FL365+).

Objective: To further improve the airspace structure and increase capacity within Bordeaux ACC in order to meet traffic demand.

Proposal ID : 81.034 Impl. Status: State(s) & Org. Comments: Description: Planned ITA . Annex 11 stated that the 5LNCs shall be To replace existing 5LNC ROYAL as OKOMU. 21 JUL 2016 unique. Originator(s): Objective: Project Group: EUROCONTROL . ROYAL is used 4 times worldwide and is To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT RFG SE ICAO created in ICARD for USA. 189. . ICAO DM sent relevant message to ITA. region, to improve the aeronautical information provided and be Project Category: compliant with ICAO Annex 11. . Part of Torino procedures change. 5LNC Related proposals:  81.035 Proposal ID : 74.008b Impl. Status: State(s) & Org. Comments: Description: Planned MKD . SID KRATO is designed (10 years ago) for

To re-design existing SID KRATO for DEP LWSK by extension to 21 JUL 2016 Originator(s): DEP LWSK from RWY16. RAXAD and withdrawal of 5LNC KRATO. . Currently 5LNC KRATO is not part of the Project Group: IACA Objective: RFG SE EUROCONTROL ATS route network in Skopje FIR and there To further improve airspace organisation within Skopje FIR. is no further continuation of the SID. Project Category: . Based also on current RAD RWY16 could 5LNC be used for DEP LWSK to RAXAD only on Airspace Structure dog-leg SID SINKO where the absolute 190. straight flying distance is +17.4NM. . DCT KRATO - RAXAD (6NM) was introduced on 16 AUG 2011 by NOTAM and was inserted in RAD from 20 OCT 2011. Will be withdrawn following the introduction of new SID to RAXAD.

Related proposals:  74.008a Proposal ID : 88.011 Impl. Status: State(s) & Org. Comments: Project Name: FLOS Planned DNK 191. 18 AUG 2016 Description: Originator(s):

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 120 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To swap the publication of “Table of cruising levels” in AIP Denmark, Project Category: EUROCONTROL from ENR 1.3 to ENR 1.7 in accordance with Annex 15. AIP

Objective: To adapt the publication of the FLOS used within the airspace of Denmark. Proposal ID : 88.016 Impl. Status: State(s) & Org. Comments: Description: Planned DNK Replecing former proposal 66.024 To change all CDR 1/2 within Danish FIR into CDR 1. 18 AUG 2016 Originator(s): Related proposals: 192. Objective: Project Category: DNK  88.017 To further harmonise the utilisation of the existing CDRs within ECAC CDRs airspace. Proposal ID : 86.079 Impl. Status: State(s) & Org. Comments: Description: Planned FRA Alternative routes for UM985 LUMAS - OBLAD - To implement the following eastbound CDRs: 18 AUG 2016 STP and UM731 FJR - TINOT - PELOS Originator(s): 1. Z191 LUMAS - NEVIX - NETUP - STP; Project Category: FRA respectively. 2. Z192 LUMAS - NEVIX - ROTIS - ADITA - STP; CDRs 193. 3. Z193 DIVKO - SOSUR - OLNUL - NIVDA - PELOS; 4. Z194 DIVKO - SOSUR - OBLAD - NIVDA - PELOS.

Objective: To further improve the alternative ATS routes when LFD54B or LFD54DA are active. Proposal ID : 87.048 Impl. Status: State(s) & Org. Comments: Project Name: City Pair Level cap Planned GBR 18 AUG 2016 Description: Originator(s): To raise the City Pair Level Cap from FL270 to FL290 for traffic ex Project Category: GBR 194. Severn and Midlands Groups to EBBR. RAD

Objective: Vertical FE To further improve flight efficiency within UK. Proposal ID : 86.046 Impl. Status: State(s) & Org. Comments: Description: Planned POL REGTO 492004N 204933E is new boundary 1. To implement eastbound ATS route T195 REGTO - INKIX. 18 AUG 2016 SVK point between Warszawa FIR and Bratislava

2. To insert point INKIX 490556N 0210551E on ATS routes UN133 or Project Category: Originator(s): FIR. 195. B/UB7. Airspace Structure POL 3. To introduce new SID to REGTO for EPKT/KK. ATS Routes SVK Objective: To further improve airspace organization and ATS route network

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 121 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

between Warszawa FIR and Bratislava FIR for DEP EPKT/KK.

Proposal ID : 84.067c Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Planned DEU Currently lower/upper limits are set either as 15 SEP 2016 FL80 or FL100 or FL200 or FL240 or FL250 etc. Description: Originator(s): 1. Phase 3: To adapt the remaining lower/upper vertical limits, Project Category: EUROCONTROL Related proposals: expressed in FL, of ATS routes within Germany - change of IFR FL AIP  84.067a 196. to VFR FL. ATS Routes  84.067b 2. To withdraw flow restrictions from ENR 3.3 to avoid duplication with RAD related remarks.

Objective: To adapt in State AIP ATS routes vertical limits. Proposal ID : 81.039 Impl. Status: State(s) & Org. Comments: Description: Planned GBR . Annex 11 stated that the 5LNCs shall be

To replace existing 5LNC BRAVO. 15 SEP 2016 Originator(s): unique. . BRAVO is used 7 times worldwide and is 197. Objective: Project Category: EUROCONTROL To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT 5LNC ICAO allocated in ICARD to Brazil. region, to improve the aeronautical information provided and be . ICAO DM sent relevant message to GBR compliant with ICAO Annex 11. (DM24/01 MSG 14-034). Proposal ID : 84.047 Impl. Status: State(s) & Org. Comments: Description: Planned GBR . BISBO is reserved in ICARD for France. To replace existing 5LNC BISBO. 15 SEP 2016 . Point is used in UK for military aerodrome Originator(s): Objective: Project Category: EUROCONTROL purpose at EGUN. 198. a. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO . Proposal for replacement is based on EUR/NAT region; “Common criteria for replacement of b. To improve the aeronautical information provided; duplicated 5LNCs” as point is not reserved c. To be compliant with ICAO Annex 11. for UK. Proposal ID : 87.039 Impl. Status: State(s) & Org. Comments: Project Name: SID truncation Planned GBR 15 SEP 2016 Description: Originator(s): Truncation of EGSS BUZAD SID at new waypoint UTAVA and establish Project Category: GBR 199. new ATS route Q75 BKY - UTAVA - BUZAD. ATS Routes

Objective: To reduce the portion of the flight plannable route at 4000ft by circa 15 nm thereby reducing fuel uplift/burn.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 122 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 87.040 Impl. Status: State(s) & Org. Comments: Project Name: Airspace Rationalisation Planned GBR 15 SEP 2016 Description: Originator(s): To remove the Souther CTAs 2 & 3 by expanding Southern CTA 1 to Project Category: GBR 200. include them and renaming of the airspace as Southern CTA. Airspace Structure

Objective: To remove anomalous airspace that can cause confusion as to teh classification of teh airspace beneath teh two anomalous areas. Proposal ID : 87.049 Impl. Status: State(s) & Org. Comments: Project Name: Airspace Efficiency Planned GBR 15 SEP 2016 Description: Originator(s): To allow the following "Direct" flight planning options: Project Category: GBR 201. 1. GAPLI DCT TINAN; DCTs 2. TINAN DCT GIBSO DCT DVR. RAD

Objective: To further improve route efficiency within UK. Proposal ID : 87.045 Impl. Status: State(s) & Org. Comments: Project Name: SID Truncation Planned GBR 15 SEP 2016 Description: Originator(s): 1. To truncate the EGLL MID SIDs to new points UNBOB and UNVIK Project Category: GBR however the existing MID SIDs will remain published and available ATS Routes for aircraft that cannot meet the climb gradient required for the UNBOB & UNVIK SIDs (less than 5% of traffic). 2. To extend Y803 from MID to UNVIK to replace the portion of the 202. MID SID and amend M185 to route MID - UNBOB - OCK to replace the portion of the MID SID. 3. To re-designate Y803 east of MID as L18 and remove the U from UL18 and transfer the amended route into ENR3.3 of the UK AIP

Objective: To reduced fuel uplift as a result of a shortened SID for EGL deps via MID, rationalize route designation and be ICAO compliant. Proposal ID : 87.046 Impl. Status: State(s) & Org. Comments: Project Name: CDR Conversion Planned GBR

Description: 15 SEP 2016 Originator(s): 203. To change the category of ATS route segment UL613 MOGLI - MAMAL Project Category: GBR from CDR1/3 to PERM. ATS Routes

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 123 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: To further improve ATS route network within London FIR. Proposal ID : 87.041 Impl. Status: State(s) & Org. Comments: Project Name: SID Truncation Planned GBR 15 SEP 2016 Description: Originator(s): Truncation of EGSS CPT SIDs to new way point NUGBO and extend Project Category: GBR existing route M183 from BKY via NUGBO and SILVA to CPT. ATS Routes

204. Objective: SID Truncation aimed at redcing flight plannable portion of flight at 4000ft by circa 30nm and therefore reduce fuel uplift/burn.

Proposal ID : 87.042 Impl. Status: State(s) & Org. Comments: Project Name: Airspace Re-structuring Planned GBR 15 SEP 2016 IRL Description: To establish the Strumble CTA between the western edge of N864 and Project Category: Originator(s): the FIR Boundary to replace Class A airspace of L9, N546, M17 & P2 as Airspace Structure GBR 205. well as the Class C airspace coincident with it up to FL245. ATS Routes

Objective: To re-describe the structure of the airspace will facilitate the phased transfer of ATS Routes from ENR3.1/3.2 into ENR3.3 and the emoval of the U desigantor prefix where appropriate. Proposal ID : 87.033 Impl. Status: State(s) & Org. Comments: Project Name: D201 Bypass Route Phase 2 Planned GBR Redevelopment of Danger Area EG D201 15 SEP 2016 IRL Comples to establish two new portions requires Description: Conversion of existing ATS (U)M17 between STU and VATRY to CDR Project Category: Originator(s): existing route (U)M17 to become CDR between 1/3 and establish new bypass route CDR Q63 (with U removed) STU - ATS Routes GBR STU & VATRY. 206. LANPI (new point) - VATRY that will be avilable when (U)M17 is not available to go around new Danger Area EG D701F.

Objective: Q63 will be the first of two bypass routes that will enable VATRY to be used when (U)M17 is not available. Proposal ID : 87.043 Impl. Status: State(s) & Org. Comments: Project Name: Swanwick Contingency Route Planned GBR Contingency Route 207. 15 SEP 2016 Description: Originator(s):

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 124 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To establish a contingency route T999 BKY - SIVDA - OTBED FL155 - Project Category: GBR FL195 only. ATS Routes

Objective: Contingency Route to be only actiavted by NOTAM in the event og a significant outage/evacuation at Swanwick allowing limited operation of traffic from certain airports in the LTMA/Solent arae to specified airports in the north of the UK without entering Swanwick LAC airspace - transpfer of traffic from Swanwick TC to Prestwick Centre. Proposal ID : 84.119 Impl. Status: State(s) & Org. Comments: Description: Planned GBR . GANTO is reserved in ICARD for France / To replace existing 5LNC GANTO with EVDEG. 15 SEP 2016 U.S.A.F.E UK with existing coordinates. One record

Objective: Project Category: Originator(s): exists in ICARD which is not connected to 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC EUROCONTROL UK as GANTO is not FIR boundary point. EUR/NAT region; ICAO . Point is used in UK for military aerodrome 208. 2. To improve the aeronautical information provided; purpose at EGUN. 3. To be compliant with ICAO Annex 11. . Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for UK and cannot be used twice in same State. Proposal ID : 87.014a Impl. Status: State(s) & Org. Comments:

Description: Planned NLD Related proposals: To re-designate the following existing ATS routes: 15 SEP 2016 GBR  87.014b 1. Y/UY76 REFSO - RIMBU - DET as Z/UZ291 (release of Y76); MUAC Project Category: 2. L/UL26 OTBED - PENIL as L/UL60 (release of L26). Originator(s): 209. Route Objective: Redesignation EUROCONTROL To rationalise the existing ATS route designators within Netherland and GBR UK in order to simplify the designation, release for further use and further facilitate the flight planning. Proposal ID : 88.027 Impl. Status: State(s) & Org. Comments: Description: Planned NOR TB1 / TB1E are TACAN routes only intended to To re-align existing TACAN ATS route TB1 as ... ORL - BASTU - FLE ... 15 SEP 2016 be used by military aircraft during IFR Originator(s): and remove TB1E. Project Category: NOR operations above FL195. 210. Objective: ATS Routes To harmonize military traffic flows with available ground based navigational aids. Proposal ID : 85.029b / 22.031b Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 125 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Planned POL Depending on update of PANSA internal flight

To allow northbound Night "Direct" flight planning option LUGOL DCT 15 SEP 2016 Originator(s): plan validation and airspace management POLON. systems. Project Group: UKR 211. Objective: SG BALTIC

To further improve the flight planning options within Warszawa FIR. Project Category: DCTs Proposal ID : 69.095b Impl. Status: State(s) & Org. Comments: Project Name: Prestwick ACC Proposed GBR summer 2016 Description: Originator(s): To introduce new operating system iTEC (interoperability Through Project Category: GBR 212. European Collaboration) within Prestwick ACC. ATM System

Objective: The iTEC project will introduce a Trajectory Based FDP and associated Controller Tools to the Prestwick Upper Airspace Sectors. Proposal ID : 85.022 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . The use of both DCTs is planned in To allow the following Night “Direct” flight planning options for traffic summer 2016 combination with SEAFRA allowed option Originator(s): type MIL: Project Category: U.S.A.F.E ROTAR DCT AIOSA. 213. a. NAXAV DCT ROTAR; Civil/Military . The whole DCTs option NAXAV - ROTAR - b. AIOSA DCT TIGRA. AIOSA - TIGRA will reduce route distance Airspace Objective: DCTs by 31NM compared to current routing To further improve the flight planning options within Italy. RAD saving €1000 per flight. Proposal ID : 86.052c Impl. Status: State(s) & Org. Comments:

Description: Planned DEU Related proposals: To re-designate ATS route UZ16 POVEL - GALMA as UZ94. 13 OCT 2016 Originator(s):  86.052a 214. Objective: Project Category: DEU To rationalise the existing ATS route designators/ RDs within Germany in Route order to further facilitate flight planning and release RDs. Redesignation Proposal ID : 88.003 Impl. Status: State(s) & Org. Comments: Description: Planned DEU . Airspace developments due to capacity 1. To introduce new SID GISDI for Paderborn (EDLP) airport. 13 OCT 2016 MUAC problems in some of Langen ACC sectors. 2. To implement the following westbound ATS routes for DEP EDLP: . The DEP traffic using these ATS routes will 215. Project Category: Originator(s): a. Y13 SONOR - GISDI - ALEXU - EDEGA; Airspace Structure DEU cross another sector and also get a b. Y14 GISDI - NATSU. significantly shortened routing. ATS Routes Objective:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 126 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To further imporve airspace organization within Germany. Proposal ID : 88.002 Impl. Status: State(s) & Org. Comments: Description: Planned DEU . As per JeppView coordinates of SEBER are To withdraw waypoint SEBER and re-align existing ATS routes UL126 13 OCT 2016 MUAC 5358.75 01017.32 while of BOGMU

and UL171 via waypoint BOGMU removing waypoint located with 1 sec Project Group: FAB EC 5358.75 01017.33. difference. . The situation is at least like this since 2007, FAB EC Originator(s): Objective: EUROCONTROL the only reason it popped up now is Project Category: because of direction change on N850. 216. To further simplify the ATS route network within Germany. ATS Routes . FABEC will be added as Project owners, as the changes in this area are influenced by former planning for CBA Land/CW. . Removal of SEBER will resolve worldwide 5LNC duplication with Canada.

Proposal ID : 88.017 Impl. Status: State(s) & Org. Comments: Description: Planned DEU Replecing former proposal 66.024 To Harmonise and adapt all CDRs at the interface between Hannover 13 OCT 2016 Originator(s): Related proposals: UIR / Kobenhavn FIR. Project Category: DEU 217.  88.016 Objective: CDRs To further harmonise the utilisation of the existing CDRs within ECAC airspace. Proposal ID : 87.001 Impl. Status: State(s) & Org. Comments: Project Name: SAXFRA - Slovenian Austrian X-border Free Route Planned AUT Phased implementation: Airspace 10 NOV 2016 SVN . FRAW Stage 1 - 18 OCT 2012.

Description: Project Group: Originator(s): . FRAW Stage 2 - 7 MAR 2013. To introduce H24/7 Cross Border Free Route Airspace as an airspace FAB CE AUT . FRAW Stage 3a/b - 6 MAR 2014 - 11 DEC entity within AoRs of Austro Control (east of ROCKY Line) and RFG SE SVN 2014. . FRAW Stage 4a/b - 2 APR 2015 - 10 DEC Slovenia Control from GND to FL660. Project Category: 2015. Objective: Free Route . FRA Ljubljana Phase 1 - 6 MAR 2014 218. To further improve flight efficiency within AoRs of Austro Control (east of Airspace . FRAW Stage 5 and FRA Ljubljana Phase 2 ROCKY Line) and Slovenia Control. will be absorbed by SAXFRA. Cancellation of ATS routes in Wien FIR foreseen (except of Non RNAV ATS routes below FL095).

Related proposals:  76.047  77.066a  77.072a

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 127 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 77.072b  77.072c  77.072d  87.008 Proposal ID : 87.008 Impl. Status: State(s) & Org. Comments:

Project Name: ATS routes / RAD update Planned DEU Related proposals: 10 NOV 2016 AUT Description:  87.001 To update German ATS routes at the German - Austrian interface and Project Category: Originator(s): implement point based RAD restrictions (Austrian ATS routes will be ATS Routes DEU 219. deleted - SAXFRA). RAD AUT

Objective: To support SAXFRA.

Proposal ID : 88.026 / 23.042 Impl. Status: State(s) & Org. Comments: Project Name: EST - RUS airpsace changes Planned EST

Description: 10 NOV 2016 RUS LVA To implement new ATS routes and adapt the existing ATS route network Project Group: 220. within Tallinn FIR. SG BALTIC Originator(s):

Objective: Project Category: EST To improve ATS route connections between Estonia and Russian ATS Routes RUS Federation. Proposal ID : 87.035 Impl. Status: State(s) & Org. Comments: Description: Planned FRA To re-designate the following existing ATS routes: 10 NOV 2016 Originator(s): a. T12 MOROK - PENDU as L856 (same segment with different RDs Project Category: EUROCONTROL T12/UL856); Route b. T32 EPL - LASAT as N491 (same segment with different RDs Redesignation T32/UN491); 221. c. UT40 TORPA - LUL as UM624 (extension); d. UT40 LUL - GIVOR as UT60.

Objective: To rationalise the existing ATS route designators within French FIRs in order to further facilitate flight planning and resolve double RDs use in ICAO EUR Region. Proposal ID : 87.011 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 128 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Planned FRA To re-designate the following existing ATS routes: 10 NOV 2016 Originator(s): a. T16 MINPA - SAU as T616; Project Category: EUROCONTROL b. UY105 TOKDO - LERGA as UY305; Route c. UZ39 BOLSA - SIJAN as UZ539; Redesignation 222. d. UZ131 OLRAK - FJR as UZ151.

Objective: To rationalise the existing ATS route designators within French FIRs in order to further facilitate flight planning and resolve double RDs use in ICAO EUR Region. Proposal ID : 83.040c Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Planned SVN 10 NOV 2016 Description: Originator(s): To adapt the upper vertical limit of ATS route Y560 ARMIX - ILB, by Project Group: EUROCONTROL 223. changing the IFR FL130 to VFR FL. RFG SE

Objective: Project Category: To adapt in State AIP ATS routes vertical limits. AIP Proposal ID : 71.040b / 16.026b Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Ukraine, Step 1 (Sc 1b) Planned UKR Free Route Airspace Ukraine - FRAU project 10 NOV 2016 Description: Originator(s): Related proposals: To implement H24 Free Route Airspace operations above FL275 Project Group: UKR  71.040a / 16.026a within individual UTAs in Ukraine. RFG SE  81.018a / 19.021a 224. SG BLACK  81.018b / 19.021b Objective: To implement FRA Concept and further improve flight efficiency within Project Category: Kyiv UIR. Free Route Airspace Proposal ID : 86.056c Impl. Status: State(s) & Org. Comments: Project Name: Nicosia Direct Route Airspace - Phase 1C Planned CYP . DCT options are approved and included in 08 DEC 2016 the Blue Med document “OPS-D2.1 - BLUE Description: Originator(s): To allow 4 (four) NIGHT "Direct" flight planning options above FL285. Project Group: CYP MED BM DCT _AVBL Night Wkend_ Catalogue version Nov 2015_rev 1.2” Objective: FAB BLUE MED FAB BLUE MED RFG SE produced by the BM RNC & FR TF. 225. To further improve flight planning options within Nicosia FIR. . Night period 21:00 - 04:00. Project Category: DCTs Related proposals: RAD  71.088a  71.088b  86.056a

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 129 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 86.056b  86.056d  86.056e Proposal ID : 87.013 Impl. Status: State(s) & Org. Comments: Description: Planned DEU The estimate by the USAF is save of €270K and To allow “Direct” flight planning option WUR DCT TIPAM for DEP ETAR. 08 DEC 2016 41K kilograms per year Originator(s): 226. Objective: Project Category: U.S.A.F.E To further improve the flight planning options within Germany. DCTs RAD Proposal ID : 88.010 Impl. Status: State(s) & Org. Comments: Project Name: FLOS Planned DEU . Currently the required “Table of cruising 08 DEC 2016 levels” is NOT published in AIP Germany as Description: Originator(s): To publish in accordance with Annex 15 in AIP Germany, ENR 1.7 the Project Category: EUROCONTROL required by Annex 15. Germany is the only relevant “Table of cruising levels” used within the airspace of Germany. AIP State in NM area without AIP reference to FLOS to be used. Objective: . ENR 3.3 - Note 1 contains explanation of To publish the FLOS used within the airspace of Germany. arrows meaning and use of terms ODD/EVEN. ODD covers the altitude/flight levels starting with an odd number (e.g. 227. FL70, FL90 …) while EVEN covers the altitude/flight levels starting with an even number (e.g. FL60, FL80 …). . As there is no ICAO explanation for terms ODD/EVEN the expression in AIP ENR 1.7 shall be based on Annex 2, Appendix 3 “Table of cruising levels”, a) including exact magnetic tracks applied as per table or Note represented as (***). Proposal ID : 87.050 Impl. Status: State(s) & Org. Comments: Project Name: Night DCT Network Planned DEU Redundant Night ATS Routes will be removed 08 DEC 2016 FRA Description: Related proposals: To implement a comprehensive Night DCT Network across both Geneva Project Category: CHE  87.051 & Zurich ACC Areas of Responsibility, offering significant shortcuts DCTs AUT 228. during night. Night Routes FAB EC ITA Objective: To offer significant shortcuts during night and gain experience with DCTs Originator(s): extending across AoR boundaries. CHE FAB EC

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 130 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 87.005b Impl. Status: State(s) & Org. Comments: Project Name: FRA Germany - Phase 2 Planned DEU Use of RAD Appendix 7 for TRA308 depending

Description: 08 DEC 2016 Originator(s): the experiences of usage RAD for ED-D47A/B (implemented AIRAC1513). To continue preparation of Full Free Route Airspace Germany by: Project Group: DEU 1. using of RAD Appendix 7 for ED-R308 (TRA); FAB EC FAB EC Related proposals:

2. lowering the MIN FL of some existing DCTs into AoR Munich ACC; Project Category:  87.005a 3. introducing first set of compulsory transition/connecting points for ATS Routes  87.005c ARR/DEP to/from some German airports; 229. Free Route  87.005d 4. publication of 4 lateral FRA cells as sub-airspaces within EDUU UIR Airspace  87.005e to support new RAD restriction/transition points/ transition routes; RAD 5. if required introduction of first set of compulsory transition routes linked to each transition point/connecting point.

Objective: To support implementation of Full Free Route and simplify the RAD.

Proposal ID : 87.009 Impl. Status: State(s) & Org. Comments: Project Name: M17 Off-load Route Planned GBR D201A is likely to be activated more often by 08 DEC 2016 IRL NOTAM FL145+ and therefore this will close Description: To establish alternative routing using Q65 and Q66 via new waypoints Project Category: Originator(s): (U)M17 - to avoid a 40nm detour via WAL plan 230. when M17 STU - VATRY is closed by activity in D201A. ATS Routes GBR to establish new routes Q65/Q66 with only a 4nm detour. (U)M17 epected to be closed Objective: around 40 days per year for up to 4 hours per Provide an alternative offload route to accommodate traffic when (U)M17 day. is closed by activity in D201A FL145+. Proposal ID : 87.032 Impl. Status: State(s) & Org. Comments: Project Name: SID Truncation Planned GBR Subject to prposed 2Y SIDs replacing current 1L 08 DEC 2016 SIDs from 26th May 2016. Description: Originator(s): a. WCO 5D Delete SID and use UNGAP 1D/ADMEX 1D and DCTs to Project Category: GBR get to WCO. ATS Routes b. WCO 1L Delete SID and use NEMKA 1E/GOXER 1Y and DCTs to get to WCO. c. COWLY 1L Truncated at new waypoint GOXER and become 231. GOXER 1Y and use L612 to get to COWLY. d. CPT 1L Dellete SID and use GOXER 1Y via L612 and extended Y321 to get to CPT. e. DTY 1L Truncated at new point XXXXX and use DCT to get to BANTO (P155) and L10 to get to DTY.

Objective: To reduce the flight portion at SID altitude and associated redction in fuel

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 131 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

uplift. Proposal ID : 84.023 Impl. Status: State(s) & Org. Comments: Description: Planned GBR . Adaptation of RDs in lower and upper

To re-designate existing ATS route N580 GOW - TIR as L602 (release of 08 DEC 2016 Originator(s): airspace. N580). . Currently the ATS segment GOW - TIR is Project Category: EUROCONTROL Objective: Route designated both as N580 and UL602. To rationalise the existing ATS route designators within Scottish FIR in Redesignation . RD N580 exists only along the GOW - order to further facilitate flight planning and release RDs. TIR segment and by re-designation it can be released for use by other State/s. 232. . This proposal reflects the ideal re- designation with use of only one RD - L/UL602 despite that presumably there will be a “RD break” of L602 between TLA - GOW. . Another possibility is to have two or three RDs on that segment by designating it as N572 and/or Y958 and UL602. Proposal ID : 88.029 Impl. Status: State(s) & Org. Comments: Project Name: CDR Availability Planned GBR . Needs agreement from UK MOD and 08 DEC 2016 USAFE. Description: Originator(s): To extend the CDR 1 avilability of UY124 by one hour until 09:00 (08:00) Project Category: GBR . Reciprocally the CDR2 avilablity is reduced MON - FRI. ATS Routes IRL by 1h. 233. Objective: To provide shorter route for Dublin departures via AMPIT, allow greater runway capacity at Dublin Airport and reduce complexity/enhance safety on the PC IoM Sector. Proposal ID : 88.022 Impl. Status: State(s) & Org. Comments: Project Name: ATS Route Accessibility Improvement Planned GBR Below FL195 - FL155 remains only available 08 DEC 2016 weekends. Description: Originator(s): To extend the availability of ATS route segment N864 WAL - DCS Project Category: GBR (FL195 - FL245) to H24. ATS Routes 234. Objective: To reduce track mileage for traffic operating between FL200 and FL240 between WAL and DCS in both directions and reduce complexity on Sector 29. Proposal ID : 85.115 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 132 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Name: Airspace Efficiency Planned GBR Related proposals: 08 DEC 2016 Description: Originator(s):  85.114 235. To implement westbound ATS route (CDR) TALGA - LANON. Project Category: GBR

Objective: ATS Routes To further reduce track routeing. Proposal ID : 87.044 Impl. Status: State(s) & Org. Comments: Project Name: Route Designator rationalisation Planned GBR This will not release L15 but will facilitate the 08 DEC 2016 FRA eventual removal of the U designator prefix from Description: 236. To re-designate L15 LYD - IRKUN as M91. Project Category: Originator(s): UL15 and transfer into 3.3. re-designation is ATS Routes GBR planned for December 2016 - removal of U will Objective: be summer 2017 To facilitate removal of U from UL15. Proposal ID : 74.016c / CE0096 Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Zagreb, Phase 5b - SEAFRA Planned HRV . In coordination with Free Route introduction

Description: 08 DEC 2016 BIH in Beograd ACC. SRB . FRA cross border application in Zagreb To introduce H24 Free Route Airspace in Zagreb ACC AoR above Project Group: FL325. FAB CE Originator(s): ACC and Beograd ACC AoRs. . Implementation depends on BH ATM, Objective: RFG SE HRV Phase 2 implementation. To further improve airspace organisation within Sarajevo FIR and Zagreb Project Category: . RTS in Jan/Feb 2016. 237. FIR. Free Route Airspace Related proposals:  69.086a  74.016a  74.048a  74.048b  74.059b  75.013 Proposal ID : 71.085c Impl. Status: State(s) & Org. Comments: Project Name: FAIR-IT Free Route Airspace Italy, Phase 3 Planned ITA . Co-operation inside BLUE MED with all the 08 DEC 2016 partners involved, to extend FAIR-IT at FAB Description: Originator(s): To implement Full Free Route Airspace, initially above FL335. Project Group: ITA level, starting from 2015. FAB BLUE MED . Cross-border with Malta. Objective: 238. RFG SE Related proposals: To further improve the airspace structure and the flight planning options within Milano, Roma and Brindisi UIR. Project Category:  71.085a Free Route  71.085b Airspace  71.085d  71.089c

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 133 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 88.021 Proposal ID : 88.021 Impl. Status: State(s) & Org. Comments:

Project Name: Removal U prefix Milano, Roma and Brindisi UIR. Planned ITA Related proposals: 08 DEC 2016 Description: Originator(s):  71.085c To remove "U" prefix for Upper ATS routes within Milano, Roma and Project Category: ITA 239. Brindisi UIR, FL335+. Airspace Structure

Objective: To simplify Air Traffic Management within Milano, Roma and Brindisi UIR. Proposal ID : 75.040b / 15.042b Impl. Status: State(s) & Org. Comments:

Project Name: Free Route Airspace Vilnius - Phase 2 Planned LTU Related proposals: 08 DEC 2016 Description: Originator(s):  75.040a / 15.042a To expand already implemented H24 Free Route Airspace FL245+ in Project Group: LTU  76.052 / 23.029 240. Vilnius ACC down to FL095. SG BALTIC

Objective: Project Category: To further improve airspace organisation within Vilnius FIR. Free Route Airspace Proposal ID : 71.089c Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Malta - Phase 3 Planned MLT . Co-operation/synchronisation with Free 08 DEC 2016 Route Airpsace Italy/ FAIR-IT, Phase 3. Description: Originator(s): To implement H24 Free Route Airspace above FL335 within Malta UIR. Project Group: MLT . Depending on new system implementation. . Cross-border with Italy. FAB BLUE MED Objective: 241. To further improve the flight planning options within Malta UIR as a third Project Category: Related proposals: step of Free Route Airspace Malta implementation. Free Route  71.085c Airspace  71.085d  71.089a  71.089b Proposal ID : 74.059b Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Beograd, Phase 5b - SEAFRA Planned SRB . In coordination with Free Route introduction 08 DEC 2016 MNE in Zagreb ACC. Description: To introduce H24 Free Route Airspace in Beograd ACC AoR above Project Group: BIH . FRA cross border application in Zagreb HRV ACC and Beograd ACC AoRs. 242. FL325. FAB CE . Implementation depends on BH ATM, Objective: RFG SE Originator(s): SRB Phase 2 implementation. To further improve airspace organisation within Sarajevo FIR and Project Category: . RTS March 2016. Beograd FIR. Free Route

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 134 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Airspace Related proposals:  69.086a  74.016a  74.016c  74.048a  74.048b  75.013  80.081 Proposal ID : 80.081 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Planned SRB Together with H24 Free Route 08 DEC 2016 MNE Airspace implementation in Beograd ACC. Description: Phase 1 includes: Project Group: Originator(s): Related proposals: 1. Change of en-route navigational requirements from RNP5 (B-RNAV) RFG SE EUROCONTROL  74.059b

243. to PBN RNAV5 and RNAV routes adaptation; Project Category: 2. Adjustment of coordinates in accordance with WGS84 Manual, AIP Annex 15 and Doc 8168.

Objective: To resolve airspace data publication inconsistencies in State AIP. Proposal ID : 86.028 Impl. Status: State(s) & Org. Comments: Description: Planned SRB . More than 60 (sixty) VFR reporting points To withdraw or replace VFR reporting points published as pronounceable 08 DEC 2016 MNE are designated as five-letter pronounceable 5LNCs in AIP Serbia / Montenegro, part AD 2, Chart for VFR flights. name-codes (5LNCs). Most of them are Project Group: Originator(s): Objective: RFG SE EUROCONTROL reserved in ICARD and already used To align AIP publication in accordance with Annex 11. worldwide by other States. Project Category: . In accordance with Annex 11 only when a 244. 5LNC significant point is used for ATC purposes, it AIP shall be designated by a unique five-letter pronounceable “name-code”. . Internal finalization of VFR reporting point purpose, reason of AIP publication and compatibility with ICAO shall be considered. Proposal ID : 80.039 / 19.010 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed AZE . Currently lower/upper limits of upper ATS autumn 2016 routes are set as FL200 - FL430 while for Description: Originator(s): 245. To adapt the lower/upper vertical limits, expressed in FL, of ATS routes Project Group: EUROCONTROL lower ATS routes upper limit is FL195 and within Baku FIR - change of IFR FL to VFR FL. SG BLACK lower varies as FL050, FL060,…FL150 etc. . Upper limits will be expanded till FL660. Objective: Project Category:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 135 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To adapt in State AIP ATS routes vertical limits. AIP ATS Routes Proposal ID : 86.049 / 23.005 Impl. Status: State(s) & Org. Comments: Description: Proposed AZE To implement westbound ATS route RASAM - ADEKI for DEP UBBB. autumn 2016 Originator(s): Objective: Project Group: EUROCONTROL 246. To further improve ATS route network within Baku FIR. SG BLACK

Project Category: ATS Routes Proposal ID : 86.051b / 23.007b Impl. Status: State(s) & Org. Comments: Description: Proposed AZE As agreed all changes inside Tbilisi FIR were To implementation bi-directional ATS route L133 NETON - DISKA. autumn 2016 GEO implemented as from 3 MAR 2016.

Objective: Project Group: Originator(s): Related proposals: 247. To further improve ATS route network between Baku FIR and Tbilisi FIR. SG BLACK EUROCONTROL  86.051a / 23.007a

Project Category: ATS Routes Proposal ID : 80.036 / 19.007 Impl. Status: State(s) & Org. Comments: Description: Proposed BGR . New point east of ARGES for DEP To implement shorter ATS route option for DEP LROP/LRBS via Sofia autumn 2016 ROU LROP/BS to ODERO. FIR towards Turkish airspace. . Same point used for DEP LROP to RIXEN Project Group: Originator(s): Objective: RFG SE EUROCONTROL during Summer period (t.b.d.); To further improve ATS route options between Sofia FIR and Bucuresti SG BLACK . Use of RONBU for DEP LROP during FIR. Winter period (t.b.d.); Project Category: . RAD: RONBU - RIXEN “Only available only ATS Routes for DEP LROP/BS”; 248. . LOA: DEP LROP/BS initially climb FL150; . Location of new point with regard to LRTSA 1C/1D, LRR34; . Changes in LROP/LRCK TMA (new departure routes, time); . New SIDs from LROP/LRBS via OSTAL planned by Romania; . Implementation depends on UDROS / ODERO reorganization. Proposal ID : 81.001 / 19.060 Impl. Status: State(s) & Org. Comments: 249. Project Name: Night Free Route Sofia FIR - FRAS, Phase 2 Proposed BGR Currently Night FRA is applicable FL245 -

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 136 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: autumn 2016 Originator(s): FL660 and flights ARR/DEP from airports

Phase 2: To expand the FRAS by lowering the FL limit from FL245 to Project Group: BGR located within LBSR FIR are not eligible for FRA FL095, inclusion of ARR/DEP as part of FRA operations and introduction FAB DANUBE operations and must be planned along the route of new FRA points. RFG SE network published in ENR 3.3 irrespective of the planned FL. Objective: SG BLACK

To further improve the Free Route Airspace operations within Sofia FIR. Project Category: Related proposals: Free Route  76.014 / 16.009 Airspace  83.010 Proposal ID : 81.002b / 20.043 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues - Phase Proposed BGR . Further discussed at BULATSA / 2. autumn 2016 EUROCONTROL bi-lateral meeting in Originator(s): Description: Project Group: EUROCONTROL October 2013. To resolve the spotted AIP ENR 3.3 publication issues - Phase 2. RFG SE . AIS Office prepares the relevant updates in 250. accordance with ECAC States AIP en-route Objective: SG BLACK publication issues document. To resolve airspace data publication inconsistencies in State AIP. Project Category: AIP Related proposals:  81.002a Proposal ID : 86.008 Impl. Status: State(s) & Org. Comments: Description: Proposed BGR . Currently via DOLAP and normally To improve the use of existing point GODEK by: autumn 2016 SRB continuing via UL615 (saving of 7.5NM per

a. revision of upper limit of ATS route N188 GODEK - OBLAK; Project Group: Originator(s): flight). b. allowance of DEP LBSF towards LI airspace; . GODEK was initially established to allow 251. RFG SE EUROCONTROL c. exclusion of OGOTA from L615 avoiding turn to DOLAP. one way DEP / ARR LBSF flow with NISVA Project Category: Objective: but currently is used rarely by maximum Airspace Structure one or two daily flights below FL145 as To further improve ATS route network between Sofia FIR and Beograd ATS Routes FIR. allowed after 30 APR 2015. Proposal ID : 86.020 / 23.036 Impl. Status: State(s) & Org. Comments: Description: Proposed BGR

To implement new P-RNAV SIDs/STARs for Gorna Oryahovitsa (LBGO) autumn 2016 Originator(s): airport. Project Group: BGR 252. Objective: RFG SE To further improve airspace organisation within Sofia FIR. SG BLACK

Project Category: Airspace Structure Proposal ID : 76.021 / 16.016 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 137 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed BLR . AAAAA will be new boundary point between To implement the following ATS routes: autumn 2016 POL Ukraine and Belarus. a. USTIL - AAAAA - BABUN bi-directional; UKR . Poland - further study required. Project Group: b. SUPAK - USTIL eastbound; SG BALTIC Originator(s): . Belarus further studies required taking into 253. c. USTIL - BABKO westbound. UKR account future changes of route network in Project Category: area. Objective: ATS Routes To further improve ATS route network between Warszawa FIR, L'viv FIR and Minsk FIR. Proposal ID : 76.022 / 16.017 Impl. Status: State(s) & Org. Comments: Description: Proposed BLR . AAAAA will be new boundary point To implement westbound ATS route ASKIL - AAAAA - VI. autumn 2016 UKR between Ukraine and Belarus.

Objective: Project Group: Originator(s): . 50MPCPE: Improving the flight efficiency of 254. To further improve ATS route network between L'viv FIR and Minsk FIR. SG BALTIC UKR the city pair UUEE - LIRF. . BLR further studies required taking into Project Category: account further changes of route network in ATS Routes Moscow area. Proposal ID : 80.032 / 19.003 Impl. Status: State(s) & Org. Comments: Description: Proposed BLR . BLR further studies required taking into To implement southbound ATS route RATIN - DIBON - KOVUS. autumn 2016 UKR account further changes of route network in

Objective: Project Group: Originator(s): Moscow area . The city pairs interested in this new option 255. To further improve ATS route network between Minsk FIR and Lviv FIR. SG BALTIC EUROCONTROL are CP41 UUEE - LIRF and CP45 UUDD - Project Category: LYTV. ATS Routes . Current option for flights via AMIRI is longer by 7.4NM. Proposal ID : 81.065 Impl. Status: State(s) & Org. Comments: Description: Proposed CZE . Despite that restrictions are coded as LK To allow traffic from southern Italy and Malta to Stockholm and Northern autumn 2016 POL their existence is also connected to the

Scandinavia via UL156 by deleting/amending RAD restrictions LK2190 / Project Category: Originator(s): neighbouring States requirements. LK2070 / EP2041 / EP2081. . LK2190 restricts flights over LEDVA along RAD IATA Objective: UL156 only for arrivals to 4 (four) Polish and 3 (three) Czech airports. 256. To further improve the airspace utilisation at the interface between Czech Republic and Poland providing shorter route options. . LK2070 restricts flights on UL156 HLV - LUMOT only for arrivals to 3 (three) Polish airports and departures from 2 (two) Czech airports. . Saving is 16 NM compared to current available option via VEBAL - LITKU - JED.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 138 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 78.051 Impl. Status: State(s) & Org. Comments: Project Name: RAD EPED5003 Proposed DEU . As of 28th June 2012 additional Night/ autumn 2016 POL Weekend DCT’s are open by Free Route Description: To extend the availability of EPED5003 DCT LASIS - DIBED from Project Category: Originator(s): Airspace Maastricht/ FRAM, especially made for departure EHAM. 257. currently only Night to weekend (Friday 20.00 - Monday 06.00). RAD IATA . To make optimum use of these additional Objective: options by KLM the adjacent DCTs have to To further improve the airspace utilisation at the interface between be open as well. Germany and Poland. . Germany ready to implement. Proposal ID : 87.030 Impl. Status: State(s) & Org. Comments: Description: Proposed DNK 1. To re-designate existing ATS route T53 ALS - TUDLO as T153. autumn 2016 Originator(s): 2. To delete RD T53 from current double designaton of ATS route Project Category: EUROCONTROL 258. segment P729 TUDLO - KOR. Route Objective: Redesignation To rationalise the existing ATS route designators within Denmark in order to further facilitate flight planning and avoid duplicate RDs use. Proposal ID : 75.002 Impl. Status: State(s) & Org. Comments: Description: Proposed FRA . Proposal supported by Marseille FMP. To reconsider the RAD restriction LILF1019 according to the criterion of autumn 2016 ITA . With origin in LE2001 restriction to be

flexibility in order to cancel the RAD restriction during some specific Project Group: Originator(s): managed in an interface Barcelona ACC- 259. periods/days/hours. Marseille ACC. 50 MPCPEs EUROCONTROL Objective: FRA . Not acceptable by Italy - confirmed again at Project Category: RAD review NOV 2013. To improve the FE of the CP LIRF - LEMD. RAD Proposal ID : 80.010h Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed GBR . All RDs are not in accordance with Annex autumn 2016 NLD 11 and not coordinated via ICARD. Description: To re-designate the following existing Helicopter routes: KZ35, KZ40, Project Category: Originator(s): . In AIP UK Helicopter routes are not published in ENR 3.4 as required by Annex 260. KZ45, KZ46, KZ50. AIP EUROCONTROL 15. It is stated that these routes appear in Objective: Route Redesignation AD 2, ENR 1.15 and ENR 6 but the To adapt existing RDs in accordance with ICAO requirements. information there is not sufficient and complete. Proposal ID : 84.010 / 21.027 Impl. Status: State(s) & Org. Comments: Description: Proposed GEO . Outcome of the Second Meeting of the Ad 261. 1. To implement unidirectional ATS route system between Ankara FIR autumn 2016 TUR Hoc Afghanistan Contingency Group

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 139 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

and Tbilisi FIR; Project Group: Originator(s): (AHACG/2) held at Istanbul, Turkey from 17 2. To change existing bi-directional ATS route N644 to eastbound; RFG SE TUR to 19 November 2014. 3. To implement new westbound ATS route parallel to N644. SG BLACK . The purpose of this reorganization is to

Objective: Project Category: enable an efficient traffic flow in the region. To further improve the ATS route network between Ankara FIR and ATS Routes . Additionally a reduced ATS surveillance- Tbilisi FIR. based longitudinal spacing from 20NM to10NM after the implementation of OLDI is also considered. Proposal ID : 88.005 / 23.019 Impl. Status: State(s) & Org. Comments: Description: Proposed GEO . ALIKA is SID/STAR point for UGKO. To insert waypoint ALIKA also on ATS route N77 BANUT - IBERI. autumn 2016 . Point exists only on ATS route A277 (below Originator(s): Objective: Project Group: EUROCONTROL FL195) but not on N77 (above FL195). 262. To further improve connectivity between lower and upper ATS routes. RFG SE . Theoretically due to missing connection all SG BLACK ARR/DEP UGKO shall fly below FL195 from/till BANUT. Project Category: ATS Routes Proposal ID : 86.055 Impl. Status: State(s) & Org. Comments:

Project Name: Santorini - LGSR Instrument Procedures Proposed GRC Related proposals: autumn 2016 Description: Originator(s):  81.086 To implement new Instrument Approach Procedures, SIDs, STARs Project Group: GRC 263. from/to Santorini aerodrome (LGSR). RFG SE

Objective: Project Category: To further improve airspace organisation within ATHINAI FIR. Airspace Structure Proposal ID : 87.028b Impl. Status: State(s) & Org. Comments: Project Name: Borealis FRA - Step 2 Proposed ISL . These flights will be able to fly direct tracks autumn 2016 NOR via defined TMA/airport entry/exit points in Description: To implement FRA for flights departing/arriving within Reykjavik FIR via Project Group: Originator(s): Reykjavik FIR and the NAT oceanic control Bodø FIR and Norway FIR. FAB FAB area boundary. Denmark/Sweden Denmark/Sweden . The oceanic boundary waypoint will be in Objective: LAT/LONG degrees and minutes or 5LNC To further improve the airspace structure and the flight planning options FAB NEFAB FAB NEFAB 264. FAB UK/Ireland FAB UK/Ireland (in compliance with current IFPS within Borealis FRA Area States. requirements). RFG NW ISL

Project Category: Related proposals: Free Route  87.028a Airspace  87.028c  87.028d  87.028e

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 140 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 87.028f  87.028g Proposal ID : 86.017 Impl. Status: State(s) & Org. Comments: Description: Proposed MKD . All points are currently published in AIP,

To withdraw the following existing waypoints: KORIV, TUXOV, UPERO autumn 2016 Originator(s): ENR 4.3. and VAROX. . KORIV is reserved in ICARD for MKD. Project Group: EUROCONTROL Objective: RFG SE . TUXOV and UPERO are on common boundary Skopje FIR / Beograd FIR and To further simplify airspace organisation within Skopje FIR and release Project Category: unnecessary waypoints. not published in AIP Serbia / Montenegro. 5LNC In ICARD TUXOV is free for use by other States while UPERO is reserved only for MKD. . VAROX is on common boundary Skopje FIR - Athinai FIR / Hellas UIR and not 265. published in AIP Greece as well as continuation of ATS route L/UL616. Contrary to that in ICARD VAROX is reserved only for GRC. . Existing airspace organization within South East Europe shows that existence of these waypoints is not operationally required. . In case being withdrawn these 5LNCs will be release in ICARD as part of simplification project initiated by ICAO and EUROCONTROL. Proposal ID : 88.013 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed MKD autumn 2016 Description: Originator(s): To adapt existing ATS routes definition and template in AIP, ENR 3 in Project Category: EUROCONTROL 266. accordance with Annex 15. AIP

Objective: To resolve airspace data publication inconsistencies in State AIP. Proposal ID : 88.012 Impl. Status: State(s) & Org. Comments: Description: Proposed NOR . Currently it is stated that “Flight levels shall To publish in accordance with Annex 15 in AIP Norway, ENR 1.7 the autumn 2016 be selected so as to meet the requirements Originator(s): 267. relevant “Table of cruising levels”. established regarding minimum terrain Project Category: EUROCONTROL Objective: AIP clearance and in addition correspond to the To adapt the publication of the FLOS used within the airspace of Norway. table of cruising levels in BSL F 1-1,

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 141 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

vedlegg III (Annex 2, Appendix 3 REF).” . AIP ENR 1.7 shall include the “Table of cruising levels” with exact reference of magnetic tracks applied. The reference Annex 2, Appendix 3 is not sufficient as there are 4 (four) tables possible and magnetic tracks might either be as per tables there 000° - 179° / 180° - 359° or as per Notes *** 090° - 269° / 270° - 089°. Proposal ID : 62.028a / 20.044a Impl. Status: State(s) & Org. Comments: Description: Proposed POL ATS route not accepted by Poland due to To allow "Direct" flight planning option on segment ETRUS - GORPI - autumn 2016 workload of ACC Sector Drezdenko and Originator(s): CHO - GOVEN during Night. Project Group: IATA postponed until introduction of the vertical split 268. in Warszawa FIR. Objective: SG BALTIC

To further improve flight planning options within Warszawa FIR. Project Category: Related proposals: DCTs  62.028b / 20.044b Proposal ID : 65.052a / 18.040a Impl. Status: State(s) & Org. Comments: Description: Proposed POL . Saving for city pair LTAI - EKCH is 9NM To allow the following NIGHT "Direct" flight planning options: autumn 2016 SWE compared to LENOV UN133 LDZ UM70

a. LENOV DCT BABEN or LENOV DCT VIBUL; Project Group: Originator(s): BABEN UL617 KOLOB. b. REGLI DCT BURAN; SG BALTIC IATA . Saving for city pair LYTV - ESSA is 15NM c. XELOL DCT LENOV or ELPOL DCT LENOV. compared to SOPAV UL617 RONEX UL733 Project Category: BURAN. Objective: DCTs 269. To further improve flight planning options within Warszawa FIR and . Depends on implementation of vertical split Sweden UIR. in Warszawa ACC sectors. . As an intermediate step, XELOL-LENOV, ELPOL-LENOV and LENOV-RONEX published as a night DCTs.

Related proposals:  75.048b Proposal ID : 86.045 / 22.047 Impl. Status: State(s) & Org. Comments: Description: Proposed POL As GITOV is boundary point with RUS the To allow "Direct" flight planning options PODAN DCT GITOV and GITOV autumn 2016 RUS change might have an impact on traffic flows in

DCT PODAN. Project Group: Originator(s): that region. 270. Objective: SG BALTIC POL

To further imporve flight planning options within Warszawa FIR. Project Category: DCTs

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 142 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

RAD Proposal ID : 86.047 / 23.003 Impl. Status: State(s) & Org. Comments: Description: Proposed POL All other options exist or will be allowed by 10

To expand the NIGHT "Direct" flight planning option ENOBI DCT SUI to autumn 2016 Originator(s): DEC 2015. H24. Project Group: BLR 271. Objective: SG BALTIC

To further improve flight planning option within Warszawa FIR. Project Category: DCTs RAD Proposal ID : 80.003 Impl. Status: State(s) & Org. Comments: Project Name: Removal U prefix Lisbon FIR Proposed PRT . "U" prefix removal for all routes below FRAL autumn 2016 is under consideration. Description: Originator(s): To remove the distinction between Upper and Lower ATS routes - "U" Project Category: PRT . Further adaptation of lower and upper ATS 272. prefix within Lisbon FIR. ATS Routes routes might be required.

Objective: To simplify Air Traffic Management in Lisbon FIR. Proposal ID : 82.005 Impl. Status: State(s) & Org. Comments: Description: Proposed PRT Requirement is due to duplicate use in different To re-designate the following ATS routes: autumn 2016 parts of the ICAO EUR/NAT region of route Originator(s): 1. Y101 ODEMI - USALU as new Y; Project Category: EUROCONTROL designators. 2. Y102 XAPAS - USALU as new Y; Route 3. Y103 VFA - GIMAL as new Y; Redesignation 4. Y105 ERTIS - GENRO as new Y; 5. Y207 FTM - LIS - EKMAR as new Y; 6. UZ4 BAROK - ESP as new Z; 7. UZ5 PIREN - ESP as new Z; 8. Z11 DEGUN - VERAM as new Z; 273. 9. Z14 NARTA - LIDRO as new Z; 10. Z15 BABEX - OTPAK as new Z; 11. UZ21 BUSEN - GUNTI as new Z; 12. UZ28 DIRMA - BANAL as new Z; 13. UZ29 DIRMA - ARMED as new Z; 14. UZ220 ABALO - NIDUL as new Z; 15. Z226 INBOM - PRT as new Z; 16. UH80 ASPOR - PRT as T7 or T326 or T328; 17. W/UW106 RALUS - MOSEN as Z/UZ406.

Objective:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 143 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To further simplify the existing RDs within Portugal and avoid duplication in ICAO EUR/NAT Region. Proposal ID : 64.044 / 17.014 Impl. Status: State(s) & Org. Comments: Description: Proposed ROU The implementation of the new Terminal Area, To enlarge AoR of the existing Cluj APP. autumn 2016 NAPOC TMA for LRCL, LRTM and LRSB Originator(s): Objective: Project Group: ROU includes: To further improve the airspace organisation within Bucuresti FIR. RFG SE . vertical limits 3000 ft up to FL175; SG BLACK . class C airspace; . the three CTRs defined as rectangles, GND Project Category: up to 3000 ft ALT, class of airspace C; 274. Airspace Structure . common transition altitude (including for TMA MCTR LRCT) 7000 ft; . 121 standard and P-RNAV SIDs and STARs for LRCL, LRTM and LRSB; . realigned military areas; . 44 DCTs to allow overflights.

Proposal ID : 53.006 Impl. Status: State(s) & Org. Comments: Project Name: RAXAD and MAKED dualisation Proposed SRB . Point TUTUN 421743N 0220104E will be autumn 2016 MKD new TCP between Skopje ACC and Description: To dualise the existing points RAXAD and MAKED as follows: Project Group: Originator(s): Beograd ACC, 10NM west of RAXAD. a. VAGEN - TUTUN - SKJ bidirectional; RFG SE EUROCONTROL . Further dualisation north of VAGEN could b. TUTUN - PEP southbound; MKD also be considered. Project Category: 275. c. TUTUN - TALAS southbound; ATS Routes Related proposals: d. TUTUN - ERANA southbound (TUTUN - ERANA is parallel with the  64.005 existing UL617 and will be used for ARR LGTS/LGKV).

Objective: To further improve the ATS route network between Beograd FIR/UIR and Skopje FIR while reducing workload and increasing safety and efficiency. Proposal ID : 88.024 / 23.041 Impl. Status: State(s) & Org. Comments: Description: Proposed TUR

To implement bi-directional / westbound ATS route T/UT422 CAY - autumn 2016 Originator(s): ROKVA - ODMAX. Project Group: TUR 276. Objective: RFG SE To further improve ATS route options for ARR/DEP LTAS (Zonguldak) SG BLACK

airport. Project Category: ATS Routes

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 144 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 83.037 / 21.009 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed UKR Currently upper limit of lower ATS routes is set autumn 2016 as FL270 while lower limit of upper ATS routes Description: Originator(s): To adapt the lower/upper vertical limits, expressed in FL, of ATS routes Project Group: EUROCONTROL is set as FL280. 277. within Kyiv UIR - change of IFR FL to VFR FL. SG BLACK

Objective: Project Category: To adapt in State AIP ATS routes vertical limits. AIP ATS Routes Proposal ID : 83.002 Impl. Status: State(s) & Org. Comments: Project Name: CDO Munich - EDDM airport Planned DEU . Trial 13.10.2013 till 31.12.2014 was 02 FEB 2017 ITA extended till 31.12.2015: Description: To implement new CDO approaches (STARs) at Munich/ EDDM airport. Project Category: Originator(s): o ATC München, Sectors NDG/WLD, EGG/RDG und APP North, Objective: ATS Routes DEU Vertical FE from 16.10.2014 STA und APPS, from To further improve the ATS route network and flight efficiency within 13.11.2014 LOVV. Munich FIR. o CDO STA coming from Padua (16. Oct. 2014). 278. o CDO NAPSA coming from Vienna (13. Nov. 2014). . March '16: preparations ongoing for CDO from South via Padua ACC (via point ANDEC). . End of April '16: Bilateral meeting Munich ACC – Padua. . CDOs from Austria via NAPSA currently on hold. Proposal ID : 85.009a / 21.023a Impl. Status: State(s) & Org. Comments:

Project Name: Free Route Airspace Georgia - FRAG Phase 1 Planned GEO Related proposals: 02 FEB 2017 Description: Originator(s):  85.009b / 21.023b To implement H24 Free Route Airspace FL255 - FL660 in Tbilisi CTA. Project Group: GEO 279. SG BLACK Objective: To further improve airspace organisation within Tbilisi FIR. Project Category: Free Route Airspace Proposal ID : 88.023 Impl. Status: State(s) & Org. Comments: Project Name: ATS Route Improvement Planned GBR 280. 02 MAR 2017 Description: Originator(s):

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 145 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To re-align existing ATS route P137 as SIVDA - REDFA and removal of U Project Category: GBR from RD UP137. ATS Routes

Objective: To reduce track mileage by 2.2NM and reflects what is tactically provided on a routeine basis by controllers. Proposal ID : 86.050 / 23.006 Impl. Status: State(s) & Org. Comments: Description: Proposed AZE . Aside of airspace design solution - SID To allow DEP UGTB via DISKA. winter 2016/17 GEO DISKA allowance of DCT as per Doc 4444

Objective: Project Group: Originator(s): is also possible via RAD Appendix 5. To further improve ATS route or flight planning options for traffic UGTB - SG BLACK EUROCONTROL . Saving for city pair UGTB - UBBB is around 281. UBBB. 60NM. Project Category: . Further discussions on allowance of ADEKI ATS Routes for city pair UGTB - UBBB shall be DCTs considered by both States. RAD Proposal ID : 77.065 Impl. Status: State(s) & Org. Comments: Project Name: EVIVI dualisation Proposed BGR . Request by Greece for a new exit point winter 2016/17 GRC towards Bulgaria. Description: To re-organize the existing ATS routes in the EVIVI area. Project Group: Originator(s): . Bi-lateral meeting required to consolidate a 282. common proposal. RFG SE GRC Objective: To further improve ATS route network between Sofia FIR and Athens Project Category: Related proposals: FIR/Hellas UIR. ATS Routes  75.010 Proposal ID : 75.010 / DU0089 Impl. Status: State(s) & Org. Comments:

Description: Proposed BGR Related proposals: a. To implement southbound ATS route M/UM748 GOL - LMO. winter 2016/17 GRC  77.065 b. To adapt Sofia ACC sectors C / D boundary. Project Group: Originator(s): Objective: FAB DANUBE BGR 283. To further improve airspace organisation between Sofia FIR and Hellas RFG SE GRC

UIR. Project Category: ATC Sectors ATS Routes Proposal ID : 84.024 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed BIH . Part of proposed actions in AIP adaptation.

Description: winter 2016/17 Originator(s): 284. To publish RNAV routes in ENR 3.3 in accordance with Annex 15. Project Category: EUROCONTROL

Objective: AIP

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 146 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To resolve airspace data publication inconsistencies in State AIP. Proposal ID : 86.025 Impl. Status: State(s) & Org. Comments: Description: Proposed BIH . Availability required outside of SEAFRA To allow “Daily” flight planning option VEBAL DCT OSLUD DCT AKIKA winter 2016/17 HRV operational hours 05:00 - 23:00 (04:00 -

for ARR BKPR / LYPR. Project Group: MNE 22:00). SRB . Routing is 28NM shorter than currently 285. Objective: RFG SE used routing via KOMAR. To further improve flight planning options within Zagreb FIR, Sarajevo Project Category: Originator(s): FIR and Beograd FIR. DCTs IATA RAD EUROCONTROL Proposal ID : 84.052 Impl. Status: State(s) & Org. Comments: Description: Proposed CHE . GOGOL is reserved in ICARD for Armenia. To replace existing 5LNC GOGOL with KOVIM. winter 2016/17 . Proposal for replacement is based on Originator(s): Objective: Project Category: EUROCONTROL “Common criteria for replacement of 286. 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO duplicated 5LNCs” as point GOGOL is not EUR/NAT region; reserved for Switzerland. 2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11. Proposal ID : 87.034 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed CYP Currently lower limit is set as either FL100 or winter 2016/17 FL110 or FL250 or FL260. Description: Originator(s): To adapt the lower vertical limits, expressed in FL, of ATS routes within Project Group: EUROCONTROL 287. Nicosia FIR - change of IFR FL to VFR FL. RFG SE

Objective: Project Category: To adapt in State AIP ATS routes vertical limits. AIP ATS Routes Proposal ID : 86.030 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed CZE . Currently following a removal of “U” prefix winter 2016/17 some ATS routes (M725, M748, P27, etc.) Description: Originator(s): To adapt in AIP Czech Republic ENR 3.3, ATS route vertical limits Project Category: EUROCONTROL are used as bi-directional below established (FL235 or FL245) for direction distinction. AIP FL. . AIP Czech Republic states that different 288. ATS Routes Objective: direction is applicable “FL240 below”. To align AIP publication in accordance with ERNIP Part 1. . Normally this FL expression shall be with VFR FL - FL235 or FL245.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 147 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 80.010f Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed DNK All RDs are not coordinated via ICARD. winter 2016/17 NLD Description: To re-designate the following existing Helicopter routes: KZ10, KZ15. Project Group: Originator(s): RFG NW EUROCONTROL 289. Objective: To adapt existing RDs in accordance with ICAO requirements. Project Category: AIP Route Redesignation Proposal ID : 50.053b Impl. Status: State(s) & Org. Comments: Project Name: Lisbon / Casablanca / Canarias Axis Proposed ESP . ONDA Morocco and NAV Portugal ready.

Description: winter 2016/17 PRT . Tri-lateral meeting required. MAR To review the airspace organisation on the Lisbon / Casablanca / Project Group: Related proposals: Canarias axis: RFG SW Originator(s):  60.034b

a. to optimise the ATS route network in line with the new Canarias Project Category: ESP  73.052 TMA organisation; Airspace Structure PRT  75.022 b. PRNAV structure for Canarias TMA, Phase 2 (includes Casablanca TMA MAR  79.021 290. / Canarias interface); c. to create an ATS route segment from Fuerteventura (GCFV) and Lanzarote (GCRR) to NAVIX and vice versa; d. to create new STAR ORTIS and SID BIMBO for GCFV and GCRR airports.

Objective: To further improve the ATS route network and airspace organisation within Canarias FIR/UIR. Proposal ID : 77.029 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP The new SID would be 7 NM shorter than the To implement new SID MEROS and/or CHELY from LEPA winter 2016/17 current one and it could be used by a significant Originator(s): Objective: Project Category: EUROCONTROL amount of flights and City Pairs (138 flights, 58 291. City Pairs, on 29 June 2012) To provide AOs with additional and more efficient options for traffic TMA IACA departing from LEPA and proceeding north-eastbound Related proposals:  76.003 Proposal ID : 75.023 Impl. Status: State(s) & Org. Comments: Project Name: LUMAS, Phase 2 Proposed ESP This proposal will be considered for integration winter 2016/17 as a part of the development. 292. Description: Originator(s): To implement northbound ATS route P/UP9 MEROS - DIBER. Project Category: ESP Related proposals:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 148 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: ATS Routes  66.053b To further improve ATS route network in DIBER / LUMAS area of  66.053d Barcelona FIR.  66.053e Proposal ID : 66.053e Impl. Status: State(s) & Org. Comments: Project Name: LUMAS, Phase 2b Proposed ESP Introduction of the new structure shall be without winter 2016/17 FRA impact of the LF-D54 South that remains AMC Description: To re-organise the ATS route network at the interface between Spain and Project Group: Originator(s): non-manageable. France, around LF-D54 military zone and to reconsider the traffic RFG SW ESP Proposal is under study following the LECB- distribution of overflying currently points DIBER or LUMAS. FRA LFMM Interface Meeting No.2 held 15-16 OCT Project Category: 2014. 1. To implement a 3 point interface network structure for flights from 293. Airspace Structure Barcelona to Marseille ACC instead of current 2 points interface ATC Sectors Related proposals: (DIBER / LUMAS).  66.053d ATS Routes Objective:  75.023 To further improve the ATS route network and airspace structure and to enhance sector capacity at the interface between Marseille ACC and Barcelona ACC. Proposal ID : 86.031 / 23.027 Impl. Status: State(s) & Org. Comments: Description: Proposed EST . Both areas are located across Tallinn FIR / To publish in AIP Estonia and AIP Latvia ENR 5.2 TSA2 and TSA8 as winter 2016/17 LVA Riga FIR boundary but are published as CBAs and harmonize their way of activation. TSAs. Project Group: Originator(s): Objective: SG BALTIC EUROCONTROL . In AIP Estonia ENR 5.2 all TSAs are coded To align AIP publication in accordance with ERNIP Part 3. in accordance with ERNIP, Part 3 as Project Category: EETSA except TSA2 and TSA8 where AIP nationality letters for location indicator “EE” Airspace Structure are missing. The same is published in ENR TRA (apparently this shall be ENR 6.1). . In AIP Latvia ENR 5.2 none of the TSAs are coded in accordance with ERNIP, Part 3 as 294. nationality letters for location indicator “EV” are missing and there are undesired spaces. Both TSA 2 and TSA 8 are published but only for TSA 8 is stated in Column “Remark” “CBA in the Tallinn and Riga FIR”. In ENR 6.1 again “EV” is missing and only TSA 8 is indicated as TSA 8 (CBA). . Additional discrepancy spotted for TSA2 and TSA8 is the way of activation where in AIP Estonia is stated “NOTAM on the day

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 149 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

before OPS” while in AIP Latvia - “AMC manageable” and “Real-time activity information from Riga ATC Centre”. Proposal ID : 80.002 Impl. Status: State(s) & Org. Comments: Description: Proposed FRA . Outcome of West Europe RAD Review 30th

To extend the time availability during summer period of existing night winter 2016/17 Originator(s): - 31st May 2013. ATS route UQ236 PIBAT - MEDIL. . This ATS route currently is available only 295. Project Category: IATA Objective: Night Routes during nights 22.00 - 05.00 (23.00 - 04.00). To further improve the availability of night options within France. . Time availability in winter period is 7 hours while in summer only 5 hours. Proposal ID : 80.065 Impl. Status: State(s) & Org. Comments: Project Name: Realign P18 Proposed GBR Allows for correct positioning via winter 2016/17 RAD restrictions for all MTMA departures. Description: Originator(s): To realign P18 from STAFA - TELBA to STAFA - VIDOK. Project Category: GBR Dependent on HON SID truncation.

Objective: ATS Routes To reduce flight plannable mileage for EGGP NANTI departures and 296. Manchester LISTO 1Y/1R departures by 2.5NM per flight (will increase flight plannable mileage for some Manchester HON 1Y/1R by 2.5NM). Actual mileage in both cases will remain unchanged from today. Will facilitate correct positioning for transferring to next sector under aircraft's own navigation rather than being transferred on assigned headings. Proposal ID : 80.001 Impl. Status: State(s) & Org. Comments: Description: Proposed GBR . Two of these 5LNCs are crossings of upper To consider possible 5LNC removal from one of the ATS routes of the winter 2016/17 unidirectional ATS routes and do not have Originator(s): crossing waypoints published on both ATS routes: Project Category: EUROCONTROL connections with lower airspace unless a. OKAMA - L/UL602 / UM604; 5LNC allowed via DCT filling. The other two are b. TOLSA - L/UL602 / UN866; ATS Routes also part of lower ATS routes. c. KUBAX - UY70 / UN866; . Most of the possible undesired, even illogic, d. BEKMO - UY70 / UM604. turns are not acceptable by the ACCs and

297. Objective: unavailable by RAD restrictions. To simplify the ATS route network within London FIR/UIR and Scottish . Waypoints might continue to stay as FIR/UIR. crossings but published on only one of the ATS routes which will not allow undesired turns and RAD restrictions will be withdrawn. . Possible 5LNC removal from one of the ATS routes should also be considered in

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 150 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

view of ATC procedures and usage in case of vectoring and resuming navigation to the relevant ATS route or waypoint. . Currently all crossing points part of UK ATS route network are under consideration by NATS. Proposal ID : 85.114 Impl. Status: State(s) & Org. Comments: Project Name: Airspace Efficiency Proposed GBR Will be available only for traffic at FL360 and winter 2016/17 FRA above overflying the UK FIR and not for Paris Description: To implement westbound ATS route SOVAT - CPT. Project Category: Originator(s): TMA departures or for traffic cruising FL350 and 298. below nor landing in the UK FIR. Objective: ATS Routes GBR To further reduce track mileage. Related proposals:  85.115 Proposal ID : 87.010 Impl. Status: State(s) & Org. Comments: Project Name: Newcastle STAR & RNAV Approach Project Proposed GBR Newcastle STAR & RNAV Approach Project winter 2016/17 Description: Originator(s): 1. To establish STARs for arrivals into Newcastle (EGNT) airport via Project Category: GBR POL. ATS Routes 299. 2. To establish northbound ATS route P19 POL - XXXXX to provide connectivity to start of STAR from XXXXX to ZZZZZ via YYYYY.

Objective: Establish STARs to EGNT to help reduce controller and pilot workload Proposal ID : 67.005b Impl. Status: State(s) & Org. Comments: Description: Proposed GBR . FL300 and above only.

To implement, as CDR 1, bidirectional ATS route segment KARNO - winter 2016/17 Originator(s): . Provide connectivity to/from UL180 and POL (Phase 2). UP16. Project Group: GBR Objective: RFG SW . Review greater use below FL300 post 300. To further improve the ATS route network within London FIR/UIR. implementation. Project Category: . BERUL - MERLY original proposal by IACA. ATS Routes Related proposals:  67.005a Proposal ID : 81.044 Impl. Status: State(s) & Org. Comments: Description: Proposed ISL . OTRON is used by and is allocated in

To replace 5LNC OTRON. winter 2016/17 Originator(s): ICARD to Russian Federation. 301. Objective: Project Category: EUROCONTROL . ICAO DM sent relevant message to ISL To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT 5LNC ICAO (DM28/01 MSG 14-050).

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 151 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

region, to improve the aeronautical information provided and be . ISL states that point is used for RWY20 compliant with ICAO Annex 11. procedures at BIKF airport but agrees to release first semester 2015. Proposal ID : 87.028c Impl. Status: State(s) & Org. Comments: Project Name: Borealis FRA - Step 3 Proposed ISL . These flights will be able to fly direct tracks winter 2016/17 GBR via defined TMA/airport entry/exit points in Description: To implement FRA for flights departing/arriving within Reykjavik FIR via Project Group: Originator(s): Reykjavik FIR and the NAT oceanic control Scottish FIR (EGPX). FAB FAB area boundary. Denmark/Sweden Denmark/Sweden . The oceanic boundary waypoint will be in Objective: LAT/LONG degrees and minutes as To further improve the airspace structure and the flight planning options FAB NEFAB FAB NEFAB FAB UK/Ireland FAB UK/Ireland coordinates OR 5LNC (in compliance with within Borealis FRA Area States. current IFPS requirements). 302. RFG NW ISL

Project Category: Related proposals: Free Route  87.028a Airspace  87.028b  87.028d  87.028e  87.028f  87.028g Proposal ID : 52.025a / BM0129 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . Option usable by traffic to/from the new To implement the following bidirectional ATS route segments: winter 2016/17 Enfhida airport in Tunisia. Originator(s): a. CRAYE - TUPAL; OR Project Group: ITA . To add the following comment: “Planned to b. PAL - CRAYE. be reassessed during works about 303. FAB BLUE MED Objective: RFG SE reorganisation of military areas for strike To further improve the ATS route network between Brindisi UIR and fighter F35 needs (Ionian sea and Sicily Project Category: areas). Roma UIR. ATS Routes Proposal ID : 65.080 / BM0080 Impl. Status: State(s) & Org. Comments: Project Name: DIRED - PNZ Proposed ITA To add the following comment: “Planned to be winter 2016/17 reassessed during works about reorganisation Description: Originator(s): To implement northbound RNAV route DIRED - PNZ. Project Group: ITA of military areas for strike fighter F35 needs 50 MPCPEs (Ionian sea and Sicily areas). 304. Objective: FAB BLUE MED To further improve the ATS route network within Roma ACC while offering a shorter route option for traffic LICC - LIRF (50MPCPE). Project Category: ATS Routes PBN Proposal ID : 65.081 / BM0165 Impl. Status: State(s) & Org. Comments: European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 152 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed ITA To add the following comment: “Planned to be To implement, as CDR, RNAV route DELER - NEKPI northbound only. winter 2016/17 reassessed during works about reorganisation Originator(s): Objective: Project Group: ITA of military areas for strike fighter F35 needs 305. To further improve the ATS route network in Roma UIR while offering a 50 MPCPEs (Ionian sea and Sicily areas). shorter route option for traffic LICC - LIRF. FAB BLUE MED

Project Category: ATS Routes Proposal ID : 66.021 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA To add the following comment: “Planned to be To extend the availability of CDR3 UY170 LEGLO - ABREG within winter 2016/17 reassessed during works about reorganisation Originator(s): Milano UIR as CDR1/2 following the utilisation of UY170 ABREG - Project Category: EUROCONTROL of military areas for strike fighter F35 needs ARGAX - ROMIR within Swiss UIR. (Ionian sea and Sicily areas). 306. CDRs Objective: Related proposals: To further harmonise the utilisation of the existing CDRs within ECAC  61.025b airspace.  79.026 Proposal ID : 52.025b / BM0078 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA Planned to be reassessed during works about To implement the following bidirectional ATS route segments: winter 2016/17 reorganisation of military areas for strike fighter Originator(s): a. BRD - CDC; OR Project Group: IATA F35 needs (Ionian sea and Sicily areas b. CDC - CRAYE combined) . FAB BLUE MED Objective: RFG SE 307. a. To further improve the ATS route network within Brindisi UIR. Project Category: b. To allow new flight planning options for operators flying between ATS Routes airports in the north Africa (DTMB, DTNH, DTTA), Malta (LMML) and south Italy (LICB, LICC, LICJ) on one side and Scandinavian States and Russian Federation on the other.

Proposal ID : 69.100 / BM0006 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA Planned to be reassessed during works about To implement bidirectional ATS route segment TRP - TUC. winter 2016/17 TUN reorganisation of military areas for strike fighter

Objective: Project Group: Originator(s): F35 needs (Ionian sea and Sicily areas). 308. To offer a shorter route option at the interface ITALY_TUNISIA. FAB BLUE MED FAB BLUE MED

Project Category: ATS Routes Proposal ID : 69.109 / BM0022 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 153 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed ITA To implement bidirectional ATS route segment UT313 NEMBO - VALMA winter 2016/17 MLT

- DORAS - FIR BDRY - INDOT, available during Night. Project Group: Originator(s): 309. Objective: FAB BLUE MED FAB BLUE MED

To improve the route network between ELB and Sicily (Italy). Project Category: ATS Routes Proposal ID : 69.128a / BM0041 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA Continuation PES - NIT requires further study To implement bidirectional ATS route segment PININ - PNZ - PES. winter 2016/17 for full benefits. Originator(s): Objective: Project Group: FAB BLUE MED Related proposals: 310. To offer a direct route to traffic between Tunisia/Italy and East Europe. FAB BLUE MED  69.128b

Project Category: ATS Routes Proposal ID : 78.002 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . Currently in accordance with RAD To implement new shorter option for ARR LIPR via RIFEN. winter 2016/17 restriction LI2253 UT128 ROSKA - BELOV Originator(s): Objective: Project Category: EUROCONTROL is not available for traffic ARR LIPR. The To further improve ATS route network within Milano FIR. ATS Routes aim is “To segregate arriving traffic. This traffic shall file ROSKA UM859”. This restriction is valid 05.00 - 21.00 (Summer) 06.00 - 21.00 (Winter). All ARR LIPR are forced to fly on very sharp dog-leg via ROSKA - CHI - BELOV additionally pushed 311. 18NM. . If UT128 will be allowed for ARR LIPR there is a need for lower route as today limit is FL265 AGOMO - BELOV but contrary to that there is DCT ROSKA - RIM (FL095 - FL460) due to “There is no alternative route for flight planning for traffic type MIL”. There is a different treatment between civil and military flights in that case. Proposal ID : 81.009 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . Solution possible after the re-organisation

To implement new ATS route or allow “Direct” flight planning option or winter 2016/17 Originator(s): of Roma TMA, Milano ACC, Roma ACC, 312. improve the RAD for flights to Pisa (LIRP) airport from ADOSA. Padova ACC and Brindisi ACC. Project Category: IATA Objective: ATS Routes . Currently the shortest possible option for

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 154 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To further improve ATS route options for ARR LIRP. DCTs ARR LIRP from North is via VIC - FER - RAD BOA - LUPOS. . Proposed solutions for B737-700 in zero wind conditions might save per flight up to 25NM, 116 kg fuel and 3 min flying time.

Related proposals:  79.034c Proposal ID : 84.043 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . URENA is with double reservation in ICARD To replace existing 5LNC URENA. winter 2016/17 for Russian Federation and Italy. Originator(s): Objective: Project Category: EUROCONTROL . Proposal for replacement by Italy is based 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO on “Common criteria for replacement of 313. EUR/NAT region; duplicated 5LNCs” as point is used on 2. To improve the aeronautical information provided; single ATS route. 3. To be compliant with ICAO Annex 11. . Change is planned to be done within the work for LIBD (Bari) SIDs/STARs revision.

Proposal ID : 85.002 Impl. Status: State(s) & Org. Comments: Description: Proposed MAR . Re-designation requested on behalf of the

To re-designate the existing ATS route Q101 BML - OZT as Q401. winter 2016/17 Originator(s): UK in view of their Helicopter Route Project . It is proposed as much as possible RD 314. Objective: Project Category: GBR To rationalise the existing ATS route designators in order to further Route EUROCONTROL number to be coherent with flight tracks. facilitate flight planning. Redesignation . Morocco was already informed and coordination is in progress. Proposal ID : 78.029 Impl. Status: State(s) & Org. Comments:

Project Name: HOPE - Harmonisation of Oslo Procedures and Proposed NOR Related proposals: Environment - Phase 2 winter 2016/17 Originator(s):  73.004 Description: Project Category: NOR 1. Adjustments of HOPE 1 procedures. PBN 2. RNP approaches based on Visual RNAV Approach tests TMA 315. 3. New adjusted noise abatement procedures at Oslo/ ENGM airport adapted to visual RNAV approach tests and revised SIDs.

Objective: To further improve airspace organisation in Norway FIR for flights to/from Oslo (ENGM) airport. (Revised Point Merge System Oslo TMA - post ASAP development). Proposal ID : 86.029 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 155 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed NOR . Currently in accordance with AIP Norway To adapt coding of ENGM RNAV SIDs via VEMIN and VIBUK. winter 2016/17 only three SIDs VEMIN4A, VEMIN9D and Originator(s): Objective: Project Category: EUROCONTROL VIBUK5C exist for RWY01L/19R To align AIP publication in accordance with ICAO Annex 11 and Doc AIP connecting 6 other waypoints. These 8168. connections after VEMIN and VIBUK are named - “transitions” where the same named “transitions” have different environmental performances. . These 6 waypoints are specified significant 316. points on designated ATS routes, at which the en-route phase of a flight commences. The en-route phase cannot start at VEMIN or VIBUK as there is no connection with ATS routes. . Normally these NUVSA, EVTOG, ATLAP, TOR, MASEV and OKSAT “transitions” shall be codded as separate SIDs using these en-route name-codes.

Proposal ID : 65.010b / 23.028 Impl. Status: State(s) & Org. Comments: Description: Proposed POL Pending on introduction of the vertical split. 1. To implement westbound ATS route SUW - OSKUD. winter 2016/17 Originator(s): Related proposals: 2. To change from eastbound to bidirectional the existing UY225 ATS Project Group: DEU  65.010a 317. route segment BODLA - OSKUD. SG BALTIC EUROCONTROL  68.078

Objective: Project Category: To further improve the ATS route network within Warszawa FIR. ATS Routes Proposal ID : 76.052 / 23.029 Impl. Status: State(s) & Org. Comments: Project Name: FRA Like (DCT) Warsaw FIR, Phase 3 Proposed POL . Stepped implementation: winter 2016/17 o Night DCTs Description: Originator(s): H24 DCTs (FRA like) expanding the availability of existing DCT options Project Group: POL o Weekend DCTs and allowing additional "Direct" flight planning options in the Upper SG BALTIC o H24 DCTs in upper airspace (FRA like) . RTS in April 2013. airspace of Warsaw FIR, FL355 and above. Project Category: . Part of Polish Airspace Project 2010+ 318. Objective: DCTs (Phase 4). To further improve the airspace organisation and flight efficiency within Free Route Warszawa FIR. Airspace Related proposals:  62.091b  62.091c  75.040b / 15.042b  76.053 / 18.039

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 156 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 78.028a  86.041 / 22.046  88.015 / 23.023 Proposal ID : 84.026 / 23.030 Impl. Status: State(s) & Org. Comments: Description: Proposed POL . In accordance with EP2068 ATS route To allow flight planning during Night on LENOV N133 POLON N983 winter 2016/17 SWE N983 POLON - ELPOL is not available for ELPOL AMROR ROE , by excluding it from restriction EP2068. traffic when L621 is open with operational Project Group: Originator(s): Objective: SG BALTIC IATA goal to reduce traffic complexity in sector C. 319. . Proposal is penetrating the same ACC To allow additional shorter flight plannable options within Warszawa FIR. Project Category: sectors as allowed routing but is saving RAD 15NM. . After the implementation of Warszawa ACC vertical sector split . Proposal ID : 70.019z / 23.031 Impl. Status: State(s) & Org. Comments: Description: Proposed POL Consider FRA H24 implementation Warsaw FIR. To allow H24 "Direct" flight planning option SUPAK DCT POLON. winter 2016/17 Originator(s): Related proposals: Objective: Project Group: FAB CE  70.019x 320. To further improve the flight planning options within Warszawa FIR while SG BALTIC

providing additional shorter route options. Project Category: DCTs RAD Proposal ID : 84.027 / 23.033 Impl. Status: State(s) & Org. Comments: Description: Proposed POL . Shorter option for flights from ESSA to/from To allow “Direct” flight planning option DIMEX DCT PENOR. winter 2016/17 SWE Austria and beyond.

Objective: Project Group: Originator(s): . After implementation of Warszawa ACC 321. To allow additional shorter flight plannable option within Warszawa FIR. SG BALTIC IATA vertical sector split.

Project Category: DCTs RAD Proposal ID : 84.058 Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Santa Maria FIR Proposed PRT . FRAL - Free Route Airspace Lisboa FIR

Description: winter 2016/17 Originator(s): above FL245 implemented 7 May 2009. . Free Route Airspace SAN & ASI 322. To extend the Lisbon Free Route Airspace concept/ FRAL to Santa Project Category: PRT Maria FIR. Free Route sectors/FRASAI, Phase 2 implemented 1 Airspace May 2014. Objective: Related proposals:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 157 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To further improve the airspace utilisation between Santa Maria FIR and  64.030 Lisbon FIR.  68.002 Proposal ID : 80.058 Impl. Status: State(s) & Org. Comments: Project Name: RNAV 1 procedures Ljubljana TMA Proposed SVN winter 2016/17 Description: Originator(s): To design and publish RNAV 1 STARs for Ljubljana airport. Project Group: SVN 323. RFG SE Objective: To further improve the airspace organisation within TMA Ljubljana. Project Category: PBN TMA Proposal ID : 84.031 Impl. Status: State(s) & Org. Comments: Description: Proposed SWE . SULAX is reserved in ICARD for Sweden. To replace existing 5LNC SULAX. winter 2016/17 FRA . Proposal for replacement is based on

Objective: Project Category: Originator(s): “Common criteria for replacement of To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT 5LNC EUROCONTROL duplicated 5LNCs” as point is not reserved for France 324. region, to improve the aeronautical information provided and be ICAO compliant with ICAO Annex 11. . ICARD DM EUR/NAT reconfirmed by e-mail to France on 27 May 2016 that they shall substitute SULAX unless they can find an arragement with Sweden (SULAX was released by France in February 2012) Proposal ID : 80.021b / 23.032 Impl. Status: State(s) & Org. Comments: Description: Proposed TUR To introduce P-RNAV SIDs/STARs for Ankara/Esenboga (LTAC) airport. winter 2016/17 Originator(s): Objective: Project Group: TUR RFG SE 325. To further improve the airspace organisation within Istanbul FIR and SG BLACK

Ankara FIR. Project Category: PBN TMA Proposal ID : 80.023e / 23.034 Impl. Status: State(s) & Org. Comments:

Description: Proposed TUR Related proposals: To introduce RNP APCH, SIDs/STARs for Igdir (LTCT) airport. winter 2016/17 Originator(s):  80.023a 326. Objective: Project Group: TUR  80.023b To further improve the airspace organisation within Istanbul FIR and RFG SE  80.023c Ankara FIR. SG BLACK  80.023d

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 158 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Category: PBN TMA Proposal ID : 84.074 Impl. Status: State(s) & Org. Comments: Description: Planned DEU . ANIBI is reserved in ICARD for Morocco

To replace existing 5LNC ANIBI. 27 APR 2017 Originator(s): and used as VFR point. . Proposal for replacement is based on 327. Objective: Project Category: EUROCONTROL To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT 5LNC ICAO “Common criteria for replacement of region, to improve the aeronautical information provided and be duplicated 5LNCs” as point is not reserved compliant with ICAO Annex 11. for Germany. Proposal ID : 87.005c Impl. Status: State(s) & Org. Comments:

Project Name: FRA Germany - Phase 3 Planned DEU Related proposals: 27 APR 2017 Description: Originator(s):  87.005a To continue preparation of Full Free Route Airspace Germany by: Project Group: DEU  87.005b 1. use of RAD Appendix 7 for ED-R401 (VPA); FAB EC FAB EC  87.005d

2. introducing next set of compulsory transition/connecting points for Project Category:  87.005e ARR/DEP to/from most German airports (to cover North East H24 328. DCTs and South West at Night); Free Route 3. introducing if required set of compulsory transition routes linked to Airspace each transition point/connecting point (above); RAD 4. updating RAD Appendix 4 DCT (if required) supporting MIL on.

Objective: To support implementation of Full Free Route and simplify the RAD. Proposal ID : 68.012c Impl. Status: State(s) & Org. Comments:

Project Name: Lower airspace re-organisation Beograd FIR - Step 3 Planned MNE Related proposals: 25 MAY 2017 SRB Description:  68.012a 1. To introduce flight director position in Beograd TMA. Project Group: Originator(s):  68.012d 329. 2. To reduce RDR separation minima to 3NM at least for flight director. RFG SE MNE

Objective: Project Category: SRB To further improve the airspace structure and ATS route network within Airspace Structure Beograd FIR. Proposal ID : 71.086a Impl. Status: State(s) & Org. Comments: Project Name: FRALB - Free Route Airspace Albania - Phase 1 Proposed ALB . Night period - 21:00 - 05:00 (20:00 - 04:00). spring 2017 . ATS route network will be suspended during 330. Description: Originator(s): To implement NIGHT Free Route Airspace within Tirana CTA / UTA, Project Group: ALB FRA hours. . Phase 1 is planned to continue till 7 DEC

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 159 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

FL195 and above. RFG SE FAB BLUE MED 2017 and will be extended to H24.

Objective: Project Category: Related proposals: To align the airspace structure with real operations and to Free Route  71.085a make operational DCT's flight planable. Airspace  71.086b  71.087  71.089b Proposal ID : 69.052 / 16.008 / DU0073 Impl. Status: State(s) & Org. Comments:

Project Name: SEEN FRA Proposed BGR Related proposals: spring 2017 ROU Description:  82.030 / 20.032 HUN To implement cross-border NIGHT Free Route Airspace within the Project Group:  82.031 / 20.033 DANUBE FAB area. and HUFRA area. FAB DANUBE Originator(s):  82.032 / 20.034

331. Objective: RFG SE FAB DANUBE  82.033 / 20.035 SG BLACK To further improve the Free Route Airspace operations within and between Budapest FIR, Bucuresti FIR and Sofia FIR. Project Category: Free Route Airspace Proposal ID : 87.051 Impl. Status: State(s) & Org. Comments:

Project Name: Long Range Direct Routings Proposed CHE Related proposals: spring 2017 AUT Description:  87.050 1. To implement a set of published DCT segments during night that are Project Category: DEU specifically designed to facilitate and shortcut significant traffic flows DCTs FRA on a large scale (across ANSP boundaries). Night Routes ITA 332. FAB EC 2. To facilitate level changes, very long segments will be divided into several legs. Originator(s):

Objective: CHE To further improve flight efficiency during night and gain first experience FAB EC with DCT segments across ANSP boundaries. Proposal ID : 87.052 Impl. Status: State(s) & Org. Comments: Project Name: Direct Route Airspace Implementation - Geneva AoR Proposed CHE Redundant ATS routes will be removed.

Description: spring 2017 FRA Related proposals: FAB EC To implement a comprehensive network of DCT segments in AoR Project Category:  87.053 333. Geneva, FL315+, available H24 subject to airspace availability. DCTs Originator(s):  87.054

Objective: CHE To increase flight efficiency during daytime. FAB EC Proposal ID : 69.097c Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 160 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Name: Free Route Airspace Praha/ FRAPRA, Step 3 Proposed CZE . All Airways above FL 165 remain available spring 2017 for flight planning. Description: Originator(s): To allow additional individual "Direct" (DCT) options as support to the Project Group: CZE . Departing/Arriving within FRA shall file via existing ATS route network in Praha FIR. FAB CE airways. 334. . Any further development will be based on Objective: Project Category: FAB CE xBorder FRA Project. To further improve the flight planning options within Praha FIR as a third Free Route step towards the full implementation of Free Route Airspace Praha/ Airspace Related proposals: FRAPRA.  69.097a  69.097b Proposal ID : 52.036 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . Connection ESAMI - ARI within Casablanca To implement, as CDR, bi-directional ATS route segment M/UM372 AMR spring 2017 MAR FIR exists. - ESAMI. . Implementation of this CDR depending on Project Category: Originator(s): 335. Objective: ATS Routes IACA Spain decision. To further improve the ATS route network between Madrid UIR and Casablanca FIR.

Proposal ID : 61.017 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . Morocco: ready for implementation. To implement, as CDR1/3, southbound ATS route segment PIMOS - spring 2017 MAR . Initially approved by the Spanish military,

FES. Project Category: Originator(s): pending official confirmation. 336. Objective: ATS Routes IATA . PIMOS - FES bidirectional to be considered To further improve the ATS route network between Madrid UIR and at a later stage. Casablanca FIR. Proposal ID : 85.015 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . In practice currently there are no logic To implement the following new bi-directional ATS routes: spring 2017 MAR options between MGA and ALM except

1. MGA - BERUM; Project Category: Originator(s): huge detours via GONZA and TTN. 2. MGA - ALM, ATS Routes MAR . First option is only inside Madrid FIR. or, to allow “Direct” flight planning options for the two segments. . Second option requires coordination DCTs 337. Objective: RAD between the two States as possible DCTs 1. To further improve the ATS route structure within Madrid FIR and are cross-border. Casablanca FIR. . Morocco is ready and an implementation 2. To allow better flight planning options between Madrid FIR and request is already communicated to Spain Casablanca FIR. during the meeting held in Casablanca this year. Waiting for their answer and decision. Proposal ID : 81.069 / 21.028 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 161 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Name: ECAC States AIP en-route publication issues Proposed EST spring 2017 Description: Originator(s): To revise ENR 3.3 template column naming and publish relevant Project Group: EST 338. aeronautical data in accordance with ICAO requirements. SG BALTIC

Objective: Project Category: To adapt publication of significant points in accordance AIP with ICAO requirements. Proposal ID : 69.064c / 16.035c Impl. Status: State(s) & Org. Comments: Project Name: NEFAB and DK/SE FAB Free Route Airspace - Proposed FAB NEFAB . NEFRA: North European Free Route NEFRA Phase 2 spring 2017 FAB Airspace (NEFAB plus DK/SE). Denmark/Sweden . ATS routes will be kept. Description: Project Group: To implement H24 cross border Free Route Airspace between DK-SE FAB Originator(s): . Phase 1 planned for 23 JUN 2016. FAB and NEFAB, above FL285. Denmark/Sweden FAB NEFAB 339. Objective: FAB NEFAB SG BALTIC To further improve the airspace structure between Norway FIR, Finland FIR, Sweden FIR, Tallinn FIR, Riga FIR and Kobenhavn FIR. Project Category: Free Route Airspace Proposal ID : 57.024 Impl. Status: State(s) & Org. Comments: Project Name: New TSA 6 Proposed FRA France: Civil - military agreement reached. spring 2017 Description: Originator(s): Related proposals: To redesign TSA6 LF_R146B and TSA8 LF_R7B. Project Group: FRA  65.045

340. RFG SW  88.019 Objective: To adapt military areas for more dynamic ASM and specific training Project Category: missions within Brest ACC. Civil/Military Airspace Proposal ID : 83.077 Impl. Status: State(s) & Org. Comments: Description: Proposed FRA To re-designate the following existing ATS routes: spring 2017 Originator(s): 1. Y491 SOMEN - BETUV as Y111 (same segment with different RDs Project Category: EUROCONTROL Y491/UY111); 341. Route 2. Y491 BETUV - KOKOS as N491 (release of Y491) (same segment Redesignation with different RDs Y491/UN491).

Objective: To adapt the ATS route designation in lower and upper airspace. Proposal ID : 88.019 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 162 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Name: Jersey new ATS delegation Proposed FRA Implementation planned in connection with New spring 2017 TSA 6 (ID 57.024). Description: Originator(s): To create a new TMA East of existing Jersey CTA with delegation of ATS. Project Category: FRA Related proposals:

342. Objective: TMA  57.024 To further improve the airspace structure at the interface between Jersey Vertical FE APP and London ACC while allowing new Jersey and Guernsey SID/STAR implementation for optimum climb/descent profiles. Proposal ID : 80.073 Impl. Status: State(s) & Org. Comments: Description: Proposed GBR Not available for UK overflights via NATEB. To establish a DCT or ATS route between RIBEL and GUNTU FL245+. spring 2017 Originator(s): 343. Objective: Project Category: GBR To reduce flight plannable mileage and reflect the route tactically DCTs provided on a regular basis. RAD Proposal ID : 88.028 Impl. Status: State(s) & Org. Comments: Project Name: PLAS Proposed GBR . Requires CAA Regaulatory approval as well spring 2017 IRL as 3NM radar separation approval. Description: To implement systemised closely spaced ATS route structure across the Project Category: Originator(s): . Route Designators have been requested Irish Sea below FL285 by establishing up to 8 RNAV1 routes (5 between Airspace Structure GBR and provided and reserved for the UK. 344. London FIR and Shannon FIR and 3 between London FIR and Scottish ATC Sectors FIR). ATS Routes

Objective: CDRs To increase safety and capacity as well as environmental & efficiency improvements in the PC IoM Sector. Proposal ID : 64.066b / 09.012b Impl. Status: State(s) & Org. Comments:

Project Name: Tbilisi TMA Proposed GEO Related proposals: spring 2017 Description: Originator(s):  64.066a / 09.012a a. To reconfigure existing Tbilisi TMA. Project Group: EUROCONTROL 345. b. To introduce new SIDs/STARs for Tbilisi (UGTB) airport. SG BLACK GEO

Objective: Project Category: To further improve the airspace organisation within Tbilisi FIR. TMA Proposal ID : 68.022 / 11.019 Impl. Status: State(s) & Org. Comments: Project Name: Batumi TMA Proposed GEO

Description: spring 2017 Originator(s): 346. To reconfigure Batumi TMA and establish new SIDs/STARs ROLIN Project Group: GEO (FL190/FL180). SG BLACK

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 163 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: Project Category: To further improve airspace organisation within Tbilisi FIR. TMA Proposal ID : 72.050 / 14.013 Impl. Status: State(s) & Org. Comments: Project Name: Batumi and Kutaisi TMAs Optimization Proposed GEO spring 2017 Description: Originator(s): a. To expand the existing TMAs, both in their horizontal and vertical Project Group: GEO 347. boundaries. SG BLACK b. To implement separated SIDs and STARs. Project Category: Objective: TMA To further improve airspace organisation within Tbilisi FIR. Proposal ID : 76.019b / 16.014b Impl. Status: State(s) & Org. Comments: Description: Proposed GEO Proposals for implementation of sub-proposal 1: 1. To allow bidirectional use of point BARAD by changing to spring 2017 AZE Option 1: Establishment of NEVEB as new TCP

bidirectional existing eastbound ATS route M747 LAGAS - BARAD. Project Group: Originator(s): between Baku ACC and Tbilisi ACC. ATC on 2. To allow bidirectional use of point ADEKI by changing to SG BLACK EUROCONTROL M747 BARAD - NEVEB and M737 DISKA - bidirectional the following existing westbound ATS routes: NEVEB will be provided by Tbilisi ACC including a. N644 LEYLA - ADEKI; Project Category: responsibility of NEVEB westbound traffic b. L850 BEKIR - ADEKI; ATS Routes separation. 348. c. N319 EDELU - ADEKI; Option 2: No change in TCPs and introduction d. T921 POLAD - ADEKI. of FL allocation on BARAD for westbound traffic

Objective: depending on loads. For example BARAD only To further improve ATS route network within South Caucasus Area FL340 / FL360 on Primary Permission Request procedure. between Baku FIR and Tbilisi FIR. Related proposals:  76.019a / 16.014a Proposal ID : 74.064b Impl. Status: State(s) & Org. Comments: Description: Proposed GRC Connected to PBN implementation in Athens 1. To implement ATS route M749 SKP - ROPOX (crossing point with spring 2017 TMA. Originator(s): northern lateral limits of Athinai TMA) - ATV with the relevant Project Group: GRC procedures (SIDs and STARs) for LGAV. RFG SE 349. 2. To withdraw ATS route B1 SKP - ABLON - ATV following the implementation of M749. Project Category: ATS Routes Objective: To further improve ATS route network within Athinai FIR / Hellas UIR. Proposal ID : 74.064c Impl. Status: State(s) & Org. Comments: 350. Description: Proposed GRC Connected to PBN implementation in Athens

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 164 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

1. To realign ATS route segment G8 / N/UN604 KRO - OLIDA - LSV spring 2017 Originator(s): TMA.

as KRO - SUSOR (crossing point with G/UG802) - LSV. Project Group: GRC 2. To withdraw ATS route G8 ATV - KRO - OLIDA - LSV following the RFG SE re-alignment of N604. Project Category: Objective: ATS Routes To further improve ATS route network within Athinai FIR. Proposal ID : 85.018 Impl. Status: State(s) & Org. Comments: Description: Proposed GRC Connected to PBN implementation in Athens To implement new SIDs/STARs for Athens (LGAV) airport. spring 2017 TMA. Originator(s): 351. Objective: Project Category: GRC To further improve the airspace organisation within Athinai FIR. Airspace Structure PBN Proposal ID : 84.011 Impl. Status: State(s) & Org. Comments: Project Name: Central sector Zagreb Phase 2b Proposed HRV Phase 2a: FL355 and above 2 April 2015 spring 2017 Description: Originator(s): Related proposals: Additional Sector Group Phase 2b: Project Group: HRV  69.001 352. Full lateral and vertical implementation of Central sector below FL355. RFG SE  69.068b

Objective: Project Category:  74.051b To further improve the airspace structure within Zagreb FIR and increase ATC Sectors capacity. Proposal ID : 71.048c Impl. Status: State(s) & Org. Comments:

Description: Proposed MAR Related proposals: To introduce radar approach (MSSR mode S and Primary radar spring 2017 Originator(s):  71.048a approach) for Marrakech (GMMX) Ménara airport. Project Category: MAR 353.  71.048b Objective: Airspace Structure  71.048d To further improve airspace organisation around Marrakech (GMMX) Ménara airport. Proposal ID : 81.048 Impl. Status: State(s) & Org. Comments: Description: Proposed MAR . Annex 11 stated that the 5LNCs shall be

To replace existing 5LNC TOLSO. spring 2017 Originator(s): unique. . TOLSO is used by and is allocated in 354. Objective: Project Category: EUROCONTROL To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT 5LNC ICAO ICARD to Spain. region, to improve the aeronautical information provided and be compliant with ICAO Annex 11. Proposal ID : 66.081d Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 165 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed MAR To implement the following ATS routes: spring 2017 Originator(s): a. BAGBO - PIXOV bi-directional (CDR); Project Category: MAR 355. b. OZT - OJD bi-directional (CDR). ATS Routes Objective: To further improve ATS route network within Casablanca FIR/UIR. Proposal ID : 69.084c Impl. Status: State(s) & Org. Comments: Project Name: Implementation of PBN SID/STAR and APCH Proposed SRB procedures in Beograd FIR spring 2017 MNE

Description: Project Group: Originator(s): 1. To Implement GNSS RNP1 SID/STAR and RNP APCH for RFG SE SRB 356. (LYPG). Project Category: MNE 2. To implement GNSS RNP1 SID/STAR for Tivat airport (LYTV). PBN Objective: TMA To further improve the airspace structure within Beograd FIR. Proposal ID : 68.012b Impl. Status: State(s) & Org. Comments:

Project Name: Lower airspace re-organisation Beograd FIR - Step 2 Proposed SRB Related proposals: spring 2017 Description: Originator(s):  68.012a 1. To revise vertically all other TMAs inside Beograd FIR, except Project Group: SRB  68.012c Podgorica TMA and Tivat TMA. RFG SE  68.012d 2. To adjust the traffic flows to/from Beograd Nikola Tesla Airport 357. Project Category: (LYBE) and introduction of a new RNAV1 and conventional SID and Airspace Structure STARs consequently.

Objective: To further improve the airspace structure and ATS route network within Beograd FIR. Proposal ID : 85.030 / 22.032 Impl. Status: State(s) & Org. Comments: Description: Proposed UKR . AAAAA – will be new boundary point To implement the following ATS routes: spring 2017 ROU between Bucuresti FIR and L’viv FIR/Kyiv

a. SOMAT - AAAAA - OSTOV southbound (even FLs above FL275); Project Group: Originator(s): UIR. 358. b. LOMOS - BBBBB - TADUN northbound (odd FLs above FL275). . Sections of ATS routes expected to be CDR SG BLACK UKR Objective: in Bucuresti FIR, with alternative routing Project Category: along existing ATS routes to RUMUK. To further improve the ATS route network between Kyiv UIR and ATS Routes Bucuresti FIR. Proposal ID : 86.056d Impl. Status: State(s) & Org. Comments: 359. Project Name: Nicosia Direct Route Airspace - Phase 2A Planned CYP

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 166 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

22 JUN 2017 Related proposals: Description: Originator(s): To allow new H24 and/or expand from NIGHT to H24 some of the Project Group: CYP  86.056a existing "Direct" flight planning options above FL285. FAB BLUE MED FAB BLUE MED  86.056b RFG SE  86.056c Objective: To further improve flight planning options within Nicosia FIR. Project Category:  86.056e DCTs RAD Proposal ID : 83.030a / 21.003a Impl. Status: State(s) & Org. Comments:

Project Name: Free Route Airspace Yerevan ACC Proposed ARM Related proposals: summer 2017 Description: Originator(s):  83.030b / 21.003b To implement Night Free Route Airspace in Yerevan ACC. Project Group: ARM 360. SG BLACK Objective: To further improve airspace organisation within Yerevan FIR. Project Category: Free Route Airspace Proposal ID : 53.009 / 16.038 / DU0008 Impl. Status: State(s) & Org. Comments: Project Name: RAD LBLT1000 Proposed BGR . IBLAL currently is only available for traffic summer 2017 TUR departing LTBA/BU/FJ, to reduce Description: To allow overflights via IBLAL by withdrawing RAD restriction Project Group: Originator(s): complexity of Varna sectors. LBLT1000. FAB DANUBE EUROCONTROL . Requires further study and simulations.

361. Objective: RFG SE SG BLACK To further improve the utilisation of existing ATS route network. Project Category: ATS Routes RAD Proposal ID : 62.048b / 17.015 Impl. Status: State(s) & Org. Comments: Project Name: Common Terminal Airspace System Proposed BGR . Implementation date is not defined yet - summer 2017 FTS/RTS and Safety case are required. Description: Originator(s): 1. To establish a common Terminal Airspace System and implement P- Project Group: BGR . Large scale airspace management project RNAV procedures for Burgas (LBBG) and Varna (LBWN) airports. RFG SE as a follow up of the merger of the two ACCs. 362. 2. To adjust the ACC sectors according to the future common TMA, if SG BLACK necessary. Related proposals: Project Category: Objective: Airspace Structure  62.048a To further improve the airspace structure within Sofia FIR and to cope PBN with the expected traffic increase at the Black Sea airports(Phase 2). Proposal ID : 68.006b / 19.064 / DU0039 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 167 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed BGR . CND - WRN will be used under conditions 1. To implement dualised unidirectional ATS routes system on axis summer 2017 ROU as passes via area LRR32.

CND - WRN for ARR/DEP LBBG/LBWN. Project Group: Originator(s): . During passed years several proposals for 2. To adapt TMA boundaries and establish direct transfer of air traffic FAB DANUBE EUROCONTROL this dualised system of ATS routes were control between Constanta APP and Varna APP. made by MDA and UKR. RFG SE Objective: SG BLACK . MDA: BALIK or WRN - AAAAA - GLT - To further improve the airspace structure between Sofia FIR and BBBBB - LIPTA northbound; WRN - AAAAA Project Category: - BBBBB - BOTNA northbound; ARGES - Bucuresti FIR while allowing smooth climbing/descending profiles for Airspace Structure 363. ARR/DEP LBBG/LBWN and off-loading ACC sectors (Phase 2). BBBBB - LIPTA northbound. . UKR: BADKA - RATNO - BAREN northbound; WRN - BBBBB - AAAAA - CND northbound. Reconsideration of RAD restriction LB2008 (TUGSO).

Related proposals:  68.006a

Proposal ID : 82.030 / 20.032 Impl. Status: State(s) & Org. Comments:

Project Name: DANUBE FAB FRA - Phase 2 Proposed BGR Related proposals: summer 2017 ROU Description:  69.052 / 16.008 To extend time availability of NIGHT Free Route Airspace within the Project Group: Originator(s):  82.031 / 20.033 DANUBE FAB area. FAB DANUBE FAB DANUBE  82.032 / 20.034

364. Objective: RFG SE  82.033 / 20.035 SG BLACK To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR. Project Category: Free Route Airspace Proposal ID : 87.018 / 23.012 Impl. Status: State(s) & Org. Comments: Description: Proposed BLR . AAAAA - will be new boundary point To implement one of the following bi-directional ATS routes: summer 2017 MDA BLR/UKR. a. DUBIN - AAAAA - BBBBB - BINOM; or UKR . BBBBB - will be new boundary point Project Group: b. DUBIN - AAAAA - BBBBB - LIPTA - GIDRO; or SG BALTIC Originator(s): UKR/MDA. 365. c. DUBIN - AAAAA - LAVDA. SG BLACK MDA

Objective: Project Category: To further improve ATS route network between Belarus, Ukraine and ATS Routes Moldova. Proposal ID : 83.006 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 168 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed CHE To re-designate existing ATS route Z55 BASUD - GERSA as Z50 summer 2017 Originator(s): 366. (release of Z55). Project Category: EUROCONTROL Objective: Route To further simplify the existing RDs within Switzerland. Redesignation Proposal ID : 87.019 Impl. Status: State(s) & Org. Comments: Description: Proposed DEU Requested DCT options could decrease the To allow H24 “Direct” flight planning options VEBAK DCT NOLRU DCT summer 2017 MUAC USAF flight time by 16 minutes saving €318 and

367. NAVPI and vice-versa for ARR/DEP ETNG. 1.1M CO2 per and year Project Category: Originator(s): Objective: DCTs U.S.A.F.E To further improve the flight planning options within Maastricht UAC. RAD FAB EC Proposal ID : 66.031 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . Currently the availability is as follows: 1. To adapt the availability of UM176 PPN - CMA - CLS within Madrid summer 2017 o PPN - CMA: CDR3: MON/FRI EXC Originator(s): UIR / Barcelona UIR. Project Category: EUROCONTROL HOL:SUMMER:0500- 2. To use UM176 PPN - CMA - CLS as CDR 2, week-days during the CDRs 1500;WINTER:0600-1600. activation period of D104 (05:00 - 23:00 during winter and 06:00 - o CMA - CLS: CDR3: MON/FRI EXC 368. 24:00 during summer) and as CDR 1 or permanent the rest of the HOL:SUMMER:0500- time. 2300;WINTER:0600-2400.

Objective: . Pending military agreement. To further harmonise the utilisation of the existing CDRs within ECAC . A full revision of CDRs ongoing. airspace. Proposal ID : 79.021 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . Outcome of South West Europe RAD

To allow via RAD ATS route T16 - UN975 - ORTIS for ARR summer 2017 Originator(s): Review 21st - 22nd February 2013. GCRR/GCFV. . Solution via the RAD was requested again Project Group: IACA Objective: RFG SW due to missing STARs ORTIS. . Under Lisbon / Casablanca / Canarias Axis To further improve the ATS route network while providing additional, Project Category: shorter flight planning options within Canarias FIR/UIR. proposal by IACA for STAR ORTIS, request ATS Routes by Spain to be deleted as operationally not 369. RAD feasible. . The two possibilities might be either DCTs from ORTIS via RAD Appendix 4 or connecting point ORTIS via RAD Appendix 5. . Connections after NAVIX via Casablanca FIR are also possible but complex due to difficult co-ordination with Morocco.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 169 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

. The NM RAD Team proposed this issue to be further discussed at SW Axis meetings. . Permanent airspace design solution will be linked to Canarias TMA Phase II.

Related proposals:  50.053b  75.022 Proposal ID : 77.075 Impl. Status: State(s) & Org. Comments:

Description: Proposed ESP Related proposals: To implement new SID PTC from LEIB. summer 2017 Originator(s):  75.007 370. Objective: Project Category: ESP To further improve the ATS route network within Barcelona FIR while ATS Routes allowing a shorter route connection to existing route segment PTC - CPD - CHELY/ MEROS. Proposal ID : 79.020 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . Outcome of South West Europe RAD

To consider possible 5LNC removal from one of the ATS routes of the summer 2017 Originator(s): Review 21st - 22nd February 2013. crossing waypoints published on both ATS routes. . All 5LNCs are crossings of only upper ATS Project Category: EUROCONTROL Objective: 5LNC routes and in most of the cases To simplify the ATS route network within Madrid FIR/UIR and Barcelona ATS Routes unidirectional one. These 5LNCs do not FIR/UIR. have connections with lower airspace unless allowed via DCT filling. . Most of the possible undesired, even illogic, turns are not acceptable by the ACCs and 371. unavailable by RAD restriction. . Waypoints might continue to stay as crossings but published on only one of the ATS routes which will not allow undesired turns and RAD restriction will be withdrawn. . Possible 5LNC removal from one of the ATS routes should also be considered in view of ATC procedures and usage in case of vectoring and resuming navigation to the relevant ATS route or waypoint. Proposal ID : 79.024 Impl. Status: State(s) & Org. Comments: Project Name: EUR/NAT States AIP en-route publication issues Proposed ESP . Publication location (AIP placeholder) for

372. summer 2017 Spain will be further discussed under Description: Originator(s): To adapt the AIP CDR publication of: Project Category: EUROCONTROL WP/11. The ATS routes are published in 5

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 170 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

a. Lower/Upper limits expression in VFR FLs or intermediate levels AIP (five) ENR sub-parts instead of required by between IFR FLs; CDRs ICAO - ENR 3.1/3.2/3.3.. b. CDR categories of ATS routes UL58, UM445, UM744, UN747, . In most of the cases the CDRs are UN860, UT245, UT249, UT252 and UT312. published with IFR FL limits and either

Objective: FL340 or FL360 or FL380 is not covered by To adapt in State AIP ATS route vertical limits. conditions and stays as available FL. . Pending military agreement.

Proposal ID : 80.046 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . Saves 26 minutes of flight time and $5,965 To allow eastbound flights on UN741 from EDUMO to NELSO. summer 2017 USD per flight. Originator(s): Objective: Project Group: U.S.A.F.E . Under study by Canarias ACC due to To further improve the ATS route network while allowing eastbound RFG SW conflicting routes in non-radar environment. 373. flights between EDUMO and NELSO on UN741 for USAF flights when Project Category: diplomatic clearances can't be obtained. ATS Routes

Proposal ID : 82.019 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP Currently crews can only request the BLN2H

To re-consider the use of RWY13 procedures for DEP LEMG, depending summer 2017 Originator(s): SID on departure (on ATC Approval). This is on traffic demand and if necessary to revise them. very rarely given and aircraft route to the south Project Category: IACA 374. Objective: Airspace Structure on BLN2C which uses an additional 145 kg of To further improve SID / STAR procedures to improve flight efficiency fuel. The large number of departures routing to and the environment. the north via BLN would bring significant environmental benefits. Proposal ID : 84.036 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . MAROT is with double reservation in To replace existing 5LNC MAROT. summer 2017 ICARD for Russian Federation and Haiti. Originator(s): Objective: Project Category: EUROCONTROL . Proposal for replacement is based on 375. . To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO “Common criteria for replacement of EUR/NAT region; duplicated 5LNCs” as point is not reserved . To improve the aeronautical information provided; for Spain. . To be compliant with ICAO Annex 11. Proposal ID : 84.056 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed ESP . In accordance with AIP Spain, part AD2,

376. Description: summer 2017 Originator(s): LEMD P-RNAV SIDs are identified by coded designator containing 8 (eight)

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 171 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To publish all SIDs / STARs in AIP Spain, ENR 2 in accordance with Project Category: EUROCONTROL characters - BARDI1AX, BARDI1AY, Annex 11: AIP NANDO3AR, etc. coming from additional 1. coded designator to contain maximum 7 (seven) characters; letter added. All other P-RNAV SIDs also 2. after the validity indicator only 1 (one) letter indicating the route contain similar additional letter - SIE1AL, indicator is allowed. VTB2AS, etc.

Objective: . In accordance with AIP Spain, part AD2, all To resolve airspace data publication inconsistencies in State AIP. LEMD and LEBL instrument arrivals - continuous descent (CDA) STARs are identified by coded designator containing 9 (nine) characters - MORAL3DCC or ORBIS1DCC or ALBER1DCN or PUMAL2DCN, etc. . Furthermore with AIRAC AMDT 01/15 (WEF 05 MAR 2015) Spain continued to publish new CDA STARs for Gran Canaria AD containing 9 characters such as COSTI1DCC, ODEGI1DCC, REMGI1DCC and VIDRI1DCC. . This 8 (eight) or 9 (nine) characters publication of designators is not compliant with ICAO and has an impact on aeronautical database systems. As an example in EAD SDO (Static Data Operations) STAR PUMAL2DCN is converted and coded as MAL2DCN due to 7 characters limit. . Spain (ENAIRE ATM and AIS part) as well as ICAO were approached on clarifying the justification of this publication.

Related proposals:  84.056a Proposal ID : 85.089 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP 1. To implement the following ATS routes: summer 2017 Originator(s): a. Z17 MABUX - GODOX eastbound; Project Category: ESP b. Z19 EPAMA - WALLY westbound; ATS Routes 377. c. UZ26 EBROX - LATRO northbound; d. UL184 TLD - RBO northbound (extension of existing RD); e. Z53 ADKIM - VJF northbound; f. Z82 MEROS - VERSO northbound; g. L58 VIBAS - PEPAS - OBAKA - BERUM bi-directional.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 172 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

2. To re-designate the following existing ATS routes: a. Z/UZ230 HIJ - TLD as L/UL184 (release of Z230); b. UT257 NANDO - MABUX as Z17. 3. To withdraw existing ATS route UT257 MABUX - LASPO (double designation as UM871).

Objective: To further improve ATS route network within Spain. Proposal ID : 87.021 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . In accordance with Annex 15, ENR 4.4 shall To withdraw or replace, in accordance with ICAO Annex 11 and Annex summer 2017 contain ONLY “An alphabetically arranged Originator(s): 15, the following reporting points published AIP Spain, ENR 4.4.: Project Category: EUROCONTROL list of name-code designators (five-letter a. NORAY - not coordinated via ICARD; 5LNC pronounceable “name-code”) established b. All SID/STAR RNAV points - most of them already published in AD AIP for significant points at positions not marked 2; by the site of radio navigation aids, c. Around 50 (fifty) five-letter pronounceable name codes (5LNCs) including:” used for Military purpose - not coordinated via ICARD; . In accordance with Annex 11 where a d. Other codes used for Military purpose - plain text or letters/numbers significant point is required at a position not combinations. marked by the site of a radio navigation aid,

Objective: and is used for ATC purposes, it shall be To further improve the AIP publication avoiding 5LNCs inconsistency designated by a unique five-letter with Annex 11. pronounceable “name-code”. This name- code designator then serves as the name as well as the coded designator of the significant point. States’ requirements for 378. unique five-letter pronounceable name- code designators shall be notified to the Regional Offices of ICAO for coordination. . Information on this AIP inconsistency was already reported to Spain and relevant actions expected. . As from 4 FEB 2016 the following SID/STAR RNAV points will be replaced by 5LNCs: FV624, FV625, FV733, FV734, FV735, FV736, RR403, RR404, RR405, RR521 to DEMEX, LIRBU, ROXES, NOBLI, RATAT, TUVIL, GARGO, LOBSO, GOLFY, TUXAM respectively. . Part of the military 5LNCs are created in ICARD following coordination with ICAO and based on ICARD 5LNC Task Force decisions.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 173 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 87.017 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . Lower ATS route A44 exists as MGA - AMR To implement the following bi-directional ATS routes: summer 2017 DZA - TARIK - MOS inside Madrid FIR and

a. UT115 MGA - AMR; Project Category: Originator(s): Algiers FIR. b. UM192 AMR - GATAS - TARIK. . Extension of RD N865 or M192 and new 379. ATS Routes ESP Objective: RD are foreseen to be used. To further improve ATS route network within Barcelona FIR at interface . No information for implementation of Upper with Algiers FIR. part TARIK - MOS.

Proposal ID : 85.021 Impl. Status: State(s) & Org. Comments: Description: Proposed ESP . Requested due to shifting of USAF routing

To allow H24 “Direct” flight planning options LUXUR DCT PIMAD or summer 2017 Originator(s): to enter the Barcelona FIR at point LUXUR GENIO DCT PIMAD and vice-versa for ARR/DEP LERT / LEMO. instead via point MORSS for aircraft coming Project Category: U.S.A.F.E Objective: DCTs from South West Asia which saves around To further improve flight planning options for flights arriving/departing RAD 4 minutes of flight time and €100K per year. . Requested DCT options could decrease the 380. to/from LERT / LEMO. USAF flight time by 7 minutes saving another €200K per year. . Options will allow proper connection to ATS route UT100 and will avoid existing very sharp turn LUXUR/GENIO UM134 XARON UT100 PIMAD Proposal ID : 88.009 Impl. Status: State(s) & Org. Comments: Project Name: FLOS Proposed ESP . In accordance with AIP ENR 1.7-2 “Table of summer 2017 cruising levels” the direction of cruising Description: Originator(s): To adapt existing ATS routes in AIP Spain, ENR 3 or swap to/publish Project Category: EUROCONTROL levels in Spain is East/West: ODD 000° - new FLOS in AIP Spain, ENR 1.7. AIP 179° (e.g. FL310, FL330 …FL410…etc.) and EVEN 180° - 359° (e.g. …, FL300, Objective: FL320 …FL430…etc.). To adapt the FLOS used within the airspace of Spain. . In accordance with AIP ENR 3 for majority of ATS routes the direction of cruising levels 381. is contrary (anti-hemispheric) to what is specified in ENR 1.7. With help by Jeppesen it was found that around 75% of ATS route segments are NOT in accordance with AIP ENR1.7. . In RAD Appendix 4 the direction of cruising levels announced for majority of DCTs is also contrary to AIP Spain. . Portugal, Morocco, and France use the

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 174 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

other FLOS North/South (ODD 090° - 269° and EVEN 270° - 089°). Proposal ID : 78.014 / 20.045 Impl. Status: State(s) & Org. Comments: Description: Proposed FIN Currently none of the published in AIP Finland To adapt all EFHK RNAV SIDs with ATS route network. summer 2017 EFHK RNAV SIDs last 5LNCs have connection Originator(s): Objective: Project Group: EUROCONTROL to the existing ATS route network. Either points 382. To further improve airspace organisation within Helsinki TMA. SG BALTIC are on the line of relevant ATS route or far from any ATS routes. In AIP all these points are Project Category: published as only connected to EFHK AD. 5LNC ATS Routes Proposal ID : 87.016 Impl. Status: State(s) & Org. Comments: Description: Proposed FRA To re-designate the following existing ATS routes: summer 2017 ITA a. Z637 AOSTA - BANKO as L615; CHE Project Category: b. UZ637 AOSTA - BANKO - MILPA as UL615 (release of Z637). Originator(s): 383. Route Objective: Redesignation EUROCONTROL To rationalise the existing ATS route designators within Italy and France in order to simplify the designation, release for further use and further facilitate the flight planning. Proposal ID : 83.025b Impl. Status: State(s) & Org. Comments:

Project Name: Marseille ACC re-organisation Phase 3 Proposed FRA Related proposals: summer 2017 Description: Originator(s):  83.025a To redefine the split between the layer 1 and the layer 2 for all the Project Category: FRA 384. sectors in Marseille ACC. ATC Sectors

Objective: To further improve the airspace structure and capacity within Marseille ACC. Proposal ID : 87.015 Impl. Status: State(s) & Org. Comments: Description: Proposed FRA To re-designate the existing ATS route UQ211 BALSI - VATIR as UQ209 summer 2017 CHE (release of Q211). Project Category: Originator(s): 385. Objective: Route EUROCONTROL To rationalise the existing ATS route designators within France in order Redesignation to simplify the designation, release for further use and further facilitate the flight planning.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 175 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 75.073b Impl. Status: State(s) & Org. Comments:

Project Name: Paris ACC re-organisation - Phase 2 Proposed FRA Related proposals: summer 2017 Description: Originator(s):  69.089a To re-organise the lower airspace and delegate ATS to APP units Project Category: FRA  69.089c 386. below FL145 for relevant airspace in Paris ACC. Airspace Structure  69.089e

Objective:  69.089f To further improve the airspace structure within France FIR.  75.080  75.082 Proposal ID : 87.028d Impl. Status: State(s) & Org. Comments: Project Name: Borealis FRA - Step 4 Proposed GBR . Dependant and possible to implement after summer 2017 instalation of the new ATM system at Description: Originator(s): To implement H24 Free Route Airspace above FL255 at Prestwick Project Group: FAB Prestwick ACC foreseen MAR 2016. ACC AoR within the following ATC Sectors: FAB Denmark/Sweden . Also looking at cross-border DCT’s with a. Rathlin Sector; Denmark/Sweden FAB NEFAB adjacent States. b. Central Sector; FAB NEFAB FAB UK/Ireland . ATS route network will be withdrawn above FL255. c. Hebrides High Sector; FAB UK/Ireland ISL 387. d. Moray High Sector; RFG NW Related proposals:

e. Part of Tyne Sector; Project Category:  81.073a f. Montrose North Sector; Free Route  87.028a g. Part of Dean Cross North Sector.  87.028b Airspace Objective:  87.028c To further improve the airspace structure and the flight planning options  87.028e within Borealis FRA Area States.  87.028f  87.028g Proposal ID : 87.028e Impl. Status: State(s) & Org. Comments: Project Name: Borealis FRA - Step 5 Proposed GBR Enhanced Free Route operation with increased summer 2017 NOR lateral flexibility (latitude expressed in degrees Description: To implement FRA for all flights transiting via Bodø, Norway or Scottish Project Group: Originator(s): and minutes) for all flights when crossing 010W FIRs. FAB FAB and 000L east of Iceland, en route via Bodø, Denmark/Sweden Denmark/Sweden Norway or Scottish FIRs.

Objective: FAB NEFAB FAB NEFAB 388. To further improve the airspace structure and the flight planning options FAB UK/Ireland FAB UK/Ireland Related proposals: RFG NW ISL  87.028a within Borealis FRA Area States. Project Category:  87.028b Free Route  87.028c Airspace  87.028d  87.028f  87.028g

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 176 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 88.014 Impl. Status: State(s) & Org. Comments: Description: Proposed GBR When area D323B is not active the option is To implement bi-directional ATS route ASKAM - OTBED or allow "Direct" summer 2017 ATS route UL975. Originator(s): 389. flight planning options ASKAM DCT OTBED and OTBED DCT ASKAM. Project Category: IATA Objective: ATS Routes To improve airspace options when area D323C is not active. DCTs Proposal ID : 88.006 / 23.020 Impl. Status: State(s) & Org. Comments: Description: Proposed GEO . At first phase shorter flight planning options To design and introduce UGTB STARs via TISOT. summer 2017 will be allowed by RAD Appendix 5. Originator(s): Objective: Project Group: EUROCONTROL . Currently arrivals follow ATS routes G482 / 390. To further imporve airspace structure within Tbilisi FIR. RFG SE N82 and then STAR via DF with extension SG BLACK of 60NM.

Project Category: Airspace Structure Proposal ID : 88.008 / 23.022 Impl. Status: State(s) & Org. Comments: Description: Proposed GEO . In accordance with ICAO the basic indicator To properly designate all UGTB STARs in accordance with Annex 11. summer 2017 shall be the name or name-code of the Originator(s): Objective: Project Group: EUROCONTROL significant point where a standard arrival 391. To adapt the STAR coding. RFG SE route begins. SG BLACK . Currently for few STARs the description defines that names used for coding are not Project Category: these points where a STAR begins. AIP Proposal ID : 87.012 Impl. Status: State(s) & Org. Comments: Description: Proposed GRC

To change the availability of existing ATS route UP14 PINDO - RIKSO summer 2017 Originator(s): from Night (22.00 - 04.00) to H24. Project Group: EUROCONTROL 392. Objective: RFG SE

To further improve ATS routes network in PINDO area of Hellas UIR. Project Category: ATS Routes Proposal ID : 86.021 Impl. Status: State(s) & Org. Comments: Description: Proposed HRV . BAREB was allowed for HUFRA operation To allow point BAREB for SEAFRA operation. summer 2017 as from 25 JUN 2015 Originator(s): 393. Objective: Project Group: EUROCONTROL . As continuation currently Croatia allows To further improve FRA options within Zagreb FIR. RFG SE only BAREB DCT VIBOP (FL265 - FL335) and VIBOP DCT BAREB (FL295 - FL345)

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 177 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Category: outside of SEAFRA operations Free Route Airspace Proposal ID : 65.066 Impl. Status: State(s) & Org. Comments: Description: Proposed IRL . ENSURE project removed All ''Upper'' ATS To re-designate all remaining ''Lower'' non-RNAV ATS routes as RNAV summer 2017 routes as of 17 DEC 2009. Originator(s): and rationalise the use of existing RNAV designators as follows: Project Category: EUROCONTROL . Minor rationalisation of lower routes a. W10 CRK - CML - GERVO - CLY - LIFFY as N12; Route feasible. b. W12 SHA - CLY as N160; Redesignation . Release of freed up ATS routes required. c. W13 DUB - INKUR - KORAK - SHA as L975; . Exact AIRAC date still to be confirmed. 394. d. W15 KORAK - CRN as Q150; . It is likely that routes will be withdrawn – e. V14 BAGSO - DUB - SHA as L70; (Borealis- Step1, extension of FRA down to f. Q202 SUROX - DEVOL as L18 (release of Q202). FL075).

Objective: Related proposals: To rationalise the existing ATS route designators within Shannon  87.028a FIR/UIR and SOTA in order to make them compatible with the existing RNAV airspace and further facilitate the flight planning. Proposal ID : 83.016 Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed IRL . FRA was introduced on 17 DEC 2009 and summer 2017 announced via AIC. Description: Originator(s): To publish in AIP Ireland the Free Route Airspace procedures. Project Category: EUROCONTROL . Around 5 years later the AIP Publication is 395. AIP missing or it is not in accordance with Objective: ERNIP Part 1. To adapt in AIP the FRA publication in accordance with the ERNIP. . Coordination between the NM and Ireland on AIP publication was already initiated. Proposal ID : 87.028a Impl. Status: State(s) & Org. Comments: Project Name: Borealis FRA - Step 1 Proposed IRL . The implementation of this step will include summer 2017 removal of the lower ATS routes (FL075 - Description: Originator(s): To extend the Free Route Airspace in Shannon CTA down to FL075. Project Group: FAB FL245) within most of the Shannon CTA. . The portion of the Shannon CTA between Objective: FAB Denmark/Sweden Denmark/Sweden FAB NEFAB FL185 and FL245 above the Dublin CTA is To further improve the airspace structure and the flight planning options not affected. This will bring flight planning 396. within Borealis FRA Area States. FAB NEFAB FAB UK/Ireland FAB UK/Ireland ISL for operators in line with the current daily operation. RFG NW

Project Category: Related proposals: Free Route  65.066 Airspace  87.028b  87.028c

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 178 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 87.028d  87.028e  87.028f  87.028g Proposal ID : 88.025 Impl. Status: State(s) & Org. Comments: Project Name: AIRLA - RNAV approaches Proposed IRL . Phased implementation 2017/2018 summer 2017 . To be conducted under a funding contract Description: Originator(s): a. To develop RNAV LPV approaches to 21 State & Regional airport Project Category: IRL awarded by GSA. runways. Airspace Structure b. To restructure the airspace at each airport to provide direct routing TMA 397. to the new LPV procedures, protected by controlled airspace.

Objective: To further improve the airspace structure and enhance efficiency within Shannon UIR. Proposal ID : 81.041 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . Annex 11 stated that the 5LNCs shall be To replace existing 5LNC BRAVO. summer 2017 unique. Originator(s): Objective: Project Group: EUROCONTROL . BRAVO is used 7 times worldwide and is 398. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT RFG SE ICAO allocated in ICARD to Brazil. region, to improve the aeronautical information provided and be . ICAO DM sent relevant message to ITA Project Category: (DM23/01 MSG 14-027). compliant with ICAO Annex 11. 5LNC Proposal ID : 84.044 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . RASIN is with double reservation in ICARD To replace existing 5LNC RASIN. summer 2017 for Croatia and Senegal. Originator(s): Objective: Project Category: EUROCONTROL . Point is used in Italy for military aerodrome purpose at LICZ. 399. 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO EUR/NAT region; . Proposal for replacement is based on 2. To improve the aeronautical information provided; “Common criteria for replacement of 3. To be compliant with ICAO Annex 11. duplicated 5LNCs” as point is not reserved for Italy. Proposal ID : 84.045 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . LORIS is not in ICARD and it is not

To replace existing 5LNC LORIS. summer 2017 Originator(s): available for selection in any region. 400. Objective: Project Category: EUROCONTROL . Point is used in Italy for two separate 1. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO military aerodrome purpose at LICZ and

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 179 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

EUR/NAT region; LIPL. 2. To improve the aeronautical information provided; . Proposal for replacement is based on 3. To be compliant with ICAO Annex 11. “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Italy.

Proposal ID : 65.018c Impl. Status: State(s) & Org. Comments: Description: Proposed MAR To implement ATS route segment SONSO - RAVOL - summer 2017 Originator(s): OSDAM northbound. Project Category: MAR 401. Objective: ATS Routes To further improve the ATS route network within Casablanca FIR.

Proposal ID : 66.078b Impl. Status: State(s) & Org. Comments: Description: Proposed MAR To implement the following ATS routes: summer 2017 Originator(s): 1. RBT - TOLSI northbound; Project Category: MAR 402. 2. BAGBO - RBT bidirectional (CDR). ATS Routes Objective: To further improve the ATS route network within Casablanca FIR. Proposal ID : 66.081b Impl. Status: State(s) & Org. Comments: Description: Proposed MAR Currently SUBAL - SUNID - IBALU - RBT and To implement the following ATS route segments: summer 2017 BEXAL - SUNID - NISBA are available as DCTs. Originator(s): a. SUBAL - SUNID - IBALU - RBT bi-directional; Project Category: MAR Related proposals: b. BEXAL - SUNID - NISBA bi-directional; ATS Routes  66.081c 403. c. SONSO - MAK northbound; d. CSD - RBT bi-directional;

Objective: To further improve ATS route network within Casablanca FIR/UIR. Proposal ID : 67.006 Impl. Status: State(s) & Org. Comments: Description: Proposed MAR Connection already exists as DCT in RAD

To implement southbound ATS route TAKAV - VEDOD. summer 2017 Originator(s): Appendix 4. 404. Objective: Project Category: IACA To further improve the ATS route network within Casablanca FIR. ATS Routes Proposal ID : 71.049 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 180 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed MAR Re-organisation of existing Fes (GMFF) Saiis 1. To introduce radar approach (MSSR mode S and Primary radar summer 2017 airport TMA implemented. Originator(s): approach) for Fes (GMFF) Saiis airport. Project Category: MAR 405. 2. To implement new SIDs and STARs for Fes (GMFF) Saiis airport. Airspace Structure Objective: TMA To further improve airspace organisation around Fes (GMFF) Saiis airport. Proposal ID : 71.050 Impl. Status: State(s) & Org. Comments: Description: Proposed MAR To introduce radar approach (MSSR mode S and Primary radar summer 2017 Originator(s): approach). Project Category: MAR 406. Objective: Airspace Structure To further improve airspace organisation around Casablanca (GMMN) Mohammed V airport. Proposal ID : 71.051 Impl. Status: State(s) & Org. Comments: Description: Proposed MAR a. To implement new TMA. summer 2017 Originator(s): b. To implement new SIDs and STARs. Project Category: 407. MAR Objective: Airspace Structure To further improve airspace organisation around Nador (GMMW) El TMA Aroui airport. Proposal ID : 71.055 Impl. Status: State(s) & Org. Comments: Description: Proposed MAR To introduce radar approach (MSSR mode S and Primary radar summer 2017 Originator(s): approach) for Tanger (GMTT) Ibn Battouta airport. Project Category: 408. MAR Objective: Airspace Structure To further improve airspace organisation around Tanger (GMTT) Ibn Battouta airport. Proposal ID : 81.042 Impl. Status: State(s) & Org. Comments: Description: Proposed MAR . Annex 11 stated that the 5LNCs shall be

To replace existing 5LNC KESIR. summer 2017 Originator(s): unique. . KESIR is used by and is allocated in ICARD 409. Objective: Project Category: EUROCONTROL To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT 5LNC ICAO to Turkey. region, to improve the aeronautical information provided and be compliant with ICAO Annex 11. Proposal ID : 85.010 Impl. Status: State(s) & Org. Comments: European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 181 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed MAR . Outcome of SW Axis/37 (17 - 18 MAR

To allow “Direct” H24 flight planning option IBALU DCT SAMAR for ARR summer 2017 Originator(s): 2015). GCLP / GCXO. . An optimum use was considered by AOs Project Category: ESP Objective: DCTs and it is for all European DEP except EG.. / To further improve the flight planning options within Morocco for arrivals RAD EI… to Grand Canaria and Tenerife North airports. . Information on possible loading (25 daily flights) was provided to Morocco for further 410. consideration. . Similar distance as existing option via TERTO but shifts traffic in other Canarias ACC Sector allowing proper re-distribution. . Option available after the new sectorisation. . This DCT is used Tactically between Canarias ,Casablanca and Seville during weekend on request by Canarias Proposal ID : 67.004b Impl. Status: State(s) & Org. Comments: Description: Proposed NLD

To redesignate existing ATS route L/UL19 MOLIX - TULIP as M/UM624 summer 2017 Originator(s): (release of L19). Project Group: EUROCONTROL 411. Objective: FAB EC

To further improve the ATS route network within Amsterdam FIR in order Project Category: to adapt the ATS route designators to the existing traffic flows and Route facilitate flight planning. Redesignation Proposal ID : 80.010c Impl. Status: State(s) & Org. Comments: Project Name: ECAC States AIP en-route publication issues Proposed NLD . RDs KZ02 - 09 are not in accordance with summer 2017 Annex 11. Description: Originator(s): To re-designate the following existing Helicopter routes: KZ02 - KZ09, Project Category: EUROCONTROL . All RDs are not coordinated via ICARD. 412. KZ20, KZ23, KZ25, KZ30, KZ53, KZ60, KZ66. AIP

Objective: Route To adapt existing RDs in accordance with ICAO requirements. Redesignation Proposal ID : 81.045 Impl. Status: State(s) & Org. Comments: Description: Proposed NLD . Annex 11 stated that the 5LNCs shall be

To replace 5LNC REGNA. summer 2017 Originator(s): unique. . REGNA is allocated to Russian 413. Objective: Project Category: EUROCONTROL To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT 5LNC ICAO Federation.Released by Netherlands on 19 region, to improve the aeronautical information provided and be AUG 2002 but still used for EHRD SID as compliant with ICAO Annex 11. per AIPNetherlands - ENR 4.4-4 / 27 JUN

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 182 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

2013. . ICAO DM sent relevant message to NLD (DM28/01 MSG 14-051). . NLD confirmed 290114 that they will investigate.

Proposal ID : 84.117 Impl. Status: State(s) & Org. Comments: Description: Proposed NLD . PEPEL is reserved in ICARD for To replace existing 5LNC PEPEL. summer 2017 Uzbekistan. Originator(s): Objective: Project Category: EUROCONTROL . Proposal for replacement is based on “Common criteria for replacement of 414. a. To avoid 5LNCs duplication within the ECAC area of the ICAO 5LNC ICAO EUR/NAT region; duplicated 5LNCs” as point is not reserved b. To improve the aeronautical information provided; for the Netherlands. c. To be compliant with ICAO Annex 11.

Proposal ID : 79.076c / 19.065c Impl. Status: State(s) & Org. Comments:

Project Name: RNAV procedures for EPPO Proposed POL Related proposals: summer 2017 Description: Originator(s):  79.076a To implement RNAV procedures for TMA Poznan South (EPPO) airport. Project Group: POL  79.076b 415. SG BALTIC Objective: To further improve the airspace organisation within Warszawa FIR. Project Category: PBN TMA Proposal ID : 87.020 / 23.037 Impl. Status: State(s) & Org. Comments: Description: Proposed POL . Currently this DCT is allowed for traffic DEP

To expand the utilization of existing H24 “Direct” flight planning option summer 2017 Originator(s): EK/ES - ARR EDDM, LOWI, LOWS and DENKO DCT LATAG by allowing ARR LI... LOWW. Project Group: IATA 416. Objective: SG BALTIC . This DCT is solely within Warszawa ACC To further improve the utilization of allowed DCTs within Warszawa FIR. Sector D and could shorten flying distance Project Category: with 34NM. RAD Proposal ID : 62.028b / 20.044b Impl. Status: State(s) & Org. Comments: Description: Proposed POL Night DCT ETRUS - GORPI - CHO - GOVEN

To expand the "Direct" flight planning option on segment ETRUS - summer 2017 Originator(s): existing. 417. GORPI - CHO - GOVEN to H24. Project Group: IATA Related proposals:

SG BALTIC  62.028a / 20.044a

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 183 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: Project Category: To further improve flight planning options within Warszawa FIR. DCTs Proposal ID : 65.052b / 18.040b Impl. Status: State(s) & Org. Comments: Description: Proposed POL Night DCT flight planning options existing. To expand the following Night "Direct" flight planning options to H24: summer 2017 SWE

a. LENOV DCT BABEN or LENOV DCT VIBUL; Project Group: Originator(s): b. REGLI DCT BURAN; 418. SG BALTIC IATA c. XELOL DCT LENOV or ELPOL DCT LENOV. Project Category: Objective: DCTs To further improve flight planning options within Warszawa FIR and Sweden UIR. Proposal ID : 70.019c / CE0043 Impl. Status: State(s) & Org. Comments: Description: Proposed SVK Currently not part of FRABRA. To implement H24 "Direct" flight planning option PITOK DCT LALES. summer 2017 Originator(s): Related proposals: Objective: Project Group: FAB CE  74.017 / 16.025 419. To further improve the ATS route network within the FAB CE area while FAB CE

providing additional shorter route options. Project Category: DCTs RAD Proposal ID : 70.019x / CE0064 Impl. Status: State(s) & Org. Comments: Description: Proposed SVK Currently not part of FRABRA To allow H24 "Direct" flight planning option PARAK DCT SUPAK. summer 2017 Originator(s): Related proposals: Objective: Project Group: FAB CE  70.019z / 23.031 420. To further improve the ATS route network within the FAB CE area while FAB CE

providing additional shorter route options. Project Category: DCTs RAD Proposal ID : 81.068c Impl. Status: State(s) & Org. Comments: Description: Proposed SVK . SVK: no northbound track feasible for To allow "Direct" flight planning option ALAMU or ERGOM DCT BILNA. summer 2017 safety reasons. Originator(s): Objective: Project Group: IATA . This is the only missing link on bi-directional 421. To further flight planning option on Northbound direction within Bratislava RFG SE options from Croatia via Hungary, Slovakia, FIR. Czech Republic and Poland towards Project Category: Scandinavia and vice-versa. DCTs RAD Related proposals:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 184 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

 81.064a  81.064b  81.066  81.067 Proposal ID : 87.022 Impl. Status: State(s) & Org. Comments: Description: Proposed SVK . 6 (six) VFR reporting points are similar to To withdraw or replace, in accordance with ICAO Annex 11, VFR entry summer 2017 five-letter pronounceable name-codes Originator(s): and exit points to/from CTRs published as village names composed of Project Category: EUROCONTROL (5LNCs). Most of these names are five-letters similar to pronounceable 5LNCs in AIP Slovakia, part AD 2. reserved as 5LNCs in ICARD and already AIP Objective: used worldwide by other States. To further improve the AIP publication avoiding duplication of . These names maintained in any 422. pronounceable 5LNCs. aeronautical database create and might create artificial name duplication contrary to Annex 11. . Internal finalization of VFR reporting point purpose, reason of AIP publication and compatibility with ICAO shall be considered.

Proposal ID : 86.027 / 23.038 Impl. Status: State(s) & Org. Comments: Description: Proposed SWE . Around 30 (thirty) VFR reporting points are

To withdraw or replace VFR reporting points published as pronounceable summer 2017 Originator(s): designated as five-letter pronounceable 5LNCs in AIP Sweden, part AD 2, Visual Approach Charts. name-codes (5LNCs). Most of them are Project Group: EUROCONTROL Objective: SG BALTIC reserved in ICARD and already used To align AIP publication in accordance with Annex 11. worldwide by other States. Project Category: . In accordance with Annex 11 only when a 423. 5LNC significant point is used for ATC purposes, it AIP shall be designated by a unique five-letter pronounceable “name-code”. . Internal finalization of VFR reporting point purpose, reason of AIP publication and compatibility with ICAO shall be considered. . Pending CAA decision. Proposal ID : 60.010g / 15.046g Impl. Status: State(s) & Org. Comments: Project Name: SMART, Phase 4 Proposed TUR . SMART: Systematic Modernization of ATM summer 2017 Resources in Turkey. Description: Originator(s): 424. To completely redesign entire Turkish lower and upper airspace, ACC Project Group: TUR Related proposals: sectorisation (20 sectors FL235 and above) and reconfigure ACC/APP RFG SE  60.010c with DFL235 and FL325. SG BLACK  60.010f

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 185 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: Project Category:  60.010h / 15.046h To further improve airspace organisation within Istanbul FIR and Ankara Airspace Structure FIR and enhance capacity within the Turkish ACCs in order to cope with ATC Sectors the increasing traffic demand (SMART project, Phase 4). Proposal ID : 74.056 / 17.016 Impl. Status: State(s) & Org. Comments: Description: Proposed TUR None allowance of alternative ATS route option

To adapt RAD restriction LT2017 by adding exception during Night summer 2017 Originator(s): . This restriction is directly connected with (Note 3) same as RAD restriction LT2070. any changes to RAD restriction LT2070. As Project Group: EUROCONTROL Objective: RFG SE from 5 MAY 2011 LT2070 (Note 3) had To further improve airspace utilisation between Istanbul FIR, Hellas UIR SG BLACK been changed and during the NIGHT period and Sofia FIR. 17.30h - 02.30h (AIRAC APR - AIRAC OCT Project Category: inclusive) DEP LTAI are allowed to fly via RAD IMR (and not only via VADEN/MAKOL). 425. The most logic option is IMR UN128 LMO PEREN where there are two possibilities UN128 PEREN - FSK - RUGAS or UN133 PEREN - EVIVI. Currently LT2017 is not adapted to LT2070. . This restriction artificially blocks second alternative and AOs are not able to fly via EVIVI. Proposal ID : 87.027 / 23.039 Impl. Status: State(s) & Org. Comments: Project Name: 5LNC KAMAN Proposed TUR KAMAN is one of that TMA entry/exit points, is summer 2017 on the AWY A/UA 285 and will be replaced by Description: Originator(s): To replace existing 5LNC KAMAN. Project Group: ICAO ADVOK point which has been allocated to 426. SG BLACK Turkey at 13.04.2015. Objective: 1. To avoid 5LNC duplication worldwide. Project Category: 2. To improve the aeronautical information provided. 5LNC 3. To be compliant with ICAO Annex 11. Proposal ID : 80.021c / 20.046c Impl. Status: State(s) & Org. Comments: Description: Proposed TUR

To introduce P-RNAV SIDs/STARs for Izmir/Adnan Menderes (LTBJ) summer 2017 Originator(s): airport. Project Group: TUR 427. Objective: RFG SE To further improve the airspace organisation within Istanbul FIR and SG BLACK

Ankara FIR. Project Category: PBN

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 186 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

TMA Proposal ID : 71.086b Impl. Status: State(s) & Org. Comments: Project Name: FRALB - Free Route Airspace Albania - Phase 2 Planned ALB ATS route network will be withdrawn. 07 DEC 2017 Description: Originator(s): Related proposals: To extend time availability to H24 of NIGHT Free Route Airspace within Project Group: ALB  71.085a 428. Tirana CTA / UTA. RFG SE FAB BLUE MED  71.086a

Objective: Project Category:  71.087 To further improve the Free Route Airspace operations within Tirana FIR. Free Route  71.089b Airspace Proposal ID : 86.056e Impl. Status: State(s) & Org. Comments:

Project Name: Nicosia Direct Route Airspace - Phase 2B Planned CYP Related proposals: 07 DEC 2017 Description: Originator(s):  86.056a To allow new H24 and/or expand to H24 the rest of the existing NIGHT Project Group: CYP  86.056b "Direct" flight planning options above FL285. FAB BLUE MED FAB BLUE MED  86.056c 429. RFG SE Objective:  86.056d To further improve flight planning options within Nicosia FIR. Project Category: DCTs RAD Proposal ID : 87.005d Impl. Status: State(s) & Org. Comments:

Project Name: FRA Germany - Phase 4 Planned DEU Related proposals: 07 DEC 2017 Description: Originator(s):  87.005a To implement Full Free Route Airspace Germany, Solution 1a and 1b as Project Group: DEU  87.005b follows: FAB EC FAB EC  87.005c

1. H24 within North East (above FL285/315); Project Category:  87.005e 430. 2. Night within South West (above FL245/315); Free Route 3. Night within AoR of Munich ACC (FL245 - FL315); Airspace 4. Night within AoR of Bremen ACC (FL245-FL285).

Objective: To implement Full FRA according to PCP requirements and improve flight efficiency within FABEC. Proposal ID : 87.036a Impl. Status: State(s) & Org. Comments: Project Name: FRAM2 Project - Phase 1 Planned MUAC . Night period 23:00 - 05:00 (22:00 - 04:00).

Description: 07 DEC 2017 BEL . ATS route network and all allowed DCTs will 431. To introduce NIGHT Free Route Airspace above FL245 within the Project Group: DEU exist. NLD Maastricht UAC AoR. FAB EC Related proposals:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 187 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: Project Category: Originator(s):  87.036b To allow Free Route Airspace operations within Maastricht UAC. Free Route MUAC  87.036c Airspace FAB EC Proposal ID : 84.063 / 22.048 Impl. Status: State(s) & Org. Comments: Description: Proposed FIN . Currently in AIP Finland, Part AD for each

To withdraw or replace, in accordance with Annex 11, VFR reporting autumn 2017 Originator(s): aerodrome after the table with RNAV points published as pronounceable 5LNCs in AIP Finland, part AD 2. terminal points there is a table with VFR Project Group: EUROCONTROL Objective: SG BALTIC reporting points most of which are declared as compulsory. To comply with requirements of Annex 11 in designation of significant Project Category: points with 5LNCs. . These VFR reporting points are designated 5LNC as five-letter pronounceable name-codes (5LNCs) and internal finalization of their purpose, reason of AIP publication and 432. compatibility with ICAO shall be discussed. . In accordance with Annex 11 only when a significant point is used for ATC purposes, it shall be designated by a unique five-letter pronounceable “name-code”. . None of these 5LNCs are reserved for Finland. . The use of already reserved 5LNCs is contrary to provisions of Annex 11 and might be considered as safety issue. Proposal ID : 75.050 / 15.043 Impl. Status: State(s) & Org. Comments: Project Name: BALTIC FAB ATS routes Proposed POL . AAAAA (540216N 0233059) will be a new autumn 2017 LTU common boundary point between FIR Description: a. To implement the following new ATS routes: Project Group: Originator(s): EPWA and FIR EYVL (coordinates are not i. EVODO - AAAAA westbound; FAB Baltic FAB Baltic finally fixed). ii. SUW - VABER eastbound; SG BALTIC . Changes to Vilnius SIDs/STARs also iii. AAAAA - BADUS westbound; required. Project Category: . Depends on changes in Moscow area iv. AAAAA - LAVAR westbound. ATS Routes 433. b. To change the following existing ATS routes: followed by changes in interface between i. N858 DENKO - BOKSU - LAVAR change of direction to Republic of Belarus and Lithuania. westbound; ii. L735 GOVEN - ZZZZZ - AAAAA westbound; iii. T727 SUI - XXXXX - VABER change of direction to eastbound; iv. Y225 new segment OSKUD - YYYYY (in T727) eastbound; v. L29 VABER - LAVAR change of direction to eastbound.

Objective:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 188 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To further improve the ATS route network within the Baltic FAB. Proposal ID : 82.031 / 20.033 Impl. Status: State(s) & Org. Comments:

Project Name: DANUBE FAB FRA - Phase 3 Proposed BGR Related proposals: winter 2017/18 ROU Description:  69.052 / 16.008 To extend time availability to H24 on Seasonal bases above a certain Project Group: Originator(s):  82.030 / 20.032 FL of NIGHT Free Route Airspace within the DANUBE FAB area. FAB DANUBE FAB DANUBE  82.032 / 20.034

434. Objective: RFG SE  82.033 / 20.035 SG BLACK To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR. Project Category: Free Route Airspace Proposal ID : 87.054 Impl. Status: State(s) & Org. Comments: Project Name: Implementation of FUA restrictions Proposed CHE This includes the operational use of Flight winter 2017/18 AUT Planning Buffer Zones and the implementation Description: To change from a route-based airspace management to an airspace- Project Category: DEU of (potentially complex) FUA restrictions in RAD based ASM philosophy. Civil/Military ITA Appendix 7 and adaptation of several 435. Airspace FRA restrictions in the Pan-Europe Annex - see Objective: FAB EC attached file. To get Swiss Airspace Management techniques ready for FRA DCTs implementation. RAD Originator(s): Related proposals: CHE  87.052 FAB EC  87.053 Proposal ID : 87.053 Impl. Status: State(s) & Org. Comments: Project Name: Direct Route Airspace Implementation AoR Zurich Proposed DEU Redundant ATS routes will be removed. winter 2017/18 FRA Description: Related proposals: To implement a comprehensive network of DCT segments in Zurich ACC Project Category: CHE  87.052 FAB EC 436. AoR, FL305+, H24 subject to airspace availability. DCTs  87.054

Objective: Originator(s): To increase flight efficiency during daytime and become compliant with CHE PCP implementing rule. FAB EC Proposal ID : 75.082 Impl. Status: State(s) & Org. Comments: Project Name: Brest ACC re-organisation Proposed FRA . Under study. To be done progressively. winter 2017/18 . Final Step summer 2015. Description: Originator(s): 437. To re-organise the lower airspace and ATS delegation to APP units Project Category: FRA Related proposals: below FL195 for relevant airspace in Brest ACC (2nd and final Step) . Airspace Structure  69.089a

Objective:  69.089c

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 189 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To further improve the airspace structure within France FIR.  69.089e  69.089f  75.073a  75.080

Proposal ID : 75.069 Impl. Status: State(s) & Org. Comments: Project Name: Paris Point Merge TE Proposed FRA

Description: winter 2017/18 BEL MUAC To implement the Point Merge TE (Paris ACC) for Paris TMA arrivals Project Category: from the north-east. Airspace Structure Originator(s):

438. Objective: TMA FRA To further improve the airspace structure while increasing the capacity of FAB EC the sectors concerned, the decent profiles and sequencing of traffic with destination Paris TMA.

Proposal ID : 64.014d Impl. Status: State(s) & Org. Comments: Project Name: ESSO - Espace Superieur du Sud Ouest Proposed FRA Common project at the

Description: winter 2017/18 ESP Barcelona/Madrid/Bordeaux interface (BAMBI) is part of this project. To re-organize Bordeaux ACC upper airspace (military zones, route Project Group: Originator(s): network and sectorisation) taking into account both French civilian and RFG SW FRA Related proposals:

military requirements (adaptation to the new training needs resulting Project Category: ESP  64.014b from new aircraft and new weapons).  66.053a 439. Airspace Structure Objective: Civil/Military  66.053b To further improve the ATS route network and associated airspace Airspace  66.053d structure both within Bordeaux UIR and at the interface between France UIR, Madrid UIR and Barcelona UIR, by segregating major traffic flows and creating specialised ATC sectors, in order to increase capacity, considering civil as well as military airspace requirements. Proposal ID : 64.014b Impl. Status: State(s) & Org. Comments: Project Name: Barcelona, Madrid, Bordeaux Interface, BAMBI Proposed FRA . BAMBI: Common project at the Barcelona/ winter 2017/18 ESP Madrid/ Bordeaux interface along the Description: To re-organise the Barcelona/ Bordeaux interface as part of the Project Group: Originator(s): South-west axis. . a. Agreement with French military required. 440. Barcelona/Madrid/Bordeaux (BAMBI) interface: RFG SW FRA

1. to implement PPG - ALBER dualization via new point EREPI. Project Category: ESP Related proposals: 2. to implement northbound trident GIROM - TIPAP - OKABI.  64.014c Airspace Structure Objective: Civil/Military  64.014d

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 190 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

To further improve the ATS route network and associated airspace Airspace structure at the Barcelona FIR/ Bordeaux FIR interface by segregating major traffic flows in order to increase capacity, considering civil as well as military airspace requirements. Proposal ID : 64.014c Impl. Status: State(s) & Org. Comments: Project Name: Barcelona, Madrid, Bordeaux Interface, BAMBI Proposed FRA BAMBI: Common project at the Barcelona/

Description: winter 2017/18 ESP Madrid/ Bordeaux interface along the South- west axis. To re-organise the Madrid/ Bordeaux interface as part of the Project Group: Originator(s): Barcelona/Madrid/Bordeaux (BAMBI) interface: RFG SW FRA Related proposals:

1. To re-design TSA 34 (enlargement). Project Category: ESP  64.014b 2. To adjust ATS routes accordingly (LATEK area). 441. Airspace Structure 3. To change Madrid ACC sectors ZGZ/PAU/PAL accordingly. Civil/Military Objective: Airspace To further improve the airspace structure at the interface between Madrid FIR/UIR and Bordeaux FIR by enlarging TSA34 in response to future military needs and adjust ATS routes/ ATC sectors accordingly, considering civil as well as military airspace requirements. Proposal ID : 84.018b Impl. Status: State(s) & Org. Comments: Project Name: S-WAFLE - South West Adaptation Flight Level Proposed FRA Phase 1: 4th layer in sector P (FL365+). Evolution Phase 2 winter 2017/18 Originator(s): Related proposals: Description: Project Category: FRA  84.018a To create an additional layer in Bordeaux ACC sectors L, R and P, Phase ATC Sectors 442. 2: 5th layer in sectors L and R (FL385+)

Objective: To further improve the airspace structure and increase capacity within Bordeaux ACC in order to meet traffic demand. Proposal ID : 85.009b / 21.023b Impl. Status: State(s) & Org. Comments:

Project Name: Free Route Airspace Georgia - FRAG Phase 2 Proposed GEO Related proposals: winter 2017/18 Description: Originator(s):  85.009a / 21.023a To expand existing H24 Free Route Airspace in Tbilisi CTA down to Project Group: GEO 443. FL085. SG BLACK

Objective: Project Category: To further improve airspace organisation within Tbilisi FIR. Free Route Airspace Proposal ID : 71.052 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 191 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Proposed MAR 1. To implement a new TMA for Tetouan (GMTN) Saniat R’mel airport. winter 2017/18 Originator(s): 2. To implement new SIDs and STARs for Tetouan (GMTN) Saniat Project Category: MAR 444. R’mel airport. Airspace Structure Objective: TMA To further improve airspace structure around Tetouan (GMTN) Saniat R’mel airport. Proposal ID : 71.053 Impl. Status: State(s) & Org. Comments: Description: Proposed MAR 1. To implement new TMA for Al Hoceima (GMTA) Cherif El Idrissi winter 2017/18 Originator(s): airport. Project Category: MAR 2. To implement new SIDs and STARs for Al Hoceima (GMTA) Cherif Airspace Structure 445. El Idrissi airport. TMA Objective: To further improve airspace organisation around Al Hoceima (GMTA) Cherif El Idrissi airport.

Proposal ID : 65.044 Impl. Status: State(s) & Org. Comments: Project Name: INTRAC Proposed MLT INTRAC/ New Terminal Routing Airspace winter 2017/18 Concept. Description: Originator(s): 446. To design and publish RNAV SIDs and STARs for LMML airport. Project Category: EUROCONTROL

Objective: Airspace Structure To further improve the airspace organisation within Malta FIR. PBN Proposal ID : 76.053 / 18.039 Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Warsaw FIR, Phase 4 Proposed POL . Part of Polish Airspace Project 2010+ winter 2017/18 (Phase 5). Description: Originator(s): To implement full Free Route Airspace in Warsaw FIR FL305+. Project Group: POL . No extension planned to lower FRA operations within Warsaw FIR below Objective: SG BALTIC 447. FL305. To further improve the airspace organisation and flight Project Category: efficiency within Warszawa FIR (Polish Airspace Project 2010+, Phase Free Route Related proposals: 5). Airspace  62.091b  62.091c  76.052 / 23.029 Proposal ID : 60.010h / 15.046h Impl. Status: State(s) & Org. Comments: Project Name: FRA Like (DCT) SMART, Phase 5 Proposed TUR Planned, phased implementation: 448. winter 2017/18 . SMART: Systematic Modernization of ATM

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 192 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Project Group: Originator(s): Resources in Turkey. To allow Free Route flight during Night (DCTs) and Weekend RFG SE TUR . 2012 -2015: gradual implementation of (DCTs) above FL285. DCTs during night or H24; Project Category: Objective: . Nov 2013: full current airspace structure Free Route validation in SAAM, including en-route and To further improve airspace organisation within Istanbul FIR and Ankara Airspace FIR and enhance capacity within the Turkish ACCs in order to cope with TMA; the increasing traffic demand (SMART project, Phase 5). . Nov 2013 - Spring 2014: detailed development of Free Route Airspace airspace design and associated sectorisation; . Autumn/Winter 2014/15 - RTS of new airspace structure; . Spring 2015 - Autumn 2015: fine-tuning of airspace design, airspace publication validation with NM, airspace structure testing in DNM systems; . Summer 2018: FRA implementation.

Related proposals:  60.010c  60.010f  60.010g / 15.046g  76.068 / 19.063 Proposal ID : 68.012d Impl. Status: State(s) & Org. Comments:

Project Name: Lower airspace re-organisation Beograd FIR - Step 4 Planned SRB Related proposals: 24 MAY 2018 MNE Description:  68.012a To further reorganize vertical and horizontal TMA boundaries in Beograd Project Group: Originator(s):  68.012b 449. FIR. RFG SE SRB  68.012c

Objective: Project Category: MNE To further improve the airspace structure and ATS route network within Airspace Structure Beograd FIR. Proposal ID : 73.053 Impl. Status: State(s) & Org. Comments: Project Name: Barcelona TMA, Phase 1 Proposed ESP Project currently on hold, further update spring 2018 pending. Description: Originator(s): To introduce new SIDs and STARs for LEBL airport, prior to the Project Group: ESP Related proposals: 450. implementation of new P-RNAV structure of Barcelona TMA. RFG SW  66.085

Objective: Project Category: To further improve airspace organisation within Barcelona FIR. Airspace Structure TMA

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 193 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 69.095a Impl. Status: State(s) & Org. Comments: Project Name: Prestwick Lower Airspace - PLAS Proposed GBR . To establish PRNAV procedures, revised spring 2018 SIDs that accommodate CCDs, revised Description: Originator(s): To re-design the Northern Terminal Control Area/ NTCA of Prestwick Project Category: GBR STARs allowing CDAs from higher altitudes, ACC (formerly Manchester TMA project). PBN improved arrival and departure TMA management and holding concepts to Objective: include Point Merge, if and where 451. To further improve the airspace structure within London FIR through considerate appropriate. redesign in order to enhance safety, capacity and provide environmental . To consider specific requests for route improvements with expected traffic growth from airfields in Northern improvements from the operators such as England. TNT - LAMIX and LIBSO - PEDIG.

Related proposals:  82.054 Proposal ID : 82.054 Impl. Status: State(s) & Org. Comments: Project Name: SID Truncation Proposed GBR Part 2 of Prestwick Lower Airspace - PLAS spring 2018 project. Description: Originator(s): To truncate EGBB Northbound SIDs as follows: Project Category: GBR Related proposals: a. WHI 4D Truncate at new waypoint LUVUM and become LUVUM 1D Airspace Structure  69.095a and use L8 to get to NANTI and use L8 to ASNIP and Y53 to WAL - ATM System removes requirement for DCT between WHI and WAL; 452. b. TNT 4D Truncate at new waypoint LEDLA and become LEDLA 1D and use T29 to get to TNT; c. WHI 1L/TNT 1L Truncate at new waypoint ODUNU and become ODUNU 1L and use extended Y124 to get to NANTI and MOGTA and extended T29 to get from ODUNU to TNT (via LEDLA).

Objective: To reduce portion of flight plan route fuelled at SID Altitude. Proposal ID : 76.051 Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Madrid / Brest Proposed PRT . Postponed from winter 2014/15 to winter

Description: spring 2018 ESP 2017/18 after FRES/2 meeting. FRA . FRAL - Free Route Airspace Lisbon FIR To implement Free Route Airspace based on DCTs in Madrid FIR and Project Group: Brest FIR as a continuation of Free Route Airspace in Lisbon FIR. FAB EC Originator(s): above FL245 implemented 7 May 2009. FAB SW PRT . Free Route Airspace SAN & ASI 453. Objective: ESP sectors/FRASAI, Phase 2 implemented 1 To further improve the airspace organisation between Lisbon FIR, Project Category: May 2014. Madrid FIR and Brest FIR. Free Route FRA Airspace FAB EC Related proposals:  64.030  73.051

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 194 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Proposal ID : 76.068 / 19.063 Impl. Status: State(s) & Org. Comments: Project Name: Istanbul International Airport - Phase 1 Proposed TUR . LTBA and LTFJ airports will continue to be spring 2018 BGR operational. LTBA might be devoted to other Description: 1. To implement a new Istanbul international airport - northwest of Project Group: Originator(s): types of traffic. the city - having initially 3 (three) runways with the plan to extend up RFG SE TUR . That will also result in a major TMA re- design with significant network impacts. to six runways. SG BLACK 454. 2. To re-organise the airspace of Istanbul FIR and Sofia FIR Project Category: Related proposals: accordingly, if required.  60.010h / 15.046h Airspace Structure Objective: TMA To further improve the airspace structure and to accommodate the traffic growth planned by Turkish airlines for the coming years. Proposal ID : 83.030b / 21.003b Impl. Status: State(s) & Org. Comments:

Description: Proposed ARM Related proposals: To implement H24 Free Route Airspace in Yerevan ACC. summer 2018 Originator(s):  83.030a / 21.003a Objective: Project Group: ARM 455. To further improve airspace organisation within Yerevan FIR. SG BLACK

Project Category: Free Route Airspace Proposal ID : 64.027 / 18.038 Impl. Status: State(s) & Org. Comments: Project Name: Common Terminal Airspace System Proposed BGR Implementation will be at least one year after summer 2018 introduction of P-RNAV procedures for Burgas Description: Originator(s): 1. To implement a common Terminal Airspace System and implement Project Group: BGR (LBBG) and Varna (LBWN) airports.. P-RNAV procedures for Sofia (LBSF), Plovdiv (LBPD) and Graf RFG SE Ignatievo (LBGI) airports. SG BLACK 456. 2. To adjust the ACC sectors according to the future common TMA, if Project Category: necessary. Airspace Structure Objective: PBN To further improve the airspace structure within Sofia FIR and to cope with the expected traffic increase. Proposal ID : 71.088a Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Cyprus - FRANIC Phase 1 Proposed CYP . Studies ongoing in the context of Blue Med. summer 2018 . Needs alignment with IDP & TEN-T. Description: Originator(s): 457. To implement H24 Free Route Airspace FL285 - FL660 inNicosia FIR. Project Group: CYP Related proposals:

Objective: FAB BLUE MED FAB BLUE MED  71.088b RFG SE  86.056a To align the airspace structure with real operations. Operational DCT's to

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 195 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

be made flight plannable Project Category:  86.056b Free Route  86.056c Airspace Proposal ID : 66.085 Impl. Status: State(s) & Org. Comments: Project Name: Barcelona TMA, Phase 2 Proposed ESP Project currently on hold, further update pending summer 2018 . Description: Originator(s): To introduce new P-RNAV structure for Barcelona (LEBL) TMA, Phase Project Group: ESP Related proposals: 458. 2. RFG SW  73.053

Objective: Project Category: To further improve airspace organisation within Barcelona FIR. PBN TMA Proposal ID : 71.047 Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Casablanca, Phase 1 Proposed MAR Night period to be further defined. summer 2018 Description: Originator(s): Related proposals: To implement Night FRA based on DCTs in Western part of Casablanca Project Category: MAR  71.054 459. FIR (Oceanic and West Sectors). DCTs

Objective: Free Route To further improve the flight planning options within Casablanca FIR. Airspace RAD Proposal ID : 71.054 Impl. Status: State(s) & Org. Comments:

Project Name: Free Route Airspace Casablanca, Phase 2 & Phase 3 Proposed MAR Related proposals: summer 2018 Description: Originator(s):  71.047 1. To introduce Casablanca ACC dynamic sector management. Project Category: MAR 2. To implement Free Route during Night/Week-end within South and Free Route East Sectors (Phase 2). Airspace 460. 3. To implement Free Route within South Sector FL250+ (Full concept Phase 3). 4. To implement Free Route for East/West traffic (Oceanic and West Sectors).

Objective: To further improve airspace organisation within Casablanca FIR. Proposal ID : 81.022a / 19.061a Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Turkey - Phase 1 Proposed TUR . Turkey: within the sovereign airspace only.

Description: summer 2018 Originator(s): . Night period 23.00 - 05.00 (22.00 - 04.00). 461. To implement Night FRA Operations above FL285 in Turkey. Project Group: TUR Related proposals: RFG SE EUROCONTROL

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 196 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Objective: SG BLACK  81.022b / 19.061b

To implement FRA operations in Ankara and Istanbul FIRs Project Category: Free Route Airspace

Proposal ID : 81.018a / 19.021a Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Ukraine, Step 2 (Sc 2a) Planned UKR Free Route Airspace Ukraine - FRAU project 08 NOV 2018 Description: Originator(s): Related proposals: To implement H24 - Free Route Airspace operations above FL275 - Project Group: UKR  71.040a / 16.026a Ukraine wide. RFG SE  71.040b / 16.026b

462. SG BLACK  81.018b / 19.021b Objective: To implement FRA Concept and further improve flight efficiency within Project Category: Kyiv UIR. Free Route Airspace

Proposal ID : 60.006b Impl. Status: State(s) & Org. Comments: Project Name: BH ATM, Phase 2 Planned BIH . Phase 1: FL325 and below successfully 06 DEC 2018 HRV implemented 13 NOV 2014. Description: To re-organise the airspace structure within Sarajevo FIR above FL325. Project Group: MNE o Re-sectorisation required within Croatia SRB and Serbia. Objective: RFG SE . Close coordination with the Network To further improve the ATS route network and associated airspace Project Category: Originator(s): 463. BIH Manager and neighbouring ACCs. structure in order to support the establishment of the new ACC within Airspace Structure . Phased implementation of Night DCTs and Sarajevo FIR (BH ATM Project, Phase 2). H24 DCTs FL245+ planned. . Postponed due to lack of ATCOs.

Related proposals:  60.006a Proposal ID : 87.005e Impl. Status: State(s) & Org. Comments:

Project Name: FRA Germany - Phase 5 Planned DEU Related proposals: 06 DEC 2018 Description: Originator(s):  87.005a To implementation of Full Free Route Airspace Germany, Solution 2 H24 Project Group: DEU  87.005b 464. within South West - core area - (above FL385). FAB EC FAB EC  87.005c

Objective: Project Category:  87.005d To implement H24 Full FRA - according to PCP requirements and Free Route improve flight efficiency within FABEC. Airspace Proposal ID : 85.027 / 22.029 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 197 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Name: Free Route Airspace Moldova - Phase 3 Proposed MDA Related proposals: autumn 2018 Description: Originator(s):  72.052 / 14.015 To implement H24 Free Route Airspace above FL285 within Chisinau Project Group: MDA  83.061 / 21.016 FIR (NFRAC). RFG SE 465. SG BLACK Objective: To further improve the airspace organisation within Chisinau FIR. Project Category: Free Route Airspace Proposal ID : 62.091e / 23.035 Impl. Status: State(s) & Org. Comments: Project Name: Polish Airspace Project 2010+, Phase 3b Proposed POL . Depending on technical issues autumn 2018 (frequencies) and increasing the amount of Description: Originator(s): To implement a new airspace structure and sectorisation within Project Group: POL ATC staff. Warszawa ACC considering vertical splits (division into three layers), SG BALTIC . New elementary sectors with vertical splits. 466. . Finally the division into three layers. including TMA connectivity and interface areas with neighbouring States. Project Category: Objective: Airspace Structure Related proposals: To further improve the airspace structure within Warszawa ACC and ATC Sectors  62.091c increase capacity while applying vertical splits. Proposal ID : 82.032 / 20.034 Impl. Status: State(s) & Org. Comments:

Project Name: DANUBE FAB FRA - Phase 4 Proposed BGR Related proposals: winter 2018/19 ROU Description:  69.052 / 16.008 To extend H24 availability on Seasonal bases to all FLs of NIGHT Project Group: Originator(s):  82.030 / 20.032 Free Route Airspace within the DANUBE FAB area. FAB DANUBE FAB DANUBE  82.031 / 20.033

467. Objective: RFG SE  82.033 / 20.035 SG BLACK To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR. Project Category: Free Route Airspace Proposal ID : 87.036b Impl. Status: State(s) & Org. Comments: Project Name: FRAM2 Project - Phase 2 Proposed MUAC . Night period 23:00 - 05:00 (22:00 - 04:00). winter 2018/19 BEL . ATS route network and all allowed DCTs will Description: To expand to NIGHT and Weekends existing Free Route Airspace Project Group: DEU exist. NLD 468. above FL245 within the Maastricht UAC AoR. FAB EC Related proposals:

Objective: Project Category: Originator(s):  87.036a To further improve the Free Route Airspace operations within Maastricht Free Route MUAC  87.036c UAC. Airspace FAB EC Proposal ID : 82.033 / 20.035 Impl. Status: State(s) & Org. Comments:

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 198 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Project Name: DANUBE FAB FRA - Phase 5 Proposed BGR Related proposals: summer 2019 ROU Description:  69.052 / 16.008 To extend to full H24 above certain FL of NIGHT Free Route Airspace Project Group: Originator(s):  82.030 / 20.032 within the DANUBE FAB area. FAB DANUBE FAB DANUBE  82.031 / 20.033

469. Objective: RFG SE  82.032 / 20.034 SG BLACK To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR. Project Category: Free Route Airspace Proposal ID : 81.022b / 19.061b Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Turkey - Phase 2 Proposed TUR Turkey: within the sovereign airspace only. summer 2019 Description: Originator(s): Related proposals: To implement H24 FRA Operations above FL285 in Turkey. Project Group: TUR  81.022a / 19.061a RFG SE EUROCONTROL 470. Objective: SG BLACK To implement FRA operations in Ankara and Istanbul FIRs. Project Category: Free Route Airspace Proposal ID : 81.018b / 19.021b Impl. Status: State(s) & Org. Comments: Project Name: Free Route Airspace Ukraine, Step 2 (Sc 2b) Proposed UKR Class C Airspace, in Ukraine, at present - (year 2019 2014) is at FL105 and above. Description: Originator(s): To extend implementation of H24 - Free Route Airspace operations in Project Group: UKR Related proposals: entire Class C Airspace - Ukraine wide. RFG SE  71.040a / 16.026a 471. SG BLACK  71.040b / 16.026b Objective: To implement FRA Concept and further improve flight efficiency within Project Category:  81.018a / 19.021a L'viv CTA/UTA, Kyiv CTA/UTA, Odesa CTA/UTA and Dnipropetrovs'k Free Route CTA/UTA. Airspace Proposal ID : 87.055 Impl. Status: State(s) & Org. Comments:

Project Name: New Cross-Border Coordination Concept Proposed CHE Related proposals: winter 2019/20 DEU Description:  87.056a FRA To implement a new cross-border coordination concept as opposed to Project Category:  87.056b the current way of working, exchange of flights between centres will not Airspace Structure ITA 472. FAB EC be based solely on points, but will be organized via "gates" or "windows". ATC Sectors

Objective: ATM System Originator(s): To flexibilize the exchange of flights between adjacent centres and Free Route CHE prepare for FRA implementation. Airspace FAB EC

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 199 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

RAD Proposal ID : 87.056a Impl. Status: State(s) & Org. Comments:

Project Name: FRA Switzerland Night - Phase 1 Proposed CHE Related proposals: winter 2019/20 DEU Description:  87.055 FRA To implement (full) Free Route Airspace during Night within Zurich and Project Category:  87.056b ITA 473. Geneva AoRs. Free Route FAB EC Objective: Airspace To improve flight efficiency during night and gain experience with (full) Originator(s): Free Route operations. CHE FAB EC Proposal ID : 64.031 Impl. Status: State(s) & Org. Comments: Project Name: Berlin Brandenburg International (BER) airport Proposed DEU . EDDB:The planned openings of the new winter 2019/20 Berlin Brandenburg International (BER) Description: Originator(s): New Berlin Brandenburg International (BER) airport: Project Category: DEU airport on 03.06.2012 and 27.10.2013 were a. to establish a second runway at BER airport (current Berlin Airspace Structure postponed. Schoenefeld airport); TMA . EDDT : Berlin-Tegel planned to be closed b. to establish independent parallel runway operations; same time as EDDB is in operation. c. new/modified SIDs/STARs; . Possible ATFM Regulations due to 474. d. operational procedures; acclimatization of ACC and TWR staff (new e. to adjust Terminal sectors; airspace C structure and DEP/ARR f. one additional departure sector; procedures). g. to raise the DFL from FL165 to FL205. RNDSG/81 DEU: to be on hold when more details will be availble in the future. Objective: To further improve the airspace structure within Bremen FIR by Related proposals: expansion of Berlin Schoenefeld airport to become Berlin Brandenburg  65.011c International (BER) airport.  70.063 Proposal ID : 70.063 Impl. Status: State(s) & Org. Comments: Project Name: Sachsen/ SAS Upper sector Proposed DEU Depending on traffic evolution/demand and FRA

Description: winter 2019/20 Originator(s): implementation as well as the opening of the BER airport. To implement a Sachsen/ SAS Upper sector. Project Category: DEU

475. Objective: ATC Sectors Related proposals: To further improve the airspace structure while balancing  64.031 traffic/workload and consequently increasing capacity within Bremen FIR to meet traffic demand. Proposal ID : 87.028f Impl. Status: State(s) & Org. Comments:

476. Project Name: Borealis FRA - Step 6 Proposed GBR .

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 200 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: spring 2020 Originator(s): .

To implement H24 Free Route Airspace above FL 255 within the whole Project Group: FAB . Prestwick ACC AoR and in parts of London ACC AoR above FL335. Denmark/Sweden . Transition on to Free Route operations with FAB Objective: Denmark/Sweden FAB NEFAB potential Cross Border DCTs with adjacent To further improve the airspace structure and the flight planning options FAB NEFAB FAB UK/Ireland States. within Borealis FRA Area States. FAB UK/Ireland ISL . Above some specific ACC sectors, FRA operations will start only above FL285. RFG NW

Project Category: Related proposals: Free Route  81.073a Airspace  87.028a  87.028b  87.028c  87.028d  87.028e  87.028g

Proposal ID : 87.036c Impl. Status: State(s) & Org. Comments: Project Name: FRAM2 Project - Phase 3 Proposed MUAC ATS route network and all allowed DCTs will be spring 2020 BEL deleted. Description: To expand to H24 existing Free Route Airspace above FL245 within the Project Group: DEU Related proposals: NLD 477. Maastricht UAC AoR. FAB EC  87.036a

Objective: Project Category: Originator(s):  87.036b To further improve the Free Route Airspace operations within Maastricht Free Route MUAC UAC. Airspace FAB EC Proposal ID : 65.051b Impl. Status: State(s) & Org. Comments: Project Name: New runway Dublin Airport (EIDW) Proposed IRL Depending on traffic evolution, subject to growth summer 2020 to 23.5 M pax/y. Description: Originator(s): a. To build a new north parallel runway for Dublin Airport (EIDW). Project Category: IRL Related proposals: b. To develop SIDs and STARs for the new north parallel runway at Airspace Structure  65.051a 478. Dublin airport.

Objective: To further improve the airspace structure within Shannon UIR, to increase capacity and further enhance the efficiency of ATM operations at Dublin airport. Proposal ID : 87.037 Impl. Status: State(s) & Org. Comments: Project Name: Langen 2.0 Proposed DEU Phased implementation with early 479. 2020 implementation steps before 2020.

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 201 28 June 2016 Edition: 1.0 ARN V-2016 - 2019/20

Description: Project Category: Originator(s): To re-design Langen ACC sectors completely, based on traffic flows. DEU ATC Sectors Objective: To further improve the airspace organization within Germany. Proposal ID : 69.176 / BM0106 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA To be further evaluated by Italy. To implement southbound ATS route segment BAKOR - CHI - TEA. 2020 Originator(s): Objective: Project Group: FAB BLUE MED 480. To further improve the ATS route network while offering a shorter route in FAB BLUE MED

the north/eastern part of Italian airspace. Project Category: ATS Routes Proposal ID : 69.132 / BM0045 Impl. Status: State(s) & Org. Comments: Description: Proposed ITA . LI R49 interference; To implement bidirectional ATS route segment ARNOS - ROSKA. 2020 SVN . Complex coordination.

Objective: Project Group: Originator(s): 481. To further improve the ATS route network while offering a shorter route in FAB BLUE MED FAB BLUE MED

the northern part of Italian airspace. Project Category: ATS Routes Proposal ID : 71.085d Impl. Status: State(s) & Org. Comments: Project Name: FAIR-IT Free Route Airspace Italy, Phase 4 Proposed ITA Developments in line with PCP. 2020 Description: Originator(s): Related proposals: To extend the Free Route Airspace from above FL335 down to FL315. Project Group: ITA  71.085a

482. RFG SE  71.085b Objective: To further improve the airspace structure and the flight planning options Project Category:  71.085c within Milano, Roma and Brindisi UIR. Free Route  71.089c Airspace

- END -

European Route Network Improvement Plan - Part 2 - ARN Version 2016 - 2019/20 - Catalogue of Projects 202 28 June 2016 Edition: 1.0 Contact details

DNM/COO/NOM/OPL [email protected]

EUROCONTROL

© June 2016 – European Organisation for the Safety of Air Navigation (EUROCONTROL) This document is published by EUROCONTROL for information purposes. It may be copied in whole or in part, provided that EUROCONTROL is mentioned as the source and it is not used for commercial purposes (i.e. for financial gain). The information in this document may not be modified without prior written permission from EUROCONTROL. www.eurocontrol.int