PART C – REFINEMENT TO THE PROJECT DESCRIPTION 1. CHANGES RELATED TO THE DAM OR ASSOCIATED INFRASTRUCTURE 1 2. PIPELINE REFINEMENT 2 2.1. Area 1 2 2.2. Area 2 3 2.3. Area 3 3 2.4. Other changes to pipeline construction or operation 5

NATHAN DAM AND PIPELINES AEIS PAGE i

1. CHANGES RELATED TO THE DAM OR ASSOCIATED INFRASTRUCTURE

No changes to the dam or associated infrastructure are currently proposed. This may alter when detailed design is undertaken but the potential scale of any change is not envisaged as affecting the results of the impact assessment.

NATHAN DAM AND PIPELINE AEIS PAGE 1

2. PIPELINE REFINEMENT

2.1. Area 1

For sake of clarity, some of the text presented in this section repeats that presented in Part B, Chapter 1.

Area 1 is the length of pipeline that extends from the dam to . SunWater is the proponent for the Woleebee Creek to Glebe Weir Pipeline project (W2G) which involves the beneficial use of treated Coal Seam Gas (CSG) water, including transport to the existing Glebe Weir and use within the Dawson Valley Water Supply Scheme. The lifespan of that project will in all likelihood overlap with the Nathan Dam and Pipelines Project, should the latter be approved. The availability of the treated CSG water will delay the need to construct the dam until such time as the volume of available CSG water cannot fulfil pipeline demands. The dam would then be constructed and the direction of flow in the W2G pipeline would be reversed such that river water could be delivered to pipeline customers.

The W2G pipeline is approved, constructed and operational.

The design of the W2G Weir pipeline incorporated certain fittings and design features which allow the linking of the Nathan pipeline and reversal of flow direction with minimum disturbance. The Nathan Dam and Pipelines Project therefore does not include many aspects of pipeline construction in Area 1 as these have been completed as part of the W2G project. The length of pipeline no longer included is approximately 69.4 km. The aspects which remain part of the Nathan Dam and Pipelines Project are (Figure C.1):

. construction of 3.3 km of pipeline from Nathan Dam to join the W2G pipeline; . decommissioning of 10.3 km of the W2G pipeline between Glebe Weir and chainage 3.3 km; . construction of pump station 2 and associated balancing storage at chainage 9 km; . construction of pump station 3 at chainage 38 km (the balancing storage proposed at this location was also included in the W2G project); and . connection of the Nathan pipeline to the W2G pipeline at chainages 3.3 km and 72.7 km.

Each of these activities were described and assessed in the EIS with the exception of decommissioning of a section of the W2G pipeline. That process is: . above ground infrastructure will be removed and potentially re-used on the Nathan pipeline; . any underground infrastructure will be blanked off and sealed; . the maintenance track will be removed; and . the easement will be rehabilitated with pasture species or native vegetation, depending on the location.

Of the 10.3 km to be decommissioned, 7.2 km is within the Nathan water storage area at Full Supply Level (FSL) so will be underwater when the dam is at FSL. In this section the maintenance track will not be removed and the extent of rehabilitation will be restricted to temporary grassing to prevent erosion until the dam fills.

NATHAN DAM AND PIPELINE AEIS PAGE 2

2.2. Area 2

Area 2 is the length of pipeline that extends from Wandoan to Chinchilla. The changes to this area have resulted from design progression and EIS submissions (Figure C.2). The changes are: . pipeline diameter; . alignment changes to avoid entering State Controlled Roads (Figure C-2a); . alignment changes to avoid impacts on land parcels where possible (Figure C-2b) and this mainly resulted in utilising local road reserves around Wandoan; and . alignment changes to avoid vegetation.

One submission requested realignment of the route just prior to Chinchilla. SunWater has reviewed the suggestion, and other possible alternatives, but unfortunately it is very difficult to find an alternative that does not impact on significantly more remnant vegetation, including (RE 11.4.12) and EPBC (RE 11.3.3) endangered ecosystems. The major road reserve suggested as an alternative contains significant remnant vegetation. To place the pipeline in private property adjacent to the road reserve would avoid this vegetation but impact on a larger number of landholders. From the information provided in the submission it does appear that a route through the property which avoids most of the impacts identified is feasible and will be discussed with the landholder during detailed design.

One submission stated that the EIS should clarify that the proposed balancing storage will not involve any take of overflow. SunWater does not intend that the balancing storage, at approximately 110 km, collects overland flow water.

2.3. Area 3

Area 3 consists of the length of pipeline from Chinchilla to Dalby (Figure C-3). Two significant changes to the Project as described in the EIS have been incorporated as part of the Project now being assessed: termination of the pipeline near Warra rather than Dalby; and placing the pipeline on the opposite side of the highway just south west of Chinchilla to the new termination point.

2.3.1. Termination near Warra

Western Downs Regional Council informed SunWater that they would not potentially require water from Nathan Dam for approximately 30 years. As such, and because there were no other significant potential customers north of Dalby until approximately Warra, it was decided to terminate the pipeline just north of Warra at chainage 218.7 km. The original termination was at chainage 263.3 km. As a result no approval is sought and no works will be undertaken in the approximately 44.6 km between the termination near Warra and Dalby. Any future pipeline to Dalby will be treated as a lateral pipeline and relevant approvals will be sought at the appropriate time. No additional works are required as a result of this change. No terminal storage is required.

The point of termination was chosen to avoid affecting the township of Warra, several roads and items of infrastructure in this area and Cooranga Creek. The location allows relatively simple later development of the extension to Dalby, should it be required, adjacent to the highway while also providing access to possible future customers south of the alignment via Warra-Kogan Road or Winstons Road via minimal impact crossings of

NATHAN DAM AND PIPELINE AEIS PAGE 3

Cooranga Creek. Termination in this area also avoids the need for works on the Jimbour floodplain between Warra and Dalby.

2.3.2. Re-location to the western side of the Warrego Highway

As a result of reduced availability of co-location opportunities to the east of the highway and of assessment of issues raised by submitters (particularly related to flooding on this side of the railway), alternative routes across the floodplain to the revised termination near Warra were investigated. Moving to the western side of the highway and railway was an alternative suggested by a number of respondents and was a sensible means of avoiding the flooding issues on the upstream side of this infrastructure. SunWater also assessed an alternative which travelled further south aligning with the Kogan Condamine Road, in order to avoid much of the floodplain cropping area. However this route was substantially longer and more expensive and required crossing the Condamine River twice.

The now preferred Western option (Figures C-3a-g) would follow the existing route until approximately 9 km south of Chinchilla before crossing the Warrego Highway approximately 500 m south of Hastings Road. This crossing point is preferred to any earlier point because it avoids remnant vegetation in and near the road reserve and also avoids conflicting with the Chinchilla Kogan Road intersection. The route then parallels the Warrego Highway within private property but skirts to the south of houses that front the highway, Brigalow State School, Brigalow township, significant but non-remnant vegetation immediately south of Brigalow, crosses Jingi Jingi Creek, avoids endangered remnant RE 11.9.6 and terminates 29 km south of Chinchilla at chainage 218.7 km.

The majority of currently identified major potential customers for the water are south of the highway so having the trunk pipeline on this side avoids the need to bore under the highway as each lateral connection is constructed.

A comparison of key characteristics of the eastern and western (side of the highway) options is provided in Table C.1.

Table C.1 Comparison between eastern and western options

Characteristic Eastern (EIS option) Western (revised option) Length 20 km 20 km Number of private land parcels 25 25 Number of roads 24 11 Property Access 13 14 Water Storages 6 1 Number of watercourses 9 9 Number of mapped wetlands 2 0

2.3.3. Summary of impacts as related to design changes

The design changes noted in the sections above result in a substantial reduction of impacts associated with the Project. Essentially the length of pipeline to be constructed as part of the Project has been reduced from 263.3 km to 149.3 km. All impacts associated with pre-construction, construction and operations are

NATHAN DAM AND PIPELINE AEIS PAGE 4

commensurately reduced. Table C.2 provides a summary of these attributes. The direct capital cost of the pipeline has reduced from $750 million to $540 million. The latter reflects current pricing as well as reductions in the scale of the Project.

Table C.2 Summary of impacts related to pipeline design and alignment changes

Item As shown in EIS As Revised Pipeline length (km) 263.3 149.3 Individual lots impacted 225* 137 Roads impacted 123 66 Significant Watercourses crossed 13 10 Vegetation clearing required (ha) 123.6 109.5 Lengths of pipe 18750 10198 Pipe fittings 3200 1741 Number of above ground fittings 1024 588 Volume of bedding material (m3) 500,000 450,000 Gravel (tonnes) 240,000 200,000 Road base (tonnes) 14,000 12,000 Rock facing (tonnes) 15,000 12,000 Rock fill (tonnes) 20,000 16,000 Clay (m3) 175,000 150,000 Concrete (m3) 30,000 15,000 Pavement (m3) 90,000 74,000 Hardstand (lay down areas) (m3) 10,000 8,200 Waste trench spoil (m3) 378,000 340,200 Water (Ml) 432 324 Diesel fuel use (kl) 4790 3592 * Note the EIS actually showed 238 but this counted multiple impacts on the same lot, which the current count does not.

Appendix 2B of the EIS listed all land parcels impacted by the pipeline. The appendix has been updated to reflect the existence of the W2G pipeline and the changes in Area 3. These are presented in Appendix B2.

2.4. Other changes to pipeline construction or operation

Section 2.4.3.2 of the EIS noted that while approximately 500 m of pipeline trench would be open at any one time, it would reduce to approximately 50 m at the end of each day. The latter is impractical for construction contractors. Procedures will be adopted in accordance with the APIA Code of Environmental Practice such as frequent use of trench plugs or other material which allows fauna to escape the trench or provides shade to fauna which enters the trench.

NATHAN DAM AND PIPELINE AEIS PAGE 5

The pipe sizes used for the W2G project differed slightly from those proposed for the Nathan Dam and Pipelines Project. These pipe sizes can be accommodated in the Nathan Dam and Pipelines Project and have been used to revise the trenching and transport requirements.

NATHAN DAM AND PIPELINE AEIS PAGE 6 Eid EIDSVOLD Nathan Dam Site svo ld - Theodo AMTD 315.3km re Ro B ad u Fitzroy Dev Road r n e tt H ig PS 1 hw ay

PS 2 MUND

TAROOM

Fig C-1a

PS 3

M

u n d u b b e r a A - u D b u u r o rnR n o g oad WANDOAN ad R oan R o nd Fig C-2 a a d - W n o s k c

a

J

L e GULUGUBA ic h h p\237633-D.mxd a PS 4 r

d t

H

i g h w a

y

DRILLHAM Fig C-3 DULACCA MILES ad i Ro Wonda a - hill inc ChCHINCHILLA y - Ja y aro nd a d ing o a KJANDOWAEw w o ae Road h R g Warrego Highway i ra H a t - T d lla r hi a c h n Pipeline Termination i

h h c i K C og e an L - C Roma - Condamine Road on d D a WARRA CONDAMINE m a d l in a b e o y R R JIMBOUR oa an - og J d K a - n a d r o r a w WKOGAN MACALISTERa ad e Ro R o a y r a D a r alb y - K d a og w d an R h n oa d g a i

e d H a M o a - n R y oga n e K - u DALBY n B Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam PrelimPrinted: Design Thursday, 39 9 2013& 01:39:12 Business A5/P5 Case\Pipeline\Drawings\ArcMa i ra m a

a T d n

o

C ay ighw Su TA RA H Surat Dev Road rat Dev R ie oad n oo M MEANDARRA THE GUMS

Projection: GDA94 Zone 56 LEGEND Figure C-1 Nathan - Warra Pipeline Woleebee - Glebe Weir Pipeline 010205 Kilometres NATHAN DAM AND PIPELINES PROJECT Pump Station Scale 1:900,000 (at A4) Nathan Dam to Warra Pipeline Pump Station & Balancing Storage SW 237633D Nathan Dam Site AMTD 315.3km

Glebe Weir PS 1 0 km Connection Chainage 3.35km

Decomissioned Woleebee to Glebe Weir Pipeline

PS 2 10 km Nathan Pipeline Pump Station and Balancing Storage

20 km

TAROOM

30 km p\242902-A Fig C-1a.mxd Fig p\242902-A

PS 3

40 km

50 km

60 km

70 km Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam PrelimPrinted: Design Thursday, 52 9 2013& 12:52:25 Business A5/P5 Case\Pipeline\Drawings\ArcMa

Connection Chainage 72.7km

80 km

LEGEND Projection: GDA94 Zone 56 Nathan - Warra Pipeline Covenant National Park Figure C-1a Woleebee - Glebe Pipeline Easement Reserve 0246 Woleebee - Glebe Pipeline Decommissioned Freehold State Forrest Kilometres NATHAN DAM AND PIPELINES PROJECT Pump Station Housing Land State Land Scale 1:300,000 (at A4) Lands lease No Tenure Nathan Dam to Warra Pipeline SW 242902-A 70 km

Connection Chainage 72.7km

80 km WANDOAN

Fig C-2a 90 km

100 km

GULUGUBA

PS 4 110 km

120 km p\242902-A Fig C-2.mxd Fig p\242902-A

130 km

140 km

150 km

160 km

DRILLHAM MILES 170 km COLUMBOOLA Fig C-2b

k 180 Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam PrelimPrinted: Design Thursday, 38 9 2013& 01:38:47 Business A5/P5 Case\Pipeline\Drawings\ArcMa

Chinchilla Weir

LEGEND Projection: GDA94 Zone 56 Nathan - Warra Pipeline Covenant National Park Figure C-2 Nathan - Dalby Pipeline (Original EIS) Easement Reserve 0246 Woleebee - Glebe Pipeline Freehold State Forrest Kilometres NATHAN DAM AND PIPELINES PROJECT Pump Station Housing Land State Land Scale 1:380,000 (at A4) Lands lease No Tenure Nathan Dam to Warra Pipeline SW 242902-A 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9

k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m

k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5

km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3

km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd Printed: Thursday, 22 9 2013 01:22:02 A5/P5 m k 2 85 RP216757

2 SP106043

L E IC H H A R m D k T 6 H 8 IG H W A Y 29 FT130

L m E IC k H H 7 A R 8 D T H IG H W A Y

km 8 8 28 FT913

L E IC H H A R D T H km IG 9 H 8 W A Y

27 FT130

LEGEND Projection: GDA 1994 - Zone 56 Nathan - Warra Pipeline Easement Fig C-2a Nathan - Dalby Pipeline (Original EIS) Road 0 200 400 600 Affected Lots Land Meters NATHAN DAM AND PIPELINES PROJECT PIPELINE CHANGES Scale 1:20,000 m Water SW 242904-A k 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

m 1 m

m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5

m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1

m k 8 6 1

m k 9 6 1

m k 0 7 1

m k 1 7 1

m k

2 7 1

m k

3 7 1

m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

km 0 18

m k 1 8 1

m

k

2

8

1

m

k

3

8 m

1 k

4

8

1

m

k

5

8

1

m

k

6

8

1

187 km

188 km

189 km

m k 0 9 1

m k 1 9 1

m k 2 9 1

m k 3 9 1

m k 4 9 1

m k 5 9 1

m k 6 9 1

m k 7 9 1

m k 8 9 1

m k 9 9 1

200 km

m k 1 0 2

m k 2 0 2

m k 3 0 2

m 4 k 20

m k 5 0 2

2

0

6

k

m

m

k

7

0

2 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9 k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5 km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3 km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

m k 85

m k 86

m k 7 8

km 88

km 89

km 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

m 1 m m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5 m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1 Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd Printed: Thursday, 22 9 2013 01:22:02 A5/P5

m k 8 6 130 1 LY223 129 LY223

A GRAHA MS ROAD m k 9 6 A 1 GRAHAM S ROAD

m k 0 7 1

125 LY244

126 LY205

m k 1 106 7 1 LY152

2 RP79246

m k 118 LY244 2 7 1

m Projection: GDA 1994 - Zone 56 k LEGEND 3 7 Nathan - Warra Pipeline Easement Fig C-2b 1 Nathan - Dalby Pipeline (Original EIS) Road 0 200 400 600 Affected Lots Land Meters NATHAN DAM AND PIPELINES PROJECT Scale PIPELINE CHANGES Water 1:20,000 SW 242904-A m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

km 0 18

m k 1 8 1

m

k

2

8

1

m

k

3

8 m

1 k

4

8

1

m

k

5

8

1

m

k

6

8

1

187 km

188 km

189 km

m k 0 9 1

m k 1 9 1

m k 2 9 1

m k 3 9 1

m k 4 9 1

m k 5 9 1

m k 6 9 1

m k 7 9 1

m k 8 9 1

m k 9 9 1

200 km

m k 1 0 2

m k 2 0 2

m k 3 0 2

m 4 k 20

m k 5 0 2

2

0

6

k

m

m

k

7

0

2

m k 8 0 2

m k 9 0 2

210 km

m k 1 1 2

m k 2 1 2

m k 3 1 2

m k 4 1 2

m k 5 1 2

m k 6 1 2

m k 7 1 2

m k 8 1 2 180 km

Fig C-3a

CHINCHILLA 190 km Fig C-3b

JANDOWAE Weir Fig C-3c

200 km Fig C-3d

Fig C-3e 210 km

Fig C-3f

p\242902-A Fig C-3.mxd Fig p\242902-A Fig C-3g

Pipeline Termination Chainage 218.7km WARRA

KOGAN MACALISTER Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam PrelimPrinted: Design Thursday, 59 9 2013& 12:59:42 Business A5/P5 Case\Pipeline\Drawings\ArcMa

LEGEND Projection: GDA94 Zone 56 Nathan - Warra Pipeline Covenant National Park Figure C-3 Nathan - Dalby Pipeline (Original EIS) Easement Reserve 0246 Freehold State Forrest Kilometres NATHAN DAM AND PIPELINES PROJECT Housing Land State Land Scale 1:300,000 (at A4) Lands lease No Tenure Nathan Dam to Warra Pipeline SW 242902-A 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9 k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5 km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3 km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

m k 85

m k 86

m k 7 8

km 88

km 89

km 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

m 1 m

m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5 m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1

m k 8 6 1

m k 9 6 1

m k 0 7 1

m k 1 7 1

m k

2 7 1

m k

3 7 1

m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

m k Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd 0 Printed: Thursday, 22 9 2013 01:22:02 A5/P5 18

D

A

O

R

L

L

I

H B U R D G N E R T R A B Y R S I R D O G A E D m R k O 1 A 8 D 1

m

k B

U 3 2 1564 R 14 8 L3493 N RP900413 SP207421 T 1

B

R m I k D

G 3 1 E

8 R m 1 RP41434 O k 15 A D 4 RP900413 8

1

69 LY1054 286 m

LY264 k 255 5 D LY201 8 OA AI R 1 ND WO ILLA 2 CH CHIN RP893204 AD RO I RO A NDA D WO ILLA NCH CHI 19 D SP156284 A E I RO A V OND I W R ILLA H D C HIN D C H O A

W P

N Z E I T S E R M M O P A D O D R A A O R m I D R L Y O 20k

C W Y L N O E R SP1566 284 S S E E 8 R T D O 1 R A E O D A M D E

C

22 21 R SP156049 O SP156049 AD CHINCHILLA 23 187 km SP156049

24 SP156049

D

A

O

R

Y

R

E

T

E 30 W E M E L34186 ST ER C N RA ILW AY

LEGEND Projection: GDA 1994 - Zone 56 Nathan - Warra Pipeline Easement Fig C-3a 0 200 400 600 Nathan - Dalby Pipeline (Original EIS) Road 188 km Affected Lots Land Meters NATHAN DAM AND PIPELINES PROJECT Scale PIPELINE CHANGES Water 1:20,000 SW 242904-A

189 km

m k 0 9 1

m k 1 9 1

m k 2 9 1

m k 3 9 1

m k 4 9 1

m k 5 9 1

m k 6 9 1

m k 7 9 1

m k 8 9 1

m k 9 9 1

200 km

m k 1 0 2

m k 2 0 2

m k 3 0 2

m 4 k 20

m k 5 0 2

2

0

6

k

m

m

k

7

0

2

m k 8 0 2

m k 9 0 2

210 km

m k 1 1 2

m k 2 1 2

m k 3 1 2

m k 4 1 2

m k 5 1 2

m k 6 1 2

m k 7 1 2

m k 8 1 2 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9 k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5 km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3 km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

m k 85

m k 86

m k 7 8

km 88

km 89

km 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

m

1 m m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5 m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1

m k 8 6 1

m k 9 6 1

m k 0 7 1

m k 1 7 1

m k

2 7 1

m k

3 7 1

m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

km 0 18

m k 1 8 1

m k

2

8

1

m k

3

8 m

1 k

4

8

1

m

k

5

8

1

m

k

6

8

1

187 km

188 km

Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd Printed: Thursday, 22 9 2013 01:22:02 A5/P5

176 SP236980

W 1 AR R RP206371 EG O H IG H W AY 189 km

146 LY608 m k 0 9 1

W AR R EG O 145 H IG LY608 H W AY m k 1 9 H O 1 R SW O O D S R O AD

m k W AR 2 R 9 EG 1 O H IG H W AY

144 m RP802305 k H 3 O 9 W R A SW 1 R O R O EG D O S H R IG O H A W D AY 141 LY608

m k 4 9 1 LEGEND Projection: GDA 1994 - Zone 56 Nathan - Warra Pipeline Easement Fig C-3b Nathan - Dalby Pipeline (Original EIS) Road 0 200 400 600 Affected Lots Land Meters NATHAN DAM AND PIPELINES PROJECT Scale PIPELINE CHANGES Water 1:20,000 SW 242904-A

m k 5 9 1

m k 6 9 1

m k 7 9 1

m k 8 9 1

m k 9 9 1

200 km

m k 1 0 2

m k 2 0 2

m k 3 0 2

m 4 k 20

m k 5 0 2

2

0

6

k

m

m

k

7

0

2

m k 8 0 2

m k 9 0 2

210 km

m k 1 1 2

m k 2 1 2

m k 3 1 2

m k 4 1 2

m k 5 1 2

m k 6 1 2

m k 7 1 2

m k 8 1 2 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9 k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5 km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3 km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

m k 85

m k 86

m k 7 8

km 88

km 89

km 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

m

1 m m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5 m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1

m k 8 6 1

m k 9 6 1

m k 0 7 1

m k 1 7 1

m k

2 7 1

m k

3 7 1

m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

km 0 18

m k 1 8 1

m k

2

8

1

m k

3

8 m

1 k

4

8

1

m k

5

8

1

m k

6

8

1

187 km

188 km

189 km

m k 0 9 1

m k 1 9 1

m k 2 9 1

m k 3 9 1

Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd Printed: Thursday, 22 9 2013 01:22:02 A5/P5

m k 4 9 1 H O W R S AR W R O E O 141 G D O S LY608 H R IG O H A W D AY

1613 L34102 m k H O 5 R 9 SW 1 O O D S R O A D

1 RP50703

H O R W SW AR O R O m E D D G S k A O R O 6 O H A R IG D 9 H 1 2 N W A AY L3488 G O K

A L W L E I ST H ER C N N R I A H IL C W AY

m k 7 9 1

W AR R 1611 EG O L34102 H IG H W AY

D

A

O m

R k

N 8 A 9 G 1

O

K

A

L

L I

H

C W

N I O L H FF C E W S R AR O R AD EG O H IG H W AY m 55 k LY605 9 9 1

1 RP210311

LEGEND Projection: GDA 1994 - Zone 56 Nathan - Warra Pipeline Easement Fig C-3c Nathan - Dalby Pipeline (Original EIS) Road 0 200 400 600 Affected Lots Land Meters NATHAN DAM AND PIPELINES PROJECT Scale PIPELINE CHANGES Water 1:20,000 SW 242904-A 200 km

m k 1 0 2

m k 2 0 2

m k 3 0 2

m 4 k 20

m k 5 0 2

2

0

6

k

m

m

k

7

0

2

m k 8 0 2

m k 9 0 2

210 km

m k 1 1 2

m k 2 1 2

m k 3 1 2

m k 4 1 2

m k 5 1 2

m k 6 1 2

m k 7 1 2

m k 8 1 2 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9 k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5 km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3 km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

m k 85

m k 86

m k 7 8

km 88

km 89

km 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

1 m m

m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5 m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1

m k 8 6 1

m k 9 6 1

m k 0 7 1

m k 1 7 1

m k

2 7 1

m k

3 7 1

m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

km 0 18

m k 1 8 1

m k

2

8

1

m k

3

8 m

1 k

4

8

1

m k

5

8

1

m k

6

8

1

187 km

188 km

189 km

m k 0 9 1

m k 1 9 1

m k 2 9 1

m k 3 9 1

m k 4 9 1

m k 5 9 1

m k 6 9 1

m k 7 9 1

m k 8 9 1

m k 9 9 Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd 1 Printed: Thursday, 22 9 2013 01:22:02 A5/P5

55 LY605

W W A O R LF R FE EG S O R H O IG AD H W AY 200 km

m k 1 0 2

W AR R 1 EG O RP210311 H IG H m W k AY 2 0 2

m 1518 k 3 L3491 0 2

W AR R EG O H IG H W AY

m 8 4 k LY812 20

9 SP172886

C AM P m BE k 1 LL S 5 RP18231 TR 0 E 2 ET

LEGEND Projection: GDA 1994 - Zone 56 BRIGALOW Nathan - Warra Pipeline Easement Fig C-3d 2 0 200 400 600 0 Nathan - Dalby Pipeline (Original EIS) Road 6

NATHAN DAM AND PIPELINES PROJECT k Affected Lots Land Meters m Scale PIPELINE CHANGES Water 1:20,000 SW 242904-A

m

k

7

0

2

m k 8 0 2

m k 9 0 2

210 km

m k 1 1 2

m k 2 1 2

m k 3 1 2

m k 4 1 2

m k 5 1 2

m k 6 1 2

m k 7 1 2

m k 8 1 2 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9 k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5 km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3 km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

m k 85

m k 86

m k 7 8

km 88

km 89

km 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

1 m m

m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5 m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1

m k 8 6 1

m k 9 6 1

m k 0 7 1

m k 1 7 1

m k

2 7 1

m k

3 7 1

m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

km 0 18

m k 1 8 1

m k

2

8

1

m k

3

8 m

1 k

4

8

1

m k

5

8

1

m k

6

8

1

187 km

188 km

189 km

m k 0 9 1

m k 1 9 1

m k 2 9 1

m k 3 9 1

m k 4 9 1

m k 5 9 1

m k 6 9 1

m k 7 9 1

m k 8 9 1

m k 9 9 1

200 km

m k 1 0 2

m k 2 0 2

m k 3 0 2

m 4 k 20

Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd m Printed: Thursday, 22 9 2013 01:22:02 A5/P5 k 5 0 2

1 RP18231 155 B5905 BRIGALOW

2

0

6

k

m

76 B5901 158 157 LY1000 B5901 W AR R EG O H IG H W m A Y k

7

0

2

74 SP157066 m k 8 0 2

D

A

O

R

S

S

T E S C E C W A D A D O R m R A k S O 9 N B O 28 0 T T I 2 N LY603 I B W B

A

R

69 LY603 210 km

m k 1 1 2

LEGEND Projection: GDA 1994 - Zone 56 Nathan - Warra Pipeline Easement Fig C-3e Nathan - Dalby Pipeline (Original EIS) Road 0 200 400 600 Affected Lots Land Meters NATHAN DAM AND PIPELINES PROJECT Scale PIPELINE CHANGES Water 1:20,000 SW 242904-A m k 2 1 2

m k 3 1 2

m k 4 1 2

m k 5 1 2

m k 6 1 2

m k 7 1 2

m k 8 1 2 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9 k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5 km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3 km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

m k 85

m k 86

m k 7 8

km 88

km 89

km 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

m 1 m

m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5 m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1

m k 8 6 1

m k 9 6 1

m k 0 7 1

m k 1 7 1

m k

2 7 1

m k

3 7 1

m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

km 0 18

m k 1 8 1

m k

2

8

1

m k

3

8 m

1 k

4

8

1

m k

5

8

1

m k

6

8

1

187 km

188 km

189 km

m k 0 9 1

m k 1 9 1

m k 2 9 1

m k 3 9 1

m k 4 9 1

m k 5 9 1

m k 6 9 1

m k 7 9 1

m k 8 9 1

m k 9 9 1

200 km

m k 1 0 2

m k 2 0 2

m k 3 0 2

m 4 k 20

m k 5 0 2

2

0

6

k m

m k

7

0

2

m k 8 0 2

m k 9 0 2

210 km

Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd Printed: Thursday, 22 9 2013 01:22:02 A5/P5 m k 1 1 2

D

A

O

R

Y

R

A

D

N 69 U O

LY603 B

A

M m L k H E 2 1 2

W AR R EG O H IG H W AY

m k 133 3 LY603 1 2

13 W LY847 AR R EG O H IG H 225 W A LY817 Y

D

A

m O k R 4 1 2

4 LY817

W AR R EG O m H k IG H 5 W 1 AY 2

EHLM A ROAD m k 136 6 LY824 1 138 2 LY633

72 LY615

LEGEND Projection: GDA 1994 - Zone 56 m k 7 Nathan - Warra Pipeline Easement Fig C-3f 1 2 Nathan - Dalby Pipeline (Original EIS) Road 0 200 400 600 Affected Lots Land Meters NATHAN DAM AND PIPELINES PROJECT Scale PIPELINE CHANGES Water 1:20,000 SW 242904-A

m k 8 1 2 0 km

m k

1

km 2

3 km

m 4 k

5 km

6 km

7 km

m 8 k

9 km

10 km

11 km

12 km

13 km

1 4 km

m k 5 1

km 16

17 km

18 km

19 km

20 km

21 km

22 km

23 km

24 km

2 5 k m

26 km

27 km

28 km

km 29

30 km

31 km

3 2 km

33 km

3 4 k m

m k 5 3

36 km

3 7 k m

3 8 km

3 9 k m

4 0 km

41 km

4 2 k m

43 km

44 km

45 km

m k

6

4

47 km

48 km

49 km

5 0 k m

5 1 k m

5 2 k m

53 km

54 km

5 5 km

5 6 k m

57 km

58 km

59 km

60 km

6 1 km

6 2 km

6 3 km

6 4 km

6 5 km

66 km

67 km

68 km

69 km

70 km

7 1 km

7 2 km

7 3 km

7 4 km

75 km

76 km

77 km

m k 8 7

km 79

m k 80

m k 81

82 km

83 km

m k 84

m k 85

m k 86

m k 7 8

km 88

km 89

km 90

m k 91

m k 2 9

m k 93

m k 94

m k 5 9

m k 6 9

m k 7 9

m k 8 9

m k 9 9

m k

0 0 1

m k

1 0 1

m k

2 0 1

m k

3 0 1

m 104 k

km 105

106 km

1 07 km

108 km

km 9 10

km 0 11

km 1 11

km 2 11

km 3 11

m k 4 11

m 5 k 11

m 6 k 11

m 7 k 11

m 8 k 11

m 9 k 11

km 0 12

m k 1 2 1

km 2 12

km 3 12

km 4 12

km 5 12

m k 6 2 1

m k 7 2 1

m k 8 2 1

129 km

m 0 k 13

131 km

132 km

133 km

m k

4 3 1

m k

5 3 1

m k

6 3 1

m k

7 3

m 1 m

m

k

k

k

8

9

0

3

3

4

1

1

1

km 1 14

km 2 14

km 3 14

km 4 14

m k 5 4 1

m k 6 4 1

m k 7 4 1

m k 8 4 1

m k 9 4 1

m k 0 5 1

m k 1 5 1

km 2 15

km 3 15

m 4 k 15

m 5 k 15

m

k

6

5 m

1 k

7

5 m

1 k

8

5

1

m k 9 5 1

m k 0 6 1

m k 1 6 1

m k

2 6 1

m k

3 6 1

m k

4 6 1

m k 5 6 1

m k 6 6 1

m k 7 6 1

m k 8 6 1

m k 9 6 1

m k 0 7 1

m k 1 7 1

m k

2 7 1

m k

3 7 1

m k

4 7 1

m k

5 7 1

m k

6 7 1

m 7 k 17

m k

8 7 1

km 179

km 0 18

m k 1 8 1

m k

2

8

1

m k

3

8 m

1 k

4

8

1

m k

5

8

1

m k

6

8

1

187 km

188 km

189 km

m k 0 9 1

m k 1 9 1

m k 2 9 1

m k 3 9 1

m k 4 9 1

m k 5 9 1

m k 6 9 1

m k 7 9 1

m k 8 9 1

m k 9 9 1

200 km

m k 1 0 2

m k 2 0 2

m k 3 0 2

m 4 k 20

m k 5 0 2

2

0

6

k m

m k

7

0

2

m k 8 0 2

m k 9 0 2

210 km

m k 1 1 2

m k 2 1 2

m k 3 1 2

m k 4 1 2

m k 5 1 2

m k 6 1 2

Document: T:\Asset Solutions\Dev-SunWater\P-ASWP-0026-AA-01-02 Nathan Dam Prelim Design & Business Case\Pipeline\Drawings\ArcMap\242904-A.mxd Printed: Thursday, 22 9 2013 01:22:02 A5/P5

ROAD 72 LY615 m k 7 1 138 2 LY633

1 RP107780 m k 8 1 2

161 LY863 D A O R L E D G A

A 12 O

N R L RP206348

L S E V P

U

R

T

S

D

I

B

Pipeline Termination Chainage 218.7km

13 RP206348

W A R R E G O H IG H W AY Pipeline continued to Dalby - Chainage 263km

W AR R EG O H IG H W AY

D A O RO R AD

R O A D ROAD

WARRA

LEGEND Projection: GDA 1994 - Zone 56 Nathan - Warra Pipeline Easement Fig C-3g Nathan - Dalby Pipeline (Original EIS) Road 0 200 400 600 Affected Lots Land Meters NATHAN DAM AND PIPELINES PROJECT Scale PIPELINE CHANGES Water 1:20,000 SW 242904-A