Inventory of LGED Road Network, March 2005, Bangladesh

Total Page:16

File Type:pdf, Size:1020Kb

Inventory of LGED Road Network, March 2005, Bangladesh SATKHIRA LOCAL GOVERNMENT ENGINEERING DEPARTMENT DISTRICT SUMMARY OF ROAD DISTRICT : SATKHIRA EARTHEN BC BRICK PVT. RIGID PVT. ROAD TYPE NUMBER OF TOTAL SURFACE TYPE-WISE BREAKE-UP CONDITION OF BC & RIGID PVT. ROAD STRUCTURE EXISTING GAP ROAD LENGTH (Km) (As of December, 2003) (Km) (Km) EARTHEN FLEXIBLE BRICK RIGID GOOD FAIR POOR BAD NUMBER SPAN NUMBER SPAN PAVEMENT PAVEMENT PAVEMENT (m) (m) (BC) (WBM/HBB/ (CC/RCC) BFS) Upazila Road 53 658 221 357 81 0 168 164 5 19 1253 2313 144 1045 Union Road 90 539 326 169 43 0 120 37 6 6 766 992 393 868 Village Road-A 509 1785 1573 114 98 0 84 23 1 7 784 1424 1421 1563 Village Road-B 798 1814 1766 19 29 0 16 1 0 2 387 508 1347 1491 TOTAL 1450 4796 3886 660 250 0 388 225 12 35 3190 5237 3305 4967 3339 133 126 0 100 24 1 9 Length of Total Road Network Length of Total Road Network under Condition of BC & Rigid Pavement under different Categories different Surface Categories of Total Road Network 14% 2% 5% 5.2% 0.0% 38% 11% 13.8% 34% 59% 37% 81.0% Upazila Road Union Road Village Road-A Village Road-B EARTHEN BC BRICK PVT. RIGID PVT. GOOD FAIR POOR BAD Different Surface Categories and Condition of Different Surface Categories and Condition of BC & Rigid Pavement under Upazila Road BC & Rigid Pavement under Union Road 700 600 600 500 500 400 Total Length Total Length 400 Earthen Earthen Brick Pvt. Brick Pvt. BC & Rigid Pvt. 300 BC & Rigid Pvt. 658 Good Good Fair 539 Fair 300 Poor Poor 168 Bad Bad 200 200 326 357 120 100 221 164 100 169 81 37 5 43 19 6 0 0 6 Page 214 BASIC INFORMATION OF ROAD DIVISION : KHULNA DISTRICT : SATKHIRA ROAD ROAD NAME CREST TOTAL SURFACE TYPE-WISE BREAKE-UP (Km) STRUCTURE EXISTING GAP CODE WIDTH LENGTH (m) (Km) EARTHEN FLEXIBLE BRICK RIGID NUMBER SPAN NUMBER SPAN PAVEMENT PAVEMENT PAVEMEN (m) (m) (BC) (WBM/HBB/ T BFS) (CC/RCC) 1 2 3 4 5 6 7 8 9 10 11 12 UPAZILA : ASSASUNI ROAD TYPE : UPAZILA ROAD 287042002 Assasuni - Bardal 6.50 9.150.00 3.60 5.55 0.00 16 10.50 1 300.00 287042003 Assasuni - Parulia 6.00 17.739.26 6.48 1.99 0.00 36 47.75 0 0.00 287042004 Budhata - Baka GC 5.50 14.230.00 14.23 0.00 0.00 34 194.36 0 0.00 287042005 Kola Bus Stand - Protapnagar GC Road 5.00 4.400.00 0.00 4.40 0.00 5 4.20 0 0.00 287042006 Budhata-Dalua 4.00 6.662.46 3.77 0.43 0.00 16 12.28 1 0.00 287042007 Budhata - Gazirhat GC via Bangdah GC. 4.00 6.990.28 5.86 0.85 0.00 12 19.96 0 0.00 287042008 Budhata-Uzirpur 4.00 9.220.30 8.92 0.00 0.00 17 17.84 1 100.00 287042009 Kadakati -Protapnagar via Goaldanga 3.50 33.196.51 0.00 26.68 0.00 40 79.89 6 105.00 287042010 Natana - Uzirpur GC. 3.50 3.003.00 0.00 0.00 0.00 0 0.00 0 0.00 UPAZILA ROAD TOTAL: 9 Nos. Road 104.5721.81 42.86 39.90 0.00 176 386.78 9 505.00 ROAD TYPE : UNION ROAD 287043010 Kadakati UP-Gabtola hat - Kadakati GC 3.50 8.758.75 0.00 0.00 0.00 1 4.40 4 63.60 287043017 Khazra UP- Bardal GC 4.50 8.007.70 0.00 0.30 0.00 2 6.00 0 0.00 287043020 Sriula UP - Shitalpur bazar 3.60 3.001.65 1.35 0.00 0.00 1 0.30 1 1.00 287043037 Ekshora bazar- Bichotbazar(Anulia UP) 3.60 3.003.00 0.00 0.00 0.00 2 3.00 0 0.00 287043038 Protapnagar UP - Taltala Bazer 4.50 1.401.40 0.00 0.00 0.00 3 1.20 0 0.00 287043042 Kakbasia bazar- Monipur bazar-Khazra UP road3.60 9.209.20 0.00 0.00 0.00 0 0.00 2 2.00 287043044 Kapsanda bazar-Khazra UP 4.50 6.104.02 0.00 2.08 0.00 0 0.00 0 0.00 287043046 Dargapur UP Office- Tentulia Bazer 3.50 6.966.96 0.00 0.00 0.00 6 7.90 0 0.00 UNION ROAD TOTAL: 8 Nos. Road 46.4142.68 1.35 2.38 0.00 15 22.80 7 66.60 ROAD TYPE : VILLAGE ROAD-A 287044002 Kola - Ghola 3.50 2.732.73 0.00 0.00 0.00 1 0.90 2 1.80 287044004 Protabnagar - Kallyanpur 3.50 1.501.50 0.00 0.00 0.00 1 0.60 2 1.20 287044006 Anulia - Paikpara 4.50 2.801.39 0.00 1.41 0.00 1 0.60 4 2.40 287044010 Gadaipur - Routara 3.65 7.407.40 0.00 0.00 0.00 2 5.00 2 2.00 287044011 Bardal -Chak Buria(Baintala) 3.00 7.507.50 0.00 0.00 0.00 0 0.00 3 3.00 287044012 Dumurpota - Fakrabad 3.00 3.153.15 0.00 0.00 0.00 0 0.00 3 3.00 287044014 Bardal - Baintala 4.00 8.006.09 0.00 1.91 0.00 1 1.50 4 4.00 287044015 Jamalnagar - Keargati 3.00 1.001.00 0.00 0.00 0.00 0 0.00 1 1.00 287044016 Narerabad -Champakhali 3.00 2.002.00 0.00 0.00 0.00 0 0.00 2 5.00 287044019 Dhapua - Mokamkhali 3.00 3.003.00 0.00 0.00 0.00 1 6.09 1 1.00 287044022 Gabtola - Khariati 3.00 12.0012.00 0.00 0.00 0.00 0 0.00 3 3.00 287044027 Kadakati hat - Agardari 3.00 1.501.50 0.00 0.00 0.00 0 0.00 2 2.00 287044029 Mohiswarkati R&H - Chumuria 3.00 4.754.75 0.00 0.00 0.00 2 12.00 2 2.00 287044030 Chapra R&H - Bausuli 2.50 3.003.00 0.00 0.00 0.00 0 0.00 2 2.00 287044034 Bakra - Hazipur Road 4.20 3.132.79 0.00 0.34 0.00 0 0.00 2 6.00 287044036 Sovnali - Latakhali 3.00 6.406.40 0.00 0.00 0.00 0 0.00 3 3.00 287044037 Sovnali - Kalishani 3.00 5.605.60 0.00 0.00 0.00 0 0.00 2 2.00 287044038 Badartala - Mozgurkhali 3.00 3.503.50 0.00 0.00 0.00 0 0.00 1 1.50 287044039 Balabaria - Adalatpur 3.00 1.201.20 0.00 0.00 0.00 1 0.90 1 1.00 287044040 Balabaria - Kodanda 3.00 3.503.50 0.00 0.00 0.00 0 0.00 1 1.00 287044042 Haribanga - Balabaria-Puijala 4.00 5.005.00 0.00 0.00 0.00 0 0.00 2 2.00 287044043 Naktara - Gazipur 3.00 1.001.00 0.00 0.00 0.00 0 0.00 1 1.00 287044045 Hazrakhali - Baliakhali 3.00 3.203.20 0.00 0.00 0.00 0 0.00 1 1.00 287044046 Kalimakhali - Kalimakhali Pry. School 3.00 3.003.00 0.00 0.00 0.00 2 3.50 1 1.00 287044047 Dumurpota - Jamalnagar 3.00 1.401.40 0.00 0.00 0.00 0 0.00 2 2.00 287044048 Katakhali - Hazipur 2.50 3.003.00 0.00 0.00 0.00 1 1.50 0 0.00 287044051 R&H Bally Bridge - Assasuni Parulia 5.60 0.500.00 0.50 0.00 0.00 1 0.90 0 0.00 Page 215 BASIC INFORMATION OF ROAD DIVISION : KHULNA DISTRICT : SATKHIRA ROAD ROAD NAME CREST TOTAL SURFACE TYPE-WISE BREAKE-UP (Km) STRUCTURE EXISTING GAP CODE WIDTH LENGTH (m) (Km) EARTHEN FLEXIBLE BRICK RIGID NUMBER SPAN NUMBER SPAN PAVEMENT PAVEMENT PAVEMEN (m) (m) (BC) (WBM/HBB/ T BFS) (CC/RCC) 1 2 3 4 5 6 7 8 9 10 11 12 287044052 Kalibarri-Puizala 3.00 5.205.20 0.00 0.00 0.00 0 0.00 2 2.00 287044053 Bardal - Madia - Murarikati 3.00 7.007.00 0.00 0.00 0.00 1 12.00 1 1.00 287044054 Budhata Rice Mill - Bandgah 3.50 1.501.50 0.00 0.00 0.00 1 0.90 2 1.80 287044055 Sreedharpur - Khariati 3.00 5.105.10 0.00 0.00 0.00 0 0.00 3 2.70 287044057 Naktara FRB to Baliakhali WAPDA via Radharati3.50 5.005.00 0.00 0.00 0.00 0 0.00 4 8.00 287044059 Dargapur - Takarkhuthi kayaghat -Tentulia 4.00 7.532.04 2.57 2.93 0.00 10 16.80 1 1.00 287044060 Sriula FRB - Sriula Kheyaghat via BD Chow House4.00 1.000.35 0.65 0.00 0.00 0 0.00 0 0.00 287044061 Sriula FRB - Sriula sluicegate via Gazi bari Mosque2.50 1.001.00 0.00 0.00 0.00 0 0.00 0 0.00 287044063 Kamalapur - Sriula via Shitalpur 3.50 2.001.50 0.00 0.50 0.00 0 0.00 0 0.00 287044064 Assasuni - Dayerghat 3.66 2.002.00 0.00 0.00 0.00 9 7.03 0 0.00 287044065 Kachua - Nowapara Khyaghat road 3.00 2.502.50 0.00 0.00 0.00 1 0.60 0 0.00 287044066 Natana - Puizala 3.30 4.304.30 0.00 0.00 0.00 1 2.00 6 4.50 287044067 Mohiskur - Puijala Ferry ghat 4.00 5.104.29 0.00 0.82 0.00 2 8.85 1 1.50 287044068 Chiladanga - Chumuria 3.50 4.252.84 1.41 0.00 0.00 0 0.00 1 1.00 287044069 Taltala Bazar-Kurikahonia Launchghat 4.50 1.380.00 0.00 1.38 0.00 3 0.75 0 0.00 287044070 Bisot - Chandbaria Khyaghat 4.00 7.004.76 0.00 2.24 0.00 0 0.00 4 2.40 287044071 Mohiskur - Mariala 3.50 6.006.00 0.00 0.00 0.00 18 21.64 0 0.00 287044073 Chakla - Ruerbeel Road 3.00 3.502.00 0.00 1.50 0.00 0 0.00 2 2.50 287044074 Ckakla - Subhdardrakati 3.00 2.002.00 0.00 0.00 0.00 0 0.00 2 1.80 287044075 Gokulnagar - D.Ekshora 3.00 4.504.50 0.00 0.00 0.00 0 0.00 1 1.50 287044076 Kallyanpur Clinic - Kallyanpur Sluice Gate Road4.00 2.600.53 0.00 2.07 0.00 1 0.60 1 1.00 287044077 Sanatankati - Nakna 3.00 1.001.00 0.00 0.00 0.00 1 1.50 2 1.20 287044078 Sridharpur - Kalabagi 3.00 1.801.80 0.00 0.00 0.00 0 0.00 2 1.20 287044079 Khariati - Boyershing 2.50 4.604.60 0.00 0.00 0.00 0 0.00 2 1.80 287044082 Dadpur - Prohitpur 3.00 2.382.38 0.00 0.00 0.00 0 0.00 2 1.00 287044083 Moheswarkati - Bausholi 2.50 3.003.00 0.00 0.00 0.00 0 0.00 1 1.00 287044084 Setpur Pry.
Recommended publications
  • Bangladesh Workplace Death Report 2020
    Bangladesh Workplace Death Report 2020 Supported by Published by I Bangladesh Workplace Death Report 2020 Published by Safety and Rights Society 6/5A, Rang Srabonti, Sir Sayed Road (1st floor), Block-A Mohammadpur, Dhaka-1207 Bangladesh +88-02-9119903, +88-02-9119904 +880-1711-780017, +88-01974-666890 [email protected] safetyandrights.org Date of Publication April 2021 Copyright Safety and Rights Society ISBN: Printed by Chowdhury Printers and Supply 48/A/1 Badda Nagar, B.D.R Gate-1 Pilkhana, Dhaka-1205 II Foreword It is not new for SRS to publish this report, as it has been publishing this sort of report from 2009, but the new circumstances has arisen in 2020 when the COVID 19 attacked the country in March . Almost all the workplaces were shut about for 66 days from 26 March 2020. As a result, the number of workplace deaths is little bit low than previous year 2019, but not that much low as it is supposed to be. Every year Safety and Rights Society (SRS) is monitoring newspaper for collecting and preserving information on workplace accidents and the number of victims of those accidents and publish a report after conducting the yearly survey – this year report is the tenth in the series. SRS depends not only the newspapers as the source for information but it also accumulated some information from online media and through personal contact with workers representative organizations. This year 26 newspapers (15 national and 11 regional) were monitored and the present report includes information on workplace deaths (as well as injuries that took place in the same incident that resulted in the deaths) throughout 2020.
    [Show full text]
  • Mapping Exercise on Water- Logging in South West of Bangladesh
    MAPPING EXERCISE ON WATER- LOGGING IN SOUTH WEST OF BANGLADESH DRAFT FOR CONSULTATION FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS March 2015 I Preface This report presents the results of a study conducted in 2014 into the factors leading to water logging in the South West region of Bangladesh. It is intended to assist the relevant institutions of the Government of Bangladesh address the underlying causes of water logging. Ultimately, this will be for the benefit of local communities, and of local institutions, and will improve their resilience to the threat of recurring and/or long-lasting flooding. The study is intended not as an end point, but as a starting point for dialogue between the various stakeholders both within and outside government. Following release of this draft report, a number of consultations will be held organized both in Dhaka and in the South West by the study team, to help establish some form of consensus on possible ways forward, and get agreement on the actions needed, the resources required and who should be involved. The work was carried out by FAO as co-chair of the Bangladesh Food Security Cluster, and is also a contribution towards the Government’s Master Plan for the Agricultural development of the Southern Region of the country. This preliminary work was funded by DfID, in association with activities conducted by World Food Programme following the water logging which took place in Satkhira, Khulna and Jessore during late 2013. Mike Robson FAO Representative in Bangladesh II Mapping Exercise on Water Logging in Southwest Bangladesh Table of Contents Chapter Title Page no.
    [Show full text]
  • Title Home Gardening for Biodiversity Conservation in Kalaroa Upazila Of
    Home Gardening for Biodiversity Conservation in Kalaroa Title Upazila of Satkhira District, Bangladesh KABIR, Md. Enamul; RAHMAN, Md. Mahabur; ANDO, Author(s) Kazuo Citation Tropical Agriculture and Development (2016), 60(4): 205-215 Issue Date 2016 URL http://hdl.handle.net/2433/241705 © Japanese Society for Tropical Agriculture / 日本熱帯農業学 会; Publisher permitted to deposit this paper on this repository. / 発行元の許可を得て登録しています。; Please take counsel with Japan Academic Association For Copyright Right Clearance (JAC) if any users wish to reproduce, make derivative work, distribute or make available to the public any part or whole thereof. / ご利用に当たっては「学術著作権協 会」にご相談ください。 Type Journal Article Textversion publisher Kyoto University Trop. Agr. Develop. 60(4):205 - 215,2016 Home Gardening for Biodiversity Conservation in Kalaroa Upazila of Satkhira District, Bangladesh 1, 2 2 1, Md. Enamul KABIR , Md. Mahabur RAHMAN , and Kazuo ANDO * 1 Center for Southeast Asian Studies, Kyoto University, 46 Shimoadachi-cho, Yoshida Sakyo-ku, Kyoto 606-8501, Japan 2 Forestry and Wood Technology Discipline, Khulna University, Khulna-9208, Bangladesh Abstract Agroforestry homegardens are important repository of useful plants in most tropical and subtropical world. Home gardens, which are maintained by at least 20 million households, represent possible strategies for livelihood provision, environmental amelioration and perhaps more importantly biodiversity conservation in Bangladesh.Having no accessible natural forests, majority people of Satkhira District in Bangladesh are heavily depend on home gardens to meet their basic forest resources need. This study investigated the existing useful plant resources, its utilization and conservation importance of home gardens in Kalaroa Upazila of Satkhira District, Bangladesh. All useful plants were censused, totalling 270 species including four threatened from 50 randomly selected home gardens totalling 9.29 ha area.
    [Show full text]
  • Ministry of Food and Disaster Management
    Disaster Management Information Centre Disaster Management Bureau (DMB) Ministry of Food and Disaster Management Disaster Management and Relief Bhaban (6th Floor) 92-93 Mohakhali C/A, Dhaka-1212, Bangladesh Phone: +88-02-9890937, Fax: +88-02-9890854 Email:[email protected],H [email protected] Web:http://www.cdmp.org.bd,H www.dmb.gov.bd Emergency Summary of Cyclonic Storm “AILA” Title: Emergency Bangladesh Location: 20°22'N-26°36'N, 87°48'E-92°41'E, Covering From: SAT-30-MAY-2009:1430 Period: To: SUN-31-MAY-2009:1500 Transmission Date/Time: SUN-31-MAY-2009:1630 Prepared by: DMIC, DMB Summary of Cyclonic Storm “AILA” Current Situation Total 14 districts were affected by the cyclone. 147 persons Total Death: 167 reported dead. Many areas of the affected districts were inundated and houses, roads and embankments were People Missed: 0 damaged. Detailed damage information collection is in progress. People Injured: 7,108 Government administration, local elected representatives and Family Affected: 7,34,189 other Non Government organizations are now working in rescue and response in cyclone affected upazilas around the coastal People Affected: 32,19,013 areas. These organization have started their relief and Houses Damaged: 5,41,351 rehabilitation operations immediately just after the cyclone crossed over. Crops Damaged: 3,05,156 acre Local elected representatives and elites are encouraging and providing confidence to the affected people for facing the situation. The Bangladesh army and Coast Guard are trying to establish local communication and still handling the rescue operations. Actions Taken • In a follow up meeting of special meeting of Disaster & Emergency Response (DER) group held in CDMP conference room today decided that the NGO’s/donors will send their responses to DMIC and DER for further assessment by 02 June 2009.
    [Show full text]
  • 87 04 15 025 1 *Anulia 916 37.1 62.0 0.8 0.1 819 19.5 71.3 8.7 0.5
    Table C-05: Percentage Distribution of Population aged 10 years and above by Sex, Marital status, Residence and Community % Male % Female Administrative Unit UN / MZ / Total Total ZL UZ Vill RMO Residence Never Divorced / Never Divorced / WA MH Male Married Widowed Female Married Widowed Community married Separated married Separated 1 2 3 4 5 6 7 8 9 10 11 12 87 Satkhira Zila Total 785399 34.8 64.4 0.7 0.1 813804 21.3 68.5 8.7 1.5 87 1 Satkhira Zila 703970 34.5 64.7 0.7 0.1 733238 21.1 68.6 8.8 1.5 87 2 Satkhira Zila 58240 37.3 62.1 0.5 0.2 57387 24.4 67.2 7.0 1.4 87 3 Satkhira Zila 23189 36.0 63.3 0.6 0.2 23179 22.9 67.4 8.1 1.5 87 04 Assasuni Upazila Total 105676 34.6 64.5 0.8 0.1 107791 21.2 68.7 8.8 1.3 87 04 1 Assasuni Upazila 102178 34.6 64.5 0.8 0.1 104312 21.2 68.6 8.9 1.3 87 04 3 Assasuni Upazila 3498 35.8 63.8 0.4 0.1 3479 23.1 69.7 6.0 1.2 87 04 15 Anulia Union Total 9464 35.8 63.5 0.6 0.1 9719 21.6 68.2 9.0 1.2 87 04 15 025 1 *Anulia 916 37.1 62.0 0.8 0.1 819 19.5 71.3 8.7 0.5 87 04 15 025 01 1 Anulia 774 36.4 62.8 0.6 0.1 705 19.6 71.6 8.4 0.4 87 04 15 025 02 1 Nayakhali 142 40.8 57.7 1.4 0.0 114 19.3 69.3 10.5 0.9 87 04 15 081 1 *Ballabhpur 561 30.1 68.6 1.2 0.0 578 18.5 70.2 11.2 0.0 87 04 15 113 1 *Bara Nasipur 645 36.3 63.6 0.2 0.0 632 20.7 69.5 9.0 0.8 87 04 15 113 01 1 Chenchua 417 34.5 65.5 0.0 0.0 407 19.7 70.5 9.1 0.7 87 04 15 113 02 1 Jaliakhali 228 39.5 60.1 0.4 0.0 225 22.7 67.6 8.9 0.9 87 04 15 119 1 *Basudebpur 248 31.9 67.3 0.8 0.0 240 20.4 72.5 6.7 0.4 87 04 15 151 1 *Bholanathpur 331 35.0 64.0 0.9 0.0 341
    [Show full text]
  • E-Tender Notice No-05/2020-21 E-Tender Is Invited in the National E-GP System Portal ( for the Procurement of Following Tender ID & Schemes
    Government of the People’s Republic of Bangladesh Local Government Engineering Department Office of the Executive Engineer Satkhira. www.lged.gov.bd Tel : No. 0471-63413, Fax: 0471-62818. Reference No: 46.02.8700.001.05.083.19-2014 Date: 08-09-2020 e-Tender Notice No-05/2020-21 e-Tender is invited in the National e-GP System Portal (http://www.eprocure.gov.bd) for the procurement of following Tender ID & Schemes. (For LTM, Only Enlisted Contractors of the Khulna Region, LGED are eligible. In that case, Tenderer must be submitted updated tenderer’s Enlistment Book of LGED.) SL Tender Tender Closing Package No. & Name of works No ID No. date & time e-Tender/LGED/STK/GOBM/20-21/W-28 12-Oct-2020 Rehabilitation of Tala-Kalaroa Upazila H/Q via Dalua GC Patkelghata GC (Tala Portion) Road 12:30 1 492203 by RCC from Ch. 23068m-23688m under Tala Upazila Dist.-Satkhira. Road ID No.287902001 [OSTETM] e-Tender/LGED/STK/GOBM/20-21/W-27 12-Oct-2020 2 492202 Rehabilitation of Budhata GC-Uzirpur GC Road (Assasuni Part) from Ch. 00m-3000m under 12:30 Assasuni Upazila Dist.-Satkhira. Road Id No.287042007[OSTETM] e-Tender/LGED/STK/GOBM/20-21/W-20 12-Oct-2020 Periodic Maintenance of Kaliganj RHD-Debhata GC via Khanzia Bazar (Kaliganj Portion) 12:30 3 492201 Road from Ch. 00m-3750m under Kaliganj Upazila Dist.-Satkhira. Road ID No.287472007 [OSTETM] e-Tender/LGED/STK/GOBM/20-21/W-18 12-Oct-2020 Periodic Maintenance of Kazirhat R&H-Trimohani GC via Khordohat & Kashiadanga Bazar 12:30 4 492200 Road from Ch.
    [Show full text]
  • Ecological Consequences of Shrimp Farming in Southwestern Satkhira District of Bangladesh
    Open Access Austin Journal of Earth Science A Austin Full Text Article Publishing Group Research Article Ecological Consequences of Shrimp Farming in Southwestern Satkhira District of Bangladesh Md. Humayun Kabir*, Iffat Jahan Eva Abstract Department of Geography and Environment, University of Dhaka, Bangladesh The present study based on primary investigations (focus group discussion, *Corresponding author: Md. Humayun Kabir, field observation, household interviews etc.), laboratory analyses for soil and Department of Geography and Environment, University water quality (heavy metal test, pH, salinity, electricity conductivity, particle size of Dhaka, Dhaka 1000, Bangladesh analysis etc.) and secondary materials (remote sensing data, satellite images analysis etc.) reveals that due to poor drainage system and continuous shrimp Received: June 02, 2014; Accepted: July 21, 2014; farming at Chandipur Village under Debhata Upazila of Satkhira District, salinity Published: July 26, 2014 level of both soil and water are increasing. In addition PH, salinity, electrical conductivity of soil and water have been found in a very critical condition. Different types of heavy and toxic metals such as Na, Fe, Cr, Zn, Ni, and Pb have been detected in ghers’ soil. However, to reduce such toxic concentration in water and soil, measures to introduce drainage system (to control water quality and discharge effluents from ghers), to control the use of fish-feed, to stop further conversion of land into gher and to promote plantation of local species have to be adopted. Keywords: Ecological impacts; Soil & water quality; Shrimp farming; Satkhira; Bangladesh Introduction with shrimp [11]. In addition, different climatic variables including cyclone, salinity, sea level rise, water temperature, flood, rainfall, and Fisheries in Bangladesh is one of the major contributors to drought have had adverse effects on coastal ecosystem [5].
    [Show full text]
  • Part-A Samadhan with Disadvantaged People
    PART-A SAMADHAN WITH DISADVANTAGED PEOPLE 1. Background: Samadhan is a Non-government, Non-political, Non-religious multidimensional development service oriented local level voluntary organization. It is working in south-west region of Bangladesh from October 14, 1987 for poverty alleviation and sustainable socio-economic development for the poor and ultra poor inhabitants of the Kopotakkha, Betraboti, Shonai, Ichamoti, Harihar, Sreenadi and Mukteswari River basin areas under Jessore and Satkhira District. The said areas are the most poverty-stricken & disaster prone. Every year the Flood, waterlogged, Drought, Arsenic contamination in water and some other disaster are occurred here several times. The peoples are loosing wealth, disrupting their livelihood pattern becoming livelihood risk and vulnerable situation. At least 80% families are directly or indirectly depend on traditional agriculture systems. Agro based modern technologies are very difficulties to apply in this areas. The Agriculture activities dose not enhances to change their livelihoods of the 60% families. Locally they don’t have sufficient job opportunities i.e. they are remain un-employed for more than 09 months of the year. More than 50% people have to go to out for searching alternative jobs; especially in the district and city town for off firming job i.e. they are changing their profession for survivability. Some of the poor families undertake fishing, collection and selling of fire woods and cow dong, vending of vegetables and spices etc as alternative source to earn money for their survivability. The women headed day labor families can’t arrange suitable job. The numbers of extremely poor families are more than 25%, they are never considered to involve with any development activities.
    [Show full text]
  • BANGLADESH Cyclone Amphan: Joint Needs Assessment
    Cyclone Amphan Joint Needs Assessment (JNA) Needs Assessment Working Group (NAWG) Bangladesh Date: 31 May 2020 BANGLADESH Cyclone Amphan: Joint Needs Assessment Monsoon Flood | July Coordinated efforts of Needs Assessment Working Group About the Working Group : The Needs Assessment Working Group (NAWG) is the platform for government and non government humanitarian agencies under Humanitarian Coordination Task Team (HCTT). The secretariat of the Working Group is hosted by CARE Bangladesh under the “Supporting Bangladesh Rapid Needs Assessment (SUBARNA) Project.” Implemented By Fund Managed By Funded By Disclaimer: This material has been funded by UK aid from the UK government, however the views expressed do not necessarily reflect the UK government’s official policies. Table of Contents Topic Page No Executive Summary 04 Overall Impact 05 Key Findings 06 Sectoral Key Findings 07-11 Joint Needs Assessment (JNA) Methodology 12 Cyclonic Storm (Amphan) 13-14 National Preparedness and Early Action 15-16 Geographical Scope of the Assessment 17 Demographic and Geographical Impacts 18-20 Priority Geographic Areas (by Districts) 21 Sectoral Impacts and Prioritize 22-36 -Child Protection -Early Recovery -Education -Food Security -Gender Based Violence (GBV) -Health -Nutrition -Shelter -SRH -WASH Anticipation of Secondary Hazards 37 Community Needs and Priorities 38 Geographic and Response Priorities 39 Annex 1: Government Response 41 Annex 2: Humanitarian Agency Response 42 Annex 3: Relevant information and Data 43 Annex 4: Situation and priorities of Person with Disability 44 Annex 5: Glossary and Acronyms 45 Annex 6: Assessment timeline 46 Annex 7 : Reference 47 Annex 8: Acknowledgment 48-50 Executive Summary The ‘super cyclone’ Amphan made landfall on 20 May 2020 on Jammu island in West Bengal, India and crossed Bangladesh on 20-21 May.
    [Show full text]
  • NARRI Consortium Scaling up Inclusive Resilience Amongst Water
    NARRI Consortium Scaling up Inclusive Resilience Amongst Water Logged Communities in South Western Bangladesh Final Narrative Report CARE Bangladesh December 2017 Period: 01-04-2016 to 30-09-2017 with NCE 30-11-2017 I. Status of the Key Performance Indicators: Overall Overall List of available Remarks SL Indicator Sub-group achievem target MOV* (If any) ent 01 District 01 Consolidated Risk Number of District, Upazilla 02 Upazilla 02 Reduction Action and Municipalities 1 02 Municipality 02 Plan Report implemented CBDP Baseline Report Institutionalization model 26 Union 26 End line Report 252 Ward 252 School Safety Plan Number of Upazilla's and 0 Upazilla 0 Report 2 Municipalities developed 0 Municipality 0 School Safety Plans Baseline Report 06 Schools 06 End line Report Training/Event Number of Upazilla's 01 Upazilla 01 Report 3 practicing Resilient Livelihood Baseline Report Analysis and Planning 150 Household 150 End line Report Platform and Establishment of South Water membership report 4 Western Water Logging 01 logging 01 Media coverage Platform platform Monitoring Report * MOV= Means of Verification (available supporting documents that can prove the reported figure) II. Performed Activities: (A) Performed Preparatory Activities: (Office Renting, Partner Selection, Procurement, Staff recruitment, Preparatory meeting, Inception meeting, Foundation training for staffs etc.) Narrative Description (Explain how the activity has been done please limited in 250words) Project Office Renting and set-up: CARE Bangladesh set-up a field level Project Office at Satkhira district just after awarding the project. Though there was a Team Office functioning at Satkhira with two small projects, required space for the new project was not available.
    [Show full text]
  • Report on AK Taj Group Masrur M. A. Hoque.Pdf (983.4Kb)
    Internship Report on AK TAJ GROUP Prepared for, MD. Tamzidul Islam Assistant Professor BRAC BusinessSchool BRAC University Prepared By, Masrur M. A. Hoque ID # 12164092 Submission Date – 15/12/2015 LETTER OF TRANSMITTAL December 15, 2015 MD. Tamzidul Islam Assistant Professor BRAC BusinessSchool BRAC University Subject: Internship Report. Dear Sir, I would like to thank you for supervising and helping me throughout the semester. With due respect I am submitting a copy of intern report foryourappreciation. I have given my best effort to prepare the report with relevant information that I have collected from an onsite production department which is belongs to a group of company and from other sources during my accomplishthe course. I have the immense pleasure to have the opportunity to study on the marketing practices of AK TAJ Group. There is no doubt that the knowledge I have gathered during the study will help me in real life. For your kind consideration I would like to mention that there might be some errors and mistakes due to limitations of my knowledge. I expect that you will forgive me considering that I am still learner and in the process of learning. Thanking for your time and reviews. Yours faithfully Masrur M. A. Hoque ID-12164092 BRAC Business School BRAC University Acknowledgement The successful completion of this internship might not be possible in time without the help some person whose suggestion and inspiration made it happen. First of all I want to thank my Course Instructor MD. Tamzidul Islam for guiding me during the course. Without his help this report would not have been accomplished.
    [Show full text]
  • 87 04 15 025 1 *Anulia 533 234 299 185 5 5 0 1 234 43 60 87 04 15
    Table C-10: Distribution of Population aged 7 years and above not attending school by Employment Status, Sex, Residence and Community Employment Status Administrative Unit Population aged 7+ and not UN / MZ / ZL UZ Vill RMO Residence attending school Employed Looking for work Household work Do not work WA MH Community Both Male Female Male Female Male Female Male Female Male Female 1 2 3 4 5 6 7 8 9 10 11 12 13 87 Satkhira Zila Total 505114 208262 296852 173638 17796 960 603 2777 224415 30887 54038 87 1 Satkhira Zila 470196 194289 275907 162293 15299 899 562 2655 210394 28442 49652 87 2 Satkhira Zila 22769 9102 13667 7419 1816 39 27 71 8864 1573 2960 87 3 Satkhira Zila 12149 4871 7278 3926 681 22 14 51 5157 872 1426 87 04 Assasuni Upazila Total 72783 29580 43203 23808 2578 152 115 747 32449 4873 8061 87 04 1 Assasuni Upazila 70717 28727 41990 23146 2475 148 112 733 31594 4700 7809 87 04 3 Assasuni Upazila 2066 853 1213 662 103 4 3 14 855 173 252 87 04 15 Anulia Union Total 7437 3068 4369 2489 130 12 7 116 3546 451 686 87 04 15 025 1 *Anulia 533 234 299 185 5 5 0 1 234 43 60 87 04 15 025 01 1 Anulia 433 191 242 150 3 1 0 1 192 39 47 87 04 15 025 02 1 Nayakhali 100 43 57 35 2 4 0 0 42 4 13 87 04 15 081 1 *Ballabhpur 571 229 342 180 8 0 1 3 240 46 93 87 04 15 113 1 *Bara Nasipur 426 184 242 154 2 0 0 1 215 29 25 87 04 15 113 01 1 Chenchua 289 124 165 103 0 0 0 1 149 20 16 87 04 15 113 02 1 Jaliakhali 137 60 77 51 2 0 0 0 66 9 9 87 04 15 119 1 *Basudebpur 271 128 143 112 7 1 0 4 131 11 5 87 04 15 151 1 *Bholanathpur 169 57 112 48 0 0 0 0
    [Show full text]