ОАО Surgutneftegaz

Total Page:16

File Type:pdf, Size:1020Kb

ОАО Surgutneftegaz Facade and stained-glass windows Architectural lighting Engineering systems Automation and dispatching The Company LIK Foreside Since the founding the company has been rapidly developing by implementing of civilian and industrial facilities constructions not only in Tyumen Oblast in circumpolar oil and gas fields but in Sverdlovsk oblast, Republic of Tatarstan, Republic of Bashkortostan, Chelyabinsk oblast, Amur oblast, Khabarovsk Krai, etc. as well. The main activities of the company are: Since the very foundation of the company we focused not only on annual growth of economic indicators but on formation of a competent and efficient teamof responsible engineers and projects supervisors who are ready to realize architectural and engineering objects of any complexity The Company chose the main activities of construction activity from the very beginning. There are: Facade and stained-glass windows Internal engineering systems Architectural lighting ! Automation and dispatching About us in Engineering and technical members of staff numbers 73 97 Completed projects 317 Automation systems 860 items of ventilating and climate control equipment 517000 м2 of facades and stained-glass windows Geographical spread Our Customers Magadan Novy Urengoy Moscow Nyagan Surgut(office) Khanty-Mansiysk AO: Pyt-Yakh, Kogalym, Lyantor, Nizhnevartovsk, Nefteyugansk, Megion, Salym Khanty-Mansiysk Tobolsk Yekaterinburg Tyumen Kazan (office) Uglegorsk (Amur Oblast) Khabarovsk Facade projects Facade LIK Foreside's mission-oriented activity is work with hinged ventilated facades. From the foundation our specialists have implemented more than dozens projects with unique architectural characteristics and with using of advanced technologies several of them were applies for the first time ever in the territory of Russian Federation. In particular, we do Engineering and Materials selection design Qualitative installation Facades winterization Supply of high-quality materials Buildings from manufacturing works architectural lighting Building fund KhMAD Zhilische Block of 25-floor houses, 37 building estate, Surgut Supply o f equipment and materials Installation of hinged ventilated facades September 2014-December 2015 Western Siberia MPN Administrative and amenitybuilding of FCC (Finance and Construction Corporation), UES (unified energy system), MPN (main power networks) of Western Siberia, Surgut Reconstruction of translucent constructions December 2013- March 2014 PAO Sberbank Central administrative building of OAO Sberbank, Dzerzhinskogo St., Surgut Design, supply and installation of hinged ventilated facades EvoTech with ceramic granite brick cladding1200*600 including concealed fixing November 2012 –September 2013 ОАО Surgutneftegaz Center of Polytechnic Study, Schematic design and detail ОАО Surgutneftegaz, engineering, complement Zapadno-Surgutskoye field, and setting up of facades Surgut constructions and stained-glass windows September 2014- March 2016 ОАО Surgutneftegaz Design, supply, installation Production and Administrative of hinged ventilated facades Building of OGPD and stained-glass windows (Oil-and-Gas Production Department), Komsomolskneft, Fedorovskiy township, Surgut Decноябрьember 2013-Mar2012-августch 2014 2013 ОАО Surgutneftegaz Design, installation of entry Center of Polytechnic Study, ОАО Surgutneftegaz, Zapadno-Surgutskoye field, Surgutsky District September 2014- March 2016 ООО Zapsibintermonolitstroi Housing estate with attached parking, Igorya Kirtbaya St.,37 building estate, Surgut Installation of hinged ventilated facades July 2014-November 2015 BI (budgetary institution), Surgut District Clinical Hospital Design, supply, supervising installation of hinged ventilated facades Clinical Hospital Building, Surgut 2012 SEE (self-employed entrepreneur) Sambor 14-floor block of flats, 38 Profsoyuzov St, Surgut Design, supply, installation of hinged ventilated facades with ceramic granite brick cladding. Installation was running without using of scaffolds and boards but with covering of monolithic carcass Setting up of heat system. Start of the system was accomplishing by LIK Foreside specialists floor by floor under external temperature more -30 2013 OOO OAB (Office and Amenity Building) Yekaterinburg Office block, Korolenko St., Yekaterinburg Design, supply, installation of hinged ventilated facades which are based on aluminium facades system with ceramic granite brick cladding and CRC(corrosion-resistant coating) 2012 OOO "Osnovaniye" Housing estate with variable number of storeys, Krasnokokshayskaya St., Kazan Design, supply and installation of hinged ventilated facades EvoTech with ceramic granite brick bonded using lining cladding way. Installation was running without using of scaffolds and boards but with covering of monolithic carcass July 2013- December 2013 6-floor house with integrated premises,. Dostoyevskogo St., Kazan Design, installation of hinged ventilated facades May 2015- March 2016 ОАО Surgutneftegaz Design, implementation of Architectural lighting Center of Polytechnic Study, for the main building ОАО Surgutneftegaz, Zapadno-Surgutskoye field, Surgutsky District September 2014- March 2016 ООО Genstroy-Kazan Housing estate «Verbnyy», sectional accommodation unit with integrated non-residential premise, №M-51Verbnaya St, Sovetsky City District, Kazan Schematic design and detail engineering, supply, installation of hinged ventilated facades July 2014 – December 2015 OOO Gik-Stroy Housing estate «Pobeda», I-III, V construction stages, Pobedy Ave., Kazan Schematic design and detail engineering, supply and installation of hinged ventilated facades Outset 2014 ООО RN-Yuganskneftegaz Office block, Nefteyugansk, 2 building estate, 26 building, 1 bulk Design, supply, installation of hinged ventilated facades and stained-glass windows December 2015-July 2016 ООО PCO-34 Business center, Dzerzhinskogo St., Surgut Design, supply, installation of hinged ventilated facades Design, complement, installation and setting up of ventilating and air conditioning systems April 2014- April 2016 MPI (municipal public institution) Capital Construction Management of Surgut region Children's art school №2, Design, supply, Piks City District, Surgut installation of hinged ventilated facades November 2015-July 2016 SEE Sambor 13-floor block of flats, Mayakovskogo St., Bely Jar township, Surgutsky District Design, supply and installation of hinged ventilated facades with ceramic granite brick Installation of heat system for residential house. Starting-up and adjustment of heat system March 2014-December 2014 Engineering projects Engineering Projects Engineering systems and engineering support LIK Foreside Company implements all services to provide buildings with modern engineering systems We work with: - Designing - Erecting - Starting-up and adjustment of ventilation, - Supply air-conditioning, comfort and technologic - Repair cold, heat, electricity and water supply - Upgrading LIK Foreside provides in service support and maintenance operations to engineering systems. The differential characteristic of our Company is experience and ability to design and realize complicated engineering systems in Far North conditions with its peak of energy efficiency though at the lowest external temperature till -57 ООО Nizhnevartovskii GTP (Gas Treatment Plant) Reconstruction of Tyumen Compressor Plant, Nizhnevartovsky District Complex supply of Veza and Clivet ventilating equipment Installation supervision, starting-up and adjustment OOO UgraZasPererabotka Reconstruction of CS-3 (Compressor Station) (5 sub-facilities) Installation of ventilating, heat supply and air conditioning on sub-facilities reconstructions systems Сlivet and Veza equipment supply Shopping center «Agora» Designing, supply, Automation and installation and setting dispatching of buildings up of air conditioning engineering systems Shopping and Entertainments systems with 3,5 MW (ABB, Siemens) Center «Agora», aggregate capacities Surgut (York. Carrier) and ventilation systems (York, Swegon, Veza) ОАО SiburTumenGaz The main pumping station Yuzhno-Balykskiy GPP (Gas Processing Plant) Erecting and setting up of Сlivet and Veza ventilating equipment Yuzhno-Balykskiy ССR (central control room) Supply, installation and setting up of UNIFLAIR Precision conditioning ООО UgraMegaSport Ice arena, Khanty-Mansiysk Reconstruction of smoke exhaust system ООО StrojTransGaz-M The Vostochny Cosmodrome, Uglegorsk (Amur Oblast) Fabrication and supply of ventilation system control panel OOO ZapsibTransGaz Warm Station with MRS (machinery and repair shop) Yuzhno-Balykskiy GPP Supply of Veza and SovPlim ventilating equipment OOO SoyuzPromStroj Melik-Karamova St, Surgut, shopping center «Vesna» Ventilating and climate control equipment installation Construction and installation work ОАО Sibur Holding 6 sub-facilities of OPF (Off-Plot Facilities) Tobolsk- Polymer Complex supply of Veza ventilating equipment Building fund KhMAD Supply, installation and Zhilische setting up of smoke exhaust system Veza Proletarskiy Ave., Surgut PB «WGC-2» (wholesale generation company) Surgut-1 Power Station Supply, installation, setting up of Veza ventilating equipment OOO EvroStroy-S Business centre “Panorama”, Surgut Design and fabrication of engineering system automation Complex supply of Veza Ventilating equipment with recuperation ОАО Sibur Holding GF -2 5 sub-facilities Tobolsk-Pertochemistry Complex supply of Veza ventilating equipment Installation, starting-up and adjustment ОАО Severnye Stroitelnye Tekhnologii Tower-block
Recommended publications
  • RESUME BORIS ANATOLYEVICH VOLKOVOY Moscow
    RESUME BORIS ANATOLYEVICH VOLKOVOY Moscow Tel/Fax: +7 499 133 7205 Mobile phone: +7 916 113-1469 E-mail: [email protected] EDUCATION: Moscow State University, College of Linguistics MA, 1992, English and French major Moscow Oil and Gas University. A one year training course in industrial safety and HSE for Oil and Gas Industry (2008-2009) Native languages: Russian and Ukrainian EXPERIENCE: 1990 / MD-Seis Joint Enterprise : Raduzhny, interpreter 1991 / White Nights Joint Venture : Raduzhny, interpreter 1991 - 1992 / Dowell-Schlumberger : Moscow - Raduzhny , coordinator 1992 / Technology Ventures ; Raduzhny, Surgut, Nizhnevartovsk, Tengiz, Orenburg; interpreter 1992-1993 / Chevron : Tengiz , interpreter 1993 / Halliburton : Nizhnevartovsk , Arkhangelsk , Usinsk , interpreter 1994 / Brown and Root : Moscow , Arkhangelsk , Ashkhabad , translator and interpreter 1994 / Houston Engineers : Nizhnevartovsk , Megion , Surgut , interpreter 1994 / Statoil : Moscow ; interpreter 1994 / Camco Drilling Group (Reed, Hycalog): Nizhnevartovsk, Nefteugansk, Murmansk, Ashkhabad, Baku ; 1995 / REDA Pump Co. ; Raduzhny; interpreter 1995 / Agip SpA ; Kogalym, Langepas, Moscow; interpreter/translator 1995 / Alfa Laval Oilfield Services ; translating of technical manuals 1995 / Occidental Petroleum ; Baku; interpreter 1995 / Stewart & Stevenson ; Megion ; Langepas ; interpreter 1996-1997 / Exxon Ventures CIS ; Moscow, Kazakhstan, Sakhalin ; translator and interpreter 1996 / British Gas/Agip ; Karachaganak ; interpreter 1996 / Total ; Moscow, Kharyaga ; translation
    [Show full text]
  • Bank of Khanty Mansiysk
    Издательский проект Publishing project Международный институт проблем The international institute of problems of Международного института проблем The international institute of problems of устойчивого развития sustainable development устойчивого развития sustainable development ¿Í͉ËÚÓ‚‡Ì ÔË Œ„‡ÌËÁ‡ˆËË Œ·˙‰ËÌÂÌÌ˚ı Õ‡ˆËÈ Accredited by the United Nations ÃÂʉÛ̇ӉÌ˚È ËÌÒÚËÚÛÚ ÔÓ·ÎÂÏ ÛÒÚÓÈ˜Ë‚Ó„Ó ‡Á- The international institute of problems of sustain- »Á‰‡ÂÚÒˇ ÔË ËÌÙÓχˆËÓÌÌÓÈ ÔÓ‰‰ÂÊÍ Published with information support of the Ministry of For- ‚ËÚˡ (ûœ”–) ÔÓ‚Ó‰ËÚ ‡·ÓÚ˚ ÔÓ ÙÓÏËÓ‚‡Ì˲ ûƒ –ÓÒÒËË eign Affairs of Russia able development (IIPSD) carries out works on the for- ‚ –ÓÒÒËÈÒÍÓÈ ‘‰‡ˆËË Ì‡Û˜ÌÓ-ÏÂÚÓ‰ÓÎӄ˘ÂÒÍÓÈ √·‚Ì˚È Â‰‡ÍÚÓ Editor in chief mation in the Russian Federation of a scientific-method- ·‡Á˚, ‚ÌÛÚË„ÓÒÛ‰‡ÒÚ‚ÂÌÌÓÈ Ë ÏÂʉÛ̇ӉÌÓÈ ÒË- ÇÍÒËÏ ¿ÎÂÍ҇̉ӂ˘ ‘≈ƒŒ–≈ÕüŒ Maxim FEDORENKO ological base, the state and international system of co- [email protected] [email protected] ÒÚÂÏ ÒÓÚÛ‰Ì˘ÂÒÚ‚‡ ‰Îˇ ‡ÎËÁ‡ˆËË ÔÓ„‡ÏÏ ÛÒ- operation for the realization of programmes of sustain- –‰‡ÍÚÓ Editor ÚÓÈ˜Ë‚Ó„Ó ‡Á‚ËÚˡ. ¬ËÍÚÓ ¿ÎÂÍ҇̉ӂ˘ ÿÀ‹÷≈¬ Victor MALTSEV able development. [email protected] [email protected] Дирекция МИПУР Directorate of IIPSD ‡ÎËÁÛÂÚ ÒÚ‡Ú„˲ ûœ”– ̇ ÛÒÚÓȘ˂Ó Зарубежные представительства журнала Foreign representatives of the magazine, realizes the strategy of IIPSD on sustainable ‡Á‚ËÚË ‚ ÍÓÌÍÂÚÌ˚ı ÔÓÂÍÚ‡ı; ‡Á‡·‡Ú˚‚‡ÂÚ «Внешнеэкономические связи» и Международного ‘External Economic Relations’ and The International Insti development in concrete projects; develops института проблем устойчивого развития tute of sustainable development problems ÏÂı‡ÌËÁÏ˚ Ë ÔË‚ÎÂ͇ÂÚ ÚÂıÌÓÎÓ„ËË, mechanisms and involves the technologies Ó·ÂÒÔ˜˂‡˛˘Ë ÛÒÚÓȘ˂Ó ‡Á‚ËÚË √ÂχÌˡ: „.
    [Show full text]
  • Chapter 7. Cities of the Russian North in the Context of Climate Change
    ? chapter seven Cities of the Russian North in the Context of Climate Change Oleg Anisimov and Vasily Kokorev Introduction In addressing Arctic urban sustainability, one has to deal with the com- plex interplay of multiple factors, such as governance and economic development, demography and migration, environmental changes and land use, changes in the ecosystems and their services, and climate change.1 While climate change can be seen as a factor that exacerbates existing vulnerabilities to other stressors, changes in temperatures, precipitation, snow accumulation, river and lake ice, and hydrological conditions also have direct implications for Northern cities. Climate change leads to a reduction in the demand for heating energy, on one hand, and heightens concerns about the fate of the infrastruc- ture built upon thawing permafrost, on the other. Changes in snowfall are particularly important and have direct implications for the urban economy, because, together with heating costs, expenses for snow removal from streets, airport runways, roofs, and ventilation spaces underneath buildings standing on pile foundations built upon perma- frost constitute the bulk of a city’s maintenance budget during the long cold period of the year. Many cities are located in river valleys and are prone to fl oods that lead to enormous economic losses, inju- ries, and in some cases human deaths. The severity of the northern climate has a direct impact on the regional migration of labor. Climate could thus potentially be viewed as an inexhaustible public resource that creates opportunities for sustainable urban development (Simp- 142 | Oleg Anisimov and Vasily Kokorev son 2009). Long-term trends show that climate as a resource is, in fact, becoming more readily available in the Russian North, notwith- standing the general perception that globally climate change is one of the greatest challenges facing humanity in the twenty-fi rst century.
    [Show full text]
  • Materials) Provided to Shareholders in Preparation for the Annual General Shareholders’ Meeting of Pjsc Gazprom in 2018
    INFORMATION (MATERIALS) PROVIDED TO SHAREHOLDERS IN PREPARATION FOR THE ANNUAL GENERAL SHAREHOLDERS’ MEETING OF PJSC GAZPROM IN 2018 Saint Petersburg, 2018 2 List of information (materials) provided to shareholders in preparation for the annual General Shareholders’ Meeting of PJSC GAZPROM 1. Announcement of the annual General Shareholders’ Meeting of PJSC GAZPROM. 2. PJSC GAZPROM Annual Report for 2017 and Annual Accounts (Financial Statements) for 2017, including the Auditor’s Report. 3. Report on PJSC GAZPROM related party transactions made in 2017. 4. Opinion of PJSC GAZPROM Audit Commission on reliability of data contained in PJSC GAZPROM Annual Report for 2017, Annual Accounts (Financial Statements) for 2017 and in the Report on PJSC GAZPROM related party transactions made in 2017. 5. Review of PJSC GAZPROM Auditor’s Report by the Audit Committee of PJSC GAZPROM Board of Directors. 6. Profit allocation recommendations of PJSC GAZPROM Board of Directors, in particular, the amount, timing and form of payment of the annual dividends on the Company’s shares and the date, as of which the persons entitled to the dividends are determined. 7. Information on the candidacy for PJSC GAZPROM Auditor. 8. Proposals on the amount of remuneration to members of PJSC GAZPROM Board of Directors. 9. Proposals on the amount of remuneration to members of PJSC GAZPROM Audit Commission. 10. Draft Amendments to the Regulation of General Shareholders’ Meeting of PJSC GAZPROM and the comparative table of amendments thereto vs the current version. 11. Information on candidates to PJSC GAZPROM Board of Directors, in particular, on the availability of their consent to be elected.
    [Show full text]
  • Ugra Investment Proposals
    Khanty-Mansiysk Autonomous Okrug – Ugra UGRA INVESTMENT PROPOSALS 4 12 22 EXISTING UGRA PROPERTY GOODS AND EQUIPMENT INDUSTRIAL INFRASTRUCTURE COMPLEXES OFFERED TO PRIVATE FOR FEC (INDUSTRIAL PARKS) INVESTORS 8 projects 2 projects 5 projects 26 30 36 PRODUCTION OF CONSTRUCTION FOREST INDUSTRY AGROINDUSTRIAL MATERIALS COMPLEX COMPLEX 2 projects 3 projects 3 projects 42 50 52 MINING COMPLEX VOLUME OF INVESTMENT INDUSTRY DEPARTMENT OF 6 projects PROPOSALS THE KHANTY-MANSIYSK AUTONOMOUS OKRUG – UGRA 54 56 DEPARTMENT OF ECONOMIC DEVELOPMENT FUND OF DEVELOPMENT OF THE KHANTY-MANSIYSK THE KHANTY-MANSIYSK Content AUTONOMOUS OKRUG - UGRA AUTONOMOUS OKRUG - UGRA 2 3 Ugra investment proposals EXISTING UGRA PROPERTY 01 COMPLEXES, OFFERED TO PRIVATE INVESTORS JSC “Yugorskiy forest industry holding” 6 JSC “Yugorskiy fish hatchery” 7 JSC “Polyarnyi kvartz” 8 Beryozovskiy and Oktyabrskiy fish factories 9 Property complex in urban-type settlement Mortka of Kondinskiy district 10 (wood processing industry) 4 5 JSC “Yugorskiy forest industry holding” JSC “Yugorskiy fish hatchery” Sovetskiy city, Khanty-Mansiysk city, Nyagan city, Yugorsk city, Sovetskiy district Khanty-Manskiysk city, of the Khanty-Mansiysk Autonomous Okrug - Ugra of the Khanty-Mansiysk Autonomous Okrug - Ugra 01 / 05 02 / 05 Prerequisites for the project development: Production Prerequisites for the project development: Current industrial ● Presence of large consumers capacity: ● The need for performing compensatory infrastructure in the territory of Ugra; measures to restore number of
    [Show full text]
  • Subject of the Russian Federation)
    How to use the Atlas The Atlas has two map sections The Main Section shows the location of Russia’s intact forest landscapes. The Thematic Section shows their tree species composition in two different ways. The legend is placed at the beginning of each set of maps. If you are looking for an area near a town or village Go to the Index on page 153 and find the alphabetical list of settlements by English name. The Cyrillic name is also given along with the map page number and coordinates (latitude and longitude) where it can be found. Capitals of regions and districts (raiony) are listed along with many other settlements, but only in the vicinity of intact forest landscapes. The reader should not expect to see a city like Moscow listed. Villages that are insufficiently known or very small are not listed and appear on the map only as nameless dots. If you are looking for an administrative region Go to the Index on page 185 and find the list of administrative regions. The numbers refer to the map on the inside back cover. Having found the region on this map, the reader will know which index map to use to search further. If you are looking for the big picture Go to the overview map on page 35. This map shows all of Russia’s Intact Forest Landscapes, along with the borders and Roman numerals of the five index maps. If you are looking for a certain part of Russia Find the appropriate index map. These show the borders of the detailed maps for different parts of the country.
    [Show full text]
  • Download This Article in PDF Format
    E3S Web of Conferences 210, 07013 (2020) https://doi.org/10.1051/e3sconf/202021007013 ITSE-2020 The experience of application of microbiological indicators in monitoring procedures of aquatic ecosystems in the Middle Ob basin Elena Shornikova1,*and Marina Arslanova1,2 1Department of Ecology and Biophysics, Surgut State University, 628400, Lenina av. 1, Surgut, Khanty-Mansi Autonomous Okrug – Ugra, Russia 2Surgutneftegas PAO, Talakan Department of Technological Transport No. 1, 628400, Nefteyugansk highway 7, Surgut, Khanty-Mansi Autonomous Okrug – Ugra, Russia Abstract. The results of microbiological monitoring of the rivers with the various nature and intensity of anthropogenic load in the Middle Ob basin carried out from 2002 to 2019 is presented. The programme of monitoring included following parameters: the number of bacteria of 5 ecological- trophic groups, gram-staining and morphology of isolated bacteria study, testing of bacterial resistance to antibiotics and phenols. Also coefficients of mineralization and Water quality indexes were calculated. On the base of calculated values, the self-purification potential of the rivers was estimated. Studied rivers were categorized into 5 classes of water quality. In the most rivers on unpolluted and urban area G+ and coccus forms of bacteria were predominant in the microbial community. In the rivers within oilfields the proportion of G– and rod-shaped bacteria was increased considerably. Seasonal and spatial distribution of resistant bacteria over the rivers allows to apply them as markers of the nature and intensity of the anthropogenic load. 1Introduction Traditionally, aquatic microbiology studies the composition of microorganisms in natural waters, their role in biogeochemical processes occurring in waterbodies. This mainly concerns the biodiversity of microorganisms, as well as the physiological processes of their growth and reproduction.
    [Show full text]
  • «One Planet - One Future!»
    Forum Diary #ММЭФ2018 #ОднаПланетаОдноБудущее #СпастиИсохранить 2018 X International Youth –UGRA Environmental Forum KHMAO 27–31 may may 27–31 «One Planet - One Future!» 1 1 «Clean planet starts with you» – this phrase has become the motto of X International Youth Environmental Forum «One Planet - One Future!». The Forum, which exists today in Ugra in the framwork of a large-scale environmental and educational project, International Environmental Action «Save and Protect», has reunited the participants of XI In-ternational Conference of UNESCO Associated Schools «The Ob-Irtysh Basin: the youth studies and preserves the natural and cultural heritage in the regions of world great rivers» and XIV District Youth Environmental Forum «Let’s Save the Blossoming World of Ugra!». The founders of the Forum are the Government of Khanty-Mansiysk Autonomous District - Ugra and the Russian Federation Commission for UNESCO. The Forum was organized by the Service for Control and Supervision in Environmental Protection, Wildlife Objects and Forest Relations of Khanty-Mansiysk Autonomous District - Ugra; the Department of Public and External Relations of the autonomous district and Khanty-Mansiysk District Public Or-ganization of All-Russian Public Organization «Russian Union of Youth». Its goal is to unite the efforts of young people to preserve the natural and cultural heritage in the regions in the context of interre-gional and international cooperation. Thanks to the Forum today: the youth is involved in solving some issues of preserving the natural and cultural heritage in regions and countries; the younger gen-eration potential is being enhanced by means of environmental education and learning for the sus-tainable development; young people, who carry out socially useful environmental activities, are pro-vided with support and recognition; the experience of interregional and international youth envorn-mental associations in nature protection activities is studied.
    [Show full text]
  • Relict Permafrost in the Central Part of Western Siberia
    Permafrost, Phillips, Springman & Arenson (eds) © 2003 Swets & Zeitlinger, Lisse, ISBN 90 5809 582 7 Relict permafrost in the central part of Western Siberia G.V. Ananjeva (Malkova), E.S. Melnikov & O.E. Ponomareva Earth Cryosphere Institute, Siberian Division, Russian Academy of Sciences: Russia, Moscow ABSTRACT: Relict permafrost has been encountered during the investigation of numerous oil and gas fields in the central part of Western Siberia at depths ranging from 100–150 m (top of permafrost) to 250–400 m (base) below ground surface. We present results of ongoing geological and hydrogeological research and provide additional information on the geocryological conditions prevalent in this territory. The new data have modified our scien- tific views on the character of relict permafrost in the central part of Western Siberia. Computer maps depicting the extent of relict permafrost and the accompanying database are available based on GIS – technology. 1 INTRODUCTION A map of Western Siberian permafrost thickness and structure (scale 1:2 500 000; V. Baulin editor) accompa- The cryolithozone in the central part of Western Siberia nied by explanations and borehole catalogues was is characterized by the presence of relict permafrost at issued in 1985 as a result of this research (Baulin & depth. The relict permafrost was formed as a result of Dubikov 1982). severe climatic conditions in the Pleistocene. Huge Furthermore, geologists and geographers from soils masses froze which were both on land and under Moscow State University under the supervision of V. the shallow sea at that time. With subsequent Holocene Trofimov were engaged in the exploration of per- climate warming the permafrost soils thawed from the mafrost occurrences in Western Siberia in 1970–1985 ground surface, but persisted at depth as relics.
    [Show full text]
  • Macro-Regional System Development of Yugra Cities
    Brief for GSDR – 2016 Update Macro-regional system development of Yugra cities A. Vykhodtсev, N. Voitik, I. Akhmedova, Tyumen State University, Russia* Introduction town (the Russian term of that time "town" meant any inhabited locality, surrounded by a Nowadays Khanty-Mansy Autonomous Dis- defensive wall). Most of these principalities and trict is the most urban area in Russia and the Eur- their capital cities-towns ceased to exist by the asian continent. The area with severe climatic end of the 16th century. conditions and rich oil resources attracts labour migrants. During the resources development no In the 16-17 centuries the colonization of one knew that after a time big cities would grow Yugra by the Russians had a pronounced military there, gradually becoming urban agglomerations. character that allowed creating conditions for Natural, economic and ecological features of mass development of the territory by farmers Yugra make us looking at the development of the and industrialists. The outposts-cities were built – urbanization process. Obskoy (Mansurov) town (1585, lasted until 1594), Berezov (1593), Surgut (1594) (History..., Historical aspects of urbanization in Yugra 1999, Essays..., 2000). The first settlements appeared on the terri- Due to changing trade routes (Mangazeya tory of Yugra in the upper Paleolith, for example, trade route) and increasing depletion of fur- the unique ancient Neolithic hillfort of Amna in bearing riches of the Priobskaya taiga these set- the pool of the Kazim River in Northern Eurasia. tlements gradually fell into decay. In the first half of the 1st Millennium BC there were large settlements of 30-40 homes up to The Russian Empire policy in the early 20th 300-350 people in communities (History..., 1999, century tended to preserve the fishing grounds of Essays..., 2000, Yugra..
    [Show full text]
  • Scientific Research of the Sco Countries: Synergy and Integration 上合组织国家的科学研究:协同和一体化
    SCIENTIFIC RESEARCH OF THE SCO COUNTRIES: SYNERGY AND INTEGRATION 上合组织国家的科学研究:协同和一体化 Materials of the Date: International Conference October 14 Beijing, China 2019 上合组织国家的科学研究:协同和一体化 国际会议 参与者的英文报告 International Conference “Scientific research of the SCO countries: synergy and integration” Part 2: Participants’ reports in English 2019年10月14日。中国北京 October 14, 2019. Beijing, PRC Materials of the International Conference “Scientific research of the SCO countries: synergy and integration” - Reports in English (October 14, 2019. Beijing, PRC) ISBN 978-5-905695-66-7 这些会议文集结合了会议的材料 - 研究论文和科学工作 者的论文报告。 它考察了职业化人格的技术和社会学问题。 一些文章涉及人格职业化研究问题的理论和方法论方法和原 则。 作者对所引用的出版物,事实,数字,引用,统计数据,专 有名称和其他信息的准确性负责 These Conference Proceedings combine materials of the conference – research papers and thesis reports of scientific workers. They examines tecnical and sociological issues of research issues. Some articles deal with theoretical and methodological approaches and principles of research questions of personality professionalization. Authors are responsible for the accuracy of cited publications, facts, figures, quotations, statistics, proper names and other information. ISBN 978-5-905695-66-7 © Scientific publishing house Infinity, 2019 © Group of authors, 2019 CONTENT ECONOMICS 完善创新经济中服务机构实现经济可持续性的工具 Perfection of tools for economic sustainability of service organizations in an innovative economy Grashin Sergey Aleksandrovich............................................................................12 “绿色”经济增长条件下的人力资源管理 Human Resource Management in the conditions
    [Show full text]
  • Benefit Sharing in the Arctic • Maria Tysiachniouk, Andrey N
    Benefit Sharing in the Arctic • Maria Tysiachniouk, Andrey N. • Maria Petrov Tysiachniouk, and Violetta Gassiy Benefit Sharing in the Arctic Extractive Industries and Arctic People Edited by Maria Tysiachniouk, Andrey N. Petrov and Violetta Gassiy Printed Edition of the Special Issue Published in Resources www.mdpi.com/journal/resources Benefit Sharing in the Arctic Benefit Sharing in the Arctic Extractive Industries and Arctic People Special Issue Editors Maria Tysiachniouk Andrey N Petrov Violetta Gassiy MDPI • Basel • Beijing • Wuhan • Barcelona • Belgrade • Manchester • Tokyo • Cluj • Tianjin Special Issue Editors Maria Tysiachniouk Andrey N Petrov Centre for Independent Social Research University of Northern Iowa Russia USA Violetta Gassiy Kuban State University Russia Editorial Office MDPI St. Alban-Anlage 66 4052 Basel, Switzerland This is a reprint of articles from the Special Issue published online in the open access journal Resources (ISSN 2079-9276) (available at: https://www.mdpi.com/journal/resources/special issues/industry people). For citation purposes, cite each article independently as indicated on the article page online and as indicated below: LastName, A.A.; LastName, B.B.; LastName, C.C. Article Title. Journal Name Year, Article Number, Page Range. ISBN 978-3-03936-164-9 (Hbk) ISBN 978-3-03936-165-6 (PDF) Cover image courtesy of Maria Tysiachniouk, Andrey N. Petrov and Violetta Gassiy. c 2020 by the authors. Articles in this book are Open Access and distributed under the Creative Commons Attribution (CC BY) license, which allows users to download, copy and build upon published articles, as long as the author and publisher are properly credited, which ensures maximum dissemination and a wider impact of our publications.
    [Show full text]