Schramm Park South; CN 22776 Enclosed Is Important Road Closure

Total Page:16

File Type:pdf, Size:1020Kb

Schramm Park South; CN 22776 Enclosed Is Important Road Closure June 26, 2019 NDOT Project: ER-31-2(115) Schramm Park South; C.N. 22776 Enclosed is important road closure and detour route information concerning an upcoming proposed transportation improvement project along Nebraska Highway 31 (N-31) in Sarpy County. The Nebraska Department of Transportation (NDOT) plans to restore approximately .10 miles of roadway embankment along N-31 and stabilize the riverbank of the Platte River south of Schramm Park State Recreation Area from approximately mile marker (MM) 4.43 to MM 4.53. The removal and replacement of pavement at turnout areas may also be necessary as part of this project. Construction is anticipated to begin as soon as July 8, 2019. The proposed project would take approximately sixty days (weather permitting) and would require detouring N-31 traffic. A designated detour would be provided utilizing Nebraska Highway 50 (N-50), Nebraska Highway 370 (N-370) and Interstate 80 (I-80). Local access to all drives, roads and private drives along N-31 would be maintained during construction. Please refer to the enclosed detour route map for more information. Any questions or comments regarding this project should be submitted to: Sarah Soula, Public Involvement Manager, Nebraska Department of Transportation, P.O. Box 94759, Lincoln, NE 68509-4759; [email protected]; (402) 479-4871. For further information, contact Tim Weander, NDOT District 2 Engineer, (402) 595-2534, [email protected]. Additional information regarding the project may also be found on the NDOT website at http://dot.nebraska.gov/projects/future-projects/ by clicking on the “Schramm Park South” link. NDOT has worked to develop this project to minimize inconvenience and hardships. We are dedicated to improving Nebraska’s highway system and with your help we can achieve this goal. Sincerely, Sarah R. Soula Public Involvement Manager Nebraska Department of Transportation (402) 479-4871 [email protected] SRS/com18-zo Enclosure.
Recommended publications
  • Trends in Streamflow Characteristics of Selected Sites in the Elkhorn
    Prepared in cooperation with the Upper Elkhorn Natural Resources District and the Lower Elkhorn Natural Resources District Trends in Streamflow Characteristics of Selected Sites in the Elkhorn River, Salt Creek, and Lower Platte River Basins, Eastern Nebraska, 1928–2004, and Evaluation of Streamflows in Relation to Instream-Flow Criteria, 1953–2004 Scientific Investigations Report 2009–5011 U.S. Department of the Interior U.S. Geological Survey Cover. Bridge over the Elkhorn River at Waterloo, Nebraska (photograph taken by the U.S. Geological Survey, 1928). Trends in Streamflow Characteristics of Selected Sites in the Elkhorn River, Salt Creek, and Lower Platte River Basins, Eastern Nebraska, 1928–2004, and Evaluation of Streamflows in Relation to Instream-Flow Criteria, 1953–2004 By Benjamin J. Dietsch, Julie A. Godberson, and Gregory V. Steele Prepared in cooperation with the Upper Elkhorn Natural Resources District and the Lower Elkhorn Natural Resources District Scientific Investigations Report 2009–5011 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior KEN SALAZAR, Secretary U.S. Geological Survey Suzette M. Kimball, Acting Director U.S. Geological Survey, Reston, Virginia: 2009 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment, visit http://www.usgs.gov or call 1-888-ASK-USGS For an overview of USGS information products, including maps, imagery, and publications, visit http://www.usgs.gov/pubprod To order this and other USGS information products, visit http://store.usgs.gov Any use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S.
    [Show full text]
  • Table of Contents Article 1: Title and Purpose
    TABLE OF CONTENTS ARTICLE 1: TITLE AND PURPOSE................................................................................................................1 SECTION 1.01 TITLE ........................................................................................................................................1 SECTION 1.02 PURPOSE ...................................................................................................................................1 ARTICLE 2: DEFINITIONS...............................................................................................................................2 SECTION 2.01 RULES .......................................................................................................................................2 SECTION 2.02 DEFINITIONS .............................................................................................................................2 ARTICLE 3: DISTRICTS AND OFFICIAL MAP .........................................................................................35 SECTION 3.01 DISTRICTS...............................................................................................................................35 SECTION 3.02 PROVISION FOR OFFICIAL ZONING MAP..................................................................................35 ARTICLE 4: GENERAL PROVISIONS..........................................................................................................36 SECTION 4.01 PLANNING COMMISSION RECOMMENDATIONS........................................................................36
    [Show full text]
  • Board of County Commissioners Sarpy County
    2009-335 BOARD OF COUNTY COMMISSIONERS SARPY COUNTY RESOLUTION FLOOD PLAIN DEVELOPMENT Nebraska Department of Roads WHEREAS, pursuant to Neb. Rev. Stat. § 23-104 (Reissue 1997)', the County has the power to do all acts in relation to the concerns of the County necessary to the exercise of its corporate powers; and, WHEREAS, pursuant to Neb. Rev. Stat. § 23-103 (Reissue 1997), the powers of the County as a body are exercised by the County Board of Commissioners (County Board); and, WHEREAS, the County Board has the authority to adopt a Zoning Regulation, which shall have the force and effect of law pursuant to Neb. Rev. Stat.§ 23-114 (2004 Cum. Supp); and, WHEREAS, said Zoning Regulation requires the County Board to approve applications for development permits within any Flood Plain District; and WHEREAS, Rebecca Homer, Planning Director has reviewed the Nebraska Department of Road's application for a Flood Plain Development Permit for compliance with the Zoning Regulation on the property legally described in the attached Exhibit A; and, WHEREAS, said application includes an elevation certificate which is in compliance with Section 30, Flood Plain District of Zoning Regulations and further, the Natural Resources District has no objection to the development permit; and, WHEREAS, the Planning Director has made a recommendation of approval as noted in the attached Exhibit A, which Exhibit A includes the Planning Director report, the no rise certificate on the subject property, and the Natural Resources District comments. Resolution Flood Plain Development - NDOR November 2009 NOW, THEREFORE, BE IT RESOLVED BY THE SARPY COUNTY BOARD OF COMMISSIONERS THAT the Flood Plain Development Pennit Application for the property legally described in the attached Exhibit A is hereby approved.
    [Show full text]
  • National Register of Historic Places Registration Form
    NFS Form 10-900 OMB No. 1024-0018 (Rev. 10-90) United States Department of the Interior National Park Service 2 5 1994 National Register of Historic Places NATIONAL Registration Form REGISTER This form is for use in nominating or requesting determinations for individual properties and districts. See instructions in How to Complete the"Nationaj,Register of Historic Places Registration Form (National Register Bulletin 16A). Complete each item by marking "x" in the fppropriate box or by entering the information requested. If any item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, architectural classification, materials, and areas of significance, enter only categories and subcategories from the instructions. Place additional entries and narrative items on continuation sheets (NFS Form 10-900a). Use a typewriter, word processor, or computer, to complete all items. 1. Name of Property____________________________________________________________ historic name N/A________________________________________________________ other names/site number Pawnee City Historic Business District: PW06: multiple_____________ 2. Location street & number roughly bounded by 5th. 7th, "F", and "G" Streets not for publication [n/a] city or town Pawnee City___________________________ vicinity [n/a] state Nebraska code NE county Pawnee code 133 zip code 68420 3. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act of 1986, as amended, I hereby certify that this [X] nomination [ ] request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opinion, the property [X] meets [ ] does not meet the National Register Criteria.
    [Show full text]
  • Annual Report For
    Nebraska Department of Roads A Performance-based Transportation Agency 2003 Report Leaders in Public Safety and Service since 1895 From the Director ... Since 1895, the Nebraska Department of Roads has served the citizens of Nebraska. We've accomplished this by doing "the right things right" based on valid data collection and analysis and the use of emerging technologies. We measure our performance in an effort to continually improve the service we provide to our customers and taxpayers of Nebraska. Again this year, we had a roadway disaster. On I-80 near Big Springs, Nebraska, a semi-trailer truck slammed into the center pier of an overpass and caused the bridge to collapse onto one of the nation's busiest highways. Our crews and partners responded, ensured public safety, and quickly restored I-80 to service. We may not be able to spend it as we do a dollar bill, but the "Currency of the future is TRUST." We strive to retain your trust by making the best use of every dollar we spend. That has been and will continue to be an ever challenging task. I submit to you the Nebraska Department of Roads' 2003 Annual Report that summarizes the past year and plans for the future. I welcome your comments on how we are doing and how we can improve. John L. Craig Director Critical Transportation Issues The Executive Committee of the Transportation Research Board (TRB) has identified some critical issues in transportation that face the nation. The State of Nebraska is affected by many of these issues, is aware of them, and strives to address them.
    [Show full text]
  • Interlocal Agreement with the City of Gretna for Cost Share of Temporary Traffic Signal at U.S
    Resolution 2019-394 BOARD OF COMMISSIONERS SARPY COUNTY, NEBRASKA Interlocal Agreement with the City of Gretna for Cost Share of Temporary Traffic Signal at U.S. Highway 6/Nebraska Highway 31 and Lincoln Road Whereas, pursuant to Neb. Rev. Stat. 23-104(6), the County has the power to do all acts in relation to the concerns of the County necessary to the exercise of its corporate powers; and, Whereas, pursuant to Neb. Rev. Stat. 23-103, the powers of the County as a body are exercised by the County Board; and, Whereas, general supervision and control of the public roads of each county is vested in the County Board by virtue of Neb. Rev. Stat. 39-1402; and Whereas, pursuant to Neb. Rev. Stat. 13-801, et seq., an Interlocal Cooperation Act Agreement has been proposed between the City of Gretna and Sarpy County for allocation of the cost of placement of a temporary traffic signal at the intersection of U.S. Highway 6/Nebraska Highway 31 and Lincoln Road, as more particularly outlined in said Agreement, attached hereto and incorporated herein; and, Whereas, it is in the best interests of the residents of Sarpy County to participate in said Interlocal Cooperation Agreement. NOW, THEREFORE, BE IT RESOLVED by that this Board hereby approves and adopts the attached Interlocal Cooperation Agreement. BE IT FURTHER RESOLVED that the Chair and Clerk are hereby authorized to execute said Agreement on behalf of Sarpy County, Nebraska, and any other related documents, the same being approved by this Board, and that they are authorized to take such other actions as may be necessary under the terms of said Agreement.
    [Show full text]
  • Table of Contents
    Table of Contents Pawnee County ........................................................................... 3 Village of Burchard ................................................................... 20 Village of DuBois ....................................................................... 31 Pawnee City ............................................................................... 42 Village of Steinauer ................................................................... 55 Village of Table Rock ................................................................ 68 Humboldt Table Rock Steinauer Public Schools ................... 81 Table Rock Fire District ............................................................ 91 Nemaha NRD Multi-Jurisdictional Hazard Mitigation Plan | 2020 1 Page Is Intentionally Blank 2 Nemaha NRD Multi-Jurisdictional Hazard Mitigation Plan | 2020 County Profile Pawnee County Nemaha Natural Resources District Multi-Jurisdictional Hazard Mitigation Plan Update 2020 Nemaha NRD Multi-Jurisdictional Hazard Mitigation Plan | 2020 3 Section Seven | Pawnee County Profile Local Planning Team Table PCO.1: Pawnee County Local Planning Team Name Title Jurisdiction Amanda Burki Emergency Manager Johnson and Pawnee County Pawnee County Assessor / Johnathan Bailey Pawnee County Floodplain Manager Location and Geography Pawnee County is located in southeastern Nebraska and is bordered by Gage, Johnson, Nemaha, and Richardson Counties. It also borders the State of Kansas to the south. The total area of Pawnee County is 433 square
    [Show full text]
  • City of Syracuse, Nebraska
    CITY OF SYRACUSE, NEBRASKA ORDINANCE NO. 1015 AN ORDINANCE OF THE CITY OF SYRACUSE, OTOE COUNTY, NEBRASKA TO AMEND CHAPTER 28 OF THE CODE OF ORDINANCES ADOPTING A DEFINITION OF CONTROLLED ACCESS HIGHWAY AND ESTABLISHING A PROCEDURE TO REQUEST ACCESS TO CONTROLLED ACCESS HIGHWAY; TO PROVIDE FOR THE REPEAL OF CONFLICTING ORDINANCES OR SECTIONS; AND TO PROVIDE AN EFFECTIVE DATE. BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF SYRACUSE, NEBRASKA THAT: Section 1. Section 28-1 - Definitions shall be amended as follows: Sec. 28-1. - Definitions. The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Controlled access highway means Nebraska Highway 50, also known as Park Street, upon which the entrance to and departure from such highway/street for vehicular traffic shall be regulated by the city council, upon recommendation by the planning commission. Sidewalk space means that portion of a street between curb lines and adjacent property lines. Section 2. Chapter 28 shall be amended as follows: (a) No private access, public street, public highway, agricultural access, or trail access shall be made, opened, or connected to a controlled access highway within the jurisdiction of the city without review and recommendation by the planning commission and approval by the city council. Such approval shall be given only if the public interest shall be served thereby and shall specify the terms, conditions, and type of access upon which such approval is given. Approval, if granted, shall be for a specific type of access only, and such access shall not be transferred to a different use.
    [Show full text]
  • 444-6866 Board of Directors
    OMAHA-COUNCIL BLUFFS METROPOLITAN AREA PLANNING AGENCY 2222 Cuming Street, Omaha (402) 444-6866 BOARD OF DIRECTORS MEETING Thursday, February 27, 2020 at 1:30 p.m. AGENDA This meeting of the Metropolitan Area Planning Agency Board of Directors will be conducted in compliance with the Nebraska Statues of the Open Meeting Act. For reference, the Open Meeting Act is posted on the wall of the Board Room. A. ROLL CALL / INTRODUCTIONS B. APPROVAL OF THE AGENDA (ACTION) C. BOARD MINUTES of the January 23, 2020 meeting. (ACTION) D. AGENCY REPORTS & PRESENTATIONS – (INFO) 1. AGENCY REPORTS a. Executive Director’s Report b. Employee Recognition - Karna Loewenstein, Communications and Outreach Manager – 5 Years c. Staff Report: Don Gross, Community and Economic Development Manager E. PUBLIC COMMENTS – See Footnote F. CONSENT AGENDA – (ACTION) Any individual item may be removed by a Board Member for special discussion and consideration. Unless there is an exception, these items will be approved as one with a single vote of the Board of Directors. 1. FINANCE COMMITTEE MINUTES of the February 19, 2020 meeting. 2. FINAL CONTRACT PAYMENTS a. City of Council Bluffs - Paratransit Services - $7,636.00 b. Emspace + Lovgren - CMAQ and Reduced Fare Program - $23,164.13 3. TRAVEL – Technology of Participation (ToP) Facilitation Methods of Training - 4 Staff Members - Seward, NE - $2,548.92 G. OLD BUSINESS – 1. CONTRACT AMENDMENTS – a. Pacific Junction - Agreement for Service – Property Acquisition Administrative Services - $80,000 This amendment will add administrative services for property acquisitions in Pacific Junction funded through the Iowa Flood Mitigation Fund (FMF) program. MAPA will charge $4,000 per property for 20 properties.
    [Show full text]
  • 108Th, Omaha & West Maple Rd., Ramblewood
    NEBRASKA DEPARTMENT OF TRANSPORTATION NOTICE OF HIGHWAY IMPROVEMENT PROJECT West Maple Rd., 156th – 108th, Omaha & West Maple Rd., Ramblewood – 156th, Omaha Project Nos.: NH­64­7(125) & NH­64­7(126) Control Nos.: 22689 & 22690 Identified as West Maple Rd., 156th - 108th, Omaha These projects are located within a Municipal Separate and West Maple Rd., Ramblewood - 156th, Omaha, the Storm Sewer System (MS4) community. Post proposed projects would repair and resurface approxi­ construction storm water best management practices mately 8.67 miles of Nebraska Highway 64 (N­64) (BMPs) are required and will be incorporated into located within the city limits of Omaha in Douglas the final design of the project. Wetland impacts are County. anticipated, no mitigation would be required. The proposed West Maple Rd., Ramblewood - 156th, Knolls Golf Course, Tranquility Park, Lake Forest Estates Omaha project would begin about 0.86 miles west Park, Hefflinger Park, Heron Haven, Whispering Elk of the junction of N­64 and Nebraska Highway 31 at Creek and Antler Country are all within the vicinity of approximately mile marker (MM) 62.11 and extend the proposed projects; no impacts are anticipated. east 4.70 miles to MM 66.81, 0.13 miles west of the Construction is tentatively scheduled to begin in early intersection of N­64 and 156th Street. The proposed 2019 with completion by fall 2020. West Maple Rd., 156th - 108th, Omaha project would begin where the previous project ends at approximately The proposed project would be constructed under traffic MM 66.81 and extend 3.97 miles east to MM 70.78, with lane closures controlled with approved temporary approximately 0.20 miles west of the N­64 and 108th traffic control devices and practices.
    [Show full text]
  • The Trail Development Plan 9090 a ANETWORK NETWORK of of DISCOVERY DISCOVERY 4
    A NETWORK OF DISCOVERY 89 The Trail Development Plan 9090 A ANETWORK NETWORK OF OF DISCOVERY DISCOVERY 4 Above: Lied Platte River Bridge on opening day in 2002. Previous page: Steamboat Trace Trail. (Photo courtesy of Nemaha Natural Resources District.) THE TRAIL DEVELOPMENT PLAN 91 Trans-State Trails A NETWORK OF DISCOVERY The Trail “There was nothing but land: not a The Trans-State Trails are unique facilities that serve a national country at all, but the material out as well as regional and local market. Signature trails around of which countries are made…. I Development Plan America include the Katy Trail in Missouri, the Root River Trail in had the feeling that the world was Minnesota, the C&O Canal Trail in the District of Columbia and his chapter presents the detailed development plan for left behind, that we had got over the Maryland, and the George Mikkelson Trail in South Dakota. In the refined Network of Discovery. It provides details edge of it, and were outside man’s Nebraska, we are blessed with the opportunity, and perhaps for the development concept outlined in the second jurisdiction.” T responsibility, to develop not one but three signature Trans- chapter and proposes a strategically focused and sustainable State Trails: the American Discovery Trail, the Cowboy Trail, and long-term trail system. The key development features of the -Willa Cather, My Antonia the “Fertile Crescent.” Each of these is different, but each has trail network include: the potential to be critical at a variety of levels. In addition, a fourth opportunity, across the southern tier of the state, • Three Trans-State Trails, signature long-distance facilities appears to be emerging as a result of railroad abandonment of both national and local importance, with the possibility I think that no single factor can activity in 2003.
    [Show full text]
  • TABLE of CONTENTS Section 1 Introduction and Purpose & Need
    Draft Environmental Assessment 168th Street, Poppleton to Ehlers Project Numbers: STPC-3811(1) and STPC-3811(2) City of Omaha, Nebraska February 2017 Draft Environmental Assessment 168th Street, Poppleton to Ehlers Project Numbers: STPC-3811(1) and STPC-3811(2) City of Omaha, Nebraska TABLE OF CONTENTS Section 1 Introduction and Purpose & Need ....................................................................................1 1.1 Introduction .................................................................................................................................. 1 1.2 Background and Study Area .......................................................................................................... 3 1.2.1 Background ........................................................................................................................... 3 1.2.2 Logical Termini and Environmental Study Area .................................................................... 7 1.3 Purpose of the Proposed Project .................................................................................................. 8 1.4 Need for the Proposed Project ..................................................................................................... 8 1.4.1 Insufficient Roadway Capacity .............................................................................................. 8 1.4.2 Inadequate Bridge Conditions ............................................................................................ 11 1.4.3 Discontinuity with Roadways and
    [Show full text]