700 Series Changes 2014 Standard Specifications Item

Total Page:16

File Type:pdf, Size:1020Kb

700 Series Changes 2014 Standard Specifications Item 700 Series Changes 2014 Standard Specifications Item 700 - Pothole Repair Removed DMS-9201. The material is no longer being used. 700.3.1. Added 2 paragraphs to describe the finish of the repair under the Standard Repair item to match what was in the Saw-Cut repair section. 700.4.2. Removed statement to dispose of hot mix remaining at end of the day. 700.4.3. Removed statement to dispose of hot mix remaining at end of the day. Item 712 - Cleaning and Sealing Joints and Cracks (Asphalt Concrete) 712.2. Revised material requirement for fine aggregate to include reference Item 340.2.1.3. (Fine Aggregate). 712.4. Added requirement to follow manufacturer’s temperature requirements. 712.4. Added requirement to fill cracks greater than ½ inch with dry sand. Item 713 – Cleaning and Sealing Joints and Cracks (Concrete Pavement) New Specification Previous SS 7435 Item 720 - Repair of Spalling In Concrete Pavement 720.4.1. Added “Protect and re-use existing reinforcing if encountered, unless otherwise directed.” 720.4.2. Added “Apply primer to the repair area in accordance with manufacturer’s recommendations.” Item 721 - Fiber Reinforced Polymer Patching Material New Specification Previous SS 7622 Item 730 - Roadside Mowing 730.2.5 Added new article about providing a pressure washer to wash equipment. 730.3.3. Added new article requiring pressure washing of equipment when shown on the plans. 730.5. Added “pressure washing” to payment clause. Item 731 - Herbicide Treatment New Specification Combination of SS7026 & SS 7039 Item 734 - Litter Removal 734.1. Revised the definition from “matter” to “all objects” Item 735 - Debris Removal 735.1. Added the word “all” before “objects”. 735.3. Added “Notify the Department for removal of hazardous materials.” 735.3.4. Added new article for Debris Removal on “High Occupancy Vehicle (HOV) Lane.” 735.3.5. Added new article for Debris Removal on “Direct Connector Ramp Debris Removal.” 735.4.2. Added new measurement article on “HOV Lane Debris Removal.” 735.4.3. Added new measurement article on “Direct Connector Ramp Debris Removal.” 735.5. Added “and for cycle location number specified.” 735.5. Added “Debris removal in Buffer-Separated Concurrent Flow lanes is considered subsidiary to debris removal in Center Medians and Mainlanes, unless otherwise shown on the plans.” Item 738 - Cleaning and Sweeping Highways 738.3. Redefined debris from “Debris is defined as dirt and other matter not part of the highway facility.” to “Debris is defined as dirt and other objects not part of the highway facility including dead animals, tires, tire fragments, wood, furniture, mattresses, household appliances, and scrap metal.” 738.3.5. Added “Direct Connector Cleaning and Sweeping.” 738.3.6. Added “HOV Lane Cleaning and Sweeping.” 738.4. Added “HOV lane centerline mile is defined as the distance measured along each HOV lane regardless of the number of lanes. A direct connector centerline mile is defined as the distance measured along each direct connector regardless of the number of lanes.” 738.4.5. Added “HOV Lane Cleaning and Sweeping. By the cycle or HOV lane centerline mile.” 738.4.6. Added “Direct Connector Cleaning and Sweeping. By the cycle or direct connector centerline mile.” Item 740 - Graffiti Removal and Anti-Graffiti Coating Merged special provision 740-001 (Revised 740.2. Materials). 740.3.1.1. Revised specification to clearly separate cleaning concrete vs. metal. 740.3.1.2. Removed Anti Graffiti Coating Type I 740.3.1.2. Added Coating Type II – Solvent Cleanable and Type III – Water Cleanable. 740.5. Added new payment items for “Anti-Graffiti Coating (Permanent-Type II),” and “Anti- Graffiti Coating Permanent- Type III).” Item 745 Picnic Area Maintenance Revised Specification Name to remove “Rest Area” 745. Removed all references and requirements specifically for rest areas in “Work Methods”, “Measurement” and “Payment”. Item 751 - Landscape Maintenance No Changes Item 752 - Tree and Brush Removal 752.4.2. Added “Prune trees in accordance with Class IV National Arborist Association Pruning Standards for shade trees.” 752.4.2. Added “benzalkonium chloride” as an alternative to disinfecting tools and revised wording for clarity. Added “Avoid pruning whenever possible between February 15th and June 15th, the period for maximum insect and fungal activity.” 752.4.5. Added new article on “Stump Removal.” 752.5.2. Added “of the dimension specified.” 752.5.4. Added new measurement item for “Stump Removal” 752.6. Added “of the dimension specified.” after Tree Trimming. 752.6. Added new pay item for “Stump Removal.” Item 760 - Cleaning and Reshaping Ditches 760.2. Added “or reshape by cleaning silt from the ditch and spreading on backslope as approved.” 760.4. Revised Payment “Ditch Cleaning and Reshaping (Foot).” Item 764 - Pump Station and Drainage System Cleaning 764.3. Added the word “Vacuum Truck” before description of truck and “or as approved”. Item 770 - Guard Fence Repair Merged special provision 770-049 770.4.1. Added “with any bolt hole spacing” to “rail”. 770.4.9. Added “two rails” to “By the foot from center to center of posts” 770.4.10. Added “included metal sleeves” 770.4.12. Added “Includes top or side mount posts.” 770.4.14. Added “as directed” after “By each marker replaced”. 770.5. Added “Any rail removed and replaced in order to rem/repl posts will not be paid for directly, but be considered subsidiary to various bid items.” and “Coring new holes and furnishing new bolts and epoxy for the repair or replacement of posts w/base plate shall be considered subsidiary to various bid items.” Item 771 - Repair Cable Barrier System New Specification Modified SS 7224 771.3. Added “Provide a tension meter and use it after repair is complete to verify cables in repaired area are properly tensioned. Re-tension the cable barrier system to within manufacturer recommended range as needed. Check cables for proper tensioning when requested and re-tension to within manufacturer recommended range as needed.” 771.4.6. Added “Check and Re-tension Cables. By each run checked and re-tensioned. A run is defined as a section of cable barrier system beginning and ending with a terminal section.” 771.5. Added new pay item “Check and Re-tension Cables.” Item 772 - Post and Cable Fence 772.2.7. Added a new article, “Gate. Furnish gates as shown on the plans.” 772.3.3. Added a new article, “Repair. Plumb and realign post in a vertical and horizontal position. Stretch cable to remove sag between posts. One cable splice will be allowed between posts, adjacent to the post, but no more than 2 splices in any 100 ft. of cable. Removal and replacement of posts, anchors, or cable will be paid with the appropriate bid Item.” 772.4.8. Added a new article, “New Installation of Post and Cable Fence (Gate). By each gate installed. 772.4.9. Added a new article, “Repair. By the foot of fence from center to center of pull posts for each repair.” 772.5. Added, “Post and Cable Fence (Gate) (New Installation),” or “Post and Cable Fence (Repair).” 772.5. Revised last sentence of paragraph to read:” This price is full compensation for cable splices, straightening posts, realignments of posts, tightening cable, backfilling posts and anchor holes, installation of reflectors, bollards, foundations, backfilling, gate and hardware, paint, materials, equipment, labor, tools, and incidentals.” Item 774 - Attenuator Repair No Changes Item 776 - Metal Rail Repair 776.1. Revised Description to add, “Replace metal traffic or pedestrian rail if beyond repair as determined by the Engineer.” 776.3. Added, “Replace steel or aluminum rail to match the original or details shown on the plans if the damaged rail is beyond repair as determined by the Engineer.” 776.4. Added, “Rail replacement will be measured by the foot between centers of the first undamaged post on each side of the replacement or to the end of the rail.” 776.5. Added, “, and “Replacement” of the type specified.” Item 778 - Concrete Rail Repair New Specification Replaces multiple one project only or district wide specifications. Item 780 – Concrete Crack Repair New Specification Name (Old name was Epoxy Injection) Completely rewritten to reference new “Concrete Repair Manual.” 780.3. Added “Surface Sealing”. Item 784 - Steel Member Repair New Specification Name (Old name was Repairing Steel Bridge Members) 784.4.3. Revised the name of the reference specification, “Item 780, “Concrete Crack Repair,”” Item 785 - Bridge Joint Repair or Replacement New Specification Item 786 - Carbon Fiber Reinforced Polymer (CFRP) New Specification Follows Statewide SS 4191 Item 788 - Concrete Beam Repair Merged special provision 788-001 Rewritten to reference new “Concrete Repair Manual.” Item 789 - Treatment for ASR-Affected Concrete New Specification Follows Statewide SS 4124 .
Recommended publications
  • UDOT Supplemental Specifications
    UDOT Supplemental Specifications Table of Contents Section No. Title – Type 1. 01355 Environmental Compliance – Supplemental Specification (01/01/17) 2. 01455 Material Quality Requirements – Supplemental Specification (01/01/17) 3. 01456 Materials Dispute Resolution – Supplemental Specification (01/01/17) 4. 01554 Traffic Control – Supplemental Specification (01/01/17) 5. 01557S Maintenance of Traffic – Special Provision (04/19/16) 6. 01571 Temporary Environmental Controls – Supplemental Specification (01/01/17) 7. 01721 Survey – Supplemental Specification (01/01/17) 8. 02056 Embankment, Borrow, and Backfill – Supplemental Specification (01/01/17) 9. 02221 Remove Structure and Obstruction – Supplemental Specification (01/01/17) 10. 02316 Roadway Excavation – Supplemental Specification (01/01/17) 11. 02610 Drainage Pipe – Supplemental Specification (01/01/17) 12. 02701 Pavement Smoothness – Supplemental Specification (01/01/17) 13. 02742S Project Specific Surfacing Requirements – Department Special Provision (06/30/15) 14. 02744S Stone Matrix Asphalt (SMA) – Materials Special Provision (06/30/15) 15. 02748 Prime Coat/Tack Coat – Supplemental Specification (01/01/17) 16. 02765M Pavement Marking Paint – Materials Special Provision (10/05/15) 17. 02768 Pavement Marking Materials – Supplemental Specification (01/01/17) 18. 02822 Right-of-Way Fence and Gate – Supplemental Specification (01/01/17) 19. 02841 W-Beam Guardrail – Supplemental Specification (01/01/17) 20. 02842 Delineators – Supplemental Specifications (01/01/17) 21. 02843 Crash Cushions and Barrier End Treatments – Supplemental Specification (01/01/17) 22. 02844 Concrete Barrier – Supplemental Specification (01/01/17) 23. 02890 Retroreflective Sheeting – Supplemental Specification (01/01/17) 24. 02891 Traffic Sign – Supplemental Specification (01/01/17) 25. 13557 Variable Message Sign – Supplemental Specification (01/01/17) Supplemental Specification 2017 Standard Specification Book SECTION 01355 ENVIRONMENTAL COMPLIANCE PART 1 GENERAL 1.1 SECTION INCLUDES A.
    [Show full text]
  • Cable Barrier Submission
    Washington State Cable Median Barrier In-Service Study Doug McClanahan Washington State Department of Transportation PO Box 47329 Olympia Washington 98504-7329 Tel: (360) 705-7264 Fax: (360) 705-7330 [email protected] Richard B. Albin Washington State Department of Transportation PO Box 47329 Olympia Washington 98504-7329 Tel: (360) 705-7451 Fax: (360) 705-7330 [email protected] John C. Milton Washington State Department of Transportation PO Box 47329 Olympia Washington 98504-7329 Tel: (360) 705-7299 Fax: (360) 705-7330 [email protected] Submitted for presentation at the 83rd Annual Meeting of the National Transportation Research Board, Washington D.C., 2004. Estimated word count: 4080 text. November 2003 Washington State Cable Median Barrier In-Service Study Doug McClanahan Washington State Department of Transportation Richard B. Albin Washington State Department of Transportation John C. Milton Washington State Department of Transportation ABSTRACT Since 1989, the American Association of State Highway and Transportation Engineers (AASHTO) Roadside Design Guide has contained information on a cable median barrier design that mounts the middle cable on the back side of the posts so that it can contain and redirect vehicles that strike the system from either side. Cable median barrier has been tested in accordance with NCHRP Report 350 Test Level 3. However, there are only a couple of studies that have been performed on the in-service performance of this system. This report documents Washington’s experience with cable median barrier by analyzing its initial installation cost, maintenance costs, maintenance experiences, and accident history before and after installation. The report is based on accident and maintenance report data associated with 24.4 total miles of cable median barrier located in three distinct locations along Interstate 5 (I-5).
    [Show full text]
  • Research Spotlight
    RESEARCH ADMINISTRATION Bureau of Field Services Michigan Department of Transportation Research Spotlight Cable median barriers: Project Information REPORT NAME: Study of High- A cost-effective means Tension Cable Barriers on Michigan Roadways to save lives START DATE: October 2011 Median-crossover crashes are among the most hazardous events that can occur on freeways, often leading to serious injury or death. In recent REPORT DATE: October 2014 years, high-tension cable median barriers have emerged as a cost- RESEARCH REPORT NUMBER: effective alternative to conventional barriers in preventing such crashes. RC-1612 MDOT began installing them on state freeways in 2008. This research TOTAL COST: $223,895 project confirmed that cable median barriers are effective at reducing crossover crashes and improving freeway safety in Michigan, produced COST SHARING: 20% MDOT, 80% guidelines to help identify the best locations to install them, and FHWA through the SPR, Part II, developed content for public outreach materials explaining their benefit. Program MDOT Project Manager Problem Carlos Torres, P.E. Freeway median barriers made of concrete, steel Geometric Design Unit guardrail or high-tension Design Division cable are all effective at Michigan Department of preventing crossover Transportation crashes, but they can be 425 West Ottawa Street costly to install and main- Lansing, MI 48909 tain. Cable median barriers [email protected] have lower installation costs 517-335-2852 than concrete or guardrail Since their installation on selected Michigan highways beginning in alternatives, though they 2008, cable median barriers have reduced crossover crash rates in are more easily damaged these highway segments by 87 percent. by vehicle strikes, leading to higher maintenance and repair costs.
    [Show full text]
  • NDOT Statewide Integrated Transportation Reliability Program ______
    ______________________________________________ NDOT Statewide Integrated Transportation Reliability Program _____________________ DRAFT Technical Memorandum No. 6 – Performance Measurement Plan Prepared by: October, 2009 092202013 Copyright © 2009, Kimley-Horn and Associates, Inc. TABLE OF CONTENTS DRAFT – PERFORMANCE MEASUREMENT PLAN 1. OVERVIEW OF PERFORMANCE MEASUREMENT PLAN ................................................................. 1 1.1 What is Performance Measurement and Why Use it? ......................................................... 1 1.2 How Performance Measurement is Used in Other States .................................................... 2 1.3 How Can Performance Monitoring Benefit NDOT and its Partners? ................................ 4 1.4 How is Transportation Performance Currently Being Monitored? .................................... 4 1.5 What is the Best Way to Measure Reliability in Nevada? ................................................... 5 1.6 How Do Performance Measures Relate to ITRP Strategies?............................................. 10 2. OUTCOME-BASED PERFORMANCE MEASURES .......................................................................... 11 3. ACTIVITY-BASED PERFORMANCE MEASURES ........................................................................... 23 4. PERFORMANCE MEASUREMENT REPORTING ............................................................................ 33 1.1 Overview of the Process and Progress ...............................................................................
    [Show full text]
  • Use of Barriers in Rural Open Road Conditionsâ•fla Synthesis Study
    Purdue University Purdue e-Pubs JTRP Technical Reports Joint Transportation Research Program 2012 Use of Barriers in Rural Open Road Conditions—A Synthesis Study Erdong Chen Purdue University, [email protected] Jennifer Brown Purdue University, [email protected] Andrew Tarko Purdue University, [email protected] Recommended Citation Chen, E., J. Brown, and A. Tarko. Use of Barriers in Rural Open Road Conditions—A Synthesis Study. Publication FHWA/IN/JTRP-2012/08. Joint Transportation Research Program, Indiana Department of Transportation and Purdue University, West Lafayette, Indiana, 2012. doi: 10.5703/ 1288284314670. This document has been made available through Purdue e-Pubs, a service of the Purdue University Libraries. Please contact [email protected] for additional information. JOINT TRANSPORTATION RESEARCH PROGRAM INDIANA DEPARTMENT OF TRANSPORTATION AND PURDUE UNIVERSITY USE OF BARRIERS IN RURAL OPEN Road Conditions— A SYNTHESIS STUDY Erdong Chen Graduate Research Assistant School of Civil Engineering Purdue University Jennifer Brown Graduate Research Assistant School of Civil Engineering Purdue University Andrew P. Tarko Professor of Civil Engineering School of Civil Engineering Center for Road Safety Purdue University Corresponding Author SPR-3515 Report Number: FHWA/IN/JTRP-2012/08 DOI: 10.5703/1288284314670 RECOMMENDED CITATION Chen, E., J. Brown, and A. P. Tarko. Use of Barriers in Rural Open Road Conditions—A Synthesis Study. Publication FHWA/IN/JTRP-2012/08. Joint Transportation Research Program, Indiana Department of Transportation
    [Show full text]
  • Feature 215 Medians
    Chapter 7. RCI Features & Characteristics Feature 215 FEATURE 215 MEDIANS Roadway Side Allows Tie LRS Package Feature Type Interlocking Secured C Yes Yes Length Yes Yes Responsible Party for District Planning Data Collection Definition/Background: Denotes type of medians and median barriers on divided highways. MDBARTYP | TYPE OF MEDIAN BARRIER Who/What uses this Offset Offset HPMS MIRE Information Required For Direction Distance 35 Planning, Maintenance, Work All functionally classified N/A N/A Program, Traffic Operations, roadways on the SHS, all HPMS HPMS standard samples off the SHS, Active Exclusive roadways, all SIS related roadways, and all managed lanes. Definition/Background: Denotes type of median barrier. Important When Gathering: A barrier is defined as any longitudinal and vertical physical structure between roadbeds preventing motorists from crossing to the other side of the travelway. How to Gather this Data: Record appropriate code. Special Situations: When more than one barrier type exists, use Code 20-Other. Codes Descriptions 03 Cable Barrier 04 Guardrail (all types) 05 Fence 06 Barrier Wall 20 Other 28 Canal, river, or other waterway 7-172 | RCI Handbook Feature 215 EXAMPLES EXAMPLES OF CODING COMBINATIONS RCI Handbook | 7-173 Chapter 7. RCI Features & Characteristics Feature 215 MEDWIDTH | HIGHWAY MEDIAN WIDTH Who/What uses this Offset Offset HPMS MIRE Information Required For Direction Distance 36 Planning, Maintenance, Work All functionally classified N/A N/A Program, Traffic Operations, roadways on the SHS, all HPMS HPMS standard samples off the SHS, Active Exclusive roadways, all SIS related roadways, and all managed lanes. Definition/Background: Denotes the median width in feet.
    [Show full text]
  • Seminar Presentation
    2014 SPECIFICATIONS UPDATE Book Cover for the 2014 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges Hierarchy of Organizational Elements 3 TXDOT SPECIFICATION FORMAT 2004 Format 2014 Format 4 GENERAL REQUIREMENTS ITEMS 1 – 9 Roxana Garcia, P.E. ITEM 1 – Definitions of Terms New Definitions: . Concrete Construction Joint. A joint formed by placing plastic concrete in direct contact with concrete that has attained its initial set. Intelligent Transportation System. An integrated system that uses video and other electronic detection devices to monitor traffic flows. Monolithic Concrete Placement. The placement of plastic concrete in such a manner and sequence to prevent a construction joint. Replacement Alternate. A bid item identified in the proposal form that a Bidder may substitute for a specific regular item of work. Suspension. Action taken by the Department or federal government pursuant to regulation that prohibits a person or company from entering into a Contract, or from participating as a subcontractor, or supplier of materials or equipment used in a highway improvement Contract as defined in Transportation Code, Chapter 223, Subchapter A. 6 ITEM 2 – Instructions to Bidders . Incorporated the current special provisions for Item 2. Clarifies that a bid proposal form will not be issued to a Bidder who is suspended or debarred by the Commission, Department, or any federal agency. Separates the language regarding confidential questionnaire and bidder’s questionnaire. Separates the language for electronic and manual bids. Updates the section regarding Home State Bidding Preferences with the latest legislative requirements. 7 ITEM 3 – Award and Execution of Contract . For projects with railroad requirements, the Contractor submits the right of entry agreement and associated insurance during contract execution.
    [Show full text]
  • ATTACHMENT D02 Table of Guidance, Gaps & Needs in The
    ATTACHMENT D02 Table of Guidance, Gaps & Needs in the RDG NCHRP 15-65 DEVELOPMENT OF SAFETY PERFORMANCE BASED GUIDELINES FOR THE ROADSIDE DESIGN GUIDE January 2018 Christine E. Carrigan, P.E., Ph.D. Malcolm H. Ray, P.E., Ph.D. P.O. Box 312 12 Main Street Canton, Maine 04221 RDG Guidance Summary Table Version: 3-12.2017 Author: EMR Table or Type of Decision Making Section Section Title Description of Guidance Ref? Figure Guidance Basis From NCHRP 2 Economic Evaluation of Roadside Safety Gap: Work recently completed but not implemented - The Roadside Safety Analysis Program (RSAPv3) Update Gap 20-07(360) 22-27 From Roadside Topography and Drainage Gap: Work recently completed but not implemented - Guidelines for Cost-effective Safety Treatment of Roadside NCHRP 3 Gap 20-07(360) Features Ditches 16-05 From Roadside Topography and Drainage NCHRP 3 Gap: Work recently completed but not implemented - Development of Clear Recovery Area Guidelines Gap 20-07(360) Features 17-11(02) From Roadside Topography and Drainage NCHRP 3 Gap covered by recently initiated research - Guidelines for Slope Traversability Gap 20-07(360) Features 17-55 3.1 The Clear-Zone Concept Old guidance: high-speed highways, 30 ft. clear zone allows 80% of errant vehicles to recover Y(6) Out-Dated Eng. Judgement 3.1 Tab. 3-1 The Clear-Zone Concept Table of recommended clear zone by speed, ADT, & fore/back slope severity No Design 3.1 Tab. 3-2 The Clear-Zone Concept Table of horizontal curve adjustment factor to clear-zone by radius and speed No Placement From Gap: push the forgiving roadside concept more.
    [Show full text]
  • Attachment 1 ATP Project List (PDF)
    ATTACHMENT 1 Active Transportation Program (ATP) Project List District January 1 - March 31, 2019 PPNO Approved ATP Approved Actual Current Award County Budget Budget Expended EAC Finish Finish Finish Amount No . Route Title Location and Type of Work Phase ($1,000 s) ($1,000 s) ($1,000 s) ($1,000 s) Milestone Date Date Date ($1,000 s) 1 01 Humboldt Bay Trail The project is located along the NCRA and Caltrans Highway PAED 0 0 0 0 Baseline 0 2391 South 101 corridor between Eureka and Brainard Slough (~2 miles PSE 0 0 0 0 PAED 08/29/18 HUM south of Arcata) with Humboldt Bay to the west and north. RW Sup 0 0 0 0 RW Cert 05/01/20 Construction of 4.2 mile Class I bike path along the N. Coast Con Sup 0 0 0 0 RTL 07/23/20 Railroad Authority and Hwy 101 transportation corridor RW Cap 0 0 0 0 Begin Const 10/15/20 between Eureka and Arcata, and construction of cable barrier Con Cap 13 ,296 13 ,296 0 0 End Const 07/07/22 Total 13 ,296 13 ,296 0 0 2 01 McKinleyville Safe The McKinleyville Safe Routes to School Program will be PAED 25 25 0 25 Baseline 0 2504 A Routes to School located in McKinleyville, an unincorporated community within PSE 40 40 0 0 PAED 06/28/20 HUM Program Humboldt County, California. Specifically, the project focuses RW Sup 0 0 0 0 RW Cert 03/02/21 on McKinleyville Avenue, from Gassaway Avenue to the south Con Sup 0 0 0 0 RTL 04/01/21 entrance of McKinleyville High School and Bates Roads from RW Cap 12 12 0 0 Begin Const 05/01/21 Fernwood Drive to Morris Elementary School.
    [Show full text]
  • Suggested Maintenance Practices for Roadside Weed and Brush Problems
    Suggested Maintenance Practices for Roadside Weed and Brush Problems Circular E-958 January 2017 Oklahoma Cooperative Extension Service Division of Agricultural Sciences and Natural Resources Oklahoma State University Clayton Hurst Extension Associate Oklahoma State University Lydia Calhoun Extension Assistant Oklahoma State University Dennis Martin Turfgrass Specialist Oklahoma State University Recommendations in this publication are based on research supported by the Oklahoma Department of Transportation. Suggested Maintenance Practices for Roadside Weed and Brush Control Right-of-way vegetation management is a very important grass), brush, switchgrass, total vegetation control and aquatic part of the overall roadside maintenance program. The veg- weeds. With respect to recommended timing of applications, etation adjacent to the road surface is a functional part of the refer to the spray zone map (Figure 1) based on your location road. In addition to mechanical methods, herbicides are used within Oklahoma. for managing right-of-way vegetation. When used correctly, Please remember these are only suggestions and the follow- herbicides can selectively control undesirable weeds and leave ing information is for preliminary planning. There is no substitute nearby beneficial plants unharmed. for an applicator scouting roadside areas regularly to note the This Extension circular summarizes herbicides, amounts conditions of the desired species, weeds present, and their of product per acre, water carrier rates, timing of application, stage of development. Be sure to follow the manufacturer’s and important comments regarding vegetation management directions, not withstanding the information contained in this programs. These programs include control of Johnsongrass, circular. Read and follow all label directions. annual grasses and broadleaves, silver bluestem (silver beard- Zone 3 Zone 2 Zone 1 Figure 1.
    [Show full text]
  • Cable Median Barrier Failure Analysis and Prevention
    University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Final Reports & Technical Briefs from Mid- America Transportation Center Mid-America Transportation Center 2012 Cable Median Barrier Failure Analysis and Prevention Dean L. Sicking University of Nebraska-Lincoln, [email protected] Cody S. Stolle University of Nebraska-Lincoln, [email protected] Follow this and additional works at: https://digitalcommons.unl.edu/matcreports Part of the Civil Engineering Commons Sicking, Dean L. and Stolle, Cody S., "Cable Median Barrier Failure Analysis and Prevention" (2012). Final Reports & Technical Briefs from Mid-America Transportation Center. 45. https://digitalcommons.unl.edu/matcreports/45 This Article is brought to you for free and open access by the Mid-America Transportation Center at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Final Reports & Technical Briefs from Mid-America Transportation Center by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. Nebraska Transportation Center Report # TRP-03-275-12 Final Report 25-1121-0001-428 Cable Median Barrier Failure Analysis and Prevention Dean L. Sicking, Ph.D., P.E. Professor Department of Civil Engineering University of Nebraska-Lincoln Cody S. Stolle, Ph.D., E.I.T. Postdoctoral Research Associate 2012 NTC Nebraska Transportation Center 262 WHIT 2200 Vine Street Lincoln, NE 68583-0851 (402) 472-1975 “This report was funded in part through grant[s] from the Federal Highway Administration [and Federal Transit Administration], U.S. Department of Transportation. The views and opinions of the authors [or agency] expressed herein do not necessarily state or reflect those of the U. S. Department of Transportation.” MATC University Transportation Center Research Program Fiscal Years 2010-2012 CABLE MEDIAN BARRIER FAILURE ANALYSIS AND PREVENTION Submitted by Cody S.
    [Show full text]
  • CDOT Cable Barrier Guide 2017
    August 18, 2017 CDOT Cable Barrier Guide COLORADO DEPARTMENT OF TRANSPORTATION CABLE BARRIER GUIDE 1.0 SUMMARY AND DESCRIPTION 1.1 Summary High-tension cable barrier consists of steel wire cables mounted on weak steel posts and is used to prevent vehicles from crossing medians into opposing traffic lanes or to contain roadside departures. Cable barrier is cost effective to install compared to rigid or semi-rigid barrier systems and tends to result in less severe damage to the impacting vehicle. Cable barrier does not act as a windbreak, and therefore will not cause snow drifting. 1.2 Description CDOT uses a type of high-tension cable barrier that consists of pre-stretched cables mounted on lightweight steel posts and tightened to several thousand pounds of tension. High-tension cable barrier can be placed in long run lengths. The run length is the distance of cable barrier between end anchors. The run length may be limited by the presence of median openings or obstacles such as structures, median columns, etc. High-tension cable barrier is installed by CDOT using concrete footings in which metal tubes are cast to form sockets for the posts. The socket allows a post to be replaced with relative ease during repairs. The damaged post is removed from the socket and replaced with a new post. This eliminates the need for specialized post driving equipment and subsurface utility location for each repair. High-tension systems can be used on slopes of 4:1 and flatter. CDOT requires FHWA approved cable barrier meeting performance criteria in the National Cooperative Highway Research Program (NCHRP) Report 350, Recommended Procedures for the Safety Performance Evaluation of Highway Features, for Test Level 3 to be allowed on high speed highways.
    [Show full text]