Public Infrastructure Provider

Total Page:16

File Type:pdf, Size:1020Kb

Public Infrastructure Provider PUBLIC INFRASTRUCTURE PROVIDER Type of No. Name of Operator Contact Address Licence MTN Towers Tel +256 31 212 0333, +256 31 212 0013 1 MTN Uganda Limited PIP Plot 22 Hannington Road P.O. Box 24624 Kampala, Uganda Email: [email protected] LANDLINE HELPLINE 997 ISP HELPLINE 300 P.O.BOX 7171 KAMPALA,UGANDA 2 Uganda Telecom Limited PIP V Plot 2A-4A, Telephone House, Speke Road +256-414333200(Not Free) emai;l [email protected], call 100 or +256790000100 3 Africell Uganda Limited PIP website; www.africell.com 0752 230110 from another line P. O. Box 6771 Kampala 4 Airtel Uganda Limited PIP Visit us at airtel House, Plot no. 40 Jinja Road, Kampala. Fax: +256 75 2234933 Physical Address:Woodmead North Office Park 54 Maxwell 5 Altech Infocom PIP AfricaPostal Address:PO Box 153Bergvlei 2012South AfricaTelephone: +27 11 715 9031Fax: +27 11 715 912 6 Iway Africa Uganda Limited PIP Communications Johannesburg 128 15th Street, Randjiespark, Midrand, Gauteng, South Africa, Tel: +27 (0) 11 265 3000 | Fax: +27 (0) 11 265 3000 7 Datanet PIP Branch Contacts Nico Kriel Product Manager- Datazone Tel: 011 990 626 Smile Communications Uganda Ltd. Plot 10-12 Smiles Comunication 8 PIP Corporation Rise Limited Bukoto Kampala. +256(0)414530470 Foris Telecom - Uganda Plot 9 Lourdel Road, Nakasero Hill P. O. Box 27894, Kampala, Uganda. Foris Telecom Uganda 9 PIP Tel: +256 (0) 417 306 600 Limited +256 (0) 706 222 841 +256 (0) 706 222 842 Workers House Ground Floor toll free: 1-888-826-4374 or 416-756-2424 10 Tangerine PIP By email [email protected] Contact details: By phone: 0800 300 800 from Uganda 11 Afrimax Uganda Limited PIP +256 723 100 100 outside Uganda Walk-in service centre: 1 Kololo Hill Drive Kampala Smart Tower, 6799 Ayala Avenue, Makati City, Metro 12 Sure Telecom PIP Manila STREET VIEW Call 0740 100 100 13 One Solution Limited PIP 57B Luthuli Avenue P.O Box 35450, Kampala 0417335900 email; [email protected] website: www.onesolutions.ug Uganda Electricity 14 Transmission Company Ltd PIP Plot 10, Hannington Rd P.O.Box 7625, Kampala (UETCL) Roke Investment 15 PIP Plot 35 Lumumba Avenue. P.O. Box 31386 Kampala International Limited Palm Courts, Plot 7A, Rotary Avenue 16 Nita Uganda PIP P.O.BOX 33151 Kampala, Uganda. +256 417 80 10 38 P.O.BOX 28611 Kampala 17 Seacom Uganda Limited PIP Plot 4 Jinja Road 0752 230110 from another line P. O. Box 6771 Kampala 18 Uganda Towers PIP Visit us at airtel House, Plot no. 40 Jinja Road, Kampala. Fax: +256 75 2234933 Eaton Towers Uganda Clement Hill Road, Plot 13 19 Eaton Towers PIP Nakasero, Kampala Uganda Telephone: +256 312 203112 P.O. Box: 28237, Kampala 20 Simbanet Uganda Limited PIP Email: [email protected] Suite Plot 7-11, Buganda Road 21 C-squared Uganda Limited PIP +256471432597 ATC Uganda Rwenzori Towers, 6th Floor 22 ATC Uganda Limited PIP Plot 6 Nakasero Road P.O. Box 7275, Kampala, Uganda Phone: +256 (0) 312 132 700 Palm Courts, Plot 7A, Rotary Avenue (Former Lugogo Bypass) 23 NITA Uganda PIP P.O. Box 33151, Kampala - Uganda Telephone: +256-417- 801038 Fax: +256 417-801050 Email: [email protected] .
Recommended publications
  • Digital Finance for Energy Access in Uganda
    DIGITAL FINANCE FOR ENERGY ACCESS IN UGANDA: PUTTING MOBILE MONEY BIG DATA ANALYTICS TO WORK Mayank Jain, Robin Gravesteijn, Arne Jacobson, Emily Gamble, Nicola Scarrone ABSTRACT Access to clean energy is a basic need that directly supports people’s livelihood, yet more than 30 million Ugandans live without electricity. Pay-as-you-go (PayGo) is a promising and innovative financing solution that can make clean energy affordable for low-income people. However, there remains significant knowledge gaps regarding the digital energy finance market’s size, outreach, growth and impact. This study leverages anonymized mobile money data of PayGo solar energy users in Uganda to gain insight on digital energy financing in Uganda. It also draws from a customer phone survey that assesses solar product adoption and quality of life improvements. We find that the Uganda solar market is growing rapidly and currently has around one million active customers. Around 12 percent of the Ugandan households own a solar home system and there is opportunity for further market expansion, especially in areas with high levels of mobile money penetration. The clean energy market is becoming more inter-connected with the digital finance market. In fact, digital energy financing through PayGo has promoted wider financial inclusion around 110,000 new mobile money customers. Likewise, when Uganda’s implemented a temporary mobile money tax it caused an immediate slow-down in PayGo uptake and new mobile money activations indicating it negatively impacted the country’s access to clean energy and formal finance. The customer survey result indicates that poorer customers seem equally able to purchase larger solar systems as compared to richer customers because of mobile money financing.
    [Show full text]
  • Isp Interconnectivity in Uganda
    1 MAKERERE UNIVERSITY ISP INTERCONNECTIVITY IN UGANDA Namuddu Caroline 14/U/12191/PS and Matovu Ronald/ 14/U/123456 A proposal submitted in partial fulfilment of the requirements for the award of Degree of Bachelor of Science in Computer Engineering of the College of Engineering, Design, Art and Technology, Makerere University. Date of Submission: May, 2018 2 3 Dedication This project is dedicated to my parents, Mr. and Mrs. Mugerwa for the staunch and stern provision they have made to and for me through the years. For the hope they have in me and the dreams I hold, for the encouragement and correction they have given me. 4 Acknowledgement It is with deepest gratitude that I appreciate the unwaveringly supportive efforts made by my supervisor, Eng. Diarmuid O’ Briain, and my co-supervisor Mr. Jonathan Serugunda who offered all form of consultation in my endeavours with this research project. I would like to greatly thank Ronald Matovu my project partner a student of Computer Engineering at Makerere University, for the unconditional help and assistance he offered during the entire project. I would still like to thank netlabsUG Research Centre for all the assistance they offered in terms of equipment, that enabled us build our testbed and providing us with same to effectively carry out our research for project. Unimaginable thanks to my parents for the moral, financial and emotional support they have given through the four years. I would like to thank and appreciate all the lecturers I have gladly had the honour of being taught by. I would like to thank God for the precious gift of life and strength.
    [Show full text]
  • Chapter 5 Traffic Survey and Traffic Demand Forecast
    Final Report – Executive Summary The Study on Greater Kampala Road Network and Transport Improvement in the Republic of Uganda November 2010 CHAPTER 5 TRAFFIC SURVEY AND TRAFFIC DEMAND FORECAST 5.1 TRAFFIC SURVEY The Study Team conducted a traffic survey in January 2010 to identify the current traffic condition and to forecast the future traffic demand. A supplemental traffic survey was also conducted on major junctions in June 2010 to study the current intersection condition and problems. The objective, method and coverage of six types of traffic survey are summarized as below: Table 5.1.1 Outline of Traffic Survey Survey Objectives Method Coverage To obtain traffic volumes on 12 locations (12hr) Traffic Count Survey Vehicular Traffic Count major roads 2 locations (24hr) Origin-Destination (O-D) To capture trip information of Interview with drivers at 9 locations Survey vehicles roadsides To obtain traffic volumes and Intersection Traffic Count movement at major Vehicular Traffic Count 2 locations Survey intersections To collect information about Taxi (Minibus) Passenger and Interview with taxi public transport driver and 5 major taxi parks Driver Interview Survey drivers and users users, and their opinions Boda-Boda (Bike Taxi) To collect information about Interview with boda-boda 6 areas on major Passenger and Driver boda-boda drivers and users, drivers and users roads Interview Survey and their opinions To collect information on Actual driving survey by Travel Speed Survey present traffic situation on passenger car major roads Source: JICA Study Team Actual traffic survey was conducted from January to February 2010. Each type of survey schedule is shown in below figure: 2009 2010 Survey Dec.
    [Show full text]
  • UGANDA BUSINESS IMPACT SURVE¥ 2020 Impact of COVID-19 on Formal Sector Small and Mediu Enterprises
    m_,," mm CIDlll Unlocking Public and Private Finance for the Poor UGANDA BUSINESS IMPACT SURVE¥ 2020 Impact of COVID-19 on formal sector small and mediu enterprises l anda Revenue Authority •EUROPEAN UNION UGANDA BUSINESS IMPACT SURVEY 2020 Contents ABBREVIATIONS ............................................................................................................................................. iii ACKNOWLEDGMENTS ................................................................................................................................. iv EXECUTIVE SUMMARY .................................................................................................................................. v BACKGROUND ................................................................................................................................................ 1 Business in the time of COVID-19 ............................................................................................................ 1 Uganda formal SME sector ........................................................................................................................ 3 SURVEY INFORMATION ................................................................................................................................ 5 Companies by sector of economic activity ........................................................................................... 5 Companies by size .....................................................................................................................................
    [Show full text]
  • Airtel Africa Plc Results for the Nine-Month Period Ended 31 December 2020 29 January 2021
    Airtel Africa plc Results for the nine-month period ended 31 December 2020 29 January 2021 Another quarter of double-digit growth, with continued improvement in revenue growth and EBITDA profitability Highlights • Reported revenue increased by 13.8% to $2,870m with Q3’21 reported revenue growth of 19.5%. • Constant currency underlying revenue growth was 18.6%, with Q3’21 growth of 22.8%. Growth for the nine months was recorded across all regions: Nigeria up 21.6%, East Africa up 23.4% and Francophone Africa up 8.0%; and across all services, with voice revenue up 10.4%, data up 31.1% and mobile money up 34.2%. • Underlying EBITDA for the nine months was $1,297m, up 16% in reported currency while constant currency underlying EBITDA growth was 22.5%. • Underlying EBITDA margin for the nine months was 45.5%, up by 118 bps (up 144 bps in constant currency). Q3’21 underlying EBITDA margin was 46.9%. • Operating profit increased by 21.8% to $800m in reported currency, and by 29.9% in constant currency. • Free cash flow was $466m, up 20% compared to the same period last year. • Basic EPS was 5.5 cents, down 36.5%, largely due to prior year exceptional items and a one-off derivative gain. Excluding these, basic EPS rose by 19.8%. EPS before exceptional items was 5.0 cents. • Customer base up 11.0% to 118.9 million, with increased penetration across mobile data (customer base up 23.5%) and mobile money services (customer base up 29.0%).
    [Show full text]
  • 4.9 Uganda Additional Service Provision Contact List Uganda Additional Service Provision Contact List
    4.9 Uganda Additional Service Provision Contact List Uganda Additional Service Provision Contact List Type of Service Company Location(s) Physical Address Email & Website Phone Number (office) Description of Services Provided Supplier of Sunrise Commodities Kampala Plot 163/165, Monteirovincent711@y Mob: +256 712 624 624 Suppliers and millers maize, beans, ahoo.com & Millers Bombo Road, maize flour and Kawempe CSB Supplier Aponye (U) Ltd Kampala Nalukolongo aponyeonline@gmail. +256 414 270 526 Supply and com Mob: +256 772 603 transportation of grains 909 Supplier Premier Commodities Kampala Nalukolongo info@premiercommodit n/a Ltd ies.com Supplier Export Trading Group Kampala Industrial Area info.uganda@etgworld. n/a Supply of grains and oils Namanve com http://www.etgworld. com Supplier Byinzika Enterprises Kampala Plot 3, Johnston [email protected] +256 414 259 519/312 n/a Ltd Street, 277 221 http://www.biyinzika.co. ug/ Fax: +256 414 343 268 Supplier Tiny Mirrors Kampala Plot 17 Old n/a Mob: n/a Masaka Road, +256-712-666453 Nalukolongo industrial area, Fax: +256-414-274777 Kampala Supplier SRS (U) Ltd Kampala n/a n/a +256 41 285 282 +256 n/a 41 505 723 Supplier Diary Kampala n/a n/a n/a n/a Corporation Ltd Supplier MTN Uganda Plot 22 Hanninton Kampala customerservice@mt +256 31 221 2333 Supplier Road n.co.ug Ltd - VSAT Fax: +256 31 221 2233 http://mtn.co.ug/ Supplier Agro ways (U) Ltd Plot 34-60 Jinja http://www.agroways. +256 454 479 381 Supplies/warehousing ug/ Kyabazinga Mob: +256 712 Way, Jinja 404245, +256 782 391354 Supplier Capital Reef- n/a Kampala HK@CAPITALREEF.
    [Show full text]
  • INSURANCE REGULATORY AUTHORITY of UGANDA Plot 5 Kyadondo Road Legacy Towers Block B 2Nd Floor P O Box 22855 KAMPALA LIST of APPROVED AUDITORS for the YEAR 2021
    INSURANCE REGULATORY AUTHORITY OF UGANDA Plot 5 Kyadondo Road Legacy Towers Block B 2nd Floor P O Box 22855 KAMPALA LIST OF APPROVED AUDITORS FOR THE YEAR 2021 M/s Abet & Company M/s Allied Certified Public Accountants Certified Public Accountants of Uganda 4th Floor Raja Chambers Plot 79 Bukoto Street Kamwokya Plot 3 Parliament Avenue POBox 21199 P O Box 24234 KAMPALA KAMPALA Email: [email protected] Email:[email protected] M/s AN Associates M/s Ardenfield Certified Public Accountants Certified Public Accountants Plot 114 MutajaziRoad, Kibuli Plot 9 Kampala Road PO Box 5030 Suite 24 Agip House KAMPALA Opposite Orient House Email:[email protected] P O Box 40327 KAMPALA Email:[email protected] M/s Augustus Associates M/s Bawunha&Badebye Certified Public Accountants Certified Public Accountants 1st Floor Suites A9 A12 &A13 3rd Floor-Suite 3D Opposite Salz Hotel Musana Plaza Plot 399/4 Ntinda-Naalya Road Plot 1904 Ntinda-Kisaasi Road PO Box 9752 P O Box 40210 KAMPALA KAMPALA Tel: +256414668614 Email:[email protected] Email:[email protected] 1 M/s Biz & Company M/S BVL & Co Certified Public Accountants Certified Public Accountants Tulip Development House Plot 1A Naguru East Road Plot 37/39 Kimera close, Naguru Naguru Hill 3rd floor Block A P O Box 26285 P.O BOX 10939 KAMPALAEmail:[email protected] KAMPALA Email:[email protected] M/s Cartwright M/s CMK & Co Certified Public Accountants Certified Public Accountants Plot 121 Ntinda Nakasero Road Former Information Flats P.O BOX 34078 Ntinda Road, Ntinda KAMPALA
    [Show full text]
  • Ministry of Health
    UGANDA PROTECTORATE Annual Report of the MINISTRY OF HEALTH For the Year from 1st July, 1960 to 30th June, 1961 Published by Command of His Excellency the Governor CONTENTS Page I. ... ... General ... Review ... 1 Staff ... ... ... ... ... 3 ... ... Visitors ... ... ... 4 ... ... Finance ... ... ... 4 II. Vital ... ... Statistics ... ... 5 III. Public Health— A. General ... ... ... ... 7 B. Food and nutrition ... ... ... 7 C. Communicable diseases ... ... ... 8 (1) Arthropod-borne diseases ... ... 8 (2) Helminthic diseases ... ... ... 10 (3) Direct infections ... ... ... 11 D. Health education ... ... ... 16 E. ... Maternal and child welfare ... 17 F. School hygiene ... ... ... ... 18 G. Environmental hygiene ... ... ... 18 H. Health and welfare of employed persons ... 21 I. International and port hygiene ... ... 21 J. Health of prisoners ... ... ... 22 K. African local governments and municipalities 23 L. Relations with the Buganda Government ... 23 M. Statutory boards and committees ... ... 23 N. Registration of professional persons ... 24 IV. Curative Services— A. Hospitals ... ... ... ... 24 B. Rural medical and health services ... ... 31 C. Ambulances and transport ... ... 33 á UGANDA PROTECTORATE MINISTRY OF HEALTH Annual Report For the year from 1st July, 1960 to 30th June, 1961 I.—GENERAL REVIEW The last report for the Ministry of Health was for an 18-month period. This report, for the first time, coincides with the Government financial year. 2. From the financial point of view the year has again been one of considerable difficulty since, as a result of the Economy Commission Report, it was necessary to restrict the money available for recurrent expenditure to the same level as the previous year. Although an additional sum was available to cover normal increases in salaries, the general effect was that many economies had to in all be made grades of staff; some important vacancies could not be filled, and expansion was out of the question.
    [Show full text]
  • Privacy in Uganda
    0 0 0 1 1 0 1 1 0 1 0 0 0 0 0 0 1 0 1 1 0 0 1 1 1 1 0 0 0 1 0 1 0 0 1 1 1 1 1 1 1 0 1 0 0 1 0 1 0 0 0 0 0 1 0 1 1 0 1 0 1 0 0 1 1 0 1 1 1 0 1 1 1 0 1 1 0 0 0 1 0 0 0 0 1 0 1 1 1 0 1 0 0 1 0 1 0 1 0 1 1 1 0 0 0 0 0 0 0 0 0 1 0 ! 0 0 1 1 0 1 1 0 0 0 1 0 1 1 0 ! 0 0 0 0 1 0 1 1 0 1 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 1 1 1 0 0 0 0 1 1 1 0 0 0 0 1 0 Privacy in Uganda 0 1 1 10 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 An Overview of0 How0 ICT Policies Infringe0 on Online Privacy 0 0 0 0 and Data Protection 0 0 0 0 0 0 0 0 0 @ CIPESA ICT Policy Briefing Series No. 06/15 December 2015 0 100110010010 1010110100 100010 010100 110101 001010 01001 001010 00 110101 00101001 001 01010 0010001 000100010100100 1000010 1010010 110101 00101001 001 010 0 110101 00101001 001 01010 0010001 000100010100100 1000010 101001010 010100 110101 00101001 001 0 1101 001001 001010 100110 010010 1010 110100 10010 0101 1101 001001 001010 100110 010010 1010 110100 10010 01010100 001010 10010 11101 001001 001010 100110 010010 1010 110100 10010 01010100 00 110101 00101001 001 01010 0010001 000100010100100 1000010 1010010 110101 001001 001010 110101 00101001 001 01010 0010001 0001000101 Introduction 00 110101 00101001 001 01010 0010001 000100010100100 1000010 101001010100 001001 100010 001010 11010 00 110101 00101001 001 01010 0010001 000100010100100 1000010 1010010 001001 00101001 001 0 001010 10010 11101 001001 001010 100110 010010 1010 110100 10010 0101010010 0010 00 110101 00101001 001 01010 0010001 000100010100100 1000010 1010 10100 1001 100010 0 00 110101 00101001 001 01010 0010001 000100010100100 1000010 1010010 As of June 2015, Uganda had an internet penetration rate of 37% and there were 64 telephone connections per 100 inhabitants.1 This was made possible by increasing investments in the Information Communication Technologies (ICT) sector by the private sector and – to a lesser extent - the government, proliferation of affordable smart phones and a steady decrease in internet costs enabled by a liberal competitive telecommunication sector.
    [Show full text]
  • Republic of Uganda
    REPUBLIC OF UGANDA VALUE FOR MONEY AUDIT REPORT ON SOLID WASTE MANAGEMENT IN KAMPALA MARCH 2010 1 TABLE OF CONTENTS REPUBLIC OF UGANDA .......................................................................................................... 1 VALUE FOR MONEY AUDIT REPORT ..................................................................................... 1 ON SOLID WASTE MANAGEMENT IN KAMPALA .................................................................... 1 LIST OF ABBREVIATIONS ...................................................................................................... 4 EXECUTIVE SUMMARY ........................................................................................................... 5 CHAPTER 1 ......................................................................................................................... 10 INTRODUCTION ................................................................................................................ 10 1.0 BACKGROUND .............................................................................................10 1.1 MOTIVATION ...............................................................................................12 1.2 MANDATE ....................................................................................................13 1.3 VISION ........................................................................................................13 1.4 MISSION .................................................................................................................
    [Show full text]
  • Global Information Society Watch 2009 Report
    GLOBAL INFORMATION SOCIETY WATCH (GISWatch) 2009 is the third in a series of yearly reports critically covering the state of the information society 2009 2009 GLOBAL INFORMATION from the perspectives of civil society organisations across the world. GISWatch has three interrelated goals: SOCIETY WATCH 2009 • Surveying the state of the field of information and communications Y WATCH technology (ICT) policy at the local and global levels Y WATCH Focus on access to online information and knowledge ET ET – advancing human rights and democracy I • Encouraging critical debate I • Strengthening networking and advocacy for a just, inclusive information SOC society. SOC ON ON I I Each year the report focuses on a particular theme. GISWatch 2009 focuses on access to online information and knowledge – advancing human rights and democracy. It includes several thematic reports dealing with key issues in the field, as well as an institutional overview and a reflection on indicators that track access to information and knowledge. There is also an innovative section on visual mapping of global rights and political crises. In addition, 48 country reports analyse the status of access to online information and knowledge in countries as diverse as the Democratic Republic of Congo, GLOBAL INFORMAT Mexico, Switzerland and Kazakhstan, while six regional overviews offer a bird’s GLOBAL INFORMAT eye perspective on regional trends. GISWatch is a joint initiative of the Association for Progressive Communications (APC) and the Humanist Institute for Cooperation with
    [Show full text]
  • LETSHEGO-Annual-Report-2016.Pdf
    INTEGRATED ANNUAL REPORT 2016 AbOUT This REPORT Letshego Holdings Limited’s Directors are pleased to present the Integrated Annual Report for 2016. This describes our strategic intent to be Africa’s leading inclusive finance group, as well as our commitment to sustainable value creation for all our stakeholders. Our Integrated Annual Report aims and challenges that are likely to impact to provide a balanced, concise, and delivery of our strategic intent and transparent commentary on our strategy, ability to create value in the short, performance, operations, governance, and medium and long-term. reporting progress. It has been developed in accordance with Botswana Stock The material issues presented in Exchange (BSE) Listing Requirements as the report were identified through well as King III, GRI, and IIRC reporting a stakeholder review process. guidelines. This included formal and informal interviews with investors, sector The cenTral The requirements of the King IV guidelines analysts, Executive and Non- are being assessed and we will address Executive Letshego team members, Theme of The our implementation of these in our 2017 as well as selected Letshego reporT is Integrated Annual Report. customers. sUstaiNAbLE While directed primarily at shareholders A note on diScloSureS vALUE creatiON and providers of capital, this report We are prepared to state what we do and we offer should prove of interest to all our other not disclose, namely granular data on stakeholders, including our Letshego yields and margins as well as on staff an inTegraTed team, customers, strategic partners, remuneration as we deem this to be accounT of our Governments and Regulators, as well as competitively sensitive information the communities in which we operate.
    [Show full text]